_08042026-609
City of Hendersonville · Sumner County · meeting of Aug 4, 2026 · Minutes
Open the original document More from City of Hendersonville
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
HPC Agenda
08/04/2026
1
HENDERSONVILLE PLANNING COMMISSION
MINUTES
Main Meeting Room
Tuesday, August 4, 2026
6:30 PM
Chairman Tim Altizer called the meeting to order at 6:30 PM in the City Hall Main Meeting
Room, 101 Maple Drive North, Hendersonville, TN.
1. OPENING PRAYER (Youtube Link)
Chairman Tim Altizer led the opening prayer.
2. ROLL CALL (Youtube Link)
Present: Tim Altizer, Jeff, Cundiff, John Evans, Barry Hardwick, Charles Hasty, Michael Martin,
Jamie McMurry, Wendy Slatery, and Mike Wessel.
Absent: None
Also Present: Keith Free, Planning Director; Timothy Whitten, Assistant Planning Director;
Zachary Coleman, Senior Planner; Caitlin Shinn, Planner; Frank “Tater” Mills, City Engineer; and
Jeff Stites, Deputy Fire Marshall; and Sloane Moore, Planning Technician.
BRIEF ACTION SUMMARY
A. Acceptance of Agenda (Youtube Link)
MOTION by Wessel, seconded by Slatery, to accept the Hendersonville Planning Commission
Meeting Agenda of Tuesday, August 4, 2026.
Altizer, Cundiff, Evans, Hardwick, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
HPC Agenda
08/04/2026
2
B. Minutes (Youtube Link)
MOTION by Slatery, seconded by Hasty, to accept the Hendersonville Planning Commission
Meeting Minutes of Tuesday, July 7, 2026.
Altizer, Evans, Hardwick, Hasty, Slatery, and Wessel voted aye.
Nay: None. Cundiff, Martin, & McMurry Abstained. Absent: None.
MOTION PASSED. (6-0-3)
C. Consent Agenda (Youtube Link)
MOTION by Slatery, seconded by Wessel, to approve the Consent Agenda as presented with
all staff comments.
(1) SP-007474-2026: Forest Park Phase 1 Amenity Center – Site Plan
(2) SP-007476-2026: Imperial Pointe Building A – Site Plan
(3) SUB-007475-2026: Millstone Phase 7 Section 2 – Final Plat
(4) SP-007477-2026: Pope John Paul II Addition Phase 1 – Site Plan
Altizer, Cundiff, Evans, Hardwick, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
D. ANNEX-007468-2026: Avelyn – Annexation / Plan of Services (Youtube Link)
MOTION by Slatery, seconded by Martin, to approve the Avelyn Annexation and Plan of
Services.
Altizer, Cundiff, Evans, Hardwick, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
E. DP-007472-2026: Avelyn - CDP (Youtube Link)
MOTION by Altizer, seconded by Wessel, to approve the Avelyn Comprehensive Development
Plan with all staff comments and the addition of an eight-foot bike path by Lots 1 & 2.
Altizer, Cundiff, Evans, Hardwick, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
HPC Agenda
08/04/2026
3
F. SP-007475-2026: DegThai Wall Mural – Site Plan (Youtube Link)
MOTION by Slatery, seconded by Wessel, to approve the DegThai Wall Mural Site Plan, with
all staff comments.
Altizer, Cundiff, Hardwick, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Evans voted nay. None Abstained. Absent: None.
MOTION PASSED. (8-1-0)
G. Election of Secretary (Youtube Link)
MOTION by Slatery, seconded by Hasty, to approve the election of Barry Hardwick as
Planning Commission Secretary.
Altizer, Cundiff, Evans, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Nay: None. Hardwick abstained. Absent: None.
MOTION PASSED. (8-0-1)
H. ZOAM-007457-2026: Zoning Ordinance Text Amendments (Youtube Link)
MOTION by Altizer, seconded by Slatery, to approve the text amendments to the
Hendersonville Zoning Ordinance.
Altizer, Cundiff, Evans, Hardwick, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
I. Adjournment (Youtube Link)
MOTION by Altizer, seconded by Slatery, to adjourn the Hendersonville Planning Commission
Meeting at 8:34 PM.
Altizer, Cundiff, Evans, Hardwick, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
HPC Agenda
08/04/2026
4
DETAILED MINUTES
1. PUBLIC HEARING (Youtube Link)
Requested by 615 Design Group to annex 32.8 acres into the City Limits with a Plan of Services
and to rezone the property to Suburban Residential, Planned Development (SR1-PD), and to
approve a Comprehensive Development Plan for the property. The property is located on the
west side of Avant Lane, south of Old Drakes Creek Road, as identified on Sumner County Tax
Map 138 Parcel 036.00.
Public Hearing opened at 6:33PM.
