RecordWell Data

FY22 Proposed Operating Budget

City of Chattanooga · Hamilton County · Budget documents

Open the original document More from City of Chattanooga

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

ONE CHATTANOOGA CAPITAL BUDGET 2022-2026 CREATING SHARED PROSPERITY AND OPPORTUNITY FOR ALL CHATTANOOGANS CITY OF CHATTANOOGA MAYOR TIM KELLY C-2 Intr oductionT he FY22-2026 Capital Improvement Plan (CIP) shows the City of Chattanooga’s five-year plan for physical improvements throughout Chattanooga, as well as internal projects that impr ove the provision of services to residents. The first year of the CIP is the fiscally-constr ained capital budget, whereas the successive years are a roadmap for future action. F unding for capital projects—defined as projects costing more than $50,000 and with a useful lifeofgreaterthanoneyear—isrequestedannuallybydepartmentsalongsidetheBFO pr ocess.Capitalrequestsarereviewedandcollaborativelyprioritizedbythe25membersof the CIP Committee, an interdisciplinary team of department administrators and designees. T he CIP process encourages strategic thinking about the City’s current and future capital needs and priorities, and requires collaboration and focus in order to reach a fiscally sustainable program of projects. The below strategies represent highlights of the next five ye ars.FY22 Highlights – Capital Budget• Unprecedented investments in paving and sidewalks, with over $10,000,000 budgeted in general paving and $1.8 million for sidewalks• Substantial investments in neighborhoods, including $2 million for community center renovations, $1 million for enhanced maintenance of parks, and $700,000 for the Neighborhood Reinvestment Fund• Additional funding for greenways and neighborhood connectivity, with $1.8 million for sidewalks, $1 million for the Midtown Pathway, and $250,000 for the Alton Park Connector • New investments in workforce development in the form of a $2 million commitment to the new Building & Construction Workforce Center in Avondale.• Continuing our commitment to brownfield remediation with $500,000 to complete the cleanup of the • City brownfield site and $100,000 for matching funds for brownfield cleanup grants• Continued commitments to early learning through appropriations to two of our community partners to expand available early learning seats, funding for the Quality Matters grant program, and additional funding for enhanced maintenance of City Head Start centers.• Additional funding for planning, including expanded funding for the parks and gr eenways master plan and $250,000 for an emergency preparedness plan to better pr epare for future disasters.• Ongoing investments in sustainability, including $750,000 for the Power to Protect r esilience project at the Police Service Center, and $1,384,493.00 for fleet fuel diversification. C-3 DRAFT - UPDATED 8-19-21 G overnmental ProjectsT hebelowprojectsarefundedthroughacombinationofgovernmentalfundssuchasCitytaxr evenues,grants,generalobligationbonds,andinternalservicefunds.Projectdescriptionsa reincludedforFY22projects,andalistoffutureyearprojectsareshownattheendofeachr esultsarea.B etter GovernmentO ffersFunded:5T otalFunding:$1,700,000% ExternalFunding:0%Digital InfrastructureInvestmentsF undingforupgradeofCitywebsiteandotheroutward-facingCitydigitalportals.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 500,000 0 0 0 0 500,000 City NetworkRebuildT his capital funding request is to continue efforts to replace out of date, out of support technicali nfrastructureinCitybuildings.Thisfundingisvitaltoimproveperformance,maintainsecuritymeasuresa ndcreateefficiencies.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 300,000 400,000 0 0 0 700,000 Emer gencyPreparednessPlanT hiscontractwillassisttheCitywithEmergencyDisasterPreparedness.Part1isthecontinuationofs ervicesrelativetotheEasterTornadoApril2020DisasterRecoveryManagement;Part2COVID-19R ecoveryManagement;Part3FutureDisasterEventsFEMAManagement(Bootsonthegroundfromd ay1);andPart4EmergencyPreparednessPlan(Toassessthecurrent CityresponseplansforDPW/P arksandothers,andpreparenewcomprehensiveresponseplansandestablishingPre-Bidcontractstob eabletohaveContractorAssistanceintherecoverystartingday1).FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 250,000 50,000 50,000 50,000 50,000 450,000 C-4 DRAFT - UPDATED 8-19-21 Plan ofServicesObligationsF undsforpendingobligationsrelatedtoannexedareas.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 500,000 5,300,000 0 0 0 5,800,000 F irewallUpgradeC urrentfirewallsarefouryearsoldandarereachingendofsupport. Firewallsarecriticaltoprotectionoft heCity’sdatacenter.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 150,000 0 0 0 0 150,000 C-5 DRAFT - UPDATED 8-19-21 C ommunityO ffersFunded:15T otalFunding:$10,403,749.92% ExternalFunding:0%Chat tanoogaZoo:AfricanExpansionF riends of the Zoo, Inc. (FOZ) seeks to help the city to expand its impact on citizens through economicg rowth, quality of life improvement, and unique educational opportunities. In May 2020, FOZ proudlyo penedphaseIoftheAfricanExpansionbringinggiraffes,blueduikers,andmultipleAfricanbirdspeciestot hezoowithastateoftheartgiraffebarn,feedingplatform,andindoorandoutdoorviewsoftheseanimals.A sthisprojectcontinues,FOZisexpandingtheAfricanareaattheZootoexpandthegiraffespaceandadda dditional exhibit spaces to house lions, warthogs, porcupines, and otherAfrican species.As we havea lreadyseen,thisexpansionwillcreatenewjobsattheZooinseveraldepartments,increasetheZoo'se ducational capabilities by expanding classroom learning space in a new pavilion, it will create newi nteractivelearningopportunitiesforallagesrelatedtothesecharismaticanimals,anditwillgivecitizensg reateropportunitiesforrecreationoutdoorsinafamilysetting.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 250,000 0 0 0 0 250,000 Br ownfieldGrantMatchT hisofferfundsarequired20%grantcostshare,ifawardedduringthiscompetitioncycle,tocarryoutb rownfieldcleanupactivities.Costsharemaybeintheformofacontributionofmoney,materialors ervices.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 100,000 0 0 0 0 100,000 T hisCapitalprojectistoaddressmajorBuildingSystemElementsatCommunityCentersandotherCityB uildings,suchasHVACsystems,roofingsystemreplacements,exteriorguttersanddownspoutsourcel eaks,structuralrepairs,floorreplacements,restroomrehabilitation,buildingcodeupgrades,ADAC ompliance,etc.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 1,675,000 1,500,000 1,500,000 1,500,000 1,500,000 7,675,000 C-6 DRAFT - UPDATED 8-19-21 City Buildings & Community Centers Major Maintenance Gr eenwayFarmConferenceCenterF undingtocompletethereconstructionofGreenwayFarmConferenceCenter.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 150,000 0 0 0 0 150,000 C ommunityCenterImprovementsC ommunity centers are a vital part of every community.They serve as the legacy backbone that spansg enerations.Eachcommunityisrecognizedbythecenterthatisthefaceofthatarea.Greatstrideshaveb eenmadetorenovateseveralexistingcenters,includingAvondaleandEastLake.However,eachcenterh as need for continuing upkeep.This budget request is to improve the aesthetics, updates, and fill them aintenancerepairneedsofeachcenterthatarenotcoveredbymajormaintenancefunding.Themajorityo fourfacilitieshavenothadthoroughdeepcleanings,paint,floorsresurfacedorcleanedin20plusyears.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 2,000,000 1,000,000 1,000,000 1,000,000 1,000,000 6,000,000 L ynnbrookParkL ynnbrookParkisa1.4-acrevacantsitethatwillbethelocationofbothastreamrestorationprojectandl inearpark.ThisisChattanooga'sfirstparkprojectidentifiedthroughtheTrustforPublicLand'sClimate-S martCitiesdecisionsupporttool,whichusespark,transportation,healthandenvironmentaldatatotargett hemostimpactfulparkinvestments.LynnbrookParkislocatedinanareacurrentlylackingaccesstopublicp arks.Over3,000peoplelivingwithina10-minutewalkofthisvacantlotwillbeabletoaccessahigh-qualityp ublicspaceonceconstructed.Redevelopmentofthissiteintoapublicparkisahighpriorityforthecity,asi twillcontributetotherevitalizationandempowermentoftheOakGroveneighborhood,whichisdenserandm orediversethanthecityasawhole.Thisprojectwilltransformanunderutilizedspaceintoavaluablec ommunityasset.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 750,000 0 0 0 0 750,000 L uptonCityF undingtocompletetheremediationprojectattheoldLuptonMillsite.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 475,000 0 0 0 0 475,000 C-7 DRAFT - UPDATED 8-19-21 Parks, PlaygroundsandFieldMaintenanceT heParksDivisionmaintainsandrepairstheseveralpublicrestroom,pavilions,barns,andotherbuildingst ructuresthroughouttheparksystem.ParksMaintenancewillcontinuereplacementofheavilywornandd amagedplaygroundequipmentatmanysitesthatareneartheendoftypicallifeandrequiresexpensiver epairs to remain in safe and usable condition. Parks has a 3rd party consultant on contract to accessco nditionandgiverecommendationforreplacement. Additionallywiththesefunds,majorrepairsandotherr outinemaintenanceactivitiesthathavenotbeenpreviouslyfeasiblewillbescheduledandcompletedtom akeYouthAthleticAssociationcomplexesattractivetovisitorsandsafeforparticipants. Severalprojectsa reinprogressand/orhavebeencompletedatthesesitesalongwithotherparksites.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 1,000,000 300,000 300,000 300,000 300,000 2,200,000 N eighborhoodReinvestmentFundT he intent of the Neighborhood Reinvestment Fund is to make targeted investments in under-investedn eighborhoods across the city, guided by plans adopted by the Chattanooga City Council and needsi dentifiedbyneighborhoodsthemselvesandCitystaff.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 703,749.92 2,000,000 2,000,000 2,000,000 2,000,000 8,703,749.92 Publ icArtPercentforArtFundsB ased on our public art strategic plan recommendation to Develop a Budget Policy and CapitalI mprovementProject(CIP)guidelinesthatallocate2%oftheCity'soverallabove-groundCIPbudgetfori ntegratedpublicart.Eachyear,theCapitalPlannerandthePublicArtDirectorwillcoordinatethePercentf orArtcalculationanddesignationofpublicartfundstoselectCIPprojectsduringtheCIPBudgetProcess.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 260,000 0 0 0 0 260,000 P rojectReturn(A.O.)A gencyappropriationtoProjectReturnforthreevehiclesfortheirChattanoogaoffice.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 125,000 0 0 0 0 125,000 C-8 DRAFT - UPDATED 8-19-21 St ElmoPlaygroundReplacement&DrainageimprovementsI nFY21,theCitywasawardagrantthroughBCBStocreateanewplaygroundandworkoutareainStElmoP ark,extremelypopularneighborhoodpark.Tocomplimenttheprojecttherewillbesomeadditionalsitew orktobeperformedintheparkalongwithremovaloftheoldplayequipment's. Thenaturaltopographya nddrainageofthesitecreatesareasofholdingwaterwithintheboundariesofthepark.Theparkneedst o reimagined to address the drainage issues and could possibly include moving the location of thep laygrounditself.Thetotalrequestwillincludedesign,sitework,removalofoldequipment,gradingandd rainage,andlandscapingFY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 40,000 0 0 0 0 40,000 S idewalksT hisprojectinstallsnewandrepairsexistingsidewalksacrosstheCitytoallowsafemobilitybyanyusera ndtohelpencourageactivepublicspaceandengagementofcommercialandresidentialareas.