Packet
Williamson County · Williamson County · meeting of Apr 9, 2026 · Agenda packets
Open the original document More from Williamson County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
April 2026 Planning Commission Packet
PC PACKET 4-9-2026.PDF
APRIL 2026 PC MINUTES
02 APRIL 2026 PC MINUTES.PDF
1.
Documents:
2.
Documents:
ORDER OF BUSINESS
WILLIAMSON COUNTY REGIONAL PLANNING COMMISSION
1. Call to order
2. Roll Call
3.
Announcements
4.
Public Comments
5.
Consideration of Minutes
6.
Consideration of Consent Agenda
7.
Presentation of Agenda Items for Discussion and Action
8. Other Business
AGENDA
WILLIAMSON COUNTY REGIONAL PLANNING COMMISSION
Williamson County Administrative Complex
April 9, 2026 at 5:30 p.m.
PUBLIC COMMENTS:
Public comment is permitted on Agenda items – sign-in prior to the meeting is required.
MINUTES:
1. Approval of March 19, 2026 Minutes
CONSENT AGENDA:
2. Consent Agenda
BONDS:
3. The Arbors at Leipers Fork – Performance Bond for Water (HB&TS) located off
Hargrove Road.
4. The Arbors at Leipers Fork – Performance Bond for Roads, Drainage and Erosion
Control located off Hargrove Road.
5. Arrington Ridge, Section 1 – Maintenance Bond for Roads, Drainage and Erosion
Control located off Cox Road.
6. Blackberry Ridge - Maintenance Bond for Roads, Drainage and Erosion located off
Bending Chestnut Road.
7. Conduit Church – Performance Bond for Landscaping located off Lewisburg Pike.
8. Fairhaven – Performance Bond for Landscaping located off Bethesda Road.
9. Fiddlers Glen, Section 1 – Performance Bond for Wastewater Collection System located
off Murfreesboro Road.
10. Fiddler Glen, Section 2 – Performance Bond for Roads, Drainage and Erosion Control
located off Murfreesboro Road.
11. Fiddlers Glen, Section 2 – Performance Bond for Wastewater Collection System located
off Murfreesboro Road.
12. High Park Hill, Section 2 – Maintenance Bond for Wastewater Collection System
located off Murfreesboro Road.
13. Homes at Mulberry Springs WW – Performance Bond for Landscaping located off
Taliaferro Road.
14. Homes at Mulberry Springs WW – Performance Bond for Wastewater Treatment and
Disposal System located off Taliaferro Road.
15. Lifepoint Church – Performance Bond for Landscaping located off Clovercroft Road.
16. Reeds Vale, Section 4 - Performance Bond for Landscaping located off Lampkins
Bridge Road.
17. Reeds Vale, Section 4 – Performance Bond for Wastewater Collection System located
off Lampkins Bridge Road.
18. Reeds Vale, Section 4 – Performance Bond for Roads, Drainage and Erosion Control
located off Lampkins Bridge Road.
19. Southall WW Area – Maintenance Bond for Wastewater Treatment and Disposal
System located off Carters Creek Pike.
20. Southall WW Area – Maintenance Bond for Wastewater Collection System located off
Carters Creek Pike.
21. Terravista, Section 1 – Maintenance Bond for Roads, Drainage and Erosion Control
located off Long Lane.
22. Terravista, Section 1 – Maintenance Bond for Wastewater Collection System located
off Long Lane.
23. The Mill at Bond Springs, Section 1 – Performance Bond for Roads, Drainage and
Erosion Control located off Bethesda Road.
24. Troubadour Golf Club/Farmstead – Performance Bond or Landscaping located off
Patton Road.
25. Troubadour, Section 2 – Maintenance Bond for Roads, Drainage and Erosion Control
located off Patton Road.
26. White Horse Farms – Performance Bond for Landscaping located off Murfreesboro
Road.
OLD BUSINESS:
27. Terravista Roads, Drainage, and Erosion Control Bond Update
28. Concept Plan Review for 3036 Old Murfreesboro Road Subdivision, containing 30 lots
on 34.15 acres located off Old Murfreesboro Road in the 5 th Voting District (1-2025-
213).
29. Preliminary Plat Review for Chestnut Hill Farms LLE Subdivision, containing 5 lots on
28.5 acres located off Whippoorwill Drive in the 1st Voting District (1-2025-324).
PUBLIC HEARINGS:
30. Amendment to the Subdivision Regulations regarding expiration of Plats without
sureties (6-2026-600).
31. Amendments to Articles 11 and 23 of the Zoning Ordinance regarding the use of
Nontraditional Wastewater Treatment and Disposal Systems within the Urban Growth
Boundaries (UGB’s) (6-2026-601).
CONCEPT PLANS:
32. Concept Plan Review for Willowstone Estates (AKA Clovercroft Estates), containing 25
lots on 184.62 acres located off Clovercroft Road in the 4 th Voting District (1-2025-
211).
PRELIMINARY PLATS:
33. Preliminary Plat Review for Joybelle Estates Subdivision, containing 12 lots on 110.1
acres located off Eudailey Covington Road in the 2nd Voting District (1-2026-304).
34. Preliminary Plat Review for 8828 Horton Highway, containing 5 lots on 28. 01 acres
located off Horton Highway in the 2nd Voting District (1-2025-334).
FINAL PLATS:
35. Final Plat Review (Revised) for Taliaferro Subdivision, containing 27 lots on 196.93
acres located off Taliaferro Road in the 5th Voting District (1-2026-404).
MINUTES OF THE
WILLIAMSON COUNTY REGIONAL PLANNING COMMISSION
MEETING OF MARCH 19, 2026
MEMBERS PRESENT
David Bailey
Brian Clifford
Don Crohan
Lee Kennedy
Steve Lane
Jessica Lucyshyn
Keith McCord
Sammie McCoy
Eddie Sanders
STAFF PRESENT
Michael Matteson, Community Development
Director
Aaron V. Holmes, Planning Director
Floyd Heflin, County Engineer
Michael Scott, Ass’t to County Engineer
Kristi Ransom, County Attorney
Joe James, Planning Coordinator
Lincoln Sweet, Senior Planner
Charlie Waldrop, Planning Technician
Michelle Mullins, Planning Assistant
The Williamson County Regional Planning Commission met in regular session Thursday,
March 19, 2026, at 5:30 p.m. in the Auditorium of the Williamson County Administrative
Complex. Commissioners Baldree, Hatcher, and Richter were unable to attend.
Chairman McCoy called the meeting to order and took Roll Call. A quorum was present.
Chairman McCoy asked if there were any announcements.
Mr. Holmes announced the following:
• A Revised Report was provided for Item 21 noting the applicant’s request to Defer
to May instead of April;
• A Revised Consent Agenda was provided noting Item 21 deferral to May;
• Items 17, 18, and 21 are on the Consent Agenda for deferral;
• Commissioners Baldree and Hatcher were reappointed to the Planning Commission
on March 9th; and
• On March 9th, the County Commission adopted the SS4A Plan, which includes the
Roadway Safety Action Plan and the Multimodal Greenway Plan.
PUBLIC COMMENTS:
Tom Schekenberger, Williamson County resident and President of the Vineyard Valley
HOA, advised that he had previously emailed the Planning Commission in November and
spoke at the November Planning Commission Meeting about the forty (40) foot right-of-
way being changed to thirty-eight (38) feet. Of the three (3) Sections in the subdivision,
Sections 1 and 3 are completed, while Section 2 is still outstanding due to the homeowner
of Lot 208 that refuses to sign off on the approval for this. He has worked closely with
Greg Templeton and Josh Dickerson from Willow Branch Partners and their itinerary of
events that have taken place is accurate. They have made every effort to get the
homeowner of Lot 208 to approve this, however, they continue to refuse. He asked that
the Planning Commission agree to move forward with approval.
Williamson County Planning Commission
Meeting of March 19, 2026
Page 2 of 10
CONSIDERATION OF FEBRUARY 12, 2026 MINUTES:
Chairman McCoy asked if there were comments or questions on the Minutes. Hearing
none, he asked for a motion.
Commissioner Clifford made a motion to approve the February 12, 2026 Minutes. The
motion was seconded by Commissioner Crohan. The motion was unanimously approved.
CONSENT AGENDA:
Chairman McCoy recused himself from the Consent Agenda.
Vice-Chairman Crohan asked if there were any items that needed to be discussed
separately. Hearing none, he asked for a motion to accept the Consent Agenda as a
whole.
Commissioner Bailey made a motion to approve the Consent Agenda per Staff
recommendations. Commissioner Sanders seconded the motion. The motion was
unanimously approved.
BONDS:
3. McDaniel Estates, Section 4 – Maintenance Bond for Roads, Drainage and Erosion
Control located off McDaniel Road. - $260,000
Recommendation: Extend in the current amount for a period of one (1) year or
when Engineering staff has determined the improvements have been completed and
the bond is ready for review, whichever comes first.
4. Lifepoint Church (AKA Redemption City Church) – Performance Bond for Sewer (City
of Franklin) located off Clovercroft Road - $254,000
Recommendation: Extend in the current amount for a period of one (1) year.
5. Starnes Creek, Section 3 - Performance Bond for Roads, Drainage and Erosion
Control located off Meeks Road. – $188,000
Recommendation: Reduce to Maintenance in the amount of $140,000 for a period of
one (1) year.
6. Stephens Valley, Section 8 - Maintenance Bond for Roads, Drainage and Erosion
Control located off Sneed Road - $475,000
Recommendation: Extend in the current amount for a period of one (1) year.
7. Swansons Ridge, Section 1 – Maintenance Bond for Roads, Drainage, and Erosion
Control located off Kittrell Road - $300,000
Recommendation: Reduce to the amount of $195,000 for a period of one (1) year or
when Engineering staff has determined the improvements have been completed and
the bond is ready for review, whichever comes first.
8. Terravista WW System – Maintenance Bond for Wastewater Treatment and
Disposal System located off Long Lane. - $120,000
Recommendation: Extend in the current amount for a period of one (1) year.
9. The Grove, Section 1 – Maintenance Bond for Wastewater Treatment and
Disposal System located off Eudailey-Covington Road. - $495,250
Recommendation: Reduce to the amount of $148,575 for a period of two (2) years.
Williamson County Planning Commission
Meeting of March 19, 2026
Page 3 of 10
10. The Grove, Section 11 – Maintenance Bond for Roads, Drainage and Erosion Control
located off Arno Road. - $400,000
Recommendation: Release the bond.
11. The Mill at Bond Springs, Section 3 - Performance Bond for Roads, Drainage, and
Erosion Control located off Bethesda Road. - $225,000
Recommendation: Extend in the current amount for a period of one (1) year.
12. Wyelea, Section 1 - Performance Bond for Landscaping located off Del Rio Pike. -
$28,458
Recommendation: Extend in the current amount for a period of six (6) months to
allow for completion.
13. Wyelea, Section 1 – Maintenance Bond for Roads, Drainage and Erosi on Control
located off Del Rio Pike. - $1,263,000
Recommendation: Reduce to the amount of $632,000 for a period of one (1) year.
14. Wyelea, Section 1 – Performance Bond for Wastewater Collection System located
off Del Rio Pike. - $203,000
Recommendation: Extend in the current amount for a period of one (1) year.
15. Wyelea Wastewater Area – Performance Bond for Wastewater Treatment and
Disposal System located off Del Rio Pike. - $174,429
Recommendation: Extend in the current amount for a peri od of one (1) year.
DEFERRAL ITEMS:
ITEM 17
PRELIMINARY PLAT REV IEW FOR 3036 OLD MUR FREESBORO ROAD
SUBDIVISION, CONTAIN ING 30 LOTS ON 34.15 ACRES LOCATED OFF O LD
MURFREESBORO ROAD IN THE 5TH VOTING DISTRICT (1-2025-213).
At this time, the applicant is requesting deferral to the April 2026 Planning Commission
Meeting in order to allow the applicant more time to address Staff comments. Staff
concurs with this request.
ITEM 18
PRELIMINARY PLAT REVIEW FOR CHESTNUT HIL L FARMS LLE SUBDIVIS ION,
CONTAINING 5 LOTS ON 28.5 ACRES LOCATED OFF WHIPPOOR WILL DRIVE
IN THE 1ST VOTING DISTRICT (1-2025-324).
At this time, the applicant is requesting deferral to the April 2026 Planning Commission
Meeting in order to allow the applicant more time to address Staff comment s. Staff
concurs with this request.
ITEM 21
PRELIMINARY PLAT REVIEW FOR LOT 5 OF THE LARRY U TURNER PROP ERTY
LLE SUBDIVISION, CON TAINING 1 LOT ON 48. 96 ACRES LOCATED OFF CARL
ROAD IN THE 5TH VOTING DISTRICT (1 -2025-301).
At this time, the applicant is requesting deferral to the May 2026 Planning Commission
Meeting in order to allow the applicant more time to address Staff comments. Staff
concurs with this request.
Williamson County Planning Commission
Meeting of March 19, 2026
Page 4 of 10
OLD BUSINESS:
ITEM 16
ROADS, DRAINAGE AND EROSION CONTROL BOND REVIEW OF TERRAVIST A
SUBDIVISION, SECTIONS 1 AND 2.
Brent Thoeny , with True Land Consultants, represented the applicant , The Jones
Company. He advised that there was a request for comments with regard to the
Engineering Letter for the retaining walls and they got in touch with the original Engineer,
so those comments have now been addressed. He sent in his revised report and that is
currently under review.
For Phase 1, they walked around with a contractor an d are waiting for the bid to come
back for those issues. Weather permitting, they will get started on those soon.
As for the Phase 2 comments, Detention Pond 5 still needs some work, but it has been
too wet, so the contractor is scheduled to go out in th e next week. The Geo tech stated
he was satisfied with the repairs that have been done and they received the first draft of
his letter on March 16 th. They should receive his final letter within a week to provide to
the County in regard to the slope repairs.
A drop-out occurred and will be dealt with at the same time as the Wastewater Road as
well as the stormwater cleanout.
The major grading is done for the most part and is set up for next week to clean the
stormwater for Phase 2.
The additional road cores have been done, and they are waiting on the Geo tech’s report
to understand the result of those cores.
They received the scope of the Wastewater Road and that was walked with the contractor
as well. There were some changes made and they are waiting for a new bid on that to
get started.
Chairman Mccoy asked if there were any questions from the Commission
Commissioner Bailey asked the applicant how long he anticipated until this project is
completed.
Mr. Theony stated that he estimates completion in early summer due to weather
conditions creating delays. It needs to be dryer to complete some of these task s.
Mr. Scott advised that he had created a PowerPoint with some pictures for the
Commission to review.
In Section 2 he provided pictures of the access road that has been realigned and re -
stabilized. There will be some additional work done there at the curb and a concrete
apron will be installed.
Detention Pond 5 has had some work done on it, but there is still some ponding, so it
has been unable to be completed. The soil area where there was a slide has been repaired
and they are currently waiting on the Geotech report.
He explained that there were trees that were planted in the landscape buffer in error and
the applicant was asked to remove them and plant the trees where they were supposed
to be planted.
Williamson County Planning Commission
Meeting of March 19, 2026
Page 5 of 10
In Section 1, there are additional issues that need to be addressed.
Detention Pond 2 is still swampy and needs to be re -graded with drainage repaired.
Detention Pond 1 needs a great deal of work, and the County has spoken to the
applicant’s Engineering team about this.
The water quality swale has exposed pipe and needs to be repaired.
He advised that multiple areas need to be addressed in Section 2 including: road core
samples, Geotechnical, re-grading slopes and re-grading Detention Pond 5.
In Section 1 the areas to be addressed include: removing the eight (8) trees from the
landscape buffer, road core samples, re-grading Detention Ponds 1, 2A, 2B, and 2D, slope
re-grading and completion of the water quality swale.
He anticipates active construction onsite by the next Planning Commission meeting and
provided a timeline for the punch list to be completed by.
Commissioner Clifford asked why this project continues to have so many issues.
Mr. Theony advised that some of the issues are due to the slope and terrain, some of it
is due to the time of year with the wet weather. He stated he is not opposed to the
timeline provided by Mr. Scott, with a couple of possible changes due to concerns that
the soil will be dry enough by then.
Commissioner Bailey asked how he would readjust the schedule so they can determine
at the next meeting how much progress has been mad e.
Mr. Theony stated that getting equipment on site by April 9th may be hard because it still
may be too wet, and they are going to try to work on Detention Pond 5 next week if it’s
dry enough. He plans to have the access road completed by next month and as far as
the recommended deadlines for June and July he believes that they should be fine as
long as weather permits. He believes some deadlines can be moved up and some may
be later than expected.
Commissioner Bailey asked that he formalize his anticipated deadline and provide that to
the Planning Commission.
Mr. Theony advised that he would be happy to do so , and asked that Mr. Scott send his
initial deadline recommendations to him.
Chairman McCoy agreed that April and May are generally wet months so that will be taken
into consideration.
Commissioner Crohan a sked if the Planning Commission could have the updated
recommendations for deadlines prior to the next Commission meeting.
Mr. Theony stated that shouldn’t be an issue.
ITEM 17
CONCEPT PLAN REVIEW FOR 3036 OLD MURFREESBORO ROAD SUBDIVISION,
CONTAINING 28 LOTS ON 34.15 ACRES LOCATED OFF OLD MURFREESBORO
ROAD IN THE 5TH VOTING DISTRICT (1 -2025-213).
This Item is on the Consent Agenda as a deferral.
Williamson County Planning Commission
Meeting of March 19, 2026
Page 6 of 10
ITEM 18
PRELIMINARY PLAT REVIEW FOR CHESTNUT HIL L FARMS LLE SUBDIVIS ION,
CONTAINING 5 LOTS ON 28.50 ACRES LOCATED OFF WH IPPOORWILL DRIVE
IN THE 1ST VOTING DISTRICT (1-2025-324).
This Item is on the Consent Agenda as a deferral.
ITEM 19
PRELIMINARY PLAT REVIEW (REVISED) FOR ARTESIAN ACRES SUBDIVISION,
LOT 10, CONTAINING 1 LOT ON 5.00 ACRES L OCATED OFF ARTESIAN DRIVE
IN THE 5TH VOTING DISTRICT (1-2025-323).
Mr. James reviewed the background (see Staff Report) recommending approval of this
Preliminary Plat with the following conditions:
1. A Land Disturbance Permit must be obtained for the lot;
2. A Notice of Coverage issued by TDEC will be required prior to the issuance of a
Land Disturbance Permit;
3. Prior to submittal of the Final Plat, driveway and drainage infrastructure must be
complete, consistent with Zoning Ordinance requirements; and
4. Satisfaction of Section 3.05 of the Subdivision Regulations, as it pertains to fire
apparatus access requirements, prior to building permit issuance.
Chairman McCoy asked if there were any questions for Staff.
Commissioner Crohan asked if the lot was unbuildable initially, have they since
determined that they can put in a septic system now to make it buildable.
Mr. James stated that he was correct.
Commissioner Clifford made a motion to approve per Staff recommendations.
Commissioner Bailey seconded the motion. The motion was unanimously approved.
ITEM 20
PRELIMINARY PLAT REVIEW FOR LOG VALLEY T RAIL LLE SUBDIVISION , LOT
3, CONTAINING 1 LOT ON 16.21 ACRES LOCAT ED OFF LOG VALLEY TR AIL IN
THE 1ST VOTING DISTRICT (1-2025-339).
Mr. Sweet reviewed the background (see Staff Report) recommending approval of this
Preliminary Plat.
Chairman McCoy asked if there were any questions for staff.
Commissioner Crohan asked how they are going to cross the creek on the property.
Mr. Heflin, County Engineer, advised that there had been some previous approvals by the
Stormwater Appeals Board in regard to creek crossings and driveways that would be
required and this will be addressed with the building permit.
Chairman McCoy asked if there were any additional questions. Hearing none, he asked
for a motion.
Williamson County Planning Commission
Meeting of March 19, 2026
Page 7 of 10
Commissioner Crohan made a motion to approve per Staff recommendations.
Commissioner Bailey seconded the motion. The motion was unanimously approved.
PRELIMINARY PLATS:
ITEM 21
PRELIMINARY PLAT REVIEW FOR LOT 1 OF THE LARRY U. TURNER PROPERTY
LLE SUBDIVISION, CON TAINING 1 LOT ON 20. 33 ACRES LOCATED OFF CARL
ROAD IN THE 5TH VOTING DISTRICT (1 -2026-301).
This Item is on the Consent Agenda as a deferral.
ITEM 22
PRELIMINARY PLAT REVIEW FOR THE ARBORS OF LEIPER’S FORK
SUBDIVISION, PHASE 2, CONTAINING 16 LOTS ON 379 ACRES LOCATED OFF
HARGROVE ROAD IN THE 1ST VOTING DISTRICT (1-2026-300).
Mr. Waldrop reviewed the background (see Staff Report) recommending approval of
this Preliminary Plat with the following conditions:
1. Execution of a Stormwater Maintenance Agreement and submission of an Operation
and Maintenance Plan for stormwater improvements; and
2. Submission of the approved Final Plat in .dwg format on recordable media based on
the Tennessee State Plane Coordinate System prior to signature and recording of
the plat.
Chairman McCoy asked if there were any questions for Staff. Hearing none, he asked for
a motion.
Commissioner Crohan made a motion to approve per Staff recommendations.