John Colwell, Gary McCarney, Verlin Hardin, John Kehmna, Patrick Mazie, Terry Doty, Paul
Vandekamp, Robert Reyburn, Paul Towne, Melinda Beaver, Kaylie Austin, Shannon Hickman,
Mike Darnell, Bob Avant, and Mark Evans spoke at the public hearing.
Public Hearing closed at 7:03PM.
Requested by Hendersonville Planning Department for the purpose of receiving public comment
on proposed revisions to the Zoning Ordinance for the City of Hendersonville.
Public Hearing opened at 7:07PM.
J. Ritterbeck and Kathleen Ferrell spoke at the public hearing.
Public Hearing closed at 7:13PM.
2. PUBLIC COMMENT (Youtube Link)
Public Comment opened at 7:13PM and closed at 7:13PM since no one signed up to speak.
3. ACCEPTANCE OF AGENDA (Youtube Link)
MOTION by Wessel, seconded by Slatery, to accept the Hendersonville Planning Commission
Meeting Agenda of Tuesday, August 4th, 2026.
Altizer, Cundiff, Evans, Hardwick, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Nay: None. Absent: None.
MOTION PASSED. (9-0-0)
HPC Agenda
08/04/2026
5
4. MINUTES: (Youtube Link)
MOTION by Slatery, seconded by Hasty, to accept the Hendersonville Planning Commission
Meeting Minutes of Tuesday, July 7, 2026.
Altizer, Cundiff, Evans, Hardwick, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (6-0-3)
5. CONSENT AGENDA: (Youtube Link)
MOTION by Slatery, seconded by Wessel, to approve the Consent Agenda as presented with all
staff comments.
(1) SP-007474-2026: Forest Park Phase 1 Amenity Center – Site Plan
(2) SP-007476-2026: Imperial Pointe Building A – Site Plan
(3) SUB-007475-2026: Millstone Phase 7 Section 2 – Final Plat
(4) SP-007477-2026: Pope John Paul II Addition Phase 1 – Site Plan
Altizer, Cundiff, Evans, Hardwick, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
SP-007474-2026: Forest Park Phase 1 Amenity Center – Site Plan
Owner: Jen TN 2 LLC (Beazer Homes)
Location: 1635 Saundersville Rd, Parcel 137 041.00
Leading Planning Staff: Caitlin Shinn
HPC Agenda
08/04/2026
6
STAFF REPORT
Beazer Homes LLC is requesting approval for the Forest Park Phase 1 Amenity Center, proposed for
the open space area within Phase 1, Section 2 of the Forest Park Planned Development at 6301
Kings Canyon Way. The property is currently zoned Suburban Residential, Low Density, Planned
Development (SR-1-PD).
HPC Agenda
08/04/2026
7
Proposed Site Layout
The proposed project encompasses a 7,071-square-foot amenity building accompanied by a wide
range of outdoor recreational facilities, including a swimming pool, a splash pad, a playground area,
and an adult outdoor lounge. To support community access and convenience, the site plan also
incorporates 43 parking spaces, a neighborhood mailbox kiosk, and a dedicated trailhead featuring a
trailhead kiosk.
Proposed expanded landscaping and hardscape entry feature
HPC Agenda
08/04/2026
8
Clubhouse Front Elevation
Clubhouse Rear Elevation
Clubhouse Right Elevation
Clubhouse Left Elevation
HPC Agenda
08/04/2026
9
Pool Equipment Building (Next to Splash Pad)
Mailbox Kiosk Elevations
Additionally, Beazer Homes is proposing an upgraded entryway and hardscape feature. This
improvement includes enhanced monument signage accompanied by expanded landscaping, as well
as a 3-rail fence with stone columns extending along both sides of the entrance up to the first
intersection of Norman Way and Kings Canyon Way. The fence and expanded landscaping will be
maintained by the Homeowners Association (HOA), and the fence cannot be removed without prior
approval from the Planning Commission.
HPC Agenda
08/04/2026
10
Entryway/Hardscape Feature
As part of the 2018 approval of the Forest Park Preliminary Development Plan (PDP), the developer
was required to dedicate parkland to the City and construct a trailhead. To fulfill this requirement, the
developer will dedicate 39.7 acres of land to the City as parkland.
Forest Park Pattern Book BOMA Approved 09/16/21
HPC Agenda
08/04/2026
11
Forest Park Pattern Book BOMA Approved 09/16/21
Proposed Parkland to be dedicated by Beazer Homes
HPC Agenda
08/04/2026
12
STAFF COMMENTS – PLANNING DEPARTMENT:
1. Provide a dedicated sheet for the trailhead, including the proposed trailhead kiosk location (as
shown in pattern book) and construction details. Clearly define the construction limits for the
trailhead elements being built by Beazer Homes.
2. Add note: City of Hendersonville may add signage for trailhead parking once trail has been
constructed.
3. Correct the label on the mailbox kiosk elevation to accurately read "mailbox kiosk" instead of "pool
equipment building."
