Board of Mayor and Alderman Agenda Packet (PDF)
City of Hendersonville · Sumner County · meeting of Feb 10, 2026 · Agenda packets
Open the original document More from City of Hendersonville
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Anyone needing accommodations due to disabilities, please contact the ADA Coordinator at 615- 822-1016 at least 24 hours
prior to the meeting.
CITY OF HENDERSONVILLE
BOARD OF MAYOR AND ALDERMEN
February 10, 2026 at 7:00 p.m.
101 Maple Drive North, Hendersonville, TN 37075
I. Call to Order by the
Mayor
II. Acceptance of Agenda
III. Presentations
IV. Public Hearing
V. Minutes
A. Approval of January 13,
2026 BOMA meeting minutes
VI. Citizens’ Commen
ts
VII. Nomination
A. Nomination of Stephe
n Winzenread as the Public Works Director
VIII. Consent Agenda
1. Receive and F
ile: FY2025 Annual Comprehensive Financial Report
(Available on the City’s Website Here)
2. Receive and File:
Declaration of Emergency in Hendersonville, Tennessee
dated January 25, 2026
IX. Ordinances and R
esolutions
Sasse, 3. Second reading o
f Ordinance 2025-24, an ordinance to amend Title 5, Municipal
Burgdorf, Finance and Taxation, to allow for the acceptance of partial payments for City of
Hendersonville real and personal property taxes
Martin 4. Reading of
Resolution 2026-01, a resolution approving the TBN Music City this
This is just a fix to be(Millenia Cottages) Final Development Plan located at 645 East Main Street,
correcting the indents Hendersonville, Tennessee
Collins, 5. Second re
ading of Ordinance 2025-26, an ordinance amending the
Clary Hendersonville Municipal Code, Title 20 establishing credits for assessed
impact fees
Collins, 6. Second rea
ding of Ordinance 2025-25, an ordinance amending the
Clary fix Hendersonville Municipal Code, Title 20 establishing impact fees for the
Fit in this City of Hendersonville
Clary 7. First re
ading of Ordinance 2026-01, an ordinance amending the Hendersonville
indentation again for Municipal Code repealing and replacing Title 4 (Municipal Personnel), amending
Correct the spacing Section 2-101 (Appointing Members to various Boards and Commissions), and to
This is a pain to keep adopt a revised edition of the Personnel Rules and Regulations
3-16
177
18-21
22-31
32-38
39-130
131-293
1
Pages
Anyone needing accommodations due to disabilities, please contact the ADA Coordinator at 615- 822-1016 at least 24 hours
prior to the meeting.
Clary 8. Firs
t reading of Ordinance 2026-02, an ordinance amending budget ordinance
2025-09 to reflect mid-year adjustments to the City’s 2026 fiscal year budget
(Subject to approval of the Board, pursuant to Ordinance 2002-12)
Clary 9. Rea
ding of Resolution 2026-04, a resolution to waive permit fees for properties
damaged by the January 2026 winter storms (Subject to approval of the Board,
pursuant to Ordinance 2002-12)
Clary 10. Re
ading of Resolution 2026-05, a resolution of the City of Hendersonville,
Tennessee expressing opposition to any State-imposed cap on property taxes,
which limits local governments in funding services desired by their residents, and
urging the City’s legislative delegation to oppose State legislation that would
impose such a cap (Subject to approval of the Board, pursuant to Ordinance
2002-12)
Clary 11. Re
ading of Resolution 2026-06, a resolution authorizing the Mayor to extend the
City’s interlocal agreement of mutual aid assistance with Number One Volunteer
Fire Department and Shackle Island Volunteer Fire Department for City Fire
Department services (Subject to approval of the Board, pursuant to Ordinance
2002-12)
X. Other Agen
da Items
12. Vote on the
appointment of Alyce Couche to the Arts Council
XI. Reports
13. Brief Co
mmittee Reports:
1. Capital Projects – Roberson
2. Planning - Martin
3. Public Safety – Goodwin
4. General - Garza
5. Finance – Sasse
14. BOMA Repor
t
XI. Executiv
e Session: Status on Markthomas Rogers vs. City of Hendersonville, Adams
Contracting, LLC, Kimley-Horn and Associates, Inc., and Pape-Dawson Consulting
Engineers, LLC F/K/A Ragan Smith Associates, Inc.
A. Considera
tion of Markthomas Rogers vs. City of Hendersonville, Adams
Contracting, LLC, Kimley-Horn and Associates, Inc., and Pape-Dawson
Consulting Engineers, LLC F/K/A Ragan Smith Associates, Inc.
XII. Adjournme
nt
294-300
301-303
304-315
316-322
323
324-334
2
MINUTES OF REGULAR MEETING
JANUARY 13, 2026
PAGE 1
CITY OF HENDERSONVILLE
BOARD OF MAYOR AND ALDERMEN
MINUTES OF REGULAR MEETING
January 13, 2026 at 7:00 P.M.
101 Maple Drive North, Hendersonville, TN 37075
PRESENT
JAMIE CLARY, MAYOR
MARK SKIDMORE, VICE-MAYOR, ALDERMAN
MARK BURGDORF, ALDERMAN
RACHEL COLLINS, ALDERMAN
KAREN DIXON, ALDERMAN
MARK EVANS, ALDERMAN
JANNA GARTON, ALDERMAN
BOB GARZA, ALDERMAN
TERRI GOODWIN, ALDERMAN
MICHAEL MARTIN, ALDERMAN
EDDIE ROBERSON, ALDERMAN
JEFF SASSE, ALDERMAN
DON WARD, ALDERMAN
LANCE WRAY, CITY ATTORNEY
TAMARA INGERSOLL, CITY RECORDER
Th
e January 13, 2026, BOMA meeting was opened with prayer led by Ryan Flatt, Events
Coordinator with Recovery Refuge at Long Hollow Church.
The P
ledge of Allegiance was led by Mayor Clary.
AGE
NDA
Goodw
in moved; Skidmore seconded a motion to accept the January 13, 2026, agenda.
Robe
rson moved; Garton seconded a motion to amend the agenda to group all of the
appointments and reappointments to board and committees under #9 on the agenda.
The
re was a unanimous vote to approve the amendment to the agenda.
Gar
ton moved; Goodwin seconded a motion to amend the agenda by removing item #1
from the consent agenda.
The
re was a unanimous vote to approve the amendment to the agenda.
Goodw
in moved; Garza seconded a motion to amend the agenda by adding the
confirmation of the nomination of George Edwards as Fire Chief immediately following
citizens’ comments.
3
MINUTES OF REGULAR MEETING
JANUARY 13, 2026
PAGE 2
There was a unanimous vote to approve the amendment to the agenda.
T
he motion to accept the agenda as thrice amended was approved unanimously.
Clary declared the motion carried.
PRESENTATIONS
T
here were a presentation of the Festival of Lights awards by Natalie Lankster from the
Parks Department and Rachel Ink with Holiday Fest. The winners were as follows:
B
est Overall – 99 Blue Ridge Trace
Clark Griswold – 1078 Avery Trace Circle
Most Lit – 1568 Drakes Creek Road
Reason for the Season – 126 Twin Bay Drive
Traditional – 100 Lucinda Lane
Neighborhood Harmony – Santa Claus Lane (Nathan Forest Drive)
PUBLIC HEARING
N
one.
M
INUTES
D
ixon moved; Ward seconded a motion to approve the December 9, 2025, minutes.
T
here was no discussion.
T
here was a unanimous vote to approve the December 9, 2025, minutes.
C
lary declared the motion carried.
C
ITIZENS’ COMMENTS
C
al Gentry indicated that he is the acting project manager for the Grace Place project. He
noted that Grace Place appreciates the support of the Board. He noted that several people
were in attendance to show support of Grace Place. He spoke in support of the ordinance
to waive payment into the Tree Bank for non-profit organizations.
C
hris Taylor spoke in support of Grace Place and noted that they do great work for the
community. He also spoke regarding impact fees. He suggested that strongarming
developers works well. With impact fees, the City would be giving up the ability to
negotiate. Impact fees set the minimum and most developers won’t pay more than the
impact fee amount. He strongly encourages that if impact fees are passed, to approve the
version presented by Collins and Clary that does not add impact fees to commercial
development. Mr. Taylor also commended the City on the development of the
Transportation Plan and spoke about how progressive this is.
D
avid Luckey is a local builder and investor. He also spoke against impact fees,
4
MINUTES OF REGULAR MEETING
JANUARY 13, 2026
PAGE 3
particularly related to commercial properties. He noted that the study that was done has to
be done every five years. He noted that the population of the City has grown 4.6% over the
last five years. The Tichler Bise study noted that the population is estimated to grow by
12% over the next five years and Mr. Luckey explained that he does not think this
assumption is accurate and that the population numbers in the study are overstated. He
noted that over the last five years the City’s fund balance has grown from $18.7m to
$44.7m. During this same time sales tax revenue has gone up 92%. He feels that it would
be detrimental to impede commercial growth by establishing impact fees.
CO
NSENT AGENDA
N
one.
NO
MINATION
M
ayor Clary nominated George Edwards as Fire Chief.
T
here was unanimous vote to approve the Mayor’s nomination to appoint George Edwards
as Fire Chief.
C
lary declared the nomination approved.
O
RDINANCES AND RESOLUTIONS
T
he caption was read for reading of Resolution 2025-43, a resolution to authorize waiver of
payment into the tree bank fund for qualifying nonprofit organizations.
R
oberson moved; Evans seconded a motion to approve Resolution 2025-43.
C
lary explained that he had a discussion with two of the members of the Grace Place board
and they mentioned that Grace Place paid $58,000 into the Tree Bank. The Tree Bank was
created a couple decades ago to protect the tree canopy in the city. When trees are
removed, we need to make sure that trees are replaced. If they can’t be replaced on the
same property they were removed from, funds must be paid to the city in order for trees to
be planted elsewhere at a later time. Mayor Clary supports the Tree Bank. However,
collecting $58,000 from a non-profit seems like too much as Grace Place already does a lot
for the community and provides for the greater good of the city.
M
ayor Clary brought this resolution forward in order for non-profit organizations that
provide for the greater good of the community beyond what the contribution to the Tree
Bank would do would not have to pay into the Tree Bank.
W
ith no objections, Alderman Garza was added as a sponsor.
A
lderman Roberson noted that he believes in the Tree Bank and keeping the city green.
However, non-profits invest in more than trees; they invest in the lives of individuals. This
resolution not only provides relief to Grace Place but will provide an exemption in the
future to non-profits.
5
MINUTES OF REGULAR MEETING
JANUARY 13, 2026
PAGE 4
Alderman Sasse expressed his appreciation for Grace Place and the work they do for the
community. He asked about the retro-activeness of this resolution because Grace Place has
already paid these fees. He asked what needs to be done to refund these fees to Grace
place. Director Ingersoll responded that once this legislation passes, the refund can be
incorporated into the mid-year budget amendment that will be coming forward to Finance
Committee at the end of January. The authorization to refund them is in this resolution.
A
lderman Garton spoke in support of this resolution and believes that the funds will be
better used by Grace Place in this instance.
A
lderman Evans noted that section six indicates that this resolution is effective upon
adoption and is retroactive to January 1, 2025.
T
here was a unanimous vote to approve Resolution 2025-43.
C
lary declared the motion carried.
T
he caption was read for the reading of Resolution 2025-44, a resolution to authorize a fee
waiver for temporary sign permits for signs placed on city property by qualifying nonprofit
organizations.
D
ixon moved; Goodwin seconded a motion to approve Resolution 2025-44.
A
lderman Dixon indicated that this resolution is related to the sign permit required in order
to put up a sign and the cost is $27. This resolution would waive this fee for non-profit
organizations.
W
ith no objections, Alderman Burgdorf was added as a sponsor.
A
lderman Burgdorf asked what the qualifying factors are for the non-profits. Alderman
Dixon noted that it is anyone that is a 501 and subject to approval. Mayor Clary further
clarified that the full qualifications are detailed in section one of the resolution.
A
lderman Sasse asked for the definition of a temporary sign. Director Free indicated that
is 30 days or less. Alderman Sasse also asked if they would still be required to obtain a
permit and Director Free confirmed that they would need a permit.
A
lderman Collins indicated that in her experience the requestor will get a sticker to put on
the back of the sign that has the location of the sign and the dates it is approved for.
T
here was a unanimous vote to approve Resolution 2025-44.
C
lary declared the motion carried.
T
he caption was read for first reading of Ordinance 2025-23, an ordinance amending the
Hendersonville Municipal Code, Title 20 establishing impact fees for the City of
Hendersonville.
B
urgdorf moved; Sasse seconded a motion to approve Ordinance 2025-23.
6
MINUTES OF REGULAR MEETING
JANUARY 13, 2026
PAGE 5
Mayor Clary opened the discussion by noting that this ordinance as well as Ordinance
2025-25 and Ordinance 2025-26 could be discussed together as they all address different
ideas for the implementation of impact fees. Each would then be voted on separately.
Alderman Sasse asked for a summary of the differences between the ordinances. Director
Free went over the basic differences. Ordinance 2025-23 includes both residential and
commercial, 2025-25 is residential only. Ordinance 2025-23 sets the amount that can be
charged roughly 50% of the maximum. Ordinance 2025-25 sets the amount that can be
charged flat amount that increases incrementally through 2030 and is also below the
maximum. Most of the remaining items in these ordinances are very similar. Under both,
planned developments are exempt from paying impact fees.
Alderman Martin indicated that both ordinances have an administrator and asked if this
would be a new employee or fall under an existing employee. Director Free indicated that
this is being assigned to the Finance Director.
Alderman Martin also asked how much revenue would have been generated last year if the
impact fees had been implemented then. Director Free noted that for Ordinance 2025-23
the estimated commercial impact fees would have been $424,000 and residential would
have been $1,400,000 for a total of over $1.8m. However, if you remove the planned
developments from this, the total would have been $75,000 -$100,000. For ordinance
2025-25 the estimated residential impact fee would have been $810,000 but by removing
planned development the total would have been $40,000-$60,000.
Alderman Martin asked for clarification regarding who would pay for the impact fees, the
developer or the homeowner. Director Free noted that in both ordinances the developer
determines who ends up paying the cost. The developer will pay but may pass this on to
the homeowner.
Alderman Martin asked for explanation of the credit system. Director Free explained that
if the developer does more than they are required in the plan, the additional items may
count towards credit and would reduce or eliminate the impact fees required to be paid.
Alderman Martin asked about Costco as an example. Costco did considerably more in
improvements than the required impact fees. Director Free noted that the impact fee is set
as the expectation of the developer and the City’s point of leverage for negotiation is
reduced.
Alderman Martin noted that Ordinance 2025-23 is more common and traditional compared
to others. Ordinance 2025-25 is more unique. Ordinance 2025-23 is more defensible and
hopes others will support it.
Alderman Goodwin noted that she can’t support Ordinance 2025-23 because we would not
have all the improvements that Costco and others have done. The businesses would pay
just the impact fee and nothing more.
Alderman Garza used to work in retail and does not support commercial impact fees.
Commercial properties already pay a higher property tax rate at 40% and they general sales
tax revenue. They also bring jobs to Hendersonville. We need to keep in mind destination
7
MINUTES OF REGULAR MEETING
JANUARY 13, 2026
PAGE 6
businesses as people will drive to the next town over to shop there.
Alderman Ward noted that he does not support commercial impact fees. He asked if we do
have to complete another study in five years and the cost of the study. Director Free
responded that we do have to complete a study every five years and the cost is typically
between $50,000 and $80,000. Alderman Ward also asked when we anticipate being fully
built out residentially which would be the end of impact fee collection. Director Free
indicated that the estimate timing is 9-13 years.
Alderman Evans commented on affordability. The cost of new homes is expensive. He
asked for clarification on Costco. They paid roughly $1.7m in improvements and if we had
impact fees they would have only paid roughly $700,000. Director Free noted that it is
difficult to determine what would have happened as the market is always changing.
Alderman Evans noted that impact fees can limit what the City receives. He also noted that
the City has done a good job of negotiating improvements from the developers. He also
noted that many residential developments are paying voluntary impact fees.
Alderman Evans noted that he has been fielding comments from constituents regarding
impact fees. He indicated that his understanding of impact fees is that the impact fees have
to be for new capital projects for parks or transportation. It is not for maintenance.
Alderman Evans asked if impact fees could be used for any of the projects on the
transportation plan. Mr. Wray indicated that impact fees can be used for these projects as
long as it increases capacity and are needed as a result of and needed by the development
that paid the impact fees. Alderman Evans notes his concern that projects funded by
impact fees might push transportation plan projects down in priority.
Alderman Dixon indicated that she intends to vote for impact fees tonight. She asked the
sponsors of 2025-23 what the motivation for commercial impact fees is.
Alderman Burgdorf noted that his ward is the oldest in the city. He noted that impact fees
are a one-time charge. His constituents want a level playing field for both residential and
commercial. This is a way for the developers to help with infrastructure for roads and
parks. Impact fees can be used for a lot of things. He asked if sales tax revenue went up,
down or remained flat last year. Director Ingersoll indicated that it went up a little bit.
Alderman Burgdorf noted that this board may approve impact fees, but another board may
remove them. The board also has the ability to make updates if changes are necessary. He
is in support of ordinance 2025-23.
Alderman Sasse noted that the impact fee study was presented months ago and is glad the
city is finally moving on them. He wants fairness across residential and commercial.
Setting the fees at 50% allows the city to partner with the developers to build infrastructure
for the residents. Citizens are paying the sales tax, not the businesses. He noted that with
the new development at Maple Row impact fees may have been enough to pay for the
traffic signal that is needed.
Alderman Skidmore noted that the discussions on impact fees have been gong on a long
time and he supports the decisions of previous boards. He noted that consideration needs
to be made for the small business developers. He is more concerned about what the
constituency wants compared to what the big developer wants. He questioned whether
8
MINUTES OF REGULAR MEETING
JANUARY 13, 2026
PAGE 7
impact fees are a fee or a tax. He is against taxes. He thinks that the impact fee study is
archaic and needs to be completed to be more relevant.
Alderman Martin is in support of this because of the retail component and supports how the
fees go to roads and not parks.
Alderman Dixon noted that she is leaning toward supporting residential only impact fees
due to the great work the Planning department has done negotiating with developers for
improvements.
Alderman Roberson noted that the Tennessee General Assembly answered the question
about whether impact fees are a fee or a tax. T.C.A. §6-2-201(15) indicates that it is a fee.
Mr. Wray confirmed that it is a fee from a legal perspective.
Alderman Roberson also asked if impact fees were to be waived, if the city would have to
pay them for the developer. Director Free confirmed that they would have to be paid.
Alderman Roberson then asked if a church or non-profit would be required to pay impact
fees. Director Free confirmed that they would be required to pay. Mr. Wray explained that
if the board found that the public benefit outweighed the fee, they could incorporate an
exemption into the ordinance. Alderman Roberson also noted that they would not be
required to pay under 2025-25 as this is only for residential.
Alderman Roberson indicated that the city has several developments that have paid
voluntary impact fees. Director Free explained that developers often pay these in order to
have a use added, to allow higher density or other factors.
Alderman Roberson wants to make sure he understand the ramifications of both
ordinances. He requested that an analysis of the Costco development be passed out. He
feels this is important to the financial well-being of the city. Costco spent $1.7m in offsite
improvements. With impact fees they would have needed to spend roughly $750,000.
Alderman Roberson noted that even without impact fees developers are required to do
some improvements. Director Free confirmed that they have to do whatever the traffic
study indicates is necessary for their development. Costco pays roughly $52,000 in
property taxes, $14,000 in personal property taxes and generates roughly $2,000,000 in
sales tax annually. They also employ 214 people.
Alderman Roberson indicated that he supports ordinance 2025-25 as it meets the goals and
objectives that are important to the city to succeed in the future. This will place the cost of
infrastructure on the cost causer, will not impact the city’s robust business community, this
impact fee is at a reasonable level that won’t have significant impact on home affordability,
the City already requires extensive improvements be completed by commercial developer
without the use of impact fees. He noted that for the Maple Row development the
developers paid for the traffic signal.
There was a motion by Dixon, seconded by Garton to take a ten (10) minute recess
beginning at 9:07 p. m.
Aye: Burgdorf, Collins, Dixon, Evans, Garton, Garza, Goodwin, Martin, Roberson,
Skidmore, and Clary.
9
MINUTES OF REGULAR MEETING
JANUARY 13, 2026
PAGE 8
Nay: Sasse and Ward
Clary declared the motion carried.
The meeting resumed at 9:18 p.m.
Alderman Collins pointed out that if a traffic study indicates that a traffic signal or turn
lane is required, that is separate from any credits. Ward 5 and 6 are most likely to have
development with impact fees. She doesn’t want to lose good businesses in Hendersonville
because of impact fees. She also noted that sales tax revenues are also very important.
Alderman Collins noted that attainability is an issue and the city also needs to pay for the
projects included in the transportation plan and impact fees could pay for a portion of it.
Alderman Collins also noted that adding an impact fee will increase the cost of a house for
the homeowner.
Alderman Collins asked if it is legally required for the work done with impact fee funds be
in proximity of the development. Mr. Wray explained that the work done has to be in
relation to the new development. If work has to completed, it must be needed because of
the new development.
Alderman Skidmore indicated that he did not believe that it is correct that sales tax
increases prevented an increase to property tax.
Alderman Roberson noted that the increase sales tax for PIPP is only part of the sales tax
and that sales tax has increased. It has been used to pay for public safety vehicle
replacement. Without this new sales tax increase, an increase to property tax would have
been likely.
Mayor Clary asked if we have the obligation to seek the opinion of the Planning
Commission for impact fees. Director Free indicated that we do not. We did have
Planning Commission review the plan for impact fees and they recommended that it move
to BOMA. They wanted to make sure that the business community wasn’t negatively
impacted. Wendy Slatery from the Planning Commission also noted that something could
be done to help the budget without having an impact on development.
Alderman Skidmore called to question. No one else was in the queue to speak so no vote
was necessary.
Aye: Burgdorf, Martin, Sasse, and Skidmore.
Nay: Collins, Dixon, Evans, Garton, Garza, Goodwin, Roberson, Ward, and Clary.
Clary declared the motion failed.
The caption was read for first reading of Ordinance 2025-25, an ordinance amending the
Hendersonville Municipal Code, Title 20 establishing impact fees for the City of
Hendersonville.
Collins moved; Roberson seconded a motion to approve Ordinance 2025-25.
10
MINUTES OF REGULAR MEETING
JANUARY 13, 2026
PAGE 9
Mayor Clary indicated that he sent out an amendment that he would like to have
considered. He also clarified that the multifamily, the fee is by unit, not the development
as a whole. The base rate of $3,500 is based on the amount of voluntary impact fees that
are being paid by the most recent development.
Clary made a motion to amend, Collins seconded, to replace Section (2) Fee Table with the
following:
Residential Development shall be assessed on a per unit basis for Single Family and Multi Family
Dwellings with the following rates for calendar years 2026-2030 and beyond:
Residential – Impact Fee by Type
2026 2027 2028 2029 2030 - beyond
Single Family
$3,500
$4,000
$4,500
$5,000
$5,500
Multi-Family
$2,500
$3,000
$3,500
$4,000
$4,500
Single Family – Impact Fee Allocation
2026 2027 2028 2029 2030 - beyond
1/3 Parks
$1,155
$1,320
$1,485
$1,650
$1,815
2/3 Roads
$2,345
$2,680
$3,015
$3,350
$3,685
Total
$3,500
$4,000
$4,500
$5,000
$5,500
Multi Family – Impact Fee Allocation
2026 2027 2028 2029 2030 - beyond
1/3 Parks
$825
$990
$1,155
$1,320
$1,485
2/3 Roads
$1,675
$2,010
$2,345
$2,680
$3,015
Total
$2,500
$3,000
$3,500
$4,000
$4,500
Vote on Amendment:
Aye: Burgdorf, Collins, Dixon, Evans, Garton, Garza, Goodwin, Martin, Ward and Clary.
Nay: Roberson, Sasse and Skidmore.
Clary declared the motion carried.
Vote on Main Motion:
Aye: Collins, Dixon, Evans, Garton, Garza, Goodwin, Martin, Roberson, Ward and Clary.
Nay: Burgdorf, Sasse and Skidmore.
11
MINUTES OF REGULAR MEETING
JANUARY 13, 2026
PAGE 10
Clary declared the motion carried.
The caption was read for first reading of Ordinance 2025-26, an ordinance amending the
Hendersonville Municipal Code, Title 20 establishing credits for assessed impact fees.
Clary moved, Collins seconded a motion to approve Ordinance 2025-26.
Mayor Clary explained that credits were done in a stand alone ordinance do make this
easier to understand.
Mr. Wray explained that there was a clerical error and that sections 20-1408 through 20-
1412 that were included in ordinance 2025-23 should have been included in this ordinance.
Clary moved, Collins seconded a motion to amend by adding the following language after
section 20-1407, (6):
20-1408. Miscellaneous Provisions
(1) Developer Exactions. Nothing in this chapter shall restrict the City from requiring the construction
of necessary improvements required (e.g. the addition of required open space; or a traffic study show a
reduction in level of service to justify the addition of a turn lane) to serve the development project, whether
or not such improvements are of a type for which credits are available.
(2) Use of Impact Fees and Segregation of Funds. Impact fee funds that are distinct from the general
fund of the City are hereby created, and the impact fees received will be deposited in each of the interest-
bearing accounts of the associated impact fee. Eli gible expenditures from the monies in the impact fee
accounts shall be used only for following:
(a) Impact fee revenues shall be used exclusively for capital improvements or equipment for
streets and parks, as applicable, to serve new development and as approved by the Board
of Mayor and Aldermen. Funds shall be maintained in separate accounts for roads impact
fees and parks impact fees.
(b) Qualifying project costs include project engineering costs; the acquisition cost of rights
of way and easements, including legal costs; the construction cost of improvements,
including, but not limited to, public street travel lanes, public pedestrian and bicycle
pathways, turning lanes or the portion thereof located within the right of way of a public
street, lighting, signalization, signage, equipment, and landscaping improvements that are
required for the road improvement to function effectively or a ssociated with the park
improvements; and the principal, interest and other financing costs of bonds, notes or
other obligations issued by or on behalf of the City to finance qualified improvements.
(3) Ineligible expenses. Ongoing operational costs, maintenance of existing facilities . In addition,
rehabilitation, reconstruction, replacement or capital equipment , except to the extent that the projects
increase the capacity to serve new development.
(4) Recordkeeping. The impact fee administrator shall maintain accurate records of the impact fees
paid, including the name of the person paying such fees, the project for which the fees were paid, the date
of payment of each fee, the amounts received in payment for each fee, and any other matters that the City
deems appropriate of necessary to the accurate accounting of such fees. Records shall be available for
review by the public during normal business hours and with reasonable advance notice pending the
availability of the impact fee administrator.
12
MINUTES OF REGULAR MEETING
JANUARY 13, 2026
PAGE 11
(5) Programming of Funds. The City shall assign monies from the impact fee fund to specific projects
and related expenses for eligible improvements of the type for which the fees in that fund were paid. Any
monies, including any accrued interest, not assigned to specific projects within such capital improvements
program and not expended shall be retained in the same impact fee fund until the next fiscal year.
(6) Underpayment or Overpayment. If an impact fee has not been paid, has been underpaid or
overpaid for any reason, the underpayment or overpayment shall be remedied as soon as possible after it
is discovered. Any amounts overpaid by an applicant shall be refunded by the impact fee administrator to
the applicant within thirty (30) days after the discovery of the overpayment, with interest since the date of
such overpayment. Any amounts not paid or underpaid by the applicant shall be paid to the impact fee
administrator within thirty (30) days after notice is given to the applicant of the amount due. In the case
of a nonpayment or underpayment, the City shall not issue any additional permits or approvals for the
project for which the impact fee was previously underpaid until such underpayment is corrected, and if
amounts owed to the City are not paid within such thirty (30) day period, the City may also rescind any
permits issued in reliance on the previous payment of such impact fee.
(7) Periodic Updates. The study will be revisited from time to time, at approximately five (5) year
intervals, for adjustments to the fee schedule, or at the request of the Board of Mayor and Aldermen.
20-1412. Effective Date
This ordinance shall become effective for any submittals received after ____________ that do not
meet the vesting standards as set forth by the ordinance.
There was unanimous approval of this amendment.
Clary declared the motion carried.
Alderman Sasse asked for an explanation on the expiration of credits. Mayor Clary
explained that if a developer doesn’t complete the improvements for credit within 10 years,
they would have to pay the impact fees.
Aye: Burgdorf, Collins, Dixon, Evans, Garton, Garza, Goodwin, Martin, Roberson, Sasse,
Ward and Clary.
Nay: Skidmore.
Clary declared the motion carried.
The caption was read for first reading of Ordinance 2025-24, an ordinance to amend Title
5, Municipal Finance and Taxation, to allow for the acceptance of partial payments for City
of Hendersonville real and personal property taxes.
Sasse moved; Burgdorf seconded a motion to approve Ordinance 2025-24.
There was a unanimous vote to approve Ordinance 2025-24.
Clary declared the motion carried.
The caption was read for reading of Resolution 2025-45, a resolution to establish a
purchasing card policy for the City of Hendersonville and to replace the existing credit card
13
MINUTES OF REGULAR MEETING
JANUARY 13, 2026
PAGE 12
policy, dated July 9, 2009, with said purchasing card policy upon implementation of the
purchasing card program.
Sasse moved; Garza seconded a motion to approve Resolution 2025-45.
There was a unanimous vote to approve Resolution 2025-45.
Clary declared the motion carried.
OTHER AGENDA ITEMS
Goodwin moved; Garza seconded a motion to approve the following appointments and
reappointments:
Vote on the reappointment of Ken Brinkley to the Adjustment and Appeals Board
Vote on the reappointment of Mike McCarroll to the Adjustments and Appeals Board
Vote on the reappointment of Robbie Borghi to Beautiful Hendersonville
Vote on the reappointment of Daryl Spindler to the Personnel Board
Vote on the reappointment of Nancy Golden to the Stormwater Appeals Board
Vote on the reappointment of Steve Gregory to the Stormwater Appeals Board
Vote on the appointment of Andrew Hait to the Stormwater Appeals Board
Vote on the appointment of Sean Campbell to the Industrial Development Board
Vote on the reappointment of John Sheley to the Industrial Development Board
Vote on the appointment of Dan Haskell to the Lakeshore Committee
Vote on the reappointment of Gene Hively to the Arts Council
Vote on the appointment of Michael Krasnow to the Beer Board
There was a unanimous vote to approve these appointments and reappointments.
Clary declared the motion carried.
REPORTS
Brief Committee Reports
General-Garza
• Sent to BOMA with a positive recommendation the final development plan for
TBN Music City.
• Update to Municipal Code and Personnel Rules & Regulations to BOMA with a
14
MINUTES OF REGULAR MEETING
JANUARY 13, 2026
PAGE 13
positive recommendation.
• Discussion on aviation noise.
Public Safety-Goodwin
• Discussed on street parking
Planning – Martin
• Heritage Park Approved
• 1 Twenty Sanders Ferry Approved
• Nashville Tempered Glass Approved
BOMA Report-Eckenroth
• Capital Projects meeting on the 22nd
• Mid-Year budget underway
• Salary study is underway
• Sales tax is up about 3%
• Investment income is above budget
• Public safety calls for service is steady
• Drakes Creek/Stop 30 all property owners have settled and the last payment went
out this week
EXECUTIVE SESSION
Executive session regarding Gary Lynn Ealey vs. City of Hendersonville was entered into at 10:08
pm and exited at 10:30 pm.
Evans moved, Garton seconded a motion to approve the proposed settlement agreement, upon the
condition that to the fullest extent of the law, the current and proposed restrictions on rentals shall
run with the land and shall be permanent, binding, and not subject to amendment, modification,
waiver, or termination without consent of the City. This settlement resolves this litigation without
any monetary payment by the City and, while it removes the owner-occupancy requirement for this
specific development, under these unique circumstances, it preserves specific and strict rental
restrictions in favor of the City and is determined to be in the City’s best interest. The City
Attorney and staff are authorized to execute all documents necessary to finalize and implement the
terms of the settlement.
Aye: Evans, Garton, Garza, Goodwin, Martin, Roberson, Sasse, and Ward.
Nay: Burgdorf, Collins, Dixon, Skidmore and Clary.
Clary declared the motion carried.
Upon motion by Garza and second by Goodwin, there was a unanimous vote for
approval to adjourn.
Clary declared the meeting adjourned at 10:32 p.m.
15
MINUTES OF REGULAR MEETING
JANUARY 13, 2026
PAGE 14
Approved: Jamie Clary, Mayor
Attest: Tamara Ingersoll, City Recorder
16
17
ORDINANCE 2025-24
Sponsor: Sasse, Burgdorf
AN ORDINANCE TO AMEND TITLE 5, MUNICIPAL FINANCE AND TAXATION, TO ALLOW
FOR THE ACCEPTANCE OF PARTIAL PAYMENT S FOR CITY OF HENDERSONVILLE
REAL AND PERSONAL PROPERTY TAXES
WHEREAS, T.C.A. § 6-56-109(a) authorizes an y municipality that collects its own property taxes to
accept partial payments of local property taxes; and
WHEREAS, the Board of Mayor and Aldermen of the City of Hendersonville believe that such a program
is in the best interest of the City;
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF MAYOR AND ALDERMEN OF
THE CITY OF HENDERSONVILLE, TENNESSEE that Title 5, Municipal Finance and Taxation of
the Hendersonville Municipal Code shall be amended to include the following as a new chapter 7:
CHAPTER 7 – PROPERTY TAX PAYMENTS AND REFUNDS
5-701 - Partial Payments of Property Taxes
(1) The City shall accept partial payments of annual real property taxes beginning
with the 2026 tax year. Notwithstanding the following schedule, the entire
amount of taxes due must be paid in full prior to the first day of March or shall be
considered delinquent. Any unpaid amount shall begin accruing interest on
March 1
st pursuant to T.C.A § 67-5-2010(a)(1).
