CITY OF HENDERSONVILLE
CAPITAL PROJECTS COMMITTEE
May 18, 2026, at 4:30 p.m., Main Meeting Room
101 Maple Drive North, Hendersonville, TN 37075
Anyone needing accommodations due to disabilities, please contact the ADA Coordinator at 615- 822-1016 at least
24 hours prior to the meeting.
I. Ca
ll to Order by the Chairman
II. Accep
tance of agenda
III. Mi
nutes
A. A
pproval of the January 21, 2026, Meeting Minutes
IV. C
itizen Comments
V. Ac
tion Items
A. St
aff recommendation for TIP submission to GNRC
VI. D
iscussion Items
A. Sa
undersville (LIC) Exit 8
B. Drakes Creek/Stop 30 - R/W, Permitting, and Traffic Handling Plan Update
C. Transportation Capital Improvement Plan Project Statuses
i. West Main Access Management
ii. Median – Pilot Project
iii. Drake Creek/Anderson (Durham Farms Roundabout)
iv. Indian Lake School Zone Project
v. New Shackle Island Corridor
vi. Stop 30 Widening
vii. Saundersville Road
1. Dayflower Drive Right Turn Lane
2. Innsbrook Ave. and Saundersville Intersection
viii. Drakes Creek Park Egress at Indian Lake Boulevard
ix. Rockland Road and Imperial Blvd. Roundabout
D. LED Conversion Update
E. Cherokee Culvert Replacement
F. Signal Synchronization Phase II
G. West Main ADA
H. Old Drakes Creek/New Shackle Island Intersection Project – Verbal update
I. Other Business
VI
I. Adjournment
2-5
1
Pages
6
1
CAPTIAL PROJECTS COMMITTEE MEETING, January 21, 2026
MAIN MEETING ROOM, 5:00 pm
Pre
sent: Chairman Eddie Roberson, Vice-Chairman Bob Garza, Alderman Terri Goodwin
Ab
sent: Alderman Mark Skidmore, Alderman Jeffrey Sasse
Ot
hers Present: Alderman Rachel Collins, Alderman Mark Evans, Alderman Mark Burdorf, Chief of
Operations (COO) Jessie Eckenroth, Interim Public Works Director Stephen Winzenread , Planning
Director Keith Free, Assistant Planning Director Timothy Whitten, RK&K Representative Stuart
Samberg
Ca
ll to order at 5:00 pm
Ac
ceptance of the Agenda
Moti
on: Alderman Terri Goodwin
Second: Alderman Bob Garza
Vote: Approved Unanimously
Min
utes
A. Moti
on to Approve August 11, 2025, Capital Project Committee meeting minutes
Moti
on: Alderman Terri Goodwin
Second: Alderman Bob Garza
Vote: Approved unanimously
Ci
tizens Comments
None
GN
RC Update – Submitted Project, Status and Funding
In
terim Public Works Director Stephen Winzenread reported that all projects listed on the 2025
Transportation Capital Improvement Plan have been submitted to GNRC for consideration. They
are expecting a draft of the regional transportation plan to be released in March. Mr. Winzenread
also reported there has been a recent update to the estimate on the Drakes Creek/Stop 30 project.
As a result, an amendment for funding on this project will be submitted.
2
Action Items
1. D
rakes Creek Traffic Study – Summary of study from RK&K with Q&A
In
terim Public Works Director Stephen Winzenred reported that RK&K was asked to prepare
a study on the project. RK&K Representative Stuart Samberg was present to present the
study findings. Mr. Samberg went over three alternative options they considered:
• Al
ternative #1 – Coordinated Signals
• Alternative #2 – Anderson Road/Herman Harrison Drive roundabout
• Alternative #3 – Avant Lane/Countryside Drive/Anderson Road roundabout
RK&
K recommended Alternative #3 as the preferred option. RK&K answered additional
question regarding the alternatives. Interim Public Works Director Stephen Winzenread
asked the committee guidance on moving forward with design. Alderman Roberson
proposed a Resolution of Intent to proceed be added as an action item for the next meeting
with the desire that all committee members be present for further discussion.
2. S
top 30 Project - Discussion/decision for the next steps
Int
erim Public Works Director Stephen Winzenread reported that recent work on Stop 30
included replacing several culverts, repaving, striping, and replacing several road signs.