4. Correct image of fence column from brick to stone.
5. Correct minimum caliper size on deciduous trees to 2.5” as per Zoning Ordinance requirements.
6. All shrubs should be a minimum of 24” in height along the parking lot perimeter.
7. Provide City’s standard tree planting details and selection notes.
8. Show light poles on landscape plan and resolve any conflicts.
9. Provide proposed light pole height.
Submitted by Caitlin Shinn, Planner (July 29th, 2026)
STAFF COMMENTS –PUBLIC WORKS:
1. While dechlorinated swimming pool discharge is typically an acceptable non-stormwater discharge
per Municipal Code 18-208, water from a backwash line typically contains other debris caught by
the filtration mechanism. The backwash line shall not be discharged into the Exceptional
Tennessee Water. This must be routed to a sanitary sewer line.
Submitted by Frank Mills, City Engineer (July 29th, 2026)
STAFF COMMENTS – FIRE DEPARTMENT:
1. No comments.
Submitted by Jeffery Stites, Deputy Fire Marshal (July 29th, 2026)
STAFF COMMENTS – UTILITY DISTRICT:
1. WHUD water and sewer.
Submitted by David Brigance, HUD Construction Supervisor (July 29th, 2026)
HPC Agenda
08/04/2026
13
SP-007476-2026: Imperial Pointe Building A – Site Plan
Owner: Imperial Investment Group
Location: 111 Imperial Blvd, Parcel 163C F 002.00
Leading Planning Staff: Timothy Whitten
STAFF REPORT
This lot is located at 111 Imperial Boulevard, across the street from Gene Brown Elementary School. It
is zoned Dockside Neighborhood (DN).
The lot has 5 existing office buildings on it. This development was approved in 2006 with a total of 6
buildings, but the last building, shown as a 24,150sf office/retail/storage facility, was never
constructed. Now, Imperial Investment Group is requesting site plan approval to construct a 24,059sf
office and accessory warehouse.
HPC Agenda
08/04/2026
14
The proposed building will be one floor and have brick and stone siding on the front and sides of the
building. The image below shows metal on the rear of the building, but the applicant has agreed to
change to a material that complies with commercial building design requirements.
PROPOSED EXTERIOR BUILDING ELEVATIONS
HPC Agenda
08/04/2026
15
HPC Agenda
08/04/2026
16
ZONING MAP
STAFF COMMENTS – PLANNING DEPARTMENT:
1. Provide recent site and topo survey stamped by TN-registered surveyor.
2. Civil details sheet was left out of the resubmittal – provide detail sheet and comply with any
comments arising out of review.
3. Add the following note to the Site Plan site data chart on the cover sheet: Warehouse is not
permitted as a primary use in Dockside Neighborhood; it is only allowed as an accessory use to a
permitted primary use.
4. Provide dumpster enclosure detail.
5. Asphalt in front of existing dumpster will need to be repaired as part of this site plan.
6. Revise the material on the rear elevation to one that complies with commercial building design
requirements.
Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (July 29th, 2026)
HPC Agenda
08/04/2026
17
STAFF COMMENTS – PUBLIC WORKS:
1. Per previous correspondence, please provide an overall pre- vs post-development evaluation of the
peak discharge at the outfalls, hydraulic routing calculations for the full build out of the storm
network and the receiving infrastructure (next two down-gradient pipes) during the 25-year design
storm.
Submitted by Frank Mills, City Engineer (July 29th, 2026)
STAFF COMMENTS – FIRE DEPARTMENT:
1. No comment.
Submitted by Jeffery Stites, Deputy Fire Marshal (July 29th, 2026)
STAFF COMMENTS – UTILITY DISTRICT:
1. Will owe water and sewer tap and capacity fees to HUD.
Submitted by David Brigance, HUD Construction Supervisor (July 29th, 2026)
SUB-007475-2026: Millstone Phase 7, Section 2 – Final Plat
Owner: Schell Brothers
Location: Parcel 146 004.00 & 004.23
Leading Planning Staff: Zachary Coleman / Caitlin Shinn
HPC Agenda
08/04/2026
18
STAFF REPORT
The applicant, Pulte Homes, is requesting Final Plat approval for Millstone Phase 7, Section 2. This
request represents the next phase of development within the Millstone Planned Development,
specifically providing for the continuation of Arbor Park Lane, Lingering Way, and Harvest Acres Lane.
The proposed subdivision section encompasses 56 single-family residential lots and four dedicated
open space tracts. Lot sizes within this section range from a minimum of 7,150 square feet to a
maximum of 21,448 square feet.
HPC Agenda
08/04/2026
19
The subject property is zoned Mixed Residential, Planned Development (MXR-PD) and is subject to the
development standards established by the Millstone Planned Development master plan.
