HPC Minutes
09/01/2026
1
HENDERSONVILLE PLANNING COMMISSION
MINUTES
Main Meeting Room
Tuesday, September 1, 2026
6:30 PM
Chairman Tim Altizer called the meeting to order at 6:30 PM in the City Hall Main Meeting
Room, 101 Maple Drive North, Hendersonville, TN.
1. OPENING PRAYER (Youtube Link)
Chairman Tim Altizer led the opening prayer.
2. ROLL CALL (Youtube Link)
Present: Tim Altizer, Jeff, Cundiff, Barry Hardwick, Charles Hasty, Jamie McMurry, Wendy Slatery,
and Mike Wessel.
Absent: John Evans and Michael Martin.
Also Present: Keith Free, Planning Director; Caitlin Shinn, Planner; Frank “Tater” Mills, City
Engineer; and Jeff Stites, Deputy Fire Marshall; and Sloane Moore, Assistant Planner.
HPC Minutes
09/01/2026
2
BRIEF ACTION SUMMARY
A. Acceptance of Agenda (Youtube Link)
MOTION by Slatery, seconded by Wessel, to accept the Hendersonville Planning Commission
Meeting Agenda of Tuesday, September 1, 2026.
Altizer, Cundiff, Hardwick, Hasty, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: Evans and Martin.
MOTION PASSED. (7-0-2)
B. Minutes (Youtube Link)
MOTION by Slatery, seconded by Hasty, to accept the Hendersonville Planning Commission
Meeting Minutes of Tuesday, August 4, 2026.
Altizer, Cundiff, Hardwick, Hasty, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: Evans and Martin.
MOTION PASSED. (7-0-2)
C. Consent Agenda (Youtube Link)
MOTION by Slatery, seconded by Hasty, to approve the Consent Agenda as presented with
all staff comments.
(1) SP-007528-2026: Alexander Commercial Phase 2 (Firebirds) – Site Plan
Altizer, Cundiff, Hardwick, Hasty, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: Evans and Martin.
MOTION PASSED. (7-0-2)
D. SP-007476-2026: Imperial Pointe Building A – Site Plan (Youtube Link)
MOTION by Hardwick, seconded by Wessel, to approve the Waiver for Imperial Pointe
Building A Site Plan.
Altizer, Cundiff, Hardwick, Hasty, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: Evans and Martin.
MOTION PASSED. (7-0-2)
E. SP-007529-2026: Lincoln Rockland Material Waiver – Site Plan (Youtube Link)
MOTION by Hasty, seconded by Wessel, to approve the Material Waiver for Lincoln Rockland
Site Plan.
Altizer, Cundiff, Hardwick, Hasty, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: Evans and Martin.
MOTION PASSED. (7-0-2)
HPC Minutes
09/01/2026
3
F. Adjournment (Youtube Link)
MOTION by Slatery, seconded by Hasty, to adjourn the Hendersonville Planning Commission
Meeting at 6:49 PM.
Altizer, Cundiff, Hardwick, Hasty, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: Evans and Martin.
MOTION PASSED. (7-0-2)
HPC Minutes
09/01/2026
4
DETAILED MINUTES
3. PUBLIC COMMENT (Youtube Link)
Public Comment opened at 6:31PM and closed at 6:31PM since no one signed up to speak.
4. ACCEPTANCE OF AGENDA: (Youtube Link)
MOTION by Slatery, seconded by Wessel, to accept the Hendersonville Planning Commission
Meeting Agenda of Tuesday, September 1, 2026.
Altizer, Cundiff, Hardwick, Hasty, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: Evans and Martin.
MOTION PASSED. (7-0-2)
5. MINUTES: (Youtube Link)
MOTION by Slatery, seconded by Hasty, to accept the Hendersonville Planning Commission
Meeting Minutes of Tuesday, August 4, 2026.
Altizer, Cundiff, Hardwick, Hasty, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: Evans and Martin.
