RecordWell Data

Hendersonville Planning Commission Agenda (PDF)

City of Hendersonville · Sumner County · meeting of Sep 1, 2026 · Agendas

Open the original document More from City of Hendersonville

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

HPC Agenda 09/01/2026 1 HENDERSONVILLE PLANNING COMMISSION AGENDA Main Meeting Room Tuesday, September 1, 2026 6:30 PM 1. OPENING PRAYER 2. ROLL CALL 3. PUBLIC COMMENT 4. ACCEPTANCE OF AGENDA 5. MINUTES: Minutes of August 4, 2026 6. CONSENT AGENDA: SP-007528-2026: Alexander Commercial Phase 2 (Firebirds) - Site Plan Owner: Firebirds Wood Fired Grill Location: 267 East Main St, Parcel 159J A 016.00 Lead Planning Staff: Caitlin Shinn / Timothy Whitten HPC Agenda 09/01/2026 2 7. SITE PLANS: SP-007476-2026: Imperial Pointe Building A– Site Plan Waiver Owner: Imperial Investment Group Location: 111 Imperial Blvd, Parcel 163C F 002.00 Lead Planning Staff: Caitlin Shinn / Timothy Whitten *Waiver Request* SP-007529-2026: Lincoln Rockland Material Waiver– Site Plan Owner: Lincoln Property Company Location: Parcel 160 066.01 Lead Planning Staff: Caitlin Shinn / Timothy Whitten *Waiver Request* 8. STAFF-LEVEL PROJECTS, PENDING: SUB-006988-2025: C L Powell Addition Lot 17 & 18 Resub – Final Plat (134 Powell Dr) A - 5/14/26 Lead Planning Staff: Caitlin Shinn SP-007390-2026: Forest Park Phase 1 Model Home– Site Plan (1685 Sandersville Rd) A – 08/27/26 Lead Planning Staff: Caitlin Shinn SUB-007230-2026: TBN (Millenia Cottages) – Final Plat (645 E Main St) S – 8/28/26 Lead Planning Staff: Timothy Whitten 9. PLANNING DIRECTOR COMMENTS 10. ADJOURNMENT 1 Firebirds Wood Fired Grill is proposing a 5,400sf restaurant on the vacant middle lot in the Alexander Commercial planned development. Starbucks on the lot to the east and Fast Pace Health Urgent Care is to the west. The lot is zoned GC-PD (General Commercial Planned Development) and is 1.92 acres. 54 parking spaces are required, and 88 spaces are proposed. A 20’ landscape buffer will be provided along the rear property line adjacent to the Maple Row Estates residential subdivision. The proposed building will be mostly brick, with some high-quality architectural metal panels above the main entry doors. AGENDA DATE: September 1, 2026 HPC PROJECT #: SP-007528-2026 PROJECT NAME: Alexander Commercial Ph 2 (Firebirds) PROJECT TYPE: Site Plan PROJECT LOCATION: 261 East Main St, Parcel 159J A 017.00 WARD: Ward 2 STAFF REPORT: 1 FINAL STAFF REPORT & COMMENTS 2 STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. Street address should be shown as 261 E Main St. 2. In the site data table on sheet C100, the minimum side yard setback should be shown as “10’ or 0’ of a firewall is present.” 3. Provide stamp/seal on sheet C200. 4. FDC may need a brick screen wall or be relocated to a less visible location. 5. NES-approved electric service plan must be submitted and approved before site plans can be stamped approved. 6. Buffer shrubs must be 48” min. ht. 7. Provide privacy fence within the rear buffer to align and match adjacent privacy fence. Provide fence detail. 8. Limit light trespass at rear property line to no greater than 1.0 fc. 9. Show outlines of roof-top units on the building elevations. Units may not extend above building parapet wall. Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director and Caitlin Shinn, Planner (August 26, 2026) 3 STAFF COMMENTS – PUBLIC WORKS: 3 1. See markups on plans. Submitted by Frank Mills, City Engineer (August 26, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. Hendersonville Subdivision Regulations 3.7.1 – Provide a utility plan that indicates the location of the proposed hydrants, fire service main sizes, lengths, locations, weights, materials, point of connection to city main; the sizes, types and locations of valves, valve indicators, regulators, meters and valve pits; and the depth that the top of the pipe is laid below grade. ACTION: Provide a utility plan that indicates the location of the proposed hydrants, fire service main sizes, lengths, locations, weights, materials, point of connection to city main; the sizes, types and locations of valves, valve indicators, regulators, meters and valve pits; and the depth that the top of the pipe is laid below grade per Hendersonville Subdivision Regulations 3.7.1. 