FY21 Proposed Capital Budget
City of Chattanooga · Hamilton County · Budget documents
Open the original document More from City of Chattanooga
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
C I T Y O F C H A T T A N O O G A
C A P I T A L B U D G E T
2 0 2 1 - 2 0 2 5
S A F E R S T R E E T S | G R O W I N G E C O N O M Y | S T R O N G E R N E I G H B O R H O O D S
H I G H P E R F O R M I N G G O V E R N M E N T | S M A R T E R S T U D E N T S , S T R O N G E R F A M I L I E S
O u r mi s s i o n i s t o b r e a k d o w n t h e b a r r i e r s t h a t p r e v e n t p e o p l e f r o m l i v i n g t h e l i v e s t h e y w a n t i n o u r c o mmu n i t y .
Introduction
The FY21-25 Capital Improvement Plan (CIP) shows the City of Chattanooga’s five-year
plan for physical improvements throughout Chattanooga, as well as internal projects that
improve the provision of services to residents. The first year of the CIP is the fiscally-con-
strained capital budget, whereas the successive years are a roadmap for future action.
Funding for capital projects—defined as projects costing more than $50,000 and with a
useful life of greater than one year—is requested annually by departments alongside the
BFO process. Capital requests are reviewed and collaboratively prioritized by the 16 mem-
bers of the CIP Committee, an interdisciplinary team of department administrators and
designees. The CIP process encourages strategic thinking about the City’s current and
future capital needs and priorities, and requires collaboration and focus in order to reach
a fiscally sustainable program of projects. The below strategies represent highlights of the
for FY21.
FY21 Highlights – Capital Budget
• Key investments in crime prevention as support continues for the real time intelligence
center
• Replacement of Fire Station 15
• Street improvements and repairs of over $8 million
• Funding for CARTA improvements including vehicle and technology replacements
• Public Safety resilient corridor projects with EPB to maintain resilient and sustainable
electric power during all conditions including manmade and natural disruptions
• Additional funding for YFD sites and facilities
• Protect neighborhood affordability through continued funding of Chattanooga’s afford-
able housing fund
• Additional funding to complete key segments of our greenway system, including Manu-
facturers Road, Alton Park Connector, and the Midtown Pathway
• State of the art financial planning tools to ensure our dollars and investments are pro-
tected
• Investments in early learning, including new curriculum, repairs and security improve-
ments at Head Start facilities, and planning for new Head Start facilities
• Continued investment in our library as a strong learning partner for our community
• Continued funding of the Neighborhood Reinvestment Fund to make targeted invest-
ments in neighborhood infrastructure and commercial areas
• Preparing for installation of a new street and the potential expansion of new jobs for the
former Tubman site
• Support of new Health & Wellness district through support of the 3rd and 4th S infra-
structure project
• Funding to replace a record number of police patrol vehicles
• Significant funding for mainteance and upkeep of City facilities, parks, and YFD cen-
ters
• Funding for infrastructure repairs resulting from damage from the April 2020 tornado
event
FY21-25 Capital Budget
C-1
3rd / 4th Street (REQ)
The project will transform the 3rd and 4th Street area from Georgia Ave. to Hampton St.
into a well-connected grid of 2-way streets with at-grade intersections, and will change
Riverfront Parkway from a high speed highway into an urban boulevard with calmed
traffic and pedestrian/bicycle facilities.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
80% $8,500,000 $0 $0 $0 $0 $8,500,000
Governmental Projects
The below projects are funded through a combination of governmental funds
such as City tax revenues, general obligation bonds, and internal service
funds. Project descriptions are included for the FY21 projects.
Growing Economy
FY21 Offers Funded: 12
FY21 City Funding: $5,450,000
FY21 External Funding: $9,069,714
1st Street Steps
Appropriation to receive additional funds from River City Company for additional scope
for the 1st Street Steps project.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
100%
$379,599 $0 $0 $0 $0 $379,599
FY21-25 Capital Budget
C-2
East Chattanooga Rising Planning & Design
Funding for planning and design of future public infrastructure associated with the East
Chattanooga Rising project.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $100,000 $0 $0 $0 $0 $100,000
8th Street and Broad Street Streetscape
Continue shared street along 8th St. from Chestnut St. to Broad St. and build new
streetscape (including pedestrian (ADA compliance), bike facility, on-street parking, and
landscaping, sidewalks). These improvements are envisioned as a template for a ful-
ly-streetcaped Broad Street as originally envisioned in the 2014 City Center Plan.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $1,600,000 $0 $0 $0 $0 $1,600,000
Central Avenue (REQ)
Project will construct new Central Ave. extension between 3rd St. and Riverside Dr.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
80% $2,000,000 $10,500,000 $0 $0 $0 $12,500,000
FY21-25 Capital Budget
C-3
Hardy St. Extension
Installation of new street west from Roanoke Ave. in conjunction with the East
Chattanooga Rising development.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $350,000 $850,000 $0 $0 $0 $1,200,000
Golf Course Renovations and Maintenance
Chattanooga’s Municipal golf courses provide excellent recreational opportunities to
Chattanooga residents at an affordable price. In recent years, unfortunately, operating
costs have outgained revenues and capital projects have not been able to be funded.
After a review by a golf course consulting team in FY20, several items of capital improve-
ment and deferred maintenance have been identified. A five year CIP plan will be sub-
mitted to address these items. The items to be addressed will be surface and subsurface
drainage, especially on the fairways, rebuilding sand bunkers, and addressing several
trees that need to be removed or trimmed for safety. Cart paths, irrigation, leveling tee
boxes, course signage updates, facility updated, practice facility renovation, and parking
lot improvements will also be addressed in the CIP plan. The plan will average an esti-
mated $1.5 Million a year throughout the duration of the 5-year plan.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $100,000 $1,680,000 $1,630,000 $1,600,000 $1,450,000 $6,460,000
Golf Course Maintenance Equipment Replacement
Replace mowing equipment at Brainerd and Brown Acres golf courses. Current mowing
fleet includes mowers and other equipment that is in most cases at least 15years old. It
has become very costly to rehab every winter. Over the past five fiscal years, Golf Opera-
tions has had over $140,000 in repair parts expense for mowers. Staff estimates that at
least 60% to 70% of this expense is directly related to the age of the fleet.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000
FY21-25 Capital Budget
C-4
Tivoli Foundation Appropriation (A.O.)
Yearly support for the Tivoli Foundation capital campaign.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $500,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $4,500,000
Public Art Artists’ Work Program
This fund will not only provide much-needed work for independent artists in the wake of
COVID-19, but it will also infuse the local creative economy with various project-related
purchases tied to the creation, installation, and documentation of public art projects.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $150,000 $0 $0 $0 $0 $150,000
Patten Parkway
Continuation of the Patten Parkway project that is transforming this long-neglected
street into a great public space.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $350,000 $0 $0 $0 $0 $350,000
Walnut Plaza/Holmberg Bridge/Ed Johnson Site Prep
Appropriation to receieve funds from the Community Foundation for Ed Johnson
Memorial site preperation.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
100% $290,095 $0 $0 $0 $0 $290,095
FY21-25 Capital Budget
C-5
Business Continuity Assessment & Plan
The City is seeking to perform an assessment to develop a citywide Business Continuity
Plan. This plan will be followed in the event of an unplanned emergency to limit inter-
ruptions and ensure recovery of critical business processes and operations. This will be
an integral part of Disaster Recovery Planning.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $220,000 $0 $0 $0 $0 $220,000
City Buildings & YFD Centers Major Maintenance
This Capital project is to address major Building System Elements at YFD Centers and
other City Buildings, such as HVAC systems, roofing system replacements, exterior gut-
ters and downspout source leaks, structural repairs, floor replacements, restroom reha-
bilitation, building code upgrades, ADA Compliance, etc.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $1,700,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $5,700,000
City Hall Boiler Replacement
The existing boiler for the HVAC system is at the end of its life. A new boiler will provide
a long term more cost efficient solution.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $70,000 $0 $0 $0 $0 $70,000
High-Performing Government
FY21 Offers Funded: 15
FY21 City Funding: $11,157,661
FY21 External Funding: $2,733,975
FY21-25 Capital Budget
C-6
City Network Rebuild
This capital funding request is to continue efforts to replace out of date, out of support
technical infrastructure in City buildings. This funding is vital to improve performance,
maintain security measures and create efficiencies. Current topology requires a strong
network infrastructure to connect to applications and data. Reliable, consistent con-
nectivity is crucial to maintain business continuity and data access for all departments
citywide. The Network Rebuild capital request is in direct support of these critical busi-
ness objectives.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $400,000 $200,000 $0 $0 $0 $600,000
Citywide Security Cameras
This capital request is to continue efforts to add or replace security cameras in public
areas and City buildings. These cameras are viewable in the Real-Time Intelligence Cen-
ter (RTIC) allowing for increased visibility during public events and critical incidents. The
FY21 funds will be used to replace antiquated CCTV cameras across the City and to add
cameras in strategic locations identified by CPD.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $155,493 $200,000 $0 $0 $0 $355,493
Cloud Software as a Service (SaaS) ERP
The City’s ERP (Enterprise Resource Planning) software is old technology not keeping
pace with user expectations. It is also only about 48% implemented while we are paying
100% of the maintenance cost. The City needs to demonstrate process improvements in
the areas of General Ledger, Purchasing, Projects & Grants management, Time & Labor,
Accounts Payable, Fixed Assets, Human Resources, Budget creation, and Cash Man-
agement that will incorporate best practices, and enhance the end-user experience. All
applications should be mobile-enabled and provide key performance indicators, dash-
boards, and predictive analytics. The City has a potential opportunity to invest in a
product that will increase productivity, greater flexibility, and remain current with tech-
nology trends.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $2,711,513 $0 $0 $0 $0 $2,711,513
FY21-25 Capital Budget
C-7
Fleet Capital Infusion
Capital dollars are need to purchase vehicles that are in the Fleet Replacement Program
that are not fully funded; this includes one fire truck for FY21.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $587,558 $0 $0 $0 $0 $587,558
Fleet Program Purchases
This is to appropriate Fleet Program Reserve funds so that they may be used to replace
vehicles currently in the program that are at the end of their lease terms.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
46% $5,000,000 $0 $0 $0 $0 $5,000,000
Increased Curbside Recylcing
This is a cleanup item to adjust expected external grant revenues
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
100% $454,000 $0 $0 $0 $0 $454,000
FY21-25 Capital Budget
C-8
Plan of Services Obligations
Funds for pending obligations related to annexed areas.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $150,000 $0 $0 $0 $0 $150,000
Police Annex Renovation Phase I Completion and Phase II-III
Originally requested $600k to renovate an entire Chattanooga Police Department facility
commonly known as Police Annex. Police Annex houses multiple units including Narcot-
ics, Street Crimes, Auto Theft, Polygraph, Vice, NIBIN, Crime Scene, ballistics, etc. The
Phase I renovation came in over budget, and this funding should allow completion of
that phase.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $120,000 $250,000 $0 $0 $0 $370,000
Lactation Room Compliance
Human Resources is requesting Capital funds to enhance City facilities to comply with
federal and state laws that require all employee worksites to have lactation rooms as
well as to promote the health and wellness of City employees who are nursing after the
birth of a child.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $50,000 $0 $0 $0 $0 $50,000
FY21-25 Capital Budget
C-9
POWER to PROTECT: A Resilient Public Safety Microgrid Project, in
Partnership with EPB
The City and EPB propose to develop an electric microgrid for maintaining power and
communications abilities for the City and County’s emergency response agencies. The
project would incorporate photovoltaic (PV) solar, battery storage and control systems at
the public safety complex on Amnicola Highway, including CPD, CFD, County EMS, 911
and TVRCS assets, in order to maintain continuous, resilient and sustainable electric
power during regular operational conditions as well as periods of man-made and natu-
ral disruptions. In addition to providing primary operational benefits, this project would
support additional secondary operational benefits such as improved (covered) parking
conditions and electric charging for all-electric and/or hybrid vehicles which may be in-
corporated into the City’s fleet. This effort is also aiming to strategically coordinate with
other departments with regards to facility improvements, information technology and
transportation related efforts, such as a needed new roof for the Police Services Center.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $1,300,000 $0 $0 $0 $0 $1,300,000
Property Tax System
This offer is for the implementation of a new Property Tax Management system to replace
the current Property Tax Management system provided and supported by Harris Govern.
The current contract with Harris Govern has been in effect for five years and is expiring
with no additional renewal options.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $675,072 $0 $0 $0 $0 $675,072
Police Service Center Roof Replacements
The current roof system is at the end of its expected life. TThe overall design of current
roof system is anantiquated roof that is no longer being used in today’s standard re-
placements. The tar/gravel labor rate is cost prohibitive for using the same design as
replacement. The T.P.O. roof design is the current standard for new roofs and re-roof
systems. Price includes Architect bid specifications / blueprint design to ensure proper
drainage/protection of walk pads and the overall installation. This project is also tied to
the public safety complex resilience project.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $348,000 $0 $0 $0 $0 $348,000
FY21-25 Capital Budget
C-10
ADA Bus Stop Connections
This is an update to reflect changes to federal funding sources.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
90% $75,357 $0 $0 $0 $0 $75,357
Bridge Maintenance - Multiple Locations (P20402) Trans Bridge - Repairs to
City Owned Bridges - Standifer Gap (REQ)
Funding to help replace Standifer Gap Road Bridge, which has been closed since 2015.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $100,000 $500,000 $0 $0 $0 $600,000
Bridge Management & Maintenance - Multiple Locations (Local Funds Capital
Projects - Not tied to TIP)
Repair structures and appurtenances on the network of City-owned bridges on as-need-
ed basis, in accordance with findings in regular TDOT inspections and reports on the
bridges.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $400,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $4,400,000
Safer Streets
FY21 Offers Funded: 27
FY21 City Funding: $11,204,010
FY21 External Funding: $11,669,975
FY21-25 Capital Budget
C-11
Chattanooga Traffic Signals and Communications Upgrade - Amnicola Hwy.
