Hendersonville Planning Commission Agenda (PDF)

City of Hendersonville · Sumner County · meeting of May 5, 2026 · Agendas

Open the original document More from City of Hendersonville

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

HPC Agenda 05/05/2026 1 HENDERSONVILLE PLANNING COMMISSION AGENDA Main Meeting Room Tuesday, May 5th 2026 6:30 PM 1. OPENING PRAYER 2. ROLL CALL 3. PUBLIC COMMENT (AGENDA ITEMS ONLY) 4. ACCEPTANCE OF AGENDA 5. MINUTES: Minutes of April 7th, 2026 6. CONSENT AGENDA PRELIMINARY PLATS: SUB-007238-2026: Forest Park Phase 2a/3a – Preliminary Plat Owner: Jen TN 2 LLC (Beazer Homes LLC) Location: 1685 Sandersville Rd, Parcel 137 038.00 Lead Planning Staff: Zachary Coleman SUB-007237-2026: Forest Park Phase 7 – Preliminary Plat Owner: Jen TN 2 LLC (Beazer Homes LLC) Location: 1685 Sandersville Rd, Parcel 137 038.00 Lead Planning Staff: Zachary Coleman HPC Agenda 05/05/2026 2 FINAL PLAT: SUB-007236-2026: Forest Park Phase 1 Section 2 – Final Plat Owner: Jen TN 2 LLC (Beazer Homes LLC) Location: 1685 Sandersville Rd, Parcel 137 038.00 Lead Planning Staff: Caitlin Shinn SUB-007235-2026: Forest Park Phase 1 Section 3 – Final Plat Owner: Jen TN 2 LLC (Beazer Homes LLC) Location: 1685 Sandersville Rd, Parcel 137 038.00 Lead Planning Staff: Caitlin Shinn SUB-007234-2026: Lincoln Rockland – Final Plat Owner: Lincoln Property Company Location: Parcel 160 066.01 Lead Planning Staff: Timothy Whitten/Caitlin Shinn SUB-007231-2026: Imperial Square Sec 1 Lot 4 & Sec 4 Lot 3 (WaWa) – Final Plat Owner: CSC Hendersonville LLC Location: 451 W Main St, Parcel 163C F 001.00 Lead Planning Staff: Timothy Whitten/Caitlin Shinn SITE PLAN SP-007057-2025: 134 Shivel Dr – Site Plan Owner: Rob Cushman Location: 134 Shivel Dr, Parcel 163D B 003.00 Lead Planning Staff: Timothy Whitten/Caitlin Shinn SP-007228-2026: Lincoln Rockland – Site Plan Owner: Lincoln Property Company Location: Parcel 160 066.01 Lead Planning Staff: Timothy Whitten/Caitlin Shinn SP-007239-2026: N&N Moving Supplies – Site Plan Owner: PBM3 LLC Location: 216 Innovation Way, Parcel 160M A 005.01 Lead Planning Staff: Timothy Whitten/Caitlin Shinn HPC Agenda 05/05/2026 3 SP-007269-2026: Rugby Fields Pavillion Extension – Site Plan Owner: City of Hendersonville Location: 451 W Main St, Parcel 163C F 001.00 Lead Planning Staff: Timothy Whitten/Caitlin Shinn SP-007229-2026: WaWa – Site Plan Owner: CSC Hendersonville LLC Location: 451 W Main St, Parcel 163C F 001.00 Lead Planning Staff: Timothy Whitten/Caitlin Shinn 7. STAFF-LEVEL PROJECTS, APPROVED: SUB-007110-2026: Hendersonville Business Park Lot 3 – Final Plat (100 New Shackle Island Rd) SP-007030-2025: Stonecrest Ph 5 Sec 2 & 3 Elevation Amendment – Site Plan (1351 Saundersville Road) SUB-007050-2025: W.A. Shivel Addition Lot 1, 2, & 3 – Final Plat (134 Shivel Dr) SP-007150-2026: West Main Exxon Beverage Cooler Addition – Site Plan (1082 West Main Street) 8. STAFF-LEVEL PROJECTS, PENDING: SUB-006988-2025: C L Powell Addition Lot 17 & 18 Resub – Final Plat (134 Powell Dr) S - 3/30/26 Lead Planning Staff: Caitlin Shinn SUB-007230-2026: TBN (Millenia Cottages) – Final Plat (645 E Main St) S – 5/30/26 Lead Planning Staff: Timothy Whitten HPC Agenda 05/05/2026 4 9. PLANNING DIRECTOR COMMENTS: 13. ADJOURNMENT 1 The applicant, CSDG, on behalf of the owner and developer has submitted a Preliminary Plat for Forest Park Phases 2A/3B. This Phase includes 44 attached single-family lots (2-unit villa, Type G lots), 47 townhome lots (3- and 4-unit cottages, Type H lots) 4 open space tracts and public right of way that are part of the approved amended Final Development Plan for Forest Park. AGENDA DATE: May 5th, 2026 HPC PROJECT #: SUB-007238-2026 PROJECT NAME: Forest Park Phase 2A/3B – Preliminary Plat PROJECT TYPE: Preliminary Plat PROJECT LOCATION: 1685 Sandersville Rd, Parcel 137 038.00 WARD: Ward 5 STAFF REPORT: 1 FINAL STAFF REPORT & COMMENTS 2 The overall development includes 612 housing units (156 attached 2 unit villas and 3, 4, and 5 unit cottages, 456 single-family units) across 269.7 acres and 9 Phases. The site is zoned SR-1 PD. Proposed Lot Layout Phases 2A/3B of Forest Park contain forty-four (44) 2-unit villa Type “G” lots and forty-seven (47) 3- and 4-unit cottage Type H lots (91 total units) across 17.17 acres. The lots range in size from 0.09-0.19 acres (3,900-7,978 sq. ft.) in these Phases. 