RecordWell Data

Hendersonville Planning Commission Agenda (PDF)

City of Hendersonville · Sumner County · meeting of Jun 2, 2026 · Agendas

Open the original document More from City of Hendersonville

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

1 3. PUBLIC COMMENT (AGENDA ITEMS ONLY) HENDERSONVILLE PLANNING COMMISSION AGENDA Main Meeting Room Tuesday, June 2nd 2026 6:30 PM 1. OPENING PRAYER 2. ROLL CALL 4. ACCEPTANCE OF AGENDA 5. MINUTES: Minutes of May 5th, 2026 6. CONSENT AGENDA: PRELIMINARY PLATS SUB-007293-2026: Forest Park Phase 8 – Preliminary Plat Owner: Jen TN 2 LLC (Beazer Homes LLC) Location: 1685 Saundersville Rd, Parcel 137 038.00 Lead Planning Staff: Zachary Coleman SUB-007294-2026: Forest Park Phase 9 – Preliminary Plat Owner: Jen TN 2 LLC (Beazer Homes LLC) Location: 1685 Saundersville Rd, Parcel 137 038.00 Lead Planning Staff: Zachary Coleman HPC Agenda 06/02/2026 2 SUB-007295-2026: Savannah Phase 9 – Preliminary Plat Owner: Creekside Homes, LLC Location: Parcel 146 87.00 & 87.03 Lead Planning Staff: Zachary Coleman SITE PLAN SP-007296-2026: Center Point Church Parking Lot – Site Plan Owner: Center Point General Baptist Church Location: 1000 Center Point Rd, Parcel 160 007.00 Lead Planning Staff: Timothy Whitten 7. SITE PLAN SP-007298-2026: Saundersville Station Solar Lights – Site Plan Owner: SS Land Investment LLC Location: Parcel 137 046.00 & 046.02 Lead Planning Staff: Zachary Coleman (Waiver Request) 8. STAFF-LEVEL PROJECTS, PENDING: SUB-007380-2026: Pate Subdivision Lots 49,50,& 51 – Final Plat (129 Stadium Dr) S - 5/29/26 Lead Planning Staff: Caitlin Shinn SUB-006988-2025: C L Powell Addition Lot 17 & 18 Resub – Final Plat (134 Powell Dr) A - 5/13/26 Lead Planning Staff: Caitlin Shinn HPC Agenda 06/02/2026 SP-007362-2026: Our Lady of the Lake Prayer Garden and Columbarium – Site Plan (1729 Stop Thirty Rd) A – 5/28/26 Lead Planning Staff - Timothy Whitten 3 SUB-007230-2026: TBN (Millenia Cottages) – Final Plat (645 E Main St) A – 5/13/26 Lead Planning Staff: Timothy Whitten 9. PLANNING DIRECTOR COMMENTS: 11. ADJOURNMENT HPC Agenda 06/02/2026 The applicant, CSDG, on behalf of the owner and developer has submitted a Preliminary Plat for Forest Park Phase 8. This Phase includes 45 single family detached lots, 4 open space tracts and public right of way that are part of the approved amended Final Development Plan for Forest Park. 1 AGENDA DATE: June 2nd, 2026 HPC PROJECT #: SUB-007293-2026 PROJECT NAME: Forest Park Phase 8 – Preliminary Plat PROJECT TYPE: Preliminary Plat PROJECT LOCATION: 1685 Sandersville Rd, Parcel 137 038.00 WARD: Ward 5 FINAL STAFF REPORT & COMMENTS 2 The overall development includes 612 housing units (156 attached 2 unit villas and 3, 4, and 5 unit cottages, 456 single-family units) across 269.7 acres and 9 Phases. The site is zoned SR-1 PD. Proposed Lot Layout Phase 8 of Forest Park contains six (6) Type “D” lots and thirty-nine (39) Type “E” lots across 14.87 acres. Typical lot sizes range from 0.17 - 0.31 acres (7,500 – 13,622 sq. ft.) The typical lot layouts are provided on the following page, along with examples of potential elevations of the homes from the approved PDP. 3 Proposed Lot Types 4 1. No comments. Submitted by Zachary Coleman, Senior Planner (May 27th, 2026) 1. No Comments. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (May 27th, 2026) 5 STAFF COMMENTS – UTILITY DISTRICT: 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (May 27th, 2026) 1. No Comments. Submitted by David Brigance, HUD Construction Supervisor (May 27th, 2026) The applicant, CSDG, on behalf of the owner and developer has submitted a Preliminary Plat for Forest Park Phase 9. This Phase includes 14 single family detached lots, 1 open space tract and public right of way that are part of the approved amended Final Development Plan for Forest Park. 1 AGENDA DATE: June 2nd, 2026 HPC PROJECT #: SUB-007294-2026 PROJECT NAME: Forest Park Phase 9 – Preliminary Plat PROJECT TYPE: Preliminary Plat PROJECT LOCATION: 1685 Sandersville Rd, Parcel 137 038.00 WARD: Ward 5 FINAL STAFF REPORT & COMMENTS 2 The overall development includes 612 housing units (156 attached 2 unit villas and 3, 4, and 5 unit cottages, 456 single-family units) across 269.7 acres and 9 Phases. The site is zoned SR-1 PD. Proposed Lot Layout Phase 9 of Forest Park contains fourteen (14) Type “E” lots across 6.16 acres. Typical lot sizes range from 0.19 - 0.46 acre (8,173 – 19,954 sq. ft.) The typical lot layouts are provided on the following page, along with examples of potential elevations of the homes from the approved PDP. The Phase 9 Preliminary Plat is the final preliminary plat submittal for the Forest Park development. 3 Proposed Lot Types 4 STAFF COMMENTS – UTILITY DISTRICT: 1. No comments. Submitted by Zachary Coleman, Senior Planner (May 27th, 2026) 1. No Comments. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (May 27th, 2026) 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (May 27th, 2026) 1. No Comments. Submitted by David Brigance, HUD Construction Supervisor (May 27th, 2026) The applicant, Bruce Rainey and Associates, has submitted a Preliminary Plat for Savannah Phase 9. This Phase includes 16 single -family detached lots across 16.87 acres that are part of the approved amended FMDP for the Savannah development. The average lot size is 0.79 acre (34,408 sq. ft.) The Savannah Phase 9 Preliminary Plat was first approved by Planning Commission on September 6, 2022. The Construction Plans were submitted in January 2023 but vesting for this phase expired in January 2026. The vesting for the overall development is still in effect, but a new Preliminary Plat submittal is required to go back to Planning Commission for approval prior to resubmission and completion of Construction Plans. 1 AGENDA DATE: June 2nd, 2026 HPC PROJECT #: SUB-007295-2026 PROJECT NAME: Savannah Phase 9 – Preliminary Plat PROJECT TYPE: Preliminary Plat PROJECT LOCATION: Parcel 146 87.00 & 87.03 WARD: Ward 5 FINAL STAFF REPORT & COMMENTS 2 Preliminary Plat Existing Conditions 3 STAFF COMMENTS – UTILITY DISTRICT: 1. No comments. Submitted by Zachary Coleman, Senior Planner (May 27th, 2026) 1. No Comments. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (May 27th, 2026) 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (May 27th, 2026) 1. No Comments. Submitted by David Brigance, HUD Construction Supervisor (May 27th, 2026) Center Point Church is located at 1000 Center Point Rd, at the intersection of Caldwell Drive and Center Point Road. It is zoned SR -1. In 2024 the church obtained a conditional use permit from the Board of Zoning Appeals to expand their parking lot onto some adjacent SR-1 zoned property that it owns. Now, the church 1 AGENDA DATE: June 2nd, 2026 HPC PROJECT #: SP-007296-2026 PROJECT NAME: Center Point Church Parking Lot Site Plan PROJECT TYPE: Site Plan PROJECT LOCATION: 1000 Center Point Rd, Parcel 160 007.00 WARD: Ward 3 FINAL STAFF REPORT & COMMENTS 2 is requesting approval of a site plan to add 23 parking spaces on the adjacent parcel. The new parking lot will be located behind (south-east of) the existing primary parking lot. Access to the new parking will be via an existing driveway off of Center Point Road and through the existing primary parking lot. 1. No Comments. Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (April 29th, 2026) 3 STAFF COMMENTS – UTILITY DISTRICT: 1. This development will be required to satisfy water quality and detention requirements. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (April 29 th, 2026) 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (April 29th, 2026) 1. No Comments. Submitted by David Brigance, HUD Construction Supervisor (April 29th, 2026) The applicant Hunter Janes, on behalf of Southeastern Building Corp., has submitted a site plan seeking approval for proposed solar streetlights to be installed in a recently completed section of Saundersville Station, which is zoned SR-1-PD. The final two homes in Saundersville Station Phase 8, Sections 1 and 2, have just been completed. 1 AGENDA DATE: June 2nd, 2026 HPC PROJECT #: SP-007298-2026 PROJECT NAME: Saundersville Station Solar Lights Site Plan PROJECT TYPE: Site Plan PROJECT LOCATION: Parcel 137 046.00 & 046.2 WARD: Ward 5 FINAL STAFF REPORT & COMMENTS 2 Recently, the contractor discovered that the conduit for the approved streetlights was not installed by the original contractor. Southeastern is proposing the installation of seven (7) solar streetlights as the most efficient and effective solution. This approach would minimize the potential impact and disruption associated with bringing heavy equipment back onto the site. Overall Site Plan Per the applicant, the battery (Li -Ion 88.8 Wh) for each light has approximately a 7 -hour charge time but is sized to run for 30 hours without solar regeneration. The battery lasts a minimum of 1500+ charge cycles so will need to be replaced every 4-5 years (cost is around $200/battery). The solar panel and LED light are rated to last 20 years (the panel loses 0.5 -0.8% of efficiency per year). The poles last as long as a typical streetlight pole. The solar panel may need to be cleaned occasionally if excess dirt/debris is present. The HOA will be responsible for the maintenance/replacement of these streetlights. 3 A photometric plan was requested to compare the previously approved lighting to what is proposed but was unable to be provided. There are still questions as to whether the proposed lighting would provide adequate lighting year-round due to the effect of seasonal changes in sunlight and extended weather events. The applicant provided the following letter regarding this submittal with further clarification on the issues currently being faced: 4 5 STAFF COMMENTS – UTILITY DISTRICT: 1. No comments. Submitted by Zachary Coleman, Senior Planner (May 27th, 2026) 1. No Comments. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (May 27th, 2026) 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (May 27th, 2026) 1. No Comments. Submitted by David Brigance, HUD Construction Supervisor (May 27th, 2026)

Source: City of Hendersonville website. First collected Oct 7, 2026.