RecordWell Data

_03032026-543

City of Hendersonville · Sumner County · meeting of Mar 3, 2026 · Minutes

Open the original document More from City of Hendersonville

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

HPC Minutes 03/03/2026 HENDERSONVILLE PLANNING COMMISSION MINUTES Main Meeting Room Tuesday, March 3rd, 2026 6:30 PM Chairman Tim Altizer called the meeting to order at 6:30 PM in the City Hall Main Meeting Room, 101 Maple Drive North, Hendersonville, TN. 1. OPENING PRAYER (Youtube Link) Tim Altizer led the opening prayer. 2. ROLL CALL (Youtube Link) Present: Tim Altizer, John Evans, Barry Hardwick, Charles Hasty, Todd Kerr, Michael Martin, Vanessa Silkwood, Wendy Slatery, and Mike Wessel. Absent: None. Also Present: Timothy Whitten, Assistant Planning Director; Zachary Coleman, Senior Planner; Caitlin Shinn, Planner; Trey Lavender, Assistant City Engineer; Chris Willyard, Deputy Fire Marshall; and Zacc Jackson, Assistant Planner. BRIEF ACTION SUMMARY A. Acceptance of Agenda (Youtube Link) MOTION by Slatery, seconded by Wessel, to accept the Hendersonville Planning Commission Meeting Agenda of Tuesday, February 3rd, 2026. Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye. Nay: None. None Abstained. Absent: None. MOTION PASSED. (9-0-0) B. Minutes (Youtube Link) MOTION Silkwood, seconded by Slatery, to accept the Hendersonville Planning Commission Meeting Minutes of Tuesday, February 3rd, 2026. Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye. Nay: None. Martin Abstained. Absent: None. MOTION PASSED. (8-0-1) HPC Minutes 03/03/2026 C. Consent Agenda (Youtube Link) MOTION by Silkwood, seconded by Wessel, to approve the Consent Agenda as presented with all staff comments. (1) Forrest Park Phase 5 – Preliminary Plat A brief overview was given by Zachary Coleman on Forrest Park Phase 5 prior to vote. Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye. Nay: None. None Abstained. Absent: None. MOTION PASSED. (9-0-0) D. SP-007109-2026: Rogers Group Hendersonville Shop – Site Plan (Youtube Link) MOTION by Slatery, seconded by Altizer, to accept the Rogers Group Hendersonville Shop proposal for a waiver request for the building material and the waiver of the greenway with payment in lieu to be finalized by the Planning Department and leave open the discussion around future greenway development in other locations of the property especially the west side presented with all staff comments. Timothy Whitten gave a summary of Rogers Group Hendersonville Shop prior to vote. Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye. Nay: None. None Abstained. Absent: None. MOTION PASSED. (9-0-0) E. SUB-007011-2025: Windstar Bay Section 1A Lot 73 Setback Deviation – Final Plat (Youtube Link) MOTION by Silkwood, seconded by Wessel, to approve the Windstar Bay Section 1A Lot 73 Setback Deviation Final Plat as presented with all staff comments. Caitlin Shinn gave a summary of Windstar Bay Section 1A Lot 73 Setback Deviation Final Plat prior to the vote. Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye. Nay: None. None Abstained. Absent: None. MOTION PASSED. (9-0-0) F. Adjournment (Youtube Link) MOTION by Slatery, seconded by Kerr, to adjourn the Hendersonville Planning Commission Meeting at 6:56 PM. Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye. Nay: None. None Abstained. Absent: None. MOTION PASSED. (9-0-0) HPC Minutes 03/03/2026 DETAILED MINUTES 3. PUBLIC COMMENT (AGENDA ITEMS ONLY) (Youtube Link) Public comments opened at 6:31PM and closed at 6:31PM since no one spoke. 4. ACCEPTANCE OF AGENDA (Youtube Link) MOTION by Slatery, seconded by Wessel , to accept the Hendersonville Planning Commission Meeting Agenda of Tuesday, March 3rd, 2026. Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye. Nay: None. None Abstained. Absent: None. MOTION PASSED. (9-0-0) 5. MINUTES: (Youtube Link) MOTION by Silkwood, seconded by Slatery, to accept the Hendersonville Planning Commission Meeting Minutes of Tuesday, February 3rd, 2026. Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye. Nay: None. Martin Abstained. Absent: None. MOTION PASSED. (8-0-1) 6. CONSENT AGENDA: (Youtube Link) SUB-007108-2026: Forest Park Phase 5 – Preliminary Plat Owner: Jen TN 2 LLC (Beazer Homes LLC) Location: 1685 Sandersville Rd, Parcel 137 038.00 Lead Planning Staff: Zachary Coleman HPC Minutes 03/03/2026 The applicant, CSDG, on behalf of the owner and developer has submitted a Preliminary Plat for Forest Park Phase 5. This Phase includes 32 single-family lots that are part of the approved amended Final Development Plan for Forest Park. STAFF REPORT: 1 ,. ~: I ;~: ~ ; -. i. < \ ,. '':.J .,.,., " .: .J .. -- , ,I ., I I \ I / :-', ·,~-, £ ., , 1 , \ ' ; HPC Minutes 03/03/2026 Proposed Lot Layout The overall development includes 612 housing units (156 attached 2 unit villas and 3, 4, and 5 unit cottages, 456 single-family units) across 269.7 acres and 9 Phases. The site is zoned SR-1 PD. Preliminary plats have been previously provided and reviewed for Phases 1, 3, 4 and 6. Together with Phase 5, this accounts for 276 single family units and 63 attached villas/cottages across 162.7 acres. Remaining Phases (2, 7, 8, and 9) will be comprised of 180 single family units and 93 attached villas/cottages across 107 acres. ii-=­t__ __ 11~•-- ~: _.,_ - ·-·- ~ I ' I HPC Minutes 03/03/2026 Proposed Lot Types Phase 5 of Forest Park contains twelve (12) Type “D” lots, and twenty (20) Type “E” lots across 13.7 acres. Type “D” lots are side-access Carriage homes and Type “E” lots are front-access Signature homes. Typical lot examples of each are provided for reference. ROUGHETux ! ' I ' ' I I ./" :;'::""" I ' I L ______ _ I ~ ~ t i ; ,..,,. Xl'8(AIP't.U.L ~EN'll\q,'t; , , . 40' )( 8 ' '"'"""' =-• -TIC D ....... SsdNdn tp Comee I ml Front: lO' Rear: 20' Side: 7 , Side Street: 20 ~ ~ • t § ~ s J, • 8 ~ : ~ ~ § ;, lO'kLU.t1&.S.L .........atNVl;l.Of'l; 40' X f.1' '"'-"'NG KX) l PIUMI l!I. 0,,.,._,,mc D .....,,. Ss:tbick:5 {D Normal LoU Fronc 20' Rm : 20" Side: r • 'lO'~CAAKU.I.. -tl.Jll~~:: :t LPf"b _ 'i., 5ert?arki (E NPCPJ:ill Lot) front: 20' Rear: 20" Side: 7' 44 HPC Minutes 03/03/2026 STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. Add note to PLAT NOTES: Pump station will be sufficiently screened with landscaping and fencing. The proposed landscaping will be provided within the Forest Park Phase 5 Construction Documents. 2. Remove this portion. Street trees should be the developer's responsibility. This can be addressed in construction plans. 3. Add that any street trees in the ROW are also to be maintained by HOA. Submitted by Zachary Coleman, Senior Planner (February 25th, 2026) STAFF COMMENTS – PUBLIC WORKS: 3 1. See Markups. Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (February 25th, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (February 25th , 2026) STAFF COMMENTS – UTILITY DISTRICT: 5 1. No Comments. Submitted by David Brigance, HUD Construction Supervisor (February 25th , 2026) MOTION by Silkwood, seconded by Slatery, to approve the Consent Agenda as presented with all staff comments. (1) Forrest Park Phase 5 – Preliminary Plat A brief overview was given by Zachary Coleman on Forrest Park Phase 5. Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye. Nay: None. None Abstained. Absent: None. MOTION PASSED. (9-0-0) MOTION PASSED. (8-0-0) HPC Minutes 03/03/2026 7. SITE PLANS: SP-007109-2026: Rogers Group Hendersonville Shop – Site Plan (Youtube Link) Owner: Reostone LLC Location: 244 Station Camp Creek Rd, Parcel 137 013.00 Lead Planning Staff: Timothy Whitten (Waiver Request) This project is to add a 11,000sf maintenance facility to the Rogers Group quarry off of Big Station Camp Creek Boulevard. The property is zoned Industrial (I). Waiver request for building materials: Buildings in Industrial zones are allowed to have metal siding on all sides except for the front facing a street. This building will sit about 225 feet from Big Station Camp Creek Boulevard, and is 41’-3” in height. Rogers STAFF REPORT: 1 Rogers Group Hendersonville Shop - Site Plan ., ,. \ I / :."