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 1,800,000 1,731,510 1,950,000 2,000,000 2,000,000 9,481,510 Tivol iTheatreandPerformingArtsCenter(A.O.)F undingforrehabilitationandmaintenanceoftheTivoliTheatreandMemorialAuditorium.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 1,000,000 1,000,000 1,000,000 1,000,000 0 4,000,000 S terchiFarmParkS terchiFarmParkisa20-acreparkinEastChattanoogathatprovidesamajoraccessareaandtrailheadf ortheSouthChickamaugaCreekBluewayandtheSouthChickamaugaCreekGreenway.Sincetherehasb eena2yeargapbetweentheinitialfundingandconstruction,thisrequestistocovertheincreasedcosto f construction.The Sterchi Farm Redevelopment Phase I project was initiated by local nonprofits tod evelop a more multifaceted park, increase patronage, and restore the barn structure.This project hase volved,encompassingmanyprojectsintooneplanninganddesignproject.ProjectpartnersincludeTPL,B enwoodFoundation,LyndhurstFoundation,PublicArt,ParksMaintenanceandOpenSpaces.ThePhaseI includesthepavilion,AdventureTrail,andrestroomsandboatlaunch.Thepavilion,adventuretrailandr estrooms are installed, this phase of construction will complete the driveway to the boat launch anda mphitheater.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 75,000 0 0 0 0 75,000 C-9 DRAFT - UPDATED 8-19-21 D owntownO ffersFunded:1T otalFunding:$500,000% ExternalFunding:0%Riverfr ontCapitalProjectsF undsforimplementationofriverfrontcapitalprojects. Becausethefundingsourceisfromhotel/motelr evenues,expendituresarelimitedtotheriverfrontarea.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 500,000 0 0 0 0 500,000 C-10 DRAFT - UPDATED 8-19-21 E conomic DevelopmentO ffersFunded:3T otalFunding:$3,550,000% ExternalFunding:0%East ChattanoogaRisingPlanning&DesignF undingforplanninganddesignassociatedwiththeEastChattanoogaRisingTIF.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 100,000 0 0 0 0 100,000 East ChattanoogaRisingDistrictInfrastructureF undingforfutureinfrastructureneedsassociatedwiththeEastChattanoogaRisingTIF.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 2,050,000 0 0 0 0 2,050,000 Har dyStreetExtensionC onstructionfundingfortheextensionofHardyStreetintotheNipponPaintsite.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 1,400,000 0 0 0 0 1,400,000 C-11 DRAFT - UPDATED 8-19-21 E ducationO ffersFunded:5T otalFunding:$1,025,000% ExternalFunding:0%Ignite DiscoveryCapitalCampaign(A.O.)T hesecondyearoftheCity’scommitmenttotheCreativeDiscoveryMuseum’scapitalcampaign.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 100,000 100,000 100,000 100,000 0 400,000 Head StartCapitalImprovementsH eadStarthiredanarchitecturalfirmtoevaluateeachofourbuildingsinJulyof2019toidentifyareasw herecapitalexpendituresforupgradeandmaintenanceofourfacilitiesshouldbeutilized.HeadStarta lsocoordinatedwiththeDepartmentofPublicWorkstoconductanenvironmentalassessmentforalls itestodetermineallimmediateareasforHealthandSafetyconcerns.ThisincludedevaluationforLeadP aint,Asbestos,WaterQuality,AirQuality,andMold.Fromthesereportsanimmediatepunchlistfora ctionwasdeveloped.Duringthe2020/2021FiscalYearChattanoogaHeadStart/EarlyHeadStartu tilizedtheCitysupportingfundingtocompleteneededinfrastructurerepairandreplacementtoensureh ealthysafeenvironmentsforthechildrenandfamiliesthatweserve.Thesefundsallowedfornewroofsa ndmuchneededelectricalupgradesforsaferoperationofourprogram.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 325,000 150,000 150,000 150,000 150,000 925,000 Montessori ElementaryatHighlandParkPreKProgram(A.O.)A gencyappropriationtoMontessoriElementaryatHighlandParktoassistwithimplementingtheirPre-Kp rogram.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 100,000 0 0 0 0 100,000 C-12 DRAFT - UPDATED 8-19-21 Qual ityMattersCapitalFund(A.O.)U nder Tennessee's Report Card and Rated License System, every licensed child care provider mustr eceive an annual evaluation as part of its licensing process. This program is required for all licensedp rovidersaftertheyhavebeenlicensedforoneyear.Thissystemiscriticallyimportantwithratingsofzero( lowest)tothree(3)stars(highest).Inourcommunity,only42%ofchildcarecentersandhomesmeetthes taterequirementsforthree(3)stars.Inordertosupporttheincreaseinhighqualitychildcareprograms,s mallcapitalgrantswillbeawardedtoprogramswithidentifiedimprovementneedsasmeasuredbytheTNS tarRatingSystem.Thesegrantswillbeawardedtolicensedchildcareproviders,orprovidersinneedoff undingtomovefromanunlicensedprogramtohighqualitylicensedprogram.Fundsmustbeexpendedw ithin6monthsofaward.Participantswillberequiredtoaccepttechnicalassistancethroughthisprocess.T hisisanagencyappropriationtotheUnitedWay.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 200,000 0 0 0 0 200,000 P urposePointLearningAcademy(A.O.)P urposePointLearningAcademy(PPLA)isanewearlylearningchildhoodcenterinEastChattanooga,a llowingunderservedchildrentoachievetheirfullestpotential,whilealsoservingwholefamilies. Thenewc enterwillopeninAugust,2021with58studentsinYear1andthenincreaseto132students(infants-4y earolds)inYear2. Inordertomakethishappen,renovationsmustbemadetoanexistingstructure,c osting$600,000.Thisisaone-timeagencyappropriationtoChattanoogaChristianSchool,whowillservea s the fiscal agent/receipient of funds for this partnership between CCS, Purpose Point CommunityR esourceCenter,andMt.CanaanBaptistChurch.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 300,000 0 0 0 0 300,000 C-13 DRAFT - UPDATED 8-19-21 F leetO ffersFunded:3T otalFunding:$6,334,493% ExternalFunding:23%Fleet CapitalInfusionP urchaseofvehiclesnotcurrentlyinthefleetreplacementprogram.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 450,000 1,100,000 1,100,000 1,100,000 1,100,000 4,850,000 Driving forResiliency:FleetFuelDiversificationT hisprojectincludesarequestfor$319,079asa25%grantmatchforfunding,ifawarded,fromtheStateo fTennessee,VolkswagenDieselSettlement,EnvironmentalMitigationTrust,MediumandLargeTruckG rantsProgram.Thisfunding,combinedwitha75%Statecontributionof$950,414,wouldprovideforthep urchaseofsix(6)alternatefuel(2compressednaturalgasand4propane)vehiclesandone(1)all-e lectricvehicle.TotalProjectCost:$1,269,494.Approximately$115,000wouldalsoberequestedinordert opurchasenecessarymodularfuelinginfrastructureforthepropaneandCNGvehicles.A50/50%costs hareofelectricvehiclecharginginfrastructure(installed)at$3,412eachforCity/Stateisincludedinthea bove25/75%splitnotedabove.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total69% 1,384,493 0 0 0 0 1,384,493 Fleet ProgramPurchasesT hisistoappropriateFleetProgramReservefundssothattheymaybeusedtoreplacevehiclescurrentlyi ntheprogramthatareattheendoftheirleaseterms.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 4,500,000 5,000,000 5,000,000 5,000,000 5,000,000 24,500,000 C-14 DRAFT - UPDATED 8-19-21 G eneralO ffersFunded:3T otalFunding:$650,000% ExternalFunding:0%PW Cap-EnvironRemediationButcherBlkR emediationofdrycleaningsolventsinthesoilbeneaththecurrentEPBbuilding. Alandswapbetweent heCity&EPBforEPBtoconstructtheirheadquartersbuildingonthesiteincludedaprovisionthattheCityw ould remediate dry cleaning solvents in the soil. Funds from the state Dry Cleaner EnvironmentalR emediationProgram(DCERP)wereusedtopayforthebulkoftheremediation.TheCitypaysforineligiblei tems such as utilities and other space costs associated with the remediation until the site is closed byD CERPandtheequipmentisremovedfromservice.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 350,000 25,000 25,000 25,000 25,000 450,000 City YardImprovementsU tilizingopportunitiestotrainstaffinsmallergroupsettingandpassemploymentinformationtostaff.F enceneedstobereplacedtoupdatesecurity.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 100,000 0 0 0 0 100,000 Bike ChattanoogaT heCity'sBikeChattanoogasystemhasexperiencedrecordgrowthsincetheintroductionofe-bikes. T hesystem's42stationsand400bikesserved35,000userswith88,000tripsin2020. Our55e-bikes( 14%ofourfleet)handled55%ofthetrips,showingaclearpreference. Toexpande-bikeaccessibilitytom orecitizensandvisitors,theCitywillprovide$100,000forexpansionofe-bikesandhardwiringofs tationsasadditionalchargingpoints. ItisanticipatedthattheLyndhurstFoundationwillprovide$ 100,000inmatchingfundsforatotalof$200,000;Lyndhurst'sfundingiscontingentupongapprovalbyt heirboardinNovember2022.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total50% 200,000 0 0 0 0 200,000 C-15 DRAFT - UPDATED 8-19-21 G reenwaysO ffersFunded:3T otalFunding:$1,388,053% ExternalFunding:10%Mid townPathwayT hisprojectwillinstallasharedusepathalongthesouthsideofBrainerdRd.fromSpringCreekRd.totheS outhChickamaugaCreekGreenwaytrailheadatGreenwayViewDr.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 1,000,000 1,000,000 1,200,000 0 0 3,200,000 S. ChickamaugaCreekGreenwayRailRoadConstructionAgreementT heTrustforPublicLandisreimbursingtheCityforthecostoftheConstructionAgreementwithCSXRailR oadforconstructionassociatedwiththeS.ChickamaugaCreekGreenway.Theamountofreimbursementw ill be based on the total cost determined by CSX Rail Road at the conclusion of their constructiono versight.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total100% 138,053 0 0 0 0 138,053 Al tonParkConnectorT heAltonParkConnectorwillconstructasharedusepathalongaformerraillinethatparallels33rdSt.a ndconnectstheRiverwalkonthewestandAltonParkandSouthsideCommunityParkontheeast. C DOTispartneringwiththeTrustforPublicLand,whohasdonatedtheformerrailpropertytotheCitya ndisleadingcommunityengagementanddesign.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 250,000 2,250,000 0 0 0 2,500,000 C-16 DRAFT - UPDATED 8-19-21 H ousingO ffersFunded:2T otalFunding:$1,050,000% ExternalFunding:0%Homelessness InfrastructureandResourcesF undingforimprovementstohomelessnesssupportinfrastructure.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 50,000 0 0 0 0 50,000 Heal th,EducationandHousingFacilitiesBoard(AffordableHousingFund)(A.O.)T hesefundswillbeallocatedtotheHEBfordistributionaspartoftheCity’sfive-yearcommitmenttoitsA ffordableHousingFund.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 1,000,000 1,000,000 1,000,000 0 0 3,000,000 C-17 DRAFT - UPDATED 8-19-21 L ibraryO ffersFunded:1T otalFunding:$100,000% ExternalFunding:0%Library ADAAccessibilityImprovementsT hisofferrequestwillfundnecessaryandlegallyrequiredaccessibilityimprovementstoallLibraryl ocations.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 200,000 1,309,000 770,691 0 0 2,279,691 C-18 DRAFT - UPDATED 8-19-21 O utdoorsO ffersFunded:4T otalFunding:$800,000% ExternalFunding:0%Parks Planning,DesignandImplementationA dditional funding to support expanded scope for the Parks and Greenways Master Plan.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 100,000 200,000 200,000 200,000 200,000 900,000 Parks ADARepairsI mprovement of facilities and hardscapes as identified from the analysis of current ADA Assessment P rogram. The selected firm has completed their analysis and has identified and prioritized non-compliant a reas in a detailed report. Based off the assessment, we received a lengthy list of needs that will require i mmediate attention from the City. Parks & Engineering have began some of these repairs with current f unding but based on initial cost estimate, total repairs are estimated at $1,000,000. Funding could also e xtend initial assessment to Park sites not included in original program.