Public Works Committee Meeting Agenda Packet (PDF)
City of Hendersonville · Sumner County · meeting of May 26, 2026 · Agenda packets
Open the original document More from City of Hendersonville
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY OF HENDERSONVILLE
PUBLIC WORKS COMMITTEE
May 26, 2026, Conference Room 1 at 5:30 p.m.
101 Maple Drive North, Hendersonville, TN 37075
Anyone needing accommodations due to disabilities, please contact the ADA Coordinator at 615- 822-1016 at least
24 hours prior to the meeting.
I. Call to Order by the Chairman
II. Acceptance of agenda
III. Minutes
A. A
pproval of A
pril 28, 2026, meeting minutes
IV. Citizens’ Comments
V. Ordinances and Resolutions
VI. Other Agenda Items
1. Trash Collection Update
2. Storm Debris Removal Update – Stump Project (verbal update)
3. Imperial Boulevard and Rockland Road Roundabout
4. Drakes Creek and Stop 30 Intersection Project (verbal update)
5. Light Synchronization Project ( verbal update)
6. LED Streetlight Conversion Project (verbal update)
7. Recycling Discussion
8. Old Drakes Cr./New Shackle Island Rd. - County Project (verbal update)
9. Other Business
VII. Adjournment
1
2-4
5-6
7-85
1
Pages
PUBLIC WORKS COMMITTEE MEETING, APRIL 28, 2026
CONFERENCE ROOM 1, 5:30 pm
Present: Alderman Mark Skidmore (Chairman), Alderman Eddie Roberson (Vice-Chairman)
Absent: Alderman Michael Martin
Others Present: Mayor Jamie Clary, COO Jesse Eckenroth, Public Works Director Stephen Winzenread,
Communications Manager Casey LaMarr, Alderman Mark Burgdorf, Alderman Don Ward, Resident Jovy
Thomas
Called to order at 5:31 pm
Acceptance of Agenda
Mo
tion: Alderman Roberson
Second: Alderman Skidmore
Vote: Approved unanimously
Motion to Approve March 24, 2026, Public Works Committee meeting minutes
Mo
tion: Alderman Roberson
Second: Alderson Skidmore
Vote: Approved unanimously
Citizens Comments
Re
sident Jovy Thomas spoke regarding concerns about recycling availability within the city. See further
discussion under Other Agenda Items – Recycling Discussion.
Ordinances and Resolutions
1. Re
ading of Resolution 2026-16, a resolution authorizing the Mayor to sign a proposal with the
Tennessee Department of Transportation (TDOT) for a bridge project over Mansker Creek on
Gallatin Pike.
Discussion included clarification that the project is led by TDOT and involves replacement of an
aging bridge. The committee noted the agreement primarily formalizes the city’s cooperation
with the project. Alderman Skidmore requested to be added as a sponsor.
Motion: Alderman Roberson
Second: Alderman Skidmore
Vote: Approved unanimously
2
Ot
her Agenda Items
2. Tras
h Collection Update
Staff reported that service performance remains stable with a low number of missed collections.
A temporary increase in reported misses was attributed to a holiday schedule delay. Overall,
service levels remain consistent and improved compared to prior periods.
3. Storm Debris Removal Update (verbal update)
Staff reported that primary debris removal operations are complete. Ongoing work includes
FEMA-related reimbursement processes and stump grinding at parks and public spaces, with
approximately 130 stumps identified. Work is progressing quickly and expected to conclude
soon.
4. Drakes Creek and Stop 30 Intersection Project (verbal update)
Staff provided an update on permitting progress with state and federal agencies. While
permitting remains complex, agencies have been responsive, and progress is being made toward
approval. Property acquisition is nearing completion.
5. Light Synchronization Project (verbal update)
The project has received TDOT bid approval at approximately $1.6 million. The pre-construction
meeting is expected to begin in early May with construction to begin in late May/early June. The
project will include upgraded radar detection systems to improve traffic signal performance.
6. LED Streetlight Conversion Project (verbal update)
Approximately 775 of 2,338 streetlights (about 35%) have been converted to LED. Work is
ongoing throughout the city, including parks and residential areas. Staff is also coordinating with
HOAs regarding potential participation in the program.
7. Recycling Discussion
The committee discussed recycling concerns raised by resident Jovy Thomas regarding limited
access to public recycling options for materials such as plastic bottles and glass. Members
reviewed existing options, including limited retail drop-offs, the county resource authority, and
private subscription-based services. It was noted that prior efforts to expand recycling services
faced cost and vendor challenges. Staff will compile information on available recycling resources
and report back for further discussion.
3
8. Oth
er Business
• D isc
ussion of funding strategies for infrastructure projects, including potential use of
stormwater funds.
• Request for updates on transportation projects at future meetings.
• Discussion regarding street sign standards, including ADA compliance and design specifications.
Staff will develop guidance for acceptable sign standards.
Motion to Adjourn
Motion: Alderman Roberson
Second: Alderman Skidmore
Vote: Approved unanimously
Adjourned at 6:22 pm
______________________________________________________
Mark Skidmore, Chairman
4
Trash Collection
Update
04/20/26 – 05/15/26
5
Trash Collection Misses 04/20/26 – 05/15/26
Date
Daily
Reported
Misses
4/20/2026 6
4/21/2026 7
4/22/2026 3
4/23/2026 8
4/24/2026 6
4/27/2026 6
4/28/2026 7
4/29/2026 9
4/30/2026 6
5/1/2026 6
5/4/2026 7
5/5/2026 9
5/6/2026 8
5/7/2026 11
5/8/2026 6
5/11/2026 10
5/12/2026 13
5/13/2026 9
5/14/2026 2
5/15/2026 6
Total 145
0
10
20
30
40
50
60
# Daily Misses
Reported Trash Collection Misses
6
Traffic Operations Assessment - Imperial Boulevard at Rockland Road
City of Hendersonville, TN
NS Project Number: NS.20255.001
Page 1
Introduction
At the request of City of Hendersonville, Neel -Schaffer performed a technical investigation to
determine the feasibility of converting the intersection of Imperial Boulevard at Rockland Road to
roundabout control. The purpose of this study is to provide planning-level due diligence to:
• Investigate design parameters necessary to achieve acceptable operational performance
• Identify potential implementation and constructability considerations
• Document planning-level project implications to support City decision-making
The study assessment referenced the following documents for technical guidance, information, and
analysis criteria:
• AASHTO A Policy on Geometric Design of Highways and Streets (Green Book)
• Manual on Uniform Traffic Control Devices (MUTCD)
• TDOT Roundabout Design Reference Guide
• TDOT Highway System Access Manual, Volume 2
The following overview provides a summary of the evaluation.
Study Location and Existing Conditions
The study evaluated the unsignalized intersection of Imperial Boulevard and Rockland Road, which
currently operates as a four-legged intersection. Rockland Road and the east (westbound) driveway
approaches are stop-controlled, while Imperial Boulevard operates as free-flow for both approaches.
Imperial Boulevard is classified as a major collector with a posted speed limit of 35 MPH . Within the
project area, the roadway generally consists of a five-lane cross-section on the northbound approach,
including two 12-foot travel lanes in each direction and a 12-foot two-way left-turn lane (TWLTL). The
southbound approach consists of two travel lanes without a center turn lane. The northbound
outbound lanes transition into the approach lanes at the adjacent signalized intersection of Imperial
Boulevard and West Main Street. Imperial Boulevard serves as a primary access route for surrounding
residential subdivisions and commercial developments. Rockland Road is also classified as a major
collector with a posted speed limit of 35 MPH . The roadway has an average pavement width of 24
feet, consisting of two 12- foot travel lanes and narrow shoulders. It primarily serves adjacent
residential areas and provides access to Imperial Boulevard.
Traffic Data and Derivation of Base Year and Horizon Year Traffic Models
Preliminary tasks began with acquiring intersection vehicle turning movement counts. The turning
movement counts were collected at the study intersection s on Wednesday December 10, 2025,
between 7:00am-6:00pm. The weekday AM, Midday, and PM peak hours, as indicated by the vehicle
turning movement counts, are:
• AM Pe
ak Hour: 7:45am
-8
:45am
• M
idday Peak hour: 12:00pm
-1:00p
m
• PM Pe
ak Hour: 4:30pm
-5:30p
m
7
Traffic Operations Assessment - Imperial Boulevard at Rockland Road
City of Hendersonville, TN
NS Project Number: NS.20255.001
Page 2
Intersection turning movement counts were collected to establish existing traffic conditions and to
assess potential impacts associated with future traffic growth within the study area under Base Year
(2036) and Horizon Year (2046) conditions. Collected traffic volumes were projected to future year
conditions using an annual growth rate of 1.5%. This growth rate was developed using historical data
from TDOT count station 83000098 located on West Main Street. The resulting background traffic
model used for f uture year analysis represents a combination of existing ambient traffic, projected
traffic volumes grown at an annual rate of 1.5 %, and additional trip generation associated with the
proposed gas station located at 451 West Main Street.
Methodology
The assessment began with an evaluation of alternative intersection control types at the intersection
of Imperial Boulevard and Rockland Road. This was done in accordance with TDOT’s Intersection and
Interchange Evaluation (IIE) procedure outlined in the Highway System Access Manual (HSAM),
Volume 2. The evaluation follows the TDOT IIE process, progressing from planning-level screening to
detailed operational analysis to support selection of a preferred alternative. TDOT’s IIE process is a
data-driven, performance-based methodology used to objectively screen and evaluate intersection
and interchange control alternatives. The evaluation consists of two stages:
• Stage 1 – Scoping (CAP-X Analysis): Planning-level screening using the Capacity Analysis for
Planning of Junctions (CAP-X) tool developed by the Federal Highway Administration (FHWA).
This tool applies critical lane volume analysis to estimate volume -to-capacity (v/c) ratios for
various intersection control types.
• Stage 2 – Preferred Option Selection: This stage consists of conducting more detailed
operational, safety, cost, and qualitative analyses of the intersection control alternatives that
advanced from Stage 1 (Scoping) in order to identify a single preferred option.
The following intersection control alternatives were evaluated as part of the Stage 1 screening:
• Two-Way Stop Control (existing condition)
• All-Way Stop Control
• Traffic Signal
• Roundabout
Stage 1 – Scoping Results
The planning-level evaluation compared volume-to-capacity (v/c) ratios for each control type under
horizon year conditions. Results are summarized below:
Table 1: TDOT IIE Stage I - Scoping Results
Control Type AM V/C PM V/C
Two-Way Stop Control 1.82 2.09
All-Way Stop Control 1.55 1.88
Traffic Signal 0.47 0.70
Roundabout 0.30 0.59
8
Traffic Operations Assessment - Imperial Boulevard at Rockland Road
City of Hendersonville, TN
NS Project Number: NS.20255.001
Page 3
The Stage 1 results indicate that both two -way and all- way stop control alternatives exceed
acceptable capacity thresholds, suggesting that these control types would not provide adequate
operational performance under future conditions. In contrast, both the traffic signal and roundabout
alternatives operate within acceptable v/c ranges, with the roundabout alternative demonstrating
the lowest v/c ratios. However, the viability of a traffic signal is limited due to the close proximity of
the existing signal at East Main Street. This spacing raises concerns related to inadequate signal
progression, potential queue spillback between intersections, and overall inefficiencies associated
with coordinating closely spaced traffic signals. The results of the TDOT IIE Stage 1 analysis indicate
that a roundabout is a viable intersection control alternative for the study location. Compared to
other control types, the roundabout may provide the most favorable operational performance under
projected horizon year conditions.
Operational Analysis Results (Stage 2)
A detailed operational analysis was conducted to evaluate intersection performance under existing
(2026), base (2036), and horizon (2046) year conditions for each control alternative. Table 2 presents
a summary of operational metrics, including estimated Level of Service (LOS) and average vehicle
delays for the AM and PM peak periods. Detailed intersection analysis summary sheets are provided
in the Appendix.
Table 2 – Intersection Level of Service Analysis
Notes:
1) Two-Way Stop Control (Existing) - Existing lane assignments and approach geometry.
2) All-Way Stop Control - Retained current intersection approach lane assignments and geometry.
3) Traffic Signal Control - Includes a southbound left-turn lane; all other lane assignments and approach geometry remain
existing.
4) Roundabout Control - Single-lane circulatory roadway with dual-lane northbound and southbound approaches and a
single-lane westbound approach.
a) Eastbound Approach: 1-Shared Left/Thru/Right Lane
b) Eastbound Approach: 1-Shared Left/Thru Lane, 1-Right Turn Lane
AM Peak PM Peak AM Peak PM Peak AM Peak PM Peak
Two-Way Stop
Control Overall E (35.2s) C (20.7s) F (86.9s) D (34.3s) F (237.6s) F (83.6s)
All-Way Stop Control Overall C (15.8s) C (21.6s) C (20.1s) E (37.5s) D (32.4s) F (69.8s)
Signalized Overall C (21.8s) D (43.1s) C (23.5s) D (46.9s) C (27.3s) D (52.4s)
Overall A A A A (7.7s)
Eastbound Approach A A (8.0s) A C (23.6s)
Overall A A A A (2.1s)
Eastbound Approach A A A A (4.4s)
Imperial Blvd &
Rockland Rd
2046Intersection
Analysis Years
Roundabout a)
2NS-1EW
Roundabout b)
2NS-2E-1W
Intersection Control Type & Alternative
Scenarios 2026 2036
9
Traffic Operations Assessment - Imperial Boulevard at Rockland Road
City of Hendersonville, TN
NS Project Number: NS.20255.001
Page 4
Two-Way Stop Control (Existing Condition)
The existing two -way stop -controlled intersection operates acceptably during some existing peak
periods; however, delays increase significantly under future conditions. By the horizon year (2046),
the intersection is projected to operate at LOS “F” during both AM and PM peak hours, with excessive
delays exceeding 200 seconds in the AM peak hour. These results indicate that the existing control is
not sustainable under projected traffic growth.
All-Way Stop Control
The all‑way stop control alternative provides moderate operational improvements under near ‑term
conditions; however, its performance is not sustained under projected future demand. By 2046, the
intersection operates at LOS “F” during the PM peak hour, indicating that this alternative would not
provide adequate long‑term operational performance.
Signalized Intersection
The signalized alternative provides stable and acceptable operations across all analysis years. The
intersection is projected to operate at LOS “C” during AM peak hours and LOS “D” during PM peak
hours under horizon year conditions. While acceptable, this alternative results in higher overall delays
compared to the roundabout alternatives. The signalized alternative was dismissed due to its
proximity to the existing signal at East Main Street, resulting in concerns with closely spaced signal
operations, including queue spillback, limited storage, and inefficient coordination.
Roundabout Control
The roundabout analysis initially assumed a single -lane eastbound entry, which operated at LOS C
under design -year conditions and is considered acceptable. To further examine operational
performance, a more in -depth operational evaluation was conducted assuming a dual-lane
eastbound entry to assess whether additional geometric enhancements would meaningfully improve
operations. The supplemental analysis was performed to determine whether eastbound operations
could be improved. The two roundabout configurations were evaluated:
• Roundabout Alternative A (2NS- 1EW): includes two approach lanes on the northbound and
southbound approaches, while the eastbound and westbound approaches consist of a single
lane serving all movements
• Roundabout Alternative B (2NS-2E-1W): The eastbound approach is modified to include two
approach lanes consisting of a shared left ‑through lane and an exclusive right ‑turn lane. All
other approach geometries and lane assignments remain unchanged from Alternative A.
Both roundabout alternatives demonstrate acceptable overall operational performance, operating at
LOS “A” during all peak periods and analysis years. However, as previously mentioned, the eastbound
approach may experience higher delays under horizon year traffic conditions.
• Alternative A operates at LOS C (23.6 seconds) during the 2046 PM peak hour
• Alternative B operates at LOS A (4.4 seconds) during the same period
10
Traffic Operations Assessment - Imperial Boulevard at Rockland Road
City of Hendersonville, TN
NS Project Number: NS.20255.001
Page 5
The predictive analysis indicates that the roundabout control scenario offers the most favorable
operational performance during both AM and PM peak periods.
Queueing Analysis (95th Percentile)
A queueing analysis was performed to evaluate the ability of each intersection control alternative to
accommodate projected vehicle storage demands. The analysis focused on the northbound approach
at West Main Street at Imperial Boulevard, given its proxim ity to the study intersection . Available
storage length s on the northbound approach of West Main Street and Imperial Blvd are
approximately 200 feet per lane. Future year queue lengths were estimated using the 95th percentile
queue, which represents near worst-case conditions. This measure was used to assess the likelihood
of vehicular spillback into the roundabout.
Roundabout Control Scenario
Roundabouts operate under yield control with vehicles entering the circulatory roadway only when
acceptable gaps are available. This form of control promotes continuous flow , which could have
vehicles depart from the roundabout toward the downstream signal at a rate that exceeds the signal’s
available storage and capacity during peak periods. This condition could result in queue spillback from
the signalized approach that extends south toward the roundabout. Under roundabout control at
Imperial Boulevard an d Rockland Road, the following queue conditions are projected on the
northbound approach of West Main Street:
• 2036 Conditions:
Northbound left -turn queues exceed available storage during peak periods, with
queues up to 473 feet (PM peak).
Through and right-turn movements remain within available storage.
• 2046 Conditions:
Northbound left -turn queues increase further, with a maximum queue of
approximately 692 feet (PM peak).
Through and right -turn movements continue to operate within available storage
limits.
These results indicate that under roundabout control, left -turn queues are expected to exceed
available storage, particularly during peak periods, which could result in spillback. A complete
summary of the estimated queue lengths is provided in the Appendix
Other Intersection Control Scenarios
For comparative analysis, estimated queue lengths were also evaluated for two-way stop control, all-
way stop control, and signalized control:
• Two-Way Stop Control / All-Way Stop Control:
Queue lengths for the northbound left- turn movement exceed available storage
under future conditions, reaching up to 380 feet (PM peak, 2046)
These control types show moderate queue growth and are not operationally viable.
11
Traffic Operations Assessment - Imperial Boulevard at Rockland Road
City of Hendersonville, TN
NS Project Number: NS.20255.001
Page 6
• Signalized Control:
Northbound left-turn queues are comparable to other alternatives, reaching up to
414 feet (PM peak, 2046)
While LOS results and projected operations are acceptable, queues still approach or
exceed available storage
Summary and Recommendations
Based on the prepared analyses, the evaluation indicates that while multiple intersection control
alternatives were considered, only the signalized and roundabout options provide acceptable long- term
operational performance. Of these, the roundabout alternative demonstrates superior operational
performance, maintaining lower delays under all analysis conditions. The assessment indicates that
acceptable operations can be achieved with a single -lane eastbound entry while additional approach
widening is not required to accommodate projected traffic demand.
The queueing analysis identified potential storage limitations for the northbound approach, particularly
the left-turn movement, at West Main Street and Imperial Blvd. This condition is present across all control
types and reflects broader corridor constraints rather than a limitation unique to roundabout control.
Overall, the findings support that a roundabout represents a feasible and appropriate solution that can
provide efficient, long-term operational performance.
As part of this evaluation, a conceptual layout was developed to assess the feasibility of a roundabout the
study intersection. The layout reflects a conservative design approach, incorporating a larger design
vehicle and corresponding inscribed circle diameter to ensure sufficient accommodation of all turning
movements. As the proposed roundabout advances toward preliminary design, these parameters may be
refined to better align with site-specific constraints and operational needs. This may include consideration
of a smaller design vehicle, such as a school bus or fire truck, and a reduced inscribed circle diameter .
Implementation considerations such as right -of-way requirements, utility relocations, driveway
accessibility, and multimodal accommodations were considered at a conceptual level and will require
further evaluation as the project advances into preliminary design
We hope the information included in the analysis is useful as the City pursues the desired
improvements at this intersection. If we can be of further assistance or provide additional
information, please do not hesitate to contact us.
Sincerely,
NEEL-SCHAFFER, INC.
Jacob Carson, P.E., PTOE, RSP
1
Engineer II
12
APPENDIX
13
TDOT IIE Form - Data Inputs
2036 =Opening Year Design Hourly Volumes (DHV)
0 84 499 9
4 (0) (131) (340) (5)
SB
N-S 2036 2046 EB PEDS ←↓→ PEDS (0) 0
85 (96) ↑↑ (1) 2
0( 0 ) →← (0) 3
419 (161) ↓↓ (0) 0
2036 0( 0 ) PEDS ←↑→ PEDS WB
2046
NB (215) (405) (1) (0)
2% 3% 183 427 6 0
1% 2% (AM) = AM Peak Hour Approach
PM = PM Peak Hour Approach
Blue = Pedestrian Volumes
Within a 1/2 mile of the project location are there: 2046 = Design Year Design Hourly Volumes (DHV)
No Yes No
Yes Yes No 0 97 579 11
(0) (152) (395) (5)
SB
EB PEDS ←↓→ PEDS (0) 0
98 (112) ↑↑ (1) 3
30 ( 0 ) →← (0) 4
9 486 (187) ↓↓ (0) 0
0( 0 ) PEDS ←↑→ PEDS WB
0.095
NB (249) (470) (1) (0)
1.00 213 496 7 0
0.3892
10.50
2.56
Project Information
Intersection and Interchange Evaluation (IIE) Forms
Version: 09142020
Entering AADT:
No. of Crashes:
5,572
30
5,774
8,238
North:
East:
South:
Leg Current AADT
Critical Rate
(C):
A/SW:
A/C:
Turning Movement Volumes (TMV)Project and Location Data
E
N
W
Entering Hourly
Volumes
Imperial Blvd at Rockland Rd Traffic Operations Study
County:
Analyst/Firm:
Project Name:
PIN:
Date:
Project Type of
Work: Intersection Improvements
Urban
5,099West:
Major Road
Name:
Traffic Data
Major Road
Direction:
Opening Year
Minor Road
Name: Rockland Rd
Sumner
NSI
Existing
Control Type: Two-Way Stop Control No. of Legs:
Imperial Blvd
Design Year:
Major Road
T % (DHV):
SW Avg. Rate:
Crash Rate (A):
Multimodal Activity
Imperial Blvd
1/12/2026
Rockland Rd
14,000
Major Road AADT:
Major Road AADT:
Major Road
T % (AADT):
Minor Road
T % (AADT):
Design Year
Funct. Class of
Major Road:
S
12,750
Opening Year:
Collector Land Use
Context:
Minor Road
T % (DHV):
Rockland Rd
Imperial BlvdBus stop: School:
Retail Center: Other Civic
Institution:
Context to Support
Multimodal Activity:
Library:
Crash History and Intersection Crash Rate
LowExisting or Future Estimated Multimodal Activity Level:
Entering Hourly
Volumes2023-2025Crash Data Year(s): No. of Years:
14
IITDOT
Department of
. Transportation
D
I L - ~ ......
I I
...... 1;
B @ - ~
D ,---
B B -
I
~ ......
I I i---
- 1; ...... - ,---
i---
i---
Intersection Location:
Number of Intersection Legs: Date:
Existing Control Type: Version: 09142020
Imperial Blvd at Rockland Rd in Sumner County
PIN:
Analyst:
0.00
NSI
1/12/26
Two-Way Stop Control
4
Control Type
Conflict Point Score
(lower # is better)
Is the option feasible and
reasonable?
Is the option likely to
improve or maintain safety?
Is the option likely to
improve operations?
Is th
e Op
toin likely
to imp
rove
or ma
intain mu
ltimo
dal access
?