~./;~ 1 " I I \ I 1 / \·: HPC Minutes 03/03/2026 Group is requesting a waiver to allow the front to have metal siding. There is an existing evergreen buffer along part of the Big Station road frontage, and Rogers Group is proposing to extend that buffer south-east to help screen the building from the road. HPC Minutes 03/03/2026 Request for relief from obligation to build greenway: In 2015, Rogers Group obtained approval from the Planning Commission for a relocation of their asphalt plant and stockpile from the area between the creek and Lower Station Camp Creek Road, to the area where it now sits east of Lower Station Camp Creek Road (LSCCR) and west of Big Station Camp Creek Road. As part of the approval, they were required to comply with the Bicycle/Pedestrian Plan (which is found within the Future Land Use & Transportation Plan) and build a greenway along the creek through their property. The greenway was to extend from the railroad track and follow the creek south to connect to East Main Street. It was to be built once the area vacated by the asphalt plant was remediated and returned to grass (the remediation was required by the Corp of Engineers). Per the approval, if permission could not be obtained from the Corps for location of the greenway along the creek, then Rogers Group would instead be required to build sidewalk, curb and gutter along a portion (about 1,300 feet) of their Big Station Camp Creek road frontage. The remediation was completed some time in 2021. Staff let Rogers Group know at the time that the construction of the greenway would need to be completed before any further projects were approved. After the remediation, and per the approved site plan, Rogers Group retained some operations along the west side of Lower Station Camp Creek Road. This includes a major haul road connecting the asphalt plant on the east side of LSCCR to the quarry on the west side of the creek, and an overhead conveyor belt system that transports rock and material from the quarry to the asphalt plant and stockpile areas. In the intervening years since the approval of the 2015 project, it has become apparent to Planning staff and to Rogers Group that there are significant hurdles to be overcome in placing a greenway in this environment. The overhead conveyor belt, while having guards in place to minimize material falling from it, still has some risk of that occurring. The haul road, which carries numerous large trucks and equipment daily, would pose a significant risk to a greenway crossing. And, ongoing operations surrounding the greenway route deposit a large amount of rock dust on the HPC Minutes 03/03/2026 trees, grass and all paved surfaces throughout the year. All of these factors present significant challenges to the safety and desirability of a greenway running through this area. In the attached letter from Rogers Group, they are requesting relief from the requirement to building the greenway or the improvements on Big Station Camp Creek Boulevard. They are proposing to make a payment- in-lieu of construction of the greenway, which could be used by the City towards completion of the Saundersville Road greenway, which will connect the Indian Lake Village greenway to the Sumner County greenway which runs along Lower Station Camp Creek Road up to Long Hollow Pike. In addition, Planning staff has been in discussion with Rogers Group about the possibility of them providing an easement along the western boundary of their property adjacent to the Millstone subdivision. This easement could provide a second, more grade-friendly route to the planned Saundersville Road greenway which will run along Saundersville Road and