FORM-BASED CODE COMMITTEE
MINUTES
December 8, 2016
The duly advertised meeting of the Form -Based Code Committee was held on December 8 , 2016,
at 2:00 p.m. at the Development Resource Center, Conference R oom 1A. Karen Hundt called the
meeting to order. Angela Wallace called the roll and swore in all those who would be addressing
the Committee . John Straussberger explained the rules of procedure and announced that the
meeting is being recorded.
Members Present : David Barlew, Matthew Whitaker, Heidi H efferlin, Gabe Thomas, Ladell
Peoples, Jason Havron, William Smith, Grace Frank and John Straussberger
Members Absent: None
Staff Members Present: Karen Hundt, Angela Wallace and Phil Noblett
Applicants Present: Vinicio J. Liriano and Marta Alder of St. George Holdings, LLC
Heidi made a motion to approve the Minutes from the last meeting. The motion was
seconded by Jason and unanimously approved.
OTHER BUSINESS
Assignment of Terms:
David Barlew Architect 1 year
Matthew Whitaker Architect 3 years
Heidi Hefferlin Architect 2 years
Gabe Thomas Developer 1 year
Ladell Peoples Builder 2 years
Grace Frank Property Owner 2 years
Jason Havron Property Owner 1 year
William Smith Property Owner 3 years
John Straussberger Developer 3 years
If term expires, can you be reappointed? Yes
William made a motion to approve the terms . The motion was seconded by Jason and
unanimously approved
Ladell made a motion to approve the Rules of Order. The motion was seconded by Jason
and unanimously approved
FBCC Minutes
12/8/16
p. 2
OLD BUSINESS
Case #16-FB-00002 – 14 Frazier Avenue
PROJECT DESCRIPTION:
The applicant, Vinicio J. Liriano, has applied for the following work:
• Add 1 additional story to original building
Karen Hundt presented the PowerPoint presentation. Staff R eport - Neighborhood sign in sheets
were received. ESH -3 zone; all buildings in this area are 3 stories; there is one, Bridgeview
building, with 5 with the 5th story stepped back 10 feet.
Discussion: Vinicio J. Lirian o addressed the Committee. This will be high end with commercial
on main floor and rental units on all other s. Met with neighborhood associations and we thank
them for their cooperation. The intent of the zone is retail, residential and commercial. That is
what we are proposing to do. 2
nd and 3rd will be residential. The 4 th will be the penthouse and it
will be set back 10 feet. We comply with the rules of FBC on all other levels. We are talking
about 6.5 feet higher than what is allowed by FBC. We are requesting to increase the height by 1
floor. The use is safe, walkable and attractive.
Community Comments: Garnet Chapin - We did meet with them. There are concerns that this
would impact the historic character of our neighborhood. This is not a good precedent to start at
this point with FBC. He said they need another story in order to work financial ly. That is not a
good reason to add another floor.
Brook Bradley -King – I am also concerned about the historic aspect of North Chattanooga.
Allowing an additional floor does set a precedent and changes the fabric of this street. The current
buildings are historic and should not be knocked down for future growth. I ask you deny the
project.
Claudio (builder) – We said we are trying to make a high end building in this community.
Without the 4
th story we cannot build what is planned. If we do not get approved for the 4 th we
will build a 3 story building.
Rash – You will not be able to see the 4
th story from the street. On the back it will be 4 stories but
we are trying to keep the historic look on Frazier.
Vinicio – We are only requesting a 4
th floor with a setback of 10 feet. It will not set precedent,
each case will be considered by this Board on a case by case basis. We want to appeal; we are
only building a part of the 4th floor and are only asking for 6.5 extra feet.
William – Did he submit this information on time ? I t is different from what was submitted last
month. He did submit on time.
Committee Discussion: David – Looking at the map of urban edge, what is the rational of having
4 stories on part of it and 3 stories on the other. Karen – We looked at the height of existing
buildings and potential opportunities for redevelopment. West of Market Street has more
FBCC Minutes
12/8/16
p. 3
opportunity for redevelopment. Heidi – Did it have anything to do with topography? Karen –
Yes. William – Would approval of this affect the max height of SH4? Karen – Yes ESH4 is 50
feet max and he is at less than 47 feet. David – If we change the code for this building and he
doesn’t build, would future projects be at the approved restriction ? Karen – Yes. Zoning stays
with the property. Ladell – Is this a historic district? Karen – No. Ladell – What are your
feelings on having the impact this will have on this district? Heidi – The taller buildin gs are
usually on the ends of the block. I feel it is going to be visible although they are staying close to
the height of the next door building. Although from the park, it appears to be a bigger building.