(2) Partial payments will be accepted according to the following Schedule:
A maximum of five (5) monthly payments may be made between
October and February with the final payment due prior to the first day of
March.
(3) Partial payment of property taxes may not be made in installments of less than fifty
dollars ($50.00), except for a final payment.
(4) Any voucher issued pursuant to a relief program shall be used as all or a portion of
the final payment.
(5) Partial payments will be accepted in the form of cash, check, money order or credit
card.
(6) Notwithstanding the schedule in subsection (2), no penalties, fines, interest or other
fees shall be assessed against the taxpayer except as provided by T.C.A. § 67-5-
2010(a)(1).
(7) Prior to the final reading of this ordinance, the City Recorder shall transmit to the
State Comptroller of the Treasury a copy of this ordinance, which shall serve as
18
the plan required by T.C.A. § 6-56- 109 (b). To fulfill the requirements of that
Section, the City hereby declares that:
(a) The City has the appropriate accounting technology to implement this
program; and,
(b) The City can implement this program within existing resources.
This ordinance shall take effect at the earliest date allowed by law.
First Reading: January 13 th, 2026, passed.
Second Reading: ___________________________
APPROVED:
__________________________
ATTEST: JAMIE CLARY, Mayor
_________________________________________
TAMARA INGERSOLL, City Recorder
APPROVED AS TO FORM AND LEGALITY:
_____________________________________
LANCE A. WRAY, City Attorney
19
LEGISLATIVE HISTORY
Ordinance 2025-24
Sponsors: Sasse, Burgdorf
Committee: Finance
Date of Committee Meeting: December 9, 2025
Committee Recommendation: Yes
BOMA First Reading: January 13, 2026
Vote: Aye: Burgdorf, Collins, Dixon, Evans, Garton, Garza, Goodwin, Martin, Roberson,
Sasse, Skidmore, Ward, Clary. Motion carried.
BOMA Second Reading: February 10, 2026
20
DATE: February 10, 2026
ORDINANCE/RESOLUTION # Ordinance 2025-24
SPECIFIC REQUEST/
RECOMMENDATION:
That the Board of Mayor and Alderman consider
Ordinance 2025-24, approving an update to the Municipal
Code to allow the acceptance of partial payments for
property taxes.
REPORT PREPARED BY: Tamara Ingersoll, Finance Director
BACKGROUND: 1
Historically, due to constraints of the City’s financial system, property taxes have only been accepted in the
full amount of the bill. No payment plans or partial payments have been accepted. The City recently
implemented a new financial system that has functionality to accept partial payments for property tax bills.
Each year, there are several citizens that ask about setting up a payment plan . They are typically citizens
who qualify for the tax freeze or tax relief programs. Historically, these citizens have been told that we
cannot do this for them. Approval of ordinance 2025 -24 would allow staff to accommodate the requests
of these citizens.
DISCUSSION: 2
Currently Sumner County and several surrounding cities accept partial payments for property taxes. By
approving this ordinance, citizens that currently are able to establish a payment plan with Sumner County,
would be able to set up the same type of payment plan with the city.
This ordinance would set the parameters for the allowance of partial payments in a manner that will benefit
citizens and have minimal impact on staff. The city now has the technology to implement this program and
can do so with existing staffing resources.
FISCAL IMPACT: 3
There is no impact to the budget for the adoption of this ordinance.
ATTACHMENTS: 4
1. Ordinance 2025-24
STAFF
REPORT
21
RESOLUTION 2026-01
Sponsor: Martin
A RESOLUTION APPROVING THE TBN MUSIC CITY (MILLENIA COTTAGES) FINAL
DEVELOPMENT PLAN LOCATED AT 645 EAST MAIN STREET, HENDERSONVILLE,
TENNESSEE
WHEREAS, the rezoning and original Preliminary Development Plan (PDP) for TBN Music City located
at 645 East Main Street /0 Music Village Blvd. , Hendersonville, Tennessee (Parcel 158A A 008), was
approved by the Board of Mayor and Aldermen upon second passing of Ordinance 2024-01 on February
27, 2024, with certain conditional changes; and
WHEREAS, on January 6, 2026, the Hendersonville Planning Commission voted 6 to 3 for approval to
the Board of Mayor and Aldermen the TBN Music City Final Development Plan:
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF MAYOR AND ALDERM EN OF
THE CITY OF HENDERSONVILLE, TENNESSEE, that the attached Final Development Plan for TBN
Music City located at 645 East Main Street, Hendersonville, Tennessee (Parcel 158A A 008) is hereby
approved as recommended by the Hendersonville Planning Commission on January 6, 2026.
Adopted this the ____ day of ________________, 2026.
APPROVED:
__________________________
JAMIE CLARY, Mayor
ATTEST:
_________________________________________
TAMARA INGERSOLL, City Recorder
APPROVED AS TO FORM AND LEGALITY:
_____________________________________
LANCE A. WRAY, City Attorney
22
LEGISLATIVE HISTORY
Resolution 2026-01
Sponsor: Martin
Committee: General
Date of Com
mitt ee Meeting: January 13, 2026
Committee Recommendation: Yes
BOMA Reading: February 10, 2026
23
UPDATE TO STAFF REPORT & COMMENTS:
• At its November 4
th meeting, the HPC voted to defer TBN Music City to allow the
developer to go back and add parking for the Independent Living cottages. The plan has
been revised to meet all parking requirements. This has been done by adding one
surface parking space per cottage unit (or two additional spaces per structure). The
applicant is no longer requesting a waiver of any parking requirements. The plan
has also been revised to address previous staff comments. One other minor change
that has been made since the last HPC meeting is that one of the cottages that fronted
on Music Village Boulevard has been relocated to the first row of units on the north side
of the property. The total number of units remains unchanged.
AGENDA DATE: February 10, 2026
ORDINANCE/RESOLUTION # Resolution 2026-01
PROJECT NAME: TBN (Millenia Cottages)
PROJECT TYPE: Final Development Plan
PROJECT LOCATION: 645 E Main Street, Parcel 158A A 008
WARD: Ward 5
FINAL STAFF
REPORT &
COMMENTS
24
2
• Since the definition of Independent Living was a topic of discussion at the last meeting,
the full definition from the zoning ordinance has been provided below:
• The following staff comments have been added to this revised plan:
All proposed sidewalks are to be constructed in conjunction with the first phase (i.e. the
cottages). A three foot grass strip is required between each pair of cottage parking
spaces.
25
3
THE UPDATED FDP
The Preliminary Development Plan for TBN Music City went before the Planning Commission in
January of 2024 and received a negative recommendation to the Board of Mayor & Aldermen. BOMA
then approved the PDP (see image below) following the applicant’s commitment to retain and
refurbish the Twitty Mansion. The BOMA plan reduced the number of Independent Living cottages
from 96 to 90 due to keeping the Twitty Mansion, and showed retention of the brick wall and entrance
along East Main Street.
STAFF REPORT: 1
26
4
PDP APPROVED BY BOMA
27
5
PROPOSED FDP
Now, TBN is moving forward with a request to approve the Final Development Plan (FDP). The PDP
that was approved by BOMA proposed 90 Independent Living cottages, 80 Assisted Living units, a
clubhouse and pool, a chapel, 39,300sf of Office and supporting retail, and retention of the existing
theater, barn, and Twitty Mansion. The proposed FDP removes the Assisted Living facility with its 80
units and expands the Independent Living cottages from 90 to 110 units. Unit density for the cottages
is reduced from 5.82 units/ac. to 4.94 units/ac (15 units/ac is the maximum allowed by the zoning
ordinance). It retains the Twitty Mansion (now fully renovated) and the theater, but shows the existing
barn to be replaced with a new barn/storage facility. The two office outparcels that were proposed on
either side of the Main Street entrance have been reduced to one outparcel to the east of the
28
6
entrance, for a total of 12,650sf vs the previous 39,300sf. Ingress/egress points on Main Street have
been reduced from two to one. Ingress/egress points on Caudill have been increased from 2 to 3.
Overall, the revised layout is similar to the PDP, but presents a very different appearance to East
Main. Instead of having a large assisted living facility and two office buildings facing Main Street, now
the cottages will take the place of all but one of the office buildings and will back up to Main Street
and the existing brick wall.
Parking requirements for the Independent Living cottages is 2 spaces per unit, plus one per
employee. The zoning ordinance states that garages are not allowed to count towards required
parking. TBN is requesting a waiver to allow garages to count towards required parking. The current
layout provides one space in the driveway and one in the garage for units types A through E. Unit type
F meets the required parking since it has two spaces in each driveway. See the attached waiver
request letter from the applicant.
Exterior building elevations of the proposed cottages, clubhouse and barn have been provided. The
siding material on the cottage unit types is not defined. Per images that were included with the PDP,
staff is requiring that the applicant work with staff through the site plan process to provide a sizeable
percentage of brick/stone on each unit and otherwise increase the design quality to be more
equivalent to those initial images (see Planning staff comment #5). The clubhouse
PROPOSED COTTAGES
29
7
PROPOSED CLUBHOUSE
PROPOSED STORAGE BARN
______________________________________________________________________________________________
ESTIMATED NEXT STEPS IN THIS FINAL DEVELOPMENT PLAN APPROVAL PROCESS:
1. BOMA General Committee Meeting (Jan. 13, 2026, estimated)
2. BOMA Regular Meeting (Jan. 27, 2026, estimated)
______________________________________________________________________________________________
STAFF COMMENTS – PLANNING DEPARTMENT: 2
1. In the applicant response to staff comments, it is stated that there are no improvements
proposed to the existing parking lot north-east of the theater and that therefore no
landscaping improvements should be required to it until such time that changes are made.
However, the plans show the existing parking lot to be completely reconfigured on multiple
sheets. Please resolve the conflict.
2. A 20’ Type B buffer is shown along the edge of the parking lot that is north-east of the
existing theater. If the existing parking lot is to be retained, the full 20’ width may not be able
to be obtained without removing some of the pavement width.
3. Amend the Proposed Uses chart as follows to bring it into compliance with the chart
approved with the PDP:
• “General Business” should be “General Business Services”
• Add “Restaurant Quick Service (limited to coffee shop”
4. Sheet L1.0 does not show the proposed office outlot as shown on the other sheets – revise.
30
8
5. The provided cottage elevations do not match the level of design and quality of materials
shown with the PDP. The PDP illustrations showed units with deep porches and eaves, a
mixture of brick, stone and fiber cement board, and other architectural features. While the
proposed cottages do not have to match the illustrations, the overall quality of design and
materials should be at least equivalent. Work with staff through the site plan stage to refine
the elevations and bring them more into alignment with what is shown with the PDP.
6. Proposed materials on the barn elevations are not called out, but appear to resemble CMU
block. CMU is not a permitted material. Work with staff to meet and exceed City building
design requirements
7. Since the cottages are now proposed to back up to East Main Street, preserve all of the
existing brick wall to help serve as a screen from the street. In addition, provide evergreen
screening between the wall and the units.
8. The chart on sheet C2-00 lists unit types A through D, but the layout plan and elevations
show units E and F. Update the chart to reflect counts for all unit types.
Submitted by Timothy Whitten, RLA, AICP, Assistant Planning Director (December 17th, 2025)
STAFF COMMENTS – PUBLIC WORKS: 3
1. No Comments
Submitted by Stephen Winzenread, PE, Assistant Public Works Director/City Engineer (December
17th, 2025)
STAFF COMMENTS – FIRE DEPARTMENT: 4
1. No Comment.
Submitted by Chris Willyard, Deputy Fire Marshal (December 17th, 2025)
STAFF COMMENTS – UTILITY DISTRICT: 5
1. No Comments
Submitted by David Brigance, HUD Construction Supervisor (December 17th, 2025)
31
ORDINANCE 2025-26
Sponsors: Collins, Clary
AN ORDINANCE AMENDING THE HENDERSONVILLE MUNICIPAL CODE, TITLE 20
ESTABLISHING CREDITS FOR ASSESSED IMPACT FEES
WHEREAS the City of Hendersonville is authorized by Tennessee Code Annotated (TCA) §§ 13-3-
401 et seq. and §§ 13-4-301 et seq., and by its general municipal powers under TCA § 6-2-201, to assess
and collect development impact fees for roads and parks in order to ensure that new development pays
its proportionate share of the cost of public facilities needed to serve it; and
WHEREAS, from time-to-time, developers construct or fund eligible road and park improvements, or
dedicate land for parks, that directly offset the need for the City to construct or acquire such facilities
with impact fee revenues; and
WHEREAS Tennessee law and sound public policy require that developers who provide such eligible
improvements or land receive appropriate credit against applicable impact fees, or reimbursement from
impact fee funds; and
WHEREAS the Board of Mayor and Aldermen find that establishing a clear, uniform, and transparent
process for the award, valuation, and administration of impact fee credits and reimbursements will
promote fairness, encourage voluntary provision of needed public facilities by the development
community, and ensure compliance with Tennessee law.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF MAYOR AND ALDERMEN OF
THE CITY OF HENDERSONVILLE, TENNESSEE as follows:
SECTION 1. Enact Title 20, Chapter 14, Section 1407 establishing credits for assessed impact fees to
read as follows:
CHAPTER 14
IMPACT FEES
SECTION
20-1407. Credits
20-1407. Credits
Credit against the road and park impact fees shall be provided for contributions toward the major
road and park systems included in the calculation of the impact fee.
32
(1) Reimbursement Credits Available. The City may provide reimbursement from the impact
fee account for qualifying contributions toward the road and parks system that are included in the
calculation of the impact fee.
(a) Approved reimbursements for construction shall generally become effective
when the improvements have been completed and have been accepted by the City
u nder the provision of an agreement approved by the City Board of Mayor and
Aldermen.
(b)
Approved reimbursements for land dedication shall become effective only upon
conveyance of land that the City, in its sole discretion, elects to accept; nothing herein shall
obligate the City to accept any proposed dedication.
For the purposes of this section a “Qualifying Contribution” means as follows:
(2) Land Valuation. Credit for dedication of land for park or park improvement shall be
assessed on the value of the land to be dedicated. The value of any land required or offered to be
dedicated during the subdivision process, Planned Development rezoning, or other approval shall
be based upon the fair market value for park and open-space use of the land at the time of agreement,
and agreed upon by both the applicant(s) and the City Board of Mayor and Aldermen. The value
shall be determined by a certified appraiser who is selected and paid for by the applicant, and who
uses generally accepted appraisal techniques. If the City disagrees with the appraised value, the
City may engage another appraiser at the City's expense, and the value shall be an amount equal to
the average of the two appraisals. If either party rejects the average of the two appraisals, the cost
may be negotiated . Approved credits for dedicated land shall become effective when the land has
been conveyed to the City and has been accepted by the City.
(3) Construction Cost. In order to receive credit for major parks system improvements, the
developer shall submit complete engineering drawings, specifications, and construction cost
estimates or property appraisals to the Impact Fee Administrator. The Impact Fee Administrator
shall review submittal with Public Works , Planning, and/or Parks Directors or their designee(s)
whose departmental responsibility is to work with the specific project to determine the amount of
reimbursement credit due based on the information submitted.
(4) Developer Agreement. To qualify for an impact fee credit, the developer must enter into an
agreement with the City. At a minimum, the developer agreement shall specify the amount of the credit.
If adequate fees are not available in the impact fee account, an agreement for repayment may be
negotiated with the City Board of Mayor and Aldermen with the assistance of Finance staff.
(5) Expiration of Credits. Credits provided pursuant to this chapter shall be valid from the effective
date of such credits until ten (10) years after such date.
(6) Pre Ordinance Offset Credits. Developers and applicants exempt from impact fees shall not be
eligible to obtain reimbursement credits for improvements completed prior to the effective date of this
chapter.
33
First Reading: ___________________
Second Reading: _________________
APPROVED:
___________________________
JAMIE CLARY, Mayor
ATTEST:
________________________________
TAMARA INGERSOLL, City Recorder
APPROVED AS TO FORM AND LEGALITY:
________________________________
LANCE A. WRAY, City Attorney
34
LEGISLATIVE HISTORY
Ordinance 2025-26
Sponsor: Collins, Clary
Committee: General
Date of Committee Meeting: December 9, 2025
Committee Recommendation: Yes
Committee: Finance
Date of Committee Meeting: December 9, 2025
Committee Recommendation: Yes
First BOMA Reading: January 13, 2026
Amendment: There was an amendment to add the following language after section 20-1407, (6):
20-1408. Miscellaneous Provisions
(1) Developer Exactions. Nothing in this chapter shall restrict the City from requiring the
construction of necessary improvements required (e.g. the addition of required open space; or a traffic
study show a reduction in level of service to justify the addition of a turn lane) to serve the development
project, whether or not such improvements are of a type for which credits are available.
(2) Use of Impact Fees and Segregation of Funds. Impact fee funds that are distinct from the general
fund of the City are hereby created, and the impact fees received will be deposited in each of the interest-
bearing accounts of the associated impact fee. Eli gible expenditures from the monies in the impact fee
accounts shall be used only for following:
(a) Impact fee revenues shall be used exclusively for capital improvements or equipment
for streets and parks, as applicable, to serve new development and as approved by the
Board of Mayor and Aldermen. Funds shall be maintained in separate accounts for roads
impact fees and parks impact fees.
(b) Qualifying project costs include project engineering costs; the acquisition cost of rights
of way and easements, including legal costs; the construction cost of improvements,
including, but not limited to, public street travel lanes, public pedestrian and bicycle
pathways, turning lanes or the portion thereof located within the right of way of a public
street, lighting, signalization, signage, equipment, and landscaping improvements that
are required for the road improvement to function effectively or associated with the park
improvements; and the principal, interest and other financing costs of bonds, notes or
other obligations issued by or on behalf of the City to finance qualified improvements.
(3) Ineligible expenses. Ongoing operational costs, maintenance of existing facilities. In addition,
rehabilitation, reconstruction, replacement or capital equipment , except to the extent that the projects
increase the capacity to serve new development.
(4) Recordkeeping. The impact fee administrator shall maintain accurate records of the impact fees
paid, including the name of the person paying such fees, the project for which the fees were paid, the
date of payment of each fee, the amounts received in pay ment for each fee, and any other matters that
the City deems appropriate of necessary to the accurate accounting of such fees. Records shall be
available for review by the public during normal business hours and with reasonable advance notice
pending the availability of the impact fee administrator.
(5) Programming of Funds. The City shall assign monies from the impact fee fund to specific
projects and related expenses for eligible improvements of the type for which the fees in that fund were
paid. Any monies, including any accrued interest, not assigne d to specific projects within such capital
35
improvements program and not expended shall be retained in the same impact fee fund until the next
fiscal year.
(6) Underpayment or Overpayment. If an impact fee has not been paid, has been underpaid or
overpaid for any reason, the underpayment or overpayment shall be remedied as soon as possible after
it is discovered. Any amounts overpaid by an applicant shall be refunded by the impact fee administrator
to the applicant within thirty (30) days after the discovery of the overpayment, with interest since the
date of such overpayment. Any amounts not paid or underpaid by the applicant shall be paid to the
impact fee administrator within thirty (30) days after notice is given to the applicant of the amount due.
In the case of a nonpayment or underpayment, the City shall not issue any additional permits or approvals
for the project for which the impact fee was previously underpaid until such underpayment is corrected,
and if amounts owed to the City are not paid within such thirty (30) day period, the City may also rescind
any permits issued in reliance on the previous payment of such impact fee.
(7) Periodic Updates. The study will be revisited from time to time, at approximately five (5) year
intervals, for adjustments to the fee schedule, or at the request of the Board of Mayor and Aldermen.
20-1412. Effective Date
This ordinance shall become effective for any submittals received after ____________ that do not meet
the vesting standards as set forth by the ordinance.
Vote on Amendment: Aye: Burgdorf, Collins, Dixon, Evans, Garton, Garza, Goodwin, Martin,
Roberson, Sasse, Skidmore, Ward, Clary. Motion carried.
Vote on Original Motion as Amended: Aye: Burgdorf, Collins, Dixon, Evans, Garton, Garza,
Goodwin, Martin, Roberson, Sasse, Ward, Clary. Nay: Skidmore. Motion carried.
Second BOMA Reading: February 10, 2026
36
DISCUSSION: 2
The ultimate goal of impact fees is to enhance infrastructure to minimize the negative effects of new
development, for example, traffic congestion. The sooner the additional infrastructure is built the sooner
city residents will experience the benefits of the improvements; therefore, it is beneficial to complete the
infrastructure improvements as quickly as possible. If the city adopts a credit system that recognizes
and/or incentivizes the developer to build system-wide infrastructure, rather than the city, the project
can typically be completed more expediently and at a lower cost. Not all developers/developments will
be in a position to build system-wide infrastructure, but those that can and are willing could be eligible
for credits against impact fees. Ordinance 2025-26 recognizes that developments may not be subject to
all or a part of the impact fees if the development constructs or donates qualifying infrastructure or land.
DATE: February 10, 2026
ORDINANCE/RESOLUTION # Ordinance 2025-26
SPECIFIC REQUEST/
RECOMMENDATION:
That the Board of Mayor and Alderman consider
adopting impact fee credits for residential development.
REPORT PREPARED BY:
Zachary Coleman, Senior Planner
Keith L. Free, Planning Director
Jesse Eckenroth, COO
BACKGROUND: 1
Impact fees are defined as one-time charges levied by local governments on new development. They are
charged to developers to help municipalities recover infrastructure and public service costs. These
collected fees are often used by agencies to mitigate the impacts that new developments incur with
respect to traffic congestion, infrastructure (water, sewer, traffic signals), public parks, public safety and
more.
Impact fees are commonly used by cities across the nation. The State of Tennessee allows municipalities
to impose impact fees on new development. The City of Hendersonville’s charter also establishes the
City’s authority to enact impact fees, subject to the Board’s adoption.
Cities in close proximity to Hendersonville that have implemented impact fees, include but are not
limited to: Franklin, Murfreesboro, La Vergne, Smyrna and White House.
The city has discussed impact fees at BOMA meetings, committee meetings and at standalone public
workshops. In 2019, BOMA voted not to enact impact fees at that time primarily due to the potential
impact on commercial and industrial development in the city limits, as opposed to neighboring cities with
no commercial impact fees. As such, at no time has the City ever had a formal impact fee. However, at
times some developments have offered the City voluntary fees which were accepted, but no formal fee
has ever been required.
STAFF
REPORT
37
2
FISCAL IMPACT: 3
The Impact Fee Study identified the maximum allowable impact fees for various development types to
ensure new development pays its fair share of infrastructure costs. The city may provide
reimbursement from the impact fee account for contributions toward the road and parks system that
are included in the calculation of the impact fee.
ADDITIONAL INFORMATION / PHOTOS: 4
Impact studies benefit from scheduled updates to keep current with costs and new developments. If the
city implements impact fees an update to the study and credits will be pursued, ideally the time
between updates would be five (5) years or less. The cost to update the impact fee study can be
calculated into the development fees.
ATTACHMENTS: 5
1. Ordinance 2025-26
38
ORDINANCE 2025-25
Sponsors: Collins, Clary
AN ORDINANCE AMENDING THE HENDERSONVILLE MUNICIPAL CODE, TITLE 20
ESTABLISHING IMPACT FEES FOR THE CITY OF HENDERSONVILLE
WHEREAS, the City of Hendersonville recognizes the need to fund capital facilities to support
growth and maintain service levels for streets and parks; and
WHEREAS, The City of Hendersonville has the authority to assess development impact fees
pursuant to the authority of Mayor-Aldermanic charter cities as set forth in Sec. 6-2-201 (14) and (15),
Tennessee Code Annotated; and
WHEREAS, the population within the City has grown and is projected for further growth, and
will create additional demand for new residential and nonresidential development; and
WHEREAS, the Board of Mayor and Aldermen wished to examine impact fees and their legal
requirements for the City of Hendersonville; and
WHEREAS, the Board of Mayor and Aldermen requested and authorized the Planning
Department obtain the services of a consultant; and
WHEREAS, the chosen consultant, Tischler-Bise, obtained information from city departments
and utilized a recognized legal method to determine a set of proposed fees for Parks, Roads, Police and
Fire in order to assess associated residential and nonresidential impact fees; and
WHEREAS, the Impact Fee Study identifies the maximum allowable impact fees for various
development types to ensure new development pays its fair share of infrastructure costs; and
WHEREAS, the City recognizes the additional net-positive tax and other fiscal contributions
provided by nonresidential development property owners, including among other things, the
contribution made or to be made in the future in cash , higher property tax rates, sales tax, fees or
assessments by nonresidential property owner towards the capital costs of the necessary public service
covered by these development impact fees, and thus at this time the determination that these long-term
year over year contributions are more desirable and significant than the amount of the development
impact fees that would otherwise be imposed on new nonresidential development; and
WHEREAS, the City finds that at present, there is both a rational nexus and a rough
proportionality between the development impacts created by residential development and the type s of
impact covered by this section, and
WHEREAS, the City desires to build in an annual adjustment tied to a recognized economic
index in order to provide consistency, predictability, and transparency, and to review at no longer than
a biennial basis to ensure the ongoing proportionality between the fee amounts, the types of development
assessed and the costs of required infrastructure such that the collection of impact fees are done in a
reasonable and equitable manner to fund future additional public facilities; and
WHEREAS, the City desires to adopt impact fees for new residential development within the
city in order to offset costs associated with the impact the development has on city resources; and
39
WHEREAS, the protection of the health, safety, and general welfare of the citizens of the City
requires that the park and road facilities of the City be expanded and improved to meet the demands of
new residential development; and
WHEREAS, it is the desire of this Board to evaluate the fees and projects to be completed that
serve as the basis of the fees, identify a strategy to complete projects, and identify personnel to compute
and track fee submittals and monetary balances; and
WHEREAS, the Board of Mayor and Aldermen declares it is in the best interest of the City to
establish and collect impact fees in a reasonable and equitable manner to fund these future additional
public facilities.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF MAYOR AND ALDERMEN OF
THE CITY OF HENDERSONVILLE, TENNESSEE as follows:
SECTION 1. Enact Title 20, Chapter 14 establishing a new Chapter in the City of Hendersonville
Municipal Code entitled “Impact Fees”, to read as follows:
CHAPTER 14
IMPACT FEES
SECTION
20-1401. Applicability
20-1402. Purpose and Scope
20-1403. Definitions
20-1404. Impact Fee Administrator
20-1405. Fees and Determination
20-1406. Vesting and Exemptions
20-1407. Reserved
20-1408. Miscellaneous Provisions
20-1409. Appeals
20-1410. Violation
20-1411. Severability
20-1412. Effective Date
20-1401. Applicability
The provisions of this chapter shall apply to all new development within the corporate limits of the City
of Hendersonville, unless such development is expressly exempted by means described further in this
chapter.
20-1402. Purpose, Intent and Findings
The intent of this chapter is to ensure that new development bears a proportionate share of the cost of
capital improvements; to ensure that the proportionate share does not exceed the cost of providing such
facilities; and to ensure that funds collected from new development are actually used to construct
improvements that serve new development as outlined in the Impact Fee Study. The City of
Hendersonville recognizes and finds that:
40
1) At present, the additional net -positive tax and other fiscal contributions provided by
nonresidential development property owners, including among other things, the contribution
made or to be made in the future in cash or by taxes, fees or assessments by no nresidential
property owner towards the capital costs of the necessary public service covered by these
development impact fees , outweigh the amount of the development impact fees that would
otherwise be imposed on new nonresidential development.
2) The transaction privilege tax revenues generated by nonresidential development is a substantial
source of revenue justifying non-imposition of development impact fees at this time.
3) The City requires nonresidential development, at the time of development, to mitigate traffic
and other impacts through the construction of new or improved infrastructure in the public right
of way including but not limited to, new turn lanes, new through lanes, road widening , new
traffic signals, new stormwater infrastructure and other infrastructure as deemed appropriate by
traffic studies and the City Engineer.
4) The City has a rational basis for determining that tax revenues and other fiscal contributions
fairly and adequately offset foregone development impact fees on nonresidential development
while by contrast, the City believes that at present, residential development may approximately
generate more expenses than revenue.
5) There is both a rational nexus and a rough proportionality between the development impacts
created by residential development and the types of impact covered by this section..
20-1403. Definitions
1) “Applicant” means the applicant for a building permit for which an impact fee is due pursuant
to the provisions of this chapter.
2) “Building”
means any structure built for the support, shelter, or enclosure of persons,
chattels, or movable property of any kind, including a mobile home, but excluding buildings
used for agricultural purposes.
3) “Building Permit” means a permit issued by the building official authorizing performance of a
specified activity in or on a structure or building.
4) “Capital Improvement” means any road or park capital improvement, including but not limited
to planning, preliminary engineering, engineering design studies, land surveys, right -of-way
acquisition, engineering, permitting and construction of all the necessary features for any
construction project including, but not limited to:
(a) Construction of new through lanes;
(b) Construction of new turn lanes;
(c) Construction of new bridges;
(d) Construction of new drainage facilities in conjunction with new road construction;
(e) Purchase and installation of traffic signalization (including new and upgraded
signalization);
(f) Construction of curbs, medians and shoulders in conjunction with new road
construction;
(g) Relocating utilities to accommodate new road construction;
(i) New parks;
41
(j) New park buildings, equipment and amenities; and
5) “Developer” means any individual, firm, company partnership, joint venture, association
corporation, estate, trust, business trust, receiver, syndicate, or other group, or entity responsible
for a new development or a new development project.
6) “Development Project” means an interrelated set of developments, approved by the City
pursuant to a subdivision plat, planned development or other development plan.
7) “Dwelling Unit” means a room, or rooms connected together constituting a separate,
independent housekeeping establishment for owner occupancy, rental or lease on a daily,
weekly, monthly, or longer basis; physically separated from any other room(s) or dwelling units
which may be in the same structure; and containing independent cooking and sleeping facilities.
8) “Impact Fee Study” means the most recently prepared Impact Fee Study prepared for the
City of Hendersonville by Tischler Bice, Inc, or an updated similar report approved by the
Hendersonville Board of Mayor and Aldermen.
9) “Multi-Family” means a building used for three or more dwelling units, excluding
townhomes.
10) “Nonresidential” means the development of any property for any use other than residential use,
except as may be exempted by this chapter.
11) “Office/Institutional” means buildings housing primarily office or institutional uses, including
but not limited to corporate headquarters, medical offices, real estate offices, hospitals
government buildings, schools, day care centers, and private lodges.
12) “Residential” means single-family or multi-family dwelling units.
13) “Retail/Commercial” means shopping centers, commercial land uses and other
nonresidential land uses not elsewhere classified in the fee schedule.
14) “Roads” means transportation system, including but not limited to streets, traffic signals and
signs, bicycle lanes, curb and gutter, medians and sidewalks.
15) “Impact Fee Administrator” means the City of Hendersonville Finance Director, or his or her
designee.
16) “Single Family Dwelling” means a dwelling unit on an individual lot principally used, designed,
or adapted for use by a single family.
17) “Structure” means anything built, constructed, or erected that is located permanently or semi -
permanently on the ground or attached to something having a permanent or semi -permanent
location on the ground, but specifically excluding paving or other resurfacing of the ground.
18) “Square Feet” means gross floor area, defined as the total area of all floors of a primary
building and all associated accessory buildings, measured from the external surface of the
outside walls, but excluding covered walkways, open roofed over areas, porches and similar
spaces, exterior terraces or steps, chimneys, roof overhangs, and similar features. Excluded
42
areas include basements or attic spaces of less than seven feet in height and vehicular
parking and maneuvering areas.
19) “Warehouse” means a building primarily devoted to the storage of materials or goods,
typically for the purposes of distribution.
20-1404. Impact Fee Administrator
Staffing will be provided for an impact fee administrator with experience and/or education in municipal
finance. The duties of the impact fee administrator shall include:
(1) Coordination with Planning, Public Works, Parks, and Codes staff to ensure proper fees are
collected.
(2) Collection of fees from assigned collection department, ensuring fees go to specified accounts.
(3) Assisting applicants with questions regarding their impact fees and associated inquiries.
(4) Maintaining records of applicants who have paid impact fees.
(5) Tracking of project expenditures, including other sources of project funds.
(6) Coordination with Public Works, Parks, Police, and Fire staff to track projects and completion.
(7) Staff reviews with Public Works and Parks to review potential credits.
(8) Coordinate with applicant on results of appraisals, when necessary. Write memo to detail the
results of any request for impact fee credits and report results to Board. Hire appraiser and
coordinate with applicant and Board for resolution as needed.
(9) Assisting various departments with programming and budgeting of funds for projects that
serve as the nexus for impact fees.
(10) Tracking and payment of refunds.
20-1405. Determination of Fees and Refunds
(1) Fee Schedule. Any person who applies for a building permit for an impact—generating
development, except those exempted, shall pay an impact fee in accordance with the following
fee schedule prior to the issuance of a building permit. If any credit is due pursuant to section
20-1407, the amount of such credit shall be deducted from the amount of the fee to be paid. Fees
per 1,000 square feet shall be based on square feet, as herein defined, and shall be prorated to
the nearest dollar.
(2) Fee Table.
Residential Development shall be assessed on a per unit basis for Single Family and Multi Family
Dwellings with the following rates for calendar years 2026-2030:
Residential - Impact Fee by Type
2026 2027 2028 2029 2030
Single Family $ 5,000 $ 5,000 $ 5,500 $ 6,000 $ 6,500
Multi-Family $ 3,498 $ 3,498 $ 3,848 $ 4,198 $ 4,547
43
Single Family - Impact Fee Allocation
2026 2027 2028 2029 2030
1/3 Parks $ 1,667 $ 1,667 $ 1,833 $ 2,000 $ 2,167
2/3 Roads $ 3,333 $ 3,333 $ 3,667 $ 4,000 $ 4,333
Total $ 5,000 $ 5,000 $ 5,500 $ 6,000 $ 6,500
Multi Family - Impact Fee Allocation
2026 2027 2028 2029 2030
1/3 Parks $ 1,166 $ 1,166 $ 1,283 $ 1,399 $ 1,516
2/3 Roads $ 2,332 $ 2,332 $ 2,565 $ 2,798 $ 3,032
Total $ 3,498 $ 3,498 $ 3,848 $ 4,198 $ 4,547
(3) Collection of Fees. Impact fees shall be collected at the time of building permit issuance or as
otherwise determined by the City, unless deferred by agreement with the City, subject to
conditions ensuring payment prior to occupancy.