AM V/C Ratio (CAP X)
PM V/C Ratio (CAP X)
Should the Option proceed
to Stage II? TDOT IIE Stage I Form - Scoping
At-Grade Intersection Safety Q1 Q2 Q3 Q4 Decision
Traffic Signal 48 Yes Yes Yes No 0.47 0.70 No
Two-Way Stop Control 48 No No No No 1.82 2.09 No
A l l - W a y S t o p C o n t r o l 4 8 N oN oN oN o 1 . 5 5 1 . 8 8 N o
Continuous Green T n/a No No No No No
Q u a d r a n t R o a d w a y 4 0 N oN oN oN o N o
Partial Displaced Left Turn 44 No No No No No
Displaced Left Turn 40 No No No No No
Signalized RCUT 20 No No No No No
J - T u r n ( U n s i g n a l i z e d R C U T ) 2 0 N oN oN oN o N o
Median U-Turn 20 No No No No No
P a r t i a l M e d i a n U - T u r n 2 8 N oN oN oN o N o
Bowtie 24 No No No No No
Split Intersection 36 No No No No No
Roundabout 8 Yes Yes Yes No 0.30 0.59 Yes
Other (provide description) No No No No No
Grade-Separated Intersection Safety Q1 Q2 Q3 Q4 Decision
E c h e l o n 2 8 N oN oN oN o -
Center Turn Overpass 32 No No No No -
Interchange Safety Q1 Q2 Q3 Q4 Decision
D i a m o n d 2 8 N oN oN oN o -
Partial Cloverleaf 20 No No No No -
Displaced Left Turn Interchange 28 No No No No -
Contraflow Left Interchange 32 No No No No -
DDI 20 No No No No -
S i n g l e P o i n t 3 2 N oN oN oN o -
Single Point with Round
about 12 No No No No -
Other (provide description) No No No No -
Not necessary for volumes
Not Applicable
Not necessary for volumes
Not necessary for volumes
Not necessary for volumes
Not necessary for volumes
Not necessary for volumes
Not necessary for volumes
Not Applicable
CAP-X Screening Decision Justification
CAP-X Screening Decision Justification
Not necessary for volumes
Not necessary for volumes
Over capacity. Do not want stop control
Proceed; V/C under 2NS × 2EW lane assignment
Not necessary for volumes
Not necessary for volumes
Not necessary for volumes
Over capacity. Do not want stop control
Not Applicable
Not necessary for volumes
Not necessary for volumes
Not necessary for volumes
Not necessary for volumes
Not necessary for volumes
Not necessary for volumes
Capacity Screening Decision Justification
Acceptable signal capacity; roundabout preferred
15
IIITDOT
Departmen~ of
iiiiiiiiiiii-. Transportat1on
4 PIN: Date: 1/12/26
Analyst: Version: 09142020
Project Cost
Tool Used
Total Project Cost
Life Cycle Cost
Tool Used
Analysis Period
Total Life Cycle NPV Cost
Traffic Operations
Traffic Analysis Software Used
2036 Opening Year AM PM AM PM AM PM AM PM AM PM
LOS F D C E B D A A - -
Delay (s/veh) 86.9 34.3 20.1 37.5 19.8 40.1 1.4 1.6
v/c 1.132 0.812 0.71 0.97 0.578 0.6505 0.328 0.522
Queues Accommodated? No No Yes No Yes No Yes Yes - -
2046 Design Year AM PM AM PM AM PM AM PM AM PM
LOS F F D F C E A A - -
Delay (s/veh) 237.6 83.6 32.4 69.8 25.5 65.5 1.6 2.1
v/c 2.016 1.441 0.812 1.22 0.6135 0.7965 0.387 0.641
Queues Accommodated? No No No No Yes No Yes Yes - -
Predictive Crash Analysis
Tool Used
Analysis Period
Total Crashes
Fatal & Injury Crashes
Multimodal
Are peds, bicyclists, and transit
riders accommodated?
Stakeholder Posture
Local Community Support
TDOT Support
TDOT Approval
Preferred Option?
TDOT Reviewer Name and Title Signature Date
N o t A p p l i c a b l e ----
TDOT IIE Stage II Form - Selection
0.00
NSITDOT IIE Stage II Form - Selection
Intersection Location:
Number of Intersection Legs:
Imperial Blvd at Rockland Rd in Sumner County
Existing Control Option 1 Option 2 Option 3 Option 4
Two-Way Stop Control All-Way Stop Control Traffic Signal Roundabout
The Two-Way Stop Control analysis reports LOS and delay for the eastbound stop-controlled approach.Comments
Not Applicable ----
Not Applicable ----
Not Applicable ----
Not Applicable ----
Not Accommodated Adequately Adequately Adequately -
-----
Synchro Synchro SIDRA -
2036 to 2046
-
2036 to 2046
-
2036 to 2046
-
None
2036 to 2046 2036 to 2046 2036 to 2046 2036 to 2046 2036 to 2046
-----
2036 to 2046
-
2036 to 2046
-
Synchro
16
-
I
II
TOOT ,
Departmen~ o
. Transportat1or
'
l I I l I
-
-
--'
-
--
-
I I
Estimated 95th Percentile Queue Length Summary Tables
Notes:
1) The available storage length of approximately 200 feet was estimated based on aerial mapping measurements
2) 200 feet of available storage for each lane, totaling 400 ft
3) Results show estimated 95th Percentile queue lengths based on analysis models
AM Peak MD Peak PM Peak
NB Left Turn4 293 ft 250 ft 473 ft
NB Thru Lane 56 ft 86 ft 205 ft
NB Right Turn 24 ft 28 ft 70 ft
NB Left Turn4 336 ft 297 ft 692 ft
NB Thru Lane 115 ft 116 ft 184 ft
NB Right Turn 37 ft 42 ft 58 ft
Notes:
4) Reported queue lengths reflect average back-of-queue values with queues assumed to be evenly distributed across available lanes
5) SimTraffic results represent the average of 10 simulation runs
AM Peak MD Peak PM Peak AM Peak MD Peak PM Peak AM Peak MD Peak PM Peak
NB Left Turn6 173 ft 165 ft 280 ft 173 ft 165 ft 280 ft 162 ft 175 ft 276 ft
NB Thru Lane 38 ft 51 ft 37 ft 38 ft 51 ft 37 ft 36 ft 52 ft 37 ft
NB Right Turn 57 ft 65 ft 80 ft 57 ft 65 ft 80 ft 39 ft 97 ft 99 ft
NB Left Turn6 198 ft 191 ft 325 ft 198 ft 191 ft 325 ft 220 ft 201 ft 307 ft
NB Thru Lane 41 ft 56 ft 41 ft 41 ft 56 ft 41 ft 34 ft 60 ft 43 ft
NB Right Turn 60 ft 70 ft 86 ft 60 ft 70 ft 86 ft 17 ft 109 ft 124 ft
NB Left Turn6 262 ft 221 ft 380 ft 262 ft 221 ft 380 ft 292 ft 235 ft 414 ft
NB Thru Lane 47 ft 61 ft 45 ft 47 ft 61 ft 45 ft 55 ft 66 ft 53 ft
NB Right Turn 65 ft 75 ft 105 ft 65 ft 75 ft 105 ft 94 ft 124 ft 153 ft
Notes:
6) Reported queue lengths reflect average back-of-queue values with queues assumed to be evenly distributed across available lanes
W Main St at
Imperial Blvd
2026
2036
2046
Roundabout Control Scenario
W Main St at Imperial Blvd - Northbound Approach Queue Lengths
W Main St at Imperial Blvd - Northbound Approach Queue Lengths (Based on Other Control Types at Imperial Blvd at Rockland)
Intersection Analysis
Year Lane Group
Two-Way Stop Control Scenario All-Way Stop Control Scenario Signalized Control Scenario
W Main St at
Imperial Blvd
2036
2046
200 ft
Intersection Analysis
Year Lane Group
Intersection Movement Available Storage
Length1
W Main St at
Imperial Blvd
NB Left Turn2 200 ft
200 ft
NB Thru Lane 200 ft
NB Right Turn
17
Figure A
Existing Year (2026)
r Peak Hou
Traffic Volumes
AM (MD) [PM]
NOT TO SCALE
185 (129) [158]
351 (310) [370]
3 (3) [7]
5 (1) [5]2 (1) [5]21 (3) [2]
113 (74) [72]
293 (284) [430]
14 (4) [18]
139 (121) [361]
2 (2) [2]
83 (70) [73]
302 (235) [318]
19 (22) [11]
111 (145) [165]
114 (132) [117]1063 (969) [947]16 (9) [16]
23 (54) [30]
13 (12) [14]
15 (25) [27]
265 (226) [357]
785 (1033) [1262]
15 (45) [32]
W Main St
Imperial Blvd
Rockland Rd
18
0
1-L NEEL- SCHAFFER =:. Solut:lons you can build upon
Figure B
Base Year (2036)
r Peak Hou
Traffic Volumes
AM (MD) [PM]
NOT TO SCALE
215 (150) [183]
407 (360) [429]
3 (3) [8]
5 (1) [5]2 (1) [5]21 (3) [2]
131 (86) [84]
340 (329) [499]
15 (5) [19]
161 (140) [419]
2 (2) [2]
96 (81) [85]
348 (273) [367]
22 (26) [13]
128 (168) [191]
131 (153) [135]1232 (1124) [1098]19 (10) [19]
27 (63) [35]
15 (14) [16]
17 (29) [31]
307 (262) [413]
908 (1198) [1462]
17 (52) [37]
W Main St
Imperial Blvd
Rockland Rd
19
0
1-L NEEL- SCHAFFER =:. Solut:lons you can build upon
Figure C
Horizon Year (2046)
r Peak Hou
Traffic Volumes
AM (MD) [PM]
NOT TO SCALE
250 (174) [213]
473 (419) [497]
3 (4) [9]
5 (1) [5]2 (1) [6]22 (4) [3]
153 (100) [97]
396 (383) [581]
15 (5) [21]
188 (163) [487]
2 (3) [2]
112 (95) [99]
402 (317) [424]
26 (30) [15]
148 (196) [221]
152 (178) [156]1433 (1308) [1277]22 (12) [22]
31 (73) [41]
18 (16) [19]
20 (34) [36]
356 (305) [480]
1054 (1395) [1698]
20 (61) [43]
W Main St
Imperial Blvd
Rockland Rd
20
0
1-L NEEL- SCHAFFER =:. Solut:lons you can build upon
Located
On:
Year AADT Trend
2025 27,798 11% 1.26%
2024 25,077 -1% 0.25%
2023 25,427 -4% 0.45%
2022 26,351 4% 1.03%
2021 25,350 32%
2020 19,196 -7%
2019 20,747 -10%
2018 22,967 -4%
2017 23,880 2%
2016 23,346 -5%
2015 24,527 -
2.0%
1.5%
0.0%
1.5%
1.02
10
1.161
30,500
20
1.347
35,250
Count Station 83000098
SR006 MAIN ST
Calculated Growth Rate
Ambient Growth Rate (USE):
Unconfirmed Developments:
Total Growth Rate (Use):
Growth Factor:
Number of Years:
(from '26 to Base '36)
Growth Multiplier:
Number of Years:
(from '26 to Horizon '46)
Major Rd AADT ('36 )
Major Rd AADT ('46 )
Growth Multiplier:
Growth Rate
21
Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume
LOCATION: LOCATION: Imperial Blvd -- Rockland Rd QC JOB #: QC JOB #: 17371401
CITY/STATE: CITY/STATE: Hendersonville, TN DATE: DATE: Wed, Dec 10 2025
406 433
113 293 0
298
83
1
1
0
0.880.88
0
222
139
0
1
185 349 1
432 535
Peak-Hour: 7:45 AM -- 8:45 AMPeak-Hour: 7:45 AM -- 8:45 AM
Peak 15-Min: 8:00 AM -- 8:15 AMPeak 15-Min: 8:00 AM -- 8:15 AM
1.7 2.8
0.9 2 0
0.7
3.6
0
0
0
0
3.6
3.6
0
0
0.5 2.6 0
2.5 1.9
0
0 0
0
0 1 0
0
0
0
0
0
0
0 0 0
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
15-Min Count15-Min CountPeriod Period Beginning AtBeginning At
Imperial Blvd Imperial Blvd
(Northbound)(Northbound)
Imperial Blvd Imperial Blvd
(Southbound)(Southbound)
Rockland RdRockland Rd
(Eastbound)(Eastbound)
Rockland RdRockland Rd
(Westbound)(Westbound) TotalTotal HourlyHourlyTotalsTotalsLeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU
6:00 AM 71 48 0 0 0 13 2 0 3 0 9 0 0 0 0 0 146
6:15 AM 80 59 0 0 0 18 4 0 6 0 8 0 0 1 0 0 176
6:30 AM 66 62 0 0 0 16 5 0 7 0 11 0 0 0 0 0 167
6:45 AM 88 60 0 0 0 21 6 0 12 0 14 0 0 0 0 0 201 690
7:00 AM 80 77 0 0 0 33 7 0 11 0 22 0 0 0 0 0 230 774
7:15 AM 63 59 0 0 0 36 19 0 11 0 30 0 0 0 0 0 218 816
7:30 AM 65 54 0 0 0 45 21 0 16 0 27 0 0 0 0 0 228 877
7:45 AM 45 64 1 0 0 61 25 0 21 0 42 0 0 0 1 0 260 936
8:00 AM 48 92 0 0 0 104 28 0 15 0 43 0 0 0 0 0 330 1036
8:15 AM 53 117 0 0 0 64 31 0 21 0 36 0 0 0 0 0 322 1140
8:30 AM 39 76 0 0 0 64 29 0 26 0 18 0 0 0 0 0 252 1164
8:45 AM 41 56 0 0 0 56 17 0 16 2 23 0 0 0 0 0 211 1115
Peak 15-MinPeak 15-MinFlowratesFlowrates
NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftL
eft ThruThru RightRight UU LeftLeft ThruThru RightRight UU
All Vehicles 192 368 0 0 0 416 112 0 60 0 172 0 0 0 0 0 1320
Heavy Trucks 4 20 0 0 8 0 8 0 8 0 0 0 48
Buses
Pedestrians 0 0 0 0 0
Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0
Scooters
Comments:
Report generated on 12/17/2025 4:27 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212
Page 1 of 1
22
_J:. :L _J:. :L .. ., \. .. .. ., \. .. . □ ..
• "\
' • . "\
' •
7: • :1 7: • :1
TRUE DATA TO IMPROVE MOBILITY
_J _. L _Jn b__ _J~. ~L
t ~ t +
"\
'
7 .. 1 7~. ~1
_J:. :L --i+ _J~. ~L .. ., re] \. .. -----.
:~ : . ~~ ..
7
11 rl • "\ - ' • "\ '
7: • :1 7~· ~1
Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume
LOCATION: LOCATION: Imperial Blvd -- Rockland Rd QC JOB #: QC JOB #: 17371402
CITY/STATE: CITY/STATE: Hendersonville, TN DATE: DATE: Wed, Dec 10 2025
363 384
74 284 5
204
70
3
5
2
0.900.90
1
193
121
1
9
129 310 3
406 442
Peak-Hour: 12:00 PM -- 1:00 PMPeak-Hour: 12:00 PM -- 1:00 PM
Peak 15-Min: 12:45 PM -- 1:00 PMPeak 15-Min: 12:45 PM -- 1:00 PM
2.5 1.3
1.4 2.8 0
1
0
0
0
0
0
2.1
3.3
0
0
0.8 1.6 0
3 1.4
0
0 0
0
0 0 0
0
0
0
0
0
0
0 0 0
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
15-Min Count15-Min CountPeriod Period Beginning AtBeginning At
Imperial Blvd Imperial Blvd
(Northbound)(Northbound)
Imperial Blvd Imperial Blvd
(Southbound)(Southbound)
Rockland RdRockland Rd
(Eastbound)(Eastbound)
Rockland RdRockland Rd
(Westbound)(Westbound) TotalTotal HourlyHourlyTotalsTotalsLeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU
11:00 AM 26 92 1 0 0 59 13 0 19 0 26 0 0 0 0 0 236
11:15 AM 24 74 0 0 0 71 12 0 31 0 30 0 0 0 0 1 243
11:30 AM 27 91 0 0 0 74 23 0 14 0 24 0 0 0 0 0 253
11:45 AM 26 83 1 0 0 84 28 0 15 0 30 0 0 0 0 0 267 999
12:00 PM 30 64 1 0 0 63 14 0 21 1 29 0 0 0 2 0 225 988
12:15 PM 34 88 0 0 0 62 23 0 14 0 24 0 1 0 0 0 246 991
12:30 PM 39 65 1 0 2 77 23 0 14 0 33 0 0 0 0 0 254 992
12:45 PM 26 93 1 0 2 82 14 1 21 1 35 0 0 1 1 0 278 1003
Peak 15-MinPeak 15-MinFlowratesFlowrates
NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU
All Vehicles 104 372 4 0 8 328 56 4 84 4 140 0 0 4 4 0 1112
Heavy Trucks 0 12 0 0 12 0 0 0 8 0 0 0 32
Buses
Pedestrians 0 0 0 0 0
Bic
ycles 0 0 0 0 0 0 0 0 0 0 0 0 0
Scooters
Comments:
Report generated on 12/17/2025 4:27 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212
Page 1 of 1
23
_J:. :L _J:. :L .. ., \. .. .. ., \. .. . □ ..
• "\
' • . "\
' •
7: • :1 7: • :1
TRUE DATA TO IMPROVE MOBILITY
_J _. L _Jn b__ _J~. ~L
t ~ t +
"\
'
7 .. 1 7~. ~1
_J:. :L --i+ _J~. ~L .. ., re] \. .. -----.
:~ : . ~~ ..
7
11 rl • "\ - ' • "\ '
7: • :1 7~· ~1
Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume
LOCATION: LOCATION: Imperial Blvd -- Rockland Rd QC JOB #: QC JOB #: 17371403
CITY/STATE: CITY/STATE: Hendersonville, TN DATE: DATE: Wed, Dec 10 2025
510 448
72 430 8
233
73
2
5
0
0.980.98
3
434
361
0
8
158 368 5
791 531
Peak-Hour: 4:30 PM -- 5:30 PMPeak-Hour: 4:30 PM -- 5:30 PM
Peak 15-Min: 4:30 PM -- 4:45 PMPeak 15-Min: 4:30 PM -- 4:45 PM
1 1.1
0 1.2 0
0.9
1.4
0
0
0
0
0.7
0.6
0
0
1.3 1.1 0
0.9 1.1
2
0 0
0
0 0 0
0
0
0
0
0
0
0 0 0
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
15-Min Count15-Min CountPeriod Period Beginning AtBeginning At
Imperial Blvd Imperial Blvd
(Northbound)(Northbound)
Imperial Blvd Imperial Blvd
(Southbound)(Southbound)
Rockland RdRockland Rd
(Eastbound)(Eastbound)
Rockland RdRockland Rd
(Westbound)(Westbound) TotalTotal HourlyHourlyTotalsTotalsLeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU
3:00 PM 30 69 0 0 1 96 33 0 16 0 56 0 0 0 0 0 301
3:15 PM 31 80 0 0 0 119 25 0 15 0 72 0 0 0 0 0 342
3:30 PM 39 118 1 0 0 106 28 0 16 2 53 0 0 0 2 0 365
3:45 PM 45 115 2 0 1 74 13 0 17 0 83 0 0 0 7 0 357 1365
4:00 PM 37 97 1 0 0 92 20 2 20 0 73 0 0 0 0 0 342 1406
4:15 PM 42 75 0 0 0 109 15 3 20 0 75 0 0 0 0 0 339 1403
4:30 PM 44 105 2 0 1 104 20 1 18 0 81 0 0 0 1 0 377 1415
4:45 PM 30 105 0 0 0 103 19 1 19 0 78 0 0 0 1 0 356 1414
5:00 PM 47 76 3 0 2 101 23 2 26 0 93 0 0 3 0 0 376 1448
5:15 PM 37 82 0 0 0 122 10 1 10 0 109 0 0 0 0 0 371 1480
5:30 PM 31 63 0 0 0 95 15 0 19 0 94 0 0 0 0 0 317 1420
5:45 PM 37 53 0 0 0 99 27 0 16 0 77 0 0 0 0 0 309 1373
Peak 15-MinPeak 15-MinFlowratesFlowrates
NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftL
eft ThruThru RightRight UU LeftLeft ThruThru RightRight UU
All Vehicles 176 420 8 0 4 416 80 4 72 0 324 0 0 0 4 0 1508
Heavy Trucks 4 0 0 0 0 0 0 0 0 0 0 0 4
Buses
Pedestrians 0 8 0 0 8
Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0
Scooters
Comments:
Report generated on 12/17/2025 4:27 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212
Page 1 of 1
24
_J:. :L _J:. :L .. ., \. .. .. ., \. .. . □ ..
• "\
' • . "\
' •
7: • :1 7: • :1
TRUE DATA TO IMPROVE MOBILITY
_J _. L _Jn b__ _J~. ~L
t ~ t +
"\
'
7 .. 1 7~. ~1
_J:. :L --i+ _J~. ~L .. ., re] \. .. -----.
:~ : . ~~ ..
7
11 rl • "\ - ' • "\ '
7: • :1 7~· ~1
Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume
LOCATION: LOCATION: Imperial Blvd -- Johnny Cash Pkwy QC JOB #: QC JOB #: 17371404
CITY/STATE: CITY/STATE: Hendersonville, TN DATE: DATE: Wed, Dec 10 2025
51 50
23 13 15
1368
15
16
1183
769
0.950.95
1058
1044
260
109
890
287 19 106
382 412
Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM
Peak 15-Min: 8:00 AM -- 8:15 AMPeak 15-Min: 8:00 AM -- 8:15 AM
0 2
0 0 0
3.6
6.7
0
3.6
7.3
3.9
6.1
2.7
0.9
7.2
2.8 0 7.5
2.1 3.9
0
0 0
0
0 0 0
0
0
0
0
0
0
0 0 0
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
15-Min Count15-Min CountPeriod Period Beginning AtBeginning At
Imperial Blvd Imperial Blvd
(Northbound)(Northbound)
Imperial Blvd Imperial Blvd
(Southbound)(Southbound)
Johnny Cash PkwyJohnny Cash Pkwy
(Eastbound)(Eastbound)
Johnny Cash PkwyJohnny Cash Pkwy
(Westbound)(Westbound) TotalTotal HourlyHourlyTotalsTotalsLeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU
6:00 AM 48 2 2 0 1 1 5 0 1 44 12 0 2 124 3 0 245
6:15 AM 52 4 7 0 1 3 6 0 0 68 18 0 1 202 1 0 363
6:30 AM 60 4 4 0 2 1 5 0 2 74 16 0 4 288 3 0 463
6:45 AM 59 3 11 0 1 1 3 0 2 103 17 0 8 292 2 0 502 1573
7:00 AM 60 5 11 0 3 1 4 0 4 116 28 0 10 359 3 0 604 1932
7:15 AM 47 1 13 0 2 1 5 0 3 132 39 0 15 365 1 1 625 2194
7:30 AM 56 2 20 0 5 2 5 0 4 168 33 0 33 329 6 0 663 2394
7:45 AM 54 2 24 0 3 3 4 0 4 232 57 0 24 245 1 0 653 2545
8:00 AM 81 8 21 0 6 5 7 0 4 181 101 0 29 257 5 0 705 2646
8:15 AM 96 7 41 0 1 3 7 0 3 188 69 0 23 227 4 0 669 2690
8:30 AM 62 6 35 0 5 3 5 0 6 158 58 0 34 230 8 0 610 2637
8:45 AM 44 3 21 0 12 4 7 0 7 197 46 0 25 231 3 0 600 2584
Peak 15-MinPeak 15-MinFlowratesFlowrates
NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftL
eft ThruThru RightRight UU LeftLeft ThruThru RightRight UU
All Vehicles 324 32 84 0 24 20 28 0 16 724 404 0 116 1028 20 0 2820
Heavy Trucks 16 0 12 0 0 0 0 28 12 0 48 0 116
Buses
Pedestrians 0 0 0 0 0
Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0
Scooters
Comments:
Report generated on 12/17/2025 4:27 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212
Page 1 of 1
25
_J:. :L _J:. :L
... .J \. ... ... .J \. .. ... □ .. ... "\
' ... ... "\
' ...