The Planning Commission previously approved the Preliminary Plat for Millstone Phase 7, Section 2 on
May 7, 2024, followed by Planning staff approval of the associated civil Construction Plans on January
3, 2025.
The Final Plat complies with both the previously approved preliminary plat and the engineered
construction plans, as well as all applicable municipal subdivision regulations.
HPC Agenda
08/04/2026
20
STAFF COMMENTS – PLANNING DEPARTMENT:
1. Call out all setbacks on corner lots.
Submitted by Zachary Coleman, Senior Planner and Caitlin Shinn, Planner (July 29th, 2026)
STAFF COMMENTS – PUBLIC WORKS:
1. Provide benchmark.
Submitted by Frank “Tater” Mills, City Engineer (July 29th, 2026)
STAFF COMMENTS – FIRE DEPARTMENT:
1. No comment.
Submitted by Jeffrey Stites, Deputy Fire Marshal (July 29, 2026)
STAFF COMMENTS – UTILITY DISTRICT:
1. HUD will not sign plat until sewer system is completed and released.
Submitted by David Brigance, HUD Construction Supervisor (July 29th, 2026)
HPC Agenda
08/04/2026
21
SP-007477-2026: Pope John Paul II Addition Phase 1 – Site Plan
Owner: Pope John Paul Catholic School
Location: 177 Caldwell Dr, Parcel 1161 052.01
Leading Planning Staff: Timothy Whitten
STAFF REPORT
Pope John Paul II School is proposing to construct a 16,962sf brick-veneer addition to the school.
The existing building is 100,749sf, so the new total will be 117,700sf. The addition will displace a
small portion of the parking lot located between 386 and the building. 224 parking spaces are
required, and 433 spaces will be provided. Current student enrollment is 713 students. The
conditional use permit that the school operates under allows up to 1000 students.
HPC Agenda
08/04/2026
22
Other proposed site improvements include lengthening the entrance driveway to improve drop-
off/pick-up stacking, and adding a north-bound left turn lane on Caldwell Drive.
PROPOSED IMPROVEMENTS TO CALDWELL DR
HPC Agenda
08/04/2026
23
LOTS OWNED BY THE SCHOOL AND ASSOCIATED ZONING
HPC Agenda
08/04/2026
24
HPC Agenda
08/04/2026
25
STAFF COMMENTS – PLANNING DEPARTMENT:
1. The city is requesting an additional 30’ wide greenway easement on PJPII-owned parcel located on
the south side of 386 (part of parcel map 161 047.01).
Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (July 29th, 2026)
STAFF COMMENTS –PUBLIC WORKS:
1. Additional drainage easements and ROW is needed for the proposed improvements to Caldwell
Drive.
2. Caldwell Drive roadside drainage ditch and impact to driveways/underlying culverts is not
constructible as shown. Please revise.
3. Stormwater detention is required.
Submitted by Frank Mills, City Engineer (July 29th, 2026)
HPC Agenda
08/04/2026
26
STAFF COMMENTS – FIRE DEPARTMENT:
1. Hendersonville Subdivision Regulations 3.7.2.1 – Provide a hydrant layout that meets the fire flow
requirements and identify each source and the calculated flow rate. ACTION: Provide a hydrant
layout that meets the fire flow requirements and identify each source and the calculated flow rate
per Hendersonville Subdivision Regulations 3.7.2.1.
2. Hendersonville Subdivision Regulations 3.7.1 – Provide a utility plan that indicates the location of
the proposed hydrants, fire service main sizes, lengths, locations, weights, materials, point of
connection to city main; the sizes, types and locations of valves, valve indicators, regulators,
meters and valve pits; and the depth that the top of the pipe is laid below grade. ACTION: Provide
a utility plan that indicates the location of the proposed hydrants, fire service main sizes, lengths,
locations, weights, materials, point of connection to city main; the sizes, types and locations of
valves, valve indicators, regulators, meters and valve pits; and the depth that the top of the pipe is
laid below grade per Hendersonville Subdivision Regulations 3.7.1
3. Provide a hydrant layout that meets the fire flow requirements and identify each source and the
calculated flow rate. ACTION: Provide a hydrant layout that meets the fire flow requirements and
identify each source and the calculated flow rate.
4. Residences and buildings 3600 sq. ft. or larger require a Hydrant Flow Test. This test needs to be
scheduled and passed. Please contact the applicable Utility District (HUD/WHUD) to get more
information about the Hydrant Flow test. ACTION: Schedule and pass Hydrant Flow Test.
Submitted by Jeffery Stites, Deputy Fire Marshal (July 29th, 2026)
STAFF COMMENTS – UTILITY DISTRICT:
1. WHUD water and sewer.
Submitted by David Brigance, HUD Construction Supervisor (July 29th, 2026)
HPC Agenda
08/04/2026
27
6. DEVELOPMENT PLANS:
ANNX-007468-2026: Avelyn – Annexation/Plan of Service (Youtube Link)
Owner: Robert Avant
Location: 1765 Avant Lane, Parcel 138 036.00
Leading Planning Staff: Caitlin Shinn / Zachary Coleman
MOTION by Slatery, seconded by Martin, to approve the Avelyn Annexation and Plan of Services.
