RecordWell Data

Revised Board Package

Fairfax County · Fairfax County · Notices

Open the original document More from Fairfax County

This document is no longer listed on Fairfax County's website. We kept the copy we read.

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

FAIRFAX COUNTY BOARD OF SUPERVISORS October 27, 2026 AGENDA 9:30 Presentations 9:30 History Commission Annual Report Presentation 9:30 Board Appointments to Citizen Boards, Authorities, Commissions, and Advisory Groups 10:00 Matters Presented by Board Members 10:00 Items Presented by the County Executive ADMINISTRATIVE ITEMS 1 Authorization to Advertise a Public Hearing on Proposed Ordinance to Amend the Code of the County of Fairfax, Chapter 3, County Employees, Article 5, Financial Disclosures, Section 3- 5-2.1 2 Authorization to Advertise a Public Hearing to Consider an Ordinance to Amend and Readopt Fairfax County Code Sections 7-2-5, 7-2-6, and 7-2-13, to Divide and Create Precincts in Hunter Mill and Dranesville Districts; Move Polling Places in Mason and Providence Districts; and Adjust Precinct Boundaries in Hunter Mill, Providence, and Sully Districts (Hunter Mill, Dranesville, Mason, Providence, and Sully Districts) 3 Authorization to Advertise a Public Hearing to Adopt an Ordinance Establishing an Economic Revitalization Zone for Skyline Buildings 4, 5, and 6 (Mason District) 4 Extension of Review Period for 2232 Application for AT&T Boulevard Estates Telecommunication Site (Braddock District) 5 Approval of a Resolution to Authorize Execution of a Low-No Emission Grant and Bus Transfer Agreement with the Washington Metropolitan Area Transit Authority 6 Approval of Traffic Calming Measures as Part of the Residential Traffic Administration Program – Oak Drive (Mount Vernon District) 1 FAIRFAX COUNTY BOARD OF SUPERVISORS October 27, 2026 ADMINISTRATIVE ITEMS (continued) 7 Approval of Traffic Calming Measures as Part of the Residential Traffic Administration Program – Middle Run Drive (Springfield District) 8 Approval of “$200 Additional Fine for Speeding” Signs as Part of the Residential Traffic Administration Program – Lacy Boulevard (Mason District) 9 Authorization for the Office of Environmental and Energy Coordination to Apply for and Accept Grant Funding from Virginia Department of Energy to Support the Interconnection of Distributed Solar Energy Systems to the Electric Grid (Mount Vernon District) 10 Authorization for the Fairfax County Park Authority to Apply for Grant Funding from the U.S. National Park Service to Support the Reinvigoration of South Lakes Drive Park (Hunter Mill District) ACTION ITEMS 1 Endorsement of Design Plans for the Rolling Road and Grigsby Drive Traffic Signal Project (Braddock and Springfield Districts) 2 Authorization of an Amendment to the Amended and Restated Interim Real Estate Exchange Agreement Between the Fairfax County Board of Supervisors and Inova Health Care Services Regarding the Joint Redevelopment at Reston Town Center North (Hunter Mill District) 3 Authorization to Execute a Memorandum of Agreement with the Virginia Department of Transportation for the Joint Operations and Maintenance Plan of the Richmond Highway Bus Rapid Transit Project (Franconia and Mount Vernon Districts) 4 Approval of the Second Amended and Restated Memorandum of Understanding Between the Fairfax County Board of Supervisors and the Fairfax County Convention and Visitors Corporation INFORMATION ITEMS 1 County Holiday Schedule – Calendar Year 2027 2 FAIRFAX COUNTY BOARD OF SUPERVISORS October 27, 2026 CLOSED SESSION Closed Session PUBLIC HEARINGS 3:00 Public Hearing on RZ-2025-DR-00017 (APB Woodland Park JV LLC) (Dranesville and Hunter Mill Districts) (Concurrent with PCA-77-C-098-06 (RZPA-2025-DR-00046) and PCA-80-C-028- 09 (RZPA-2025-DR-00049)) 3:00 Public Hearing on PCA-77-C-098-06 (RZPA-2025-DR-00046) (APB Woodland Park JV LLC) (Dranesville District) (Concurrent with RZ-2025-DR-00017 and PCA-80-C-028-09 (RZPA-2025- DR-00049)) 3:00 Public Hearing on PCA-80-C-028-09 (RZPA-2025-DR-00049) (APB Woodland Park JV LLC) (Dranesville and Hunter Mill Districts) (Concurrent with RZ-2025-DR-00017 and PCA-77-C- 098-06 (RZPA-2025-DR-00046)) 3:00 Public Hearing on SE-2026-FR-00020 (Lucila Catalina Araujo and Gary Antonio Araujo de la Cruz) (Franconia District) 3:00 Public Hearing on SE-2023-DR-00036 (Laura Winfield Berkebile and Julia Helena Eugenia Berkebile Fazio) (Dranesville District) 3:00 Public Hearing on RZ-2025-DR-00021 (Sekas Homes, Ltd) (Dranesville District) 3:30 Public Hearing on Proposed Plan Amendment 2025-I-J4 (Gate House Plaza) (Providence District) (Concurrent with SEA-95-P- 008-02) 3:30 Public Hearing on SEA-95-P-008-02 (Silver Gatehouse LLC) (Providence District) (Concurrent with Plan Amendment 2025-I- J4) 3:30 Public Hearing on SE-2025-MA-00043 (Fairfax County Water Authority) (Mason District) 3:30 Public Hearing on PCA-2017-PR-015-002/CDPA-2017-PR-015 (RZPA-2025-PR-00071) (B9 Sequoia the Mile Owner LLC) (Providence District) 3 FAIRFAX COUNTY BOARD OF SUPERVISORS October 27, 2026 PUBLIC HEARINGS (continued) 3:30 Public Hearing on RZ-2024-MA-00004 (MS-Gallows, LLC) (Mason District) 3:30 Public Hearing on SE-2026-PR-00004 (INOVA Health Care Services) (Providence District) 4:00 Public Hearing on PCA-2017-DR-012/CDPA-2017-DR-012 (RZPA-2022-DR-00149) (Pomeroy Investments, Inc. and the Pomeroy Companies Inc.) (Dranesville District) 4:00 Public Hearing on Proposed Plan Amendment 2013-III-FC1(C), Fairfax Center Area, Phase III, Core Area (Braddock and Springfield Districts) 4:00 Public Hearing on the Acquisition of Certain Land Rights Necessary for the Construction of the Richmond Highway Bus Rapid Transit (RHBRT) Project 2G40-162-000 (Franconia and Mount Vernon Districts) 4:00 Public Hearing on a Proposed Zoning Ordinance Amendment Re: 2026 Code of Virginia Updates 4:00 Public Hearing to Sell Easement Rights in Board of Supervisors Owned Property at Wolf Trap Fire Station at 1315 Beulah Road to Castleton, L.C. (Dranesville District) 4:30 Public Hearing for the Enlargement of a Sanitary District to Include 1945 Valley Wood Road for Refuse/Recycling Collection Service (Dranesville District) 4:30 Public Hearing for the Enlargement of a Sanitary District to Include 1941 Valley Wood Road for Refuse/Recycling Collection Service (Dranesville District) 4:30 Public Hearing for the Contraction of a Sanitary District to Remove 612 N Oak Street from Refuse/Recycling Collection Service (Dranesville District) 4:30 Public Hearing for the Enlargement of a Sanitary District to Include Ivy Hill Drive Area for Refuse/Recycling Collection Service (Dranesville District) 4 FAIRFAX COUNTY BOARD OF SUPERVISORS October 27, 2026 PUBLIC HEARINGS (continued) 4:30 Public Hearing forthe De-Creation/Re-Creation of a Sanitary District to Remove Vacuum Leaf Collection Service from Woodland Terrace Area (Dranesville District) 5:00 Public Hearing for the Contraction of a Sanitary District to Remove 6614 Edsall Road Sanitary District from Refuse/Recycling Collection Service (Mason District) 5:00 Public Hearing for the De-Creation/Re-Creation of a Sanitary District to Remove Vacuum Leaf Collection Service from Walnut Hill Community (Mason District) 5:00 Public Comment 5 Fairfax County, Virginia BOARD OF SUPERVISORS AGENDA Tuesday October 27, 2026 9:30 a.m. PRESENTATIONS RESOLUTION — To recognize Marlene Blum for dedicating more than four decades to public service and volunteer leadership in Fairfax County. Requested by Chairman McKay and Supervisor Palchik. RESOLUTION — To recognize the Shepherd’s Center of Fairfax-Burke on its 20th anniversary and celebrate its dedication to supporting older adults through volunteer services, educational programs and community connections. Requested by Chairman McKay and Supervisor Sizemore Heizer. RESOLUTION — To recognize the Fairfax Women’s Soccer Association on its 50th anniversary and celebrate its longstanding commitment to promoting women’s soccer and community engagement. Requested by Chairman McKay. RESOLUTION — To recognize Celebrate Fairfax on its 43rd anniversary and honor its contributions to community engagement, cultural celebrations and bringing residents together across Fairfax County. Requested by Chairman McKay. PROCLAMATION — To designate November 14, 2026, as Fairfax Recycles Day and Stormwater Day in the County. Requested by Chairman McKay, Supervisor Herrity, Supervisor Palchik and Supervisor Lusk. STAFF: Tony Castrilli, Director, Office of Public Affairs Jeremy Lasich, Office of Public Affairs Imtiaz Ali, Office of Public Affairs 6 Board Agenda Item October 27, 2026 9:30 a.m. History Commission Annual Report Presentation ENCLOSED DOCUMENTS: Attachment 1 – Fairfax County History Commission Annual Report PRESENTED BY: Subhi Mehdi, Chair, Fairfax County History Commission 7 Fairfax County History Commission 2026 Annual Report Attachment 1 8 A PROCLAMATION Commemorating the 250th Anniversary of American Independence by the Fairfax County History Commission WHEREAS, 2026 marks 250 years since the Declaration of Independence, when the American colonies asserted their right to self-governance and embraced the belief that everyone is created equal, with fundamental rights to life, liberty, and the