MOTION PASSED. (7-0-2)
6. CONSENT AGENDA: (Youtube Link)
MOTION by Slatery, seconded by Hasty, to approve the Consent Agenda as presented with
all staff comments.
(1) SP-007528-2026: Alexander Commercial Phase 2 (Firebirds) – Site Plan
Altizer, Cundiff, Hardwick, Hasty, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: Evans and Martin.
MOTION PASSED. (7-0-2)
HPC Minutes
09/01/2026
5
SP-007528-2026: Alexander Commercial Phase 2 (Firebirds) - Site Plan
Owner: Firebirds Wood Fired Grill
Location: 267 East Main St, Parcel 159J A 016.00
Lead Planning Staff: Caitlin Shinn / Timothy Whitten
STAFF REPORT
Firebirds Wood Fired Grill is proposing a 5,400-sf restaurant on the vacant middle lot in the
Alexander Commercial planned development. Starbucks on the lot to the east and Fast Pace Health
Urgent Care is to the west. The lot is zoned GC-PD (General Commercial Planned Development) and
is 1.92 acres. 54 parking spaces are required, and 88 spaces are proposed. A 20’ landscape buffer
will be provided along the rear property line adjacent to the Maple Row Estates residential
subdivision.
The proposed building will be mostly brick, with some high-quality architectural metal panels above
the main entry doors.
HPC Minutes
09/01/2026
6
STAFF COMMENTS – PLANNING DEPARTMENT:
1. Street address should be shown as 261 E Main St.
2. In the site data table on sheet C100, the minimum side yard setback should be shown as “10’ or
0’ of a firewall is present.”
3. Provide stamp/seal on sheet C200.
4. FDC may need a brick screen wall or be relocated to a less visible location.
5. NES-approved electric service plan must be submitted and approved before site plans can be
stamped approved.
6. Buffer shrubs must be 48” min. ht.
7. Provide privacy fence within the rear buffer to align and match adjacent privacy fence. Provide
fence detail.
8. Limit light trespass at rear property line to no greater than 1.0 fc.
9. Show outlines of roof-top units on the building elevations. Units may not extend above building
parapet wall.
Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director and Caitlin Shinn, Planner
(August 26, 2026)
STAFF COMMENTS –PUBLIC WORKS:
1. See markups on plans.
Submitted by Frank Mills, City Engineer (August 26, 2026)
HPC Minutes
09/01/2026
7
STAFF COMMENTS – FIRE DEPARTMENT:
1. Hendersonville Subdivision Regulations 3.7.1 – Provide a utility plan that indicates the location of
the proposed hydrants, fire service main sizes, lengths, locations, weights, materials, point of
connection to city main; the sizes, types and locations of valves, valve indicators, regulators,
meters and valve pits; and the depth that the top of the pipe is laid below grade. ACTION: Provide
a utility plan that indicates the location of the proposed hydrants, fire service main sizes, lengths,
locations, weights, materials, point of connection to city main; the sizes, types and locations of
valves, valve indicators, regulators, meters and valve pits; and the depth that the top of the pipe is
laid below grade per Hendersonville Subdivision Regulations 3.7.1.
2. IFC 2021 503.2.4 – Turning Radius: Provide a truck turning template using the Hendersonville Fire
Department template. ACTION: Provide a truck turning template using the Hendersonville Fire
Department template.
3. Hendersonville Subdivision Regulations 3.7.2.2– The type and location of each fire hydrant shall
be designated by the Hendersonville Fire Department and approved by the governing utility
district. Hydrant specifications in 3.7.2. ACTION: The type and location of each fire hydrant shall
be designated by the Hendersonville Fire Department and approved by the governing utility
district. Hydrant specifications in 3.7.2.
4. NFPA 2016 6.4.5.4 - Fire department connections shall be located not more than 100 ft (30.5 m)
from the nearest Fire hydrant connected to an approved water supply. ACTION: Fire department
connections shall be located not more than 100 ft (30.5 m) from the nearest Fire hydrant
connected to an approved water supply per code NFPA 2016 6.4.5.4.