7: • :1 7:·:1
TRUE DATA TO IMPROVE MOBILITY
_J _. L _jn L _J~. ~L
t ~ t
~
"\
'
7 .. 1
4-
7~. ~,
___J- ..-
-----+
_J:. :L
-----+
_J~. ~L -----+
..
.J re] \. .. -----.
:~ : ... ~~ .. --, 'I 'I 1 Ir ... "\ - ' ... "\ '
7: • :1 7~· ~,
Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume
LOCATION: LOCATION: Imperial Blvd -- Johnny Cash Pkwy QC JOB #: QC JOB #: 17371405
CITY/STATE: CITY/STATE: Hendersonville, TN DATE: DATE: Wed, Dec 10 2025
91 76
54 12 25
1258
45
9
1110
1033
0.930.93
969
1304
226
132
1203
235 22 145
370 402
Peak-Hour: 11:30 AM -- 12:30 PMPeak-Hour: 11:30 AM -- 12:30 PM
Peak 15-Min: 11:45 AM -- 12:00 PMPeak 15-Min: 11:45 AM -- 12:00 PM
2.2 3.9
3.7 0 0
3.9
4.4
0
3.5
3.3
3.5
3.5
4.4
3.8
3
5.5 4.5 1.4
4.1 4
0
0 0
0
0 0 0
0
0
0
0
0
0
0 0 0
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
15-Min Count15-Min CountPeriod Period Beginning AtBeginning At
Imperial Blvd Imperial Blvd
(Northbound)(Northbound)
Imperial Blvd Imperial Blvd
(Southbound)(Southbound)
Johnny Cash PkwyJohnny Cash Pkwy
(Eastbound)(Eastbound)
Johnny Cash PkwyJohnny Cash Pkwy
(Westbound)(Westbound) TotalTotal HourlyHourlyTotalsTotalsLeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU
11:00 AM 74 4 41 0 3 5 10 0 11 233 49 0 20 191 3 0 644
11:15 AM 62 1 38 0 9 2 6 0 8 221 49 0 31 265 3 0 695
11:30 AM 66 9 36 0 9 1 10 0 11 246 58 0 35 237 3 0 721
11:45 AM 55 7 37 0 5 3 10 0 15 271 71 0 37 270 4 0 785 2845
12:00 PM 52 3 36 0 6 3 20 0 10 250 51 0 29 222 2 0 684 2885
12:15 PM 62 3 36 0 5 5 14 0 9 266 46 0 31 240 0 0 717 2907
12:30 PM 48 3 29 0 8 5 8 0 14 242 66 0 32 211 7 0 673 2859
12:45 PM 67 6 44 0 11 5 6 0 9 259 68 0 23 198 4 0 700 2774
Peak 15-MinPeak 15-MinFlowratesFlowrates
NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU
All Vehicles 220 28 148 0 20 12 40 0 60 1084 284 0 148 1080 16 0 3140
Heavy Trucks 16 0 4 0 0 4 8 16 20 4 52 0 124
Buses
Pedestrians 0 0 0 0 0
Bic
ycles 0 0 0 0 0 0 0 0 0 0 0 0 0
Scooters
Comments:
Report generated on 12/17/2025 4:27 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212
Page 1 of 1
26
_J:. :L _J:. :L
... .J \. ... ... .J \. .. ... □ .. ... "\
' ... ... "\
' ...
7: • :1 7: • :1
TRUE DATA TO IMPROVE MOBILITY
_J _. L _jn L _J~. ~L
t ~ t
~
"\
'
7 .. 1
4-
7~. ~1
___J- ..-
-----+
_J:. :L
-----+
_J~. ~L -----+
..
.J re] \. .. -----.
:~ : ... ~~ .. --, 'I 'I 1 Ir ... "\ - ' ... "\ '
7: • :1 7~· ~,
Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume
LOCATION: LOCATION: Imperial Blvd -- Johnny Cash Pkwy QC JOB #: QC JOB #: 17371406
CITY/STATE: CITY/STATE: Hendersonville, TN DATE: DATE: Wed, Dec 10 2025
71 59
30 14 27
1276
32
16
1070
1247
0.970.97
942
1631
352
112
1434
304 11 160
478 475
Peak-Hour: 3:15 PM -- 4:15 PMPeak-Hour: 3:15 PM -- 4:15 PM
Peak 15-Min: 3:30 PM -- 3:45 PMPeak 15-Min: 3:30 PM -- 3:45 PM
1.4 1.7
3.3 0 0
2.1
3.1
0
2
1.6
2.2
1.5
0.9
0
1.5
1.6 0 1.3
0.6 1.5
1
0 0
1
0 0 0
0
0
0
0
0
0
0 0 0
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
15-Min Count15-Min CountPeriod Period Beginning AtBeginning At
Imperial Blvd Imperial Blvd
(Northbound)(Northbound)
Imperial Blvd Imperial Blvd
(Southbound)(Southbound)
Johnny Cash PkwyJohnny Cash Pkwy
(Eastbound)(Eastbound)
Johnny Cash PkwyJohnny Cash Pkwy
(Westbound)(Westbound) TotalTotal HourlyHourlyTotalsTotalsLeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU
3:00 PM 53 0 35 0 4 4 8 0 4 263 89 0 40 228 2 0 730
3:15 PM 57 1 39 0 9 2 6 0 12 279 109 0 33 249 3 0 799
3:30 PM 82 2 41 0 9 4 11 0 6 320 99 0 31 223 5 0 833
3:45 PM 99 4 34 0 6 5 8 0 5 333 60 0 22 242 2 0 820 3182
4:00 PM 66 4 46 0 3 3 5 0 9 315 84 0 26 228 6 0 795 3247
4:15 PM 54 2 42 0 4 4 10 0 7 311 86 0 31 220 0 0 771 3219
4:30 PM 87 6 39 0 4 3 9 0 10 300 88 0 34 205 0 0 785 3171
4:45 PM 81 8 35 0 2 4 3 0 12 316 93 0 25 223 1 0 803 3154
5:00 PM 71 2 30 0 9 4 10 0 12 307 95 0 30 250 0 0 820 3179
5:15 PM 75 1 15 0 4 3 7 0 4 304 101 0 27 203 3 0 747 3155
5:30 PM 56 4 17 0 5 1 7 0 12 328 86 0 17 178 1 0 712 3082
5:45 PM 49 2 16 0 5 4 10 0 8 369 98 0 25 175 0 0 761 3040
Peak 15-MinPeak 15-MinFlowratesFlowrates
NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftL
eft ThruThru RightRight UU LeftLeft ThruThru RightRight UU
All Vehicles 328 8 164 0 36 16 44 0 24 1280 396 0 124 892 20 0 3332
Heavy Trucks 4 0 8 0 0 0 0 16 12 0 32 0 72
Buses
Pedestrians 0 0 0 0 0
Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0
Scooters
Comments:
Report generated on 12/17/2025 4:27 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212
Page 1 of 1
27
_J:. :L _J:. :L
... .J \. ... ... .J \. .. ... □ .. ... "\
' ... ... "\
' ...
7: • :1 7: • :1
TRUE DATA TO IMPROVE MOBILITY
_J _. L _jn L _J~. ~L
t ~ t
~
"\
'
7 .. 1
4-
7~. ~1
___J- ..-
-----+
_J:. :L
-----+
_J~. ~L -----+
..
.J re] \. .. -----.
:~ : ... ~~ .. --, 'I 'I 1 Ir ... "\ - ' ... "\ '
7: • :1 7~· ~,
HCM 7th TWSC Current Year 2026-Existing Conditions
6: Imperial Blvd & RockLand Rd AM Peak Hour
01/20/2026 Synchro 12 Report
NSI Page 1
Intersection
Int Delay, s/veh 8.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 83 1 139 5 2 21 185 351 3 14 293 113
Future Vol, veh/h 83 1 139 5 2 21 185 351 3 14 293 113
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 100 - - - 125 -----
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
H e a v y V e h i c l e s , % 222222222222
Mvmt Flow 94 1 158 6 2 24 210 399 3 16 333 128
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1050 1252 231 1020 1314 201 461 0 0 402 0 0
Stage 1 429 429 - 821 821 -------
Stage 2 621 823 - 199 493 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
C r i t i c a l H d w y S t g 1 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
C r i t i c a l H d w y S t g 2 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 181 171 772 191 157 806 1096 - - 1153 - -
Stage 1 574 582 - 335 387 -------
Stage 2 442 386 - 784 545 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 138 136 772 120 125 806 1096 - - 1153 - -
Mov Cap-2 Maneuver 138 136 - 120 125 -------
Stage 1 565 573 - 271 313 -------
Stage 2 344 312 - 612 537 -------
Approach EB WB NB SB
HCM Ctrl Dly, s/v 35.2 16.9 3.11 0.36
HCM LOS E C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1096 - - 138 772 334 86 - -
HCM Lane V/C Ratio 0.192 - - 0.692 0.205 0.095 0.014 - -
HCM Ctrl Dly (s/v) 9.1 - - 75.5 10.9 16.9 8.2 0.1 -
HCM Lane LOS A - - F B C A A -
HCM 95th %tile Q(veh) 0.7 - - 3.9 0.8 0.3 0 - -
28
41+
HCM 7th TWSC Current Year 2026-Existing Conditions
6: Imperial Blvd & RockLand Rd MD Peak Hour
01/20/2026 Synchro 12 Report
NSI Page 1
Intersection
Int Delay, s/veh 4.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 70 1 121 1 1 3 129 310 3 4 284 74
Future Vol, veh/h 70 1 121 1 1 3 129 310 3 4 284 74
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 100 - - - 125 -----
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
H e a v y V e h i c l e s , % 222222222222
Mvmt Flow 78 1 134 1 1 3 143 344 3 4 316 82
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 825 1000 199 800 1039 174 398 0 0 348 0 0
Stage 1 366 366 - 633 633 -------
Stage 2 459 634 - 167 407 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
C r i t i c a l H d w y S t g 1 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
C r i t i c a l H d w y S t g 2 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 265 242 809 276 229 839 1157 - - 1208 - -
Stage 1 626 621 - 434 472 -------
Stage 2 551 471 - 818 596 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 229 211 809 200 200 839 1157 - - 1208 - -
Mov Cap-2 Maneuver 229 211 - 200 200 -------
Stage 1 624 619 - 381 413 -------
Stage 2 480 413 - 678 593 -------
Approach EB WB NB SB
HCM Ctrl Dly, s/v 17.17 14.93 2.5 0.11
HCM LOS C B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1157 - - 229 809 368 31 - -
HCM Lane V/C Ratio 0.124 - - 0.345 0.166 0.015 0.004 - -
HCM Ctrl Dly (s/v) 8.5 - - 28.8 10.3 14.9 8 0 -
HCM Lane LOS A - - D BBAA -
HCM 95th %tile Q(veh) 0.4 - - 1.5 0.6 0 0 - -
29
41+
HCM 7th TWSC Current Year 2026-Existing Conditions
6: Imperial Blvd & RockLand Rd PM Peak Hour
01/20/2026 Synchro 12 Report
NSI Page 1
Intersection
Int Delay, s/veh 7.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 73 2 361 5 5 2 158 370 7 18 430 72
Future Vol, veh/h 73 2 361 5 5 2 158 370 7 18 430 72
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 100 - - - 125 -----
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 98 98 98 98 98 98 98 98 98 98 98 98
H e a v y V e h i c l e s , % 222222222222
Mvmt Flow 74 2 368 5 5 2 161 378 7 18 439 73
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1026 1219 256 961 1253 192 512 0 0 385 0 0
Stage 1 512 512 - 704 704 -------
Stage 2 514 707 - 257 549 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
C r i t i c a l H d w y S t g 1 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
C r i t i c a l H d w y S t g 2 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 189 179 743 211 171 817 1049 - - 1170 - -
Stage 1 513 535 - 394 438 -------
Stage 2 512 436 - 725 515 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 152 149 743 87 142 817 1049 - - 1170 - -
Mov Cap-2 Maneuver 152 149 - 87 142 -------
Stage 1 503 525 - 333 371 -------
Stage 2 426 369 - 357 505 -------
Approach EB WB NB SB
HCM Ctrl Dly, s/v 20.73 36.51 2.67 0.4
HCM LOS C E
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1049 - - 152 743 126 104 - -
HCM Lane V/C Ratio 0.154 - - 0.504 0.496 0.097 0.016 - -
HCM Ctrl Dly (s/v) 9.1 - - 50.7 14.5 36.5 8.1 0.1 -
HCM Lane LOS A - - F BEAA -
HCM 95th %tile Q(veh) 0.5 - - 2.4 2.8 0.3 0 - -
30
41+
HCM 7th TWSC Base Year 2036-Existing Conditions
6: Imperial Blvd & RockLand Rd AM Peak Hour
01/20/2026 Synchro 12 Report
NSI Page 1
Intersection
Int Delay, s/veh 18.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 96 1 161 5 2 21 215 407 3 15 340 131
Future Vol, veh/h 96 1 161 5 2 21 215 407 3 15 340 131
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 100 - - - 125 -----
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
H e a v y V e h i c l e s , % 222222222222
Mvmt Flow 109 1 183 6 2 24 244 463 3 17 386 149
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1216 1449 268 1181 1522 233 535 0 0 466 0 0
Stage 1 495 495 - 953 953 -------
Stage 2 721 955 - 228 569 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
C r i t i c a l H d w y S t g 1 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
C r i t i c a l H d w y S t g 2 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 137 130 730 145 117 769 1029 - - 1092 - -
Stage 1 525 544 - 278 336 -------
Stage 2 385 335 - 754 504 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 97 97 730 81 88 769 1029 - - 1092 - -
Mov Cap-2 Maneuver ~ 97 97 - 81 88 -------
Stage 1 515 534 - 212 256 -------
Stage 2 282 256 - 554 495 -------
Approach EB WB NB SB
HCM Ctrl Dly, s/v 86.92 21.48 3.3 0.36
HCM LOS F C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1029 - - 97 730 250 80 - -
HCM Lane V/C Ratio 0.237 - - 1.132 0.25 0.127 0.016 - -
HCM Ctrl Dly (s/v) 9.6 - - 212 11.6 21.5 8.3 0.1 -
HCM Lane LOS A - - F B C A A -
HCM 95th %tile Q(veh) 0.9 - - 7.3 1 0.4 0 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s
+: Computation Not Defined *: All major volume in platoon
31
41+
HCM 7th TWSC Base Year 2036-Existing Conditions
6: Imperial Blvd & RockLand Rd MD Peak Hour
01/20/2026 Synchro 12 Report
NSI Page 1
Intersection
Int Delay, s/veh 5.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 81 1 140 1 1 3 150 360 3 5 329 86
Future Vol, veh/h 81 1 140 1 1 3 150 360 3 5 329 86
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 100 - - - 125 -----
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
H e a v y V e h i c l e s , % 222222222222
Mvmt Flow 90 1 156 1 1 3 167 400 3 6 366 96
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 958 1161 231 929 1207 202 461 0 0 403 0 0
Stage 1 424 424 - 735 735 -------
Stage 2 534 737 - 194 472 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
C r i t i c a l H d w y S t g 1 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
C r i t i c a l H d w y S t g 2 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 212 194 772 222 182 806 1096 - - 1152 - -
Stage 1 578 585 - 377 424 -------
Stage 2 498 423 - 789 557 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 177 163 772 149 153 806 1096 - - 1152 - -
Mov Cap-2 Maneuver 177 163 - 149 153 -------
Stage 1 575 582 - 320 359 -------
Stage 2 419 359 - 625 554 -------
Approach EB WB NB SB
HCM Ctrl Dly, s/v 23.57 17.45 2.59 0.13
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1096 - - 177 772 295 33 - -
HCM Lane V/C Ratio 0.152 - - 0.516 0.202 0.019 0.005 - -
HCM Ctrl Dly (s/v) 8.9 - - 45.3 10.8 17.4 8.1 0 -
HCM Lane LOS A - - E B C A A -
HCM 95th %tile Q(veh) 0.5 - - 2.6 0.8 0.1 0 - -
32
41+
HCM 7th TWSC Base Year 2036-Existing Conditions
6: Imperial Blvd & RockLand Rd PM Peak Hour
01/20/2026 Synchro 12 Report
NSI Page 1
Intersection
Int Delay, s/veh 11.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 85 2 419 5 5 2 183 429 8 19 499 84
Future Vol, veh/h 85 2 419 5 5 2 183 429 8 19 499 84
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 100 - - - 125 -----
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 98 98 98 98 98 98 98 98 98 98 98 98
H e a v y V e h i c l e s , % 222222222222
Mvmt Flow 87 2 428 5 5 2 187 438 8 19 509 86
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1186 1410 297 1110 1449 223 595 0 0 446 0 0
Stage 1 591 591 - 815 815 -------
Stage 2 595 819 - 294 634 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
C r i t i c a l H d w y S t g 1 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
C r i t i c a l H d w y S t g 2 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 144 137 699 164 130 781 977 - - 1111 - -
Stage 1 460 493 - 337 389 -------
Stage 2 458 387 - 689 471 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 109 109 699 50 103 781 977 - - 1111 - -
Mov Cap-2 Maneuver 109 109 - 50 103 -------
Stage 1 451 482 - 273 315 -------
Stage 2 363 313 - 261 461 -------
Approach EB WB NB SB
HCM Ctrl Dly, s/v 34.3 58.72 2.82 0.4
HCM LOS D F
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 977 - - 109 699 79 95 - -
HCM Lane V/C Ratio 0.191 - - 0.812 0.612 0.155 0.017 - -
HCM Ctrl Dly (s/v) 9.6 - - 113.1 17.9 58.7 8.3 0.2 -
HCM Lane LOS A - - F C F A A -
HCM 95th %tile Q(veh) 0.7 - - 4.6 4.2 0.5 0.1 - -
33
41+
HCM 7th TWSC Horizon Year 2046-Existing Conditions
6: Imperial Blvd & RockLand Rd AM Peak Hour
01/20/2026 Synchro 12 Report
NSI Page 1
Intersection
Int Delay, s/veh 46.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 112 1 188 5 2 21 250 473 3 15 396 153
Future Vol, veh/h 112 1 188 5 2 21 250 473 3 15 396 153
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 100 - - - 125 -----
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
H e a v y V e h i c l e s , % 222222222222
Mvmt Flow 127 1 214 6 2 24 284 538 3 17 450 174
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1409 1680 312 1367 1765 270 624 0 0 541 0 0
Stage 1 571 571 - 1107 1107 -------
Stage 2 838 1109 - 260 658 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
C r i t i c a l H d w y S t g 1 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
C r i t i c a l H d w y S t g 2 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver ~ 98 94 684 106 83 727 953 - - 1024 - -
Stage 1 473 503 - 224 284 -------
Stage 2 327 283 - 723 459 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 64 64 684 49 57 727 953 - - 1024 - -
Mov Cap-2 Maneuver ~ 64 64 - 49 57 -------
Stage 1 463 493 - 157 199 -------
Stage 2 219 199 - 486 450 -------
Approach EB WB NB SB
HCM Ctrl Dly, s/v 237.57 31.05 3.57 0.34
HCM LOS F D
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 953 - - 64 684 170 69 - -
HCM Lane V/C Ratio 0.298 - - 2.016 0.312 0.188 0.017 - -
HCM Ctrl Dly (s/v) 10.4 - -$ 611.8 12.6 31.1 8.6 0.2 -
HCM Lane LOS B - - F B D A A -
HCM 95th %tile Q(veh) 1.3 - - 12.1 1.3 0.7 0.1 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s
+: Computation Not Defined *: All major volume in platoon
34
41+
HCM 7th TWSC Horizon Year 2046-Existing Conditions
6: Imperial Blvd & RockLand Rd MD Peak Hour
01/20/2026 Synchro 12 Report
NSI Page 1
Intersection
Int Delay, s/veh 9.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 95 1 163 1 1 4 174 419 4 5 383 100
Future Vol, veh/h 95 1 163 1 1 4 174 419 4 5 383 100
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 100 - - - 125 -----
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
H e a v y V e h i c l e s , % 222222222222
Mvmt Flow 106 1 181 1 1 4 193 466 4 6 426 111
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1112 1349 268 1079 1402 235 537 0 0 470 0 0
Stage 1 492 492 - 854 854 -------
Stage 2 620 857 - 224 548 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
C r i t i c a l H d w y S t g 1 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
C r i t i c a l H d w y S t g 2 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 163 149 730 173 139 767 1028 - - 1088 - -
Stage 1 527 546 - 320 373 -------
Stage 2 442 372 - 758 515 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 130 121 730 104 112 767 1028 - - 1088 - -
Mov Cap-2 Maneuver 130 121 - 104 112 -------
Stage 1 524 542 - 259 303 -------
Stage 2 356 302 - 565 512 -------
Approach EB WB NB SB
HCM Ctrl Dly, s/v 44.87 19.64 2.71 0.12
HCM LOS E C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1028 - - 130 730 253 29 - -
HCM Lane V/C Ratio 0.188 - - 0.821 0.248 0.026 0.005 - -
HCM Ctrl Dly (s/v) 9.3 - - 101.4 11.6 19.6 8.3 0 -
HCM Lane LOS A - - F B C A A -
HCM 95th %tile Q(veh) 0.7 - - 5 1 0.1 0 - -
35
41+
HCM 7th TWSC Horizon Year 2036-Existing Conditions
6: Imperial Blvd & RockLand Rd PM Peak Hour
01/20/2026 Synchro 12 Report
NSI Page 1
Intersection
Int Delay, s/veh 26.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 99 2 487 5 6 3 213 497 9 21 581 97
Future Vol, veh/h 99 2 487 5 6 3 213 497 9 21 581 97
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 100 - - - 125 -----
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 98 98 98 98 98 98 98 98 98 98 98 98
H e a v y V e h i c l e s , % 222222222222
Mvmt Flow 101 2 497 5 6 3 217 507 9 21 593 99
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1377 1636 346 1287 1681 258 692 0 0 516 0 0