Altizer, Cundiff, Evans, Hardwick, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
DP-007472-2026: Avelyn – Comprehensive Development Plan
Owner: Robert Avant
Location: 1765 Avant Lane, Parcel 138 036.00
Leading Planning Staff: Caitlin Shinn / Zachary Coleman
MOTION by Altizer, seconded by Wessel, to approve the Avelyn Comprehensive Development Plan
with all staff comments and the addition of an eight-foot bike path by Lots 1 & 2.
Altizer, Cundiff, Evans, Hardwick, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
HPC Agenda
08/04/2026
28
STAFF REPORT
ANNEXATION AND PLAN OF SERVICES
The applicant, 615 Design Group, on behalf of the developer Schell Brothers Nashville, LLC,
requests voluntary annexation of the Avant Property at 1765 Avant Lane contingent upon rezoning
from Rural Residential (RR) (Sumner County) to Planned Unit Development (SR-1-PD) in the City of
Hendersonville. The property is located along the western side of Avant Lane, to the south of Old
Drakes Creek Road. The site is identified as Parcel 36.00 of Tax Map 138 and is approximately
32.80 acres.
HPC Agenda
08/04/2026
29
The surrounding area
consists of a mixture of
zoning types and land
uses. The property is
currently surrounded to the
north and west by large
residential tracts zoned RR
in Sumner County and
zoned ER in
Hendersonville. The City of
Hendersonville Rugby
Fields are adjacent to the
south.
The Durham Farms
subdivision is directly to
the east and is zoned
MXR-PD in Hendersonville.
Durhams Farms is a
residential development
consisting of one to two-
story single-family
detached homes with alley
loaded garages and front
entry garages and a mixture of masonry materials on the exteriors.
On the north side of Old Drakes Creek Road sits Drakes Pointe, a subdivision consisting of
one to two-story, single-family detached homes featuring side entry garages and full brick
and cement board exteriors. Adjacent to the southwest of the property is the planned
Falcon Ridge Subdivision that is also zoned SR-1-PD.
The areas to the north and northwest of the site along Old Drakes Creek Road are a
mixture of single-family detached homes on large rural tracts..
HPC Agenda
08/04/2026
30
The property lies within the City of Hendersonville’s Urban Growth Boundary and is within
an area identified in Chapter 3 of the City of Hendersonville’s Future Land Use and
Transportation Plan as Mixed-Use Neighborhood.
The required Plan of Services for the annexation has been prepared for the Commission to
consider. This is attached to this report and available for the Commission’s review, along
with the Resolutions for the Plan of Services and the proposed Annexation.
---------------------------------------------------------------------------------------------------------------------------------------------------------
------------------------------------
ESTIMATED NEXT STEPS IN THE ANNEXATION AND PLAN OF SERVICES APPROVAL
PROCESS:
1. BOMA General Committee Meeting (August 11, 2026 - estimated)
2. BOMA Regular Meeting – 1st Reading – Plan of Services Resolution (September 8, 2026 -
estimated)
3. BOMA Regular Meeting – 2nd Reading – Annexation Resolution (October 13, 2026 - estimated)
HPC Agenda
08/04/2026
31
COMPREHENSIVE DEVELOPMENT PLAN
In conjunction with the Annexation Request above, the applicant has submitted a
Comprehensive Development Plan application to rezone the property from Rural
Residential – RR (Sumner County) to Suburban Residential Planned Development – SR-1-
PD. The gated residential development will consist of 36 single-family detached home lots
on 32.80 acres, for a density of 1.09 dwelling units per acre. Minimum lot size will be
16,000 sf, and all homes will be for purchase. The proposed homes will range in size from
2,400 sf. to 3,200+ sf. All homes will have a minimum of 3 bedrooms, and a minimum 2-
car front or side entry garage with decorative garage doors. The home elevations will be
constructed of a mixture of masonry and cement board materials. Each lot and home will
have foundation landscaping and sodded front yards.
The Avant Lane entrance into the community will feature landscaped development signage
and shall be gated with private internal streets. An additional emergency access entrance
will be provided with a crash gate and signage. Additionally, common open spaces will be
maintained by the HOA. A dedicated open space will be established along the western lots
of the development, on the east side of Drakes Creek. This area will create a natural buffer
HPC Agenda
08/04/2026
32
between the new project and adjoining properties, while preserving the existing woodland
trees and vegetation within the floodplain area. Within the community there will be
decorative streetlights with sidewalks on both sides of the street to create character and
continuity throughout the neighborhood.
