_04072026-557
City of Hendersonville · Sumner County · meeting of Apr 7, 2026 · Minutes
Open the original document More from City of Hendersonville
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
HPC Minutes
04/07/2026
HENDERSONVILLE PLANNING COMMISSION
MINUTES
Main Meeting Room
Tuesday, April 7th, 2026
6:30 PM
Chairman Tim Altizer called the meeting to order at 6:30 PM in the City Hall Main Meeting Room,
101 Maple Drive North, Hendersonville, TN.
1. OPENING PRAYER (Youtube Link)
Tim Altizer led the opening prayer.
2. ROLL CALL (Youtube Link)
Present: Tim Altizer, John Evans, Barry Hardwick, Charles Hasty, Todd Kerr, Michael Martin, Vanessa
Silkwood, Wendy Slatery, and Mike Wessel.
Absent: None.
Also Present: Keith Free, Planning Director; Timothy Whitten, Assistant Planning Director; Caitlin Shinn,
Planner; Trey Lavender, Assistant City Engineer; Chris Willyard, Deputy Fire Marshall; and Jeff Stites,
Deputy Fire Marshall
BRIEF ACTION SUMMARY
A. Acceptance of Agenda (Youtube Link)
MOTION by Slatery, seconded by Silkwood, to accept the Hendersonville Planning Commission
Meeting Agenda of Tuesday, April 7th, 2026.
Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
B. Minutes (Youtube Link)
MOTION by Silkwood, seconded by Wessel, to accept the Hendersonville Planning Commission
Meeting Minutes of Tuesday, March 3rd, 2026.
Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
HPC Minutes
04/07/2026
C. Consent Agenda (Youtube Link)
MOTION #1 by Hasty, seconded by Martin, to remove TBN (Millenia Cottages) Site Plan off the
Consent Agenda.
Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
MOTION #2 by Slatery, seconded by Kerr, to approve the remaining items on the Consent Agenda
with all staff comments.
(1) Forest Park Phase 2 – Preliminary Plat
(2) Forest Park Phase 1 Section 1 – Final Plat
A brief overview was given by Keith Free on Forrest Park Phase 2 Preliminary Plat. Caitlin Shinn
gave a brief overview of Forest Park Phase 1 Section 1 Final Plat.
Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
D. SP-007153-2026: TBN (Millenia Cottages) – Site Plan (Youtube Link)
MOTION by Hardwick, seconded by Martin, to accept the TBN (Millenia Cottages) Site Plan as
presented with all staff comments.
Timothy Whitten gave a summary of TBN (Millenia Cottages) prior to vote.
Altizer, Evans, Hardwick, Kerr, Martin, Silkwood, and Slatery voted aye.
Nay: Hasty, Wessel. None Abstained. Absent: None.
MOTION PASSED. (7-2-0)
E. ANNX-007158-2026: Cornerstone Church Hendersonville / TN District Council of the Assemblies of
God – Annexation/Rezone (Youtube Link)
MOTION by Hardwick, seconded by Altizer, to approve with recommendation to the Board of Mayor
and Alderman the Cornerstone Church Hendersonville and Tennessee District Council of the
Assemblies of God Plan of Service/Annexation/Rezoning including all finding of facts with all staff
comments with the office zoning designation that it is in line with the future land use plan of the
city and with the listed plan of services that go with that designation.
Caitlin Shinn gave a summary of Cornerstone Church Hendersonville and Tennessee District
Council of the Assemblies of God Plan of Service/Annexation prior to the vote.
MOTION PASSED. (8-1-0)
Altizer, Evans, Hardwick, Hasty, Kerr, Silkwood, Slatery, and Wessel voted aye.
Nay: Martin. None Abstained. Absent: None
HPC Minutes
04/07/2026
Resolution 2026-01: A Resolution recommending acceptance of the completed streets in
Durham Farms, Phase 4, Section 35B, Hendersonville, Sumner County, Tennessee.
(Youtube Link)
MOTION by Kerr, seconded by Wessel, to approve and recommend Street Acceptance of completed
streets in Durham Farms Phase 4 Section 35B.
Keith Free gave a summary of Resolution 2026-01 Street Acceptance of completed streets in
Durham Farms Phase 4 Section 35B prior to vote.
Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
F. Adjournment (Youtube Link)
MOTION by Slatery, seconded by Hasty, to adjourn the Hendersonville Planning Commission
Meeting at 7:29 PM.
Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
HPC Minutes
04/07/2026
DETAILED MINUTES
3. PUBLIC HEARING ((Youtube Link))
Request by Cornerstone Church Hendersonville and Tennessee District Council of the Assemblies of
God to annex 22.38 acres into the City Limits, and to rezone the property to Office (O). The property is
located on the north side of Route 386, east of Stop 30 Road, as identified on Sumner County Tax
Map 145 Parcel 044.00 000, 044.00 001 and Tax Map 145 048.03
Public hearing opened at 6:31PM and closed at 6:31PM since no one spoke.
4. PUBLIC COMMENT (AGENDA ITEMS ONLY) (Youtube Link)
Public comments opened at 6:32PM and closed at 6:32PM since no one spoke.
5. ACCEPTANCE OF AGENDA (Youtube Link)
MOTION by Slatery, seconded by Silkwood, to accept the Hendersonville Planning Commission
Meeting Agenda of Tuesday, April 7th, 2026.
Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
6. MINUTES: (Youtube Link)
MOTION by Silkwood, seconded by Wessel, to accept the Hendersonville Planning Commission
Meeting Minutes of Tuesday, March 3rd, 2026.
Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
7. CONSENT AGENDA: (Youtube Link)
SUB-007151-2026: Forest Park Phase 2 – Preliminary Plat
Owner: Jen TN 2 LLC (Beazer Homes LLC)
Location: 1685 Sandersville Rd, Parcel 137 038.00
Lead Planning Staff: Zachary Coleman
_1 _________ 1 __ _
HPC Minutes
04/07/2026
The applicant, CSDG, on behalf of the owner and developer has submitted a Preliminary Plat for Forest
Park Phase 2. This Phase includes 73 single-family lots and 2 open space tracts that are part of the
approved amended Final Development Plan for Forest Park.
STAFF REPORT: 1
Forest Park Phase 2- Preliminary Plat
,.,
~\.,. I
... : .J
r:,,_J
. '• .,
r ~: r f
,.. ,, \ :-.
~
\
- -· , ,I
l
I
,,,
/'
t -.. ~t-., l.,I
, L
/ \:
\
I
HPC Minutes
04/07/2026
Proposed Lot Layout
The overall development includes 612 housing units (156 attached 2 unit villas and 3, 4, and 5 unit
cottages, 456 single-family units) across 269.7 acres and 9 Phases. The site is zoned SR-1 PD.
Preliminary plats have been previously provided and reviewed for Phases 1, 3, 4, 5, and 6. Together with
Phase 2, this accounts for 349 single family units and 63 attached villas/cottages across 219.4 acres.
Remaining Phases (7, 8, and 9) will be comprised of 103 single family units and 93 attached
villas/cottages across 50.3 acres.
\
\
'."::::::::===r-~7~:~f~~®~~!:L'.; /
1·, \ / -"
• ' ' :t~--. ·~ ~i...___:: ), '-. li'!i~iF.'.~:::::.:_:::_?.::;:?,_-~::~;~.:;~;.;~-t~"~ : __ ~ -~-:~.~=;·;t::~}~~---''-'-"'-== :w, ' ~ ~~c--
(0 -':~1z;.
C
,, ,,
·--.. ,-'"" :1
;-
\,C•'
I Ii
r L . I?
=-~7J t
) • I
- --------------- ------------ ---L--:. .,.~_l __ --_.2;:i._ _ 11....-....J.......L...--s - - --•~ ~ A '< ', ""' ~II
~ ' ,.,
s~11 n1
EB
--------
~ -1~
~- ~ !
SE 1 ~-~~
!l1ffJ
' ' I ' '
~
HPC Minutes
04/07/2026
Proposed Lot Types
Phase 2 of Forest Park contains seventy-three (73) Type “A” lots across
56.74 acres. Type “A” lots are larger single family Estate lots with side
access garages.
"
L _______ _
\
• l'O' MMMUI
NLCINc.·INVB.Of'l.