Stage 1 685 685 - 946 946 -------
Stage 2 691 951 - 340 735 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
C r i t i c a l H d w y S t g 1 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
C r i t i c a l H d w y S t g 2 6 . 5 4 5 . 5 4- 6 . 5 4 5 . 5 4-------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 104 100 650 121 94 741 899 - - 1046 - -
Stage 1 404 446 - 281 338 -------
Stage 2 401 336 - 648 424 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 72 74 650 21 69 741 899 - - 1046 - -
Mov Cap-2 Maneuver ~ 72 74 - 21 69 -------
Stage 1 394 435 - 213 256 -------
Stage 2 295 255 - 148 413 -------
Approach EB WB NB SB
HCM Ctrl Dly, s/v 83.61 129.24 3.04 0.42
HCM LOS F F
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 899 - - 72 650 42 90 - -
HCM Lane V/C Ratio 0.242 - - 1.441 0.764 0.339 0.02 - -
HCM Ctrl Dly (s/v) 10.3 - -$ 360.5 26.2 129.2 8.5 0.2 -
HCM Lane LOS B - - F D F A A -
HCM 95th %tile Q(veh) 0.9 - - 8.5 7.1 1.2 0.1 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s
+: Computation Not Defined *: All major volume in platoon
36
41+
HCM 7th Signalized Intersection Summary Current Year 2026-Signal Alternative
6: Imperial Blvd & RockLand Rd AM Peak Hour
01/23/2026 Synchro 12 Report
NSI Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 83 1 139 5 2 21 185 351 3 14 293 113
Future Volume (veh/h) 83 1 139 5 2 21 185 351 3 14 293 113
I n i t i a l Q ( Q b ) , v e h 000000000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 94 1 158 6 2 24 210 399 3 16 333 128
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
P e r c e n t H e a v y V e h , % 222222222222
Cap, veh/h 209 2 188 13 4 52 641 2451 18 615 1437 543
Arrive On Green 0.12 0.12 0.12 0.04 0.04 0.04 0.07 0.68 0.68 0.57 0.57 0.57
Sat Flow, veh/h 1763 19 1585 306 102 1226 1781 3615 27 983 2523 953
Grp Volume(v), veh/h 95 0 158 32 0 0 210 196 206 16 233 228
Grp Sat Flow(s),veh/h/ln 1782 0 1585 1634 0 0 1781 1777 1865 983 1777 1699
Q Serve(g_s), s 6.5 0.0 12.7 2.5 0.0 0.0 6.1 5.2 5.2 0.9 8.4 8.7
Cycle Q Clear(g_c), s 6.5 0.0 12.7 2.5 0.0 0.0 6.1 5.2 5.2 0.9 8.4 8.7
Prop In Lane 0.99 1.00 0.19 0.75 1.00 0.01 1.00 0.56
Lane Grp Cap(c), veh/h 211 0 188 69 0 0 641 1205 1265 615 1012 968
V/C Ratio(X) 0.45 0.00 0.84 0.46 0.00 0.00 0.33 0.16 0.16 0.03 0.23 0.24
Avail Cap(c_a), veh/h 343 0 305 157 0 0 887 1205 1265 615 1012 968
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.97 0.97 0.97
Uniform Delay (d), s/veh 53.4 0.0 56.1 60.8 0.0 0.0 9.5 7.6 7.6 12.2 13.9 13.9
Incr Delay (d2), s/veh 1.5 0.0 10.9 4.8 0.0 0.0 0.3 0.3 0.3 0.1 0.5 0.6
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.0 0.0 5.6 1.1 0.0 0.0 2.3 2.0 2.1 0.2 3.5 3.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 54.9 0.0 67.0 65.6 0.0 0.0 9.8 7.9 7.9 12.3 14.4 14.5
L n G r p L O S D EE AAABBB
Approach Vol, veh/h 253 32 612 477
Approach Delay, s/veh 62.4 65.6 8.5 14.4
Approach LOS EEAB
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 94.6 13.0 14.1 80.5 22.4
Change Period (Y+Rc), s 6.5 7.5 5.5 6.5 7.0
Max Green Setting (Gmax), s 71.5 12.5 26.5 39.5 25.0
Max Q Clear Time (g_c+I1), s 7.2 4.5 8.1 10.7 14.7
Green Ext Time (p_c), s 2.5 0.0 0.5 3.1 0.7
Intersection Summary
HCM 7th Control Delay, s/veh 21.8
HCM 7th LOS C
37
HCM 7th Signalized Intersection Summary Current Year 2026-Signal Alternative
6: Imperial Blvd & RockLand Rd MD Peak Hour
01/23/2026 Synchro 12 Report
NSI Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v e h / h ) 7 01 1 2 1113 1 2 9 3 1 034 2 8 4 7 4
F u t u r e V o l u m e ( v e h / h ) 7 01 1 2 1113 1 2 9 3 1 034 2 8 4 7 4
I n i t i a l Q ( Q b ) , v e h 000000000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
A d j F l o w R a t e , v e h / h 7 81 1 3 4113 1 4 3 3 4 434 3 1 6 8 2
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
P e r c e n t H e a v y V e h , % 222222222222
Cap, veh/h 178 2 161 3 3 10 740 2702 24 743 1884 481
Arrive On Green 0.10 0.10 0.10 0.01 0.01 0.01 0.04 0.75 0.75 0.67 0.67 0.67
Sat Flow, veh/h 1760 23 1585 335 335 1004 1781 3610 31 1034 2802 716
G r p V o l u m e ( v ) , v e h / h 7 90 1 3 4500 1 4 3 1 6 9 1 7 84 1 9 9 1 9 9
Grp Sat Flow(s),veh/h/ln 1782 0 1585 1673 0 0 1781 1777 1865 1034 1777 1741
Q Serve(g_s), s 6.3 0.0 12.4 0.4 0.0 0.0 3.6 4.0 4.0 0.2 6.2 6.4
Cycle Q Clear(g_c), s 6.3 0.0 12.4 0.4 0.0 0.0 3.6 4.0 4.0 0.2 6.2 6.4
Prop In Lane 0.99 1.00 0.20 0.60 1.00 0.02 1.00 0.41
Lane Grp Cap(c), veh/h 181 0 161 17 0 0 740 1330 1396 743 1195 1171
V/C Ratio(X) 0.44 0.00 0.83 0.30 0.00 0.00 0.19 0.13 0.13 0.01 0.17 0.17
Avail Cap(c_a), veh/h 404 0 359 151 0 0 984 1330 1396 743 1195 1171
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.95 0.95 0.95
Uniform Delay (d), s/veh 63.4 0.0 66.2 73.7 0.0 0.0 6.4 5.2 5.2 8.1 9.1 9.1
Incr Delay (d2), s/veh 1.7 0.0 10.6 9.5 0.0 0.0 0.1 0.2 0.2 0.0 0.3 0.3
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.9 0.0 5.5 0.2 0.0 0.0 1.3 1.4 1.5 0.0 2.5 2.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 65.0 0.0 76.8 83.3 0.0 0.0 6.6 5.4 5.4 8.1 9.3 9.4
L n G r p L O S E EF AAAAAA
Approach Vol, veh/h 213 5 490 402
Approach Delay, s/veh 72.4 83.3 5.8 9.4
Approach LOS E F A A
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 118.8 9.0 11.4 107.4 22.2
Change Period (Y+Rc), s 6.5 7.5 5.5 6.5 7.0
Max Green Setting (Gmax), s 81.5 13.5 26.5 49.5 34.0
Max Q Clear Time (g_c+I1), s 6.0 2.4 5.6 8.4 14.4
Green Ext Time (p_c), s 2.1 0.0 0.3 2.6 0.8
Intersection Summary
HCM 7th Control Delay, s/veh 20.2
HCM 7th LOS C
38
HCM 7th Signalized Intersection Summary Current Year 2026-Signal Alternative
6: Imperial Blvd & RockLand Rd PM Peak Hour
01/23/2026 Synchro 12 Report
NSI Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v e h / h ) 7 32 3 6 1552 1 5 8 3 7 07 1 8 4 3 0 7 2
F u t u r e V o l u m e ( v e h / h ) 7 32 3 6 1552 1 5 8 3 7 07 1 8 4 3 0 7 2
I n i t i a l Q ( Q b ) , v e h 000000000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
A d j F l o w R a t e , v e h / h 7 42 3 6 8552 1 6 1 3 7 87 1 8 4 3 9 7 3
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
P e r c e n t H e a v y V e h , % 222222222222
Cap, veh/h 426 12 389 14 14 6 558 2286 42 598 1727 285
Arrive On Green 0.25 0.25 0.25 0.02 0.02 0.02 0.05 0.64 0.64 0.57 0.57 0.57
Sat Flow, veh/h 1737 47 1585 742 742 297 1781 3569 66 998 3052 504
Grp Volume(v), veh/h 76 0 368 12 0 0 161 188 197 18 254 258
Grp Sat Flow(s),veh/h/ln 1784 0 1585 1780 0 0 1781 1777 1858 998 1777 1780
Q Serve(g_s), s 7.4 0.0 50.2 1.5 0.0 0.0 8.2 9.4 9.4 1.8 16.0 16.2
Cycle Q Clear(g_c), s 7.4 0.0 50.2 1.5 0.0 0.0 8.2 9.4 9.4 1.8 16.0 16.2
Prop In Lane 0.97 1.00 0.42 0.17 1.00 0.04 1.00 0.28
Lane Grp Cap(c), veh/h 437 0 389 34 0 0 558 1138 1190 598 1006 1007
V/C Ratio(X) 0.17 0.00 0.95 0.36 0.00 0.00 0.29 0.17 0.17 0.03 0.25 0.26
Avail Cap(c_a), veh/h 640 0 569 109 0 0 741 1138 1190 598 1006 1007
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.94 0.94 0.94
Uniform Delay (d), s/veh 65.5 0.0 81.6 106.6 0.0 0.0 18.0 15.9 15.9 21.1 24.2 24.2
Incr Delay (d2), s/veh 0.2 0.0 20.0 6.3 0.0 0.0 0.4 0.3 0.3 0.1 0.6 0.6
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.4 0.0 22.8 0.7 0.0 0.0 3.6 4.1 4.3 0.4 7.2 7.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 65.6 0.0 101.6 112.9 0.0 0.0 18.4 16.2 16.2 21.2 24.8 24.8
LnGrp LOS E F F B B B C C C
Approach Vol, veh/h 444 12 546 530
Approach Delay, s/veh 95.5 112.9 16.8 24.7
Approach LOS F F B C
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 147.4 11.7 16.4 131.0 60.9
Change Period (Y+Rc), s 6.5 7.5 5.5 6.5 7.0
Max Green Setting (Gmax), s 106.5 13.5 33.5 67.5 79.0
Max Q Clear Time (g_c+I1), s 11.4 3.5 10.2 18.2 52.2
Green Ext Time (p_c), s 3.6 0.0 0.7 5.4 1.7
Intersection Summary
HCM 7th Control Delay, s/veh 43.1
HCM 7th LOS D
39
HCM 7th Signalized Intersection Summary Base Year 2036-Signal Alternative
6: Imperial Blvd & RockLand Rd AM Peak Hour
01/23/2026 Synchro 12 Report
NSI Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 96 1 161 5 2 21 215 407 3 15 340 131
Future Volume (veh/h) 96 1 161 5 2 21 215 407 3 15 340 131
I n i t i a l Q ( Q b ) , v e h 000000000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 109 1 183 6 2 24 244 463 3 17 386 149
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
P e r c e n t H e a v y V e h , % 222222222222
Cap, veh/h 237 2 213 13 4 52 595 2397 16 555 1355 516
Arrive On Green 0.13 0.13 0.13 0.04 0.04 0.04 0.08 0.66 0.66 0.54 0.54 0.54
Sat Flow, veh/h 1766 16 1585 306 102 1226 1781 3620 23 927 2516 958
Grp Volume(v), veh/h 110 0 183 32 0 0 244 227 239 17 271 264
Grp Sat Flow(s),veh/h/ln 1782 0 1585 1634 0 0 1781 1777 1866 927 1777 1698
Q Serve(g_s), s 7.4 0.0 14.7 2.5 0.0 0.0 7.5 6.4 6.4 1.1 10.8 11.0
Cycle Q Clear(g_c), s 7.4 0.0 14.7 2.5 0.0 0.0 7.5 6.4 6.4 1.1 10.8 11.0
Prop In Lane 0.99 1.00 0.19 0.75 1.00 0.01 1.00 0.56
Lane Grp Cap(c), veh/h 239 0 213 69 0 0 595 1177 1236 555 957 915
V/C Ratio(X) 0.46 0.00 0.86 0.46 0.00 0.00 0.41 0.19 0.19 0.03 0.28 0.29
Avail Cap(c_a), veh/h 343 0 305 132 0 0 827 1177 1236 555 957 915
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.96 0.96 0.96
Uniform Delay (d), s/veh 51.9 0.0 55.1 60.8 0.0 0.0 10.9 8.5 8.5 14.1 16.3 16.4
Incr Delay (d2), s/veh 1.4 0.0 15.6 4.8 0.0 0.0 0.6 0.4 0.3 0.1 0.7 0.8
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.4 0.0 6.7 1.1 0.0 0.0 2.9 2.5 2.6 0.3 4.6 4.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 53.3 0.0 70.7 65.6 0.0 0.0 11.6 8.9 8.9 14.2 17.0 17.1
L n G r p L O S D EE BAABBB
Approach Vol, veh/h 293 32 710 552
Approach Delay, s/veh 64.2 65.6 9.8 17.0
Approach LOS EEAB
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 92.6 13.0 16.1 76.5 24.4
Change Period (Y+Rc), s 6.5 7.5 5.5 6.5 7.0
Max Green Setting (Gmax), s 73.5 10.5 27.5 40.5 25.0
Max Q Clear Time (g_c+I1), s 8.4 4.5 9.5 13.0 16.7
Green Ext Time (p_c), s 4.4 0.0 1.0 5.2 0.7
Intersection Summary
HCM 7th Control Delay, s/veh 23.5
HCM 7th LOS C
40
HCM 7th Signalized Intersection Summary Base Year 2036-Signal Alternative
6: Imperial Blvd & RockLand Rd MD Peak Hour
01/23/2026 Synchro 12 Report
NSI Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v e h / h ) 8 11 1 4 0113 1 5 0 3 6 035 3 2 9 8 6
F u t u r e V o l u m e ( v e h / h ) 8 11 1 4 0113 1 5 0 3 6 035 3 2 9 8 6
I n i t i a l Q ( Q b ) , v e h 000000000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
A d j F l o w R a t e , v e h / h 9 01 1 5 6113 1 6 7 4 0 036 3 6 6 9 6
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
P e r c e n t H e a v y V e h , % 222222222222
Cap, veh/h 204 2 183 3 3 10 688 2655 20 686 1815 470
Arrive On Green 0.12 0.12 0.12 0.01 0.01 0.01 0.05 0.73 0.73 0.65 0.65 0.65
Sat Flow, veh/h 1763 20 1585 335 335 1004 1781 3615 27 982 2793 724
G r p V o l u m e ( v ) , v e h / h 9 10 1 5 6500 1 6 7 1 9 7 2 0 66 2 3 1 2 3 1
Grp Sat Flow(s),veh/h/ln 1782 0 1585 1673 0 0 1781 1777 1865 982 1777 1740
Q Serve(g_s), s 7.1 0.0 14.5 0.4 0.0 0.0 4.5 5.0 5.0 0.3 7.9 8.0
Cycle Q Clear(g_c), s 7.1 0.0 14.5 0.4 0.0 0.0 4.5 5.0 5.0 0.3 7.9 8.0
Prop In Lane 0.99 1.00 0.20 0.60 1.00 0.01 1.00 0.42
Lane Grp Cap(c), veh/h 206 0 183 17 0 0 688 1305 1370 686 1155 1131
V/C Ratio(X) 0.44 0.00 0.85 0.30 0.00 0.00 0.24 0.15 0.15 0.01 0.20 0.20
Avail Cap(c_a), veh/h 404 0 359 139 0 0 929 1305 1370 686 1155 1131
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.91 0.91 0.91
Uniform Delay (d), s/veh 61.8 0.0 65.1 73.7 0.0 0.0 7.3 6.0 6.0 9.3 10.6 10.6
Incr Delay (d2), s/veh 1.5 0.0 10.5 9.5 0.0 0.0 0.3 0.2 0.2 0.0 0.4 0.4
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.3 0.0 6.4 0.2 0.0 0.0 1.7 1.8 1.9 0.1 3.2 3.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 63.3 0.0 75.5 83.3 0.0 0.0 7.6 6.2 6.2 9.3 10.9 11.0
L n G r p L O S E EF AAAABB
Approach Vol, veh/h 247 5 570 468
Approach Delay, s/veh 71.0 83.3 6.6 10.9
Approach LOS E F A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 116.6 9.0 12.7 104.0 24.4
Change Period (Y+Rc), s 6.5 7.5 5.5 6.5 7.0
Max Green Setting (Gmax), s 82.5 12.5 27.5 49.5 34.0
Max Q Clear Time (g_c+I1), s 7.0 2.4 6.5 10.0 16.5
Green Ext Time (p_c), s 3.7 0.0 0.7 4.6 0.9
Intersection Summary
HCM 7th Control Delay, s/veh 20.8
HCM 7th LOS C
41
HCM 7th Signalized Intersection Summary Base Year 2036-Signal Alternative
6: Imperial Blvd & RockLand Rd PM Peak Hour
01/23/2026 Synchro 12 Report
NSI Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v e h / h ) 8 52 4 1 9552 1 8 3 4 2 98 1 9 4 9 9 8 4
F u t u r e V o l u m e ( v e h / h ) 8 52 4 1 9552 1 8 3 4 2 98 1 9 4 9 9 8 4
I n i t i a l Q ( Q b ) , v e h 000000000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
A d j F l o w R a t e , v e h / h 8 72 4 2 8552 1 8 7 4 3 88 1 9 5 0 9 8 6
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
P e r c e n t H e a v y V e h , % 222222222222
Cap, veh/h 493 11 448 14 14 6 486 2152 39 520 1572 264
Arrive On Green 0.28 0.28 0.28 0.02 0.02 0.02 0.06 0.60 0.60 0.52 0.52 0.52
Sat Flow, veh/h 1743 40 1585 742 742 297 1781 3570 65 944 3043 512
Grp Volume(v), veh/h 89 0 428 12 0 0 187 218 228 19 296 299
Grp Sat Flow(s),veh/h/ln 1783 0 1585 1780 0 0 1781 1777 1859 944 1777 1778
Q Serve(g_s), s 8.3 0.0 58.4 1.5 0.0 0.0 10.7 12.2 12.2 2.2 21.3 21.5
Cycle Q Clear(g_c), s 8.3 0.0 58.4 1.5 0.0 0.0 10.7 12.2 12.2 2.2 21.3 21.5
Prop In Lane 0.98 1.00 0.42 0.17 1.00 0.04 1.00 0.29
Lane Grp Cap(c), veh/h 504 0 448 34 0 0 486 1071 1121 520 918 919
V/C Ratio(X) 0.18 0.00 0.95 0.36 0.00 0.00 0.38 0.20 0.20 0.04 0.32 0.33
Avail Cap(c_a), veh/h 616 0 548 93 0 0 665 1071 1121 520 918 919
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.90 0.90 0.90
Uniform Delay (d), s/veh 59.6 0.0 77.5 106.6 0.0 0.0 22.6 19.8 19.8 26.2 30.8 30.9
Incr Delay (d2), s/veh 0.2 0.0 25.0 6.3 0.0 0.0 0.7 0.4 0.4 0.1 0.8 0.8
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.8 0.0 27.0 0.7 0.0 0.0 4.7 5.4 5.6 0.5 9.7 9.8
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 59.7 0.0 102.6 112.9 0.0 0.0 23.3 20.2 20.2 26.3 31.7 31.7
L n G r p L O S E FF CCCCCC
Approach Vol, veh/h 517 12 633 614
Approach Delay, s/veh 95.2 112.9 21.1 31.5
Approach LOS F F C C
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 139.1 11.7 19.0 120.2 69.2
Change Period (Y+Rc), s 6.5 7.5 5.5 6.5 7.0
Max Green Setting (Gmax), s 111.5 11.5 35.5 70.5 76.0
Max Q Clear Time (g_c+I1), s 14.2 3.5 12.7 23.5 60.4
Green Ext Time (p_c), s 4.2 0.0 0.8 6.4 1.8
Intersection Summary
HCM 7th Control Delay, s/veh 46.9
HCM 7th LOS D
42
HCM 7th Signalized Intersection Summary Horizon Year 2046-Signal Alternative
6: Imperial Blvd & RockLand Rd AM Peak Hour
01/23/2026 Synchro 12 Report
NSI Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 112 1 188 5 2 21 250 473 3 15 396 153
Future Volume (veh/h) 112 1 188 5 2 21 250 473 3 15 396 153
I n i t i a l Q ( Q b ) , v e h 000000000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 127 1 214 6 2 24 284 538 3 17 450 174
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
P e r c e n t H e a v y V e h , % 222222222222
Cap, veh/h 268 2 241 8 3 32 527 2309 13 476 1222 468
Arrive On Green 0.15 0.15 0.15 0.03 0.03 0.03 0.10 0.64 0.64 0.49 0.49 0.49
Sat Flow, veh/h 1768 14 1585 306 102 1226 1781 3623 20 865 2511 963
Grp Volume(v), veh/h 128 0 214 32 0 0 284 264 277 17 317 307
Grp Sat Flow(s),veh/h/ln 1782 0 1585 1634 0 0 1781 1777 1867 865 1777 1697
Q Serve(g_s), s 8.5 0.0 17.2 2.5 0.0 0.0 9.9 8.2 8.2 1.3 14.5 14.7
Cycle Q Clear(g_c), s 8.5 0.0 17.2 2.5 0.0 0.0 9.9 8.2 8.2 1.3 14.5 14.7
Prop In Lane 0.99 1.00 0.19 0.75 1.00 0.01 1.00 0.57
Lane Grp Cap(c), veh/h 270 0 241 43 0 0 527 1132 1190 476 864 826
V/C Ratio(X) 0.47 0.00 0.89 0.74 0.00 0.00 0.54 0.23 0.23 0.04 0.37 0.37
Avail Cap(c_a), veh/h 315 0 280 113 0 0 724 1132 1190 476 864 826
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.93 0.93 0.93
Uniform Delay (d), s/veh 50.4 0.0 54.1 62.9 0.0 0.0 14.1 10.0 10.0 17.5 20.9 20.9
Incr Delay (d2), s/veh 1.3 0.0 25.2 21.9 0.0 0.0 0.9 0.5 0.5 0.1 1.1 1.2
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.9 0.0 8.5 1.3 0.0 0.0 4.0 3.2 3.4 0.3 6.3 6.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 51.7 0.0 79.3 84.8 0.0 0.0 15.0 10.5 10.5 17.6 22.0 22.1
L n G r p L O S D EF BBBBCC
Approach Vol, veh/h 342 32 825 641
Approach Delay, s/veh 68.9 84.8 12.0 21.9
Approach LOS E F B C
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 91.8 11.4 19.6 72.2 26.7
Change Period (Y+Rc), s 9.0 8.0 7.0 9.0 7.0
Max Green Setting (Gmax), s 74.0 9.0 27.0 40.0 23.0
Max Q Clear Time (g_c+I1), s 10.2 4.5 11.9 16.7 19.2
Green Ext Time (p_c), s 3.5 0.0 0.7 4.2 0.5
Intersection Summary
HCM 7th Control Delay, s/veh 27.3
HCM 7th LOS C
43
HCM 7th Signalized Intersection Summary Horizon Year 2046-Signal Alternative
6: Imperial Blvd & RockLand Rd MD Peak Hour
01/23/2026 Synchro 12 Report
NSI Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v e h / h ) 9 51 1 6 3114 1 7 4 4 1 945 3 8 3 1 0 0
F u t u r e V o l u m e ( v e h / h ) 9 51 1 6 3114 1 7 4 4 1 945 3 8 3 1 0 0
I n i t i a l Q ( Q b ) , v e h 000000000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
A d j F l o w R a t e , v e h / h 1 0 61 1 8 1114 1 9 3 4 6 646 4 2 6 1 1 1
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
P e r c e n t H e a v y V e h , % 222222222222
Cap, veh/h 233 2 209 3 3 13 630 2587 22 624 1744 450
Arrive On Green 0.13 0.13 0.13 0.01 0.01 0.01 0.06 0.72 0.72 0.62 0.62 0.62
Sat Flow, veh/h 1765 17 1585 276 276 1105 1781 3611 31 923 2795 722
G r p V o l u m e ( v ) , v e h / h 1 0 70 1 8 1600 1 9 3 2 2 9 2 4 16 2 6 9 2 6 8
Grp Sat Flow(s),veh/h/ln 1782 0 1585 1658 0 0 1781 1777 1865 923 1777 1740
Q Serve(g_s), s 8.3 0.0 16.8 0.5 0.0 0.0 5.6 6.3 6.3 0.4 10.1 10.3
Cycle Q Clear(g_c), s 8.3 0.0 16.8 0.5 0.0 0.0 5.6 6.3 6.3 0.4 10.1 10.3
Prop In Lane 0.99 1.00 0.17 0.67 1.00 0.02 1.00 0.41
Lane Grp Cap(c), veh/h 235 0 209 20 0 0 630 1273 1336 624 1108 1086
V/C Ratio(X) 0.46 0.00 0.87 0.31 0.00 0.00 0.31 0.18 0.18 0.01 0.24 0.25
Avail Cap(c_a), veh/h 392 0 349 127 0 0 868 1273 1336 624 1108 1086
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.86 0.86 0.86
Uniform Delay (d), s/veh 60.2 0.0 63.8 73.5 0.0 0.0 8.6 6.9 6.9 10.7 12.5 12.5
Incr Delay (d2), s/veh 1.4 0.0 11.6 8.6 0.0 0.0 0.4 0.3 0.3 0.0 0.4 0.5