pursuit of happiness; and WHEREAS, Fairfax County, Virginia, holds an eminent place in this history as the home of George Washington and George Mason, whose leadership and ideas helped shape the foundations of our republic; and WHEREAS, the County’s people, places, and events reflect the broader story of a nation working hard to fulfill the promise of freedom, including the experiences of those whose voices were not fully realized at the nation’s founding; and WHEREAS, the Fairfax County History Commission is entrusted with preserving, interpreting, and promoting this rich history for the education and benefit of present and future generations; and NOW, THEREFORE, BE IT PROCLAIMED that the Fairfax County History Commission hereby commemorates the 250th Anniversary of American Independence, and encourages all residents to learn, reflect, and participate in the preservation and celebration of our nation’s history. Given this year of our Nation’s 250th Anniversary, by the Fairfax County History Commission. Attachment 1 9 Executive Summary 3 Executive Summary July 2025—June 2026 4 Major Initiatives 250th Commemoration Strengthening Ties with Fairfax County Park Authority 5 6 Outreach Historic Courthouse and Historic Records Center William H. Randall Estates Historic District Section 106 Threatened Sites 7 7 7 10 Sustained Efforts Advocacy 14 2026 History Conference 15 Awards 17 Oral History 18 Inventory of Historic Sites 18 Historic Markers 19 Resident Curator Program 21 Budget Report 22 Membership Meet Our Members 23 Advisory Members 23 Front Cover (from top moving left to right): Fairfax Resolves booklets, Dunn Loring Elementary School Historic plaque, Commissioner Michelle Arcari Rose; Commissioners Subhi Mehdi and Brian Heintz presenting History Commission Award, unveiling of the James Goins historical marker, History Conference speaker Richard Bell; Interactive exhibit at Fairfax County History Conference; Commissioner Anne Stuntz at the Legato Schoolhouse; Supervisor Dalia Palchik and Commissioner Sue Kovach Shuman with a drawing of the Historic Fairfax County Courthouse. Attachment 1 10 Executive Summary 4 The Fairfax County History Commission is pleased to present its FY 2026 annual report, which aligns with the county’s strategic plan, particularly the key drivers of equity and inclusive engagement. The Commission positively impacts Fairfax County residents through activities for lifelong education and learning, cultural and recreational opportunities, and effective and efficient government. We thank the Board of Supervisors for the opportunity to preserve and promote the history of our county. Highlights of our achievements during this reporting period include: • Leading and supporting the commemoration of the nation’s semiquincentennial through our partnership with and membership in the Fairfax County 250th Commission. • Organizing and presenting our record-breaking 2026 Fairfax County History Conference. • Creating and launching the video series Revolutionary Voices: The Fairfax Story. • Reprinting the popular revolutionary document, the Fairfax Resolves. • Rewarding outstanding historical research and writing in our community. • Advocating for the preservation and protection of Dunn Loring Elementary School, the Bowman Distillery, Laurel Hill House and other properties on our Threatened Sites List. • Ongoing outreach for preservation and recognition of historic sites including the Fairfax County Historic Courthouse and William H. Randall Estates Historic District. • Participating in Section 106 reviews as a consulting party with positive outcomes. • Engaging with county residents at Oakton Day, Charles Broadwater Day, Mount Vernon Summerpalooza, and Juneteenth Celebrations in Gum Springs and Vienna. • Updating and maintaining the Fairfax County Inventory of Historic Sites. • Expanding our coverage of African American history by advancing markers for First Baptist Church of Merrifield and Spring Bank Colored School. The Commission acknowledges and thanks staff from the Department of Planning and Development, the Architectural Review Board, the Park Authority, the Virginia Room, and Channel 16 for their contributions and support. We look forward to another productive year in FY 2027! Subhi Mehdi Chair, Fairfax County History Commission Attachment 1 11 Major Initiatives 5 250th Commemoration In FY 2026, the History Commission prioritized county and regional efforts to observe and commemorate the semiquincentennial of the American Revolution, the Revolutionary War, and the Independence of the United States of America. The resources of the History Commission supported the efforts of the Fairfax County 250th Commission and partner organizations in executing activities and events commemorating the past, present and future of America across the nine supervisory districts of Fairfax County. Four history commissioners serve directly on the Fairfax 250 Commission. Two commissioners, Gretchen Bulova and Tammy Mannarino, served as officers during this fiscal year, leading the creation, enhancement and amplification of hundreds of activities and events. Both regularly speak on behalf of Fairfax 250 to arts, military and community organizations. Commissioners Mannarino and Bulova led the publication of two booklets interpreting and reprinting foundational documents written by Fairfax County residents in the Revolutionary period: The Fairfax Resolves and The Virginia Declaration of Rights. They supported a third booklet published by Fairfax 250, Honoring the Fairfax County, Virginia Patriots of the Revolution. Commissioners Subhi Mehdi (Dranesville) and Jen Macpherson (Franconia) represented their Supervisory Districts on the body, assisting in planning and public outreach. Additionally, other commissioners supported 250th efforts within Fairfax County through their related activities and networks outside the History Commission. Commissioners Anne Stuntz and Holly Irwin, for example, shared opportunities for cross-promotion of community efforts in their work with Vienna 250 and Falls Church 250, respectively. Similarly, in her role at the Fairfax County Park Authority, Commissioner Cheryl-Ann Repetti supported Fairfax 250 by providing outreach and historical content for exhibits. Commissioner Sue Kovach Shuman led two efforts that provided depth to the county’s marking of this important period: the 2026 History Conference and the Oral History project, Revolutionary Voices: The Fairfax Story, both of which are detailed later in this report. All history commissioners supported 250th events through their advocacy of an amazing array of historical sites in Fairfax County. Their support of the 2026 The History Commission printed and distributed more than 1000 copies of The Fairfax Resolves. History Commission display at History Conference. Conference. Attachment 1 12 Major Initiatives 6 Conference made it the largest and most interactive to date. Finally, History Commission Advisory Member Mary Lipsey represented the Springfield District on the Fairfax 250 Commission, providing educational expertise and experience to appreciative audiences. Strengthening Ties with Fairfax County Park Authority The Fairfax County History Commission (FCHC) and the Fairfax County Park Authority (FCPA) both execute core functions in support of Fairfax County’s history and heritage resources. They are both committed to their roles -- which sometimes overlap. Notably, the FCPA stewards more than 40 sites on the History Commission’s Inventory of Historic Sites. The FCPA routinely attends FCHC’s Inventory Committee meetings and the FCHC tracks FCPA’s Resident Curator program. The History Commission’s Advocacy Committee often makes use of outreach opportunities provided by FCPA events. This year’s celebration of America’s 250th saw additional collaborations between the FCHC and the FCPA on public education. Having experienced the benefits of this close collaboration and recognizing their common function as county cultural resource stewards, the commission observed that overall coordination and cooperation between the two entities could be improved. In a bid to enhance strategic communication, the History Commission appointed Commissioner Todi Carnes as a formal liaison to the FCPA. Commissioner Carnes worked previously with FCPA Friends groups as an advocate for parks. The commission hopes to develop processes and programs that will facilitate a more synergistic relationship between the FCHC and the FCPA, leading to better support for the county’s history and heritage resources. Toward this end, Commissioner Carnes has met with key Park Authority personnel, attended Park Authority Board meetings, and has been observing interactions between the two organizations. Increased engagement is planned in FY 2027. Consistent with one of the Commission’s purposes stipulated in the Board of Supervisors 2019 authorizing resolution, Commissioner Carnes will also explore how the creation of trusts and endowments might be implemented to secure financing in support of FCPA-owned historic structures and properties. FCPA Archaeology and Collections Branch staff at Fairfax County History Conference. Attachment 1 13 Outreach 7 Historic Courthouse and Historic Records