3 Proposed Lot Types The typical lot layouts for each lot type are shown below, along with examples of potential elevations of the homes from the approved PDP. 4 STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. All comments were addressed in resubmittal. Submitted by Zachary Coleman, Senior Planner (April 29th, 2026) STAFF COMMENTS – PUBLIC WORKS: 3 1. See Markups. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (April 29th, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (April 29th, 2026) 5 STAFF COMMENTS – UTILITY DISTRICT: 5 1. No Comments. Submitted by David Brigance, HUD Construction Supervisor (April 29th, 2026) 1 The applicant, CSDG, on behalf of the owner and developer has submitted a Preliminary Plat for Forest Park Phase 7. This Phase includes 46 single family detached lots, 1 open space tract and public right of way that are part of the approved amended Final Development Plan for Forest Park. AGENDA DATE: May 5th, 2026 HPC PROJECT #: SUB-007237-2026 PROJECT NAME: Forest Park Phase 7 – Preliminary Plat PROJECT TYPE: Preliminary Plat PROJECT LOCATION: 1685 Sandersville Rd, Parcel 137 038.00 WARD: Ward 5 STAFF REPORT: 1 FINAL STAFF REPORT & COMMENTS 2 The overall development includes 612 housing units (156 attached 2 unit villas and 3, 4, and 5 unit cottages, 456 single-family units) across 269.7 acres and 9 Phases. The site is zoned SR-1 PD. Proposed Lot Layout Preliminary plats have been previously provided and reviewed for Phases 1, 3, 4, 5, and 6. Together with Phase 2, this accounts for 349 single family units and 63 attached villas/cottages across 219.4 acres. Remaining Phases (7, 8, and 9) will be comprised of 103 single family units and 93 attached villas/cottages across 50.3 acres. 3 Proposed Lot Types Phase 7 of Forest Park contains nine (9) Type “D” lots and thirty seven (37) Type “E” lots across 11.75 acres. Typical lot sizes range from 0.17 - 0.27 acres (7,500 – 11,723 sq. ft.) The typical lot layouts are to the right and below, along with examples of potential elevations of the homes from the approved PDP. 4 5 STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. All comments were addressed in resubmittal. Submitted by Zachary Coleman, Senior Planner (April 29th, 2026) STAFF COMMENTS – PUBLIC WORKS: 3 1. See Markups. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (April 29th, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (April 29th, 2026) STAFF COMMENTS – UTILITY DISTRICT: 5 1. No Comments. Submitted by David Brigance, HUD Construction Supervisor (April 29th, 2026) 1 The applicant, Beazer Homes, is requesting Final Plat approval for Forest Park Phase 1 Section 2, located at 1685 Saundersville Road. The proposed subdivision includes 14 single-family lots and two open space areas. The property is zoned Suburban Residential, Low Density (SR-1-PD) Planned Development, with lot sizes ranging from 10,482 square feet to 11,203 square feet. The Forest Park PDP was approved in 2018, followed by FDP approval in 2021. The Phase 1 Preliminary Plat was approved in 2022, with a revision approved in 2023. Construction plans were approved in 2024. The submitted Final Plat is in compliance with the approved Phase 1 Preliminary Plat and Construction Plans. AGENDA DATE: May 5th, 2026 HPC PROJECT #: SUB-007236-2026 PROJECT NAME: Forest Park Phase 1 Section 2 PROJECT TYPE: Final Plat PROJECT LOCATION: 1685 Sandersville Rd, Parcel 137 038.00 WARD: Ward 5 STAFF REPORT: 1 FINAL STAFF REPORT & COMMENTS 2 With the approval of the PDP in 2018, the Forest Park developers were required to construct a trailhead and dedicate approximately 36 acres as potential passive parkland. The trailhead is to be constructed at the developer’s expense prior to full build-out of the subdivision and dedicated to the City upon completion. 