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.9 0.0 7.4 0.3 0.0 0.0 2.2 2.4 2.5 0.1 4.2 4.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 61.5 0.0 75.4 82.1 0.0 0.0 9.0 7.2 7.2 10.7 13.0 13.0
L n G r p L O S E EF AAABBB
Approach Vol, veh/h 288 6 663 543
Approach Delay, s/veh 70.3 82.1 7.7 13.0
Approach LOS E F A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 114.0 9.3 13.9 100.1 26.8
Change Period (Y+Rc), s 6.5 7.5 5.5 6.5 7.0
Max Green Setting (Gmax), s 84.5 11.5 28.5 50.5 33.0
Max Q Clear Time (g_c+I1), s 8.3 2.5 7.6 12.3 18.8
Green Ext Time (p_c), s 4.5 0.0 0.8 5.4 1.0
Intersection Summary
HCM 7th Control Delay, s/veh 21.9
HCM 7th LOS C
44
HCM 7th Signalized Intersection Summary Horizon Year 2036-Signal Alternative
6: Imperial Blvd & RockLand Rd PM Peak Hour
01/23/2026 Synchro 12 Report
NSI Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v e h / h ) 9 92 4 8 7563 2 1 3 4 9 79 2 1 5 8 1 9 7
F u t u r e V o l u m e ( v e h / h ) 9 92 4 8 7563 2 1 3 4 9 79 2 1 5 8 1 9 7
I n i t i a l Q ( Q b ) , v e h 000000000000
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
A d j F l o w R a t e , v e h / h 1 0 12 4 9 7563 2 1 7 5 0 79 2 1 5 9 3 9 9
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
P e r c e n t H e a v y V e h , % 222222222222
Cap, veh/h 565 11 512 13 16 8 416 2003 36 439 1399 233
Arrive On Green 0.32 0.32 0.32 0.02 0.02 0.02 0.08 0.56 0.56 0.46 0.46 0.46
Sat Flow, veh/h 1748 35 1585 632 759 379 1781 3572 63 885 3048 508
Grp Volume(v), veh/h 103 0 497 14 0 0 217 252 264 21 345 347
Grp Sat Flow(s),veh/h/ln 1783 0 1585 1770 0 0 1781 1777 1859 885 1777 1779
Q Serve(g_s), s 9.1 0.0 68.0 1.7 0.0 0.0 13.9 16.0 16.0 2.9 28.7 28.8
Cycle Q Clear(g_c), s 9.1 0.0 68.0 1.7 0.0 0.0 13.9 16.0 16.0 2.9 28.7 28.8
Prop In Lane 0.98 1.00 0.36 0.21 1.00 0.03 1.00 0.29
Lane Grp Cap(c), veh/h 576 0 512 37 0 0 416 996 1042 439 816 817
V/C Ratio(X) 0.18 0.00 0.97 0.38 0.00 0.00 0.52 0.25 0.25 0.05 0.42 0.42
Avail Cap(c_a), veh/h 600 0 533 84 0 0 583 996 1042 439 816 817
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.84 0.84 0.84
Uniform Delay (d), s/veh 53.5 0.0 73.5 106.3 0.0 0.0 29.0 24.7 24.7 33.0 39.9 40.0
Incr Delay (d2), s/veh 0.1 0.0 31.1 6.3 0.0 0.0 1.4 0.6 0.6 0.2 1.4 1.4
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.2 0.0 32.1 0.9 0.0 0.0 6.3 7.1 7.5 0.7 13.2 13.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 53.7 0.0 104.6 112.5 0.0 0.0 30.4 25.3 25.3 33.1 41.3 41.3
L n G r p L O S D FF CCCCDD
Approach Vol, veh/h 600 14 733 713
Approach Delay, s/veh 95.8 112.5 26.8 41.1
Approach LOS F F C D
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 129.9 12.1 22.4 107.5 78.0
Change Period (Y+Rc), s 6.5 7.5 5.5 6.5 7.0
Max Green Setting (Gmax), s 114.5 10.5 37.5 71.5 74.0
Max Q Clear Time (g_c+I1), s 18.0 3.7 15.9 30.8 70.0
Green Ext Time (p_c), s 5.0 0.0 1.0 7.6 1.0
Intersection Summary
HCM 7th Control Delay, s/veh 52.4
HCM 7th LOS D
45
HCM 7th AWSC Current Year 2026-AWSC Alternative
6: Imperial Blvd & RockLand Rd AM Peak Hour
01/26/2026 Synchro 12 Report
NSI Page 1
Intersection
Intersection Delay, s/veh 15.6
Intersection LOS C
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 83 1 139 5 2 21 185 351 3 14 293 113
Future Vol, veh/h 83 1 139 5 2 21 185 351 3 14 293 113
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
H e a v y V e h i c l e s , % 222222222222
Mvmt Flow 94 1 158 6 2 24 210 399 3 16 333 128
Number of Lanes 011010120020
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1223
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 2321
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 3212
HCM Control Delay, s/veh 13.5 11.8 15.6 17
HCM LOS B B C C
Lane NBLn1 NBLn2 NBLn3 EBLn1 EBLn2 WBLn1 SBLn1 SBLn2
Vol Left, % 100% 0% 0% 99% 0% 18% 9% 0%
Vol Thru, % 0% 100% 98% 1% 0% 7% 91% 56%
Vol Right, % 0% 0% 3% 0% 100% 75% 0% 44%
Sign Control Stop Stop Stop Stop Stop Stop Stop Stop
Traffic Vol by Lane 185 234 120 84 139 28 161 260
LT Vol 185 0 0 83 0 5 14 0
Through Vol 0 234 11 7102 1 4 7 1 4 7
R T V o l 0030 1 3 9 2 10 1 1 3
Lane Flow Rate 210 266 136 95 158 32 182 295
G e o m e t r y G r p 66666666
Degree of Util (X) 0.439 0.517 0.265 0.225 0.319 0.074 0.371 0.57
Departure Headway (Hd) 7.511 7.002 6.985 8.483 7.268 8.333 7.314 6.959
Convergence, Y/N Yes Yes Yes Yes Yes Yes Yes Yes
Cap 479 516 514 424 494 429 492 519
Service Time 5.253 4.744 4.726 6.232 5.017 6.096 5.058 4.703
HCM Lane V/C Ratio 0.438 0.516 0.265 0.224 0.32 0.075 0.37 0.568
HCM Control Delay, s/veh 16 17 12.2 13.7 13.4 11.8 14.3 18.6
HCM Lane LOS C C BBBBBC
HCM 95th-tile Q 2.2 2.9 1.1 0.9 1.4 0.2 1.7 3.5
46
4ft
HCM 7th AWSC Current Year 2026-AWSC Alternative
6: Imperial Blvd & RockLand Rd MD Peak Hour
01/26/2026 Synchro 12 Report
NSI Page 1
Intersection
Intersection Delay, s/veh 12.3
Intersection LOS B
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 7 01 1 2 1113 1 2 9 3 1 034 2 8 4 7 4
F u t u r e V o l , v e h / h 7 01 1 2 1113 1 2 9 3 1 034 2 8 4 7 4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 7 81 1 3 4113 1 4 3 3 4 434 3 1 6 8 2
Number of Lanes 011010120020
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1223
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 2321
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 3212
HCM Control Delay, s/veh 11.5 10.3 12.3 12.8
HCM LOS BBBB
Lane NBLn1 NBLn2 NBLn3 EBLn1 EBLn2 WBLn1 SBLn1 SBLn2
Vol Left, % 100% 0% 0% 99% 0% 20% 3% 0%
Vol Thru, % 0% 100% 97% 1% 0% 20% 97% 66%
Vol Right, % 0% 0% 3% 0% 100% 60% 0% 34%
Sign Control Stop Stop Stop Stop Stop Stop Stop Stop
Traffic Vol by Lane 129 207 106 71 121 5 146 216
L T V o l 1 2 900 7 00140
Through Vol 0 207 10 3101 1 4 2 1 4 2
R T V o l 0030 1 2 130 7 4
Lane Flow Rate 143 230 118 79 134 6 162 240
G e o m e t r y G r p 66666666
Degree of Util (X) 0.272 0.403 0.207 0.167 0.239 0.011 0.293 0.416
Departure Headway (Hd) 6.823 6.317 6.297 7.61 6.405 7.426 6.503 6.246
Convergence, Y/N Yes Yes Yes Yes Yes Yes Yes Yes
Cap 526 569 568 470 558 479 552 574
Service Time 4.578 4.072 4.052 5.379 4.173 5.221 4.263 4.006
HCM Lane V/C Ratio 0.272 0.404 0.208 0.168 0.24 0.013 0.293 0.418
HCM Control Delay, s/veh 12.1 13.3 10.7 11.9 11.2 10.3 12 13.4
HCM Lane LOS BBBBBBBB
HCM 95th-tile Q 1.1 1.9 0.8 0.6 0.9 0 1.2 2
47
4ft
HCM 7th AWSC Current Year 2026-AWSC Alternative
6: Imperial Blvd & RockLand Rd PM Peak Hour
01/26/2026 Synchro 12 Report
NSI Page 1
Intersection
Intersection Delay, s/veh 21.6
Intersection LOS C
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 7 32 3 6 1552 1 5 8 3 7 07 1 8 4 3 0 7 2
F u t u r e V o l , v e h / h 7 32 3 6 1552 1 5 8 3 7 07 1 8 4 3 0 7 2
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 7 42 3 6 8552 1 6 1 3 7 87 1 8 4 3 9 7 3
Number of Lanes 011010120020
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1223
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 2321
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 3212
HCM Control Delay, s/veh 27.4 13 17.4 21.4
HCM LOS D B C C
Lane NBLn1 NBLn2 NBLn3 EBLn1 EBLn2 WBLn1 SBLn1 SBLn2
Vol Left, % 100% 0% 0% 97% 0% 42% 8% 0%
Vol Thru, % 0% 100% 95% 3% 0% 42% 92% 75%
Vol Right, % 0% 0% 5% 0% 100% 17% 0% 25%
Sign Control Stop Stop Stop Stop Stop Stop Stop Stop
Traffic Vol by Lane 158 247 130 75 361 12 233 287
LT Vol 158 0 0 73 0 5 18 0
Through Vol 0 247 12 3205 2 1 5 2 1 5
R T V o l 0070 3 6 120 7 2
Lane Flow Rate 161 252 133 77 368 12 238 293
G e o m e t r y G r p 66666666
Degree of Util (X) 0.376 0.552 0.29 0.184 0.761 0.034 0.527 0.632
Departure Headway (Hd) 8.404 7.89 7.852 8.641 7.433 9.941 7.984 7.764
Convergence, Y/N Yes Yes Yes Yes Yes Yes Yes Yes
Cap 427 456 456 414 486 362 449 463
Service Time 6.179 5.665 5.626 6.413 5.203 7.641 5.761 5.54
HCM Lane V/C Ratio 0.377 0.553 0.292 0.186 0.757 0.033 0.53 0.633
HCM Control Delay, s/veh 16.2 20 13.8 13.4 30.3 13 19.4 23.1
HCM Lane LOS C C B B D B C C
HCM 95th-tile Q 1.7 3.3 1.2 0.7 6.6 0.1 3 4.3
48
4ft
HCM 7th AWSC Base Year 2036-AWSC Alternative
6: Imperial Blvd & RockLand Rd AM Peak Hour
01/26/2026 Synchro 12 Report
NSI Page 1
Intersection
Intersection Delay, s/veh 20.1
Intersection LOS C
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 96 1 161 5 2 21 215 407 3 15 340 131
Future Vol, veh/h 96 1 161 5 2 21 215 407 3 15 340 131
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
H e a v y V e h i c l e s , % 222222222222
Mvmt Flow 109 1 183 6 2 24 244 463 3 17 386 149
Number of Lanes 011010120020
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1223
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 2321
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 3212
HCM Control Delay, s/veh 15.7 12.8 19.8 23.1
HCM LOS C B C C
Lane NBLn1 NBLn2 NBLn3 EBLn1 EBLn2 WBLn1 SBLn1 SBLn2
Vol Left, % 100% 0% 0% 99% 0% 18% 8% 0%
Vol Thru, % 0% 100% 98% 1% 0% 7% 92% 56%
Vol Right, % 0% 0% 2% 0% 100% 75% 0% 44%
Sign Control Stop Stop Stop Stop Stop Stop Stop Stop
Traffic Vol by Lane 215 271 139 97 161 28 185 301
LT Vol 215 0 0 96 0 5 15 0
Through Vol 0 271 13 6102 1 7 0 1 7 0
R T V o l 0030 1 6 1 2 10 1 3 1
Lane Flow Rate 244 308 158 110 183 32 210 342
G e o m e t r y G r p 66666666
Degree of Util (X) 0.543 0.642 0.327 0.279 0.401 0.081 0.458 0.712
Departure Headway (Hd) 8.007 7.496 7.481 9.104 7.882 9.183 7.849 7.495
Convergence, Y/N Yes Yes Yes Yes Yes Yes Yes Yes
Cap 450 481 479 394 456 388 458 482
Service Time 5.769 5.258 5.242 6.879 5.657 6.983 5.614 5.26
HCM Lane V/C Ratio 0.542 0.64 0.33 0.279 0.401 0.082 0.459 0.71
HCM Control Delay, s/veh 19.9 22.8 13.9 15.4 15.9 12.8 17.1 26.8
HCM Lane LOS C C B C C B C D
HCM 95th-tile Q 3.2 4.5 1.4 1.1 1.9 0.3 2.4 5.6
49
4ft
HCM 7th AWSC Base Year 2036-AWSC Alternative
6: Imperial Blvd & RockLand Rd MD Peak Hour
01/26/2026 Synchro 12 Report
NSI Page 1
Intersection
Intersection Delay, s/veh 14.3
Intersection LOS B
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 8 11 1 4 0113 1 5 0 3 6 035 3 2 9 8 6
F u t u r e V o l , v e h / h 8 11 1 4 0113 1 5 0 3 6 035 3 2 9 8 6
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 9 01 1 5 6113 1 6 7 4 0 036 3 6 6 9 6
Number of Lanes 011010120020
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1223
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 2321
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 3212
HCM Control Delay, s/veh 12.7 11 14.2 15.3
HCM LOS BBBC
Lane NBLn1 NBLn2 NBLn3 EBLn1 EBLn2 WBLn1 SBLn1 SBLn2
Vol Left, % 100% 0% 0% 99% 0% 20% 3% 0%
Vol Thru, % 0% 100% 98% 1% 0% 20% 97% 66%
Vol Right, % 0% 0% 2% 0% 100% 60% 0% 34%
Sign Control Stop Stop Stop Stop Stop Stop Stop Stop
Traffic Vol by Lane 150 240 123 82 140 5 170 251
L T V o l 1 5 000 8 10150
Through Vol 0 240 12 0101 1 6 5 1 6 5
R T V o l 0030 1 4 030 8 6
Lane Flow Rate 167 267 137 91 156 6 188 278
G e o m e t r y G r p 66666666
Degree of Util (X) 0.332 0.494 0.252 0.206 0.3 0.013 0.365 0.519
Departure Headway (Hd) 7.285 6.777 6.76 8.148 6.937 8.164 6.976 6.717
Convergence, Y/N Yes Yes Yes Yes Yes Yes Yes Yes
Cap 497 536 534 442 520 439 520 540
Service Time 4.985 4.477 4.46 5.867 4.656 5.894 4.676 4.417
HCM Lane V/C Ratio 0.336 0.498 0.257 0.206 0.3 0.014 0.362 0.515
HCM Control Delay, s/veh 13.6 15.9 11.7 13 12.6 11 13.6 16.4
HCM Lane LOS B C BBBBBC
HCM 95th-tile Q 1.4 2.7 1 0.8 1.3 0 1.7 3
50
4ft
HCM 7th AWSC Base Year 2036-AWSC Alternative
6: Imperial Blvd & RockLand Rd PM Peak Hour
01/27/2026 Synchro 12 Report
NSI Page 1
Intersection
Intersection Delay, s/veh 37.5
Intersection LOS E
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 8 52 4 1 9552 1 8 3 4 2 98 1 9 4 9 9 8 4
F u t u r e V o l , v e h / h 8 52 4 1 9552 1 8 3 4 2 98 1 9 4 9 9 8 4
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 8 72 4 2 8552 1 8 7 4 3 88 1 9 5 0 9 8 6
Number of Lanes 011010120020
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1223
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 2321
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 3212
HCM Control Delay, s/veh 58.2 14.4 23.8 34.7
HCM LOS F B C D
Lane NBLn1 NBLn2 NBLn3 EBLn1 EBLn2 WBLn1 SBLn1 SBLn2
Vol Left, % 100% 0% 0% 98% 0% 42% 7% 0%
Vol Thru, % 0% 100% 95% 2% 0% 42% 93% 75%
Vol Right, % 0% 0% 5% 0% 100% 17% 0% 25%
Sign Control Stop Stop Stop Stop Stop Stop Stop Stop
Traffic Vol by Lane 183 286 151 87 419 12 269 334
LT Vol 183 0 0 85 0 5 19 0
Through Vol 0 286 14 3205 2 5 0 2 5 0
R T V o l 0080 4 1 920 8 4
Lane Flow Rate 187 292 154 89 428 12 274 340
G e o m e t r y G r p 66666666
Degree of Util (X) 0.478 0.706 0.371 0.233 0.98 0.038 0.673 0.816
Departure Headway (Hd) 9.224 8.707 8.668 9.468 8.251 11.161 8.848 8.629
Convergence, Y/N Yes Yes Yes Yes Yes Yes Yes Yes
Cap 390 414 416 379 440 321 408 419
Service Time 6.971 6.453 6.415 7.22 6.002 8.936 6.599 6.379
HCM Lane V/C Ratio 0.479 0.705 0.37 0.235 0.973 0.037 0.672 0.811
HCM Control Delay, s/veh 20.2 29.9 16.5 15.1 67.2 14.4 28.1 40
HCM Lane LOS CDCCFBDE
HCM 95th-tile Q 2.5 5.3 1.7 0.9 12.1 0.1 4.8 7.5
51
4ft
HCM 7th AWSC Horizon Year 2046-AWSC Alternative
6: Imperial Blvd & RockLand Rd AM Peak Hour
01/26/2026 Synchro 12 Report
NSI Page 1
Intersection
Intersection Delay, s/veh 32.4
Intersection LOS D
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 112 1 188 5 2 21 250 473 3 15 396 153
Future Vol, veh/h 112 1 188 5 2 21 250 473 3 15 396 153
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
H e a v y V e h i c l e s , % 222222222222
Mvmt Flow 127 1 214 6 2 24 284 538 3 17 450 174
Number of Lanes 011010120020
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1223
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 2321
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 3212
HCM Control Delay, s/veh 20 14.3 30.4 42.4
HCM LOS C B D E
Lane NBLn1 NBLn2 NBLn3 EBLn1 EBLn2 WBLn1 SBLn1 SBLn2
Vol Left, % 100% 0% 0% 99% 0% 18% 7% 0%
Vol Thru, % 0% 100% 98% 1% 0% 7% 93% 56%
Vol Right, % 0% 0% 2% 0% 100% 75% 0% 44%
Sign Control Stop Stop Stop Stop Stop Stop Stop Stop
Traffic Vol by Lane 250 315 161 113 188 28 213 351
LT Vol 250 0 0 112 0 5 15 0
Through Vol 0 315 15 8102 1 9 8 1 9 8
R T V o l 0030 1 8 8 2 10 1 5 3
Lane Flow Rate 284 358 183 128 214 32 242 399
G e o m e t r y G r p 66666666
Degree of Util (X) 0.689 0.818 0.416 0.359 0.524 0.092 0.582 0.919
Departure Headway (Hd) 8.728 8.214 8.2 10.064 8.835 10.451 8.649 8.299
Convergence, Y/N Yes Yes Yes Yes Yes Yes Yes Yes
Cap 415 441 440 357 408 343 419 439
Service Time 6.47 5.956 5.942 7.822 6.593 8.224 6.397 6.046
HCM Lane V/C Ratio 0.684 0.812 0.416 0.359 0.525 0.093 0.578 0.909
HCM Control Delay, s/veh 28.8 38.7 16.7 18.4 21 14.3 22.8 54.3
HCM Lane LOS D E C C C B C F
HCM 95th-tile Q 5 7.6 2 1.6 2.9 0.3 3.6 10.2
52
4ft
HCM 7th AWSC Horizon Year 2046-AWSC Alternative
6: Imperial Blvd & RockLand Rd MD Peak Hour
01/26/2026 Synchro 12 Report
NSI Page 1
Intersection
Intersection Delay, s/veh 17.9
Intersection LOS C
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 9 51 1 6 3114 1 7 4 4 1 945 3 8 3 1 0 0
F u t u r e V o l , v e h / h 9 51 1 6 3114 1 7 4 4 1 945 3 8 3 1 0 0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 1 0 61 1 8 1114 1 9 3 4 6 646 4 2 6 1 1 1
Number of Lanes 011010120020
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1223
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 2321
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 3212
HCM Control Delay, s/veh 14.7 11.8 17.8 19.9
HCM LOS B B C C
Lane NBLn1 NBLn2 NBLn3 EBLn1 EBLn2 WBLn1 SBLn1 SBLn2
Vol Left, % 100% 0% 0% 99% 0% 17% 3% 0%
Vol Thru, % 0% 100% 97% 1% 0% 17% 97% 66%
Vol Right, % 0% 0% 3% 0% 100% 67% 0% 34%
Sign Control Stop Stop Stop Stop Stop Stop Stop Stop
Traffic Vol by Lane 174 279 144 96 163 6 197 292
L T V o l 1 7 400 9 50150
Through Vol 0 279 14 0101 1 9 2 1 9 2
R T V o l 0040 1 6 340 1 0 0
Lane Flow Rate 193 310 160 107 181 7 218 324
G e o m e t r y G r p 66666666
Degree of Util (X) 0.415 0.623 0.319 0.259 0.378 0.017 0.453 0.649
Departure Headway (Hd) 7.731 7.222 7.202 8.731 7.514 8.916 7.467 7.209
Convergence, Y/N Yes Yes Yes Yes Yes Yes Yes Yes
Cap 466 500 500 412 478 401 483 502
Service Time 5.478 4.969 4.949 6.484 5.266 6.691 5.215 4.957
HCM Lane V/C Ratio 0.414 0.62 0.32 0.26 0.379 0.017 0.451 0.645
HCM Control Delay, s/veh 15.9 21.2 13.3 14.5 14.8 11.8 16.3 22.4
HCM Lane LOS C C BBBBCC
HCM 95th-tile Q 2 4.2 1.4 1 1.7 0.1 2.3 4.6
53
4ft
HCM 7th AWSC Horizon Year 2036-AWSC Alternative
6: Imperial Blvd & RockLand Rd PM Peak Hour
01/26/2026 Synchro 12 Report
NSI Page 1
Intersection
Intersection Delay, s/veh 69.8
Intersection LOS F
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 9 92 4 8 7563 2 1 3 4 9 79 2 1 5 8 1 9 7
F u t u r e V o l , v e h / h 9 92 4 8 7563 2 1 3 4 9 79 2 1 5 8 1 9 7
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 1 0 12 4 9 7563 2 1 7 5 0 79 2 1 5 9 3 9 9
Number of Lanes 011010120020
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1223
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 2321
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 3212
HCM Control Delay, s/veh 130.3 15.6 33 57.8
HCM LOS F C D F
Lane NBLn1 NBLn2 NBLn3 EBLn1 EBLn2 WBLn1 SBLn1 SBLn2
Vol Left, % 100% 0% 0% 98% 0% 36% 7% 0%
Vol Thru, % 0% 100% 95% 2% 0% 43% 93% 75%
Vol Right, % 0% 0% 5% 0% 100% 21% 0% 25%
Sign Control Stop Stop Stop Stop Stop Stop Stop Stop
Traffic Vol by Lane 213 331 175 101 487 14 312 388
LT Vol 213 0 0 99 0 5 21 0
Through Vol 0 331 16 6206 2 9 1 2 9 1
R T V o l 0090 4 8 730 9 7
Lane Flow Rate 217 338 178 103 497 14 318 395
G e o m e t r y G r p 66666666
Degree of Util (X) 0.567 0.834 0.438 0.291 1.237 0.046 0.799 0.971
Departure Headway (Hd) 10.026 9.505 9.468 10.18 8.958 12.32 9.769 9.55
Convergence, Y/N Yes Yes Yes Yes Yes Yes Yes Yes
Cap 363 385 383 352 407 292 372 384
Service Time 7.726 7.205 7.168 7.95 6.728 10.02 7.469 7.25
HCM Lane V/C Ratio 0.598 0.878 0.465 0.293 1.221 0.048 0.855 1.029
HCM Control Delay, s/veh 25.1 45.3 19.3 17.1 153.8 15.6 41.8 70.7
HCM Lane LOS D E C C F C E F
HCM 95th-tile Q 3.4 7.6 2.2 1.2 20.7 0.1 6.9 11.1
54
4ft
MOVEMENT SUMMAR
Y
Site: 36
AM Peak [Imperial Blvd & Rockland Rd_36AM (Site Folder: General)]
Output produced by SIDRA
INTERSECTION V
ersion: 9.1.6.228
New Site
Site Category: Base
Y
ear 2036
AM Peak
Roundabout
Design Life
Analysis (Final
Y
ear): Results for 10 years
V
ehicle Movement Performance
Demand Flows
Arrival Flows
95% Back Of Queue
Mov
ID
T
urn
Mov
Class
Deg.