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 150,000 300,000 300,000 300,000 300,000 1,350,000 T railBrandingImplementationF ull implementation of strategic visioning, branding campaign, and production of signage for off-street t rail system City-wide.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 50,000 150,000 150,000 150,000 150,000 650,000 W alden’sRidgeParkA gency appropriation to Hamilton County to assist in construction of Walden's Ridge Park.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 500,000 0 0 0 0 500,000 C-19 DRAFT - UPDATED 8-19-21 P ublic SafetyO ffersFunded:10T otalFunding:$4,960,000% ExternalFunding:5%CPD EquipmentandRMSY ear One funding for renewal of CPD equipment contracts and/or updated RMS.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 500,000 0 0 0 0 500,000 Citywide SecurityCamerasT his capital request is to continue efforts to add or replace security cameras in public areas and City b uildings. These cameras are viewable in the Real-Time Intelligence Center (RTIC) allowing for increased v isibility during public events and critical incidents. The FY22 funds will be used to replace antiquated C CTV cameras across the City and to add cameras in strategic locations identified by CPD and the C amera Replacement Committee.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 50,000 250,000 250,000 250,000 250,000 1,050,000 Fir eTrainingCenterUpgradePlanningandDesignT raining firefighters and police officers requires an academic understanding of emergency response w ork. However, it is vital to move the academic theory into a hands-on model of training. This necessary m odel cannot occur without the facilities to provide those experiences. This offer signifies a change in d irection from building a new training center to working with a consultant to renovate the existing t raining center property. The requested funds this year would be added to the $150,000 already set a side toward upgrading the regional training facility. Though COVID dramatically affected the d epartment's ability to focus time and resources to this project in FY2021, the CFD is preparing to focus e nergy to this project in FY2022. Prior to the pandemic hitting the department so hard, the city's Public W orks Department provided a formal survey for the Training Center property. That information will still b e used after hiring a consultant. The plan includes working with a consultant to reorganize the existing s ite space and best arrangement and use of the drill ground.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 150,000 2,500,000 0 0 0 2,650,000 C-20 DRAFT - UPDATED 8-19-21 Pol iceDronesT he Unmanned Aerial System (UAS) unit within the Chattanooga Police Department would be utilized in v arious aspects from Search and Rescue, Event Monitoring, and Violent Crime Investigations.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 150,000 0 0 0 0 150,000 L awEnforcementTrainingCenterD esign of site work and initial facilities of the new firing range.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total50% 2,200,000 8,000,000 5,000,000 5,000,000 0 20,200,000 Power toProtect:AResilientPublicSafetyMicrogridProjectwithEPBT his $750K funding request is to allow for completion of the "Power to Protect" project originally funded w ith $1.3 M for FY2021. FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 750,000 0 0 0 0 750,000 P oliceLaptopsT his is a continuation of a previously approved capital offer, which replaces outdated in-car laptops with l aptops that are current with today's technology.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 300,000 300,000 300,000 300,000 300,000 1,500,000 C-21 DRAFT - UPDATED 8-19-21 Stat ion15Replacement(Addition)T he request in this Capital offer is for additional funding toward the construction of the Station 15 R eplacement project. After consultation with members of the Public Works Engineering Division and with t he selected architect (MBI Companies, Inc.), it has been determined to make this request due to the v olatility of the construction market. Locally, material costs and labor demand has caused construction p roject increases at virtually all levels, including city projects. Upon their advice and suggestion, the C hattanooga Fire Department wants to plan and be prepared for these increases by requesting an a dditional $500,000 for the Station 15 Replacement project.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 500,000 0 0 0 0 500,000 R TICT he Real-Time Intelligence Center (R.T.I.C.) will be a force multiplier in our ongoing effort to reduce violent c rime within our communities. RTIC Investigators will use the most technologically advanced equipment t o actively support Intelligence-Led Policing strategies by forging real-time data with active intelligence. T he addition of both mobile and pole-mounted surveillance cameras as well as License Plate Readers with c ommercial data access will increase RTIC Investigator's ability to monitor current or perpetual acts of v iolence to provide real-time information to field officers and criminal investigators.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0 %275,000 120,000 120,000 120,000 120,000 755,000 S tationCapitalMaintenanceandRepairT he Chattanooga Fire Department stands prepared to respond around the clock, and fire station m aintenance is vital to ensuring a healthy and operable place for firefighters to work and live. This offer r equests to fund three major maintenance projects, as well as general capital maintenance funding: c ontinued replacement of aging apparatus bay exhaust systems, HVAC replacement (Training), and a new p rogram to install proximity card entry systems into fire stations. In addition, experience has taught the d epartment that it is important and wise to set aside funds for unforeseen maintenance projects. For i nstance, in FY2021, the department had to replace the roof for Station 1 and that was unforeseen and t ook much of the available funding from last year's reduced request. Exhaust systems are vital for the h ealth of employees, as the system pulls harmful carbon monoxide, gases, and soot from the bay area. T he old systems had to be attached to the apparatus and simply expelled the exhaust from the bay, which i s not a solution good for the environment. The new system uses a technology that actually “scrubsâ€N t he harmful exhaust, collecting the soot particles in a filtration system. These funds would also be used to r eplace the HVAC system at the Fire Training Center. Finally, the CFD is requesting to begin a program to i nstall proximity card systems in each station.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 85,000 500,000 500,000 500,000 500,000 2,085,000 C-22 DRAFT - UPDATED 8-19-21 R ecreationO ffersFunded:3T otalFunding:$1,000,000% ExternalFunding:0%Gol fCourseRenovationsandMaintenanceC hattanooga's municipal golf courses provide excellent recreational opportunities to Chattanooga r esidents at an affordable price. In recent years, unfortunately, operating costs have outgained revenues a nd capital projects have not been able to be funded. After a review by a golf course consulting team in F Y20, several items of capital improvement and deferred maintenance have been identified. A five year C IP plan will be submitted to address these items. The items to be addressed will be surface and s ubsurface drainage, especially on the fairways, rebuilding sand bunkers, and addressing several trees that n eed to be removed or trimmed for safety. Cart paths, irrigation, leveling tee boxes, course signage u pdates, facility updated, practice facility renovation, and parking lot improvements will also be addressed i n the CIP plan. The plan will average an estimated $1.5 Million a year throughout the duration of the 5 -year plan.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 100,000 1,680,000 1,630,000 1,600,000 1,450,000 6,460,000 Gol fCourseMaintenanceEquipmentReplacementR eplace mowing equipment at Brainerd and Brown Acres golf courses. Current mowing fleet includes m owers and other equipment that is in most cases at least 15 years old. It has become very costly to r ehab every winter. Over the past five fiscal years, Golf Operations has had over $140,000 in repair parts e xpense for mowers. Staff estimates that at least 60% to 70% of this expense is directly related to the a ge of the fleet.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 100,000 250,000 250,000 250,000 250,000 1,100,000 Soft ballFacilityImprovementsS oftball facility improvements at Frost Stadium and Summit of Softball.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 800,000 800,000 800,000 0 0 2,400,000 C-23 DRAFT - UPDATED 8-19-21 R oadsO ffersFunded:11T otalFunding:$19,837,548.30% ExternalFunding:41%Bridge Management&Maintenance-MultipleLocationsR epair structures and appurtenances on the network of City-owned bridges on as-needed basis, in a ccordance with findings in regular TDOT inspections and reports on the bridges.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 726,548.30 1,000,000 1,000,000 1,000,000 1,000,000 4,726,548.30 Bridge Maintenance-StandiferGapR eplace Standifer Gap Road Bridge, which has been closed since 2015.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total80% 1,300,000 0 0 0 0 1,300,000 Davidson RoadF inal phase of Davidson Road repairs and repaving; additional funding for the water quality project is b udgeted for FY24.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 350,000 0 0 0 0 350,000 Equitable EVInfrastructureF unding for electric vehicle infrastructure in underserved neighborhoods.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 100,000 0 0 0 0 100,000 C-24 DRAFT - UPDATED 8-19-21 Retaining WallManagementandMaintenanceT his project will create a program to repair retaining walls and other structures within the right-of-way, i ncluding investigation of appropriate repair techniques and implementation.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 50,000 200,000 200,000 200,000 200,000 850,000 Lake ResortDriveT his project will construct a permanent repair to Lake Resort Dr. that experienced failure from excessive r ainfall in the 2019 emergency.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total100% 800,000 0 0 0 0 800,000 G oodwinRoadSegment4/HamiltonPlBlvd.T his project will change lane configurations, add signals, and improve access to/from the interstate o nto/off of Hamilton Place Boulevard. This project is in the FY 2020-2023 Transportation Improvement P rogram.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total8 0%800,000 4,000,000 4,000,000 0 0 8,800,000 R oadwaySlopeFailureT hese funds are utilized to address roadway slope failures throughout the City.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 100,000 500,000 500,000 500,000 500,000 2,100,000 Hamil lRd.RailroadInterconnectP rovide connectivity between the Hamill Rd rail road crossing and the traffic signal at North Pointe Blvd. a nd Hamill Rd. Track activation will trigger signs advising of train and notify HC911 for better routing of e mergency vehicles while trains are present.