Center On December 18, 2025, The Fairfax County Historic Courthouse and Circuit Courts Historic Records Center experienced a catastrophic HVAC System failure. Operations at the Historic Courthouse were suspended and historic documents were relocated to the Main Courthouse, Merrifield (Prosperity Avenue) and a Springfield warehouse. The History Commission wrote a letter to the Board of Supervisors on January 15, requesting that the County prioritize the historic building restoration while the staff and tenants have been evacuated instead of adhering to the judicial center master plan timetable approved in 2021. The Commission also urged that the irreplaceable historic records being temporarily rehoused be safely stored. It is unfortunate that the timing of this failure encumbered research efforts and canceled events that would have enhanced the County’s commemoration of the nation’s 250th anniversary. William H. Randall Estates Historic District In September 2025, the History Commission wrote a letter to the Virginia Department of Historic Resources in support of the nomination of the William H. Randall Estates Historic District to the Virginia Landmarks Register and to the National Register of Historic Sites. The William H. Randall Estates Historic District was listed on the Fairfax County Inventory of Historic Sites in 2022 for its significance to Fairfax County’s cultural heritage, its association with influential people and groups, and its association with a discrete population, ethnic group, or community. The subdivision additionally reflects mid-20th century residential architecture with many of the homes retaining the custom features selected by the original owners. Randall Estates, now more than sixty years old, exemplifies a successful neighborhood of quality homes built by a Black developer, Jube Shiver Sr., and available to African American families during a period when racially restrictive deed covenants, financial redlining and other discriminatory practices excluded or limited their access to other neighborhoods. The Historic District was added to the Virginia Landmarks Register on September 18, 2025, and to the National Register of Historic Places on March 23, 2026. Section 106 Section 106 of the National Historic Preservation Act of 1966 requires federal agencies to consider the effects of any changes to historic properties when they carry out, fund, permit, license, or approve projects. The History Commission often serves as a consulting party on 106 projects. During the 2026 fiscal year, the Commission participated in the review process for the proposed Terminal/Concourse Redevelopment and Associated Projects at Washington Dulles International Airport (IAD). This is a multiphase project and more opportunities for review are anticipated. Recent events have put the routine procedures associated with Section 106 in jeopardy. Below is a summary highlighting impacts of the History Commission’s participation as a consulting party. Since 2010, the FCHC has participated in at least 11 undertakings, not including local cell towers. Notable projects include: Capital One Lounge, Dulles Airport Historic District: Located in the airport restaurant designed Attachment 1 14 Outreach 8 by Eero Saarinen, the new lounge was designed in 2020 -2021. As a consulting party, the History Commission raised concerns in 2021 that the proposed modifications could adversely affect the historic integrity of Saarinen’s design. During 2022, the Commission continued evaluating proposed updates, responding to developer revisions, and providing feedback intended to mitigate possible adverse effects. Impact: In September 2023 the Capital One Lounge opened in the Dulles Airport Historic District. The Commission’s input contributed to design revisions that helped to avoid or minimize potential adverse effects. The successful redevelopment of the original restaurant into the Capital One Lounge now represents an appropriate and compatible adaptive reuse of the historic space. Soapstone/Association Drive: The Soapstone Connector is a joint project of the Federal Highway Administration and Fairfax Department of Transportation to extend Soapstone Drive a half a mile over the Dulles Toll Road to connect Sunset Hills Road and Sunrise Valley Drive in Reston. The History Commission became a consulting party for the project in 2017. The connector threatened buildings within the Association Drive complex. Built between 1972 and 1991, Association Drive was part of the initial concept and implementation of the Reston Plan. In 2019, the Association Drive Historic District was determined to be eligible for the National Register. The Commission participated in consultation to identify and agree upon measures to mitigate the adverse effect on the historic district. Impact: In August 2022, an agreement was reached that included mitigation supported by the Commission: documentation of the buildings, three wayside markers, and a publicly available report documenting the significance of Association Drive. The commission awaits the mitigation plan to be implemented when the Soapstone project, not yet under construction, draws to a close. McMillen Farm: This 550-acre dairy farm in the Dranesville District was built between 1850 and 1900. The property was determined eligible for the National Register in 1994 and was listed on the Fairfax County Inventory of Historic Sites in 1996. In October 2020, the History Commission became a consulting party for the project which included residential development of the historic dairy farm. The home, Coomber Hall, and several other structures were unsuccessfully offered for sale and removal. Impact: A memorandum of agreement (MOA) with the developer, the Army Corps of Engineers, Virginia Department of Historical Resources, the county, and the History Commission called for HABS level III documentation of the buildings and an interpretive installation. In Fall 2021, following documentation in accordance with the MOA, the structures were demolished to make way for new residential housing. Reportedly, the historic barn was deconstructed with some materials salvaged to build a private barn within Fairfax County. Commissioner Stuntz and DPD staff worked with Dovetail Consulting to produce the signage called for in the MOA. It was installed in 2023. Attachment 1 15 Outreach 9 Richmond Highway Bus Rapid Transit Project – The Richmond Highway Bus Rapid Transit (BRT) project (branded as “The One”) extends 7.4 miles, from the Huntington Metro Station to Fort Belvoir. This project required widening along the Richmond Highway corridor in an area that contains numerous historic buildings and communities. The Commission began providing comments in September 2019, pressing for National Register eligibility for Gum Springs, Walsh Hall (a former Fairfax County one-room school), and a Wells Fargo Bank (formerly the Colonial Home, a tourist Inn that was built in 1941 as a replica of Mount Vernon). In May 2020, the History Commission asked to be named as a consulting party. Fairfax County Department of Transportation and the Federal Transit Authority determined that The Fairfax County History Commission and Architectural Review Board fell under the purview of the Department of Planning and Development and therefore had to coordinate their comments through DPD. Impact: In May 2020, Virginia Department of Historic Resources (DHR) concurred that Gum Springs should be treated as eligible for listing in the National Register of Historic Places (NRHP). The BRT plans were modified to mitigate impacts near the community. While Walsh Hall and the Wells Fargo Bank were not deemed National Register eligible, later roadway designs reduced effects near these properties. Above left: the Capital One Lounge. Above right: Walsh Hall, now a part of Saint Louis School was the Groveton School House. It was protected from possible demolition as part of the Richmond Highway Bus Rapid Transportation project by discussions that emerged from the Section 106 process. At left: Mitigating signage at McMillen farm site. Attachment 1 16 Outreach 10 Threatened Sites The History Commission has noted a growing trend of historic buildings threatened by demolition. In 2023, the commission compiled its first list of threatened sites. The commission acknowledges that not every historic building can be preserved. We are examining how we may more proactively address the issue of what should be more vigilantly protected. Threatened sites noted by the commission in 2026 include the following: Olander and Margaret Banks House District: Franconia Listing(s): N/A Threat: Scheduled for Demolition Olander Banks, Sr., a successful Alexandria businessman and his wife Margaret Lomax Banks bought 10-acres in Fairfax County and built a custom home in the late 1950s. The house was designed from plans Margaret pulled from a popular women’s magazine. They lived in the home, which ultimately had 27 rooms, for more than 40 years with their nine children. Olander Banks, Sr. was recognized as a business leader in the Alexandria African American Hall of Fame in 2013. In 2001, the Banks family sold the property to Fairfax County for a community park with an easement to continue living there. In 2011, the