Satn
A
ver
.
Delay
Level of
Service
Prop.
Que
Ef
f.
Stop Rate
A
ver
.
No. of
Cycles
A
ver
.
Speed
[
T
otal
HV ]
[
T
otal
HV ]
[ V
eh.
Dist ]
veh/h
%
veh/h
%
v/c
sec
veh
ft
mph
South: Imperial Blvd
3
L2
All MCs
293
0.5
293
0.5
0.329
0.9
LOS
A
2.3
56.9
0.43
0.22
0.43
33.0
8
T1
All MCs
555
2.6
555
2.6
0.329
0.8
LOS
A
2.3
58.6
0.42
0.21
0.42
35.1
18
R2
All MCs
4
0.0
4
0.0
0.329
0.8
LOS
A
2.3
58.6
0.41
0.21
0.41
35.1
Approach
852
1.9
852
1.9
0.329
0.9
LOS
A
2.3
58.6
0.42
0.22
0.42
34.3
East: New EW Street
1
L2
All MCs
7
0.0
7
0.0
0.056
3.1
LOS
A
0.2
5.5
0.60
0.54
0.60
33.9
6
T1
All MCs
3
0.0
3
0.0
0.056
3.1
LOS
A
0.2
5.5
0.60
0.54
0.60
34.6
16
R2
All MCs
29
0.0
29
0.0
0.056
3.1
LOS
A
0.2
5.5
0.60
0.54
0.60
34.3
Approach
38
0.0
38
0.0
0.056
3.1
LOS
A
0.2
5.5
0.60
0.54
0.60
34.3
North: Imperial Blvd
7
L2
All MCs
20
0.0
20
0.0
0.286
1.7
LOS
A
1.8
45.4
0.54
0.34
0.54
34.2
4
T1
All MCs
464
2.0
464
2.0
0.286
1.7
LOS
A
1.9
46.9
0.53
0.33
0.53
35.0
14
R2
All MCs
179
0.9
179
0.9
0.286
1.4
LOS
A
1.9
46.9
0.52
0.32
0.52
34.9
Approach
663
1.6
663
1.6
0.286
1.6
LOS
A
1.9
46.9
0.53
0.33
0.53
35.0
W
est: Rockland Rd
5
L2
All MCs
131
3.6
131
3.6
0.435
3.0
LOS
A
2.4
60.4
0.62
0.52
0.66
33.3
2
T1
All MCs
3
0.0
3
0.0
0.435
2.7
LOS
A
2.4
60.4
0.62
0.52
0.66
34.1
12
R2
All MCs
220
3.6
220
3.6
0.435
3.0
LOS
A
2.4
60.4
0.62
0.52
0.66
33.8
Approach
353
3.6
353
3.6
0.435
3.0
LOS
A
2.4
60.4
0.62
0.52
0.66
33.6
55
All V
ehicles
1906
2.1
1906
2.1
0.435
1.6
LOS
A
2.4
60.4
0.50
0.32
0.51
34.4
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parame
ter Settings dialog (Opti
ons tab).
Roundabout LOS Method: Same as Signalised Intersections.
V
ehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per mov
ement.
LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches an
d intersection).
Intersection and
Approach LOS values are based on average delay for all movements (v/c not used as
specified in HCM 6).
Roundabout Capacity Model: SIDRA
HCM.
Delay Model: SIDRA
Standard (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA
queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap
-Acceptance Capacity Formula: SIDRA
Standard (Akçelik M3D).
HV (%) values are calculated for
All Movement Classes of
All Heavy V
ehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand an
d Upstream Capacity Const
raint ef
fects.
SIDRA
INTERSECTION 9.1
|
Copyright © 2000
-2024
Akcelik and
Associates Pty Ltd
|
sidrasolutions.com
Organisation: NEEL
-SCHAFFER
|
Licence: NETWORK / 1PC
|
Processed:
T
uesday
, Janu
ary 20, 2026 12:1
1:09 PM
Project:
Y
:\Projects\0020000\0020000\20255 Hendersonville On
-Call
T
rans\01
-ImperialBlvdStudy\D
esign Data\SIDRA\Imperial
BlvdStudy
.sip9
56
MOVEMENT SUMMAR
Y
Site: 36 MD Peak [Imperial Blvd & Rockland Rd_36MD (Site Folder: General)]
Output produced by SIDRA
INTERSECTION V
ersion: 9.1.6.228
New Site
Site Category: Base
Y
ear 2036 MD Peak
Roundabout
Design Life
Analysis (Final
Y
ear): Results for 10 years
V
ehicle Movement Performance
Demand Flows
Arrival Flows
95% Back Of Queue
Mov
ID
T
urn
Mov
Class
Deg.
Satn
A
ver
.
Delay
Level of
Service
Prop.
Que
Ef
f.
Stop Rate
A
ver
.
No. of
Cycles
A
ver
.
Speed
[
T
otal
HV ]
[
T
otal
HV ]
[ V
eh.
Dist ]
veh/h
%
veh/h
%
v/c
sec
veh
ft
mph
South: Imperial Blvd
3
L2
All MCs
200
0.8
200
0.8
0.253
0.6
LOS
A
1.6
40.9
0.34
0.16
0.34
33.4
8
T1
All MCs
480
1.6
480
1.6
0.253
0.6
LOS
A
1.6
41.8
0.33
0.15
0.33
35.3
18
R2
All MCs
4
0.0
4
0.0
0.253
0.5
LOS
A
1.6
41.8
0.33
0.15
0.33
35.4
Approach
684
1.4
684
1.4
0.253
0.6
LOS
A
1.6
41.8
0.34
0.15
0.34
34.7
East: New EW Street
1
L2
All MCs
1
0.0
1
0.0
0.009
2.4
LOS
A
0.0
0.8
0.53
0.38
0.53
34.1
6
T1
All MCs
1
0.0
1
0.0
0.009
2.4
LOS
A
0.0
0.8
0.53
0.38
0.53
34.8
16
R2
All MCs
4
0.0
4
0.0
0.009
2.4
LOS
A
0.0
0.8
0.53
0.38
0.53
34.5
Approach
7
0.0
7
0.0
0.009
2.4
LOS
A
0.0
0.8
0.53
0.38
0.53
34.5
North: Imperial Blvd
7
L2
All MCs
7
0.0
7
0.0
0.224
1.1
LOS
A
1.3
33.7
0.42
0.24
0.42
34.7
4
T1
All MCs
439
2.8
439
2.8
0.224
1.0
LOS
A
1.3
34.3
0.41
0.23
0.41
35.5
14
R2
All MCs
1
15
1.4
1
15
1.4
0.224
0.9
LOS
A
1.3
34.3
0.40
0.22
0.40
35.2
Approach
560
2.5
560
2.5
0.224
1.0
LOS
A
1.3
34.3
0.41
0.23
0.41
35.4
W
est: Rockland Rd
5
L2
All MCs
108
1.4
108
1.4
0.336
2.2
LOS
A
1.6
40.0
0.55
0.42
0.55
33.7
2
T1
All MCs
3
0.0
3
0.0
0.336
2.1
LOS
A
1.6
40.0
0.55
0.42
0.55
34.4
12
R2
All MCs
187
0.0
187
0.0
0.336
2.1
LOS
A
1.6
40.0
0.55
0.42
0.55
34.1
Approach
297
0.5
297
0.5
0.336
2.1
LOS
A
1.6
40.0
0.55
0.42
0.55
34.0
57
All V
ehicles
1548
1.6
1548
1.6
0.336
1.0
LOS
A
1.6
41.8
0.41
0.23
0.41
34.8
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parame
ter Settings dialog (Opti
ons tab).
Roundabout LOS Method: Same as Signalised Intersections.
V
ehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per mov
ement.
LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches an
d intersection).
Intersection and
Approach LOS values are based on average delay for all movements (v/c not used as
specified in HCM 6).
Roundabout Capacity Model: SIDRA
HCM.
Delay Model: SIDRA
Standard (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA
queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap
-Acceptance Capacity Formula: SIDRA
Standard (Akçelik M3D).
HV (%) values are calculated for
All Movement Classes of
All Heavy V
ehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand an
d Upstream Capacity Const
raint ef
fects.
SIDRA
INTERSECTION 9.1
|
Copyright © 2000
-2024
Akcelik and
Associates Pty Ltd
|
sidrasolutions.com
Organisation: NEEL
-SCHAFFER
|
Licence: NETWORK / 1PC
|
Processed:
T
uesday
, Janu
ary 20, 2026 12:17:28 PM
Project:
Y
:\Projects\0020000\0020000\20255 Hendersonville On
-Call
T
rans\01
-ImperialBlvdStudy\D
esign Data\SIDRA\Imperial
BlvdStudy
.sip9
58
MOVEMENT SUMMAR
Y
Site: 36 PM Peak [Imperial Blvd & Rockland Rd_36PM (Site Folder: General)]
Output produced by SIDRA
INTERSECTION V
ersion: 9.1.6.228
New Site
Site Category: Base
Y
ear 2036 PM Peak
Roundabout
Design Life
Analysis (Final
Y
ear): Results for 10 years
V
ehicle Movement Performance
Demand Flows
Arrival Flows
95% Back Of Queue
Mov
ID
T
urn
Mov
Class
Deg.
Satn
A
ver
.
Delay
Level of
Service
Prop.
Que
Ef
f.
Stop Rate
A
ver
.
No. of
Cycles
A
ver
.
Speed
[
T
otal
HV ]
[
T
otal
HV ]
[ V
eh.
Dist ]
veh/h
%
veh/h
%
v/c
sec
veh
ft
mph
South: Imperial Blvd
3
L2
All MCs
224
1.3
224
1.3
0.286
0.7
LOS
A
2.0
49.5
0.39
0.19
0.39
33.3
8
T1
All MCs
525
1.1
525
1.1
0.286
0.6
LOS
A
2.0
50.7
0.38
0.18
0.38
35.2
18
R2
All MCs
10
0.0
10
0.0
0.286
0.6
LOS
A
2.0
50.7
0.38
0.18
0.38
35.3
Approach
759
1.1
759
1.1
0.286
0.7
LOS
A
2.0
50.7
0.38
0.18
0.38
34.6
East: New EW Street
1
L2
All MCs
6
0.0
6
0.0
0.020
2.6
LOS
A
0.1
1.9
0.55
0.44
0.55
33.3
6
T1
All MCs
6
0.0
6
0.0
0.020
2.6
LOS
A
0.1
1.9
0.55
0.44
0.55
34.0
16
R2
All MCs
2
0.0
2
0.0
0.020
2.6
LOS
A
0.1
1.9
0.55
0.44
0.55
33.8
Approach
15
0.0
15
0.0
0.020
2.6
LOS
A
0.1
1.9
0.55
0.44
0.55
33.7
North: Imperial Blvd
7
L2
All MCs
23
0.0
23
0.0
0.299
1.3
LOS
A
1.9
47.6
0.48
0.29
0.48
34.4
4
T1
All MCs
61
1
1.2
61
1
1.2
0.299
1.3
LOS
A
1.9
48.8
0.47
0.28
0.47
35.2
14
R2
All MCs
103
0.0
103
0.0
0.299
1.1
LOS
A
1.9
48.8
0.46
0.27
0.46
35.0
Approach
737
1.0
737
1.0
0.299
1.2
LOS
A
1.9
48.8
0.47
0.28
0.47
35.2
W
est: Rockland Rd
5
L2
All MCs
104
1.4
104
1.4
0.788
8.1
LOS
A
7.6
191.0
0.86
0.92
1.28
31.5
2
T1
All MCs
2
0.0
2
0.0
0.788
7.9
LOS
A
7.6
191.0
0.86
0.92
1.28
32.2
12
R2
All MCs
513
0.6
513
0.6
0.788
8.0
LOS
A
7.6
191.0
0.86
0.92
1.28
32.0
Approach
620
0.7
620
0.7
0.788
8.0
LOS
A
7.6
191.0
0.86
0.92
1.28
31.9
59
All V
ehicles
2131
1.0
2131
1.0
0.788
3.0
LOS
A
7.6
191.0
0.55
0.43
0.68
34.0
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parame
ter Settings dialog (Opti
ons tab).
Roundabout LOS Method: Same as Signalised Intersections.
V
ehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per mov
ement.
LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches an
d intersection).
Intersection and
Approach LOS values are based on average delay for all movements (v/c not used as
specified in HCM 6).
Roundabout Capacity Model: SIDRA
HCM.
Delay Model: SIDRA
Standard (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA
queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap
-Acceptance Capacity Formula: SIDRA
Standard (Akçelik M3D).
HV (%) values are calculated for
All Movement Classes of
All Heavy V
ehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand an
d Upstream Capacity Const
raint ef
fects.
SIDRA
INTERSECTION 9.1
|
Copyright © 2000
-2024
Akcelik and
Associates Pty Ltd
|
sidrasolutions.com
Organisation: NEEL
-SCHAFFER
|
Licence: NETWORK / 1PC
|
Processed:
T
uesday
, Janu
ary 20, 2026 12:18:01 PM
Project:
Y
:\Projects\0020000\0020000\20255 Hendersonville On
-Call
T
rans\01
-ImperialBlvdStudy\D
esign Data\SIDRA\Imperial
BlvdStudy
.sip9
60
MOVEMENT SUMMAR
Y
Site: 46
AM Peak [Imperial Blvd & Rockland Rd_46AM (Site Folder: General)]
Output produced by SIDRA
INTERSECTION V
ersion: 9.1.6.228
New Site
Site Category: Horizon
Y
ear 2046
AM Peak
Roundabout
Design Life
Analysis (Final
Y
ear): Results for 10 years
V
ehicle Movement Performance
Demand Flows
Arrival Flows
95% Back Of Queue
Mov
ID
T
urn
Mov
Class
Deg.
Satn
A
ver
.
Delay
Level of
Service
Prop.
Que
Ef
f.
Stop Rate
A
ver
.
No. of
Cycles
A
ver
.
Speed
[
T
otal
HV ]
[
T
otal
HV ]
[ V
eh.
Dist ]
veh/h
%
veh/h
%
v/c
sec
veh
ft
mph
South: Imperial Blvd
3
L2
All MCs
341
0.5
341
0.5
0.390
1.1
LOS
A
2.9
72.4
0.48
0.26
0.48
32.8
8
T1
All MCs
645
2.6
645
2.6
0.390
1.0
LOS
A
2.9
74.7
0.47
0.25
0.47
34.9
18
R2
All MCs
4
0.0
4
0.0
0.390
0.9
LOS
A
2.9
74.7
0.47
0.25
0.47
34.9
Approach
990
1.9
990
1.9
0.390
1.0
LOS
A
2.9
74.7
0.48
0.26
0.48
34.1
East: New EW Street
1
L2
All MCs
7
0.0
7
0.0
0.061
3.5
LOS
A
0.2
6.2
0.64
0.59
0.64
33.7
6
T1
All MCs
3
0.0
3
0.0
0.061
3.5
LOS
A
0.2
6.2
0.64
0.59
0.64
34.4
16
R2
All MCs
29
0.0
29
0.0
0.061
3.5
LOS
A
0.2
6.2
0.64
0.59
0.64
34.1
Approach
38
0.0
38
0.0
0.061
3.5
LOS
A
0.2
6.2
0.64
0.59
0.64
34.0
North: Imperial Blvd
7
L2
All MCs
20
0.0
20
0.0
0.348
2.1
LOS
A
2.3
58.4
0.61
0.41
0.61
34.0
4
T1
All MCs
540
2.0
540
2.0
0.348
2.1
LOS
A
2.4
60.7
0.60
0.40
0.60
34.8
14
R2
All MCs
209
0.9
209
0.9
0.348
1.8
LOS
A
2.4
60.7
0.59
0.38
0.59
34.7
Approach
769
1.6
769
1.6
0.348
2.0
LOS
A
2.4
60.7
0.60
0.39
0.60
34.7
W
est: Rockland Rd
5
L2
All MCs
153
0.0
153
0.0
0.527
3.8
LOS
A
3.3
84.0
0.70
0.63
0.81
32.9
2
T1
All MCs
3
0.0
3
0.0
0.527
3.8
LOS
A
3.3
84.0
0.70
0.63
0.81
33.5
12
R2
All MCs
256
3.3
256
3.3
0.527
4.2
LOS
A
3.3
84.0
0.70
0.63
0.81
33.2
Approach
412
2.1
412
2.1
0.527
4.0
LOS
A
3.3
84.0
0.70
0.63
0.81
33.1
61
All V
ehicles
2209
1.8
2209
1.8
0.527
2.0
LOS
A
3.3
84.0
0.56
0.38
0.58
34.1
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parame
ter Settings dialog (Opti
ons tab).
Roundabout LOS Method: Same as Signalised Intersections.
V
ehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per mov
ement.
LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches an
d intersection).
Intersection and
Approach LOS values are based on average delay for all movements (v/c not used as
specified in HCM 6).
Roundabout Capacity Model: SIDRA
HCM.
Delay Model: SIDRA
Standard (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA
queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap
-Acceptance Capacity Formula: SIDRA
Standard (Akçelik M3D).
HV (%) values are calculated for
All Movement Classes of
All Heavy V
ehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand an
d Upstream Capacity Const
raint ef
fects.
SIDRA
INTERSECTION 9.1
|
Copyright © 2000
-2024
Akcelik and
Associates Pty Ltd
|
sidrasolutions.com
Organisation: NEEL
-SCHAFFER
|
Licence: NETWORK / 1PC
|
Processed:
T
uesday
, Janu
ary 20, 2026 12:19:08 PM
Project:
Y
:\Projects\0020000\0020000\20255 Hendersonville On
-Call
T
rans\01
-ImperialBlvdStudy\D
esign Data\SIDRA\Imperial
BlvdStudy
.sip9
62
MOVEMENT SUMMAR
Y
Site: 46 MD Peak [Imperial Blvd & Rockland Rd_46MD (Site Folder: General)]
Output produced by SIDRA
INTERSECTION V
ersion: 9.1.6.228
New Site
Site Category: Horizon
Y
ear 2046 MD Peak
Roundabout
Design Life
Analysis (Final
Y
ear): Results for 10 years
V
ehicle Movement Performance
Demand Flows
Arrival Flows
95% Back Of Queue
Mov
ID
T
urn
Mov
Class
Deg.
Satn
A
ver
.
Delay
Level of
Service
Prop.
Que
Ef
f.
Stop Rate
A
ver
.
No. of
Cycles
A
ver
.
Speed
[
T
otal
HV ]
[
T
otal
HV ]
[ V
eh.