2. IFC 2021 503.2.4 – Turning Radius: Provide a truck turning template using the Hendersonville Fire Department template. ACTION: Provide a truck turning template using the Hendersonville Fire Department template. 3. Hendersonville Subdivision Regulations 3.7.2.2– The type and location of each fire hydrant shall be designated by the Hendersonville Fire Department and approved by the governing utility district. Hydrant specifications in 3.7.2. ACTION: The type and location of each fire hydrant shall be designated by the Hendersonville Fire Department and approved by the governing utility district. Hydrant specifications in 3.7.2. 4. NFPA 2016 6.4.5.4 - Fire department connections shall be located not more than 100 ft (30.5 m) from the nearest Fire hydrant connected to an approved water supply. ACTION: Fire department connections shall be located not more than 100 ft (30.5 m) from the nearest Fire hydrant connected to an approved water supply per code NFPA 2016 6.4.5.4. 5. Install additional fire hydrant to comply with 100' requirement and place FDC on the building or submit plans for FDC monument wall (placement and design subject to city approval). ACTION: Install additional fire hydrant to comply with 100' requirement and place FDC on the building or submit plans for FDC monument wall (placement and design subject to city approval). Submitted by Jeffery Stites, Deputy Fire Marshal (August 26, 2026) STAFF COMMENTS – UTILITY DISTRICT: 5 1. See comments on plans. Submitted by David Brigance, HUD Construction Supervisor (August 26, 2026) 1 The Planning Commission approved the site plan application for Imperial Point Building A at last month’s meeting. At that meeting, staff explained that the applicant had agreed to remove the metal from the rear wall and to provide a material that complied with the City’s commercial building design standards. The applicant is now requesting a waiver to allow metal on the rear wall. The wall faces a retaining wall that ranges in height from 12 feet to 15 feet (shown as a green line in the image below). So only the upper part of the 20-foot-tall wall will be visible to the adjacent parcel to the north. That parcel is AGENDA DATE: September 1, 2026 HPC PROJECT #: SP-007476-2026 PROJECT NAME: Imperial Pointe Building A Waiver Request PROJECT TYPE: Site Plan PROJECT LOCATION: 111 Imperial Blvd, Parcel 163C F 002.00 WARD: Ward 2 STAFF REPORT: 1 FINAL STAFF REPORT & COMMENTS 2 owned by Park Place Senior Living Facility. The undeveloped portion of the parcel serves as open space for the senior living facility, and can’t be developed. 3 WAIVER IS BEING REQUESTED TO ALLOW METAL SIDING ON REAR WALL 4 ORIGINAL STAFF REPORT FROM SITE PLAN APPROVAL: This lot is located at 111 Imperial Boulevard, across the street from Gene Brown Elementary School. It is zoned Dockside Neighborhood (DN). The lot has 5 existing office buildings on it. This development was approved in 2006 with a total of 6 buildings, but the last building, shown as a 24,150sf office/retail/storage facility, was never constructed. Now, Imperial Investment Group is requesting site plan approval to construct a 24,059sf office and accessory warehouse. The proposed building will be one floor and have brick and stone siding on the front and sides of the building. The image below shows metal on the rear of the building, but the applicant has agreed to change to a material that complies with commercial building design requirements. PROPOSED EXTERIOR BUILDING ELEVATIONS 5 6 ZONING MAP 7 STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. Provide recent site and topo survey stamped by TN-registered surveyor. 2. Civil details sheet was left out of the resubmittal – provide detail sheet and comply with any comments arising out of review. 