Commissioner Lane seconded the motion. The motion was unanimously approved.
ITEM 23
PRELIMINARY PLAT REVIEW FOR THE GROVE SUBDIVISION, PHASE 15 ,
CONTAINING 9 LOTS ON 10.73 ACRES LOCATED OFF ARNO ROAD IN THE 2ND
VOTING DISTRICT (1-2026-302).
Mr. James reviewed the background (see Staff Report) recommending approval of this
Preliminary Plat with the following conditions:
1. The HOA documents must be submitted with the Final Plat, and the approved HOA
documents must be recorded concurrently with the recording of the Final Plat;
2. Establishment of a Performance Bond for roads, drainage and erosion control;
3. Establishment of a Performance Bond for water improvements in favor of
Milcrofton Utility District;
4. Establishment of a Performance Bond for the wastewater collection system as
applicable;
Williamson County Planning Commission
Meeting of March 19, 2026
Page 8 of 10
5. Submission of Landscaping Plans and establishment of a Performance Bond for
Landscaping;
6. Execution of Performance Agreements for the above referenced sureties;
7. Execution of a Stormwater Maintenance Agreement and submission of an
Operation and Maintenance Plan for stormwater improvements; and
8. Submission of the approved Final Plat in .dwg format on recordable media based
on the Tennessee State Plane Coordinate System prior to signature and recording
of the plat.
Chairman McCoy asked if there were any questions for staff.
Commissioner Lucyshyn asked how many Phases there are in the Subdivision.
The applicant, Adam Seger, representing Dale and Associates , stated that this should be
the last Phase for residential lots.
Chairman McCoy asked if there were any further questions. Hearing none, he asked for
a motion.
Commissioner Bailey made a motion to approve per Staff recommendations.
Commissioner Clifford seconded the motion. The motion was unanimously approved.
FINAL PLATS:
ITEM 24
FINAL PLAT REVIEW FO R MARLOWE MEADOWS AT CARL ROAD LLE
SUBDIVISION, CONTAIN ING 5 LOTS ON 108.66 ACRES LOCATED OFF C ARL
ROAD IN THE 9TH VOTING DISTRICT (1 -2026-402).
Mr. Sweet reviewed the background (see Staff Report) recommending approval of this
Preliminary Plat with the following conditions:
1. The applicant shall adopt and record a covenant that declares that the access
easement is not a public road, and imposes the requirement of maintenance by
all properties served by the access easement. The covenant shall be recorded
concurrently with the recording of the plat; and
2. Satisfaction of Section 3.05 of the Subdivision Regulations, as it pertains to fire
apparatus access requirements for all lots, prior to building permit issuance.
Chairman McCoy asked if there were any questions for Staff. Hearing none, he asked for
a motion.
Commissioner Crohan made a motion to approve per Staff recommendations.
Commissioner Lane seconded the motion. The motion was unanimously approved.
ITEM 25
FINAL PLAT REVIEW (R EVISED) FOR LITTLE C REEK FARMS SUBDIVISI ON,
CONTAINING 18 LOTS O N 57.08 ACRES LOCATE D OFF WILSON PIKE IN THE
4TH VOTING DISTRICT (1-2026-403).
Mr. Waldrop reviewed the background (see Staff Report) recommending approval of t he
Preliminary Plat with the following conditions:
Williamson County Planning Commission
Meeting of March 19, 2026
Page 9 of 10
1. The HOA documents shall address the requirements of Section 17.11: Gated
Subdivisions and Section 17.12: Private Streets of the Zoning Ordinance. The HOA
documents must be approved prior to the recording of the plat and the approved
HOA documents must be recorded concurrently with the recording of the Final
Plat;
2. A permit for the security gate will need to be obtained prior to its installation, and
all requirements for such gates as outlined in Section 17.11 of the Zoning
Ordinance must be met;
3. Establishment of a Performance Bond for roads, drainage and erosion control in
the amount of $824,000. This reduced amount is based on work completed;
4. Posting of a Performance Bond in the amount of $398,549 for water improvements
as specified by Milcrofton Utility District;
5. Establishment of a Performance Bond for Landscaping Improvements in the
amount of $7,475;
6. Execution of Performance Agreements for the above referenced sureties;
7. Execution of a Stormwater Maintenance Agreement and submission of an
Operation and Maintenance Plan for stormwater improvements; and
8. Providing two (2) copies of the approved Final Plat in .dwg format on recordable
media based on the Tennessee State Plane Coordinate System prior to signature
and recording of the Final Plat.
Chairman McCoy asked if there were any questions for Staff. Hearing none, he asked for
a motion.
Commissioner Crohan made a motion to approve per Staff recommendations.
Commissioner Lane seconded the motion. The motion was unanimously approved.
ITEM 26
FINAL PLAT REVIEW (R EVISED AND REAPPROVAL) FOR VINEYARD VALL EY
SUBDIVISION, SECTION 2, CONTAINING 15 LOTS ON 16.15 ACRES LO CATED
OFF NEILLS BRANCH DRIVE IN THE 2ND VOTING DI STRICT (1-2025-423).
Mr. Waldrop reviewed the background (see Staff Report) recommending approval of t he
Preliminary Plat with the same conditions established with the approval of the r evised
Final Plat (See Attachment 26-6). It should be noted that if approved, the recording of
this Plat will not affect Lot 208; and therefore, the owners’ signatures are not required.
Chairman McCoy asked if there were any questions for Staff.
Commissioner Sanders asked what the width of the sidewalk would be if approved.
Mr. Heflin advised that it can be no less than thirty-six (36) inches. He asked the applicant
to address this.
Amanda Reed, representing the applicant, Pape Dawson , advised that there are only
sidewalks on one side of the road and the lots that are affected on that side had the
right-of-way reduced by two (2) feet and goes from forty (40) to thirty -eight (38) feet
overall.
Williamson County Planning Commission
Meeting of March 19, 2026
Page 10 of 10
Mr. Heflin asked about the measurements fo r Lot 208 in particular.
Ms. Reed advised that Lot 208’s sidewalk will be reduced to thirty -six (36) inches.
Mr. Heflin stated that this would still comply with ADA requirements.
Chairman McCoy asked if there were any further questions.
Commissioner Bailey asked if anyone knew why the owner of Lot 208 refused to sign the
Plat.
Ms. Reed advised that they did not know why and they didn’t appear to have attended
the meeting, but the HOA had been very supportive, and they tried for months to work
with the owner of Lot 208 to no avail.
Commissioner Crohan asked if there was any known reason why the owner of Lot 208
wouldn’t sign and if this project would cause any harm to their property.
Ms. Reed advised she was not aware of any harm.
Chairman McCoy asked if there were any further questions for Staff. Hearing none, he
asked for a motion.
Commissioner Crohan made a motion to approve per Staff recommendations.
Commissioner Clifford seconded the motion. The motion was unanimously approved.
ITEM 27
FINAL PLAT REVIEW FOR MOXLEY LLE SUBDIVISION (AKA TURNAGE WO ODS
SUBDIVISION), CONTAI NING 3 LOTS ON 15.04 ACRES LOCATED OFF
MURFREESBORO ROAD IN THE 12TH VOTING DISTRICT (1-2025-418).
Mr. Sweet reviewed the background (see Staff Report) recommending approval of t he
Preliminary Plat with the following conditions:
1. The applicant shall adopt and record a covenant that declares that the access
easement is not a public road and imposes the requirement of maintenance by
all properties served by the access easement. The covenant shall be recorded
concurrently with the recording of the plat; and
2. Fire sprinkler systems shall be installed in all habitable structures prior to building
permit issuance.
Chairman McCoy asked if there were any questions for staff. Hearing none, he asked for
a motion.
Commissioner Crohan made a motion to approve per Staff recommendations.
Commissioner Bailey seconded the motion. The motion was unanimously approved.
Chairman McCoy made a motion to adjourn. There being no further business, the meeting
was adjourned at approximately 6:02 p.m.
APPROVED BY A MAJORITY VOTE BY THE WILLIAMSON COUNTY REGIONAL
PLANNING COMMISSION ON APRIL 9, 2026
____________________________________
Chairman
CONSENT AGENDA
WILLIAMSON COUNTY REGIONAL PLANNING COMMISSION
WILLIAMSON COUNTY ADMINISTRATIVE COMPLEX
APRIL 9, 2026
BONDS:
3. The Arbors at Leipers Fork – Performance Bond for Water (HB&TS) located off
Hargrove Road. - $536,000
Recommendation: HB&TS Utility District requests this be extended in the current
amount for a period two (2) months. Staff concurs with this request.
4. The Arbors at Leipers Fork – Performance Bond for Roads, Drainage and Erosion
Control located off Hargrove Road. - $703,000
Recommendation: Reduce to the amount of $469,000 for a period of one (1) year.
5. Arrington Ridge, Section 1 – Maintenance Bond for Roads, Drainage and Erosion
Control located off Cox Road. - $250,000
Recommendation: Extend in the current amount for a period of one (1) year.
6. Blackberry Ridge - Maintenance Bond for Roads, Drainage and Erosion located off
Bending Chestnut Road. - $250,000
Recommendation: Extend in the current amount for a period of one (1) year.
7. Conduit Church – Performance Bond for Landscaping located off Lewisburg Pike . -
$12,850
Recommendation: Extend in the current amount for a period of six (6) months to
allow for replanting.
8. Fairhaven – Performance Bond for Landscaping located off Bethesda Road. - $261,866
Recommendation: Extend in the current amount for six (6) months to allow for
completion.
9. Fiddlers Glen, Section 1 – Performance Bond for Wastewater Collection System located
off Murfreesboro Road. - $178,000
Recommendation: Extend in the current amount for a period of one (1) year.
10. Fiddler Glen, Section 2 – Performance Bond for Roads, Drainage and Erosion Control
located off Murfreesboro Road. - $553,000
Recommendation: Reduce to the amount of $415,000 for a period of one (1) year.
11. Fiddlers Glen, Section 2 – Performance Bond for Wastewater Collection System
located off Murfreesboro Road.- $60,000
Recommendation: Extend in the current amount for a period of one (1) year.
12. High Park Hill, Section 2 – Maintenance Bond for Wastewater Collection System
located off Murfreesboro Road. - $28,110
Recommendation: Release the bond.
13. Homes at Mulberry Springs Wastewater – Performance Bond for Landscaping located
off Taliaferro Road. - $55,500
Recommendation: Extend for a period of six (6) months to allow for completion.
14. Homes at Mulberry Springs Wastewater – Performance Bond for Wastewater
Treatment and Disposal System located off Taliaferro Road. - $100,200
Recommendation: Extend in the current amount for a period of one (1) year.
15. Lifepoint Church – Performance Bond for Landscaping located off Clovercroft Road. -
$159,225
Recommendation: Extend for a period of six (6) months to allow for completion.
16. Reeds Vale, Section 4 - Performance Bond for Landscaping located off Lampkins
Bridge Road. - $123,252
Recommendation: Extend for a period of six (6) months to allow for completion.
17. Reeds Vale, Section 4 – Performance Bond for Wastewater Collection System located
off Lampkins Bridge Road. - $360,045.50
Recommendation: Reduce to Maintenance in the amount of $108,013.65 for a period
of two (2) years.
18. Reeds Vale, Section 4 – Performance Bond for Roads, Drainage and Erosion Control
located off Lampkins Bridge Road. - $2,800,000
Recommendation: Reduce to the amount of $1,400,000 for a period of one (1) year.
19. Southall Rural Retreat Wastewater Area – Maintenance Bond for Wastewater
Treatment and Disposal System located off Carters Creek Pike. - $124,700
Recommendation: Release the bond.
20. Southall Rural Retreat Wastewater Area – Maintenance Bond for Wastewater
Collection System located off Carters Creek Pike. - $122,700
Recommendation: Release the bond.
21. Terravista, Section 1 – Maintenance Bond for Roads, Drainage and Erosion Control
located off Long Lane. - $950,000
Recommendation: Extend in the current amount for a period of one (1) year.
22. Terravista, Section 1 – Maintenance Bond for Wastewater Collection System located
off Long Lane. - $45,690
Recommendation: Extend in the current amount for a period of one (1) year.
23. The Mill at Bond Springs, Section 1 – Performance Bond for Roads, Drainage and
Erosion Control located off Bethesda Road. - $300,000
Recommendation: Reduce in the amount of $225,000 for a period of one (1) year.
24. Troubadour Golf Club/Farmstead – Performance Bond or Landscaping located off
Patton Road. - $150,738
Recommendation: Extend in current amount for a period of six (6) months to allow
for completion.
25. Troubadour, Section 2 – Maintenance Bond for Roads, Drainage and Erosion Control
located off Patton Road. - $567,000
Recommendation: Reduce bond to $425,000 for a period of one (1) year; or when
Engineering staff has determined the improvements have been completed and the
bond is ready for review by the Planning Commission; whichever comes first.
26. White Horse Farms – Performance Bond for Landscaping located off Murfreesboro
Road. - $69,369
Recommendation: Extend in the current amount for a period of six (6) months to
allow for completion.
DEFERRAL ITEMS:
ITEM 28
CONCEPT PLAN REVIEW FOR 3036 OLD MURFREESBORO ROAD SUBDIVISION,
CONTAINING 30 LOTS ON 34.15 ACRES LOCATED OFF OLD MURFREESBORO
ROAD IN THE 5TH VOTING DISTRICT (1-2025-213).
At this time, the applicant is requesting deferral to the May 2026 Planning Commission
Meeting in order to allow the applicant more time to address Staff comments. Staff
concurs with this request.
ITEM 29
PRELIMINARY PLAT REVIEW FOR CHESTNUT HILL FARMS LLE SUBDIVISION,
CONTAINING 5 LOTS ON28.5 ACRES LOCATED OFF WHIPPOORWILL DRIVE IN
THE 1ST VOTING DISTRICT (1-2025-324).
At this time, the applicant is requesting deferral to the May 2026 Planning Commission
Meeting in order to allow the applicant more time to address Staff comments. Staff
concurs with this request.
ITEM 33
PRELIMINARY PLAT REVIEW FOR JOYBELLE ESTATES SUBDIVISION,
CONTAINING 12 LOTS ON 110.1 ACRES LOCATED OFF EUDAILEY COVINGTON
ROAD IN THE 2ND VOTING DISTRICT (1-2026-304).
At this time, the applicant is requesting deferral to the May 2026 Planning Commission
Meeting in order to allow the applicant more time to address Staff comments. Staff
concurs with this request.
ITEM 34
PRELIMINARY PLAT REVIEW FOR 8828 HORTON HIGHWAY, CONTAINING 5
LOTS ON 28.01 ACRES LOCATED OFF HORTON HIGHWAY IN THE 2ND VOTING
DISTRICT (1-2025-334).
At this time, the applicant is requesting deferral to the May 2026 Planning Commission
Meeting in order to allow the applicant more time to address Staff comments. Staff
concurs with this request.
MOTION TO ACCEPT STAFF RECOMMENDATION
1st _____ 2nd ______ VOTE: ___________
NOTE: All matters listed under the consent agenda are considered to be routine.
There will be no separate discussion of these items unless a Planning
Commission member so requests, in which case it will be removed from the
Consent Agenda so that discussion may be held on that item.
Reviewer: LE
Date: 04/09/2026
ITEM 3
NAME: THE ARBORS AT LEIPERS FORK
BOND TYPE: PERFORMANCE BOND FOR WATER (HB&TS)
LOCATION: OFF HARGROVE RD
BACKGROUND: The following table shows the previous history of this bond.
MTG BOND TYPE ACTION TAKEN BOND AMOUNT
April 2025 Performance for
Water Implemented $536,000
LAST ACTION : At the April 2025 meeting, this body granted approval of this
subdivision with the following conditions: 1.) The HOA documents shall address the
requirements of Section 17.11: Gated Subdivisions and Section 17.12: Private Streets of
the Zoning Ordinance. The HOA documents must be approved prior to the recording of
the plat and the approved HOA documents must be recorded concurrently with the
recording of the Final Plat; 2.) A permit for the security gate will need to be obtained
prior to its installation, and all requirements for such gates as outlined in Section 17.11
of the Zoning Ordinance must be met; 3.) Establishment of a Performance Bond for
roads, drainage and er osion control in the amount of $70 3,000. This amount is based
on work completed ; 4.) Posting of a Performanc e Bond in the amount of $536,000 for
water improvements as specified by HB&TS Utility District; 5.) Execution of Performance
Agreements for the above referenced sureties; 6.) Execution of a Stormwater
Maintenance Agreement and submission of an Operation and Maintenance Plan for
stormwater improvements; and 7.) Providing two (2) copies of the approved Final Plat
in .dwg format on recordable media based on the Tennessee State Plane Coordinate
System prior to signature and recording of the Final Plat.
RECOMMENDATION: HB&TS Utility District requests this be extended in the current
amount for a period two (2) months. Staff concurs with this request.
CURRENT RECOMMENDED
$536,000 $536,000
Performance Performance
Reviewer: MS
Date: 04/09/2026
ITEM 4
NAME: THE ARBORS AT LEIPERS FORK
BOND TYPE: PERFORMANCE BOND FOR ROADS DRAINAGE AND
EROSION CONTROL
LOCATION: OFF HARGROVE RD
BACKGROUND: The following table shows the previous history of this bond.
MTG BOND TYPE ACTION TAKEN BOND AMOUNT
April 2025
Performance for
Roads, Drainage &
Erosion Control
Implemented $703,000
LAST ACTION : At the April 2025 meeting, this body granted approval of this
subdivision with the following conditions: 1.) The HOA documents shall address the
requirements of Section 17.11: Gated Subdivisions and Section 17.12: Private Streets of
the Zoning Ordinance. The HOA documents must be approved prior to the recording of
the plat and the approved HOA documents must be recorded concurrently with the
recording of the F inal Plat; 2.) A permit for the security gate will need to be obtained
prior to its installation, and all requirements for such gates as outlined in Section 17.11
of the Zoning Ordinance must be met; 3.) Establishment of a Performance Bond for
roads, drainage and er osion control in the amount of $703,000. This amount is based
on work completed ; 4.) Posting of a Performanc e Bond in the amount of $536,000 for
water improvements as specified by HB&TS Utility District; 5.) Execution of Performance
Agreements fo r the above referenced sureties; 6.) Execution of a Stormwater
Maintenance Agreement and submission of an Operation and Maintenance Plan for
stormwater improvements; and 7.) Providing two (2) copies of the approved Final Plat
in .dwg format on recordable m edia based on the Tennessee State Plane Coordinate
System prior to signature and recording of the Final Plat.
RECOMMENDATION: Staff visited the site and noted that some improvements have
been completed. Staff recommends that the Performance Bond be redu ced to the
amount of $469,000 for a period of one (1) year.
CURRENT RECOMMENDED
$703,000 $469,000
Performance Performance
REVIEWER: MS
DATE: 04/09/2026
ITEM 5
NAME: ARRINGTON RIDGE, SECTION 1
BOND TYPE: MAINTENANCE BOND FOR ROADS, DRAINAGE AND
EROSION CONTROL
LOCATION: COX ROAD
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION
TAKEN
BOND AMOUNT
April 2020 Performance RDE Implemented $383,000
April 2021 Performance RDE Extend $383,000
April 2022 Performance RDE Reduce to Maint
& Extend
$250,000
April 2023 Maintenance RDE Extend $250,000
April 2024 Maintenance RDE Extend $250,000
April 2025 Maintenance RDE Extend $250,000
LAST ACTION: At the April 2025 meeting, this body granted approval to extend this
bond in the current amount for a period of one (1) year.
RECOMMENDATION: Staff visited the site and noted that some improvements have
been completed. Staff recommends that the Maintenance Bond be extended in the
current amount for a period of one (1) year.
CURRENT RECOMMENDED
$250,000 $250,000
Maintenance Maintenance
REVIEWER: MS
DATE: 04/09/2026
ITEM 6
NAME: BLACKBERRY RIDGE
BOND TYPE: MAINTENANCE BOND FOR ROADS, DRAINAGE AND
EROSION CONTROL
LOCATION: OFF BENDING CHESTNUT RD
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION TAKEN BOND AMOUNT
March 2014 Performance RDE Implemented $295,000
April 2015-2021 Performance RDE Extend $295,000
April 2022 Performance RDE Reduce to Maint
& Extend
$250,000
April 2023 Maintenance RDE Extend $250,000
April 2024 Maintenance RDE Extend $250,000
April 2025 Maintenance RDE Extend $250,000
LAST ACTION: At the April 2025 meeting, this body granted approval to extend this
bond in the current amount for a period of one (1) year.
RECOMMENDATION: Staff visited the site and noted that some improvements h ave
been made. Staff recommends that the Maintenance Bond be extended in the current
amount for a period of one (1) year.
CURRENT RECOMMENDED
$250,000 $250,000
Maintenance Maintenance
Reviewer: OCW
Date: 04/09/2026
ITEM 7
NAME: CONDUIT CHURCH (PARKING ADDITION)
BOND TYPE: PERFORMANCE BOND FOR LANDSCAPING
LOCATION: OFF LEWISBURGE PIKE
BACKGROUND: The following table shows the previous history of the bond.