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total100% 6,000 0 0 0 0 6,000 C-25 DRAFT - UPDATED 8-19-21 T rafficSignalInfrastructureMaintenanceT he City of Chattanooga has over 345 signalized intersections. The infrastructure and technology that e nsures the signals function properly is reaching the end of or is past its useful life. This project will replace a nd repair infrastructure for 10 signals across the City annually.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 300,000 1,000,000 1,000,000 1,000,000 1,000,000 4,300,000 T IPPavingT his project will leverage federal funds in the TIP to fund large cost resurfacing projects. Streets eligible f or funding in the TIP are functionally classified as Principal and Minor Arterials and Collector streets and t end to be longer streets, carry higher volumes or traffic and have higher posted speed limits. Any streets s elected for TIP funding must go through the TDOT Local Programs process for funding obligation.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total8 0%1,750,000 1,200,000 1,200,000 1,200,000 1,200,000 6,550,000 T ransitSignalPrioritizationT his project consists of design and development of a transit signal priority system and accessibility u pgrades at intersections along CARTA Route 4 using Intelligent Transportation System technologies.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total94% 5,250,000 0 0 0 0 5,250,000 S treetImprovements(paving)T hese funds are used for CDOT's annual resurfacing contract. They are a critical part of comprehensive p avement management that includes paving and preventative maintenance techniques.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 8,305,000 8,800,000 8,800,000 8,800,000 8,800,000 43,505,000 C-26 DRAFT - UPDATED 8-19-21 T ransitO ffersFunded:3T otalFunding:$1,683,684% ExternalFunding:58%Nort h-SouthMultimodalConnectivityCorridorI n partnership with CARTA, install five mobility hubs that include transit shelters, accessibility i mprovements, lighting, and Bike Chattanooga Bicycle Transit System stations along a new CARTA bus r oute along Willow St., Dodson Ave., and Glass St.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 1,000,000 0 0 0 0 1,000,000 CAR TAVehicles&EquipmentT his project is for the replacement of up to 10 fixed route transit coaches (20 fixed route transit coaches o ver the 3 year funding period FY 21-23). Most of the vehicles past their useful life are between 16-20 y ears old.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 413,684 680,000 250,000 250,000 250,000 1,843,684 T ransitStopAccessibility(Section5310)I mprove and expand the accessible pedestrian network around CARTA fixed route stops to enhance a ccessibility to transit for older adults and individuals with disabilities. This offer represents the 2020 r ound of 5310 funding. It is an expansion of work that was done with previous Section 5310 grants C DOT has received.FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total80% 225,000 0 0 0 0 225,000 C-27 DRAFT - UPDATED 8-19-21 W orkforce DevelopmentO ffersFunded:1T otalFunding:$2,000,000% ExternalFunding:0%Build ing&ConstructionWorkforceCenter(vocational/tradeschool)(A.O.)T his funding is for the construction and programming of the Building & Construction Workforce Center, w hich will serve as a vocational/trade school for students from The Howard School and East Ridge High S chool, and for adults desiring to learn skills in construction-related vocations. FY22 Percent External P roposed FY22P roposed FY23P roposed FY24P roposed FY25P roposed FY26CIP Total0% 2,000,000 0 0 0 0 2,000,000 C-28 DRAFT - UPDATED 8-19-21 I nterceptor Sewer SystemO ffersFunded:35T otalFunding:$115,000,000% ExternalFunding:0%Pr ojectdescriptionscanbefoundbelow;projectfundingdetailscanbefoundlaterIn thisdocument.• 23rd St PS Improvements▪ This project includes making capital improvements to the 23rd Street PS. These impr ovements are designed to improve the capacity, performance and reliability of the station and help to reduce sanitary sewer overflows in the area.• Citico Creek Sub-basin Combined Sewer Separation▪ This project includes the installation of new sewer pipe associated with the seperation of sanitary sewer and storm drainage piping in conjunction with the the Central Avenue road extension project.• Citico Force Main Replacement▪ Funding for Citico Force Main replacement.• Citico Pump Station Improvements▪ This project includes making capital improvements to the Citico Pump Station such as a New Motor Control Center, HVAC, Lighting, new pumps, motors and drives, wet well cleaned and coated, and other site improvements.• Collection System Equipment Purchase▪ Allows for continued reliable, efficient maintenance and operations• Contingency - Plans and Studies▪ Contingency funds allocated for plans and studies that have not been identified yet: Centrifuge Upgrades• Contingency - Plans and Studies (SCADA Master Plan - Phase 1)▪ The objective of this Project is to develop the initial phase of a comprehensive SCADA System 5-year Master Plan for the City of Chattanooga Waste Resources Division. The Engineer will prepare a report which compiles all findings, analyses, SOP's, and other recommendations to provide SCADA and Operational Technology planning for the City’s wastewater and collections systems. C-29 DRAFT - UPDATED 8-19-21 • CSOTF Equipment Replacement Program▪ This project will involve the replacement of the fine screens at both the Central A venue and Citico CSOTFs. These fine screens are reaching the end of their useful service life and need replacement. The Central CSO facility was constructed in the year 2000, and the Citico CSO was constructed in 1999.• E2I2 SSO Abatement Program - East Ridge (WWS Ph. 5 - East Brainerd)▪ This project, which is one of three components in the overall E2I2 program, includes the development of a feasibility study to determine the size, location, and required infrastructure improvements needed to construct an EQ station with up to 20 MGD of capacity near the intersection of I-75 and the South Chickamauga Creek. The corresponding East Ridge EQ Station will include a pump station, force main, and gravity sewer improvements; the planning, engineering, and construction of this infrastructure will take place in this project if the feasibility study determines that it is economically and technically feasible to do so. This project is a cooperative, cost-sharing undertaking with WWTA that will yield savings for tax and rate payers in Chattanooga and WWTA while pr oviding the benefit of schedule extensions on certain components of the City of Chattanooga's EPA Consent Decree.• E2I2 SSO Abatement Program - Lee Hwy (WWS Ph. 7 - Lee Highway)▪ This project, which is one of three components in the overall E2I2 program, consists of the planning, engineering, and construction of an EQ station for wet weather storage in the Lee Highway area. The project will also include the construction of a pump station, force main, and gravity sewer line impr ovements, as well as other infrastructure improvements needed to allow for r egional connections to deliver approximate 10 MGD of flow through this location. This project is a cooperative, cost-sharing undertaking with WWTA that will yield savings for tax and rate payers in Chattanooga and WWTA while pr oviding the benefit of schedule extensions on certain components of the City of Chattanooga's EPA Consent Decree.• E212 SSO Abatement Program- Red Bank (SPOI Ph. 4A)▪ Funding for E212 SSO Abatement Program- Red Bank (SPOI Ph. 4A).• Focused SSES and Rehab - Phase II▪ This project involves completing Sanitary Sewer Evaluation Studies (SSES) and the rehabilitation of sanitary sewer pipe in twenty-four of Chattanooga's Sewersheds, as directed in the CD. These repairs will help reduce sanitary sewer overflows in the Sewersheds and will increase overall collection system capacity to the MBWWTP. C-30 DRAFT - UPDATED 8-19-21 • Friars Branch Pump Station Grinders▪ The existing pump station has recently been upgraded but needs a new scr eening system to prevent rags and other debris from reaching and damaging the pumps. The City is requesting the preliminary engineering, detailed design, bidding, construction administration and inspection services for a replacement pump station. The preliminary engineering phase will evaluate various options such as one or two grinders, or a bar screen and determine the most cost-ef fective option• Implementation of CD Green Infra Projects in the CSS▪ Pr oject involves the implementation of the CD green infrastructure projects in the CSS.• ISS Capacity Improvements (Creekside Preserve)▪ This project includes capacity improvements to the Creekside Preserve area to r esolve the chronic SSOs• MBWWTP Laboratory Equipment▪ This project provides the necessary equipment required to maintain an efficient and effective plant laboratory, to ensure compliance with the City's NPDES per mit for the MBWWTP.• MBWWTP Oxygen Plant Upgrades▪ The Oxygen Plant located at Moccasin Bend WWTP is currently owned by the City and operated and maintained by the Treatment Plant staff. This project is a T echnical Memorandum with a financial analysis study to determine the optimal path forward regarding ownership, operation and maintenance of the Oxygen Plant. The study will determine the plant condition, whether it should be r eplaced or rehabilitated• MBWWTP Solids Process Optimization Implementation - Phase 2 (Thickener Upgrade) ▪ This project includes improvements to the MBWWTP solids handling process to pr ovide reliability and efficiency and to allow the plant to continue to produce land applied materials as a part of the City’s National Bio-solids Partnership Certified Program. This project includes the rehabilitation of three of the MBWWTP gravity thickeners, full replacement of the equipment in two of the gravity thickeners, thickener pumping improvements and necessary associated electrical and piping improvements. As the existing thickeners and thickener pumping stations near their “end of life”, these improvements will allow the solids handling process to continue to provide land applied solids and will allow for better performance and reliability. C-31 DRAFT - UPDATED 8-19-21 • MBWWTP Solids Process Optimization Implementation - Phase 4 (A-D) (Digester Upgrades - THP)▪ • MBWWTP Warehouse Improvements▪ This project includes the development of a warehouse condition assessment, investigation of access, security, operational feasibility and recommendation of r eplacement/upgrades of warehouse components. Approximate 10,000 sq ft expansion. • MBWWTP Water Use and Re-use Implementation▪ This project includes improvements to the MBWWTP potable and plant water systems to reduce overall water use. It involves implementing water conservation to reduce consumption, substituting lower-grade water for certain non-potable water process uses, and finding and eliminating leaks in the water system. • Mountain Creek PS Improvements▪ This project involves making improvements to the Mountain Creek Pump Station that include the replacement of the Motor Control Center (MCC) and upgrade of the controls at the current facility. The upgrades will allow the station to increase its performance and reliability and to help to reduce sanitary sewer overflows in the area.