Dist ]
veh/h
%
veh/h
%
v/c
sec
veh
ft
mph
South: Imperial Blvd
3
L2
All MCs
232
0.8
232
0.8
0.301
0.8
LOS
A
2.0
51.4
0.39
0.19
0.39
33.3
8
T1
All MCs
559
1.6
559
1.6
0.301
0.7
LOS
A
2.1
52.6
0.38
0.18
0.38
35.2
18
R2
All MCs
5
0.0
5
0.0
0.301
0.6
LOS
A
2.1
52.6
0.38
0.18
0.38
35.2
Approach
796
1.4
796
1.4
0.301
0.7
LOS
A
2.1
52.6
0.39
0.19
0.39
34.6
East: New EW Street
1
L2
All MCs
1
0.0
1
0.0
0.01
1
2.7
LOS
A
0.0
1.1
0.56
0.43
0.56
34.1
6
T1
All MCs
1
0.0
1
0.0
0.01
1
2.7
LOS
A
0.0
1.1
0.56
0.43
0.56
34.8
16
R2
All MCs
5
0.0
5
0.0
0.01
1
2.7
LOS
A
0.0
1.1
0.56
0.43
0.56
34.5
Approach
8
0.0
8
0.0
0.01
1
2.7
LOS
A
0.0
1.1
0.56
0.43
0.56
34.5
North: Imperial Blvd
7
L2
All MCs
7
0.0
7
0.0
0.269
1.3
LOS
A
1.7
42.2
0.47
0.28
0.47
34.5
4
T1
All MCs
51
1
2.8
51
1
2.8
0.269
1.3
LOS
A
1.7
43.1
0.47
0.27
0.47
35.3
14
R2
All MCs
133
1.4
133
1.4
0.269
1.1
LOS
A
1.7
43.1
0.46
0.26
0.46
35.0
Approach
651
2.5
651
2.5
0.269
1.2
LOS
A
1.7
43.1
0.46
0.27
0.46
35.2
W
est: Rockland Rd
5
L2
All MCs
127
0.0
127
0.0
0.424
2.8
LOS
A
2.2
56.2
0.62
0.52
0.65
33.4
2
T1
All MCs
4
0.0
4
0.0
0.424
2.8
LOS
A
2.2
56.2
0.62
0.52
0.65
34.1
12
R2
All MCs
217
3.3
217
3.3
0.424
3.0
LOS
A
2.2
56.2
0.62
0.52
0.65
33.8
Approach
348
2.1
348
2.1
0.424
2.9
LOS
A
2.2
56.2
0.62
0.52
0.65
33.6
63
All V
ehicles
1803
1.9
1803
1.9
0.424
1.3
LOS
A
2.2
56.2
0.46
0.28
0.47
34.6
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parame
ter Settings dialog (Opti
ons tab).
Roundabout LOS Method: Same as Signalised Intersections.
V
ehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per mov
ement.
LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches an
d intersection).
Intersection and
Approach LOS values are based on average delay for all movements (v/c not used as
specified in HCM 6).
Roundabout Capacity Model: SIDRA
HCM.
Delay Model: SIDRA
Standard (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA
queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap
-Acceptance Capacity Formula: SIDRA
Standard (Akçelik M3D).
HV (%) values are calculated for
All Movement Classes of
All Heavy V
ehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand an
d Upstream Capacity Const
raint ef
fects.
SIDRA
INTERSECTION 9.1
|
Copyright © 2000
-2024
Akcelik and
Associates Pty Ltd
|
sidrasolutions.com
Organisation: NEEL
-SCHAFFER
|
Licence: NETWORK / 1PC
|
Processed:
T
uesday
, Janu
ary 20, 2026 12:21:32 PM
Project:
Y
:\Projects\0020000\0020000\20255 Hendersonville On
-Call
T
rans\01
-ImperialBlvdStudy\D
esign Data\SIDRA\Imperial
BlvdStudy
.sip9
64
MOVEMENT SUMMAR
Y
Site: 46 PM Peak [Imperial Blvd & Rockland Rd_46PM (Site Folder: General)]
Output produced by SIDRA
INTERSECTION V
ersion: 9.1.6.228
New Site
Site Category: Horizon
Y
ear 2046 PM Peak
Roundabout
Design Life
Analysis (Final
Y
ear): Results for 10 years
V
ehicle Movement Performance
Demand Flows
Arrival Flows
95% Back Of Queue
Mov
ID
T
urn
Mov
Class
Deg.
Satn
A
ver
.
Delay
Level of
Service
Prop.
Que
Ef
f.
Stop Rate
A
ver
.
No. of
Cycles
A
ver
.
Speed
[
T
otal
HV ]
[
T
otal
HV ]
[ V
eh.
Dist ]
veh/h
%
veh/h
%
v/c
sec
veh
ft
mph
South: Imperial Blvd
3
L2
All MCs
261
1.3
261
1.3
0.339
0.9
LOS
A
2.5
63.2
0.45
0.23
0.45
33.1
8
T1
All MCs
609
1.1
609
1.1
0.339
0.8
LOS
A
2.6
64.9
0.44
0.22
0.44
35.0
18
R2
All MCs
1
1
0.0
1
1
0.0
0.339
0.7
LOS
A
2.6
64.9
0.43
0.22
0.43
35.1
Approach
880
1.1
880
1.1
0.339
0.8
LOS
A
2.6
64.9
0.44
0.22
0.44
34.4
East: New EW Street
1
L2
All MCs
6
0.0
6
0.0
0.025
3.0
LOS
A
0.1
2.5
0.59
0.50
0.59
33.3
6
T1
All MCs
7
0.0
7
0.0
0.025
3.0
LOS
A
0.1
2.5
0.59
0.50
0.59
34.0
16
R2
All MCs
4
0.0
4
0.0
0.025
3.0
LOS
A
0.1
2.5
0.59
0.50
0.59
33.8
Approach
17
0.0
17
0.0
0.025
3.0
LOS
A
0.1
2.5
0.59
0.50
0.59
33.7
North: Imperial Blvd
7
L2
All MCs
26
0.0
26
0.0
0.359
1.7
LOS
A
2.4
60.7
0.55
0.34
0.55
34.1
4
T1
All MCs
71
1
1.2
71
1
1.2
0.359
1.6
LOS
A
2.5
62.6
0.54
0.33
0.54
35.0
14
R2
All MCs
1
19
0.0
1
19
0.0
0.359
1.4
LOS
A
2.5
62.6
0.53
0.32
0.53
34.8
Approach
856
1.0
856
1.0
0.359
1.6
LOS
A
2.5
62.6
0.54
0.33
0.54
34.9
W
est: Rockland Rd
5
L2
All MCs
121
1.4
121
1.4
0.978
23.7
LOS C
18.1
455.4
1.00
1.53
2.58
25.9
2
T1
All MCs
2
0.0
2
0.0
0.978
23.4
LOS C
18.1
455.4
1.00
1.53
2.58
26.3
12
R2
All MCs
596
0.6
596
0.6
0.978
23.6
LOS C
18.1
455.4
1.00
1.53
2.58
26.2
Approach
720
0.7
720
0.7
0.978
23.6
LOS C
18.1
455.4
1.00
1.53
2.58
26.1
65
All V
ehicles
2473
1.0
2473
1.0
0.978
7.7
LOS
A
18.1
455.4
0.64
0.64
1.10
31.7
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parame
ter Settings dialog (Opti
ons tab).
Roundabout LOS Method: Same as Signalised Intersections.
V
ehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per mov
ement.
LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches an
d intersection).
Intersection and
Approach LOS values are based on average delay for all movements (v/c not used as
specified in HCM 6).
Roundabout Capacity Model: SIDRA
HCM.
Delay Model: SIDRA
Standard (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA
queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap
-Acceptance Capacity Formula: SIDRA
Standard (Akçelik M3D).
HV (%) values are calculated for
All Movement Classes of
All Heavy V
ehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand an
d Upstream Capacity Const
raint ef
fects.
SIDRA
INTERSECTION 9.1
|
Copyright © 2000
-2024
Akcelik and
Associates Pty Ltd
|
sidrasolutions.com
Organisation: NEEL
-SCHAFFER
|
Licence: NETWORK / 1PC
|
Processed:
T
uesday
, Janu
ary 20, 2026 3:40:12 PM
Project:
Y
:\Projects\0020000\0020000\20255 Hendersonville On
-Call
T
rans\01
-ImperialBlvdStudy\D
esign Data\SIDRA\2NS
-2E
-1W_ImperialBlvdStudy
.sip9
66
MOVEMENT SUMMAR
Y
Site: 36
AM Peak [Imperial Blvd & Rockland Rd_36AM (Site Folder: General)]
Output produced by SIDRA
INTERSECTION V
ersion: 9.1.6.228
New Site
Site Category: Base
Y
ear 2036
AM Peak
Roundabout
Design Life
Analysis (Final
Y
ear): Results for 10 years
V
ehicle Movement Performance
Demand Flows
Arrival Flows
95% Back Of Queue
Mov
ID
T
urn
Mov
Class
Deg.
Satn
A
ver
.
Delay
Level of
Service
Prop.
Que
Ef
f.
Stop Rate
A
ver
.
No. of
Cycles
A
ver
.
Speed
[
T
otal
HV ]
[
T
otal
HV ]
[ V
eh.
Dist ]
veh/h
%
veh/h
%
v/c
sec
veh
ft
mph
South: Imperial Blvd
3
L2
All MCs
293
0.5
293
0.5
0.328
0.9
LOS
A
2.2
55.5
0.42
0.22
0.42
33.0
8
T1
All MCs
555
2.6
555
2.6
0.328
0.8
LOS
A
2.2
57.0
0.41
0.21
0.41
35.1
18
R2
All MCs
4
0.0
4
0.0
0.328
0.8
LOS
A
2.2
57.0
0.40
0.21
0.40
35.2
Approach
852
1.9
852
1.9
0.328
0.9
LOS
A
2.2
57.0
0.41
0.21
0.41
34.3
East: New EW Street
1
L2
All MCs
7
0.0
7
0.0
0.056
3.1
LOS
A
0.2
5.4
0.59
0.53
0.59
33.9
6
T1
All MCs
3
0.0
3
0.0
0.056
3.1
LOS
A
0.2
5.4
0.59
0.53
0.59
34.6
16
R2
All MCs
29
0.0
29
0.0
0.056
3.1
LOS
A
0.2
5.4
0.59
0.53
0.59
34.3
Approach
38
0.0
38
0.0
0.056
3.1
LOS
A
0.2
5.4
0.59
0.53
0.59
34.3
North: Imperial Blvd
7
L2
All MCs
20
0.0
20
0.0
0.286
1.7
LOS
A
1.8
45.3
0.54
0.34
0.54
34.2
4
T1
All MCs
464
2.0
464
2.0
0.286
1.7
LOS
A
1.8
46.8
0.53
0.33
0.53
35.0
14
R2
All MCs
179
0.9
179
0.9
0.286
1.4
LOS
A
1.8
46.8
0.52
0.32
0.52
34.9
Approach
663
1.6
663
1.6
0.286
1.6
LOS
A
1.8
46.8
0.53
0.33
0.53
35.0
W
est: Rockland Rd
5
L2
All MCs
131
3.6
131
3.6
0.161
2.1
LOS
A
0.7
17.6
0.52
0.40
0.52
31.9
2
T1
All MCs
3
0.0
3
0.0
0.161
1.9
LOS
A
0.7
17.6
0.52
0.40
0.52
32.6
12
R2
All MCs
220
3.6
220
3.6
0.220
1.7
LOS
A
1.0
26.0
0.52
0.39
0.52
35.0
Approach
353
3.6
353
3.6
0.220
1.8
LOS
A
1.0
26.0
0.52
0.39
0.52
33.7
67
All V
ehicles
1906
2.1
1906
2.1
0.328
1.3
LOS
A
2.2
57.0
0.47
0.29
0.47
34.4
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parame
ter Settings dialog (Opti
ons tab).
Roundabout LOS Method: Same as Signalised Intersections.
V
ehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per mov
ement.
LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches an
d intersection).
Intersection and
Approach LOS values are based on average delay for all movements (v/c not used as
specified in HCM 6).
Roundabout Capacity Model: SIDRA
HCM.
Delay Model: SIDRA
Standard (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA
queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap
-Acceptance Capacity Formula: SIDRA
Standard (Akçelik M3D).
HV (%) values are calculated for
All Movement Classes of
All Heavy V
ehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand an
d Upstream Capacity Const
raint ef
fects.
SIDRA
INTERSECTION 9.1
|
Copyright © 2000
-2024
Akcelik and
Associates Pty Ltd
|
sidrasolutions.com
Organisation: NEEL
-SCHAFFER
|
Licence: NETWORK / 1PC
|
Processed:
Thursday
, Jan
uary 22, 2026 12:40:34 PM
Project:
Y
:\Projects\0020000\0020000\20255 Hendersonville On
-Call
T
rans\01
-ImperialBlvdStudy\D
esign Data\SIDRA\2NS
-2E
-1W_ImperialBlvdStudy
.sip9
68
MOVEMENT SUMMAR
Y
Site: 36 MD Peak [Imperial Blvd & Rockland Rd_36MD (Site Folder: General)]
Output produced by SIDRA
INTERSECTION V
ersion: 9.1.6.228
New Site
Site Category: Base
Y
ear 2036 MD Peak
Roundabout
Design Life
Analysis (Final
Y
ear): Results for 10 years
V
ehicle Movement Performance
Demand Flows
Arrival Flows
95% Back Of Queue
Mov
ID
T
urn
Mov
Class
Deg.
Satn
A
ver
.
Delay
Level of
Service
Prop.
Que
Ef
f.
Stop Rate
A
ver
.
No. of
Cycles
A
ver
.
Speed
[
T
otal
HV ]
[
T
otal
HV ]
[ V
eh.
Dist ]
veh/h
%
veh/h
%
v/c
sec
veh
ft
mph
South: Imperial Blvd
3
L2
All MCs
200
0.8
200
0.8
0.253
0.6
LOS
A
1.6
40.1
0.34
0.16
0.34
33.4
8
T1
All MCs
480
1.6
480
1.6
0.253
0.6
LOS
A
1.6
40.9
0.33
0.15
0.33
35.3
18
R2
All MCs
4
0.0
4
0.0
0.253
0.5
LOS
A
1.6
40.9
0.33
0.15
0.33
35.4
Approach
684
1.4
684
1.4
0.253
0.6
LOS
A
1.6
40.9
0.33
0.15
0.33
34.8
East: New EW Street
1
L2
All MCs
1
0.0
1
0.0
0.009
2.4
LOS
A
0.0
0.8
0.53
0.38
0.53
34.1
6
T1
All MCs
1
0.0
1
0.0
0.009
2.4
LOS
A
0.0
0.8
0.53
0.38
0.53
34.8
16
R2
All MCs
4
0.0
4
0.0
0.009
2.4
LOS
A
0.0
0.8
0.53
0.38
0.53
34.5
Approach
7
0.0
7
0.0
0.009
2.4
LOS
A
0.0
0.8
0.53
0.38
0.53
34.5
North: Imperial Blvd
7
L2
All MCs
7
0.0
7
0.0
0.224
1.1
LOS
A
1.3
33.6
0.42
0.24
0.42
34.7
4
T1
All MCs
439
2.8
439
2.8
0.224
1.0
LOS
A
1.3
34.2
0.41
0.23
0.41
35.5
14
R2
All MCs
1
15
1.4
1
15
1.4
0.224
0.9
LOS
A
1.3
34.2
0.40
0.22
0.40
35.2
Approach
560
2.5
560
2.5
0.224
1.0
LOS
A
1.3
34.2
0.41
0.23
0.41
35.4
W
est: Rockland Rd
5
L2
All MCs
108
1.4
108
1.4
0.124
1.8
LOS
A
0.5
12.8
0.47
0.36
0.47
32.1
2
T1
All MCs
3
0.0
3
0.0
0.124
1.7
LOS
A
0.5
12.8
0.47
0.36
0.47
32.8
12
R2
All MCs
187
0.0
187
0.0
0.170
1.3
LOS
A
0.7
18.6
0.46
0.33
0.46
35.2
Approach
297
0.5
297
0.5
0.170
1.5
LOS
A
0.7
18.6
0.47
0.34
0.47
34.0
69
All V
ehicles
1548
1.6
1548
1.6
0.253
0.9
LOS
A
1.6
40.9
0.39
0.22
0.39
34.8
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parame
ter Settings dialog (Opti
ons tab).
Roundabout LOS Method: Same as Signalised Intersections.
V
ehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per mov
ement.
LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches an
d intersection).
Intersection and
Approach LOS values are based on average delay for all movements (v/c not used as
specified in HCM 6).
Roundabout Capacity Model: SIDRA
HCM.
Delay Model: SIDRA
Standard (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA
queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap
-Acceptance Capacity Formula: SIDRA
Standard (Akçelik M3D).
HV (%) values are calculated for
All Movement Classes of
All Heavy V
ehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand an
d Upstream Capacity Const
raint ef
fects.
SIDRA
INTERSECTION 9.1
|
Copyright © 2000
-2024
Akcelik and
Associates Pty Ltd
|
sidrasolutions.com
Organisation: NEEL
-SCHAFFER
|
Licence: NETWORK / 1PC
|
Processed:
Thursday
, Jan
uary 22, 2026 12:41:22 PM
Project:
Y
:\Projects\0020000\0020000\20255 Hendersonville On
-Call
T
rans\01
-ImperialBlvdStudy\D
esign Data\SIDRA\2NS
-2E
-1W_ImperialBlvdStudy
.sip9
70
MOVEMENT SUMMAR
Y
Site: 36 PM Peak [Imperial Blvd & Rockland Rd_36PM (Site Folder: General)]
Output produced by SIDRA
INTERSECTION V
ersion: 9.1.6.228
New Site
Site Category: Base
Y
ear 2036 PM Peak
Roundabout
Design Life
Analysis (Final
Y
ear): Results for 10 years
V
ehicle Movement Performance
Demand Flows
Arrival Flows
95% Back Of Queue
Mov
ID
T
urn
Mov
Class
Deg.
Satn
A
ver
.
Delay
Level of
Service
Prop.
Que
Ef
f.
Stop Rate
A
ver
.
No. of
Cycles
A
ver
.
Speed
[
T
otal
HV ]
[
T
otal
HV ]
[ V
eh.
Dist ]
veh/h
%
veh/h
%
v/c
sec
veh
ft
mph
South: Imperial Blvd
3
L2
All MCs
224
1.3
224
1.3
0.283
0.7
LOS
A
1.8
46.6
0.37
0.18
0.37
33.3
8
T1
All MCs
525
1.1
525
1.1
0.283
0.6
LOS
A
1.9
47.5
0.36
0.17
0.36
35.3
18
R2
All MCs
10
0.0
10
0.0
0.283
0.6
LOS
A
1.9
47.5
0.35
0.17
0.35
35.3
Approach
759
1.1
759
1.1
0.283
0.7
LOS
A
1.9
47.5
0.36
0.17
0.36
34.7
East: New EW Street
1
L2
All MCs
6
0.0
6
0.0
0.020
2.6
LOS
A
0.1
1.9
0.55
0.43
0.55
33.3
6
T1
All MCs
6
0.0
6
0.0
0.020
2.6
LOS
A
0.1
1.9
0.55
0.43
0.55
34.0
16
R2
All MCs
2
0.0
2
0.0
0.020
2.6
LOS
A
0.1
1.9
0.55
0.43
0.55
33.8
Approach
15
0.0
15
0.0
0.020
2.6
LOS
A
0.1
1.9
0.55
0.43
0.55
33.7
North: Imperial Blvd
7
L2
All MCs
23
0.0
23
0.0
0.299
1.3
LOS
A
1.9
47.3
0.48
0.29
0.48
34.4
4
T1
All MCs
61
1
1.2
61
1
1.2
0.299
1.3
LOS
A
1.9
48.5
0.47
0.28
0.47
35.2
14
R2
All MCs
103
0.0
103
0.0
0.299
1.1
LOS
A
1.9
48.5
0.46
0.26
0.46
35.0
Approach
737
1.0
737
1.0
0.299
1.2
LOS
A
1.9
48.5
0.47
0.27
0.47
35.2
W
est: Rockland Rd
5
L2
All MCs
104
1.4
104
1.4
0.186
3.7
LOS
A
0.7
18.7
0.59
0.52
0.59
31.5
2
T1
All MCs
2
0.0
2
0.0
0.186
3.6
LOS
A
0.7
18.7
0.59
0.52
0.59
32.1
12
R2
All MCs
513
0.6
513
0.6
0.519
3.0
LOS
A
3.2
80.8
0.67
0.59
0.76
34.7
Approach
620
0.7
620
0.7
0.519
3.1
LOS
A
3.2
80.8
0.66
0.58
0.73
34.0
71
All V
ehicles
2131
1.0
2131
1.0
0.519
1.6
LOS
A
3.2
80.8
0.49
0.33
0.51
34.6
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parame
ter Settings dialog (Opti
ons tab).
Roundabout LOS Method: Same as Signalised Intersections.
V
ehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per mov
ement.
LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches an
d intersection).
Intersection and
Approach LOS values are based on average delay for all movements (v/c not used as
specified in HCM 6).
Roundabout Capacity Model: SIDRA
HCM.
Delay Model: SIDRA
Standard (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA
queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap
-Acceptance Capacity Formula: SIDRA
Standard (Akçelik M3D).
HV (%) values are calculated for
All Movement Classes of
All Heavy V
ehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand an
d Upstream Capacity Const
raint ef
fects.
SIDRA
INTERSECTION 9.1
|
Copyright © 2000
-2024
Akcelik and
Associates Pty Ltd
|
sidrasolutions.com
Organisation: NEEL
-SCHAFFER
|
Licence: NETWORK / 1PC
|
Processed:
Thursday
, Jan
uary 22, 2026 12:41:44 PM
Project:
Y
:\Projects\0020000\0020000\20255 Hendersonville On
-Call
T
rans\01
-ImperialBlvdStudy\D
esign Data\SIDRA\2NS
-2E
-1W_ImperialBlvdStudy
.sip9
72
MOVEMENT SUMMAR
Y
Site: 46
AM Peak [Imperial Blvd & Rockland Rd_46AM (Site Folder: General)]
Output produced by SIDRA
INTERSECTION V
ersion: 9.1.6.228
New Site
Site Category: Horizon
Y
ear 2046
AM Peak
Roundabout
Design Life
Analysis (Final
Y
ear): Results for 10 years
V
ehicle Movement Performance
Demand Flows
Arrival Flows
95% Back Of Queue
Mov
ID
T
urn
Mov
Class
Deg.
Satn
A
ver
.
Delay
Level of
Service
Prop.
Que
Ef
f.
Stop Rate
A
ver
.
No. of
Cycles
A
ver
.
Speed
[
T
otal
HV ]
[
T
otal
HV ]
[ V
eh.
Dist ]
veh/h
%
veh/h
%
v/c
sec
veh
ft
mph
South: Imperial Blvd
3
L2
All MCs
341
0.5
341
0.5
0.387
1.1
LOS
A
2.8
69.9
0.47
0.26
0.47
32.9
8
T1
All MCs
645
2.6
645
2.6
0.387
1.0
LOS
A
2.8
72.0
0.46
0.24
0.46
34.9
18
R2
All MCs
4
0.0
4
0.0
0.387
0.9
LOS
A
2.8
72.0
0.45
0.24
0.45
35.0
Approach
990
1.9
990
1.9
0.387
1.0
LOS
A
2.8
72.0
0.46
0.25
0.46
34.2
East: New EW Street
1
L2
All MCs
7
0.0
7
0.0
0.061
3.5
LOS
A
0.2
6.1
0.64
0.59
0.64
33.7
6
T1
All MCs
3
0.0
3
0.0
0.061
3.5
LOS
A
0.2
6.1
0.64
0.59
0.64
34.4
16
R2
All MCs
29
0.0
29
0.0
0.061
3.5
LOS
A
0.2
6.1
0.64
0.59
0.64
34.1
Approach
38
0.0
38
0.0
0.061
3.5
LOS
A
0.2
6.1
0.64
0.59
0.64
34.0
North: Imperial Blvd
7
L2
All MCs
20
0.0
20
0.0
0.347
2.1
LOS
A
2.3
58.1
0.61
0.40
0.61
34.0
4
T1
All MCs
540
2.0
540
2.0
0.347
2.1
LOS
A
2.4
60.4
0.60
0.39
0.60
34.8
14
R2
All MCs
209
0.9
209
0.9
0.347
1.8
LOS
A
2.4
60.4
0.59
0.38
0.59
34.7
Approach
769
1.6
769
1.6
0.347
2.0
LOS
A
2.4
60.4
0.60
0.39
0.60
34.8
W
est: Rockland Rd
5
L2
All MCs
153
0.0
153
0.0
0.188
2.2
LOS
A
0.8
20.9
0.55
0.44
0.55
32.0
2
T1
All MCs
3
0.0
3
0.0
0.188
2.2
LOS
A
0.8
20.9
0.55
0.44
0.55
32.5
12
R2
All MCs
256
3.3
256
3.3
0.270
2.0
LOS
A
1.3
33.1
0.57
0.44
0.57
34.8
Approach
412
2.1
412
2.1
0.270
2.0
LOS
A
1.3
33.1
0.56
0.44
0.56
33.7
73
All V
ehicles
2209
1.8
2209
1.8
0.387
1.6
LOS
A
2.8
72.0
0.53
0.34
0.53
34.3
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parame
ter Settings dialog (Opti
ons tab).