MEETING
DATE
BOND TYPE ACTION
TAKEN
BOND
AMOUNT
February 2024 Performance Landscaping Implemented $12,850
November 2024 Performance Landscaping Extend $12,850
May 2025 Performance Landscaping Extend $12,850
November 2025 Performance Landscaping Extend $12,850
LAST ACTION: At the November 2025 meeting, this body granted approval to extend
this bond in the current amount for a period of six (6) months to allow completion.
RECOMMENDATION: Staff visited the site and noted most of the landscaping has
been installed, however, landscaping along the northern property line abutting the
parking lot did not survive. Staff recommends this bond be extended for six (6) months
to allow for replanting.
CURRENT RECOMMENDED
$12,850 $12,850
Performance Performance
Reviewer: JJ/CW
Date: 04/09/2026
ITEM 8
NAME: FAIRHAVEN
BOND TYPE: PERFORMANCE BOND FOR LANDSCAPING
LOCATION: BETHESDA ROAD
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION TAKEN BOND AMOUNT
February 2024 Performance
Landscaping
Implemented $261,866
February 2025 Performance
Landscaping
Defer to May
meeting
$261,866
May 2025 Performance
Landscaping
Extend $261,866
October 2025 Performance
Landscaping
Extend $261,866
LAST ACTION: At the October 2025 meeting, this body granted approval to extend
this bond in the current amount for a period of six (6) months .
RECOMMENDATION: Staff visited the site and noted that most of the landscaping
had been installed, however, landscaping along a pedestrian w alkway next to the
entrance gate had not been installed. Staff recommends this bond be extended for six
(6) months to allow for completion.
CURRENT RECOMMENDED
$261,866 $261,866
Performance Performance
Reviewer: AVH
Date: 04/09/2026
ITEM 9
NAME: FIDDLERS GLEN, SECTION 1
BOND TYPE: PERFORMANCE BOND FOR WW COLLECTION SYSTEM
LOCATION: MURFREESBORO ROAD
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION TAKEN BOND AMOUNT
March 2023 Performance WW
Collection System Implemented $178,000
February 2024 Performance WW
Collection System Extend $178,000
February 2025 Performance WW
Collection System Extend $178,000
LAST ACTION: At the February 2025 meeting, this body granted approval t o extend
this bond in the current amount for a period of one (1) year.
RECOMMENDATION: Build-out for this Section has been achieved; however, we are
not in receipt of the required certification letter s. Accordingly, it is recommended this
bond be extended in the current amount for a period of one (1) year.
CURRENT RECOMMENDED
$178,000 $178,000
Performance Performance
Reviewer: MS
Date: 04/09/2026
ITEM 10
NAME: FIDDLERS GLEN, SECTION 2
BOND TYPE: PERFORMANCE BOND FOR ROADS, DRAINAGE AND
EROSION CONTROL
LOCATION: OFF MURFREESBORO ROAD
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION TAKEN BOND AMOUNT
April 2023 Performance RDE Implemented $553,000
April 2024 Performance RDE Extend $553,000
April 2025 Performance RDE Extend $553,000
LAST ACTION: At the April 2025 meeting, this body granted approval to extend this
bond in the current amount for a period of one (1) year.
RECOMMENDATION
: Staff visited the site and noted that some improvements have
been completed. Staff recommends that the Performance Bond be reduced to the
amount of $415,000 for a period of one (1) year.
CURRENT RECOMMENDED
$553,000 $415,000
Performance Performance
Reviewer: AVH
Date: 04/09/2026
ITEM 11
NAME: FIDDLERS GLEN, SECTION 2
BOND TYPE: PERFORMANCE BOND FOR WASTEWATER COLLECTION
SYSTEM
LOCATION: OFF MURFREESBORO ROAD
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION TAKEN BOND AMOUNT
April 2023 Performance WW
Collection System Implemented $60,000
April 2024 Performance WW
Collection System Extend $60,000
April 2025 Performance WW
Collection System Extend $60,000
LAST ACTION: At the April 2025 meeting, this body granted approval to extend this
bond in the current amount for a period of one (1) year.
RECOMMENDATION: Build-out for this Section has been achieved; however, we are
not in receipt of the required certification letter s. Accordingly, it is recommended this
bond be extended in the current amount for a period of one (1) year.
CURRENT RECOMMENDED
$60,000 $60,000
Performance Performance
Reviewer: AVH
Date: 04/09/2026
ITEM 12
NAME: HIGH PARK HILL, SECTION 2
BOND TYPE: MAINTENANCE BOND FOR WASTEWATER COLLECTION
SYSTEM
LOCATION: OFF MURFREESBORO ROAD
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION TAKEN BOND AMOUNT
April 2023 Performance WW
Collection System Implemented $93,700
April 2024 Performance WW
Collection System
Reduced to
Maintenance and
Extended
$28,110
LAST ACTION: At the April 2024 meeting, this body granted approval to reduce this
bond to Maintenance in the amount of $28,110 for a period of Two (2) years.
RECOMMENDATION: This bond has satisfied the requisite two (2) year maintenance
period. Therefore, Staff recommends releasing the bond.
CURRENT RECOMMENDED
$28,110 Release
Maintenance
Reviewer: OWC
Date: 04/09/2026
ITEM 13
NAME: HOMES AT MULBERRY SPRINGS WW
BOND TYPE: PERFORMANCE BOND FOR LANDSCAPING
LOCATION: OFF TALIAFERRO ROAD
BACKGROUND: The following table shows the previous history of this bond.
MTG BOND TYPE ACTION TAKEN BOND AMOUNT
April 2025 Performance for
Landscaping Implemented $55,500
LAST ACTION : At the April 2025 meeting, this body granted approval of this
subdivision with the following conditions: 1.) A letter from TDEC indicating that the
Nontraditional Wastewater Treatment and Disposal System was installed and is
functioning; 2.) As-built drawings showing the location of all system components and a
sealed certification letter from the design engineer indicating that said system was
constructed in accordance with the approved construction plans and specifications; 3.)
A letter from the owner/utility provider indicating that it has accepted the said system
and is currently operating same; 4.) The posting of a Performance Bond in the amount
of $ 100,200 for the Nontraditional Wastewater Treatment and Disposal System as
specified by the County’s wastewater consultant; 5.) The posting of a Performance
Bond in the amount of $ 55,500 for landscaping improvements; and 6.) Execution of
Performance Agreements for the above referenced sureties
RECOMMENDATION: Staff visited the site and noted that the landscaping had not
been installed. Staff recommends this bond be extended for six (6) months to allow for
completion.
CURRENT RECOMMENDED
$55,500 $55,500
Performance Performance
Reviewer: AVH
Date: 04/09/2026
ITEM 14
NAME: HOMES AT MULBERRY SPRINGS WW
BOND TYPE: PERFORMANCE BOND FOR WASTEWATER TREATMENT AND
DISPOSAL SYSTEM
LOCATION: OFF TALIAFERRO ROAD
BACKGROUND: The following table shows the previous history of this bond.
MTG BOND TYPE ACTION TAKEN BOND AMOUNT
April 2025
Performance WW
Treatment and
Disposal System
Implemented $100,200
LAST ACTION : At the April 2025 meeting, this body granted approval of this
subdivision with the following conditions: 1.) A letter from TDEC indicating that the
Nontraditional Wastewater Treatment and Disposal System was installed and is
functioning; 2.) As-built drawings showing the location of all system components and a
sealed certification letter from the design engineer indicating that said system was
constructed in accordance with the approved construction plans and specifications; 3.)
A letter from the owner/utility provider indicating that it has accepted the said system
and is currently operating same; 4.) The posting of a Performance Bond in the amount
of $ 100,200 for the Nontraditional Wastewater Treatment and Disposal System as
specified by the County’s wastewater consultant; 5.) The posting of a Performance
Bond in the amount of $ 55,500 for landscaping improvements; and 6.) Execution of
Performance Agreements for the above referenced sureties
RECOMMENDATION: Build-out for this Section of the development has been not
achieved; and we are not in receipt of the required certification letter from the utility
provider. Accordingly, it is recommended this bond be extended in the current amount
for a period of one (1) year.
CURRENT RECOMMENDED
$100,200 $100,200
Performance Performance
Reviewer: OCW
Date: 04/09/2026
ITEM 15
NAME: LIFEPOINT CHURCH
BOND TYPE: PERFORMANCE BOND FOR LANDSCAPING
LOCATION: OFF CLOVERCROFT RD
BACKGROUND: The following table shows the previous history of the bond.
MEETING
DATE
BOND TYPE ACTION TAKEN BOND
AMOUNT
August 2022 Performance
Landscaping
Implemented $159,225
February 2025 Performance
Landscaping
Performance $159,225
February 2026 Performance
Landscaping
Performance $159,225
LAST ACTION: At the February 2026 meeting, this body granted approval to extend
this bond in the current amount for a period of six (6) months.
RECOMMENDATION: Staff visited the site and noted most of the landscaping had
been installed. However, the landscaping for two parking lots 2 and 3 had not yet been
installed. Staff recommends this bond be exten ded for six (6) months to allow for
completion.
CURRENT RECOMMENDED
$159,225 $159,225
Performance Performance
Reviewer: OCW
Date: 04/09/2026
ITEM 16
NAME: REEDS VALE, SECTION 4
BOND TYPE: PERFORMANCE BOND FOR LANDSCAPING
LOCATION: OFF LAMPKINS BRIDGE ROAD
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION TAKEN BOND AMOUNT
March 2025 Performance for
Landscaping
Implemented $123,252
LAST ACTION: At the March 2025 meeting, this body granted approval of this final plat
with the following conditions: 1) Establishment of a P erformance Bond for Roads,
Drainage and E rosion co ntrol in the amount of $2,800,000 ; 2) Establishment of a
Maintenance Bond for Water I mprovements in favor of Milcrofton Utility D istrict in the
amount of $438,914; 3) Per the recommendation of the County’s Wastewater Consultant,
establishment of a Performance Bond for the Wastewater Collection System in the amount
of $360,045.50; 4) Establishment of a Performance Bond for Landscaping Improvements
in the amount of $123,252; 5) Execution of performance agreements for the above
referenced sureties; 6) The approved HOA docu ments must be recorded concurrently
with the recording of the Final Plat; 7) Execution of a Stormwater Maintenance Agreement
and submission of an Operation and Maintenance Plan for stormwater improvements;
and 8) Submission of the approved Final Plat in .d wg format on recordable media based
on the Tennessee State Plane Coordinate System prior to signature and recording of the
plat
RECOMMENDATION: Staff visited the site and noted that the landscaping had not yet
been installed. Staff recommends this bond be extended for six (6) months to allow for
completion.
CURRENT RECOMMENDED
$123,252 $123,252
Performance Performance
Reviewer: AVH
Date: 04/09/2026
ITEM 17
NAME: REEDS VALE, SECTION 4
BOND TYPE: PERFORMANCE BOND FOR WASTEWATER COLLECTION
SYSTEM
LOCATION: OFF LAMPKINS BRIDGE ROAD
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION TAKEN BOND AMOUNT
March 2025 Performance WW
Collection System Implemented $360,045.50
LAST ACTION: At the March 2025 meeting, this body granted approval of this final plat
with the following conditions: 1) Establishment of a P erformance Bond for Roads,
Drainage and E rosion co ntrol in the amount of $2,800,000 ; 2) Establishment of a
Maintenance Bond for Water I mprovements in favor of Milcrofton Utility D istrict in the
amount of $438,914; 3) Per the recommendation of the County’s Wastewater Consultant,
establishment of a Performance Bond for the Wastewater Collection System in the amount
of $360,045.50; 4) Establishment of a Performance Bond for Landscaping Improvements
in the amount of $123,252; 5) Execution of performance agreements for the above
referenced sureties; 6) The approved HOA documents must be recorde d concurrently
with the recording of the Final Plat; 7) Execution of a Stormwater Maintenance Agreement
and submission of an Operation and Maintenance Plan for stormwater improvements;
and 8) Submission of the approved Final Plat in .dwg format on recordable media based
on the Tennessee State Plane Coordinate System prior to signature and recording of the
plat
RECOMMENDATION: Build-out for this Section has been achieved; and we are receipt
of the required certification letter s. Accordingly, it is recomme nded that this bond be
reduced to Maintenance in the amount of $108,013.65 for a period of two (2) years.
CURRENT RECOMMENDED
$360,045.50 $108,013.65
Performance Maintenance
Reviewer: MS
Date: 04/09/2026
ITEM 18
NAME: REEDS VALE, SECTION 4
BOND TYPE: PERFORMANCE BOND FOR ROADS, DRAINAGE AND
EROSION CONTROL
LOCATION: OFF LAMPKINS BRIDGE ROAD
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION TAKEN BOND AMOUNT
March 2025 Performance for
Roads, Drainage
and Erosion Control
Implemented $2,800,000
LAST ACTION: At the March 2025 meeting, this body granted approval of this final plat
with the following conditions: 1) Establishment of a P erformance Bond for Roads,
Drainage and E rosion co ntrol in the amount of $2,800,000 ; 2) Establishment of a
Maintenance Bond for Water I mprovements in favor of Milcrofton Utility D istrict in the
amount of $438,914; 3) Per the recommendation of the County’s Wastewater Consultant,
establishment of a Performance Bond for the Wastewater Collection System in the amount
of $360,045.50; 4) Establishment of a Performance Bond for Landscaping Improvements
in the amount of $123,252; 5) Execution of performance agreements for the above
referenced sureties; 6) The approved HOA documents must be recorded concurrently
with the recording of the Final Plat; 7) Execution of a Stormwater Maintenance Agreement
and submission of an Operation and Maintenance Plan for stormwater improvements ;
and 8) Submission of the approved Final Plat in .dwg format on recordable media based
on the Tennessee State Plane Coordinate System prior to signature and recording of the
plat
RECOMMENDATION: Staff visited the site and noted that some improvements hav e
been completed. Staff recommends that the Performance Bond be reduced to the
amount of $1,400,000 for a period of one (1) year.
CURRENT RECOMMENDED
$2,800,000 $1,400,000
Performance Performance
REVIEWER: AVH
DATE: 04/09/2026
ITEM 19
NAME: SOUTHALL RURAL RETREAT WW AREA
BOND TYPE: MAINTENANCE BOND FOR WASTEWATER TREATMENT AND
DISPOSAL SYSTEM
LOCATION: CARTERS CREEK PK
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION
TAKEN
BOND AMOUNT
August 2019 Performance WW
Treatment & Disposal
Implemented $124,700
September 2020 Performance WW
Treatment & Disposal
Extend $124,700
September 2021 Performance WW
Treatment & Disposal
Extend $124,700
August 2022 Performance WW
Treatment & Disposal
Extend $124,700
August 2023 Performance WW
Treatment & Disposal
Extend $124,700
April 2024 Performance WW
Treatment & Disposal
Extend $124,700
LAST ACTION: At the April 2024 meeting, this body granted approval to extend this
bond in the current amount for a period of one (1) year.
RECOMMENDATION: This bond has satisfied the requisite two (2) year maintenance
period. Therefore, Staff recommends releasing the bond.
CURRENT RECOMMENDED
$124,700 Release
Maintenance
REVIEWER: AVH
DATE: 04/09/2026
ITEM 20
NAME: SOUTHALL RURAL RETREAT WW AREA
BOND TYPE: MAINTENANCE BOND FOR WASTEWATER COLLECTION
SYSTEM
LOCATION: CARTERS CREEK PK
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION
TAKEN
BOND AMOUNT
August 2019 Performance WW
Collection System
Implemented $409,000
September 2020 Performance WW
Collection System
Extend $409,000
September 2021 Performance WW
Collection System
Extend $409,000
August 2022 Performance WW
Collection System
Extend $409,000
August 2023 Performance WW
Collection System
Extend $409,000
April 2024 Performance WW
Collection System
Reduce to
Maintenance and
amount
$122,700
LAST ACTION: At the April 2024 meeting Build-out for this development has been
achieved, and we are in receipt of the required certification letters. Accordingly, it is
recommended that this bond be reduced to maintenance in the amount of $122,700 for
a period of two (2) years.
RECOMMENDATION: This bond has satisfied the requisite two (2) year maintenance
period. Therefore, Staff recommends releasing the bond.
CURRENT RECOMMENDED
$122,700 Release
Maintenance
Reviewer: MS
Date: 04/09/2026
ITEM 21
NAME: TERRAVISTA, SECTION 1
BOND TYPE: MAINTENANCE BOND FOR ROADS, DRAINAGE AND
EROSION CONTROL
LOCATION: OFF LONG LANE
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION TAKEN BOND AMOUNT
April 2022 Performance RDE Implemented $1,900,000
April 2023 Performance RDE Extend $1,900,000
April 2024 Performance RDE Reduce to
Maintenance &
Extend
$950,000
April 2025 Maintenance RDE Extend $950,000
LAST ACTION: At the April 2025 meeting, this body granted approval to reduce this
bond to maintenance in the amount of $950,000 for a period of one (1) year.
RECOMMENDATION: Staff visited the site and noted that some improvements have
been completed. Staff recommends that the Mainten ance Bond be extended in the
current amount for a period of one (1) year.
CURRENT RECOMMENDED
$950,000 $950,000
Maintenance Maintenance
Reviewer: AVH
Date: 04/09/2026
ITEM 22
NAME: TERRAVISTA, SECTION 1
BOND TYPE: MAINTENANCE BOND FOR WASTEWATER COLLECTION
SYSTEM
LOCATION: OFF LONG LANE
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION TAKEN BOND AMOUNT
April 2022 Performance WW
Collection System
Implemented $152,300
April 2023 Maintenance WW
Collection System
Reduced and
Extend
$45,690
LAST ACTION: At the April 2023 meeting, this body granted approval to extend this
bond in the current amount for a period of two (2) years.
RECOMMENDATION: Staff recommends that the Maintenance Bond be extended in the
current amount for a period of one (1) year.
CURRENT RECOMMENDED
$45,690 $45,690
Maintenance Maintenance
REVIEWER: MS
DATE: 04/09/2026
ITEM 23
NAME: THE MILL AT BOND SPRINGS, SECTION 1
BOND TYPE: PERFORMANCE BOND FOR ROADS, DRAINAGE AND
EROSION CONTROL
LOCATION: BETHESDA ROAD
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION
TAKEN
BOND AMOUNT
February 2020 Performance RDE Implemented $300,000
April 2021 Performance RDE Extend $300,000
April 2022 Performance RDE Extend $300,000
April 2023 Performance RDE Extend $300,000
April 2024 Performance RDE Extend $300,000
April 2025 Performance RDE Extend $300,000
LAST ACTION: At the April 2025 meeting, this body granted approval to extend this
bond in the current amount for a period of one (1) year.
RECOMMENDATION: Staff visited the site and noted that some improvements ha ve
been completed. Staff recommends that the Performance Bond be reduced to the
amount of $225,000 for a period of one (1) year.
CURRENT RECOMMENDED
$300,000 $225,000
Performance Performance
Reviewer: OCW
Date: 04/09/2026
ITEM 24
NAME: TROUBADOUR GOLF/CLUB FARMSTAND
BOND TYPE: PERFORMANCE BOND FOR LANDSCAPING
LOCATION: OFF COX ROAD
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION TAKEN BOND AMOUNT
June 2025 Performance for
Landscaping
Implemented $150,738
LAST ACTION: At the June 2025 meeting
The Site Plan is in order, and Staff recommends approval with the following conditions:
1.) Prior to the recording of the Final Plat of the Section in which the Amenity Center is
located, the HOA documents shall be revised to be consistent with the requirements and
limitations of the Private Recreational Center Use Type as described by the Zoning
Ordinance; 2.) Per the recommendation of the County’s Wastewater Con sultant, the
posting of a Performance Bond for the Collection System in the amount of $12,000; 3.)
Execution of a Stormwater Maintenance Agreement and submission of an Operation and
Maintenance Plan for stormwater improvements; 4.) Posting of a Performance Bond for
landscaping improvements in the amount of $150,738; and 5.) Execution of a
Performance Agreement for the above referenced sureties.
RECOMMENDATION: Staff visited the site and noted that most of the landscaping had
been installed, however, some plants were missing. Staff recommends this bond be
extended for six (6) months to allow for completion.
CURRENT RECOMMENDED
$150,738 $150,738
Performance Performance
Reviewer: MS
Date: 04/09/2026
ITEM 25
NAME: TROUBADOUR, SECTION 2 (AKA HIDEAWAY AT
ARRINGTON, SECTION 2)
BOND TYPE: MAINTENANCE BOND FOR ROADS, DRAINAGE AND
EROSION CONTROL
LOCATION: OFF COX RD
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION TAKEN BOND AMOUNT
November 2015 Performance RDE Implemented $567,000
October 2016 Performance RDE Extend $567,000
October 2017 Performance RDE Extend $567,000
April 2018 Performance RDE Convert to Maint
& Extend
$567,000
April 2019 Maintenance RDE Extend $567,000
April 2020 Maintenance RDE Extend $567,000
April 2021 Maintenance RDE Extend $567,000
April 2022 Maintenance RDE Extend $567,000
April 2023 Maintenance RDE Extend $567,000
April 2024 Maintenance RDE Extend $567,000
April 2025 Maintenance RDE Extend $567,000
LAST ACTION: At the April 20 25 meeting, this body granted approval to extend this
bond in the current amount for a period of one (1) year.