All new development in the City shall be
subject to the assessment and collection of impact fees unless otherwise expressly provided
herein. The City will not issue a certificate of occupancy for any Structure until the required
impact fee has been paid in full. For other uses not requiring a Building Permit, the City will not
approve a development plan until the requisite impact fee has been paid in full. In addition, the
City will issue a stop work order on any development for which the applicable impact fee has
not been paid as required.
(4)
If the planned use for any development as stated by the applicant was misrepresented or
changes within one (1) year of the building permit, the impact fee administrator and city
reserves the right to recoup any difference from the fee collected .
(5) Impact Fee Calculation Errors. If the impact fee has been calculated and paid based on error or
misrepresentation, it shall be recalculated and the difference refunded to the original payer or
assignee. If impact fees are owed, no permit of any type may be issued for the building or
structure in question, or for any other portion of a development of which the building or structure
in question is a part, until impact fees are paid.
(6) Refund; Permit Expiration. If an applicant has paid an impact fee required by this chapter and
the building permit later expires without the possibility of further extension, and the
development activity for which the impact fee was imposed did not occur and no impact has
44
resulted, then the applicant who paid such fee shall be entitled to a refund of the fee paid, without
interest. In order to be eligible to receive such refund, the applicant who paid such fee shall be
required to submit an application requesting such refund within thirty (30) days after the
expiration of the permit or extension for which the fee was paid. The City shall charge an
administrative fee for verifying and computing the refund of 3% of the amount of the refund.
20-1406. Vesting and Exemptions
In order to address legal questions of vesting, projects and property with an associated Planned
Development, site plan, or preliminary/final subdivision plat approved prior to _________ shall be
exempt from impact fees, provided the approval has not expir ed. Exempt applicants include prior
development agreements and per lot fees. Other exemptions include:
(1) Developments that received a final site plan approval or building permit prior to the effective
date of the Ordinance.
(2) Building permits for Forest Park and Glenbrook Village North, whose development
plans were approved with the provision that the developer would not be responsible for future
impact fees.
(3)
Residential Alterations. Alterations of an existing dwelling unit where no additional
dwelling units are created.
(4) Residential Replacement. Replacement of a destroyed, partially- destroyed or moved
residential building or structure with a new building or structure of the same use, and with
the same number of dwelling units.
(5) Nonresidential Development.
(6) No Waivers; Payment of Fees by City. Other than exempted development, i mpact fees shall
not be waived. In order to promote the economic development of the City or the public health,
safety, and general welfare of its residents, the Board of Mayor and Aldermen may agree to
pay some or all of the impact fees imposed on a proposed development or redevelopment from
other funds of the City that are not restricted to other uses. Any such decision to pay impact
fees on behalf of an applicant shall be at the discretion of the Board of Mayor and Aldermen
of the City of Hendersonville and shall be made pursuant to goals and objectives articulated
by the Board.
20-1407. Reserved
20-1408. Miscellaneous Provisions
(1) Developer Exactions. Nothing in this chapter shall restrict the City from requiring the
construction of necessary improvements required (e.g. the addition of required open space ; or a traffic
study show a reduction in level of service to justify the addition of a turn lane) to serve the development
project, whether or not such improvements are of a type for which credits are available.
45
(2) Use of Impact Fees and Segregation of Funds. Impact fee funds that are distinct from the general
fund of the City are hereby created, and the impact fees received will be deposited in each of the interest-
bearing accounts of the associated impact fee. Eligible expenditures from the monies in the impact fee
accounts shall be used only for following:
(a) Impact fee revenues shall be used exclusively for capital improvements or equipment
for streets and parks, as applicable, to serve new development and as approved by the
Board of Mayor and Aldermen. Funds shall be maintained in separate accounts, one
fund for Parks Development Impact Fees and one fund for Roads Development Impact
Fees.
(b) Qualifying project costs include project engineering costs; the acquisition cost of rights
of way and easements, including legal costs; the construction cost of improvements,
including, but not limited to, public street travel lanes, public pedestrian and bicycle
pathways, turning lanes or the portion thereof located within the right of way of a public
street, lighting, signalization, signage, equipment, and landscaping improvements that
are required for the road improvement to function effectively or associated with the park
improvements; and the principal, interest and other financing costs of bonds, notes or
other obligations issued by or on behalf of the City to finance qualified improvements.
(3) Ineligible expenses. Ongoing operational costs and maintenance of existing facilities.
Rehabilitation, reconstruction, replacement or capital equipment except to the extent that the projects
increase the capacity to serve new development..
(4) Recordkeeping. The impact fee administrator shall maintain accurate records of the impact fees
paid, including the name of the person paying such fees, the project for which the fees were paid, the
date of payment of each fee, the amounts received in pay ment for each fee, and any other matters that
the City deems appropriate of necessary to the accurate accounting of such fees. Records shall be
available for review by the public during normal business hours and with reasonable advance notice
pending the availability of the impact fee administrator.
(5) Programming of Funds. The City shall assign monies from the impact fee fund to specific
projects and related expenses for eligible improvements of the type for which the fees in that fund were
paid. Any monies, including any accrued interest, not assigne d to specific projects within such capital
improvements program and not expended shall be retained in the same impact fee fund until the next
fiscal year.
(6) Underpayment or Overpayment. If an impact fee has not been paid, has been underpaid or
overpaid for any reason, the underpayment or overpayment shall be remedied as soon as possible after
it is discovered. Any amounts overpaid by an applicant shall be refunded by the impact fee administrator
to the applicant within thirty (30) days after the discovery of the overpayment, with interest since the
date of such overpayment. Any amounts not paid or underpaid by the applicant shall be paid to the
impact fee administrator within thirty (30) days after notice is given to the applicant of the amount due.
In the case of a nonpayment or underpayment, the City shall not issue any additional permits or approvals
for the project for which the impact fee was previously underpaid until such underpayment is corrected,
and if amounts owed to the City are not paid within such thirty (30) day period, the City may also rescind
any permits issued in reliance on the previous payment of such impact fee.
46
(7) Periodic Updates. The study will be revisited from time to time, or at the request of the Board
of Mayor and Aldermen, but said review to be no longer than a biennial basis to ensure the ongoing
proportionality between the fee amounts, the types of development assessed and the costs of required
infrastructure such that the collection of impact fees are done in a reasonab le and equitable manner to
fund future additional public facilities.
20-1409. Appeals
Any determination made by the impact fee administrator charged with the administration of any part of
this chapter may be appealed to the Board of Mayor and Aldermen within thirty (30) days from the date
of the decision to be appealed.
20-1410. Violation
Furnishing false information on any matter relating to the administration of this chapter, including
without limitation the furnishing of false information regarding the expected size, use, or impacts from
a proposed development, shall be a violation of this chapter.
20-1411. Severability
If a provision of this chapter or its application to any person or circumstance is held invalid, the invalidity
does not affect other provisions or applications of the division that can be given effect without the invalid
provision or application, and to this end the provisions of this chapter are severable.
20-1412. Effective Date
This ordinance shall become effective for any submittals received after ____________ that do not meet
the vesting standards as set forth by the ordinance.
First Reading: January 13
th, 2026, passed.
Second Reading: _________________
APPROVED:
___________________________
JAMIE CLARY, Mayor
ATTEST:
________________________________
TAMARA INGERSOLL, City Recorder
APPROVED AS TO FORM AND LEGALITY:
________________________________
LANCE A. WRAY, City Attorney
47
LEGISLATIVE HISTORY
Ordinance 2025-25
Sponsor: Collins, Clary
Committee: General
Date of Committee Meeting: December 9, 2025
Committee Recommendation: Yes
Committee: Finance
Date of Committee Meeting: December 9, 2025
Committee Recommendation: Yes
First BOMA Reading: January 13, 2026
Amendment: There was an amendment to replace section (2) Fee Table with the following:
Residential Development shall be assessed on a per unit basis for Single Family and Multi
Family Dwellings with the following rates for calendar years 2026-2030 and beyond:
Residential – Impact Fee by Type
2026 2027 2028 2029 2030 - beyond
Single Family
$3,500
$4,000
$4,500
$5,000
$5,500
Multi-Family
$2,500
$3,000
$3,500
$4,000
$4,500
Single Family – Impact Fee Allocation
2026 2027 2028 2029 2030 - beyond
1/3 Parks
$1,155
$1,320
$1,485
$1,650
$1,815
2/3 Roads
$2,345
$2,680
$3,015
$3,350
$3,685
Total
$3,500
$4,000
$4,500
$5,000
$5,500
Multi Family – Impact Fee Allocation
2026 2027 2028 2029 2030 - beyond
1/3 Parks
$825
$990
$1,155
$1,320
$1,485
2/3 Roads
$1,675
$2,010
$2,345
$2,680
$3,015
Total
$2,500
$3,000
$3,500
$4,000
$4,500
Vote on Amendment: Aye: Burgdorf, Collins, Dixon, Evans, Garton, Garza, Goodwin, Skidmore,
Ward, Clary. Nay: Martin, Roberson, Sasse. Motion carried.
Vote on Original Motion as Amended: Aye: Collins, Dixon, Evans, Garton, Garza, Goodwin, Martin,
Roberson, Ward, Clary. Nay: Burgdorf, Sasse, Skidmore. Motion carried.
Second BOMA Reading: February 10, 2026
48
DISCUSSION: 2
Impact fees for residential use include single-family dwellings and multi-family dwellings. The only
difference, from an impact study perspective, between single-family and multi-family dwellings is the
higher occupancy rate of 2.56 per single-family dwelling versus the occupancy rate of 1.65 per multi-
family dwelling. The higher occupancy rate of single-family dwellings equates to more demand (use) on
the system and therefore the fee reflects the mathematical equity according to occupancy rate.
The Impact Fee Study identified the maximum allowable impact fees for various development types to
ensure new development pays its fair share of infrastructure costs. The proposed ordinance does not
impose any impact fees on commercial development and proposes residential fees at less than half of
the maximum allowable limit. Residential development shall be assessed on a per unit basis for single-
family and multi-family dwellings, with one-third of the revenue generated from impact fees dedicated
exclusively to parks and two-thirds dedicated exclusively to roads (transportation infrastructure).
DATE: February 10, 2026
ORDINANCE/RESOLUTION # Ordinance 2025-25
SPECIFIC REQUEST/
RECOMMENDATION:
That the Board of Mayor and Alderman consider adopting
impact fees for new residential development (single
family and multi-family dwellings).
REPORT PREPARED BY:
Zachary Coleman, Senior Planner
Keith L. Free, Planning Director
Jesse Eckenroth, COO
BACKGROUND: 1
Impact fees are defined as one-time charges levied by local governments on new development. They are
charged to developers to help municipalities recover infrastructure and public service costs. These
collected fees are often used by agencies to mitigate the impacts that new developments incur with
respect to traffic congestion, infrastructure (water, sewer, traffic signals), public parks, public safety and
more.
Impact fees are commonly used by cities across the nation. The state of Tennessee allows municipalities
to impose impact fees on new development. The City of Hendersonville’s charter also establishes the
City’s authority to enact impact fees, subject to the Board’s adoption.
Cities in close proximity to Hendersonville that have implemented impact fees, include but are not
limited to: Franklin, Murfreesboro, La Vergne, Smyrna and White House.
The City has discussed impact fees at BOMA meetings, committee meetings and at standalone public
workshops. In 2019, BOMA voted not to enact impact fees at that time primarily due to the potential
impact on commercial and industrial development in the city limits, as opposed to neighboring cities with
no commercial impact fees. As such, at no time has the City ever had a formal impact fee. However, at
times some developments have offered the City voluntary fees which were accepted, but no formal fee
has ever been required.
STAFF
REPORT
49
2
The following table details the total fee per type of dwelling and the amount of the fee dedicated to
parks and to roads:
2026 and 2027
Roads Parks Total
Single-Family $3,333 $1,667 $5,000
Multi-Family $2,332 $1,166 $3,498
2028
Roads Parks Total
Single-Family $3,667 $1,833 $5,500
Multi-Family $2,565 $1,283 $3,848
2029
Roads Parks Total
Single-Family $4,000 $2,000 $6,000
Multi-Family $2,798 $1,399 $4,198
2030
Roads Parks Total
Single-Family $4,333 $2,167 $6,500
Multi-Family $3,032 $1,516 $4,547
50
3
FISCAL IMPACT: 3
Revenue generated by impact fees is only eligible for use on capital expenditures that mitigate impacts
of new developments. Total revenue collections are determined by the level of activity but can be
calculated by multiplying the number of residential units built by the amount of the fee. In calendar
year 2024 there were 285 single-family dwelling units and zero multi-family units permitted which would
have produced a total fee revenue of $1,425,000 using the 2026 impact fee of $5,000 for single-family
units ($950,000 for Roads and $475,000 for Parks). By comparison, in calendar year 2023 there were
264 single-family units and 247 multi-family units permitted, producing a fee revenue of $2,184,006
(using 2026 impact fees of $1,320,000 and $864,006 respectively).
Beginning in 2028, this ordinance proposes a fee increase as noted in the preceding charts for single-
family and multi-family dwellings.
ADDITIONAL INFORMATION / PHOTOS: 4
Impact studies benefit from scheduled updates to keep current with costs and new developments. If the
city implements impact fees an update to the study will be pursued, ideally the time between updates
would be five (5) years or less. The cost to update the impact fee study can be calculated into the
development fees.
ATTACHMENTS: 5
1. October 29, 2025, Impact Fee Study - Public Safety & Transportation
2. January 26, 2024, Impact Fee Report – Parks
3. Spreadsheet – Impact Fee Study – Comparison to Other Cities with BOMA Options
4. Impact Fee Examples – Based on sample projects
*Items 1-4 for this ordinance are the same as the attachments to ORD2025-23 and can be found on
pages xx-xx of the packet.
5. Ordinance 2025-25
51
Impact Fee Study
Prepared for:
City of Hendersonville, Tennessee
October 29, 2025
4701 Sangamore Road
Suite S240
Bethesda, MD
(301) 320-6900
www.TischlerBise.com
52
Impact Fee Study
Hendersonville, Tennessee
[PAGE INTENTIONALLY LEFT BLANK]
53
Impact Fee Study
Hendersonville, Tennessee
i
TABLE OF CONTENTS
Executive Summary ................................................................................................................ 3
Tennessee Legal Framework ............................................................................................................ 3
General Legal Framework ................................................................................................................. 3
General Methodologies .................................................................................................................... 5
Cost Recovery (Past Improvements) .................................................................................................... 5
Incremental Expansion (Concurrent Improvements) ........................................................................... 5
Plan-Based (Future Improvements) ..................................................................................................... 6
Conceptual Impact fee Calculation ................................................................................................... 6
Credits ............................................................................................................................................. 6
Proposed Impact Fee Components ................................................................................................... 7
Proposed Impact Fees ...................................................................................................................... 8
Fire ......................................................................................................................................... 9
Methodology ................................................................................................................................... 9
Proportionate Share ......................................................................................................................... 9
Service Units .................................................................................................................................. 10
Residential .......................................................................................................................................... 10
Nonresidential .................................................................................................................................... 11
Fire Facilities – Incremental Expansion ........................................................................................... 12
Existing Standards and Cost Factors ................................................................................................... 12
Projected Demand .............................................................................................................................. 13
Fire Apparatus – Incremental Expansion ........................................................................................ 14
Existing Standards and Cost Factors ................................................................................................... 14
Projected Demand .............................................................................................................................. 16
Impact Fee Study – Plan-Based ....................................................................................................... 16
Debt Credit .................................................................................................................................... 17
Proposed Fire Impact Fees ............................................................................................................. 18
Projected Revenue from Fire Impact Fees ...................................................................................... 19
Police .................................................................................................................................... 20
Methodology ................................................................................................................................. 20
Proportionate Share ....................................................................................................................... 20
Service Units .................................................................................................................................. 21
Residential .......................................................................................................................................... 21
Nonresidential .................................................................................................................................... 22
Police Facilities – Incremental Expansion ........................................................................................ 22
Existing Standards and Cost Factors ................................................................................................... 22
Projected Demand .............................................................................................................................. 24
Police Vehicles – Incremental Expansion ........................................................................................ 25
Existing Standards and Cost Factors ................................................................................................... 25
Projected Demand .............................................................................................................................. 26
Impact Fee Study – Plan-Based ....................................................................................................... 26
Proposed Police Impact Fees .......................................................................................................... 27
Projected Revenue from Police Impact Fees ................................................................................... 28
Transportation ...................................................................................................................... 29
54
Impact Fee Study
Hendersonville, Tennessee
ii
Methodology ................................................................................................................................. 29
Proportionate Share ....................................................................................................................... 29
Vehicle Trip Generation Rates and Adjustments ............................................................................. 29
Residential Trip Generation Rates ...................................................................................................... 29
Nonresidential Trip Generation Rates ................................................................................................ 30
Trip Rate Adjustments ........................................................................................................................ 30
Commuter Trip Adjustment ............................................................................................................... 31
Adjustment for Pass-By Trips ............................................................................................................. 31
Average Weekday Vehicle Trips ......................................................................................................... 32
Vehicle Miles Traveled (VMT) ......................................................................................................... 33
National Average Trip Length ............................................................................................................. 33
Expected Vehicle Miles Traveled ........................................................................................................ 33
Actual Vehicle Miles Traveled ............................................................................................................ 34
Local Adjustment Factor ..................................................................................................................... 35
Local Trip Lengths ............................................................................................................................... 35
Local Vehicle Miles Traveled .............................................................................................................. 35
Street Network Capacity and Usage ................................................................................................... 36
Projected VMT ............................................................................................................................... 37
Capacity Improvements – Incremental Expansion .......................................................................... 38
Development Fee Report – Plan-Based ........................................................................................... 38
Proposed Transportation Impact Fees ............................................................................................ 39
Projected Revenue from Transportation Impact Fees ..................................................................... 40
Appendix A: Land Use Assumptions ...................................................................................... 41
Residential Development ............................................................................................................... 41
Persons Per Housing Unit ................................................................................................................... 41
Existing Population and Housing Units ............................................................................................... 42
Projected Population and Housing Units ............................................................................................ 42
Nonresidential Development ......................................................................................................... 43
Existing Employment and Floor Area ................................................................................................. 44
Projected Employment and Floor Area .............................................................................................. 44
Development Projections ............................................................................................................... 46
Appendix B: Land Use Definitions ......................................................................................... 47
Residential Development ............................................................................................................... 47
Nonresidential Development ......................................................................................................... 48
55
Impact Fee Study
Hendersonville, Tennessee
3
EXECUTIVE SUMMARY
The City of Hendersonville, Tennessee, retained TischlerBise to prepare this study to analyze the impacts
of development on City capital facilities and to calculate impact fees based on that analysis. Through
interviews and discussions with City staff, TischlerBise developed the proposed impact fees discussed in
this study. Methodologies and calculations are presented in this report as supporting documentation for
an update to the Impact Fee program in the City of Hendersonville.
Impact fees are collected from new construction at the time a building permit is issued and used to
construct system improvements needed to accommodate new development. An impact fee represents
future development’s proportionate share of capital facility needs. Impact fees do have limitations and
should not be regarded as the total solution for infrastructure funding. Rather, they are one component
of a comprehensive funding strategy to ensure provision of adequate public facilities. Impact fees may
only be used for capital improvements or debt service for growth -related infrastructure. In contrast to
general taxes, impact fees may not be used for operations, maintenance, replacement of infrastructure,
or correcting existing deficiencies. This update of Hendersonville’s impact fees includes the following
components:
1. Fire
2. Police
3. Transportation
Tennessee Legal Framework
While the State of Tennessee does not have specific authorizing legislation for impact fees, the State does
grant the power for municipalities with a mayor -aldermanic charter to impose impact fees on new
development. As a mayor-aldermanic charter city, the City of Hendersonville may:
“Establish, open, relocate, vacate, alter, widen, extend, grade, improve, repair, construct, reconstruct,
maintain, light, sprinkle and clean public highways, streets, boulevards, parkways, sidewalks, alleys, parks,
public grounds, public facilities, libraries and squares, wharves, bridges, viaducts, subways, tunnels,
sewers and drains within or without the corporate limits, regulate their use within the corporate limits,
assess fees for the use of or impact upon such property and facilities, and take and appropriate property
therefor under § 7-31-107 -- 7-31-111 and § 29-16-203, or any other manner provided by general laws.”
(Tenn. Code Ann. § 6-2-201 (15))
General Legal Framework
Both state and federal courts have recognized the imposition of impact fees as a legitimate form of land
use regulation, provided the fees meet standards intended to protect against regulatory takings. Land use
regulations, development exactions, and impact fees are subject to the Fifth Amendment prohibition on
taking of private property for public use without just compensation. To comply with the Fifth Amendment,
development regulations must be shown to substantially advance a legitimate governmental inter est. In
the case of impact fees, that interest is in the protection of public health, safety, and welfare by ensuring
development is not detrimental to the quality of essential public services. The means to this end are also
important, requiring both proce dural and substantive due process. The process followed to receive
56
Impact Fee Study
Hendersonville, Tennessee
4
community input (i.e., stakeholder meetings, work sessions, and public hearings) provides opportunities
for comments and refinements to the impact fees.
There is little federal case law specifically dealing with impact fees, although other rulings on other types
of exactions (e.g., land dedication requirements) are relevant. In one of the most important exaction
cases, the U. S. Supreme Court found that a government agency imposing exactions on development must
demonstrate an “essential nexus” between the exaction and the interest being protected (see Nollan v.
California Coastal Commission, 1987). In a more recent case (Dolan v. City of Tigard, OR, 1994), the Court
ruled that an exaction must also be “roughly proportional” to the burden created by development.
However, the Dolan decision appeared to set a higher standard of review for mandatory dedications of
land than for monetary exactions such as impact fees.
There are three reasonable relationship requirements for impact fees that are closely related to “rational
nexus”, or “reasonable relationship” requirements enunciated by a number of state courts. Although the
term “dual rational nexus” is often used to characterize the standard by which courts evaluate the validity
of impact fees under the U.S. Constitution, we prefer a more rigorous formulation that recognizes three
elements: “need,” “benefit,” and “proportionality.” The dual rational nexus test explicitly addresses only
the first two, although proportionality is reasonably implied, and was specifically mentioned by the U.S.
Supreme Court in the Dolan case. Individual elements of the nexus standard are discussed further in the
following paragraphs.
All new development in a community creates additional demands on some, or all, public facilities provided
by local government. If the capacity of facilities is not increased to satisfy that additional demand, the
quality or availability of public services for the entire community will deteriorate. Impact fees may be used
to recover the cost of development-related facilities, but only to the extent that the need for facilities is
a consequence of development that is subject to the fees. The Nollan decision reinforced the principle
that development exactions may be used only to mitigate conditions created by the developments upon
which they are imposed. That principle clearly applies to impact fees. In this study, the impact of
development on infrastructure needs is analyzed in terms of quantifiable relationships between various
types of development and the demand for specific capital facilities, based on applicable level -of-service
standards.
The requirement that exactions be proportional to the impacts of development was clearly stated by the
U.S. Supreme Court in the Dolan case and is logically necessary to establish a proper nexus. Proportionality
is established through the procedures used to identify development -related facility costs, and in the
methods used to calculate impact fees for various types of facilities and ca tegories of development. The
demand for capital facilities is measured in terms of relevant and measurable attributes of d evelopment
(e.g., a typical housing unit’s average weekday vehicle trips).
A sufficient benefit relationship requires that impact fee revenues be segregated from other funds and
expended only on the facilities for which the fees were charged. Impact fees must be expended in a timely
manner and the facilities funded by the fees mu st serve the development paying the fees. However,
nothing in the U.S. Constitution or the state enabling legislation requires that facilities funded with fee
revenues be available exclusively to development paying the fees. In other words, benefit may extend to
a general area including multiple real estate developments. Procedures for the earmarking and
57
Impact Fee Study
Hendersonville, Tennessee
5
expenditure of fee revenues are discussed near the end of this study. All of these procedural as well as
substantive issues are intended to ensure that new development benefits from the impact fees they are
required to pay. The authority and procedures to implement impact fees is separate from and
complementary to the authority to require improvements as part of subdivision or zoning review.
As documented in this report, the City of Hendersonville has complied with applicable legal precedents.
Impact fees are proportionate and reasonably related to the capital improvement demands of new
development. Specific costs have been identified using local data and current dollars. With input from City
staff, TischlerBise identified demand indicators for each type of infrastructure and calculated
proportionate share factors to allocate costs by type of development. This report documents the formulas
and input variables used to calculate the impact fees for each type of public facility. Impact fee
methodologies also identify the extent to which new development is entitled to various types of credits
to avoid potential double payment of growth-related capital costs.
General Methodologies
There are three general methodologies for calculating impact fees. The choice of a particular methodology
depends primarily on the timing of infrastructure construction (past, concurrent, or future) and service
characteristics of the facility type being addressed. Each methodology has advantages and disadvantages
in a particular situation, and can be used simultaneously for different cost components.
Reduced to its simplest terms, the process of calculating impact fees involves two main steps: (1)
determining the cost of development -related capital improvements and (2) allocating those costs
equitably to various types of development. In practice, though, the calculation of impact fees can become
quite complicated because of the many variables involved in defining the relationship between
development and the need for facilities within the designated service area. The following paragraphs
discuss three ba sic methodologies for calculating impact fees and how those methodologies can be
applied.
Cost Recovery (Past Improvements)
The rationale for recoupment, often called cost recovery, is that future development is paying for its share
of the useful life and remaining capacity of facilities already built, or land already purchased, from which
future development will benefit. This methodology is often used for utility systems that must provide
adequate capacity before future development can take place.
Incremental Expansion (Concurrent Improvements)
The incremental expansion methodology documents current level -of-service (LOS) standards for each
type of public facility, using both quantitative and qualitative measures. This approach assumes there are
no deficiencies or surplus capacity in existing inf rastructure, and future development is paying only its
proportionate share for growth -related infrastructure. Revenue will be used to expand or provide
additional facilities, as needed, to accommodate future development. An incremental expansion cost
methodology is best suited for public facilities that will be expanded in regular increments to keep pace
with development.
58
Impact Fee Study
Hendersonville, Tennessee
6
Plan-Based (Future Improvements)
The plan-based methodology allocates costs for a specified set of improvements to a specified amount of
development. Improvements are typically identified in a long -range facility plan and development
potential is identified by a land use plan. There are two options for determining the cost per demand unit:
(1) total cost of a public facility can be divided by total demand units (average cost), or (2) the growth -
share of the public facility cost can be divided by the net increase in demand units over the pl anning
timeframe (marginal cost).
Conceptual Impact fee Calculation
In contrast to project-level improvements, impact fees fund growth-related infrastructure that will benefit
multiple development projects, or the entire jurisdiction (referred to as system improvements). The first
step is to determine an appropriate demand indicator for the particular type of infrastructure. The
demand indicator measures the number of demand units for each unit of development. For example, an
appropriate indicator of the demand for park facilities is population growth, and the increase in
population can be estimated from the average number of residents per housing unit. The second step in
the impact fee formula is to determine infrastructure units per demand unit, typically called level -of-
service (LOS) standards. In keeping with the parks example, a common LOS standard is park amenities per
resident. The third step in the impact fee formula is the cost of various infrastructure units. To complete
the parks example, this part of the formula would establish the cost for purchasing and/or const ructing
new park amenities.
Credits
Regardless of the methodology, a consideration of credits is integral to the development of a legally
defensible impact fee. There are two types of credits that should be addressed in impact fee studies and
ordinances. The first is a revenue credit due to possible double payment situations, which could occur
when other revenues may contribute to the capital costs of infrastructure covered by the impact fee. This
type of credit is integrated into the fee calculation, thus reducing the fee amount. The second is a site-
specific credit or developer reimbursement for dedication of land or construction of system
improvements. An example would be if a developer builds a park with improvements and dedicates to
the City. This type of credit is addressed in the administration and implementation of the development
fee program. For ease of administration, TischlerBise normally recommends developer reimbursements
for system improvements.
59
Impact Fee Study
Hendersonville, Tennessee
7
Proposed Impact Fee Components
Figure 1 summarizes service areas, methodologies, and cost components for the proposed fees.
Figure 1: Proposed Service Areas, Methodologies, and Cost Components
Calculations throughout this report are based on an analysis conducted using Excel software. Most results
are discussed in the report using two, three, and four decimal places, which represent rounded figures.
However, the analysis itself uses figures carried to their ultimate decimal places; therefore, the sums and
products generated in the analysis may not equal the sum or product if the reader replicates the
calculation with the factors shown in the report (due to the rounding of figures shown, not in the analysis).
!"#"$$%F'()*+,-#(
."FI-#"$
."FI-#"(
0F"%
12$3(
4"#2I"F'
56#F"7"63%,(
89:%6$-26 ),%6;<%$"= 12$3(
0,,2#%3-26
>-F" 1-3'?-=" !@0 >-F"(>%#-,-3-"$A(>-F"(
0::%F%3*$
B"I",2:7"63(>""(
4":2F3
)2:*,%3-26A
C"M-#,"(NF-:$
)2,-#" 1-3'?-=" !@0 )2,-#"(>%#-,-3-"$A(
)2,-#"(C"M-#,"$
B"I",2:7"63(>""(
4":2F3
)2:*,%3-26A
C"M-#,"(NF-:$
NF%6$:2F3%3-26 1-3'?-=" !@0 .3F""3(
57:F2I"7"63$
B"I",2:7"63(>""(
4":2F3 CFN
60
Impact Fee Study
Hendersonville, Tennessee
8
Proposed Impact Fees
Proposed impact fees will be assessed per dwelling unit for residential development, and per 1,000 square
feet of floor area for nonresidential development. The proposed impact fees represent the maximum
allowable amount feasible for each development type, and this represents future development’s fair
share of the cost for the appropriate capital facilities.
Hendersonville may adopt fees that are less than the amounts shown; however, a reduction in impact fee
revenue will necessitate an increase in other revenues, a decrease in planned capital improvements,
and/or a decrease in level-of-service standards. All costs in the Impact Fee Study represent current dollars
with no assumed inflation over time. If costs change significantly over time, impact fees should be
recalculated.
Figure 2: Proposed Impact Fees
!"#$%F'()*"%+ ,-.-I0 ,123 ,-4.051 ,-6.1I-
78%9":()*"%+ ,336 ,;65 ,3.3;2 ,0.I;4
<#=8>9?")% ,553 ,-02 ,6.3I6 ,5.5-;
@A**F?B")% ,-.360 ,I;0 ,I.23- ,-6.6;3
CMM"BF'N'C9FF?'!F?G"BF> ,313 ,;6- ,1.53- ,3.22I
<#>9"989"A#)% ,-.42; ,23I ,0.315 ,-4.5I1
H?AIA>F=
(FF>
JF>"=F#9")%'(FF>'IF?'O#"9
LA#?F>"=F#9")%'(FF>'IF?'-.444'!M8)?F'(FF9
HA%"BF !9?FF9 H?AIA>F=
(FF>
O#"9'!"NF
OFGF%AI*F#9'P+IF
HA%"BF !9?FF9("?F
("?F
61
Impact Fee Study
Hendersonville, Tennessee
9
FIRE
Methodology
The fire impact fee includes components for fire facilities, fire apparatus, the cost of calculating the fire
impact fees, and a credit for existing fire debt . Fire impact fees are based on the incremental expansion
methodology for facilities and apparatus and the plan-based methodology for the cost of calculating fire
impact fees. Costs are allocated to both residential and nonresidential development using dif ferent
demand indicators for each type of development. Residential impact fees are calculated on a per capita
basis, then converted to an appropriate amount for eac h type of housing unit based on persons per
housing unit factors. Nonresidential impact fees are calculated using nonresidential vehicle trips. Trip
generation rates are highest for commercial/retail development and lowest for industrial development,
whereas trip rates for office/institutional development fall between the other two categories. Using
vehicle trip rates ensures that impact fees are consistent with the relative demand for fire services from
nonresidential development.
Proportionate Share
TischlerBise recommends functional population to allocate the cost of fire infrastructure to residential
and nonresidential development. Functional population is similar to what the U.S. Census Bureau calls
"daytime population.” This approach accounts for people living and working in a jurisdiction, but it also
considers commuting patterns and time spent at home and at nonresidential locations. OnTheMap is a
web-based mapping and reporting application that shows where workers are employed and where they
live. It describes geographic patterns of jobs by their employment locations and residential locations as
well as the connections between the two locations. OnTheMap was developed through a unique
partnership between the U.S. Census Bureau and its Local Employment Dynamics (LED) partner states.
Residents that do not work are assigned 20 hours per day to residential development and 4 hours per day
to nonresidential development (annualized averages). Residents that work in Hendersonville are assigned
14 hours to residential development and 10 hours to nonresidential development. Residents that work
outside Hendersonville are assigned 14 hours to residential development. Inflow commuters are assigned
10 hours to nonresidential development. Based on 2022 functional population data for Hendersonville,
the most recent year available, the cost allocation for residential development is 76 percent while
nonresidential development accounts for 24 percent of the demand for fire infrastructure.
62
Impact Fee Study
Hendersonville, Tennessee
10
Figure F1: Functional Population
Service Units
Residential
The “service unit” used for residential development is persons per housing unit (PPHU). This is a measure
of, on average, the number of persons residing in each housing unit. As shown in Figure F2, there are 2.56
persons per single family unit and 1. 65 persons per multifamily unit. Factors have been calculate based
on data provided by the U.S. Census Bureau’s 2023 ACS 5-year estimates (further discussed in Appendix
A).