Install new traffic signal and communications equipment along Amnicola Hwy to support
real-time communication and monitoring, data collection, signal timing modification,
and congestion management along the corridor.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
83% $1,200,000 $0 $0 $0 $0 $1,200,000
Citywide Intersection Improvements
Improve intersections across the City identified through CDOT’s intersection prioritiza-
tion methodology that considers vehicle crash history analysis, pedestrian safety con-
cerns, vehicular flow improvements, public requests, and other factors. Treatments may
include converting intersections to roundabouts, installing signals at warranted intersec-
tions, hardscape treatments (sidewalks, refuge islands, etc.), ADA improvements, strip-
ing, signage, etc. The improvements may include making temporary improvements to
test design solutions and permanent treatments to formalize tested solutions.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $300,000 $500,000 $500,000 $500,000 $500,000 $2,300,000
CMAQ 2 Protected Bike Lanes
This is the second phase of the CMAQ protected bike lane project, and will establish
one-way protected lanes on multiple streets around the greater downtown area that will
complete gaps in existing bicycle infrastructure.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
98% $306,748 $0 $0 $0 $0 $306,748
FY21-25 Capital Budget
C-12
Elder Mountain Road
This is a budget cleanup item to finalize funding for Elder Mountain Road
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $937,926 $0 $0 $0 $0 $937,926
Fire Training Center Upgrade Planning and Design
Training firefighters and police officers requires an academic understanding of emer-
gency response work. However, it is vital to move the academic theory into a hands-on
model of training. This necessary model cannot occur without the facilities to provide
those experiences. This offer signifies a change in direction from building a new training
center to working with a consultant to renovate the existing training center property.
The requested funds this year would be added to the $75,000 already set aside toward a
regional training facility. The plan includes working with a consultant to reorganize the
existing site space toward the best arrangement and use of the drill ground. After the
planning phase, one of the primary needs is to construct a new drill tower due to heavy
use of the existing tower which has repairs made annually. Staying on the current site
and working to upgrade the current facility could save the city and taxpayers millions
of dollars, but significant investment must be made in the next few years. It is also still
anticipated that Hamilton County Office of Emergency Management would partner with
Chattanooga toward construction costs since all of the area fire departments use our
regional training facility.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $150,000 $2,500,000 $0 $0 $0 $2,650,000
Hwy 58 Bicycle and Pedestrian Facilities Phase 2 (REQ)
This project is the second phase of a shared use path along Hwy. 58 from the current
end of the path at Webb Rd. to Willard Rd.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
80% $100,000 $0 $0 $2,100,000 $0 $2,200,000
FY21-25 Capital Budget
C-13
Lake Resort Drive
Funding to complete repairs to and reopen Lake Resort Drive.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $720,000 $0 $0 $0 $0 $720,000
Law Enforcement Training Center
Property purchase for a new law enforcement training facility
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
50% $1,000,000 $3,000,000 $4,000,000 $2,500,000 $2,500,000 $13,000,000
McKamey - Facility Repairs and Upgrades (A.O.)
The McKamey Animal Center is 12 years old and although initially a state-of-the art
facility when it opened in 2008 the center has sheltered over 86,000 animals since its
doors opened. The wear and tear on the facility has been extreme and despite ongoing
maintenance to keep the facility in good repair the equipment and animal housing areas
are in need of new equipment and renovation. This request is for the replacement and or
repair of outdated equipment such as HVAC equipment and systems and the repair and
or replacement of 105 of the 240 canine kennels and exercise runs. The center houses
on average over 500 animals daily and in peak season as many as 800 animals are in
the center. In addition we require exterior facility upgrades such as exterior painting,
(the facility has not been painted since 2007) the entire exterior has peeling paint and
damaged gutters. The exterior fencing surrounding the perimeter of the facility and its
entry gates are in need of repair and or replacing. Additional gates and fencing is needed
for the safety of the animals during after hours when the facility is closed to keep intrud-
ers out.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $75,000 $0 $0 $0 $0 $75,000
FY21-25 Capital Budget
C-14
Midtown Pathway
This project will install a shared use path along the south side of Brainerd Rd. from
Spring Creek Rd. to the South Chickamauga Creek Greenway trailhead at Greenway
View Dr.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $400,000 $2,022,000 $0 $0 $0 $2,422,000
Pavement and Traffic Infrastructure Debris Damage - FEMA
13,700’ linear feet of pavement damage due to tornado debris and emergency response
from heavy equipment needed for search and rescue, clearing roadways, and securing
power lines and poles as well as replacement of damaged traffic signal infrastructure and
signage.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
87.50% $2,000,000 $0 $0 $0 $0 $2,000,000
Pavement Flood Damage - FEMA
Pavement and shoulder damage due to stormwater runoff and flooding, slope failures,
etc.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
87.50% $400,000 $0 $0 $0 $0 $400,000
FY21-25 Capital Budget
C-15
Roadway Slope Failure (P20205)
These funds are utilized to address roadway slope failures throughout the City.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $750,000 $500,000 $500,000 $500,000 $500,000 $2,750,000
RTIC
The Real-Time Intelligence Center (R.T.I.C.) will be a force multiplier in our ongoing effort
to reduce violent crime within our communities. RTIC Investigators will use the most
technologically advanced equipment to actively support Intelligence-Led Policing strat-
egies by forging real-time data with active intelligence. The addition of both mobile and
pole-mounted surveillance cameras will increase RTIC Investigator’s ability to monitor
current or perpetual acts of violence to provide real-time information to field officers and
criminal investigators.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $83,600 $83,600 $0 $0 $0 $167,200
Sidewalks (P20306)
This project installs new and repairs existing sidewalks across the City to allow safe mo-
bility by any user and to help encourage active public space and engagement of commer-
cial and residential areas.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $400,000 $1,574,100 $1,731,510 $1,904,661 $2,095,127 $7,705,398
FY21-25 Capital Budget
C-16
Station 15 Replacement
The Chattanooga Fire Department (CFD) is requesting funding to replace Station 15 that
primarily serves the Eastdale and Brainerd communities. The station has been in dis-
repair and does not meet the needs of a modern fire station, including being too small
to accommodate most modern fire apparatus, a lack of women’s facilities, and a lack of
ability to properly store personal protective equipment. This is the next community fire
station in the CFD’s Station Replacement Plan. This offer seeks funds, added to partial
funding already set aside, to complete the land purchase, design, and construction of the
replacement for CFD’s Station 15 and the demolition of the old station.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $2,050,000 $0 $0 $0 $0 $2,050,000
Station Capital Maintenance
The Chattanooga Fire Department stands prepared to respond around the clock, and
fire station maintenance is vital to ensuring a healthy and operable place for firefighters
to work and live. This offer requests to fund four major maintenance projects: contin-
ued replacement of aging apparatus bay exhaust systems, roof replacements and large
maintenance projects (Station 10), HVAC replacement (Training), and a new program to
install proximity card entry systems into fire stations. Exhaust systems are vital for the
health of employees, as the system pulls harmful carbon monoxide, gases, and soot from
the bay area. The old systems had to be attached to the apparatus and simply expelled
the exhaust from the bay, which is not a solution good for the environment. The new
system uses a technology that actually “scrubs” the harmful exhaust, collecting the soot
particles in a filtration system. Station 10’s foundation has sunk causing bay doors to be
inoperable and walls to begin tilting away from the main structure. These funds would
also be used to replace/correct unforeseen roof and structural damage in CFD buildings.
Finally, the CFD is requesting to begin a program to install proximity card systems in
each station.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $300,000 $0 $0 $0 $0 $300,000
South Chickamauga Creek Greenway - Caine Lane
This is a budget cleanup item to appropriate additional federal funds.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
100% $0 $0 $0 $0 $0 $310,234
FY21-25 Capital Budget
C-17
TIP Paving CHATT3R1720 (P20214)
This project will leverage federal funds in the TIP to fund large cost resurfacing projects.
Streets eligible for funding in the TIP are functionally classified as Principal and Minor
Arterials and Collector streets and tend to be longer streets, carry higher volumes or
traffic and have higher posted speed limits. Any streets selected for TIP funding must go
through the TDOT Local Programs process for funding obligation.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
67% $1,200,000 $1,200,000 $1,200,000 $1,200,000 $1,200,000 $6,000,000
Traffic Signal Infrastructure Maintenance
The City of Chattanooga has over 340 signalized intersections. The infrastructure and
technology that ensures the signals function properly is reaching the end of or is past its
useful life. This project will replace and repair infrastructure for signals across the City
annually.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $300,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $4,300,000
Street Improvements (paving) (P20201)
These funds are used for CDOT’s annual resurfacing contract. They are a critical part of
comprehensive pavement management that includes paving, microsurfacing, crack seal,
seal coat, and preventative maintenance.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
44% $3,953,024 $5,000,000 $5,000,000 $5,000,000 $5,000,000 $23,953,024
FY21-25 Capital Budget
C-18
Transit Signal Prioritization
This project consists of design and development of a transit signal priority system and
accessibility upgrades at intersections along CARTA Route 4 using Intelligent Transpor-
tation System technologies.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
93% $3,064,000 $5,250,000 $0 $0 $0 $8,314,000
Transit Stop Accessibility (Section 5310)
Improve and expand the accessible pedestrian network around CARTA fixed route stops
to enhance accessibility to transit for older adults and individuals with disabilities. It is
an expansion of work that was done with previous Section 5310 grants CDOT has re-
ceived.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
80% $375,000 $0 $0 $0 $0 $375,000
Trans Stsc Sdwk - Riverwalk Extension (US 27 - Mocc Bend IC) (P20309)
Man/Hamm Streetscape Project
This project will create a shared-use path from Highway 27 along Manufacturers Road
and Hamm Road to connect the North Shore Riverwalk at Coolidge Park to the future
site of the Moccasin Bend Interpretive Center.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
80% $2,023,096 $0 $0 $0 $0 $2,023,096
FY21-25 Capital Budget
C-19
Chattanooga Zoo: African Expansion (A.O.)
Friends of the Zoo, Inc. (FOZ) seeks to help the city to expand its impact on citizens
through economic growth, quality of life improvement, and unique educational opportu-
nities. FOZ is expanding the African area at the Zoo to bring giraffe, lions, and a number
of other species to Chattanooga. This expansion will create new jobs at the Zoo in sev-
eral departments, increase the Zoo’s educational capabilities by expanding classroom
learning space in a new pavilion, it will create new interactive learning opportunities for
all ages related to these charismatic animals, and it will give citizens greater opportuni-
ties for recreation outdoors in a family setting. In total, this campaign is a $10 million
project which will increase the Zoo’s impact on the community all while building a more
sustainable business. The Chattanooga Zoo is owned by the City, and operated by FOZ.
Each building and exhibit built at the Zoo is a City building and increases City assets.
FOZ seeks a partnership in this endeavor so our Zoo can become a greater enhancement
to the quality of life for our residents and offer more engaging opportunities as a living
classroom.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $500,000 $250,000 $250,000 $250,000 $250,000 $1,500,000
Smarter Students, Stronger Families
FY21 Offers Funded: 12
FY21 City Funding: $3,717,202
FY21 External Funding: $224,805
Erlanger Children’s Hospital (A.O.)
City contribution toward the construction of the new Erlanger Children’s Hospital, in
honor of the victims of the Woodmore Bus Tragedy.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $250,000 $0 $0 $0 $0 $250,000
FY21-25 Capital Budget
C-20
Library ADA Accessibility Improvements
This offer request will fund necessary and legally required accessibility improvements
to all Library locations. In Fiscal Year 2021, accessible bathrooms on each floor at the
Downtown Main location will be funded.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $288,000 $999,460 $415,932 $0 $0 $1,703,392
Ignite Discovery Capital Campaign (Creative Discovery Museum) (A.O.)
The Creative Discovery Museum (CDM) seeks a City of Chattanooga investment of
$500,000, payable over 5 years, to enhance visitor’s experience and ensure long-term
sustainability. Communities rich in education, culture, arts and recreation are attrac-
tive to companies and workers, and CDM is a tool often used by corporations to attract
and retain talent. As well, CDM embodies Chattanooga’s commitment to children, rein-
forcing the city’s family-friendly brand and contributing overall to the region’s quality of
life.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $100,000 $0 $0 $0 $0 $100,000
Head Start Capital Improvements
Head Start operates four child care sites; three in Chattanooga and one in Daisy (2302
Ocoee St; 4701 Devine Ave; 501 W 12th St; 9531 Ridge Trail Rd, Soddy Daisy). Two
of the four buildings being assessed are in aging HCDE school buildings being leased
by Head Start, 12th St is a City owned building, and Daisy is a County owned build-
ing. Many of these buildings are experiencing regular systems failures; for instance,
the heating system at the Avondale Head Start site failed the week after winter break
2018, causing children to be out of school for almost two extra weeks, and cost approx-
imately $100,000 that had not been budgeted. This expenditure had an impact on oth-
er programmatic elements including classroom and curriculum supplies. In FY 2020 a
comprehensive Head Start facilities review, conducted by Hefferlin + Kronenberg Archi-
tects, PLLC was completed. In this review approximately $10 million in short, mid and
longterm repairs and renovations. This offer will satisfy some of the most pressing needs
identified in this review.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $400,000 $0 $0 $0 $0 $400,000
FY21-25 Capital Budget
C-21
Quality Matters Capital Fund (United Way) (A.O.)
This offer is submitted by United Way of Greater Chattanooga as fiscal sponsor for the
Quality Matters Capital Fund. In our community only 42% of childcare centers and
homes meet the state requirements for three stars. In order to support the increase in
high quality childcare programs, small capital grants will be awarded to programs with
identified improvement needs as measured by the TN Star Rating System. These grants
will be awarded to licensed childcare providers, or providers in need of funding to move
from an unlicensed program to high quality licensed program. Funds must be expended
within 6 months of award. Participants will be required to accept technical assistance
through this process, by way of CC R&R, TECTA, and committee referrals.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $200,000 $0 $0 $0 $0 $200,000
OEL Curriculum
The Office of Early Learning will purchase the evidence based Creative Curriculum for
each Seats for Success program that achieves 3 Stars, the highest level of quality rec-
ognized by the State of Tennessee. OEL will also provide training on curriculum imple-
mentation, and work with Child Care Resource and Referral to provide these programs
ongoing coaching on implementation to fidelity. This program will provide a one-time
investment with sustainability of implementation through existing resources (CCR&R).
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $150,000 $0 $0 $0 $0 $150,000
Library Children’s Area Roof Replacement
This request would fund the removal and replacement of the 4,625 square foot roof over
the Children’s Department at the Chattanooga Public Library Main Downtown location.