3. Add the following note to the Site Plan site data chart on the cover sheet: Warehouse is not permitted as a primary use in Dockside Neighborhood; it is only allowed as an accessory use to a permitted primary use. 4. Provide dumpster enclosure detail. 5. Asphalt in front of existing dumpster will need to be repaired as part of this site plan. 6. Revise the material on the rear elevation to one that complies with commercial building design requirements. Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (July 29th, 2026) STAFF COMMENTS – PUBLIC WORKS: 3 1. Per previous correspondence, please provide an overall pre- vs post-development evaluation of the peak discharge at the outfalls, hydraulic routing calculations for the full build out of the storm network and the receiving infrastructure (next two down-gradient pipes) during the 25-year design storm. Submitted by Frank Mills, City Engineer (July 29th, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. No comments. Submitted by Jeffery Stites, Deputy Fire Marshal (July 29th, 2026) STAFF COMMENTS – UTILITY DISTRICT: 5 1. Will owe water and sewer tap and capacity fees to HUD. Submitted by David Brigance, HUD Construction Supervisor (July 29th, 2026) 1 The site plan for Lincoln Rockland, the industrial planned development off of Rockland Road, was approved by the Planning Commission in May of this year. The exterior building elevations proposed tilt- up concrete panels to form the building walls, with some areas of brick to be provided in key areas. In the images below, the green lines indicate in plan view where those areas of brick are located, and the areas highlighted in red show where on the building elevations the brick is located. AGENDA DATE: September 1, 2026 HPC PROJECT #: SP-007529-2026 PROJECT NAME: Lincoln Rockland Material Waiver PROJECT TYPE: Site Plan PROJECT LOCATION: 0 HWY 31 E, Parcel 160 066.01 WARD: Ward 2 STAFF REPORT: 1 FINAL STAFF REPORT & COMMENTS 2 BUILDING 1 3 BUILDING 2 Lincoln Rockland, which is in an Industrial Planned Development district, is now requesting to convert the brick to stamped formliner, which means that instead of real brick being inset into the tilt-up panel walls, the tilt-up panels will be stamped with a simulated brick pattern. Lincoln Rockland has two other industrial sites under development in Hendersonville, both of which have very similar tilt-up concrete wall buildings to these. The development on Molly Walton Road, which is zoned Industrial Planned Development, has similar areas of real brick inset into the tilt-up walls. The development on Innovation Way, which is zoned Industrial (not a planned development) uses stamped brick-pattern formliner instead of real brick, and the stamped brick is painted to match the other areas of tilt-up. The city’s building design standards allow tilt-up concrete as a primary building material in Industrial zone district. The Molly Walton development and this proposed development are both zoned Industrial- Planned Development, whereas the Innovation Way development is not in a planned development. Generally, developments within planned developments are held to a higher design standard than straight-zone districts. This is why the Molly Walton and Lincoln Rockland developments were asked by staff to provide some areas of brick, while staff did not ask the same of the Innovation Way development. 4 5 6 STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. No comments. Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (August 26, 2026) 7 STAFF COMMENTS – PUBLIC WORKS: 3 1. No comments. Submitted by Frank Mills, City Engineer (August 26, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. No comments. Submitted by Jeffery Stites, Deputy Fire Marshal (August 26, 2026) STAFF COMMENTS – UTILITY DISTRICT: 5 1. No comments. Submitted by David Brigance, HUD Construction Supervisor (August 26, 2026)

Source: City of Hendersonville website. First collected Oct 7, 2026.