Figure F2: Persons Per Housing Unit (PPHU)
!"#$%"&'$() !"#$%& '"()*%
+*H$-.'*/0-$H1*% 234563 7*0()8!$9 7*0()
J")1&"%H).;*H.<*(=1%L 5342?? 6@ 2554A2@
B#/-*9"&.J")1&"%H) 6C4255
B#/-*9"&.1%.7"%&"()*%M1--" 54??@ 3N FN456@
B#/-*9"&.*0H)1&".7"%&"()*%M1--" 6F4AF5 3N 52@4FN6
J")1&"%H1$-.G0HH*H$- 34@N?4266
!"#$%"&'$()*+,(-" ./0
12&-"#$%"&'$()
;*%IJ*(=1%L.J")1&"%H) 5342?? N 3624AF6
O*H).L*M$H"&.1%.7"%&"()*%M1--" 6@422A
J")1&"%H).B#/-*9"&.1%.7"%&"()*%M1--" 54??@ 3@ 5?4?@@
;*%IJ")1&"%H.<*(="().N1%O-*J.M*##0H"()P 324A?A 3@ 32A4?A@
;*%(")1&"%H1$-.G0HH*H$- 5554N66
12&-"#$%"&'$()*+,(-" 340
+*H$- 345?64@NN
5"6(&%*7&$'#*$&*3833
G*0(M"Q.RSGS.T"%)0).U0("$04.V%+P"X$/.Y//-1M$H1*%.$%&.LB7!.V(1L1%I!")H1%$H1*%.B#/-*9#"%H.GH$H1)H1M)4.
R"()1*%.2S65SN.N"#/-*9#"%HPS
!"#$%F'()*"%+ H-./
01%2"3()*"%+ 4-/.
4-'!FF'5)#6'78F'9881*:2";#8
<F=F%;:*F#2'L+:F ?F@8;#8':F@'
A;18"#$'7#"24
BF8"6F#2")%'<F=F%;:*F#2':F@'7#"2
63
Impact Fee Study
Hendersonville, Tennessee
11
Nonresidential
TischlerBise recommends using nonresidential vehicle trips as the nonresidential service unit for fire
infrastructure. Average weekday vehicle trip ends for nonresidential development are from the 11 th
edition of the reference book, Trip Generation, published in 2021 by the Institute of Transportation
Engineers. A trip end represents a vehicle either entering or exiting a development (as if a traffic counter
were placed across a driveway). Trip ends for nonresidential development are calculated per thousand
square feet.
The basic trip adjustment factor is 50 percent for all nonresidential development except commercial and
institutional. For commercial and institutional development, the trip adjustment factor is less than 50
percent because retail uses attract vehicles as they pass by on arterial and collector roads. For example,
when someone stops at a convenience store on the way home from work, the convenience store is not
the primary destination. For an average size shopping center, the ITE (2017) indicates that on average 34
percent of the vehicles that enter are passing by on their way to some other primary destination. The
remaining 66 percent of attraction trips have the shopping center as their primary destination. Because
attraction trips are half of all trips, the trip adjustment factor (0.66 X 0.50 = 0.33) is approximately 33
percent of the trip ends.
Using the current estimates of nonresidential square footage, TischlerBise applies the trip generation
rates and adjustment factors to calculate average weekday vehicle trips for nonresidential development
in Hendersonville. TischlerBise estimates that there are 69,915 average weekday vehicle trips attributable
to existing nonresidential development in Hendersonville.
Figure F3: Current Estimate of Nonresidential Vehicle Trips
!"#"$%F'"() !"# *+, -#.I01234 +56F 7879 7879
+4F" :(6) ;%2" K+, -2=>?)'"() !"#I:(6)? K"@I+56F?
*(2>?)563$ ABC DD8 NFG9 98H !"#$ 7IG9J OI998
;%''"5L63$ ABC J78 MGF8D MMH %!"!% MID8D MGIJGG
NOO6L"IPIN)@"5IB"5#6L"? ABC GD8 D8FJN 98H &"'! DIQ8J D8IMND
*(?)6)>)6%(3$ ABC 978 77F9Q MMH ("'& 7I8M7 D9IDNG
+%)3$IR%(5"?62"()63$I+56F? )*+*%&
-2=>?)"2I
01234IK+,
64
Impact Fee Study
Hendersonville, Tennessee
12
Fire Facilities – Incremental Expansion
Existing Standards and Cost Factors
Hendersonville currently provides 53,357 square feet of fire facilities to existing development and plans
to maintain the existing level of service by constructing additional fire facilities to serve future
development. To allocate the proportionate share of demand to residential and nonresident ial
development, this analysis uses proportionate share factors shown in Figure F1. Hendersonville’s existing
LOS for residential development is 0. 6062 square feet per person ( 53,357 square feet X 76 percent
residential share / 66,898 persons). The nonresidential level of service is 0. 1832 square feet per vehicle
trip (53,357 square feet X 24 percent nonresidential share / 69,915 vehicle trips). Based on recent fire
station construction costs in Tennessee this analysis uses a construction cost estimate of $450 per square
foot. For fire facilities, the cost is $ 272.78 per person (0.6062 square feet per person X $ 450 per square
foot) and $82.42 per vehicle trip (0.1832 square feet per vehicle trip X $450 per square foot).
Figure F4: Existing Standards for Fire Facilities
!"#$%F'(F)* +H-.%"/0""(
+(.(F)*/1 23445
+(.(F)*/6 123275
+(.(F)*/8 43282
+(.(F)*/2 83655
+(.(F)*/9 :3892
+(.(F)*/7 73555
+(.(F)*/: ;356;
<)(.= 98389:
L)#(/'"%/+H-.%"/0))( ?295
@AF#(F*B/+H-.%"/0""( 98389:
C"#FD"*(F.=/+N.%" :7F
6569/G)'-=.(F)* 7734;4
+H-.%"/0""(/'"%/G"%#)* 5H7576
L)#(/'"%/G"%#)* ?6:6H:4
I)*%"#FD"*(F.=/+N.%" 62F
6569/J"NF$="/<%F'# 7;3;19
+H-.%"/0""(/'"%/J"NF$="/<%F' 5H1486
L)#(/'"%/J"NF$="/<%F' ?46H26
+)-%$"O/L"*D"%#)*MF=="/0F%"/!"'.%(N"*(
O"M"=P)QP+"%MF$"/ROS+T/+(.*D.%D#
C"#FD"*(F.=
L)#(/0.$()%#
I)*%"#FD"*(F.=
65
Impact Fee Study
Hendersonville, Tennessee
13
Projected Demand
Hendersonville plans to maintain the existing level of service for fire facilities over the next 10 years. Based
on a projected population increase of 10,455 persons, future residential development demands
approximately 6,338 square feet of fire facilities (10,455 additional persons X 0. 6062 square feet per
person). With projected nonresidential growth of 9,478 vehicle trips, future nonresidential development
demands approximately 1,736 square feet of fire facilities (9,478 additional vehicle trips X 0.1832 square
feet per vehicle trip). The growth-related cost of fire facilities is $3,633,057 (8,073 square feet X $450 per
square foot).
Figure F5: Growth-Related Need for Fire Facilities
!"#$%FG(%)* +,-*G."IG01G2*
345356 017$I"G2""* ."IG8"I-,%
349:;6 017$I"G2""* ."IG<"=)L?"G@I).
A"-)F"%*)$? B,%I"-)F"%*)$? @,*$?
636C 55D:N: 5NDN9C F3DCC9 96D:35 C;D;CG
6365 5GDNF; G3D:3; F9D9:C 96DN5: CFD9C;
636G 5:DN:N G9DG3; F9D:9N 9;D9;; CFDNC6
636: G3D3;F G6D595 F6DFC; 9;D;33 CCDGC;
636N G9D3:3 G;DCF6 F;D3:5 9;DFG3 C5DCC5
63;3 G6D96C GFDF:6 F;DG63 9;D5F6 CGD;56
63;9 G;D9G9 GCDF;5 FFD;CF 9;D:9G C:D9G9
63;6 GFD695 G5DF3F FFDN:: 9;DNNF C:DN:6
63;; GCD656 GGD;:5 FCD569 9FD9GF CNDGNC
63;F G5D;3G G:D;:6 F5D6CC 9FD;C5 53D596
63;C GGD;C; GND;N; F5D::N 9FDCF6 59DF;3
H%LI"$-" 93DFCC NDFG: 5D;;: 9DG;5 :D3G;
I6D:C9D:GG IG:9D9:3 I;D5;;D3CG
@J."G,KGH%KI$-*I7L*7I" L"M"?G,KG0"IM)L"
!"#$%FGK,IG2)I"G2$L)?)*)"-
NI,O*=PA"?$*"FGQR."%F)*7I"-
2)I"G2$L)?)*)"- IFC3
S"$I 8,.7?$*),% <"=)L?"G@I).- 017$I"G2""*
66
Impact Fee Study
Hendersonville, Tennessee
14
Fire Apparatus – Incremental Expansion
Existing Standards and Cost Factors
Hendersonville currently provides 36 units of fire apparatus to existing development and plans to maintain
the existing level of service by acquiring additional apparatus to serve future development. Based on costs
provided by staff, the weighted average cost of the existing fleet is $ 554,613 per unit. The analysis uses
this cost as a proxy for future apparatus costs.
Figure F6: Existing Fire Apparatus Inventory
!"#$%F'(F)* +*F(# +*F(H-)#( .)(I0H-)#(
1222H34"%F$I*H5I60"H784'"% 1 922J;2K= 922J;2K=
.I$(F$I0HL"#$8"H.%IF0"% 1 92;??? 92;???
@"(HABF# J 9C?;??? 9K?;???
J??=H5MN*"H784'"%H-8#()4H-FI##F# 1 9G=H;??? 9G=H;???
J?11H5MN*"H1??IH70I(J)%4HOILL"%H.%8$B 1 9J;???;??? 9J;???;???
J?1JH-F"M%)0"(HAF0M"%IL)HJH?? 1 9NK;=?C 9NK;=?C
J?1JH-F"M%)0"(H.IF)" 1 9NK;=?C 9NK;=?C
J?1JH5MN*"H784'"%H-8#()4H-FI##F# 1 921?;??? 921?;???
-OLP5HQF%"RL"#$8"HO)I(HSCCMQ.T 1 9N??;??? 9N??;???
1JHQ(UHLF6FLHV800HP*J0I(IX0"HO)I(HYF(FHR)()% J 9JJ;??? 9NN;???
J?1CH5MN*"H.['F))*H784'"%H 1 922J;2K= 922J;2K=
J?1CH5MN*"H-[$0)*"H1??IHOILL"%H.%8$B 1 91;222;HKH 91;222;HKH
J?1HH-F"M%)0"(HAF0M"%IL) J 92H;??? 912?;???
J?1HHA+.7V5PH5*6F*"H 1 922J;2K= 922J;2K=
J?1HHA'I%(I* 1 91;1??;??? 91;1??;???
J?1KH\IYI#IBFHR80"H 1 91K;??? 91K;???
J?1=H-F"M%)0"(HAF0M"%IL) J 9NK;=?C 92C;N?K
J?1GH-F"M%)0"(HAF0M"%IL)H1H?? J 9NK;=?C 92C;N?K
J?1GH7F"%$"H5*J)%$"%H784'"% J 91;2GH;2CN 9C;2=1;GKG
J?12H-F"M%)0"(H.IF)" 1 9NK;=?C 9NK;=?C
J?12H-F"M%)0"(HAF0M"%IL)H1H?? 1 9NK;=?C 9NK;=?C
J?J1H-F"M%)0"(HAF0M"%IL)HJH?? 1 9NK;=?C 9NK;=?C
J?JJHQ)%LH77]H5S'0)%"% 1 9NK;=?C 9NK;=?C
J?JJH7F"%$"H5*J)%$"%H784'"%H 1 922J;2K= 922J;2K=
J?JCH-F"M%)0"(H.IF)" 1 9NK;=?C 9NK;=?C
J?JHH-F"M%)0"(HAF0M"%IL)HJH?? J 9NK;=?C 92C;N?K
J?JCH7F"%$"H5*J)%$"%H784'"% 1 9G12;?2? 9G12;?2?
J?JNH7F"%$"H5*J)%$"%H784'"% 1 922J;2K= 922J;2K=
J?JHH7F"%$"H5*J)%$"%H3"%FI0H1?=IHOILL"%H.%8$B 1 91;222;HKH 91;222;HKH
.)(I0 CK 9HHN;K1C 912;2KK;?KJ
67
Impact Fee Study
Hendersonville, Tennessee
15
To allocate the proportionate share of demand to residential and nonresidential development, this
analysis uses proportionate share factors shown in Figure F1. Hendersonville’s existing LOS for residential
development is 0.00041 units per person (36 units X 76 percent residential share / 66,898 persons). The
nonresidential level of service is 0.00012 units per vehicle trip (36 units X 24 percent nonresidential share
/69,915 vehicle trips). For fire apparatus, the cost is $ 226.83 per person (0. 00041 units per person X
$554,613 per unit) and $68.54 per vehicle trip (0.00012 units per vehicle trip X $554,613 per unit).
Figure F7: Existing Standards for Fire Apparatus
!"#$%F"'()*"+H$"(-"+(./#F 01123456
78#9F#/$(./#F9 64
:"9#'"/F#H;(<%H+" =4L
?@?1(AB-C;HF#B/ 443DND
./#F9(-"+(A"+9B/ @F@@@25
GB9F(-"+(A"+9B/ 0??4FD6
HB/+"9#'"/F#H;(<%H+" ?2L
?@?1(I"%#J;"(O+#-9 4N3N51
./#F9(-"+(I"%#J;"(O+#- @F@@@5?
GB9F(-"+(I"%#J;"(O+#- 04DF12
<BC+J"L(M"/'"+9B/*#;;"(N#+"(O"-H+FP"/F
HB/+"9#'"/F#H;
Q"*";RBSR<"+*#J"(TQU<V(<FH/'H+'9
:"9#'"/F#H;
GB9F(NHJFB+9
68
Impact Fee Study
Hendersonville, Tennessee
16
Projected Demand
Hendersonville plans to maintain the existing level of service for fire apparatus over the next 10 years.
Based on a projected population increase of 10,455 persons, future residential development demands
approximately 4.3 units ( 10,455 additional persons X 0. 00041 units per person). With projected
nonresidential growth of 9,478 vehicle trips, future nonresidential development demands approximately
1.2 units (9,478 vehicle trips X 0.00012 units per vehicle trip). The growth-related cost of fire apparatus is
$3,021,069 (5.4 units X $554,613 per unit).
Figure F8: Growth-Related Need for Fire Apparatus
Impact Fee Study – Plan-Based
The cost to prepare the fire impact fee equals $20,274. TischlerBise recommends that Hendersonville
update its report every five years. Based on this cost, proportionate shares, and five -year projections of
new development from the Land Use Assumptions detailed in Appendix A, the cost is $ 2.95 per person
and $1.07 per vehicle trip.
Figure F9: Impact Fee Study Expense
!"#$%FG(%)* +,-*G."IG(%)*
0100023 (%)*- ."IG4"I-,%
0100035 (%)*- ."IG6"7)89"G:I).
;"-)F"%*)$9 <,%I"-)F"%*)$9 :,*$9
505= LL?@A@ LA?A3= 5B12 @1L CL10
505L LB?A2C B0?@0C 5B1@ @1B CL1=
505B L@?A@A B3?B0C 5@15 @1A CB13
505@ B0?0C2 B5?L3L 5@1L A10 CB1L
505A B3?0@0 BC?=25 5A13 A13 C@15
50C0 B5?35= B2?2@5 5A1= A15 C@1B
50C3 BC?3B3 B=?2CL 5A1A A1C CA15
50C5 B2?53L BL?202 C012 A12 CA1@
50CC B=?5L5 BB?C@L C01@ A1L 201C
50C2 BL?C0B B@?C@5 C315 A1B 201A
50C= BB?C=C BA?CAC C31L A1@ 2312
D%8I"$-" 30?2== A?2B@ 21C 315 =12
N5?CB3?2BA NL2A?=A0 NC?053?0LA
F"$I
G)I"GH..$I$*I- N==2?L3C
JI,K*7L;"9$*"FGMN."%F)*II"-
6"7)89"G:I).- (%)*-
:O."G,PGD%PI$-*II8*II" Q"R"9G,PGS"IR)8"
!"#$%FGP,IGG)I"GH..$I$*I-
4,.I9$*),%
!"#"$$%F'()*+,-#(
."F/-#" 01$2 ."F/-#"(34-2 567"%F(
08%49"
01$2(:"F(
."F/-#"(34-2
;"$-<"42-%, =>? )1:*,%2-14 5@AAB CADN5
!14F"$-<"42-%, AF? G"8-#,"(HF-:$ F@5>= CIDJ=
)F1:1F2-14%2"(.8%F"
K-F" CAJ@A=F
69
Impact Fee Study
Hendersonville, Tennessee
17
Debt Credit
The fire impact fees include a credit for existing debt service. Hendersonville has bond financed recent
fire facilities construction and the purchase of fire apparatus. A credit is necessary since new development
will pay the fire impact fee and will also generate property tax revenue used to repay existing debt service.
As shown in Figure F10, the principal portion of existing debt service equals $3,742,747 over the next 9
years. To allocate the proportionate share of demand to residential and nonresidential development, this
analysis uses proportionate share factors shown in Figure F1. Annual principal payments are divided by
projected population and vehicle trips in each year to estimate the principal payment per person and
vehicle trip. To account for the time value of money, annual principal payments per person and trip are
discounted using a net present value formula based on an interest rate of 4.0 percent. The total net
present value of future principal payments is $34.46 per person and $10.49 per vehicle trip.
Figure F10: Fire Debt Credit
!"#$%"&'$() *+&,"#$%"&'$()
-.(,"/01234 -.(,"/05634
5758 98:;<26: 968=<=1; 22<>:> 92?16 9=65<612 2:<:=8 95?76
5752 9277<65: 9682<;52 21<:6; 92?15 9=66<=7; 17<>7; 95?76
5751 9651<;>= 9;56<>=7 2><:>: 96?1= 9=75<81= 1=<17; 9=?6;
575> 965:<=8; 9;52<=82 17<7;6 96?22 9=75<::1 15<2=2 9=?65
575: 96;5<2:1 9;5><>87 1=<7>7 96?2; 9=7;<>61 1;<865 9=?6=
57;7 96;6<62: 9;;7<=:1 15<=58 96?8> 9=76<51; 16<6>5 9=?67
57;= 9516<:>: 957><::5 1;<=1= 95?>2 928<::1 18<6;2 97?>1
57;5 9516<:>: 957><::5 16<5=2 95?>5 928<::1 12<676 97?>2
57;; 9516<:>: 957><::5 18<525 95?1> 928<::1 11<;>2 97?>8
@+'() 9;<165<161 95<>66<6>1 967?6> 9>:><58: 9=5?;;
6?73 6?73
9;6?62 9=7?6:
=?/-AB/+C/'."/C+A,/DA,,"&'/N+&%#/C+,/C$,"/#'('$+&#/(&%/(FF(,('A#
G",/H".$D)"/
@,$F
I$#D+A&'/!('" I$#D+A&'/!('"
*"'/G,"#"&'/H()A" *"'/G,"#"&'/H()A"
J"(, G,$&D$F()= G+FA)('$+& G",/G",#+& H".$D)"/
@,$F#
70
Impact Fee Study
Hendersonville, Tennessee
18
Proposed Fire Impact Fees
Infrastructure components and cost factors used to calculate the proposed fire impact fees are
summarized in the upper portion of Figure F11. The total capital cost is $468.10 per person and $141.54
per vehicle trip.
Fire impact fees for residential development are assessed per housing unit and vary proportionately
according to the number of persons per housing unit. For a single -family unit, the fee of $1 ,198 is
calculated using a cost of $468.10 per person multiplied by 2.56 persons per housing unit.
Fire impact fees for nonresidential development are assessed per 1,000 square feet and vary
proportionately according to the number o f average weekday vehicle trips. For industrial development,
the fee of $337 per 1,000 square feet is calculated using a cost of $ 141.54 per vehicle trip multiplied by
2.38 AWVT per 1,000 square feet.
Figure F11: Proposed Fire Impact Fees
!""#$%F'%("() $%*)#'"+#H"+*%( $%*)#'"+#-+.'
!.+"#!I0.1.)."* 2343546 263573
!.+"#8''I+I)9* 233:56; 2:65<7
="L"1%'F"()#!""#?"'%+) 235@< 2A5B4
!.+"#="C)#$+"M.) N2;757:F N2AB57@F
-%)I1 27:65AB 2A7A5<7
G.(H1"#!IF.1I 35<: 2AJA@6
O91).L!IF.1I A5:< 2443
M(M9*)+.I1 35;6 2;;4
$%FF"+0.I1 A353A 2AJ436
NOO.0"#P#N)Q"+#G"+L.0"* <573 24:4
M(*).)9).%(I1 457< 2AJB<7
A5#G""#RI(M#S*"#8**9F').%(*
S(.)#-I'" H"+*%(*#'"+#
T%9*.(H#S(.)A
H+%'%*"M
!""*
="L"1%'F"()#-I'"
?"*.M"().I1#!""*#'"+#S(.)
U%(+"*.M"().I1#!""*#'"+#AJBBB#GV9I+"#!"")
8PX-#'"+
AJBBB#GV#!)A
H+%'%*"M
!""*
71
Impact Fee Study
Hendersonville, Tennessee
19
Projected Revenue from Fire Impact Fees
This section summarizes the potential cash flow to Hendersonville based on adoption of the proposed fire
impact fees. The cash flow projections are based on the development projections discussed in the Land
Use Assumptions section and the proposed fire impact fees. If development occurs at a more rapid rate
than projected, the demand for infrastructure and the impact fee revenue will increase at a corresponding
rate. If development occurs at a slower rate than projected, the demand for infrastructure and the impact
fee revenue will decrease at a corresponding rate. Projected impact fee revenue equals $6,233,403 over
the next 10 years and total projected expenditures equal $6,674,400.
Figure F12: Projected Revenue from Fire Impact Fees
!"#$%FG(F)"* +H-.%-I0G(F)"* 1#%)2
3-"*G3)4-2-%-*. 56786679:;G 59G 56786679:;G
3-"*GK==)")%>. 5679?@798AG 59G 5679?@798AG
B*C*2#=M*I%G3**GE*=#"% 5?97?;FG 59G 5?97?;FG
!"#$% &'(')*(*++, &+, &'(')*(*++,
(-I02*G3)M-2G H>2%-I3)M-2G JIO>.%"-)2 L#MM*"4-)2 MNN-4*GOGM%F*" JI.%-%>%-#I)2
5@7@AP 5;;? 566; 5@7;?P 5;8; 5@79:F
=*"G>I-% =*"G>I-% =*"GQ(3 =*"GQ(3 =*"GQ(3 =*"GQ(3
R.0GSI-% R.0GSI-% Q(3 Q(3 Q(3 Q(3
T).* ?9?: ?@796? 87@98 ?7;:P 67@9@ @7A9P ?796?
U*)"G@ ?9?8 ?@76PP 87@PP ?7;;9 67@66 @7AFP ?798:
U*)"G? ?9?; ?@7;F6 87?;9 ?7;P6 67@8: @7AA9 ?79AA
U*)"G6 ?9?P ??79AP 876:6 ?7;A: 67@AP ?796? ?7@6F
U*)"GF ?9?A ??7F:F 87F6: ?7P9; 67?6@ ?79;: ?7@8A
U*)"G: ?969 ??7P9A 87:@; ?7P?9 67?8F ?7@@A ?7?9:
U*)"G8 ?96@ ?67@8F 87899 ?7P66 67?A; ?7@8F ?7?F@
U*)"G; ?96? ?67:?9 878P? ?7PF: 6766@ ?7?@9 ?7?;P
U*)"GP ?966 ?67P;: 87;8F ?7P:P 6768: ?7?:8 ?76@8
U*)"GA ?96F ?F7?69 87PF; ?7P;@ 67F99 ?769F ?76:F
U*)"G@9 ?96: ?F7:P8 87A?A ?7PP6 67F6: ?76:6 ?76A6
67::6 P?6 @?8 66F FF: 68@
&*(-.'(/01 &'1.('21 &*-(12. &.)'(**0 &1*2(*20 &1/+()21
587?667F96
5878;F7F99
@9IU*)"GJI4"*).*
34"567#68,96:6;<6
3**GL#M=#I*I%
U*)"
V"#P*4%*OG3**GE*C*I>*
1#%)2G+H=*IO-%>"*.
72
Impact Fee Study
Hendersonville, Tennessee
20
POLICE
Methodology
The components of Hendersonville’s police impact fee include facilities, vehicles , and the cost of
calculating the police impact fees. Police impact fees are based on the incremental expansion
methodology for facilities and vehicles, and the plan-based methodology for the cost of calculating police
impact fees . Costs are allocated to both residential and nonresidential development using different
demand indicators for each type of development. Residential impact fees are calculated on a per capita
basis, then converted to an appropriate amount for each type of housing unit based on person s per
housing unit factors. Nonresidential impact fees are calculated using nonresidential vehicle trips. Trip
generation rates are highest for commercial/retail development and lowest for industrial development,
whereas trip rates for office/ institutional development fall between the other two categories. Using
vehicle trip rates ensures that impact fees are consistent with the relative demand for police services from
nonresidential development.
Proportionate Share
TischlerBise recommends functional population to allocate the cost of police infrastructure to residential
and nonresidential development. Functional population is similar to what the U.S. Census Bureau calls
"daytime population.” This approach accounts fo r people living and working in a jurisdiction, but it also
considers commuting patterns and time spent at home and at nonresidential locations. OnTheMap is a
web-based mapping and reporting application that shows where workers are employed and where they
live. It describes geographic patterns of jobs by their employment locations and residential locations as
well as the connections between the two locations. OnTheMap was developed through a unique
partnership between the U.S. Census Bureau and its Local Employment Dynamics (LED) partner states.
Residents that do not work are assigned 20 hours per day to residential development and 4 hours per day
to nonresidential development (annualized averages). Residents that work in Hendersonville are assigned
14 hours to residential development and 10 hours to nonresidential development. Residents that work
outside Hendersonville are assigned 14 hours to residential development. Inflow commuters are assigned
10 hours to nonresidential development. Based on 2022 functional population data for Hendersonville,
the most recent year available, the cost allocation for residential development is 76 percent while
nonresidential development accounts for 24 percent of the demand for police infrastructure.
73
Impact Fee Study
Hendersonville, Tennessee
21
Figure P1: Functional Population
Service Units
Residential
The “service unit” used for residential development is persons per housing unit (PPHU). This is a measure
of, on average, the number of persons residing in each housing unit. As shown in Figure P2, there are 2.56
persons per single family unit and 1. 65 persons per multifamily unit. Factors have been calculate based
on data provided by the U.S. Census Bureau’s 2023 ACS 5-year estimates (further discussed in Appendix
A).
Figure P2: Persons Per Housing Unit (PPHU)
!"#$%"&'$() !"#$%& '"()*%
+*H$-.'*/0-$H1*% 234563 7*0()8!$9 7*0()
J")1&"%H).;*H.<*(=1%L 5342?? 6@ 2554A2@
B#/-*9"&.J")1&"%H) 6C4255
B#/-*9"&.1%.7"%&"()*%M1--" 54??@ 3N FN456@
B#/-*9"&.*0H)1&".7"%&"()*%M1--" 6F4AF5 3N 52@4FN6
J")1&"%H1$-.G0HH*H$- 34@N?4266
!"#$%"&'$()*+,(-" ./0
12&-"#$%"&'$()
;*%IJ*(=1%L.J")1&"%H) 5342?? N 3624AF6
O*H).L*M$H"&.1%.7"%&"()*%M1--" 6@422A
J")1&"%H).B#/-*9"&.1%.7"%&"()*%M1--" 54??@ 3@ 5?4?@@
;*%IJ")1&"%H.<*(="().N1%O-*J.M*##0H"()P 324A?A 3@ 32A4?A@
;*%(")1&"%H1$-.G0HH*H$- 5554N66
12&-"#$%"&'$()*+,(-" 340
+*H$- 345?64@NN
5"6(&%*7&$'#*$&*3833
G*0(M"Q.RSGS.T"%)0).U0("$04.V%+P"X$/.Y//-1M$H1*%.$%&.LB7!.V(1L1%I!")H1%$H1*%.B#/-*9#"%H.GH$H1)H1M)4.
R"()1*%.2S65SN.N"#/-*9#"%HPS
!"#$%F'()*"%+ H-./
01%2"3()*"%+ 4-/.
4-'!FF'5)#6'78F'9881*:2";#8
<F=F%;:*F#2'L+:F ?F@8;#8':F@'
A;18"#$'7#"24
BF8"6F#2")%'<F=F%;:*F#2':F@'7#"2
74
Impact Fee Study
Hendersonville, Tennessee
22
Nonresidential
TischlerBise recommends using nonresidential vehicle trips as the nonresidential service unit for police
infrastructure. Average weekday vehicle trip ends for nonresidential development are from the 11 th
edition of the reference book, Trip Generation, published in 2021 by the Institute of Transportation
Engineers. A trip end represents a vehicle either entering or exiting a development (as if a traffic counter
were placed across a driveway). Trip ends for nonresidential development are calculated per thousand
square feet.
The basic trip adjustment factor is 50 percent for all nonresidential development except commercial and
institutional. For commercial and institutional development, the trip adjustment factor is less than 50
percent because retail uses attract vehicles as they pass by on arterial and collector roads. For example,
when someone stops at a convenience store on the way home from work, the convenience store is not
the primary destination. For an average size shopping center, the ITE (2017) indicates that on average 34
percent of the vehicles that enter are passing by on their way to some other primary destination. The
remaining 66 percent of attraction trips have the shopping center as their primary destination. Because
attraction trips are half of all trips, the trip adjustment factor (0.66 X 0.50 = 0.33) is approximately 33
percent of the trip ends.
Using the current estimates of nonresidential square footage, TischlerBise applies the trip generation
rates and adjustment factors to calculate average weekday vehicle trips for nonresidential development
in Hendersonville. TischlerBise estimates that there are 69,915 average weekday vehicle trips attributable
to existing nonresidential development in Hendersonville.
Figure P3: Current Estimate of Nonresidential Vehicle Trips
Police Facilities – Incremental Expansion
Existing Standards and Cost Factors
Hendersonville currently provides 29,373 square feet of police facilities to existing development and plans
to maintain the existing level of service by constructing additional police facilities to serve future
development. To allocate the proportionate share of demand to residential and nonresi dential
development, this analysis uses proportionate share factors shown in Figure P1. Hendersonville’s existing
LOS for residential development is 0. 3337 square feet per person ( 29,373 square feet X 76 percent
residential share / 66,898 persons). The nonresidential level of service is 0. 1008 square feet per vehicle
trip (29,373 square feet X 24 percent nonresidential share / 69,915 vehicle trips).
!"#"$%F'"() !"# *+, -#.I01234 +56F 7879 7879
+4F" :(6) ;%2" K+, -2=>?)'"() !"#I:(6)? K"@I+56F?
*(2>?)563$ ABC DD8 NFG9 98H !"#$ 7IG9J OI998
;%''"5L63$ ABC J78 MGF8D MMH %!"!% MID8D MGIJGG
NOO6L"IPIN)@"5IB"5#6L"? ABC GD8 D8FJN 98H &"'! DIQ8J D8IMND
*(?)6)>)6%(3$ ABC 978 77F9Q MMH ("'& 7I8M7 D9IDNG
+%)3$IR%(5"?62"()63$I+56F? )*+*%&
-2=>?)"2I
01234IK+,
75
Impact Fee Study
Hendersonville, Tennessee
23
Based on recent police station construction costs in Tennessee this analysis uses a construction cost
estimate of $500 per square foot. For police facilities, the cost is $166.85 per person (0.3337 square feet
per person X $ 500 per square foot) and $ 50.41 per vehicle trip (0. 1008 square feet per trip X $500 per
square foot).
Figure P4: Existing Standards for Police Facilities
!"#$%F'(F)* +H-.%"/0""(
1)2F$"/!"'.%(3"*( 456578
1)2F$"/9**": 446;<<
=)(.2 L?6<5<
@)#(/'"%/+H-.%"/0))( AB88
C:F#(F*D/+H-.%"/0""( L?6<5<
N"#FF"*(F.2/+G.%" 5;H
L8LB/1)'-2.(F)* ;;6I?I
+H-.%"/0""(/'"%/1"%#)* 8J<<<5
@)#(/'"%/1"%#)* A4;;JIB
O)*%"#FF"*(F.2/+G.%" L7H
L8LB/L"GF$2"/=%F'# ;?6?4B
+H-.%"/0""(/'"%/L"GF$2"/=%F' 8J488I
@)#(/'"%/L"GF$2"/=%F' AB8J74
+)-%$"M/N"*F"%#)*OF22"/1)2F$"/!"'.%(3"*(
O)*%"#FF"*(F.2
@)#(/0.$()%#
P"O"2Q)RQ+"%OF$"/SPT+U/+(.*F.%F#
N"#FF"*(F.2
76
Impact Fee Study
Hendersonville, Tennessee
24
Projected Demand
Hendersonville plans to maintain the existing level of service for police facilities over the next 10 years.
Based on a projected population increase of 10,455 persons, future residential development demands
approximately 3,489 square feet of police facilities (10,455 additional persons X 0. 3337 square feet per
person). With projected nonresidential growth of 9,478 vehicle trips, future nonresidential development
demands approximately 956 square feet of police facilities (9,478 additional vehicle trips X 0.1008 square
feet per vehicle trip). The growth-related cost of police facilities is $ 2,222,217 (4,444 square feet X $500
per square foot).