In calendar year 2019 every roof but that over the Children’s Department at the Down-
town Library was replaced. The roof over the Children’s Department is original to the
building and beyond end-of-life. If funded, all existing layers of this roof would be re-
moved and replaced with modern construction. High density insulation would be used
to ensure damage against foot traffic.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $180,000 $0 $0 $0 $0 $180,000
FY21-25 Capital Budget
C-22
YFD East Lake Renovation
YFD is renovating our East Lake YFD Center. This ask is to provide funding to complete
the entire project.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $725,000 $0 $0 $0 $0 $725,000
YFD/Head Start Building
Future building planned for YFD Administration staff and Head Start facility.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $100,000 $0 $0 $0 $0 $100,000
YFD Center Improvements
YFD centers are a vital part of every community. Each community is recognized by the
center that is the face of that area. Great strides have been made to renovate severalex-
isting centers, including Avondale and East Lake. However, each center has need of con-
tinuing upkeep. This budget request is to improve the aesthetics, updates, and fill the
maintenance repair needs of each center, as well as to provide site improvements.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $750,000 $0 $0 $0 $0 $750,000
Security Mandated Network Switch Replacement
This request would fund replacement of the current network switches at the Downtown
Main, Eastgate, Northgate, and South Chattanooga locations of the Chattanooga Public
Library. The current network switches are at end-of-life, and thus will not receive future
security updates or any other support from the manufacturer. Cable upgrades are only
necessary at the Eastgate, Northgate, and South Chattanooga Branches. The City of
Chattanooga Department of Information Technology has informed the Library this re-
placement is necessary.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
75% $299,007 $0 $0 $0 $0 $299,007
FY21-25 Capital Budget
C-23
(Affordable Housing Fund) Housing, Education and Facilities Board (A.O.)
These funds will be allocated to the HEB for distribution.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $1,000,000 $0 $0 $0 $0 $1,000,000
Alton Park Connector
The Alton Park Connector will construct a shared use path along a former rail line that
parallels 33rd St. and connects the Riverwalk on the west and Alton Park and Southside
Community Park on the east. CDOT is partnering with the Trust for Public Land, who
has donated the former rail property to the City and is leading community engagement
and design.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $500,000 $2,250,000 $0 $0 $0 $2,750,000
Batter’s Place Tennis Courts - FEMA
Damage from April 2020 tornado event. Multiple trees fallen onto tennis courts damag-
ing fencing, netting, and lighting system.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
87.50% $50,000 $0 $0 $0 $0 $50,000
Stronger Neighborhoods
FY21 Offers Funded: 24
FY21 City Funding: $6,079,078
FY21 External Funding: $1,354,045
FY21-25 Capital Budget
C-24
Brainerd Golf Course - FEMA
Damage from April 2020 tornado event. Roof damage.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
87.50% $5,000 $0 $0 $0 $0 $5,000
Brown Acres Golf Course - FEMA
Damage from April 2020 tornado event. Stormwater drainage system failure.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
87.50% $55,000 $0 $0 $0 $0 $55,000
CARTA Facilities Projects (A.O.)
This project is for the rehabilitation of administration, maintenance, and CARTA’s inter-
modal facilities. Rehabilitation of CARTA’s administration and maintenance and main-
tenance facilities projects include roof repairs for the bus barn, repair or replacement
of a sprinkler system, replacement of HVAC equipment, the replacement of rollup doors
for CARTA’s maintenance shop, track work, rehabilitation of electrical/lighting systems,
and plumbing/piping replacement or repair. This project also includes funding for the
replacement of one to two bus shelters to CARTA’s service area, including site work and
design. Most of CARTA’s bus shelters are on the city of Chattanooga right of way, and
CARTA coordinates with the Chattanooga Department of Transportation when a new
shelter will be installed.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $298,116 $46,899 $49,244 $54,168 $62,293 $510,720
FY21-25 Capital Budget
C-25
CARTA Technology Projects (A.O.)
This project includes CARTA’s estimate for needed replacements of computers and other
administrative hardware (printers, monitors, switches, etc.) to replace aging machines. In
addition, this project includes replacement of servers and storage for CARTA’s network.
Replacement of servers and storage could be delayed, however, CARTA would have to
maintain hardware warranties in order to mitigate risk of an equipment failure of aging
equipment.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $18,965 $28,611 $31,500 $34,500 $37,500 $151,076
CARTA Vehicles & Equipment (A.O.)
More than 1/2 of CARTA’s existing fleet is past its useful life. For FY 21, CARTA has
included awarded grant funds that have been encumbered. CARTA recently received a
large grant of $11,010,000, which has a local match of 10% or $1,101,000. Since this
is such a large award, CARTA has asked for $186,883 to fund this particular grant for
FY21 and will fund the remainder in future years. This project is for the replacement of
up to 14 fixed route transit coaches, approximately 9 of which will be all electric coach-
es. Currently, 65% of CARTA’s fixed route fleet is past its useful life of 12 years; most of
the vehicles past their useful life are between 16-20 years old. It is CARTA’s overall goal
to transition to an all electric fleet, and CARTA is working towards slowly adding more
electric coaches to its fixed route fleet.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $750,000 $675,000 $680,000 $250,000 $250,000 $2,605,000
Chattanooga Heritage House - FEMA
Damage from April 2020 tornado event. 50 feet of damage to building fascia and edge of
roof.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
87.50% $142,000 $0 $0 $0 $0 $142,000
FY21-25 Capital Budget
C-26
City Yard Improvements
The Paul Clark Building houses the City Wide Services operations. Upgrades to the Paul
Clark Building and grounds include repaving multiple parking lots, painting and up-
grades to office space, fencing according to new code requirements, tool room improve-
ments This is not part of the City Hall Campus and Facilities Master plan.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $50,000 $0 $0 $0 $0 $50,000
Environmental Protection Agency (EPA) Brownfield Cleanup Grant Cost
Share
This offer funds a required grant cost share, if awarded during this competition cycle, to
carry out cleanup activities at brownfield sites. Cost share may be in the form of a con-
tribution of money, material or services.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
83% $600,000 $0 $0 $0 $0 $600,000
Field Lighting
The City owns and maintains 5 youth athletic association ballfield complexes that are
operated by non-profit organizations that provide recreational opportunities for commu-
nity youths. These complexes have been around for many years and show wear and tear.
In recent years, the City has put several thousands of dollars into maintenance and re-
pairs to the lighting systems for the fields. Several wooden poles have had to be replaced
due to failure and rotting, with many more showing signs of future safety concerns. The
fixtures are older, power-consuming, metal halide bulbs that require regular replacement
and re-aiming. Lastly, the controls and wiring require constant attention and more often
than not the City has to use a licensed electrical contractor to perform any work on these
systems. Full system replacement is recommended to improve efficiency, overall lighting,
reduce maintenance, and provide safe operation. Direct buried metal poles, updated con-
trols, wiring, with higher efficiency LED fixtures that come with a 25-year warranty will
be included in these new field lighting systems. The City will need to invest $450,000 to
$900,000 at each site over the next 5 years to complete all replacements.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $450,000 $750,000 $650,000 $920,000 $900,000 $3,670,000
FY21-25 Capital Budget
C-27
Greenway Farm Conference Center Replacement
New Conference Center. Public Works has construction documents for a new building for
commercial use and more energy efficient than the old residential house currently being
used. The park and conference center currently produces about $80,000 annually in
revenues from rentals. The conference center is used for a wide range of activities from
family gatherings, weddings, communities groups, corporate events, recreational events,
and more. The park hosts a number of large outdoor events each year, including the
annual Mud Run & Chickstock Festival where the conference center is used as the event
headquarters and hospitality areas. The plan for the new design is simple and includes
a large conference room with kitchenette, public restrooms, an offices and storage space,
along with a maintenance area and new outdoor porch space.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $550,000 $0 $0 $0 $0 $550,000
Lakeside Ballfields - FEMA
Damage from April 2020 tornado event. Large tree down on top of fence.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
87.50% $5,901 $0 $0 $0 $0 $5,901
Lupton City
Additional funds for environmental remediation at the former Lupton Mill site.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $200,000 $0 $0 $0 $0 $200,000
Lynnbrook Park
Lynnbrook Park is a 1.4 acre vacant site that will be the location of both a stream resto-
ration project and a linear park.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $500,000 $500,000 $0 $0 $0 $1,000,000
FY21-25 Capital Budget
C-28
Neighborhood Reinvestment Fund (NRF)
The intent of the Neighborhood Reinvestment Fund is to make targeted investments in
under-invested neighborhoods across the city, guided by plans adopted by the Chatta-
nooga City Council and needs identified by neighborhoods themselves and City staff.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $97,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $8,097,000
Outdoor Chattanooga Office
Additional revenue needed to cover donation shortfall.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $95,000 $0 $0 $0 $0 $95,000
Parks ADA Repairs
Improvement of facilities and hardscapes as identified from the analysis of current ADA
Assessment Program. The selected firm has completed their analysis and has identified
and prioritized non-compliant areas in a detailed report. Based off the assessment, we
received a lengthy list of needs that will require immediate attention from the City. Parks
& Engineering have began some of these repairs with current funding but based on ini-
tial cost estimate, total repairs are estimated at $1,000,000. Funding could also extend
initial assessment to Park sites not included in original program.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $200,000 $300,000 $300,000 $300,000 $300,000 $1,400,000
FY21-25 Capital Budget
C-29
Parks Cap - TN Riverpark-CB Robinson Bridge
Additional revenue needed to cover donation shortfalls.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $37,990 $0 $0 $0 $0 $37,990
Parks, Playgrounds, Field Maintenance
The Parks Division maintains and repairs the several public restroom, pavilions, barns,
and other building structures throughout the park system. Parks Division will continue
replacement of heavily worn and damaged playground equipment at many sites that are
near the end of typical life and requires expensive repairs to remain in safe and usable
condition. Parks has a 3rd party consultant on contract to access condition and give rec-
ommendation for replacement. Additionally with these funds, major repairs and other
routine maintenance activities that have not been previously feasible will be scheduled
and completed to make Youth Athletic Association complexes attractive to visitors and
safe for participants. Several projects are in progress and/or have been completed at
these sites along with other park sites.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $300,000 $150,000 $150,000 $150,000 $150,000 $900,000
Public Art in Capital
Based on our public art strategic plan recommendation to develop a Budget Policy and
Capital Improvement Project (CIP) guidelines that allocate a portion of the City’s overall
above-ground CIP budget for integrated public art. Each year, the Strategic Capital Plan-
ning Manager and the Public Art Director will coordinate the calculation and designation
of public art funds to select CIP projects during the CIP Budget Process.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $260,000 $0 $0 $0 $0 $260,000
FY21-25 Capital Budget
C-30
Site Improvement Requirements for YFD Centers
To meet the site condition requirements for the new construction associated with the
improvements of YFD Centers, i.e., parking lots, landscaping, etc. 10’ out from new facil-
ities.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $600,000 $0 $0 $0 $0 $600,000
Summit of Softball Complex - FEMA
Damage from April 2020 tornado event. 3 dugouts destroyed and 7 damaged, 4 shade
structures destroyed and 6 damaged, backstop and netting destroyed and other netting
systems damaged, fences and scoreboards destroyed, foul post bent, covered shed and
parking lot light standards destroyed, trees uprooted or decapitated, restroom buildings
damaged, score table stand destroyed, damaged or missing field tarps, signage missing.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
87% $718,151 $0 $0 $0 $0 $718,151
FY21-25 Capital Budget
C-31
23rd St PS Improvements
This project includes making capital improvements to the 23rd Street PS. These improve-
ments are designed to improve the capacity, performance and reliability of the station
and help to reduce sanitary sewer overflows in the area.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $1,000,000 $3,000,000 $0 $0 $0 $4,000,000
Citico Creek Sub-basin Combined Sewer Separation
This project includes the installation of new sewer pipe associated with the seperation
of sanitary sewer and storm drainage piping in conjunction with the the Central Avenue
road extension project.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $6,000,000 $0 $0 $0 $0 $6,000,000
Enterprise Fund Projects
Enterprise projects are funded through user fees rather general fund revenues.
Interceptor Sewer System - Consent Decree Projects
Focused SSES and Rehab - Phase II
This project involves completing Sanitary Sewer Evaluation Studies (SSES) and the reha-
bilitation of sanitary sewer pipe in twenty-four of Chattanooga’s Sewersheds, as directed
in the CD. These repairs will help reduce sanitary sewer overflows in the Sewersheds and
will increase overall collection system capacity to the MBWWTP.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $8,500,000 $8,000,000 $8,000,000 $8,000,000 $8,500,000 $41,000,000
Interceptor Sewer System - Other Projects
FY21-25 Capital Budget
C-32
Contingency - Plans and Studies
Contingency funds allocated for plans and studies that have not been identified yet
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000
Contingency MBWWTP Improvements
Contingency funds allocated for MBWWTP improvement projects that have not been
identified yet.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $914,600 $4,000,000 $2,500,000 $3,000,000 $3,000,000 $13,414,600
CSOTF Equipment Replacement Program
This project will involve the replacement of the fine screens at both the Central Avenue
and Citico CSOTFs. These fine screens are reaching the end of their useful service life
and need replacement. The Central CSO facility was constructed in the year 2000, and
the Citico CSO was constructed in 1999.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $300,000 $300,000 $300,000 $300,000 $0 $1,200,000
Citico PS Reliability Improvements
This project includes additional funds for the in-progress construction at the Citico PS
for valves, actuators, screen and wetwell cleaning. The Citico PS Reliability project in-
volves making improvements to the Citico Pump Station to provide backup of the station
for emergency and maintenance situations. The improvements include the addition of a
backup emergency submersible pumping station and a permanent emergency standby
generator. In addition, a condition assessment and rehabilitation of the large diameter
force main pipelines the station serves will be conducted.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $1,500,000 $0 $0 $0 $0 $1,500,000
FY21-25 Capital Budget
C-33
CSOTF Improvements - Phase 1
The CSOTF Improvements - Phase 1 project stems from the CSOTF Optimization Plan, a
three-phased approach to maximizing the use of storage and treatment in the CSOTFs to
reduce overflows at West Bank and elsewhere within the City’s sewer system. This first
phase includes inexpensive changes to the facilities that could be implemented quickly
as relatively little construction is expected to be required. This budget entry is for addi-
tional funding associated with the inclusion of SCADA and PLC upgrades into the origi-
nal project scope.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $2,000,000 $0 $0 $0 $0 $2,000,000
E2I2 SSO Abatement Program - East Ridge (WWS Ph. 5 - East Brainerd)
This project, which is one of three components in the overall E2I2 program, includes
the development of a feasibility study to determine the size, location, and required infra-
structure improvements needed to construct an EQ station with up to 20 MGD of capac-
ity near the intersection of I-75 and the South Chickamauga Creek. The corresponding
East Ridge EQ Station will include a pump station, force main, and gravity sewer im-
provements; the planning, engineering, and construction of this infrastructure will take
place in this project if the feasibility study determines that it is economically and techni-
cally feasible to do so. This project is a cooperative, cost-sharing undertaking with WWTA
that will yield savings for tax and rate payers in Chattanooga and WWTA while providing
the benefit of schedule extensions on certain components of the City of Chattanooga’s
EPA Consent Decree.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $20,000,000 $20,000,000 $0 $0 $0 $40,000,000
FY21-25 Capital Budget
C-34
E2I2 SSO Abatement Program - Red Bank (SPOI Ph. 4A)
This project, which is one of three components in the overall E2I2 program, includes
the development of a feasibility study to determine the size, location, and required infra-
structure improvements needed to construct an EQ station with an estimated 11 MGD
of capacity near the intersection of Pineville Rd and Hudson Rd. The corresponding Red
Bank EQ Station will include a pump station, force main, and gravity sewer improve-
ments; the planning, engineering, and construction of this infrastructure will take place
in this project if the feasibility study determines that it is economically and technically
feasible to do so. This project is a cooperative, cost-sharing undertaking with WWTA that
will yield savings for tax and rate payers in Chattanooga and WWTA while providing the
benefit of schedule extensions on certain components of the City of Chattanooga’s EPA
Consent Decree.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $5,000,000 $0 $0 $0 $0 $5,000,000
Implementation of CD Green Infra Projects in the CSS
Project involves the implementation of the CD green infrastructure projects in the CSS.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $500,000 $500,000 $500,000 $0 $0 $1,500,000
E2I2 SSO Abatement Program - Lee Hwy (WWS Ph. 7 - Lee Highway)
This project, which is one of three components in the overall E2I2 program, consists of
the planning, engineering, and construction of an EQ station for wet weather storage in
the Lee Highway area. The project will also include the construction of a pump station,
force main, and gravity sewer line improvements, as well as other infrastructure im-
provements needed to allow for regional connections to deliver approximate 10 MGD of
flow through this location. This project is a cooperative, cost-sharing undertaking with
WWTA that will yield savings for tax and rate payers in Chattanooga and WWTA while
providing the benefit of schedule extensions on certain components of the City of Chatta-
nooga’s EPA Consent Decree.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $5,000,000 $10,000,000 $0 $0 $0 $15,000,000
FY21-25 Capital Budget
C-35
Implementation of Vulnerability Recommendations
This project involves implementing the recommendations from the completed EPA man-
dated security vulnerability assessment of the MBWWTP.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $500,000 $500,000 $0 $0 $0 $1,000,000
Lupton Drive Chronic SSO Elimination Project
This project involves the rehabilitation or upsizing of sanitary sewer pipe and manholes.