Ladell – If we approved this will the 4
th story have to be stepped back or can they change and
build it out to the edge ? Karen – We can make that a condition. John – That is the purpose of
making the motion very defined. The motion needs to be very specific. William – Will those
conditions also go along with the future of that property? Karen – Yes but only to that particular
building. John – This is one of the first cases and whatever motion is made, you will have future
applicants come in and ask for the same deal. We are setting a precedent. Grace – What is the
square footage of the fourth floor ? Vinicio - 2,258 sq. ft. The wall is set back 10 feet. The roof
extends about 2 feet into that 10 feet. John – The concern is the front and back setback. Heidi –
We should note that the 10 f oot setback is not all the way around. Should it be considered if the
setbacks could be staggered with more on the front and less on the sides? Claudio – We can set
back 20 feet on Frazier and 0 on back.
Ladell made a motion to deny Case # 16-FB-00002 – 14 Fr azier Avenue as submitted
pursuant to the Chattanooga City Code, Chapter 38, Article X VI and pursuant to the Form-
Based Code, subject to any and all conditions. Conditions: lack of hardship
David seconded the motion. The motion was unanimously approved.
Case #16-FB-00004 – 1445 Market Street
PROJECT DESCRIPTION:
The applicant, Marta Alder of St. George Holdings, LLC, has applied for the following work:
• Building height from 53’ to 64’
Karen Hundt presented the PowerPoint presentation. Increase from 4 to 5 stories. USH4 zone.
Neighboring buildings are from 1-5 stories. Parking will be underneath the building.
Discussion: Marta Alder and Nathan Hidad addressed the Committee: The 5
th story will be a
rooftop bar with bathrooms, storage, spa and elevator – a support area of 4,000 square feet. The
set back from Market is 32 feet and from side alley is 24 feet. It is not visible from Market Street
at all. This will be an upscale hotel and therefore this is needed. It will go very well in this a rea –
the entertainment district. I explained in my additional comments that a rooftop follows the
principal of FBC for the hotel.
David – The atrium – is it’s heights not the same? Marta – I don’t have the actual footage on that
but it will be a little higher. It will be a 15 story – it is not included in the 4,000 square feet you
have quoted. John – It would still be considered part of the 5
th floor. Marta – It will be lounge
FBCC Minutes
12/8/16
p. 4
music played in the outside area of the roof. Happy hour will probably be the high time for this
area. There is a lounge and restaurant in the hotel that will handle the late night entertainment.
Community Comments: Stroud Watson – The owner has had meetings with the community with a
great deal of discussion. You have des cribed only the square footage and setbacks. We are
concerned about other areas that you don’t have as your issues.
Roger – If Marta sells this , is there anything to prevent a future tenant to have loud rock music ?
John – That is really not something we can address.
Marta – I did comply with the meetings I needed to have. This is something that is going to come
to the area. It is for the use of the bar and rooftop bars are going to happen here. This is
something that hotels are offering now.
Heidi – Did we clarify the trellis ? Karen – If is not part of the 5
th story. Ladell – Anyone could
build a roof top facility as long as it was not a structure? Karen – True. David – The C-7 had it so
roofs could be occupible. Does FBC have that in thei rs? Karen – I don’t believe so. John – That
could happen without approval. How many rooms will you have in this hotel? Marta – 55. John
– If you moved this down to the 4 th floor how many room s would you have to lose ? Marta – I
don’t know exactly. It would primarily be the spa space. Spas are something that has become
really big in hotels. Jason – When we discussed this last month, under the USH code there is no
SH5 so we deferred to another building code that specified what 5 stories would be. SH6 is 75
feet, would a 5 story building be 60, 65 feet or what. Karen – One of the things we are proposing
to fix with the review at 6 months. Under the DCX that is a 5 and it is a 60’ max. You have to
have egress so you would have to have space for that. Karen – If all you are putting on the floor is
elevator or stairs on a 5
th floor – that is not considered a floor. The top edge is 53 feet of the
original building. Grace – The Clark Building has a rooftop area so the elevator on top of it would
that not considered a 5th floor. John – Is it possible to maintain 60 foot height and get the 5 th floor
in? Marta – I don’t know I will have to talk to the architects. David – You said the 53 feet was at
the top of the parapet. Do you know what the height of the roof top is? Marta – I don’t know.