• Program Management For Consent Decree Implementation▪ This project is the annual renewal of the scope and fee of program management services for the implementation of the EPA CD program.• Pump Station Generator 2▪ This project involves the installation of emergency generator backup electrical power to selected MBWWTP areas and pump stations to minimize the disrupted electrical service during power outages. C-32 DRAFT - UPDATED 8-19-21 This project includes improvements to the MBWWTP solids handling process to provide reliability and efficiency and to allow the plant to continue to produce land applied materials. The necessary improvements include rehabilitation of the existing anaerobic digesters, rehabilitation of the centrifuge buildings, additional sludge storage facilities, and other necessary improvements to the MBWWTP solids process. The existing digesters are nearing their “end of life” and rehabilitation is necessary to keep them in consistent operation. This rehabilitation will allow for continued operations and will increase performance in the solids handling process. • Pump Station Improvements▪ Contingency money allocated for pump station upgrade projects. This year's scheduled project is Hixson #2.• Pump Station Improvements (Big Ridge PS 5 & 12)▪ This project involves making capital improvements to the Big Ridge #5 Pump Station located at 4802 Woodland Circle, Hixson, TN 37343 and the Big Ridge #12 Pump Station located at Lake Resort Terrace, Chattanooga, TN 37415. Some of these upgrades include new pumps, bypass, and generator. • Pump Station Improvements (IPS Screen Bypass Project)▪ This project includes the installation of a bypass system to allow for flow through the IPS and to the MBWWTP process during blinding conditions of the IPS scr een• Purchase New Centrifuge▪ This project provides the necessary equipment required to maintain efficient and ef fective solids handling, to ensure compliance with the City's NPDES permit for the MBWWTP.• Purchase New Thickener Pumps▪ This project provides the necessary equipment required to maintain efficient and ef fective solids handling, to ensure compliance with the City's NPDES permit for the MBWWTP.• South Chic PS Improvements▪ This project includes making capital improvements to the South Chick. PS These impr ovements are designed to improve the capacity, performance and reliability of the station and help to reduce sanitary sewer overflows in the area.• Tiftonia PS#3 Safety Upgrade▪ This project includes safety and reliability improvements associated with converting the Tiftonia #2 PS from a canned pump station to a submersible pump station as well as the assessment and rehabilitation or replacement of sewer force main in the basin• Vehicle Purchase▪ This project includes a Vehicle Purchase for ISS. C-33 DRAFT - UPDATED 8-19-21 • Wet Weather Response Team▪ This project will evaluate the effect of wet weather events on the various City sewers, combined sewer overflow treatment facilities (CSOTFs), pump stations (PSs), and Moccasin Bend Wastewater Treatment Plant (MBWWTP) to improve operation efficiency and reduce sanitary sewer overflows (SSOs).• Wet Weather Storage - Phase 6 - Hixson PS #1▪ This project will construct 5 MG of wet weather storage and replace the Hixson #1 PS located off of Adams Road. The project will store peak wet weather flows, pr event sanitary sewer overflows, and meet the future capacity requirements as set forth in the Consent Decree. The project will also increase reliability thr oughout the sanitary sewer system in the event of power or mechanical failur es. This project will provide the City with the system capacity necessary to appr ove future developments and promote growth throughout the City and surr ounding areas.• Winterview Pump Station and Basin Improvements▪ This project includes reliability and capacity improvements at the Winterview Pump Station as well as the rehabilitation of sanitary sewer pipe in the basin. Impr ovements include potential rehabilitation or replacement of pumps, valving, I&C/SCADA infrastructure, etc. C-34 DRAFT - UPDATED 8-19-21 W ater QualityO ffersFunded:11T otalFunding:$6,600,000% ExternalFunding:0%Pr ojectdescriptionscanbefoundbelow;projectfundingdetailscanbefoundlaterIn thisdocument.• AutomatedFloodWarningSystem▪ AutomatedfloodwarningsystemforfloodpronestreetsaroundtheCity. 2) C ontinuationofPhaseI&IIUSArmyCorpsofEngineerscontracttoprovidetheC ityofChattanoogawithHydrologicandHydraulicstudies,FederalEmergencyM anagement(FEMA)FloodInsuranceStudy(FIS)submittals,creationofapilotH ydrologicEngineeringCentersReal-TimeSimulation(HEC-RTS)model,d evelopmentoffloodestimationtoolsforuseinemergencysituations,co nceptualdevelopmentoftoolsandguidancetoevaluatetheimpactsfromf uturedevelopment,andadditionalsupportofmidelingandmappingproductscr eatedinthepreviousphases.• Dartmouth/FivePointsWatershedSIP▪ PhaseIofafivephaseStormwaterInfrastructureReplacementProject. Rapidd evelopmentinpastyearshascausedincreasedrunoffpotentialintheareaandt axedanundersized,agingsystem.• FloodControlPumpStationUpgrades▪ Upgradestopumpstationsthroughoutthecity• GlassStreetArea/TaylorSt,DodsonAve,CrutchfieldSt▪ StreamrestorationprojectofWPAditchasidentifiedintheAMECpriorityreport. • HeavyEquipment▪ Newequipmenttoreplaceexisting/aged• HeritageParkWaterQuality▪ FundingforwaterqualitycapitalimprovementsatHeritagePark • On-CallLandscapeDesign▪ VariousCitysitesthatrequirelandscapevegetation designsthatmeetnewCityr equirements. C-35 DRAFT - UPDATED 8-19-21 • StreamBufferConservation▪ Implementastreambufferprogramthatbenefitsandimprovesstreambankst abilization,erosion/sedimentcontrol,promoteshabitatandwildlifealongwithr educingtheimpactfromfloods. • StreamRestoration/VariousSites▪ VarioussizestreamrestorationprojectstoreducesedimenttransportofTMDLs• USACE/FEMAFloodplainCulvertReplacementProjects▪ CulvertReplacementProjecttoreplaceundersizedCulvertsinFEMAMappedS treamSegmentsto100yrconveyancecapacity• WaterQualityTMDL&LandManagement▪ Topreserveandenhancethequalityofthephysicalenvironmentwithprojectst hatmeettheTMDLandWQregulatorychanges. Thesevariousprojectswillco nsistofplanning,designandconstructiontomanagewaterquantityandi mprovewaterqualityonCityownedproperty. C-36 DRAFT - UPDATED 8-19-21   C-37 DRAFT - UPDATED 8-19-21 ORDINANCE NO. __________ AN ORDINANCE APPROPRIATING, AUTHORIZING OR ALLOCATING FUNDS TO THE CAPITAL IMPROVEMENTS BUDGET FOR THE FISCAL YEAR 2021-2022. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CHATTANOOGA, TENNESSEE: SECTION 1. That there be and is hereby appropriated, authorized, or allocated the hereinafter set funds from the sources specified for the public purposes indicated of the Capital Improvements Plan for the Fiscal Year Ending June 30, 2022, and SECTION 2. That there be and is hereby authorized the appropriation of all capital donations, including partnership agreements not previously appropriated, to the projects and the capital fund for which they are intended. GENERAL GOVERNMENTAL FUNDS PROPRIETARY CAPITAL FUNDS BE IT FURTHER ORDAINED, That this Ordinance shall take effect immediately from and after its passage as provided by law. KM/DM __________________________________________ CHAIRPERSON APPROVED_______ DISAPPROVED _________ DATE: ______________________________, 2021 __________________________________________ MAYOR PASSED _____________________, 2021 City Of Chattanooga Capital Budget Summary by Department Fiscal Year 2022 Summary Schedule (Capital) Proposed FY22 External Sources Reserves Operations GO Bonds SRF/WIFIA EconDev Other City Sources Total General Governmental Fire Department 735,000 - 85,000 - 650,000 - - - 735,000 Police Department 3,425,000 1,100,000 875,000 - 1,100,000 - 350,000 - 3,425,000 Public Works 29,707,789 6,077,162 4,870,655 4,100,000 815,000 - 4,275,000 9,569,972 29,707,789 General Government 12,065,698 4,950,000 4,504,345 - 300,000 - 1,650,000 661,353 12,065,698 Community Development 2,050,000 - 815,000 - 1,235,000 - - - 2,050,000 Economic Development 1,360,000 - 360,000 - - 1,000,000 - 1,360,000 Parks and Outdoors 3,236,250 (75,000) 1,386,250 - 900,000 - 1,025,000 - 3,236,250 City Planning 703,750 - 3,750 - - 700,000 - 703,750 Early Learning 325,000 - 325,000 - - - - - 325,000 East Chattanooga Rising 3,550,000 - - - - - 3,550,000 3,550,000 General Governmental Total 57,158,487 12,052,162 13,225,000 4,100,000 5,000,000 - 9,000,000 13,781,325 57,158,487 - Enterprise - Water Quality 6,600,000 - - 6,600,000 - - - 6,600,000 Interceptor Sewer System 115,000,000 - 25,700,000 28,300,000 61,000,000 - - 115,000,000 Enterprise Total 121,600,000 - 25,700,000 34,900,000 61,000,000 - - 121,600,000 - Total All Funds 178,758,487 12,052,162 38,925,000 39,000,000 5,000,000 61,000,000 9,000,000 13,781,325 178,758,487 C-40 DRAFT - UPDATED 8-19-21   C-41 DRAFT - UPDATED 8-19-21 City Of Chattanooga Capital Budget Summary by ProjectFiscal Year 2022 **The initials "A.O." and "A.S.F." as appear in this section shall have the same meaning as described in Section 5a of the Operating Budget Ordinance 13xxx Departments Proposed FY22 External Reserves Operations Bonds SRF WIFIA Economic Development Other City TotalGeneral Governmental 57,158,487 12,052,162 13,225,000 4,100,000 5,000,000 9,000,000 13,781,325 57,158,487 General Government 12,065,698 4,950,000 4,504,345 - 300,000 1,650,000 661,353 12,065,698 Building and Construction Workforce Center 2,000,000 - 2,000,000 - - - 2,000,000 Building & Construction Workforce Center (vocational/trade school) (A.O.)2,000,000 - 2,000,000 - - - 2,000,000 Chattanooga Area Regional Transportation Authority 413,684 - 413,684 - - - 413,684 CARTA Vehicles & Equipment 413,684 - 413,684 - - - 413,684 Chattanooga Christian School 300,000 - 300,000 - - - 300,000 Purpose Point Learning Academy (A.O.) 300,000 - 300,000 - - - 300,000 Chattanooga Public Library 200,000 - - - - 200,000 200,000 Library ADA Accessibility Improvements 200,000 - - - - 200,000 200,000 Creative Discovery Museum 100,000 - 100,000 - - - 100,000 Ignite Discovery Capital Campaign 100,000 - 100,000 - - - 100,000 Department of Information Technology 6,659,094 4,950,000 850,000 - 300,000 450,000 109,094 6,659,094 C30055 FIN Cap - City Network Rebuild 109,094 - - - - 109,094 109,094 City Network Rebuild 300,000 - 300,000 - - - 300,000 Citywide Security Cameras 50,000 - 50,000 - - - 50,000 Digital Infrastructure Investments 500,000 - 500,000 - - - 500,000 Firewall Upgrade 150,000 - - - 150,000 - 150,000 Traffic Signal Infrastructure Maintenance 300,000 - - - 300,000 - - 300,000 Transit Signal Prioritization 5,250,000 4,950,000 - - 300,000 - 5,250,000 Finance and Administration 352,260 - - - 352,260 352,260 A60108 GG Cap - Enterprise South Industrial Park 352,201 - - - 352,201 352,201 C30005 FIN Cap - City Hall Campus Renovation 59 - - - 59 59 Friends of the Zoo, Inc. 115,661 - 115,661 - - - 115,661 Chattanooga Zoo: African Expansion 250,000 - 250,000 - - - 250,000 D30004 GS Cap - Zoo Improvements (134,339) - (134,339) - - - (134,339) Hamilton County 500,000 - 500,000 - - - 500,000 Walden's Ridge Park 500,000 - 500,000 - - - 500,000 Project Return 125,000 - 125,000 - - - 125,000 Project Return (A.O.) 125,000 - 125,000 - - - 125,000 Tivoli Foundation 1,000,000 - - - 1,000,000 - 1,000,000 Tivoli Theatre and Performing Arts Center (A.O.) 1,000,000 - - - 1,000,000 - 1,000,000 United Way of Greater Chattanooga 200,000 - - - 200,000 - 200,000 Quality Matters Capital Fund (A.O.) 200,000 - - - 200,000 - 200,000 Young Women's Leadership Academy Foundation 100,000 - 100,000 - - - 100,000 Montessori Elementary at Highland Park PreK Program (A.O.) 100,000 - 100,000 - - - 100,000 - Police Department 3,425,000 1,100,000 875,000 - 1,100,000 350,000 - 3,425,000 Chattanooga Police Department 3,425,000 1,100,000 875,000 - 1,100,000 350,000 - 3,425,000 Police Drones 150,000 - 100,000 - 50,000 - 150,000 Police Laptops 300,000 - - - 300,000 - 300,000 RTIC 275,000 - 275,000 - - - 275,000 CPD Equipment and RMS 500,000 - 500,000 - - - 500,000 Law Enforcement Training Center 2,200,000 1,100,000 - - 1,100,000 - - 2,200,000 - Fire Department 735,000 - 85,000 - 650,000 - - 735,000 Fire Department 735,000 - 85,000 - 650,000 - - 735,000 Fire Training Center Upgrade Planning and Design 150,000 - - - 150,000 - - 150,000 Station 15 Replacement (addition) 500,000 - - - 500,000 - - 500,000 Station Capital Maintenance and Repair 85,000 - 85,000 - - - 85,000 - Public Works 29,707,789 6,077,162 4,870,655 4,100,000 815,000 4,275,000 9,569,972 29,707,789 Public Works 29,707,789 6,077,162 4,870,655 4,100,000 815,000 4,275,000 9,569,972 29,707,789 Alton Park Connector 250,000 - - - 250,000 - - 250,000 Bike Chattanooga 200,000 100,000 100,000 - - - 200,000 Bridge Maintenance - Standifer Gap 1,300,000 1,040,000 - - 260,000 - - 1,300,000 Bridge Management & Maintenance - Multiple Locations726,548 - 361,576 - - 364,972 726,548 1,675,000 - 1,675,000 - - - 1,675,000 C-42 DRAFT - UPDATED 8-19-21 *#-D !"