This project will improve the reliability and structural integrity of the existing pipe and
will eliminate targeted chronic SSOs.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $1,000,000 $0 $0 $0 $0 $1,000,000
MBWWTP Oxygen Plant Upgrades
This project includes the emergency replacement of liquid oxygen piping associated with
the MBWWTP Oxygen Plant whose condition has deteriotated significantly.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $250,000 $1,750,000 $0 $0 $0 $2,000,000
FY21-25 Capital Budget
C-36
MBWWTP Solids Process Optimization Implementation - Phase 4 (A-D) (Di-
gester Upgrades)
This project includes improvements to the MBWWTP solids handling process to provide
reliability and efficiency and to allow the plant to continue to produce land applied mate-
rials as a part of the City’s National Bio-solids Partnership Certified Program. The neces-
sary improvements include rehabilitation of the existing anaerobic digesters, rehabilita-
tion of the centrifuge buildings, additional sludge storage facilities, and other necessary
improvements to the MBWWTP solids process. The existing digesters are nearing their
“end of life” and rehabilitation is necessary to keep them in consistent operation. This
rehabilitation will allow for continued operations and will increase performance in the
solids handling process.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $11,500,000 $20,000,000 $20,000,000 $20,000,000 $8,500,000 $80,000,000
MBWWTP Water Use and Re-use Implementation
This project includes improvements to the MBWWTP potable and plant water systems
to reduce overall water use. It involves implementing water conservation to reduce con-
sumption, substituting lower-grade water for certain non-potable water process uses,
and finding and eliminating leaks in the water system.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $700,000 $0 $0 $0 $0 $700,000
MBWWTP Wet Weather Treatment Feasibility Study
This project includes the development of a feasible alternatives analysis to assess the
implementation of any feasible alternatives to prevent the bypass of flow from any treat-
ment process at the MBWWTP that would violate the plant’s NPDES permit following the
completion of the Phase 1 Consent Decree projects.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $500,000 $0 $0 $0 $0 $500,000
FY21-25 Capital Budget
C-37
Program Management For Consent Decree Implementation
This project is the annual renewal of the scope and fee of program management services
for the implementation of the EPA CD program.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $3,485,400 $2,100,000 $2,100,000 $2,100,000 $2,100,000 $11,885,400
Pump Station Generator 1
This project involves the installation of emergency generator backup electrical power to
selected MBWWTP areas and pump stations to minimize the disrupted electrical service
during power outages.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $750,000 $0 $0 $0 $0 $750,000
Pump Station Improvements
Contingency money allocated for pump station upgrade projects that have not been iden-
tified yet
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $2,000,000 $2,000,000 $0 $0 $2,000,000 $6,000,000
FY21-25 Capital Budget
C-38
Pump Station Improvements (IPS Screen Bypass Project)
This project includes the installation of a bypass system to allow for flow through the IPS
and to the MBWWTP process during blinding conditions of the IPS screen
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $1,500,000 $0 $0 $0 $0 $1,500,000
Riverview Park/CGCC Chronic SSO Elimination Project
This project involves the rehabilitation or upsizing of sanitary sewer pipe and manholes.
This project will improve the reliability and structural integrity of the existing pipe and
will eliminate targeted chronic SSOs.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $1,000,000 $0 $0 $0 $0 $1,000,000
Tiftonia PS#3 Safety Upgrade
This project includes safety and reliability improvements associated with converting the
Tiftonia #2 PS from a canned pump station to a submersible pump station as well as the
assessment and rehabilitation or replacement of sewer force main in the basin
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $2,000,000 $0 $0 $0 $0 $2,000,000
FY21-25 Capital Budget
C-39
West Tiftonia Sewer Connector Rehabilitation
This project involves the rehabilitation of sanitary sewer pipe and manholes located in
the Lookout Creek Sewer Basin. This project will improve the reliability and structural
integrity of the existing pipe and will remove unwanted inflow and infiltration from the
system.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $350,000 $0 $0 $0 $0 $350,000
Wet Weather Storage - Phase 3
This project includes the construction of wet weather storage strategically throughout
the system to store peak wet weather flows, prevent sanitary sewer overflows, and meet
the future capacity requirements as set forth in the Consent Decree. The project will also
increase reliability throughout the sanitary sewer system in the event of power or me-
chanical failures. This budget entry covers the additional cost of construction associat-
ed with executing a bid alternate for the construction of a third tank at the in-progress
facility.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $10,000,000 $0 $0 $0 $0 $10,000,000
Summit Landfill - FEMA
Damage to landfill facilities (fencing w/ baredwire top, garage doors, and side of shop
building)
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
88% $184,000 $0 $0 $0 $0 $184,000
Solid Waste
FY21-25 Capital Budget
C-40
Summit Landfill Storage Building - FEMA
Storage building rollup doors damaged. Smaller shed had roof partially blown off.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
88% $25,000 $0 $0 $0 $0 $25,000
Tennessee Valley Regional Communications System (TVRCS) - Microwave
Radio and Multiprotocol Label Switching (MPLS) Replacement and upgrade.
The over all project will require two vendor to complete due to pricing. The new micro-
wave radio and Multi Protocol Label Switching (MPLS) equipment costs were allocated in
the FY 2019 budget. These additional dollars need to be added to the original allocation
in order to integrate the existing Public Safety radio network into the new microwave
radio and MPLS networks.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $800,000 $0 $0 $0 $0 $800,000
Automated Flood Warning System
Continuation of Phase I & II US Army Corps of Engineers contract to provide the City of
Chattanooga with Hydrologic and Hydraulic studies, Federal Emergency Management
(FEMA) Flood Insurance Study (FIS) submittals, creation of a pilot Hydrologic Engineer-
ing Centers Real-Time Simulation (HEC-RTS) model, development of flood estimation
tools for use in emergency situations, conceptual development of tools and guidance to
evaluate the impacts from future development, and additional support of mideling and
mapping products created in the previous phases.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $350,000 $150,000 $150,000 $150,000 $150,000 $950,000
Tennessee Valley Regional Communications System
Water Quality
FY21-25 Capital Budget
C-41
Dartmouth/Five Points Watershed SIP
Phase I of a five phase Stormwater Infrastructire Replacement Project. Rapid develop-
ment in past years has caused increased runoff potential in the area and taxed an un-
dersized, aging system.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $900,000 $0 $0 $250,000 $0 $1,150,000
Davidson Road
Funds for Phases II and III of a three phase Stormwater Green Infrastructure (GI) proj-
ect. The GSI system will infiltrate runoff from smaller, frequent storms. Drainage will be
reduced from travel lanes and create a shoulder for improved safety.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $750,000 $750,000 $0 $0 $0 $1,500,000
Flood Control Pump Station Upgrades
Upgrades to pump stations throughout the city
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $750,000 $250,000 $0 $0 $0 $1,000,000
FY21-25 Capital Budget
C-42
Floodplain Modeling
To provide accurate, up-to-date information regarding flood levels, flood risk and asso-
ciated hazards for areas within the City of Chattanooga in conformance with current
FEMA standards. This project is necessary to assist the DPW and certain other city
officials, with needed engineering services, on an on-call basis. Early identification of
flood-prone properties during emergencies allows public safety organizations to establish
warning and evacuation priorities.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $200,000 $0 $200,000 $250,000 $0 $650,000
Glass St Area/Taylor St., Dodson Ave, Crutchfield St
Stream restoration project of WPA ditch as identified in the AMEC priority report
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $1,500,000 $1,000,000 $0 $0 $0 $2,500,000
Granada Dr. System Relocation
Collapsed system through private property relocateed into City R.O.W. to alleviate stand-
ing water in street
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $350,000 $0 $0 $0 $0 $350,000
FY21-25 Capital Budget
C-43
Heavy Equipment
Equipment replacement for continued service on water quality projects
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $200,000 $650,000 $525,000 $485,000 $420,000 $2,280,000
N Market St, Branch/Renaissance Park
Redirection of N. Market St Branch flows above baseflow to increase water quality and
aid function of the Renaissance Park Wetland
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $250,000 $0 $0 $0 $0 $250,000
Riverfront Parkway/MLK CSS Separation Project
Sanitary/Stormwater Separation Project. Boynton Dr. trunk line extension and Gate-
way Ave. trunk line extension to Proposed Phase II system
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $700,000 $0 $0 $0 $0 $700,000
FY21-25 Capital Budget
C-44
S Germantown Rd/Brainerd Rd - FEMA
155’ long road slip/break, 35’ long road embankment, 240’ long road slip
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
87% $186,941 $0 $0 $0 $0 $186,941
Stream Buffer Conservation
This program will reduce nutrients and other pollutants in subsurface flow caused by
sediment, pesticides and other materials from entering streams.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $250,000 $0 $0 $0 $100,000 $350,000
USACE/FEMA Floodplain Culvert Replacement Projects
Culvert Replacement Project to replace undersized Culverts in FEMA Mapped Stream
Segments to 100 yr conveyance capacity
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $100,000 $100,000 $250,000 $250,000 $0 $700,000
WQ Vehicles
Vehicle replacement of old vehicles to reduce the maintenance cost and provide contin-
ued inspection services of water quality stormwater control measures.
FY21 Percent
External
Proposed
FY21
Proposed
FY22
Proposed
FY23
Proposed
FY24
Proposed
FY25
CIP Total
0% $150,000 $0 $0 $0 $0 $150,000
FY21-25 Capital Budget
C-45
ORDINANCE NO. __________
AN ORDINANCE APPROPRIATING, AUTHORIZING OR
ALLOCATING FUNDS TO THE CAPITAL IMPROVEMENTS
BUDGET FOR THE FISCAL YEAR 2020-2021.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CHATTANOOGA,
TENNESSEE:
SECTION 1. That there be and is hereby appropriated, authorized, or allocated the
hereinafter set funds from the sources specified for the public purposes indicated of the Capital
Improvements Plan for the Fiscal Year Ending June 30, 2021:
SECTION 2. That there be and is hereby authorized the appropriation of all capital
donations, including partnership agreements not previously appropriated, to the projects and the capital
fund for which they are intended.
GENERAL GOVERNMENTAL FUNDS
FROM General Obligation Bonds 10,000,000$
General Fund Reserves 3,500,000
Economic Development Fund (1111) 18,000,000
State Street Aid (2050) 2,937,926
Fleet Management Fund (6504) 2,720,025
Industrial Development Board- Loan (IDB) 450,000
State Local Government Support Grant 4,014,616
TN Department of Environment and Conservation (TDEC) 454,000
Congestion Mitigation and Air Quality Grant (CMAQ) 1,301,802
Environmental Protection Agency Brownfield Cleanup Grant 500,000
Federal Communications Commission (FCC) 224,805
Tennessee Department of Transportation 214,536
State Funding (Summit of Softball & Outdoor Chatt. Office) (18,695)
Federal Transit Administration (FTA) 360,285
Transportation Improvement Programs (TIP) 11,208,711
Federal Emergency Management Agency (FEMA) 2,532,038
Federal Emergency Management Agency (FEMA) FY20 (18,763,500)
Tennessee Emergency Management Agency (TEMA) 422,007
Tennessee Emergency Management Agency (TEMA) FY20 (3,127,250)
Federal Highway Administration 2,650,000
C-46
Hamilton County 500,000
Hamilton County (1st St. Redesign & South Chatt YFD sign) (50,100)
Donation - River City Company 379,599
Donation - River City Company (Patten Pkwy) (110,000)
Donation - Recycle Partnership (Increase Curbside Recycling) 526,000
Donation - West Rock (Increase Curbside Recycling) (576,000)
Donation - Lyndhurst (Outdoor Chatt. Office & CB Robinson) (130,200)
Donation - Community Foundation 290,095
TO General Government & Supported Agencies 7,574,313$
East Chattanooga Rising 450,000
Department of Police 2,851,600
Department of Fire 2,450,000
Department of Public Works 10,410,649
Department of Economic & Community Development 3,348,853
Department of Transportation 11,305,385
Department of Youth & Family 2,019,900
40,410,700$ 40,410,700$
PROPRIETARY CAPITAL FUNDS
FROM: State Revolving Loan Fund/GO Bonds/Revenue Bonds (ISS) 50,000,000$
Interceptor Sewer System Operations (Fund 6010) 21,800,000
Interceptor Sewer System Reserves (Fund 6010) 14,650,000
Federal Department of Energy (1,462,500)
Solid Waste Fund Operation (Fund 6020) 26,125
Tennessee Emergency Management Agency (FEMA) SW 156,750
Tennessee Emergency Management Agency (TEMA) SW 26,125
Water Quality Fund Operations (Fund 6030) 6,473,368
Water Quality Fund Operations (Fund 6030) FY20 (1,875)
Tennessee Emergency Management Agency (FEMA) WQ 140,205
Tennessee Emergency Management Agency (FEMA) WQ FY20 (11,250)
Tennessee Emergency Management Agency (TEMA) WQ 23,368
Tennessee Emergency Management Agency (TEMA) WQ FY20 (1,875)
Tennessee Valley Regional Communication System Reserve 800,000
TO: Interceptor Sewer Fund 84,987,500$
Solid Waste Fund 209,000
Water Quality Fund 6,621,941
Tennessee Valley Regional Communication 800,000
TOTAL PROPRIETARY FUNDS 92,618,441$ 92,618,441$
TOTAL CAPITAL BUDGET 133,029,141$ 133,029,141$
C-47
BE IT FURTHER ORDAINED, That this Ordinance shall take effect immediately from and after its
passage as provided by law.