1t 'XIIO'
A
~ 20'
Rear: 20'
Side: 7'
HPC Minutes
04/07/2026
SUB-007154-2026: Forest Park Phase 1 Section 1 – Final Plat
Owner: Jen TN 2 LLC (Beazer Homes LLC)
Location: 1685 Sandersville Rd, Parcel 137 038.00
Lead Planning Staff: Zachary Coleman
STAFF COMMENTS – PLANNING DEPARTMENT: 2
1. All comments were addressed in resubmittal.
Submitted by Zachary Coleman, Senior Planner (March 31st, 2026)
STAFF COMMENTS – PUBLIC WORKS: 3
1. No Comments.
Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (March
31st, 2026)
STAFF COMMENTS – FIRE DEPARTMENT: 4
1. No Comments.
Submitted by Chris Willyard, Deputy Fire Marshal (March 31st, 2026)
STAFF COMMENTS – UTILITY DISTRICT: 5
1. No Comments.
Submitted by David Brigance, HUD Construction Supervisor (March 31st, 2026)
HPC Minutes
04/07/2026
The applicant, Beazer Homes, is requesting Final Plat approval for Forest Park Phase 1 Section 1, located at
1685 Saundersville Road. The primary purpose of this section is to establish the subdivision's main entrance
and install the necessary supporting infrastructure.
Total area of Phase 1 Section 1 is 3.689 acres with 2.573 acres being open space. There are no homes
proposed within this specific section.
Forest Park PDP was approved in 2018 with the FDP approved in 2021. The Phase 1 Preliminary Plat initially
received approval in 2022 followed by a revision and approval in 2023. The Phase 1 Construction Plans were
approved in October 2024. The Final Plat submitted is in compliance with the previously approved Phase 1
Preliminary Plat and approved Construction Plans.
STAFF REPORT: 1
Forest Park Phase 1 Section 1- Final Plat
/-/)·:~ * '··-·:,
" , ; J ~ -r7 ,, ~
r~._, /
_;1,,. :.',.,~( 1 L " I
\
\ I
l I
I ,:
\
I
HPC Minutes
04/07/2026
STAFF COMMENTS – PLANNING DEPARTMENT: 2
1. Correct grass strip to show 6 feet not 5 feet per PDP/FDP.
2. Show 6-foot grass strip measurement on both sides of the entry road.
3. On Certificate of Approval of Recording, remove the subdivision name.
4. On Certificate of Approval of Utility Systems, insert plat name.
5. On Certificate of Approval of Utility Systems, remove regional planning commission and replace with
applicable utility district.
6. The Certificate of Common Areas Dedication must be amended to identify the developer as the
declaring party, rather than the 'owner'.
Submitted by Caitlin Shinn, Planner (March 31st, 2026)
STAFF COMMENTS – PUBLIC WORKS: 3
1. See Markups.
Submitted by Stephen Winzenread, PE, Public Works Director/City Engineer (March 31st, 2026)
===-=NO\'l,M~ .. ~rAY
-~==== ·~-'17•r -
l! ~ i.il 0 .~
1 1:1 _J•· i
' IL-- 1:L r i;-::::~__:..Jt - ~
----...
. ••-
-~" j I
VICINITY MAP
"1.lf fl:'.I.V.:.o\l.C
U.~""' J liALLOW,i,
ETIJi
M,t,= '37 PAACEL ]TX)
oe 01J1, M ~s2
---- ·- -
e~~•, ~ = . I.IL_ .. ; ~ ~ - 8,.~~~ .. -·-- f
. ------ " & ~ - ·- - c,, ;::::==="'"'~"'~1~~~~, l
'
--- _ :::._--..-~-:.2-~;-:;,-:;------( ! -· ,r
-~·.1irw~,;- - --1 -..-,--
GWHG" ou~, --..,_ - ---- --- - :"°' ,,,:
w..PU7~AACF1 i:i oo _ _
IHI XJ/ l'G ~~• /:
1 /1.1' ~
A
HPC Minutes
04/07/2026
STAFF COMMENTS – FIRE DEPARTMENT: 4
1. No Comments.
Submitted by Chris Willyard, Deputy Fire Marshal (March 31st, 2026)
STAFF COMMENTS – UTILITY DISTRICT: 5
1. No Comments.
Submitted by David Brigance, HUD Construction Supervisor (March 31st, 2026)
MOTION #1 by Hasty, seconded by Martin, to remove TBN (Millenia Cottages) Site Plan off
the Consent Agenda.
Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
MOTION #2 by Slatery, seconded by Kerr, to approve the remaining items on the Consent
Agenda with all staff comments.
(1) Forest Park Phase 2 – Preliminary Plat
(2) Forest Park Phase 1 Section 1 – Final Plat
A brief overview was given by Keith Free on Forrest Park Phase 2 Preliminary Plat. Caitlin
Shinn gave a brief overview of Forest Park Phase 1 Section 1 Final Plat.
Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
HPC Minutes
04/07/2026
8. SITE PLANS:
SP-007153-2026: TBN (Millenia Cottages) – Site Plan (Youtube Link)
Owner: Trilogy Asset Investments Inc.