Roundabout LOS Method: Same as Signalised Intersections.
V
ehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per mov
ement.
LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches an
d intersection).
Intersection and
Approach LOS values are based on average delay for all movements (v/c not used as
specified in HCM 6).
Roundabout Capacity Model: SIDRA
HCM.
Delay Model: SIDRA
Standard (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA
queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap
-Acceptance Capacity Formula: SIDRA
Standard (Akçelik M3D).
HV (%) values are calculated for
All Movement Classes of
All Heavy V
ehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand an
d Upstream Capacity Const
raint ef
fects.
SIDRA
INTERSECTION 9.1
|
Copyright © 2000
-2024
Akcelik and
Associates Pty Ltd
|
sidrasolutions.com
Organisation: NEEL
-SCHAFFER
|
Licence: NETWORK / 1PC
|
Processed:
Thursday
, Jan
uary 22, 2026 12:42:07 PM
Project:
Y
:\Projects\0020000\0020000\20255 Hendersonville On
-Call
T
rans\01
-ImperialBlvdStudy\D
esign Data\SIDRA\2NS
-2E
-1W_ImperialBlvdStudy
.sip9
74
MOVEMENT SUMMAR
Y
Site: 46 MD Peak [Imperial Blvd & Rockland Rd_46MD (Site Folder: General)]
Output produced by SIDRA
INTERSECTION V
ersion: 9.1.6.228
New Site
Site Category: Horizon
Y
ear 2046 MD Peak
Roundabout
Design Life
Analysis (Final
Y
ear): Results for 10 years
V
ehicle Movement Performance
Demand Flows
Arrival Flows
95% Back Of Queue
Mov
ID
T
urn
Mov
Class
Deg.
Satn
A
ver
.
Delay
Level of
Service
Prop.
Que
Ef
f.
Stop Rate
A
ver
.
No. of
Cycles
A
ver
.
Speed
[
T
otal
HV ]
[
T
otal
HV ]
[ V
eh.
Dist ]
veh/h
%
veh/h
%
v/c
sec
veh
ft
mph
South: Imperial Blvd
3
L2
All MCs
232
0.8
232
0.8
0.299
0.8
LOS
A
2.0
49.9
0.38
0.19
0.38
33.3
8
T1
All MCs
559
1.6
559
1.6
0.299
0.7
LOS
A
2.0
51.0
0.37
0.18
0.37
35.2
18
R2
All MCs
5
0.0
5
0.0
0.299
0.6
LOS
A
2.0
51.0
0.37
0.18
0.37
35.3
Approach
796
1.4
796
1.4
0.299
0.7
LOS
A
2.0
51.0
0.38
0.18
0.38
34.6
East: New EW Street
1
L2
All MCs
1
0.0
1
0.0
0.01
1
2.7
LOS
A
0.0
1.1
0.56
0.43
0.56
34.1
6
T1
All MCs
1
0.0
1
0.0
0.01
1
2.7
LOS
A
0.0
1.1
0.56
0.43
0.56
34.8
16
R2
All MCs
5
0.0
5
0.0
0.01
1
2.7
LOS
A
0.0
1.1
0.56
0.43
0.56
34.5
Approach
8
0.0
8
0.0
0.01
1
2.7
LOS
A
0.0
1.1
0.56
0.43
0.56
34.5
North: Imperial Blvd
7
L2
All MCs
7
0.0
7
0.0
0.269
1.3
LOS
A
1.6
42.0
0.47
0.28
0.47
34.5
4
T1
All MCs
51
1
2.8
51
1
2.8
0.269
1.3
LOS
A
1.7
43.0
0.46
0.27
0.46
35.3
14
R2
All MCs
133
1.4
133
1.4
0.269
1.1
LOS
A
1.7
43.0
0.45
0.26
0.45
35.1
Approach
651
2.5
651
2.5
0.269
1.2
LOS
A
1.7
43.0
0.46
0.27
0.46
35.2
W
est: Rockland Rd
5
L2
All MCs
127
0.0
127
0.0
0.151
1.9
LOS
A
0.6
15.8
0.51
0.40
0.51
32.1
2
T1
All MCs
4
0.0
4
0.0
0.151
1.9
LOS
A
0.6
15.8
0.51
0.40
0.51
32.7
12
R2
All MCs
217
3.3
217
3.3
0.219
1.7
LOS
A
1.0
25.0
0.52
0.39
0.52
35.0
Approach
348
2.1
348
2.1
0.219
1.8
LOS
A
1.0
25.0
0.51
0.40
0.51
33.8
75
All V
ehicles
1803
1.9
1803
1.9
0.299
1.1
LOS
A
2.0
51.0
0.43
0.26
0.43
34.7
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parame
ter Settings dialog (Opti
ons tab).
Roundabout LOS Method: Same as Signalised Intersections.
V
ehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per mov
ement.
LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches an
d intersection).
Intersection and
Approach LOS values are based on average delay for all movements (v/c not used as
specified in HCM 6).
Roundabout Capacity Model: SIDRA
HCM.
Delay Model: SIDRA
Standard (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA
queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap
-Acceptance Capacity Formula: SIDRA
Standard (Akçelik M3D).
HV (%) values are calculated for
All Movement Classes of
All Heavy V
ehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand an
d Upstream Capacity Const
raint ef
fects.
SIDRA
INTERSECTION 9.1
|
Copyright © 2000
-2024
Akcelik and
Associates Pty Ltd
|
sidrasolutions.com
Organisation: NEEL
-SCHAFFER
|
Licence: NETWORK / 1PC
|
Processed:
Thursday
, Jan
uary 22, 2026 12:42:30 PM
Project:
Y
:\Projects\0020000\0020000\20255 Hendersonville On
-Call
T
rans\01
-ImperialBlvdStudy\D
esign Data\SIDRA\2NS
-2E
-1W_ImperialBlvdStudy
.sip9
76
MOVEMENT SUMMAR
Y
Site: 46 PM Peak [Imperial Blvd & Rockland Rd_46PM (Site Folder: General)]
Output produced by SIDRA
INTERSECTION V
ersion: 9.1.6.228
New Site
Site Category: Horizon
Y
ear 2046 PM Peak
Roundabout
Design Life
Analysis (Final
Y
ear): Results for 10 years
V
ehicle Movement Performance
Demand Flows
Arrival Flows
95% Back Of Queue
Mov
ID
T
urn
Mov
Class
Deg.
Satn
A
ver
.
Delay
Level of
Service
Prop.
Que
Ef
f.
Stop Rate
A
ver
.
No. of
Cycles
A
ver
.
Speed
[
T
otal
HV ]
[
T
otal
HV ]
[ V
eh.
Dist ]
veh/h
%
veh/h
%
v/c
sec
veh
ft
mph
South: Imperial Blvd
3
L2
All MCs
261
1.3
261
1.3
0.335
0.9
LOS
A
2.3
58.2
0.42
0.22
0.42
33.2
8
T1
All MCs
609
1.1
609
1.1
0.335
0.8
LOS
A
2.4
59.4
0.41
0.20
0.41
35.1
18
R2
All MCs
1
1
0.0
1
1
0.0
0.335
0.7
LOS
A
2.4
59.4
0.40
0.20
0.40
35.2
Approach
880
1.1
880
1.1
0.335
0.8
LOS
A
2.4
59.4
0.41
0.21
0.41
34.5
East: New EW Street
1
L2
All MCs
6
0.0
6
0.0
0.025
3.0
LOS
A
0.1
2.4
0.59
0.49
0.59
33.3
6
T1
All MCs
7
0.0
7
0.0
0.025
3.0
LOS
A
0.1
2.4
0.59
0.49
0.59
34.0
16
R2
All MCs
4
0.0
4
0.0
0.025
3.0
LOS
A
0.1
2.4
0.59
0.49
0.59
33.8
Approach
17
0.0
17
0.0
0.025
3.0
LOS
A
0.1
2.4
0.59
0.49
0.59
33.7
North: Imperial Blvd
7
L2
All MCs
26
0.0
26
0.0
0.359
1.7
LOS
A
2.4
60.3
0.55
0.34
0.55
34.1
4
T1
All MCs
71
1
1.2
71
1
1.2
0.359
1.6
LOS
A
2.5
62.1
0.54
0.33
0.54
35.0
14
R2
All MCs
1
19
0.0
1
19
0.0
0.359
1.4
LOS
A
2.5
62.1
0.53
0.32
0.53
34.8
Approach
856
1.0
856
1.0
0.359
1.6
LOS
A
2.5
62.1
0.54
0.33
0.54
34.9
W
est: Rockland Rd
5
L2
All MCs
121
1.4
121
1.4
0.230
4.2
LOS
A
0.9
23.7
0.63
0.58
0.63
31.3
2
T1
All MCs
2
0.0
2
0.0
0.230
4.1
LOS
A
0.9
23.7
0.63
0.58
0.63
31.9
12
R2
All MCs
596
0.6
596
0.6
0.639
4.4
LOS
A
4.8
1
19.7
0.77
0.74
0.97
34.0
Approach
720
0.7
720
0.7
0.639
4.4
LOS
A
4.8
1
19.7
0.74
0.71
0.91
33.5
77
All V
ehicles
2473
1.0
2473
1.0
0.639
2.1
LOS
A
4.8
1
19.7
0.55
0.40
0.60
34.4
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parame
ter Settings dialog (Opti
ons tab).
Roundabout LOS Method: Same as Signalised Intersections.
V
ehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per mov
ement.
LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches an
d intersection).
Intersection and
Approach LOS values are based on average delay for all movements (v/c not used as
specified in HCM 6).
Roundabout Capacity Model: SIDRA
HCM.
Delay Model: SIDRA
Standard (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA
queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap
-Acceptance Capacity Formula: SIDRA
Standard (Akçelik M3D).
HV (%) values are calculated for
All Movement Classes of
All Heavy V
ehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand an
d Upstream Capacity Const
raint ef
fects.
SIDRA
INTERSECTION 9.1
|
Copyright © 2000
-2024
Akcelik and
Associates Pty Ltd
|
sidrasolutions.com
Organisation: NEEL
-SCHAFFER
|
Licence: NETWORK / 1PC
|
Processed:
Thursday
, Jan
uary 22, 2026 12:42:48 PM
Project:
Y
:\Projects\0020000\0020000\20255 Hendersonville On
-Call
T
rans\01
-ImperialBlvdStudy\D
esign Data\SIDRA\2NS
-2E
-1W_ImperialBlvdStudy
.sip9
78
Queuing and Blocking Report
Base Year 2036-Roundabout Alternative 02/26/2026
RNBTBY36AM SimTraffic Report
NSI Page 1
Intersection: 3: Imperial Blvd & W Main St
Movement EB EB EB EB EB WB WB WB NB NB NB SB
Directions Served L T T T R L T TR L L T L
Maximum Queue (ft) 58 244 199 80 53 156 320 265 218 183 45 27
Average Queue (ft) 21 179 125 24 13 83 199 148 149 115 24 12
95th Queue (ft) 89 273 233 99 55 175 348 283 237 211 56 34
Link Distance (ft) 978 978 1039 1039 200 200 200 106
Upstream Blk Time (%) 3 0
Queuing Penalty (veh) 3 0
Storage Bay Dist (ft) 100 150 150 100
Storage Blk Time (%) 24 2 0 2 19
Queuing Penalty (veh) 4 10 0 15 25
Intersection: 3: Imperial Blvd & W Main St
Movement SB
Directions Served TR
Maximum Queue (ft) 54
Average Queue (ft) 29
95th Queue (ft) 61
Link Distance (ft) 106
Upstream Blk Time (%) 0
Queuing Penalty (veh) 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: Imperial Blvd & RockLand Rd
Movement EB EB WB NB NB NB SB SB
Directions Served LT R LTR L T R LT R
Maximum Queue (ft) 32 32 27 43 72 29 72 35
Average Queue (ft) 15 15 8 17 34 6 40 15
95th Queue (ft) 40 40 28 51 87 31 81 46
Link Distance (ft) 150 71 386 386 200 200
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 100 125
Storage Blk Time (%) 0
Queuing Penalty (veh) 0
Network Summary
Network wide Queuing Penalty: 58
79
Queuing and Blocking Report
Base Year 2036-Roundabout Alternative 02/26/2026
RNBTBY36MD SimTraffic Report
NSI Page 1
Intersection: 3: Imperial Blvd & W Main St
Movement EB EB EB EB EB WB WB WB NB NB NB SB
Directions Served L T T T R L T TR L L T L
Maximum Queue (ft) 102 373 295 197 58 165 338 287 194 165 73 58
Average Queue (ft) 39 276 215 110 17 118 239 182 146 117 28 24
95th Queue (ft) 112 410 332 237 69 198 398 340 214 191 86 68
Link Distance (ft) 978 978 1039 1039 200 200 200 106
U p s t r e a m B l k T i m e ( % ) 2000
Queuing Penalty (veh) 2000
Storage Bay Dist (ft) 100 150 150 100
Storage Blk Time (%) 29 9 1 17 22
Queuing Penalty (veh) 15 62 4 97 34
Intersection: 3: Imperial Blvd & W Main St
Movement SB
Directions Served TR
Maximum Queue (ft) 82
Average Queue (ft) 51
95th Queue (ft) 92
Link Distance (ft) 106
Upstream Blk Time (%) 0
Queuing Penalty (veh) 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: Imperial Blvd & RockLand Rd
Movement EB EB WB NB NB NB SB SB
Directions Served LT R LTR L T R LT R
Maximum Queue (ft) 36 33 8 33 46 9 60 15
Average Queue (ft) 15 17 2 11 21 2 30 3
95th Queue (ft) 45 41 12 38 56 14 76 17
Link Distance (ft) 163 71 374 374 200 200
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 100 125
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 213
80
Queuing and Blocking Report
Base Year 2036-Roundabout Alternative 02/26/2026
RNBTBY36PM SimTraffic Report
NSI Page 1
Intersection: 3: Imperial Blvd & W Main St
Movement EB EB EB EB EB WB WB WB NB NB NB SB
Directions Served L T T T R L T TR L L T L
Maximum Queue (ft) 113 460 340 241 68 164 380 322 247 200 168 73
Average Queue (ft) 38 311 237 130 18 108 248 184 210 164 70 36
95th Queue (ft) 119 524 398 298 89 198 450 360 284 239 205 81
Link Distance (ft) 978 978 1039 1039 200 200 200 106
U p s t r e a m B l k T i m e ( % ) 1 8401
Queuing Penalty (veh) 24500
Storage Bay Dist (ft) 100 150 150 100
Storage Blk Time (%) 30 15 2 15 20
Queuing Penalty (veh) 11 139 10 83 27
Intersection: 3: Imperial Blvd & W Main St
Movement SB
Directions Served TR
Maximum Queue (ft) 84
Average Queue (ft) 49
95th Queue (ft) 99
Link Distance (ft) 106
Upstream Blk Time (%) 2
Queuing Penalty (veh) 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: Imperial Blvd & RockLand Rd
Movement EB EB WB NB NB NB SB SB
Directions Served LT R LTR L T R LT R
Maximum Queue (ft) 89 124 11 117 193 39 104 52
Average Queue (ft) 44 81 3 48 97 11 50 17
95th Queue (ft) 134 162 18 150 271 81 118 72
Link Distance (ft) 163 71 374 374 200 200
Upstream Blk Time (%) 2 4 1 0 0
Queuing Penalty (veh) 0 0 0 0 0
Storage Bay Dist (ft) 100 125
Storage Blk Time (%) 0 13 0 13
Queuing Penalty (veh) 2 11 2 24
Network Summary
Network wide Queuing Penalty: 339
81
Queuing and Blocking Report
Horizon Year 2046-Roundabout Alternative 02/27/2026
RNBTHY46AM SimTraffic Report
NSI Page 1
Intersection: 3: Imperial Blvd & W Main St
Movement EB EB EB EB EB WB WB WB NB NB NB SB
Directions Served L T T T R L T TR L L T L
Maximum Queue (ft) 103 335 282 98 62 156 397 321 232 195 101 30
Average Queue (ft) 30 249 187 35 23 88 272 199 184 154 37 14
95th Queue (ft) 114 383 324 120 79 168 449 351 263 227 115 38
Link Distance (ft) 978 978 1039 1039 200 200 200 106
Upstream Blk Time (%) 6 1 0
Queuing Penalty (veh) 9 1 0
Storage Bay Dist (ft) 100 150 150 100
Storage Blk Time (%) 30 4 0 3 24
Queuing Penalty (veh) 6 28 0 21 36
Intersection: 3: Imperial Blvd & W Main St
Movement SB
Directions Served TR
Maximum Queue (ft) 73
Average Queue (ft) 40
95th Queue (ft) 83
Link Distance (ft) 106
Upstream Blk Time (%) 1
Queuing Penalty (veh) 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: Imperial Blvd & RockLand Rd
Movement EB EB WB NB NB NB SB SB
Directions Served LT R LTR L T R LT R
Maximum Queue (ft) 37 38 19 64 92 15 109 44
Average Queue (ft) 18 24 7 25 50 3 56 21
95th Queue (ft) 47 50 26 72 109 23 125 55
Link Distance (ft) 163 71 374 374 200 200
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 100 125
Storage Blk Time (%) 1
Queuing Penalty (veh) 1
Network Summary
Network wide Queuing Penalty: 103
82
Queuing and Blocking Report
Horizon Year 2046-Roundabout Alternative 02/27/2026
RNBTHY46MD SimTraffic Report
NSI Page 1
Intersection: 3: Imperial Blvd & W Main St
Movement EB EB EB EB EB WB WB WB NB NB NB NB
Directions Served L T T T R L T TR L L T R
Maximum Queue (ft) 115 479 389 232 56 170 433 358 218 182 90 27
Average Queue (ft) 51 378 285 137 18 135 322 253 170 139 42 5
95th Queue (ft) 132 537 444 276 71 202 530 414 255 215 116 50
Link Distance (ft) 978 978 1039 1039 200 200 200 200
Upstream Blk Time (%) 4 1 0
Queuing Penalty (veh) 5 1 0
Storage Bay Dist (ft) 100 150 150 100
Storage Blk Time (%) 1 36 16 3 30 24
Queuing Penalty (veh) 5 22 126 12 196 42
Intersection: 3: Imperial Blvd & W Main St
Movement SB SB
Directions Served L TR
Maximum Queue (ft) 62 87
Average Queue (ft) 30 56
95th Queue (ft) 71 113
Link Distance (ft) 106 106
Upstream Blk Time (%) 0 5
Queuing Penalty (veh) 0 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: Imperial Blvd & RockLand Rd
Movement EB EB WB NB NB NB SB SB
Directions Served LT R LTR L T R LT R
Maximum Queue (ft) 35 42 11 40 65 26 90 41
Average Queue (ft) 20 24 2 17 37 6 38 17
95th Queue (ft) 46 51 14 47 77 31 98 52
Link Distance (ft) 163 71 374 374 200 200
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 100 125
Storage Blk Time (%) 0
Queuing Penalty (veh) 0
Network Summary
Network wide Queuing Penalty: 410
83
Queuing and Blocking Report
Horizon Year 2046-Roundabout Alternative 02/27/2026
RNBTHY46PM SimTraffic Report
NSI Page 1
Intersection: 3: Imperial Blvd & W Main St
Movement EB EB EB EB EB WB WB WB NB NB NB SB
Directions Served L T T T R L T TR L L T L
Maximum Queue (ft) 86 650 556 299 118 166 474 383 254 200 156 78
Average Queue (ft) 37 468 325 185 60 143 315 245 232 181 58 40
95th Queue (ft) 111 758 622 388 193 206 579 474 283 230 184 92
Link Distance (ft) 978 978 1039 1039 200 200 200 106
U p s t r e a m B l k T i m e ( % ) 2 7801
Queuing Penalty (veh) 41 11 0 0
Storage Bay Dist (ft) 100 150 150 100
Storage Blk Time (%) 0 33 22 7 0 48 21
Queuing Penalty (veh) 0 14 225 41 1 309 33
Intersection: 3: Imperial Blvd & W Main St
Movement SB
Directions Served TR
Maximum Queue (ft) 83
Average Queue (ft) 48
95th Queue (ft) 96
Link Distance (ft) 106
Upstream Blk Time (%) 2
Queuing Penalty (veh) 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: Imperial Blvd & RockLand Rd
Movement EB EB WB NB NB NB SB SB
Directions Served LT R LTR LT R LT R
Maximum Queue (ft) 157 155 22 348 249 9 162 120
Average Queue (ft) 69 103 8 252 116 3 96 48
95th Queue (ft) 183 176 30 481 389 16 192 176
Link Distance (ft) 163 73 368 368 368 200 200
Upstream Blk Time (%) 6 4 25 14 0 3
Queuing Penalty (veh) 0 0 0 0 2 10
Storage Bay Dist (ft) 100
Storage Blk Time (%) 0 18
Queuing Penalty (veh) 1 19
Network Summary
Network wide Queuing Penalty: 707
84
85
w
w w w w w
M
w
M
w w w w
w w w
w
M
w w w
w
M
w w w
w
M
w w w w w
w
M
w w w
w
M
w w w w
w w w w w
M
w
M
w w w w
w w w
w
M
w w w
w
M
w w w w
w w w w w w w w
w
M
w w w
w
M
w w
WM
~w ~w w~
WW
M<.J
"' w w ..
""' ;:: z
>-<!>
1,L
~
-NEEL-SCHAFFER
i ; ~.~~~~!~er.co m I ~0u1!:s:!\~u;;1:5
DRAWING INFORMATION
NOTICE TO DRAWING HOLDER CONTRACT NO.:
NEEL-SCHAFFE<INC.,HEREINAmRREFERRECTOASTI<E f-''=·' cc·'- '='ROJ=."'"0=-·'+------1 Imperial Boulevard at Rockland Road
ENGINEER HAS PREPAAEDANO FURNISHED THIS DRAWING TO THE f-=SUc'RVEYE"i"~DBccY~, +--=DA~TE~,~3/2~5/202=o-,
:;:~~~~~:~1=!CTTHC:-~~~rC:~:~~~R ~~tRWN~"=:: t=::::::=t ::°';.,"c:':::"':::5/202::::::'~ Traffic Operations Assessment
PROJECT. THIS DRAWING IS FOR CONCEPTUAL PURPOSES ONLY. r--CHKD: DATE:
'"'"'" ' ' BJ,crrocHANGE. QA/Q~CAI.' :: Roundabout Concept Sketch
NOTFOR
CONSTRUCTION
SEAL:
REVISIONS
CITY OF
HENDERSONVILLE
SHEETNAME:
CONCEPTUAL
ROUNDABOUT
SKETCH 1
Source: City of Hendersonville website. First collected Oct 7, 2026.