eventually connect the Indian Lake Greenway to the Sumner County Greenway which runs along Lower Station Camp Creek Road from Station Camp High School to Long Hollow Pike. Rogers Group has indicated a willingness to provide this easement. HPC Minutes 03/03/2026 HPC Minutes 03/03/2026 STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. No Comments Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (February 25th, 2026) STAFF COMMENTS – PUBLIC WORKS: 3 1. No Comments Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (February 25th, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. IFC 2021 503.2.4 – Turning Radius: Provide a truck turning template using the Hendersonville Fire Department template. Action: Truck turning template should show truck navigating around the structure. 2. Hendersonville Subdivision Regulations 3.7.2.1 – Provide a hydrant layout that meets the fire flow requirements and identify each source and the calculated flow rate. Action: Provide a hydrant layout that meets the fire flow requirements and identify each source and the calculated flow rate per Hendersonville Subdivision Regulations 3.7.2.1 (sizes of lines need to be included.) 3. NFPA 2016 6.4.5.4 - Fire department connections shall be located not more than 100 ft (30.5 m) from the nearest Fire hydrant connected to an approved water supply. Action: Fire department connections shall be located not more than 100 ft (30.5 m) from the nearest Fire hydrant connected to an approved water supply per code NFPA 2016 6.4.5.4 (show FDC and distance). 4. IFC 2021 912.2.1 – Provide Sprinkler system FDC on street (address) side of building. Action: Provide Sprinkler system FDC on street (address) side of building per code IFC 2021 912.2.1 (Show FDC) 5. IFC 2021 D105.3 – Aerial fire apparatus access meeting IFC 2018 D105.2 shall be provided parallel to one entire side of the building. A minimum of 15’ and a maximum of 30’ from the structure. Action: IFC 2021 D105.3 – Aerial fire apparatus access meeting IFC 2018 D105.2 shall be provided parallel to one entire side of the building. A minimum of 15’ and a maximum of 30’ from the structure. (Show on truck turning template) 6. IFC 2021 D103.5 – Gates securing the fire apparatus access road shall comply with all of the following: gate width shall not be less than 20 feet, gates shall be horizontal swing, horizontal slide, vertical lift or vertical pivot type, electric gates shall be equipped with means of opening the gate by fire department personnel for emergency access. Emergency opening devices shall be approved by the fire code official. (Knox lock or Knox override) Methods of locking shall be submitted for approval by the fire code official. Action: Meet gate requirements per code IFC 2021 D103.5: gate width shall not be less than 20 feet, gates shall be swinging or sliding type, electric gates shall be equipped with means of opening the gate by fire department personnel for emergency access. Emergency opening devices shall be approved by the fire code official. (Knox lock or Knox override) Methods of locking shall be submitted for approval by the fire code official. (Needs to be show on plans) Meet gate requirements per code IFC 2021 D103.5: gate width shall not be less than 20 feet, gates shall be swinging or sliding type, electric gates shall be HPC Minutes 03/03/2026 8. OTHER: SUB-007011-2025: Windstar Bay Section 1A Lot 73 Setback Deviation – Final Plat (Youtube Link) Owner: Philip Bresson Location: 107 Fairlake Ct, Parcel 170K A 017.00 Lead Planning Staff: Caitlin Shinn equipped with means of opening the gate by fire department personnel for emergency access. Emergency opening devices shall be approved by the fire code official. (Knox lock or Knox override) Methods of locking shall be submitted for approval by the fire code official. (Needs to be show on plans) 7. IFC 2021 D104.1 – Buildings exceeding 30 feet or three stories in