Fairfax County Park Authority (FCPA) approved the master plan for the Olander and Margaret Banks Neighborhood Park. The Banks House has remained vacant over the past decade since the park was created. In March 2026, three concepts for the Olander and Margaret Banks Park were presented to the FCPA Park Authority Board (PAB). All three concepts involved demolition of the house. The Fairfax County PAB voted to adopt the next steps in the demolition and left the selection of one of the presented concepts to be determined. Laurel Hill House (in DC Workhouse and Reformatory Historic District, Lorton) District: Mount Vernon Listing(s): National Register, Virginia Landmarks Register, FCHC Inventory Threat: Demolition by Neglect Major William Lindsay, a Colchester carpenter and tavern-keeper, served in the Revolutionary War and was wounded at the Battle of Guilford Courthouse in 1781. He built the frame house, known as Laurel Hill, between 1787-1790 and lived there with his wife Ann Calvert and their large family. The house was renovated in the early twentieth century to serve as the superintendent’s residence for the reformatory. In the late 1930s, prison labor was used to Attachment 1 17 Outreach 11 construct the classically designed, terraced gardens adjacent to the house. Made almost entirely of brick, the garden’s hardscaping is also a contributing structure in the Historic District. A cemetery associated with the Lindsay family also sits adjacent to the house. A 2008 Historic Structure Report provided options for preservation of the Laurel Hill house, that were never acted upon. The report concluded that it is likely that undisturbed land around the house includes archaeological resources associated with the use and occupation of the house, both before and during the period of significance. There is community interest in this property. It has been the recent site of Eagle Scout projects and of Sons of the American Revolution and Daughters of the American Revolution projects and commemorations. Neighboring communities are concerned about the state of the neglected building. Robert Wiehle House District: Hunter Mill Listing(s): FCHC Inventory Threat: Storm Damage/Demolition by Neglect Built in 1895, this privately-owned Victorian home is one of only three buildings remaining from the Town of Wiehle planned by Dr. Carl A. Max Wiehle, a German-born doctor, and incorporated in 1898. On July 5, 2026, the roof and at least one second-floor bedroom were damaged by a falling tree. The home was not insured and funds are not available for repair. The homeowner has reached out in the media seeking a partnership to restore the home. Bowman Distillery/Wiehle Town Hall District: Hunter Mill Listing(s): National Register, Virginia Landmarks Register, FCHC Inventory Threat: Demolition by Neglect In 1892, this brick Classical revival building was the centerpiece of German immigrant and businessman C.A. Max Wiehle’s planned “utopian community.” The first floor served as the Town Hall and the second floor was the Wiehle Methodist Episcopal Church. In 1927 the A. Smith Bowman Distillery converted the building into one of the first legal post-Prohibition whiskey distilleries in the United States, operating it through the 1950s. In May 2026, Preservation Virginia placed the Wiehle Town Hall on its Virginia’s Most Endangered Historic Places List 2026. Attachment 1 18 Outreach 12 Clifton Elementary School District: Springfield Listing(s): FCHC Inventory Threat: Demolition Clifton Elementary school was built in 1953 on the site of an earlier school. The school was designed by Earl B. Bailey, the architect for Luther Jackson High School and other Fairfax County and Prince William County Public Schools. The design of the Clifton school reflects the Mid-Century Modern style prominent after World War II. In late June 2025, the Fairfax County Public School Board voted to update Policy 8258 - Building Evaluation, Building Renovation, and Infrastructure Maintenance to read: “Buildings deemed uninhabitable shall be removed from service immediately and demolished within 36 months of the uninhabitable determination, unless granted an extension by the School Board for documented extenuating circumstances.” This decision was followed immediately by a vote to declare Clifton Elementary School uninhabitable. DeBell House (Sunnyside) District: Sully Listings: A recent Phase II Level Survey recommended the house eligible for the National Register of Historic Places. Threat: Demolition for Development A well-known landmark in the Centreville community, the earliest section of the DeBell House was constructed before 1854. The house was sold in 2019. When the new owners determined that they could not adaptively reuse the building, they began planning to demolish the house and build a church. This required a special permit. The case was brought to the commission’s attention by staff and by concerned citizens in the Centreville area, including the DeBell family. The commission offered testimony to the Board of Zoning Appeals (BZA) and asked that the building be allowed to remain in place, consistent with the Comprehensive Plan recommendation for properties that are eligible for the Register. Though the BZA deferred its decision to allow community advocates time to devise a solution, none was forthcoming. The special permit was granted on February 26, 2025, but the owners have not yet taken steps to demolish Sunnyside. Attachment 1 19 Outreach 13 Dunn Loring School District: Providence Listing(s): FCHC Inventory Threat: Demolition for New School Demolition of the historic school is imminent. Work has begun on fencing the property and disconnecting the utilities. FCPS has completed its proffers of a Phase II Intensive Level Documentation, photography that meets Historic American Buildings Survey (HABS) standards, a written report, preservation of the historic Works Progress Administration (WPA) plaque, and design of an interpretive exhibit including all or a portion of the pediment and salvaged bricks, and on-site historic markers. The historic front entrance (door 4) will be preserved and reconstructed in the main hall of the new school building. At left: Signage developed for Dunn Loring school. At right: Commissioner Kovach Shuman with alumni and members of the public at Dunn Loring Day. Conference. Attachment 1 20 Sustained Efforts 14 Advocacy The Advocacy Committee promotes interest in county history by participating in a variety of community events. It assists in the commission’s mission to advise and inform the Board of Supervisors on matters of preservation. During this reporting period, the Advocacy Committee staffed information tables at numerous county events including: • Oakton Day in the Park • Oak Hill Open House • Commemoration of the 251st anniversary of the Fairfax County Independent Company of Volunteers • Mount Vernon Town Hall • Charles Broadwater Day • Viva Vienna • Mount Vernon District Summerpalooza • Fort Belvoir Commemoration of the 251st Army Birthday • Juneteenth Celebrations in Gum Springs and Vienna At each event, the Advocacy Committee provides a professional exhibit displaying History Commission efforts across the county. We share current materials promoting our efforts such as the African American History Inventory, supporting Fairfax 250 and engaging the public regarding their historical interests and concerns. We engage children with activity pages and old-fashioned games. Committee members also worked on several complex preservation issues regarding Dunn Loring School (see the Threatened Sites section) and at Fort Belvoir. On March 5, 2026, Fort Belvoir Leadership broke ground on a new housing development named Young Village to honor Brigadier General Charles Young in accordance with the recommendation of History Commission members Top: Broadwater headstone, Vienna. Middle, from left edge: Commissioners Stuntz, Meyer and Macpherson honoring the contributions of Colonel Charles Broadwater to American Independence. Bottom: Groundbreaking for Young Village housing complex. Commissioner Mannarino stands with descendant Vincent Carter, County Liaison to Fort Belvoir, Vance Zavela, Colonel David Stewart and Command Sargeant Major Brandon Creel. Attachment 1 21 Sustained Efforts 15 and other representatives of the community. The committee continues to enhance the commission’s outreach, research historic preservation tools and maintain a list of threatened historic properties to keep the Board informed. The committee supports and complements the work of other commission committees and prepares the Annual Report and presentation for the Board of Supervisors. The Advocacy Committee is chaired by Anne Stuntz and has six members. History Conference On April 18, 2026, the history conference was held at the Fairfax County Government Center for the first time. It drew a record- breaking crowd of nearly 250 attendees. The theme was Revolutionary Ideas: Fairfax County’s American Revolution. Several partners (George Mason University’s Center for Mason Legacies, the Fairfax County Park Authority, the Fairfax 250 Commission, and the Historical Society of Fairfax County) worked with the History Commission to coordinate and fund the conference. Chaired