PASSED _______ ______________, 2020
__________________________________________
CHAIRPERSON
APPROVED_______ DISAPPROVED _________
DATE: ______________________________, 2020
__________________________________________
MAYOR
C-48
FY21-25 Capital Budget
C-49
City Of Chattanooga
Capital Budget Summary by Department
Fiscal Year 2021
Summary Schedule (Combined Capital & Cleanup)
Department
Proposed
FY2021 External Sources Reserves Operations GO Bonds SRF/Bonds
Economic
Dev
Other City
Sources Total
General Governmental
Economic and Community Development 3,348,853 500,000 100,000 - 500,000 - 2,232,000 16,853 3,348,853
Fire Department 2,450,000 - 150,000 - 2,050,000 - 250,000 - 2,450,000
Police Department 2,851,600 500,000 203,600 - 1,800,000 - 348,000 - 2,851,600
Public Works 10,410,649 2,423,069 859,279 - 1,000,000 - 3,453,276 2,675,025 10,410,649
Transportation 11,305,385 (840,025) 925,000 - 2,995,000 - 5,287,484 2,937,926 11,305,385
Youth & Family Development 2,019,900 (5,100) 337,919 - 1,475,000 - 212,081 - 2,019,900
General Government 7,574,313 224,805 924,202 - 180,000 - 6,217,159 28,147 7,574,313
East Chattanooga Rising 450,000 - - - - - - 450,000 450,000
General Governmental Total 40,410,700 2,802,749 3,500,000 - 10,000,000 - 18,000,000 6,107,951 40,410,700
Enterprise
Water Quality 6,621,941 150,448 - 6,473,368 - - - (1,875) 6,621,941
Solid Waste 209,000 182,875 - 26,125 - - - - 209,000
TVRCS 800,000 - - - - - - 800,000 800,000
Interceptor Sewer Fund 84,987,500 (1,462,500) 14,650,000 21,800,000 30,000,000 20,000,000 - - 84,987,500
Enterprise Total 92,618,441 (1,129,177) 14,650,000 28,299,493 30,000,000 20,000,000 - 798,125 92,618,441
Total All Funds 133,029,141 1,673,572 18,150,000 28,299,493 40,000,000 20,000,000 18,000,000 6,906,076 133,029,141
FY21-25 Capital Budget
C-50
City Of Chattanooga
Capital Budget Summary by Department
Fiscal Year 2021
Summary Schedule (Capital)
Department Proposed FY21 External Sources Reserves Operations GO Bonds SRF EconDev
Other City
Sources Total
General Governmental
Economic and Community Development 3,332,000 500,000 100,000 - 500,000 2,232,000 - 3,332,000.00
Fire Department 2,450,000 - 150,000 - 2,050,000 250,000 - 2,450,000
Police Department 2,851,600 500,000 203,600 - 1,800,000 348,000 - 2,851,600
Public Works 12,290,294 4,257,714 859,279 - 1,000,000 3,453,276 2,720,025 12,290,294
Transportation 31,715,385 19,569,975 925,000 - 2,995,000 5,287,484 2,937,926 31,715,385
Youth & Family Development 2,025,000 - 337,919 - 1,475,000 212,081 - 2,025,000
General Government 7,546,166 224,805 924,202 - 180,000 6,217,159 - 7,546,166
East Chattanooga Rising 450,000 - - - - 450,000 450,000.00
General Governmental Total 62,660,445 25,052,494 3,500,000 - 10,000,000 18,000,000 6,107,951 62,660,445
Enterprise
Water Quality 6,636,941 163,573 - 6,473,368 - - 6,636,941
Solid Waste 209,000 182,875 - 26,125 - - 209,000
TVRCS 800,000 - - - - 800,000 800,000
Interceptor Sewer System 86,450,000 - 14,650,000 21,800,000 30,000,000 20,000,000 - - 86,450,000
Enterprise Total 94,095,941 346,448 14,650,000 28,299,493 30,000,000 20,000,000 - 800,000 94,095,941
Total All Funds 156,756,386 25,398,942 18,150,000 28,299,493 40,000,000 20,000,000 18,000,000 6,907,951 156,756,386
FY21-25 Capital Budget
C-51
City Of Chattanooga
Capital Budget Summary by Department
Fiscal Year 2021Summary Schedule (Cleanup)
Department
Proposed
FY2021 External Sources Reserves Operations GO Bonds SRF
Economic
Dev
Other City
Sources Total
General Governmental
Economic and Community Development 16,853 16,853.00 16,853.00
Fire Department - -
Police Department - -
Public Works (1,879,645) (1,834,644.80) (45,000.00) (1,879,644.80)
Transportation (20,410,000) (20,410,000.00) (20,410,000.00)
Youth & Family Development (5,100) (5,100.00) (5,100.00)
General Government 28,147 28,147.00 28,147.00
General Governmental Total (22,249,745) (22,249,745) - - - - - - (22,249,745)
Enterprise
Water Quality (15,000) (13,125) (1,875) (15,000)
Solid Waste
TVRCS - -
Interceptor Sewer Fund (1,462,500) (1,462,500) (1,462,500)
Enterprise Total (1,477,500) (1,475,625) - - - - - (1,875) (1,477,500)
Total All Funds (23,727,245) (23,725,369.80) - - - - - (1,875) (23,727,244.80)
FY21-25 Capital Budget
C-52
FY21-25 Capital Budget
C-53
City Of Chattanooga
Capital Budget Summary by Project
Fiscal Year 2021
**The initials "A.O." and "A.S.F." as appear in this section shall have the same meaning as described in Section 5a of the Operating Budget Ordinance 13xxx
Row Labels Proposed FY21 External Reserves Operations Bonds SRF
Economic
Development Other City
General Governmental 62,660,445 25,052,494 3,500,000 - 10,000,000 18,000,000 6,107,951
General Government 7,546,166 224,805 924,202 - 180,000 6,217,159 -
Agency 1,550,000 - - - 1,550,000 -
Chattanooga Zoo: African Expansion (A.O.) 500,000 - - - 500,000 -
Erlanger Children's Hospital (A.O.) 250,000 - - - 250,000 -
Ignite Discovery Capital Campaign (Creative Discovery Museum) (A.O.) 100,000 - - - 100,000 -
Quality Matters Capital Fund (United Way) (A.O.) 200,000 - - - 200,000 -
Tivoli Foundation Appropriation (A.O.) 500,000 - - - 500,000 -
Chattanooga Public Library 767,007 224,805 74,202 - 180,000 288,000 -
Library ADA Accessibility Improvements 288,000 - - - 288,000 -
Library Children's Area Roof Replacement 180,000 - - - 180,000 - -
Security Mandated Network Switch Replacement 299,007 224,805 74,202 - - -
Department of Information Technology 725,493 - 100,000 - 625,493 -
Business Continuity Assessment & Plan 220,000 - - - 220,000 -
City Network Rebuild 350,000 - - - 350,000 -
Citywide Security Cameras 155,493 - 100,000 - 55,493 -
Finance and Administration 3,386,585 - - - 3,386,585 -
Cloud Software as a Service (SaaS) ERP 2,711,513 - - - 2,711,513 -
Property Tax System 675,072 - - - 675,072 -
Human Resources 50,000 - - - 50,000 -
Lactation Room Compliance 50,000 - - - 50,000 -
Chattanooga Area Regional Transportation Authority 1,067,081 - 750,000 - 317,081 -
CARTA Facilities Projects (A.O.) 298,116 - - - 298,116 -
CARTA Technology Projects (A.O.) 18,965 - - - 18,965 -
CARTA Vehicles & Equipment (A.O.) 750,000 - 750,000 - - -
Economic and Community Development 3,332,000 500,000 100,000 - 500,000 2,232,000 -
Economic and Community Development 3,332,000 500,000 100,000 - 500,000 2,232,000 -
Alton Park Connector 500,000 - - - 500,000 - -
Environment Protection Agency (EPA) Brownfield Cleanup Grant Cost Share 600,000 500,000 100,000 - - -
Health, Education and Housing Facilities Board (Affordable Housing Fund) (A.O.) 1,000,000 - - - 1,000,000 -
Lupton City 200,000 - - - 200,000 -
Lynnbrook Park 500,000 - - - 500,000 -
McKamey - Facility Repairs and Upgrades (A.O.) 75,000 - - - 75,000 -
Neighborhood Reinvestment Fund (NRF) 47,000 - - - 47,000 -
Public Art Artists' Work Program 150,000 - - - 150,000 -
Public Art in Capital 260,000 - - - 260,000 -
Police Department 2,851,600 500,000 203,600 - 1,800,000 348,000 -
Police Department 2,851,600 500,000 203,600 - 1,800,000 348,000 -
Law Enforcement Training Center 1,000,000 500,000 - - 500,000 - -
Police Annex Renovation Phase II-lll 120,000 - 120,000 - - -
Police Service Center Roof Replacements 348,000 - - - 348,000 -
with EPB 1,300,000 - - - 1,300,000 - -
RTIC 83,600 - 83,600 - - -
Fire Department 2,450,000 - 150,000 - 2,050,000 250,000 -
Fire Department 2,450,000 - 150,000 - 2,050,000 250,000 -
Fire Training Center Upgrade Planning and Design 150,000 - 150,000 - - -
FY21-25 Capital Budget
C-54
City Of Chattanooga
Capital Budget Summary by Project
Fiscal Year 2021
**The initials "A.O." and "A.S.F." as appear in this section shall have the same meaning as described in Section 5a of the Operating Budget Ordinance 13xxx
Row Labels Proposed FY21 External Reserves Operations Bonds SRF
Economic
Development Other City
Station 15 Replacement 2,050,000 - - - 2,050,000 - -
Station Capital Maintenance 250,000 - - - 250,000 -
Public Works 12,290,294 4,257,714 859,279 - 1,000,000 3,453,276 2,720,025
Public Works 12,290,294 4,257,714 859,279 - 1,000,000 3,453,276 2,720,025
1st Street Steps 379,599 379,599 - - - -
Batter's Place Tennis Courts - FEMA 50,000 43,750 - - 6,250 -
Brainerd Golf Course - FEMA 5,000 4,375 - - 625 -
Brown Acres Golf Course - FEMA 55,000 48,125 - - 6,875 -
Chattanooga Heritage House - FEMA 142,000 124,250 - - 17,750 -
City Buildings & YFD Centers Major Maintenance 1,700,000 - - - 1,700,000 -
City Hall Boiler Replacement 70,000 - 70,000 - - -
City Yard Improvements 50,000 - 50,000 - - -
Field Lighting 450,000 - - - 450,000 - -
Fleet Capital Infusion 587,558 256,289 - 331,269 -
Fleet Program Purchases 5,000,000 2,279,975 - - - 2,720,025
Golf Course Maintenance Equipment Replacement 200,000 - - - 200,000 -
Golf Course Renovations and Maintenance 100,000 - 100,000 - - -
Greenway Farm Conference Center Replacement 550,000 - - - 550,000 - -
Increased Curbside Recycling 454,000 454,000 - - - -
Lakeside Ballfields - FEMA 5,901 5,163 - - 738 -
Outdoor Chattanooga Office 95,000 - 95,000 - - -
Parks ADA Repairs 200,000 - - - 200,000 -
Parks Cap - TN Riverpark-CB Robinson Bridge 37,990 - 37,990 - - -
Parks, Playgrounds, Field Maintenance 300,000 - - - 300,000 -
Plan of Services Obligations 150,000 - 150,000 - - -
Site Improvement Requirements for YFD Centers 600,000 - 100,000 - 500,000 -
Summit of Softball Complex - FEMA 718,151 628,382 - - 89,769 -
Walnut Plaza/Holmberg Bridge/Ed Johnson Site Prep 290,095 290,095 - - - -
YFD/Head Start Building 100,000 - - 100,000 -
Transportation 31,715,385 19,569,975 925,000 - 2,995,000 5,287,484 2,937,926
Transportation 31,715,385 19,569,975 925,000 - 2,995,000 5,287,484 2,937,926
3rd / 4th Street (REQ) 8,500,000 6,800,000 - - 1,700,000 - -
8th Street and Broad Street Streetscape 1,600,000 - - - 1,600,000 -
ADA Bus Stop Connections 75,357 67,821 - - 7,536 -
Bridge Maintenance - Multiple Locations (P20402) Trans Bridge - Repairs to City
Owned Bridges - Standifer Gap (REQ) 100,000 - 100,000 - - -
Bridge Management & Maintenance - Multiple Locations (Local Funds Capital
Projects - Not tied to TIP) 400,000 - - - 400,000 -
Central Avenue (REQ) 2,000,000 1,600,000 - - - 400,000 -
Chattanooga Traffic Signals and Communications Upgrade - Amnicola Hwy. 1,200,000 1,000,000 - - 200,000 -
Citywide Intersection Improvements 300,000 - - - 300,000 -
CMAQ 2 Protected Bike Lanes 306,748 301,802 - - 4,946 -
Elder Mountain Road 937,926 - - - - 937,926
Hwy 58 Bicycle and Pedestrian Facilities Phase 2 (REQ) 100,000 80,000 - - 20,000 -
Lake Resort Drive 720,000 - - - 495,000 225,000 -
Midtown Pathway 400,000 - - - 400,000 - -
Patten Parkway 350,000 - - - 350,000 -
FY21-25 Capital Budget
C-55
City Of Chattanooga
Capital Budget Summary by Project
Fiscal Year 2021
**The initials "A.O." and "A.S.F." as appear in this section shall have the same meaning as described in Section 5a of the Operating Budget Ordinance 13xxx
Row Labels Proposed FY21 External Reserves Operations Bonds SRF
Economic
Development Other City
Pavement and Traffic Infrastructure Debris Damage - FEMA 2,000,000 1,750,000 - - 250,000 -
Pavement Flood Damage - FEMA 400,000 350,000 - - 50,000 -
Roadway Slope Failure (P20205) 750,000 - 750,000 - - -
Sidewalks (P20306) 400,000 - - - 400,000 - -
South Chickamauga Creek Greenway - Caine Lane 310,234 310,234 - - - -
Street Improvements (paving) (P20201) 3,953,024 1,734,641 - - 218,383 2,000,000
TIP Paving CHATT3R1720 (P20214) 1,200,000 800,000 - - 400,000 -