Heidi made a motion to approve Case # 16-FB-00004 – 1445 Market Street as submitted
pursuant to the Chattanooga City Code, Chapter 38, Article X VI and pursuant to the Form-
Based Code , subject to any and all condit ions. Conditions: there is a 35’ setback on the
south alley, 23’4 on west alley side 32’ setback on Market Street all from the property line;
and the 5th floor be limited to 4,000 sq. ft. and a height of 64’.
Matt seconded the motion. The motion was unanimously approved.
NEW BUSINESS
None
NEXT MEETING DATE: January 12, 2017
FBCC Minutes
12/8/16
p. 5
There is a 6 month review of the FBC and if you have any comments or thoughts on the code
please communicate that to Karen.
William – I like the addition and the layout is a good idea. Heidi - I would second that and ask
that everyone answer these questions. John – We need to emphasize that the applicants need to be
thorough with information on their hardships. That way they would be prepared.
Karen – We still don’t have a permanent staff person in the LDO. Once that person is hired, some
of these issues will be resolved. Our plan is to brief the City Council on the first Tuesday in
January at 3:00 and brief the Planning Commission on the 2
nd Monday in January at lunch time.
We will take the proposed changes to the City Council in February.
Heidi – What do we need to bring to these meetings ? Karen – Anything that is sent to you by
Angela.
John – Applicants have to provide drawings with the application? Karen – Site plan and
elevations.
Jason made a motion to adjourn.
David seconded the motion. The motion was unanimously approved.
The meeting was adjourned at 3:35 pm.
____________________________________
John Straussberger, Chair
____________________________________
Angela Wallace, Secretary
FORM-BASED CODE COMMITTEE
MINUTES
November 10, 2016
The duly advertised meeting of the Form -Based Code Committee was held on November 10,
2016, at 2:00 p.m. at the Development Resource Center, Conference R oom 1A. Karen Hundt
called the meeting to order . Angela Wallace called the roll and swore in all those who would be
addressing the Committee . Karen explained the rules of procedure and announced that the
meeting is being recorded.
Members Present : David Barlew, Matthew Whitaker, Heidi Hefferlin, G abe Thomas, Ladell
Peoples, Grace Frank, Jason Havron, William Smith and John Straussberger
Members Absent: None
Staff Members Present: Karen Hundt and Angela Wallace
Applicants Present: Vinicio J. Liriano, Michael Craig Peavy for Vision, and Marta Alder of St.
George Holdings, LLC
OTHER BUSINESS
Adoption of By-laws for Committee: Who is voting vs all members? Phil – 5 people have to be
voting to be a majority. With 9 members, 5 members have to be present to vote. Phil – It is up to
the Committee if you want a majority of the present or a majority of the body (9). Heidi – A
majority of the body. David – It says a majority of the body have to vote in the affirmative. Phil –
This could cause repeat appearance if you don’t have a majority of the body (5) vs. majority of the
present. We can work on this along the way if you want. William – Roberts Rules says a majority
of the voting members. John – The only issue is there is not usually perfect attendance at the
meetings and that could cause an applicant to get frustrated in that they would have to return again
and again to get a majority affirmative vote. Phil – All appeals would go to the City Council .
Question about the year of the Committee should be changed to starting now instead of the July 1
date. Phil – It can be changed if you want. Can we modify the rule to be a majority of the present
members? Phil – Yes you can. You may want to make it a 3 or 4 vote instead of 5.
John S. made a motion to adopt By-laws with amendments:
1. 5.03 modified so beginning date is November 1 and ending date October 31.
2. than 4 total of the Committee voting in the affirmative
Heidi seconded the motion. Motion was unanimously approved.
Election of Chair and Vice-Chair
Chair: Nominated - John Straussberger - Unanimously approved
Vice-Chair: Nominated - Heidi Hefferlin– Unanimously approved
Secretary: Nominated - Jason Havron – Unanimously approved
FBCC Minutes
11/10/16
p. 2
Assignment of Terms:
David Barlew Architect
Matthew Whitaker Architect
Heidi Hefferlin Architect
Gabe Thomas Developer
Ladell Peoples Developer
Grace Frank Property Owner
Jason Havron Property Owner
William Smith Property Owner
John Straussberger Developer
Motion was made to defer this till next meeting. Seconded and unanimously approved.