5. Install additional fire hydrant to comply with 100' requirement and place FDC on the building or
submit plans for FDC monument wall (placement and design subject to city approval). ACTION:
Install additional fire hydrant to comply with 100' requirement and place FDC on the building or
submit plans for FDC monument wall (placement and design subject to city approval).
Submitted by Jeffery Stites, Deputy Fire Marshal (August 26, 2026)
STAFF COMMENTS – UTILITY DISTRICT:
1. See comments on plans.
Submitted by David Brigance, HUD Construction Supervisor (August 26, 2026)
HPC Minutes
09/01/2026
8
7. SITE PLANS:
SP-007476-2026: Imperial Pointe Building A– Site Plan Waiver (Youtube Link)
Owner: Imperial Investment Group
Location: 111 Imperial Blvd, Parcel 163C F 002.00
Lead Planning Staff: Caitlin Shinn / Timothy Whitten
*Waiver Request*
MOTION by Hardwick, seconded by Wessel, to approve the Waiver for Imperial Pointe Building A
Site Plan.
Altizer, Cundiff, Hardwick, Hasty, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: Evans and Martin.
MOTION PASSED. (7-0-2)
HPC Minutes
09/01/2026
9
STAFF REPORT
The Planning Commission approved the site plan application for Imperial Point Building A at last
month’s meeting. At that meeting, staff explained that the applicant had agreed to remove the metal
from the rear wall and to provide a material that complied with the City’s commercial building design
standards.
The applicant is now requesting a waiver to allow metal on the rear wall. The wall faces a retaining
wall that ranges in height from 12 feet to 15 feet (shown as a green line in the image below). So only
the upper part of the 20-foot-tall wall will be visible to the adjacent parcel to the north. That parcel is
owned by Park Place Senior Living Facility. The undeveloped portion of the parcel serves as open
space for the senior living facility and can’t be developed.
HPC Minutes
09/01/2026
10
WAIVER IS BEING REQUESTED TO ALLOW METAL SIDING ON REAR WALL
HPC Minutes
09/01/2026
11
ORIGINAL STAFF REPORT FROM SITE PLAN APPROVAL:
This lot is located at 111 Imperial Boulevard, across the street from Gene Brown Elementary
School. It is zoned Dockside Neighborhood (DN).
The lot has 5 existing office buildings on it. This development was approved in 2006 with a total of
6 buildings, but the last building, shown as a 24,150sf office/retail/storage facility, was never
constructed. Now, Imperial Investment Group is requesting site plan approval to construct a
24,059sf office and accessory warehouse.
The proposed building will be one floor and have brick and stone siding on the front and sides of
the building. The image below shows metal on the rear of the building, but the applicant has agreed
to change to a material that complies with commercial building design requirements.
PROPOSED EXTERIOR BUILDING ELEVATIONS
HPC Minutes
09/01/2026
12
HPC Minutes
09/01/2026
13
STAFF COMMENTS – PLANNING DEPARTMENT:
1. Provide recent site and topo survey stamped by TN-registered surveyor.
2. Civil details sheet was left out of the resubmittal – provide detail sheet and comply with any
comments arising out of review.
3. Add the following note to the Site Plan site data chart on the cover sheet: Warehouse is not
permitted as a primary use in Dockside Neighborhood; it is only allowed as an accessory use to a
permitted primary use.
4. Provide dumpster enclosure detail.
5. Asphalt in front of existing dumpster will need to be repaired as part of this site plan.
6. Revise the material on the rear elevation to one that complies with commercial building design
requirements.
Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (July 29th, 2026)
HPC Minutes
09/01/2026
14
STAFF COMMENTS –PUBLIC WORKS:
1. Per previous correspondence, please provide an overall pre- vs post-development evaluation of the
peak discharge at the outfalls, hydraulic routing calculations for the full build out of the storm
network and the receiving infrastructure (next two down-gradient pipes) during the 25-year design
storm.