height. Buildings or facilities exceeding 30 feet (9144 mm) or three stories in height shall have not fewer than two means of fire apparatus access for each structure. Action: Meet standards per IFC 2021 D104.1 – Buildings exceeding 30 feet or three stories in height have 2 or more fire access means (gate needs to be shown on plans with 20' access) Submitted by Chris Willyard, Deputy Fire Marshal (February 25th, 2026) STAFF COMMENTS – UTILITY DISTRICT: 5 1. No Comments. Submitted by David Brigance, HUD Construction Supervisor (February 25th, 2026) MOTION by Slatery, seconded by Altizer, to accept the Rogers Group Hendersonville Shop proposal for a waiver request for the building material and the waiver of the greenway with payment in lieu to be finalized by the Planning Department and leave open the discussion around future greenway development in other locations of the property especially the west side presented with all staff comments. Timothy Whitten gave a summary of Rogers Group Hendersonville Shop prior to vote. Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye. Nay: None. None Abstained. Absent: None. MOTION PASSED. (9-0-0) HPC Minutes 03/03/2026 The applicants, Phillip and Nancy Bresson, are requesting a setback deviation for the property located at 107 Fairlake Court. The subject parcel is situated within the Windstar Bay Section 1A Cluster Development. The applicants are seeking to reduce the required rear setback from 20 feet to 10 feet to facilitate a new home addition. STAFF REPORT: 1 Windstar Bay Section 1A Lot 73- Setback Deviation ,,,, :-'#--~- , l.41 1 I \ ·: / \ I \ I HPC Minutes 03/03/2026 Plot Plan with Proposed Addition The applicants are proposing a two-story addition to the primary residence featuring a therapy pool and sauna on the lower level and a laundry room, half-bath, and a studio on the upper level. There will also be a 251- square-foot open deck (15.70’ x 16’) will be situated on top of the lower-level therapy pool area. \ ' INITIAL SUBMITTAL RECEIVED Dec 30 2025 PLANNING DEPT I I \ ' ' \ ' ' \ I ' \ ' ' CURVE DELTA ANGLE RADIUS 50.00' ARC LENGTH CHORD BEARING CHORD LENGTH C1 63'0651" PROPERTY ADDRESS 55.08' S 70'10'22' E 52.JJ PLOT PLAN 107 FA/Rl.AKE COURT THIS PLOT PLAN Wf.S DONE AT THE REQUEST OF THE BUILDER. THE BUILDING ENVELOPE SHOWN ON THE LOT DEPICTS HOW THE HOUSE Wf.S STAKED ON THE LOT BY THE SURVEYOR. HPC Minutes 03/03/2026 First Floor Plans Foundation Plans For properties outside of cluster developments, the Zoning Ordinance permits a 10-foot rear setback if the land is adjacent to Army Corps property. --- \ \ --- \ HPC Minutes 03/03/2026 The submitted floor plans and plot plan provide a clear visual comparison of the building footprint. These documents specifically illustrate the encroachment of the proposed structure into the standard 20-foot rear setback, contrasted against the requested 10-foot setback line. This visual data confirms that the addition would be unachievable under the current 20-foot restriction. Proposed Front Elevation Proposed Left Elevation I I ..... f'C .......... ~-,--~-- • •h ....... . , .. , ... .,..,,..., "'- "".t HPC Minutes 03/03/2026 Proposed Rear Elevation The Windstar Bay Section 1A Cluster Development maintains specific setbacks of 30’ front setback, 7.5’ side setback, and 20’ rear setback. The requested deviation is limited to the rear property line. The project has undergone architectural review by the Windstar Bay Homeowners Association, and a formal letter has been received from the Homeowners Association (HOA) approving the addition as proposed. HOA Approval Letter BBB Et EYM IAN Windstar Bay Homeowners Association Inc 50 Vantage Way, Suite 100 Nashville, TN 37228 Nancy W & Philip J Bresson 107 FAIRLAKE COURT HENDERSONVILLE, TN 37075 Dear Nancy W Bresson, February 02, 2026 Reference: 107 FAIRLAKE COURT Your request for an Architectural Modification on your property at 107 FAIRLAKE COURT