Traffic Signal Infrastructure Maintenance 250,000 - - - 250,000 -
Trans Stsc Sdwk - Riverwalk Extension (US 27 - Mocc Bend IC) (P20309)
Man/Hamm Streetscape Project 2,023,096 1,618,477 - - 404,619 -
Transit Signal Prioritization 3,064,000 2,857,000 - - 207,000 -
Transit Stop Accessibility (Section 5310) 375,000 300,000 75,000 - - -
YFD Recreation 2,025,000 - 337,919 - 1,475,000 212,081 -
YFD Recreation 2,025,000 - 337,919 - 1,475,000 212,081 -
Head Start Capital Improvements 400,000 - 287,919 - 112,081 -
OEL Curriculum 150,000 - 50,000 - 100,000 -
YFD Center Improvements 750,000 - - - 750,000 - -
YFD East Lake Renovation 725,000 - - - 725,000 - -
East Chattanooga Rising 450,000 - - - - 450,000
East Chattanooga Rising 450,000 - - - - 450,000
East Chattanooga Rising Public Infrastructure 100,000 - - - - 100,000
Hardy St. Extension 350,000 - - - - 350,000
Enterprise 94,095,941 346,448 14,650,000 28,299,493 30,000,000 20,000,000 - 800,000
Solid Waste 209,000 182,875 - 26,125 - -
Solid Waste 209,000 182,875 - 26,125 - -
Summit Landfill - FEMA 184,000 161,000 - 23,000 - -
Summit Landfill Storage Building - FEMA 25,000 21,875 - 3,125 - -
Water Quality 6,636,941 163,573 - 6,473,368 - -
Water Quality 6,636,941 163,573 - 6,473,368 - -
Automated Flood Warning System 350,000 - 350,000 - -
Dartmouth/Five Points Watershed SIP 900,000 - 900,000 - -
Davidson Road 750,000 - 750,000 - -
Flood Control Pump Station Upgrades 750,000 - 750,000 - -
Floodplain Modeling 200,000 - 200,000 - -
Glass St Area/Taylor St., Dodson Ave, Crutchfield St 1,500,000 - 1,500,000 - -
Granada Dr. System Relocation 350,000 - 350,000 - -
Heavy Equipment 200,000 - 200,000 - -
N Market St, Branch/Renaissance Park 250,000 - 250,000 - -
Riverfront Parkway/MLK CSS Separation Project 700,000 - 700,000 - -
S Germantown Rd/Brainerd Rd - FEMA 186,941 163,573 - 23,368 - -
Stream Buffer Conservation 250,000 - 250,000 - -
USACE/FEMA Floodplain Culvert Replacement Projects 100,000 - 100,000 - -
WQ Vehicles 150,000 - 150,000 - -
TVRCS 800,000 - - - - 800,000
FY21-25 Capital Budget
C-56
City Of Chattanooga
Capital Budget Summary by Project
Fiscal Year 2021
**The initials "A.O." and "A.S.F." as appear in this section shall have the same meaning as described in Section 5a of the Operating Budget Ordinance 13xxx
Row Labels Proposed FY21 External Reserves Operations Bonds SRF
Economic
Development Other City
TVRCS 800,000 - - - - 800,000
Tennessee Valley Regional Communications System (TVRCS) - Microwave Radio
and Multiprotocol Label Switching (MPLS) Replacement and upgrade. 800,000 - - - - 800,000
Interceptor Sewer System 86,450,000 - 14,650,000 21,800,000 30,000,000 20,000,000 - -
Interceptor Sewer System 86,450,000 - 14,650,000 21,800,000 30,000,000 20,000,000 - -
23rd St PS Improvements 1,000,000 - 1,000,000 - -
Citico Creek Sub-basin Combined Sewer Separation 6,000,000 - 6,000,000 - -
Citico PS Reliability Improvements 1,500,000 1,500,000 - - -
Contingency - Plans and Studies 200,000 - 200,000 - -
Contingency MBWWTP Improvements 914,600 914,600 - - -
CSOTF Equipment Replacement Program 300,000 - 300,000 - -
CSOTF Improvements - Phase 1 2,000,000 2,000,000 - - -
E2I2 SSO Abatement Program - East Ridge (WWS Ph. 5 - East Brainerd) 20,000,000 - - 20,000,000 - -
E2I2 SSO Abatement Program - Lee Hwy (WWS Ph. 7 - Lee Highway) 5,000,000 - - 5,000,000 - -
E2I2 SSO Abatement Program - Red Bank (SPOI Ph. 4A) 5,000,000 - - 5,000,000 - -
Focused SSES and Rehab - Phase II 8,500,000 - - 8,500,000 - -
Implementation of CD Green Infra Projects in the CSS 500,000 - - 500,000 - -
Implementation of Vulnerability Recommendations 500,000 - - 500,000 - -
Lupton Drive Chronic SSO Elimination Project 1,000,000 1,000,000 - - -
MBWWTP Oxygen Plant Upgrades 250,000 250,000 - - -
Upgrades) 11,500,000 - - 11,500,000 - -
MBWWTP Water Use and Re-use Implementation 700,000 - 700,000 - -
MBWWTP Wet Weather Treatment Feasibility Study 500,000 - - 500,000 - -
Program Management For Consent Decree Implementation 3,485,400 3,485,400 - - -
Pump Station Generator 1 750,000 - 750,000 - -
Pump Station Improvements 2,000,000 2,000,000 - - -
Pump Station Improvements (IPS Screen Bypass Project) 1,500,000 1,500,000 - - -
Riverview Park/CGCC Chronic SSO Elimination Project 1,000,000 - 1,000,000 - -
Tiftonia PS#3 Safety Upgrade 2,000,000 2,000,000 - - -
West Tiftonia Sewer Connector Rehabilitation 350,000 - 350,000 - -
Wet Weather Storage - Phase 3 10,000,000 - 10,000,000 - -
Grand Total 156,756,386 25,398,942 18,150,000 28,299,493 40,000,000 20,000,000 18,000,000 6,907,951
FY21-25 Capital Budget
C-57
City Of Chattanooga
Other City Sources by Project
Fiscal Year 2021
Department Recommended
Other City
Sources
Fleet Mgt
Fund (6504)
State Street
Aid Ops
(2050)
State Street
Aid Reserves
TVRCS
Reserves IDB- TIF Loan
Total Other
City Sources
General Governmental - -
Economic & Community Development - -
Police - -
Public Works 2,720,025 2,720,025 2,720,025
Transportation 2,937,926 1,500,000 1,437,926 2,937,926
East Chattanooga Rising 450,000 450,000 450,000
Total Govt Funds 6,107,951 2,720,025 1,500,000 1,437,926 - - 6,107,951
ENTERPRISE FUNDS:
Interceptor Sewer -
Solid Waste -
Interceptor Sewer - - - - - - -
Solid Waste - -
Water Quality - -
TVRCS 800,000 800,000 800,000
Total Enterprise Funds 800,000 - - 800,000 - 800,000
Total All Funds 6,907,951 2,720,025 1,500,000 1,437,926 800,000 - 6,907,951
General Government - 0
Security Mandated Network Switch
Replacement -
Economic & Community Development - -
Environmental Protection Agency
(EPA) Brownfield Cleanup Grant Cost
Share - -
Police - -
Law Enforcement Training Center - -
McKamey- Facility Repairs and
Upgrades - -
Power, Connect, Deploy: Designing a
Public Safety Resilient Corridor - -
Public Works 2,720,025 2,720,025
1st Street Steps - -
Batter's Place Tennis Courts - -
Brainerd Golf Course - FEMA
Brown Acres Golf Courses- FEMA - -
Chattanooga Heritage House- FEMA - -
Fleet Capital Infusion
Fleet Program Purchases 2,720,025 2,720,025 2,720,025
Increased Curbside Recycling
Lakeside Ballfields - FEMA
Summit Softball Complex - FEMA - -
Walnut Plaza/Holmberg Bridge/Ed
Johnson Site Prep - -
Transportation 2,937,926 2,937,926
ADA Bus Stop Connections - -
Other City Sources
FY21-25 Capital Budget
C-58
City Of Chattanooga
Other City Sources by Project
Fiscal Year 2021
Department Recommended
Other City
Sources
Fleet Mgt
Fund (6504)
State Street
Aid Ops
(2050)
State Street
Aid Reserves
TVRCS
Reserves IDB- TIF Loan
Total Other
City Sources
Other City Sources
3rd/4th Street - -
Central Avenue - -
Chattanooga Traffic Signals and
Communications Upgrade- Amnicola
Highway - -
CMAQ 2 Protected Bike Lanes - -
Elder Mountain Road 937,926 937,926 937,926
Hwy 58 Bicycle and Pedestrian
Facilities Phase 2 - -
Patten Parkway - -
Pavement and Traffic Infrastructure
Debris Damage - FEMA - -
Pavement Flood Damage - FEMA - -
South Chickamauga Creek Greenway-
Caine Lane
Street improvements (paving)
(P20201) 2,000,000 562,074 1,437,926 2,000,000
TIP Paving - -
Trans Stsc Sdwlk - Riverwalk Extension
(Middle St to Incline) TIP Project
Name: St. Elmo Riverwalk Extension - -
Transit Signal Prioritization - -
Transit Stop Accessibility (Section - -
East Chattanooga Rising 450,000 450,000
Hardy St 350,000 350,000 350,000
East Chattanooga Rising Planning &
Design 100,000 100,000 100,000
Interceptor Sewer System - -
- -
Solid Waste - -
Summit Landfill and Storage building- FEMA -
Water Quality - -
S Germantown Rd/ Brainerd Rd-
FEMA - -
TVRCS 800,000 800,000
Microwave Radio and Mulitprotocol
Label Switching (MPLS) 800,000 800,000 800,000
Total Projects 6,907,951 2,720,025 1,500,000 1,437,926 800,000 450,000 6,907,951
FY21-25 Capital Budget
C-59
City Of Chattanooga
Other External Sources by Project
Fiscal Year 2021
Department Recommended
External
Sources CMAQ
Community
Foundation
Environmental
Protection
Agency
Brownfield
Cleanup Grant
Federal Transit
Administration
(FTA) FEMA FHWA
Hamilton
County
River City
Company
State LGS
Grants TDOT TEMA
Transportation
Improvement
Program (TIP)
FCC (Federal
Communications
Commission) TDEC
General Governmental 224,805 224,805
Economic & Community Development 500,000 500,000
Police 500,000 500,000
Public Works 4,257,714 290,095 732,038 379,599 2,279,975 122,007 454,000
Transportation 19,569,975 1,301,802 360,285 1,800,000 2,650,000 1,734,641 214,536 300,000 11,208,711
East Chattanooga Rising -
Total Govt Funds 25,052,494 1,301,802 290,095 500,000 360,285 2,532,038 2,650,000 500,000 379,599 4,014,616 214,536 422,007 11,208,711 224,805 454,000
ENTERPRISE FUNDS:
Interceptor Sewer -
Solid Waste -
Interceptor Sewer - - - - - 0 - - - - - - - - -
Solid Waste 182,875 156,750 26,125
Water Quality 163,573 140,205 23,368 -
TVRCS -
Total Enterprise Funds 346,448 - - - - 296,955 - - - - - 49,493 - - -
Total All Funds 25,398,942 1,301,802 290,095 500,000 360,285 2,828,993 2,650,000 500,000 379,599 4,014,616 214,536 471,500 11,208,711 224,805 454,000
General Government 224,805
Security Mandated Network Switch
Replacement 224,805 224,805
Economic & Community Development 500,000
Environmental Protection Agency
(EPA) Brownfield Cleanup Grant Cost
Share 500,000 500,000
Police 500,000
Law Enforcement Training Center 500,000 500,000
McKamey- Facility Repairs and
Upgrades -
Power, Connect, Deploy: Designing a
Public Safety Resilient Corridor -
Public Works 4,257,714
1st Street Steps 379,599 379,599
Batter's Place Tennis Courts 43,750 37,500 6,250
Brainerd Golf Course - FEMA 4,375 3,750 625
Brown Acres Golf Courses- FEMA 48,125 41,250 6,875
Chattanooga Heritage House- FEMA 124,250 106,500 17,750
Fleet Capital Infusion -
Fleet Program Purchases 2,279,975 2,279,975
Increased Curbside Recycling 454,000 454,000
Lakeside Ballfields - FEMA 5,163 4,425 738
Summit Softball Complex - FEMA 628,382 538,613 89,769
Walnut Plaza/Holmberg Bridge/Ed
Johnson Site Prep 290,095 290,095
Transportation 19,569,975
ADA Bus Stop Connections 67,821 60,285 7,536
3rd/4th Street 6,800,000 6,800,000
Central Avenue 1,600,000 1,600,000
Chattanooga Traffic Signals and
Communications Upgrade- Amnicola
Highway 1,000,000 1,000,000
CMAQ 2 Protected Bike Lanes 301,802 301,802
Elder Mountain Road
Hwy 58 Bicycle and Pedestrian
Facilities Phase 2 80,000 80,000
Patten Parkway -
External Funding Sources
FY21-25 Capital Budget
C-60
City Of Chattanooga
Other External Sources by Project
Fiscal Year 2021
Department Recommended
External
Sources CMAQ
Community
Foundation
Environmental
Protection
Agency
Brownfield
Cleanup Grant
Federal Transit
Administration
(FTA) FEMA FHWA
Hamilton
County
River City
Company
State LGS
Grants TDOT TEMA
Transportation
Improvement
Program (TIP)
FCC (Federal
Communications
Commission) TDEC
External Funding Sources
Pavement and Traffic Infrastructure
Debris Damage - FEMA 1,750,000 1,500,000 250,000
Pavement Flood Damage - FEMA 350,000 300,000 50,000
South Chickamauga Creek Greenway-
Caine Lane 310,234 310,234
Street improvements (paving)
(P20201) 1,734,641 1,734,641
TIP Paving 800,000 800,000 -
Trans Stsc Sdwlk - Riverwalk Extension
(Middle St to Incline) TIP Project
Name: St. Elmo Riverwalk Extension 1,618,477 1,618,477
Transit Signal Prioritization 2,857,000 2,650,000 207,000
Transit Stop Accessibility (Section 300,000 300,000
East Chattanooga Rising
Hardy St -
East Chattanooga Rising Planning &
Design
Interceptor Sewer System -
-
Solid Waste 182,875
Summit Landfill and Storage building- FEMA 182,875 156,750 26,125
