1
2
Board Minutes
May 27, 2026
CALL TO ORDER
The Clarksville Gas & Water Board was called to order, on Wednesday, May 27, 2026 at 4:30
p.m. A quorum was present.
ATTENDANCE
The following were in attendance:
Tom Drew, Curtis Johnson, Stacey Streetman, Mark Riggins, Patrick Chesney,
Troy Jones, Dawn Thomack, and Brandy Slaughter
APPROVAL OF MINUTES
Board member Stacey Streetman made a motion to approve the minutes from the April
21, 2026 meeting. Board member Curtis Johnson seconded that motion. All were in favor, the
minutes passed.
BOARD ACTION REQUIRED
A. Request for Professional Service: Black & Veatch Corporation (B&V): After Mark
explained this contract, the Board was asked to approve a professional services contract
with Black and Beach Corporation for a water quality testing and reuse study
collaboration. Board member, Stacey Streetman made a motion for approval. Curtis
Johnson seconded the motion. All were in favor, the motion was approved.
B. Request for Professional Services: Tennessee College of Applied Technology: A contract
with the Tennessee College of Applied Technology was presented for specialized
electrical, hydraulic, and fluid power training. This training was requested by water and
3
wastewater mechanics in areas such as sewer lift and water distribution. Costs were
based on a price sheet that was provided for the specific training utilized. Board
Member Curtis Johnson made a motion for approval. Board member Stacey Streetman
seconded the motion. All were in favor, the motion was approved.
C. Bid Summary Recommendation: South Clarksville Water Treatment Plant Disinfection:
Cumberland Valley Constructors submitted a bid for a project that covers the regular
maintenance and replacement of membranes and controls at the existing water
treatment plant, which are necessary for the water filtration process. The bid was for
$2.4 million. Board member Stacey Streetman made a motion for approval. Board
member Curtis Johnson seconded the motion. All were in favor, the motion passed.
D. Bid Summary Recommendation: Ft. Campbell East End Road Bridge Natural Gas Main
Replacement: A bid summary was presented from Morris Wall Construction Company,
Inc. to replace a six inch gas main on the East End Road Bridge at Ft. Campbell. This
cost-reimbursement project is estimated at $259,751.66. Board Member Stacey
Streetman made a motion for approval. Board member Curtis Johnson seconded the
motion. All were in favor, the motion passed.
E. Bid Summary Recommendation: Automatic Opening Doors Installation: A bid summary
was presented from Triple S Contracting for $160,000 to perform accessibility
improvements. Work includes installing automated push-button door openers at the
North Service Center, the main building, and the South Service Center to ensure the
facilities are handicap accessible. Board member Stacey Streetman made a motion for
approval. Board member Curtis Johnson seconded the motion. All were in favor, the
motion passed.
F. Cost Reimbursement Agreement with Foxman LLC for Sampling and Water Quality
Testing: An agreement with Google was presented regarding the reimbursement of up
to $100,000 for water quality testing and sampling expenses, which were previously
approved under the Black and Veatch Corporation project. Mark Riggins also noted that
there are also potential future discussions regarding capital investment partnerships
with Google. Board member Stacey Streetman made a motion for approval. Board
member Curtis Johnson seconded the motion. All were in favor, the motion passed.
G. Underground Facility Locating and Marking Services with UtiliQuest LLC. : A sole source
contract with UtiliQuest for underground utility locating and marking services was
presented. It was presented as a sole source justification due to the extensive time set
up required for Tennessee One Call response programs and the contractors successful
nine year performance history. Board member Stacey Streetman made a motion for
4
approval. Board member Curtis Johnson seconded the motion. All were in favor, the
motion passed.
H. Pipeline & Hazardous Materials Safety Administration Certifications, Assurances, and
Clauses: PHMSA pipeline safety certifications, lobbying assurances, and Title VI non-
discrimination adherence documents were presented to the Board. Board member
Stacey Streetman made a motion for approval. Board member Curtis Johnson seconded
the motion. All were in favor, the motion passed.
I. FY27 Pay Table: An updated pay table was presented to the Board, which incorporated a
previously approved budget including a 3% cost of living increase, and a 2% wage
increase. Mark Riggins explained that these shifts align the pay table with the approved
budget. This would be implemented with the pay period that begins June 29, 2026.
Board member Stacey Streetman made a motion for approval. Board member Curtis
Johnson seconded the motion. All were in favor, the motion passed.
REPORTS
A. Sold Assets – Mark reviewed this with the board members. There were no questions.
B. Contract Change Order: Suiter-Turner Lane – Mark reviewed this and the changes with
the board members. There were no questions.