Location: 645 E Main Street, Parcel 158A A 008
Lead Planning Staff: Timothy Whitten/Zachary Coleman
The Final Development Plan (FDP) for TBN Millenia Cottages was approved by the Planning Commission in
January of this year. Now, TBN is back to request approval of the site plan.
The site plan is in substantial compliance with the approved FDP. TBN has worked extensively with staff to
ensure the architecture of the various unit types, community facility, and other buildings meet and exceed
building design standards. The “Hello Darlin” wall is shown to remain, and the damaged section repaired.
In addition, the wall will be extended to the west to provide screening of the units from Main Street, and
additional portions of the existing brick wall behind 645 and 641 E Main Street will be preserved. Staff is
requiring additional vegetative screening of the units backing up to East Main Street.
STAFF REPORT: 1
.. ~, "·: .J
::-!\ ~ ,' t::.. I
•~ ( ,; r_.
,. .r .... , I' .. ,.
"- .... ~
\.
,:;
I
\ I
\
I
HPC Minutes
04/07/2026
COMMUNITY CENTER
UNIT A
UNIT B
UNIT C
HPC Minutes
04/07/2026
UNIT D
UNIT F
STAFF COMMENTS – PLANNING DEPARTMENT: 2
1. On the photometric plan provide cut sheets for light poles and luminaires. Provide detail showing base
height and overall height (maximum 22’ from grade allowed).
2. Call out the brick wall extension to match existing, or otherwise indicate how the new wall will be integrated
with the existing wall.
3. More robust evergreen landscape screening is needed of the trash facilities at the community center.
4. Provide dumpster enclosure/gate details.
5. On sheets C11 & C12, update the road names to show them as “Private”.
6. Segmental block retaining walls should be decorative type block. Submit sample/cut sheets for review and
approval.
7. Sheet C4-11 retaining wall adjacent to E Main St: avoid slopes greater than 3:1.
8. Indicate road names. Provide feedback from E911 on how units will be addressed.
9. Approval of the site plan is subject to approval of a consolidation plat. Plat must be recorded prior to building
permit application.
10. Show underground electric service to all units/facilities. Show transformer locations. Show where utility
meters will be located. Identify locations of all meter walls on plans. Meter walls should be faced with brick
on all sides. Provide detail of meter walls.
i---- =----
HPC Minutes
04/07/2026
11. Provide NES-approved electric service plan.
12. If an enclosure is required around the pump station, it should be a brick enclosure, not chainlink fence. If a
fence is not required by the utility district, vegetative screening may be an acceptable alternative. Work with
staff to resolve.
13. Provide street trees along both sides of Music City Boulevard.
14. Robust evergreen screening is needed to screen the backs of units from E Main St.
15. Street trees generally must be canopy-type trees.
16. Community center parking lot perimeter shrubs must be double row, triangular spacing, maximum 5’ o.c.
17. Provide parking lot perimeter shrubs along Music City Boulevard side of existing parking lot.
18. Provide calculations for required street trees.
19. Provide calculations showing how tree replacement is being met.
20. Work with staff to address comments on unit A, B and F building elevations as shown below and on markups:
segment lull stone.
Add shed awnings
s1m1lar to unit D (or
similar).
~----- ~ ..........
HPC Minutes
04/07/2026
Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (March 31st, 2026)
STAFF COMMENTS – PUBLIC WORKS: 3
1. Please provide sidewalk where the property fronts E main Street. Please consider reshaping the
roadside drainage such that the sidewalk is not inundated during the 25-year design storm (provide
supporting channel analysis). This appears to be feasible. Please also evaluate the feasibility of
installing curb and gutter along Main Street while keeping the roadside drainage open (curb cuts or
some structure that drops runoff into the conveyance. The curb cuts/structure should be placed such
that the gutter spread does not encroach more than half the adjacent travel lane width - provide
supporting calculations).
Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (March 31st,
2026)
STAFF COMMENTS – FIRE DEPARTMENT: 4
1. No Comments.
Submitted by Chris Willyard, Deputy Fire Marshal (March 31st, 2026)
STAFF COMMENTS – UTILITY DISTRICT: 5
1. See Comments on Plans.
Submitted by David Brigance, HUD Construction Supervisor (March 31st, 2026)
:LEVATION Make these pro1ected
wall sections lull
stone
HPC Minutes
04/07/2026
8. OTHER:
ANNX-007158-2026: Cornerstone Church Hendersonville / TN District Council of the Assemblies of
God – Annexation/Rezone
(Youtube Link)
Owner: Cornerstone Church Nashville/ TN District Council of the Assemblies of
God
Location: 1402 & 1410 Kingdom Way, Parcel 145 044.00 000, 001 & 145
048.03
Lead Planning Staff: Caitlin Shinn/Zachary Coleman
MOTION by Hardwick, seconded by Martin, to accept the TBN (Millenia Cottages) Site
Plan as presented with all staff comments.
