Revised Board Package
Fairfax County · Fairfax County · Notices
Open the original document More from Fairfax County
This document is no longer listed on Fairfax County's website. We kept the copy we read.
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
FAIRFAX COUNTY
BOARD OF SUPERVISORS
October 27, 2026
AGENDA
9:30 Presentations
9:30 History Commission Annual Report Presentation
9:30 Board Appointments to Citizen Boards, Authorities, Commissions,
and Advisory Groups
10:00 Matters Presented by Board Members
10:00 Items Presented by the County Executive
ADMINISTRATIVE
ITEMS
1 Authorization to Advertise a Public Hearing on Proposed
Ordinance to Amend the Code of the County of Fairfax, Chapter
3, County Employees, Article 5, Financial Disclosures, Section 3-
5-2.1
2 Authorization to Advertise a Public Hearing to Consider an
Ordinance to Amend and Readopt Fairfax County Code Sections
7-2-5, 7-2-6, and 7-2-13, to Divide and Create Precincts in Hunter
Mill and Dranesville Districts; Move Polling Places in Mason and
Providence Districts; and Adjust Precinct Boundaries in Hunter
Mill, Providence, and Sully Districts (Hunter Mill, Dranesville,
Mason, Providence, and Sully Districts)
3 Authorization to Advertise a Public Hearing to Adopt an
Ordinance Establishing an Economic Revitalization Zone for
Skyline Buildings 4, 5, and 6 (Mason District)
4 Extension of Review Period for 2232 Application for AT&T
Boulevard Estates Telecommunication Site (Braddock District)
5 Approval of a Resolution to Authorize Execution of a Low-No
Emission Grant and Bus Transfer Agreement with the
Washington Metropolitan Area Transit Authority
6 Approval of Traffic Calming Measures as Part of the Residential
Traffic Administration Program – Oak Drive (Mount Vernon
District)
1
FAIRFAX COUNTY
BOARD OF SUPERVISORS
October 27, 2026
ADMINISTRATIVE
ITEMS
(continued)
7 Approval of Traffic Calming Measures as Part of the Residential
Traffic Administration Program – Middle Run Drive (Springfield
District)
8 Approval of “$200 Additional Fine for Speeding” Signs as Part of
the Residential Traffic Administration Program – Lacy Boulevard
(Mason District)
9 Authorization for the Office of Environmental and Energy
Coordination to Apply for and Accept Grant Funding from Virginia
Department of Energy to Support the Interconnection of
Distributed Solar Energy Systems to the Electric Grid (Mount
Vernon District)
10 Authorization for the Fairfax County Park Authority to Apply for
Grant Funding from the U.S. National Park Service to Support the
Reinvigoration of South Lakes Drive Park (Hunter Mill District)
ACTION ITEMS
1 Endorsement of Design Plans for the Rolling Road and Grigsby
Drive Traffic Signal Project (Braddock and Springfield Districts)
2 Authorization of an Amendment to the Amended and Restated
Interim Real Estate Exchange Agreement Between the Fairfax
County Board of Supervisors and Inova Health Care Services
Regarding the Joint Redevelopment at Reston Town Center
North (Hunter Mill District)
3 Authorization to Execute a Memorandum of Agreement with the
Virginia Department of Transportation for the Joint Operations
and Maintenance Plan of the Richmond Highway Bus Rapid
Transit Project (Franconia and Mount Vernon Districts)
4 Approval of the Second Amended and Restated Memorandum of
Understanding Between the Fairfax County Board of Supervisors
and the Fairfax County Convention and Visitors Corporation
INFORMATION
ITEMS
1 County Holiday Schedule – Calendar Year 2027
2
FAIRFAX COUNTY
BOARD OF SUPERVISORS
October 27, 2026
CLOSED SESSION
Closed Session
PUBLIC
HEARINGS
3:00 Public Hearing on RZ-2025-DR-00017 (APB Woodland Park JV
LLC) (Dranesville and Hunter Mill Districts) (Concurrent with
PCA-77-C-098-06 (RZPA-2025-DR-00046) and PCA-80-C-028-
09 (RZPA-2025-DR-00049))
3:00 Public Hearing on PCA-77-C-098-06 (RZPA-2025-DR-00046)
(APB Woodland Park JV LLC) (Dranesville District) (Concurrent
with RZ-2025-DR-00017 and PCA-80-C-028-09 (RZPA-2025-
DR-00049))
3:00 Public Hearing on PCA-80-C-028-09 (RZPA-2025-DR-00049)
(APB Woodland Park JV LLC) (Dranesville and Hunter Mill
Districts) (Concurrent with RZ-2025-DR-00017 and PCA-77-C-
098-06 (RZPA-2025-DR-00046))
3:00 Public Hearing on SE-2026-FR-00020 (Lucila Catalina Araujo
and Gary Antonio Araujo de la Cruz) (Franconia District)
3:00 Public Hearing on SE-2023-DR-00036 (Laura Winfield Berkebile
and Julia Helena Eugenia Berkebile Fazio) (Dranesville District)
3:00 Public Hearing on RZ-2025-DR-00021 (Sekas Homes, Ltd)
(Dranesville District)
3:30 Public Hearing on Proposed Plan Amendment 2025-I-J4 (Gate
House Plaza) (Providence District) (Concurrent with SEA-95-P-
008-02)
3:30 Public Hearing on SEA-95-P-008-02 (Silver Gatehouse LLC)
(Providence District) (Concurrent with Plan Amendment 2025-I-
J4)
3:30 Public Hearing on SE-2025-MA-00043 (Fairfax County Water
Authority) (Mason District)
3:30 Public Hearing on PCA-2017-PR-015-002/CDPA-2017-PR-015
(RZPA-2025-PR-00071) (B9 Sequoia the Mile Owner LLC)
(Providence District)
3
FAIRFAX COUNTY
BOARD OF SUPERVISORS
October 27, 2026
PUBLIC
HEARINGS
(continued)
3:30 Public Hearing on RZ-2024-MA-00004 (MS-Gallows, LLC)
(Mason District)
3:30 Public Hearing on SE-2026-PR-00004 (INOVA Health Care
Services) (Providence District)
4:00 Public Hearing on PCA-2017-DR-012/CDPA-2017-DR-012
(RZPA-2022-DR-00149) (Pomeroy Investments, Inc. and the
Pomeroy Companies Inc.) (Dranesville District)
4:00 Public Hearing on Proposed Plan Amendment 2013-III-FC1(C),
Fairfax Center Area, Phase III, Core Area (Braddock and
Springfield Districts)
4:00 Public Hearing on the Acquisition of Certain Land Rights
Necessary for the Construction of the Richmond Highway Bus
Rapid Transit (RHBRT) Project 2G40-162-000 (Franconia and
Mount Vernon Districts)
4:00 Public Hearing on a Proposed Zoning Ordinance Amendment
Re: 2026 Code of Virginia Updates
4:00 Public Hearing to Sell Easement Rights in Board of Supervisors
Owned Property at Wolf Trap Fire Station at 1315 Beulah Road
to Castleton, L.C. (Dranesville District)
4:30 Public Hearing for the Enlargement of a Sanitary District to
Include 1945 Valley Wood Road for Refuse/Recycling Collection
Service (Dranesville District)
4:30 Public Hearing for the Enlargement of a Sanitary District to
Include 1941 Valley Wood Road for Refuse/Recycling Collection
Service (Dranesville District)
4:30 Public Hearing for the Contraction of a Sanitary District to
Remove 612 N Oak Street from Refuse/Recycling Collection
Service (Dranesville District)
4:30 Public Hearing for the Enlargement of a Sanitary District to
Include Ivy Hill Drive Area for Refuse/Recycling Collection
Service (Dranesville District)
4
FAIRFAX COUNTY
BOARD OF SUPERVISORS
October 27, 2026
PUBLIC
HEARINGS
(continued)
4:30 Public Hearing forthe De-Creation/Re-Creation of a Sanitary
District to Remove Vacuum Leaf Collection Service from
Woodland Terrace Area (Dranesville District)
5:00 Public Hearing for the Contraction of a Sanitary District to
Remove 6614 Edsall Road Sanitary District from
Refuse/Recycling Collection Service (Mason District)
5:00 Public Hearing for the De-Creation/Re-Creation of a Sanitary
District to Remove Vacuum Leaf Collection Service from Walnut
Hill Community (Mason District)
5:00 Public Comment
5
Fairfax County, Virginia
BOARD OF SUPERVISORS
AGENDA
Tuesday
October 27, 2026
9:30 a.m.
PRESENTATIONS
RESOLUTION — To recognize Marlene Blum for dedicating more than four decades to
public service and volunteer leadership in Fairfax County. Requested by Chairman
McKay and Supervisor Palchik.
RESOLUTION — To recognize the Shepherd’s Center of Fairfax-Burke on its 20th
anniversary and celebrate its dedication to supporting older adults through volunteer
services, educational programs and community connections. Requested by Chairman
McKay and Supervisor Sizemore Heizer.
RESOLUTION — To recognize the Fairfax Women’s Soccer Association on its 50th
anniversary and celebrate its longstanding commitment to promoting women’s soccer
and community engagement. Requested by Chairman McKay.
RESOLUTION — To recognize Celebrate Fairfax on its 43rd anniversary and honor its
contributions to community engagement, cultural celebrations and bringing residents
together across Fairfax County. Requested by Chairman McKay.
PROCLAMATION — To designate November 14, 2026, as Fairfax Recycles Day and
Stormwater Day in the County. Requested by Chairman McKay, Supervisor Herrity,
Supervisor Palchik and Supervisor Lusk.
STAFF:
Tony Castrilli, Director, Office of Public Affairs
Jeremy Lasich, Office of Public Affairs
Imtiaz Ali, Office of Public Affairs
6
Board Agenda Item
October 27, 2026
9:30 a.m.
History Commission Annual Report Presentation
ENCLOSED DOCUMENTS:
Attachment 1 – Fairfax County History Commission Annual Report
PRESENTED BY:
Subhi Mehdi, Chair, Fairfax County History Commission
7
Fairfax County History Commission
2026 Annual Report
Attachment 1
8
A PROCLAMATION
Commemorating the 250th Anniversary of American Independence
by the Fairfax County History Commission
WHEREAS, 2026 marks 250 years since the Declaration of Independence,
when the American colonies asserted their right to self-governance and
embraced the belief that everyone is created equal, with fundamental rights
to life, liberty, and the pursuit of happiness; and
WHEREAS, Fairfax County, Virginia, holds an eminent place in this history as
the home of George Washington and George Mason, whose leadership and
ideas helped shape the foundations of our republic; and
WHEREAS, the County’s people, places, and events reflect the broader story of
a nation working hard to fulfill the promise of freedom, including the
experiences of those whose voices were not fully realized at the nation’s
founding; and
WHEREAS, the Fairfax County History Commission is entrusted with
preserving, interpreting, and promoting this rich history for the education and
benefit of present and future generations; and
NOW, THEREFORE, BE IT PROCLAIMED that the
Fairfax County History Commission hereby commemorates the 250th
Anniversary of American Independence, and encourages all residents to learn,
reflect, and participate in the preservation and celebration of our nation’s
history.
Given this year of our Nation’s 250th Anniversary,
by the Fairfax County History Commission.
Attachment 1
9
Executive Summary
3
Executive Summary July 2025—June 2026 4
Major Initiatives
250th Commemoration
Strengthening Ties with Fairfax County Park Authority
5
6
Outreach
Historic Courthouse and Historic Records Center
William H. Randall Estates Historic District
Section 106
Threatened Sites
7
7
7
10
Sustained Efforts
Advocacy 14
2026 History Conference 15
Awards 17
Oral History 18
Inventory of Historic Sites 18
Historic Markers 19
Resident Curator Program 21
Budget Report 22
Membership
Meet Our Members 23
Advisory Members 23
Front Cover (from top moving left to right): Fairfax Resolves booklets, Dunn Loring Elementary School Historic
plaque, Commissioner Michelle Arcari Rose; Commissioners Subhi Mehdi and Brian Heintz presenting History
Commission Award, unveiling of the James Goins historical marker, History Conference speaker Richard Bell;
Interactive exhibit at Fairfax County History Conference; Commissioner Anne Stuntz at the Legato Schoolhouse;
Supervisor Dalia Palchik and Commissioner Sue Kovach Shuman with a drawing of the Historic Fairfax County
Courthouse.
Attachment 1
10
Executive Summary
4
The Fairfax County History Commission is pleased to present its FY 2026 annual report, which
aligns with the county’s strategic plan, particularly the key drivers of equity and inclusive
engagement. The Commission positively impacts Fairfax County residents through activities for
lifelong education and learning, cultural and recreational opportunities, and effective and
efficient government.
We thank the Board of Supervisors for the opportunity to preserve and promote the history of
our county. Highlights of our achievements during this reporting period include:
• Leading and supporting the commemoration of the nation’s semiquincentennial through
our partnership with and membership in the Fairfax County 250th Commission.
• Organizing and presenting our record-breaking 2026 Fairfax County History Conference.
• Creating and launching the video series Revolutionary Voices: The Fairfax Story.
• Reprinting the popular revolutionary document, the Fairfax Resolves.
• Rewarding outstanding historical research and writing in our community.
• Advocating for the preservation and protection of Dunn Loring Elementary School, the
Bowman Distillery, Laurel Hill House and other properties on our Threatened Sites List.
• Ongoing outreach for preservation and recognition of historic sites including the Fairfax
County Historic Courthouse and William H. Randall Estates Historic District.
• Participating in Section 106 reviews as a consulting party with positive outcomes.
• Engaging with county residents at Oakton Day, Charles Broadwater Day, Mount Vernon
Summerpalooza, and Juneteenth Celebrations in Gum Springs and Vienna.
• Updating and maintaining the Fairfax County Inventory of Historic Sites.
• Expanding our coverage of African American history by advancing markers for First
Baptist Church of Merrifield and Spring Bank Colored School.
The Commission acknowledges and thanks staff from the Department of Planning and
Development, the Architectural Review Board, the Park Authority, the Virginia Room, and
Channel 16 for their contributions and support.
We look forward to another productive year in FY 2027!
Subhi Mehdi
Chair, Fairfax County History Commission
Attachment 1
11
Major Initiatives
5
250th Commemoration
In FY 2026, the History Commission prioritized
county and regional efforts to observe and
commemorate the semiquincentennial of the
American Revolution, the Revolutionary War, and
the Independence of the United States of
America. The resources of the History
Commission supported the efforts of the Fairfax
County 250th Commission and partner
organizations in executing activities and events
commemorating the past, present and future of
America across the nine supervisory districts of
Fairfax County.
Four history commissioners serve directly on the Fairfax 250 Commission. Two commissioners,
Gretchen Bulova and Tammy Mannarino, served as officers during this fiscal year, leading the
creation, enhancement and amplification of hundreds of activities and events. Both regularly
speak on behalf of Fairfax 250 to arts, military and community organizations. Commissioners
Mannarino and Bulova led the publication of two booklets interpreting and reprinting
foundational documents written by Fairfax County residents in the Revolutionary period: The
Fairfax Resolves and The Virginia Declaration of Rights. They supported a third booklet
published by Fairfax 250, Honoring the Fairfax County, Virginia Patriots of the Revolution.
Commissioners Subhi Mehdi (Dranesville) and Jen Macpherson (Franconia) represented their
Supervisory Districts on the body, assisting in planning and public outreach.
Additionally, other commissioners supported 250th efforts within Fairfax County through their
related activities and networks outside the History Commission. Commissioners Anne Stuntz
and Holly Irwin, for example, shared opportunities for cross-promotion of community efforts in
their work with Vienna 250 and Falls Church 250,
respectively. Similarly, in her role at the Fairfax
County Park Authority, Commissioner Cheryl-Ann
Repetti supported Fairfax 250 by providing
outreach and historical content for exhibits.
Commissioner Sue Kovach Shuman led two efforts
that provided depth to the county’s marking of
this important period: the 2026 History
Conference and the Oral History project,
Revolutionary Voices: The Fairfax Story, both of
which are detailed later in this report. All history
commissioners supported 250th events through
their advocacy of an amazing array of historical
sites in Fairfax County. Their support of the 2026
The History Commission printed and distributed
more than 1000 copies of The Fairfax Resolves.
History Commission display at History Conference.
Conference.
Attachment 1
12
Major Initiatives
6
Conference made it the largest and most interactive to date. Finally, History Commission
Advisory Member Mary Lipsey represented the Springfield District on the Fairfax 250
Commission, providing educational expertise and experience to appreciative audiences.
Strengthening Ties with Fairfax County Park Authority
The Fairfax County History Commission (FCHC) and the Fairfax County Park Authority (FCPA)
both execute core functions in support of Fairfax County’s history and heritage resources. They
are both committed to their roles -- which sometimes overlap. Notably, the FCPA stewards
more than 40 sites on the History Commission’s Inventory of Historic Sites. The FCPA routinely
attends FCHC’s Inventory Committee meetings and the FCHC tracks FCPA’s Resident Curator
program. The History Commission’s Advocacy Committee often makes use of outreach
opportunities provided by FCPA events. This year’s celebration of America’s 250th saw
additional collaborations between the FCHC and the FCPA on public education. Having
experienced the benefits of this close collaboration and recognizing their common function as
county cultural resource stewards, the commission observed that overall coordination and
cooperation between the two entities could be improved.
In a bid to enhance strategic
communication, the History
Commission appointed
Commissioner Todi Carnes as a
formal liaison to the FCPA.
Commissioner Carnes worked
previously with FCPA Friends groups
as an advocate for parks. The
commission hopes to develop
processes and programs that will
facilitate a more synergistic
relationship between the FCHC and
the FCPA, leading to better support
for the county’s history and heritage
resources. Toward this end,
Commissioner Carnes has met with
key Park Authority personnel,
attended Park Authority Board meetings, and has been observing interactions between the two
organizations. Increased engagement is planned in FY 2027.
Consistent with one of the Commission’s purposes stipulated in the Board of Supervisors 2019
authorizing resolution, Commissioner Carnes will also explore how the creation of trusts and
endowments might be implemented to secure financing in support of FCPA-owned historic
structures and properties.
FCPA Archaeology and Collections Branch staff at Fairfax
County History Conference.
Attachment 1
13
Outreach
7
Historic Courthouse and Historic Records Center
On December 18, 2025, The Fairfax County Historic Courthouse and Circuit Courts Historic
Records Center experienced a catastrophic HVAC System failure. Operations at the Historic
Courthouse were suspended and historic documents were relocated to the Main Courthouse,
Merrifield (Prosperity Avenue) and a Springfield warehouse. The History Commission wrote a
letter to the Board of Supervisors on January 15, requesting that the County prioritize the
historic building restoration while the staff and tenants have been evacuated instead of
adhering to the judicial center master plan timetable approved in 2021. The Commission also
urged that the irreplaceable historic records being temporarily rehoused be safely stored. It is
unfortunate that the timing of this failure encumbered research efforts and canceled events
that would have enhanced the County’s commemoration of the nation’s 250th anniversary.
William H. Randall Estates Historic District
In September 2025, the History Commission wrote a letter to the Virginia Department of
Historic Resources in support of the nomination of the William H. Randall Estates Historic
District to the Virginia Landmarks Register and to the National Register of Historic Sites. The
William H. Randall Estates Historic District was listed on the Fairfax County Inventory of Historic
Sites in 2022 for its significance to Fairfax County’s cultural heritage, its association with
influential people and groups, and its association with a discrete population, ethnic group, or
community. The subdivision additionally reflects mid-20th century residential architecture with
many of the homes retaining the custom features selected by the original owners. Randall
Estates, now more than sixty years old, exemplifies a successful neighborhood of quality homes
built by a Black developer, Jube Shiver Sr., and available to African American families during a
period when racially restrictive deed covenants, financial redlining and other discriminatory
practices excluded or limited their access to other neighborhoods. The Historic District was
added to the Virginia Landmarks Register on September 18, 2025, and to the National Register
of Historic Places on March 23, 2026.
Section 106
Section 106 of the National Historic Preservation Act of 1966 requires federal agencies to
consider the effects of any changes to historic properties when they carry out, fund, permit,
license, or approve projects. The History Commission often serves as a consulting party on 106
projects. During the 2026 fiscal year, the Commission participated in the review process for the
proposed Terminal/Concourse Redevelopment and Associated Projects at Washington Dulles
International Airport (IAD). This is a multiphase project and more opportunities for review are
anticipated.
Recent events have put the routine procedures associated with Section 106 in jeopardy. Below
is a summary highlighting impacts of the History Commission’s participation as a consulting
party. Since 2010, the FCHC has participated in at least 11 undertakings, not including local cell
towers. Notable projects include:
Capital One Lounge, Dulles Airport Historic District: Located in the airport restaurant designed
Attachment 1
14
Outreach
8
by Eero Saarinen, the new lounge was designed in 2020 -2021. As a consulting party, the
History Commission raised concerns in 2021 that the proposed modifications could adversely
affect the historic integrity of Saarinen’s design. During 2022, the Commission continued
evaluating proposed updates, responding to developer revisions, and providing feedback
intended to mitigate possible adverse effects.
Impact: In September 2023 the Capital One Lounge opened in the Dulles Airport Historic
District. The Commission’s input contributed to design revisions that helped to avoid or
minimize potential adverse effects. The successful redevelopment of the original
restaurant into the Capital One Lounge now represents an appropriate and compatible
adaptive reuse of the historic space.
Soapstone/Association Drive: The Soapstone Connector is a joint project of the Federal
Highway Administration and Fairfax Department of Transportation to extend Soapstone Drive a
half a mile over the Dulles Toll Road to connect Sunset Hills Road and Sunrise Valley Drive in
Reston. The History Commission became a consulting party for the project in 2017. The
connector threatened buildings within the Association Drive complex. Built between 1972 and
1991, Association Drive was part of the initial concept and implementation of the Reston Plan.
In 2019, the Association Drive Historic District was determined to be eligible for the National
Register. The Commission participated in consultation to identify and agree upon measures to
mitigate the adverse effect on the historic district.
Impact: In August 2022, an agreement was reached that included mitigation supported
by the Commission: documentation of the buildings, three wayside markers, and a
publicly available report documenting the significance of Association Drive. The
commission awaits the mitigation plan to be implemented when the Soapstone project,
not yet under construction, draws to a close.
McMillen Farm: This 550-acre dairy farm in the Dranesville District was built between 1850 and
1900. The property was determined eligible for the National Register in 1994 and was listed on
the Fairfax County Inventory of Historic Sites in 1996. In October 2020, the History Commission
became a consulting party for the project which included residential development of the
historic dairy farm. The home, Coomber Hall, and several other structures were unsuccessfully
offered for sale and removal.
Impact: A memorandum of agreement (MOA) with the developer, the Army Corps of
Engineers, Virginia Department of Historical Resources, the county, and the History
Commission called for HABS level III documentation of the buildings and an interpretive
installation. In Fall 2021, following documentation in accordance with the MOA, the
structures were demolished to make way for new residential housing. Reportedly, the
historic barn was deconstructed with some materials salvaged to build a private barn
within Fairfax County. Commissioner Stuntz and DPD staff worked with Dovetail
Consulting to produce the signage called for in the MOA. It was installed in 2023.
Attachment 1
15
Outreach
9
Richmond Highway Bus Rapid Transit Project – The Richmond Highway Bus Rapid Transit (BRT)
project (branded as “The One”) extends 7.4 miles, from the Huntington Metro Station to Fort
Belvoir. This project required widening along the Richmond Highway corridor in an area that
contains numerous historic buildings and communities. The Commission began providing
comments in September 2019, pressing for National Register eligibility for Gum Springs, Walsh
Hall (a former Fairfax County one-room school), and a Wells Fargo Bank (formerly the Colonial
Home, a tourist Inn that was built in 1941 as a replica of Mount Vernon). In May 2020, the
History Commission asked to be named as a consulting party. Fairfax County Department of
Transportation and the Federal Transit Authority determined that The Fairfax County History
Commission and Architectural Review Board fell under the purview of the Department of
Planning and Development and therefore had to coordinate their comments through DPD.
Impact: In May 2020, Virginia Department of Historic Resources (DHR) concurred that
Gum Springs should be treated as eligible for listing in the National Register of Historic
Places (NRHP). The BRT plans were modified to mitigate impacts near the community.
While Walsh Hall and the Wells Fargo Bank were not deemed National Register eligible,
later roadway designs reduced effects near these properties.
Above left: the Capital One Lounge.
Above right: Walsh Hall, now a part of
Saint Louis School was the Groveton
School House. It was protected from
possible demolition as part of the
Richmond Highway Bus Rapid
Transportation project by discussions that
emerged from the Section 106 process.
At left: Mitigating signage at McMillen
farm site.
Attachment 1
16
Outreach
10
Threatened Sites
The History Commission has noted a growing trend of historic buildings threatened by
demolition. In 2023, the commission compiled its first list of threatened sites. The commission
acknowledges that not every historic building can be preserved. We are examining how we may
more proactively address the issue of what should be more vigilantly protected. Threatened
sites noted by the commission in 2026 include the following:
Olander and Margaret Banks House
District: Franconia
Listing(s): N/A
Threat: Scheduled for Demolition
Olander Banks, Sr., a successful
Alexandria businessman and his
wife Margaret Lomax Banks bought
10-acres in Fairfax County and built
a custom home in the late 1950s. The house was designed from plans Margaret pulled from a
popular women’s magazine. They lived in the home, which ultimately had 27 rooms, for more
than 40 years with their nine children. Olander Banks, Sr. was recognized as a business leader in
the Alexandria African American Hall of Fame in 2013. In 2001, the Banks family sold the
property to Fairfax County for a community park with an easement to continue living there. In
2011, the Fairfax County Park Authority (FCPA) approved the master plan for the Olander and
Margaret Banks Neighborhood Park. The Banks House has remained vacant over the past
decade since the park was created. In March 2026, three concepts for the Olander and
Margaret Banks Park were presented to the FCPA Park Authority Board (PAB). All three
concepts involved demolition of the house. The Fairfax County PAB voted to adopt the next
steps in the demolition and left the selection of one of the presented concepts to be
determined.
Laurel Hill House (in DC Workhouse and
Reformatory Historic District, Lorton)
District: Mount Vernon
Listing(s): National Register, Virginia Landmarks
Register, FCHC Inventory
Threat: Demolition by Neglect
Major William Lindsay, a Colchester carpenter
and tavern-keeper, served in the Revolutionary
War and was wounded at the Battle of Guilford
Courthouse in 1781. He built the frame house,
known as Laurel Hill, between 1787-1790 and
lived there with his wife Ann Calvert and their
large family. The house was renovated in the early twentieth century to serve as the
superintendent’s residence for the reformatory. In the late 1930s, prison labor was used to
Attachment 1
17
Outreach
11
construct the classically designed, terraced gardens adjacent to the house. Made almost
entirely of brick, the garden’s hardscaping is also a contributing structure in the Historic District.
A cemetery associated with the Lindsay family also sits adjacent to the house.
A 2008 Historic Structure Report provided options for preservation of the Laurel Hill house, that
were never acted upon. The report concluded that it is likely that undisturbed land around the
house includes archaeological resources associated with the use and occupation of the house,
both before and during the period of significance. There is community interest in this property.
It has been the recent site of Eagle Scout projects and of Sons of the American Revolution and
Daughters of the American Revolution projects and commemorations. Neighboring
communities are concerned about the state of the neglected building.
Robert Wiehle House
District: Hunter Mill
Listing(s): FCHC Inventory
Threat: Storm Damage/Demolition by Neglect
Built in 1895, this privately-owned Victorian
home is one of only three buildings remaining
from the Town of Wiehle planned by Dr. Carl A.
Max Wiehle, a German-born doctor, and
incorporated in 1898. On July 5, 2026, the roof
and at least one second-floor bedroom were
damaged by a falling tree. The home was not
insured and funds are not available for repair.
The homeowner has reached out in the media
seeking a partnership to restore the home.
Bowman Distillery/Wiehle Town Hall
District: Hunter Mill
Listing(s): National Register, Virginia
Landmarks Register, FCHC Inventory
Threat: Demolition by Neglect
In 1892, this brick Classical revival
building was the centerpiece of
German immigrant and businessman
C.A. Max Wiehle’s planned “utopian
community.” The first floor served as
the Town Hall and the second floor
was the Wiehle Methodist Episcopal
Church. In 1927 the A. Smith
Bowman Distillery converted the
building into one of the first legal post-Prohibition whiskey distilleries in the United States,
operating it through the 1950s. In May 2026, Preservation Virginia placed the Wiehle Town Hall
on its Virginia’s Most Endangered Historic Places List 2026.
Attachment 1
18
Outreach
12
Clifton Elementary School
District: Springfield
Listing(s): FCHC Inventory
Threat: Demolition
Clifton Elementary school was
built in 1953 on the site of an
earlier school. The school was
designed by Earl B. Bailey, the
architect for Luther Jackson
High School and other Fairfax
County and Prince William
County Public Schools. The
design of the Clifton school reflects the Mid-Century Modern style prominent after World War
II. In late June 2025, the Fairfax County Public School Board voted to update Policy 8258 -
Building Evaluation, Building Renovation, and Infrastructure Maintenance to read:
“Buildings deemed uninhabitable shall be removed from service immediately and demolished
within 36 months of the uninhabitable determination, unless granted an extension by the
School Board for documented extenuating circumstances.”
This decision was followed immediately by a vote to declare Clifton Elementary School
uninhabitable.
DeBell House (Sunnyside)
District: Sully
Listings: A recent Phase II Level
Survey recommended the house
eligible for the National Register
of Historic Places.
Threat: Demolition for
Development
A well-known landmark in the
Centreville community, the
earliest section of the DeBell
House was constructed before
1854. The house was sold in 2019.
When the new owners
determined that they could not adaptively reuse the building, they began planning to demolish
the house and build a church. This required a special permit. The case was brought to the
commission’s attention by staff and by concerned citizens in the Centreville area, including the
DeBell family. The commission offered testimony to the Board of Zoning Appeals (BZA) and
asked that the building be allowed to remain in place, consistent with the Comprehensive Plan
recommendation for properties that are eligible for the Register. Though the BZA deferred its
decision to allow community advocates time to devise a solution, none was forthcoming. The
special permit was granted on February 26, 2025, but the owners have not yet taken steps to
demolish Sunnyside.
Attachment 1
19
Outreach
13
Dunn Loring School
District: Providence
Listing(s): FCHC Inventory
Threat: Demolition for New School
Demolition of the historic school is
imminent. Work has begun on fencing
the property and disconnecting the
utilities. FCPS has completed its
proffers of a Phase II Intensive Level
Documentation, photography that
meets Historic American Buildings
Survey (HABS) standards, a written
report, preservation of the historic
Works Progress Administration (WPA) plaque, and design of an interpretive exhibit including all
or a portion of the pediment and salvaged bricks, and on-site historic markers. The historic
front entrance (door 4) will be preserved and reconstructed in the main hall of the new school
building.
At left: Signage developed for Dunn Loring school. At right: Commissioner Kovach Shuman with alumni and
members of the public at Dunn Loring Day. Conference.
Attachment 1
20
Sustained Efforts
14
Advocacy
The Advocacy Committee promotes interest in
county history by participating in a variety of
community events. It assists in the commission’s
mission to advise and inform the Board of
Supervisors on matters of preservation. During this
reporting period, the Advocacy Committee staffed
information tables at numerous county events
including:
• Oakton Day in the Park
• Oak Hill Open House
• Commemoration of the 251st anniversary of
the Fairfax County Independent Company of
Volunteers
• Mount Vernon Town Hall
• Charles Broadwater Day
• Viva Vienna
• Mount Vernon District Summerpalooza
• Fort Belvoir Commemoration of the 251st
Army Birthday
• Juneteenth Celebrations in Gum Springs and
Vienna
At each event, the Advocacy Committee provides a
professional exhibit displaying History Commission
efforts across the county. We share current materials
promoting our efforts such as the African American
History Inventory, supporting Fairfax 250 and
engaging the public regarding their historical interests
and concerns. We engage children with activity
pages and old-fashioned games.
Committee members also worked on several
complex preservation issues regarding Dunn Loring
School (see the Threatened Sites section) and at Fort
Belvoir. On March 5, 2026, Fort Belvoir Leadership
broke ground on a new housing development
named Young Village to honor Brigadier General
Charles Young in accordance with the
recommendation of History Commission members
Top: Broadwater headstone, Vienna.
Middle, from left edge: Commissioners
Stuntz, Meyer and Macpherson honoring the
contributions of Colonel Charles Broadwater
to American Independence.