Figure P5: Growth-Related Need for Police Facilities
!"#$%FG(%)* +,-*G."IG01G2*
345556 017$I"G2""* ."IG8"I-,%
34933: 017$I"G2""* ."IG;"<)=L"G
?"-)F"%*)$L @,%I"-)F"%*)$L A,*$L
B3BC DDN:F: DFNF9C BBN5B5 6N3C3 BFN565
B3BD D6NFG5 63N:35 BBND6B 6N95F BFN:99
B3B6 D:NF:F 69N635 B5N3B9 6NB53 53NBC9
B3B: 63N35G 6BND9D B5N563 6N5BB 53NDFB
B3BF 69N3:3 65NCGB B5N69F 6NG9C 59N95G
B353 6BN9BC 6GNG:B BGN3D: 6NC93 59NC6:
B359 65N969 6CNG5D BGNG96 6ND3D 5BN3B5
B35B 6GNB9D 6DNG3G BGN6DD 6N63G 5BNGDF
B355 6CNBDB 66N5:D BCN99C 6N:35 5BNF96
B35G 6DN536 6:N5:B BCNGD5 6NF35 55N5D6
B35C 66N5C5 6FN5F5 BCN:9B :N33C 55N:96
93HIIGJ%=I"$-" 93NGCC FNG6: 5NG:F FCD GNGGG
K9N6GGN5FD KG66N:B9 KBNBBBNB96LI,M*<H?"L$*"FGNO."%F)*7I"-
!"#$%FGP,IG8,L)="G2$=)L)*)"-
I"$I 8,.7L$*),% ;"<)=L"GAI).- 017$I"G2""*
AQ."G,PGJ%PI$-*I7=*7I" R"S"LG,PG0"IS)="
8,L)="G2$=)L)*)"- KC33
77
Impact Fee Study
Hendersonville, Tennessee
25
Police Vehicles – Incremental Expansion
Existing Standards and Cost Factors
Hendersonville currently provides 171 police vehicles to existing development and plans to maintain the
existing level of service by acquiring additional vehicles to serve future development. Based on costs
provided by the Hendersonville Police Department, the weighted average cost of the existing fleet is
$44,630 per unit. The analysis uses this cost as a proxy for future vehicle costs. To allocate the
proportionate share of demand to residential and nonresidential development, this analysis uses
proportionate share factors shown in Figure P1. Hendersonville’s existing LOS for residential development
is 0.0019 units per person (171 units X 76 percent residential share / 66,898 persons). The nonresidential
level of service is 0.0006 units per vehicle trip (171 units X 24 percent nonresidential share / 69,915 vehicle
trips). For police vehicles, the cost is $86.70 per person (0.0019 units per person X $44,630 per unit) and
$26.20 per vehicle trip (0.0006 units per vehicle trip X $44,630 per unit).
Figure P6: Existing Standards for Police Vehicles
!"#$%F'(F)* +*F(# +*F(H-)#( .)(/0H-)#(
1+2# 345 6478393 6:844;844;
<F$=L'H.%L$=# 33 64:8?:9 673784:9
1"@/*# 3A 65;8BB; 6:::8;99
.)(/0 3A3 6448:59 6A8:538?9;
C"FDN("@HFG"%/D"H'"%H+*F( 6448:59
HIF#(F*DH+*F(# 3A3
J"#F@"*(F/0H1N/%" A:O
B9B7H<)'L0/(F)* ::8?;?
+*F(#H'"%H<"%#)* 9L993;
-)#(H'"%H<"%#)* 6?:LA9
M)*%"#F@"*(F/0H1N/%" B4O
B9B7H2"NF$0"H.%F'# :;8;37
+*F(#H'"%H2"NF$0"H.%F' 9L999:
-)#(H'"%H2"NF$0"H.%F' 6B:LB9
1)L%$"NHO"*@"%#)*GF00"H<)0F$"H!"'/%(P"*(
-)#(HQ/$()%#
R"G"0S)TS1"%GF$"HURV1PH1(/*@/%@#
M)*%"#F@"*(F/0
J"#F@"*(F/0
78
Impact Fee Study
Hendersonville, Tennessee
26
Projected Demand
Hendersonville plans to maintain the existing level of service for police vehicles over the next 10 years.
Based on a projected population increase of 10,455 persons, future residential development demands
approximately 20.3 units ( 10,455 additional persons X 0. 0019 units per person). With projected
nonresidential growth of 9,478 vehicle trips, future nonresidential development demands approximately
5.6 units (9,478 additional vehicle trips X 0.0006 units per vehicle trip). The growth-related cost of police
vehicles is $1,154,771 (25.9 units X $44,630 per unit).
Figure P7: Growth-Related Need for Police Vehicles
Impact Fee Study – Plan-Based
The cost to prepare the police impact fee equals $20,274. TischlerBise recommends that Hendersonville
update its report every five years. Based on this cost, proportionate share, and five -year development
projections from the Land Use Assumptions in Appendix A, the cost is $ 2.95 per person and $1.07 per
vehicle trip.
Figure P8: Impact Fee Study Expense
!"#$%&G(%)* +,-*G."IG(%)*
010023 (%)*- ."IG4"I-,%
010005 (%)*- ."IG6"7)89"G
:"-)&"%*)$9 ;,%I"-)&"%*)$9 <,*$9
=0=L 55?@3@ 53?32L 2A010 B210 2C210
=0=5 5C?3BA C0?@0A 2A=10 B215 2CA15
=0=C 5@?3@3 C2?C0A 2AB10 B=12 2C512
=0=@ C0?0AB C=?525 2A512 B=15 2C@1C
=0=3 C2?0@0 CA?LB= 2A@12 BA1= 2@21A
=0A0 C=?2=L CB?B@= 2B012 BA1C 2@A1@
=0A2 CA?2C2 CL?BA5 2B=12 BB1A 2@51B
=0A= CB?=25 C5?B0B 2BB1= BB1@ 2@310
=0AA CL?=5= CC?A@5 2B51= BL1B 23215
=0AB C5?A0C C@?A@= 2B@1= B510 23B1=
=0AL CC?ALA C3?A3A 2L01A B515 23513
20DNIGF%8I"$-" 20?BLL 3?BC@ =01A L15 =L13
G305?BC= G=B@?=33 G2?2LB?CC2HI,I*7D:"9$*"&GJK."%&)*LI"-
!"#$%&GM,IG4,9)8"G6"7)89"-
N"$I 4,.L9$*),% 6"7)89"G<I).-
<N."G,MGF%MI$-*IL8*LI" O"P"9G,MGQ"IP)8"
4,9)8"G6"7)89"- GBB?5A0
(%)*-
!"#"$$%&'()*+,-#(
."&/-#" 01$2 ."&/-#"(34-2 567"%&(
08%49"
01$2(:"&(
."&/-#"(34-2
;"$-<"42-%, =>? )1:*,%2-14 5@AAB CADN5
!14&"$-<"42-%, AF? G"8-#,"(H&-:$ F@5>= CIDJ=
)&1:1&2-14%2"(.8%&"
)1,-#" CAJ@A=F
79
Impact Fee Study
Hendersonville, Tennessee
27
Proposed Police Impact Fees
Infrastructure components and cost factors used to calculate the proposed police impact fees are
summarized in the upper portion of Figure P9. The total capital cost is $256.50 per person and $77.68 per
vehicle trip.
Police impact fees for residential development are assessed per housing unit and vary proportionately
according to the number of persons per housing unit. For a single-family unit, the fee of $657 is calculated
using a cost of $256.50 per person multiplied by 2.56 persons per housing unit.
Police impact fees for nonresidential development are assessed per 1,000 square feet and vary
proportionately according to the number of vehicle trips. For industrial development, the fee of $185 per
1,000 square feet is calculated using a cost of $ 77.68 per vehicle trip multiplied by 2.38 vehicle trips per
1,000 square feet.
Figure P9: Proposed Police Impact Fees
!""#$%F'%("() $%*)#'"+#H"+*%( $%*)#'"+#-+.'
H%I.0"#!10.I.)."* 2344567 278593
H%I.0"#:";.0I"* 2645<8 2=45=8
L"?"I%'F"()#!""#@"'%+) 2=5A7 2358<
-%)1I 2=74578 2<<546
B.(CI"#!1F.IM =574 247<
NFI).G!1F.IM 3547 29=H
I(JF*)+.1I =5H6 2367
$%FF"+0.1I 3=5=3 2A96
OLL.0"#M#O);"+#B"+?.0"* 759= 29=3
I(*).)F).%(1I <597 27<A
35#B""#N1(J#O*"#P**FF').%(*
L"?"I%'F"()#-M'" PQ:-#'"+
3R888#BS#!)3
H+%'%*"J
!""*
O(.)#-M'" H"+*%(*#'"+#
T%F*.(C#O(.)3
H+%'%*"J
!""*
@"*.J"().1I#!""*#'"+#O(.)
U%(+"*.J"().1I#!""*#'"+#3R888#BSF1+"#!"")
80
Impact Fee Study
Hendersonville, Tennessee
28
Projected Revenue from Police Impact Fees
This section summarizes the potential cash flow to Hendersonville based on adoption of the proposed
police impact fees. The cash flow projections are based on the development projections discussed in the
Land Use Assumptions section and the proposed police impact fees. If development occurs at a more rapid
rate than pro jected, the demand for infrastructure and the impact fee revenue will increase at a
corresponding rate. If development occurs at a slower rate than projected, the demand for infrastructure
and the impact fee revenue will decrease at a corresponding rate. Projected impact fee revenue equals
$3,418,827 over the next 10 years and total projected expenditures equal $3,397,262.
Figure P10: Projected Revenue from Police Impact Fees
!"#$%FG(F)"* +H-.%-I0G(F)"* 1#%)2
3#2-4*G5)4-2-%-*. 678777879:G 6; 678777879:G
3#2-4*GK*F-42*. 6989=>8::9G 6; 6989=>8::9G
?*@*2#AB*I%G5**GC*A#"% 67;87:>G 6; 67;87:>G
1#%)2 6M8ME:87F7G 6;G 6M8ME:87F7G
(-I02*G5)B-2G HI2%-J5)B-2G OILI.%"-)2 M#BB*"4-)2 NOO-4*GPGN%F*" OI.%-%I%-#I)2
6F=: 6>7M 69Q= 6E>Q 6>79 6=:E
A*"GII-% A*"GII-% A*"GR(5 A*"GR(5 A*"GR(5 A*"GR(5
S.0GTI-% S.0GTI-% R(5 R(5 R(5 R(5
U).* 7;7= 798;M7 F89;F 78:=Q M89;9 98E;Q 78;M7
V*)"G9 7;7F 798MQQ F89QQ 78::; M89MM 98E>Q 78;F=
V*)"G7 7;7: 798:>M F87:; 78:QM M89F= 98EE; 78;EE
V*)"GM 7;7Q 778;EQ F8M=M 78:E= M89EQ 78;M7 789M>
V*)"G> 7;7E 778>=> F8>M= 78Q;: M87M9 78;:= 789FE
V*)"G= 7;M; 778Q;E F8=9: 78Q7; M87F> 7899E 787;=
V*)"GF 7;M9 7M89F> F8F;; 78QMM M87E: 789F> 787>9
V*)"G: 7;M7 7M8=7; F8FQ7 78Q>= M8MM9 7879; 787:Q
V*)"GQ 7;MM 7M8Q:= F8:F> 78Q=Q M8MF= 787=F 78M9F
V*)"GE 7;M> 7>87M; F8Q>: 78Q:9 M8>;; 78M;> 78M=>
V*)"G9; 7;M= 7>8=QF F8E7E 78QQM M8>M= 78M=M 78MEM
M8==M Q7M 97F MM> >>= MF9
!"#$$%#&%' !$%(#")' !"$#""* !$+,#"%, !+()#%'" !"'*#+$*
6M8>9Q8Q7:
6M8ME:87F71#%)2G+HA*IL-%I"*.
9;JV*)"GOI4"*).*
-./01231456171891
3"#P*4%*LG5**GC*@*II*
5**GM#BA#I*I%
V*)"
81
Impact Fee Study
Hendersonville, Tennessee
29
TRANSPORTATION
Methodology
The transportation impact fee includes components for street improvements, and the cost of calculating
the transportation impact fees. The incremental expansion methodology is used for street improvements,
and the plan-based methodology is used for the cost of calculating the transportation impact fees.
Proportionate Share
The transportation impact fees will allocate the cost between residential and nonresidential based on trip
generation rates, trip adjustment factors, and trip lengths.
Vehicle Trip Generation Rates and Adjustments
Average weekday vehicle trips are used as a measure of demand by land use. Vehicle trips are estimated
using average weekday vehicle trip ends from the reference book, Trip Generation, 11th Edition, published
by the Institute of Transportation Engineers (ITE) in 2021. A vehicle trip end represents a vehicle entering
or exiting a development (as if a traffic counter were placed across a driveway). To calculate the impact
fees, trip generation rates a re adjusted to avoid double counting each trip at both the origin and
destination points. The basic trip adjustment factor is 50 percent. As discussed further below, the impact
fee methodology includes additional adjustments to make the fees proportionate to the infrastructure
demand for particular types of development.
Residential Trip Generation Rates
For residential development, TischlerBise uses trip generation rates published in Trip Generation, Institute
of Transportation Engineers (ITE), 11 th Edition (2021). The prototype for single -family development is
Single-Family Detached Housing (ITE 210) which generates 9.43 average weekday vehicle trip ends per
dwelling unit. The prototype for multi -family development is Multifamily Housing Low -Rise (I TE 220)
which generates 6.74 average weekday vehicle trip ends per dwelling unit.
82
Impact Fee Study
Hendersonville, Tennessee
30
Nonresidential Trip Generation Rates
For nonresidential development, TischlerBise uses trip generation rates published in Trip Generation ,
Institute of Transportation Engineers, 11 th Edition (2021). The prototype for industrial development is
Manufacturing (ITE 140) which generates 4.75 average weekday vehicle trip ends per 1,000 square feet
of floor area. For office development, the proxy is General Office (ITE 710), and it generates 10.84 average
weekday vehicle trip ends per 1,000 square feet of floor area. The prototype for commercial development
is Shopping Center (ITE 820) which generates 37.01 average weekday vehicle trips per 1,000 square feet
of floor area. For institutional development, the proxy is Government Office (ITE 730), and it generates
22.59 average weekday vehicle trip ends per 1,000 square feet of floor area.
Figure T1: Average Weekday Vehicle Trip Ends by Land Use
Trip Rate Adjustments
To calculate transportation impact fees, trip generation rates require an adjustment factor to avoid double
counting each trip at both the origin and destination points. Therefore, the basic trip adjustment factor is
50 percent. As discussed further in this section, the development fee methodol ogy includes additional
adjustments to make the fees proportionate to the infrastructure demand for particular types of
development.
!"# $%FG() *+)H-".I0-#()1 *+)H-".I0-#()1 #F023H%%1-4%. 567G.%-8%%9
:3)% ;(I9 4%.-$F)-;(I9< 4%.-#F023H%%< $%FG()-;(I9 4%.-#F023H%%
<<= LI?@9-!()719.IG2 <A===-56-89 BCME FC<= <CGE HFE
<F= !()719.IG2-4G.+ <A===-56-89 FCFE ICJ< <C<H MHB
<B= OG(7LGM97.I(? <A===-56-89 BCEG ICG< <CMJ GIM
<G= *G.%@371I(? <A===-56-89 <CE< GC=G =CFB IAJGF
IGB N11I19%)-LIOI(? P%) ICH= BCIB =CH< (G
IGB N11I19%)-LIOI(? <A===-56-89 BC<J BCIB =CJJ <A=<I
F<= Q39%2 .33F ECJJ <BCFB =CGH (G
H<= Q310I9G2 <A===-56-89 <=CEE FCEE ICMH FG=
E<= R%(%.G2-SLLIM%-TGO?-1IU%V <A===-56-89 <=CMB FCFF FCIH F=E
EI= O%)IMG2P$%(9G2-SLLIM% <A===-56-89 FHC== MCE< BC<F IBI
EF= R3O%.(F%(9-SLLIM% <A===-56-89 IICGJ ECBG FC=F FF=
EG= SLLIM%-4G.+ <A===-56-89 <<C=E FCGB FC<F FI=
EH= X%1%G.M@-Y-$%O-:%(9%. <A===-56-89 <<C=M FCFE FCIJ F=B
EE= R71I(%11-4G.+ <A===-56-89 <ICBB BC=B FC=M FIG
MI= 5@300I(?-:%(9%.-TGO?-1IU%V <A===-56-89 FEC=< <ECBI IC<I BE<
<C-".I0-R%(%.G9I3(A-!(19I979%-3L-".G(103.9G9I3(-#(?I(%%.1A-<<9@-#)I9I3(-TI=I<VC
LG()-;1%-[-5IU%
83
Impact Fee Study
Hendersonville, Tennessee
31
Commuter Trip Adjustment
Residential development has a larger trip adjustment factor of 6 3 percent to account for commuters
leaving Hendersonville for work. According to the 2009 National Household Travel Survey (see Table 30)
weekday work trips are typically 31 percent of production trips (i.e., all out -bound trips, which are 50
percent of all trip ends). As shown in Figure T2, the U.S. Census Bureau’s OnTheMap web application
indicates 87 percent of resident workers traveled outside of Hendersonville for work in 2022. In
combination, these factors (0.31 x 0.50 x 0.87 = 0.13) support the additional 13 percent allocation of trips
to residential development.
Figure T2: Commuter Trip Adjustment
Adjustment for Pass-By Trips
For commercial and institutional development, the trip adjustment factor is less than 50 percent because
this type of development attracts vehicles as they pass by on arterial and collector roads. For example,
when someone stops at a convenience store on the way home from work, the conven ience store is not
the primary destination. For the average shopping center, ITE data indicate 34 percent of the vehicles that
enter are passing by on their way to some other primary destination. The remaining 66 percent of
attraction trips have the commercial site as their primary destination. Because attraction trips are half of
all trips, the trip adjustment factor is 66 percent multiplied by 50 percent, or approximately 33 percent of
the trip ends.
!!"#$%F#'($!)%*%'+!H'F!-.I0%'+!%'!1#'F#I$.'*%22# 34556
!!"#$%F#'($!7.889(%'+!:9($%F#!1#'F#I$.'*%22#!;.I!-.I0 <=4L=3
!!?8@2.A#F!"#$%F#'($ <B4C33
MNHI#!.;!?8@2.A#F!"#$%F#'($!7.889(%'+!:9($%F#!1#'F#I$.'*%22#!;.I!-.I0 5LF
GH$#!HI.F9I(%.'!JI%@$O =6F
LFF%(%.'H2!HI.F9I(%.'!JI%@$O O3F
"#$%F#'(%H2!JI%@!LFM9$(8#'(!NHI(.I C3F
JI%@!LFM9$(8#'(!NHI(.I!;.I!7.889(#I$
M.9II#O!PQMQ!7#'$9$!G9I#H94!:'JN#RH@!L@@2%IH(%.'!S*#I$%.'!CQ<3QTU!H'F!)?1V!:I%+%'PV#$(%'H(%.'!?8@2.A8#'(!
M(H(%$(%I$4!<6<OQ
OQ!LII.IF%'+!(.!(N#!XH(%.'H2!1.9$#N.2F!JIH*#2!M9I*#A!S<66BUY4!@9R2%$N#F!%'!V#I#8R#I!<6OO!S$##!JHR2#!36U4!N.8#P
RH$#F![.I0!(I%@$!HI#!(A@%IH22A!36QBB!@#II#'(!.;!\@I.F9I(%.']!(I%@$4!%'!.(N#I#" I)I(=.; P3MN O C3NO MMMQJ COMLOO NMCQQ PCMNMJ
S(="0%.B"%=")%.B()R 1*"H)#R=").R*.A.V?FB I)I(=.; J3LQ O P3LJ MMMQJ PNMMPQ NMPLJ NMMCP
SS(="0%.B"%=")%.B()R T((#".[(*8)#.A.!H8Y.468< I)I(=.; J3LJ O P3MJ MMMQJ PQMLCJ OMJJJ CMNJJ
B(-@*)#R.B()R L"0%.I)H#.A.F8<"=H)* I)I(=.; P3ON O O3LO MMMQJ OQMMOO PPMNNL PNMPMC
F8<"=H)*.T*2R L"0%.I)H#.?%=""%.A.?)#R"=0.S"==5.B()R I)I(=.; P3PJ O O3OJ MMMQJ PLMONJ PJMNNQ PPMNOC
1#R"=0(#.!)#" G)0%.I)H#.A.;68Y"=*)#R.[H**0.4= I)I(=.; P3PO O O3OO MMMQJ PLMMOO OMOCN OMLNM
;68Y"=*)#R.[H**0.4= 1#R"=0(#.!#.A.G)0%.4= I)I(=.; O3OC O O3MN MMMQJ OCMJPP OMOCN PJMNNL
SG)0%.4=H2" F#RH)#.!)@".BR.A.F#RH)#.!)@".BR I)I(=.; J3NQ O P3CJ MMMQJ PPMQJQ NMJJJ CMLJJ
T(#H%).R)=@P)5 G)0%.I)H#.A.;68Y"=*)#R.[H**0.4B I)I(=.; P3QO O C3JO MMMQJ ONMLJO NMPLQ LMOPN
X*"#Y=((@.L)5 1#R="P0.B6#.A.V?FB I)I(=.; J3QP O O3JO LMLQJ OJMOLM OPMNOO PPMJMM
S;)*RP"**.4=H2" ;(6#%5.!H#".A.;"#%"=.R(H#%.B()R I)I(=.; P3JL O O3PM MMMQJ PLMOLC PJMPQC PPMJNN
;)$"0.T"#R.B()R X)0%(#.A.4(6$*)0.T"#R I)I(=.; P3NO O C3OO MMMQJ OMMNNO QMNJJ LMOCO
S=""FH**.B()R B(-@*)#R.B()R.A.T((#".[(*8)# I)I(=.; J3NO O P3OO MMMQJ PJMLNO OMMNP CMJPO
ST((#".[(*8)# S=""FH**.B()R.A.S(="0%.B"%=")% I)I(=.; J3OO O J3OO MMMQJ CMMLO OMJJJ MMJ
!"#$% &'()) *)+(+& *,*-*,).& &*&,-/' +.0,).0
?(6=-"_.["#R"=0(#2H**".R6Y*H-.L(=@0
S;(6#%0."0%H8)%"R.Y)0"R.(#.(%F"=.-(8<)=)Y*".=()RP)5.2(*68"0.)#RU(=.<=H(=.0%6R5.2(*68"0
B()R S=(8.A.G( ;*)00 ;)<)-H%5.
<"=.!)#"
87
Impact Fee Study
Hendersonville, Tennessee
35
Local Adjustment Factor
Expected VMT reflects anticipated travel demand on the entire roadway system; therefore, it is necessary
to calibrate demand. To calibrate demand on the street network, actual travel demand of 602,207 VMT,
based on local traffic counts provided by Hendersonville Public Works , is compared to expected travel
demand of 2,535,259 VMT. The ratio between actual VMT and expected VMT equals 0.240, and this ratio
provides the local adjustment factor used to adjust national average trip lengths by type of land use.
Figure T7: Local Adjustment Factor
Local Trip Lengths
Shown below in Figure T8, TischlerBise applies the local adjustment factor to the national average trip
lengths to calculate local trip lengths. The analysis uses local trip lengths shown below to calculate VMT.
Figure T8: Local Trip Lengths
Local Vehicle Miles Traveled
Multiplying average weekday vehicle trips and local trip lengths by existing development units provides
VMT generated by existing development. Existing development generates 607,207 VMT.
Figure T9: Existing VMT by Land Use
!"#$%F'()* +,-./,-
0123"#34'()* /.565./57
!"#$%F'#8'0123"#34'()* ,9/:,
;8"%F'!4<$=#L3?#'@%"#8A
!"#"$%F'"() *+)H%(+$-.#I 0%1+$ 0%1+$
23F" 24HF-0"(I)5 .67-8+1)%4 24HF-0"(I)5
9H(I$"-8+'H$3 :;<=L L<?@L ;<?;
AB$)HC8+'H$3 :;<=L L<?@L ;<?;
M(6BN)4H+$ F<GL L<?@L ?<LF
H%''"41H+$ =<FL L<?@L :<;I
JOOH1"-L-J)5"4-9"4#H1"N F<GL L<?@L ?<LF
M(N)H)B)H%(+$ F<GL L<?@L ?<LF
9%B41"M-?L??-*N29-+(6-2HN15$"4OHN"-+(+$3NHN-O%4-$%1+$-+67BN)'"()-O+1)%4
!"#"$%F'"() !"# *+H -#.I0123 4%56$ 7879 7879
+3F" :(;) K%2" ="LI+?;F@ +?;FI4"(.)L !"# =A+
B;(.$"IC6';$3 M: 7E8 9FGH IF7I 7EJ8I7 H8HJ88O
AL$);MC6';$3 M: 77E HF79 IF7I NJE8N OIJO79
*(2L@)?;6$ OBC EE8 7FIO 7F8O 7JP9O EIJNHO
K%''"?5;6$ OBC O78 E7F7E EFIG IJE8E 97JNEP
QRR;5"ISIQ)L"?IB"?#;5"@ OBC O78 9FH7 7F8O EJG8O 7EJ9HO
*(@);)L);%(6$ OBC PE8 PFH9 7F8O 7J8I7 IEJ9NE
+%)6$ N8PJ78P
88
Impact Fee Study
Hendersonville, Tennessee
36
Street Network Capacity and Usage
As shown in Figure T6, Hendersonville provided an inventory of road segments including segment lengths
and lane quantities. The analysis uses average daily traffic counts provided by Hendersonville’s Public
Works Department. Multiplying each segment’s length by the number of lanes yields the number of lane
miles per segment, and multiplying the traffic counts by the segment lengths provides the average
weekday vehicle miles traveled (VMT). Hendersonville’s existing arterial network supports 607,207 VMT
on 126.64 lane miles.
Shown below, Figure T10 documents the capacity of Hendersonville’s street network. Based on a total of
1,181,204 vehicle miles of capacity (VMC), the street network provides a capacity of 9,327 vehicles per
lane mile, ( 126.64 lane miles / 1,181,204 VMC). The current daily volume on Hendersonville’s street
network is 607,207 VMT. The resulting ratio is 1. 95 VMC / VMT (1,181,204 VMC / 607,207 VMT). The
baseline VMC / VMT ratio for any incremental expansion method is 1.0 (i.e., VMC = VMT); therefore, the
current ratio of 1. 95 VMC / VMT exceeds the current LOS ensuring new capacity built with impact fees
will not exceed the current LOS.
Figure T10: Arterial Network Capacity and Usage
!"#$%&'$()&*+%), -./0/1
2)3+4%)&*+%),&"5&6$7$4+#8 -9-:-9.;1
6$7$4+#8&7)<&'$()&*+%) =9L.?
2)3+4%)&*+%),&"5&!<$@)% /;?9.;?
2*!&7)<&'$()&*+%) 19?=A
2*6&B&2*!&C$#+" -0=A
M<#)<+$%&6$7$4+#8&C$#+"
89
Impact Fee Study
Hendersonville, Tennessee
37
Projected VMT
Transportation impact fees rely on data pertaining to existing and future average weekday VMT.
Multiplying the average weekday VMT rates for new development prototypes by the projection of new
residential and nonresidential development provides existing and projected VMT. As shown in Figure T11,
existing development generates 602,207 VMT, and projected development generates an additional
96,478 VMT over the next 10 years.
Shown below, Hendersonville currently serves existing development with 126.64 lane miles in its existing
street network. To account for excess capacity in the street network, the analysis divides existing arterial
lane miles by the VMC / VMT ratio to calculate 65.10 adjusted lane miles (126.64 lane miles / 1.95 VMC
per VMT). Hendersonville needs to construct approximately 10.3 lane miles of street improvements over
the next 10 years to maintain the existing levels of service.
Figure T11: Projected VMT
!"#"$%F'"() !"# *+H -#.I0123 +45F 6%78$ -#.I0123
+3F" 9(5) :%2" ;+H -2K=L)'"() +45FI6"(.)? ;@+
A5(.$"IB8'5$3 C9 MNF GHIJ OJL JHMJ NGHMN
@=$)5MB8'5$3 C9 MMN OHNI OJL JHMJ NJHNJ
*(2=L)458$ OAB NNF IHNP PFL MHFQ IHGP
:%''"4758$ OAB QMF JNHFN JJL NHJG NOHGN
RSS57"ITIR)?"4IA"4#57"L OAB QMF NFHQI PFL MHFQ NNHMG
*(L)5)=)5%(8$ OAB NNF MMHPG JJL MHFQ NPHPJ
U8L" N M J I P NF NFMV"84
MFMP MFMO MFMN MFMQ MFMG MFJF MFJP *(74"8L"
A5(.$"MB8'5$3I9(5)L MNWFJM MNWJQQ MNWNIJ MMWFGQ MMWIPI MMWQFG MIWPQO JWPPJ
@=$)5MB8'5$3I9(5)L OWNFO OWNQQ OWMNF OWJPJ OWIJP OWPNN OWGMG QMJ
*(2=L)458$IOAB MWNPQ MWNNF MWNQJ MWNGP MWQFN MWQMF MWQQJ NMO
:%''"4758$IOAB JWNFN JWNJJ JWNOP JWNGQ JWMJN JWMOI JWIJP JJI
RSS57"ITIR)?"4IA"4#57"LIOAB NWGFQ NWGIQ NWGGF MWFJM MWFNP MWNNG MWJPJ IIP
*(L)5)=)5%(8$IOAB MWFJM MWFOP MWFGG MWNJI MWNOG MWMFP MWJGJ JON
A5(.$"MB8'5$3I+45FL NMIWGPM NMNWFOJ NMGWNNI NJNWMQP NJJWJGO NJPWPFN NIOWFOM MNWNNF
@=$)5MB8'5$3I+45FL MPWGMP MOWMNP MOWOMP MOWGNI MNWJMI MNWONJ MGWIMM JWIGO
X"L52"()58$I+45FL NPFWQNN NPJWJJQ NPPWNGQ NPQWMPG NOFWNNG NOJWNQF NNPWIQJ MIWOFO
*(2=L)458$I+45FL OWPPF OWPNG OWOFG OWOJQ OWOOQ OWOGQ OWQIQ MGQ
:%''"4758$I+45FL JNWQNN JQWMOO JQWOPG JGWFPO JGWIPN JGWQOM INWGPM IWFNI
RSS57"ITIR)?"4IA"4#57"LI+45FL NFWJIN NFWPOF NFWNQI NNWFNJ NNWMIO NNWIQI NMWNPI MWINJ
*(L)5)=)5%(8$I+45FL NPWNIN NPWJGN NPWOPN NPWGFG NOWNNN NOWIJQ NNWQJG MWOGJ
Y%(4"L52"()58$I+45FL OGWGNP NFWQFJ NNWNFJ NMWONO NJWPIM NIWIQM NGWJGJ GWINQ
+%)8$I;"?57$"I+45FL MMFWNGM MMIWNIF MMNWPFN MJFWQNP MJIWMOM MJNWOOM MPIWQNO JIWFQI
!"#$%&'(! )*+,-*+ ).),+/. )-),0** )01,220 )/1,/3. )11,.-/ +*0,)21 3),/+2
-((=8$I*(74"8L" GWPJI GWPPQ GWPQJ GWOFQ GWOJJ GWNOO 3,+))
-7)=8$I68("I@5("L NMOHOI NMQHO NJFHO NJMHO NJIHO NJOHO NIOHQ MFHN
-((=8$I*(74"8L" MHF MHF MHF MHF MHF MHF MHF
-2K=L)"2I68("I@5$"L OPHNF OOHN ONHN OQHM OGHM NFHM NPHI NFHJ
-((=8$I*(74"8L" NHF NHF NHF NHF NHF NHF NHF
C"(2"4L%(#5$$"WI+"(("LL""
90
Impact Fee Study
Hendersonville, Tennessee
38
Capacity Improvements – Incremental Expansion
The transportation impact fee includes a component for construction of additional capacity
improvements, and the analysis uses an incremental methodology to maintain the existing level of service
for capacity improvements. As shown in Figure T12, the analysis uses VMT to calculate existing level -of-
service standards. Hendersonville' currently provides 126.6 lane miles of capacity improvements, so the
existing level of service is 1. 070 lane miles per 10,000 VMT ( 126.6 lane miles / 1. 95 VMC per VMT /
(607,207 VMT / 10,000)). As shown in Figure T12, the analysis uses a cost of $ 5,269,267 per lane mile,
which was provided by Hendersonville’s Public Works Department. For capacity improvements, the cost
is $563.57 per VMT (126.6 lane miles / 1.95 VMC per VMT / 607,207 VMT X $5,269,267 per lane mile).
Figure T12: Existing Standards for Capacity Improvements
Development Fee Report – Plan-Based
The cost to prepare the transportation impact fee equals $ 27,032. TischlerBise recommends that
Hendersonville updates its report every five years. Based on the 5-year cost, proportionate share, and 5-
year projections of future development from the Land Use Assumptions document, the cost is $0.56 per
VMT.
Figure T13: Impact Fee Study Expense
!"#$%F'(%)*+'%H-.' /012341235
67-#$-+8%)*+'%H-.'# 923:3
;H!%<%;H=%L*$-" 9:40
?@AB#$'@%)*+'%H-.'# 3C:4
2M20%;H= 3M512M5
)*+'%H-.'#%F'(%9M1MMM%;H= 9:M5M
!"#$%F'(%;H= /03E:05
F"B(G'H%I'+@'(#"+J-..'%OBL.-G%M"(N#%O'F*($P'+$
!"#$%Q*G$"(#
)'J'.R"SRF'(J-G'%T)UFV%F$*+@*(@#
!"#"$$%&'()*+,-#(
."&/-#" 01$2 ."&/-#"(34-2 567"%&(
08%49"
01$2(:"&(
."&/-#"(34-2
.2&""2 ;<=>?@< A,,( B??C MNF G=>HB= ;?I5J
)&1:1&2-14%2"(.8%&"
91
Impact Fee Study
Hendersonville, Tennessee
39
Proposed Transportation Impact Fees
Input variables for the transportation impact fee are shown in the upper section of Figure T14. The total
capital cost is $564.13 per VMT.