Three design options for Stop 30 were presented which included:
a. P
reliminary Concept – Concept has been develop and could be used as a guide for
future developments.
• No additional cost
b. Basic Road Design Services (10% Line a Grade Design)
• Estimate design and service cost $128,211
• Could be used as basis of design for future developments along corridor
c. Full Design – Bid Ready Documents
• Estimated design cost $715,800
• Estimated construction cost $19.9 million
Int
erim Public Works Director Stephen Winzenread asked for the committee’s approval to
move forward with one of the options. After further discussion Alderman Roberson moved
for a motion to procced forward with the Basic Road Design Services option.
Moti
on: Alderman Bob Garza
Second: Alderman Terri Goodwin
Vote: Approved unanimously
3
Discussion Items
3. Transportation Capital Improvement Plan Status Update
Status provided on the 36 projects on the City’s Transportation Capital Improvement Plan.
4. West Main Access Management Plan
Discussion of the concept of the project, which includes installation of landscaped center
medians to reduce the number of conflict points in the road.
5. Landscaping and Signage (Planning)
Project concept discussed which includes a project to install a section of landscaped
median on Main Street between New Shackle Island Road and Imperial Boulevard. There
are also plans to install a gateway sign near the west City Limit along Main Street. Median
concept and sign concept were presented. A motion to proceed with both the median and
sign project was made by Alderman Bob Garza.
Motion: Bob Garza
Second: Terri Goodwin
Vote: Approved unanimously
6. LED Conversion Update
A contract is in place and the contractor is anticipated to soon begin work. Project is
expected to be complete by September 2026.
7. Drakes Creek/Stop 30 Intersection
Construction cost estimate of $9.2 million has been revised to $10.8 million.
Communication with GNRC to address the funding difference has already begun with
expectation of an amendment.
8. Cherokee Culvert Replacement
Project will account for proposed widening that is part of Project #13 (Cherokee Road
School Zone) on the Transportation Capital Improvement Plan. Current status is in right-of-
way (Property Acquisition) with an estimated completion in 2028.
4
9. Saundersville (LIC) Exit 8
Pro
ject is in the right-of-way phase with design completion and bid letting date in 2030.
10
. Signal Synchronization Phase II
TD
OT issued a notice to proceed to construction on 12/23/25. The consultant is currently
updating construction documents and plans while also preparing the bid documentation.
Estimated completion date is for the 3rd quarter of 2026.
11
. West Main ADA
Proj
ect received notice to proceed to right of way, and is now the in Right-of-Way
Acquisition phase with an estimated completion in 2028.
12
. Imperial/Rockland Traffic Study
Tr
affic data collection, intersection analysis, and land survey has begun on the project.
13
. Saundersville Road at Dayflower
Pro
ject is the design phase.
14
. Innsbrooke and Saundersville Rd Section Improvements
The
Project is in the traffic analysis and design phases.
15
. Other Business
None
Ad
journment
Moti
on to Adjourn
Motion: Alderman Terri Goodwin
Second: Alderman Bob Garza
Vote: Approved Unanimously
Adjourned: 6:27 pm
___
_______________________________________
Eddie Roberson, Chairman
5
RTP Name
RTP
Project
Length
RTP Estimate Proposed TIP Project
Name TIP Termini (Location)
TIP
Project
Length
TIP Project Description Total Est. Local Match
(20%) Federal (80%)
City
Plan
Rank
City Capital Transportation
Plan Name
LAND USE AND TRANSPORTATION PLAN
Roadway Recommendations Name
(Major Thoroughfare Plan)
Main Street
Reconstruction
(Rockland to
Walton Ferry)
3.85
miles $ 112,261,726.00
Main Street
Reconstruction -
Phase 1
Imperial Boulevard to
Walton Ferry Road
1.0
mile
Main street reconstruction with
implementation of access
management strategies including
lanscaped medians, sidewalks, and
underground utilities
$ 29,849,186.00 $ 5,969,837.20 $ 23,879,348.80 2 West Main Access Management Main Street (Mansker Creek - 386)
Drakes Creek Road
Widening (Stop 30
to Hwy 386)
0.26
mile $ 2,574,000.00 Drakes Creek Road
Widening
Near the junction of
Highway 386 north to
approximately the
intersection of
Arrowhead Drive
0.5
mile
Widen Drakes Creek Road from SR
386/Vietnam Veterans Blvd from 2
lanes to 5 lanes. Signalization and
intersection improvments at Stop
30 Road. The project also involved
raising the intersection above the
flood elevation and replacing a
condemned bridge.