RECOMMENDATION: Staff visited the site and noted that some improvements have
been made. The applicant has requested a release of the bond, however, there are items
that still need to be addressed. Staff recommends that the Maintenance Bond be reduced
to $425,000 for a period of one (1) year; or when Engineering st aff has determined the
improvements have been completed and the bond is ready for review by the Planning
Commission; whichever comes first.
CURRENT RECOMMENDED
$567,000 $425,000
Maintenance Maintenance
Reviewer: OCW
Date: 04/09/2026
ITEM 26
NAME: WHITE HORSE FARMS
BOND TYPE: PERFORMANCE BOND FOR LANDSCAPING
LOCATION: OFF Murfreesboro Road
BACKGROUND: The following table shows the previous history of the bond.
MEETING DATE BOND TYPE ACTION TAKEN BOND AMOUNT
March 2025 Performance for
Landscaping Implemented $69,369
LAST ACTION: At the February 2025 meeting, the Board of Zoning Appeals approved a
Special Use Permit to allow a Rural Retreat -Extensive Use on the property . A t March
2025 meeting, this body established a Performance Bond for landscaping improvements
in the amount of $69,369 for the use.
RECOMMENDATION: Staff visited the site and noted that not all landscaping was
planted. Staff recommends this bond be extended for six (6) months to allow for
completion.
CURRENT RECOMMENDED
$69,369 $69,369
Performance Performance
Item 27—Page 1 of 1
Date: 4-09-2026
ITEM 27
TERRAVISTA ROADS, DRAINAGE, AND EROSION CONTROL BOND UPDATE
Attachment 27-1 Staff Timeline of Improvements
27-2 Applicant’s Timeline of Improvements
Recommendations
• A
pril 9, 2026
• Equipment need to be on site.
• A
ctive construction
• May 14, 2026
• Pond grading complete
• S
tabilization activities
• June 11, 2026
• Access road complete
• P
onds stabilized and water quality swale complete
• July 9, 2026
• Majority of Open Issues closed out
• E
ngineering, geotechnical, core reports, etc.
Timeline Provided by Staff
Presented at March 2026 Planning Commission
ATTACHMENT 27-1
TERRA VISTA PROJECTED TIMELINES
SECTION 2
OPEN ISSUES REMAINING FROM RDE REPORT:
May 30, 2026
• GEOTECHNICAL SLOPE REPAIR APPROVED, AWAITING LETTER/REPORT
• POND 5 BOTTOM REGRADING (NEEDING IT TO DRY OUT)
• WASTE WATER ACCESS ROAD (AWAITING BID FROM REVISED SCOPE)
• ROAD CORE SAMPLE REPORT
o AWAITING RESULTS OF REPORT AND SCOPE OF WORK IF NEEDED
• ROAD CORE WORK IF NEEDED
SECTION 1
OPEN ISSUES REMAINING FROM RDE REPORT:
APRIL 30, 2026
• ROAD CORE SAMPLING
• GEOREPORT FROM WET AREA LOCATED IN THE BACKYARD OF LOT 108
MAY / JUNE 2026
• POND GRADING STARTED (WEATHER ALLOWING)
• WATER QUALITY SWALE COMPLETE (WEATHER ALLOWING)
• ROAD CORE WORK IF NEEDED
JULY 31, 2026
• MAJORITY OF OPEN ISSUES CLOSED OUT
• ALL GEOTECHNICAL LETTERS, CORE REPORTS, ENGINEERING REPORTS, ETC...
Timeline Provided by Applicant
To be Presented at April 2026 Planning Commission
ATTACHMENT 27-2
Item 28—Page 1 of 1
Reviewer: JYJ
Date: 4/9/2026
ITEM 28
CONCEPT PLAN REVIEW FOR 3036 OLD MURFREESBORO ROAD SUBDIVISION,
CONTAINING 28 LOTS ON 34.15 ACRES LOCATED OFF OLD MURFREESBORO
ROAD IN THE 5TH VOTING DISTRICT (1-2025-213).
Area 34.15 acres (0.84 DU/A)
Lots 28
Zoning Triune Character Area – 2 (TCA-2)
Water Nolensville/College Grove Utility District
Sewer Non-Traditional Wastewater Treatment and Disposal System
Development Options Major Traditional Subdivision
Chapter 1101 Status Rural
Map and Parcels 113—040.00 and 038.00
File Number (1-2025-213)
At this time, the applicant is requesting deferral to the May 2026 Planning Commission
Meeting in order to allow the applicant more time to address Staff comments. Staff
concurs with this request.
Item 29—Page 1 of 1
Reviewer: OCW
Date: 4-09-2026
ITEM 29
PRELIMINARY PLAT REVIEW FOR CHESTNUT HIL L FARMS LLE SUBDIVIS ION,
CONTAINING 5 LOTS ON 28.50 ACRES LOCATED OFF WHIPPOORWILL DR IVE
IN THE 1ST VOTING DISTRICT (1-2025-324).
Area 28.50 acres
Zoning Municipal Growth Area – 1 (MGA-1)
Lots 5
Water Water Authority of Dickson County
Sewer Individual On-Site Septic Systems
Development Options Large Lot Easement
Map and Parcel 002---00301
File Number (1-2025-324)
At this time, the applicant is requesting deferral to the May 2026 Planning Commission
Meeting in order to allow the applicant more time to address Staff comments. Staff
concurs with this request.
Item 30—Page 1 of 1
Reviewer: AVH
Date: 04/09/2026
ITEM 30
AMENDMENT TO ARTICLE 2 OF THE WI LLIAMSON COUNTY SUBDIVISION
REGULATIONS REGARDING EXPIRATION OF PLATS WITHOUT A REQUIRED
SURETY (6-2026-600)
Attachment 30-1 Proposed Amendment
File Number (6-2026-600)
In recent months, Staff has requested the addition of several Non -Agenda Items to the
Planning Commission’s agenda in order to reapprove several Final Plats whose approvals
had expired. These Final Plats did not require the posting of sureties, i.e. bonds, for
infrastructure improvements, such as roads and water improvements. Staff noted the
primary reason the above -mentioned Final Plats’ approvals had expired was due to the
applicant being unable to acquire the signature for the utility district serving water to the
property within the required sixty (60) days to record the approved Final Plat.
Staff is proposing this amendment to the Subdivision Regulations in order to increase the
amount of time to record Final Plats that do not require the posting of sureties, i.e. bonds,
from sixty (60) days to ninety (90) days. Staff believes th is increase in time will provide
an applicant with sufficient time to acquire the required signatures and record the
approved Final Plat. It should be noted that currently Final Plats that d o require the
posting of sureties have ninety (90) days in which to post the sureties, and 120 days to
record the Final Plat.
Staff recommends approval of the proposed Text Amendment .
ATTACHMENT 30-1
Attachment 30-1, Page 1 of 1
Amend Article 2, Section 2.04 (E)(5)(d) as follows:
Currently Reads:
d) All Final Plats without a required surety, shall be recorded within 60 days of approval by the
Planning Commission. Failure to record within 60 days will result in expiration of the approval
of the Final Plat.
Proposed to Read (Deletions are in Strikethrough Red and change are Underlined and in Bold Red):
d) All Final Plats without a required surety, shall be recorded within 60 90 days of approval by the
Planning Commission. Failure to record within 60 90 days will result in expiration of the
approval of the Final Plat.
Item 31—Page 1 of 2
Reviewer: AVH
Date: 4-09-2026
ITEM 31
AMENDMENTS TO ARTICLES 11 AND 23 OF THE ZONING ORDINANCE
REGARDING THE USE OF NONTRADITIONAL WASTEWATER TREATMENT AND
DISPOSAL SYSTEMS WITHIN THE URBAN GROWTH BOUNDARIES (UGB’S) (6-
2026-601).
Attachment 31-1 Proposed Amendments
31-2 Resolution
File Number (6-2026-601)
In November of 2024, Williamson County and the municipalities located therein adopted
the Williamson County Growth Plan (“Growth Plan”) , which, among other things,
established the goal to “Ensure that the system of Urban Growth Boundaries ( UGB’s),
Planned Growth Areas ( PGA’s) and Rural Areas function as optimally as possible .”
Strategy 1A of the Growth Plan sets forth that the County and municipalities will work
together to create and implement interim policies related to development within the
UGB’s. This strategy includes allowing or prohibiting the use of alternative wastewater
systems, i.e. Nontraditional Wastewater Treatment and Disposal Systems, within the
UGB’s. County Staff met with Staff from each of the municipalities and discussed the
placement of these Nontraditional Wastewater Treatment and Disposal S ystems inside
the UGB’s . For various reasons, including the difficulty of retrofitting these types of
systems to municipal sewer systems, the municipalities d id not want alternative
wastewater systems to be utilized within the UGB’s. County Staff agrees with this.
The Growth Plan revised the boundaries of the municipalities’ UGB’s, and now includes
parcels that are zoned Rural Development -5 (RD -5) and Rural Preservation -5 (RP-5).
Currently, the Zoning Ordinance permits Nontraditional Wastewater Treatment and
Disposal Systems within the RD -5 and RP -5 zoning districts regardless of whether the
property is located inside or outside a UGB. These systems are not permitted within the
MGA-1 and MGA-5 districts when used in conjunction with any of the u ses listed under
the Residential Use Classification in Tables 11.01-1 and 11.01-2: Table of Uses, i.e. new
residential developments. The systems are also not allowed within the Municipal Growth
Area-Hamlet (MGA-H) district. It should be noted that these systems are permitted within
the Municipal Growth Area -1 (MGA-1) and Municipal Growth Area -5 (MGA-5) districts
when used in conjunction when serving a single , individual use, such as a school or
church.
In order to address the use of Nontraditional Wastewater Treatment and Disposal
Systems within the RD-5 and RP-5 zoning districts when the properties are located within
a municipality’s UGB, Staff is proposing these Text Amendments to prohibit these systems
on properties zoned RD -5 and RP -5 when the properties are located within a
municipality’s UGB and when proposed for use for new residential developments. The
Item 31—Page 2 of 2
Reviewer: AVH
Date: 4-09-2026
Text Amendment also adds the definition of Urban Growth Boundary (UGB). The use of
the systems for individual uses, such as a school or church, within the RD-5 and RP -5
districts when the properties are located within a municipality’s UGB will be permitted, as
they are in the MGA districts.
Staff believes these Text Amendments are consistent with the longstanding County Policy
prohibiting the use of these systems within the UGB’s for new residential developments.
Therefore, Staff recommends approval of the proposed Text Amendments, and that the
attached Resolution be forwarded to the County Commission with a recommendation for
adoption.
ATTACHMENT 31-1
Attachment 31-1—Page 1 of 1
Amend Article 11, Section 11.03 (E)(5)(a) to add new subsection (iv):
iv) New Nontraditional Wastewater Treatment and Disposal Systems shall only be permitted on
properties within the RD-5 or the RP-5 districts when those properties are located within an
Urban Growth Boundary (UGB), as defined in Section 23.04: Definitions , if they are s ingle,
on-site s ystems serving individual uses othe r than those listed under the Residential Use
Classification in Tables 11.01-1 and 11.01-2: Table of Uses.
Amend Article 23, Section 23.04: Definitions to add the following definition:
Urban Growth Boundary (UGB)
The areas outside of and surrounding the incorporated boundaries of the municipalities that are
projected to accommodate future growth, which are envisioned as becoming part of the municipality in
the future, and are illustrated in the Williamson County Growth Plan, effective November 13, 2024, and as
amended.
ATTACHMENT 31-2
RESOLUTION NO. __________
Requested by: Planning Department
A RESOLUTION TO AMEND ARTICLES 11 AND 23 OF THE ZONING ORDINANCE
REGARDING THE USE OF NONTRADITIONAL WASTEWATER TREATMENT AND
DISPOSAL SYSTEMS WHEN USED WITHIN THE URBAN GROWTH BOUNDARIES
(UGB’S)
WHEREAS, on May 14, 2012, the Board of County Commissioners adopted the current
Zoning Ordinance and Official Zoning Map, and established an effective date of
January 1, 2013; and
WHEREAS, in November of 2024, Williamson County and the municipalities located therein
adopted the Williamson County Growth Plan (“Growth Plan”), and established
Urban Growth Boundaries (UBG’s) for the municipalities;
WHEREAS, the Growth Plan established the goal to “Ensure that the system of Urban Growth
Boundaries (UGB’s), Planned Growth Areas (PGA’s) and Rural Areas function as
optimally as possible”;
WHEREAS, Strategy 1A of the Growth Plan sets forth that the County and municipalities will
work together to create and implement interim policies related to development
within the UGB’s, which includes whether to allow or prohibit the use of
alternative wastewater systems, i.e. Nontraditional Wastewater Treatment and
Disposal Systems, within the UGB’s;
WHEREAS, the Growth Plan revised the boundaries of the municipalities’ UGB’s, and now
includes parcels within the County’s jurisdiction that are zoned Rural
Development-5 (RD-5) and Rural Preservation-5 (RP-5);
WHEREAS, currently, Nontraditional Wastewater Treatment and Disposal Systems are
permitted within the RD-5 and RP-5 zoning districts regardless of whether the
property is located inside or outside a UGB;
WHEREAS, this proposed Text Amendment would clarify that Nontraditional Wastewater
Treatment and Disposal Systems are not permitted within the RD-5 and RP-5
zoning districts when:
• The property is located inside a municipalities’ UGB; and
• When the system is proposed to serve any uses listed under the Residential Use
Classification in Tables 11.01 -1 and 11.0 1-2: T able of Uses , i.e. new
residential developments; and
• The Text Amendment also adds the definition of Urban Growth Boundary
(UGB).
WHEREAS, this proposed Text Amendment is consistent with County Policy prohibiting the
use of Nontraditional Wastewater Treatment and Disposal Systems when they are
proposed to serve any use listed under the Residential Use Classification in Tables
11.01-1 and 11.01-2: Table of Uses, i.e. new residential developments, when
located within the UGB’s, which has been in effect since the adoption of the
original Growth Plan and adoption of the Municipal Growth Area districts;
WHEREAS, the Planning Commission and Staff believe this change is appropriate and is
consistent with the intent of the proposed Text Amendment; and
WHEREAS, on April 9th, 2026, the Williamson County Regional Planning Commission
conducted its official Public Hearing on this amendment, which is attached hereto
and incorporated herein; and
WHEREAS, based upon its consideration of all the information, Planning Staff
recommendation, and its own Public Hearing, the Williamson County Regional
Planning Commission has recommended the adoption of the amendments as
presented; and
2
WHEREAS, the Board of County Commissioners finds and determines that the best interests of
Williamson County and its citizens will be served by the adoption of this
amendment to the Zoning Ordinance as recommended by the Regional Planning
Commission; and
WHEREAS, due notice has been published and a public hearing has been held as required by
the Tennessee Code Annotated, Title 13, Chapter 7, Part 1.
NOW, THEREFORE, BE IT RESOLVED, that the Williamson County Board of
Commissioners at its regular meeting on this the 11th day of May, 2026, after
conducting the public hearing as required by law, hereby adopts the amendment
to the Williamson County Zoning Ordinance, which is attached hereto and
incorporated herein as if included verbatim, in accordance with its authority in
Tennessee Code Annotated, Title 13, Chapter 7, Part 1.
NOW, THEREFORE, BE IT FURTHER RESOLVED, that the amendments will be effective
and enforced on this the 11th day of May, 2026.
________________________________
County Commissioner
COMMITTEES REFERRED TO AND ACTION TAKEN:
Regional Planning Commission: For:_____ Against:_____
Commission Action Taken: For:_______Against:________Pass:_______Out:_________
____________________________ _______________________________
Jeff Whidby, County Clerk Brian Beathard, Commission Chairman
______________________________
Rogers C. Anderson, County Mayor
_________________________
Date
Item 32—Page 1 of 3
Reviewer: AVH
Date: 4-09-2026
ITEM 32
CONCEPT PLAN REVIEW FOR WILLOWSTONE ESTATES (AKA CLOVERCROFT
ESTATES), CONTAINING 25 LOTS ON 184.62 ACRES LOCATED OFF
CLOVERCROFT ROAD IN THE 4TH VOTING DISTRICT (1-2025-211)
Attachment 32-1 Concept Plan
32-2 Aerial Photograph
Area 184.62 acres (1 DU/0.14 AC)
Lots 25
Zoning Rural Development–5 (RD-5)
Water Nolensville/College Grove Utility District
Sewer Nontraditional Wastewater Treatment and Disposal S ystem
Development Option Conservation Subdivision
Chapter 1101 Status Rural
Map and Parcels 081--- 00600 and 01201
File Number (1-2025-211)
The applicant is requesting Concept Plan approval for a 25 -lot Conservation Subdivision
in the Rural Development-5 (RD-5) zoning district. Concept Plan approval is the first stage
in the development process.
The proposed development consists of twenty-five (25) lots, which range in size from one
(1) acre to 1.77 acres, with an average lot size of 1.15 acres. The overall density is 0.14
dwelling units per acre. Surrounding properties range in size from approximately
seventeen (17) acres to ninety-five (95) acres and are used for residential or agricultural
purposes. The Clovercroft Preserve developme nt is located on an adjoining parcel.
The subject propert ies total approximately 185 acres in size and are located off
Clovercroft Road. The site contains a number of natural resources, including moderate
and very steep slopes, slippage soils, a creek and its associated Waterway Natural Area
(WNA), and expansive areas of woodlands. Approximately eighty-three percent (83%)
of the site will be preserved in open space, and ninety percent (90%) of the existing tree
canopy will be retained. Natural Resource Protections standards have been met.
The required Open Space strip around the perimeter of the property has been provided.
Water service will be provided by the Nolensville/College Grove Utility District , and
wastewater will be handled via the adjacent Clovercroft Acres Nontraditional Wastewater
Treatment and Disposal System, which serves the Clovercroft Preserve development .
Staff has confirmed the current system has adequate capacity to serve the proposed
Item 32—Page 2 of 3
Reviewer: AVH
Date: 4-09-2026
subdivision, and all bonds associated with the Nontraditional Wastewater Treatment and
Disposal System will be established during the Final Plat stage.
Access is provided by a single entrance off Clovercroft Road. The internal roadway
network will be publicly maintained. N o roadway improvements are required in
conjunction with this development.
The applicant has indicated the desire to revise the Concept Plan in the near future to
add additional lots. A revision to the Concept Plan to add these additional lots will require
a revision to this Co ncept Plan but only after the aforementioned Clovercroft Acres
Nontraditional Wastewater Treatment and Disposal System Site Plan is revised to add
additional capacity to serve any additional lots.
It should be noted that once detailed construction and engineering plans are prepared in
conjunction with the submittal of a Preliminary Plat, changes to the layout, including the
potential for a reduction of lots and relocation of drainage infrastructure, may be
necessary. A Landscaping Plan will also be requir ed.
The Concept Plan is in order, and Staff recommends approval with the following
conditions:
The Preliminary Plat must address the following:
1. Submission of roads, drainage and erosion control plans for review and approval
by the County; and
2. Submission of water plans for review and approval by Nolensv ille/College Grove
Utility District.
The Final Plat must address the following:
1. Prior to consideration of Final Plat approval, the applicant shall submit HOA
documents for review and approval by the County Attorney’s office. The HOA
documents must be submitted with the Final Plat, and the approved HOA
documents must be recorded concurrently with the recording of the Final Plat;
2. Establishment of a Performance Bond for roads, drainage and erosion control;
3. Establishment of a P erformance Bond for water improvements in favor of
Nolensville/College Grove Utility District;
Item 32—Page 3 of 3
Reviewer: AVH
Date: 4-09-2026
4. Per the recommendation of the County’s Wastewater Consultant, establishment of
a Performance Bond for the Treatment and Disposal System and the W astewater
Collection System;
5. Submission of landscaping plans and establishment of a Performance Bond for
landscaping;
6. Execution of Performance Agreements for the above referenced sureties;
7. Execution of a Stormwater Maintenance Agreement and submission of an
Operation and Maintenance Plan for stormwater improvements; and
8. Submission of the approved Final Plat in .dwg format on recordable media based
on the Tennessee State Plane Coordinate System prior to signature and recording
of the plat.
COVER
C000 Willowstone Estates
Clovercroft Rd.,
Williamson Co. TN
NOT FOR
CONSTRUCTION
This Line Is 3 Inches When Printed Full Size
October 27, 2025
WILSON
ENGINEERING
INC.
CIVIL DESIGN SITE PLANNING
VICINITY MAP
NOT TO SCALE
Willowstone Estates
Concept Plan
Conservation Subdivision
9553 Clovercroft Rd.
Williamson County
Franklin, TN 37067
Parcel(s) ID: 081 00600 & 081 01201
PROJECT ID: 1917950
WEI PROJECT NO. 2025.06
CIVIL ENGINEER
Wilson Engineering, Inc.
2132 English Garden Way
Thompsons Station, TN 37179
Contact: Jeffrey Wilson
Phone: (615) 686-9571
Email: jeff@wilson-engineering.net
SHEET LIST
C000 COVER
C101 EXISTING SITE
C201 SITE LAYOUT
C202 SITE LAYOUT
SURVEYOR
JTA Land Surveying, Inc.