Rendering of Proposed Avant Lane Entrance
Proposed
improvements along
Avant Lane include
adding an 18” curb
and gutter along the
east side of the street
(along the existing
Durham Farms
development) and
adding trees and a
fence along the west
side of the street along
Avelyn to create a
cohesive streetscape.
HPC Agenda
08/04/2026
33
A raised crosswalk to match the crosswalk at the Rugby Fields is also proposed near the entrance of Avelyn,
along with a 5’ sidewalk along the southern property boundary along the entrance driveway of the fields.
The applicant also prepared and provided a Flood Study and Traffic Impact Statement. The Flood Study was
used to determine minimum finished floor elevations for the proposed homes. Based on the trip generation
developed as part of the Traffic Impact Statement, the development is anticipated to generate 556 daily trips,
with 30 AM peak hour trips and 37 PM peak hour trips.
Based on the Zoning Ordinance, all residential Planned Developments shall conform to the design standards
as prepared by the developer and approved by the Planning Commission in conjunction with approval of the
Development Plan. The developer provided Design Standards and Architectural Characteristics in response to
the design standards that align with those provided in the Zoning Ordinance.
Design Standards
• All on-site utilities will be underground.
• Mail service to be provided via a centralized mail kiosk.
• Mail kiosk shall be covered, lit and include at least one parking space.
• Solid waste will be handled via City of Hendersonville Public Works.
• Private streets with a gated entrance and designed to comply with the City of Hendersonville streets
standards.
• 5-ft wide public sidewalks will be provided along both sides of the private streets to create a pedestrian
friendly community.
• Streetlights will be decorative and meet Cumberland Electric Membership Corporation(CMEC)
standards.
• All homeowners will be required to be a member of the H.O.A.
• As a member of the H.O.A, the residents will be subject to restrictive covenants and maybe required to
pay membership dues determined by a 3rd party management company.
• HOA will be managed by independent 3rd party management company.
• The common open space areas will be owned and maintained by an H.O.A.
• All common area parking lots will be private and maintained by H.O.A.
• Decorative streetlights along the private street shall be maintained by the H.O.A.
• The entrance off of Avant Lane will have new entrance signage constructed of masonry and metal
materials and anchored by landscaping.
• Builders shall install sod and landscaping along front foundations.
• If the development is to include any wet pond they shall have lighted fountains, and wet or dry ponds
shall include landscape screening around the perimeter of the pond.
HPC Agenda
08/04/2026
34
Architectural Characteristics
• The homes will be a
minimum of 2,400 sf of living
area.
• Each lot shall be a minimum
of 16,000 sf
• Building heights shall not
exceed 35 feet in height
• All buildings will be 2 and 3-
story
• All units will have at least 3
bedrooms
• All the units will have eaves
(Eaves shall be allowed to
overhang setback lines)
• All units will have a patio
area at the rear of the unit
• All homes will have a 2-car front or side entry garage (70% side entry)
• Corner lots to be side entry off the side road without a turn around
• Side entry to be a minimum width of 24-feet for the turn around
• Front entry garages will have decorative carriage-style doors with windows
• Garage door color will match trim of the unit or will be either white or a neutral color
The applicant also included the below renderings of potential home elevations. New and future elevations
shall be submitted and approved by staff in advance prior to receiving a building permit. These elevations
could only be approved if staff feel that the homes meet the character, style, and size of the new development
and surrounding area.
HPC Agenda
08/04/2026
35
HPC Agenda
08/04/2026
36
IMPACT FEES
Per Ordinance 2025-25, the proposed development would be subject to Impact Fees of $6,000 per single-
family dwelling. Impact Fees are collected at the time of building permit issuance for each dwelling. The
breakdown of the potential Impact Fees generated by the project is below:
Impact Fee Number of Dwellings Total Fee
$6,000.00 per dwelling 36 $216,000.00
Further broken down into allocations for Roads and Parks, the fees would be as follows:
Fee Type Calculation Total
Parks 1/3 x ($216,000.00) $72,000.00
Roads 2/3 x ($216,000.00) $144,000.00
The Planning Commission shall determine if the planned development is or is not in the public interest based
on the following:
1. Is the site or zoning lot upon which the planned development is to be located adaptable to the unified
development proposed?
2. Will the proposed planned development be detrimental to or endanger the public health, safety,
comfort, or general welfare of any portion of the community?
3. Will the proposed planned development be injurious to the use and enjoyment of other property in the
vicinity for the purposes already permitted?
4. Will the proposed planned development impede the normal and orderly development and improvement
of surrounding property for uses permitted in the zoning district?
HPC Agenda
08/04/2026
37
5. Is there provision for adequate utilities, drainage, off street parking and loading, pedestrian access and
all other necessary facilities?
6. Is there provision for adequate vehicular ingress and egress designed to minimize traffic congestion
upon public streets?
7. Are the location and arrangement of structures, parking areas, walks, lighting and appurtenant
facilities, compatible with the surrounding neighborhood and adjacent land uses?