3 STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. Correct corner lot typical to match Preliminary Plat. 2. Add note: The proposed fence along Norman Way is considered a community amenity and shall not be removed unless special approval is granted by the Planning Commission. 3. Phase 1 Construction Plans need to be updated and resubmitted to show all retaining walls and labeling each retaining wall. 4. List parcel data as square feet instead of acres. 4 5. Provide parking dimension information for mailbox kiosk. 6. Add note: Prior to full build-out of the subdivision, the developer is responsible for constructing the trailhead and dedicating it to the City of Hendersonville in Phase 1 and Phase 2. 7. Provide documentation clearly identifying the land to be dedicated to the City as parkland, including the total acreage, and showing the proposed location of the trailhead. 8. Clearly indicate the location of the future trailhead and future amenity center. 9. Provide an overview on the plat clearly depicting the entire parkland, similar to a vicinity map. Submitted by Caitlin Shinn, Planner (April 29th, 2026) STAFF COMMENTS – PUBLIC WORKS: 3 1. Please note this plat will not be approved by Public Works until revisions to the hydraulic calculations for the field changes to the stormwater infrastructure are reviewed and approved by Public Works. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (April 29th, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (April 29th, 2026) STAFF COMMENTS – UTILITY DISTRICT: 5 1. No Comments. Submitted by David Brigance, HUD Construction Supervisor (April 29th, 2026) 1 The applicant, Beazer Homes, is requesting Final Plat approval for Forest Park Phase 1 Section 3, located at 1685 Saundersville Road. The proposed subdivision includes 77 single-family lots and three open space areas. The property is zoned Suburban Residential, Low Density (SR-1-PD) Planned Development, with lot sizes ranging from 3,900 square feet to 12,686 square feet. AGENDA DATE: May 5th, 2026 HPC PROJECT #: SUB-007235-2026 PROJECT NAME: Forest Park Phase 1 Section 3 PROJECT TYPE: Final Plat PROJECT LOCATION: 1685 Sandersville Rd, Parcel 137 038.00 WARD: Ward 5 STAFF REPORT: 1 FINAL STAFF REPORT & COMMENTS 2 The Forest Park PDP was approved in 2018, followed by FDP approval in 2021. The Phase 1 Preliminary Plat was approved in 2022, with a revision approved in 2023. Construction plans were approved in 2024. The submitted Final Plat is in compliance with the approved Phase 1 Preliminary Plat and Construction Plans. 3 STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. Provide parking dimension information for mailbox kiosk. 2. Correct lot typical to match Phase 1 Preliminary Plat. 4 3. Adjust sidewalk for lane and place from 6’ to 5.5’. 4. Add email and phone information for owner of property. 5. List parcel data as square feet instead of acres. 6. Shift the driveways on Lots 173 and 188 away from the intersection. Submitted by Caitlin Shinn, Planner (April 29th, 2026) STAFF COMMENTS – PUBLIC WORKS: 3 1. Please note this plat will not be approved by Public Works until revisions to the hydraulic calculations for the field changes to the stormwater infrastructure are reviewed and approved by Public Works. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (April 29th, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (April 29th, 2026) STAFF COMMENTS – UTILITY DISTRICT: 5 1. No Comments. Submitted by David Brigance, HUD Construction Supervisor (April 29th, 2026) 1 This is the final plat for the Lincoln Rockland development off of Rockland Road. The preliminary plat was approved by the Planning Commission in September of 2025. The plat establishes 2 lots and open space, as well as the right-of-way for the new road. AGENDA DATE: May 5th, 2026 HPC PROJECT #: SUB-007234-2026 PROJECT NAME: Lincoln Rockland – Final Plat PROJECT TYPE: Final Plat PROJECT LOCATION: Parcel 160 066.01 WARD: Ward 3 STAFF REPORT: 1 FINAL STAFF REPORT & COMMENTS 2 STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. Per Mayor Clary’s recommendation, show the new road name as “Steinhauer.” (John and Jane Steinhauer were instrumental in Hendersonville from 1960-1990. They owned several businesses, were very involved in St. Timothy Lutheran Church, IDB, Chamber of Commerce, Planning Commission, community events, state government, and city government.) 