#$%#&', 8 *+MM"&#-D *3&-3., T)b+. T)#&-3&)&/3 City Of Chattanooga Capital Budget Summary by ProjectFiscal Year 2022 **The initials "A.O." and "A.S.F." as appear in this section shall have the same meaning as described in Section 5a of the Operating Budget Ordinance 13xxx Departments Proposed FY22 External Reserves Operations Bonds SRF WIFIA Economic Development Other City TotalCity Yard Improvements 100,000 - 100,000 - - - 100,000 Davidson Road 350,000 - - - 350,000 - 350,000 Driving for Resiliency: Fleet Fuel Diversification 1,384,493 950,414 9,079 - 425,000 - 1,384,493 Emergency Preparedness Plan 250,000 - 250,000 - - - 250,000 Equitable EV Infrastructure 100,000 - 100,000 - - - 100,000 Fleet Capital Infusion 450,000 - 450,000 - - - 450,000 Fleet Program Purchases 4,500,000 - - - - 4,500,000 4,500,000 Goodwin Road Segment 4 / Hamilton Pl Blvd. 800,000 640,000 - - 160,000 - - 800,000 Hamill Rd. Rail Road Interconnect 6,000 6,000 - - - - 6,000 K18155 Parks Mgmt Cap - Parks Mgmt Capital - Walnut Plaza/Holmberg Bridge/Ed Johnson(27,305) (27,305) - - - - (27,305) Lake Resort Drive 800,000 800,000 - - - - 800,000 Lupton City 475,000 - 475,000 - - - 475,000 Midtown Pathway 1,000,000 - 1,000,000 - - - 1,000,000 North-South Multimodal Connectivity Corridor 1,000,000 950,000 - - 50,000 - 1,000,000 P20219 Trans St Const - Shepherd Road Enhancement (HWY 153 - Airport)(100,000) (100,000) - - - - (100,000) Plan of Services Obligations 500,000 - - - 500,000 - 500,000 Power to Protect: A Resilient Public Safety Microgrid Project, in Partnership with EP750,000 - - - 750,000 - 750,000 PW Cap - Environ Remediation Butcher Blk 350,000 - 350,000 - - - 350,000 Retaining Wall Management and Maintenance 50,000 - - - 50,000 - 50,000 Riverfront Capital Projects 500,000 - - - - 500,000 500,000 Roadway Slope Failure 100,000 - - - 100,000 - - 100,000 S. Chickamauga Creek Greenway Rail Road Construction Agreement138,053 138,053 - - - - 138,053 Sidewalks 1,800,000 - - - 1,800,000 - 1,800,000 Street Improvements (paving) 8,305,000 - - 4,100,000 - 4,205,000 8,305,000 TIP Paving 1,750,000 1,400,000 - - 350,000 - 1,750,000 Transit Stop Accessibility (Section 5310) 225,000 180,000 - - 45,000 - - 225,000 - Community Development 2,050,000 - 815,000 - 1,235,000 - - 2,050,000 Community Development 2,050,000 - 815,000 - 1,235,000 - - 2,050,000 Community Center Improvements 2,000,000 - 765,000 - 1,235,000 - - 2,000,000 Homelessness Infrastructure and Resources 50,000 50,000 - - - 50,000 - Economic Development 1,360,000 - 360,000 - 1,000,000 - 1,360,000 Economic Development 1,360,000 - 360,000 - 1,000,000 - 1,360,000 Brownfield Grant Match 100,000 - 100,000 - - - 100,000 Health, Education and Housing Facilities Board (Affordable Housing Fund) (A.O.)1,000,000 - - - 1,000,000 - 1,000,000 Public Art Percent for Art Funds 260,000 - 260,000 - - - 260,000 - Parks and Outdoors 3,236,250 (75,000) 1,386,250 - 900,000 1,025,000 - 3,236,250 Parks and Outdoors 3,236,250 (75,000) 1,386,250 - 900,000 1,025,000 - 3,236,250 Golf Course Maintenance Equipment Replacement 100,000 - 100,000 - - - 100,000 Golf Course Renovations and Maintenance 100,000 - 100,000 - - - 100,000 Greenway Farm Conference Center 150,000 - - - 150,000 - - 150,000 L30118 Parks Cap - Jenkins Rd - Hennen Property (3,750) (3,750) - - - (3,750) L30120 Parks Cap - Ross' Landing Marina (75,000) (75,000) - - - - (75,000) Lynnbrook Park 750,000 - - - 750,000 - - 750,000 Parks ADA Repairs 150,000 - 150,000 - - - 150,000 Parks Planning, Design, Implementation 100,000 - - - 100,000 - 100,000 Parks, Playgrounds, Field Maintenance 1,000,000 - 1,000,000 - - - 1,000,000 Softball Facility Improvements 800,000 - - - 800,000 - 800,000 St Elmo Playground Replacement & Drainage improvements40,000 - 40,000 - - - 40,000 Sterchi Farm Park 75,000 - - - 75,000 - 75,000 Trail Branding Implementation 50,000 - - - 50,000 - 50,000 - City Planning 703,750 - 3,750 - 700,000 - 703,750 City Planning 703,750 - 3,750 - 700,000 - 703,750 Neighborhood Reinvestment Fund (NRF) 703,750 - 3,750 - 700,000 - 703,750 - C-43 DRAFT - UPDATED 8-19-21 City Of Chattanooga Capital Budget Summary by ProjectFiscal Year 2022 **The initials "A.O." and "A.S.F." as appear in this section shall have the same meaning as described in Section 5a of the Operating Budget Ordinance 13xxx Departments Proposed FY22 External Reserves Operations Bonds SRF WIFIA Economic Development Other City TotalEarly Learning 325,000 - 325,000 - - - - 325,000 Early Learning 325,000 - 325,000 - - - - 325,000 Head Start Capital Improvements 325,000 - 325,000 - - - - 325,000 - East Chattanooga Rising 3,550,000 - - - - 3,550,000 3,550,000 East Chattanooga Rising 3,550,000 - - - - 3,550,000 3,550,000 East Chattanooga Rising District Infrastructure 2,050,000 - - - - 2,050,000 2,050,000 East Chattanooga Rising Planning & Design 100,000 - - - - 100,000 100,000 Hardy Street Extension 1,400,000 - - - - 1,400,000 1,400,000 - Enterprise 121,600,000 - 25,700,000 34,900,000 25,000,000 36,000,000 - - 121,600,000 Water Quality 6,600,000 - - 6,600,000 - - 6,600,000 Public Works - Water Quality 6,600,000 - - 6,600,000 - - 6,600,000 Automated Flood Warning System 350,000 - - 350,000 - - 350,000 Dartmouth/Five Points Watershed SIP 1,950,000 - - 1,950,000 - - 1,950,000 Flood Control Pump Station Upgrades 250,000 - - 250,000 - - 250,000 Glass Street Area / Taylor St, Dodson Ave, Crutchfield St1,000,000 - - 1,000,000 - - 1,000,000 Heavy Equipment 650,000 - - 650,000 - - 650,000 Heritage Park Water Quality 200,000 - - 200,000 - - 200,000 On-Call Landscape Design 100,000 - - 100,000 - - 100,000 Stream Buffer Conservation 250,000 - - 250,000 - - 250,000 Stream Restoration/Various Sites 250,000 - - 250,000 - - 250,000 USACE/FEMA Floodplain Culvert Replacement Projects100,000 - - 100,000 - - 100,000 Water Quality TMDL & Land Management 1,500,000 - - 1,500,000 - - 1,500,000 - Interceptor Sewer System 115,000,000 - 25,700,000 28,300,000 25,000,000 36,000,000 - - 115,000,000 PW-ISS 115,000,000 - 25,700,000 28,300,000 25,000,000 36,000,000 - - 115,000,000 23rd St PS Improvements 4,000,000 - - 4,000,000 - - 4,000,000 Citico Creek Sub-basin Combined Sewer Separation 3,000,000 - - 3,000,000 - - 3,000,000 Citico Force Main Replacement 5,000,000 - - - 5,000,000 - - 5,000,000 Citico Pump Station Improvements 2,000,000 - - 2,000,000 - - 2,000,000 Collection System Equipment Purchase 550,000 - - 550,000 - - 550,000 Contingency - Plans and Studies 4,000,000 - - 4,000,000 - - 4,000,000 Contingency - Plans and Studies (SCADA Master Plan - Phase 1)214,600 - - 214,600 - - 214,600 CSOTF Equipment Replacement Program 1,500,000 - - 1,500,000 - - 1,500,000 E212 SSO Abatement Program- Red Bank (SPOI Ph. 4A)10,000,000 - - 1,000,000 9,000,000 - - 10,000,000 E2I2 SSO Abatement Program - East Ridge (WWS Ph. 5 - East Brainerd)10,000,000 - - 1,500,000 8,500,000 - - 10,000,000 E2I2 SSO Abatement Program - Lee Hwy (WWS Ph. 7 - Lee Highway)10,000,000 - - 1,500,000 8,500,000 - - 10,000,000 Focused SSES and Rehab - Phase II 8,000,000 - - 8,000,000 - - 8,000,000 Friars Branch Pump Station Grinders 600,000 - - 600,000 - - 600,000 Implementation of CD Green Infra Projects in the CSS500,000 - 64,600 435,400 - - 500,000 ISS Capacity Improvements (Creekside Preserve) 1,500,000 - 1,500,000 - - - 1,500,000 MBWWTP Laboratory Equipment 250,000 - 250,000 - - - 250,000 MBWWTP Oxygen Plant Upgrades 1,750,000 - 1,750,000 - - - 1,750,000 MBWWTP Solids Process Optimization Implementation - Phase 2 (Thickener Upgrade)500,000 - 500,000 - - - 500,000 MBWWTP Solids Process Optimization Implementation - Phase 4 (A-D) (Digester Upgrades - THP)20,000,000 - - - 10,000,000 10,000,000 - - 20,000,000 MBWWTP Warehouse Improvements 6,250,000 - 6,250,000 - - - 6,250,000 MBWWTP Water Use and Re-use Implementation 1,500,000 - 1,500,000 - - - 1,500,000 Mountain Creek PS Improvements 450,000 - 450,000 - - - 450,000 Program Management For Consent Decree Implementation3,485,400 - 3,485,400 - - - 3,485,400 Pump Station Generator 2 750,000 - 750,000 - - - 750,000 Pump Station Improvements 2,000,000 - 2,000,000 - - - 2,000,000 Pump Station Improvements (Big Ridge PS 5 & 12) 1,500,000 - 1,500,000 - - - 1,500,000 Pump Station Improvements (IPS Screen Bypass Project)1,500,000 - 1,500,000 - - - 1,500,000 Purchase New Centrifuge 400,000 - 400,000 - - - 400,000 Purchase New Thickener Pumps 600,000 - 600,000 - - - 600,000 South Chic PS Improvements 1,000,000 - 1,000,000 - - - 1,000,000 Tiftonia PS#3 Safety Upgrade 1,450,000 - 1,450,000 - - - 1,450,000 C-44 DRAFT - UPDATED 8-19-21 City Of Chattanooga Capital Budget Summary by ProjectFiscal Year 2022 **The initials "A.O." and "A.S.F." as appear in this section shall have the same meaning as described in Section 5a of the Operating Budget Ordinance 13xxx Departments Proposed FY22 External Reserves Operations Bonds SRF WIFIA Economic Development Other City TotalVehicle Purchase 150,000 - 150,000 - - - 150,000 Wet Weather Response Team 100,000 - 100,000 - - - 100,000 Wet Weather Storage - Phase 6 - Hixson PS #1 10,000,000 - - - 10,000,000 - - 10,000,000 Winterview Pump Station and Basin Improvements 500,000 - 500,000 - - - 500,000 - Grand Total 178,758,487 12,052,162 38,925,000 39,000,000 5,000,000 25,000,000 36,000,000 9,000,000 13,781,325 178,758,487 C-45 DRAFT - UPDATED 8-19-21 City Of Chattanooga Other City Sources by Project Fiscal Year 2022 Department Recommended Other City SourcesFleet Mgt Fund (6504) Hotel/MotelLibrary ReservesMiscellaneous RevenueOther Income Sale of City Owned PropertyState LGS Grant Funds State Street Aid Ops (2050) State Street Aid ReservesIDB TIF LoanGeneral Government 661,353 200,000 59 109,094352,201Police 0Public Works 9,569,9724,500,000500,000 2,014,972 1,180,0001,375,000East Chattanooga Rising 3,550,000 3,550,000Total