Bottom: Groundbreaking for Young Village
housing complex. Commissioner Mannarino
stands with descendant Vincent Carter,
County Liaison to Fort Belvoir, Vance Zavela,
Colonel David Stewart and Command
Sargeant Major Brandon Creel.
Attachment 1
21
Sustained Efforts
15
and other representatives of the community.
The committee continues to enhance the commission’s outreach, research historic preservation
tools and maintain a list of threatened historic properties to keep the Board informed. The
committee supports and complements the work of other commission committees and prepares
the Annual Report and presentation for the Board of Supervisors.
The Advocacy Committee is chaired by Anne Stuntz and has six members.
History Conference
On April 18, 2026, the history conference was
held at the Fairfax County Government
Center for the first time. It drew a record-
breaking crowd of nearly 250 attendees. The
theme was Revolutionary Ideas: Fairfax
County’s American Revolution. Several
partners (George Mason University’s Center
for Mason Legacies, the Fairfax County Park
Authority, the Fairfax 250 Commission, and
the Historical Society of Fairfax County)
worked with the History Commission to
coordinate and fund the conference.
Chaired and organized by Commissioner Sue
Kovach Shuman and George Oberle, Director
of the Center for Mason Legacies, the
conference featured both traditional
presentations and interactive activities.
Fairfax County Board Chairman Jeff McKay
welcomed attendees.
The morning began with keynote speaker
Dr. Richard Bell, author of The American
Revolution and the Fate of the World.
Commissioner Brian Heintz, with
Commissioner David Meyer and Chair Subhi
Mehdi presented two History Commission
awards. Esther White, founding director of
History Revealed, Inc, was presented with the
Beth Mitchell Award for work creating an
index for the John Glasgow & Company
Top: Commissioner Sue Kovach Shuman co-chaired the
Fairfax County History Conference and led the
Commission’s Conference Committee, a key organizing
body for the 2026 conference.
Bottom: The History Conference was held in the
Government Center for the first time.
Attachment 1
22
Sustained Efforts
16
records. The Edith Sprouse Moore Prize went to Dan Johnson for his biographical study “Amos
Fox’s World.”
A session on “The Big Picture” followed, featuring GMU faculty. Dr. Oberle spoke about slavery
in Fairfax County in the Revolutionary era. Dr. Rosemarie Zagarri discussed politics in
Revolutionary Fairfax, and Dr. Cynthia Kierner presented “Living the Revolution.” History
Commission Chair Subhi Mehdi moderated the session.
Afternoon sessions focused on interactive exhibits and presentations. Three GMU PhD
candidates presented original research on impacts of the Revolution on domestic life and
women’s roles in the Mason family. David Armstrong examined property transfers to women,
Anne Champlin explored the Mason family account books, and Alessandra DelDonna presented
on the life of Ann Eilbeck Mason. The Fairfax County Park Authority presented “Dig
Archaeology,” an interactive guessing game featuring county artifacts.
There was a trivia competition with four high
school students facing off against Fairfax County
School Board members Mateo Dunne and Kyle
McDaniel and a Northern Virginia Community
College (NVCC) student, Stephanie Greene. Marc
Dluger, director of NVCC’s Public History and
Historic Preservation Program, and Fairfax High
School teacher Rishi Agrawal ran the
competition.
Commissioner Anne Barnes invited attendees to
share concept of freedom on a community
poster. Former commissioner Mary Lipsey
presented a program on African American cemeteries. She also created “Live Like a Colonial,”
an interactive program where participants could make a toy, explore jobs of the past, and learn
slang terms. County staff, Stephanie Newman and Laura Kviklys, showcased projects from the
Department of Planning and Development, Heritage Resources Branch.
Dr. Krystyn Moon of the University of Mary Washington led an interactive research and
mapping workshop on using land records to reveal racially restricted covenants. Members of
Gunston Hall’s Descendants Advisory Board presented a film on Mason Neck’s free Black
community. The Fairfax Genealogical Society had an interactive session to help participants
explore their own family history. GMU scholars and faculty shared a few tips for using Artificial
Intelligence effectively in historical research.
The work of younger historians was featured in an exhibition of comparing the “then and now”
status of various Fairfax County historic sites. The posters were created by West Springfield
students overseen by Commissioner Brian Heintz. Also included was a poster summarizing the
14 finalist submissions for the Black/African American Historical Marker Project.
Interactive activities at the History Conference.
Attachment 1
23
Sustained Efforts
17
Behind the scenes, the conference relied on the support of History Commissioners Todi Carnes,
Brian Heintz, Carmen Powell, Margo Coleman and former Commissioners Mary Lipsey and
Esther McCullough. Ellen Gipko was a liaison with Fairfax County Public Schools and oversaw
the essential morning coffee break. The Historical Society of Fairfax County donated its 2026
yearbook to presenters, trivia competition participants, and other volunteers who helped.
Portions of the 2026 History Conference are available online.
The Conference Committee was Chaired by Sue Kovach Shuman and had five members.
Awards
History Commission 2025 Awards were announced and presented at the History Conference at
the Fairfax County Government Center Fairfax, Virginia Saturday, April 18, 2026.
2025 Beth Mitchell Prize
This award honors the memory of Beth
Mitchell who conducted valuable
research into the land grants and deeds
of Fairfax County. The Beth Mitchell
Award recognizes research that
consolidates and indexes primary source
materials into a format that can be used
to support further understanding and
interpretation of Fairfax County’s
history.
This year’s recipient, History Revealed,
Inc., is an independent, 501(c)(3) non-
profit, historical research organization,
located in Alexandria, Virgina. The
organization emphasizes individuals and communities whose stories have not been previously
told. History Revealed, Inc., created “John Glassford & Company--Index of Account Holders,
Alexandria and Colchester Stores, 1758-1769.” This is a project that contributes new insight into
life in Fairfax County from both micro and macro perspectives. The information collated covers
eleven critical years in the history of Fairfax County and provides insights into the social and
economic histories of individuals and groups in the County’s colonial era. The Fairfax County
History Commission congratulates History Revealed, Inc., and presents the Beth Mitchell Prize
to Molly Kerr and Esther White, Founding Directors.
2025 Edith Moore Sprouse Prize
The Edith Moore Sprouse Prize is named after a founding member of the Fairfax County History
Commission who authored books and monographs on Fairfax County history and served as a
Esther White, at left, receives the Beth Mitchell Prize from
History Commission Chair, Subhi Medhi.
Attachment 1
24
Sustained Efforts
18
mentor to many researchers. This award recognizes the best, fully documented, short
monographs of ten or more pages dealing with any aspect of Fairfax County history.
The award was presented this year to Dan Johnson who authored a study entitled “Amos Fox’s
World.” Originally published on the Old Bad Road website, this study tells the story of Amos
Fox, a less-than-honorable citizen in Fairfax County’s past. Johnson’s research reminds us that
not everyone can be George Washington. Fox’s life is an interesting tale that spans the County
and the City of Alexandria. This story is a narrative that includes a life that is sometimes
nefarious and sometimes even downright criminal. This tale reminds us that truth comes from
the mosaic of many forgotten lives of the past.
The Awards Committee is Chaired by Brian Heintz and has four members.
Oral History
To commemorate the 250th anniversary of American independence, the Oral History
Committee, in partnership with the 250th Committee, led the creation of a video series to
explore the meaning of the values and ideas of the American Revolution among Fairfax County
residents today. The residents interviewed represent all walks of life in the county. Some are
immigrants or children of immigrants. Others have ancestors who lived here during the
American Revolution. Community activists, artists, coaches, business owners, and a former
politician all generously shared their reflections and stories.
“Revolutionary Voices: The Fairfax Story,”
was produced by Channel 16 under the
leadership of Leonard Orange. The four-part
series examines four themes: “The American
Dream,” “Equality,” “Diversity,” and “A More
Perfect Union.”
The committee is chaired by Sue Kovach
Shuman and has six members.
Inventory of Historic Sites
The committee makes recommendations regarding the expansion and maintenance of the
Fairfax County Inventory of Historic Sites, a catalog of historically significant sites in the county,
established in 1969. There are more than 350 sites on the inventory. It is an honorary
designation and does not impose restrictions or limits as to what an owner can do with his
property. Unfortunately, at least sixty of these sites have been demolished since the creation of
the Inventory and more are threatened (see the Outreach section for a discussion of
threatened sites). During this reporting period, the Inventory Committee worked with the
Heritage Resources Branch to create the Comprehensive Plan Amendment that will incorporate
all sites added to the Inventory since 2018. The committee also reviewed and supported staff
Attachment 1
25
Sustained Efforts
19
recommendations to:
• Revise definitions and records to ensure consistency and accuracy
• Rename several inventory sites to better reflect their current condition
• Recommend sixteen properties for delisting due to a loss of integrity
The Comprehensive Plan Amendment is scheduled to go in front of the Board of Supervisors in
FY 2027.
The Inventory Committee also supported Heritage Resources staff to add historical information
to the Fairfax County GIS map. Users can now click on Inventory locations to see a description,
architectural style and builder (if known), the construction and listing dates, and if the site is
included on Virginia or National registers.
While no additional sites have been added to the Inventory during this reporting period, two
sites have been slated for demolition, Clifton Elementary School (Springfield District) and Dunn
Loring Elementary School (Providence District). Both Inventory Sites are under the purview of
Fairfax County Public Schools. The History Commission is seeking solutions to limit avoidable
demolitions in the future.
The Inventory Committee is Chaired by Tammy Mannarino and has six members.
Historic Markers
In September 2025, the last of the Black African American Experience Project markers was
unveiled at Louise Archer Elementary school. The marker recognized Louise Archer’s work as a
“Champion of Education.” Current students, educators, community leaders and former
students joined together in a joyful celebration of Ms. Archer’s achievements and those of the
communities she served. Archer was nominated for a marker by students at Louise Archer
school, Luther Jackson Middle school, and James Madison High School.
Also in September, the Marker Committee recommended approval for a marker about the First
Baptist Church of Merrifield. The committee also identified locations for two previously
approved markers: the Spring Bank Colored School will be located at the Quander School in the
Spring Bank community; Dolley Madison’s Flight from Washington will be located in McLean
Central Park near Dolley Madison Blvd. Installation of these markers has been delayed by a
backlog of orders with the manufacturer.
On June 6, 2026, the James M. Goins marker was unveiled at the Pinn Community Center. The
ceremony was marked by a community spirit Mr. Goins would have recognized and
appreciated. Descendant William Root Jr. deeply moved the gathered audience with his
recollections of his grandfather. Braddock District Supervisor Rachna Sizemore Heizer,
Attachment 1
26
Sustained Efforts
20
Congressman James Walkinshaw, and History Commission Chair Subhi Mehdi, and others
shared their observations on Mr. Goins’ legacy. The committee wishes to express its
appreciation for the support of Neighborhood and Community Services and special thanks to
Department of Planning and Development Heritage Resources staff member Stephanie
Newman, who located and coordinated with Goins family members, researched James M.
Goins’ life, and wrote the text of the marker.
The Marker Committee is chaired by Cheryl Repetti and has five members.
Top: Alumni and present staff of Louise Archer Elementary School pose in front of the Louise Archer
historical marker.
Above left: The great-grand-daughter of James Goins reads the text of the marker aloud to the
gathered crowd.
Above right: William Root Jr. shares his memories of his grandfather with Representative
Walkinshaw, Supervisor Sizemore Heizer and others in the audience.
Attachment 1
27
Sustained Efforts
21
Resident Curator Program
The Fairfax County History Commission was instrumental in the creation of the Resident
Curator Program in 2014 to preserve publicly owned historic buildings listed on or deemed
eligible for the Inventory of Historic Sites by entering long-term leases with qualified tenants
who agree to rehabilitate and maintain under-utilized historic properties. There are currently
nine properties in the Resident Curator Program. A tenth property, the Barrett House, is a
contributing structure in the District of Columbia Workhouse and Reformatory Historic District
and is under consideration for the program.
Name District Status
Fairfax Arms Mount Vernon Application Process
Dranesville Tavern Dranesville Lease Development
Lahey Lost Valley Hunter Mill Active Curatorship
Ash Grove House Hunter Mill Active Curatorship
Mount Gilead Sully Active Curatorship
Ellmore Farmhouse Hunter Mill Active Curatorship
Clark/Enyedi House Mount Vernon Active Curatorship
Turner Farmhouse Dranesville Active Curatorship
Stempson House Mount Vernon Active Curatorship
Clockwise from top left: Interior of Dranesville Tavern; windows at Lahey Lost Valley; Fairfax Arms
exterior; and stairs at Ash Grove House.
Attachment 1
28
Budget
22
FY 2026 FY 2027 FY 2027 FY 2028
Actual Adopted Budget
Plan
Estimate Request
1 2 3 4
Beginning Balance July 1 $46,822.93 $ - $53,783.29 $33,346.29
Revenues
Fairfax County $21,013.00 $21,013.00 $21,013.00 $21,013.00
Proffers $ -
$ - $ -
Other* $6,000.00 $ - $ -
Total Revenues $7,013.00 $21,013.00 $21,013.00 $21,013.00
Total Available $73,835.93
$74,796.29 $54,353.29
Expenditures
Operating Expenses $20,052.64 $21,013.00 $41,450.00 $45,000.00
Total Expenditure $20,052.64
$41,450.00 $45,000.00
Ending Balance June 30 $53,783.29
$33,346.29 $9,353.29
*The Commission received a grant from Fairfax 250 for the History Conference.
The Commission employs a part-time clerk who prepares the minutes.
An independent audit is not required for the Commission.
Items from Historic Sully Site at Fairfax History Conference.
Attachment 1
29
Membership
23
Meet Our Members – Stewards of Our History
The Fairfax County History Commission is fortunate to be guided by dedicated individuals who
bring a wide range of professional expertise, community service, and passion for preserving our
local history. Our members include educators, public servants, archaeologists, veterans, and
civic leaders who volunteer their time and talents to advance the commission’s mission of
protecting and promoting Fairfax County’s rich history for generations to come.
Commissioner Supervisor District
Subhi Mehdi – Chair Dranesville
Tammy Mannarino – Vice Chair Mount Vernon
Jennifer Macpherson – Secretary Franconia
Sue Kovach Shuman – Treasurer Providence
Michelle Arcari Rose Dranesville
Anne Barnes Mount Vernon
Gretchen Bulova Braddock
Todi Carnes Franconia
Margo Coleman Mason
Brian Heintz Braddock
Holly Irwin Mount Vernon
Jenee Lindner1 Springfield
David Meyer Fairfax City
Carmen Powell Hunter Mill
Cheryl-Ann Repetti Sully
Anne Stuntz Hunter Mill
Jordan Tannenbaum Springfield
Advisory Members
The Commission leverages Advisory Members to preserve institutional knowledge, continue
ongoing projects such as the African American History Inventory, and expand or maintain
subject matter expertise. Advisors are non-voting members appointed by the Commission.
Name Areas of Expertise
Marion Dobbins African American history in Fairfax County; Merrifield, the Pines,
Williamstown, James Lee Center
Phyllis Walker Ford African American History Inventory, African American history in
Fairfax County; Laurel Grove Museum
Mary Lipsey Braddock District history, African American History Inventory;
Cemeteries
Barbara Naef African American History Inventory, Confederate Names Index;
Reston history, FCPA site history
Barbara Peters Perspectives from the Mason District
Philip Wilkerson African American History; George Mason University
1 Term ended December 2025
Attachment 1
30
Membership
24
Front row from left to right: Subhi Mehdi, Anne Barnes, Brian Heintz, Holly Irwin, Tammy Mannarino, Carmen
Powell; Second row from left to right: Russell Brooks2, Cheryl-Ann Repetti, Jordan Tannenbaum, Jennifer
Macpherson, Sue Kovach Shuman, Gretchen Bulova, Anne Stuntz, Todi Carnes.
Not pictured: David Meyer, Michelle Arcari Rose, Margo Coleman
2 Russell Brooks was appointed to the History Commission in July 2026.
Attachment 1
31
Board Agenda Item
October 27, 2026
9:30 a.m.
Board Appointments to Citizen Boards, Authorities, Commissions, and Advisory Groups
ENCLOSED DOCUMENTS:
Attachment 1: Appointments to be heard October 27, 2026
STAFF:
Jill G. Cooper, Clerk for the Board of Supervisors
32
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 1
NOTE: This document is current as of October 14, 2026. The final document – as approved
by the Board of Supervisors - will be included in the final board package that is posted to
the website the day following the meeting.
APPOINTMENTS TO BE HEARD OCTOBER 27, 2026
(ENCOMPASSING VACANCIES PROJECTED THROUGH OCTOBER 31, 2026)
(Unless otherwise noted, members are eligible for reappointment)
ADVISORY SOCIAL SERVICES BOARD
(4-year terms – limited to 2 full terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Ben Zuhl; appointed
12/21 by Foust)
Term exp. 9/25
Resigned
Dranesville District
Representative
Bierman Dranesville
AFFORDABLE DWELLING UNIT ADVISORY BOARD (4-year terms)
Incumbent History Requirement Nominee Supervisor District
Richard N. Rose
(Appointed 7/97-4/01
by Hanley; 9/05-5/09
by Connolly; 6/13-
6/17 by Bulova)
Term exp. 5/21
Builder
(Multi-Family)
Representative
By Any
Supervisor
At-Large
James H. Scanlon
(Appointed 6/93-5/17
by Bulova)
Term exp. 5/21
Engineer/Architect/
Planner #1
Representative
By Any
Supervisor
At-Large
Continued on next page
33
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 2
AFFORDABLE DWELLING UNIT ADVISORY BOARD (4-year terms)
Continued from previous page
Incumbent History Requirement Nominee Supervisor District
Mark Drake
(Appointed 2/09-5/12
by McKay)
Term exp. 5/16
Engineer/Architect/
Planner #2
Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
James Francis Carey;
appointed 5/06 by
Connolly)
Term exp. 5/10
Resigned
Lending Institution
Representative
By Any
Supervisor
At-Large
Francis C. Steinbauer
(Appointed 8/02-5/18
by Hudgins)
Term exp. 5/22
Non-Profit Housing
Representative
By Any
Supervisor
At-Large
AFFORDABLE HOUSING ADVISORY COUNCIL (AHAC) (2-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Jeremy Allen;
appointed 6/23 by
Gross)
Term exp. 6/25
Resigned
Mason District
Representative
Jimenez Mason
34
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 3
AGRICULTURAL AND FORESTAL DISTRICT ADVISORY BOARD
(Serves at the pleasure of the Board)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Mariette Newcomb;
appointed 2/88 by
Richards)
Resigned
Farmer #2
Representative
By Any
Supervisor
At-Large
35
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 4
ALCOHOL SAFETY ACTION PROGRAM LOCAL
POLICY BOARD (ASAP) (3-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Ronald Boggio;
appointed 5/22 by
McKay)
Term exp. 10/23
Resigned
At-Large #1
Representative
By Any
Supervisor
At-Large
Grant J. Nelson
(Appointed 10/95-
5/01 by Hanley; 6/04-
9/07 by Connolly;
6/10-9/19 by Bulova)
Term exp. 6/22
At-Large #2
Representative
By Any
Supervisor
At-Large
Darren Dickens
(Appointed 11/96-
5/01 by Hanley; 6/04-
10/07 by Connolly;
6/10-9/19 by Bulova)
Term exp. 6/22
At-Large #3
Representative
By Any
Supervisor
At-Large
Bill Shuttleworth
(Appointed 6/26 by
Lusk)
Term exp. 10/26
At-Large #5
Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
Linda Perlstein;
appointed 11/22 by
Alcorn)
Term exp. 10/25
Resigned
At-Large #6
Representative
By Any
Supervisor
At-Large
36
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 5
ARCHITECTURAL REVIEW BOARD (3-year terms)
NOTE: Members shall be appointed by the Board as follows: At least two (2) members shall be
certified architects; one member shall be a landscape architect authorized to practice in Virginia;
one member shall be a lawyer with membership in the Virginia Bar; six (6) members shall be
drawn from the ranks of related professional groups such as archaeologists, historians, lawyers,
and real estate brokers.
Incumbent History Requirement Nominee Supervisor District
Christopher Daniel
(Appointed 10/23 by
McKay)
Term exp. 9/26
Architectural
Historian
Representative
By Any
Supervisor
At-Large
Kaye Orr
(Appointed 6/18-9/21
by Gross)
Term exp. 9/24
Related
Professional Group
#1 Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by Ali
A. Sohanghpurwala;
appointed 9/23 by
Smith)
Term exp. 9/24
Resigned
Related
Professional Group
#2 Representative
By Any
Supervisor
At-Large
37
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 6
ATHLETIC COUNCIL (2-year terms)
Incumbent History Requirement Nominee Supervisor District
NEW POSITION
At-Large #2
Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
Marc Fernandes;
appointed 10/20-1/22
by McKay)
Term exp. 12/23
Resigned
Diversity-At-Large
Principal
Representative
By Any
Supervisor
At-Large
Brian Luwis
(Appointed 7/19-6/21
by Foust)
Term exp. 3/23
Dranesville
District Alternate
Representative
Bierman Dranesville
VACANT
(Formerly held by
Hillary Richardson;
appointed 9/20-6/22
by Alcorn)
Term exp. 6/24
Resigned
Women's Sports
Alternate
Representative
By Any
Supervisor
At-Large
38
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 7
BOARD OF BUILDING AND FIRE PREVENTION CODE APPEALS (4-year terms)
NOTE: No official, technical assistant, inspector or other employee of the
Department of Public Works and Environmental Services, Department of Planning and
Development, or Fire and Rescue Department shall serve as a member on this Board.
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Amado Fernandez;
appointed 6/16-2/23
by Smith)
Term exp. 2/27
Resigned
Alternate #3
Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
Michael Sanio;
appointed 2/23 by
Alcorn)
Term exp. 2/27
Resigned
Alternate #4
Representative
By Any
Supervisor
At-Large
CHESAPEAKE BAY PRESERVATION ORDINANCE
EXCEPTION REVIEW COMMITTEE (4-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Anne Kanter;
appointed 9/11-10/18
by Bulova)
Term exp. 9/23
Resigned
At-Large #1
Representative
McKay At-Large
Chairman’s
VACANT
(Formerly held by
David W. Schnare;
appointed 11/10-9/23
by Herrity)
Term exp. 9/27
Resigned
Springfield District
Representative
Herrity Springfield
39
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 8
CHILD CARE ADVISORY COUNCIL (2-year terms)
Incumbent History Requirement Nominee Supervisor District
NEW POSITION
At-Large
Chairman's #2
Representative
McKay At-Large
Chairman’s
NEW POSITION
At-Large
Chairman's #3
Representative
McKay At-Large
Chairman’s
NEW POSITION
At-Large
Chairman's #4
Representative
McKay At-Large
Chairman’s
Valerie Inman
(Appointed 6/25 by
Bierman)
Term exp. 9/26
Dranesville
District
Representative
Bierman Dranesville
VACANT
(Formerly held by
Mercedes Dash;
appointed 10/25 by
Palchik)
Term exp. 9/27
Resigned
Providence
District
Representative
Palchik Providence
CIVIL SERVICE COMMISSION (2-year terms)
NOTE: The Commission shall include at least 3 members who are male, 3 members who are
female, and 3 members who are from a minority group.
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Janice Hill; appointed
12/21 by Gross; 6/24
by Jimenez)
Term exp. 12/25
Deceased
At-Large #9
Representative
By Any
Supervisor
At-Large
40
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 9
COMMISSION FOR WOMEN (3-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Shira Zemel;
appointed 2/26 by
Palchik)
Term exp. 10/26
Resigned
Providence
District
Representative
Palchik Providence
CONTINUUM OF CARE BOARD (CoC) (2-year terms)
Incumbent History Requirement Nominee Supervisor District
NEW POSITION
Dranesville District
Representative
Bierman Dranesville
Ruth Pearson
(Appointed 9/23 by
Smith)
Term exp. 6/25
Sully District
Representative
Smith Sully
CRIMINAL JUSTICE ADVISORY BOARD (CJAB) (3-year terms)
Incumbent History Requirement Nominee Supervisor District
Ricardo E. Coleman
(Appointed 9/16-3/21
by Gross)
Term exp. 3/24
Mason District
Representative
Jimenez Mason
41
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 10
DULLES RAIL TRANSPORTATION IMPROVEMENT
DISTRICT ADVISORY BOARD, PHASE II (4-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Richard Fernicola;
appointed 1/22 by
McKay)
Term exp. 1/24
Resigned
BOS At-Large #6
Representative
By Any
Supervisor
At-Large
ENGINEERING STANDARDS REVIEW COMMITTEE (3-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Maya Huber;
appointed 12/09-1/14
by Confirmation; 5/18
by Bulova)
Term exp. 3/21
Resigned
Citizen #4
Representative
By Any
Supervisor
At-Large
42
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 11
ENVIRONMENTAL COMMISSION (3-year terms)
Incumbent History Requirement Nominee Supervisor District
NEW POSITION At-Large
Chairman's
Representative
McKay At-Large
Chairman's
NEW POSITION
At-Large #1
Representative
By Any
Supervisor
At-Large
NEW POSITION
At-Large #2
Representative
By Any
Supervisor
At-Large
NEW POSITION
At-Large #3
Representative
By Any
Supervisor
At-Large
NEW POSITION
Braddock District
Representative
Sizemore
Heizer
Braddock
NEW POSITION
Dranesville
District
Representative
Bierman Dranesville
NEW POSITION
Franconia District
Representative
R. Dean Costello Lusk Franconia
NEW POSITION
Hunter Mill
District
Representative
Alcorn Hunter Mill
NEW POSITION
Mason District
Representative
Laura Anderko Jimenez
Mason
NEW POSITION
Mount Vernon
District
Representative
Larry Zaragoza Storck Mount
Vernon
NEW POSITION
Providence
District
Representative
Kathryn Alsegaf Palchik Providence
NEW POSITION
Springfield
District
Representative
Herrity Springfield
Continued on next page
43
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 12
ENVIRONMENTAL COMMISSION (3-year terms)
Continued from previous page
Incumbent History Requirement Nominee Supervisor District
NEW POSITION Sully District
Representative
Richard
Weisman
Smith Sully
NEW POSITION College/University
Student
Representative
Confirmed
by the Board
Confirmation
CONFIRMATION NEEDED:
• Ms. Nethra Purushothaman as the Student Representative
44
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 13
FAIRFAX AREA DISABILITY SERVICES BOARD
(3-year terms - limited to 2 full terms)
NOTE: Members may be reappointed after being off the Board for three years. State Code
requires that the membership in the local disabilities board include at least 30 percent
representation by individuals who have physical, visual, or hearing disabilities or their family
members. For this 15-member board, the minimum number for this representation would be five
members.
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Courtney Cezair
Mayers; appointed
6/21 by Foust)
Term exp. 11/24
Resigned
Dranesville District
Representative
Bierman Dranesville
Deborah K. Hammer
(Appointed 3/16-1/20
by Storck)
Term exp. 11/22
Not eligible for
reappointment
Mount Vernon
District
Representative
Storck Mount
Vernon
VACANT
(Formerly held by
Michael Ritter;
appointed 6/22 by
Herrity)
Term exp. 11/24
Resigned
Springfield District
Representative
Herrity Springfield
FAIRFAX COUNTY EMPLOYEES' RETIREMENT
SYSTEM BOARD OF TRUSTEES (4-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Anthony Griffin;
appointed 9/20-10/23
by Gross)
Term exp. 6/27
Resigned
At-Large #2
Representative
By Any
Supervisor
At-Large
45
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 14
HEALTH SYSTEMS AGENCY BOARD (3-year terms - limited to 2 full terms)
NOTE: Members may be reappointed after a 1-year break
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Cody J. Hennelly;
appointed 3/25 by
Lusk)
Term exp. 6/27
Resigned
Consumer #3
Representative
By Any
Supervisor
At-Large
Maria Zlotnik
(Appointed 9/22 by
McKay)
Term exp. 6/25
Consumer #4
Representative
By Any
Supervisor
At-Large
Lydia Lawrence
(Appointed 2/22 by
Foust)
Term exp. 6/24
Consumer #5
Representative
By Any
Supervisor
At-Large
Bridget Jennison
(Appointed 5/22 by
Walkinshaw)
Term exp. 6/24
Provider #1
Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
Maria Zlotnick;
appointed 6/20 by
Alcorn)
Term exp. 6/25
Resigned
Provider #4
Representative
By Any
Supervisor
At-Large
46
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 15
HISTORY COMMISSION (3-year terms)
NOTE: The Commission shall include at least one member who is a resident from each District.
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Joseph Imamura;
appointed 7/23 by
McKay)
Term exp. 12/24
Resigned
Architect
Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
Jenee Lindner;
appointed 12/21-1/25
by Herrity)
Term exp. 12/27
Resigned
Citizen #4
Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
Lynne Garvey-Hodge;
appointed 12/21 by
Gross)
Term exp. 12/24
Resigned
Historian #1
Representative
By Any
Supervisor
At-Large
47
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 16
HUMAN RIGHTS COMMISSION (3-year terms)
Incumbent History Requirement Nominee Supervisor District
Gloria Crawford
(Appointed 10/23 by
Alcorn)
Term exp. 9/26
At-Large #2
Representative
By Any
Supervisor
At-Large
Adnan Bokhari
(Appointed 5/23 by
McKay)
Term exp. 9/26
At-Large #9
Representative
By Any
Supervisor
At-Large
Shahid Malik
(Appointed 1/24 by
McKay)
Term exp. 9/26
At-Large #11
Representative
By Any
Supervisor
At-Large
Julia Boone
(Appointed 9/25 by
Alcorn)
Term exp. 9/26
At-Large #12
Representative
By Any
Supervisor
At-Large
48
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 17
HUMAN SERVICES COUNCIL (4-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Paul Thomas:
appointed 8/22 by
Alcorn)
Term exp. 7/26
Resigned
Hunter Mill
District #1
Representative
Alcorn Hunter Mill
VACANT
(Formerly held by
Edward Yost
appointed 3/23 by
Smith)
Term exp. 7/27
Resigned
Sully District #2
Representative
Smith Sully
INDUSTRIAL DEVELOPMENT AUTHORITY (4-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Christopher Glaser;
appointed 11/21 by
Alcorn)
Term exp. 10/25
Resigned
At-Large #4
Representative
By Any
Supervisor
At-Large
49
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 18
INFORMATION TECHNOLOGY POLICY
ADVISORY COMMITTEE (ITPAC) (3-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Richard Kostro;
appointed 12/25 by
Storck)
Term exp. 12/28
Resigned
Mount Vernon
District
Representative
Storck Mount
Vernon
VACANT
(Formerly held by
Dennis Carlton;
appointed 11/25 by
Smith)
Term exp. 12/28
Resigned
Sully District
Representative
Smith Sully
JUVENILE AND DOMESTIC RELATIONS DISTRICT COURT
CITIZENS ADVISORY COUNCIL (2-year terms)
Incumbent History Requirement Nominee Supervisor District
Crystopher Herrera
(Appointed 2/22 by
Foust)
Term exp. 1/24
Dranesville District
Representative
Bierman Dranesville
50
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 19
PARK AUTHORITY (4-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Johna Toomey;
appointed 1/24 by
McKay)
Term exp. 12/27
Resigned
At-Large #1
Representative
By Any
Supervisor
At-Large
POLICE OFFICERS RETIREMENT SYSTEM BOARD OF TRUSTEES (4-year terms)
Incumbent History Requirement Nominee Supervisor District
Jay Jupiter
(Appointed 2/17-3/22
by Storck)
Term exp. 12/25
Citizen At-Large #1
Representative
By Any
Supervisor
At-Large
51
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 20
RESTON TRANSPORTATION SERVICE DISTRICT
ADVISORY BOARD (4-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Angela E. Roberts;
appointed 9/21 by
Alcorn)
Term exp. 9/25
Resigned
Apartment or
Rental Owner
Associations
Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
Margaret Parker;
appointed 10/1 by
Alcorn)
Term exp. 9/25
Resigned
Commercial or
Retail Ownership
#1 Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
Peter Henry;
appointed 9/21 by
Alcorn)
Term exp. 9/25
Resigned
Commercial or
Retail Ownership
#3 Representative
By Any
Supervisor
At-Large
Michael
Shindledecker
(Appointed 9/21 by
Foust)
Term exp. 9/25
Dranesville District
Representative
Bierman Dranesville
VACANT
(Formerly held by
Stephanie Weber:
appointed 8/22 by
Alcorn)
Term exp. 9/25
Resigned
Residential
Owners/HOA/Civic
Association #3
Representative
By Any
Supervisor
At-Large
52
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 21
TRAILS, SIDEWALKS AND BIKEWAYS COMMITTEE (2-year terms)
Incumbent History Requirement Nominee Supervisor District
Lydia Lawrence
(Appointed 9/24 by
Bierman)
Term exp. 1/26
Dranesville District
Representative
Bierman Dranesville
VACANT
(Formerly held by
Henry Bankester;
appointed 1/26 by
Jimenez)
Term exp. 1/28
Resigned
Mason District
Representative
Jimenez Mason
TRANSPORTATION ADVISORY COMMISSION (2-year terms)
Incumbent History Requirement Nominee Supervisor District
Michael Champness
(Appointed 9/13-9/24
by Foust)
Term exp. 6/26
Dranesville District
Representative
Bierman Dranesville
Keith Foxx
(Appointed 2/24 by
Lusk)
Term exp. 6/26
Franconia District
Representative
Lusk Franconia
53
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 22
TRESPASS TOWING ADVISORY BOARD (3-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held
Denver Supinger;
appointed 9/24 by
McKay)
Term exp. 9/27
Resigned
Citizen Alternate
Representative
By Any
Supervisor
At-Large
Ashley Miller
(Appointed 6/26 by
McKay)
Term exp. 9/26
Towing #1
Representative
By Any
Supervisor
At-Large
Alvin Leach
(Appointed 10/10-
11/22 by Foust)
Term exp. 9/25
Towing #2
Representative
By Any
Supervisor
At-Large
54
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 23
WETLANDS BOARD (5-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Kimberly Larkin;
appointed 12/22 by
Storck)
Term exp. 12/27
Resigned
At-Large #1
Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
Bert Cramer;
appointed 1/21-12/21
by Storck)
Term exp. 12/26
Resigned
Mount Vernon
District #2
Representative
Storck Mount
Vernon
VACANT
(Formerly held by
John Collins;
appointed 1/22-12/24
by Storck)
Term exp. 12/29
Resigned
Mount Vernon
District #3
Representative
Storck Mount
Vernon
YOUNG ADULTS ADVISORY COUNCIL
(2-year terms - limited to 2 full terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Timothy Klein;
appointed 7/25 by
Lusk)
Term exp. 1/26
Resigned
Franconia District
Representative
Lusk Franconia
Continued on next page
55
ATTACHMENT 1
October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 24
YOUNG ADULTS ADVISORY COUNCIL
(2-year terms - limited to 2 full terms)
Continued from previous page
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Daniel Morgan;
appointed 2/26 by
Jimenez)
Term exp. 1/28
Resigned
Mason District
Representative
Jimenez Mason
Zafar Mahnoor
(Appointed 1/24 by
Storck)
Term exp. 1/26
Not eligible for
reappointment
Mount Vernon
District
Representative
Storck Mount
Vernon
Neel Daugherty-
Shrivastava
(Appointed 3/24 by
Palchik)
Term exp. 1/26
Providence District
Representative
Palchik Providence
Samuel Niner
(Appointed 1/22-1/24
by Herrity)
Term exp. 1/26
Not eligible for
reappointment
Springfield District
Representative
Herrity Springfield
VACANT
(Formerly held by
Eddy Sandoval;
appointed 9/21 by
Smith)
Term exp. 1/24
Resigned
Sully District
Representative
Smith Sully
56
Board Agenda Item
October 27, 2026
10:00 a.m.