260
Elm Hill Pike. Suite K
Nashville, TN 37214
Civil Contact: Greg Terry, RLS
Phone: (615) 490-6920
Email: gregt.jta@comcast.net
Owner Contact: Jim Hysen
Phone: (615) 260-3163
Email: jim@landvenues.com
OWNER / DEVELOPER
Jim Hysen
SITE
NOTES:
1. THE DEVELOPER HAS UTILIZED REASONABLE MEANS TO NOTIFY THE OPERATOR OF
THE NATURAL GAS TRANSMISSION PIPELINE TO VERIFY THE LOCATION OF THE
PIPELINE AND THE PIPELINE EASEMENT. THE DEVELOPER HAS REVIEWED, OR
ATTEMPTED TO REVIEW PRELIMINARY INFORMATION ABOUT THE PROPOSED
DEVELOPMENT WITH THE PIPELINE OPERATOR
2. TRAFFIC IMPACT STUDY NOT REQUIRED: PER THE ITE'S 12 EDITION OF THE TRIP
GENERATION MANUAL, THE 40 SFR LOTS WILL GENERATE APPROXIMATELY 41 TRIPS
IN THE PM PEAK HOUR (SEE SCREENSHOT BELOW). WHEN DIVIDING THAT BY 204
ACRES, YOU GET NEARLY EXACTLY 0.2 TRIPS/ACRE. SECTION 17.13.A OF THE
ZONING ORDINANCE EXEMPTS ALL RESIDENTIAL USE TYPES GENERATING 0.2 PEAK
HOUR TRIPS OR LESS PER ACRE
3. MINIMUM 5 FT. DRAINAGE EASEMENT ON ALL SIDE AND REAR LOT LINES UNLESS
OTHERWISE INDICATED
SITE DATA TABLE
Property Information
Parcel 1: 9553 Clovercroft Rd. ID: 081 00600
Parcel 2: 1780 Molly Hollow Rd.ID: 081 01201
Existing Site Area (Both Parcels): 203.59 Acres
Proposed Site Area:185.05 Acres
Current Zoning:RD-5 Rural Development (Conservation)
FEMA Flood Panel Map: FIRM 47187C0240F (Zone X)
Dated: 9/29/2006
ATTACHMENT 32-1A
N23°38'21"W
326.56'
N46°15'45"W210.59'
N25°41'08"W207.33'
N18°06'35"W111.79'
N31°57'22"W272.50'
N05°47'43"E
1096.36'
N06°24'30"E
376.27'
S75°00'12"W
345.50'
N83°29'52"W
910.77'
S41°44'46"W
94.80'
S28°30'46"W
238.35'
S43°29'25"W
257.28'
Parcel 33.00
Tax Map 81-G, Group "A"
OPEN SPACE "D"
CLOVERCROFT PRESERVE SUBDIVISION
SECTION 2
Plat Book P69, Page 150,
R.O.W.C., Tennessee
R.O.W.C., Tennessee
Plat Book P69, Page 150,
SECTION 2
CLOVERCROFT PRESERVE SUBDIVISION
OPEN SPACE "D"
Tax Map 81-G, Group "A"
Parcel 33.00
Parcel 8.01.00
Tax Map 81
HELEN GATLIN
Deed Book 5524, Page 723,
R.O.W.C., Tennessee
JESSIE & FRANKIE SHACKLETT
MARK B. & TAILYN L. McNEAL
SECTION 1
SUBDIVISION
OPEN SPACE "B"
CLOVERCROFT PRESERVE
OPEN SPACE
151 152
149150
"B"
CLOVERCROFT PRESERVE
Parcel 66.00
Tax Map 81-B, Group "C"
OPEN SPACE "C"
SUBDIVISION
SECTION 1
Plat Book P63, Page 142,
R.O.W.C., Tennessee
BARRED OWL DRIVE
R.O.W.C., Tennessee
Plat Book P63, Page 142,
SECTION 1
SUBDIVISION
OPEN SPACE "C"
Tax Map 81-B, Group "C"
Parcel 66.00
CLOVERCROFT PRESERVE
Tax Map 81-B, Group "C"
Parcel 65.00
Parcel 50.00
Tax Map 81-B
Group "C" Group "C"
Tax Map 81-B
Parcel 49.00
Parcel 51.00
Tax Map 81-B
Group "C" Group "C"
Tax Map 81-B
Parcel 52.00
POND
POND
POND
S83°58'39"E
984.38'
Delta=03°23'03"
R=2894.79'
L=170.97'
T=85.51'
S85°43'01"E
Chd.=170.95'
370.44'
S09°23'49"E
370.16'
S20°39'52"E
428.27'
S20°39'52"E
428.27'
POND
POINT OF BEGINNING
PROPERTY DESCRIPTION
CLOVERCROFT ROAD
(Right-Of-Way Width Varies)
S87°24'32"E
372.30'
Delta=22°38'28"
R=645.00'
L=254.88'
T=129.12'
N81°16'13"E
Chd.=253.22'
S02°42'02"E481.36'
S07°25'55"E
204.00'
S08°40'12"W
49.25'
S09°49'52"E
74.56'
S26°25'52"E
108.03'
S11°09'42"W
87.07'
S30°14'46"W
153.37'
PARCEL 6.00
TAX MAP 81
CONSTANCE LYNNE WOOLSEY,
TRUSTEE, OF THE CONSTANCE
LYNNE WOOLSEY TRUST
BOOK 9328, PAGE 408,
R.O.W.C., TENNESSEE
ADDRESS: 9553 CLOVERCROFT ROAD
AREA: 4,326,526 SQUARE FEET OR 99.32 ACRES ±
PARCEL 6.00
TAX MAP 81
CONSTANCE LYNNE WOOLSEY,
TRUSTEE, OF THE CONSTANCE
LYNNE WOOLSEY TRUST
BOOK 9328, PAGE 408,
R.O.W.C., TENNESSEE
ADDRESS: 9553 CLOVERCROFT ROAD
AREA: 4,326,526 SQUARE FEET OR 99.32 ACRES ±
MAYES CREEK
MAYES CREEK
MAYES CREEK
Parcel 8.01.00
Tax Map 81
HELEN GATLIN
Deed Book 5524, Page 723,
R.O.W.C., Tennessee
CONSTANCE LYNNE WOOLSEY,
TRUSTEE, OF THE CONSTANCE
LYNNE WOOLSEY TRUST PROPERTY
19TH CIVIL DISTRICT OF WILLIAMSON COUNTY
WWWWWWWWW
W
W
W
WW
W
W
W
W
W
W
W
W
W
W
W
W
1
2
*3
*4
*5
*6 *7
*8
*10
*11
*12
13
14
*15
*16
17
*18
*19
*20
*21
*22
*24
*25*23
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN SAN SAN SAN SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
*9
W
W
W
W
W
W
W
W
W
W
W
W
W
OPEN SPACE AREA
(UNDISTURBED) 121.72 AC
OPEN SPACE/DETENTION/
WATER QUALITY AREA 3.72 AC.
PROPERTY LINE
LEGEND
STREAM BUFFER 50'
FROM TOP OF BANK
INTERIOR OPEN SPACE
AREA 19.62 AC.
OPEN SPACE AREA AROUND
STREAM BUFFER 8.37 AC.
ROW AND ADJACENT
LOT BUFFERS
LOTS 1 ACRE OR
GREATER
Willowstone Estates
Clovercroft Rd.,
Williamson Co. TN
NOT FOR
CONSTRUCTION
This Line Is 3 Inches When Printed Full Size
October 27, 2025
WILSON
ENGINEERING
INC.
CIVIL DESIGN SITE PLANNING
0
GRAPHIC SCALE
150150300
C201
SITE LAYOUT
OPEN SPACE AREA
(UNDISTURBED)
121.72 AC.
50' WNA BUFFER
WASTEWATER CONNECTION TO
ADJACENT NEIGHBORHOOD ON
BARRED OWL DR.
OPEN AREA WITHIN
STREAM BUFFER:
8.37 ACRES
CLOVERCROFT RD.
OPEN AREA AROUND
EXISTING POND/ AREA:
2.94 ACRES
PARCEL 1: 99.32 ACRES
BARRED OWL DR.
OPEN SPACE:
8.35 ACRES
OPEN AREA AROUND
STREAM BUFFER:
2.26 ACRES
50' WNA BUFFER
ROW BUFFER
ROW BUFFER
MAYES CREEK
DETENTION AREA:
2.00 ACRES
POND
DETENTION AREA:
1.72 ACRES
APPROXIMATE
T.O.B.
OPEN SPACE
6.07ACRES
250'
150'
OPEN AREA WITHIN
STREAM BUFFER:
8.37 ACRES
40' ROW
TYP.
40' ROW
TYP.
40' ROW
TYP.FIRE HYDRANT
150' ADJACENT
LOT BUFFER
150' ADJACENT
LOT BUFFER
LANDSCAPE
BUFFER
LANDSCAPE
BUFFER
LANDSCAPE
BUFFER
LANDSCAPE
BUFFER
LANDSCAPE
BUFFER
ARBORVALE LANE
ARBORVALE LANE
WATERSONG CT.
MOSSBROOK CT.
BUILDING ENVELOPES ARE CONCEPTUAL
AND SUBJECT TO CHANGE BASED ON
SOILS, SLOPES, ETC.
PROPERTY LINE TO BE
ABOLISHED WITH THE
CONSOLIDATION OF THE 2
PARCELS
SITE DATA TABLE
Address:9553 Clovercroft Rd.
City/State/Zip: Franklin, TN 37067
Parcel(s):081 00600 & 081 01201
Current Zoning: RD-5 Rural Development
(Conservation)
Setbacks:Front: 35'
Side: 10'
Rear: 30'
*Minimum 5 ft. drainage easement on all side
and rear lot lines unless otherwise indicated
FEMA Flood
Panel Map: FIRM 47187C0240F
(Zone X) Dated: 9/29/2006
OPEN SPACE ROAD FRONTAGE REQUIREMENTS
TOTAL ROAD LENGTH:3,810 L.F.
*40% OF ROAD FRONTAGE MUST
BORDER OPEN SPACE REQUIRED: 3,810 X 40% = 1,524 L.F.
TOTAL OPEN SPACE ROAD
FRONTAGE LENGTH PROVIDED:1,968 L.F.
EXISTING WET WETHER CONVEYANCE D-1, 25'
EASEMENT, ROUTE AND DESIGN TBD IN
PROPOSED CONDITIONS. REFERENCE NRP
REPORT FOR WATERWAY PROTECTION
STANDARDS
25'
25'
25'
EXISTING WET WETHER
CONVEYANCE D-2, 25'
EASEMENT TO REMAIN
EXISTING WET WETHER
CONVEYANCE D-3, 25'
EASEMENT TO REMAIN
NOTES:
1. THE DEVELOPER HAS UTILIZED REASONABLE MEANS TO NOTIFY THE OPERATOR OF THE NATURAL
GAS TRANSMISSION PIPELINE TO VERIFY THE LOCATION OF THE PIPELINE AND THE PIPELINE
EASEMENT. THE DEVELOPER HAS REVIEWED, OR ATTEMPTED TO REVIEW PRELIMINARY
INFORMATION ABOUT THE PROPOSED DEVELOPMENT WITH THE PIPELINE OPERATOR
2. TRAFFIC IMPACT STUDY NOT REQUIRED: PER THE ITE'S 12 EDITION OF THE TRIP GENERATION
MANUAL, THE 40 SFR LOTS WILL GENERATE APPROXIMATELY 41 TRIPS IN THE PM PEAK HOUR.
WHEN DIVIDING THAT BY 204 ACRES, YOU GET NEARLY EXACTLY 0.2 TRIPS/ACRE. SECTION 17.13.A
OF THE ZONING ORDINANCE EXEMPTS ALL RESIDENTIAL USE TYPES GENERATING 0.2 PEAK HOUR
TRIPS OR LESS PER ACRE
3. MINIMUM 5 FT. DRAINAGE EASEMENT ON ALL SIDE AND REAR LOT LINES UNLESS OTHERWISE
INDICATED
4. ALL SANITARY MAINS TO BE 4" UNLESS OTHERWISE NOTED.
250'
BUILDING ENVELOPES ARE CONCEPTUAL
AND SUBJECT TO CHANGE BASED ON
SOILS, SLOPES, ETC.
150'
150'
25'
DECORATIVE ENTRANCE
WITH MEDIAN
25'
PARCEL 1: 081 00600 (99.32 AC.) & PARCEL 2: 081 01201 (104.27 AC.)
EXISTING SITE AREA:203.59 AC.
PROPOSED SITE AREA:185.05 AC.
PROPOSED OPEN SPACE AREAS:
INTERIOR AND PERIMETER BUFFER
OPEN SPACE (PURPLE):19.62 AC.
AREA AROUND STREAM BUFFER (MAGENTA): 8.37 AC.
DETENTION AREA (ORANGE)3.72 AC.
OPEN SPACE UNDISTURBED
(STRIPED RED):121.72 AC.
*TOTAL OPEN SPACE AREA:153.43 AC.
TOTAL OPEN SPACE/ TOTAL ACREAGE = % OPEN SPACE
152.31 AC / 185.05 AC =
OPEN SPACE: 82.9% OF THE TOTAL SITE
* NOTE:
AN ENGINEERED SITE PLAN WILL BE PROVIDED FOR LOTS WHERE MODERATELY STEEP SLOPES (15%-25%) ARE LOCATED ON THE LOT
150'
150'
STEEP SLOPES PROTECTION STANDARDS:
- ALL VERY STEEPS SLOPES WITHIN OPEN SPACE
WILL REMAIN UNDEVELOPED.
- MODERATELY STEEP SLOPES WILL BE
DESIGNED/ENGINEERED PER WILLIAMSON CO.
REGULATIONS AND WILL BE PRESENTED FOR
REVIEW AND APPROVAL DURING SITE PLAN AND
ENGINEERING REVIEW STAGES OF THE
PROJECT.
- FOR THE LOTS ON THE SOUTHERN PORTION
THAT ARE AFFECTED BY BOTH “MODERATE” AND
“VERY STEEP SLOPES (GREATER THAN 25%) THE
MODERATE PORTIONS WILL BE DESIGNED AND
ENGINEERED PER WILLIAMSON CO.
REGULATIONS, AND THE VERY STEEP PORTIONS
(GREATER THAN 25%), ARE EXCLUDED FROM
BUILDING ENVELOPES AND LAND DISTURBANCE
ACTIVITIES AND SHALL REMAIN IN THEIR
NATURAL AND UNDISTURBED CONDITIONS.
SLIPPAGE SOILS
SLIPPAGE SOILS SHALL BE THOSE WHERE THE
PARENT MATERIAL IS COLLUVIUM, E.G., DELROSE
AS CLASSIFIED BY THE NATURAL RESOURCES
CONSERVATION SERVICE (NRCS).
SEE NRCS MAP REFERENCE IN HYDROLOGIC
DETERMINATION FOR DELROSE SOILS AREAS
LOCATED IN THE SOUTH AND SOUTHEASTERN
CORNER OF THE EXISTING SITE. PRELIMINARY
INVESTIGATION HAS BEEN DONE AND HAS
IDENTIFIED AREAS OF POTENTIAL SLIPPAGE (SEE
EXHIBIT B) IN RNP REPORT.
SLIPPAGE SOILS PROTECTION STANDARDS
- AREAS IDENTIFIED AS SLIPPAGE SOILS WITH 15%
OR GREATER SOILS HAVE BEEN DESIGNATED AS
“OPEN SPACE”.
OPEN SPACE PROTECTION STANDARDS:
- PER THE SITE'S RD-5 ZONING CONSERVATION
SUBDIVISION STANDARD OUR PROPOSED SITE IS
PROVIDING 82.9% OF GROSS SITE AREA
DESIGNATED AS “OPEN SPACE” 153.43 OPEN
SPACE ACRES/185.05 TOTAL ACRES = 0.829 =
82.9%
WATERWAY PROTECTION STANDARDS:
- THE CONCEPT SITE PLAN PROPOSED FOR THE
FOLLOWING WNA'S OF MAYES CREEK, WWC D-2,
WWC AND D-3 TO REMAIN UNTOUCHED AND
PRESERVED IN THE PROPOSED CONDITIONS.
- FOR WWC D-1, WE ARE LEAVING ROUGHLY +/-
1/3RD (450') IN IT'S EXISTING CONDITIONS, WHILE
REROUTING THE OTHER 2/3RDS OF THE WWC TO
IT'S OUTFALL VIA DESIGNED DITCH/SWALE,
STORMWATER INFRASTRUCTURE, OR ANY
ENGINEERED REROUTING PLAN THAT MEETS
WILLIAMSON COUNTY STORMWATER
REGULATIONS. THE PROPOSED REROUTING OF
WWC D-1 WILL LOCATED APPROPRIATELY AND
WILL NOT BE PLACED WITHIN BUILDING
ENVELOPES AND WILL HAVE APPROPRIATE
DRAINAGE BUFFERS AND EASEMENTS APPLIED
PER WILLIAMSON COUNTY STORMWATER
REGULATIONS.
4" SANITARY
LINE, TYP.
4" SANITARY
LINE, TYP.
FIRE HYDRANT
FIRE HYDRANT
R48'
R48'
FIRE HYDRANT
40'
40'40'
ATTACHMENT 32-1B
N23°38'21"W
326.56'
N46°15'45"W210.59'
N25°41'08"W207.33'
N18°06'35"W111.79'
S75°00'12"W
345.50'
N83°29'52"W
910.77'
S41°44'46"W
94.80'
S28°30'46"W
238.35'
S43°29'25"W
257.28'
Parcel 33.00
Tax Map 81-G, Group "A"
OPEN SPACE "D"
CLOVERCROFT PRESERVE SUBDIVISION
SECTION 2
Plat Book P69, Page 150,
R.O.W.C., Tennessee
R.O.W.C., Tennessee
Plat Book P69, Page 150,
SECTION 2
CLOVERCROFT PRESERVE SUBDIVISION
OPEN SPACE "D"
Tax Map 81-G, Group "A"
Parcel 33.00
JESSIE & FRANKIE SHACKLETT
MARK B. & TAILYN L. McNEAL
S11°09'42"W
87.07'
S30°14'46"W
153.37'
PARCEL 6.00
TAX MAP 81
CONSTANCE LYNNE WOOLSEY,
TRUSTEE, OF THE CONSTANCE
LYNNE WOOLSEY TRUST
BOOK 9328, PAGE 408,
R.O.W.C., TENNESSEE
ADDRESS: 9553 CLOVERCROFT ROAD
AREA: 4,326,526 SQUARE FEET OR 99.32 ACRES ±
MAYES CREEK
Parcel 8.01.00
Tax Map 81
HELEN GATLIN
Deed Book 5524, Page 723,
R.O.W.C., Tennessee
BOUNDARY SURVEY
CONSTANCE LYNNE WOOLSEY,
TRUSTEE, OF THE CONSTANCE
9553 CLOVERCROFT ROAD
CITY OF FRANKLIN, TENNESSEE
19TH CIVIL DISTRICT OF WILLIAMSON COUNTY
DATE: AUGUST 20, 2025
SCALE: 1"=100'
Prepared By:
JTA LAND SURVEYING, INC.
3384 N Mt Juliet Road, Ste 900
Mt Juliet, Tennessee 37122
Phone: (615) 490-6920Job Number: 2025-313
Sheet 1 Of 2
LYNNE WOOLSEY TRUST PROPERTY
W
*18
SAN
OPEN SPACE AREA
(UNDISTURBED) 120.26 AC
OPEN SPACE/DETENTION/
WATER QUALITY AREA 4.08 AC.
PROPERTY LINE
LEGEND
STREAM BUFFER 50'
FROM TOP OF BANK
INTERIOR OPEN SPACE
AREA 19.60 AC.
OPEN SPACE AREA AROUND
STREAM BUFFER 8.37 AC.
ROW AND ADJACENT
LOT BUFFERS
LOTS 1 ACRE OR
GREATER
0
GRAPHIC SCALE
200'200'400'
C202
SITE LAYOUT
PARCEL 1: 99.32 ACRES
MOLLY HOLLOW RD.
Clovercroft,
Williamson Co. TN
NOT FOR
CONSTRUCTION
This Line Is 3 Inches When Printed Full Size
October 27, 2025
WILSON
ENGINEERING
INC.
CIVIL DESIGN SITE PLANNING
25'
PARCEL 2: 104.71 ACRES
TRACT 1 OF
PARCEL: 081 01201 00019081, DEED
BOOK: 8956, PAGE: 336
AREA: 18.54 ACRES
TO BE DIVIDED AND DEVELOPED
SEPARATELY
OPEN SPACE AREA
(UNDISTURBED)
120.26 AC.
PROPERTY LINE TO BE
ABOLISHED WITH THE
CONSOLIDATION OF THE 2
PARCELS
Willowstone Estates
Clovercroft Rd.,
Williamson Co. TN
121.72 AC.
121.72 AC.
3.72 AC.
19.62 AC.
ATTACHMENT 32-1C
ATTACHMENT 32-2
Item 33—Page 1 of 1
Reviewer: OCW
Date: 4-09-2026
ITEM 33
PRELIMINARY PLAT REVIEW FOR JOYBELLE ESTATES SUBDIVISION,
CONTAINING 12 LOTS ON 110.1 ACRES LOCATED OFF EUDAILEY COVINGTON
ROAD IN THE 2ND VOTING DISTRICT (1-2026-304).
Area 110.1 acres
Zoning Rural Development – 5 (RD-5)
Lots 12
Water Milcrofton Utility District
Sewer Individual On-Site Septic Systems
Development Options Major Traditional Subdivision
File Number (1-2026-304)
At this time, the applicant is r equesting deferral to the May 2026 Planning Commission
Meeting in order to allow the applicant more time to address Staff comments. Staff
concurs with this request.