C. Contract Change Order: Judy Construction- North Clarksville Water Treatment Plant –
Mark reviewed this with the board members. There were no questions.
D. Bid Summary – Mark reviewed this with the board. There were no questions.
E. Financial
Dawn Thomack went over the April financials for the Water Division. Revenue for
the month was $3.97 million, Year-to-date was $40.3 million. Operating expenses
were $2.9 million. Year-to-date was $30.2 million. The income from operations was
just over $1 million. Year-to-date was $10.1 million. In the month of April there was
an income of $549,000. Year-to- date there is an income of $4.1 million. Capital
spending year-to-date is just under 31.5 million.
Dawn Thomack went over the April financials for the Wastewater Division. Revenue
for the month was just under $4.5 million. Year-to-date was $45.7million.
Operating expenses for the month was $3.4 million. Year-to-date was just over
$32.9 million. The income from operations was just over $1 million. Year-to-date
5
was just under $12.8million. There was an expense of $406,000. Year-to-date was
an expense of $3.2 million. The total income in wastewater fort the month of April
was just under $663,000. Year-to-date was $9.5 million. Capital spending Year-to-
date was $26.3 million.
Dawn Thomack went over the April financials for the Gas Division. Revenue for the
month was just under $2.7 million. Year-to-date was just under $38.5 million.
Operating expenses for the month was just under $2.5million. Year-to-date was
$34.3 million. Income from operations was just under $183,000. Year-to-date was
just over $4 million. Other income was $28,000. Year-to-date was $332,000. Total
income for April was $210,000. Year-to- date was just under $4.6 million.
Debt coverage was next. In the month of April the debt coverage ratio was 2.2. The
debt to operating revenue ratio was 2.33 and is expected to improve as debt is paid
down.
Lastly, Dawn Thomack explained the cash flow levels for Water, Wastewater, and
Gas to the board. There were no questions.
F. Departmental – Mark reviewed the departmental reports with the board. There were
no questions.
ADJOURNMENT
The meeting was adjourned at 4:53 p.m.
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
Monthly Activity Summary
May 2026
Gas System distributed 481,629,000 cubic feet and averaged 15,536,000 cubic feet
per day. That represents approximately 23.5 percent of the system’s capacity
Water plant pumped 683.4 million gallons of treated water into the system and
averaged 22 million gallons per day. This represents approximately 78.6 percent of
the plant’s capacity.
Wastewater Plant treated 432.1 million gallons of sewage and averaged 13.5 million
gallons per day. That represents approximately 54 percent of the plant’s capacity.
The call center handled 9,599 calls and averaged 436 calls per day. Each call lasted
an average of 4 minutes and 55 seconds.
The service department completed 5,203 work orders and responded to 296 after
hour calls.
In the month of May, 591 accounts were flagged for high usage by the meter
readers.
Gas division installed 38 new services, and totaled 2,180 feet of pipe, 4 mains
totaling 1,817 feet of pipe, and responded to 50 odor complaints.
Water division repaired 54 water leaks, totaling 691 feet of pipe, flushed 234
hydrants, and tested 887 backflow devices.
Sewer division made 5 point repairs totaling 49 feet of pipe, cleaned 24,124 feet of
pipe.
Engineering approved 7 utility plans this month and currently had 31 ongoing
projects.
Billing Department read 116,830 meters with an accuracy rate of 99.91 percent and
sent a total of 99,562 bills and 13,992 notices
78
Meter Reading & Service Department
Monthly/Yearly Report May 2026
Meter Reading
Meters Read
Month Year Gas Water Total Accuracy Rate
May 2026 30,791
86,039
116,830
99.91%
April 2026 31,215 86,079
117,294
99.90%
March 2026 30,750 85,735 116,485 99.94%
February 2026 30,734 85,624 116,358 99.93%
January 2026 30,707 85,498 116,205 99.88%
December 2025 30,368 85,390 116,078 99.89%
November 2025 30,633 85,243 115,906 99.92%
October 2025 30,639 85,110 115,749 99.93%
September 2025 30,631 84,909 115,540 99.88%
August 2025 30,606 84,735 115,341 99.91%
July 2025 30,587 84,561 115,148 99.92%
June 2025 30,518 84,407 114,928 99.94%
12 Month
Total
368,082
1,023,176
1,391,258
99.92%
Month Year Service Orders After Hours Calls
May 2026 5,203 296
April 2026 5327 281
March 2026 5,762 312
February 2026 4,634 341
January 2026 4,481 350
December 2025 5,638 426
November 2025 4,249 302
October 2025 5,977 347
September 2025 5,039 300
August 2025 5,617 323
July 2025 5,913 323
June 2025 5,347 283
12 Month Total 63,187 3884
79