Matters Presented by Board Members
57
Board Agenda Item
October 27, 2026
10:00 a.m.
Items Presented by the County Executive
58
Board Agenda Item
October 27, 2026
ADMINISTRATIVE – 1
Authorization to Advertise a Public Hearing on Proposed Ordinance to Amend the Code
of the County of Fairfax, Chapter 3, County Employees, Article 5, Financial Disclosures,
Section 3-5-2.1
ISSUE:
Authorization to advertise a public hearing to consider an ordinance to amend The Code
of the County of Fairfax, Chapter 3, County Employees, Article 5, Financial Disclosures,
Section 3-5-2.1
RECOMMENDATION:
The County Executive recommends that the Board authorize the advertisement of a
public hearing for December 8, 2026, at 4:30 p.m., to consider adoption of this
ordinance.
TIMING:
Board action is requested on October 27, 2026, to provide sufficient time to advertise a
December 8, 2026, at 4:30 p.m., public hearing on the proposed ordinance. The
amendment will be effective January 1, 2027.
BACKGROUND:
Va. Code § 2.2-3115 authorizes the Board of Supervisors to require certain employees
and appointees to complete an annual financial disclosure form. The Board
implemented this authority in Chapter 3, Article 5 of The Code of the County of Fairfax,
which sets forth the employees and appointees that are designated to file.
Historically, Va. Code § 2.2-3115 required such employees and appointees to file the
financial disclosure form with the Clerk to the Board of Supervisors. However, Chapter
504 of the 2026 Acts of Assembly amended Va. Code § 2.2-3115 as well as other
statutes relating to the filing of financial disclosures. In accordance with the 2026
amendments, the designated employees and appointees are required to file the
financial disclosure statements electronically with the Virginia Conflict of Interest and
Ethics Advisory Council (Council) in 2028 and they have the option to file electronically
with the Council in 2027.
59
Board Agenda Item
October 27, 2026
The proposed amendments to Section 3-5-2.1 bring the County Code in line with the
new State requirements and make additional housekeeping edits.
EQUITY IMPACT:
None.
FISCAL IMPACT:
None.
ENCLOSED DOCUMENTS:
Attachment 1: Proposed Ordinance to Amend The Code of the County of Fairfax,
Chapter 3, County Employees, Article 5, Financial Disclosures, Section 3-5-2.1 (with
amendment tracked)
STAFF:
Ellicia Seard-McCormick, Deputy County Executive
Christina Peterson, Director, Department of Human Resources
ASSIGNED COUNSEL:
Daniel Robinson, Deputy County Attorney
60
AN ORDINANCE AMENDING 1
ARTICLE 5 OF CHAPTER 3 OF THE FAIRFAX COUNTY CODE, RELATING TO 2
FILING OF FINANCIAL DISCLOSURES 3
4
Draft of September 23, 2026 5
6
AN ORDINANCE to amend the Fairfax County Code by amending and 7
readopting Section 3-5-2.1, relating to Filing of Financial Disclosures. 8
9
Be it ordained by the Board of Supervisors of Fairfax County: 10
11
1. That Section 3-5-2.1 of the Fairfax County Code is amended and readopted as 12
follows: 13
14
CHAPTER 3 – County Employees. 15
16
Article 5. – Financial Disclosures. 17
18
Section 3-5-2.1. Disclosures of Financial Interest. 19
(a) As a condition to assuming or holding office or employment, members appointed by the 20
Board of Supervisors to the following entities shall file a disclosure statement of their personal 21
interests and other information as is specified in the form or forms identified in Virginia Code 22
§§ 2.2-3115 and 2.2-3117 at such times and for such periods as is required by state law: (1) the 23
Planning Commission, (2) the Board of Zoning Appeals, (3) the Fairfax County Economic 24
Development Authority, (4) the Fairfax County Industrial Development Authority, (5) the 25
Fairfax County Library Board, (6) the Fairfax County Employees' Retirement System Board of 26
Trustees, (7) the Fairfax County Police Officers Retirement System Board of Trustees, (8) the 27
Fairfax County Uniformed Retirement System Board of Trustees, (9) the Fairfax County Park 28
Authority, (10) the Fairfax County Redevelopment and Housing Authority, (11) the Fairfax 29
County Water Authority, (12) the Mosaic District Community Development Authority, (13) 30
the Fairfax County Wetlands Board, and (14) the Upper Occoquan Sewage Authority. 31
No person described in this subsection shall enter office and participate or vote as a member 32
of any board, authority, or commission until a completed disclosure form, as required by this 33
subsection, has been filed in accordance with Virginia Code § 2.2-3115.. For purposes of this 34
subsection, the word "appointment" shall include any person who is appointed directly by the 35
Board of Supervisors or any person whose appointment is confirmed after being elected, 36
nominated, or recommended by any community group or group of employees for any of the 37
boards, authorities, and commissions listed above. 38
(b) As a condition to assuming or holding office or employment, the following persons shall 39
file a disclosure statement of their personal interests and other information as is specified on 40
the form or forms identified in Virginia Code §§ 2.2-3115 and 2.2-3117 at such times and for 41
such periods as is required by state law: the County Executive, all Deputy County Executives, 42
the County Attorney and all deputy, senior assistant, and assistant county attorneys, all County 43
Commented [JA1]: Removed italics for Virginia Code
throughout document.
Deleted: with the Clerk for the Board of Supervisors44
Deleted: Virginia Code 45
Attachment 1
61
Department heads, and County employees who hold positions classified at or above the 46
following pay grades: A -1, M-1, S-33, P-27, F-29, and 0-28, except psychiatrists who are 47
employed as such by the Fairfax -Falls Church Community Services Board. 48
(c) As a condition to assuming or holding employment, the following employees also shall file 49
a disclosure statement of their personal interests and other information as is specified on the 50
form or forms identified in Virginia Code §§ 2.2-3115 and 2.2-3117 at such times and for such 51
periods as is required by state law: 52
(1) Health Department: Public Health Laboratory Director. 53
(2) Department of Finance: The Insurance Manager. 54
(3) Department of Transportation: All Transportation Planners V; all Engineers V. 55
(4) Retirement Administration Agency: All Senior Investment Managers. 56
(d) The individuals listed in subsections (a), (b) and (c) shall file a completed disclosure 57
form, as required by subsections (a), (b) and (c), in accordance with Virginia Code § 2.2 -3115 58
on or before the day such office or position of employment is assumed. 59
(e) The County Executive is hereby authorized and directed to issue procedural memoranda 60
governing the administration of the filing of the Statement of Economic Interests forms 61
identified in Virginia Code § 2.2-3117, the financial disclosure forms identified in Virginia 62
Code § 2.2-3118, and the real estate disclosure forms required under Virginia Code § 2.2-63
3115(G). The procedural memoranda shall address the filing of such forms by any individual 64
required to file by this Article, by designation by the Board of Supervisors or by state law. 65
2. That the provisions of this ordinance are severable, and if any provision of this 66
ordinance or any application thereof is held invalid, that invalidity will not affect the other 67
provisions or applications of this ordinance that can be given effect without the invalid 68
provision or application. 69
70
3. That this Ordinance will become effective on January 1, 2027. 71
72
73
GIVEN under my hand this ______ day of ______, 2026 74
75
_____________________________________ 76
77
Jill G. Cooper 78
Clerk to the Board of Supervisors 79
Deleted: 80
Deleted: Virginia Code 81
Deleted: with the Clerk for the Board of Supervisors 82
Deleted: Virginia Code 83
Deleted: Virginia Code 84
Deleted: Virginia Code 85
Attachment 1
62
Board Agenda Item
October 27, 2026
ADMINISTRATIVE – 2
Authorization to Advertise a Public Hearing to Consider an Ordinance to Amend and
Readopt Fairfax County Code Sections 7-2-5, 7-2-6, and 7-2-13, to Divide and Create
Precincts in Hunter Mill and Dranesville Districts; Move Polling Places in Mason and
Providence Districts; and Adjust Precinct Boundaries in Hunter Mill, Providence, and
Sully Districts (Hunter Mill, Dranesville, Mason, Providence, and Sully Districts)
ISSUE:
Authorization to advertise a public hearing to consider an ordinance that proposes to
amend and readopt Fairfax County Code Sections 7-2-5, 7-2-6, and 7-2-13 to divide
Cameron Glen precinct and adjust the boundary of Reston #1 precinct to create a new
precinct, Reston #4, in Hunter Mill District; divide Coates precinct to create a new
precinct, Coppermine, in Dranesville District; move the polling places for Skyline and
Holmes precincts in Mason District; move the polling place for Tysons precinct in
Providence District; adjust precinct boundaries between Tysons and Jones Branch
precincts in Providence District; and adjust the precinct boundaries between Green Trails
and Old Mill precincts in Sully District.
RECOMMENDATION:
The County Executive recommends that the Board authorize the advertisement of a
public hearing on Tuesday, December 8, 2026, at 4:30 p.m. to consider this ordinance.
TIMING:
Board action is requested on October 27, 2026, to provide sufficient time to advertise
the proposed public hearing for adoption of this ordinance on December 8, 2026, at
4:30 p.m.
BACKGROUND:
The Virginia Code permits the governing body of each county and city to establish by
ordinance as many precincts as it deems necessary with one polling place for each
precinct. The Board of Supervisors is authorized to change polling place locations
subject to the requirements of Virginia Code §§ 24.2-307, -310, and -310.1.
Virginia Code § 24.2-129 also requires that certain “covered practices” go through either
a statutorily specified public comment process or receive a Certification of No Objection
from the Attorney General before the practices can be given effect. The public
comment process takes a minimum of 75 days to complete, while the Attorney General
63
Board Agenda Item
October 27, 2026
process takes a maximum of 60 days to complete. Among the “covered practices”
identified are any changes that adjust precinct boundaries or relocate polling places in
the County. The Board must first adopt an ordinance making the boundary and polling
place changes. If and after the Board adopts the ordinance, the County Attorney will file
a request for a Certification of No Objection with the Virginia Attorney General, in
accordance with Virginia Code § 24.2-129(D).
In Hunter Mill District, staff recommend dividing Cameron Glen precinct and adjusting
the boundary of Reston #1 precinct, both of which currently have over 5,400 registered
voters. This proposal will create a new precinct to be named “Reston #4,” and its
polling place will be established at the Reston Teen Center located at 12196 Sunset
Hills Road, Reston. The new precinct is expected to have 2,449 voters, reducing the
size of Cameron Glen precinct by 2,021 voters, and Reston #1 precinct by 428 voters.
The polling place for Cameron Glen voters will remain at the North County Human
Services Building. The polling place for Reston #1 voters will remain at Lake Anne
Elementary School.
In Dranesville District, staff recommend dividing Coates precinct which currently has over
7,500 voters. This proposal will create a new precinct to be named “Coppermine,” and its
polling place will be established at the Floris United Methodist Church, 13600 Frying Pan
Road, Herndon. The new precinct will reduce the size of Coates precinct by
approximately 2,200 voters. The polling place for Coates voters will remain at Coates
Elementary School.
In Mason District, staff recommend moving the polling place for Skyline precinct from
Minnie H. Peyton Community Center at Bailey’s, 5920 Summers Lane, Falls Church, to
Arlington Moose Lodge #1315, 5710 Scoville Street, Falls Church, to provide voters in
Skyline precinct a polling place more proximate to the precinct boundaries. This
change will remove one of the co-located precincts from the Minnie H. Peyton
Community Center at Bailey’s, thus relieving parking congestion, and providing more
flexibility at the center for choosing a voting room location. Also, in Mason District, with
the anticipated completion of HVAC repair in early 2027, staff recommend returning the
polling place for Holmes precinct from Bailey’s Elementary School, 6111 Knollwood
Drive, Falls Church, to the Culmore Community Library, 6101 Knollwood Drive, Falls
Church.
In Providence District, staff recommend adjusting the boundaries of Tysons and Jones
Branch precinct to move approximately 460 voters from Tysons to Jones Branch
precinct because they live within walking distance of the Providence Committee Meeting
Room, the polling place for Jones Branch precinct. Additionally, staff recommend
moving the polling place for Tysons precinct currently located at The PARC at Tysons,
8508 Leesburg Pike, Vienna, to Boro Station, 1775 Greensboro Station Place, McLean.
The PARC at Tysons has closed and therefore will no longer be available for voting.
64
Board Agenda Item
October 27, 2026
In Sully District, staff recommend adjusting the precinct boundary between Green Trails
and Old Mill precincts to move 27 voters from Green Trails precinct to Old Mill precinct.
This small section of Green Trails precinct was created after the decennial redistricting
in 2010. Relocating these 27 voters to Old Mill is expected to improve accessibility
because these voters live closer to the Old Mill polling place, Centreville United
Methodist Church, than to the Green Trails polling place, Centreville Elementary School.
Additionally, the widening of Sully Road (Route 28) to six lanes and the installation of
sound barrier walls that now impede access to Centreville Elementary School for these
voters.
EQUITY IMPACT:
None.
FISCAL IMPACT:
Each new precinct is estimated to have a one-time cost of $29,653 and annual recurring
costs of $9,224, resulting in a first-year total of $38,877 per precinct, or $77,754 for the
two new precincts.
ENCLOSED DOCUMENTS:
Attachment 1: Virginia Code Pertaining to Election Precincts and Polling Places
Attachment 2: Summary of Proposed Precinct and Polling Place Changes
Attachment 3: Descriptions and Maps of Proposed Precinct and Polling Place Changes
Attachment 4: Proposed Ordinance
STAFF:
Ellicia Seard-McCormick, Deputy County Executive
Katherine K. Hanley, Chairman of the Fairfax County Electoral Board
Beth Dixon Methfessel, Clerk to the Fairfax County Electoral Board
ASSIGNED COUNSEL:
Martin R. Desjardins, Assistant County Attorney
65
Attachment 1
1
§ 24.2-129. Covered practices; actions required prior to enactment or administration.
A. For the purposes of this section:
"Certification of no objection" means a certification issued by the Attorney General that there is
no objection to the enactment or administration of a covered practice by a locality because the
covered practice neither has the purpose or effect of denying or abridging the right to vote
based on race or color or membership in a language minority group nor will result in the
retrogression in the position of members of a racial or ethnic group with respect to their effective
exercise of the electoral franchise.
"Covered practice" means:
1. Any change to the method of election of members of a governing body or an elected school
board by adding seats elected at large or by converting one or more seats elected from a single-
member district to one or more at-large seats or seats from a multi-member district;
2. Any change, or series of changes within a 12-month period, to the boundaries of the locality
that reduces by more than five percentage points the proportion of the locality's voting age
population that is composed of members of a single racial or language minority group, as
determined by the most recent American Community Survey data;
3. Any change to the boundaries of election districts or wards in the locality, including changes
made pursuant to a decennial redistricting measure;
4. Any change that restricts the ability of any person to provide interpreter services to voters in
any language other than English or that limits or impairs the creation or distribution of voting or
election materials in any language other than English; or
5. Any change that reduces the number of or consolidates or relocates polling places in the
locality, except where permitted by law in the event of an emergency.
"Voting age population" means the resident population of persons who are 18 years of age or
older, as determined by the most recent American Community Survey data available at the time
any change to a covered practice is published pursuant to subsection B.
B. Prior to enacting or seeking to administer any voting qualification or prerequisite to voting, or
any standard, practice, or procedure with respect to voting, that is a covered practice, the
governing body shall cause to be published on the official website for the locality the proposed
covered practice and general notice of opportunity for public comment on the proposed covered
practice. The governing body shall also publicize the notice through press releases and such
other media as will best serve the purpose and subject involved. Such notice shall be made at
least 45 days in advance of the last date prescribed in the notice for public comment.
Public comment shall be accepted for a period of no fewer than 30 days. During this period, the
governing body shall afford interested persons an opportunity to submit data, views, and
arguments in writing by mail, fax, or email, or through an online public comment forum on the
official website for the locality if one has been established. The governing body shall conduct at
least one public hearing during this period to receive public comment on the proposed covered
practice.
The governing body may make changes to the proposed covered practice in response to public
comment received. If doing so, the revised covered practice shall be published and public
66
Attachment 1
2
comment shall be accepted in accordance with this subsection, except the public comment
period shall be no fewer than 15 days.
C. Following the public comment period or periods prescribed in subsection B, the governing
body shall publish the final covered practice, which shall include a plain English description of
the practice and the text of an ordinance giving effect to the practice, maps of proposed
boundary changes, or other relevant materials, and notice that the covered practice will take
effect in 30 days. During this 30-day waiting period, any person who will be subject to or
affected by the covered practice, or any organization whose membership includes persons who
will be subject to or affected by the covered practice, may challenge in the circuit court of the
locality where the covered practice is to be implemented the covered practice as (i) having the
purpose or effect of denying or abridging the right to vote on the basis of race or color or
membership in a language minority group or (ii) resulting in the retrogression in the position of
members of a racial or ethnic group with respect to their effective exercise of the electoral
franchise. In such action, the court may, in its discretion, allow a private plaintiff a reasonable
attorney fee as part of the costs, if such plaintiff is the prevailing party.
D. The governing body of a locality seeking to administer or implement a covered practice, in
lieu of following the provisions of subsections B and C, may submit the proposed covered
practice to the Office of the Attorney General for issuance of a certification of no objection. Such
practice shall not be given effect until the Attorney General has issued such certification. A
certification of no objection shall be deemed to have been issued if the Attorney General does
not interpose an objection within 60 days of the governing body's submission or if, upon good
cause shown and to facilitate an expedited approval within 60 days of the governing body's
submission, the Attorney General has affirmatively indicated that no such objection will be
made. An affirmative indication by the Attorney General that no objection will be made or the
absence of an objection to the covered practice by the Attorney General shall not bar a
subsequent action to enjoin enforcement of such qualification, prerequisite, standard, practice,
or procedure.
2021, Sp. Sess. I, cc. 528, 533; 2026, c. 717.
§ 24.2-307 (in part). Requirements for county and city precincts.
The governing body of each county and city shall establish by ordinance as many precincts as it
deems necessary. Each governing body is authorized to increase or decrease the number of
precincts and alter precinct boundaries subject to the requirements of this chapter.
At the time any precinct is established, it shall have no more than 5,000 registered voters. The
general registrar shall notify the governing body whenever the number of voters who voted in a
precinct in an election for President of the United States exceeds 4,000. Within six months of
receiving the notice, the governing body shall proceed to revise the precinct boundaries, and
any newly established or redrawn precinct shall have no more than 5,000 registered voters.
At the time any precinct is established, each precinct in a county shall have no fewer than 100
registered voters and each precinct in a city shall have no fewer than 500 registered voters.
Each precinct shall be wholly contained within a single congressional district, Senate district,
House of Delegates district, and election district used for the election of one or more members
of the governing body or school board for the county or city.
The governing body shall establish by ordinance one polling place for each precinct.
67
Attachment 1
3
Code 1950, §§ 24-45, 24-46; 1954, c. 375; 1956, c. 378; 1962, cc. 185, 536; 1970, c. 462, §§
24.1-36, 24.1-37; 1971, Ex. Sess., c. 119; 1976, c. 616; 1977, c. 30; 1978, c. 778; 1980, c. 639;
1992, c. 445; 1993, c. 641; 1999, c. 515; 2020, c. 1268.
§ 24.2-310. Requirements for polling places.
A. The polling place for each precinct shall be located within the county or city and either within
the precinct or within one mile of the precinct boundary, unless a waiver has been granted
pursuant to subsection G. The polling place for a county precinct may be located within a city (i)
if the city is wholly contained within the county election district served by the precinct or (ii) if the
city is wholly contained within the county and the polling place is located on property owned by
the county. The polling place for a town precinct may be located within one mile of the precinct
and town boundary. For town elections held in November, the town shall use the polling places
established by the county for its elections.
B. The governing body of each county, city, and town shall provide funds to enable the general
registrar to provide adequate facilities at each polling place for the conduct of elections. Each
polling place shall be located in a public building whenever practicable. If more than one polling
place is located in the same building, each polling place shall be located in a separate room or
separate and defined space.
C. Polling places shall be accessible to qualified voters as required by the provisions of the
Virginians with Disabilities Act (§ 51.5-1 et seq.), the Voting Accessibility for the Elderly and
Handicapped Act (52 U.S.C. § 20101 et seq.), and the Americans with Disabilities Act relating to
public services (42 U.S.C. § 12131 et seq.). The State Board shall provide instructions to the
local electoral boards and general registrars to assist the localities in complying with the
requirements of the Acts.
D. If an emergency makes a polling place unusable or inaccessible, the electoral board or the
general registrar shall provide an alternative polling place and give notice of the change in
polling place, including to all candidates, or such candidate's campaign, appearing on the ballot
to be voted at the alternative polling place, subject to the prior approval of the State Board. The
general registrar shall provide notice to the voters appropriate to the circumstances of the
emergency. For the purposes of this subsection, an "emergency" means a rare and unforeseen
combination of circumstances, or the resulting state, that calls for immediate action.
E. It shall be permissible to distribute campaign and referendum materials on the election day
on the property on which a polling place is located and outside of the building containing the
room where the election is conducted except as specifically prohibited by law including, without
limitation, the prohibitions of § 24.2-604 and the establishment of the "Prohibited Area" within 40
feet of any entrance to the polling place. However, and notwithstanding the provisions of clause
(i) of subsection A of § 24.2-604, and upon the approval of the local electoral board, campaign
and referendum materials may be distributed outside the polling place and inside the structure
where the election is conducted, provided that the "Prohibited Area" (i) includes the area within
the structure that is beyond 40 feet of any entrance to the polling place and the area within the
structure that is within 40 feet of any entrance to the room where the election is conducted and
(ii) is maintained and enforced as provided in § 24.2-604. The local electoral board may approve
campaigning activities inside the building where the election is conducted when an entrance to
the building is from an adjoining building, or if establishing the 40-foot prohibited area outside
the polling place would hinder or delay a qualified voter from entering or leaving the building.
68
Attachment 1
4
F. Any local government, local electoral board, or the State Board may make monetary grants to
any non-governmental entity furnishing facilities under the provisions of § 24.2-307 or 24.2-308
for use as a polling place. Such grants shall be made for the sole purpose of meeting the
accessibility requirements of this section. Nothing in this subsection shall be construed to
obligate any local government, local electoral board, or the State Board to appropriate funds to
any non-governmental entity.
G. The general registrar or the governing body of the locality may request from the Department
of Elections a waiver to establish a polling place that does not meet the location requirements of
subsection A in the event that there is no suitable building that could be used within the precinct
or within one mile of the precinct boundary. The Department shall grant such a waiver and may
impose any conditions on the waiver that it deems necessary or appropriate to ensure
accessibility and security of the polling place and compliance with any other requirements of
state or federal law.
Code 1950, §§ 24-45, 24-46, 24-171, 24-179 through 24-181; 1954, c. 375; 1956, c. 378; 1962,
cc. 185, 536; 1970, c. 462, §§ 24.1-36, 24.1-37, 24.1-92, 24.1-97; 1971, Ex. Sess., c. 119;
1976, c. 616; 1977, c. 30; 1978, c. 778; 1980, c. 639; 1981, c. 425; 1984, c. 217; 1985, c. 197;
1986, c. 558; 1992, c. 445; 1993, cc. 546, 641; 1994, c. 307; 2003, c. 1015; 2004, c. 25; 2005,
c. 340; 2008, cc. 113, 394; 2010, cc. 639, 707; 2012, cc. 488, 759; 2016, cc. 18, 492; 2022, c. 5;
2025, c. 584.
§ 24.2-310.1. Polling places; additional requirement.
The requirement stated in this section shall be in addition to requirements stated in §§ 24.2-307,
24.2-308, and 24.2-310, including the requirement that polling places be located in public
buildings whenever practical. No polling place shall be located in a building which serves
primarily as the headquarters, office, or assembly building for any private organization, other
than an organization of a civic, educational, religious, charitable, historical, patriotic, cultural, or
similar nature, unless the State Board has approved the use of the building because no other
building meeting the accessibility requirements of this title is available.
1993, c. 904, § 24.1-37.1; 1993, c. 641.
69
Attachment 2
* VERIS registered voters as of 09/14/2026 - Reports Library_Statistics_Registrant_Counts_By_Locality
DECEMBER 2026 SUMMARY OF PRECINCT AND POLLING PLACE CHANGES
SUPERVISOR
DISTRICT
OLD
PRECINCT(S)
REGISTERED
VOTERS*
OLD
POLLING PLACE(S)
NEW
PRECINCT(S)
PROJECTED
REGISTERED
VOTERS
NEW
POLLING PLACE(S)
NOTES ON
CHANGES
HUNTER MILL 238 Cameron Glen
208 Reston #1
5,484
5,445
North County Human Services
Building
Lake Anne Elementary School
238 Cameron Glen
208 Reston #1
246 Reston #4
3,463
5,017
2,449
North County Human Services
Building
Lake Anne Elementary School
Reston Teen Center
Divide Cameron Glen precinct
and adjust boundary with Reston
#1 precinct to create Reston #4
precinct.
DRANESVILLE 332 Coates 7,571 Coates Elementary School 332 Coates
333 Coppermine
5,366
2,205
Coates Elementary School
Floris United Methodist Church
Divide Coates precinct to create
Coppermine precinct
MASON 520 Skyline 3,391 Minnie H. Peyton Community
Center at Bailey’s 520 Skyline 3,391 Arlington Moose Lodge #1315
Move Skyline polling place to
eliminate co-located precincts at
Minnie Peyton CC
MASON 506 Holmes 887 Bailey’s Elementary School 506 Holmes 887 Culmore Community Library Move polling place back to library
since HVAC repair is complete.