Karen spoke to the general obligations of the board and explained some about the Form -Based
Code. Difference between NSDRC and FBC is that FBC does not have suggestive Guidelines – it
is codes, rules and standards. All projects required to mee t all codes. All cases will be reviewed
by staff before going before the Committee . If a project meets all the codes, it will go direct ly to
permitting and will proceed. This Committee reviews request s for major modification s and
reviews appeals to any staff decision the applicant does not agree with. When reviewing these
requests, the Committee refers to a set of principles.
OLD BUSINESS
None
NEW BUSINESS
Case #16-FB-00002 – 14 Frazier Avenue
PROJECT DESCRIPTION:
The applicant, Vinicio J. Liriano, has applied for the following work:
• Add 1 additional story to original building
Karen Hundt presented the PowerPoint presentation.
Discussion: Vinicio J. Liriano addressed the Committee. Vinicio passed out a new drawing. The
building is 2 stories and the proposal is to add a 3rd and 4
th floor. The 4th floor will be set back 10
feet from the edge all the way around . T he bottom of the roof will be 47 feet. We want to
increase the height for the 4th floor. With it being set back 10 feet from the edge, it will not impact
the building next door. It will basically be the same height as the Nautilus building. The building
will be r esidential on the 2nd, 3rd and 4th floor with the first floor offices and shops. We are not
changing the historic value of the building. We will be u sing the same brick. John – What is on
FBCC Minutes
11/10/16
p. 3
the screen is different from what was handed out. Vinicio – The photo on the screen was initially
approved by C7. There will be no roof garden as shown – just screening for equipment. We have
a bike rack. We are going to work with Republic to provide parking spaces. All the residents of
this area have an agreement with Republic to provide for parking. William – No. 9 on the
application is blank – please address that. Vinicio – We are going for mixed use and make it more
appealing to the neighborhood. We are addressing all the requirements for the mixed use.
Community Comments: Garnet Chapin – I’m speaking for Hill City Neighborhood Assoc . We
met with the builders last week. T hey were totally unprepared and did not have answers to
questions. We voted to oppose the current application. We would be happy to continue dialogue
with these people. We ask that you defer this case.
Brooke Bradley King – I live on Cherokee Boule vard. What was sent in 30 days in advance?
How is that different from what was passed out. Vinicio – The only difference was the
submission of a roof garden and an outside stairs. Now there is no roof garden and no stairs.
Brooke – What you wanted was to be presented 30 days in advance of the meeting s o why was
something different passed out today? Vinicio – It was in response to the meeting on Monday.
Brooke – How is it different? The new drawings should go back through the process shouldn’t it?
John – I don’t think his design has really changed. He is asking for one additional story. Vinicio
– I have not changed the concept of 4 stories. The only thin g we are asking for is an additional
story to what is acceptable by Form -Based Code. The building will be about 2’ higher than the
Nautilus building.
Committee Discussion: Heidi – What was your recommendation? Karen – The C -7 Board
recommended the concept of the additional floor with setbacks. Within the Form -Based Code
would be 4 stories with a 50’ maximum . David – What section in the code says 10’ setback?
Karen – It is not in the FBC that was a C-7 requirement. William – Are we approving a rezoning?
Karen – You are approving additional height. Heidi – I have a problem with the discrepancie s in
the drawings and the 10’ setback is not addressed in FBC . Phil – You can stipulate conditions in
your decisions. John Bridger – Also realize that your decision will set a pre cedent for what is
done in this code. David – Read code. Heidi – I didn’t see any reason addressed for needing that
floor. Phil – There has to be reason how the modification would enhance the building. John –
Would applicant like to offer what your burden is to add this floor? Vinicio – The additional floor
would make it fiscally viable to do this project. What happens in the 10’ setback area? Vinicio –
It would be a rooftop area and access to mechanical.
Phil – You need to address in your Rules of Procedure or By-laws what the return term will be for
denied projects.
Heidi made a motion to defer Case # 16-FB-00002 – 14 Frazier Avenue as submitted
pursuant to the Chattanooga City Code, Chapter 38, Article X VI and pursuant to the Form-
Based Code, subject to any and all conditions.
William seconded the motion. The motion was unanimously approved.