2. Add note“ Maintenance of the landscaping within the two center medians, including grass and trees, as well as the street trees along both sides of the new road, shall be the responsibility of the POA.” 3. Provide a copy of the covenants & restrictions establishing the property owners association. Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (April 29th, 2026) STAFF COMMENTS – PUBLIC WORKS: 3 1. Please add the following plat note: The developer is responsible for the construction of the new public roadway. A surety shall be provided to the City of Hendersonville Planning Department for the construction of the new public roadway and for the required improvements to Rockland Road prior to the recording of this plat. The surety amount will be determined by the City Engineer.. 3 Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (April 29th, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (April 29th, 2026) STAFF COMMENTS – UTILITY DISTRICT: 5 1. No Comments. Submitted by David Brigance, HUD Construction Supervisor (April 29th, 2026) 1 This is a final plat to consolidate the Bank of America and Krystal lots on West Main into one lot for the new Wawa fuel station. AGENDA DATE: May 5th, 2026 HPC PROJECT #: SUB-007231-2026 PROJECT NAME: Imperial Square Sec 1 Lot 4 & Sec 4 Lot 3 (WaWa) – Final Plat PROJECT TYPE: Final Plat PROJECT LOCATION: 451 W Main St, Parcel 163C F 001.00 WARD: Ward 2 STAFF REPORT: 1 FINAL STAFF REPORT & COMMENTS 2 These two lots used to be in the old Imperial Square planned development (which was converted in 2009 to a straight General Commercial (GC) zoning), and have a 75 foot minimum front building setback from West Main St. This plat will remove the 75’ setback and impose a new 30 foot minimum front setback consistent with the current GC zoning. The actual setback of the building and canopy from the front property line will be 82 feet and 60 feet respectively. STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. No Comment. Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (April 29th, 2026) STAFF COMMENTS – PUBLIC WORKS: 3 1. Please provide the following plat note: Conversion of the Public Use Easement (PUE) to Public Right of Way (ROW) will occur at the City's discretion, and without compensation. The city will incur any expenses involved in related instrument preparation and recording. The owner/developer of consolidated Section 1, Lot 1 & Section 4, Lot 3 will not be compensated for removal of any improvement constructed or placed within the Public Use easement, including but not limited to, driveways, sidewalks, street lighting, site lighting, irrigation, landscaping, and signs, as a result of city's conversation of PUE to ROW and subsequent construction of roadway improvements at the Imperial Boulevard and Rockland Road intersection. 2. Please revise the limits of the right of way to be dedicated based on the DWG provided to the WaWa site engineer. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (April 29th, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (April 29th, 2026) 3 STAFF COMMENTS – UTILITY DISTRICT: 5 1. No Comments. Submitted by David Brigance, HUD Construction Supervisor (April 29th, 2026) 1 This site consists of two lots on Shivel Drive. They are located adjacent to 136/138 Shivel, which just completed construction. They are zoned Dockside Neighborhood (DN). For the purposes of this project, the lots are being consolidated into one lot totaling 0.96 acres. AGENDA DATE: May 5th, 2026 HPC PROJECT #: SP-007057-2025 PROJECT NAME: 134 Shivel Dr – Site Plan PROJECT TYPE: Site Plan PROJECT LOCATION: 134 Shivel Dr, Parcel 163D B 003.00 WARD: Ward 2 STAFF REPORT: 1 FINAL STAFF REPORT & COMMENTS 2 The proposed use is a multi-tenant building totaling 14,287 square feet. 38 parking spaces are required and 43 are being provided. The proposed building will be all-brick faced with a standing seam metal roof. STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. Add note to dumpster detail: “Top of dumpster enclosure and gate shall be minimum of 2’ above top of dumpster.” 