PROVIDENCE 738 Jones Branch
731 Tysons
2,898
3,750
Providence Committee Meeting
Room
The PARC
738 Jones Branch
731 Tysons
3,362
3,286
Providence Committee Meeting
Room
Boro Station
Readjust Tysons and Jones
Branch precinct boundaries;
move polling place for Tysons
precinct
SULLY 925 Old Mill
919 Green Trails
2,107
5,025
Centreville United Methodist
Church
Centreville Elementary School
925 Old Mill
919 Green Trails
2,134
4,998
Centreville United Methodist
Church
Centreville Elementary School
A boundary adjustment to move a
small section of Green Trails
precinct (27 voters) into Old Mill
precinct to provide voters with a
more accessible polling place
70
Attachment 3
208 RESTON #1 / December 2026
Commonwealth of Virginia
COUNTY OF FAIRFAX
HUNTER MILL District
PRECINCT: 208 RESTON #1
CONGRESSIONAL DISTRICT: 11
VIRGINIA SENATORIAL DISTRICT: 38
HOUSE OF DELEGATES DISTRICT: 7
DESCRIPTION:
Beginning at the intersection of Reston Parkway and Baron Cameron Avenue, thence with Baron
Cameron Avenue in a northeasterly direction to its intersection with Village Road, thence with Village
Road in a southeasterly direction to its intersection with North Shore Drive, thence with North Shore
Drive in a generally southwesterly direction to its intersection with Fairway Drive, thence with Fairway
Drive in a southerly, then easterly direction to its intersection with Wiehle Avenue, thence with Wiehle
Avenue in a southerly direction to its intersection with the Washington Dulles Access and Toll Road,
thence with the Washington Dulles Access and Toll Road in a westerly direction to its intersection with
Reston Parkway, thence with Reston Parkway in a northerly direction to its intersection with Sunset Hills
Road, thence with Sunset Hills Road in an easterly direction Dominion Energy’s utility easement thence
with Dominion Energy’s utility easement in a northerly direction to its intersection with the service road
of Plaza American Drive, thence with the service road of Plaza American Drive in a northerly direction to
its intersection with Sunset Hills Road, thence with Sunset Hills Road in a westerly direction to its
intersection with American Dream Way, thence with American Dream Way in a northerly, then westerly
direction to its intersection with Old Reston Avenue, thence with Old Reston Avenue in a northwesterly
direction to its intersection with Temporary Road, thence with Temporary Road in a westerly direction
to its intersection with Reston Parkway, thence with Reston Parkway in a northerly direction to its
intersection with Baron Cameron Avenue, point of beginning
POLLING PLACE: Lake Anne Elementary School
11510 North Shore Dr, Reston
NOTES: Established 1971
Precinct description revised and readopted – March 2003
Precinct divided – January 2008
Congressional District changed from 8th to 11th – January 2012
Senatorial and House Districts changed – December 2021
Boundary adjusted to create Reston #4 – December 2026
71
Attachment 3
238 CAMERON GLEN /December 2026
Commonwealth of Virginia
COUNTY OF FAIRFAX
HUNTER MILL District
PRECINCT: 238 CAMERON GLEN
CONGRESSIONAL DISTRICT: 11
VIRGINIA SENATORIAL DISTRICT: 38
HOUSE OF DELEGATES DISTRICT: 7
DESCRIPTION:
Beginning at the intersection of the east corporate boundary of the Town of Herndon and Baron
Cameron Avenue, thence with Baron Cameron Avenue in a easterly direction to its intersection with
Reston Parkway, thence with Reston Parkway in a southerly direction to its intersection with Temporary
Road, thence with Temporary Road in an easterly direction to its intersection with Old Reston Avenue,
thence with Old Reston Avenue in a southeasterly direction to its intersection Sunset Hills Road, thence
with Sunset Hills Road in a westerly direction to its intersection with Reston Parkway, thence with
Reston Parkway in a southerly direction to its intersection with the Washington Dulles Access and Toll
Road, thence with the Washington Dulles Access and Toll Road in a westerly direction to its intersection
Market Street, thence with Market Street in a westerly direction to its intersection with Town Center
Parkway, thence with Town Center Parkway in a northerly direction to its intersection with New
Dominion Parkway, thence with New Dominion Parkway in a westerly direction to its intersection with
the east corporate boundary of the Town of Herndon, thence with the corporate boundary of the Town
of Herndon in a northeasterly direction (along the Fairfax County Parkway) to its intersection with Baron
Cameron Avenue, point of beginning
POLLING PLACE: North County Human Services Building
1850 Cameron Glen Dr, Reston
NOTES: Established January 2008
Congressional District changed from 8th to 11th – January 2012
Senatorial and House Districts changed – December 2021
Precinct divided to create Reston #4 – December 2026
72
73
Attachment 3
246 Reston #4 / December 2026
Commonwealth of Virginia
COUNTY OF FAIRFAX
HUNTER MILL District
PRECINCT: 246 RESTON #4
CONGRESSIONAL DISTRICT: 11
VIRGINIA SENATORIAL DISTRICT: 38
HOUSE OF DELEGATES DISTRICT: 7
DESCRIPTION:
Beginning at the intersection of the east corporate boundary of the Town of Herndon and New
Dominion Parkway, thence with New Dominion Parkway in an easterly direction to its intersection with
Town Center Parkway, thence with Town Center Parkway in a southerly direction to its intersection with
Market Street, thence with Market Street in a westerly direction to its intersection with the Reston
Parkway, thence with the Reston Parkway in a northerly direction to its intersection with Temporary
Road, thence with Temporary Road in an easterly direction to its intersection with Old Reston Avenue,
thence with Old Reston Avenue in a southeasterly direction to its intersection with American Dream
Way, thence with American Dream Way in an easterly, then southerly direction to its intersection with
Sunset Hills Road, thence with Sunset Hills Road in an easterly direction to its intersection with the
service road of Plaza American Drive, thence with the service road of Plaza American Drive to its
intersection with Dominion Energy’s utility easement, thence with the Dominion Energy’s utility
easement to its intersection with the Washington Dulles Access and Toll Road, thence with the
Washington Dulles Access and Toll Road in a westerly direction to its intersection with the east
corporate boundary of the Town of Herndon, thence with the corporate boundary of the Town of
Herndon in a northeasterly direction (along the Fairfax County Parkway) to its intersection with New
Dominion Parkway, point of beginning
POLLING PLACE: Reston Teen Center
12196 Sunset Hills Road, Reston
NOTES: Established December 2026
74
Attachment 3
332 COATES / December 2026
Commonwealth of Virginia
COUNTY OF FAIRFAX
DRANESVILLE District
PRECINCT: 332 COATES
CONGRESSIONAL DISTRICT: 11
VIRGINIA SENATORIAL DISTRICT: 38
HOUSE OF DELEGATES DISTRICT: 8
DESCRIPTION:
Beginning at the intersection of the Loudoun County/Fairfax County Line and the Washington Dulles
Access and Toll Road, thence with the Washington Dulles Access and Toll Road in an easterly direction to
its intersection with the south corporate boundary of the Town of Herndon at Centreville Road, thence
with the corporate boundary of the Town of Herndon in an easterly direction to its intersection with the
Virginia Power Easement, thence with the Virginia Power Easement in a southwesterly direction to its
intersection with Sunrise Valley Drive, thence with Sunrise Valley Drive in a generally westerly direction
to its intersection with Centreville Road, thence with Centreville Road in a southwesterly direction to its
intersection with Coppermine Road, thence with Coppermine Road in a northwesterly direction to its
intersection with Sunrise Valley Drive, thence with Sunrise Valley Drive in a northeasterly direction to its
intersection with a tribuary of Horsepen Run (stream), thence with the meanders of the tributary of
Horsepen Run in a northwesterly direction to its intersection with the Loudoun County/Fairfax County
Line, thence with the Loudoun County/Fairfax County Line in a northeasterly direction to its intersection
with the Washington Dulles Access and Toll Road, point of beginning
POLLING PLACE: Coates Elementary School
2480 River Birch Rd, Herndon
NOTES: Established January 2009
Polling place relocated and precinct renamed – March 2010
Precinct moved from Hunter Mill District to Dranesville District – April 2011
Congressional District changed from 10th to 11th – January 2012
Senatorial and House Districts changed – December 2021
Precinct divided to create Coppermine precinct – December 2026
75
76
Attachment 3
333 COPPERMINE / December 2026
Commonwealth of Virginia
COUNTY OF FAIRFAX
DRANESVILLE District
PRECINCT: 333 COPPERMINE
CONGRESSIONAL DISTRICT: 11
VIRGINIA SENATORIAL DISTRICT: 38
HOUSE OF DELEGATES DISTRICT: 8
Beginning at the intersection of Centreville Road and Coppermine Road, thence with Centreville Road in
a southerly direction to its intersection with Frying Pan Road, thence with Frying Pan Road in a westerly
direction to its intersection with Frying Pan Branch (stream), thence with the meanders of Frying Pan
Branch in a westerly direction to its intersection with Horsepen Run (stream), thence with the meanders
of Horsepen Run in a northwesterly direction to its intersection with the Loudoun County/Fairfax County
Line, thence with the Loudoun County/Fairfax County Line in a northeasterly direction to its intersection
with a tribuary of Horsepen Run (stream), thence with the meanders of the tributary of Horsepen Run in
a southeasterly direction to its intersection with Sunrise Valley Drive, thence with Sunrise Valley Drive in
a southeasterly direction to its intersection with Coppermine Road, thence with Coppermine Road in a
southeasterly direction to its intersection with Centreville Road, point of beginning
POLLING PLACE: Floris United Methodist Church
13600 Frying Pan Road, Herndon
NOTES: Established December 2026
77
Attachment 3
506 HOLMES / December 2026
Commonwealth of Virginia
COUNTY OF FAIRFAX
MASON District
PRECINCT: 506 HOLMES
CONGRESSIONAL DISTRICT: 8
VIRGINIA SENATORIAL DISTRICT: 39
HOUSE OF DELEGATES DISTRICT: 4
DESCRIPTION:
Beginning at the intersection of Glenmore Drive and Leesburg Pike (Route 7), thence with Leesburg Pike
(Route 7) in a southeasterly direction to its intersection with Columbia Pike at Bailey's Crossroads;
thence with Columbia Pike in a southwesterly direction to its intersection with Blair Road; thence with
Blair Road in a northwesterly direction to its intersection with Beachway Drive; thence with Beachway
Drive in a northwesterly direction to its intersection with Nevius Street; thence with Nevius Street in a
northeasterly direction to its intersection with Knollwood Drive; thence with Knollwood Drive in a
southeasterly direction to its intersection with Glenmore Drive; thence with Glenmore Drive in a
northeasterly direction to its intersection with Leesburg Pike (Route 7), the point of beginning.
POLLING PLACE: Bailey’s Elementary School Culmore Community Library
6111 Knollwood Dr, Falls Church 6101 Knollwood Dr, Falls Church
NOTES: Established July 2011
Precinct combined Holmes No. 1 and Holmes No. 2 – July 2011
Precinct re-divided – November 2014
Polling place moved – December 2015
Senatorial and House Districts changed – December 2021
Precinct combined Holmes #1 and Holmes #2 – March 2022
Precinct boundary adjusted to create Tripps precinct – March 2022
Polling place renamed – July 2024
Emergency relocation of polling place – February 2026
Polling place relocated – May 2026
Polling place moved – December 2026
78
79
Attachment 3
520 SKYLINE / December 2026
Commonwealth of Virginia
COUNTY OF FAIRFAX
MASON District
PRECINCT: 520 SKYLINE
CONGRESSIONAL DISTRICT: 8
VIRGINIA SENATORIAL DISTRICT: 39
HOUSE OF DELEGATES DISTRICT: 4
DESCRIPTION:
Beginning at the intersection of Seminary Road and Leesburg Pike (Route 7) thence with Leesburg Pike
in a southeasterly direction to its intersection with South George Mason Drive, thence with South
George Mason Drive in a southwesterly direction to its intersection with an unnamed parking lot access
road along the southwestern boundary of the Skyline Plaza property, thence with the access road and a
projection of the access road along the Skyline Plaza property line in a southeasterly direction to its
intersection with the corporate boundary of the City of Alexandria, thence with the Corporate Boundary
of the City of Alexandria in a southwesterly direction to its intersection with Seminary Road, thence with
Seminary Road in a generally northwesterly direction to its intersection with Leesburg Pike, point of
beginning.
POLLING PLACE: Minnie H. Peyton Community Center at Bailey’s Arlington Moose Lodge #1315
5920 Summers Ln, Falls Church 5710 Scoville Street, Falls Church
NOTES: Established July 1981
Polling place moved from Skyline Mall – March 2003
Precinct description revised and readopted – March 2003
Polling place moved – March 2010
Boundary adjusted, polling place moved – July 2011
Senate District changed from 31st to 35th – July 2011
Delegate District changed from 46th to 49th – July 2011
Precinct divided – July 2013
Precinct divided – November 2014
Polling place moved – March 2021
Senatorial and House Districts changed – December 2021
Polling place name changed – July 2024
Polling place moved – December 2026
80
81
Attachment 3
731 TYSONS / December 2026
Commonwealth of Virginia
COUNTY OF FAIRFAX
PROVIDENCE District
PRECINCT: 731 TYSONS
CONGRESSIONAL DISTRICT: 11
VIRGINIA SENATORIAL DISTRICT: 37
HOUSE OF DELEGATES DISTRICT: 12
DESCRIPTION:
Beginning at the intersection of Leesburg Pike (Route 7) and the Washington Dulles Access and Toll
Road, thence with the Washington Dulles Access and Toll Road in an easterly direction to its intersection
with Spring Hill Road, thence with Spring Hill Road in a southerly and then westerly direction to its
intersection with Greensboro Drive, thence with Greensboro Drive in a southerly direction to its
intersection with Westpark Drive, thence with Westpark Drive in a northeasterly and then southeasterly
and then southerly direction to its intersection with Westbranch Drive, thence with Westbranch Drive in
a southwesterly then southerly direction to its intersection ysons Boulevard, thence with Tysons
Boulevard in a southerly direction to its intersection with Chain Bridge Road, thence with Chain Bridge
Road in a northeasterly direction to its intersection with the Capital Beltway (Interstate 495), thence
with the Capital Beltway in a southerly direction to its intersection with Leesburg Pike, thence with
Leesburg Pike in a northwesterly direction to its intersection with the Washington Dulles Access and Toll
Road, point of beginning.
POLLING PLACE: The Parc at Tysons Boro Station
8508 Leesburg Pike, Vienna 1775 Greensboro Station Place, McLean
NOTES: Established June 1991
Precinct description revised and readopted – March 2003
Polling place moved – July 2011
Boundary adjusted to conform to Congressional District line – July 2012
Delegate District changed from 34th to 35th - July 2011
Congressional District changed from 8th to 11th – July 2012
Precinct divided – July 2016
Boundary adjusted – July 2017
Senatorial and House Districts changed – December 2021
Precinct divided – March 2023
Polling place moved – March 2023
Polling place moved – December 2026
Boundary adjusted with Jones Branch precinct – December 2026
82
83
Attachment 3
738 JONES BRANCH / December 2026
Commonwealth of Virginia
COUNTY OF FAIRFAX
PROVIDENCE District
PRECINCT: 738 JONES BRANCH
CONGRESSIONAL DISTRICT: 11
VIRGINIA SENATORIAL DISTRICT: 37
HOUSE OF DELEGATES DISTRICT: 12
DESCRIPTION:
Beginning at the intersection of the Washington Dulles Access and Toll Road and Spring Hill Road,
thence with Spring Hill Road in a southerly direction to its intersection with Westpark Drive, thence with
Westpark Drive in a northeasterly and then southeasterly and then southerly direction to its intersection
with Westbranch Drive, thence with Westbranch Drive in a southwesterly then southerly direction to its
intersection withTysons Boulevard, thence with Tysons Boulevard in a southerly direction to its
intersection with Chain Bridge Road, thence with Chain Bridge Road in a northeasterly direction to its
intersection with the Capital Beltway (Interstate 495), thence with the Capital Beltway in a northeasterly
direction to its intersection with the Washington Dulles Access and Toll Road, thence with the
Washington Dulles Access and Toll Road in a westerly direction to its intersection with Spring Hill Road,
point of beginning,
POLLING PLACE: Providence Committee Meeting Room
7921 Jones Branch Drive, McLean
NOTES: Precinct established – March 2023
Precinct boundary adjusted with Tysons precinct – December 2026
84
Attachment 3
919 GREEN TRAILS / December 2026
Commonwealth of Virginia
COUNTY OF FAIRFAX
SULLY District
PRECINCT: 919 GREEN TRAILS
CONGRESSIONAL DISTRICT: 11
VIRGINIA SENATORIAL DISTRICT: 36
HOUSE OF DELEGATES DISTRICT: 10
DESCRIPTION:
Beginning at the intersection of Centreville Road (Route 28) and New Braddock Road, thence with New
Braddock Road in an easterly direction to its intersection with Little Rocky Run (stream), thence with the
meanders of Little Rocky Run in a generally southwesterly direction to its intersection with the Virginia
Power Easement, the Virginia Power Easement in a southerly direction to its intersection with the
Virginia Power and Columbia Liquefied Natural Gas Easement, thence with the Virginia Power and
Columbia Liquefied Natural Gas Easement in a northwesterly direction to its intersection with a
projection of Hartwood Lane along a pathway between residences numbered 6700 and 6701, thence
with this projection and Hartwood Lane in a southerly direction to its intersection with Hart Forest Drive,
thence with Hart Forest Drive and a projection of Hart Forest Drive along the pipe_x0002_stem between
residences numbered 14258 and 14259 in a westerly direction to its intersection with an unnamed
stream, thence with the meanders of the unnamed stream in a southwesterly direction to its
intersection with Compton Road, thence with Compton Road in a northwesterly direction to its
intersection with Centreville Road, thence with Centreville Road in a northeasterly direction to its
intersection with a projection of Grainery Road, thence with this projection and Grainery Road in a
southwesterly direction to its intersection with Harvest Mill Court, thence with Harvest Mill Court in a
generally northerly direction to its intersection with a pipe-stem driveway, thence with the pipe-stem
driveway and a projection of the driveway between residences numbered 6513 and 6515 in an easterly
direction to its intersection with Centreville Road, thence with Centreville Road in a northeasterly
direction to its intersection with New Braddock Road, point of beginning
POLLING PLACE: Centreville Elementary School
14330 Green Trails Blvd, Centreville
NOTES: Established May 1993
Precinct description revised and readopted – March 2003
Precinct divided – July 2011
Boundary adjusted – July 2012
Senatorial and House Districts changed – December 2021
Boundary adjusted with Old Mill precinct – December 2026
85
Attachment 3
925 OLD MILL / December 2026
Commonwealth of Virginia
COUNTY OF FAIRFAX
SULLY District
PRECINCT: 925 OLD MILL
CONGRESSIONAL DISTRICT: 11
VIRGINIA SENATORIAL DISTRICT: 36
HOUSE OF DELEGATES DISTRICT: 10
DESCRIPTION:
The precinct is bounded by I-66 on the north, a segment of Old Mill Rd on the east, Mount Olive Rd and
Compton Rd on the south and is comprised of census blocks 2010 and 2012 of tract 491301 in their
entirety. Beginning at the intersection Old Centreville Road and New Braddock Road, thence with New
Braddock Road in an easterly direction to its intersection with Centreville Road (Route 28), thence with
Centreville Road (Route 28) in a southwesterly direction to its intersection with a projection of a pipe-
stem driveway from Harvest Mill Court, thence with this projection and the pipe-stem driveway in an
westerly direction between residences numbered 6513 and 6515 to its intersection with Harvest Mill
Court, thence with Harvest Mill Court in a generally southerly direction to its intersection with Grainery
Road, thence with Grainery and a projection of Grainery Road in a northeasterly direction to its
intersection with Centerville Road, thence with Centreville Road in a southwesterly direction to its
intersection with the Prince William County/Fairfax County Line (Bull Run), thence with the Prince
William County/Fairfax County Line in a southerly, then westerly direction to its intersection with Cub
Run (stream), thence with the meanders of Cub Run in a generally northwesterly direction to its
intersection with Interstate 66, thence with Interstate 66 in a northeasterly direction to its intersection
with the Virginia Power Easement, thence with the Virginia Power Easement in a southeasterly direction
to its intersection with the Colonial Pipe Line Company Easement, thence with the Colonial Pipe Line
Company Easement in a northeasterly direction to its intersection with Old Mill Road, thence with Old
Mill Road in a southeasterly direction to its intersection with Old Centreville Road, thence with Old
Centreville Road in a northeasterly direction to its intersection with New Braddock Road, point of
beginning
POLLING PLACE: Centreville United Methodist Church
6400 Old Centreville Rd, Centreville
NOTES: Established August 2001
Precinct description revised and readopted – March 2003
Boundary adjusted – July 2012
Congressional, Senatorial, and House Districts changed – December 2021
Boundary adjusted with Bull Run precinct – March 2022
Boundary adjusted with Green Trails precinct – December 2026
86
87
Attachment 4
AN ORDINANCE AMENDING AND READOPTING FAIRFAX COUNTY CODE 1
SECTIONS 7-2-5, 7-2-6, AND 7-2-13, TO DIVIDE AND CREATE PRECINCTS IN 2
HUNTER MILL AND DRANESVILLE DISTRICTS; MOVE POLLING PLACES IN 3
MASON AND PROVIDENCE DISTRICTS; AND ADJUST PRECINCT BOUNDARIES 4
IN HUNTER MILL, PROVIDENCE, AND SULLY DISTRICTS 5
6
7
AN ORDINANCE to amend the Fairfax County Code by amending and 8
readopting Sections 7-2-5, 7-2-6, and 7-2-13, to divide and create precincts 9
in Hunter Mill and Dranesville Districts; move polling places in Mason and 10
Providence Districts; and adjust precinct boundaries in Hunter Mill, 11
Providence, and Sully Districts. 12
13
Draft of October 27, 2026 14
15
Be it ordained by the Board of Supervisors of Fairfax County: 16
17
1. That Sections 7-2-5, 7-2-6, and 7-2-13 of the Fairfax County Code are amended and 18
readopted, as follows: 19
20
ARTICLE 2. – Election Districts for the Board of Supervisors. 21
22
Section 7-2-5. – Hunter Mill District. 23
24
The Hunter Mill District shall consist of these election precincts: Aldrin, Armstrong, 25
Cameron Glen, Colvin, Dogwood, Flint Hill No. 1, Flint Hill No. 2, Floris, Fox Mill No. 1, 26
Fox Mill No. 2, Frying Pan, Glade, Hughes, Hunters Woods, Madison, McNair, North Point, 27
Piney Run, Reston No. 1, Reston No. 2, Reston No. 3, Reston No. 4, South Lakes, Stuart, 28
Sunrise Valley No. 1, Sunrise Valley No. 2, Vienna No. 1, Vienna No. 2, Vienna No. 4, 29
Vienna No. 6, Westbriar No. 1, Westbriar No. 2, and Wolftrap. 30
31
Section 7-2-6. – Dranesville District. 32
33
The Dranesville District shall consist of these election precincts: Chain Bridge, 34
Chesterbrook, Churchill, Clearview, Coates, Cooper, Coppermine, El Nido, Forestville, Great 35
Falls, Haycock, Herndon No. 1, Herndon No. 2, Herndon No. 3, Hickory, Hutchison, 36
Kenmore, Kirby, Langley, Longfellow, McLean, Pimmit, Salona, Seneca, Shouse, Spring 37
Hill, Sugarland, Westhampton, and Westmoreland. 38
39
Section 7-2-13. – General Provisions. 40
41
All references to election precincts refer to those precincts, together with the descriptions and 42
maps of the boundaries and polling places for each of those precincts, which were adopted by 43
the Board of Supervisors on March 24, 2003, as amended on March 8, 2004, March 21, 2005, 44
March 27, 2006, March 26, 2007, September 10, 2007, March 10, 2008, January 12, 2009, 45
March 9, 2010, July 27, 2010, April 26, 2011, July 26, 2011, January 10, 2012, July 10, 2012, 46
88
Page 2
March 19, 2013, July 9, 2013, November 18, 2014, June 23, 2015, December 8, 2015, July 47
12, 2016, July 11, 2017, March 20, 2018, December 4, 2018, April 9, 2019, December 3, 48
2019, March 24, 2020, March 23, 2021, June 22, 2021, December 7, 2021, March 8, 2022, 49
June 7, 2022, March 7, 2023, December 5, 2023, March 19, 2024 , June 25, 2024 , 50
January 14, 2025; June 24, 2025; and May 5, 2026; and December 8, 2026, kept on file with 51
the clerk Clerk to for the Board of Supervisors. Whenever a road, a stream, or other physical 52
feature describes the boundary of a precinct, the center of such road, stream, or physical 53
feature is the dividing line between that precinct and any adjoining precinct. 54
55
2. That the election polling places for new precincts are established at: 56
57
Supervisor District Precinct Polling Place 58
Dranesville Coppermine Floris United Methodist Church 59
(New Precinct) 13600 Frying Pan Road 60
Herndon, VA 20171 61
62
Hunter Mill Reston No. 4 Reston Teen Center 63
(New Precinct) 12196 Sunset Hills Road 64
Reston, VA 20190 65
66
3. That the election polling place for the following existing precincts are established at: 67
68
Supervisor District Precinct Polling Place 69
Mason Holmes From: 70
(Polling Place Moved) Bailey’s Elementary School 71
6111 Knollwood Drive 72
Falls Church, VA 22041 73
74
To: 75
Culmore Community Library 76
6101 Knollwood Drive 77
Falls Church, VA 22041 78
79
Skyline From: 80
(Polling Place Moved) Minnie H. Peyton 81
Community Center at Bailey’s 82
5920 Summers Lane 83
Falls Church, VA 22041 84
85
To: 86
Arlington Moose Lodge #1315 87
5710 Scoville Street 88
Falls Church, VA 22041 89
90
89
Page 3
Providence Tysons From: 91
(Polling Place Moved) The PARC at Tysons 92
8508 Leesburg Pike 93
Vienna, VA 22182 94
95
To: 96
Boro Station 97
1775 Greensboro Station Place 98
McLean, VA 22102 99
100
101
4. That precinct boundary alterations depicted in the maps and descriptions, and the 102
GIS data on which both are based, held in the records of the Clerk for the Board of 103
Supervisors as part of the December 8, 2026, public hearing on this matter, and 104
related to the Hunter Mill, Dranesville, Providence, and Sully districts, are 105
established. 106
107
5. That this ordinance shall become effective upon adoption, and shall be given effect 108
after completion of the procedures set forth in Virginia Code § 24.2-129(D). 109
110
6. That the Clerk for the Board of Supervisors will send a certified copy of this 111
ordinance to the Fairfax County Electoral Board, and staff from the Office of 112
Elections will send a copy of this ordinance to the Virginia Department of Elections. 113
114
115
116
GIVEN under my hand this _____ day of ________________, 2026 117
118
119
_____________________________________ 120
Jill G. Cooper 121
Clerk for the Board of Supervisors 122
Department of Clerk Services 123
90
Board Agenda Item
October 27, 2026
ADMINISTRATIVE – 3
Authorization to Advertise a Public Hearing to Adopt an Ordinance Establishing an
Economic Revitalization Zone for Skyline Buildings 4, 5, and 6 (Mason District)
ISSUE:
Board authorization to advertise a public hearing to consider an ordinance establishing
an Economic Revitalization Zone for Skyline Buildings 4, 5, and 6 at 5113, 5111, and
5109 Leesburg Pike under Chapter 4, Article 32 of the Fairfax County Code.
RECOMMENDATION:
The County Executive recommends that the Board authorize advertisement of a public
hearing to occur on December 8, 2026, at 4:30 p.m.
TIMING:
Board action is requested on October 27, 2026, to allow sufficient time to advertise the
proposed public hearing to occur on December 8, 2026, at 4:30 p.m.
BACKGROUND:
On May 5, 2026, the Board adopted Chapter 4, Article 32, establishing the Revitalization
and Redevelopment Economic Incentive Program, effective May 6, 2026 known as the
BUILD: Site Assembly and Redevelopment Program (Program). The Program is
administered by the Department of Economic Initiatives (DEI), as the Director,
Department of Planning and Development’s designee, in coordination with the
Department of Tax Administration (DTA). Under Fairfax County Code 4-32-6(e), eligible
applications are presented to the Board to consider the adoption of an ordinance
establishing individual Economic Revitalization Zones (ERZs).
Skyline 4 LLC, 5111 Leesburg LLC, and MTP-5109 Leesburg LLC (collectively,
Applicant) propose an ERZ containing a newly proposed assemblage of three
contiguous, separately owned parcels, which total approximately 6.52 acres. The site is
located within the approved Bailey’s Crossroads/Seven Corners Incentive Area. The
parcels are identified as tax map numbers 62-3((1)) 37B, 62-3((1)) 39B, and 62-
3((1))40A1 and all zoned Planned Development Commercial (PDC).
On February 21, 2023, the Board approved an application by Skyline 4 LLC and 5111
Leesburg LLC for participation in the former Economic Incentive Program for Buildings 4
and 5. However, the approved conversions have not been completed, and neither
91
Board Agenda Item
October 27, 2026
property has received tax benefits under that approval. The current proposal constitutes
a distinct assemblage from the 2023 approval by incorporating Building 6, which was
not included in the prior EIP approval. The applicant will rescind any benefits under the
prior EIP approval if this application is approved. Staff recommends Board approval of
this ERZ application serve to terminate the former EIP and extinguish all benefits
available under that approval.
The redevelopment proposal comprises commercial and multifamily residential
development and combines the adaptive reuse of Buildings 4 and 5 with the renovation
of Building 6. Under land use approvals PCA C-052-10 and CDPA C-052-03, the two
existing nine-story office buildings will be converted to a combined maximum of 510
residential and live/work units. They will include at least 5,000 square feet of ground-
floor amenities, retail, restaurant, personal service, or other activating uses. Building 6 is
proposed for renovation and continued office use under the existing PDC zoning. The
Department of Planning and Development has reviewed the proposal and determined
that it is in conformance with the Comprehensive Plan.
The applicant has identified the reasons for the ERZ application based upon prolonged
office vacancy, elevated construction costs, and financing constraints challenging to
redevelopment and has stated that the ERZ incentive will help secure the capital
required to implement the approved development plans.
The proposed ERZ effective date is January 1, 2030, with a termination date of
December 31, 2039. Per Section 4-32-10, staff recommends an effective date that
begins slightly beyond three years after adoption of the ERZ Ordinance so that it
coincides with the beginning of the tax year. This prevents DTA from having to calculate
and administer partial tax abatements at the beginning and end of the ERZ’s life cycle.
Staff recommends that this constitutes good cause sufficient to allow the Board to adopt
an effective date longer than three years after adoption of the ERZ Ordinance in
accordance with Section 4-32-10.
EQUITY IMPACT:
The proposed development will provide 510 new rental housing units, including eight
percent of the total dwelling units as Workforce Dwelling Units (WDUs). The WDUs are
subject to maximum household income limits of 60-80 percent of Area Median Income,
contributing to the County’s goal of expanding the supply of affordable housing. The
project, located in the Baileys Crossroads Business Center, will expand housing
opportunities in an area with high demand for rental housing and is accessible by bus
and a future BRT route. This proposed project is consistent with the One Fairfax Policy’s
Areas of Focus 2, 11, and 14, which emphasize establishing housing opportunities in
accessible, mixed-use areas with multimodal transportation.
92
Board Agenda Item
October 27, 2026
This reinvestment will support the revitalization of Baileys Crossroads while advancing
Comprehensive Plan goals for reinvestment, economic development, and more efficient
use of existing developed land. Together, the project will strengthen the area’s
employment base, add housing options, and support continued revitalization.
As the three buildings are vacant or largely vacant, the proposed redevelopment is not
expected to displace existing residents or businesses. Reactivating long-vacant
buildings will benefit the surrounding community through more foot traffic, new
community-serving ground-floor retail and services, improved safety and appearance,
and a stronger tax base over the long term. Although new market-rate development
may contribute modestly to rising rents and property values in the surrounding area over
time, the addition of up to 510 housing units, including WDUs, would also expand
supply, which can help moderate housing cost pressures in the broader market.
FISCAL IMPACT:
Qualifying BUILD Program developments receive economic benefits including a
reduction in site plan review fees of 10 percent and a partial tax exemption on the real
estate tax, calculated as the difference between the pre-redevelopment (base)
assessed value and the post-development assessed value in accordance with Virginia
Code. As the County will continue to receive real estate tax revenues on the base (pre-
redevelopment) assessed value of the site, the partial tax exemptions of the real estate
tax will not reduce the General Fund.
The Department of Tax Administration has determined that the 2026 base assessed
value of the application property is $36,727,060, generating real estate taxes of
$411,343 per year, with a base tax rate of $1.12 per $100 of assessed value. The
applicant has estimated the post-development assessed value of the property to be
$340,000,000. The partial tax abatement would be calculated on the $303,272,940
increment or difference between pre- and post-development values of the portion of the
development. Thus, with a base tax rate of $1.12 per $100 of assessed value, the total
tax abatement would be $3,396,657 per year for a maximum tax abatement of
$33,966,569 over the maximum 10-year life of the program.
Under the BUILD Program, each approved project receives an individual ERZ with
individual 10-year incentive periods as of the start of the ERZ ordinance’s effective date.
The program allows time for construction before the incentive period begins.
Accordingly, qualifying developments are expected to receive the partial real estate tax
exemption for the full 10-year period, subject to timely completion of improvements and
compliance with program requirements.
93
Board Agenda Item
October 27, 2026
ENCLOSED DOCUMENTS:
Attachment 1 – Project Locator Map
Attachment 2 – BUILD Application and Narrative for Skyline Buildings 4, 5, and 6,
transmitted September 25, 2026
Attachment 3 – ERZ Parcel and Development Exhibit
Attachment 4 – Staff Determination Letters
Attachment 5 – Proposed Ordinance Establishing an Economic Revitalization Zone for
Skyline Buildings 4, 5, and 6
STAFF:
Jennifer Miller, Deputy County Executive
Rebecca Moudry, Director, Department of Economic Initiatives
JoAnne Fiebe, Division Manager, Department of Economic Initiatives
Tracy Strunk, Director, Department of Planning and Development
David Pellegrino, Assistant Director, Department of Tax Administration
ASSIGNED COUNSEL:
Cherie H. Mack, Assistant County Attorney
Daniel Robinson, Deputy County Attorney
94
ATTACHMENT 1
Proposed ERZ for Skyline Buildings 4, 5, and 6
Leesburg Pike
Legend
Proposed Skyline ERZ
Parcel Boundaries
S George Mason Drive
95
Eligibility Application of Partial Tax Exemption for Economic Development
(Effective May 6, 2026)
Fairfax County, Virginia
Dept. of Planning and Development
Community Revitalization Section
12055 Government Center Parkway
Suite 755
Fairfax, Virginia 22035
Telephone: 703-324-9300
TTY: 711
FAX: 703-653-1799
Visit our Web Site: www.fcrevit.org
Prior to filing this application, contact the Community Revitalization Section (CRS) of the Department of
Planning and Development (DPD) staff to review the ordinance eligibility requirements to determine if
the proposed development may qualify. Improvements made prior to the Department of Tax
Administration’s (DTA) base value appraisal inspection are not eligible for the partial tax abatement.
Refer to the application procedures for additional information.
Only properties located within a Revitalization and Redevelopment Economic Incentive Area are eligible.
Refer to the ordinance at www.fcrevite.org/economic-incentive-program or contact CRS for assistance in
verifying whether your property is located in a designated location.
This application must include be complete and incl ude a paper or electronic copy of the plan for
development as well as any additional schedules, plans, specifications that support the request, as well as
an estimated fair market value of the proposed development once completed.
Property Information
Tax Map Reference
#(s):
Lot Size: Current Zoning: Proposed
Zoning:
Estimated Project
Future Fair
Market Value
Note: For additional Tax Tap Numbers attach a separate sheet. Include all T parcels.