Transportation impact fees for residential development are assessed per housing unit and vary
proportionately according to the number of VMT per housing unit. For a single -family unit, the fee of
$10,836 is calculated using a cost of $564.13 per VMT multiplied by 19.21 VMT per housing unit.
Transportation impact fees for nonresidential development are assessed per 1,000 square feet and vary
proportionately according to the number of VMT. For industrial development, the fee of $2,792 per 1,000
square feet is calculated using a cost of $564.13 per VMT multiplied by 4.95 VMT per 1,000 square feet.
Figure T14: Proposed Transportation Impact Fees
!""#$%F'%("() $%*)#'"+#,-.
I)+"")#0F'+%1"F"()* 2345637
8"1"9%'F"()#!""#:"'%+) 2;634
.%)<9 234=6>5
?1@#A""BC<M
,-.
IN(@9"#!<FN9M >F6G> 2>;HI54
-J9)NO!<FN9M >5675 27H7=3
?1@#A""BC<M
,-.
0(CJ*)+N<9 =6F3 2GH7FG
$%FF"+LN<9 >46F7 2FH37>
MNNNL"#O#M)P"+#I"+1NL"* >>6GF 24H57>
0(*)N)J)N%(<9 >3635 2IH745
8"1"9%'F"()#.M'" Q+%'%*"C
!""*
R(N)#INS" Q+%'%*"C
!""*
:"*NC"()N<9#!""*#'"+#R(N)
T%(+"*NC"()N<9#!""*#'"+#>H;;;#IUJ<+"#!"")
92
Impact Fee Study
Hendersonville, Tennessee
40
Projected Revenue from Transportation Impact Fees
This section summarizes the potential cash flow to Hendersonville based on adoption of the proposed
transportation impact fees. The cash flow projections are based on the development projections
discussed in the Land Use Assumptions section and the proposed transportation impact fees. If
development occurs at a more rapid rate than projected, the demand for infrastructure and the impact
fee revenue will increase at a corresponding rate. If development occurs at a slower rate than projected,
the demand for infrastructure and the impact fee revenue will decrease at a corresponding rate. Projected
impact fee revenue equals $ 54,425,254 over the next 10 years and total projected expenditures equal
$54,503,556.
Figure T15: Projected Revenue from Transportation Impact Fees
!"#$%FG(F)"* +H-.%-I0G(F)"* 1#%)2
(%"**%G345"#6*4*I%. 789:8;K:88= 7; 789:8;K:88=
>*6*2#54*I%G?**G@*5#"% 7AB:;KA 7; 7AB:;KA
1#%)2 789:8;K:88= 7; 789:8;K:88=
(-I02*G?)4-2C ME2%-F?)4-2C 3IGE.%"-)2 H#44*"I-)2 JOO-I*GLGJ%F*" 3I.%-%E%-#I)2
7M;:NK= 7B:B98 7A:BOA 7O:8BM 7=:KBM 7N:B=K
5*"GEI-% 5*"GEI-% 5*"G.PGO% 5*"G.PGO% 5*"G.PGO% 5*"G.PGO%
Q.0GRI-% Q.0GRI-% S(? S(? S(? S(?
T).* A;A8 AM:;KA =:M;= A:B8N K:M;M M:O;N A:;KA
U*)"GM A;A= AM:KNN =:MNN A:BB; K:MKK M:O9N A:;=8
U*)"GA A;AB AM:B9K =:AB; A:BNK K:M=8 M:OO; A:;OO
U*)"GK A;AN AA:;ON =:K8K A:BO8 K:MON A:;KA A:MK9
U*)"G9 A;AO AA:989 =:9K8 A:N;B K:AKM A:;B8 A:M=O
U*)"G8 A;K; AA:N;O =:8MB A:NA; K:A=9 A:MMO A:A;8
U*)"G= A;KM AK:M=9 =:=;; A:NKK K:AOB A:M=9 A:A9M
U*)"GB A;KA AK:8A; =:=NA A:N98 K:KKM A:AM; A:ABN
U*)"GN A;KK AK:NB8 =:B=9 A:N8N K:K=8 A:A8= A:KM=
U*)"GO A;K9 A9:AK; =:N9B A:NBM K:9;; A:K;9 A:K89
U*)"GM; A;K8 A9:8N= =:OAO A:NNK K:9K8 A:K8K A:KOK
K:88K NAK MA= KK9 998 K=M
VVVVVVVVVVV 7=:KB=:BMB 7K8;:8BM 7K:MOA:NAM 7A:NK8:O=M 7K:M=8:A=K
789:9A8:A89
789:8;K:88=
P"#X*I%*GG@*6*IE*
P"#X*I%*GG?**G@*6*IE*
1#%)2G+H5*IG-%E"*.
M;FU*)"G3II"*).*
?**GH#45#I*I%
U*)"
93
Impact Fee Study
Hendersonville, Tennessee
41
APPENDIX A: LAND USE ASSUMPTIONS
The City of Hendersonville, Tennessee, retained TischlerBise to analyze the impacts of development on its
capital facilities and prepare impact fees based on that analysis. The population, housing unit, and job
projections contained in this document provide the foundation for the impact fee s tudy. To evaluate
demand for growth -related infrastructure from various types of development, TischlerBise prepared
documentation on demand indicators by type of housing unit, jobs and floor area by type of nonresidential
development, and average weekday vehicle trip generation rates. These are the service units and demand
indicators used in the impact fee study.
Impact fees are based on the need for growth-related improvements, and they must be proportionate by
type of land use. The demographic data and development projections are used to demonstrate
proportionality and to anticipate the need for future infrastruc ture. These metrics are used to allocate
costs of development equitably among various types of development. To calculate base year estimates,
the analysis uses data from the U.S. Census Bureau, Esri Business Analyst, and information from
Hendersonville staff. Impact fee studies typically consider a ten-year horizon, with the expectation that
fees will be updated every three to five years.
Residential Development
Persons Per Housing Unit
According to the U.S. Census Bureau, a household is a housing unit occupied by year -round residents.
Development fees often use per capita standards and persons per housing unit (PPHU) or persons per
household (PPH) to derive proportionate share fee amounts. When PPHU is used in the fee calculations,
infrastructure standards are derived using year -round population. When PPH is used in the fee
calculations, the development fee methodology assumes a higher percentage of housing units will be
occupied, thus requiring seasonal or peak population to be used when deriving infrastructure standards.
TischlerBise recommends that impact fees for residential development in Hendersonville be imposed
according to the number of year -round residents per housing unit. This methodology assumes some
portion of the housing stock will be vacant during the year.
Persons per housing unit (PPHU) calculations require data on population and the types of units by
structure. Since 2010, the census has not obtained detailed information using a “long -form”
questionnaire. Instead, the U.S. Census Bureau uses a continuous monthly mailing of surveys, known as
the American Community Survey (ACS), which has limitations due to sample-size constraints. For example,
data on detached housing units are now combined with attached single units (commonly known as
townhouses). For development fees in Hendersonville, single-family units include detached stick-built
units, attached units, and mobile homes. Multi-family units include structures with two or more units, and
all other housing units.
Figure A 1 below shows the 2019-2023 5-year ACS estimates for Hendersonville. Single- family units
averaged 2.56 persons per housing unit ( 52,188 persons / 20,379 housing units) and multi -family units
averaged 1.65 persons per housing unit (9,843 persons / 5,949 housing units). In 2023, Hendersonville’s
housing stock averaged 2. 36 persons per housing unit. Housing unit estimates from ACS will not equal
94
Impact Fee Study
Hendersonville, Tennessee
42
decennial census counts of units. These data are used only to derive the custom PPHU factors for each
type of unit.
Figure A1: Persons per Housing Unit
Existing Population and Housing Units
The 2020 Census estimates for Hendersonville include 61,753 persons and 24,963 housing units. By
applying the building permit data shown below in Figure A2 to 2020 US Census estimates, TischlerBise
estimates the 2025 housing stock includes 27,138 housing units – 21,032 single-family units and 6, 106
multi-family units. The analysis converts housing units to population using the occupancy factors shown
in Figure A1. The 2025 population estimate is 66,898 persons.
Figure A2: Recent Historical Housing Permit Data
Projected Population and Housing Units
To project future population growth, the analysis uses the residential construction data shown in Figure
A2. This results in an estimated total increase of 4,377 housing units by 2035. To project future population,
the analysis holds the occupancy rate factors in Figure A1 constant throughout the 10-year time horizon.
Applying the PPHU factors to the projected housing unit increase results in an estimated increase of
10,455 persons over the next ten years.
!"#$%F'()*"%+H -.IH001111111 H2I3341111111 .560 .4I7821111111 !"#$ 88539 356H9
:;%<"'()*"%+.
2I037111111111 -I303111111111 H582 -I232111111111 %"$# ..569 850.9
=><)% 6.I47H1111111 .3I2.31111111 .532 .6I7.01111111 !"&$ H44549 -5779
!>;?@FA1B5!51CF#M;M1E;?F);I1.4H2'.4.71F*F?"@)#1C>**;#"<+1!;?GF+1-'HF)?1IM<"*)<FM
H51J#@%;KFM1KF<)@LFKI1)<<)@LFK1M<>N#L>;MFOI1)#K1*>P"%F1L>*F1;#"<M5
.51J#@%;KFM1KNF%%"#$M1"#1M<?;@<;?FM1N"<L1<N>1>?1*>?F1;#"<MI1QRMI1)#K1)%%1><LF?1;#"<M5
S>;M"#$
:"T
R)@)#@+1
Q)<FS>;M"#$1=+UF VF?M>#M S>;MFL>%KM VF?M>#M1UF?1
S>;MFL>%K
S>;M"#$1
B#"<M
VF?M>#M1UF?1
S>;M"#$1B#"<
!"#$ %F'()"*+#,F)- ./)0F1#,F)- 230#)*4'F05*
!"#$ %!! !$ %&#
!"!" '!# " '!#
!"!# %&( #') &$%
!"!! ')% )" %(%
!"!' !(% !%* &##
!"!% !)& " !)&
230#) 67896 :;: 67<6<
=''/#)*=>"$#(" 9?? @6 :9@
A"5FB"'0F#)*C3'50$/M0F3'*2$"'B5
95
Impact Fee Study
Hendersonville, Tennessee
43
Figure A3: Residential Development Projections
Nonresidential Development
In addition to data on residential development, the calculation of development impact fees requires data
on nonresidential development. TischlerBise uses the term jobs to refer to employment by place of work.
In Figure A4, gray shading indicates the nonresidential development prototypes used by TischlerBise to
derive nonresidential floor area and average weekday vehicle trips.
The prototype for industrial development is Manufacturing (ITE 140) with an average of 528 square feet
of floor area per employee. For office & other services development, the proxy is General Office (ITE 710)
with an average of 307 square feet of floor area per employee. Institutional development uses
Government Office (ITE 730) with an average of 350 square feet of floor area per employee. The prototype
for commercial development is Shopping Center (ITE 820) with an average of 471 square feet of floor area
per employee.
Figure A4: Nonresidential Demand Units
!"!# !"!$ !"!% !"!F !"!' !"(" !"(#
)*+H-.H*I 0 ! ( 1 # 0"
!"#$%&'(") **+H-H *.+-/0 *H+-H- .1+10/ .2+1H1 .3+234 ..+040 21+/44
5"$6()789)('6
23456H-7*8369 !0:"(! !0:(FF !0:%1( !!:"'F !!:1#1 !!:F"' !1:#F$ (:##(
;<6=3>7*8369 $:0"$ $:0FF $:!%" $:(#( $:1(# $:#0% $:'!' F!(
:"'&% 3.+20H 3.+4.* 3H+120 3H+/42 3H+HH- 3-+03* 02+424 /+0..
?H4@HI+A4B366H:-
CH44H++HH
0">.H*I-
M4EIH*+H
!"# $%FG() *+)H-".I0-#()1 *+)H-".I0-#()1 #F023H%%1-4%. 567G.%-8%%9
:3)% ;(I9 4%.-$F)-;(I9< 4%.-#F023H%%< $%FG()-;(I9 4%.-#F023H%%
<<= LI?@9-!()719.IG2 <A===-56-89 BCME FC<= <CGE HFE
<F= !()719.IG2-4G.+ <A===-56-89 FCFE ICJ< <C<H MHB
<B= OG(7LGM97.I(? <A===-56-89 BCEG ICG< <CMJ GIM
<G= *G.%@371I(? <A===-56-89 <CE< GC=G =CFB IAJGF
IGB N11I19%)-LIOI(? P%) ICH= BCIB =CH< (G
IGB N11I19%)-LIOI(? <A===-56-89 BC<J BCIB =CJJ <A=<I
F<= Q39%2 .33F ECJJ <BCFB =CGH (G
H<= Q310I9G2 <A===-56-89 <=CEE FCEE ICMH FG=
E<= R%(%.G2-SLLIM%-TGO?-1IU%V <A===-56-89 <=CMB FCFF FCIH F=E
EI= O%)IMG2P$%(9G2-SLLIM% <A===-56-89 FHC== MCE< BC<F IBI
EF= R3O%.(F%(9-SLLIM% <A===-56-89 IICGJ ECBG FC=F FF=
EG= SLLIM%-4G.+ <A===-56-89 <<C=E FCGB FC<F FI=
EH= X%1%G.M@-Y-$%O-:%(9%. <A===-56-89 <<C=M FCFE FCIJ F=B
EE= R71I(%11-4G.+ <A===-56-89 <ICBB BC=B FC=M FIG
MI= 5@300I(?-:%(9%.-TGO?-1IU%V <A===-56-89 FEC=< <ECBI IC<I BE<
<C-".I0-R%(%.G9I3(A-!(19I979%-3L-".G(103.9G9I3(-#(?I(%%.1A-<<9@-#)I9I3(-TI=I<VC
LG()-;1%-[-5IU%
96
Impact Fee Study
Hendersonville, Tennessee
44
Existing Employment and Floor Area
TischlerBise obtains 2024 employment estimates for Hendersonville from Esri Business Analyst. To
estimate floor area, the analysis multiplies e ach sector’s employment total by the employment density
factors shown in Figure A4. For 2024, total employment equals 23,861 jobs and e stimated floor area
equals 9,682,706 square feet.
Figure A5: Existing Nonresidential Development
Projected Employment and Floor Area
The analysis uses employment and floor area projections to illustrate the possible future pace of service
demands, revenues, and expenditures. To the extent these factors change, the projected need for
infrastructure will also change. If development occurs at a more rapid ra te than projected, the demand
for infrastructure will increase at a corresponding rate. If development occurs at a slower rate than
projected, the demand for infrastructure will also decrease.
The projections are based on compound annual growth rates for Industrial, Commercial and Office &
Institutional jobs, which were derived from the Nashville Area Metropolitan Planning Organization’s job
estimates for Sumner County in 2017 and 2045. The MPO estimates Industrial jobs will grow by 0.45% per
year, Commercial jobs by 1.03% per year, Office & Other Services jobs by 2.12% per year, and Institutional
Jobs by 1.65% per year . These growth rates were then applied to the 2024 ESRI job figures to produce
estimates for 2025 through 2035. Nonresidential floor area growth was calculated by applying the
employee density factors shown in Figure A4 to the growth in jobs.
Based on these assumptions, the 10-year projections include an increase of 3,435 jobs and approximately
1.25 million square feet of nonresidential development in Hendersonville.
!"!# $%FG%()*+H -.I0F%*1%%) !"!#*23)450)%6
7+839 J+)0;*7+83 <%F*7+8! 1;++F*=F%0>
?(6I3)F40;# @A9BC !!M @!N !AF#@ACFC
G+55%FG40;@ CA@!! !FM #F9 >A"CBAFBN
HHH4G%*I*H)J%F*-%FO4G%3C CA"N! !@M >"F 9ANCNA>C>
?(3)4)I)4+(0;F CA"C9 !@M >>" 9ABBNANCB
J+)0; !>ANC9 9""M BACN!AF"C
9L*23F4*MI34(%33*=(0;N3)*H(;4(%A*MI34(%33*-I550FNA*!"!#L
!L*JF4<*O%(%F0)4+(A*?(3)4)I)%*+H*JF0(3<+F)0)4+(*2(P4(%%F3A*99)J*264)4+(*Q!"!9RL
>L*J43GJ;%FM43%*G0;GI;0)4+(*Q!"!#*S+83*T*3.I0F%*H%%)*<%F*S+8RL
#L*U0S+F*3%G)+F3*0F%*G+(3)FIG)4+(V*U0(IH0G)IF4(PL
@L*U0S+F*3%G)+F3*0F%*P%)04;V*=GG+55+60)4+(*I*1++6*-%FO4G%3L
CL*U0S+F*3%G)+F3*0F%*H)J%F*-%FO4G%3V*$F+H%334+(0;A*-G4%()4H4G*I*J%GJ*-%FO4G%3L
FL*U0S+F*3%G)+F3*0F%*26IG0)4+(0;*-%FO4G%3V*X%0;)J*G0F%*I*-+G40;*=3343)0(G%L
Y+(F%346%()40;
G0)%P+FN
97
Impact Fee Study
Hendersonville, Tennessee
45
Figure A6: Nonresidential Development Projections
!"!# !"!$ !"!% !"!& !"!' !"(" !"(#
)*+H-.H*I 0 ! ( 1 # 0"
!"#$%F"'()
2345+6I7*8 #9!0' #9!1! #9!$$ #9!&' #9(0( #9((% #91#% !(%
:;<<HI=7*8 $9#&' $9$#% $9%!# $9%'1 $9&$1 $9'(1 %9!'& %"!
>??7=H-@->6AHI-BHIC7=H+ $9!00 $9(1( $91%% $9$01 $9%#1 $9&'% %9$$" 0910'
23+676567;3*8 $90$0 $9!$( $9($$ $91%0 $9#%& $9$&$ %9!#$ 09"%%
*%)+$ ,-./01 ,-.21- ,-.03- ,2./45 ,2.215 ,2.022 ,6.46/ 3.-32
7%(8'9:;<$%%8;=8'+
2345+6I7*8 !9%#%9'!% !9%%"9!(1 !9%&!9#'# !9%'#9"00 !9&"%91&( !9&!"9"0" !9&&(91'" 0!#9""#
:;<<HI=7*8 (90"09(!0 (90((90$& (90$#9(1! (90'%9&1$ (9!("9$&1 (9!$(9&#' (91(19'0# (("9!"!
>??7=H-@->6AHI-BHIC7=H+ 09'"%9'#$ 09'1&9(&& 09'&'9$%% !9"(09&1" !9"%19&'% !900&9&$% !9(#(9"'! 1(#9&''
23+676567;3*8 !9"(09&1# !9"$#9($1 !9"''91(% !90(19"%! !90$'9!%& !9!"#9"$# !9('(9"#! (##9(1$
*%)+$ 5.655.121 5.5/6./2- /1.136.121 /1./20.645 /1.,0,.3-, /1.-16.01/ //.14-.2-5 /.,-4.-2,
DH34HI+;3C788H9-
EH33H++HH
0"F.H*I-
23=IH*+H
98
Impact Fee Study
Hendersonville, Tennessee
46
Development Projections
Provided below is a summary of Citywide development projections used in the impact fee study. Base year estimates for 2025 are used in the
impact fee calculations. Development projections are used to illustrate a possible future pace of demand for service units and cash flows resulting
from revenues and expenditures associated with those demands.
Figure A7: Development Projections Summary
!"!# !"!$ !"!% !"!F !"!' !"(" !"() !"(! !"(( !"(* !"(#
+H-.I0.H1 ) ! ( * # $ % F ' )"
!"#$%F'(") **+H-H *.+-/0 *H+-H- .1+10/ .2+1H1 .3+234 .0+2.2 ./+32* .4+3*3 .*+01. ..+040 21+/44
5"$6()789)('6
23456.I7H8369 !):"(! !):(FF !):%*( !!:"'F !!:*#* !!:F"' !(:)$* !(:#!" !(:F%# !*:!(" !*:#F$ (:##(
;<6=3>7H8369 $:)"$ $:)FF $:!%" $:(#( $:*(# $:#)% $:$"" $:$F! $:%$* $:F*% $:'!' F!(
:"'F% 3.+20H 3.+4.* 3H+120 3H+/42 3H+HH- 3-+03* 3-+.*/ 01+313 01+*0- 02+1.. 02+424 /+0..
;<#%"=<>)'
?4@<-=13H6 #:!)' #:!*! #:!$$ #:!F' #:()( #:((% #:($" #:(F* #:*"F #:*(( #:*#% !(F
AB88.1C3H6 $:#F' $:$#% $:%!# $:%'* $:F$* $:'(* %:""$ %:"%% %:)#" %:!!* %:!'F %"'
MEE3C.IFIM=G.1I2.1H3C.- $:!)) $:(*( $:*%% $:$)* $:%#* $:F'% %:"** %:)'( %:(*# %:#") %:$$" ):**'
?4-=3=<=3B4H6 $:)$) $:!$( $:($$ $:*%) $:#%F $:$F$ $:%'% $:'"' %:"!( %:)(F %:!#$ ):"'#
:"'F% 3/+2H1 3/+41/ 3/+H0/ 34+2*- 34+41- 34+H44 3*+31* 3*+4*0 3*+-3* 3.+3-* 3.+*.2 0+/-2
?")@>6A8BCA8D'A8NF2+111G
?4@<-=13H6 !:%#F !:%%" !:%F( !:%'# !:F"% !:F!" !:F(( !:F*# !:F#F !:F%) !:FF( )!$
AB88.1C3H6 (:)") (:)(( (:)$# (:)'F (:!() (:!$* (:!'% (:(() (:($# (:*"" (:*(# ((*
MEE3C.IFIM=G.1I2.1H3C.- ):'"F ):'*F ):''" !:"(! !:"%# !:))' !:)$* !:!)" !:!#$ !:("* !:(#( **#
?4-=3=<=3B4H6 !:"(! !:"$# !:"'' !:)(* !:)$' !:!"# !:!*) !:!%F !:()$ !:(#* !:('( ($)
:"'F% -+.-- -+-2. 21+10. 21+24- 21+3H3 21+/1H 21+404 21+**4 21+.-* 21+-3- 22+1*4 2+3*4
I.4@.1-B4H366.:IJ.44.--.. )">0.H1I
?4C1.H-.
99
Impact Fee Study
Hendersonville, Tennessee
47
APPENDIX B: LAND USE DEFINITIONS
Residential Development
As discussed below, residential development categories are based on data from the U.S. Census Bureau,
American Community Survey. Hendersonville will collect impact fees from all new residential units. One-
time impact fees are determined by site capacity (i.e., number of residential units).
Single-Family:
1. Single-family detached is a one-unit structure detached from any other house, that is, with open
space on all four sides. Such structures are considered detached even if they have an adjoining
shed or garage. A one-family house that contains a business is considered detached as long as the
building has open space on all four sides.
2. Single-family attached (townhouse) is a one-unit structure that has one or more walls extending
from ground to roof separating it from adjoining structures. In row houses (sometimes called
townhouses), double houses, or houses attached to nonresidential structures, each house is a
separate, attached structure if the dividing or common wall goes from ground to roof.
3. Mobile home includes both occupied and vacant mobile homes, to which no permanent rooms
have been added, are counted in this category. Mobile homes used only for business purposes or
for extra sleeping space and mobile homes for sale on a dealer's lot, at the factory, or in storage
are not counted in the housing inventory.
Multi-Family:
1. 2+ units (duplexes and apartments) are units in structures containing two or more housing units,
further categorized as units in structures with “2, 3 or 4, 5 to 9, 10 to 19, 20 to 49, and 50 or more
apartments.”
2. Boat, RV, Van, etc. includes any living quarters occupied as a housing unit that does not fit the
other categories (e.g., houseboats, railroad cars, campers, and vans). Recreational vehicles, boats,
vans, railroad cars, and the like are included only if they are occupied as a current place of
residence.
100
Impact Fee Study
Hendersonville, Tennessee
48
Nonresidential Development
The proposed general nonresidential development categories (defined below) can be used for all new
construction within Hendersonville. Nonresidential development categories represent general groups of
land uses that share similar average weekday vehicle trip generation rates and employment densities (i.e.,
jobs per thousand square feet of floor area).
Commercial: Establishments primarily selling merchandise, eating/drinking places, and entertainment
uses. By way of example, Commercial includes shopping centers, supermarkets, pharmacies, restaurants,
bars, nightclubs, automobile dealerships, and movie theaters.
Industrial: Establishments primarily engaged in the production, transportation, or storage of goods. By
way of example, Industrial includes manufacturing plants, distribution warehouses, trucking companies,
utility substations, power generation facilities, and telecommunications buildings.
Institutional: Public and quasi- public buildings providing educational, social assistance, or religious
services. By way of example, Institutional includes schools, universities, churches, daycare facilities,
hospitals, and government buildings.
Office: Establishments providing management, administrative, professional, or business services. By way
of example, Office includes banks, business offices, medical offices, and veterinarian clinics.
101
Impact fee Report
Prepared for:
Hendersonville, Tennessee
January 26, 2024
4701 Sangamore Road
Suite S240
Bethesda, MD 20816
301.320.6900
www.TischlerBise.com
102
103
Impact fee Report
Hendersonville, Tennessee
[PAGE INTENTIONALLY LEFT BLANK]
104
105
Impact fee Report
Hendersonville, Tennessee
i
TABLE OF CONTENTS
EXECUTIVE SUMMARY ................................................................................................................................. 1
Tennessee Legal Framework ......................................................................................................................................... 1
General Legal Framework ............................................................................................................................................... 1
General Methodologies ..................................................................................................................................................... 3
Cost Recovery (Past Improvements) ............................................................................................................... 3
Incremental Expansion (Concurrent Improvements) .............................................................................. 3
Plan-Based (Future Improvements) ................................................................................................................ 3
Conceptual Impact fee Calculation .............................................................................................................................. 4
Credits ..................................................................................................................................................................................... 4
Proposed Fee Methodologies and Cost Components ........................................................................................... 4
Impact fee Schedule ........................................................................................................................................................... 5
PARKS IMPACT FEES .................................................................................................................................... 6
Methodology ......................................................................................................................................................................... 6
Proportionate Share .......................................................................................................................................................... 6
Demand Units ....................................................................................................................................................................... 6
Park Land – Incremental Expansion ........................................................................................................................... 6
Park Improvements – Incremental Expansion ....................................................................................................... 8
Projected Demand for Growth-Related Parks Infrastructure .......................................................................... 9
Park Land .................................................................................................................................................................... 9
Park Improvements .............................................................................................................................................. 10
Maximum Allowable Parks Impact fees .................................................................................................................. 11
Projected Parks Impact fee Revenue ........................................................................................................................ 12
APPENDIX A: LAND USE ASSUMPTIONS ................................................................................................... 13
Summary of Growth Indicators .................................................................................................................................. 14
Residential Development .............................................................................................................................................. 15
Persons Per Housing Unit ................................................................................................................................... 15
Residential Estimates ........................................................................................................................................... 16
Residential Projections ........................................................................................................................................ 16
APPENDIX B: LAND USE DEFINITIONS...................................................................................................... 17
Residential Development .............................................................................................................................................. 17
106
Impact fee Report
Hendersonville, Tennessee
ii
[PAGE INTENTIONALLY LEFT BLANK]
107
Impact fee Report
Hendersonville, Tennessee
1
EXECUTIVE SUMMARY
In 2023, the City of Hendersonville retained TischlerBise to analyze the impacts of future development on
park facilities and to calculate impact fees based on that analysis. Through interviews and discussions with
staff, TischlerBise developed the proposed impact fees discussed in this report. Impact fees are collected
from new construction at the time a building permit is issued and used to construct system improvements
needed to accommodate future development. An impact fee represents future development’s
proportionate share of capital facility needs. Impact fees do have limitations and should not be regarded
as the total solution for infrastructure funding needs. Rather, they are one component of a comprehensive
portfolio to ensure provision of adequate public facilities needed to serve future development. In contrast
to general taxes, impact fees may not be used for operations, maintenance, replacement of infrastructure,
or correcting existing deficiencies.
The City of Hendersonville has experienced steady residential growth in recent years, and this growth is
expected to continue in the future. As a result, Hendersonville must plan for future park improvements if
existing levels of service are to be maintained.
TENNESSEE LEGAL FRAMEWORK
While the State of Tennessee does not have specific authorizing legislation for impact fees, the State does
grant the power for municipalities with a mayor- aldermanic charter to impose impact fee s on new
development. As a mayor-aldermanic charter city, the City of Hendersonville may:
“Establish, open, relocate, vacate, alter, widen, extend, grade, improve, repair, construct, reconstruct,
maintain, light, sprinkle and clean public highways, streets, boulevards, parkways, sidewalks, alleys, parks,
public grounds, public facilities, libraries and squares, wharves, bridges, viaducts, subways, tunnels,
sewers and drains within or without the corporate limits, regulate their use within the corporate limits,
assess fees for the use of or impact upon such property and facilities, and take and appropriate property
therefor under § 7-31-107 -- 7-31-111 and § 29-16-203, or any other manner provided by general laws.”
(Tenn. Code Ann. § 6-2-201 (15))
GENERAL LEGAL FRAMEWORK
Both state and federal courts have recognized the imposition of impact fee s as a legitimate form of land
use regulation, provided the fees meet standards intended to protect against regulatory takings. Land use
regulations, development exactions, and impact fees are subject to the Fifth Amendment prohibition on
taking of private property for public use without just compensation. To comply with the Fifth Amendment,
development regulations must be shown to substantially advance a legitimate governmental inter est. In
the case of impact fees, that interest is in the protection of public health, safety, and welfare by ensuring
development is not detrimental to the quality of essential public services. The means to this end are also
important, requiring both procedural and substantive due proce ss. The process followed to receive
community input (i.e., stakeholder meetings, work sessions, and public hearings) provides opportunities
for comments and refinements to the impact fees.
There is little federal case law specifically dealing with impact fees, although other rulings on other types
of exactions (e.g., land dedication requirements) are relevant. In one of the most important exaction
cases, the U. S. Supreme Court found that a government agency imposing exactions on development must
demonstrate an “essential nexus” between the exaction and the interest being protected (see Nollan v.
108
Impact fee Report
Hendersonville, Tennessee
2
California Coastal Commission, 1987). In a more recent case (Dolan v. City of Tigard, OR, 1994), the Court
ruled that an exaction must also be “roughly proportional” to the burden created by development.
However, the Dolan decision appeared to set a higher standard of review for mandatory dedications of
land than for monetary exactions such as impact fees.
There are three reasonable relationship requirements for impact fees that are closely related to “rational
nexus”, or “reasonable relationship” requirements enunciated by a number of state courts. Although the
term “dual rational nexus” is often used to characterize the standard by which courts evaluate the validity
of impact fees under the U.S. Constitution, we prefer a more rigorous formulation that recognizes three
elements: “need,” “benefit,” and “proportionality.” The dual rational nexus test explicitly addresses only
the first two, although proportionality is reasonably implied, and was specifically mentioned by the U.S.
Supreme Court in the Dolan case. Individual elements of the nexus standard are discussed further in the
following paragraphs.
All new development in a community creates additional demands on some, or all, public facilities provided
by local government. If the capacity of facilities is not increased to satisfy that additional demand, the
quality or availability of public services for the entire community will deteriorate. Impact fees may be used
to recover the cost of development-related facilities, but only to the extent that the need for facilities is
a consequence of development that is subject to the fees. The Nollan decision reinforced the principle
that development exactions may be used only to mitigate conditions created by the developments upon
which they are imposed. That principle clearly applies to impact fee s. In this study, the impact of
development on infrastructure needs is analyzed in terms of quantifiable relationships between various
types of development and the demand for specific capital facilities, based on applicable level- of-service
standards.
The requirement that exactions be proportional to the impacts of development was clearly stated by the
U.S. Supreme Court in the Dolan case and is logically necessary to establish a proper nexus. Proportionality
is established through the procedures used to identify development -related facility costs, and in the
methods used to calculate impact fees for various types of facilities and categories of development. The
demand for capital facilities is measured in terms of relevant and measurable attributes of d evelopment
(e.g., a typical housing unit’s average weekday vehicle trips).
A sufficient benefit relationship requires that impact fee revenues be segregated from other funds and
expended only on the facilities for which the fees were charged. Impact fees must be expended in a timely
manner and the facilities funded by the fees must serve the development paying the fees. However,
nothing in the U.S. Constitution or the state enabling legislation requires that facilities funded with fee
revenues be available exclusively to development paying the fees. In other words, benefit may extend to
a general area including multiple real estate developments. Procedures for the earmarking and
expenditure of fee revenues are discussed near the end of this study. All of these procedural as well as
substantive issues are intended to ensure that new development benefits from the impact fees they are
required to pay. The authority and procedures to implement impact fee s is separate from and
complementary to the authority to require improvements as part of subdivision or zoning review.
As documented in this report, the City of Hendersonville has complied with applicable legal precedents.
Impact fee s are proportionate and reasonably related to the capital improvement demands of new
development. Specific costs have been identified using local data and current dollars. With input from City
109
Impact fee Report
Hendersonville, Tennessee
3
staff, TischlerBise identified demand indicators for each type of infrastructure and calculated
proportionate share factors to allocate costs by type of development. This report documents the formulas
and input variables used to calculate the impact fee s for each type of public facility. Impact fee
methodologies also identify the extent to which new development is entitled to various types of credits
to avoid potential double payment of growth-related capital costs.