Item 34—Page 1 of 1
Reviewer: LS
Date: 4-09-2026
ITEM 34
PRELIMINARY PLAT REVIEW FOR 8828 HORTON HIGHWAY,
CONTAINING 5 LOTS ON 28.01 ACRES LOCATED OFF HORTON HIGHWAY
IN THE 2ND VOTING DISTRICT (1-2025-334)
Area 28.01 acres
Zoning College Grove Village (CGV)
Lots 5
Water Nolensville/College Grove Utility District
Sewer Individual On-Site Septic Systems
Development Option Large Lot Easement
Chapter 1101 Status Rural
Map and Parcel 158---04302
File Number (1-2025-334)
At this time, the applicant is requesting deferral to the May 2026 Planning
Commission Meeting in order to allow the applicant more time to address Staff
comments. Staff concurs with this request.
Item 35—Page 1 of 2
Reviewer: OCW
Date: 4-09-2026
ITEM 35
FINAL PLAT REVIEW (REVISED) FOR TALIAFERRO SUBDIVISION,
CONTAINING 27 LOTS ON 196.93 ACRES LOCATED OFF TALIAFERRO ROAD IN
THE 5TH VOTING DISTRICT (1-2026-404).
Attachment 35-1 Final Plat
35-2 Aerial Photograph
Area 196.63 acres
Lots 27
Zoning Rural Development – 5 (RD-5)
Water Nolensville/College Grove Utility District
Sewer Nontraditional Wastewater Treatment and Disposal System
Development Option Conservation Subdivision
Chapter 1101 Status Rural
File Number (1-2026-404)
A Final Plat for this sub division containing twenty -seven (27) lots was approved at the
June 2025 Planning Commission meeting, and now the applicant is re questing Revised
Final Plat approval of the development in order to make the roadways private and
establish an Entrance Gate. No additional lots are proposed. Staff recommends approval
of the Revised Final Plat with the following conditions:
1. The approved HOA documents must be recorded concurrently with the recording
of the Final Plat;
2. Establishment of a Performance Bond for roads, drainage and erosion control in
the amount of $1,122,000, this amount is based on work completed;
3. Per the recommendation of the County’s Wastewater Consultant, establishment of
a Performance Bond for the wastewater collection system in the amount of
$100,200;
4. Posting of a Performance Bond in the amount of $317,500 for water improvements
as specified by Nolensville College Grove Utility District;
5. Establishment of a performance bond for landscaping in the amount of $31,410;
6. Execution of Performance agreements for the above referenced sureties;
Item 35—Page 2 of 2
Reviewer: OCW
Date: 4-09-2026
7. Execution of a Stormwater Maintenance Agreement and submission of an
Operation and Maintenance Plan for stormwater improvements; and
8. Providing two (2) copies of the approved Final Plat in .dwg format on recordable
media based on the Tennessee State Plane Coordinate System prior to signature
and recording of the Final Plat.
REVISED FINAL PLAT
SHEET
1 of 2
DATE
T-SQUARE
drawn by:
scale:
3-16-2026
date: NO. REVISIONS
reviewer:
T-SQUAREENGINEERING
111 SOUTHEAST PKWY CT ● FRANKLIN, TN ● 615-678-8212 ● www.T2-eng.com
TALIAFERRO SUBDIVISION
SroMect
19-0904 8496 TALIAFERRO ROAD
EAGLEVILLE, TN 37060
MAP 137, PARCEL 035.00
WILLIAMSON COUNTY, TENNESSEE
1" = 200'
3-16-261 REVISED PER COUNTY COMMENTS
3-16-2026
SITE
N.T.S.
LOCATION MAP
REVISED FINAL PLAT
FOR
TALIAFERRO SUBDIVISION
8496 Taliaferro ROAD
Map 137 Parcel 35
College Grove, Williamson County, Tennessee
(CONSERVATION SUBDIVISION)
RD-5 Zoning
GENERAL NOTES
1. THE PURPOSE OF THIS PLAT IS TO DEDICATE INTERNAL ROADS AS PRIVATE AND ADD A GATE TO THE
SUBDIVISION ENTRANCE.
2. THE PROPERTY SHOWN HEREON IS LOCATED WITHIN WILLIAMSON COUNTY, TN. ALL MATTERS
PERTAINING TO CONSTRUCTION, USE, LOCATION OF IMPROVEMENTS, SIGNAGE, PARKING, NOISE,
VIBRATION, EMISSIONS, FIRE HAZARDS, RADIATION, ILLUMINATION, SETBACK PROVISIONS, ETC. ARE
SUBJECT TO WILLIAMSON COUNTY'S ZONING REGULATIONS AS INTERPRETED AND REGULATED BY THE
DEPARTMENT OF COMMUNITY DEVELOPMENT.
3. SUBJECT PROPERTY IS PARCEL 35.00, AS SHOWN ON WILLIAMSON COUNTY TAX MAP 137.
4. SUBJECT PROPERTY IS OWNED BY McCANLESS & COMPAY AS REFERENCED IN DEED BOOK 422, PAGE
944, REGISTER'S OFFICE OF WILLIAMSON COUNTY, TN.
5. THE HORIZONTAL LOCATION DATA SHOWN ON THIS SURVEY WAS GATHERED USING STANDARD RADIAL
SURVEYING TECHNIQUES WITH AN ELECTRONIC TOTAL STATION AND DATA COLLECTOR AND IS BASED
UPON A POSITIONAL SOLUTION DERIVED FROM GLOBAL POSITIONING SYSTEM (GPS) OBSERVATIONS)
USING THE TDOT NETWORK. TENNESSEE STATE PLANE COORDINATE SYSTEM ZONE 4100, NAD83.
DRONE AERIAL PHOTOMETRY WAS ALSO USED TO SURVEY SOME ELEMENTS.
6. THIS FINAL PLAT WAS PREPARED WITHOUT BENEFIT OF A CURRENT TITLE SEARCH. PROPERTY IS
SUBJECT TO ANY OR ALL RESTRICTIONS OR EASEMENTS, OF RECORD OR BY PRESCRIPTION, THAT A
COMPLETE TITLE SEARCH MAY REVEAL.
7. BY SCALED MAP LOCATION AND GRAPHIC PLOTTING ONLY, THIS PROPERTY LIES WITHIN FLOOD ZONE
"X", AS DESIGNATED ON CURRENT FEDERAL EMERGENCY MANAGEMENT AGENCY MAP NO.
47187C0385G, WITH AN EFFECTIVE DATE OF 12/20/2024, WHICH IS THE CURRENT FLOOD INSURANCE
RATE MAP FOR THE COMMUNITY IN WHICH SAID PREMISES IS SITUATED.
8. THIS PROPERTY IS ZONED RURAL DEVELOPMENT DISTRICT 5 (RD-5).
9. THIS MAP OR PLAT AND THE SURVEY ON WHICH IT IS BASED WERE MADE IN ACCORDANCE WITH THE
REQUIREMENTS OF A GENERAL PROPERTY SURVEY AND CONFORMS TO THE ACCURACY OF A
CATEGORY 1 SURVEY AS CURRENTLY DEFINED AND ADOPTED BY THE TENNESSEE STATE BOARD OF
EXAMINERS FOR LAND SURVEYORS, AND THE RATIO OF PRECISION IS LESS THAN 1:10,000.
10.IT IS THE RESPONSIBILITY OF THE BUILDER TO DESIGN AND CONSTRUCT A SUITABLE GRADING AND
DRAINAGE SCHEME WHICH WILL CONVEY SURFACE WATER, WITHOUT PONDING ON THE LOT OR UNDER
THE HOUSE, FROM THE BUILDING SITE TO THE DRAINAGE SYSTEM CONSTRUCTED BY THE SUBDIVISION
DEVELOPER.
11.THIS PROPERTY HAS BEEN REVIEWED FOR THE EXISTENCE OF INTERMITTENT AND PERENNIAL
STREAMS. STREAMS THAT WOULD REQUIRE WATERWAY NATURAL AREAS AS DESCRIBED IN SECTION 4
OF THE WILLIAMSON COUNTY STORMWATER MANAGEMENT REGULATIONS HAVE BEEN LOCATED AS
SHOWN.
12. WITHIN THE WATERWAY NATURAL AREA, THERE SHALL BE NO CLEARING, GRADING, CONSTRUCTION
OR DISTURBANCE OF VEGETATION EXCEPT AS PERMITTED BY THE WILLIAMSON COUNTY ENGINEERING
DEPARTMENT.
13.THE RECORDING OF THIS PLAT VOIDS, VACATES, AND SUPERCEDES THE PLAT FOR TALIAFERRO
SUBDIVISION RECORDED IN PLAT BOOK 86, PAGE 69, R.O.W.C.
CERTIFICATE OF APPROVAL OF ELECTRIC UTILITY SYSTEM
MIDDLE TENNESSEE ELECTRIC MEMBERSHIP CORPORATION (MTE) WILL PROVIDE ELECTRIC
SERVICE TO THE SUBJECT PROPERTY ACCORDING TO THE NORMAL OPERATING PRACTICES OF
MTE AS DEFINED IN THE RULES AND REGULATIONS, BYLAWS, POLICY BULLETINS AND
OPERATIONAL BULLETINS OF MTE, AND IN ACCORDANCE WITH THE PLAT APPROVAL CHECKLIST,
TREE PLANTING GUIDELINES AND OTHER REGULATIONS CONTAINED ON THE MTE WEBSITE AT
WWW.MTE.COM (COLLECTIVELY THE "REQUIREMENTS"). NO ELECTRIC SERVICE WILL BE
PROVIDED UNTIL MTE'S REQUIREMENTS HAVE BEEN MET AND APPROVED IN WRITING BY AN
AUTHORIZED REPRESENTATIVE OF MTE. ANY APPROVAL IS, AT ALL TIMES, CONTINGENT UPON
CONTINUING COMPLIANCE WITH MTE'S REQUIREMENTS.
__________, 20____ __________________________________________
DATE MIDDLE TENNESSEE ELECTRIC
CERTIFICATE OF SURVEY ACCURACY
I HEREBY CERTIFY THAT THE PLAN SHOWN AND DESCRIBED HEREON IS A TRUE AND CORRECT
SURVEY TO THE ACCURACY REQUIRED BY THE WILLIAMSON COUNTY, TENNESSEE REGIONAL
PLANNING COMMISSION AND THAT THE MONUMENTS HAVE BEEN OR WILL BE PLACED AS
SHOWN HEREON, TO THE SPECIFICATIONS OF THE SUBDIVISION REGULATIONS, AS APPROVED
BY THE COUNTY ENGINEER.
__________, 20____ ___________________________________
DATE MARK CANTRELL, R.L.S
CERTIFICATE OF APPROVAL FOR ADDRESSES
I DO HEREBY CERTIFY THAT THE ADDRESSES DENOTED ON THIS FINAL PLAT ARE THOSE
ASSIGNED BY THE DEPARTMENT OF INFORMATION TECHNOLOGY (IT).
__________, 20____ __________________________________________
DATE IT DEPARTMENT
CERTIFICATE OF APPROVAL OF WATER SYSTEMS
I HEREBY CERTIFY THAT THE FOLLOWING UTILITY SYSTEMS OUTLINED OR INDICATED ON THE
FINAL SUBDIVISION PLAT ENTITLED "TALIAFERRO SUBDIVISION" HAVE BEEN INSTALLED IN
ACCORDANCE WITH CURRENT LOCAL AND/OR STATE GOVERNMENT REQUIREMENTS OR THAT
A SURETY BOND HAS BEEN POSTED WITH THE PLANNING COMMISSION TO ASSURE
COMPLETION OF ALL REQUIRED IMPROVEMENTS IN CASE OF DEFAULT. ADDITIONALLY, I
CERTIFY THAT THE HYDRAULIC DESIGN CRITERIA SPECIFIED IN SECTION 3.05 OF THE
WILLIAMSON COUNTY SUBDIVISION REGULATIONS HAVE BEEN MET.
__________,
20____ __________________________________________
DATE NOLENSVILLE COLLEGE GROVE UTILITY DISTRICT
CERTIFICATE OF APPROVAL OF STREETS
I HEREBY CERTIFY THAT ALL STREETS DESIGNATED ON THIS FINAL SUBDIVISION PLAT HAVE BEEN
INSTALLED IN AN ACCEPTABLE MANNER AND ACCORDING TO WILLIAMSON COUNTY ROADWAY AND
DRAINAGE REGULATIONS OR THAT A SURETY BOND HAS BEEN POSTED WITH THE WILLIAMSON COUNTY
PLANNING COMMISSION TO ASSURE COMPLETION OF ALL STREET IMPROVEMENTS IN CASE OF DEFAULT.
__________,
20____ __________________________________________
DATE COUNTY ENGINEER
__________, 20____ __________________________________________
DATE COUNTY ROAD SUPERINTENDENT
CERTIFICATE OF APPROVAL FOR RECORDING
I HEREBY CERTIFY THAT THE SUBDIVISION PLAT SHOWN HEREON HAS BEEN FOUND TO COMPLY WITH
THE SUBDIVISION REGULATIONS FOR WILLIAMSON COUNTY, TENNESSEE, WITH THE EXCEPTION OF SUCH
VARIANCES, IF ANY, AS ARE NOTED IN THE MINUTES OF THE PLANNING COMMISSION, AND THAT IT HAS
BEEN APPROVED FOR THE RECORDING IN THE OFFICE OF THE COUNTY REGISTER.
__________, 20____ __________________________________________
DATE SECRETARY, PLANNING COMMISSION
THIS APPROVAL SHALL BE INVALID IF NOT RECORDED BY _____________
DATE
CERTIFICATE OF OWNERSHIP AND DEDICATION
I (WE) HEREBY CERTIFY THAT I AM (WE ARE) THE OWNER(S) OF THE PROPERTY SHOWN AND
DESCRIBED HEREON AS EVIDENCED IN BOOK 422, PAGE 944 WILLIAMSON COUNTY REGISTER'S
OFFICE, AND THAT I (WE) HEREBY ADOPT THIS PLAN OF SUBDIVISION WITH MY (OUR) FREE
CONSENT, ESTABLISH THE MINIMUM BUILDING RESTRICTION LINE, AND THAT OFFERS OF
IRREVOCABLE DEDICATION FOR ALL PUBLIC WAYS, UTILITIES AND OTHER FACILITIES HAVE BEEN
FILED AS REQUIRED BY THESE REGULATIONS.
__________, 20____ ___________________________________
DATE OWNER
__________, 20____ ___________________________________
DATE OWNER
CERTIFICATE OF APPROVAL OF SUBDIVISION NAME & STREET NAMES
I DO HEREBY CERTIFY THAT THE SUBDIVISION NAME AND STREET NAMES DENOTED ON THIS
FINAL PLAT HAVE BEEN APPROVED BY THE WILLIAMSON COUNTY EMERGENCY MANAGEMENT
AGENCY (EMA).
__________, 20____ ___________________________________ ____________
DATE EMA DEPARTMENT TITLE/DEPT.
OR AUTHORIZED IT REPRESENTATIVE
3-16 26
UTILITY CERTIFICATION OF THE APPROVAL OF SEWER SYSTEM
I (WE) HEREBY CERTIFY THAT THE SEWAGE TREATMENT AND COLLECTION SYSTEM PROPOSED FOR
INSTALLATION, ALONG WITH ACCESS TO MAINTAIN THE COLLECTION SYSTEM AND ALL SYSTEM
COMPONENTS, AND REQUIRING ALL HOMES ON THIS PLAT TO CONNECT TO THE SUPERIOR WASTEWATER
SYSTEMS SYSTEM, FULLY MEETS THE REQUIREMENTS OF TWS, AND IS HEREBY APPROVED AS SHOWN.
__________, 20____ ___________________________________________________
DATE APPROVING AGENT, SUPERIOR WASTEWATER SYSTEMS
__________, 20____ ___________________________________________________
DATE APPROVING AGENT, SUPERIOR WASTEWATER SYSTEMS
ATTACHMENT 35-1A
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X
X
X X
X
X X X
X
X X
X
X X
X
X X X
X
X X
X
X X X
X X X
X
X
X
X
X
X
X
X
X
X
X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X X X
X
X
X X X X X X
X X
X X
X X
X X
X X X X X X X X X
X
X
X
X
X
X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X
X
X X
X
X X X
X
X X
X
X X
X
X X X
X
X X
X
X X X
X X X
X
X
X
X
X
X
X
X
X
X
X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X X X
X
X
X X X X X X
X X
X X
X X
X X
X X X X X X X X X
X
X
X
X
X
X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
TALIAFERRO ROAD (50' R.O.W.)