Owner Information
Tax Map Reference: _____________________________________________________________________
Owner’s Name: _______________________________________________________________________
Contact Person/Title: ___________________________________________________________________
Property Address: _____________________________________________________________________
Mailing Address: ______________________________________________________________________
_______________________________________________________________________
Work Phone Number: _______________________ ______________
E-mail: ___________________________________ ______________
62-3((1))37B 3.001 AC PDC PDC
62-3((1))39B 1.799 AC PDC PDC
62-3((1))40A1 1.718 PDC PDC
TBD
62-3((1))37B
Skyline 4 LLC
Robert Seldin, Managing Principal
5113 Leesburg Pike, Falls Church, VA 22041
1000 Maine Avenue, SW, Suite 300, Washington, D.C. 20024
678-428-6889
robseldin@2hsq.com
Attachment 2
96
Note: Attach extra sheets, if necessary, for additional properties or owners.
Note: Contact Person needs to be the person that DTA can call to arrange on-site inspections.
Proposed Project:
1. What type of zoning application would the proposal require? Check all that apply.
Rezoning/Proffered Condition Amendment: ______Special Exception: ______
Special Permit: ______ Site Plan: _______
2. List the application number of any approved rezoning, special exception, special permit or site plans
that currently governs development of each property. Separately, list the application number of any
pending or concurrent zoning or site plan application.
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
3. Describe the proposed property consolidation and how it meets the minimum two parcels, two owners,
and two-acre requirements of the program? ________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
4. Describe the proposed project. Please include details related to proposed uses, density/intensity,
existing buildings to be retained, demolished and /or repurposed, and new buildings proposed. Please
include additional sheets as necessary to fully describe the application. Please attach or send
electronically one (1) copy of the proposed development plan (either the rezoning application or site
plan). If the project will be built in phases, provide a phasing plan including estimated timeframes for the
completion of each phase. Electronic copies can be sent to Revitalization@fairfaxcounty.gov
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Tax Map Reference: _____________________________________________________________________
Owner’s Name: ________________________________________________________________________
Contact Person/Title: ___________________________________________________________________
Property Address: ______________________________________________________________________
Mailing Address: ______________________________________________________________________
_______________________________________________________________________
Work Phone Number: ______________________________________
E-mail: __________________________________________________
X
Original Rezoning: RZ C-052
Governing Zoning: PCA C-052-10/CDPA C-052-03/FDPA C-052-16
As Built Site Plan: #4237-SP-01-02
Pending Site Plan: SP-2023-00057
See attached.
See attached.
62-3((1))39B
5111 Leesburg LLC
Robert Seldin, Managing Principal
5111 Leesburg Pike, Falls Church, VA 22041
1000 Maine Avenue, SW, Suite 300, Washington, D.C. 20024
678-428-6889
robseldin@2hsq.com
X
Attachment 2
97
Note: Attach extra sheets, if necessary, for additional properties or owners.
Note: Contact Person needs to be the person that DTA can call to arrange on-site inspections.
Tax Map Reference: _____________________________________________________________________
Owner’s Name: ________________________________________________________________________
Contact Person/Title: ___________________________________________________________________
Property Address: ______________________________________________________________________
Mailing Address: ______________________________________________________________________
_______________________________________________________________________
Work Phone Number: ______________________________________
E-mail: __________________________________________________
62-3((1))40A1
MTP- 5109 LEESBURG LLC
Brian Gribble, Manager, The Liberty Solution, LLC as court appointed receiver for MTP-5109 Leesburg, LLC
5109 Leesburg Pike, Falls Church, VA 22041
1464 Center Park Drive, Charlotte, NC 28217
704-599-1010
bgribble@lscarolinas.com
Attachment 2
98
Attachment 2
99
5. A single parcel may contain multiple structures, bu t all structures must be fully contained within its
parcel lot lines before the final inspection and valuation may be performed by the DTA. Based on the
proposed concept plan, will parcels need to be created to meet this requirement? _____Yes _____ No
Please Explain:________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
6. Please provide any other information that you feel is pertinent to the review of this proposal below.
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
7. Would you have completed this development/repurposing without the partial tax exemption?
_____ Yes _____ No
Please explain briefly how this incentive made the project possible: _____________________________
___________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
We hereby request partial tax exemption from real estate taxes for qualifying property to be developed,
redeveloped or repurposed as provided by Article 32 Chapter 4 of the Fairfax County Code. We certify
that the statements and attachments contained in this application are true and correct to the best of our
knowledge. We certify that we are the owners or have the authority of the owner to submit this
application.
SIGNATURE:
Date of Application: _____________________Owner’s or Agent’s Signature: ________________________________
Print Name: _________________________________
Date of Application: _____________________Owner’s or Agent’s Signature: ________________________________
Print Name: _________________________________
Date of Application: _____________________Owner’s or Agent’s Signature: ________________________________
Print Name: _________________________________
Date of Application: _____________________Owner’s or Agent’s Signature: ________________________________
Print Name: _________________________________
NOTE: Failure to obtain signatures of all parties owni ng an interest in this real estate constitutes a
material misstatement of fact.
X
See attached.
X
See attached.
9/3/2026
9/3/2026
William Sudlow, Skyline 4 LLC and 5111 Leesburg LLC
Robert Seldin
Digitally signed by Robert Seldin
Date: 2026.09.04 10:42:17 -04'00'
9/3/2026
Robert Seldin, Skyline 4 LLC and 5111 Leesburg LLC
Brian Gribble, MTP- 5109 LEESBURG LLC
Attachment 2
100
Attachment 2
101
OFFICE USE ONLY
Application #: ___________________
Date Application Submitted: __/__/__
Revitalization and Redevelopment Economic Incentive
Area: ____________________
DPD Approval Date: __/__/__
Rezoning Case # __________________________
Rezoning Approval Date: __/__/__
Site Plan Case #: _________________
Site Plan Approval Date: _/__/__
Site Plan Fee Reduction: Yes or No
Amount of Reduction: $___________________
Date Issued: __/__/__
Application/Attachments to DTA: Yes or No
BOS Approval Date: __/__/__
Attachment 2
102
Attachment 1: Narrative Statement in Support of RREIP Eligibility Application
Skyline Buildings 4, 5, and 6
This narrative statement is submitted as an attachment to the Application for Inclusion in the
Revitalization and Redevelopment Economic Incentive Program (“RREIP”) on behalf of Skyline
4 LLC, 5111 Leesburg LLC, and MTP -5109 Leesburg LLC (collectively, the “Applicant”) for a
coordinated revitalization initiative involving Skyline Buildings 4, 5, and 6 at 5111, 5113, and
5109 Leesburg Pike (Tax Map References 62- 3((1))37B, 62-3((1))39B, and 62-3((1))40A1). The
subject properties are part of Skyline Center, a 97.98-acre mixed -use development originally
rezoned under RZ C -052 in December 1969. All three parcels are zoned PDC and are located
within the Bailey’s Crossroads and Seven Corners Commercial Revitalization District. This
statement responds to paragraphs 3, 4, 6, and 7 of the RREIP Application Form.
3. Proposed Property Consolidation / Assemblage Requirements
Qualifying Uses . Section 4- 32-7(a) permits commercial, industrial, or multifamily residential
development, or any combination thereof, within a designated Revitalization and Redevelopment
Economic Incentive Area. The Buildings 4 and 5 program proposes adaptive reuse of existing
office buildings for residential and live/work units, together with ground- floor amenity, retail,
restaurant, personal service, and similar activating uses. This mix of uses qualifies as multifamily
residential development under Article 32, Section 4-32-2. Building 6’s existing commercial office
use independently qualifies under Section 4 -32-7(a). For purposes of this application, Building 6
will initially proceed under the by-right redevelopment pathway in Section 4-32-6(e) as an office
renovation, which is permitted by the existing PDC zoning. The RREIP is designed to cover either
commercial or residential use. If the owner of Building 6 later elects to pursue a residential/live -
work conversion prior to receiving any tax benefits under the program, that conversion will require
a separate PCA and applicable zoning approvals.
Three Contiguous Parcels; Separate Ownership; Two -Acre Minimum. The proposed assemblage
includes Tax Map 62-3((1))37B (approximately 3.001 acres, owned by Skyline 4 LLC), Tax Map
62-3((1))39B (approximately 1.799 acres, owned by 5111 Leesburg LLC), and Tax Map 62-
3((1))40A1 (approximately 1.72 acres, owned by MTP -5109 Leesburg LLC). The parcels are
contiguous, are held by three separate owners, and total approximately 6.5 acres, well above the
two-acre minimum required by Section 4- 32-7(b). The three buildings are physically connected
by ground-level corridors, an exterior portico, a common façade, internal courtyards, and a shared
parking structure. The enclosed exhibits include a conceptual unified development plan. The
revised boundaries and separate ownership structure reflected in the application present a newly
proposed three-parcel assemblage implemented through a unified development plan.
No Prior Rezoning or Site Plan Approval for the Proposed Conversion. The proposed three-parcel
assemblage has not previously been approved for the proposed residential and live/work
conversions. For Buildings 4 and 5, the 2023 approvals were limited to a proffer condition
amendment, conceptual development plan amendment, and final development plan amendment.
Building 6 was excluded from PCA C -052-10 and has no separate PCA or site plan related to its
improvements.
Attachment 2
103
2
Necessary Future Approvals. The Applicant will obtain all zoning, site plan, and other approvals
required by the Zoning Ordinance and state and local law before receiving incentives, consistent
with Section 4-32-7(d). Building 6’s inclusion in the assemblage does not depend on completing
a residential/live -work conversion before Economic Revitalization Zone approval; its existing
commercial office use independently satisfies Section 4 -32-7(a), and the existing PDC zoning
permits the proposed by -right office renovation. If the Building 6 owner later elects to pursue a
residential/live-work conversion, that conversion will require a separate PCA and applicable
zoning approvals before incentives for Building 6 are received.
4. Proposed Project
The unified development plan combines the approved Buildings 4 and 5 program with Building 6
within one connected revitalization framework. Buildings 4 and 5 comprise the 2023- approved
adaptive-reuse program for two existing nine -story office buildings tot aling approximately
572,724 square feet, with a maximum of 510 residential and live/work units and ground- floor
amenity, retail, restaurant, personal service, and similar activating uses . Building 6 is an existing
commercial office property that independently satisfies the qualifying -use requirement. It will
initially proceed as a by-right office renovation because the existing PDC zoning permits that use,
satisfying the by -right redevelopment pathway in Section 4 -32-6(e). The RREIP is designed to
cover either commercial or residential use; if the Building 6 owner later elects a residential/live -
work conversion, that conversion will require a separate PCA and applicable zoning approvals
before incentives for Building 6 are received.
Retained and Reused Infrastructure . The three -building complex includes shared access and
parking infrastructure, supporting reinvestment across all three parcels under the unified
development plan. Each building will retain and repurpose its existing structural systems as part
of its applicable renovation or conversion.
Building Improvements. For Buildings 4 and 5, the adaptive reuse generally retains the existing
architectural structure, replaces windows with clear glass, provides an updated façade treatment,
and replaces the existing office tenant improvements with residential/live -work improvements.
Each building will include a minimum of 5,000 square feet of ground -floor space dedicated to
amenities, retail, restaurants, personal service establishments, small -scale production, and/or
similar activating uses. Building 6 will initially proceed as an office renovation under the by-right
pathway—with a minimum of $75 million in building improvements and tenant improvement
costs—and retains the option to pursue a residential/live-work conversion later through a separate
PCA and applicable zoning approvals.
Public Realm and Open Space. As part of the Buildings 4 and 5 program, the project includes new
publicly accessible open spaces with active features such as sport courts, yoga areas, game tables,
plaza seating, and a proposed pedestrian bridge to a proposed art park along George Mason Drive.
All of these facilities will be available for use by tenants in Building 6 as well. Approximately
one-third of the existing surface parking behind Buildings 4 and 5 will be removed and replaced
with open space. The Buildings 4 and 5 development will provide at least 25 percent open space
on-site, exceeding the 15 percent PDC District requirement, including approximately 1.38 acres
of publicly accessible urban park space. Open space for Building 6 is currently in conf ormance
Attachment 2
104
3
with requirements from its prior zoning approval and any proposed future changes will be
addressed in connection with its future renovation plans.
Phasing. Buildings 4 and 5 are expected to be renovated first, with Building 6 following as either
a by-right office renovation or, if elected by the owner, a residential/live -work conversion after
obtaining a separate PCA and applicable zoning approvals. Building 6 improvements may be
phased to accommodate its longer development and prospective leasing timeline. Under Section
4-32-8(b), the tax exemption is recalculated for each parcel upon substantial completion and final
inspection and valuation, allowing the unified development plan to proceed in phases.
6. Other Pertinent Information
Policy Alignment. The unified development plan advances the stated purpose of the RREIP: to
incentivize private entities to purchase, assemble, revitalize, and redevelop real property in
economically challenged areas that conform with the Comprehensive Plan. Including Bui lding 6
completes the interconnected three- building complex and permits comprehensive reinvestment
across three contiguous, separately owned parcels. No formal consolidation of ownership entities
is required by the RREIP ordinance. Buildings 4 and 5 are ch ronically underutilized office assets
that have experienced high vacancy rates for most of the last decade; their adaptive reuse will
return substantial existing office space to productive use by creating much needed housing in this
designated Revitalization Area. Building 6 has no natural assemblage partner other than Buildings
4 and 5; at approximately 1.72 acres, it cannot independently satisfy the two- acre assemblage
requirement in Section 4-32-7(b). Market dynamics have demonstrated that an incentive is needed
to attract the capital required for either an office renovation or a potential residential/live -work
conversion—precisely the kind of outcome the RREIP was designed to support. Taken together,
the unified development plan has the potential to attr act approximately $300 million of private
investment to revitalize the three buildings in a federal Opportunity Zone.
Location Within an Incentive Area . All three parcels —Tax Map References 62 -3((1))37B, 62-
3((1))39B, and 62- 3((1))40A1—are located within the Bailey’s Crossroads/Seven Corners
Commercial Revitalization District, which Article 32, Section 4 -32-5(b) identifies as a
Revitalization and Redevelopment Economic Incentive Area. The assemblage therefore satisfies
the geographic requirement for inclusion in an Economic Revitalization Zone.
Continuation of Proven Revitalization Concept . The unified development plan builds on the
successful adaptive reuse of Skyline Buildings 1, 2, and 3, which were approved for conversion to
720 residential and live/work units in July 2020 and renovated and reopened in 2025 as Three
Collective. Buildings 4 and 5 are the next phase of that revitalization strategy and received
analogous land- use approvals in February 2023. Including Building 6 completes the
interconnected complex and extends the proven adaptive -reuse model to the third contiguous
parcel.
Comprehensive Plan Consistency and Public Benefits. The 2023 approvals for Buildings 4 and 5
established a redevelopment program that conformed with the Comprehensive Plan and applicable
Zoning Ordinance provisions, followed the Guidelines for Commercial Building Repurposing,
complemented surrounding development, and provided a quality layout for the PDC District. The
Attachment 2
105
4
2023 equity impact statement recognized that this program would provide needed rental
opportunities in a high- demand area accessible by bus and a planned future BRT route, provide
workforce dwelling units equal to eight percent of total units, and support the County’s goal of
increasing affordable housing supply. Building 6 is located in the same PDC District, is physically
connected to Buildings 4 and 5, and shares the site characteristics supporting the existing
redevelopment program. A unified development plan for all three buildings therefore advances the
same Comprehensive Plan and RREIP objectives.
Prior EIP Approval . On February 21, 2023, the Board of Supervisors approved the inclusion of
Buildings 4 and 5 in the prior Economic Incentive Program. Those properties have not received
any tax benefits under that approval, and the Applicant proposes to disenroll or rescind any benefits
under the prior EIP if the three -parcel assemblage is approved for inclusion in the 2026 RREIP.
The prior EIP approval concerned Buildings 4 and 5; Building 6 is included here through the newly
proposed three-parcel assemblage.
7. Necessity of Partial Tax Exemption
The Buildings 4 and 5 program has not been completed or placed in service, and those properties
have not utilized the benefits of the prior EIP approval. The partial real estate tax exemption
available under the RREIP is necessary to support capitalization of the complex office -to-
residential/live-work conversion of Buildings 4 and 5. Building 6 faces the same market
conditions—elevated material and labor costs, rising interest rates, and capitalization -rate
pressures—that make adaptive reuse financing difficult to obtain. These market dynamics
demonstrate that an incentive is needed to attract the capital required for either an office renovation
or a residential/live -work conversion—exactly the kind of outcome the RREIP was designed to
support. The tax benefit is not triggered for a pa rcel until its improvements are substantially
complete and final inspection and valuation are completed, and the start of the benefit period can
be delayed on a parcel -by-parcel basis. That flexibility accommodates Building 6’s longer
development timeline. The RREIP’s 10-year benefit period also aligns with the Opportunity Zone
investment hold period, and that symmetry is a meaningful factor in attracting Opportunity Zone
capital.
The conversion of the two large, chronically vacant office buildings in the Buildings 4 and 5
program involves substantial construction complexity and cost. These challenges are compounded
by elevated material and labor costs, rising interest rates, and capitalization-rate pressures that have
materially affected the feasibility of adaptive reuse projects in the current market environment.
Without the partial tax exemption, the Buildings 4 and 5 program could not achieve the financing
structure necessary to support capitalization and proceed to construction.
For the Buildings 4 and 5 parcels, the 2023 base assessed value was $34,875,310, and the estimated
post-development value upon stabilization is approximately $260 million. These figures relate to
the Buildings 4 and 5 program; the final RREIP Base Value and post-improvement valuations for
each parcel will be determined by the Department of Tax Administration under Article 32. The
RREIP benefit for each parcel is calculated on the increment between its Base Value and its fair
market value after that parcel’s improvements are substantially complete.
Attachment 2
106
VAN
5111 LEESBURG PIKE
LOT 37B
SKYLINE 4BLDG HT = 129.81'
FF = 264.00'
5113 LEESBURG PIKE
LOT 39B
SKYLINE 5BLDG HT = 129.81'
FF = 264.00'
S. GEORGE MASON DRIVE - RTE 3449
(VARIABLE WIDTH PUBLIC R/W)POSTED SPEED LIMIT = 35 MPH
VAN
COURTYARD
(FOR MORE INFORMATION SEE LA PLAN)
COURTYARD
(FOR MORE INFORMATION SEE LA PLAN)
5109 LEESBURG PIKE
LOT 40A1
SKYLINE 6BLDG HT = 140'
FF = 264.00'
PROFESSIONAL SEAL
FILE: Q:\Projects\5629\5629AT\CADD\ENGINEERING\EXHIBITS\WORKING\PBASE EXHIBITS\5629AT - 00.00 PBASE - SAVE AS.dwg USER: Kelly DATE: October 5, 2026 TIME: 4:17:51 PM LAYOUT: PBASE
PLAN STATUSDATE
DRAWN BY:
DESIGNED BY:
DATE ISSUED:
SHEET
NO.
VIKA
NO.
DWG.
SCALE:
DATE
POST-APPROVAL
SHEET STATUS
VIKA VIRGINIA, LLC
8180 Greensboro Dr., Suite 200
Tysons, VA 22102
703.442.7800 | vika.com
FAIRFAX COUNTY, VIRGINIA
THE INFORMATION, DESIGN, AND CONTENT OF THESE DRAWINGS AND/OR
DOCUMENTS HERETO ARE PROPRIETARY TO VIKA VIRGINIA, L.L.C. AND
CONSTITUTE ITS PROPRIETARY INTELLECTUAL PROPERTY. THESE DRAWINGS
AND/OR DOCUMENTS MUST NOT BE DIGITALLY FORWARDED, SHARED OR COPIED,
DIGITALLY CONVERTED, MODIFIED, OR USED FOR ANY DESIGN PURPOSE, IN ANY
FORMAT, WITHOUT PRIOR WRITTEN AUTHORIZATION FROM VIKA VIRGINIA, L.L.C.
VIOLATIONS MAY RESULT IN PROSECUTION. ONLY APPROVED, SIGNED AND
SEALED PLANS OR DRAWINGS MAY BE UTILIZED FOR RECORDING AND/OR
CONSTRUCTION PURPOSES.
© 2021 VIKA VIRGINIA, L.L.C.
5629AT
SKYLINE 4-6
10/05/2026
2 OF 2
1"=30'
SITE PLAN
EXHIBIT
RREIP
APPLICATION
AREA:
SKYLINE
BUILDINGS 4,
5, AND 6
COLONADE
SKYLINE 4 AND 5 - PHASE 1
SKYLINE 6 - PHASE 2
Attachment 3
107
APPROXIMATE LIMITS
OF SKYLINE 4 GARAGE
APPROXIMATE LIMITS
OF SKYLINE 5 GARAGE
APPROXIMATE LIMITS OF SKYLINE 6 GARAGE
ONE UNIFIED GARAGE FOR ALL
3 BUILDINGS
PROFESSIONAL SEAL
FILE: Q:\Projects\5629\5629AT\CADD\ENGINEERING\EXHIBITS\WORKING\COMBINED GARAGE EXHIBIT.dwg USER: Kelly DATE: October 5, 2026 TIME: 4:19:32 PM LAYOUT: BORD
PLAN STATUSDATE
DRAWN BY:
DESIGNED BY:
DATE ISSUED:
SHEET
NO.
VIKA
NO.
DWG.
SCALE:
DATE
POST-APPROVAL
SHEET STATUS
VIKA VIRGINIA, LLC
8180 Greensboro Dr., Suite 200
Tysons, VA 22102
703.442.7800 | vika.com
FAIRFAX COUNTY, VIRGINIA
THE INFORMATION, DESIGN, AND CONTENT OF THESE
DRAWINGS AND/OR DOCUMENTS HERETO ARE PROPRIETARY
TO VIKA VIRGINIA, L.L.C. AND CONSTITUTE ITS PROPRIETARY
INTELLECTUAL PROPERTY. THESE DRAWINGS AND/OR
DOCUMENTS MUST NOT BE DIGITALLY FORWARDED, SHARED
OR COPIED, DIGITALLY CONVERTED, MODIFIED, OR USED FOR
ANY DESIGN PURPOSE, IN ANY FORMAT, WITHOUT PRIOR
WRITTEN AUTHORIZATION FROM VIKA VIRGINIA, L.L.C.
VIOLATIONS MAY RESULT IN PROSECUTION. ONLY APPROVED,
SIGNED AND SEALED PLANS OR DRAWINGS MAY BE UTILIZED
FOR RECORDING AND/OR CONSTRUCTION PURPOSES.
© 2021 VIKA VIRGINIA, L.L.C.
SKYLINE 4-6
10/05/2026
1 OF 2
1"=50'
5629
COMBINED GARAGE
EXHIBIT
SKYLINE 4 AND 5
PHASE 1 GARAGE REPAIR
SKYLINE 6
PHASE 2 GARAGE REPAIR
Attachment 3
108
initiatives
County of Fairfax, Virginia
To protect and enrich the quality of life for the e people, neighborhoods and diverse communities of Fairfax County
October 5, 2026
Brian Gribble, Manager, The Liberty Solution LLC
MTP-5109 Leesburg LLC
1464 Center Park Drive
Charlotte, NC 28217
Tax Map Reference #(s): 62-3((1))40A1
Property Address(es): 5109 Leesburg Pike,
Falls Church, VA 22041
Owner: MTP-5109 Leesburg LLC
Tax Abatement Case #: MA-001 2026
RE: DETERMINATION LETTER FOR SKYLINE BUILDINGS 4, 5, AND 6
Dear Mr. Gribble,
We have received your application for a partial real estate tax exemption under the Fairfax
County BUILD Program, also known as the Revitalization and Redevelopment Economic
Incentive Program, (Program) as provided by Article 32, Chapter 4 of the Fairfax County Code
for the above referenced property(s). I have reviewed your application and find that the
development as proposed is eligible for submission to the Board of Supervisors for
consideration. Please note that, while the application does appear to conform with the statutory
requirements of the program, final approval rests with the Board of Supervisors to determine
whether the proposed development is a qualifying property under the ordinance. It is important
to understand that the tax abatement is not guaranteed by virtue of the submission of this
application.
A public hearing is required to establish the Economic Revitalization Zone (ERZ) for your
property(s). The Board of Supervisors may approve the ERZ Ordinance and your program
application at one of their regularly scheduled meetings. Please work with my staff to
determine your Board meeting date for this matter.
If you have any questions, please contact JoAnne Fiebe at (703)324-9308 and/or
joanne.fiebe@fairfaxcounty.gov.
Rebec ou
Department of
ry, D ector
cono c Initiatives
cc:
Jay Doshi, Director, Department of Tax Administration
Vladimir Jadrijevic, Director of Real Estate, Department of Tax Administration
David Pellegrino, Assistant Director, Department of Tax Administration
Department of Economic Initiatives
Director's Office
12015 Route 50, Suite 510
Fairfax, Virginia 22033
Phone 703-324-9300
https://www.fairfaxcounty.gov/economic-initiatives/
Attachment 4
109
Rebe
Department
ector
mic Initiatives
initiatives
County of Fairfax, Virginia
To protect and enrich the quality of life for the people, neighborhoods and diverse communities of Fairfax County
October 5, 2026
Rob Seldin, Managing Principal
5111 Leesburg LLC
1000 Maine Avenue, SW, Suite 300
Washington, DC 20024
Tax Map Reference #(s): 62-3((1))39B
Property Address(es): 5111 Leesburg Pike,
Falls Church, VA 22041
Owner: 5111 Leesburg LLC
Tax Abatement Case #: MA-001 2026
RE: DETERMINATION LETTER FOR SKYLINE BUILDINGS 4, 5, AND 6
Dear Mr. Seldin,
We have received your application for a partial real estate tax exemption under the Fairfax
County BUILD Program, also known as the Revitalization and Redevelopment Economic
Incentive Program, (Program) as provided by Article 32, Chapter 4 of the Fairfax County Code
for the above referenced property(s). I have reviewed your application and find that the
development as proposed is eligible for submission to the Board of Supervisors for
consideration. Please note that, while the application does appear to conform with the statutory
requirements of the program, final approval rests with the Board of Supervisors to determine
whether the proposed development is a qualifying property under the ordinance. It is important
to understand that the tax abatement is not guaranteed by virtue of the submission of this
application.
A public hearing is required to establish the Economic Revitalization Zone (ERZ) for your
property(s). The Board of Supervisors may approve the ERZ Ordinance and your program
application at one of their regularly scheduled meetings. Please work with my staff to
determine your Board meeting date for this matter.
If you have any questions, please contact JoAnne Fiebe at (703)324-9308 and/or
joanne.fiebe@fairfaxcounty.gov.
cc:
Jay Doshi, Director, Department of Tax Administration
Vladimir Jadrijevic, Director of Real Estate, Department of Tax Administration
David Pellegrino, Assistant Director, Department of Tax Administration
Department of Economic Initiatives
Director's Office
12015 Route 50, Suite 510
Fairfax, Virginia 22033
Phone 703-324-9300
https://www.fairfaxcounty.gov/economic-initiatives/
Attachment 4
110
fade. Ca.,' D., . b••••:
economic
initiatives
County of Fairfax, Virginia
To protect and enrich the quality of life for the people, neighborhoods and diverse communities of Fairfax County
October 5, 2026
Rob Seldin, Managing Principal
Skyline 4 LLC
1000 Maine Avenue, SW, Suite 300
Washington, DC 20024
Tax Map Reference #(s): 62-3((1))37B
Property Address(es): 5113 Leesburg Pike,
Falls Church, VA 22041
Owner: Skyline 4 LLC
Tax Abatement Case #: MA-001 2026
RE: DETERMINATION LETTER FOR SKYLINE BUILDINGS 4, 5, AND 6
Dear Mr. Seldin,
We have received your application for a partial real estate tax exemption under the Fairfax
County BUILD Program, also known as the Revitalization and Redevelopment Economic
Incentive Program, (Program) as provided by Article 32, Chapter 4 of the Fairfax County Code
for the above referenced property(s). I have reviewed your application and find that the
development as proposed is eligible for submission to the Board of Supervisors for
consideration. Please note that, while the application does appear to conform with the statutory
requirements of the program, final approval rests with the Board of Supervisors to determine
whether the proposed development is a qualifying property under the ordinance. It is important
to understand that the tax abatement is not guaranteed by virtue of the submission of this
application.
A public hearing is required to establish the Economic Revitalization Zone (ERZ) for your
property(s). The Board of Supervisors may approve the ERZ Ordinance and your program
application at one of their regularly scheduled meetings. Please work with my staff to
determine your Board meeting date for this matter.
If you have any questions, please contact JoAnne Fiebe at (703)324-9308 and/or
joanne.fiebe@fairfaxcounty.gov.
Reb Director
Dep 'c Initiatives
cc:
Jay Doshi, Director, Department of Tax Administration
Vladimir Jadrijevic, Director of Real Estate, Department of Tax Administration
David Pellegrino, Assistant Director, Department of Tax Administration
Department of Economic Initiatives
Director's Office
12015 Route 50, Suite 510
Fairfax, Virginia 22033
Phone 703-324-9300
https://www.fairfaxcounty.gov/economic-initiatives/
Attachment 4
111
Attachment 5
Page 1
AN ORDINANCE AMENDING APPENDIX X OF THE FAIRFAX COUNTY CODE, 1
RELATING TO ECONOMIC REVITALIZATION ZONE ORDINANCES 2
Draft of October 6, 2026 3
AN ORDINANCE to amend the Fairfax County Code by amending and 4
readopting Appendix X, relating to Economic Revitalization Zone Ordinances 5
to include new Section X-1 establishing the Skyline 4, 5, and 6 Economic 6
Revitalization Zone. 7
8
Be it ordained by the Board of Supervisors of Fairfax County: 9
10
1. That Appendix X of the Fairfax County Code is amended and readopted as follows: 11
12
APPENDIX X. – Economic Revitalization Zone Ordinances. 13
The following ordinance has been adopted by the Board of Supervisors pursuant to Article 14
32 of Chapter 4 of the Code. 15
16
X-1. – Skyline 4, 5, and 6 Economic Revitalization Zone (MA-001 2026). 17
(a) Application Number MA-001 2026 is approved. The following parcels of land situated in 18
the Baileys Crossroads/Seven Corners Incentive Area as described in Sec. 4-32-5(b), and 19
more particularly described herein, comprise the Skyline 4, 5, and 6 Economic 20
Revitalization Zone and collectively constitute a Qualifying Property under Article 32: 21
22
Initial Owners: County Tax Map Parcel
Number:
Acreage (approx.):
Skyline 4, LLC 62-3((1)) parcel 37B 3.001 acres
5111 Leesburg LLC 62-3((1)) parcel 39B 1.799 acres
MTP-5109 Leesburg LLC 62-3((1)) parcel 40A1 1.718 acres
23
(a) The Skyline 4, 5, and 6 Economic Revitalization Zone ordinance is subject to the following 24
provisions: 25
1. The effective date of this ERZ will be January 1, 2030, and this ordinance will terminate 26
on the termination date, which is December 31, 2039. 27
2. The timeframe enumerated above constitutes the incentive period for the Skyline 4, 5, 28
and 6 Economic Revitalization Zone. Real estate tax incentives as set forth in Section 29
4-32-8 will be effective between January 1 of the tax year following the year in which 30
substantial completion occurs or the effective date, whichever is later, and will 31
terminate on the termination date. All incentives terminate no later than the termination 32
112
Attachment 5
Page 2
33
34
35
36
3. 37
38
39
40
4. 41
42
43
44
45
46
47
48
date for the Skyline 4, 5, and 6 Economic Revitalization Zone listed above, and subject
to earlier termination as set forth in Article 32. The real estate assessment on the subject
parcels will revert to full fair market value immediately after the termination date or
earlier termination.
That the provisions of this ordinance are severable, and if any provision of this
ordinance or any application thereof is held invalid, that invalidity will not affect the
other provisions or applications of this ordinance that can be given effect without the
invalid provision or application.
That this Ordinance will become effective on January 1, 2030.
GIVEN under my hand this ______ day of ______, 2026
____________________________
Jill G. Cooper
Clerk for the Board of Supervisors 49
50
113
Board Agenda Item
October 27, 2026
ADMINISTRATIVE – 4
Extension of Review Period for 2232 Application for AT&T Boulevard Estates
Telecommunication Site (Braddock District)
ISSUE:
Extension of review period for 2232 application to ensure compliance with review
requirements of Section 15.2-2232 of the Code of Virginia.
PROJECT DESCRIPTION:
General Dynamics is requesting 2232 approval to expand an existing
telecommunication compound to install a diesel generator, concrete pad, and fencing.
The extension period request is to allow the applicant, county agency review, and the
Planning Commission sufficient time to complete the 2232 review.