FBCC Minutes
11/10/16
p. 4
Case #16-FB-00003 – 515 Chestnut Street
PROJECT DESCRIPTION:
The applicant, Michael Craig Peavy for Vision, has applied for the following work:
• Urban drop off area
Karen Hundt presented the PowerPoint presentation. This is an appeal to a staff decision. They
want to provide a pedestrian drop off area at the front of the hotel.
Discussion: Michael Craig Peavy addressed the Committee: This is a 7 story hotel. We have
complied with all requirements of FBC. Where our building is located, there is a street section
showing streetscapes and urban pull offs. T he code shows a landscape strip and bike lane. We
took what the code shows and developed this. This is at a point where the sidewalk jogs. We
have talked with tr affic, landscape and design review. What we are proposing encompasses all
those points. We propose a 3 space drop off out of the drive lane and we have met and exceeded
the tree requirements. Traffic is doing a traffic study in front of the building to see if this will
work. We want to confirm that we can do this and when traffic completes their study they will
confirm if we can do this.
Heidi – The code says to do this at the side – why not do that? Craig – If we pull the building
back to have this on the side, it would not meet code. For us to have a drive thru plus a pull off on
the side would put us outside the code . David – What is the definition of vehicular access?
Brandon – It is any opportunity for a car to get off the street. David – Is the drop off in the right of
way? Brandon – It is now in the right of way and it sets the other things back on the property.
Craig – If it is a public sidewalk and it has to jog onto my property it is then our liability. We will
have to get a definition of where the property line will be.
Community Comments: Helen Burns Sharp – I am with the Downtown Homeowners Association.
It is great to have a FBC Committee. From a citizen’s standpoint the city has a webpage and we
would like to see these meetings posted on the page. There really needs to be some good reasons
for a modification. Don’t base your decisions on how many people are here to voice opposition.
There is a concern that Chestnut is being used for biking and walking and this veers from the
normal flow of pedestrian and bike flow. It is getting congested. Make sure there are compelling
reasons for the decision you make.
Brooke Bradley King – Peak periods for the hotel is during festivals, etc. What is going to happen
if 3 cars are there? Craig – The lobby is glass and that front portion is for check in or uber drop
off. It is not meant to stage 10 cars. In peak times there is entry on one side and access to the
alley in back. Brooke – Then will there be someone to direct these people to the back entrance?
Craig – No. This is compliant with what is in the code. Staff wanted to study this and see what it
would mean. There is not currently any tree canopy on Chestnut . We are doing this in
compliance. Staff is studying the peak flow. Craig – This is a building that does what the code is
requesting. There are other properties that have urban pull off , but we are proposing ours in
complete compliance with the code.
Brandon, Transportation - When we first approached the plan, there were 3 issues with the plan.
Loading, conflicts with bike lane and pedestrian traffic. We hear that it feels foreign for people to
FBCC Minutes
11/10/16
p. 5
walk through these zones. The bike lane we wanted to see if there were other ways to handle this
without impacting the bike and pedestrian ways. It does not allow for the alternatives to work.
Committee comments – Staff Report – What would a minor modification be to this? Karen – That
is spelled out in the administrative section (2-4) of the code – 4B. The staff can grant up to a 10%
decrease of required lot frontage. Heidi – Have you looked at that? Craig – No we have not. We
were right at the 85% frontage.
Item A of our code – based on what Brandon said this does not meet code. Craig – We are the
first on this stree t to do this. It is a jog that meets the code. Outside of the transparences, why
could there not be a drop off at the back of the building ? Craig – The amount of the space to do
the parking garage, we would have to go another entire level for the garage to allow room for a
drop off in the back. It would not be feasible to do that. Based on what you have , you have not
run the numbers on the street frontage. Craig – We have tightened up the trees to allow for the
cars. To the immediate left there is a transformer vault for EPB and that is the only place for it.
All hotel garage access is on south side? Craig – Yes – on the right is the exit. If you had to
redesign your building would that be a burden? Craig – Yes. Heidi – We are to consider the
public realm, we have nothing to indicate the rest of the project. Doesn’t your owner own both
properties? Craig – Yes but that alley is a public access.
Matthew made a motion to approve Case #16-FB-00003 – 515 Chestnut Street as submitted
pursuant to the Chattanooga City Code, Chapter 38, Article X VI and pursuant to the Form-
Based Code, subject to any and all conditions. Conditions:
Discussion – The cars in this project are not crossing where pedestrians walk.