8. Is there suitable landscaping for the portions of the proposed planned development which are not to be
used for structures, parking and loading areas, or access ways?
9. Is the planned development, in the specific location proposed consistent with the spirit and intent of
this Ordinance and the Land Use and Transportation Plan?
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
--------
ESTIMATED NEXT STEPS IN THE COMPREHENSIVE DEVELOPMENT PLAN APPROVAL PROCESS:
1. BOMA General Committee Meeting (August 11, 2026 - estimated)
2. BOMA Regular Meeting – 1st Reading (September 8, 2026 - estimated)
3. BOMA Regular Meeting – 2nd Reading (October 13, 2026 - estimated)
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
STAFF COMMENTS – PLANNING DEPARTMENT:
1. Crash gate should match the main entrance gate with the exception of having signage stating "No
Entry".
2. Confirm sidewalk along rugby fields entrance is on the Avant property.
3. Provide landscape buffer along Avant Ln in between fence and post/chain fence.
4. Work with Planning Staff to determine the limits of the post/chain fence detail along the front of
the development.
5. Provide fence detail of interior fence (on property line) along Avant Ln.
6. Provide limits of landscape buffer and typical buffer section.
7. What is the proposed material of the black fence chain?
8. The applicant has agreed to provide an 8’ wide multi-use path on lots 1 and 2 to tie into the
existing multi-use path in Durham Farms along Avant Lane.
Submitted by Caitlin Shinn, Planner and Zachary Coleman, Senior Planner (July 29th, 2026)
STAFF COMMENTS – PUBLIC WORKS:
1. Show improvements to Avant Lane per discussion.
Submitted by Frank Mills, City Engineer (July 29th, 2026)
HPC Agenda
08/04/2026
38
STAFF COMMENTS – FIRE DEPARTMENT:
1. No comments.
Submitted by Jeffery Stites, Deputy Fire Marshal (July 29th, 2026)
STAFF COMMENTS – UTILITY DISTRICT:
1. No comments.
Submitted by David Brigance, HUD Construction Supervisor (July 29th, 2026)
7. OTHER:
SP-007478-2026: DEGTHAI Hendersonville Wall Mural– Site Plan (Youtube Link)
Owner: Tamara Gnyp
Location: 750 B W Main St, Parcel 160O B 003.01
Leading Planning Staff: Caitlin Shinn
MOTION by Altizer, seconded by Wessel, to approve the Avelyn Comprehensive Development
Plan with all staff comments and the addition of an eight-foot bike path by Lots 1 & 2.
Altizer, Cundiff, Evans, Hardwick, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
HPC Agenda
08/04/2026
39
STAFF REPORT
The applicant, Jay Jenratha on behalf of DegThai Hendersonville, LLC, is requesting approval for two
wall murals at 750B West Main Street, the site of a new Thai restaurant. The proposal includes a
lotus flower mural on the front of the building and a Thai dragon mural on the side. The building's
exterior was previously painted burnt orange (front) and ivory (left side), as shown below.
HPC Agenda
08/04/2026
40
Previous frontage
Previous side frontage
The proposed wall murals are lotus flower mural on the front facade, while the Thai dragon design on
the building's side elevation.
HPC Agenda
08/04/2026
41
Proposed Front Mural – Lotus Flower
Proposed Side Mural – Thai Dragon
HPC Agenda
08/04/2026
42
The proposed wall murals comply with all applicable standards of the Zoning Ordinance, as outlined
below:
13.5.2.9 | WALL MURALS
Wall murals may be allowed, subject to Planning Commission approval.
A. DESIGN STANDARDS
The following criteria shall be utilized by the Planning Commission to evaluate and review for
mural approval:
1. Shall be an original work of art.
2. Shall be designed and constructed under the supervision of a qualified artist/muralist or other qualified
professional who has sufficient knowledge and experience in the design and execution of such projects, as
well as with the application of the selected medium.
3. Shall exhibit excellence in design, content, material, and application while incorporating high-quality
materials that will enhance the overall development and appearance of the site.
4. Materials shall be securely attached to the building or structure to which it is applied.
5. Materials shall be durable and weather resistant to prevent premature deterioration or other unintended
change in appearance.
6. Materials shall be appropriate for its outdoor location and climate, with special considerations for longevity
and if possible, graffiti-resistant.
7. Materials used may be, but are not limited to, paint and other artistic mediums such as tile or mosaic.
8. Colors should be complementary and harmonious with the exterior colors of the building or structure.
9. Design, location, scale, and content should be in keeping with and enhance the building, wall, windows,
fence, or other surface on which it is located, as well as the local environment.