The review period for the following application should be extended:
2232-2026-BR-00006 General Dynamics
Tax Map No. 56-4 ((1)) 20A
4904 Mattie Moore Ct, Fairfax, VA 20108
Braddock District
Accepted September 16, 2026
Requesting extension to August 25, 2027
RECOMMENDATION:
The County Executive recommends that the Board extend the review period for the
following application: 2232-2026-BR-00006.
TIMING:
Board action is requested on October 27, 2026, to extend the review period for the
application prior to the expiration of the review period on November 15, 2026.
BACKGROUND:
Subsection B of Section 15.2-2232 of the Code of Virginiastates: “Failure of the
commission to act within 60 days of a submission, unless the time is extended by the
governing body, shall be deemed approval.” The full length of an extension period may
not be necessary, and any extension is not intended to set a date for final action.
114
Board Agenda Item
October 27, 2026
EQUITY IMPACT:
None.
FISCAL IMPACT:
None.
ENCLOSED DOCUMENTS:
None.
STAFF:
Jennifer Miller, Deputy County Executive
Tracy Strunk, Director, Department of Planning and Development (DPD)
Salem Bush, Branch Chief, Public Facilities and Development Review Branch, Planning
Division, DPD
Mohamed Ali, Planner II, Public Facilities and Development Review Branch, Planning
Division, DPD
115
Board Agenda Item
October 27, 2026
ADMINISTRATIVE – 5
Approval of a Resolution to Authorize Execution of a Low-No Emission Grant and Bus
Transfer Agreement with the Washington Metropolitan Area Transit Authority
ISSUE:
Board of Supervisors’ (Board) approval of a resolution (Attachment 1) for Fairfax County
to execute a Low-No Emission Grant and Bus Transfer Agreement with the Washington
Metropolitan Area Transit Authority (WMATA) for the purchase of hybrid-electric
replacement buses for the Connector Fleet. Board approval is also requested to
authorize the Director (or designee) of the Fairfax County Department of Transportation
(FCDOT) to execute the agreement, substantially in the form of Attachment 2.
RECOMMENDATION:
The County Executive recommends that the Board approve a resolution (Attachment 1)
authorizing the Director of FCDOT (or designee) to execute an agreement (Attachment
2) with WMATA, for the purchase of hybrid-electric replacement buses.
TIMING:
Board approval is requested on October 27, 2026, so that hybrid-electric replacement
buses can be procured for the Connector fleet, thus allowing the County to continue to
meet customer demands for safe, affordable, and environmentally sustainable public
transportation.
BACKGROUND:
On April 11, 2023, the Fairfax County Board of Supervisors authorized support for
WMATA’s application to Federal Transit Administration’s (FTA) Low or No Emission
Grant Program and Buses and Bus Facilities Competitive Grant Program to assist with
the conversion of the Cinder Bed Garage from storing and maintaining diesel buses to
battery-electric buses. At that time, the County had envisioned using battery-electric
buses on the Richmond Highway Bus Rapid Transit (BRT) project and had identified the
Cinder Bed Garage as the most appropriate, cost-effective location to maintain the BRT
fleet. Through this action, the Board also authorized local share match financial support
for the grant application in the amount of $4.3 million.
116
Board Agenda Item
October 27, 2026
On August 30, 2023, FTA awarded WMATA $104.0 million in discretionary, Section
5339c (Low or No Emission Grant) funding to support the conversion of the Cinder Bed
Garage to a battery-electric facility. On July 23, 2025, FTA sent letters to all Low or No
Emission Grant Program recipients informing them that they would be allowed to
convert their grant awards away from electric bus infrastructure and electric buses to
support the purchase of hybrid-electric buses, due to “the infeasibility of employing zero-
emission technology or the economic burden and operational challenges associated
with use of such technology, along with an interest in making prudent investment
decisions with public dollars.” In December 2025, WMATA leadership contacted the
County Executive to confirm the County’s interest in remaining partners in the grant and
offered the County the opportunity to join in the purchase of hybrid-electric vehicles, to
which the County agreed.
To facilitate the purchase and delivery of buses from WMATA to the County, WMATA
explored alternatives with FTA. Based on those discussions, FCDOT staff believe it
would be prudent to allow WMATA to purchase the buses on the County’s behalf, using
the Connector’s specifications and FTA’s regulations to do so.
On July 23, 2026, the WMATA Board approved a resolution to move forward with the
purchase and transfer of hybrid-electric buses on behalf of the County. FTA is seeking a
similar resolution from the County (Attachment 1) to verify the County’s intent to enter
into an agreement with WMATA for the purchase and transfer of the vehicles. If
approved, WMATA will immediately begin the procurement process on behalf of the
County.
EQUITY IMPACT:
Fairfax Connector buses support the economic growth, health, congestion mitigation,
and prosperity goals of Fairfax County. The bus replacement program exists to replace
rolling stock which has reached the end of its useful life. This grant request would
maintain existing service levels. As such, this Board item has no inequity concerns
identified.
FISCAL IMPACT:
Grant funding up to $17.0 million from the Low or No Emission Grant Program will be
used for the purchase of replacement buses for Fairfax Connector. The Local Cash
Match (LCM) required, $3.0 million, is 17.6 percent of the award. Budgetary
adjustments required to reflect the LCM in Fund 40000, County Transit Systems,
117
Board Agenda Item
October 27, 2026
supported by state aid, will be made as part of a future quarterly budget review. There is
no General Fund impact associated with entering into this agreement.
ENCLOSED DOCUMENTS:
Attachment 1: Resolution for the Execution of a Bus Transfer Agreement with the
Washington Metropolitan Area Transit Authority (WMATA)
Attachment 2: Low-No Emission Grant and Bus Transfer Agreement
STAFF:
Jennifer Miller, Deputy County Executive
Gregg Steverson, Director, Fairfax County Department of Transportation (FCDOT)
Martha Coello, Deputy Director, FCDOT
Dwayne Pelfrey, Chief, Transit Services Division, FCDOT
Noelle Dominguez, Chief, Coordination and Funding Division, FCDOT
Vanessa Aguayo, Chief, Capital Projects Section, FCDOT
ASSIGNED COUNSEL:
Joanna Faust, Senior Assistant County Attorney
118
RESOLUTION
AGREEMENT EXECUTION RESOLUTION
A RESOLUTION FOR THE BOARD OF SUPERVISORS OF THE COUNTY OF FAIRFAX,
VIRGINIA
FOR THE EXECUTION OF A BUS TRANSFER AGREEMENT WITH
THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY (WMATA)
At a regular meeting of the Board of Supervisors of Fairfax County, Virginia, held in the Board
Auditorium of the Government Center in Fairfax, Virginia, on Tuesday, October 27, 2026, at
which meeting a quorum was present and voting, the following resolution was adopted:
WHEREAS, Chapter IV , Section 3(r)(8)(a)(ii) of Federal Transit Administration (FTA) Circular
5010.1F requires a resolution from the Board of Supervisors for the transfer of rolling stock (e.g.,
transit vehicles); and
WHEREAS, FTA awarded WMATA discretionary grant funding under the Section 5339c Low-
No Emission Vehicle Discretionary Grant program to procure replacement buses (the “Award”);
and
WHEREAS, the Award includes $17,000,000.00 (the “Allocated Share”) towards the purchase
of replacement buses (the “Buses”) for Fairfax County (the “County”); and
WHEREAS, the County will provide the required local match in the amount of $3,000,000.00
(the “Local Match”); and
WHEREAS, subject to FTA approval, and consistent with the requirements for the transfer of
rolling stock to another transit entity set out in FTA Circular 5010.1F, WMATA and the County
intend for WMATA to use the Allocated Share, including the Local Match, to purchase and
subsequently transfer the Buses to the County.
NOW, THEREFORE, BE IT RESOLVED, that the Board of Supervisors authorizes the
transfer of replacement buses from WMATA to Fairfax County using $17,000,000 of the Section
5339c Low-No Emission Vehicle Discretionary Grant awarded to WMATA to procure
replacement buses and, whereby, Fairfax County will provide the $3,000,000 local match.
FURTHER BE IT RESOLVED, that the Board of Supervisors authorizes the Director of the
Fairfax County Department of Transportation, or his designee, to execute the Bus Transfer
Agreement with WMATA, substantially in the form of that attached hereto as Attachment 2,
along with any resulting bill of sale or other documents needed to transfer the buses to Fairfax
County.
FURTHER BE IT RESOLVED, that to timely effectuate the transfer of the Buses to Fairfax
County, this Resolution shall be effective immediately.
ADOPTED this 27th day of October 2026.
A Copy Teste:
_____________________________
Jill G. Cooper
Clerk to the Board of Supervisors
119
LOW-NO EMISSION GRANT & BUS TRANSFER AGREEMENT
BETWEEN THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
AND FAIRFAX COUNTY, VIRGINIA
THIS LOW-NO EMISSION GRANT & BUS TRANSFER AGREEMENT (this “Agreement”)
is executed and made effective as of the date last set forth below (the “Effective Date”), by and between
(i) WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY, an interstate compact agency
and instrumentality of the District of Columbia, the Commonwealth of Virginia and the State of Maryland,
created with the consent of the United States Congress (“ WMATA”); and (ii) FAIRFAX COUNTY,
VIRGINIA, a Virginia body politic (the “County”) (WMATA and the County, each referred to by name or
as a “Party” and collectively the “Parties”).
WHEREAS, the Federal Transit Administration (“ FTA”) awarded WMATA the total amount
of One Hundred Four Million and No/100 Dollars ($104,000,000.00) in discretionary grant funding under
the Section 5339(c) Low-No Emission Vehicle Discretionary Grant program to procure replacement buses,
as set forth in Exhibit A (the “Award”); and
WHEREAS, the Award includes Eighty-Seven Million and No/100 Dollars ($87,000,000.00) for
busesreplacementofpurchasethe WMATAfor and MillionSeventeen
and No/100 Dollars ($17,000,000.00) “(the ShareAllocated ”) allocated towards ofpurchasethe
replacement buses for the County (the “Fairfax Buses”); and
WHEREAS, WMATA executed that certain Contract FBMNT233274 -BTK with New Flyer of
America, Inc. (the “Vendor”) on or about November 24, 2024 for the procurement of buses (the “Purchase
Contract”), and WMATA will exercise available Options to purchase the Fairfax Buses; and
WHEREAS, the County will provide the required local match toward the Allocated Share, in the
amount of Three Million and No/100 ($3,000,000.00) (the “Local Match”); and
WHEREAS, WMATA will use the Allocated Share, including the Local Match provided by the
County, to purchase and subsequently transfer the Fairfax Buses to the County, in accordance with FTA’s
approval and consistent with the requirements, including without limitation, those requirements of FTA
Circular 5010.1F Chapter III, Section 7.i. (the “Transfer”); and
WHEREAS, the Parties desire to memorialize the terms and conditions under which the Transfer
will occur in this Agreement; so
NOW, THEREFORE, based on the foregoing understanding and in consideration of the mutual
covenants, obligations, terms and conditions provided herein, the Parties hereby agree as follows:
1. LOCAL MATCH. Concurrently with the execution of this Agreement, the County shall
provide the Local Match to WMATA.
2. PROCUREMENT. WMA TA shall maintain full control over the purchasing process set
forth in the Purchase Contract. WMATA shall receive input from the County, but County shall not have the
power to vote, select, or veto decisions related to the Purchase Contract. WMA TA will make reasonable
efforts to obtain any applicable m odification, and FTA approval thereof, and to make any minor
modifications, as may be allowed within the Purchase Contract, so long as such modification(s) do(es) not
constitute a material or cardinal change under the terms of the Purchase Contract. Any other costs imposed
under the Purchase Contract above and beyond the direct procurement of the Fairfax Buses, such as first
article inspection and post-delivery audit, shall be at the cost and expense of the County.
3. PURCHASE. Upon receipt of the Award, execution of this agreement, and receipt of the
Local Match, WMATA shall use the Allocated Share to purchase the Fairfax Buses.
Attachment 2
120
4. ACCEPTANCE. WMATA and County representative shall perform a first article
inspection (FAI) and review a first pilot bus at the Vendor’s manufacturer’s facility to confirm it matches
the specifications that WMATA, the County, and the V endor have agreed (the “Specifications”) as well as
an inspection of each of the Fairfax Buses by a resident inspector at the Vendor’s manufacturing facility.
Upon acceptance for shipping and Vendor’s delivery to WMATA’s Carmen Turner Facility, WMATA will
perform a post-delivery inspection. Upon WMATA’s and the County’s satisfaction that the Fairfax Buses
meet the Specifications, WMATA shall, upon delivery and acceptance of the production, enter the Fairfax
Buses into WMATA ’s inventory.
5. CONDITIONS PRECEDENT. WMATA shall thereafter transfer the Fairfax Buses to the
County upon the satisfaction of all of the following conditions precedent:
a. WMATA has received the Award.
b. The County has provided the Local Match to WMATA and shall have certified to
WMATA and (if required) the FTA, that the County has buses in the disposition process to ensure the County
satisfies the requirement to dispose of buses for each of the new replacement Fairfax Buses.
c. The Parties have satisfied all applicable requirements set forth in FTA Circular
5010.1F, the Award, and conditions of the FTA Master Agreement, including, without limitation, the
requirement for documentation of a written request for approval to transfer vehicles, a board resolution
from each recipient, a rolling stock status report, and FTA concurrence of the Transfer.
d. The Parties have performed all of their respective obligations set forth in Sections
1-4 above.
6. TRANSFER. Upon satisfaction of all of the conditions precedent set forth in Section 5
above, WMATA shall thereafter transfer the Fairfax Buses, including the FTA obligations attached thereto,
to the County. The County will immediately incorporate the Fairfax Buses into the County’s fleet status and
provide documentation evidencing such incorporation to WMA TA and the FTA and confirming disposal of
the buses that have been replaced. All FTA required terms and conditions of the Award shall follow the
Fairfax Buses. The County will notify the FTA of the transfer of assets and comply with and assume all
obligations associated with the transfer of federally -assisted assets including the Satisfactory Continuing
Control requirements. The County will assume the federal interests, obligations and any and all FTA
required terms and conditions of the Award. WMATA will not be responsible for any costs associated with
this Agreement, including, without limitation, the Award, Fairfax Buses, Transfer or any other transaction
or assurance contemplated hereunder.
7. TERM. This Agreement is effective as of the Effective Date and will terminate upon the
County’s acceptance of the Fairfax Buses, provided, however, that the terms of Section 6 shall not terminate
until the termination of the federal interest in the Fairfax Buses.
8. REPRESENTATIONS. The Parties represent to one another, each on behalf of
themselves, as of the date of the execution of this Agreement, that (a) such Party has full power and authority
to enter into the transactions contemplated by this Agreement and to carry out its obligations hereunder; (b)
such Party has duly authorized the execution and delivery of this Agreement; (c) when executed and
delivered by the Parties, this Agreement will constitute the legal, valid and binding obligation of the
individual Party enforceable in accordance with its terms; and (d) no officer or employee of such Party who
exercises or has exercised any functions or responsibilities over any procurement contract shall have or
obtain a personal or financial interest or benefit from any activity in connection with any such procurement
contract or have any interest in any contract, subcontract, or agreement with respect therewith during the
term of this Agreement.
9. MISCELLANEOUS.
Attachment 2
121
a. Governing Law . This Agreement shall be governed by the laws of the
Commonwealth of Virginia, except where any law conflicts with the WMATA Compact, the Compact shall
control.
b. Disputes. Any disputes between the parties arising out of this Agreement may be
disposed of by the Parties by written agreement and/or amendment of this Agreement. If the Parties cannot
resolve the dispute, then the Party seeking a resolution shall provide written notice of the nature of the
dispute and the issue(s) to the other Party. If the dispute is not resolved by the Parties within thirty (30) days
of such notice, the Parties agree that the Director of the Fairfax County Department of Transportation/the
County Executive and the general manager and chief executive officer of WMATA shall attempt to resolve
such dispute without court action within thirty (30) days thereafter. If the dispute is not resolve within such
thirty (30) days, either Party may commence a civil action for resolution of the dispute in the United States
District Court for the Eastern District of Virginia, Alexandria Division. Notwithstanding any provision to
the contrary contained in this Agreement, prejudgment interest shall not be paid by one Party to the other
Party.
c. No Waiver of Immunity. This Agreement shall not be construed as a waiver of
either Party’s respective immunities, including, without limitation, municipal and sovereign immunity.
d. Notices. Any notice required or permitted under this Agreement shall be in writing
and shall be delivered by hand, sent by courier, sent by prepaid registered or certified mail with return
receipt requested and addressed as appropriate to the following addresses (or to such other or further
addresses as the Parties may designate by notice given in accordance with this paragraph), with copy sent
by electronic mail, to the extent such recipient’s email address is provided below:
If to WMATA: General Manager and CEO
Washington Metropolitan Area Transit Authority
300 7th Street SW
Washington, DC 20024
with copy to: Executive Vice President and Chief Financial Officer
Washington Metropolitan Area Transit Authority
300 7th Street SW
Washington, DC 20024
with copy to: Executive Vice President, Chief Legal Officer, and
General Counsel
Washington Metropolitan Area Transit Authority
300 7th Street SW
Washington, DC 20024
with copy to: Executive Vice President and Chief Operations Officer
Washington Metropolitan Area Transit Authority
Attachment 2
122
300 7th Street SW
Washington, DC 20024
If to the County: Director
Fairfax County Department of Transportation
4050 Legato Road, Suite 400
Fairfax, V A 22033
with copy to: Office of the County Attorney
12000 Government Center Parkway, Suite 549
Fairfax, V A 22035
Such correspondence shall be deemed delivered, upon the earlier to occur of (i) the day delivered by hand
delivery; (ii) the third day following the day on which the same shall have been mailed by U.S. registered
or certified mail, return receipt requested, with all postal charges prepaid, to the respective addresses set
forth below; (iii) the day delivered by email and acknowledged by the recipient; or (iv) actual receipt at the
Parties’ addresses.
e. Legislative Compliance.
i. Civil Rights & Nondiscrimination . The County shall comply with the
requirements set forth in the FTA Master Agreement, as applicable to the Award, and any successor thereto,
including, without limitation, those requirements set forth in thereof.
ii. Anti-Drug; Anti-Alcohol. The County shall comply with those federal
laws, regulations, executive orders or guideline strictures regarding anti-drug and alcohol policy in transit
work and operations, which include, but is not limited to, the following: "Drug -Free Workplace Act
(DFWA) of 1988," 49 USC Sections 702 et seq.; “Requirements for a Drug-Free Workplace (Grants)," 49
C.F.R. Part 29; Prevention of Prohibited Drug Use in Transit Operations," 49 C.F.R. Part 653; and
Prevention of Alcohol Misuse in Transit Operations," 49 C.F.R. Part 654.
f. Entire Agreement. Nothing in this Agreement shall be construed to modify or
diminish or supersede any existing rights, agreements, or arrangements between WMATA and the County.
Except for the representations contained in this Agreement, WMA TA does not make, and hereby disclaims,
any other representations.
g. Amendments. Except as otherwise provided herein, any amendment or
modification in any respect to the terms and conditions of this Agreement shall be made by an instrument
in writing signed by both Parties.
h. Relationship. This Agreement shall not be construed as creating a partnership,
joint venture or other relationship between the Parties, it being understood that each Party shall be and
remain a separate and independent entity for all purposes hereof. In no event shall WMATA be liable to the
County or any third party, whether in contract or in tort or in any other legal theory (including, without
limitation, strict liability, or negligence) for any claims, damages, losses, liabilities, or expenses arising out
of or in connection with the performance of this Agreement.
i. No Assignment. No transfer or assignment of this Agreement, or of any part
thereof or interest therein, directly or indirectly, voluntarily or involuntarily, shall be made unless consent
for such transfer or assignment is first approved in writing by the Parties
Attachment 2
123
j. Headings. The headings throughout this Agreement are for convenience and
reference only and shall in no way be held to explain, modify, amplify or aid in the interpretation,
construction, or meaning of the provisions of this Agreement.
k. Counterparts. This Agreement may be signed in one or more identical
counterparts, whether transmitted by electronic mail or otherwise. Each such counterpart shall be deemed
an original for purposes of this Agreement.
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date last set forth
with their signatures hereto below.
WMATA:
THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
By:
Executive Vice President and Chief Financial Officer Dated
FAIRFAX COUNTY:
FAIRFAX COUNTY, VIRGINIA
By:
Director, Fairfax County Department of Transportation Dated
LIST OF EXHIBITS
Exhibit A Low-No Emissions Grant Award
Attachment 2
124
Board Agenda Item
October 27, 2026
ADMINISTRATIVE – 6
Approval of Traffic Calming Measures as Part of the Residential Traffic Administration
Program – Oak Drive (Mount Vernon District)
ISSUE:
Board endorsement of Traffic Calming measures as part of the Residential Traffic
Administration Program (RTAP).
RECOMMENDATION:
The County Executive recommends that the Board approve a resolution (Attachment 1)
endorsing a traffic calming plan for Oak Drive (Attachment 2), consisting of the
following:
∑ Two Speed Humps on Oak Drive (Mount Vernon District)
In addition, the County Executive recommends that the Fairfax County Department of
Transportation (FCDOT) be requested to schedule the installation of the approved traffic
calming measure(s) as soon as possible.
TIMING:
Board action is requested on October 27, 2026, to allow the proposed measure(s) to be
installed as soon as possible.
BACKGROUND:
As part of RTAP, roads are reviewed for traffic calming when requested by a Board
member on behalf of a homeowners or civic association. Traffic calming employs the
use of physical devices such as speed humps, speed tables, raised pedestrian
crosswalks, chokers, or median islands to reduce the speed of traffic on a residential
street. Staff performs engineering studies documenting the attainment of qualifying
criteria. Staff works with the local Supervisor’s office and community to determine the
viability of the requested traffic calming measure to reduce the speed of traffic. Once the
plan for the road under review is approved and adopted by staff, that plan is then
submitted for approval to the residents within the ballot area in the adjacent community.
On September 11, 2026, FCDOT received verification from the Mount Vernon District
Supervisor’s office confirming community support for the Oak Drive traffic calming plan.
125
Board Agenda Item
October 27, 2026
EQUITY IMPACT:
None.
FISCAL IMPACT:
Funding in the amount of $41,000 is necessary to fund the traffic calming measures
associated with this traffic calming project. Funds are currently available in Project
2G25-076-000, Traffic Calming Program, Fund 300-C30050, Transportation
Improvements.
ENCLOSED DOCUMENTS:
Attachment 1: Traffic Calming Resolution for Oak Drive
Attachment 2: Traffic Calming Plan for Oak Drive
STAFF:
Jennifer Miller, Deputy County Executive
Gregg Steverson, Director, Fairfax County Department of Transportation (FCDOT)
Martha Elena Coello, Deputy Director, FCDOT
Eric Teitelman, Chief, Active Transportation, Capital Projects and Traffic Engineering
Division, FCDOT
Neil Freschman, Chief, Traffic Engineering Section, FCDOT
Nicole Machacuay, Transportation Planner, Traffic Engineering Section, FCDOT
Grace Vaughn, Planning Technician, Traffic Engineering Section, FCDOT
126
127
128
Board Agenda Item
October 27, 2026
ADMINISTRATIVE – 7
Approval of Traffic Calming Measures as Part of the Residential Traffic Administration
Program – Middle Run Drive (Springfield District)
ISSUE:
Board endorsement of Traffic Calming measures as part of the Residential Traffic
Administration Program (RTAP).
RECOMMENDATION:
The County Executive recommends that the Board approve a resolution (Attachment 1)
endorsing a traffic calming plan for Middle Run Drive (Attachment 2), consisting of the
following:
∑ One Speed Hump on Middle Run Drive (Springfield District)
In addition, the County Executive recommends that the Fairfax County Department of
Transportation (FCDOT) be requested to schedule the installation of the approved traffic
calming measure(s) as soon as possible.
TIMING:
Board action is requested on October 27, 2026, to allow the proposed measure(s) to be
installed as soon as possible.
BACKGROUND:
As part of RTAP, roads are reviewed for traffic calming when requested by a Board
member on behalf of a homeowners or civic association. Traffic calming employs the
use of physical devices such as speed humps, speed tables, raised pedestrian
crosswalks, chokers, or median islands to reduce the speed of traffic on a residential
street. Staff performs engineering studies documenting the attainment of qualifying
criteria. Staff works with the local Supervisor’s office and community to determine the
viability of the requested traffic calming measure to reduce the speed of traffic. Once the
plan for the road under review is approved and adopted by staff, that plan is then
submitted for approval to the residents within the ballot area in the adjacent community.
On September 17, 2026, FCDOT received verification from the Springfield District
Supervisor’s office confirming community support for the Middle Run Drive traffic
calming plan.
129
Board Agenda Item
October 27, 2026
EQUITY IMPACT:
None.
FISCAL IMPACT:
Funding in the amount of $28,000 is necessary to fund the traffic calming measures
associated with this traffic calming project. Funds are currently available in Project
2G25-076-000, Traffic Calming Program, Fund 300-C30050, Transportation
Improvements.
ENCLOSED DOCUMENTS:
Attachment 1: Traffic Calming Resolution for Middle Run Drive
Attachment 2: Traffic Calming Plan for Middle Run Drive
STAFF:
Jennifer Miller, Deputy County Executive
Gregg Steverson, Director, Fairfax County Department of Transportation (FCDOT)
Martha Elena Coello, Deputy Director, FCDOT
Eric Teitelman, Chief, Active Transportation, Capital Projects and Traffic Engineering
Division, FCDOT
Neil Freschman, Chief, Traffic Engineering Section, FCDOT
Nicole Machacuay, Transportation Planner, Traffic Engineering Section, FCDOT
Grace Vaughn, Planning Technician, Traffic Engineering Section, FCDOT
130
Attachment 1
RESOLUTION
FAIRFAX COUNTY DEPARTMENT OF TRANSPORTATION
RESIDENTIAL TRAFFIC ADMINISTRATION PROGRAM (RTAP)
TRAFFIC CALMING MEASURES
MIDDLE RUN DRIVE
SPRINGFIELD DISTRICT
At a regular meeting of the Board of Supervisors of Fairfax County, Virginia, held in the Board
Auditorium of the Government Center in Fairfax, Virginia, on Tuesday, October 27, 2026, at
which a quorum was present and voting, the following resolution was adopted:
WHEREAS, the residents in the vicinity of Middle Run Drive have requested the Springfield
District Supervisor’s Office of Fairfax County to consider remedial measures to reduce the speed
of traffic on Middle Run Drive; and
WHEREAS, an engineering study by the Fairfax County Department of Transportation
(FCDOT) for Middle Run Drive indicates that all basic traffic calming criteria are met pertaining
to functional classification of the roadway, identification of a significant speeding concern, and
proof of community support; and
WHEREAS, the proposed Traffic Calming Plan was properly presented to the community in the
affected survey area for their review and consideration; and
WHEREAS, the Traffic Calming Plan was subsequently approved by the occupied residences
within the appropriate surveyed area; and
WHEREAS, the intended source of funding for the Traffic Calming Plan is Fairfax County.
NOW THEREFORE BE IT RESOLVED, that the Board of Supervisors endorses the
proposed Traffic Calming Plan and requests that the Virginia Department of Transportation
review and approve the feasibility of implementing traffic calming measures on Middle Run
Drive as part of FCDOT's Residential Traffic Administration Program.
ADOPTED this 27th day of October, 2026.
A Copy Teste:
.
Jill G. Cooper
Clerk for the Board of Supervisors
131
Attachment 2
Q
o
GROVELAND DR
MIDDLE RUN DR
TYROLEAN WAY
§
0
250
Tax Map: 98-1 September 2026
'CDOT
o
Q
or
gO>Ns
ST
aco
500
Z) Feet
2
Q
Fairfax County Department of Transportation
Residential Traffic Administration Program
Traffic Calming Plan
Middle Run Drive
Springfield District
%
$
£o
u>
o
o
I%
EDWARD CARR
CT
Proposed Speed Hump adjacent to
8492 & 8493 Middle Run Drive
KINGS RIDGE
CT
132
Board Agenda Item
October 27, 2026
ADMINISTRATIVE – 8
Approval of “$200 Additional Fine for Speeding” Signs as Part of the Residential Traffic
Administration Program – Lacy Boulevard (Mason District)
ISSUE:
Board endorsement of “$200 Additional Fine for Speeding” signs as part of the
Residential Traffic Administration Program (RTAP).
RECOMMENDATION:
The County Executive recommends approval of the resolution (Attachment 1) for the
installation of “$200 Additional Fine for Speeding” signs on the following road:
∑ Lacy Boulevard between Columbia Pike and Colfax Avenue (Mason District)
In addition, the County Executive recommends that the Fairfax County Department of
Transportation (FCDOT) be requested to schedule the installation of the approved
“$200 Additional Fine for Speeding” signs (Attachment 2) as soon as possible.
TIMING:
Board action is requested on October 27, 2026, to help facilitate a prompt installation of
the proposed signage.
BACKGROUND:
Section 46.2-878.2 of the Code of Virginia permits a maximum fine of $200, in addition
to other penalties provided by law, to be levied on persons exceeding the speed limit on
appropriately designated residential roadways. These residential roadways must have a
posted speed limit of 35 mph or less and must be shown to have an existing speeding
problem. To determine that a speeding problem exists, staff performs an engineering
review to ascertain that certain speed and volume criteria are met.
Lacy Boulevard (Mason District) meets the RTAP requirements for posting the “$200
Additional Fine for Speeding” signs. On August 18, 2026, FCDOT received verification
from the Mason District Supervisor’s office confirming community support.
EQUITY IMPACT:
None.
133
Board Agenda Item
October 27, 2026
FISCAL IMPACT:
Funding in the amount of $600 is available in Fund 100-C10001, Signage: $200 Fine for
Speeding.
ENCLOSED DOCUMENTS:
Attachment 1: “$200 Additional Fine for Speeding” Signs Resolution – Lacy Boulevard
Attachment 2: Area Map of Proposed “$200 Additional Fine for Speeding” Signs – Lacy
Boulevard
STAFF:
Jennifer Miller, Deputy County Executive
Gregg Steverson, Director, Fairfax County Department of Transportation (FCDOT)
Eric Teitelman, Chief, Active Transportation, Capital Projects and Traffic Engineering
Division, FCDOT
Neil Freschman, Chief, Traffic Engineering Section, FCDOT
Steven K. Knudsen, Transportation Planner, Traffic Engineering Section, FCDOT
Nicole Machacuay, Transportation Planner, Traffic Engineering Section, FCDOT
Grace Vaughn, Planning Technician, Traffic Engineering Section, FCDOT
134
Attachment 1
RESOLUTION
FAIRFAX COUNTY DEPARTMENT OF TRANSPORTATION
RESIDENTIAL TRAFFIC ADMINISTRATION PROGRAM (RTAP)
$200 ADDITIONAL FINE FOR SPEEDING SIGNS
LACY BOULEVARD
MASON DISTRICT
At a regular meeting of the Board of Supervisors of Fairfax County, Virginia (“Board of
Supervisors”), held in the Board Auditorium of the Government Center in Fairfax, Virginia, on
Tuesday, October 27, 2026, at which a quorum was present and voting, the following resolution
was adopted:
WHEREAS, Section 46.2-878.2 of the Code of Virginia enables the Board of Supervisors to
request signs alerting motorists of enhanced penalties for speeding on residential roads; and
WHEREAS, the Fairfax County Department of Transportation has verified that a bona-fide
speeding problem exists on Lacy Boulevard. Such road also being identified as a Major
Collector; and
WHEREAS, community support has been verified for the installation of "$200 Additional Fine
for Speeding" signs on Lacy Boulevard; and
WHEREAS, the intended source of funding for the signs is Fairfax County.
NOW, THEREFORE BE IT RESOLVED that the Board of Supervisors endorses “$200
Additional Fine for Speeding” signs for Lacy Boulevard.
AND FURTHER, the Virginia Department of Transportation is requested to allow Fairfax
County to install "$200 Additional Fine for Speeding" signage.
ADOPTED this 27th day of October, 2026.
A Copy Teste:
.