NELSON CREEK (TYPICAL)
JACQUNETTE MURRAY
MAP 140, PARCEL 13
DEED BK 5974, PG 113
JERRY RUSSELL
MAP 140, PARCEL 12
DEED BK 2031, PG 294
MARY LOU JONES
MAP 137, PARCEL 33
JACQUNETTE MURRAY
MAP 137, PARCEL 32
DEED BK 5974, PG 113
MARVIN DEATON
MAP 140, PARCEL 15
DEED BK 2262, PG 641
ROBBIE MOORE
MAP 140, PARCEL 17.02
DEED BK 881, PG 135
JOSIE SCALES
MAP 140, PARCEL 17.03
DEED BK 881, PG 140
DONNITA SCALES
MAP 140, PARCEL 17
DEED BK 9458, PG 479
MCCANLESS INVESTMENTS
MAP 137, PARCEL 12
DEED BK 1463, PG 94
ASSESSED IN RUTHERFORD
COUNTY
AGGIE COVINGTON & TOM HEIRS
MAP 137, PARCEL 14
ARTHUR GRAVES
MAP 137, PARCEL 37
DEED BK 3268, PG 420
JENNIFER & PAUL GOLIN
MAP 137, PARCEL 36
DEED BK 8114, PG 730
MCCANLESS INVESTMENTS
MAP 137, PARCEL 17
DEED BK 1463, PG 96
JACQUNETTE MURRAY
MAP 137, PARCEL 32
DEED BK 5974, PG 113
SHANE & RENEE CASSIDY
MAP 137, PARCEL 19
DEED BK 7729, PG 792
X
X
X
X X
X
X
X
X
X
X
X
X X X X X X X X X X X X X X X
X X X
X
X
X
X
X
X
X X X
X
X X
X
X X X
X X
X
NELSON CREEK (TYPICAL)
IRON WILLOW PASS - 40' ROW (PRIVATE)
IRON WILLOW PASS - 40' ROW (PRIVATE)
ROYAL FOX ROAD - 40' ROW (PRIVATE)
FM-2''
FM-2''
FM-2''
FM-2''
FM-2''
FM-2''
FM-2''
FM-2''
FM-2''
FM-2''
FM-2''
FM-2''
FM-2''
FM-2''
FM-2''
STONE FARM TRAIL - 40' ROW (PRIVATE)
35' MBSL35' MBSL35' MBSL35' MBSL35' MBSL35' MBSL 35' MBSL
30' MBSL
30' MBSL
30' MBSL
30' MBSL
30' MBSL30' MBSL
35' MBSL
30' MBSL
35' MBSL 35' MBSL 35' MBSL35' MBSL
30' MBSL 30' MBSL
30' MBSL
30' MBSL
30' MBSL
30' MBSL
30' MBSL
30' MBSL
30' MBSL30' MBSL
30' MBSL
30' MBSL
30' MBSL
30' MBSL
30' MBSL
35' MBSL
35' MBSL
35' MBSL
35' MBSL
35' MBSL
35' MBSL 35' MBSL
35' MBSL
35' MBSL
35' MBSL
35' MBSL
35' MBSL
35' MBSL
30' MBSL
30' MBSL
30' MBSL
30' MBSL
35' MBSL
35' MBSL
10' MBSL
10' MBSL
10' MBSL10' MBSL
10' MBSL
10' MBSL10' MBSL
10' MBSL
10' MBSL
15' MBSL
10' MBSL
10' MBSL
10' MBSL10' MBSL
10' MBSL
10' MBSL10' MBSL
10' MBSL
10' MBSL 17.5' MBSL
17.5' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
17.5' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
17.5' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
10' MBSL
30' MBSL
10' MBSL
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W W W W W W
W
W
W
W
W
W W W W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W W
W
W
W W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W W
W
W
W
W
W W
W
W
W
W
W
W
W W
W W W W W W
W W
W W
W W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W W
W W W W W W
W W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W
W
W
W
W W
W W W W W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W W
W W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W W
W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W
W W W W W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W W
W
W
W
W
W
W W W
W
W
W
W
W
W
W
W W W
W
W
W
W W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W W
W
W
W
W
W
W W W
W
W
W
W
W
W W
W W W
W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W
W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W
W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W W
W W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W W
W
W W
W W
W
W
W
W
W
W W W W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W
W
W
W
W
W
W W
W
W W
W W
W
W W
W
W
W
W
W
W W
W
W W
W W
W
W W
W
W
W
W
W
W W
W W
W
W W
W
W
W
W W
W W
W
W W
W W
W
W
W
W W
W
W W
W W
W
W W
W
W
W
W W
W W
W
W W
W W
W
W W
W W
W
W W
W W
W W
W
W
W
W W
W
W W
W W
W
W W
W
W
W
W W
W W
W
W W
W W
W
W W
W W
W
W W
W W
W
W W
W
W
W
W W
W W
W
W
W
W W
W
W W
W W
W W
W
W W
W W
W
W W
W W
W
W W
W W
W
W W
W
W
W
W W
W W
W
W
W
W W
W
W W
W W
W
W
W
W W
W
W W
W W
W
W W
W W
W W
W
W W
W
W
W
W W
W W
W
W W
W W
W
W W
W W
W
W
W
W W
W
W W
W
W
W
W W
W
W
W W
W W
W
W W
W W
W
W W
W W
W
W W
W W
W W W
W W W W W
W W
W
W
W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W
6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W
6''W6''W6''W6''W6''W6''W
6''W6''W6''W6''W6''W
107
110 115
*
*
*
*
*
* *
L214
L52
L39
C6
L36
L37
L38L31C5
L32
L33
C4
L30
L17
L21L19
L18
L15
L14
L13
L10
L11
L7
L8
L6
L4
L5
L2
L3
L117
L116
L115
L120
L119
L118
L121
L122
L123
L124
L125
L126
L127
L128
L129
L130L131
L132
L133
L142
L141L140
L139
L138
L137
L136
L135
L134
L144
L143
L146
L145L145
L150
L151
L152
L147
L148
L149
L20
L23
L24
L25
L26
L27
L28
C3
L29
L35
C11
C10L46
L42
L43
L44
L45
L47
L48
C12
L49
L40
C7L41
L34
L9
L12
L16
C31
L158
C33
L159
C35 C37
L163
C39
L164C41
L167
C44
C45L170
C46
C47L173L174
C48
C49
L177
L178
C50
C51
L181
L182
L183
L184L185
L186
L187
L188
L189
L190
L191
L192L193
L194
L195
L196
L197
L198
L199
L200
L201
L202
L203
L204
L205
L206
L207
L208
L209
L210
L211
C52
L213C53
L216
L217
L218
L219
C54
L221
L222C55
L224
L225
L226
L227
L228
L229
L230
L231
L232
L233
L234
L235
L236
L237
L238
L239
L240
101
102
103
123
127
104
125
OS 3
126
124
105
106
OS 2
119
122
108
111 112 114113109
116
120
121 118
OS 4
117
OS 1
WW 5
WW 3
WW 2
WW 1
WW 4
5' PUDE
5' PUDE 5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE 5' PUDE 5' PUDE
5' PUDE
5' PUDE 5' PUDE 5' PUDE
5' PUDE
5' PUDE
5' PUDE5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE5' PUDE
5' PUDE
5' PUDE 5' PUDE 5' PUDE 5' PUDE 5' PUDE 5' PUDE 5' PUDE 5' PUDE
5' PUDE
5' PUDE
5' PUDE5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE
5' PUDE5' PUDE
5' PUDE
5' PUDE
L242
WW 6
L243
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
Parcel Line Table
Line #
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L16
L17
L18
L19
L20
L21
L23
L24
L25
L26
L27
L28
L29
L30
L31
L32
L33
Length
341.41
165.84
339.90
149.75
150.00
338.89
150.00
150.00
337.87
150.00
150.00
336.85
150.00
194.69
57.11
278.39
194.68
277.32
278.39
277.32
279.86
16.31
78.33
102.39
466.54
382.31
6.46
91.60
6.46
359.64
290.35
Direction
N84° 58' 02.65"W
N8° 07' 15.45"E
S82° 16' 02.11"E
S7° 43' 57.89"W
N8° 07' 15.45"E
S82° 16' 02.11"E
S7° 43' 57.89"W
S8° 07' 15.45"W
S82° 16' 02.11"E
N7° 43' 57.89"E
S8° 07' 15.45"W
N82° 16' 02.11"W
N7° 43' 57.89"E
S8° 07' 51.34"W
N82° 16' 02.11"W
S82° 16' 02.11"E
N7° 43' 57.89"E
S7° 43' 57.89"W
N82° 16' 02.11"W
N7° 43' 57.89"E
S38° 31' 33.80"E
S9° 02' 59.83"E
S66° 41' 56.53"E
S20° 21' 43.71"W
S78° 13' 22.29"W
N6° 32' 13.66"W
N5° 09' 14.75"E
S84° 50' 45.25"E
N5° 09' 14.75"E
N6° 32' 13.66"W
S74° 11' 12.42"E
Parcel Line Table
Line #
L34
L35
L36
L37
L38
L39
L40
L41
L42
L43
L44
L45
L46
L47
L48
L49
L52
L115
L116
L117
L118
L119
L120
L121
L122
L123
L124
L125
L126
L127
L128
Length
340.40
208.83
150.00
340.40
150.00
177.25
276.04
136.00
151.05
229.97
200.05
330.00
53.11
267.46
286.00
223.46
1025.85
14.56
148.22
125.83
118.36
111.75
81.22
302.78
76.92
71.93
92.31
95.58
32.92
39.05
8.49
Direction
N5° 09' 14.75"E
N84° 50' 45.25"W
S84° 50' 45.25"E
S5° 09' 14.75"W
N84° 50' 45.25"W
S84° 50' 45.25"E
S5° 09' 14.46"W
N84° 50' 45.25"W
S53° 53' 55.98"W
N62° 55' 21.55"W
N5° 09' 14.75"E
S84° 50' 45.25"E
S5° 09' 14.75"W
N5° 09' 14.75"E
S84° 50' 45.25"E
S5° 09' 14.75"W
N84° 33' 08.37"W
S86° 15' 47.48"E
S47° 29' 48.35"E
S25° 16' 08.69"W
N68° 35' 09.55"W
N7° 05' 14.09"W
N41° 34' 04.90"E
N6° 37' 14.94"E
N58° 15' 57.53"E
S86° 35' 19.66"E
S33° 22' 46.08"E
S33° 34' 23.89"E
S9° 17' 45.10"W
S20° 31' 41.05"W
S26° 01' 11.30"W
Parcel Line Table
Line #
L129
L130
L131
L132
L133
L134
L135
L136
L137
L138
L139
L140
L141
L142
L143
L144
L145
L145
L146
L147
L148
L149
L150
L151
L152
L158
L159
L163
L164
L167
L170
Length
37.25
57.96
105.85
93.54
32.52
48.02
147.30
43.05
48.59
64.73
69.37
50.76
192.27
245.96
44.84
117.06
52.68
67.61
91.12
108.40
127.52
68.79
140.49
67.48
136.30
24.43
87.90
87.90
24.44
1018.84
333.09
Direction
S37° 31' 02.44"W
S18° 39' 35.02"W
N72° 32' 08.17"W
S56° 51' 50.71"W
N89° 29' 16.66"W
S75° 41' 08.10"E
S68° 43' 18.65"E
S68° 59' 52.03"E
S28° 18' 48.17"E
S6° 37' 11.50"W
S38° 30' 19.15"W
S84° 51' 36.38"W
N88° 28' 00.96"W
N10° 52' 10.51"E
S81° 27' 12.81"E
S9° 27' 25.31"W
N26° 15' 11.12"W
N80° 41' 29.58"W
N45° 25' 50.19"E
N74° 03' 47.19"W
N20° 32' 36.36"W
N16° 16' 03.71"E
S81° 31' 23.03"E
S21° 53' 33.53"E
S14° 37' 09.10"W
S5° 01' 57.35"W
S11° 37' 59.41"E
N11° 37' 59.41"W
N5° 01' 57.35"E
S84° 33' 08.37"E
S84° 50' 45.25"E
Parcel Curve Table
Curve #
C3
C4
C5
C6
C7
C10
C11
C12
C31
C33
C35
C37
C39
C41
C44
C45
C46
C47
C48
C49
C50
C51
C52
C53
C54
C55
Length
25.51
205.84
35.71
20.61
69.11
54.75
97.96
69.12
70.69
39.27
58.37
46.74
50.90
70.68
152.16
51.27
34.72
146.08
306.81
262.98
105.41
64.28
195.15
155.77
75.40
75.40
Radius
125.00
270.00
175.00
75.00
44.00
75.00
53.22
44.00
45.00
135.00
175.00
135.52
175.00
45.00
53.00
44.67
75.00
53.00
350.00
300.00
120.20
71.10
230.56
229.28
48.00
48.00
Delta
11.69
43.68
11.69
15.74
90.00
41.83
105.45
90.00
90.00
16.67
19.11
19.76
16.67
90.00
164.49
65.76
26.53
157.92
50.23
50.23
50.25
51.80
48.50
38.93
90.00
90.00
Chord Direction
N0° 41' 29"W
N73° 18' 50"E
N0° 41' 29"W
S2° 31' 50"E
S50° 09' 16"W
S26° 04' 08"W
S5° 44' 38"E
S39° 50' 45"E
S50° 01' 57"W
S3° 18' 01"E
S2° 04' 41"E
N1° 43' 15"W
N3° 18' 01"W
N39° 58' 00"W
S68° 21' 45"E
N57° 18' 23"E
N23° 39' 52"W
N42° 01' 58"E
S31° 39' 01"E
N31° 39' 01"W
S81° 53' 15"E
N83° 05' 42"W
N70° 50' 33"E
N27° 07' 55"E
N37° 16' 02"W
N52° 43' 58"E
Chord Length
25.46
200.89
35.65
20.54
62.23
53.55
84.71
62.23
63.64
39.13
58.10
46.50
50.72
63.64
105.03
48.50
34.41
104.04
297.08
254.64
102.07
62.11
189.38
152.79
67.88
67.88
Parcel Area Table
PARCEL
101
102
103
104
105
106
107
108
109
110
111
112
113
114
SQ. FT.
50176.55
47121.20
46815.51
46519.00
56482.67
55955.99
58251.07
67558.69
55421.24
54509.91
56313.62
55020.36
56645.82
58190.07
ACRES
1.15
1.08
1.07
1.07
1.30
1.28
1.34
1.55
1.27
1.25
1.29
1.26
1.30
1.34
Parcel Area Table
PARCEL
115
116
117
118
119
120
121
122
123
124
125
126
127
SQ. FT.
52270.85
87846.68
76761.89
60837.74
51059.62
88792.92
160294.30
77202.26
65448.14
50604.27
50756.73
50909.18
53718.63
ACRES
1.20
2.02
1.76
1.40
1.17
2.04
3.68
1.77
1.50
1.16
1.17
1.17
1.23
Parcel Line Table
Line #
L173
L174
L177
L178
L181
L182
L183
L184
L185
L186
L187
L188
L189
L190
L191
L192
L193
L194
L195
L196
L197
L199
L200
L202
L203
L204
L205
L206
L208
L209
L210
Length
90.00
67.33
38.97
38.97
55.88
60.81
3.66
79.40
49.93
104.70
212.49
335.87
112.29
324.66
180.00
41.21
138.94
319.21
180.00
180.23
310.18
180.23
301.15
190.24
291.62
190.00
190.24
282.16
200.25
272.06
110.43
Direction
S6° 32' 13.66"E
N6° 32' 13.66"W
N56° 45' 47.37"W
S56° 45' 47.37"E
S71° 00' 18.13"W
N71° 00' 18.13"E
S18° 52' 38.00"E
S40° 04' 33.03"W
N47° 36' 36.74"W
N42° 04' 52.12"E
S84° 50' 45.25"E
S22° 31' 59.59"W
N86° 56' 58.70"W
S5° 09' 43.50"W
S84° 50' 45.25"E
N86° 56' 58.70"W
N81° 58' 25.90"W
N5° 09' 14.75"E
S84° 50' 45.25"E
N81° 58' 25.90"W
S5° 09' 14.75"W
N81° 58' 25.90"W
S5° 09' 14.75"W
N81° 58' 25.90"W
N5° 09' 14.75"E
N84° 50' 45.25"W
S81° 59' 44.22"E
S5° 09' 17.36"W
N81° 57' 11.49"W
S5° 09' 14.73"W
N81° 58' 25.90"W
Parcel Line Table
Line #
L211
L213
L214
L216
L217
L218
L219
L221
L222
L224
L226
L227
L228
L229
L230
L231
L232
L233
L234
L235
L236
L237
L238
L239
L240
L242
L243
Length
181.51
308.22
96.28
129.55
303.99
185.01
137.00
258.28
258.78
137.00
309.19
150.00
150.01
311.06
150.00
150.01
313.14
150.00
150.01
315.14
166.18
151.23
317.47
50.00
50.01
50.00
50.00
Direction
S84° 50' 45.25"E
N47° 07' 44.11"W
S7° 01' 20.51"W
N7° 43' 57.89"E
S82° 16' 02.11"E
S7° 01' 20.51"W
N7° 43' 57.89"E
N82° 16' 02.11"W
S82° 16' 02.11"E
N7° 43' 57.89"E
N82° 16' 02.11"W
S7° 43' 57.89"W
N7° 00' 57.75"E
S82° 16' 02.11"E
N7° 43' 57.89"E
S6° 56' 21.87"W
S82° 16' 02.11"E
N7° 43' 57.89"E
S6° 58' 09.50"W
N82° 16' 02.11"W
N7° 43' 57.89"E
S6° 59' 06.95"W
N84° 58' 02.65"W
N82° 31' 04.17"W
S82° 16' 02.12"E
N84° 50' 45.25"W
S19° 26' 35.35"E
Parcel Area Table
PARCEL
OS 1
OS 2
OS 3
OS 4
SQ. FT.
123654.71
685339.59
264786.50
5364074.12
ACRES
2.84
15.73
6.08
123.14
Parcel Area Table
PARCEL
WW 1
WW 2
WW 3
WW 4
WW 5
WW 6
SQ. FT.
24165.12
65956.45
53249.46
8840.54
28258.87
4449.66
ACRES
0.55
1.51
1.22
0.20
0.65
0.10
REVISED FINAL PLAT
( IN FEET )
GRAPHIC SCALE
0 200 400200 100
SCALE: 1" = 200'
SHEET
2 of 2
DATE
T-SQUARE
drawn by:
scale:
3-16-2026
date: NO. REVISIONS
reviewer:
T-SQUAREENGINEERING
111 SOUTHEAST PKWY CT ● FRANKLIN, TN ● 615-678-8212 ● www.T2-eng.com
TALIAFERRO SUBDIVISION
SroMect
19-0904 8496 TALIAFERRO ROAD
EAGLEVILLE, TN 37060
MAP 137, PARCEL 035.00
WILLIAMSON COUNTY, TENNESSEE
1" = 200'
3-16-261 REVISED PER COUNTY COMMENTS
3-16-2026
LEGEND
EXISTING PROPERTY LINE
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED PROPERTY LINE
PROPOSED BUILDING SETBACK
PROPOSED WATER LINE
PROPOSED FIRE HYDRANT
PROPOSED UTILITY EASEMENT
PROPOSED DRAINAGE EASEMENT
PROPOSED STORM SEWER
PROPOSED STORM INLET
PROPOSED SANITARY SEWER
PROPOSED SANITARY MANHOLE
6''W 6''W
2" PVC
CONSERVATION SUBDIVISION
TOTAL SITE DATA
EXISTING/REQUIRED PROPOSED
PROPERTY AREA 196.98 AC 196.93 AC
ZONING RD-5 RD-5
MAXIMUM DENSITY 1 UNIT / 5 ACRES 1 UNIT / 5 ACRES
OPEN SPACE 198.4 AC (100%) EXISTING;
119.0 AC (60%) REQUIRED 151.94 AC (77 %)
NUMBER OF LOTS 1 27
STREET FRONTAGE - 100'
NEW ROW LENGTH - 0.78 MI
BUILDING SETBACKS
FRONT - 35'
REAR - 30'
SIDE - 10'
TREE CANOPY 22.45 AC (11.3%) EXISTING;
16.2 AC (72%) REQUIRED 17.4 AC (77.6%)
ERROR OF CLOSURE 1 / 10,000 1 / 10,000
RESOURCE PROTECTION NOTE:
THIS SITE HAS BEEN REVIEWED FOR THE PRESENCE OF STEEP SLOPES,
HILLTOPS AND RIDGETOPS, SLIPPAGE SOILS, SPECIAL FLOOD HAZARDS,
HISTORICAL AND CULTURAL RESOURCES, AND KARST FEATURES. AREAS
FALLING WITHIN THESE CATEGORIES, IF ANY, HAVE BEEN NOTED ON THE
RESOURCE PROTECTION PLAN. THERE ARE NO HILLTOPS OR RIDGETOPS
IN THESE LOTS. THERE ARE NO VERY STEEP SLOPES ON THE PROPERTY.
THERE ARE NO SLIPPAGE SOILS INDICATED ON THE PROPERTY BY THE
APPROVED SOIL MAP OR NRCS WEB SOIL SURVEY. THERE ARE NO
HISTORICAL OR CULTURAL RESOURCES KNOWN ON THE PROPERTY.
THERE ARE MODERATELY STEEP SLOPES ON THE PROPERTY. PLEASE
REFER TO CRITICAL LOT NOTE FOR TREATMENT OF LOTS CONTAINING
MODERATELY STEEP SLOPES.
A HYDROLOGIC DETERMINATION REPORT OF THE PORTION OF THE
PROPERTY SOUTH OF NELSON CREEK WAS COMPLETED BY BDY
ENVIRONMENTAL ON DECEMBER 29, 2021. WETLANDS AREAS AND ELEVEN
WATERCOURSES WERE DELINEATED ON THE PROPERTY. ALL ARE
LOCATED WITHIN OPEN SPACE.
THIS PROPERTY IS 11.3% (22.45 AC) COVERED IN EXISTING TREE CANOPY.
PER REGULATION, 72% (16.17 AC) MUST BE PRESERVED. 77.6% (17.41 AC)
OF THE EXISTING TREE CANOPY IS PROPOSED AS BEING PRESERVED.
TOTAL TREE CANOPY DISTURBED BY DEVELOPMENT IS 5.04 AC.
CRITICAL LOTS
BUILDING ENVELOPES CONTAINING MODERATELY STEEP SLOPES HAVE
BEEN LABELED ON THE PLAN WITH A (*) SYMBOL. WHERE A (*) SYMBOL IS
PROVIDED FOR A LOT, AN ENGINEERED SITE PLAN MUST BE SUBMITTED
WITH APPLICATIONS FOR BUILDING PERMIT FOR THAT LOT DUE TO THE
PRESENCE OF MODERATELY STEEP SLOPES IN THE BUILDING ENVELOPES.
DETENTION
POND 1
EXISTING
POND
DETENTION
POND 2
50' DEVELOPMENT
BUFFER
50' DEVELOPMENT
BUFFER
50' DEVELOPMENT
BUFFER
FUTURE
CONNECTION R.O.W.
SOILS AREA FOR
STEP SYSTEM
250' LANDSCAPE
BUFFER
EMERGENCY
WASTEWATER POND
25' ROW DEDICATION
WETLAND (TYP.)
50' WATERWAY
NATURAL AREA BUFFER
100' WATERWAY
NATURAL AREA BUFFER
50' WATERWAYNATURAL AREA
BUFFER
100' WATERWAYNATURAL AREA
BUFFER
50' WATERWAYNATURAL AREA
BUFFER
50' WATERWAYNATURAL AREA
BUFFER
50' WATERWAY
NATURAL AREA
BUFFER
50' WATERWAY
NATURAL AREA
BUFFER
SINK HOLE
25-FT SETBACK
SINK HOLE
25-FT SETBACK
50-YR FLOODPLAIN
100-YR FLOODPLAIN
WETLAND (TYP.)
WETLAND (TYP.)
50-YR FLOODPLAIN
100-YR FLOODPLAIN
50' WATERWAYNATURAL AREA
BUFFER
25' DRAINAGE ESMT
25' DRAINAGE ESMT
SOILS AREA FOR
STEP SYSTEM
DETENTION
POND 3
40' FUTURE
R.O.W.
CLUSTER
MAILBOX UNIT
50'
PROPOSED PUMP
STATION
20' WATERLINE EASEMENT
(DB 9402, PG. 70)
8705 8704
87088709
8713
8712
87168717
8721
8720 IRON WILLOW8801 ROYAL FOX
8724 IRON WILLOW8800 ROYAL FOX
8725
8728
8732
8749 IRON WILLOW
8900 STONE FARM
8904
8764
8700
8733 8737
8736
8741
8740
8745 IRON WILLOW
8901 STONE FARM
8744 8748 8752 8756 8760
8733E
8733D
8733C
8733B
8737A
8733A
20' NCGUD UTILITY EASEMENT;
CENTERED OVER WATERMAIN
ENTRANCE
GATE
50' WATERWAY
NATURAL AREA BUFFER
ATTACHMENT 35-1B
ATTACHMENT 35-2
MINUTES OF THE
WILLIAMSON COUNTY REGIONAL PLANNING COMMISSION
MEETING OF APRIL 9, 2026
MEMBERS PRESENT
Brian Clifford
Don Crohan
Sharon Hatcher
Steve Lane
Jessica Lucyshyn
Keith McCord
Eddie Sanders
STAFF PRESENT
Michael Matteson, Community Development
Director
Aaron V. Holmes, Planning Director
Floyd Heflin, County Engineer
Michael Scott, Ass’t to County Engineer
Kristi Ransom, County Attorney
Lincoln Sweet, Senior Planner
Charlie Waldrop, Planning Technician
Lania Escobar, Office Manager
The Williamson County Regional Planning Commission met in regular session Thursday,
April 9, 2026, at 5:30 p.m. in the Auditorium of the Williamson County Administrative
Complex. Commissioners Bailey, Baldree, Kennedy, McCoy and Richter were unable to
attend.