Govt Funds 13,781,3254,500,000500,000200,000 59 109,094352,2012,014,9721,180,0001,375,0003,550,000Total All Funds 13,781,3254,500,000500,000200,000 59 109,094352,201 2,014,9721,180,0001,375,0003,550,000 General Government 661,353Library ADA Accessibility Improvements200,000 200,000City Hall Campus Renovation 59 59City Network Rebuild 109,094 109,094ESIP 352,201 352,201Transit Signal Prioritization 0 Police 0Law Enforcement Training Center 0 Public Works 9,569,972Bridge Maintenance- Standifer Gap0Driving for Resiliency: Fleet Fuel Diversification0Fleet Program Purchases 4,500,0004,500,000Goodwin Rd Segment 4/ Hamilton Pl Blvd0Hamill Rd Rail Road Interconnect 0Lake Resort Dr 0North-South Multimodal Connectivity Corridor0Riverfront Capital Projects 500,000 500,000Ross's Landing 0S. Chickamauga Creek Greenway- Rail Road Construction Agreement 0Shepherd Rd Streetscape 0Street Improvements (paving)4,569,972 2,014,972 1,180,0001,375,000TIP Paving 0Transit Stop Accessibility (Section 5310)0Walnut Plaza 0 East Chattanooga Rising 3,550,000East Chattanooga Rising District Infrastructure2,050,000 2,050,000East Chattanooga Rising Planning & Design100,000 100,000Hardy Street Extension 1,400,000 1,400,0000Total Projects 13,781,3254,500,000500,000200,000 59 109,094352,2012,014,972 1,180,0001,375,0003,550,000 Other City Sources C-46 DRAFT - UPDATED 8-19-21 City Of Chattanooga External Sources by Project Fiscal Year 2022 Department Recommended External SourcesFHWA FHWA- ER Federal Transit Administration (FTA) Hamilton CountyLyndhurst Foundation Norfolk Southern RailroadPrivate DonationsSTBG Grants Program TDOT Trust for Public Land (TPL)VW Settlement Truck GrantsGeneral Government 4,950,0004,150,000 800,000Police 1,100,000 1,100,000Public Works 6,002,162 800,000 180,000 (75,000) 100,0006,000 (127,305)2,640,0001,390,000138,053950,414East Chattanooga Rising 0Total Govt Funds 12,052,1624,150,000800,000 180,000 1,025,000 100,0006,000 (127,305)2,640,0002,190,000138,053 950,414Total All Funds 12,052,1624,150,000800,000 180,000 1,025,000 100,0006,000 (127,305)2,640,0002,190,000138,053 950,414 General Government 4,950,000Library ADA Accessibility Improvements0City Hall Campus Renovation 0City Network Rebuild 0ESIP 0Transit Signal Prioritization 4,950,0004,150,000 800,000 Police 1,100,000Law Enforcement Training Center1,100,000 1,100,0000Public Works 6,002,162Bike Chattanooga 100,000 100,000Bridge Maintenance- Standifer Gap1,040,000 1,040,000Driving for Resiliency: Fleet Fuel Diversification950,414 950,414Fleet Program Purchases 0Goodwin Rd Segment 4/ Hamilton Pl Blvd640,000 640,000Hamill Rd Rail Road Interconnect6,000 6,000Lake Resort Dr 800,000 800,000North-South Multimodal Connectivity Corridor950,000 950,000Riverfront Capital Projects 0Ross's Landing (75,000) (75,000)S. Chickamauga Creek Greenway- Rail Road Construction Agreement 138,053 138,053Shepherd Rd Streetscape (100,000) (100,000)Street Improvements (paving) 0TIP Paving 1,400,000 960,000 440,000Transit Stop Accessibility (Section 5310)180,000 180,000Walnut Plaza (27,305) (27,305) 0East Chattanooga Rising 0East Chattanooga Rising District Infrastructure0East Chattanooga Rising Planning & Design0Hardy Street Extension 0 Total Projects 12,052,1624,150,000800,000 180,000 1,025,000 100,0006,000 (127,305)2,640,0002,190,000138,053 950,414 External Funding Sources C-47 DRAFT - UPDATED 8-19-21 RESOLUTION NO. __________ A RESOLUTION ADOPTING A FIVE -YEAR CAPITAL IMPROVEMENT PLAN FOR FISCAL YEARS 2022 -2026, SUBJECT TO FUTURE REVISION; A COPY OF WHICH IS ATTACHED HERETO AND MADE A PART HEREOF BY REFERENCE. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CHATTANOOGA, TENNESSEE, That there be and is hereby adopted a five -year C apital Impro vement Plan for Fiscal Years 2022-2026 for the City of Chattanooga, subject to future revisions; a copy of which is attached hereto and made a part hereof by reference. ADOPTED: ______________________, 2021   C-49 DRAFT - UPDATED 8-19-21 City of Chattanooga FY22-26 Capital Budget Summary by Department Department Proposed FY22 Proposed FY23 Proposed FY24 Proposed FY25 Proposed FY26 5 Year Total General Governmental Fire Department 735,000 3,000,000 500,000 500,000 500,000 5,235,000 Police Department 3,425,000 8,420,000 5,420,000 5,420,000 420,000 23,105,000 Public Works 29,707,789 39,456,510 39,075,000 31,825,000 21,825,000 161,889,299 General Government/CARTA 12,065,698 4,819,744 3,459,359 2,699,793 1,604,661 24,649,255 Community Development 2,050,000 1,000,000 1,000,000 1,000,000 1,000,000 6,050,000 Economic Development 1,360,000 1,000,000 1,000,000 - - 3,360,000 Parks and Outdoors 3,236,250 3,680,000 3,630,000 2,800,000 2,650,000 15,996,250 City Planning 703,750 2,000,000 2,000,000 2,000,000 2,000,000 8,703,750 Early Learning 325,000 150,000 150,000 150,000 150,000 925,000 East Chattanooga Rising 3,550,000 - - - - 3,550,000 General Governmental Total 57,158,487 63,526,254 56,234,359 46,394,793 30,149,661 253,463,554 Enterprise - Water Quality 6,600,000 8,970,000 9,225,000 3,435,000 3,190,000 31,420,000 Interceptor Sewer System 115,000,000 64,600,000 74,200,000 71,700,000 75,000,000 400,500,000 Enterprise Total 121,600,000 73,570,000 83,425,000 75,135,000 78,190,000 431,920,000 - Total All Funds 178,758,487 137,096,254 139,659,359 121,529,793 108,339,661 685,383,554 C-50 DRAFT - UPDATED 8-19-21   C-51 DRAFT - UPDATED 8-19-21 City of ChattanoogaFY22-26 Capital Budget Summary by Project **The initials "A.O." and "A.S.F." as appear in this section shall have the same meaning as described in Section 5a of the Operating Budget Ordinance 13xxx Department Proposed FY22Proposed FY23Proposed FY24Proposed FY25Proposed FY26 5 Year Total General Governmental 57,158,487 63,526,254 56,234,359 46,394,793 30,149,661 253,463,554 General Government/CARTA 12,065,698 4,819,744 3,459,359 2,699,793 1,604,661 24,649,255 Building and Construction Workforce Center 2,000,000 - - - - 2,000,000 Building & Construction Workforce Center (vocational/trade school) (A.O.)2,000,000 - - - - 2,000,000 Chattanooga Area Regional Transportation Authority 413,684 760,744 338,668 349,793 354,661 2,217,550 CARTA Facilities Projects - 49,244 54,168 62,293 64,161 229,866 CARTA Technology Projects - 31,500 34,500 37,500 40,500 144,000 CARTA Vehicles & Equipment 413,684 680,000 250,000 250,000 250,000 1,843,684 Chattanooga Christian School 300,000 - - - - 300,000 Purpose Point Learning Academy (A.O.) 300,000 - - - - 300,000 Chattanooga Public Library 200,000 1,309,000 770,691 - - 2,279,691 Library ADA Accessibility Improvements 200,000 1,309,000 770,691 - - 2,279,691 Creative Discovery Museum 100,000 100,000 100,000 100,000 - 400,000 Ignite Discovery Capital Campaign 100,000 100,000 100,000 100,000 - 400,000 Department of Information Technology 6,659,094 1,650,000 1,250,000 1,250,000 1,250,000 12,059,094 C30055 FIN Cap - City Network Rebuild 109,094 - - - - 109,094 City Network Rebuild 300,000 400,000 - - - 700,000 Citywide Security Cameras 50,000 250,000 250,000 250,000 250,000 1,050,000 Digital Infrastructure Investments 500,000 - - - - 500,000 Firewall Upgrade 150,000 - - - - 150,000 Traffic Signal Infrastructure Maintenance 300,000 1,000,000 1,000,000 1,000,000 1,000,000 4,300,000 Transit Signal Prioritization 5,250,000 - - - - 5,250,000 Finance and Administration 352,260 - - - - 352,260 A60108 GG Cap - Enterprise South Industrial Park 352,201 - - - - 352,201 C30005 FIN Cap - City Hall Campus Renovation 59 - - - - 59 Friends of the Zoo, Inc. 115,661 - - - - 115,661 Chattanooga Zoo: African Expansion 250,000 - - - - 250,000 D30004 GS Cap - Zoo Improvements (134,339) - - - - (134,339) Hamilton County 500,000 - - - - 500,000 Walden's Ridge Park 500,000 - - - - 500,000 Project Return 125,000 - - - - 125,000 Project Return (A.O.) 125,000 - - - - 125,000 Tivoli Foundation 1,000,000 1,000,000 1,000,000 1,000,000 - 4,000,000 Tivoli Theatre and Performing Arts Center (A.O.) 1,000,000 1,000,000 1,000,000 1,000,000 - 4,000,000 United Way of Greater Chattanooga 200,000 - - - - 200,000 Quality Matters Capital Fund (A.O.) 200,000 - - - - 200,000 Young Women's Leadership Academy Foundation 100,000 - - - - 100,000 Montessori Elementary at Highland Park PreK Program (A.O.)100,000 - - - - 100,000 Fire Department 735,000 3,000,000 500,000 500,000 500,000 5,235,000 Fire Department 735,000 3,000,000 500,000 500,000 500,000 5,235,000 Fire Training Center Upgrade Planning and Design 150,000 2,500,000 - - - 2,650,000 Station 15 Replacement (addition) 500,000 - - - - 500,000 Station Capital Maintenance and Repair 85,000 500,000 500,000 500,000 500,000 2,085,000 Police Department 3,425,000 8,420,000 5,420,000 5,420,000 420,000 23,105,000 Chattanooga Police Department 3,425,000 8,420,000 5,420,000 5,420,000 420,000 23,105,000 CPD Equipment and RMS 500,000 - - - - 500,000 Law Enforcement Training Center 2,200,000 8,000,000 5,000,000 5,000,000 20,200,000 Police Drones 150,000 - - - - 150,000 Police Laptops 300,000 300,000 300,000 300,000 300,000 1,500,000 RTIC 275,000 120,000 120,000 120,000 120,000 755,000 Public Works 29,707,789 39,456,510 39,075,000 31,825,000 21,825,000 161,889,299 C-52 DRAFT - UPDATED 8-19-21 City of ChattanoogaFY22-26 Capital Budget Summary by Project Department Proposed FY22Proposed FY23Proposed FY24Proposed FY25Proposed FY26 5 Year Total Public Works 29,707,789 39,456,510 39,075,000 31,825,000 21,825,000 161,889,299 - 1,700,000 - - - 1,700,000 250,000 2,250,000 - - - 2,500,000 200,000 - - - - 200,000 1,300,000 - - - - 1,300,000 726,548 1,000,000 1,000,000 1,000,000 1,000,000 4,726,548 1,675,000 1,500,000 1,500,000 1,500,000 1,500,000 7,675,000 100,000 - - - - 100,000 - 700,000 - - - 700,000 350,000 - - - - 350,000 1,384,493 - 1,384,493 250,000 50,000 50,000 50,000 50,000 450,000 100,000 - - - - 100,000 450,000 1,100,000 1,100,000 1,100,000 1,100,000 4,850,000 4,500,000 5,000,000 5,000,000 5,000,000 5,000,000 24,500,000 800,000 4,000,000 4,000,000 - - 8,800,000 Hamill Rd. Rail Road Interconnect 6,000 - - - - 6,000 Hwy 58 Bicycle and Pedestrian Facilities Phase 2 - - 2,100,000 - - 2,100,000 K18155 Parks Mgmt Cap - Parks Mgmt Capital - Walnut Plaza/Holmberg Bridge/Ed Johnson(27,305) - - - - (27,305) Lake Resort Drive 800,000 - - - - 800,000 Long Street TDOT Repair Project - 250,000 - - - 250,000 Lupton City 475,000 - - - - 475,000 Midtown Pathway 1,000,000 1,000,000 1,200,000 - - 3,200,000 North-South Multimodal Connectivity Corridor 1,000,000 - - - - 1,000,000 P20219 Trans St Const - Shepherd Road Enhancement (HWY 153 - Airport)(100,000) - - - - (100,000) PCI Database Update - 50,000 50,000 50,000 50,000 200,000 Plan of Services Obligations 500,000 5,300,000 - - - 5,800,000 Power to Protect: A Resilient Public Safety Microgrid Project, in Partnership with EP750,000 - - - - 750,000 PW Cap - Environ Remediation Butcher Blk 350,000 25,000 25,000 25,000 25,000 450,000 Retaining Wall Management and Maintenance 50,000 200,000 200,000 200,000 200,000 850,000 Riverfront Capital Projects 500,000 - - - - 500,000 Roadway Slope Failure 100,000 500,000 500,000 500,000 500,000 2,100,000 S. Chickamauga Creek Greenway Rail Road Construction Agreement138,053 - - - - 138,053 Shallowford Road, Airport to Jersey Pike - 2,600,000 10,000,000 10,000,000 - 22,600,000 Sidewalks 1,800,000 1,731,510 1,950,000 2,000,000 2,000,000 9,481,510 Street Improvements (paving) 8,305,000 8,800,000 8,800,000 8,800,000 8,800,000 43,505,000 Thermoplastic - 400,000 400,000 400,000 400,000 1,600,000 TIP Paving 1,750,000 1,200,000 1,200,000 1,200,000 1,200,000 6,550,000 Transit Stop Accessibility (Section 5310) 225,000 - - - - 225,000 Walnut Street Bridge Detour - 100,000 - - - 100,000 Community Development 2,050,000 1,000,000 1,000,000 1,000,000 1,000,000 6,050,000 Community Development 2,050,000 1,000,000 1,000,000 1,000,000 1,000,000 6,050,000 Community Center Improvements 2,000,000 1,000,000 1,000,000 1,000,000 1,000,000 6,000,000 Homelessness Infrastructure and Resources 50,000 - - - - 50,000 Economic Development 1,360,000 1,000,000 1,000,000 - - 3,360,000 Economic Development 1,360,000 1,000,000 1,000,000 - - 3,360,000 Brownfield Grant Match 100,000 - - - - 100,000 Health, Education and Housing Facilities Board (Affordable Housing Fund) (A.O.)1,000,000 1,000,000 1,000,000 - - 3,000,000 Public Art Percent for Art Funds 260,000 - - - - 260,000 Parks and Outdoors 3,236,250 3,680,000 3,630,000 2,800,000 2,650,000 15,996,250 Parks and Outdoors 3,236,250 3,680,000 3,630,000 2,800,000 2,650,000 15,996,250 Golf Course Maintenance Equipment Replacement 100,000 250,000 250,000 250,000 250,000 1,100,000 C-53 DRAFT - UPDATED 8-19-21 G.