Jill G. Cooper
Clerk for the Board of Supervisors
135
Attachment 2
Fairfax County Department of Transportation
Residential Traffic Administration Program
Proposed $200 Additional Fine for Speeding
Lacy Boulevard
Mason District
August 2026
'CDOT
136
Board Agenda Item
October 27, 2026
ADMINISTRATIVE – 9
Authorization for the Office of Environmental and Energy Coordination to Apply for and
Accept Grant Funding from Virginia Department of Energy to Support the
Interconnection of Distributed Solar Energy Systems to the Electric Grid (Mount Vernon
District)
ISSUE:
Board of Supervisors authorization is requested for the Office of Environmental and
Energy Coordination (OEEC) to apply for and accept grant funding, if received, from the
Virginia Department of Energy (Virginia Energy), in the amount of $600,000. Funding
will cover a portion of costs for interconnecting ground-mount solar photovoltaic (PV)
panels at the I-95 Landfill Complex to the electric grid. Dominion Energy Virginia (DEV)
will impose the solar interconnection fee after it completes electric grid upgrades
deemed necessary to support the additional electric demand from the Landfill solar
system. The anticipated period of performance is six to 18 months from grant award.
No Local Cash Match is required. Board authorization is also requested for the
Chairman of the Board of Supervisors, the County Executive, and/or a designee
appointed by the County Executive to enter into the grant agreement and any related
agreements, including but not limited to Federal Subaward Agreements, on behalf of the
County. If the actual award received is significantly different from the application
amount, another item will be submitted to the Board requesting appropriation of grant
funds. Otherwise, staff will process the award administratively as per Board policy.
RECOMMENDATION:
The County Executive recommends that the Board of Supervisors authorize the Office
of Environmental and Energy Coordination to apply for and accept $600,000 in grant
funding, if awarded, from Virginia Energy to cover a portion of the utility-imposed fee for
interconnecting solar photovoltaic panels at the I-95 Landfill Complex to the electric grid.
No Local Cash Match is required. The County Executive also recommends the Board
authorize the Chairman of the Board of Supervisors, the County Executive, and/or a
designee appointed by the County Executive to enter into the grant agreement and any
related agreements, including but not limited to Federal Subaward Agreements, on
behalf of the County.
TIMING:
Board approval is requested on October 27, 2026. Due to a grant application deadline
of October 5, 2026, the application was submitted pending Board approval. This Board
137
Board Agenda Item
October 27, 2026
item is being presented at the earliest subsequent Board meeting. If the Board does not
approve this request, the application will be immediately withdrawn. The Board was
also notified via email on October 1, 2026, of the agency’s intent to apply for this grant.
BACKGROUND:
The Office of Environmental and Energy Coordination is seeking $600,000 in grant
funding through a Virginia Department of Energy funding opportunity established
through Senate Bill 659 and House Bill 683 (2026) to address one of the barriers facing
public-sector solar development: the cost of interconnecting distributed solar energy
systems to the electric grid. The funding, if awarded, will cover a portion of utility-owned
costs for interconnecting five-megawatt solar photovoltaic system at the I-95 Landfill
Complex to the electric grid.
Procured under a Power Purchase Agreement (PPA), the installing contractor owns and
operates the solar PV panels and sells the electricity generated there to Fairfax County
at a fixed dollar per kilowatt-hour rate (PPA rate) for a 30-year term. The PPA contract
allows the County to purchase renewable energy generated on-site with little or no
upfront or operational costs, thereby reducing the County’s greenhouse gas emissions
and long-term electricity costs.
Per the terms of the PPA, the PPA rate will be increased by a certain amount if the solar
interconnection fee exceeds $500,000. Dominion Energy Virginia (DEV) estimated this
fee to be $1,701,200. The $600,000 provided by the grant, if awarded, will mitigate the
increase to the PPA rate significantly, actually resulting in more than $600,000 of
additional savings over the 30-year term of the PPA.
EQUITY IMPACT:
This action supports the following One Fairfax areas of focus: a healthy and quality
environment, and a quality built and natural environment.
Installing solar photovoltaic panels on county property advances the goals and targets
of the Operational Energy Strategy (OES). Adopted in 2021, the OES includes an
overarching goal to achieve carbon neutrality in county government operations by 2040
and targets to produce 25 percent of county electricity from renewable energy
generation by 2030 and 50 percent by 2040, using FY 2018 as the baseline.
Through its efforts to achieve carbon neutrality, the county is significantly reducing its
greenhouse gas emissions and doing its part to curb the regional impacts of climate
change. Climate hazards, including extreme heat, flooding, and severe storms, often
disproportionately harm certain populations, such as low-income, disabled, or elderly
138
Board Agenda Item
October 27, 2026
populations, communities of color, those experiencing homelessness, and outdoor
workers. This action does not address the direct impacts of climate change on
vulnerable populations; such efforts are being conducted through the Resilient Fairfax
program. However, implementation of the OES and related climate mitigation efforts is
expected to reduce the severity of climate change, generating long-term benefits for the
residents of Fairfax County.
FISCAL IMPACT:
Grant funding in the amount of $600,000 is being requested from Virginia Energy to
cover a portion of the utility-imposed fee for interconnecting solar photovoltaic panels at
the I-95 Landfill Complex to the electric grid. This action does not increase the
expenditure level of the Federal-State Grant Fund as funds are held in reserve for
unanticipated grant awards in FY 2027. No Local Cash Match is required. This grant
does not allow the recovery of indirect costs.
CREATION OF NEW POSITIONS:
No new positions will be created by this grant.
ENCLOSED DOCUMENTS:
Attachment 1: Solar Interconnection Grant Program Guidelines
STAFF:
Jennifer Miller, Deputy County Executive
Robert Sandoli, Director, Office of Environmental and Energy Coordination (OEEC)
Kevin Smith, Division Manager, OEEC
Christopher S. Herrington, Director, Department of Public Works and Environmental
Services (DPWES)
Eric Forbes, Deputy Director, Solid Waste Management Program, DPWES
ASSIGNED COUNSEL:
Patricia McCay, Deputy County Attorney
139
Solar Interconnection
Grant Program Guidelines
HB683 / SB659 2026 – State Energy Office
Table of Contents
Solar Interconnection Grant Program Background..................................................................... 2
Solar Interconnection Grant Program Overview ........................................................................ 3
Budget ......................................................................................................................................... 4
Prevailing Wage Law .................................................................................................................. 4
Reporting Procedure ................................................................................................................... 4
Contracting and Invoice Payment ............................................................................................... 5
FAQs ........................................................................................................................................... 6
Application.................................................................................................................................. 7
Help & Questions........................................................................................................................ 7
Applicant Info Tab (5pts) ............................................................................................................ 8
Project Summary Tab (20pts)...................................................................................................... 8
Project Details Tab (50pts).......................................................................................................... 9
Financial Details Tab (25 pts) ....................................................................................................11
Supporting Documents...............................................................................................................11
Evaluation and Scoring Criteria .................................................................................................11
Submit Your Application........................................................................................................... 12
This document serves as a guide to applying for the Solar Interconnection Grant Program. The
Program Overview section provides the program objectives, eligibility, metrics, and funding
details. The Application section provides guidance for applying for this grant using the Virginia
Energy Grant Portal. Included as addendum is the Commonwealth of Virginia’s General Terms
and Conditions. Applicants are not required to agree to these terms and conditions to submit an
application for the award; however, acceptance of the terms and conditions will be required as a
condition of proceeding with the award in the event their project is selected. Applications are due
11:59pm, October 2, 2026.
Any questions related to your grant should be sent using the Help & Communications tab in the
Grant Portal (far left tab on the application). Virginia Energy staff will respond within five days.
The last day to submit questions is September 18, 2026.
Attachment 1
140
Solar Interconnection Grant Program 2
Solar Interconnection Grant Program Background
The Virginia General Assembly established the Solar Interconnection Grant Program through
Senate Bill 659 and House Bill 683 (2026) to address one of the barriers facing public-sector
solar development: the cost of interconnecting distributed solar energy systems to the electric
grid. While the cost of solar equipment has declined substantially over the past decade,
interconnection costs, including utility-required system upgrades, protection equipment,
engineering studies, and other infrastructure improvements, have become an increasingly
important factor affecting project feasibility.
These costs can present a challenge for local governments, school divisions, and other public
bodies that seek to invest in clean energy while remaining responsible stewards of taxpayer
funds. Even projects with strong economic returns may be delayed, down sized, or cancelled
when interconnection costs exceed available capital budgets or available grant funding. As a
result, otherwise viable public solar projects may fail to move forward despite providing long -
term energy savings.
The Solar Interconnection Grant Program, administered by the Virginia Department of Energy
(Virginia Energy), is intended to help offset these costs, enabling public bodies to pursue solar
projects that reduce energy expenditures and increase the deployment of clean energy across the
Commonwealth. The program also supports the Commonwealth's broader interest in
understanding the nature and extent of interconnection challenges facing public-sector projects.
In addition to providing financial assistance, the Program serves an important data collection and
policy development function. Current information regarding interconnection costs, timelines,
study requirements, and upgrade drivers is limited and often project specific. By collecting
standardized information from grant applicants and recipients, Virginia Energy will develop a
more comprehensive understanding of the barriers affecting public solar deployment. This
information will support the Department's required reports to the General Assembly and may
help inform future policy efforts related to distributed energy resource interconnection.
Attachment 1
141
Solar Interconnection Grant Program 3
Solar Interconnection Grant Program Overview
Solar Interconnection Grant Program offers grant funding to public bodies to offset costs
associated with the interconnection of solar facilities located on previously developed project
sites, as defined in § 56-576. Funding may be used for interconnection-related costs that are
necessary to connect an eligible solar facility to the electric distribution system, including
transformers, relays, direct transfer trip (DTT), SCADA/telemetry, metering modifications,
protection equipment, engineering, and other utility-required infrastructure necessary to
complete interconnection.
Eligibility: Virginia public bodies, as defined in § 2.2-3701, installing distributed solar projects
Total amount of funding available: Approximately $2,000,000
Anticipated Period of Performance: 6 -18 months
Proposal Amount: The Virginia Department of Energy seeks grant applications to fund
interconnection upgrade costs, up to 25% of the total solar project cost (i.e., total solar
installation + total interconnection costs) or $600,000, whichever is less. Projects that do not
meet these criteria may apply. The Virginia Department of Energy (Virginia Energy) may elect to
partially award proposals at its discretion.
Applications are due 11:59pm, October 2, 2026.
All prospective awardees must maintain an active registration in eV A.virginia.gov. Final award
approval is contingent upon review and authorization by the Virginia Department of Energy.
Virginia Energy reserves the right to make an award to one or more applicants based upon the
evaluation of applications in accordance with the requirements and evaluation criteria established
in this solicitation. Virginia Energy may make a single award, multiple awards, or no award, as
determined to be in the best interest of the Commonwealth and subject to the availability of
funding. Virginia Energy reserves the right to award the full amount requested by an applicant, a
portion of the amount requested, or amounts to multiple applicants, provided that such awards
are consistent with the purposes of the grant opportunity, available funding, and applicable state
and federal laws, regulations, and grant requirements.
Awards will be made only to applicants determined to be eligible and responsive to the
requirements of this solicitation and whose applications are determined to provide the greatest
overall benefit to the Commonwealth, consistent with the evaluation criteria stated herein.
Issuance of an award is contingent upon the applicant's continued eligibility, availability of
funding, satisfactory completion of all required pre-award documentation, and execution of the
applicable grant agreement or other required award documents. No applicant shall have a right to
funding until the applicable award documents have been fully executed by the authorized
representatives of the parties.
Attachment 1
142
Solar Interconnection Grant Program 4
Virginia Energy also reserves the right to reject any or all applications, waive minor informalities
or irregularities when permitted by applicable law, and cancel, modify, or amend this solicitation
when determined to be in the best interest of the Commonwealth.
Budget
This grant opportunity allows for interconnection-related costs that are necessary to connect an
eligible solar facility to the electric distribution system, including transformers, relays, direct
transfer trip (DTT), SCADA/telemetry, metering modifications, protection equipment,
engineering, and other utility-required infrastructure necessary to complete interconnection.
Applicants must submit the budget spreadsheet provided detailing direct costs (specifically
identifiable to the project), including personnel, fringe benefits, travel, equipment, supplies, and
contractual services, and indirect costs (shared overhead expenses such as administrative
salaries). Indirect costs must be limited to 10% or less of the applicant’s requested funding.
This grant opportunity requires compliance with all relevant Virginia procurement laws.
Prevailing Wage Law
All awardees will be required to comply with Virginia laws per the terms and conditions of the
award. Awardees are responsible for contractor and subcontractor compliance.
Projects funded through this grant are subject to Virginia’s prevailing wage requirements, which
mirror federal Davis-Bacon standards, requiring Department of Labor and Industry (DOLI) wage
determinations. Awardees and their contractors must ensure that all laborers and mechanics are
paid wages and fringe benefits at rates not less than those determined to be prevailing for the
locality and type of work performed, in accordance with applicable state law
(https://doli.virginia.gov/programs/labor-law/prevailing-wage-law/). Awardees will be responsible
for maintaining payroll records and demonstrating compliance upon request.
Reporting Procedure
Projects will be required to submit quarterly reports that document completed work and
applicable metrics listed above. Quarterly progress reports will be submitted using Virginia
Energy’s quarterly report template which requires outlining work accomplishe d, challenges
faced, and status of project timeline.
Attachment 1
143
Solar Interconnection Grant Program 5
Each project proposal should include plans for documenting invoiced work and submitting
quarterly progress reports summarizing the work completed, in addition to reporting included
with invoices.
Metrics to be used in reporting may consist of the following:
• Project location(s)
• Details on interconnection timing
• KW of generation (+ storage capacity installed, if applicable)
• Projected energy savings
• Projected carbon emissions avoided
• Community benefits achieved
• Community demographics served
• Stakeholders engaged
• Details related to interconnection upgrades, including transformers, relays, direct transfer
trip (DTT), SCADA/telemetry, metering modifications, protection equipment, engineering,
and other utility-required infrastructure necessary to complete interconnection.
Awardees must maintain and provide sufficient records to substantiate this information upon
request. Upon project completion, awardees must provide lists and photos of any equipment
installed using grant funding.
Each project proposal should include plans for documentation of invoiced work as well as
quarterly progress reports summarizing completed work and providing applicable information
discussed above.
Note: If the data is proprietary, generalized data and statistics should be provided to show the
outcomes in the report.
Contracting and Invoice Payment
Grant awardees will be required to enter into a contract agreement with Virginia Energy after
receiving the award. This agreement will include the required state terms and conditions.
Contracts involving construction are subject to retainage amounts up to 5% of the total
construction amount.
Invoices are required at least once a month and must be received by the 15th of each month.
Invoices will only be paid upon completion and acceptance by the agency of any portion of the
contracted work and upon submission of a properly itemized invoice. Final payments may be
withheld until final internal auditing of each contract is completed.
Attachment 1
144
Solar Interconnection Grant Program 6
FAQs
Can third parties support public bodies in their applications? Can third parties apply on
behalf of public bodies?
Third parties, such as solar installers, contractors, non-profits, and other entities, may support
public bodies in their applications. However, the application must be submitted by the public
body. If awarded, the public body would receive and administer the grant. Please note that this
grant opportunity requires compliance with all relevant Virginia procurement laws.
At what stage in the interconnection process can projects apply?
Due to the timeline of funding, projects are highly recommended to have a completed
interconnection study and understanding of the costs of upgrades required at the time of
application.
What types of projects are eligible?
This grant is to fund interconnection upgrade related costs for distributed solar installation on
Virginia public bodies (behind-the-meter or front-of-the-meter). Non-interconnection related
costs are not eligible for funding through this grant.
What is the timeline for selection?
Once the applications close, Virginia Energy staff will work diligently to select projects. We
expect to score, select, and begin financial vetting and contracting within ten to twelve weeks of
the final deadline.
Attachment 1
145
Solar Interconnection Grant Program 7
Application
All grant applicants must use the application format provided and must apply via the Virginia
Energy Grant Portal. If it is the first time using the system, applicants will be required to create a
user account, or log into an existing account if the system has been used previously. Note that
applications will be linked to the applicant’s account. While additional contacts may be listed
on the application, the applicant should be the primary point of contact for all grant-related
communication. At this time, applications created under a user account cannot be accessed by
other members of the same organization.
Follow word counts provided and note that any text longer than the provided word count will not
be scored. Applications may include additional appendices or attachments to support the
application, but these should be limited to essential information. Any non-essential information
will not be considered in the applicant’s score. Carefully review the program guidelines and
example terms and conditions. Proposals will be evaluated on a competitive basis and will be
awarded based on the perceived highest merit and alignment with objectives identified in the
guidelines. Awards will be made based on the scoring indicated in the application sections below.
Note that all proposals are subject to the Freedom of Information Act (FOIA).
Proposals for this funding will be accepted until 11:59pm, October 2, 2026. Only applications
that are complete and submitted by the stated deadline will be considered for review.
Help & Questions
If you have a question on your application, enter it in the Help & Questions tab of your application
(far left tab) and Virginia Energy will respond. Please allow 5 business days for a response. The
last day to submit questions is September 18, 2026.
Attachment 1
146
Solar Interconnection Grant Program 8
This document serves as a guide to the application section tabs in the Virginia Energy Grant
Portal. Applications will be evaluated by committee based on a 100-point scale, outlined below.
Save your responses in a master application document with the below headers (noting word count
maximums) and submit the complete application document in the “Supporting Documents”
section. From the master document , you may (but are not required to) copy your responses for
each tab into the Grant Portal.
Applicant Info Tab (5pts)
Contact Information: Provide the name and all relevant contact information, including
physical and email addresses and phone numbers, of the primary contact for purposes of
application and administration of the grant.
Address: Provide a mailing address for your organization.
Secondary Contacts: Provide the name and all relevant contact information of any other
staff you would like to receive correspondence about this application.
Organizational Summary (5 pts): Describe the background of key organizational
leadership, project leadership, organizational qualifications to execute program goals,
financial history, and grant management capacity. Describe any recent grant
administration your organization has completed (in the last 36 months).
Project Summary Tab (20pts)
Provide a Project Title. Using the header provided in bold in this section, copy your “Project
Summary” into the section on the bottom of this tab. Limit each header section (I, II) to a
maximum of 300 words.
I. Project Introduction (10pts): Provide a brief introduction to your proposal, to include a
clear and concise description of the project. The description should include: an overview
of the project location, the type of solar installation, the specific proposal, financial
request and interconnection upgrade costs to be covered, and a brief introduction to the
project need and benefits of the project for the local community. Briefly mention any
partners and/or selected contractors.
II. Project Scope of Work and Timeline (10pts): Outline the proposed scope of work,
including specific interconnection costs to be covered by this grant and timeline of work
related to these interconnection costs. Include a brief description of your organization’s
plans for documentation of invoiced work as well as quarterly progress reports
summarizing completed work and providing applicable information discussed above.
Attachment 1
147
Solar Interconnection Grant Program 9
Project Details Tab (50pts)
The Grant Portal includes fields not used for this program; enter 'NA' for any required field not
covered in Sections III–VIII below, except the proposed project start and end date, the
county/city, and anticipated project partners (question a ). Using the headers provided in bold in
this section, copy your “Project Details” in the open-ended narrative field on the bottom of this
tab.
For criteria that require documentation, upload the attachments with the provided naming
convention. If you do not have the documentation, note that under the section header. Limit each
header (III, IV, etc) section to a maximum of 300 words.
III. Site Selection and Project Details (5pts): System designs or layouts are encouraged but
not required.
a. Project address/location (must be a previously developed project site, as defined
in § 56-576)
b. Type of solar installation (rooftop or ground mount, behind the meter or front of
the meter)
c. Total project size (kW)
d. Total project cost
e. Expected system production
IV. Project Readiness (10pts)
a. Executed PPA and/or Public Procurement Award (ProjectReadinessA)
b. Site control documents (ProjectReadinessB)
c. Is the local zoning and permitting completed or is the project allowed by right?
Any documentation related to zoning and permitting may be included.
(ProjectReadinessC)
d. Behind the Meter Systems only:
i. Is the roof in good condition and will not need to be replaced within the
solar system life? Any documentation related to the roof age and condition
may be included. (ProjectReadinessDI)
ii. Provide an electricity bill from the site. (ProjectReadinessDII)
V. Interconnection Study and Details (10pts)
a. Interconnection Study (InterconnectionStudyA or InterconnectionStudyA1 etc.),
which should include at a minimum:
i. Utility cost estimate letter
ii. Utility construction estimate
Attachment 1
148
Solar Interconnection Grant Program 10
iii. Executed Feasibility, System Impact, and/or Facilities Study (if required
and/or completed)
iv. Interconnection Agreement (if executed)
v. Other relevant details to the proposal provided in the Interconnection
Study
b. Interconnection Study Details form, using the Excel sheet provided, to gain a
greater understanding of interconnection requirements, costs, and timelines.
(InterconnectionStudyB)
VI. Community Benefits (15 pts): Document clear benefit to the public achieved through
the solar project. Briefly note how the applicant plans to utilize any cost savings or
community benefits achieved through the solar project. Examples of benefits include, but
are not limited to:
a. Behind the Meter Systems:
i. Estimated project lifetime savings from solar install
ii. Estimated annual Solar Renewable Energy Certificates (SRECs) for the
project
b. Front of the Meter Systems:
i. Lease and/or tax revenue benefits
ii. Community Benefits Agreement (CBA)
c. Other benefits could include:
i. The solar project primarily serves/benefits a historically economically
disadvantaged community (HEDC) or other underserved communities.
ii. The solar project includes battery energy storage and provides resilience
benefits.
iii. The solar project powers critical public facilities.
iv. The solar project is developed on a brownfield.
v. The solar project fulfills local sustainability, energy, or climate goals (site
local planning documents).
VII. Project Need (10pts)
a. Provide a brief explanation of how the interconnection costs materially affected
the solar project economics, schedule, or design.
b. Any documentation related to the capital budget available for the solar project
compared to the interconnection costs required. (ProjectNeedB)
Attachment 1
149
Solar Interconnection Grant Program 11
Financial Details Tab (25 pts)
VIII. Financial Details (25pts):
a. Submit a detailed budget using the provided budget justification worksheet.
Include a brief budget narrative, including a brief summary of costs and any
information on additional funding, grants, or tax incentives that will be leveraged
to complete the project, in your complete application document. Note if there are
interconnection costs that the applicant will be covering outside of this grant.
b. Download, complete, and submit the OMB Financial Capabilities Questionnaire
provided in the Financial Details tab.
Supporting Documents
Please save your responses in a master application document with the above headers and submit
the complete application document in this section . This is the document that will ultimately be
scored, along with any required attachments.
Evaluation and Scoring Criteria
Tab Criteria Possible
Points
Score
Applicant
Info Tab Organizational Summary 5
Project
Summary
Tab (20pts)
Project Introduction 10
Project Scope of Work and Timeline 10
Project
Details Tab
(50pts)
Site Selection and Project Details 5
Project Readiness 10
Interconnection Study and Details 10
Community Benefits 15
Project Need 10
Financial
Details Tab Financial Details 25
Total 100
Attachment 1
150
Solar Interconnection Grant Program 12
Submit Your Application
Once all required documentation has been submitted and the terms and conditions have
been accepted, submit your application through the Virginia Energy Grant Portal. You will
receive a confirmation of application submission. Submitted applications may be rescinded
and revised until the application deadline. A rescinded and revised application MUST be
resubmitted to be evaluated. Previous copies of applications will not be available for
reference or evaluation. Virginia Energy will notify you whether your project has been
selected for with Intent to Award or notification that your project has not been selected.
Attachment 1
151
Board Agenda Item
October 27, 2026
ADMINISTRATIVE – 10
Authorization for the Fairfax County Park Authority to Apply for Grant Funding from the
U.S. National Park Service to Support the Reinvigoration of South Lakes Drive Park
(Hunter Mill District)
ISSUE:
Board of Supervisors authorization is requested for the Fairfax County Park Authority
(FCPA) to apply for $1,974,940 in federal grant funding from the U.S. National Park
Service (NPS) for the modernization of South Lakes Drive Park. There is a local match
requirement of $1,974,940 which would bring the total funding for the project to
$3,949,880. Funding will be used to complete a comprehensive renovation of the South
Lakes Drive Park to provide a safe, accessible, multi-generational neighborhood park.
The park is located at 11851 South Lakes Drive, Reston in the Hunter Mill district.
Successful applicants will be notified around May 2027 with an environmental
compliance period of approximately six to 12 months to take place afterwards. Notice of
financial award is expected by May 2028 with up to five years to complete the project. It
is anticipated that the local match will be met through Park bond proceeds in Fund
30400, Park Authority Bond Construction. If the County is awarded funding, the specific
bond funding will be identified, and another Board Item will be submitted to formally
accept the award.
RECOMMENDATION:
The County Executive recommends that the Board of Supervisors authorize the FCPA
to apply for $1,949,940 in federal grant funding from NPS for the redevelopment of
South Lakes Drive Park. There is a local match requirement of $1,974,940 that will be
met through Park bond proceeds. No new positions will be created.
TIMING:
Board approval is requested on October 27, 2026.
BACKGROUND:
On September 10, 2026, FCPA submitted a pre-application to the Virginia Department
of Conservation and Recreation (DCR) for the Outdoor Recreation Legacy Partnership
grant program entitled, “Safety, Accessibility and Recreation Modernization at South
Lakes Drive Park.” On September 17, 2026, DCR invited FCPA to submit a full
application to transform the 13.9-acre park. The final application is due to NPS on
152
Board Agenda Item
October 27, 2026
November 1, 2026. The existing park facilities were planned and developed in the
1980’s as a central green and recreational space for three residential villages
surrounding the park. While tall, mature trees within the park offer plentiful shade, the
original decentralized sports court and playground are each surrounded by trees,
reducing visibility and are the furthest distance from the primary designated parking
area. The park site contains a rectangular grass sport field, a 60’ grass diamond sport
field, a playground, a sport court, paved pedestrian paths and substantial wooded
areas. South Lakes Drive forms the northern edge, with established residential
development surrounding the park on the east, south and west. Currently, several park
features have passed their life cycle and/or do not meet the Americans with Disabilities
Act (ADA) standards for accessibility. Funding will be used to improve the rectangular
sport field; relocate and replace the playground and sport court in a more visible
location; add a community lawn and pavilion; construct a paved or natural surface loop
trail and accessible connections; improve a nearby diamond sport field; and restore
vacated facility areas. These improvements will create a safer, accessible, multi-
generational neighborhood park. NPS expects to inform applicants of an award
decision in May 2027. The project is a part of the FCPA 2026 Bond referendum
workplan for the bond cycle. If the grant is not awarded, bond funds will be allocated for
the entire cost of the project.
EQUITY IMPACT:
South Lakes Drive Park is a high priority target for a whole park renovation due to the
poor condition of certain park amenities, lack of accessible features, and its location
within a low-income area. Preliminary review identifies the park in or immediately
associated with Fairfax County Census Tract 4823.02. The 2025 Federal Financial
Institutions Examination Council’s (FFIEC) census data classify Tract 4823.02 as Low
Income, with tract median family income equal to 49.55 percent of the applicable
metropolitan median family income, which is well below the 80 percent threshold to
qualify for the grant program.
FISCAL IMPACT:
Grant funding in the amount of $1,949,940 is being requested from NPS for the South
Lakes Drive Park project. The local match requirement of $1,949,940 will be supported
by Park bond proceeds in Fund 30400, Park Authority Bond Construction. The current
total project estimate is $3,949,880 and no new General Fund resources are required.
To maximize the proposal’s competitive position, indirect costs will not be included in
the grant application.
153
Board Agenda Item
October 27, 2026
CREATION OF NEW POSITIONS:
There are no new grant positions associated with the application.
ENCLOSED DOCUMENTS:
Attachment 1: Grant Proposal Abstract from Pre- Application to VA DCR
STAFF:
Jessica Werder, Deputy County Executive
Jai Cole, Director, Fairfax County Park Authority (FCPA)
Nigel Fields, Deputy Directory, FCPA
Sara Baldwin, Deputy Director, FCPA
Joshua Colman, Business Administration Division Director, FCPA
Richard Chandler, Chief Financial Officer, FCPA
154
2026 ORLP Grant – Safety, Accessibility and Recreation
Modernization at South Lakes Drive Park
(Each of these will need to be saved and submitted as separate files) - Please name all files
with the Park Name followed by the document name. For example, Riverside Park-VA ORLP
Preapplication Form and Riverside Park Project Abstract Summary
Project Abstract Summary
The Fairfax County Park Authority (FCPA) seeks Outdoor Recreation Legacy Partnership
(ORLP) funding to comprehensively modernize South Lakes Drive Park in Reston, Virginia,
and transform an underutilized13.9 acre neighborhood park into a safer, more accessible,
and more inviting place for recreation. The award will modernize aging facilities and remove
documented accessibility barriers at a site ranked among FCPA’s highest priorities for ADA
improvements. Crime prevention through environmental design (CPTED) methods will be
employed in collaboration with Fairfax County Police Department to address concerns of
safety, visibility and illicit activities. The project will upgrade the 195' x 360' ft rectangular
sport field by adding irrigation and a refreshed turf; relocate and replace the playground
and sport court from the wooded periphery to a central, open area with clear sightlines;
create a flexible 28,200 sq ft community lawn and pavilion for gatherings and casual play;
build a paved, ADA accessible loop trail that links all major amenities to existing
neighborhood paths; and restore 12,748 sq ft of the vacated playground and court
footprints to native mixed hardwood forest. In partnership with Fairfax County’s
Neighborhood and Community Services (NCS), FCPA will decommission the existing 60' ft
diamond sport field to reorient and expand family recreation in a newly opened space for
multigenerational use. An FCPA diamond sport field within four miles of South Lakes Drive
Park will receive substantial upgrades to improve the experience and increase use for NCS
youth sports organizations. Supporting work, such as new furnishings, signage, drainage
and stormwater measures, and accessible connections, will combine these elements into
a cohesive park experience. The project will deliver a visible,centrally organized recreation
core with accessible routes throughout the park and more reliable field use for both
community play and permitted sports. Ecological outcomes will include reforestation of
the former facility areas, reduced pavement, increased tree canopy, and improved habitat
connectivity. The intended beneficiaries are nearby residents, especially households that
include a person with a disability, as well as the low-income, highly diverse, and densely
populated community that relies on neighborhood parks for daily recreation and social
connection.
155
Board Agenda Item
October 27, 2026
ACTION – 1
Endorsement of Design Plans for the Rolling Road and Grigsby Drive Traffic Signal
Project (Braddock and Springfield Districts)
ISSUE:
Board of Supervisors’ (Board) endorsement of the Virginia Department of
Transportation’s (VDOT’s) design plans for the Rolling Road & Grigsby Drive Traffic
Signal Project. The project will improve traffic operations and safety for students
crossing at the intersection, especially during arrival and dismissal periods.
RECOMMENDATION:
The County Executive recommends that the Board endorse the design plans for the
VDOT administered Rolling Road & Grigsby Drive Traffic Signal Project and authorizes
the Director of the Fairfax County Department of Transportation (FCDOT) to transmit
the Board’s endorsement to VDOT (Attachment 1). A Notice of Willingness to hold a
Design Public Hearing (Attachment 2) was posted on January 8, 2026, with an
expiration date of January 29, 2026. During that timeframe, the design plans were
made available by VDOT. There was one Public Hearing request received from a
resident whose main concern was the potential for congestion that could result from
installing the signal along Rolling Road. However, staff coordinated with the resident,
explaining to them that the traffic analysis showed Levels of Service ‘A’ and ‘B’ during
peak periods and that the traffic signal will effectively control and manage the
intersection’s approaches and crossings. After that discussion, the resident chose not
to proceed with the request, stating their concerns were resolved. VDOT’s letter to
FCDOT requesting Board approval of the project is included as Attachment 3.
TIMING:
Board approval is requested on October 27, 2026, to allow VDOT to proceed with final
design as soon as possible.
BACKGROUND:
This project will construct a new traffic signal at the intersection of Rolling Road and
Grigsby Drive / the entrance to West Springfield High School. Improvements for the
intersection will include installing four pedestrian crosswalks with Accessible Pedestrian
Signals (APS), as well as upgrading curb ramps for ADA (Americans with Disabilities
Act) compliance. The signal will include a Flashing Yellow Arrow (FYA) configuration
156
Board Agenda Item
October 27, 2026
for the northbound and southbound Rolling Road left-turn movements. Attachment 4
illustrates the concept plan for the project.
Public Comment Period
In accordance with the statutes of the Commonwealth of Virginia and policies of the
Commonwealth Transportation Board, a Notice of Willingness to hold a Design Public
Hearing was posted on January 8, 2026. The posting expired on January 29, 2026,
and during that period, there was one request received for a public hearing. However,
upon further coordination with the requesting citizen, their concerns were resolved and
they chose not to proceed with the request.