has been approved by the ARC of Windstar Bay Homeowners Association Inc. Specifically, you have approv al to proceed with the following request as submitted: Room Addition I'm pleased to inform you that the Windstar Bay ARC Committee and Board of Director s approved your January 15th request to construct an addition to your home which will include a therapy pool, laundry, half bath, and studio . You will be responsible to abide by all local ordinances related to thi s improve ment . . Any permit required by the City or County is the responsibility of the homeowner. Any changes in the approved plans will require a new application to be submitted to the ARC. Thank you for your continued support of Windstar Bay Homeowner s Association Inc and for maintaining and enhancing our carefully designed community. Sincerely, Windstar Bay Homeowners Association Inc This Community is Professionally Managed By: Ghertner & Company {615) 277-0358 HPC Minutes 03/03/2026 MOTION by Hasty, seconded by Silkwood, to approve the Windstar Bay Section 1A Lot 73 Setback Deviation Final Plat as presented with all staff comments. Caitlin Shinn gave a summary of Windstar Bay Section 1A Lot 73 Setback Deviation Final Plat prior to the vote. Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye. Nay: None. None Abstained. Absent: None. MOTION PASSED. (9-0-0 STAFF COMMENTS – PLANNING DEPARTMENT: 2 1. If approved, a three-page plat amendment and fees are to be submitted for review/approval to the Planning Department and then recorded with the County prior to issuance of building permit. Submitted by Caitlin Shinn, Planner (February 25th, 2026) STAFF COMMENTS – PUBLIC WORKS: 3 1. No Comments Submitted by Stephen Winzenread, PE, Public Works Director/City Engineer (February 25th, 2026) STAFF COMMENTS – FIRE DEPARTMENT: 4 1. No Comments. Submitted by Chris Willyard, Deputy Fire Marshal (February 25th, 2026) STAFF COMMENTS – UTILITY DISTRICT: 5 1. No Comments. Submitted by David Brigance, HUD Construction Supervisor (February 25th, 2026) HPC Minutes 03/03/2026 21 8. STAFF-LEVEL PROJECTS, APPROVED: (Youtube Link) SP-007051-2025: Christ Methodist Church Office Parking & Sidewalk – Site Plan (103 Maple Dr) SUB-006891-2025: Freehill Business Park Ph 2 Lot 2 & 3 – Final Plat (157 Molly Walton Dr) SUB-006708-2025: Meadows of Indian Lake Ph 4 Sec 3 Lots 248 & 249 Consolidation – Final Plat (344 & 342 Raintree Dr) SP-007058-2025: YMCA Pavillion Addition – Site Plan (102 Bluegrass Commons Blvd) 10. STAFF-LEVEL PROJECTS, PENDING: (Youtube Link) SUB-006988-2025: C L Powell Addition Lot 17 & 18 Resub – Final Plat (134 Powell Dr) A - 2/11/26 Lead Planning Staff: Caitlin Shinn SUB-007110-2026: Hendersonville Business Park Lot 3 – Final Plat (100 New Shackle Island Rd) S – 2/19/26 Lead Planning Staff: Timothy Whitten SUB-007106-2026: Maple Row Subdivision – Final Plat (105 Maple Row Blvd) S – 2/19/26 Lead Planning Staff: Timothy Whitten SP-007030-2025: Stonecrest Ph 5, Sec 2 & 3 Elevation Amendment – Site Plan (1351 Saundersville Road) A – 12/18/25 Lead Planning Staff: Caitlin Shinn HPC Minutes 03/03/2026 22 SUB-007050-2025: W.A. Shivel Addition Lot 1, 2, & 3 – Final Plat (134 Shivel Dr) S – 2/25/26 Lead Planning Staff: Timothy Whitten 11. ASSISTANT PLANNING DIRECTOR COMMENTS: (Youtube Link) Assistant Director Timothy Whitten spoke about the development of Chick-fil-a and how great the site looks. Timothy also spoke on the Westlake Gateway sign and how we are continuing to work on it with the design team and the progress we are making. 12. ADJOURNMENT {Youtube Link) HPC Minutes 03/03/2026 MOTmN by Slatery, seconded by Kerr, to adjourn the Hendersonville Planning Commission Meeting at 6:56 PM. Altizer, Evans, Hardwick, Hasty, Kerr, Martin, Silkwood, Slatery, and Wessel voted aye. Nay: None. None Abstained. Absent: None. MOTION PASSED. (9-0-0) 23

Source: City of Hendersonville website. First collected Oct 18, 2026.