% ; E-< T-.33- >$-+& N).1 *+&&3/-+. !#13 *<)--)&++') !.#%'3 Y)#&-3&)&/3 7 T-)&%#23. ^)C !.#%'3 Y)&)'3S3&- 8 Y)#&-3&)&/3 7 Y"$-#C$3 U+/)-#+&, *#-D !"#$%#&', 8 *+SS"&#-D *3&-3., Y)O+. Y)#&-3&)&/3 *#-D e).% XSC.+:3S3&-, *+SC$3-3 T-.33-, +& 4H-< T-? N<),3 4 W):#%,+& A+)% W.#:#&' 2+. A3,#$#3&/Da M$33- M"3$ W#:3.,#2#/)-#+& QS3.'3&/D N.3C).3%&3,, N$)& QR"#-)V$3 QP X&2.),-."/-".3 M$33- *)C#-)$ X&2",#+& M$33- N.+'.)S N"./<),3, ^++%[#& A+)% T3'S3&- E ; _)S#$-+& N$ !$:%? City of ChattanoogaFY22-26 Capital Budget Summary by Project Department Proposed FY22Proposed FY23Proposed FY24Proposed FY25Proposed FY26 5 Year Total Golf Course Renovations and Maintenance 100,000 1,680,000 1,630,000 1,600,000 1,450,000 6,460,000 Greenway Farm Conference Center 150,000 - - - - 150,000 L30118 Parks Cap - Jenkins Rd - Hennen Property (3,750) - - - - (3,750) L30120 Parks Cap - Ross' Landing Marina (75,000) - - - - (75,000) Lynnbrook Park 750,000 - - - - 750,000 Parks ADA Repairs 150,000 300,000 300,000 300,000 300,000 1,350,000 Parks Planning, Design, Implementation 100,000 200,000 200,000 200,000 200,000 900,000 Parks, Playgrounds, Field Maintenance 1,000,000 300,000 300,000 300,000 300,000 2,200,000 Softball Facility Improvements 800,000 800,000 800,000 - - 2,400,000 St Elmo Playground Replacement & Drainage improvements 40,000 - - - - 40,000 Sterchi Farm Park 75,000 - - - - 75,000 Trail Branding Implementation 50,000 150,000 150,000 150,000 150,000 650,000 City Planning 703,750 2,000,000 2,000,000 2,000,000 2,000,000 8,703,750 City Planning 703,750 2,000,000 2,000,000 2,000,000 2,000,000 8,703,750 Neighborhood Reinvestment Fund (NRF) 703,750 2,000,000 2,000,000 2,000,000 2,000,000 8,703,750 Early Learning 325,000 150,000 150,000 150,000 150,000 925,000 Early Learning 325,000 150,000 150,000 150,000 150,000 925,000 Head Start Capital Improvements 325,000 150,000 150,000 150,000 150,000 925,000 East Chattanooga Rising 3,550,000 - - - - 3,550,000 East Chattanooga Rising 3,550,000 - - - - 3,550,000 East Chattanooga Rising District Infrastructure 2,050,000 - - - - 2,050,000 East Chattanooga Rising Planning & Design 100,000 - - - - 100,000 Hardy Street Extension 1,400,000 - - - - 1,400,000 Enterprise 121,600,000 72,940,000 83,425,000 75,135,000 78,190,000 431,290,000 Water Quality 6,600,000 8,340,000 9,225,000 3,435,000 3,190,000 30,790,000 Public Works - Water Quality 6,600,000 8,340,000 9,225,000 3,435,000 3,190,000 30,790,000 Automated Flood Warning System 350,000 350,000 350,000 350,000 350,000 1,750,000 Brainerd & South Howell - - 100,000 100,000 100,000 300,000 Central Avenue Ext Separation Project - - 1,540,000 - - 1,540,000 Central Avenue Ext Separation Project (Central Ave/MLK) - 2,000,000 200,000 - - 2,200,000 Central Avenue Ext Separation Project (Lincoln Park System-Phase II)- 2,000,000 2,000,000 - - 4,000,000 Dartmouth/Five Points Watershed SIP 1,950,000 - 2,000,000 - - 3,950,000 Davidson Road - - 750,000 - - 750,000 Elder Mountain Road - 890,000 - - - 890,000 Flood Control Pump Station Upgrades 250,000 - - - - 250,000 Floodplain Modeling - 200,000 250,000 250,000 250,000 950,000 Glass Street Area / Taylor St, Dodson Ave, Crutchfield St 1,000,000 - - - - 1,000,000 Green Infrastructure SOV Bank - 250,000 100,000 100,000 100,000 550,000 Heavy Equipment 650,000 525,000 485,000 535,000 590,000 2,785,000 Heritage Park Water Quality 200,000 - - - - 200,000 On-Call Landscape Design 100,000 - 200,000 - 200,000 500,000 Stream Buffer Conservation 250,000 250,000 250,000 500,000 500,000 1,750,000 Stream Restoration/Various Sites 250,000 250,000 250,000 500,000 500,000 1,750,000 TN River Bank Stabilization Project - 875,000 - - - 875,000 USACE/FEMA Floodplain Culvert Replacement Projects 100,000 250,000 250,000 100,000 100,000 800,000 Water Quality TMDL & Land Management 1,500,000 500,000 500,000 1,000,000 500,000 4,000,000 Interceptor Sewer System 115,000,000 64,600,000 74,200,000 71,700,000 75,000,000 400,500,000 PW-ISS 115,000,000 64,600,000 74,200,000 71,700,000 75,000,000 400,500,000 23rd St PS Improvements 4,000,000 - - - - 4,000,000 Citico Creek Sub-basin Combined Sewer Separation 3,000,000 - - - - 3,000,000 Citico Force Main Replacement 5,000,000 - - - - 5,000,000 C-54 DRAFT - UPDATED 8-19-21 City of ChattanoogaFY22-26 Capital Budget Summary by Project Department Proposed FY22Proposed FY23Proposed FY24Proposed FY25Proposed FY26 5 Year Total Citico Pump Station Improvements 2,000,000 - - - - 2,000,000 Collection System Equipment Purchase 550,000 - - - - 550,000 Contingency - Plans and Studies 4,000,000 200,000 200,000 200,000 500,000 5,100,000 Contingency - Plans and Studies (SCADA Master Plan - Phase 1)214,600 - - - - 214,600 Contingency MBWWTP Improvements - 2,500,000 3,000,000 3,000,000 3,000,000 11,500,000 CSOTF Equipment Replacement Program 1,500,000 - - - - 1,500,000 E212 SSO Abatement Program- Red Bank (SPOI Ph. 4A) 10,000,000 - - - - 10,000,000 E2I2 SSO Abatement Program - East Ridge (WWS Ph. 5 - East Brainerd)10,000,000 - - - - 10,000,000 E2I2 SSO Abatement Program - Lee Hwy (WWS Ph. 7 - Lee Highway)10,000,000 - - - - 10,000,000 Focused SSES and Rehab - Phase II 8,000,000 8,000,000 8,000,000 8,500,000 8,500,000 41,000,000 Friars Branch Pump Station Grinders 600,000 - - - - 600,000 Implementation of CD Green Infra Projects in the CSS 500,000 500,000 - - - 1,000,000 ISS Capacity Improvements - - 2,000,000 2,000,000 - 4,000,000 MBWWTP Laboratory Equipment 250,000 - - - - 250,000 MBWWTP Oxygen Plant Replacement - 11,000,000 11,000,000 - - 22,000,000 MBWWTP Oxygen Plant Upgrades 1,750,000 - - - - 1,750,000 MBWWTP Solids Process Optimization Implementation - Phase 2 (Thickener Upgrade)500,000 - - - - 500,000 MBWWTP Solids Process Optimization Implementation - Phase 4 (A-D) (Digester Upgrades - THP)20,000,000 20,000,000 20,000,000 20,500,000 18,000,000 98,500,000 MBWWTP Warehouse Improvements 6,250,000 - - - - 6,250,000 MBWWTP Water Use and Re-use Implementation 1,500,000 - - - - 1,500,000 MBWWTP Wet Weather Treatment Upgrade - - 20,000,000 35,000,000 45,000,000 100,000,000 Mountain Creek PS Improvements 450,000 - - - - 450,000 Program Management For Consent Decree Implementation3,485,400 2,500,000 2,500,000 2,500,000 - 10,985,400 Pump Station Generator 2 750,000 - - - - 750,000 Pump Station Generator 3 - 750,000 - - - 750,000 Pump Station Improvements 2,000,000 - - - - 2,000,000 Pump Station Improvements (Big Ridge PS 5 & 12) 1,500,000 - - - - 1,500,000 Pump Station Improvements (IPS Screen Bypass Project) 1,500,000 - - - - 1,500,000 Purchase New Centrifuge 400,000 - - - - 400,000 South Chic PS Improvements 1,000,000 11,000,000 4,000,000 - - 16,000,000 Tiftonia PS#3 Safety Upgrade 1,450,000 550,000 - - - 2,000,000 Vehicle Purchase 150,000 - - - - 150,000 Wet Weather Response Team 100,000 - - - - 100,000 Wet Weather Storage - Phase 6 - Hixson PS #1 10,000,000 - - - - 10,000,000 Winterview Pump Station and Basin Improvements 500,000 1,500,000 - - - 2,000,000 Total All Funds 178,758,487 136,466,254 139,659,359 121,529,793 108,339,661 254,388,554 C-55 DRAFT - UPDATED 8-19-21 RESOLUTION NO. ___________ A RESOLUTION EXPRESSING THE INTENT OF THE CITY OF CHATTANOOGA TO ISSUE BONDS IN THE AGGREGATE AMOUNT NOT TO EXCEED FIVE MILLION FIVE HUNDRED THOUSAND DOLLARS ($5,500,000) FOR THE PURPOSE OF PAYING ALL OR A PORTION OF THE COSTS OF THE FOLLOWING: ALTON PARK CONNECTOR, BRIDGE MAINTENANCE - STANDIFER GAP, COMMUNITY CENTER IMPROVEMENTS, FIRE TRAINING CENTER UPGRADE PLANNING AND DESIGN, GOODWIN ROAD SEGMENT 4 / HAMILTON PL BLVD., GREENWAY FARM CONFERENCE CENTER, LAW ENFORCEMENT TRAINING CENTER, LYNNBROOK PARK, ROADWAY SLOPE FAILURE, STATION 15 REPLACEMENT (ADDITION), TRAFFIC SIGNAL INFRASTRUCTURE MAINTENANCE, TRANSIT STOP ACCESSIBILITY (SECTION 5310) ________________________________________________ WHEREAS, Sections 9-21-101 to 9-21-1017, both inclusive, Tennessee Code Annotated, authorize municipalities in the State of Tennessee to issue bonds for public works projects; and WHEREAS, Section 9-21-205 of said Code provides that before bonds may be issued the governing body of the municipality shall adopt a resolution known as the “INITIAL RESOLUTION” determining to issue such bonds: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CHATTANOOGA, TENNESSEE, That pursuant to the provisions of Tennessee Code Annotated, referred to in the preamble hereof, there be issued and sold Bonds in the aggregate amount not to exceed Five Million Five Hundred Thousand Dollars ($5,500,000) of the City of Chattanooga, Tennessee for the purpose of paying all or a portion of the costs of Alton Park Connector, Bridge Maintenance - Standifer Gap, Community Center Improvements, Fire Training Center Upgrade Planning and Design, Goodwin Road Segment 4 / Hamilton Pl Blvd., Greenway Farm Conference Center, Law Enforcement Training Center, Lynnbrook Park, Roadway Slope Failure, Station 15 Replacement (addition), Traffic Signal Infrastructure Maintenance, and Transit Stop Accessibility (Section 5310). Said bonds shall bear interest at such rate or rates not to exceed the rate or rates prescribed by law payable semiannually and shall be payable exclusively from taxes and shall be issued at the time or times and bear date or dates and mature at such times as may hereafter be determined by resolution. BE IT FURTHER RESOLVED, that this resolution also contemplates and authorizes the use of proceeds of any bonds hereafter issued by the City for the purpose described herein to be used to reimburse the City for any costs incurred on or after (a date sixty (60) days prior to adoption of this resolution) and, in addition, de minimis amounts incurred before that date and amounts not exceeding twenty percent percent (20%) of the adjusted issue price of the bonds which are expended for preliminary expenditures, within the meaning of Treasury Regulation Section 1.150-2, all of which costs are incurred or to be incurred with respect to projects referred to in this resolution. ADOPTED:____________________, 2021

Source: City of Chattanooga website. First collected Oct 7, 2026.