B. PROHIBITIONS
All criteria not expressly permitted in accordance with the Chapter 13.5.2.8.A above are
prohibited. Such criteria include, but are not limited to:
1. Applied to any surface that was unlawfully established.
2. Constitute or create a traffic hazard for passing motorists.
3. Obscure or detract from the significant architectural features of the said structure or have an adverse
effect on properties or facing properties.
4. Compromise the proper function of any building or use or diminish public safety.
5. Installed in locations that conflict with setback requirement of the district in which it is located.
6. Be above a height that is or would be nonconforming to current building height limitations.
7. Contain a logo or trademarked symbol, except for official government seals.
8. Include commercial text or products displaying, mimicking, or construed as symbolizing a specific brand.
9. Incorporate recognized signs of hatred or discrimination against any race, color, sex, age, national origin,
disability, religion, ancestry, marital status, familial status, gender identity or expression, or sexual
orientation.
10. Contain obscene content or material harmful to minors, as defined by law.
11. Consist of any reproduction, copy, or mass-produced work of visual art of any type.
HPC Agenda
08/04/2026
43
The murals were designed and hand-painted by professional muralist Eric “Mobe” Bass, and the
project complies with all previously stated guidelines.
Applicant’s response to design guidelines
Applicant’s response to design prohibited criteria
HPC Agenda
08/04/2026
44
STAFF COMMENTS – PLANNING DEPARTMENT:
1. No comments.
Submitted by Caitlin Shinn, Planner (July 29th, 2026)
STAFF COMMENTS –PUBLIC WORKS:
1. No comments.
Submitted by Frank “Tater” Mills, City Engineer (July 29th, 2026)
STAFF COMMENTS – FIRE DEPARTMENT:
1. No comment.
Submitted by Jeffery Stites, Deputy Fire Marshal (July 29, 2026)
STAFF COMMENTS – UTILITY DISTRICT:
1. No comments.
Submitted by David Brigance, HUD Construction Supervisor (July 29, 2026)
Election of Secretary (Youtube Link)
MOTION by Slatery, seconded by Hasty, to approve the election of Barry Hardwick as
Planning Commission Secretary.
Altizer, Cundiff, Evans, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Nay: None. Hardwick abstained. Absent: None.
MOTION PASSED. (8-0-1)
HPC Agenda
08/04/2026
45
ZOAM-007478-2026: Zoning Ordinance Text Amendments (Youtube Link)
Leading Planning Staff: Keith Free
MOTION by Altizer, seconded by Slatery, to approve the text amendments to the
Hendersonville Zoning Ordinance.
Altizer, Cundiff, Evans, Hardwick, Hasty, Martin, McMurry, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
STAFF REPORT
The proposed Zoning Ordinance amendments and the associated Public Hearing has been
continued from the July 7, 2026, Planning Commission meeting. Please refer to the Zoning
Ordinance Executive Summary for the full list of proposed changes, which will be recommended
to the Board of Mayor and Aldermen at this meeting.
HPC Agenda
08/04/2026
46
STAFF COMMENTS – PLANNING DEPARTMENT:
1. See Executive Summary.
Submitted by Keith Free, MPA, AICP, Planning Director (July 29th, 2026)
STAFF COMMENTS –PUBLIC WORKS:
1. No Comment
Submitted by Frank “Tater” Mills, City Engineer (July 29th, 2026)
STAFF COMMENTS – FIRE DEPARTMENT:
1. No comment.
Submitted by Jeffery Stites, Deputy Fire Marshal (July 29, 2026)
STAFF COMMENTS – UTILITY DISTRICT:
1. No comments.
Submitted by David Brigance, HUD Construction Supervisor (July 29, 2026)
8. STAFF-LEVEL PROJECTS, APPROVED: (Youtube Link)
The Hendersonville Planning Commission acknowledged staff’s approval of the following
projects. No action was taken.
SUB-007230-2026: Drakes Plaza Facade – Site Plan
(269-275 W. Main St)
SP-007362-2026: Our Lady of the Lake Prayer Garden and Columbarium – Site Plan
HPC Agenda
08/04/2026
47
(1729 Stop Thirty Rd)
SUB-007380-2026: Pate Subdivision Lots 49,50, & 51 – Final Plat
(129 Stadium Dr)
9. STAFF-LEVEL PROJECTS, PENDING: (Youtube Link)
SUB-006988-2025: C L Powell Addition Lot 17 & 18 Resub – Final Plat
(134 Powell Dr)
A - 5/14/26
Lead Planning Staff: Caitlin Shinn
SP-007390-2026: Forest Park Phase 1 Model Home– Site Plan
(1685 Sandersville Rd)
A – 7/2/26
Lead Planning Staff: Caitlin Shinn
SUB-007230-2026: TBN (Millenia Cottages) – Final Plat
(645 E Main St)
A – 5/13/26
Lead Planning Staff: Timothy Whitten
13. PLANNING DIRECTOR COMMENTS:
No Director comments.
Source: City of Hendersonville website. First collected Oct 7, 2026.