Timothy Whitten gave a summary of TBN (Millenia Cottages) prior to vote.
Altizer, Evans, Hardwick, Kerr, Martin, Silkwood, and Slatery voted aye.
Nay: Hasty, Wessel. None Abstained. Absent: None.
MOTION PASSED. (7-2-0)
HPC Minutes
04/07/2026
ANNEXATION AND PLAN OF SERVICES
The applicants, Cornerstone Church of Nashville and the Tennessee District Council of the Assemblies of God,
have requested voluntary annexation into the City of Hendersonville from Sumner County for the properties
located at 1402 & 1410 Kingdom Way off of Stop Thirty Rd. just on the north side of Vietnam Veterans Blvd. in
Hendersonville, TN (Parcel 145 044.00 000, 145 044.00 001 & 145 048.03), The parcels total approximately
22.38 acres.
The properties are currently zoned Rural Residential (RR) within Sumner County, lie within the City of
Hendersonville’s Urban Growth Boundary and are within an area identified in Chapter 3 of the City of
Hendersonville’s Future Land Use and Transportation Plan as Regional Activity Center.
STAFF REPORT: 1
h Assemblies TN District Council oft e
~ .,. I
', '
•• I
r .... -· / ,.
I~ - : • - ' •1
.. _, • .._.. . I ••'-
::;~,~ ;; J ~ 1 :;
..... "~ -*: ,, • ~ .. J -
•'•
/
l
\
I
I
145 044.00
;,,
,1
• -~--.!'Tu15t~~=---
HT CHE1t
HPC Minutes
04/07/2026
The properties lie adjacent to the east side of the
Wyncrest development, which is zoned SR-1. The
area south of the properties across Vietnam
Veterans Boulevard is zoned Mixed Commercial-
Planned Development (MXC-PD). There are
currently offices and a church with parking areas
located on the properties. Currently, no additional
developments are proposed on the two parcels.
The applicant is requesting voluntary annexation
under the Office (O) zoning district, which aligns
with the Regional Activity Center designation and
allows the current uses of the properties.
The required Plan of Services for the annexation
has been prepared and is attached for the
Commission to consider.
Subject Properties
Land Use Designation
Chapte r 3 - Land Use
CHAlt.ACTER AREAS
=::J
-D
--CJ
--CJ
=
RuMJ..lMNG
WATfAf-"°"'1' l.MNc
M 1XlD-USl Nt1~
Sull.JI\MN C{NTU.
RfGIONAI. AClM1"1' CfNTUI,
E....,_Ol'l"ICNT CENT(ll
PAAKI.ANO/Gou= Coua..u
ENVIM:lNHENTAUY SENSlTIVI: AAu,.
Sn.10¥' AitEA ~
WATfll. 8ooit:S
~ ' , .... """.,.
.I .·
./ ~-.. ..;_ . -
HPC Minutes
04/07/2026
ESTIMATED NEXT STEPS IN THE ANNEXATION AND
PLAN OF SERVICES APPROVAL PROCESS:
1. BOMA General Committee Meeting (April 14, 2026 - estimated)
2. BOMA Regular Meeting – 1st Reading (April 28, 2026 - estimated)
3. BOMA Regular Meeting – 1st Reading (May 26, 2026 - estimated)
-------------------------------------------------------------------------------------------------------------------------------------------
STAFF COMMENTS – PLANNING DEPARTMENT: 2
1. No comments.
Submitted by Caitlin Shinn, Planner, and Zachary Coleman, Senior Planner (March 31st, 2026)
STAFF COMMENTS – PUBLIC WORKS: 3
1. No comments.
Submitted by Stephen Winzenread, PE, Public Works Director/City Engineer (March 31st, 2026)
STAFF COMMENTS – FIRE DEPARTMENT: 4
1. No Comments.
Submitted by Chris Willyard, Deputy Fire Marshal (March 31st, 2026)
STAFF COMMENTS – UTILITY DISTRICT: 5
1. No Comments.
Submitted by David Brigance, HUD Construction Supervisor (March 31st, 2026)
ER
URBAN GROWHJ
BOUNDARY
I I
•.:·-··,f SUBJECT PROPER1Y ;
\ '
:: ::::~:\/:;~;·::~::;:~------.. 1
MXC, PD
••• ln.:li-arltake ,
,--- - · v1!ag~ ··· -;--1. . .