Water Quality 163,573
S Germantown Rd/ Brainerd Rd-
FEMA 163,573 140,205 23,368
TVRCS -
Microwave Radio and Mulitprotocol
Label Switching (MPLS) -
Total Projects 25,398,942 1,301,802 290,095 500,000 360,285 2,828,993 2,650,000 500,000 379,599 4,014,616 214,536 471,500 11,208,711 224,805 454,000
FY21-25 Capital Budget
C-61
City Of Chattanooga
Other City Sources (Budget Cleanup) by Project
Fiscal Year 2021
Project Name
GF
Water Quality
Operations
State Street Aid
(2050)
Economic
Development
Total Other City
Sources Only
Total All Funding
Sources
General (4013) - -
Fallen Five Memorial 28,147.00 28,147.00 28,147.00
- -
Economic & Community Development (4020) - -
East Lake Park Improvement (18) 45,000.00 45,000.00 45,000.00
Public Art (28,147.00) (28,147.00) (28,147.00)
- -
Public Works (4016) - -
Increase Curbside Recyling - FY20 - (50,000.00)
491 Riverfront Parkway - (262,500.00)
54 Manufacturers Road - (1,312,500.00)
Heritage Park - (8,750.00)
235 Aster Ave - (7,000.00)
- -
- -
Parks and Recreation (4015) - -
Summit of Softball - 14,500.00
1st Street Redesign (45,000.00) (45,000.00) (90,000.00)
Outdoor Chattanooga Office - (95,000.00)
Tennessee Riverpark - CB Robinson Bridge - (68,394.80)
- -
Youth and Family Development - -
South Chattanooga YFD Center Sign - (5,100.00)
- -
CDOT - -
5500 Lake Resort Dr (FEMA 2019) - (7,875,000.00)
Elder Mountain Road - (6,125,000.00)
2850 Hamil Rd - (4,375,000.00)
Wilcox Blvd Tunnel East Entrance - (1,925,000.00)
Patten Parkway - (110,000.00)
- -
ISS - -
Music/Solar Pump Stations - (1,462,500.00)
- -
- -
Water Quality - -
435 Oliver Street (1,875.00) (1,875.00) (15,000.00)
- -
- -
- -
- (1,875.00) - - (1,875.00) (23,727,244.80)
FY21-25 Capital Budget
C-62
City Of Chattanooga
External Sources (Budget Cleanup) by Project
Fiscal Year 2021
Project Name
Donations -
Lyndhurst
Foundation
River City
Company FEMA TEMA Hamilton County
Federal - Dept of
Energy State WestRock
Recycle
Partnersip Grant
Total External
Sources
General (4013) -
Fallen Five Memorial
-
Economic & Community Development (4020) -
East Lake Park Improvement (18) -
Public Art
-
Public Works (4016) -
Increase Curbside Recyling - FY20 (576,000.00) 526,000.00 (50,000.00)
491 Riverfront Parkway (225,000.00) (37,500.00) (262,500.00)
54 Manufacturers Road (1,125,000.00) (187,500.00) (1,312,500.00)
Heritage Park (7,500.00) (1,250.00) (8,750.00)
235 Aster Ave (6,000.00) (1,000.00) (7,000.00)
-
-
Parks and Recreation (4015) -
Summit of Softball 14,500.00 14,500.00
1st Street Redesign (45,000.00) (45,000.00)
Outdoor Chattanooga Office (95,000.00) (95,000.00)
Tennessee Riverpark - CB Robinson Bridge (35,200.00) (33,194.80) (68,394.80)
-
Youth and Family Development -
South Chattanooga YFD Center Sign (5,100.00) (5,100.00)
-
CDOT -
5500 Lake Resort Dr (FEMA 2019) (6,750,000.00) (1,125,000.00) (7,875,000.00)
Elder Mountain Road (5,250,000.00) (875,000.00) (6,125,000.00)
2850 Hamil Rd (3,750,000.00) (625,000.00) (4,375,000.00)
Wilcox Blvd Tunnel East Entrance (1,650,000.00) (275,000.00) (1,925,000.00)
Patten Parkway (110,000.00) (110,000.00)
-
ISS -
Music/Solar Pump Stations (1,462,500.00) (1,462,500.00)
-
-
Water Quality -
435 Oliver Street (11,250.00) (1,875.00) (13,125.00)
-
(130,200.00) (110,000.00) (18,774,750.00) (3,129,125.00) (50,100.00) (1,462,500.00) (18,694.80) (576,000.00) 526,000.00 (23,725,369.80)
FY21-25 Capital Budget
C-63
RESOLUTION NO. __________
A RESOLUTION ADOPTING A FIVE-YEAR CAPITAL
IMPROVEMENT PLAN FOR FISCAL YEARS 2021-2025,
SUBJECT TO FUTURE REVISION; A COPY OF WHICH IS
ATTACHED HERETO AND MADE A PART HEREOF BY
REFERENCE.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CHATTANOOGA,
TENNESSEE, That there be and is hereby adopted a five-year Capital Improvement Plan for
Fiscal Years 2021-2025 for the City of Chattanooga, subject to future revisions; a copy of which
is attached hereto and made a part hereof by reference.
ADOPTED: ______________________, 2020
FY21-25 Capital Budget
C-64
FY21-25 Capital Budget
C-65
City of Chattanooga
FY21-25 Capital Budget Summary by Department
FY21-25 New Capital and Clean Up (Combined)
Department
Proposed
FY2021
Proposed
FY2022
Proposed
FY2023
Proposed
FY2024
Proposed
FY2025 5 Year Total
General Governmental
Economic and Community Development 3,348,853 6,550,000 2,000,000 2,000,000 2,000,000 15,898,853
Fire Department 2,450,000 2,950,000 - - - 5,400,000
Police Department 2,851,600 3,966,696 4,000,000 2,500,000 2,500,000 15,818,296
Public Works 10,410,649 5,630,000 4,230,000 5,770,000 4,100,000 30,140,649
Transportation 11,305,385 32,196,100 13,531,510 27,904,661 25,995,127 110,932,783
Youth & Family Development 2,019,900 - - - - 2,019,900
General Government 7,574,313 3,399,970 2,676,676 1,588,668 1,599,793 16,839,420
East Chattanooga Rising 450,000 3,550,000 - - - 4,000,000
General Governmental Total 40,410,700 54,692,766 26,438,186 39,763,329 36,194,920 197,499,901
Enterprise
Water Quality 6,621,941 2,900,000 1,125,000 1,385,000 670,000 12,701,941
Solid Waste 209,000 - - - - 209,000
TVRCS 800,000 - - - - 800,000
Interceptor Sewer Fund 84,987,500 97,600,000 62,350,000 66,600,000 61,300,000 372,837,500
Enterprise Total 92,618,441 100,500,000 63,475,000 67,985,000 61,970,000 386,548,441
Total All Funds 133,029,141 155,192,766 89,913,186 107,748,329 98,164,920 584,048,342
FY21-25 Capital Budget
C-66
City of Chattanooga
FY21-25 Capital Budget Summary by Department
FY21-25 New Capital
Department Proposed FY2021
Proposed FY2022 Proposed FY2023 Proposed FY2024 Proposed FY2025
5 Year Total
General Governmental
Economic and Community Development 3,332,000 6,550,000 2,000,000 2,000,000 2,000,000 15,882,000
Fire Department 2,450,000 2,950,000 - - - 5,400,000
Police Department 2,851,600 3,966,696 4,000,000 2,500,000 2,500,000 15,818,296
Public Works 12,290,294 5,630,000 4,230,000 5,770,000 4,100,000 32,020,294
Transportation 31,715,385 32,196,100 13,531,510 27,904,661 25,995,127 131,342,783
YFD Recreation 2,025,000 - - - - 2,025,000
General Government/CARTA 7,546,166 3,399,970 2,676,676 1,588,668 1,599,793 16,811,273
East Chattanooga Rising 450,000 3,550,000 - - - 4,000,000
General Governmental Total 62,660,445 58,242,766 26,438,186 39,763,329 36,194,920 223,299,646
Enterprise
Water Quality 6,636,941 2,900,000 1,125,000 1,385,000 670,000 12,716,941
Solid Waste 209,000 - - - - 209,000
TVRCS 800,000 - - - - 800,000
Interceptor Sewer System 86,450,000 97,600,000 62,350,000 66,600,000 61,300,000 374,300,000
Enterprise Total 94,095,941 100,500,000 63,475,000 67,985,000 61,970,000 388,025,941
Total All Funds 156,756,386 158,742,766 89,913,186 107,748,329 98,164,920 611,325,587
FY21-25 Capital Budget
C-67
City of Chattanooga
FY21-25 Capital Budget Summary by Department
FY21-25 Cleanup
Department Proposed FY2021 Proposed FY2022 Proposed FY2023 Proposed FY2024 Proposed FY2025 5 Year Total
General Governmental
Economic and Community Development 16,853 - - - - 16,853
Fire Department - - - - - -
Police Department - - - - - -
Public Works (1,879,645) - - - - (1,879,645)
Transportation (20,410,000) - - - - (20,410,000)
Youth & Family Development (5,100) - - - - (5,100)
General Government 28,147 - - - - 28,147
General Governmental Total (22,249,745) - - - - (22,249,745)
Enterprise
Water Quality (15,000) - - - - (15,000)
Solid Waste - - - - -
TVRCS - - - - - -
Interceptor Sewer Fund (1,462,500) - - - - (1,462,500)
Enterprise Total (1,477,500) (1,477,500)
-
Total All Funds (23,727,245) - - - - (23,727,245)
FY21-25 Capital Budget
C-68
FY21-25 Capital Budget
C-69
City of Chattanooga
FY21-25 Capital Budget Summary by Project
**The initials "A.O." and "A.S.F." as appear in this section shall have the same meaning as described in Section 5a of the Operating Budget Ordinance 13xxx
Department Proposed FY2021 Proposed FY2022 Proposed FY2023 Proposed FY2024 Proposed FY2025
General Governmental 62,660,445 58,242,766 26,438,186 39,763,329 36,194,920
General Government/CARTA 7,546,166 3,399,970 2,676,676 1,588,668 1,599,793
Agency 1,550,000 1,250,000 1,250,000 1,250,000 1,250,000
Chattanooga Zoo: African Expansion (A.O.) 500,000 250,000 250,000 250,000 250,000
Tivoli Foundation Appropriation (A.O.) 500,000 1,000,000 1,000,000 1,000,000 1,000,000
Ignite Discovery Capital Campaign (Creative Discovery Museum) (A.O.) 100,000 - - - -
Quality Matters Capital Fund (United Way) (A.O.) 200,000 - - - -
Erlanger Children's Hospital (A.O.) 250,000 - - - -
Chattanooga Public Library 767,007 999,460 415,932 - -
Library ADA Accessibility Improvements 288,000 999,460 415,932 - -
Library Children's Area Roof Replacement 180,000 - - - -
Security Mandated Network Switch Replacement 299,007 - - - -
Department of Information Technology 725,493 400,000 - - -
City Network Rebuild 350,000 200,000 - - -
Citywide Security Cameras 155,493 200,000 - - -
Business Continuity Assessment & Plan 220,000 - - - -
Finance and Administration 3,386,585 - - - -
Cloud Software as a Service (SaaS) ERP 2,711,513 - - - -
Property Tax System 675,072 - - - -
Transportation - - 250,000 - -
Long Street TDOT Repair Project - - 250,000 - -
Human Resources 50,000 - - - -
Lactation Room Compliance 50,000 - - - -
Chattanooga Area Regional Transportation Authority 1,067,081 750,510 760,744 338,668 349,793
CARTA Technology Projects (A.O.) 18,965 28,611 31,500 34,500 37,500
CARTA Facilities Projects (A.O.) 298,116 46,899 49,244 54,168 62,293
CARTA Vehicles & Equipment (A.O.) 750,000 675,000 680,000 250,000 250,000
Economic and Community Development 3,332,000 6,550,000 2,000,000 2,000,000 2,000,000
Economic and Community Development 3,332,000 6,550,000 2,000,000 2,000,000 2,000,000
Chattown Skate Park - 1,800,000
Lynnbrook Park 500,000 500,000
Environment Protection Agency (EPA) Brownfield Cleanup Grant Cost Share 600,000 - - - -
Neighborhood Reinvestment Fund (NRF) 47,000 2,000,000 2,000,000 2,000,000 2,000,000
Public Art in Capital 260,000 - - - -
Lupton City 200,000 - - - -
Alton Park Connector 500,000 2,250,000 - - -
Public Art Artists' Work Program 150,000 - - - -
McKamey - Facility Repairs and Upgrades (A.O.) 75,000 - - - -
Health, Education and Housing Facilities Board (Affordable Housing Fund) (A.O.) 1,000,000 - - - -
Fire Department 2,450,000 2,950,000 - - -
Fire Department 2,450,000 2,950,000 - - -
Station 15 Replacement 2,050,000 - - - -
Fire Training Center Upgrade Planning and Design 150,000 2,500,000 - - -
Station Capital Maintenance 250,000 - - - -
Water Rescue Boat Program - 450,000
Police Department 2,851,600 3,966,696 4,000,000 2,500,000 2,500,000
Police Department 2,851,600 3,966,696 4,000,000 2,500,000 2,500,000
Police Service Center Roof Replacements 348,000 - - - -
RTIC 83,600 83,600 - - -
FY21-25 Capital Budget
C-70
City of Chattanooga
FY21-25 Capital Budget Summary by Project
Department Proposed FY2021 Proposed FY2022 Proposed FY2023 Proposed FY2024 Proposed FY2025
Mark43 RMS Software - 633,096
Police Annex Renovation Phase II-lll 120,000 250,000 - - -
Law Enforcement Training Center 1,000,000 3,000,000 4,000,000 2,500,000 2,500,000
POWER to PROTECT: A Resilent Public Safety Microgrid Project, In Partnership with EPB 1,300,000 - - - -
Public Works 12,290,294 5,630,000 4,230,000 5,770,000 4,100,000
Public Works 12,290,294 5,630,000 4,230,000 5,770,000 4,100,000
City Buildings & YFD Centers Major Maintenance 1,700,000 1,000,000 1,000,000 1,000,000 1,000,000
City Hall Boiler Replacement 70,000 - - - -