Vice-Chairman Crohan called the meeting to order and took Roll Call. A quorum was
present.
Vice-Chairman Crohan asked if there were any announcements.
Mr. Holmes announced the following:
• Items 28, 29, 33 and 34 are on the Consent Agenda for Deferral; and
• Public Meeting to present the Draft of the Table of Uses and the Draft Regulations
for the Arrington Village will be held next Wednesday, April 15 th at 6:00 PM at
Arrington Elementary School. The Draft of the Table of Uses and the Draft
Regulations can be found on the County’s website. The flyer and the Drafts are
on the desks.
PUBLIC COMMENTS:
No one signed up to speak.
CONSIDERATION OF MARCH 19, 2026 MINUTES:
Vice-Chairman Crohan asked if there were comments or questions on the Minutes.
Hearing none, he asked for a motion.
Commissioner Lane made a motion to approve the March 19, 2026 Minutes. The motion
was seconded by Commissioner Sanders. The motion was unanimously approved.
CONSENT AGENDA:
Commissioners Hatcher and McCord recused themselves from the Consent Agenda.
Vice-Chairman Crohan asked if there were any items that needed to be discussed
separately. Hearing none, he asked for a motion to accept the Consent Agenda as a
whole.
Williamson County Planning Commission
Meeting of April 20, 2026
Page 2 of 10
Commissioner Sanders made a motion to approve the Consent Agenda per Staff
recommendations. Commissioner Clifford seconded the motion. The motion was
unanimously approved.
BONDS:
3. The Arbors at Leipers Fork – Performance Bond for Water (HB&TS) located off
Hargrove Road. - $536,000
Recommendation: HB&TS Utility District requests this be extended in the current
amount for a period of two (2) months. Staff concurs with this request.
4. The Arbors at Leipers Fork – Performance Bond for Roads, Drainage and Erosion
Control located off Hargrove Road. - $703,000
Recommendation: Reduce to the amount of $469,000 for a period of one (1) year.
5. Arrington Ridge, Section 1 – Maintenance Bond for Roads, Drainage and Erosion
Control located off Cox Road. - $250,000
Recommendation: Extend in the current amount for a period of one (1) year.
6. Blackberry Ridge - Maintenance Bond for Roads, Drainage and Erosion located off
Bending Chestnut Road. - $250,000
Recommendation: Extend in the current amount for a period of one (1) year.
7. Conduit Church – Performance Bond for Landscaping located off Lewisburg Pike. -
$12,850
Recommendation: Extend in the current amount for a period of six (6) months to
allow for replanting.
8. Fairhaven – Performance Bond for Landscaping located off Bethesda Road. - $261,866
Recommendation: Extend in the current amount for six (6) months to allow for
completion.
9. Fiddlers Glen, Section 1 – Performance Bond for Wastewater Collection System located
off Murfreesboro Road. - $178,000
Recommendation: Extend in the current amount for a period of one (1) year.
10. Fiddlers Glen, Section 2 – Performance Bond for Roads, Drainage and Erosion Control
located off Murfreesboro Road. - $553,000
Recommendation: Reduce to the amount of $415,000 for a period of one (1) year.
11. Fiddlers Glen, Section 2 – Performance Bond for Wastewater Collection System
located off Murfreesboro Road.- $60,000
Recommendation: Extend in the current amount for a period of one (1) year.
12. High Park Hill, Section 2 – Maintenance Bond for Wastewater Collection System
located off Murfreesboro Road. - $28,110
Recommendation: Release the bond.
13. Homes at Mulberry Springs Wastewater – Performance Bond for Landscaping located
off Taliaferro Road. - $55,500
Recommendation: Extend for a period of six (6) months to allow for completion.
14. Homes at Mulberry Springs Wastewater – Performance Bond for Wastewater
Treatment and Disposal System located off Taliaferro Road. - $100,200
Recommendation: Extend in the current amount for a period of one (1) year.
Williamson County Planning Commission
Meeting of April 20, 2026
Page 3 of 10
15. Lifepoint Church – Performance Bond for Landscaping located off Clovercroft Road. -
$159,225
Recommendation: Extend for a period of six (6) months to allow for completion.
16. Reeds Vale, Section 4 - Performance Bond for Landscaping located off Lampkins
Bridge Road. - $123,252
Recommendation: Extend for a period of six (6) months to allow for completion.
17. Reeds Vale, Section 4 – Performance Bond for Wastewater Collection System located
off Lampkins Bridge Road. - $360,045.50
Recommendation: Reduce to Maintenance in the amount of $108,013.65 for a period
of two (2) years.
18. Reeds Vale, Section 4 – Performance Bond for Roads, Drainage and Erosion Control
located off Lampkins Bridge Road. - $2,800,000
Recommendation: Reduce to the amount of $1,400,000 for a period of one (1) year.
19. Southall Rural Retreat Wastewater Area – Maintenance Bond for Wastewater
Treatment and Disposal System located off Carters Creek Pike. - $124,700
Recommendation: Release the bond.
20. Southall Rural Retreat Wastewater Area – Maintenance Bond for Wastewater
Collection System located off Carters Creek Pike. - $122,700
Recommendation: Release the bond.
21. Terravista, Section 1 – Maintenance Bond for Roads, Drainage and Erosion Control
located off Long Lane. - $950,000
Recommendation: Extend in the current amount for a period of one (1) year.
22. Terravista, Section 1 – Maintenance Bond for Wastewater Collection System located
off Long Lane. - $45,690
Recommendation: Extend in the current amount for a period of one (1) year.
23. The Mill at Bond Springs, Section 1 – Performance Bond for Roads, Drainage and
Erosion Control located off Bethesda Road. - $300,000
Recommendation: Reduce in the amount of $225,000 for a period of one (1) year.
24. Troubadour Golf Club/Farmstead – Performance Bond or Landscaping located off
Patton Road. - $150,738
Recommendation: Extend in current amount for a period of six (6) months to allow
for completion.
25. Troubadour, Section 2 – Maintenance Bond for Roads, Drainage and Erosion Control
located off Patton Road. - $567,000
Recommendation: Reduce bond to $425,000 for a period of one (1) year; or when
Engineering staff has determined the improvements have been completed and the
bond is ready for review by the Planning Commission; whichever comes first.
26. White Horse Farms – Performance Bond for Landscaping located off Murfreesboro
Road. - $69,369
Recommendation: Extend in the current amount for a period of six (6) months to
allow for completion.
Williamson County Planning Commission
Meeting of April 20, 2026
Page 4 of 10
DEFERRAL ITEMS:
ITEM 28
CONCEPT PLAN REVIEW FOR 3036 OLD MURFREESBORO ROAD SUBDIVISION,
CONTAINING 30 LOTS ON 34.15 ACRES LOCATED OFF OLD MURFREESBORO
ROAD IN THE 5TH VOTING DISTRICT (1-2025-213).
At this time, the applicant is requesting deferral to the May 2026 Planning Commission
Meeting in order to allow the applicant more time to address Staff comments. Staff
concurs with this request.
ITEM 29
PRELIMINARY PLAT REVIEW FOR CHESTNUT HILL FARMS LLE SUBDIVISION,
CONTAINING 5 LOTS ON 28.5 ACRES LOCATED OFF WHIPPOORWILL DRIVE
IN THE 1ST VOTING DISTRICT (1-2025-324).
At this time, the applicant is requesting deferral to the May 2026 Planning Commission
Meeting in order to allow the applicant more time to address Staff comments. Staff
concurs with this request.
ITEM 33
PRELIMINARY PLAT REVIEW FOR JOYBELLE ESTATES SUBDIVISION,
CONTAINING 12 LOTS ON 110.1 ACRES LOCATED OFF EUDAILEY COVINGTON
ROAD IN THE 2ND VOTING DISTRICT (1-2026-304).
At this time, the applicant is requesting deferral to the May 2026 Planning Commission
Meeting in order to allow the applicant more time to address Staff comments. Staff
concurs with this request.
ITEM 34
PRELIMINARY PLAT REVIEW FOR 8828 HORTON HIGHWAY, CONTAINING 5
LOTS ON 28.01 ACRES LOCATED OFF HORTON HIGHWAY IN THE 2ND VOTING
DISTRICT (1-2025-334).
At this time, the applicant is requesting deferral to the May 2026 Planning Commission
Meeting in order to allow the applicant more time to address Staff comments. Staff
concurs with this request.
OLD BUSINESS:
ITEM 27
ROADS, DRAINAGE AND EROSION CONTROL BOND REVIEW OF TERRAVISTA
SUBDIVISION, SECTIONS 1 AND 2.
Brent Thoeny , with True Land Consultants, represented the applicant , The Jones
Company. He reported that Section 2 slope repairs are approved, and the geotechnical
letter has been submitted. The bio pond remains too wet despite drainage efforts; the
team is awaiting drier conditions and will meet with the engineer to evaluate solutions. A
bid has been received for the wastewater road, with paving under consideration pending
Williamson County Planning Commission
Meeting of April 20, 2026
Page 5 of 10
county feedback. Service road construction is anticipated within 30 –45 days. Section 1
bids are under review to confirm scope and timeline. Landscaping (approx. eight trees)
is expected within one to two weeks.
Vice-Chairman Crohan asked if there were any questions. Hearing none, he thanked Mr.
Thoeny.
ITEM 28
CONCEPT PLAN REVIEW FOR 3036 OLD MURFREESBORO ROAD SUBDIVISION,
CONTAINING 30 LOTS ON 34.15 ACRES LOCATED OFF OLD MURFREESBORO
ROAD IN THE 5TH VOTING DISTRICT (1-2025-213).
This Item is on the Consent Agenda as a deferral.
ITEM 29
PRELIMINARY PLAT REVIEW FOR CHESTNUT HILL FARMS LLE SUBDIVISION,
CONTAINING 5 LOTS ON28.5 ACRES LOCATED OFF WHIPPOORWILL DRIVE IN
THE 1ST VOTING DISTRICT (1-2025-324).
This Item is on the Consent Agenda as a deferral.
PUBLIC HEARINGS:
ITEM 30
AMENDMENT TO THE SUBDIVISION REGULATIONS REGARDING EXPIRATION
OF PLATS WITHOUT SURETIES (6-2026-600).
Mr. Holmes reviewed the background (see Staff Report) recommending approval of the
text amendment.
Vice-Chairman Crohan noted that no one signed up for the Public Hearing.
Commissioner Lucyshyn made a motion to approve per Staff recommendation.
Commissioner Sanders seconded the motion. The motion was unanimously approved.
ITEM 31
AMENDMENTS TO ARTICLES 11 AND 23 OF THE ZONING ORDINANCE
REGARDING THE USE OF NONTRADITIONAL WASTEWATER TREATMENT AND
DISPOSAL SYSTEMS WITHIN THE URBAN GROWTH BOUNDARIES (UGB’S) (6-
2026-601).
Mr. Holmes reviewed the background (see Staff Report) recommending approval of the
text amendments and that the attached Resolution be forwarded to the County
Commission for adoption.
Vice-Chairman Crohan noted that no one signed up for the Public Hearing.
Commissioner Clifford asked about the practical effects of prohibiting the systems within
the Urban Growth Boundaries now as compared to before.
Williamson County Planning Commission
Meeting of April 20, 2026
Page 6 of 10
Mr. Holmes advised that all of the properties within the Urban Growth Boundary were
zoned either MGA-1 or MGA-5 or MGA-Hamlet. The newly revised Urban Growth
Boundaries now include properties that are zoned Rural Preservation-5 or Rural
Development-5, and the types of wastewater systems are allowed within the RD-5 and
RP-5 districts. Speaking with the cities, the retrofitting of a non-traditional system to a
municipal system is difficult and costly. The cities asked that these not be permitted in
the Urban Growth Boundaries.
Mr. Matteson added that for many years the policy has been to not allow these systems
in the Growth Boundaries except for individual uses, such as churches or schools. That’s
the same policy that we’ve continued to have and have now. The only difference is that
now there are a few areas within the Growth Boundaries that are zoned RD-5 or RP-5,
and we just want to make sure these same policies we’ve had are reflected in these two
zoning districts when they’re inside the UGBs.
Commissioner Clifford asked if the cities annexed into the UGBs, how would they
connect to those systems.
Mr. Matteson added that the systems would present an impediment to the city’s
annexation because they don’t have those kinds of systems. They have public sewer
and retrofitting the systems would be difficult.
Commissioner Clifford asked about how the average homeowner living within the UGB
feels about the proposed change, about the cost, burden, and how it would affect those
property owners?
Mr. Matteson noted that most people who live within the UGB who want to be annexed
into the city and tap into the city sewer, and to develop their property in conjunction
with the City’s policies on growth and development. He noted the recent addition of
properties to the growth boundaries and the need to be consistent across the board.
Commissioner Clifford asked if a property owner doesn’t have an interest in being
annexed, how will they view the proposed amendment, and if the change would limit
their development options.
Mr. Matteson noted that if a property owner does not want to be annexed, they
probably don’t have designs for developing the property. The property owner would be
limited because they’d be looking at septic or requesting sewer from the municipalities,
which is consistent with the way the policy’s been for many years.
Commissioner Clifford asked how does this align with what the Septic Task Force has
been working on and the recommendations that are forthcoming.
Mr. Matteson responded the proposed amendment doesn’t have a direct bearing,
although if properties within the UGB were developed on septic, then it would to be
easier and less costly to do so. He clarified the proposed amendment would not impede
the new septic regulations.
Commissioner McCord asked if someone has a property at the furthest end of the UGB,
is there an appeal process for this to get a variance to allow use of a wastewater
system.
Mr. Holmes noted any request to use a nontraditional wastewater system where it
wasn’t currently allowed would be considered a use variance, which is something the
BZA can’t grant. An amendment to the Zoning Ordinance would be required to allow the
system where it isn’t currently allowed.
Williamson County Planning Commission
Meeting of April 20, 2026
Page 7 of 10
Commissioner McCord asked for clarification of what options were available for the
property and the property owner.
Mr. Holmes indicated the property could be developed with individual onsite septic
systems.
Mr. Matteson added the RD-5 and RP-5 zoning districts are one unit per five acres, and
that nontraditional wastewater systems aren’t very common for low density
development like that. It’s much more common that septic systems are used.
Vice-Chairman Crohan noted his understanding is that if a property is located within the
UGB area and the city decides to annex the property, that the property owner doesn’t
have a choice unless they were to go to the state. If the property is located within the
UGB, the property has been designated for annexation at some point.
Mr. Matteson responded that the property owner would have the ability to say “I don’t
want to be annexed,” and the cities wouldn’t automatically be able to annex them.
Additionally, there’s also a mechanism for people to request to be removed from the
Urban Growth Boundaries, as they are periodically revisited.
Commissioner Lucyshyn added her understanding was that not allowing the systems
inside the UGB was the policy within the UGBs for some time. It’s only recently, when
the UGBs were redrawn, that some properties ended up inside the UGB that are zoned
RD-5 and RP-5. We’re not putting an undue hardship on them or on anyone within the
UGB.
Mr. Matteson confirmed that she was correct.
Vice-Chairman Crohan asked if there were any other questions. Hearing none, he asked
for a motion.
Commissioner Lucyshyn made a motion to approve per Staff recommendation.
Commissioner Lane seconded the motion.
The motion was unanimously approved.
CONCEPT PLANS:
ITEM 32
CONCEPT PLAN REVIEW FOR WILLOWSTONE ESTATES (AKA CLOVERCROFT
ESTATES), CONTAINING 25 LOTS ON 184.62 ACRES LOCATED OFF
CLOVERCROFT ROAD IN THE 4TH VOTING DISTRICT (1-2025-211).
Mr. Holmes reviewed the background (see Staff Report) recommending approval of this
Concept Plan with the following conditions:
The Preliminary Plat must address the following:
1. Submission of roads, drainage and erosion control plans for review and approval
by the County; and
2. Submission of water plans for review and approval by Nolensville/College Grove
Utility District.
The Final Plat must address the following:
Williamson County Planning Commission
Meeting of April 20, 2026
Page 8 of 10
1. Prior to consideration of Final Plat approval, the applicant shall submit HOA
documents for review and approval by the County Attorney’s office. The HOA
documents must be submitted with the Final Plat, and the approved HOA
documents must be recorded concurrently with the recording of the Final Plat;
2. Establishment of a Performance Bond for roads, drainage and erosion control;
3. Establishment of a Performance Bond for water improvements in favor of
Nolensville/College Grove Utility District;
4. Per the recommendation of the County’s Wastewater Consultant, establishment of
a Performance Bond for the Treatment and Disposal System and the Wastewater
Collection System;
5. Submission of landscaping plans and establishment of a Performance Bond for
landscaping;
6. Execution of Performance Agreements for the above referenced sureties;
7. Execution of a Stormwater Maintenance Agreement and submission of an
Operation and Maintenance Plan for stormwater improvements; and
8. Submission of the approved Final Plat in .dwg format on recordable media based
on the Tennessee State Plane Coordinate System prior to signature and recording
of the plat.
Vice-Chairman Crohan asked if the applicant was present.
Joshua Denton, represented the applicant, and advised that he and the Engineer, Mr.
Wilson, would be available to answer questions.
Commissioner Bailey asked if the development was going to be gated.
Mr. Denton replied that it will not be gated because it connects to an existing development
that has public streets.
Commissioner Bailey asked where the additional lots would be located on the future
revision to the Concept Plan.
Mr. Denton noted the location of where some of the lots could potentially be located. He
referenced the Concept Plan presented at the February meeting and noted there wasn’t
sufficient wastewater capacity for all lots. He explained the Concept Plan has tailored the
number of lots to the capacity of the wastewater system that’s available. He noted any
revisions will be subject to the County’s review and approval.
Commissioner Lucyshyn added that if the applicant wants to revise the Concept Plan why
would he want approval for something that is going to change.
Mr. Denton replied that the current Concept Plan meets the requirements, and that his
client is asking for twenty-five (25) lots. He further noted that there could be a request
for additional lots, and if the expansion to the wastewater system was approved , the
applicant would likely request the additional lots. However, he noted that adding
additional lots might not occur, and so the presented Concept Plan was designed for the
wastewater system’s available capacity, and that it meets all of the County’s criteria, and
they are asking for approval.
Williamson County Planning Commission
Meeting of April 20, 2026
Page 9 of 10
Vice-Chairman Crohan asked if there were any other questions. Hearing none, he asked
for a motion.
Commissioner Clifford made a motion to approve per Staff recommendation .
Commissioner Lane seconded the motion. The motion was unanimously approved.
PRELIMINARY PLATS:
ITEM 33
PRELIMINARY PLAT REVIEW FOR JOYBELLE ESTATES SUBDIVISION,
CONTAINING 12 LOTS ON 110.1 ACRES LOCATED OFF EUDAILEY COVINGTON
ROAD IN THE 2ND VOTING DISTRICT (1-2026-304).
This Item is on the Consent Agenda as a deferral.
ITEM 34
PRELIMINARY PLAT REVIEW FOR 8828 HORTON HIGHWAY, CONTAINING 5
LOTS ON 28.01 ACRES LOCATED OFF HORTON HIGHWAY IN THE 2ND VOTING
DISTRICT (1-2025-334).
This Item is on the Consent Agenda as a deferral.
FINAL PLATS:
ITEM 35
FINAL PLAT REVIEW (REVISED) FOR TALIAFERRO SUBDIVISION,
CONTAINING 27 LOTS ON 196.93 ACRES LOCATED OFF TALIAFERRO ROAD IN
THE 5TH VOTING DISTRICT (1-2026-404).
Mr. Waldrop reviewed the background (see Staff Report) recommending approval of the
Final Plat with the following conditions:
1. The approved HOA documents must be recorded concurrently with the recording
of the Final Plat;
2. Establishment of a Performance Bond for roads, drainage and erosion control in
the amount of $1,122,000, this amount is based on work completed;
3. Per the recommendation of the County’s Wastewater Consultant, establishment of
a Performance Bond for the wastewater collection system in the amount of
$100,200;
4. Posting of a Performance Bond in the amount of $317,500 for water improvements
as specified by Nolensville College Grove Utility District;
5. Establishment of a performance bond for landscaping in the amount of $31,410;
6. Execution of Performance agreements for the above referenced sureties;
7. Execution of a Stormwater Maintenance Agreement and submission of an
Operation and Maintenance Plan for stormwater improvements; and
Williamson County Planning Commission
Meeting of April 20, 2026
Page 10 of 10
8. Providing two (2) copies of the approved Final Plat in .dwg format on recordable
media based on the Tennessee State Plane Coordinate System prior to signature
and recording of the Final Plat.
Vice-Chairman Crohan asked if there were any questions for Staff. Hearing none, he
asked for a motion.
Commissioner Sanders made a motion to approve per Staff recommendations.
Commissioner Clifford seconded the motion. The motion was unanimously approved.
Vice-Chairman Crohan made a motion to adjourn. There being no further business, the
meeting was adjourned at approximately 5:53 p.m.
APPROVED BY A MAJORITY VOTE BY THE WILLIAMSON COUNTY REGIONAL
PLANNING COMMISSION ON MAY 14, 2026
____________________________________
Chairman
Source: Williamson County website. First collected Nov 4, 2026.