$ 12,273,267.00 $ 2,454,653.40 $ 9,818,613.60 4 Stop 30/Drakes Creek
Improvements (Phase 1)
Drakes Creek Road (SR 386 to Anderson
Road)
Indian Lake Road
School Zone
Improvements
(Main Street to
Crosby/Pin Oak
Drive)
0.59
mile $ 12,368,000.00
Indian Lake Road
School Zone
Improvements
Intersection of Crosby
Dr./Pin Oak Dr. to
Main Street/Gallatin
Road
0.6
mile
Widen Indian Lake Road to include
turn lanes, sidewalks, and other
school zone improvments
$ 13,344,113.00 $ 2,668,822.60 $ 10,675,290.40 5 Indian Lake Road School Zone
Improvements
Indian Lake Road (Main Street to Sequoyah
Drive, Sequoyah Drive to Maple Drive)
14 Dayflower Dr Improvements
16 Innsbrooke & Saundersville
Intersection Improvements
Sanders Ferry Rd.
Widening
0.52
mile $ 16,456,740.00 Sanders Ferry Road
Widening
W. Main St
Intersection to near
Imperial Blvd.
0.52
mile
Construct an additional left turn
lane on Main Street Westbound
approach to Sanders Ferry and
Widen Sanders Ferry to include a
second southbound lane.
$ 10,300,000.00 $ 2,060,000.00 $ 8,240,000.00 17
Sanders Ferry Road
Improvements (Phase 1) (Main
Street to north of Imperial)
Sanders Ferry Road (Main Street to Imperial
Blvd)
Rockland Rd. and
Imperial Blvd.
Intersection
Improvement
$ 5,023,500.00
Rockland Rd. and
Imperial Blvd.
Intersection
Improvement
Near the intersection
of Roackland Road and
Imperial Boulevard
0.15
mile
Construct a roundabout at the
Rockland Rd. and Imperial Blvd.
intersection.
$ 4,097,885.00 $ 819,577.00 $ 3,278,308.00 25 Rockland & Imperial
Improvements
Sanders Ferry Road
Reconstruction
(Imperial to Hickory
Heights)
0.38
mile $ 28,687,000.00
Sanders Ferry Road
Reconstruction -
Phase 1
Imperial Boulevard to
Spade Leaf Boulevard
0.15
mile
Construct intersection at Imperial
Blvd and Sanders Ferry, and widen
Sanders Ferry Road.
$ 9,100,000.00 $ 1,820,000.00 $ 7,280,000.00 32
Sanders Ferry Rd Improvements
(Phase 2) (Imperial to Hickory
Heights)
Center Point Rd.
Widening
1.83
mile $ 30,267,000.00 Center Point Rd.
Widening - Phase 1
Near Mansker Farms
Blvd. to near Hunts
Lane
1
mile
Roadway widening and curve
corrections between Mansker
Farms Blvd and Hunts Lane
$ 2,450,000.00 $ 490,000.00 $ 1,960,000.00 34 Center Point Improvements Center Point Road (Main St to Goshentown
Rd)
$272,008,566.00 TOTAL $ 86,735,066.00 $ 17,347,013.20 $ 69,388,052.80 TOTAL
$ 64,370,600.00 Saundersville Rd.
Widening - Phase 1
Near the Myrtlewood
Lane/Innsbrooke Ave
intersection to near
0.3
mile
Saundersville Rd.
Widening
2.35
miles
CITY PLANNING DOCUMENTSREGIONAL TRANSPORTATION PLAN (RTP) PROPOSED TRANSPORTATION IMPROVEMENT PLAN (TIP) PROJECTS
Construct a roundabout at the
Myrtlewood Lane/Innsbrooke
Ave/Saundersville Intersection and
$ 5,320,615.00 $ 1,064,123.00 $ 4,256,492.00 Saundersville Road (SR 386 to Lower Station
Camp Creek Rd)
6