Concern – To the south it is very narro w. Materials – Pedestrian way finding is
done with materials. I would like to see some.
David B. seconded the motion. The motion was approved, 5 for, 3 opposed, 1 abstained.
Case #16-FB-00004 – 1445 Market Street
PROJECT DESCRIPTION:
The applicant, Marta Alder of St. George Holdings, LLC, has applied for the following work:
• Building height from 53’ to 64’
Karen Hundt presented the PowerPoint presentation. Increase from 4 to 5 stories.
Discussion: Marta Alder , Nathan Hidad addressed the Committe e: St. George footprint – the
addition matches the existing hotel. To make it profitable there is a need to have a rooftop terrace.
We need to have a bathroom to make it useable. The ro of of S t. George would be a roof terrace
with a bar and event area. We need enclosed space for support – bathrooms and a spa. The façade
of this addition is at the back of the St. George. We prepared a video to show you what we are
talking about. It is about 32 feet from the front street. There would be a terrace on the left side.
From the street you would not see any of the roof top except for the small terrace on the left side.
FBCC Minutes
11/10/16
p. 6
Community Comments: Cynthia Watson – We really want to see the hotel succe ed. We have not
seen these plans and we are having a meeting after this. We only heard about this yesterday. My
concern is there is a lot of activity on that roof so there is a question of noise. The whole roof is
going to be used. I’ve lived here for 10 years now and we live with sound. I am concerned about
how sound carries from rooftops. We look forward to talking to everyone after this meeting.
Eric Cummings – My question is about procedure with this Board . If this gets passed what is
being approved? Does that cover the whole building? What happens if this does not get built as it
is drawn? There is a risk of a 5 story building in the future. I am a supporter of this development.
There has been no discussion with the community yet. I want to make sure that the community
understands what is being approved.
Stroud Watson – I think it is important to say we have been waiting a long time for this building to
be done. I am equally concerned with what Eric said. Are you giving a block diagram approval?
With an approval here someone could come in an d develop a 5-6 story building. This is basically
a penthouse. You have to be more specific about your decisions. You have issues about all the
cases you have heard today.
Helen Burns Shape – Is this in a National Historic District. Karen – Yes, the guidelines only come
into play if the developer is using federal funds.
Marta Alter – I want to address the notification. I was notified 2 weeks ago about this meeting. I
immediately called to organize a meeting with my neighbors. It just takes time. This is a special
project. The last thing I want is a noisy bar. This will be light jazz and very subdued atmosphere.
I want to respect the neighbors.
Clarence – We are honored to bring this building back to life. We are honoring the 4 story feel
and if the Committee wants to put restrictions on it, we will be glad to meet.
Part of the requirements is that there is a neighborhood review. D oes that apply here? Karen –
We are all learnin g this as we go. This being the first meeting there has been some dissention
from the directives. William – It is not on the application that a meeting with the neighborhoods is
required. (NEED TO ADD TO APPLICATION.)
Heidi – We can approve something with conditions. We are giving a volume right away to
anyone. I feel we should be able to put conditions on decisions. John Bridger – I think we can put
conditions on decisions to a point – but not to the point that the building has to be exactly like this
building. Heidi – The height seems to be similar to the Choo Choo. I would like to stipulate there
be a setback on 2 sides. John – Some conditions can be applied but not too specific. David – I
agree that we put in stipulations . Also about the neighborhood meetings : We need to hear what
they have to say collec tively. William – Would the condition need to be within the code. John –
how many square feet are enclosed – answer 3800. Structure on corner – the trellis does show.
William – Are we changing the zoning? Karen – No we would just use the footage as used in
other codes.
David made a motion to defer Case # 16-FB-00004 – 1445 Market Street as submitted
pursuant to the Chattanooga City Code, Chapter 38, Article X VI and pursuant to the Form-
FBCC Minutes
11/10/16
p. 7
Based Code , subject to any and all conditions. Conditions: the n eighborhoods have
opportunity to meet.
Gabe seconded the motion. The motion was unanimously approved.
NEXT MEETING DATE: December 8, 2016
Gabe made a motion to adjourn.
Heidi seconded the motion. The motion was unanimously approved.
The meeting was adjourned at 4:15 pm.
____________________________________
John Straussberger, Chair
____________________________________
Angela Wallace, Secretary