and organized by Commissioner Sue Kovach Shuman and George Oberle, Director of the Center for Mason Legacies, the conference featured both traditional presentations and interactive activities. Fairfax County Board Chairman Jeff McKay welcomed attendees. The morning began with keynote speaker Dr. Richard Bell, author of The American Revolution and the Fate of the World. Commissioner Brian Heintz, with Commissioner David Meyer and Chair Subhi Mehdi presented two History Commission awards. Esther White, founding director of History Revealed, Inc, was presented with the Beth Mitchell Award for work creating an index for the John Glasgow & Company Top: Commissioner Sue Kovach Shuman co-chaired the Fairfax County History Conference and led the Commission’s Conference Committee, a key organizing body for the 2026 conference. Bottom: The History Conference was held in the Government Center for the first time. Attachment 1 22 Sustained Efforts 16 records. The Edith Sprouse Moore Prize went to Dan Johnson for his biographical study “Amos Fox’s World.” A session on “The Big Picture” followed, featuring GMU faculty. Dr. Oberle spoke about slavery in Fairfax County in the Revolutionary era. Dr. Rosemarie Zagarri discussed politics in Revolutionary Fairfax, and Dr. Cynthia Kierner presented “Living the Revolution.” History Commission Chair Subhi Mehdi moderated the session. Afternoon sessions focused on interactive exhibits and presentations. Three GMU PhD candidates presented original research on impacts of the Revolution on domestic life and women’s roles in the Mason family. David Armstrong examined property transfers to women, Anne Champlin explored the Mason family account books, and Alessandra DelDonna presented on the life of Ann Eilbeck Mason. The Fairfax County Park Authority presented “Dig Archaeology,” an interactive guessing game featuring county artifacts. There was a trivia competition with four high school students facing off against Fairfax County School Board members Mateo Dunne and Kyle McDaniel and a Northern Virginia Community College (NVCC) student, Stephanie Greene. Marc Dluger, director of NVCC’s Public History and Historic Preservation Program, and Fairfax High School teacher Rishi Agrawal ran the competition. Commissioner Anne Barnes invited attendees to share concept of freedom on a community poster. Former commissioner Mary Lipsey presented a program on African American cemeteries. She also created “Live Like a Colonial,” an interactive program where participants could make a toy, explore jobs of the past, and learn slang terms. County staff, Stephanie Newman and Laura Kviklys, showcased projects from the Department of Planning and Development, Heritage Resources Branch. Dr. Krystyn Moon of the University of Mary Washington led an interactive research and mapping workshop on using land records to reveal racially restricted covenants. Members of Gunston Hall’s Descendants Advisory Board presented a film on Mason Neck’s free Black community. The Fairfax Genealogical Society had an interactive session to help participants explore their own family history. GMU scholars and faculty shared a few tips for using Artificial Intelligence effectively in historical research. The work of younger historians was featured in an exhibition of comparing the “then and now” status of various Fairfax County historic sites. The posters were created by West Springfield students overseen by Commissioner Brian Heintz. Also included was a poster summarizing the 14 finalist submissions for the Black/African American Historical Marker Project. Interactive activities at the History Conference. Attachment 1 23 Sustained Efforts 17 Behind the scenes, the conference relied on the support of History Commissioners Todi Carnes, Brian Heintz, Carmen Powell, Margo Coleman and former Commissioners Mary Lipsey and Esther McCullough. Ellen Gipko was a liaison with Fairfax County Public Schools and oversaw the essential morning coffee break. The Historical Society of Fairfax County donated its 2026 yearbook to presenters, trivia competition participants, and other volunteers who helped. Portions of the 2026 History Conference are available online. The Conference Committee was Chaired by Sue Kovach Shuman and had five members. Awards History Commission 2025 Awards were announced and presented at the History Conference at the Fairfax County Government Center Fairfax, Virginia Saturday, April 18, 2026. 2025 Beth Mitchell Prize This award honors the memory of Beth Mitchell who conducted valuable research into the land grants and deeds of Fairfax County. The Beth Mitchell Award recognizes research that consolidates and indexes primary source materials into a format that can be used to support further understanding and interpretation of Fairfax County’s history. This year’s recipient, History Revealed, Inc., is an independent, 501(c)(3) non- profit, historical research organization, located in Alexandria, Virgina. The organization emphasizes individuals and communities whose stories have not been previously told. History Revealed, Inc., created “John Glassford & Company--Index of Account Holders, Alexandria and Colchester Stores, 1758-1769.” This is a project that contributes new insight into life in Fairfax County from both micro and macro perspectives. The information collated covers eleven critical years in the history of Fairfax County and provides insights into the social and economic histories of individuals and groups in the County’s colonial era. The Fairfax County History Commission congratulates History Revealed, Inc., and presents the Beth Mitchell Prize to Molly Kerr and Esther White, Founding Directors. 2025 Edith Moore Sprouse Prize The Edith Moore Sprouse Prize is named after a founding member of the Fairfax County History Commission who authored books and monographs on Fairfax County history and served as a Esther White, at left, receives the Beth Mitchell Prize from History Commission Chair, Subhi Medhi. Attachment 1 24 Sustained Efforts 18 mentor to many researchers. This award recognizes the best, fully documented, short monographs of ten or more pages dealing with any aspect of Fairfax County history. The award was presented this year to Dan Johnson who authored a study entitled “Amos Fox’s World.” Originally published on the Old Bad Road website, this study tells the story of Amos Fox, a less-than-honorable citizen in Fairfax County’s past. Johnson’s research reminds us that not everyone can be George Washington. Fox’s life is an interesting tale that spans the County and the City of Alexandria. This story is a narrative that includes a life that is sometimes nefarious and sometimes even downright criminal. This tale reminds us that truth comes from the mosaic of many forgotten lives of the past. The Awards Committee is Chaired by Brian Heintz and has four members. Oral History To commemorate the 250th anniversary of American independence, the Oral History Committee, in partnership with the 250th Committee, led the creation of a video series to explore the meaning of the values and ideas of the American Revolution among Fairfax County residents today. The residents interviewed represent all walks of life in the county. Some are immigrants or children of immigrants. Others have ancestors who lived here during the American Revolution. Community activists, artists, coaches, business owners, and a former politician all generously shared their reflections and stories. “Revolutionary Voices: The Fairfax Story,” was produced by Channel 16 under the leadership of Leonard Orange. The four-part series examines four themes: “The American Dream,” “Equality,” “Diversity,” and “A More Perfect Union.” The committee is chaired by Sue Kovach Shuman and has six members. Inventory of Historic Sites The committee makes recommendations regarding the expansion and maintenance of the Fairfax County Inventory of Historic Sites, a catalog of historically significant sites in the county, established in 1969. There are more than 350 sites on the inventory. It is an honorary designation and does not impose restrictions or limits as to what an owner can do with his property. Unfortunately, at least sixty of these sites have been demolished since the creation of the Inventory and more are threatened (see the Outreach section for a discussion of threatened sites). During this reporting period, the Inventory Committee worked with the Heritage Resources Branch to create the Comprehensive Plan Amendment that will incorporate all sites added to the Inventory since 2018. The committee also reviewed and supported staff Attachment 1 25 Sustained Efforts 19 recommendations to: • Revise definitions and records to ensure consistency and accuracy • Rename several inventory sites to better reflect their current condition • Recommend sixteen properties for delisting due to a loss of integrity The Comprehensive Plan Amendment is scheduled to go in front of the Board of Supervisors in FY 2027. The Inventory Committee also supported Heritage Resources staff to add historical information to the Fairfax County GIS map. Users can now click on Inventory locations to see a description, architectural style and builder (if known), the construction and listing dates, and if the