l
:
• -✓
SR-1
ER
SR-1
URBAN GROWTH
BOUNDARY
I ...... ,,
\ j 0, OFFICE
\ I
·-~ ... ___ _
··-·----....... ;
MXC, PD
SR-1
SR-1
HPC Minutes
04/07/2026
MOTION by Hardwick, seconded by Altizer, to approve with recommendation to the Board of Mayor
and Alderman the Cornerstone Church Hendersonville and Tennessee District Council of the
Assemblies of God Plan of Service/Annexation/Rezoning including all finding of facts with all staff
comments with the office zoning designation that it is in line with the future land use plan of the
city and with the listed plan of services that go with that designation.
Caitlin Shinn gave a summary of Cornerstone Church Hendersonville and Tennessee District
Council of the Assemblies of God Plan of Service/Annexation prior to the vote.
MOTION PASSED. (8-1-0)
Resolution 2026-01: A Resolution recommending acceptance of the completed streets in
Durham Farms, Phase 4, Section 35B, Hendersonville, Sumner County,
Tennessee (Youtube Link)
Altizer, Evans, Hardwick, Hasty, Kerr, Silkwood, Slatery, and Wessel voted aye.
Nay: Martin. None Abstained. Absent: None.
CITY OF HENDERSONVI LLE
PUBUC WORKS DEPARTMENT
STREET ACCEPTANCE
VICINITY MAP
Durham Farms
Phase 4, Section 35B
600
■MC:JM.::::::11•••c:::c:::c:::::::.••• Feet
0 75 150 300 450
HPC Minutes
04/07/2026
22
8. STAFF-LEVEL PROJECTS, APPROVED: (Youtube Link)
SP-007215-2026: Jackson Townhomes Ph 2 Elevations – Site Plan
(670 East Main Street)
SUB-007106-2026: Maple Row Subdivision – Final Plat
(105 Maple Row Blvd)
SP-007211-2026: Millstone Entrance Sign – Site Plan
(467 Carriage House Ln)
SP-007210-2026: Millstone Phase 7 Section 1 Lot 158 Model Home Parking – Site Plan
(1413 Arbor Park Ln)
10. STAFF-LEVEL PROJECTS, PENDING: (Youtube Link)
SUB-006988-2025: C L Powell Addition Lot 17 & 18 Resub – Final Plat
(134 Powell Dr)
S - 3/30/26
Lead Planning Staff: Caitlin Shinn
SUB-007110-2026: Hendersonville Business Park Lot 3 – Final Plat
(100 New Shackle Island Rd)
A – 4/1/26
Lead Planning Staff: Timothy Whitten
SP-007030-2025: Stonecrest Ph 5, Sec 2 & 3 Elevation Amendment – Site Plan
(1351 Saundersville Road)
S – 3/30/26
Lead Planning Staff: Caitlin Shinn
MOTION by Kerr, seconded by Wessel, to approve and recommend Street Acceptance of
completed streets in Durham Farms Phase 4 Section 35B.
Keith Free gave a summary of Resolution 2026-01 Street Acceptance of completed
streets in Durham Farms Phase 4 Section 35B prior to vote.
Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0)
SUB-007050-2025: W.A. Shivel Addition Lot 1, 2, & 3 - Final Plat
(134 Shivel Dr)
S - 3/30/26
Lead Planning Staff: Timothy Whitten
SP-007150-2026: West Main Exxon Beverage Cooler Addition - Site Plan
(1082 West Main Street)
S - 3/19/26
Lead Planning Staff: Caitlin Shinn
11. PLANNING DIRECTOR COMMENTS: JYoutube Link!
HPC Minutes
04/07/2026
Director Free noted that everything is going well with the projects and special projects. Director
Free also noted that meetings may be fuller than before due to the increase in volume of projects
being submitted but nothing that could be contentious.
12. ADJOURNMENT (Youtube Link)
MOTION by Slatery, seconded by Hasty, to adjourn the Hendersonville Planning Commission
Meeting at 7:29 PM.
Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye.
Nay: None. None Abstained. Absent: None.
MOTION PASSED. (9-0-0}
VANESSA SILK~ . Secretary
23
Source: City of Hendersonville website. First collected Oct 18, 2026.