GENERAL METHODOLOGIES
There are three general methodologies for calculating impact fees. The choice of a particular methodology
depends primarily on the timing of infrastructure construction (past, concurrent, or future) and service
characteristics of the facility type being addressed. Each methodology has advantages and disadvantages
in a particular situation, and can be used simultaneously for different cost components.
Reduced to its simplest terms, the process of calculating impact fee s involves two main steps: (1)
determining the cost of development- related capital improvements and (2) allocating those costs
equitably to various types of development. In practice, though, the calculation of impact fees can become
quite complicated because of the many variables involved in defining the relationship between
development and the need for facilities within the designated service area. The following paragraphs
discuss three basic methodologies for calculating impact fee s and how those methodologies can be
applied.
Cost Recovery (Past Improvements)
The rationale for recoupment, often called cost recovery, is that future development is paying for its share
of the useful life and remaining capacity of facilities already built, or land already purchased, from which
future development will benefit. This methodology is often used for utility systems that must provide
adequate capacity before future development can take place.
Incremental Expansion (Concurrent Improvements)
The incremental expansion methodology documents current level -of-service (LOS) standards for each
type of public facility, using both quantitative and qualitative measures. This approach assumes there are
no deficiencies or surplus capacity in existing infrastructure , and future development is paying only its
proportionate share for growth- related infrastructure. Revenue will be used to expand or provide
additional facilities, as needed, to accommodate future development. An incremental expansion cost
methodology is best suited for public facilities that will be expanded in regular increments to keep pace
with development.
Plan-Based (Future Improvements)
The plan-based methodology allocates costs for a specified set of improvements to a specified amount of
development. Improvements are typically identified in a long -range facility plan and development
potential is identified by a land use plan. There are two options for determining the cost per demand unit:
(1) total cost of a public facility can be divided by total demand units (average cost), or ( 2) the growth-
share of the public facility cost can be divided by the net increase in demand units over the planning
timeframe (marginal cost).
110
Impact fee Report
Hendersonville, Tennessee
4
CONCEPTUAL IMPACT FEE CALCULATION
In contrast to project-level improvements, impact fees fund growth-related infrastructure that will benefit
multiple development projects, or the entire jurisdiction (referred to as system improvements). The first
step is to determine an appropriate demand indicator for the particular type of infrastructure. The
demand indicator measures the number of demand units for each unit of development. For example, an
appropriate indicator of the demand for park facilities is population growth, and the increase in
population can be estimated from the average number of residents per housing unit. The second step in
the impact fee formula is to determine infrastructure units per demand unit, typically called level- of-
service (LOS) standards. In keeping with the parks example, a common LOS standard is park amenities per
resident. The third step in the impact fee formula is the cost of various infrastructure units. To complete
the parks example, this part of the formula would establish the cost for purchasing and/or const ructing
new park amenities.
CREDITS
Regardless of the methodology, a consideration of credits is integral to the development of a legally
defensible impact fee. There are two types of credits that should be addressed in impact fee studies and
ordinances. The first is a revenue credit due to possible double payment situations, which could occur
when other revenues may contribute to the capital costs of infrastructure covered by the impact fee. This
type of credit is integrated into the fee calculation, thus reducing the fee amount. The second is a site -
specific credit or developer reimbursement for dedication of land or construction of system
improvements. An example would be if a developer builds a park with improvements and dedicates to
the City. This type of credit is addressed in the administration and implementation of the development
fee program. For ease of administration, TischlerBise normally recommends developer reimbursements
for system improvements.
PROPOSED FEE METHODOLOGIES AND COST COMPONENTS
Shown below, Figure 1 summarizes the method ology and cost allocation components used for
Hendersonville’s parks impact fee report. Costs were allocated only to residential development , as
nonresidential development generated negligible demand for park facilities. P opulation was used as the
cost allocation factor.
Figure 1: Proposed Impact fee Methodologies and Cost Components
Infrastructure
Category
Service
Area
Cost
Recovery
Incremental
Expansion Plan-Based Cost
Allocation
Parks Citywide N/A Park Land, Park
Improvements N/A Population
111
Impact fee Report
Hendersonville, Tennessee
5
IMPACT FEE SCHEDULE
Impact fees for residential development will be assessed per dwelling unit, based on the type of unit. The
fees shown in Figures 2 represent the maximum allowable impact fees – the proposed impact fees fund
100 percent of growth-related park infrastructure. Hendersonville may adopt impact fee s that are less
than the amounts shown; however, a reduction in impact fee revenue will necessitate an increase in other
revenues, a decrease in planned capital improvements and/or a decrease in Hendersonville ’s LOS
standards. All costs in the impact fee study are in current dollars with no assumed inflation rate over time.
If cost estimates change significantly over time, impact fees should be recalculated.
Figure 2: Maximum Allowable Impact fees
A note on rounding: Calculations throughout this report are based on an analysis conducted using Excel
software. Most results are discussed in the report using one-, two-, and three-digit places, which represent
rounded figures. However, the analysis itself uses figures carried to their ultimate decimal places;
therefore, the sums and products generated in the analysis may not equal the sum or product if the reader
replicates the calculation with the factors shown in the report (due to the rounding of figures shown, not
in the analysis).
Residential Development
Single Family 2.63 $7,197
Multi-Family 1.78 $4,871
1. See Land Use Assumptions
Development Type Persons per
Housing Unit1
Proposed
Fees
Fees per Unit
112
Impact fee Report
Hendersonville, Tennessee
6
PARKS IMPACT FEES
METHODOLOGY
The Parks impact fee includes components for park land and park improvements. Parks impact fees use
the incremental expansion methodology . Costs are allocated only to residential development using
persons per housing unit to allocate costs.
PROPORTIONATE SHARE
TischlerBise recommends allocating 100 percent of the cost of parks infrastructure to residential
development since nonresidential development generates negligible demand for parks infrastructure.
DEMAND UNITS
Residential impact fees are calculated on a per capita basis, then converted to an appropriate amount for
each type of housing unit based on the number of persons per housing unit (PPHU). As shown in Figure
PR1, the current PPHU factors are 2. 63 persons per single-family unit and 1.78 persons per multi-family
unit. These factors are based on the U.S. Census Bureau’s 2017-2021 American Community Survey 5-year
estimates (further discussed in Appendix A).
Figure PR1: Demand Units
PARK LAND – INCREMENTAL EXPANSION
As shown below in Figure PR2, the City of Hendersonville has 514 acres of existing park land. In order to
maintain existing levels of service the City plans to expand its current inventory of park land to serve future
development. To determine the existing level of service, the current land inventory is compared to the
current number of residents in the City. This results in a level of service of 0.0079 acres per person (514
acres X 100 percent residential share / 65,059 persons).
The cost of an acre of land is estimated at $275,000, based on an estimate provided by the City. For park
land, the cost per demand unit is $2,172.65 per person (0.0079 acres per person X $275,000 per acre).
113
Impact fee Report
Hendersonville, Tennessee
7
Figure PR2: Park Land Level of Service
Description Acres
Batey Farm 75
Drakes Creek Park 135
Mallard Point Boat Launch 4
Memorial Park 44
Rugby Park 13
Sander Ferry Park 70
Veterens Park 28
Volunteer Park 45
Warrior Bike Trail 24
Durham Farm Parkland 76
Total 514
Cost per Acre $275,000
Existing Acres 514
Residential Share 100%
2023 Population 65,059
Acres per Person 0.0079
Cost per Person $2,172.65
Source: Hendersonville, Tennessee
Cost Allocation Factors
Residential
Level-of-Service (LOS) Standards
114
Impact fee Report
Hendersonville, Tennessee
8
PARK IMPROVEMENTS – INCREMENTAL EXPANSION
As shown in Figure PR3 below, City of Hendersonville parks contain 142 improvements. The City plans to
expand its current inventory of 142 park improvements to serve future development. The analysis
allocates 100 percent of demand for park improvements to residential development. Hendersonville ’s
existing level of service is 0.0022 improvements per person (142 improvements X 100 percent residential
share / 65,059 persons).
Based on the total replacement cost of $36,687,141 for Hendersonville’s existing 142 park improvements,
the average replacement cost is $259,273 per improvement. For park improvements, the cost per demand
unit is $563.91 per person (0.0022 improvements per person X $259,273 per improvement).
Figure PR3: Park Improvements Level of Service
Description Improvements Unit Cost Replacement Cost
Concession Stand 8 $391,597 $3,132,773
Boat/Kayak Access 2 $48,680 $97,360
Fishing Pier 2 $53,505 $107,010
Disc Golf Course 1 $16,038 $16,038
Playground 11 $261,214 $2,873,359
Football Field 1 $315,618 $315,618
Baseball / Softball Field 16 $237,743 $3,803,881
Batting Cage 5 $51,198 $255,988
Basketball Court 1 $15,000 $15,000
Lacrosse Field 2 $1,286 $2,572
Soccer Field 24 $618,529 $14,535,424
Multi-Purpose Field 3 $200,000 $600,000
Tennis / Pickleball 12 $126,612 $1,519,339
In-line Hockey Rink 2 $2,000,000 $4,000,000
Sand Volleyball 3 $10,000 $30,000
Picnic Shelters 21 $102,384 $2,150,054
Charcoal Grill 10 $500 $5,000
Skate Park 1 $130,178 $130,178
Dog Park 1 $39,097 $39,097
Model Airplane Field 1 $28,591 $28,591
Maintenance Facility 1 $243,883 $243,883
Restroom Facility 14 $198,998 $2,785,976
Total 142 $259,273 $36,687,141
Cost per Improvement $259,273
Existing Improvements 142
Residential Share 100%
2023 Population 65,059
Improvements per Person 0.0022
Cost per Person $563.91
Source: Hendersonville, Tennessee
Level-of-Service (LOS) Standards
Residential
Cost Allocation Factors
115
Impact fee Report
Hendersonville, Tennessee
9
PROJECTED DEMAND FOR GROWTH-RELATED PARKS INFRASTRUCTURE
Park Land
To accommodate projected development over the next ten years, Hendersonville will acquire additional
park land as development occurs. Figure PR4 forecasts growth-related demand for park improvements.
Hendersonville’s population is projected to increase by 11,127 persons by 2 033. Using the 2023 LOS,
future residential development will demand approximately 88 additional park acres (11,127 additional
persons X 0.0079 acres per person). Based on demand for 88 park acres and a cost of $275,000 per acre,
the growth-related expenditure on park improvements is $24,175,912.
Figure PR4: Growth-Related Demand for Park Land
Demand Unit Cost per Acre
2023 65,059 514
2024 66,172 523
2025 67,284 532
2026 68,397 540
2027 69,510 549
2028 70,623 558
2029 71,735 567
2030 72,848 576
2031 73,961 584
2032 75,074 593
2033 76,186 602
10-Yr Increase 11,127 88
$24,175,912 Growth-Related Expenditures
Year Population Acres
Type of Infrastructure Level of Service
Park Land $275,000
Demand for Park Land
0.0079 Acres per Person
116
Impact fee Report
Hendersonville, Tennessee
10
Park Improvements
To accommodate projected development over the next ten years, Hendersonville will construct additional
park improvements as development occurs. Figure PR5 forecasts growth-related demand for park
improvements. Hendersonville’s population is projected to increase by 11,127 persons by 2033. Using the
2023 LOS, future residential development will demand approximately 24.2 additional park improvements
(11,127 additional persons X 0. 0022 improvements per person). Based on demand for 24.2 park
improvements and an average cost of $ 259,273 per improvement, the growth -related expenditure on
park improvements is $6,274,815.
Figure PR5: Growth-Related Demand for Park Improvements
Demand Unit Cost per Unit
2023 65,059 141.5
2024 66,172 143.9
2025 67,284 146.3
2026 68,397 148.8
2027 69,510 151.2
2028 70,623 153.6
2029 71,735 156.0
2030 72,848 158.4
2031 73,961 160.9
2032 75,074 163.3
2033 76,186 165.7
10-Yr Increase 11,127 24.2
$6,274,815
Level of Service
per Person0.0022 Units
Type of Infrastructure
Park Improvements $259,273
Demand for Park Amenities
Year Population Units
Growth-Related Expenditures
117
Impact fee Report
Hendersonville, Tennessee
11
MAXIMUM ALLOWABLE PARKS IMPACT FEES
Infrastructure components and cost factors used to calculate maximum allowable Parks impact fees are
summarized in the upper portion of Figure PR6. Residential impact fees are calculated using a cost of
$2,736.55 per person and the average number of persons per housing unit. For a single -family unit, the
fee of $ 7,197 is calculated using a cost of $ 2,736.55 per person multiplied by 2. 63 persons per housing
unit.
Figure PR6: Maximum Allowable Parks Impact fees
Fee Component Cost per Person
Park Land $2,172.65
Park Improvements $563.91
Total $2,736.55
Residential Development
Single Family 2.63 $7,197
Multi-Family 1.78 $4,871
1. See Land Use Assumptions
Development Type Persons per
Housing Unit1
Proposed
Fees
Fees per Unit
118
Impact fee Report
Hendersonville, Tennessee
12
PROJECTED PARKS IMPACT FEE REVENUE
Revenue projections assume implementation of the maximum allowable Parks impact fee s and that
development over the next ten years is consistent with the development projections in Appendix A. To
the extent the rate of development either accelerates or slows down, there will be a corresponding
change in the impact fee revenue. As shown in Figure PR7, projected fee revenue equals approximately
$30 million over the next ten years compared to projected expenditures of approximately $30 million.
Figure PR7: Projected Parks Impact fee Revenue
Growth Share Existing Share Total
Park Land $24,175,912 $0 $24,175,912
Park Improvements $6,274,815 $0 $6,274,815
Total $30,450,726 $0 $30,450,726
Single Family Multi-Family
$7,197 $4,871
per unit per unit
Hsg Unit Hsg Unit
Base 2023 19,799 6,421
Year 1 2024 20,063 6,655
Year 2 2025 20,328 6,889
Year 3 2026 20,593 7,123
Year 4 2027 20,857 7,357
Year 5 2028 21,122 7,592
Year 6 2029 21,387 7,826
Year 7 2030 21,652 8,060
Year 8 2031 21,916 8,294
Year 9 2032 22,181 8,528
Year 10 2033 22,446 8,762
2,647 2,340
$19,050,813 $11,399,913
$30,450,726
$0Existing Development Share
Fee Component
Year
10-Year Increase
Projected Revenue
Projected Fee Revenue
119
Impact fee Report
Hendersonville, Tennessee
13
APPENDIX A: LAND USE ASSUMPTIONS
The City of Hendersonville retained TischlerBise to prepare this study to analyze the impacts of
development on the city’s capital facilities and to calculate development impact fees based on that
analysis. The population and housing unit projections contained in this document provide the foundation
for the development impact fee study. To evaluate the demand for growth -related infrastructure from
various types of development, TischlerBise prepared documentation on demand indicators by type of
housing unit. These metrics are the service units and demand indicators used in the development impact
fee study.
Development impact fees are based on the need for growth -related improvements, and they must be
proportionate by type of land use. The demographic data and development projections are used to
demonstrate proportionality and anticipate the need for future infrastructure. Development impact fee
studies typically look out five to ten years, with the expectation that fees will be updated every three to
five years. The estimates and projections of residential and nonresidential development in this Land Use
Assumptions document are for areas within the boundaries of Hendersonville, Tennessee. The map below
illustrates the areas within the Hendersonville Development Impact Fee Service Area.
Figure A1: Development Impact Fee Service Area Map
120
Impact fee Report
Hendersonville, Tennessee
14
SUMMARY OF GROWTH INDICATORS
Key development projections for the Hendersonville development impact fee study include housing units
and nonresidential floor area. TischlerBise estimates population and housing units using US Census data.
The projections contained in this document provide the foundation for the Development Impact Fee
Study.
These projections are used to estimate development impact fee revenue and to indicate the anticipated
need for growth-related infrastructure. The goal is to have reasonable projections without being overly
concerned with precision. Because development impa ct fee methods are designed to reduce sensitivity
to development projections in the determination of the proportionate- share fee amounts, if actual
development is slower than projected, fee revenue will decline, but so will the need for growth -related
infrastructure. In contrast, if development is faster than anticipated, Hendersonville will receive more fee
revenue, but will also need to accelerate infrastructure improvements to keep pace with the actual rate
of development.
During the next 10 years, TischlerBise projects an average annual increase of 499 housing units per year.
121
Impact fee Report
Hendersonville, Tennessee
15
RESIDENTIAL DEVELOPMENT
Current estimates and future projections of residential development are detailed in this section including
population and housing units by type.
Persons Per Housing Unit
According to the U.S. Census Bureau, a household is a housing unit occupied by year -round residents.
Development impact fees often use per capita standards and persons per housing unit (PPHU) or persons
per household (PPH) to derive proportionate share fee amounts. When PPHU is used in the fee
calculations, infrastructure standards are derived using year- round population. When PPH is used in the
fee calculations, the development impact fee methodology assumes a higher percentage of housing units
will be occ upied, thus requiring seasonal or peak population to be used when deriving infrastructure
standards. TischlerBise recommends that Hendersonville impose development impact fees for residential
development according to the number of persons per housing unit.
Occupancy calculations require data on population and the types of units by structure. The 20 20 census
did not obtain detailed information using a “long- form” questionnaire. Instead, the U.S. Census Bureau
switched to a continuous monthly mailing of surveys, known as the American Community Survey (ACS),
which has limitations due to sample -size constraints. For example, data on detached housing units are
now combined with attached single units (commonly known as townhouses, which share a common
sidewall, but are constructed on an individual parcel of land). For development impact fees in
Hendersonville, detached stick -built units, attached units, and mobile home units are included in the
“Single-Family” category. The second residential category includes duplexes and all other structures with
two or more units on an individual parcel of land. This is referred to as “Multi-Family” category. (Note:
housing unit estimates from ACS will not equal decennial census counts of units. These data are used only
to derive the custom PPHU factors for each type of unit).
Figure A2 below shows the ACS 202 1 5-Year Estimates for Hendersonville . Single-family units averaged
2.63 persons per housing unit ( 50,101 persons / 19, 038 housing units) and multi -family units had an
average of 1.78 persons per housing unit (10,350 persons / 5,805 housing units).
Figure A2: Persons per Housing Unit by Type of Housing
Single-Family Units1
50,101 18,403 2.72 19,038 2.63 76.6% 3.30%
Multi-Family Units2
10,350 5,162 2.01 5,805 1.78 23.4% 11.10%
Total 60,451 23, 565 2.57 24,843 2.43 100.0% 5.10%
Source: U.S. Census Bureau, 2017-2021 American Community Survey 5-Year Estimates
1. Includes detached, attached (i.e. townhouses).
2. Includes dwellings in structures with two or more units, and mobile home units.
Housing
Mix Vacancy RateHousing Type Persons Households Persons per
Household Housing Units Persons per
Housing Unit
122
Impact fee Report
Hendersonville, Tennessee
16
Residential Estimates
This analysis projects housing units based on building permit data provided by Hendersonville staff. By
applying the building permit data shown below in Figure A 3 to 2020 US Census estimates, TischlerBise
estimates the 202 3 housing stock includes 26,220 housing units – 19,799 single-family units and 6,421
multi-family units. The analysis converts housing units to population using the occupancy factors shown
in Figure A2. The 2023 population estimate is 65,059 persons.
Figure A3: Residential Building Permits
Residential Projections
TischlerBise projects future residential development beyond the 2023 base year using the building permit
data shown in Figure A3. Over the next 10 years, this results in an increase of 2,647 single-family units and
4,166 multi-family units. To project future population, the analysis converts housing units to population
using the occupancy factors shown in Figure A2. For this study, it is assumed that the housing unit size will
remain constant. TischlerBise projects a 10-year increase of 4,987 housing units and 11,127 persons (2,647
single-family units X 2.63 persons per housing unit + 4,166 multi-family units X 1.78 persons per housing
unit).
Figure A4: Residential Development Projections
Year Single Multi Total
2019 344 97 441
2020 245 137 382
2021 230 328 558
2022 202 115 317
2023* 303 493 796
AVERAGE 265 234 499
*Prorated
2023 2024 2025 2026 2027 2028 2033
Base Year 1 2 3 4 5 10
Population
Single Family 52,961 53,657 54,353 55,049 55,745 56,441 59,922 6,962
Multi-Family 12,098 12,515 12,931 13,348 13,765 14,181 16,264 4,166
Population 65,059 66,172 67,284 68,397 69,510 70,623 76,186 11,127
Housing Units
Single Family 19,799 20,063 20,328 20,593 20,857 21,122 22,446 2,647
Multi-Family 6,421 6,655 6,889 7,123 7,357 7,592 8,762 2,340
Total 26,220 26,719 27,217 27,716 28,215 28,714 31,207 4,987
10-Year
IncreaseHendersonville
123
Impact fee Report
Hendersonville, Tennessee
17
APPENDIX B: LAND USE DEFINITIONS
RESIDENTIAL DEVELOPMENT
As discussed below, residential development categories are based on data from the U.S. Census Bureau,
American Community Survey. The City of Hendersonville will collect impact fees from all new residential
units. One-time impact fees are determined by site capacity (i.e., number of residential units).
Single-Family Units:
1. Single-family detached is a one-unit structure detached from any other house, that is, with open
space on all four sides. Such structures are considered detached even if they have an adjoining
shed or garage. A one-family house that contains a business is considered detached as long as the
building has open space on all four sides.
2. Single-family attached (townhouse) is a one-unit structure that has one or more walls extending
from ground to roof separating it from adjoining structures. In row houses (sometimes called
townhouses), double houses, or houses attached to nonresidential structures, each house is a
separate, attached structure if the dividing or common wall goes from ground to roof.
Multi-Family Units:
1. 2+ units (duplexes and apartments) are units in structures containing two or more housing units,
further categorized as units in structures with “2, 3 or 4, 5 to 9, 10 to 19, 20 to 49, and 50 or more
apartments.”
2. Boat, RV, Van, Etc. includes any living quarters occupied as a housing unit that does not fit the
other categories (e.g., houseboats, railroad cars, campers, and vans). Recreational vehicles, boats,
vans, railroad cars, and the like are included only if they are occupied as a current place of
residence.
3. Mobile home includes both occupied and vacant mobile homes, to which no permanent rooms
have been added. Mobile homes used only for business purposes or for extra sleeping space and
mobile homes for sale on a dealer's lot, at the factory, or in storage are not counted in the housing
inventory.
124
12/3/2025 Single-Family Multi-Family Gen. Commercial Office Public/Institutional Industrial
Hendersonville (100%
Based on Fee Study) (Parks, Streets,
Fire & Police All Uses)
$19,888 $13,811 $12,247/1,000 sf $7,559/1,000 sf $10,396/1,000 sf $3,314/1,000 sf
Hendersonville
(Ordinance Proposal #1)
(Residential+Comm @50%)
(Parks & Streets only)
$9,016 $6,308 $4,786/1,000 sf $3,186/1,000 sf $4,382/1,000 sf $1,396/1,000 sf
Hendersonville
(Ordinance Proposal #2 in 3/2026)
(Residential Only @50%) (Parks
& Streets only)
$5,000 $3,498 $0/1,000 sf $0/1,000 sf $0/1,000 sf $0/1,000 sf
Hendersonville
(Ordinance Proposal #2 in 2035)
(Residential Only @50%) (Parks
& Streets only)
$6,500 $4,547 $0/1,000 sf $0/1,000 sf $0/1,000 sf $0/1,000 sf
Franklin $9,537 $7,416 $10,878-$29,304/1,000 sf $7,802/1,000 sf $2,697-$9,012/1,000 sf $1,487-$11,132/1,000 sf
Murfreesboro
$2.00/sf not to exceed
$10,952 per dwelling
$7624 per
dwelling unit $5,030/1,000 sf $1,932/1,000 sf $3,872/1,000 sf $984/1,000 sf
La Vergne $6,833 $5,247 per
dwelling unit $7,806/1,000 sf $5,971/1,000 sf $1,968-4,846/1,000 sf $2,269/1,000 sf
Mt. Juliet $0.50/sf $0.50/sf $0 $0 $0 $0
Smyrna $5,786 $3,359 $5,879/1,000 sf $6,732/1,000 sf $1,806/1,000 sf $4,076/1,000 sf
Springfield $4,555 $2,551 $5,935/1,000 sf $3,151/1,000 sf $2,240/1,000 sf $1,015/1,000 sf
White House $3,740 $2,381 $1,224-$24,496/1,000 sf $3,857-4,659/1,000 sf $269-3,409/1,000 sf $2,119/1,000 sf
Lebanon $1,500/1,000 sf $1,000 1/2 building permit fee 1/2 building permit fee 1/2 building permit fee 1/2 building permit fee
DEVELOPMENT IMPACT FEE COMPARISSONS WITH OTHER MID-TN COMMUNITIES
125
Hville DIF Study $18,371
Hville Ord 2025-00 $7,179
Hville Ord 2025-00 2026 $0
Hville Ord 2025-00 2030 $0
Franklin $16,317 -
43,956
Murfreesboro $7,545
La Vergne $11,709
Mt. Juliet $0.00
Smyrna $8,818
Springfield $8,903
White House $1,836 - 36,744
Lebanon $225
H DIF Study $74,805
H Ord 2025-00 $29,232
H Ord 2025-00 2026 $0
H Ord 2025-00 2030 $0
Franklin $66,443 –
178,989
Murfreesboro $30,723
La Vergne $47,679
Mt. Juliet $0
Smyrna $35,909
Springfield $26,251.00
White House $7,476.00 –
149,622.00
Lebanon $916.00
New Shackle Island Subway
Building Square Footage: 1,500
Commercial Examples:
Chick-fil-A (Mayfair)
Building Square Footage: 6,108
126
H DIF Study $1,914,316
H Ord 2025-00 $748,094
H Ord 2025-00 2026 $0
H Ord 2025-00 2030 $0
Franklin $1,700,329 -
4,580,478
Murfreesboro $786,234
La Vergne $1,220,148
Mt. Juliet $0.00
Smyrna $918,941
Springfield $927,694
White House $191,322 –
3,828,945
Lebanon $7,815
Costco
Building Square Footage: 156,309
127
ParkView Office/Retail
Building Square Footage: 15,956
H DIF Study $56,693
H Ord 2025-00 $23,895
H Ord 2025-00 2026 $0
H Ord 2025-00 2030 $0
Franklin $58,515
Murfreesboro $14,490
La Vergne $44,033
Mt. Juliet $0
Smyrna $50,490
Springfield $23,633
White House $28,928 –
34,943
Lebanon $1,596
Southview Professional Plaza Ph 1
Building Square Footage: 7,500
H DIF Study $120,611
H Ord 2025-00 $50,836
H Ord 2025-00 2026 $0
H Ord 2025-00 2030 $0
Franklin $124,488
Murfreesboro $30,827
La Vergne $95,273
Mt. Juliet $0
Smyrna $107,416
Springfield $50,277
White House $45,586 – 74,339
Lebanon $1,125
Office Example:
128
230 Innovation Way
Building Square Footage: 107,500
H DIF Study $356,255
H Ord 2025-00 $159,070
H Ord 2025-00 2026 $0
H Ord 2025-00 2030 $0
Franklin $159,853 –
1,196,690
Murfreesboro $105,780
La Vergne $243,918
Mt. Juliet $0.00
Smyrna $438,170
Springfield $109,113
White House $227,793
Lebanon $5,375
Industrial Example:
129
The Hickory (Multi-Family 212 Units)
Building Square Footage: 285,010
822 Nightingale Ave (Durham Farms)
Building Square Footage: 2,972
H DIF Study $2,927,932
H Ord 2025-00 $1,337,296
H Ord 2025-00 2026 $741,576
H Ord 2025-00 2030 $963,964
Franklin $1,572,192
Murfreesboro $1,616,288
La Vergne $1,112,364
Mt. Juliet $142,505
Smyrna $712,108
Springfield $540,812
White House $504,772
Lebanon $212,000
H DIF Study $19,888
H Ord 2025-00 $9,016
H Ord 2025-00 2026 $5,000
H Ord 2025-00 2030 $6,500
Franklin $9,537
Murfreesboro $5,944
La Vergne $6,833
Mt. Juliet $1,486
Smyrna $5,786
Springfield $4,555
White House $3,750
Lebanon $4,458
Residential Examples:
130
ORDINANCE 2026-01
Sponsor: Clary
AN ORDINANCE AMENDING THE HENDERSONVILLE MUNICIPAL CODE REPEALING
AND REPLACING TITLE 4 (MUNICIPAL PERSONNEL) , AMENDING SECTION 2-101
(APPOINTING MEMBERS TO VARIOUS BOARDS AND COMMISSIONS), AND TO ADOPT A
REVISED EDITION OF THE PERSONNEL RULES AND REGULATIONS.
WHEREAS, the City has undertaken a comprehensive review of its Personnel Rules and Regulations and,
in doing so, has sought and received assistance from outside legal counsel, evaluated applicable state and
federal law, solicited input from department heads, the City Attorney and other City employees, conducted
multiple work-session workshops, and incorporated substantial input received throughout the process in
order to enhance clarity, organization, internal consistency, administrative efficiency, and consistency with
applicable law; and
WHEREAS, the current framework governing the City’s personnel matters, as reflected in its ordinances,
municipal code, Personnel Rules and Regulations and separate policy documents, dates back to 1975 and
necessitates updating to better align with current operational practices and applicable law; and
WHEREAS, the City’s directives governing municipal employment are dispersed among multiple
ordinances, sections of the Municipal Code, the Personnel Rules and Regulations and other separate
personnel policy documents which would be more clearly understood, efficiently managed and fairly
administered if maintained in one comprehensive document; and
WHEREAS, the City has historically maintained Personnel Rules and Regulations and other policy
documents adopted by resolution or administrative action, while the Municipal Code also addresses matters
relating to municipal personnel adopted by ordinance and, in certain respects, overlaps with, references, or
corresponds to the others which, over time, have created the potential for inconsistency, duplication, and/or
ambiguity; and
WHEREAS, the City has determined that it is in the best interest of the City to adopt a revised and
improved edition of the Personnel Rules and Regulations as a stand-alone policy document, separate from
the Municipal Code, while simultaneously repealing and replacing Title 4 of the Municipal Code to ensure
clarity, consistency, and proper separation between codified ordinances and administrative employment
policies; and
WHEREAS, this repeal and replacement of Title 4, amendment to Section 2-101, and adoption of a revised
edition of the Personnel Rules and Regulations are all intended to eliminate outdated, duplicative, and
conflicting provisions in order that they be aligned without codifying voluminous rules which will improve
clarity, provide flexibility, reduce legal risk, and allow the City to streamline updated employment practices
without repeatedly amending the Municipal Code:
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF MAYOR AND ALDERM EN OF
THE CITY OF HENDERSONVILLE, TENNESSEE, as follows:
Section One: That Title 4, of the Hendersonville Municipal Code is hereby deleted in its entirety and
replaced with the following language:
131
TITLE 4
MUNICIPAL PERSONNEL
CHAPTER
1 SOCIAL SECURITY
2 PERSONNEL MERIT SYSTEM
3 RESERVED
4 OCCUPATIONAL SAFETY AND HEALTH PROGRAM PLAN
5 INFECTIOUS DISEASE CONTROL POLICY
CHAPTER 1
SOCIAL SECURITY
SECTION
4-101. Policy and purpose as to coverage
4-102. Necessary agreements to be executed
4-103. Withholdings from salaries or wages
4-104. Appropriations for employer's contributions
4-105. Records and reports
4-106. Exclusions
4-101. Policy and purpose as to coverage.
It is hereby declared to be the policy and purpose of the City of Hendersonville, Tennessee, to
extend, as of the date hereinafter set forth, to the employees and officials thereof, not excluded by law or
this chapter, and whether employed in connection with a governmental or proprietary function, the benefits
of the System of Federal Old Age and Survivors Insurance, as authorized by the Federal Social Security
Act and Amendments thereto, including Public Law 734-81st Congress. In pursuance of said policy and for
that purpose, the said City of Hendersonville shall take such action as may be required by applicable federal
or state laws or regulations.
4-102. Necessary agreements to be executed.
The Mayor of the City of Hendersonville, Tennessee, is hereby authorized and directed to execute
all necessary agreements and amendments thereto with the Administrator of the Old Age and Survivors
Insurance (OASI) Agency, State of Tennessee, as agent or agency, to secure coverage of employees and
officials as provided in the preceding section.
4-103. Withholdings from salaries or wages.
Withholdings from salaries or wages of employees and officials for the purpose provided in the
first section of this chapter are hereby authorized to be made in the amounts and at such times as may be
required by applicable federal or state laws or regulations, and shall be paid over to the state or federal
agency designated by said laws or regulations.
4-104. Appropriations for employer's contributions.
There shall be appropriated from available funds such amounts at such times as may be required by
applicable state or federal laws or regulations for employer's contributions; which shall be paid over to the
state or federal agency designated by said laws or regulations.
132
4-105. Records and reports.
The City of Hendersonville shall keep such records and make such reports as may be required by
applicable state and federal laws or regulations.
4-106. Exclusions.
There is hereby excluded from this chapter any authority to make any agreement with respect to
any position or any employee or official now covered or authorized to be covered by any other ordinance
creating any retirement system for any employee or official of the said City of Hendersonville or any
employee, official or position not authorized to be covered under applicable state or federal laws or
regulations.
The Mayor is authorized to execute an amendment to said agreement between the Director of the
Department of Old Age and Survivors Insurance Agency of the State of Tennessee and the City of
Hendersonville, dated August 15, 1975, to exclude from coverage under the Federal System of Old Age,
Survivors, Disability, Health Insurance, the services of an election worker if the remuneration paid for such
services in a calendar year is less than One thousand dollars ($1,000.00) on or after January 1, 1995, ending
on or before December 31, 1999, and the adjusted amount determined under Section 218(c)(8)(B) of the
Social Security Act for any calendar year, commencing on or after January 1, 2000, with respect to services
performed during any such calendar year. This exc lusion to be effective in and after a calendar year in
which a state's modification is mailed, or delivered by other means, to the appropriate federal official.