site is included on Virginia or National registers. While no additional sites have been added to the Inventory during this reporting period, two sites have been slated for demolition, Clifton Elementary School (Springfield District) and Dunn Loring Elementary School (Providence District). Both Inventory Sites are under the purview of Fairfax County Public Schools. The History Commission is seeking solutions to limit avoidable demolitions in the future. The Inventory Committee is Chaired by Tammy Mannarino and has six members. Historic Markers In September 2025, the last of the Black African American Experience Project markers was unveiled at Louise Archer Elementary school. The marker recognized Louise Archer’s work as a “Champion of Education.” Current students, educators, community leaders and former students joined together in a joyful celebration of Ms. Archer’s achievements and those of the communities she served. Archer was nominated for a marker by students at Louise Archer school, Luther Jackson Middle school, and James Madison High School. Also in September, the Marker Committee recommended approval for a marker about the First Baptist Church of Merrifield. The committee also identified locations for two previously approved markers: the Spring Bank Colored School will be located at the Quander School in the Spring Bank community; Dolley Madison’s Flight from Washington will be located in McLean Central Park near Dolley Madison Blvd. Installation of these markers has been delayed by a backlog of orders with the manufacturer. On June 6, 2026, the James M. Goins marker was unveiled at the Pinn Community Center. The ceremony was marked by a community spirit Mr. Goins would have recognized and appreciated. Descendant William Root Jr. deeply moved the gathered audience with his recollections of his grandfather. Braddock District Supervisor Rachna Sizemore Heizer, Attachment 1 26 Sustained Efforts 20 Congressman James Walkinshaw, and History Commission Chair Subhi Mehdi, and others shared their observations on Mr. Goins’ legacy. The committee wishes to express its appreciation for the support of Neighborhood and Community Services and special thanks to Department of Planning and Development Heritage Resources staff member Stephanie Newman, who located and coordinated with Goins family members, researched James M. Goins’ life, and wrote the text of the marker. The Marker Committee is chaired by Cheryl Repetti and has five members. Top: Alumni and present staff of Louise Archer Elementary School pose in front of the Louise Archer historical marker. Above left: The great-grand-daughter of James Goins reads the text of the marker aloud to the gathered crowd. Above right: William Root Jr. shares his memories of his grandfather with Representative Walkinshaw, Supervisor Sizemore Heizer and others in the audience. Attachment 1 27 Sustained Efforts 21 Resident Curator Program The Fairfax County History Commission was instrumental in the creation of the Resident Curator Program in 2014 to preserve publicly owned historic buildings listed on or deemed eligible for the Inventory of Historic Sites by entering long-term leases with qualified tenants who agree to rehabilitate and maintain under-utilized historic properties. There are currently nine properties in the Resident Curator Program. A tenth property, the Barrett House, is a contributing structure in the District of Columbia Workhouse and Reformatory Historic District and is under consideration for the program. Name District Status Fairfax Arms Mount Vernon Application Process Dranesville Tavern Dranesville Lease Development Lahey Lost Valley Hunter Mill Active Curatorship Ash Grove House Hunter Mill Active Curatorship Mount Gilead Sully Active Curatorship Ellmore Farmhouse Hunter Mill Active Curatorship Clark/Enyedi House Mount Vernon Active Curatorship Turner Farmhouse Dranesville Active Curatorship Stempson House Mount Vernon Active Curatorship Clockwise from top left: Interior of Dranesville Tavern; windows at Lahey Lost Valley; Fairfax Arms exterior; and stairs at Ash Grove House. Attachment 1 28 Budget 22 FY 2026 FY 2027 FY 2027 FY 2028 Actual Adopted Budget Plan Estimate Request 1 2 3 4 Beginning Balance July 1 $46,822.93 $ - $53,783.29 $33,346.29 Revenues Fairfax County $21,013.00 $21,013.00 $21,013.00 $21,013.00 Proffers $ - $ - $ - Other* $6,000.00 $ - $ - Total Revenues $7,013.00 $21,013.00 $21,013.00 $21,013.00 Total Available $73,835.93 $74,796.29 $54,353.29 Expenditures Operating Expenses $20,052.64 $21,013.00 $41,450.00 $45,000.00 Total Expenditure $20,052.64 $41,450.00 $45,000.00 Ending Balance June 30 $53,783.29 $33,346.29 $9,353.29 *The Commission received a grant from Fairfax 250 for the History Conference. The Commission employs a part-time clerk who prepares the minutes. An independent audit is not required for the Commission. Items from Historic Sully Site at Fairfax History Conference. Attachment 1 29 Membership 23 Meet Our Members – Stewards of Our History The Fairfax County History Commission is fortunate to be guided by dedicated individuals who bring a wide range of professional expertise, community service, and passion for preserving our local history. Our members include educators, public servants, archaeologists, veterans, and civic leaders who volunteer their time and talents to advance the commission’s mission of protecting and promoting Fairfax County’s rich history for generations to come. Commissioner Supervisor District Subhi Mehdi – Chair Dranesville Tammy Mannarino – Vice Chair Mount Vernon Jennifer Macpherson – Secretary Franconia Sue Kovach Shuman – Treasurer Providence Michelle Arcari Rose Dranesville Anne Barnes Mount Vernon Gretchen Bulova Braddock Todi Carnes Franconia Margo Coleman Mason Brian Heintz Braddock Holly Irwin Mount Vernon Jenee Lindner1 Springfield David Meyer Fairfax City Carmen Powell Hunter Mill Cheryl-Ann Repetti Sully Anne Stuntz Hunter Mill Jordan Tannenbaum Springfield Advisory Members The Commission leverages Advisory Members to preserve institutional knowledge, continue ongoing projects such as the African American History Inventory, and expand or maintain subject matter expertise. Advisors are non-voting members appointed by the Commission. Name Areas of Expertise Marion Dobbins African American history in Fairfax County; Merrifield, the Pines, Williamstown, James Lee Center Phyllis Walker Ford African American History Inventory, African American history in Fairfax County; Laurel Grove Museum Mary Lipsey Braddock District history, African American History Inventory; Cemeteries Barbara Naef African American History Inventory, Confederate Names Index; Reston history, FCPA site history Barbara Peters Perspectives from the Mason District Philip Wilkerson African American History; George Mason University 1 Term ended December 2025 Attachment 1 30 Membership 24 Front row from left to right: Subhi Mehdi, Anne Barnes, Brian Heintz, Holly Irwin, Tammy Mannarino, Carmen Powell; Second row from left to right: Russell Brooks2, Cheryl-Ann Repetti, Jordan Tannenbaum, Jennifer Macpherson, Sue Kovach Shuman, Gretchen Bulova, Anne Stuntz, Todi Carnes. Not pictured: David Meyer, Michelle Arcari Rose, Margo Coleman 2 Russell Brooks was appointed to the History Commission in July 2026. Attachment 1 31 Board Agenda Item October 27, 2026 9:30 a.m. Board Appointments to Citizen Boards, Authorities, Commissions, and Advisory Groups ENCLOSED DOCUMENTS: Attachment 1: Appointments to be heard October 27, 2026 STAFF: Jill G. Cooper, Clerk for the Board of Supervisors 32 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 1 NOTE: This document is current as of October 14, 2026. The final document – as approved by the Board of Supervisors - will be included in the final board package that is posted to the website the day following the meeting. APPOINTMENTS TO BE HEARD OCTOBER 27, 2026 (ENCOMPASSING VACANCIES PROJECTED THROUGH OCTOBER 31, 2026) (Unless otherwise noted, members are eligible for reappointment) ADVISORY SOCIAL SERVICES BOARD (4-year terms – limited to 2 full terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Ben Zuhl; appointed 12/21 by Foust) Term exp. 9/25 Resigned Dranesville District Representative Bierman Dranesville AFFORDABLE DWELLING UNIT ADVISORY BOARD (4-year terms) Incumbent History Requirement Nominee Supervisor District Richard N. Rose (Appointed 7/97-4/01 by Hanley; 9/05-5/09 by Connolly; 6/13- 6/17 by Bulova) Term exp. 5/21 Builder (Multi-Family) Representative By Any Supervisor At-Large James H. Scanlon (Appointed 6/93-5/17 by Bulova) Term exp. 5/21 Engineer/Architect/ Planner #1 Representative By Any Supervisor At-Large Continued on next page 33 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 2 AFFORDABLE DWELLING UNIT ADVISORY BOARD (4-year terms) Continued from previous page Incumbent History Requirement Nominee Supervisor District Mark Drake (Appointed 2/09-5/12 by McKay) Term exp. 5/16 Engineer/Architect/ Planner #2 Representative By Any Supervisor At-Large VACANT (Formerly held by James Francis Carey; appointed 5/06 by Connolly) Term exp. 5/10 Resigned Lending Institution Representative By Any Supervisor At-Large Francis C. Steinbauer (Appointed 8/02-5/18 by Hudgins) Term exp. 5/22 