Submitted by Frank Mills, City Engineer (July 29th, 2026)
STAFF COMMENTS – FIRE DEPARTMENT:
1. No comments.
Submitted by Jeffery Stites, Deputy Fire Marshal (July 29th, 2026)
STAFF COMMENTS – UTILITY DISTRICT:
2. Will owe water and sewer tap and capacity fees to HUD.
Submitted by David Brigance, HUD Construction Supervisor (July 29th, 2026)
HPC Minutes
09/01/2026
15
SP-007529-2026: Lincoln Rockland Material Waiver– Site Plan (Youtube Link)
Owner: Lincoln Property Company
Location: Parcel 160 066.01
Lead Planning Staff: Caitlin Shinn / Timothy Whitten
*Waiver Request*
MOTION by Hasty, seconded by Wessel, to approve the Material Waiver for Lincoln Rockland Site
Plan.
Altizer, Cundiff, Hardwick, Hasty, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: Evans and Martin.
MOTION PASSED. (7-0-2)
HPC Minutes
09/01/2026
16
STAFF REPORT
The site plan for Lincoln Rockland, the industrial planned development off of Rockland Road, was
approved by the Planning Commission in May of this year. The exterior building elevations proposed
tilt-up concrete panels to form the building walls, with some areas of brick to be provided in key
areas. In the images below, the green lines indicate in plan view where those areas of brick are
located, and the areas highlighted in red show where on the building elevations the brick is located.
BUILDING 1
HPC Minutes
09/01/2026
17
BUILDING 2
Lincoln Rockland, which is in an Industrial Planned Development district, is now requesting to convert
the brick to stamped formliner, which means that instead of real brick being inset into the tilt-up
panel walls, the tilt-up panels will be stamped with a simulated brick pattern.
Lincoln Rockland has two other industrial sites under development in Hendersonville, both of which
have very similar tilt-up concrete wall buildings to these. The development on Molly Walton Road,
which is zoned Industrial Planned Development, has similar areas of real brick inset into the tilt-up
walls. The development on Innovation Way, which is zoned Industrial (not a planned development)
uses stamped brick-pattern formliner instead of real brick, and the stamped brick is painted to match
the other areas of tilt-up.
The city’s building design standards allow tilt-up concrete as a primary building material in Industrial
zone district. The Molly Walton development and this proposed development are both zoned
Industrial-Planned Development, whereas the Innovation Way development is not in a planned
development. Generally, developments within planned developments are held to a higher design
standard than straight-zone districts. This is why the Molly Walton and Lincoln Rockland
developments were asked by staff to provide some areas of brick, while staff did not ask the same of
the Innovation Way development.
HPC Minutes
09/01/2026
18
HPC Minutes
09/01/2026
19
HPC Minutes
09/01/2026
20
STAFF COMMENTS – PLANNING DEPARTMENT:
1. No comments.
Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (August 26, 2026)
HPC Minutes
09/01/2026
21
STAFF COMMENTS – PUBLIC WORKS:
1. No comments.
Submitted by Frank Mills, City Engineer (August 26, 2026)
STAFF COMMENTS – FIRE DEPARTMENT:
1. No comments.
Submitted by Jeffery Stites, Deputy Fire Marshal (August 26, 2026)
STAFF COMMENTS – UTILITY DISTRICT:
1. No comments.
Submitted by David Brigance, HUD Construction Supervisor (August 26, 2026)
8. STAFF-LEVEL PROJECTS, PENDING: (Youtube Link)
SUB-006988-2025: C L Powell Addition Lot 17 & 18 Resub – Final Plat
(134 Powell Dr)
A - 5/14/26
Lead Planning Staff: Caitlin Shinn
SP-007390-2026: Forest Park Phase 1 Model Home– Site Plan
(1685 Sandersville Rd)
A – 08/27/26
Lead Planning Staff: Caitlin Shinn
SUB-007230-2026: TBN (Millenia Cottages) – Final Plat
(645 E Main St)
S – 8/28/26
Lead Planning Staff: Timothy Whitten