2. Provide screening of transformer and FDC from street. 3. Provide NES-approved electrical service plan. 4. Light pole height shall not exceed 22’. 5. Parking lot perimeter shrubs should wrap the south-east corner of the parking lot and extend west down the curb line to where the face of the adjacent building starts. 6. On front elevation consider adding a decorative round louvered vent at apex of gable. 7. Pilasters on north elevation should project from wall. 8. On north elevation, move the meter cluster further away from street. 3 9. On north elevation, consider adding another window close to the front corner. Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (April 29th, 2026) STAFF COMMENTS – PUBLIC WORKS: 3 1. No Comments. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (April 29th, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (April 29th, 2026) STAFF COMMENTS – UTILITY DISTRICT: 5 1. Will owe tap and capacity fees to HUD. Submitted by David Brigance, HUD Construction Supervisor (April 29th, 2026) 1 The Comprehensive Development Plan (CDP) for Lincoln Rockland was approved by the HPC and BOMA last summer. The site plan is now presented to the Planning Commission. It is in substantial compliance with the approved CDP. AGENDA DATE: May 5th, 2026 HPC PROJECT #: SP-007228-2026 PROJECT NAME: Lincoln Rockland – Site Plan PROJECT TYPE: Site Plan PROJECT LOCATION: Parcel 160 066.01 WARD: Ward 3 STAFF REPORT: 1 FINAL STAFF REPORT & COMMENTS 2 The total site area is 26.0 acres. It is zoned Industrial – Planned Development (I-PD). Two buildings are proposed totaling 255,480 square feet. Each building will provide multiple tenants spaces for various industrial uses. The developer will construct the new three-lane street (two travel lanes and a center turn lane) coming off of Rockland Road along with a 10’ wide multi-use path, and will also be making improvements to Rockland Rd. EXTERIOR BUILDING ELEVATIONS ROCKLAND ROAD IMPROVEMENTS 3 NEW ROAD SECTION STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. CDP must be stamped approved prior to site plan being stamped approved. Submit corrected CDP. 2. Per Mayor Clary’s recommendation, show new road name as “Steinhauer.” 3. Show required parking calculations and what use(s) they are based on. 4. Dimension the 5’ grass strip (may be <5’ at stream crossing) and update street cross section on sheet C2-00. 5. To assist with identification for retaining wall building permits, label each retaining wall on the overall grading plan. 6. The retaining wall facing the street will need to be a decorative type block. Provide sample block for review and approval. 7. On sheet C4-10, where the property lines form a ~90 degree angle at the street, slope should not exceed 3:1. 8. Provide species ID/QTY tags on landscape plan. 9. Replacement trees must be shown in a separate plant schedule. Required parking lot trees and street trees do not count towards tree replacement. A maximum of 25% of replacement trees may be ornamental/understory type. 10. Provide landscape calculations showing number of trees required for street tree requirements, parking lot tree requirements, and pervious area. 11. Provide consistent species for street trees. 4 12. See previous markup about providing trees in open space at intersection of Rockland and new street. 13. Plant schedule: canopy tree height-to-caliper ratios should be per ANSI Z60.1 specs. 14. Add note to plans: Open space #3 may be used for future public access. 15. Approval of the site plan is subject to approval and recording of the final plat for Lincoln Rockland. 16. Surety for construction of the new road and Rockland Rd improvements shall be provided to the City (amount to be determined by Public Works Dept) prior to issuance of a building permit for the Lincoln Rockland site plan. Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (April 29th, 2026) STAFF COMMENTS – PUBLIC WORKS: 3 1. See Markups. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (April 29th, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. IFC 2021 503.2.4 – Turning Radius: Provide a truck turning template using the Hendersonville Fire Department template. Action: Provide a truck turning template using the Hendersonville Fire Department template. 2. Hendersonville Subdivision Regulations 3.7.2.1 – For commercial districts or commercial subdivisions, there shall be one (1) or more hydrants at each street intersection depending on the required fire flow, with intermediate hydrants so that they are not over three hundred (300) feet apart. Action: For commercial districts or commercial subdivisions, one (1) or more hydrants at each street intersection depending on the required fire flow, with intermediate hydrants so that they are not over three hundred (300) feet apart per Hendersonville Subdivision Regulations 3.7.2.1. 3. Building 1 will need to have a parking stall eliminated in front of the FDC for access. Stripe and mark no parking. Action: Building 1 will need to have a parking stall eliminated in front of the FDC for access. Stripe and mark no parking. Submitted by Chris Willyard, Deputy Fire Marshal (April 29th, 2026) 5 STAFF COMMENTS – UTILITY DISTRICT: 5 1. Will need HUD and TDEC approval for new water and sewer lines. Submitted by David Brigance, HUD Construction Supervisor (April 29th, 2026) 1 This lot is located on Innovation Way, across the street from Eliott Electric, which recently completed construction. The lot is 1.84 acres and is zoned Industrial (I). AGENDA DATE: May 5th, 2026 HPC PROJECT #: SP-007239-2026 PROJECT NAME: N&N Moving Supplies – Site Plan PROJECT TYPE: Site Plan PROJECT LOCATION: 216 Innovation Way, Parcel 160M A 005.01 WARD: Ward 6 STAFF REPORT: 1 FINAL STAFF REPORT & COMMENTS 2 N&N Moving Supplies is proposing to construct a 45,062 square foot one-story facility. The lot will have two access drives off of Innovation Way. The proposed materials on the front of the building will be brick with a split-face block watertable. The brick and split-face will wrap around the side is exposed to New Shackle. The remaining walls will be metal, which is allowed in Industrial zones. 3 4 STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. Provide NES-approved electric service plan. 2. Show underground electric service to building. 3. Approval is subject to recording of subdivision plat. 4. There is no available waiver/variance available to reduce parking. Revise the plan to provide the required number of parking spaces. 5. State the proposed height of the light poles. 6. Show outlines of HVAC units if located on roof. Units must be screened by building parapet wall. Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (April 29th, 2026) STAFF COMMENTS – PUBLIC WORKS: 3 1. See Markups. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (April 29th, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (April 29th, 2026) STAFF COMMENTS – UTILITY DISTRICT: 5 1. Will owe tap and capacity fees to HUD. Submitted by David Brigance, HUD Construction Supervisor (April 29th, 2026) 1 This is a proposed expansion of the rugby facility on Avant Lane. The expansion will add an open- sided, 1,203sf pavilion to the south-west end of the existing building. AGENDA DATE: May 5th, 2026 HPC PROJECT #: SP-007269-2026 PROJECT NAME: Rugby Fields Pavillion Extension – Site Plan PROJECT TYPE: Site Plan PROJECT LOCATION: 1693 Avant Ln, Parcel 138 035.00 WARD: Ward 6 STAFF REPORT: 1 FINAL STAFF REPORT & COMMENTS 2 OBLIQUE AERIAL SHOWING APPROXIMATE AREA OF PAVILION EXPANSION 3 STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. No Comments. Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (April 29th, 2026) STAFF COMMENTS – PUBLIC WORKS: 3 1. Please delineate the limits of the floodway and flood zone. A floodplain development permit is required, along with a no rise certification for the structure being constructed in the floodplain. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (April 29th, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (April 29th, 2026) 4 STAFF COMMENTS – UTILITY DISTRICT: 5 1. No Comments. Submitted by David Brigance, HUD Construction Supervisor (April 29th, 2026) 1 This project site consists of two lots totaling 1.77 acres. Taco Bell is to the east of the lots and the post office is to the south. The lots are zoned General Commercial. Bank of America and Krystal were the previous occupants. Wawa is proposing to consolidate the two lots into one and AGENDA DATE: May 5th, 2026 HPC PROJECT #: SP-007229-2026 PROJECT NAME: WaWa – Site Plan PROJECT TYPE: Site Plan PROJECT LOCATION: 451 W Main St, Parcel 163C F 001.00 WARD: Ward 2 STAFF REPORT: 1 FINAL STAFF REPORT & COMMENTS 2 construct a fuel service station. The c-store will be 6,374 square feet and have 8 fuel pump stations. 13 parking spaces are required and 45 are provided. EXISTING ZONING DISTRICTS 3 The site has been designed to incorporate the future Imperial Blvd roundabout. When that is constructed, it will eliminate the south-west entry to the Wawa site. That will leave them with the other 3 access points at the north-west, north-east and south-east corners of the site. 4 5 STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. Restaurant should not be listed as a separate use. 2. Screen vent stack, overfill alarm switch and remote e-stop from street. 3. Provide details on proposed portable generator. May need additional screening – work with staff to resolve. 4. Electric service shall be underground. Provide NES-approved service plan. 5. The tree removal plan incorrectly identifies the trees along Main St as Bradford pears. Instead they are cherry trees and trident maples. Revise. 6. Provide tall evergreen shrubs on south and west side of dumpster. 7. Street trees along Main St should be about 40’ o.c. and fill the entire frontage minus the driveway. 8. Replacement trees must be shown in a separate plant schedule. Required site (parking lot) and street trees do not count towards tree replacement. A maximum of 25% of replacement trees may be ornamental/understory type trees. The remainder should be canopy type trees. 9. Rip rap should not be used for outlet protection unless specifically required by Public Works Dept. Provide green solution instead. 10. Work with staff to make up the 1.6% pervious area shortfall, such as by widening some landscape island and/or using some pervious pavers. 11. Landscape plan should show grass to street. 6 12. Trash enclosure detail on sheet C8-20 conflicts with architectural plan. Remove or revise to match architectural plan. 13. Top of dumpster enclosure and gate must be minimum of 2’ above top of dumpster. 14. Lighting/photometric plan is missing from set – please provide. 15. Finish color of light poles should be black or dark bronze. 16. Maximum light pole height is 22’. 17. Provide physical building material samples for review and approval. 18. Resolve tree replacement and VUA shortfall by providing the missing trees or paying into the tree bank. 19. Approval is subject to recording of the consolidation plat. Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (April 29th, 2026) STAFF COMMENTS – PUBLIC WORKS: 3 1. Please revise hatching for the right of way dedication per the comment on the final plat. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (April 29th, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. IFC 2021 503.2.4 – Turning Radius: Provide a truck turning template using the Hendersonville Fire Department template. Action: Provide a truck turning template using the Hendersonville Fire Department template. 2. IFC 2021 912.2.1 – Provide Sprinkler system FDC on street (address) side of building. Action: Provide Sprinkler system FDC on street (address) side of building per code IFC 2021 912.2.1. Submitted by Chris Willyard, Deputy Fire Marshal (April 29th, 2026) STAFF COMMENTS – UTILITY DISTRICT: 5 1. See notes on sheets C1-10 and C6-00. Submitted by David Brigance, HUD Construction Supervisor (April 29th, 2026)

Source: City of Hendersonville website. First collected Oct 7, 2026.