Project Schedule
The tentative schedule for construction advertisement is late 2028, utilizing local funds
for design, right of way, and construction.
EQUITY IMPACT:
The project falls between a low and an average vulnerability area, with 3.5% to 6.2% of
households lacking access to a vehicle. Residents without a vehicle rely more heavily
on walking, biking, and transit. A safety-focused traffic signal provides a direct benefit
to county road users by reducing crossing risk at this intersection. This project supports
the One Fairfax Policy’s focus on a multi-modal transportation system that promotes
economic growth, public health, and congestion mitigation while improving accessible
mobility. The project has the potential to advance equity by supporting equitable access
to safe mobility for all residents in the area.
FISCAL IMPACT:
There is no General Fund impact associated with this Board item. The project is
currently funded with $1,138,442 of local funds in Fund 30050, Transportation
Improvements.
ENCLOSED DOCUMENTS:
Attachment 1: Endorsement Letter for the Rolling Road & Grigsby Drive Traffic Signal
Project, UPC 127005 (October 27, 2026)
Attachment 2: VDOT Public Notice Concerning Willingness to Hold a Public Hearing
(January 8, 2026)
Attachment 3: VDOT Letter Requesting Board Approval of the Rolling Road & Grigsby
Drive Traffic Signal Project Design Plans, UPC No: 127005 (July 31, 2026)
Attachment 4: Rolling Road and Grigsby Drive Traffic Signal Project Concept Plan
157
Board Agenda Item
October 27, 2026
STAFF:
Jennifer Miller, Deputy County Executive
Gregg Steverson, Director, Fairfax County Department of Transportation (FCDOT)
Martha Coello, Deputy Director, FCDOT
Eric M. Teitelman, Chief, Active Transportation, Capital Projects and Traffic Engineering
Division, FCDOT
Vanessa Aguayo, Chief, Capital Projects Section, FCDOT
Smitha Chellappa, Transportation Planner, FCDOT
Nick Alexandrow, Transportation Planner, FCDOT
Jay Lanigan, Transportation Planner, FCDOT
158
C o u n t y o f F a i r f a x , V i r g i n i a
To protect and enrich the quality of life for the people, neighborhoods and diverse communities of Fairfax County
Fairfax County Department of Transportation
4050 Legato Road, Suite 400
Fairfax, VA 22033-2895
Phone: (703) 877-5600 TTY: 711
Fax: (703) 877-5723
www.fairfaxcounty.gov/transportation
October 27, 2026
Mr. William Cuttler, P.E., District Engineer
Virginia Department of Transportation
Northern Virginia District
4975 Alliance Drive
Fairfax, Virginia 22030
Subject: Board of Supervisors Endorsement of Rolling Road & Grigsby Drive Traffic
Signal Project, UPC 127005
Dear Mr. Cuttler:
On October 27, 2026, the Fairfax County Board of Supervisors endorsed the design plans for
the Rolling Road & Grigsby Drive Traffic Signal Project. The purpose of this project is to
improve traffic operations and safety for students crossing at the intersection of Rolling Road
and Grigsby Drive, especially during arrival and dismissal periods. The project will construct a
new traffic signal at the intersection of Rolling Road and Grigsby Drive / the entrance to West
Springfield High School. Improvements for the intersection will include installing four
pedestrian crosswalks with Accessible Pedestrian Signals (APS), as well as upgrading curb
ramps for ADA (Americans with Disabilities Act) compliance. The signal will include a
Flashing Yellow Arrow (FYA) configuration for the northbound and southbound Rolling Road
left-turn movements.
The design plans were made available as part of a Notice of Willingness to hold a Design
Public Hearing that was posted on January 8, 2026. The Notice of Willingness posting expired
on January 29, 2026, with one request letter received. It is our understanding; however, that
after VDOT met with the citizens, answered their questions, and alleviated their concerns, the
request for a Public Hearing was withdrawn.
Please call Jay Lanigan at (703) 324-9977, or me at (703) 877-5675, if you have any questions
or need additional information. Thank you for your assistance with this important project.
Sincerely,
Gregg L. Steverson, P.E., PTOE
Director
cc: Martha Coello, Deputy Director, FCDOT
Eric M. Teitelman, Chief, Active Transportation, Capital Projects and Traffic
Engineering Division, FCDOT
Attachment 1
159
Rolling Road and Grigsby Drive
Traffic Signal
Fairfax County
Willingness to Hold a Public Hearing
Find out about plans to construct a traffic signal at the intersection of Rolling
Road (Route 638) and Grigsby Drive (Route 4179) /the main West
Springfield High School entrance to improve traffic operations and safety for
students crossing at the intersection, especially during school arrival and
dismissal periods. The signal will have flashing yellow arrows for drivers
turning left from northbound and southbound Rolling Road. The project also
includes installing Accessible Pedestrian Signals at the three existing
crosswalks, adding a fourth crosswalk with Accessible Pedestrian signals,
and upgrading the curb ramps to be Americans with Disabilities Act (ADA)
compliant.
Pursuant with the National Environmental Policy Act (NEPA) and 23
CFR 771, a Programmatic Categorical Exclusion (PCE) is being prepared
under agreement with the Federal Highway Administration. When
completed, the PCE will be available on the project website listed below
and upon request. In compliance with the National Historic Preservation
Act, Section 106 and 36 CFR Part 800, information concerning the
potential effects of the project on properties listed in or eligible for listing in
the National Register of Historic Places will be included with the PCE.
Review project information at https://www.vdot.virginia.gov/Grigsby or
at VDOT’s Northern Virginia District Office, 4975 Alliance Drive, Fairfax,
VA 22030. Please call ahead at 703-259-1778 or TTY/TDD 711 to make
an appointment with appropriate personnel.
If your concerns cannot be satisfied, VDOT is willing to hold a public
hearing. You may request that a public hearing be held by sending a
written request to Mr. Ahmad Al Kawabeh, EIT, Virginia Department of
Transportation, 4975 Alliance Drive, Fairfax, VA 22030 on or prior to
January 29, 2026. If upon receiving public comments it is deemed
necessary to hold a public hearing, notice of date, time and place of the
hearing will be posted.
VDOT ensures nondiscrimination and equal employment in all programs and
activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964,
as amended. If you need more information or special assistance for persons
with disabilities or limited English proficiency, contact VDOT Civil Rights at
703-259-1775 or TTY/TDD 711.
State Project: 0638-029-696, C501, P101, R201
UPC: 127005
Federal: STP-5B01(767)
Attachment 2
160
DEPARTMENT OF TRANSPORTATION
4975 Alliance Drive
Fairfax, Virginia 22030
Stephen C. Brich, P.E.
Commissioner
July 31, 2026
Mr. Jay Lanigan
Capital Projects Section
Fairfax County Department of Transportation
4050 Legato Road, Suite 400
Fairfax, VA 22033
SUBJECT: Rolling Road & Grigsby Drive Traffic Signal Project
State Project: 0638-029-696
Federal Project: STP-5B01(767)
UPC No: 127005
In accordance with the statutes of the Commonwealth of Virginia and policies of the
Commonwealth Transportation Board, a Notice of Willingness to hold a Design Public Hearing
was posted on the above -mentioned project on January 8, 2026. The posting expired on January
29, 2026. There is one Public Hearing request received but upon additional coordination with the
resident, their concerns were resolved and they chose not to proceed with the request.
Both the Springfield and Braddock District supervisors have been informed of the project
improvements, and they have expressed their support for advancing the project. Additionally,
Supervisor Herrity shared with us that there is broad community desire and support for this signal
and the related improvements.
The purpose of this project to improve traffic operations and safety for students crossing at the
intersection, especially during arrival and dismissal periods. Improvements include installing new
traffic signal and four (4) protected pedestrian crosswalks with Accessible Pedestrian Signals
(APS), upgrading curb ramps in four quadrants to be ADA compliant, and install ing Flashing
Yellow Arrow (FYA) for the northbound and southbound Rolling Road left -turn movements at
the intersection.
Attachment 3
161
Fairfax County Department of Transportation
July 31, 2026
Page three
The following information was available for review at posting:
• The scope of this project meets the criteria for a Programmatic Categorical Exclusion
(PCE) in accordance with the National Environmental Policy Act (NEPA).
• The existing typical section for Rolling Rd provides one 11’ northbound through lane, one
11’ northbound left turn lane, one 12’ northbound shared through-right turn lane, two 12’
southbound through lanes, one 12’ southbound left turn lane, one 12’ southbound right turn
lane, one 4’ sidewalk, and one 10’ shared use path.
• The existing typical section for Grigsby Drive provides one 15’ eastbound shared through-
right-and-left turn lane, one 16’ westbound shared through-right-and-left turn lane, and two
4’sidewalks.
• The 2023 Annual Average Daily Traffic (AADT) on Rolling Road is 22,000 vehicles per
day, and the 2019 AADT on Grigsby Drive is 620 vehicles per day.
• The construction of the project will not displace any families, businesses or non -profit
organizations.
• The project cost based on 2022 pre-scoping estimate is $1,000 for preliminary engineering,
$77,000 for right -of-way and utilities and $772,000 for construction, totaling $850,000.
The current estimate, following Public Hearing posting, is $10,000 for preli minary
engineering, $143,331 for right-of-way and utilities and $985,111 for construction, totaling
$1,138,442. The updated project cost has been coordinated with Fairfax County, and funds
have been secured by increasing the LNP to cover the deficit.
• The tentative schedule for advertising for construction is late 2028, utilizing local funds for
design, right of way, and construction based on VDOT Administered Project
Administration Agreement with Fairfax County. This project is included in Statewide
Transportation Improvement Program Grouping: Construction: Safety/ITS/Operational
Improvements.
The project has been processed in accordance with current VDOT policies and procedures. A
Programmatic Categorical Exclusion (PCE) NEPA environmental document was obtained for this
project on February 05, 2026.
In light of the above information, it is requested that the Fairfax County Board of Supervisors
endorse the subject project, by resolution, as proposed in the attached exhibit. If you have any
questions or require additional information, you may reach me by phone at 703 -259-1778 or via
email at ahmad.alkawabeh@vdot.virginia.gov.
Sincerely,
Ahmad Al Kawabeh, EIT
Project Manager
NOVA Traffic Operations
Virginia Department of Transportation
162
Fairfax County Department of Transportation
July 31, 2026
Page three
CC: Minwoo Ha, PE
Nick Dais, PE
William Dunn, PE
Attachments
• Conceptual Exhibit
163
0638-029-696
6'WoodFence
H
CR
H
CR
6
'W
ood
F
ence
3
'V
inyl
F
ence
Brk.Wall
w/
Col.
C
onc.
E
nt.
Conc.Wall
3
'V
inyl
F
ence
C
onc.S
id
ew
alk
2
.5
C
onc.C
&
G
2
C
onc.C
&
G
2
C
onc.C
&
G
2
C
onc.C
&
G
2
C
onc.C
&
G
Conc.Walk
C
onc.S
id
ew
alk
8'WoodFence
6'WoodFence
Brk.Wall
w/
Col.
4'Wood
Fence
Brk.
Col.
Brk.
Col.
Brk.
Col. 2
C
onc.C
&
G
2
C
onc.C
&
G
2
.5
C
onc.C
&
G
Conc.MedianConc.Median
Conc.Median
0.5ConcCurb
0.5ConcCurb
AsphaltSidewalk
HCR
S
ign
2
.5
C
onc.C
&
G
2
.5
C
onc.C
&
G
A
sphalt
E
nt.
Conc.Wall
GravelShoulderGravelShoulder
Conc.Sidewalk
C
onc.S
id
ew
alk
Brk.
Col.
Brk.
Col.
GravelShoulder
H
CR
Brk.
Col.
Brk.
Col.
8'WoodFence
Brk.Col.
6'Chain
Link
F
ence
RollingRd
Rt.638
Asphalt
RollingRd
Rt.638
Asphalt
G
rigsby
D
r.
A
sphalt
Sign
Sign
Ipf
Ipf
C
oncrete
M
arker
Ipf
Ipf
Ipf
(N
3
8°5
6'3
8"E
3
05
.00')
Ex.ConservationEsmt.
DB 24508 Pg1247
E
x.15
'F
.C
.W
.A
.E
sm
t.
D
B
2
445
1
P
g
2
160
Ex.PerpetualStreetEsmt.DB 23728 Pg970
Ex.20'C&P Esmt.DB 2598 Pg681Ex.20'C&P Esmt.
DB 2598 Pg681
(S
5
6
°3
2
'2
5
"W
15
5
.0
0
')
(S
5
7°5
2
'3
2
"W
15
5
.0
0
')
(S
6
2
°3
8
'2
5
"W
15
5
.0
0
')
(S
6
3
°5
8
'3
2
"W
15
5
.0
0
')
N
3
8°5
6'3
8"E
N
5
7°4
9
'2
5
"E
N
6
2
°3
5
'18
"E
Ex.R/W DB 2598PG 681
Ex.R/W DB 2598PG 681
Ex.R/W DB 23728PG 970
QUADRANT
NORTHEAST
QUADRANT
SOUTHEAST
QUADRANT
SOUTHWEST
QUADRANT
NORTHWEST
PROJECT FILE NO. SHEET NO.
0
SCALE
50'25'
PLAN NO.
REVISIONS
Date Initial
FAIRFAX COUNTY
SPRINGFIELD HIGH SCHOOL NORTH ENTRANCE (NIS)
ROLLING ROAD (RTE. 638) AND GRIGSBY DRIVE (RTE. 4179)/WEST
TRAFFIC SIGNAL INSTALLATION
CONCEPTUAL EXHIBIT
Attachment 4
164
Board Agenda Item
October 27, 2026
ACTION – 2
Authorization of an Amendment to the Amended and Restated Interim Real Estate
Exchange Agreement Between the Fairfax County Board of Supervisors and Inova
Health Care Services Regarding the Joint Redevelopment at Reston Town Center North
(Hunter Mill District)
ISSUE:
Board of Supervisors (Board) authorization of the proposed Second Amendment to the
Amended and Restated Interim Real Estate Exchange Agreement (Second
Amendment) with Inova Health Care Services (Inova) for the purposes of enabling the
Board and Inova to commence design work on certain shared infrastructure for the
Reston Town Center North area.
RECOMMENDATION:
The County Executive recommends the Board approval of the Second Amendment,
substantially in the form of Attachment 1, and the Board authorization for the Fairfax
County (County) Executive to sign the Second Amendment.
TIMING:
The Board’s action is requested on October 27, 2026.
BACKGROUND:
The Board and Inova own irregularly shaped parcels that make up the Reston Town
Center North (RTCN) redevelopment area of approximately 48 acres, generally
comprised of Tax Map No. 17-1 ((1)), parcels 3F, 12, 13, 14A, 14B, 14C, 14D, 14E, and
14F, as well as Tax Map No. 17-1 ((17)), parcels 4 and 5A, as shown on Exhibit A of
Attachment 1. The existing County facilities located within the RTCN area include the
Reston Regional Library, the Embry Rucker Shelter, the North County Human Services
Building, a police station, and the North County Government Center.
The Board and Inova seek to re-subdivide or otherwise adjust the existing parcels into a
grid of streets and developable blocks to promote the redevelopment of the overall site,
as generally shown on Exhibit B of Attachment 1. To this end, the County staff and
Inova have been coordinating on a joint redevelopment of this area since 2012.
Pursuant to an Amended and Restated Interim Real Estate Exchange Agreement
(IREEA), last approved by the Board in 2024, the County and Inova jointly pursued
165
Board Agenda Item
October 27, 2026
certain initial land use approvals consisting of a “lot and block” plan (Initial Submission)
that would establish the general boundaries of the new blocks and streets, the
maximum possible building footprints on each block, details regarding the streetscape,
and utility layouts. The Initial Submission does not, however, provide specific building
footprints or designs; rather, each individual block would need further land use
approvals before building development could proceed. The Board, in its governmental
and regulatory capacity, recently approved the Initial Submission on September 15,
2026.
The IREEA also envisioned that the County and Inova would work towards transactional
documents necessary to effectuate the re-subdivision of the RTCN site and the design
and construction of the shared infrastructure necessary for the redevelopment. The
project teams continue to negotiate the terms of those documents which will be brought
to the Board for approval at a subsequent meeting. The proposed Second Amendment
to the IREEA amends the IREEA such that unspent and available funds under the
IREEA budget could be used to commence engineering design of the shared
infrastructure while the project teams continue to develop and negotiate the
transactional documents. The proposed Second Amendment also extends the deadline
within the IREEA for completion of the transactional documents to December 31, 2027.
EQUITY IMPACT:
Funding for the expansion of the public facilities including the shelter, library, and the
human services center promotes focus area 10 of the One Fairfax Policy associated
with a health and human services system where opportunities exist for all individuals
and families for the provision of accessible, high quality, affordable and culturally
appropriate services.
FISCAL IMPACT:
The Second Amendment will not oblige the County to provide additional funding. To
date, $3,200,000 has been appropriated to the project to support the preliminary
planning required for the joint zoning application and development agreement with
Inova. The IREEA obligated the County for up to $1,020,285 in new obligations, in
addition to the $469,833 in obligations already spent as part of the Original Agreement.
This project and the associated County facilities are referenced in the FY 2027 – FY
2031 Adopted Capital Improvement Program (With Future Fiscal Years to FY 2036).
ENCLOSED DOCUMENTS:
Attachment 1: Second Amendment to the Amended and Restated Interim Real Estate
Exchange Agreement.
166
Board Agenda Item
October 27, 2026
STAFF:
Jessica Werder, Deputy County Executive
Jennifer Miller, Deputy County Executive
Christina Jackson, Deputy County Executive/Chief Financial Officer
Thomas Fleetwood, Director, Housing and Community Development
Thomas Barnett, Deputy Director, Housing and Community Development
Christopher Herrington, Director, Department of Public Works and Environmental
Services (DPWES)
Tiya Raju, Deputy Director, Capital Facilities, DPWES
Vrushali Oak, Director, Capital Facilities, Building Design and Construction Division,
DPWES
ASSIGNED COUNSEL:
Ryan Wolf, Senior Assistant County Attorney
Emily Smith, Assistant County Attorney
167
1
SECOND AMENDMENT TO AMENDED AND RESTATED
INTERIM REAL ESTATE EXCHANGE AGREEMENT
THIS SECOND AMENDMENT TO AMENDED AND RESTATED INTERIM REAL
ESTATE EXCHANGE AGREEMENT (this “Amendment”) is entered into as of the ___day of
October, 2026, by and between INOVA HEALTH CARE SERVICES, a Virginia non-stock
corporation, f/k/a Inova Health System Services, f/k/a Inova Services, Inc. (“Inova”) and the
Board of Supervisors of Fairfax County, Virginia, a political subdivision of the Commonwealth
of Virginia in its proprietary capacity and not in its governmental or regulatory capacity
(“County”).
Recitals
R-1 Inova and County are parties to that certain Amended and Restated Interim Real
Estate Exchange Agreement effective as of September 23, 2024, as modified by Letter
Agreement dated October 18, 2024, and amended by the First Amendment to Amended and
Restated Interim Real Estate Exchange Agreement dated December 9, 2025 (collectively,
“IREEA 2.0”). Capitalized terms used but not otherwise defined in this Amendment have the
meaning given to such terms in IREEA 2.0.
R-2 The Phase I Zoning was approved by the Board of Supervisors of Fairfax County,
acting in its governmental capacity, on September 15, 2026. As of the date of this Amendment,
the parties have not yet completed negotiation of the REEA and the related definitive documents
contemplated by IREEA 2.0.
R-3 The parties have mutually agreed upon an update to Exhibit D showing a
remaining, unspent balance as of September 30, 2026 of $823,405 (the “Remaining Funds”)
under the total budget approved under IREEA 2.0, which Remaining Funds were not spent in
support of the Phase I Zoning scope of work anticipated in IREEA 2.0. Inova and County desire
to enter into this Amendment to (i) update the outside term of IREEA 2.0, (ii) apply the
Remaining Funds to fund additional design work for a PI Plan (as defined below), as an
expansion of the scope of the Phase I Zoning, and (iii) address other matters as set forth herein.
NOW, THEREFORE, for and in consideration of the mutual promises of the parties and
of other good and valuable consideration, receipt and sufficiency of which are hereby
acknowledged, the parties intending to be legally bound to hereby agree as follows.
1. Recitals. The Recitals above are incorporated herein by reference.
2. Outside Term. The date “December 31, 2026” set forth in Section 6.a.(ii) of IREEA 2.0 is
superseded and replaced with the date “December 31, 2027”.
3. Addition of Common Infrastructure Design Work. The County and Inova agree that it is in
their mutual best interests to proceed with preliminary design work for a Public Improvement
Attachment 1
168
2
Plan (the “PI Plan”) concurrent with negotiations on the terms of a final REEA. In
furtherance thereof, County and Inova agree as follows:
a. The heading of Section 3 of IREEA 2.0 is hereby deleted in its entirety and replaced
with “Phase I Zoning and Common Infrastructure Design”.
b. Section 3.a. of IREEA 2.0 is hereby amended to include the following text in a final
paragraph to that section:
“Common Infrastructure Design Work. The parties acknowledge and
agree that it is in their mutual interest to proceed with initial design
work, planning, and related permitting services (collectively, the
“Common Infrastructure Design Work ”) for certain common
infrastructure to be constructed in connection with “Anticipated Phase
1”, including without limitation certain segments of the “Grid of
Streets”, the “Interim Central Green”, and stormwater management and
other utilities and infrastructure (as each such capitalized term is defined
in the Proffers approved in connection with the Phase I Zoning). The
specific scope, deliverables, and level of design completion will be
developed by the parties and set forth in one or more Common
Consultant Contracts approved pursuant to the terms and conditions of
IREEA 2.0. The scope of the Common Infrastructure Design Work may
include, without limitation: (a) conceptual or approximately thirty
percent (30%) design development; (b) preparation and submission of
an initial or subsequent PI Plan; (c) responding to regulatory comments
and supporting the parties’ eff orts to obtain approval of the PI Plan or
issuance of a land disturbance permit; and (d) design of certain streets,
wet and dry utilities, stormwater management facilities, water quality
treatment facilities, and the Interim Central Green. The Interim Central
Green design will include those elements described in the Proffers
approved in connection with the Phase I Zoning.”
c. Solely for purposes of the budgeting, submission, process, invoicing, and cost-sharing
provisions of Section 3 of IREEA 2.0, the phrase “Phase I Zoning” shall be deemed
to include the Common Infrastructure Design Work such that the Common
Infrastructure Design Work is administered within the existing budgeting,
submission, process, invoicing, and cost sharing structure that applies to Common
Consultant Contracts and Common Consultant Work under IREEA 2.0. For the
avoidance of doubt, the Common Infrastructure Design Work shall not be deemed
part of the “Phase I Zoning” for purposes of Section 4 (Components of REEA) or
Section 6 (Termination) of IREEA 2.0, and neither the commencement, approval, nor
completion of the Common Infrastructure Design Work is a condition to, or alters the
conditions to, the parties’ entry into the REEA. Nothing in this Amendment
authorizes work outside an approved Common Consultant Contract or increases either
Attachment 1
169
3
party’s financial obligations beyond the applicable budget limitations in IREEA 2.0.
The parties acknowledge and agree that the Common Infrastructure Design Work is
to be funded from the Remaining Funds, that this Amendment does not increase the
County Common Consultant Budget Limit or the Inova Common Consultant Budget
Limit, and that the aggregate amounts payable by Inova and reimbursable by the
County under IREEA 2.0 shall not exceed those respective budget limits.
d. In order to reflect the inclusion of the Common Infrastructure Design Work within
the scope of Common Consultant Work under IREEA 2.0, the Exhibit D1 budget
attached hereto is hereby made a part of IREEA 2.0 and, subject to Section 3(g), is
intended to supersede and replace Exhibit D on a going forward basis such that
Exhibit D1 is the operative budget for Common Consultant Work performed after the
effective date of this Amendment. Exhibit D1 sets forth the estimated costs and line
items for the Common Infrastructure Design Work and is funded from Remaining
Funds; the amounts shown on Exhibit D1 as allocable to the County and to Inova are
sub-allocations of, and do not increase or decrease, the County Common Consultant
Budget Limit and the Inova Common Consultant Budget Limit, respectively.
Notwithstanding such supersession and replacement, the County Common Consultant
Budget Limit and the Inova Common Consultant Budget Limit remain as set forth in
the First Amendment (i.e., $1,020,285 and $822,715, respectively), such budget limits
are cumulative caps under IREEA 2.0 against which amounts previously spent,
committed, or reimbursed under Exhibit D continue to count, and the references in
Sections 3.e.iii and 3.e.iv of IREEA 2.0 to the estimated costs set forth on Exhibit D
shall not be re-determined by reference to Exhibit D1. The parties acknowledge that
further adjustment to the Exhibit D1 budget may be made as provided in IREEA 2.0
without requiring a formal amendment.
e. The last sentence of Section 3.c.ii. of IREEA 2.0 is hereby deleted in its entirety and
replaced with the following: “The parties may mutually agree to update Exhibit D or
Exhibit D1 from time to time during the term of this IREEA 2.0 so as to reallocate
estimated costs among Common Consultant line items.”
f. The Schedule B to Exhibit F attached hereto and made a part hereof sets forth
additional subjects and protections to be addressed in each Common Consultant
Contract for Common Infrastructure Design Work, the substance of which will be
included in the Common Consultant Contract(s) for Common Infrastructure Design
Work entered into after the effective date of this Amendment. The terms and
conditions set forth in Schedule B to Exhibit F are in addition to, not in lieu of, the
terms and conditions set forth in Exhibit F to IREEA 2.0. Before approving a
Common Consultant Contract, the parties shall determine whether the particular
scope and anticipated value of the improvements warrant any project specific increase
in the professional liability limits or coverage period stated in Schedule A to Exhibit
F. Unless the parties mutually approve such an increase, the existing requirements of
Attachment 1
170
4
Schedule A to Exhibit F shall apply. Reference is made to Section 3(d)(ii)(1) of
IREEA 2.0 which provides that all costs resulting from the inclusion of the Exhibit F,
Schedule A insurance requirements within the Common Consultant Contracts shall be
borne entirely by the County and paid for out of the County Reserve Contingency,
provided any such costs shall be demonstrated by reasonably sufficient evidence,
including a certification from the Common Consultant as to exactly which changes to
its insurance it had to obtain. Costs resulting from any project specific increase in the
professional liability limits or coverage period stated in Schedule A to Exhibit F
requested by the County pursuant to this Section 3(f) shall be handled in the same
manner as set forth in the immediately preceding sentence.
g. Notwithstanding the addition of Exhibit D1 and its supersession and replacement of
Exhibit D under Section 3(d), all Common Consultant Work in process under IREEA
2.0 (as may be reflected on Exhibit D), and all Common Consultant invoices and
payments in process under IREEA 2.0 (as may be reflected on Exhibit D), as of the
effective date of this Amendment shall continue to be authorized, administered,
invoiced, paid, and reimbursed under the applicable provisions of IREEA 2.0,
notwithstanding the introduction of Exhibit D1. Amounts previously spent,
committed, invoiced, or reimbursed under Exhibit D are unaffected by this
Amendment. Once all Common Consultant Work, invoices, and payments in process
under IREEA 2.0 (as may be reflected on Exhibit D) as of the effective date of this
Amendment are complete, the parties will reconcile and, if necessary, amend Exhibit
D and Exhibit D1 to reflect the completion of such work, invoices, and payments.
4. Ratification. Except as amended by the terms of this Amendment, the terms of IREEA 2.0
are ratified and confirmed. In the event of any conflict or inconsistency between this
Amendment and IREEA 2.0, this Amendment shall control.
5. Counterparts. This Amendment may be executed in one or more counterparts and delivered
electronically.
[Signatures begin on following page]
Attachment 1
171
5
IN WITNESS WHEREOF, the parties have executed this Amendment to be effective as of the
day and year first above written.
BOARD OF SUPERVISORS FOR COUNTY OF FAIRFAX, VIRGINIA, a political
subdivision of the Commonwealth of Virginia
By: ____________________________
Name: Bryan J. Hill
Title: County Executive
Date:___________________________
INOVA HEALTH CARE SERVICES, a Virginia non-stock corporation
By: ____________________________
Name: H. Thomas McDuffie, Jr.
Title: Senior Vice President
Date:___________________________
Attachment 1
172
6
Note: There is no Exhibit A, B, or C to this Amendment. The only exhibits to this Amendment
are labeled “Exhibit D1” and “Schedule B to Exhibit F” to correspond to the exhibit labelling in
IREEA 2.0.
Attachment 1
173
9/30/2026
Common
Consultant
Budget
Amount Revision
Revised Budget
Amount Comments
1.1 Consultants
Civil Engineer -Infrastructure PI Plan
Preparation and processing of the Infrastructure PI plan Urban Proposed New Contract
Task 1 A - Misc Survey $15,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE
Task 1B - Subdivision Comments $5,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE
Task 1C - Land Transaction Studies and Ownership Agreement Exhibits $5,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE
Task 1D - Site Notices for Subdivision $6,000 Urban Proposal 26-428.R1, dated 9/24/2026
Task 2 - Preliminary Planning $15,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE
Task 3 - Infrastructure Public Improvement Plan (PI Plan) $85,000 Urban Proposal 26-428.R1, dated 9/24/2026
Task 4 - SWM/BMP/Adequate Outfall $95,000 Urban Proposal 26-428.R1, dated 9/24/2026
Task 5A - Address PI Plan First Submission Comments $50,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE
Task 6 - PI Plan Meetings and Coordination $12,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE
Task 7 - Tree Preservation Plan $8,800 Urban Proposal 26-428.R1, dated 9/24/2026
Task 8 - Landscape Architect Meetings and Coordination $2,500 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE
Task 9 - Civil Coordination with Dry Utility Consultant $10,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE
Task 10 - Dry Utility Profiles $25,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE
Task 11 - Proffer Compliance Coordination $10,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE
Additional Services/Wage escalation (5%) $17,200 Sittler Budget - 5% of tasks
Reimbursables Budget $5,000 Sittler Budget
Subtotal $366,500 $0 $366,500
Civil Engineer - Alternate Services Urban
Task 31 - DRB Materials and Corrdination $3,500 Urban Proposal 26-428.R1 HNTE
Task 32 - Updated Tree Inventory $23,000 Urban Proposal 26-428.R1
Subtotal $26,500 $0 $26,500
Landscape Architect - Initial Central Green Design LandDesign Proposed New Contract
Phase 100 Pre-design/Project initiation $6,500 Budget from LandDesign
Phase 120 Central Green Schematic Design Confirmation $15,000 Budget from LandDesign
Phase 300 Limited PI Plan Design Advancement and Coordination $15,000 Budget from LandDesign
Phase 020 PI Plan Landscape Architecture Sheets and First Submission
Support $34,500 Budget from LandDesign
Phase 070 Internal Project Meetings and coordination $7,500 HNTE - Budget from LandDesign
Phase 071 Community, Stakeholder and RA DRB outreach $15,000 HNTE - Budget from LandDesign
Phase 075 Presentation and Meeting Materials $15,000 HNTE - Budget from LandDesign
Phase 032 Streetlight Location and Vendor Photometric Coordination $15,000 HNTE - Budget from LandDesign
Additional Services/Wage escalation (15%) $7,900 Sittler Budget - 15% of Phases 070,071,075 & 032,
Misc. Graphics, Color Plots and presentations $1,000 Sittler Budget
Total Landscape Architect $132,400 $0 $132,400
Architect -Central Green Structures N/A $0 $0 Assumed Not Required
Traffic Consultant - Zoning TIS Amendment
Plan and Program Coordination Galloway $10,000 Sittler budget for PI Plan assistance
Total Traffic Consultant $10,000 $0 $10,000
Signage/Wayfinding Consultant TBD $0 $0 $0 Assumed to be a REEDA cost
Lighting Photometrics TBD $0 $0 $0 To Be Determined
Geotech Consultant ECS
Base Proposal $22,500 ECS proposal dated 9/18/2026
SWM vault - Block 3 Infiltration $3,500 ECS proposal dated 9/18/2026
SWM vault - Block 5 Infiltration $2,700 ECS proposal dated 9/18/2026
Preliminary CBRs $1,200 Sittler Budget - Assumes 2 at $600 each
Meetings and Coordination $2,500 Sittler Budget
Total Geotech $32,400 $0 $32,400
Noise Consultant TBD $0 $0 $
Text truncated. Open the original for the full document.
Source: Fairfax County website. First collected Oct 26, 2026.