City Yard Improvements 50,000 - - - -
Fleet Capital Infusion 587,558 - - - -
Fleet Program Purchases 5,000,000 - - - -
Golf Course Maintenance Equipment Replacement 200,000 200,000 250,000 250,000 250,000
Greenway Farm Conference Center Replacement 550,000 - - - -
Increased Curbside Recycling 454,000 - - - -
Parks ADA Repairs 200,000 300,000 300,000 300,000 300,000
Parks, Playgrounds, Field Maintenance 300,000 150,000 150,000 150,000 150,000
Plan of Services Obligations 150,000 - - - -
Walnut Street Bridge - 1,500,000 200,000 1,500,000
Walnut Plaza/Holmberg Bridge/Ed Johnson Site Prep 290,095
Field Lighting 450,000 750,000 650,000 920,000 900,000
Garbage Truck Turn Around - 50,000 50,000 50,000 50,000
Golf Course Renovations and Maintenance 100,000 1,680,000 1,630,000 1,600,000 1,450,000
Site Improvement Requirements for YFD Centers 600,000 - - - -
1st Street Steps 379,599 - - - -
Outdoor Chattanooga Office 95,000 - - - -
Parks Cap - TN Riverpark-CB Robinson Bridge 37,990 - - - -
YFD/Head Start Building 100,000 - - - -
Brainerd Golf Course - FEMA 5,000 - - - -
Lakeside Ballfields - FEMA 5,901 - - - -
Batter's Place Tennis Courts - FEMA 50,000 - - - -
Brown Acres Golf Course - FEMA 55,000 - - - -
Chattanooga Heritage House - FEMA 142,000 - - - -
Summit of Softball Complex - FEMA 718,151 - - - -
Transportation 31,715,385 32,196,100 13,531,510 27,904,661 25,995,127
Transportation 31,715,385 32,196,100 13,531,510 27,904,661 25,995,127
3rd / 4th Street (REQ) 8,500,000 - - - -
Bridge Maintenance - Multiple Locations (P20402) Trans Bridge - Repairs to City Owned
Bridges - Standifer Gap (REQ) 100,000 500,000 - - -
Bridge Management & Maintenance - Multiple Locations (Local Funds Capital Projects -
Not tied to TIP) 400,000 1,000,000 1,000,000 1,000,000 1,000,000
Central Avenue (REQ) 2,000,000 10,500,000 - - -
CMAQ 2 Protected Bike Lanes 306,748 - - - -
Elder Mountain Road 937,926 - - - -
Goodwin Road Segment 4 / Hamilton Pl Blvd. (REQ) - - 800,000 4,000,000 4,000,000
Hwy 58 Bicycle and Pedestrian Facilities Phase 2 (REQ) 100,000 - - 2,100,000 -
McCallie Avenue Bridge Northwestern Abutment Study + Future Repair - 2,000,000 - - -
Patten Parkway 350,000 - - - -
Pavement Preventative Maintenance - 250,000 250,000 250,000 250,000
PCI Database Update - 50,000 50,000 50,000 50,000
Roadway Slope Failure (P20205) 750,000 500,000 500,000 500,000 500,000
FY21-25 Capital Budget
C-71
City of Chattanooga
FY21-25 Capital Budget Summary by Project
Department Proposed FY2021 Proposed FY2022 Proposed FY2023 Proposed FY2024 Proposed FY2025
Sidewalks (P20306) 400,000 1,574,100 1,731,510 1,904,661 2,095,127
Street Improvements (paving) (P20201) 3,953,024 5,000,000 5,000,000 5,000,000 5,000,000
TIP Paving CHATT3R1720 (P20214) 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000
Trans Stsc Sdwk - Riverwalk Extension (US 27 - Mocc Bend IC) (P20309) Man/Hamm
Streetscape Project 2,023,096 - - - -
Transit Signal Prioritization 3,064,000 5,250,000 - - -
8th Street and Broad Street Streetscape 1,600,000 - - - -
Chattanooga Traffic Signals and Communications Upgrade - Amnicola Hwy. 1,200,000 - - - -
Citywide Intersection Improvements 300,000 500,000 500,000 500,000 500,000
Thermoplastic - 400,000 400,000 400,000 400,000
Traffic Signal Infrastructure Maintenance 250,000 1,000,000 1,000,000 1,000,000 1,000,000
Transit Stop Accessibility (Section 5310) 375,000 - - - -
Walnut Street Bridge/Riverwalk Detour - 50,000
Midtown Pathway 400,000 2,022,000 - - -
South Chickamauga Creek Greenway - Caine Lane 310,234
ADA Bus Stop Connections 75,357 - - - -
Pavement Flood Damage - FEMA 400,000 - - - -
Lake Resort Drive 720,000 - - - -
Pavement and Traffic Infrastructure Debris Damage - FEMA 2,000,000 - - - -
Shallowford Rd, Airport to Jersey Pike - - 1,100,000 10,000,000 10,000,000
Tennessee Avenue/St. Elmo Avenue Intersection Improvements - 400,000 - - -
YFD Recreation 2,025,000 - - - -
YFD Recreation 2,025,000 - - - -
OEL Curriculum 150,000 - - - -
Head Start Capital Improvements 400,000 - - - -
YFD East Lake Renovation 725,000 - - - -
YFD Center Improvements 750,000 - - - -
East Chattanooga Rising 450,000 3,550,000 - - -
East Chattanooga Rising 450,000 3,550,000 - - -
Hardy St. Extension 350,000 850,000 - - -
East Chattanooga Rising Public Infrastructure 100,000 2,700,000 - - -
Enterprise 94,095,941 100,500,000 63,475,000 67,985,000 61,970,000
Water Quality 6,636,941 2,900,000 1,125,000 1,385,000 670,000
Water Quality 6,636,941 2,900,000 1,125,000 1,385,000 670,000
Automated Flood Warning System 350,000 150,000 150,000 150,000 150,000
Davidson Road 750,000 750,000 - - -
Flood Control Pump Station Upgrades 750,000 250,000 - - -
Floodplain Modeling 200,000 - 200,000 250,000 -
Heavy Equipment 200,000 650,000 525,000 485,000 420,000
Riverfront Parkway/MLK CSS Separation Project 700,000 - - - -
Stream Buffer Conservation 250,000 - - - 100,000
USACE/FEMA Floodplain Culvert Replacement Projects 100,000 100,000 250,000 250,000 -
Dartmouth/Five Points Watershed SIP 900,000 - - 250,000 -
Glass St Area/Taylor St., Dodson Ave, Crutchfield St 1,500,000 1,000,000 - - -
Granada Dr. System Relocation 350,000 - - - -
N Market St, Branch/Renaissance Park 250,000 - - - -
WQ Vehicles 150,000 - - - -
S Germantown Rd/Brainerd Rd - FEMA 186,941 - - - -
Solid Waste 209,000 - - - -
Solid Waste 209,000 - - - -
FY21-25 Capital Budget
C-72
City of Chattanooga
FY21-25 Capital Budget Summary by Project
Department Proposed FY2021 Proposed FY2022 Proposed FY2023 Proposed FY2024 Proposed FY2025
Summit Landfill Storage Building - FEMA 25,000 - - - -
Summit Landfill - FEMA 184,000 - - - -
TVRCS 800,000 - - - -
TVRCS 800,000 - - - -
Tennessee Valley Regional Communications System (TVRCS) - Microwave Radio and
Multiprotocol Label Switching (MPLS) Replacement and upgrade. 800,000 - - - -
Interceptor Sewer System 86,450,000 97,600,000 62,350,000 66,600,000 61,300,000
Interceptor Sewer System 86,450,000 97,600,000 62,350,000 66,600,000 61,300,000
23rd St PS Improvements 1,000,000 3,000,000 - - -
Contingency - Plans and Studies 200,000 200,000 200,000 200,000 200,000
Contingency MBWWTP Improvements 914,600 4,000,000 2,500,000 3,000,000 3,000,000
CSOTF Equipment Replacement Program 300,000 300,000 300,000 300,000 -
Focused SSES and Rehab - Phase II 8,500,000 8,000,000 8,000,000 8,000,000 8,500,000
Implementation of CD Green Infra Projects in the CSS 500,000 500,000 500,000 - -
Implementation of Vulnerability Recommendations 500,000 500,000 - - -
ISS Capacity Improvements - 2,000,000 2,000,000 2,000,000 2,000,000
Lupton Drive Chronic SSO Elimination Project 1,000,000 - - - -
MBWWTP Oxygen Plant Replacement - 12,000,000
MBWWTP Solids Process Optimization Implementation - Phase 4 (A-D) (Digester Upgrades) 11,500,000 20,000,000 20,000,000 20,000,000 8,500,000
MBWWTP Warehouse Improvements - 1,500,000
MBWWTP Wet Weather Treatment Feasibility Study 500,000 - - - -
Program Management For Consent Decree Implementation 3,485,400 2,100,000 2,100,000 2,100,000 2,100,000
Pump Station Generator 1 750,000 - - - -
Pump Station Generator 2 - 750,000
Pump Station Generator 3 - 750,000
Pump Station Improvements 2,000,000 2,000,000 - - 2,000,000
Pump Station Improvements (IPS Screen Bypass Project) 1,500,000 - - - -
Riverview Park/CGCC Chronic SSO Elimination Project 1,000,000 - - - -
South Chic PS Improvements - 5,000,000 11,000,000
Tiftonia PS#2 Safety Upgrade - 2,000,000
Tiftonia PS#3 Safety Upgrade 2,000,000 - - - -
West Tiftonia Sewer Connector Rehabilitation 350,000 - - - -
Wet Weather Storage - Phase 3 10,000,000 - - - -
Wet Weather Storage Phase 10 - Ringgold PS - 15,000,000
Wet Weather Storage Phase 8 - Brainerd YFD - 15,000,000
Wet Weather Storage Phase 9 - Hixson PS #1 - 10,000,000
MBWWTP Oxygen Plant Upgrades 250,000 1,750,000 - - -
E2I2 SSO Abatement Program - East Ridge (WWS Ph. 5 - East Brainerd) 20,000,000 20,000,000 - - -
MBWWTP Water Use and Re-use Implementation 700,000 - - - -
Citico Creek Sub-basin Combined Sewer Separation 6,000,000 - - - -
E2I2 SSO Abatement Program - Red Bank (SPOI Ph. 4A) 5,000,000 - - - -
Winterview Pump Station and Basin Improvements - 2,000,000
CSOTF Improvements - Phase 1 2,000,000 - - - -
E2I2 SSO Abatement Program - Lee Hwy (WWS Ph. 7 - Lee Highway) 5,000,000 10,000,000 - - -
MBWWTP Wet Weather Treatment Upgrade - 6,000,000 35,000,000
Citico PS Reliability Improvements 1,500,000 - - - -
Total All Funds 156,756,386 158,742,766 89,913,186 107,748,329 98,164,920
FY21-25 Capital Budget
C-73
RESOLUTION NO. ___________
A RESOLUTION EXPRESSING THE INT ENT OF THE CITY OF CHATTANOOGA T O
ISSUE BONDS IN THE AGGREGATE AMOUNT NOT TO EXCEED ELEVEN MILLIO N
DOLLARS ($11,000,000) FOR THE PURPOSE OF PAYING ALL OR A PORTIO N OF THE
COSTS OF THE FOLLOWING: 3RD / 4TH STREET, ALTON PARK CONNECTOR, FIELD
LIGHTING, GREENWAY FARM CONFERENCE CENTER REPLACEMENT, LAKE
RESORT DRIVE, LAW ENFORCEMENT TRAINING CENTER, LIBRARY CHILDREN 'S
AREA ROOF REPLACEMENT, MIDTOWN PATHWAY, POWER TO PROTECT: A
RESILIENT PUBLIC SAFETY MICROGRID PROJECT, IN PARTNERSHIP WITH EPB,
SIDEWALKS, STATION 15 REPLACEMENT, YFD CENTER IMPROVEMENTS AND YFD
EAST LAKE RENOVATION
______________________________________________________
WHEREAS, Sections 9-21-101 to 9-21-1017, both inclusive, Tenne ssee Code Annotated,
authorize municipalities in the State of Tennessee to issue bonds for public works projects; and
WHEREAS, Section 9-21-205 of said Code provides that before bo nds may be issued the
governing body of the municipality shall adopt a resolution kno wn as the “INITIAL
RESOLUTION” determining to issue such bonds:
NOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CHATTANOOGA,
TENNESSEE, That pursuant to the p rovisions of Tennessee Code An notated, referred to in the
preamble hereof, there be issued and sold Bonds in the aggregat e amount not to exceed Eleven
Million Dollars ($11,000,000) of the City of Chattanooga, Tenne ssee for the purpose of paying
all or a portion of the costs of 3rd / 4th Street, Alton Park Connector, Field Lighting, Greenway
Farm Conference Center Replacement, Lake Resort Drive, Law Enfo rcement Training Center,
Library Children's Area Roof Replacement, Midtown Pathway, Powe r To Protect: A Resilient
Public Safety Microgrid Project, In Partnership With EPB, Sidew alks, Station 15 Replacement,
YFD Center Improvements and YFD East Lake Renovation. Said bonds shall bear interest at
FY21-25 Capital Budget
C-74
such rate or rates not to exceed the rate or rates prescribed by law payable semiannually and shall
be payable exclusively from taxes and shall be issued at the ti me or times and bear date or dates
and mature at such times as may hereafter be determined by resolution.
BE IT FURTHER RESOLVED, That this resolution also contemplates and authorizes the
use of proceeds of any bonds hereaf ter issued by the City for t he purpose described herein to be
used to reimburse the City for any costs incurred on or after (a date sixty (60) days prior to
adoption of this resolution) and, in addition, de minimis amoun ts incurred before that date and
amounts not exceeding twenty percent percent (20%) of the adjus ted issue price of the bonds
which are expended for prelimin ary expenditures, within the mea ning of Treasury Regulation
Section 1.150-2, all of which costs are incurred or to be incur red with respect to projects referred
to in this resolution.
ADOPTED:____________________, 2020
FY21-25 Capital Budget