CHAPTER 2
PERSONNEL MERIT SYSTEM
SECTION
4-201. Definitions
4-202. Administration
4-203. Personnel rules
4-204. Classification and Compensation
4-201. Definitions.
As used in this chapter, the following quoted words and terms shall have the meanings enumerated
hereinafter:
(1) "Municipality" or "City" shall mean the City of Hendersonville, Tennessee.
(2) "Mayor" shall mean the duly elected Mayor of the City of Hendersonville, Tennessee.
(3) "Governing body," shall mean the Board of Mayor And Aldermen vested with power to
enact ordinances and resolutions for the City of Hendersonville, Tennessee.
(4) "City Administrator," shall mean the City Administrator or Chief of Operations for the City
of Hendersonville, Tennessee.
133
(5) "Human Resources Director," shall mean the Administrative Services Director or Human
Resources Director for the City of Hendersonville, Tennessee.
(6) “Employee” shall mean any individual employed by the City of Hendersonville, except
other than such an individual excluding:
(a) Elected officials
(b) Appointed Committee, Commission, and Board members
(c) Policy-making appointees, Legal advisors, and City Judge
(d) Volunteers
(e) Independent Contractors
(f) Inmate Work Crews
(7) The words, terms and phrases when used shall have the same meanings as the Personnel
Rules and Regulations which are on file in the City Recorder's office.
4-202. Administration.
1) The City Administrator shall have the basic responsibility for the personnel program as set
forth in this chapter. The City Administrator specifically shall:
(a) Be responsible for effective personnel administration;
(b) Appoint a human resources director who shall be responsible for the administration
and technical direction of the City's personnel program, with said appointment
being subject to the approval of the Board of Mayor and Aldermen;
(c) Appoint, remove, suspend, and discipline all employees of the City subject to the
policies as set forth in this chapter, provisions of the charter, and those in state law;
or the City Administrator may, at the City Administrator's discretion, authorize the
head of the department or office responsible to the City Administrator to appoint
and terminate subordinates in such departments and offices;
(d) Fix and establish the number of employees in the various city departments and
offices and determine the duties, authority, responsibility and compensation in
accordance with the policies and provisions set forth in this chapter and the City
Charter; and subject to budget limitations;
(e) Perform such other duties and exercise such other power in personnel
administration as may be prescribed by law and this chapter.
2) The City Administrator shall appoint a human resources director as set forth above,
which the director shall:
(a) Administer under the direction of the City Administrator, the personnel program
as set forth in this chapter and the personnel rules;
(b) Perform all necessary duties essential to the effective administration of the
personnel;
(c) Recommend to the City Administrator rules and revisions and amendments
thereto;
134
(d) Recommend to the City Administrator a position classification plan for approval
by the governing body, and install and maintain such a plan;
(e) Prepare and recommend to the City Administrator a pay plan for all city
employees for the governing body approval;
(f) Establish and maintain a roster of all persons in the municipal service setting
forth each employee, class title of their position, salary, and changes in class title,
status, and such other data as may be deemed desirable or useful;
(g) Develop and administer such recruiting and examining programs as deemed
necessary by the City Administrator to obtain an adequate supply of competent
applicants to meet the needs of the City;
(h) Be responsible for certification of all payrolls in matters concerning personnel
administration;
i) Develop and coordinate training, evaluation, and educational programs for city
employees;
(j) Maintain adequate personnel records to include for each employee the class, title,
pay and other relevant data;
(k) Advise the City Administrator on manpower utilization;
(l) Foster and develop programs for the improvement of personnel effectiveness,
including training, safety, health, counseling and welfare;
(m) Encourage and exercise leadership in the development of an effective personnel
system for the City; and
(n) Perform such other duties as may be assigned by the City Administrator not
inconsistent with this chapter.
4-203. Personnel rules.
1) The personnel rules shall establish regulations, specific procedures, and policies governing
the personnel system including but shall not be limited to the following:
(a) Administration of a position classification plan covering all positions, including
employment standards and minimum qualifications;
(b) Administration of a plan of compensation directly correlated with the position
classification plan, providing a rate or range of pay;
(c) The acceptance of applications for employment;
(d) The preparation, announcement and conduction of examinations, if deemed necessary
by the City Administrator;
(e) Establishment and use of employment lists containing names of persons eligible for
appointment;
(f) Certification and appointment of persons from employment lists to fill vacancies,
and the making of provisional, temporary, and emergency appointments;
(g) Evaluation of the work of employees including those serving a probationary period;
(h) Transfer, promotion and reinstatement of employees in the competitive service;
(i) Disciplinary action, demotion, suspension, and separation from the service of
employees by resignation, layoff, separation, dismissal and for incapacity to
perform required duties;
135
(j) Standardization of hours of work, attendance and leave regulations, and working
conditions;
(k) Development of employee morale, welfare and training programs;
(l) A uniform system of procedure for the handling of all grievances and appeals;
(m) Vacations, holidays, paid and unpaid leaves, and other fringe benefits;
(n) Promotional policies and procedures.
(o) Establishment, maintenance, and use of adequate and necessary personnel records
and forms; and
(p) Such other matters as may be necessary and proper to carry out the intent and
purpose of this chapter.
2) Due to the bulk of directives governing municipal employment, and to ensure clarity,
consistency, flexibility and efficiency, these directives are not codified as a part of this Code and shall
remain separately contained in the City’s Personnel Rules and Regulations, which may be amended by
Resolution and maintained on file in the City Recorder's office.
4-204. Classification & Compensation
1) The Board of Mayor and Aldermen shall adopt a classification plan by ordinance or
resolution. The human resources director shall thereafter allocate each position to its appropriate class,
subject to the approval of the Board of Mayor and Aldermen. When the duties and responsibilities of a
particular position change or when a new position is created, the human resources director shall recommend
the appropriate classification for the revised or new position, subject to the approval of the Board of Mayor
and Aldermen and subject to the fiscal constraints of amounts budgeted for salaries and benefits in the
particular department involved. The human resources director shall consult with the appropriate department
head in making all such classifications.
2) The human resources director, under the direction of the City Administrator and in
consultation with the Finance Director, shall develop a uniform and equitable pay plan consisting of
minimum, intermediate, and maximum rate of pay for each class of positions. Salary ranges for each class
shall be coordinated with the position classification plan and shall be based on the ranges of pay for other
classes, requisite qualifications, general rates of pay for comparable work in other public and private
employment in the area, cost of living data, maintenance or other benefits received by employees, the
financial policy of the City, and other economic considerations.
3) Classification and compensation plans are presented as part of the fiscal year budget
process. Revisions to the classification and compensation plans done outside the budget process shall be
presented to the governing board by resolution and/or ordinance.
4) The governing body shall review the classification and compensation plans and either
adopt, amend, or reject the plans.
The existing classification and compensation plans shall remain in effect until a new plan is adopted
by the governing body.
CHAPTER 3
RESERVED
136
CHAPTER 4
OCCUPATIONAL SAFETY AND HEALTH PROGRAM PLAN
PLAN OF OPERATION FOR THE OCCUPATIONAL SAFETY AND HEALTH PROGRAM PLAN
FOR THE EMPLOYEES OF THE CITY OF HENDERSONVILLE, TENNESSEE
APPENDICES – UPDATED AND MAINTAINED IN ADMINISTRATIVE POLICIES
I. WORK LOCATIONS
II. NOTICE TO ALL EMPLOYEES
III. PROGRAM PLAN BUDGET
IV. ACCIDENT REPORTING PROCEDURES
SECTION
4-401. Purpose and coverage
4-402. Definitions
4-403. Personnel rules
4-404. Employee’s rights and duties
4-405. Administration
4-406. Standards authorized
4-407. Variance procedure
4-408. Recordkeeping and reporting
4-409. Employee complaint procedure
4-410. Education and training
4-411. General inspection procedures
4-412. Imminent danger procedures
4-413. Abatement orders and hearings
4-414. Penalties
4-415. Confidentiality of privileged information
4-416 Discrimination investigations and sanctions
4-417. Compliance with other laws not excused
4-401. Purpose and coverage.
The purpose of this plan is to provide guidelines and procedures for implementing the Occupational
Safety and Health Program Plan for the employees of the City of Hendersonville, Tennessee.
This plan is applicable to all employees, part-time or full-time, seasonal or permanent. The City of
Hendersonville, Tennessee in electing to update and maintain an effective Occupational Safety and Health
Program Plan for its employees.
(1) Provide a safe and healthful place and condition of employment.
(2) Require the use of safety equipment, personal protective equipment, and other devices
where reasonably necessary to protect employees.
(3) Make, keep, preserve, and make available to the Commissioner of Labor and Workforce
Development, his designated representatives, or persons within the Department of Labor
137
and Workforce Development to whom such responsibilities have been delegated, including
the Safety Director of the Division of Occupational Safety and Health, adequate records of
all occupational accidents and illnesses and personal injuries for proper eval uation and
necessary corrective action as required.
(4) Consult with the Commissioner of Labor and Workforce Development or his designated
representative with regard to the adequacy of the form and content of such records.
(5) Consult with the Commissioner of Labor and Workforce Development regarding safety
and health problems which are considered to be unusual or peculiar and are such that they
cannot be resolved under an occupational safety and health standard promulgated by the
state.
(6) Assist the Commissioner of Labor and Workforce Development or his monitoring activities
to determine Program Plan effectiveness and compliance with the occupational safety and
health standards.
(7) Make a report to the Commissioner of Labor and Workforce Development annually, or as
may otherwise be required, including information on occupational accidents, injuries, and
illnesses and accomplishments and progress made toward achieving the goals of the
Occupational Safety and Health Program Plan.
(8) Provide reasonable opportunity for and encourage the participation of employees in the
effectuation of the objectives of this program plan, including the opportunity to make
anonymous complaints concerning conditions or practices which may be injurious to
employees' safety and health.
4-402. Definitions
For the purposes of this Program Plan, the following definitions apply:
(1) Commissioner Of Labor and Workforce Development means the Chief Executive Officer
of the Tennessee Department of Labor and Workforce Development. This includes any
person appointed, designated, or deputized to perform the duties or to exercise the powers
assigned to the Commissioner of Labor and Workforce Development.
(2) EMPLOYER means the City of Hendersonville, Tennessee and includes each
administrative department, board, commission, division, or other agency of the City of
Hendersonville, Tennessee.
(3) SAFETY DIRECTOR OF OCCUPATIONAL SAFETY AND HEALTH or SAFETY
DIRECTOR means the person designated by the establishing ordinance, or executive order
to perform duties or to exercise powers assigned so as to plan, develop, and administer the
Occupational Saf ety and Health Program Plan for the employees of the City of
Hendersonville, Tennessee.
(4) INSPECTOR(S) means the individual(s) appointed or designated by the Safety Director of
Occupational Safety and Health to conduct inspections provided for herein. If no such
compliance inspector(s) is appointed, inspections shall be conducted by the Safety Director
of Occupational Safety and Health.
(5) APPOINTING AUTHORITY means any official or group of officials of the employer
having legally designated powers of appointment, employment, or removal there from for
a specific department, board, commission, division, or other agency of this employer.
138
(6) EMPLOYEE means any person performing services for this employer and listed on the
payroll of this employer, either as part -time, full- time, seasonal, or permanent. It also
includes any persons normally classified as "volunteers" provided such persons rece ived
remuneration of any kind for their services. This definition shall not include independent
contractors, their agents, servants, and employees.
(7) PERSON means one (1) or more individuals, partnerships, associations, corporations,
business trusts, or legal representatives of any organized group of persons.
(8) STANDARD means an occupational safety and health standard promulgated by the
Commissioner of Labor and Workforce Development in accordance with Section VI (6) of
the Tennessee Occupational Safety and Health Act of 1972 which requires conditions or
the adoption or the use of one (1) or more practices, means, methods, operations, or
processes or the use of equipment or personal protective equipment necessary or
appropriate to provide safe and healthful conditions and places of employment.
(9) IMMINENT DANGER means any conditions or practices in any place of employment
which are such that a hazard exists which could reasonably be expected to cause death or
serious physical harm immediately or before the imminence of such hazard can be
eliminated through normal compliance enforcement procedures.
(10) ESTABLISHMENT or WORKSITE means a single physical location under the control of
this employer where business is conducted, services are rendered, or industrial type
operations are performed.
(11) SERIOUS INJURY or HARM means that type of harm that would cause permanent or
prolonged impairment of the body in that:
(a) A part of the body would be permanently removed (e.g., amputation of an arm,
leg, finger(s); loss of an eye) or rendered functionally useless or substantially
reduced in efficiency on or off the job (e.g., leg shattered so severely that mobility
would be permanently reduced), or
(b) A part of an internal body system would be inhibited in its normal performance or
function to such a degree as to shorten life or cause reduction in physical or mental
efficiency (e.g., lung impairment causing shortness of breath).
On the other hand, simple fractures, cuts, bruises, concussions, or similar injuries
would not fit either of these categories and would not constitute serious physical
harm.
(12) ACT or TOSH Act shall mean the Tennessee Occupational Safety and Health Act of 1972.
(13) GOVERNING BODY means the County Quarterly Court, Board of Aldermen, Board of
Commissioners, City or Town Council, Board of Governors, etc., whichever may be
applicable to the local government, government agency, or utility to which this plan
applies.
(14) CHIEF EXECUTIVE OFFICER means the Chief Administrative Official, County Judge,
County Chairman, County Mayor, Mayor, City Manager, General Manager, etc., as may
be applicable.
4-403. Employer's rights and duties
Rights and duties of the employer shall include, but are not limited to, the following provisions:
139
(1) Employer shall furnish to each employee conditions of employment and a place of
employment free from recognized hazards that are causing or are likely to cause death or
serious injury or harm to employees.
(2) Employer shall comply with occupational safety and health standards and regulations
promulgated pursuant to Section VI (6) of the Tennessee Occupational Safety and Health
Act of 1972.
(3) Employer shall refrain from an unreasonable restraint on the right of the Commissioner of
Labor and Workforce Development to inspect the employer's place(s) of business.
Employer shall assist the Commissioner of Labor and Workforce Development in the
performance of their monitoring duties by supplying or by making available information,
personnel, or aids reasonably necessary to the effective conduct of the monitoring activity.
(4) Employer is entitled to participate in the development of standards by submission of
comments on proposed standards, participation in hearing on proposed standards, or by
requesting the development of standards on a given issue under Section 6 of the Tennessee
Occupational Safety and Health Act of 1972.
(5) Employer is entitled to request an order granting a variance from an occupational safety
and health standard.
(6) Employer is entitled to protection of its legally privileged communication.
(7) Employer shall inspect all worksites to ensure the provisions of this Program Plan are
complied with and carried out.
(8) Employer shall notify and inform any employee who has been or is being exposed in a
biologically significant manner to harmful agents or material in excess of the applicable
standard and of corrective action being taken.
(9) Employer shall notify all employees of their rights and duties under this Program Plan. \
4-404. Employee's rights and duties.
Rights and duties of employees shall include, but are not limited to, the following provisions:
(1) Each employee shall comply with occupational safety and health act standards and all rules,
regulations, and orders issued pursuant to this Program Plan and the Tennessee
Occupational Safety and Health Act of 1972 which are applicable to his or her own actions
and conduct.
(2) Each employee shall be notified by the placing of a notice upon bulletin boards, or other
places of common passage, of any application for a permanent or temporary order granting
the employer a variance from any provision of the TOSH Act or any standard or regulation
promulgated under the Act.
(3) Each employee shall be given the opportunity to participate in any hearing which concerns
an application by the employer for a variance from a standard or regulation promulgated
under the Act.
(4) Any employee who may be adversely affected by a standard or variance issued pursuant to
the Act or this Program Plan may file a petition with the Commissioner of Labor and
Workforce Development or whoever is responsible for the promulgation of the standard or
the granting of the variance.
(5) Any employee who has been exposed or is being exposed to toxic materials or harmful
physical agents in concentrations or at levels in excess of that provided for by any
applicable standard shall be provided by the employer with information on any significant
140
hazards to which they are or have been exposed, relevant symptoms, and proper conditions
for safe use or exposure. Employees shall also be informed of corrective action being taken.
(6) Subject to regulations issued pursuant to this Program Plan, any employee or authorized
representative of employees shall be given the right to request an inspection and to consult
with the Safety Director or Inspector at the time of the physical inspection of the worksite.
(7) Any employee may bring to the attention of the Safety Director any violation or suspected
violations of the standards or any other health or safety hazards.
(8) No employee shall be discharged or discriminated against because such employee has filed
any complaint or instituted or caused to be instituted any proceeding or inspection under
or relating to this Program Plan.
(9) Any employee who believes that he or she has been discriminated against or discharged in
violation of subsection (h) of this section may file a complaint alleging such discrimination
with the Safety Director. Such employee may also, within thirty (30) days after such
violation occurs, file a complaint with the Commissioner of Labor and Workforce
Development alleging such discrimination.
(10) Nothing in this or any other provisions of this Program Plan shall be deemed to authorize
or require any employee to undergo medical examination, immunization, or treatment for
those who object thereto on religious grounds, except where such is necessary for the
protection of the health or safety or others or when a medical examination may be
reasonably required for performance of a specific job.
(11) Employees shall report any accident, injury, or illness resulting from their job, however
minor it may seem to be, to their supervisor or the Safety Director within twenty-four (24)
hours after the occurrence.
4-405. Administration.
1) The Safety Director of Occupational Safety and Health is designated to perform duties or
to exercise powers assigned so as to administer this Occupational Safety and Health Program Plan.
(a) The Safety Director may designate person or persons as he deems necessary to carry out
his powers, duties, and responsibilities under this Program Plan.
(b) The Safety Director may delegate the power to make inspections, provided procedures
employed are as effective as those employed by the Safety Director.
(c) The Safety Director shall employ measures to coordinate, to the extent possible, activities
of all departments to promote efficiency and to minimize any inconveniences under this
Program Plan.
(d) The Safety Director may request qualified technical personnel from any department or
section of government to assist him in making compliance inspections, accident
investigations, or as he may otherwise deem necessary and appropriate in order to carry
out his duties under this Program Plan.
(e) The Safety Director shall prepare the report to the Commissioner of Labor and Workforce
Development required by subsection (g) of Section 1 of this plan.
(f) The Safety Director shall make or cause to be made periodic and follow- up inspections of
all facilities and worksites where employees of this employer are employed. He shall make
recommendations to correct any hazards or exposures observed. He shall make or cause to
be made any inspections required by complaints submitted by employees or inspections
requested by employees.
141
(g) The Safety Director shall assist any officials of the employer in the investigation of
occupational accidents or illnesses.
(h) The Safety Director shall maintain or cause to be maintained records required under
Section VIII of this plan.
(i) The Safety Director shall, in the eventuality that there is a fatality, ensure that the
Commissioner of Labor and Workforce Development receives notification of the
occurrence within eight (8) hours. All work-related inpatient hospitalizations, amputations,
and loss of an eye must be reported to TOSHA within twenty-four (24) hours.
2) The administrative or operational head of each department, division, board, or other agency
of this employer shall be responsible for the implementation of this Occupational Safety and Health
Program Plan within their respective areas.
(a) The administrative or operational head shall follow the directions of the Safety Director on
all issues involving occupational safety and health of employees as set forth in this plan.
(b) The administrative or operational head shall comply with all abatement orders issued in
accordance with the provisions of this plan or request a review of the order with the Safety
Director within the abatement period.
(c) The administrative or operational head should make periodic safety surveys of the
establishment under his jurisdiction to become aware of hazards or standards violations
that may exist and make an attempt to immediately correct such hazards or violations.
(d) The administrative or operational head shall investigate all occupational accidents, injuries,
or illnesses reported to him. He shall report such accidents, injuries, or illnesses to the
Safety Director along with his findings and/or recommendations in ac cordance with
APPENDIX IV of this plan.
4-406. Standards Authorized.
The standards adopted under this Program Plan are the applicable standards developed and
promulgated under Section VI (6) of the Tennessee Occupational Safety and Health Act of 1972. Additional
standards may be promulgated by the governing body of this employer as that body may deem necessary
for the safety and health of employees. Note: 29 CFR 1910 General Industry Regulations; 29 CFR 1926
Construction Industry Regulations; and the Rules of Tennessee Department of Labor and Workforce
Development Occupational Safety and Health, CHAPTER 0800-01-1 through CHAPTER 0800-01-11 are
the standards and rules invoked.
4-407. Variance Procedure.
The Safety Director may apply for a variance as a result of a complaint from an employee or of his
knowledge of certain hazards or exposures. The Safety Director should definitely believe that a variance is
needed before the application for a variance is submitted to the Commissioner of Labor and Workforce
Development.
The procedure for applying for a variance to the adopted safety and health standards is as follows:
(1) The application for a variance shall be prepared in writing and shall contain:
142
(a) A specification of the standard or portion thereof from which the variance is
sought.
(b) A detailed statement of the reason(s) why the employer is unable to comply with
the standard supported by representations by qualified personnel having first-hand
knowledge of the facts represented.
(c) A statement of the steps employer has taken and will take (with specific date) to
protect employees against the hazard covered by the standard.
(d) A statement of when the employer expects to comply and what steps have or will
be taken (with dates specified) to come into compliance with the standard.
(e) A certification that the employer has informed employees, their authorized
representative(s), and/or interested parties by giving them a copy of the request,
posting a statement summarizing the application (to include the location of a copy
available for examination) at the places where employee notices are normally
posted and by other appropriate means. The certification shall contain a description
of the means actually used to inform employees and that employees have been
informed of their right to pe tition the Commissioner of Labor and Workforce
Development for a hearing.
(2) The application for a variance should be sent to the Commissioner of Labor and Workforce
Development by registered or certified mail.
(3) The Commissioner of Labor and Workforce Development will review the application for
a variance and may deny the request or issue an order granting the variance. An order
granting a variance shall be issued only if it has been established that:
(a) The employer:
(i) Is unable to comply with the standard by the effective date because of
unavailability of professional or technical personnel or materials and
equipment required or necessary construction or alteration of facilities or
technology.
(ii) Has taken all available steps to safeguard employees against the hazard(s)
covered by the standard.
(iii) Has as effective Program Plan for coming into compliance with the
standard as quickly as possible.
(b) The employee is engaged in an experimental Program Plan as described in
subsection (b), Section 13 of the Act.
(4) A variance may be granted for a period of no longer than is required to achieve compliance
or one (1) year, whichever is shorter.
(5) Upon receipt of an application for an order granting a variance, the Commissioner to whom
such application is addressed may issue an interim order granting such a variance for the
purpose of permitting time for an orderly consideration of such application. No such interim
order may be effective for longer than one hundred eighty (180) days.
(6) The order or interim order granting a variance shall be posted at the worksite and
employees notified of such order by the same means used to inform them of the application
for said variance (see subsection (a)(5) of this section).
143
4-408. Recordkeeping and reporting.
Recording and reporting of all occupational accident, injuries, and illnesses shall be in accordance
with instructions and on forms prescribed in the booklet. You can get a copy of the forms for recordkeeping
from the internet. Go to www.osha.gov and type "recordkeeping forms" in the search box.
The position responsible for recordkeeping is shown on the SAFETY AND HEALTH
ORGANIZATIONAL CHART, Appendix IV to this plan.
Details of how reports of occupational accidents, injuries, and illnesses will reach the recordkeeper
are specified by ACCIDENT REPORTING PROCEDURES, Appendix IV to this plan. The Rule of
Tennessee Department of Labor and Workforce Development Occupational Safety and Health,
OCCUPATIONAL SAFETY AND HEALTH RECORD- KEEPING AND REPORTING, CHAPTER
0800-01-03, as authorized by T.C.A., Title 50.
4-409. Employee complaint procedure.
If any employee feels that he is assigned to work in conditions which might affect his health, safety,
or general welfare at the present time or at any time in the future, he should report the condition to the
Safety Director of Occupational Safety and Health.
(1) The complaint should be in the form of a letter and give details on the condition(s) and
how the employee believes it affects or will affect his health, safety, or general welfare.
The employee should sign the letter but need not do so if he wishes to remain anonymous
(see subsection (h) of Section 1 of this plan).
(2) Upon receipt of the complaint letter, the Safety Director will evaluate the condition(s) and
institute any corrective action, if warranted. Within ten (10) working days following the
receipt of the complaint, the Safety Director will answer the complaint in writing stating
whether or not the complaint is deemed to be valid and if not, why not, what action has
been or will be taken to correct or abate the condition(s), and giving a designated time
period for correction or abatement. Answers to anonymous complaints will be posted upon
bulletin boards or other places of common passage where the anonymous complaint may
be reasonably expected to be seen by the complainant for a period of three (3) working
days.
(3) If the complainant finds the reply not satisfactory because it was held to be invalid, the
corrective action is felt to be insufficient, or the time period for correction is felt to be too
long, he may forward a letter to the Chief Executive Officer or to the governing body
explaining the condition(s) cited in his original complaint and why he believes the answer
to be inappropriate or insufficient.
(4) The Chief Executive Officer or a representative of the governing body will evaluate the
complaint and will begin to take action to correct or abate the condition(s) through
arbitration or administrative sanctions or may find the complaint to be invalid. An answer
will be sent to the complainant within ten (10) working days following receipt of the
complaint or the next regularly scheduled meeting of the governing body following receipt
of the complaint explaining decisions made and action taken or to be taken.
(5) After the above steps have been followed and the complainant is still not satisfied with the
results, he may then file a complaint with the Commissioner of Labor and Workforce
Development. Any complaint filed with the Commissioner of Labor and Workforce
144
Development in such cases shall include copies of all related correspondence with the
Safety Director and the Chief Executive Officer or the representative of the governing
body.
(6) Copies of all complaint and answers thereto will be filed by the Safety Director who shall
make them available to the Commissioner of Labor and Workforce Development or his
designated representative upon request.
4-410. Education and training.
1) Safety Director and/or Compliance Inspector(s):
(a) Arrangements will be made for the Safety Director and/or Compliance Inspector(s)
to attend training seminars, workshops, etc., conducted by the State of Tennessee
or other agencies. A list of seminars can be obtained.
(b) Access will be made to reference materials such as 29 CFR 1910 General Industry
Regulations; 29 CFR 1926 Construction Industry Regulations; The Rules of
Tennessee Department of Labor and Workforce Development Occupational Safety
and Health, and other equipment/supplies, deemed necessary for use in conducting
compliance inspections, conducting local training, wiring technical reports, and
informing officials, supervisors, and employees of the existence of safety and
health hazards will be furnished.
2) All Employees (including supervisory personnel):
A suitable safety and health training program for employees will be established. This program will,
as a minimum:
(a) Instruct each employee in the recognition and avoidance of hazards or unsafe
conditions and of standards and regulations applicable to the employee's work
environment to control or eliminate any hazards, unsafe conditions, or other
exposures to occupational illness or injury.
(b) Instruct employees who are required to handle or use poisons, acids, caustics,
toxicants, flammable liquids, or gases including explosives, and other harmful
substances in the proper handling procedures and use of such items and make them
aware of the per sonal protective measures, person hygiene, etc., which may be
required.
(c) Instruct employees who may be exposed to environments where harmful plants or
animals are present, of the hazards of the environment, how to best avoid injury or
exposure, and the first aid procedures to be followed in the event of injury or
exposure.
(d) Instruct all employees of the common deadly hazards and how to avoid them, such
as falls; equipment turnover; electrocution; struck by/caught in; trench cave in;
heat stress and drowning.
(e) Instruct employees on hazards and dangers of confined or enclosed spaces.
(i) Confined or enclosed space means space having a limited means of egress
and which is subject to the accumulation of toxic or flammable
contaminants or has an oxygen deficient atmosphere. Confined or
enclosed spaces include, but are not limited to, storage tanks, boilers,
145
ventilation or exhaust ducts, sewers, underground utility accesses, tunnels,
pipelines, and open top spaces more than four feet (4') in depth such as
pits, tubs, vaults, and vessels.
(ii) Employees will be given general instruction on hazards involved,
precautions to be taken, and on use of personal protective and emergency
equipment required. They shall also be instructed on all specific standards
or regulations that apply to work in dangerous or potentially dangerous
areas.
(iii) The immediate supervisor of any employee who must perform work in a
confined or enclosed space shall be responsible for instructing employees
on danger of hazards which may be present, precautions to be taken, and
use of personal protective and emergency equipment, immediately prior to
their entry into such an area and shall require use of appropriate personal
protective equipment.
4-411. General inspection procedures.
It is the intention of the governing body and responsible officials to have an Occupational Safety
and Health Program Plan that will ensure the welfare of employees. In order to be aware of hazards, periodic
inspections must be performed. These inspections will enable the finding of hazards or unsafe conditions
or operations that will need correction in order to maintain safe and healthful worksites. Inspections made
on a pre-designated basis may not yield the desired results. Inspections will be conducted, therefore, on a
random basis at intervals not to exceed thirty (30) calendar days.
(1) In order to carry out the purposes of this ordinance, the Safety Director and/or Compliance
Inspector(s), if appointed, is authorized:
(a) To enter at any reasonable time, any establishment, facility, or worksite where
work is being performed by an employee when such establishment, facility, or
worksite is under the jurisdiction of the employer and;
(b) To inspect and investigate during regular working hours and at other reasonable
times, within reasonable limits, and in a reasonable manner, any such place of
employment and all pertinent conditions, processes, structures, machines,
apparatus, devices, equipment, and materials therein, and to question privately any
supervisor, operator, agent, or employee working therein.
(2) If an imminent danger situation is found, alleged, or otherwise brought to the attention of
the Safety Director or Inspector during a routine inspection, he shall immediately inspect
the imminent danger situation in accordance with Section XII of this plan before inspecting
the remaining portions of the establishment, facility, or worksite.
(3) An administrative representative of the employer and a representative authorized by the
employees shall be given an opportunity to consult with and/or to accompany the Safety
Director or Inspector during the physical inspection of any worksite for the purpose of
aiding such inspection.
(4) The right of accompaniment may be denied any person whose conduct interferes with a
full and orderly inspection.
(5) The conduct of the inspection shall be such as to preclude unreasonable disruptions of the
operation(s) of the workplace.
146
(6) Interviews of employees during the course of the inspection may be made when such
interviews are considered essential to investigative techniques.
(7) Advance Notice of Inspections.
(a) Generally, advance notice of inspections will not be given as this precludes the
opportunity to make minor or temporary adjustments in an attempt to create
misleading impression of conditions in an establishment.
(b) There may be occasions when advance notice of inspections will be necessary in
order to conduct an effective inspection or investigation. When advance notice of
inspection is given, employees or their authorized representative(s) will also be
given notice of the inspection.
(8) The Safety Director need not personally make an inspection of each and every worksite
once every thirty (30) days. He may delegate the responsibility for such inspections to
supervisors or other personnel provided:
(a) Inspections conducted by supervisors or other personnel are at least as effective as
those made by the Safety Director.
(b) Records are made of the inspections, any discrepancies found and corrective
actions taken. This information is forwarded to the Safety Director.
(9) The Safety Director shall maintain records of inspections to include identification of
worksite inspected, date of inspection, description of violations of standards or other unsafe
conditions or practices found, and corrective action taken toward abateme nt. Those
inspection records shall be subject to review by the Commissioner of Labor and Workforce
Development or his authorized representative.
4-412. Imminent Danger Procedures.
1) Any discovery, any allegation, or any report of imminent danger shall be handled in
accordance with the following procedures:
(a) The Safety Director shall immediately be informed of the alleged imminent danger
situation and he shall immediately ascertain whether there is a reasonable basis for
the allegation.
(b) If the alleged imminent danger situation is determined to have merit by the Safety
Director, he shall make or cause to be made an immediate inspection of the alleged
imminent danger location.
(c) As soon as it is concluded from such inspection that conditions or practices exist
which constitutes an imminent danger, the Safety Director or Compliance
Inspector shall attempt to have the danger corrected. All employees at the location
shall be informed of the danger and the supervisor or person in charge of the
worksite shall be requested to remove employees from the area, if deemed
necessary.
(d) The administrative or operational head of the workplace in which the imminent
danger exists, or his authorized representative, shall be responsible for determining
the manner in which the imminent danger situation will be abated. This shall be
done in cooperation with the Safety Director or Compliance Inspector and to the
mutual satisfaction of all parties involved.
(e) The imminent danger shall be deemed abated if:
147
(i) The imminence of the danger has been eliminated by removal of
employees from the area of danger.
(ii) Conditions or practices which resulted in the imminent danger have been
eliminated or corrected to the point where an unsafe condition or practice
no longer exists.
(f) A written report shall be made by or to the Safety Director describing in detail the
imminent danger and its abatement. This report will be maintained by the Safety
Director in accordance with subsection (i) of Section XI of this plan.
2) Refusal to Abate.
(a) Any refusal to abate an imminent danger situation shall be reported to the Safety
Director and Chief Executive Officer immediately.
(b) The Safety Director and/or Chief Executive Officer shall take whatever action may
be necessary to achieve abatement.
4-413. Abatement Orders And Hearings.
1) Whenever, as a result of an inspection or investigation, the Safety Director or Compliance
Inspector(s) finds that a worksite is not in compliance with the standards, rules or regulations pursuant to
this plan and is unable to negotiate abatement with the administrative or operational head of the worksite
within a reasonable period of time, the Safety Director shall:
(a) Issue an abatement order to the head of the worksite.
(b) Post or cause to be posted, a copy of the abatement order at or near each location
referred to in the abatement order.
2) Abatement orders shall contain the following information:
(a) The standard, rule, or regulation which was found to violated.
(b) A description of the nature and location of the violation.
(c) A description of what is required to abate or correct the violation.
(d) A reasonable period of time during which the violation must be abated or
corrected.
3) At any time within ten (10) days after receipt of an abatement order, anyone affected by
the order may advise the Safety Director in writing of any obje
Text truncated. Open the original for the full document.
Source: City of Hendersonville website. First collected Oct 18, 2026.