Non-Profit Housing Representative By Any Supervisor At-Large AFFORDABLE HOUSING ADVISORY COUNCIL (AHAC) (2-year terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Jeremy Allen; appointed 6/23 by Gross) Term exp. 6/25 Resigned Mason District Representative Jimenez Mason 34 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 3 AGRICULTURAL AND FORESTAL DISTRICT ADVISORY BOARD (Serves at the pleasure of the Board) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Mariette Newcomb; appointed 2/88 by Richards) Resigned Farmer #2 Representative By Any Supervisor At-Large 35 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 4 ALCOHOL SAFETY ACTION PROGRAM LOCAL POLICY BOARD (ASAP) (3-year terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Ronald Boggio; appointed 5/22 by McKay) Term exp. 10/23 Resigned At-Large #1 Representative By Any Supervisor At-Large Grant J. Nelson (Appointed 10/95- 5/01 by Hanley; 6/04- 9/07 by Connolly; 6/10-9/19 by Bulova) Term exp. 6/22 At-Large #2 Representative By Any Supervisor At-Large Darren Dickens (Appointed 11/96- 5/01 by Hanley; 6/04- 10/07 by Connolly; 6/10-9/19 by Bulova) Term exp. 6/22 At-Large #3 Representative By Any Supervisor At-Large Bill Shuttleworth (Appointed 6/26 by Lusk) Term exp. 10/26 At-Large #5 Representative By Any Supervisor At-Large VACANT (Formerly held by Linda Perlstein; appointed 11/22 by Alcorn) Term exp. 10/25 Resigned At-Large #6 Representative By Any Supervisor At-Large 36 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 5 ARCHITECTURAL REVIEW BOARD (3-year terms) NOTE: Members shall be appointed by the Board as follows: At least two (2) members shall be certified architects; one member shall be a landscape architect authorized to practice in Virginia; one member shall be a lawyer with membership in the Virginia Bar; six (6) members shall be drawn from the ranks of related professional groups such as archaeologists, historians, lawyers, and real estate brokers. Incumbent History Requirement Nominee Supervisor District Christopher Daniel (Appointed 10/23 by McKay) Term exp. 9/26 Architectural Historian Representative By Any Supervisor At-Large Kaye Orr (Appointed 6/18-9/21 by Gross) Term exp. 9/24 Related Professional Group #1 Representative By Any Supervisor At-Large VACANT (Formerly held by Ali A. Sohanghpurwala; appointed 9/23 by Smith) Term exp. 9/24 Resigned Related Professional Group #2 Representative By Any Supervisor At-Large 37 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 6 ATHLETIC COUNCIL (2-year terms) Incumbent History Requirement Nominee Supervisor District NEW POSITION At-Large #2 Representative By Any Supervisor At-Large VACANT (Formerly held by Marc Fernandes; appointed 10/20-1/22 by McKay) Term exp. 12/23 Resigned Diversity-At-Large Principal Representative By Any Supervisor At-Large Brian Luwis (Appointed 7/19-6/21 by Foust) Term exp. 3/23 Dranesville District Alternate Representative Bierman Dranesville VACANT (Formerly held by Hillary Richardson; appointed 9/20-6/22 by Alcorn) Term exp. 6/24 Resigned Women's Sports Alternate Representative By Any Supervisor At-Large 38 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 7 BOARD OF BUILDING AND FIRE PREVENTION CODE APPEALS (4-year terms) NOTE: No official, technical assistant, inspector or other employee of the Department of Public Works and Environmental Services, Department of Planning and Development, or Fire and Rescue Department shall serve as a member on this Board. Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Amado Fernandez; appointed 6/16-2/23 by Smith) Term exp. 2/27 Resigned Alternate #3 Representative By Any Supervisor At-Large VACANT (Formerly held by Michael Sanio; appointed 2/23 by Alcorn) Term exp. 2/27 Resigned Alternate #4 Representative By Any Supervisor At-Large CHESAPEAKE BAY PRESERVATION ORDINANCE EXCEPTION REVIEW COMMITTEE (4-year terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Anne Kanter; appointed 9/11-10/18 by Bulova) Term exp. 9/23 Resigned At-Large #1 Representative McKay At-Large Chairman’s VACANT (Formerly held by David W. Schnare; appointed 11/10-9/23 by Herrity) Term exp. 9/27 Resigned Springfield District Representative Herrity Springfield 39 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 8 CHILD CARE ADVISORY COUNCIL (2-year terms) Incumbent History Requirement Nominee Supervisor District NEW POSITION At-Large Chairman's #2 Representative McKay At-Large Chairman’s NEW POSITION At-Large Chairman's #3 Representative McKay At-Large Chairman’s NEW POSITION At-Large Chairman's #4 Representative McKay At-Large Chairman’s Valerie Inman (Appointed 6/25 by Bierman) Term exp. 9/26 Dranesville District Representative Bierman Dranesville VACANT (Formerly held by Mercedes Dash; appointed 10/25 by Palchik) Term exp. 9/27 Resigned Providence District Representative Palchik Providence CIVIL SERVICE COMMISSION (2-year terms) NOTE: The Commission shall include at least 3 members who are male, 3 members who are female, and 3 members who are from a minority group. Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Janice Hill; appointed 12/21 by Gross; 6/24 by Jimenez) Term exp. 12/25 Deceased At-Large #9 Representative By Any Supervisor At-Large 40 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 9 COMMISSION FOR WOMEN (3-year terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Shira Zemel; appointed 2/26 by Palchik) Term exp. 10/26 Resigned Providence District Representative Palchik Providence CONTINUUM OF CARE BOARD (CoC) (2-year terms) Incumbent History Requirement Nominee Supervisor District NEW POSITION Dranesville District Representative Bierman Dranesville Ruth Pearson (Appointed 9/23 by Smith) Term exp. 6/25 Sully District Representative Smith Sully CRIMINAL JUSTICE ADVISORY BOARD (CJAB) (3-year terms) Incumbent History Requirement Nominee Supervisor District Ricardo E. Coleman (Appointed 9/16-3/21 by Gross) Term exp. 3/24 Mason District Representative Jimenez Mason 41 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 10 DULLES RAIL TRANSPORTATION IMPROVEMENT DISTRICT ADVISORY BOARD, PHASE II (4-year terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Richard Fernicola; appointed 1/22 by McKay) Term exp. 1/24 Resigned BOS At-Large #6 Representative By Any Supervisor At-Large ENGINEERING STANDARDS REVIEW COMMITTEE (3-year terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Maya Huber; appointed 12/09-1/14 by Confirmation; 5/18 by Bulova) Term exp. 3/21 Resigned Citizen #4 Representative By Any Supervisor At-Large 42 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 11 ENVIRONMENTAL COMMISSION (3-year terms) Incumbent History Requirement Nominee Supervisor District NEW POSITION At-Large Chairman's Representative McKay At-Large Chairman's NEW POSITION At-Large #1 Representative By Any Supervisor At-Large NEW POSITION At-Large #2 Representative By Any Supervisor At-Large NEW POSITION At-Large #3 Representative By Any Supervisor At-Large NEW POSITION Braddock District Representative Sizemore Heizer Braddock NEW POSITION Dranesville District Representative Bierman Dranesville NEW POSITION Franconia District Representative R. Dean Costello Lusk Franconia NEW POSITION Hunter Mill District Representative Alcorn Hunter Mill NEW POSITION Mason District Representative Laura Anderko Jimenez Mason NEW POSITION Mount Vernon District Representative Larry Zaragoza Storck Mount Vernon NEW POSITION Providence District Representative Kathryn Alsegaf Palchik Providence NEW POSITION Springfield District Representative Herrity Springfield Continued on next page 43 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 12 ENVIRONMENTAL COMMISSION (3-year terms) Continued from previous page Incumbent History Requirement Nominee Supervisor District NEW POSITION Sully District Representative Richard Weisman Smith Sully NEW POSITION College/University Student Representative Confirmed by the Board Confirmation CONFIRMATION NEEDED: • Ms. Nethra Purushothaman as the Student Representative 44 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 13 FAIRFAX AREA DISABILITY SERVICES BOARD (3-year terms - limited to 2 full terms) NOTE: Members may be reappointed after being off the Board for three years. State Code requires that the membership in the local disabilities board include at least 30 percent representation by individuals who have physical, visual, or hearing disabilities or their family members. For this 15-member board, the minimum number for this representation would be five members. Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Courtney Cezair Mayers; appointed 6/21 by Foust) Term exp. 11/24 Resigned Dranesville District Representative Bierman Dranesville Deborah K. Hammer (Appointed 3/16-1/20 by Storck) Term exp. 11/22 Not eligible for reappointment Mount Vernon District Representative Storck Mount Vernon VACANT (Formerly held by Michael Ritter; appointed 6/22 by Herrity) Term exp. 11/24 Resigned Springfield District Representative Herrity Springfield FAIRFAX COUNTY EMPLOYEES' RETIREMENT SYSTEM BOARD OF TRUSTEES (4-year terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Anthony Griffin; appointed 9/20-10/23 by Gross) Term exp. 6/27 Resigned At-Large #2 Representative By Any Supervisor At-Large 45 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 14 HEALTH SYSTEMS AGENCY BOARD (3-year terms - limited to 2 full terms) NOTE: Members may be reappointed after a 1-year break Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Cody J. Hennelly; appointed 3/25 by Lusk) Term exp. 6/27 Resigned Consumer #3 Representative By Any Supervisor At-Large Maria Zlotnik (Appointed 9/22 by McKay) Term exp. 6/25 Consumer #4 Representative By Any Supervisor At-Large Lydia Lawrence (Appointed 2/22 by Foust) Term exp. 6/24 Consumer #5 Representative By Any Supervisor At-Large Bridget Jennison (Appointed 5/22 by Walkinshaw) Term exp. 6/24 Provider #1 Representative By Any Supervisor At-Large VACANT (Formerly held by Maria Zlotnick; appointed 6/20 by Alcorn) Term exp. 6/25 Resigned Provider #4 Representative By Any Supervisor At-Large 46 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 15 HISTORY COMMISSION (3-year terms) NOTE: The Commission shall include at least one member who is a resident from each District. Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Joseph Imamura; appointed 7/23 by McKay) Term exp. 12/24 Resigned Architect Representative By Any Supervisor At-Large VACANT (Formerly held by Jenee Lindner; appointed 12/21-1/25 by Herrity) Term exp. 12/27 Resigned Citizen #4 Representative By Any Supervisor At-Large VACANT (Formerly held by Lynne Garvey-Hodge; appointed 12/21 by Gross) Term exp. 12/24 Resigned Historian #1 Representative By Any Supervisor At-Large 47 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 16 HUMAN RIGHTS COMMISSION (3-year terms) Incumbent History Requirement Nominee Supervisor District Gloria Crawford (Appointed 10/23 by Alcorn) Term exp. 9/26 At-Large #2 Representative By Any Supervisor At-Large Adnan Bokhari (Appointed 5/23 by McKay) Term exp. 9/26 At-Large #9 Representative By Any Supervisor At-Large Shahid Malik (Appointed 1/24 by McKay) Term exp. 9/26 At-Large #11 Representative By Any Supervisor At-Large Julia Boone (Appointed 9/25 by Alcorn) Term exp. 9/26 At-Large #12 Representative By Any Supervisor At-Large 48 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 17 HUMAN SERVICES COUNCIL (4-year terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Paul Thomas: appointed 8/22 by Alcorn) Term exp. 7/26 Resigned Hunter Mill District #1 Representative Alcorn Hunter Mill VACANT (Formerly held by Edward Yost appointed 3/23 by Smith) Term exp. 7/27 Resigned Sully District #2 Representative Smith Sully INDUSTRIAL DEVELOPMENT AUTHORITY (4-year terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Christopher Glaser; appointed 11/21 by Alcorn) Term exp. 10/25 Resigned At-Large #4 Representative By Any Supervisor At-Large 49 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 18 INFORMATION TECHNOLOGY POLICY ADVISORY COMMITTEE (ITPAC) (3-year terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Richard Kostro; appointed 12/25 by Storck) Term exp. 12/28 Resigned Mount Vernon District Representative Storck Mount Vernon VACANT (Formerly held by Dennis Carlton; appointed 11/25 by Smith) Term exp. 12/28 Resigned Sully District Representative Smith Sully JUVENILE AND DOMESTIC RELATIONS DISTRICT COURT CITIZENS ADVISORY COUNCIL (2-year terms) Incumbent History Requirement Nominee Supervisor District Crystopher Herrera (Appointed 2/22 by Foust) Term exp. 1/24 Dranesville District Representative Bierman Dranesville 50 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 19 PARK AUTHORITY (4-year terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Johna Toomey; appointed 1/24 by McKay) Term exp. 12/27 Resigned At-Large #1 Representative By Any Supervisor At-Large POLICE OFFICERS RETIREMENT SYSTEM BOARD OF TRUSTEES (4-year terms) Incumbent History Requirement Nominee Supervisor District Jay Jupiter (Appointed 2/17-3/22 by Storck) Term exp. 12/25 Citizen At-Large #1 Representative By Any Supervisor At-Large 51 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 20 RESTON TRANSPORTATION SERVICE DISTRICT ADVISORY BOARD (4-year terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Angela E. Roberts; appointed 9/21 by Alcorn) Term exp. 9/25 Resigned Apartment or Rental Owner Associations Representative By Any Supervisor At-Large VACANT (Formerly held by Margaret Parker; appointed 10/1 by Alcorn) Term exp. 9/25 Resigned Commercial or Retail Ownership #1 Representative By Any Supervisor At-Large VACANT (Formerly held by Peter Henry; appointed 9/21 by Alcorn) Term exp. 9/25 Resigned Commercial or Retail Ownership #3 Representative By Any Supervisor At-Large Michael Shindledecker (Appointed 9/21 by Foust) Term exp. 9/25 Dranesville District Representative Bierman Dranesville VACANT (Formerly held by Stephanie Weber: appointed 8/22 by Alcorn) Term exp. 9/25 Resigned Residential Owners/HOA/Civic Association #3 Representative By Any Supervisor At-Large 52 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 21 TRAILS, SIDEWALKS AND BIKEWAYS COMMITTEE (2-year terms) Incumbent History Requirement Nominee Supervisor District Lydia Lawrence (Appointed 9/24 by Bierman) Term exp. 1/26 Dranesville District Representative Bierman Dranesville VACANT (Formerly held by Henry Bankester; appointed 1/26 by Jimenez) Term exp. 1/28 Resigned Mason District Representative Jimenez Mason TRANSPORTATION ADVISORY COMMISSION (2-year terms) Incumbent History Requirement Nominee Supervisor District Michael Champness (Appointed 9/13-9/24 by Foust) Term exp. 6/26 Dranesville District Representative Bierman Dranesville Keith Foxx (Appointed 2/24 by Lusk) Term exp. 6/26 Franconia District Representative Lusk Franconia 53 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 22 TRESPASS TOWING ADVISORY BOARD (3-year terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held Denver Supinger; appointed 9/24 by McKay) Term exp. 9/27 Resigned Citizen Alternate Representative By Any Supervisor At-Large Ashley Miller (Appointed 6/26 by McKay) Term exp. 9/26 Towing #1 Representative By Any Supervisor At-Large Alvin Leach (Appointed 10/10- 11/22 by Foust) Term exp. 9/25 Towing #2 Representative By Any Supervisor At-Large 54 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 23 WETLANDS BOARD (5-year terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Kimberly Larkin; appointed 12/22 by Storck) Term exp. 12/27 Resigned At-Large #1 Representative By Any Supervisor At-Large VACANT (Formerly held by Bert Cramer; appointed 1/21-12/21 by Storck) Term exp. 12/26 Resigned Mount Vernon District #2 Representative Storck Mount Vernon VACANT (Formerly held by John Collins; appointed 1/22-12/24 by Storck) Term exp. 12/29 Resigned Mount Vernon District #3 Representative Storck Mount Vernon YOUNG ADULTS ADVISORY COUNCIL (2-year terms - limited to 2 full terms) Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Timothy Klein; appointed 7/25 by Lusk) Term exp. 1/26 Resigned Franconia District Representative Lusk Franconia Continued on next page 55 ATTACHMENT 1 October 27, 2026 Appointments to Boards, Authorities, and Commissions Page 24 YOUNG ADULTS ADVISORY COUNCIL (2-year terms - limited to 2 full terms) Continued from previous page Incumbent History Requirement Nominee Supervisor District VACANT (Formerly held by Daniel Morgan; appointed 2/26 by Jimenez) Term exp. 1/28 Resigned Mason District Representative Jimenez Mason Zafar Mahnoor (Appointed 1/24 by Storck) Term exp. 1/26 Not eligible for reappointment Mount Vernon District Representative Storck Mount Vernon Neel Daugherty- Shrivastava (Appointed 3/24 by Palchik) Term exp. 1/26 Providence District Representative Palchik Providence Samuel Niner (Appointed 1/22-1/24 by Herrity) Term exp. 1/26 Not eligible for reappointment Springfield District Representative Herrity Springfield VACANT (Formerly held by Eddy Sandoval; appointed 9/21 by Smith) Term exp. 1/24 Resigned Sully District Representative Smith Sully 56 Board Agenda Item October 27, 2026 10:00 a.m. Matters Presented by Board Members 57 Board Agenda Item October 27, 2026 10:00 a.m. Items Presented by the County Executive 58 Board Agenda Item October 27, 2026 ADMINISTRATIVE – 1 Authorization to Advertise a Public Hearing on Proposed Ordinance to Amend the Code of the County of Fairfax, Chapter 3, County Employees, Article 5, Financial Disclosures, Section 3-5-2.1 ISSUE: Authorization to advertise a public hearing to consider an ordinance to amend The Code of the County of Fairfax, Chapter 3, County Employees, Article 5, Financial Disclosures, Section 3-5-2.1 RECOMMENDATION: The County Executive recommends that the Board authorize the advertisement of a public hearing for December 8, 2026, at 4:30 p.m., to consider adoption of this ordinance. TIMING: Board action is requested on October 27, 2026, to provide sufficient time to advertise a December 8, 2026, at 4:30 p.m., public hearing on the proposed ordinance. The amendment will be effective January 1, 2027. BACKGROUND: Va. Code § 2.2-3115 authorizes the Board of Supervisors to require certain employees and appointees to complete an annual financial disclosure form. The Board implemented this authority in Chapter 3, Article 5 of The Code of the County of Fairfax, which sets forth the employees and appointees that are designated to file. Historically, Va. Code § 2.2-3115 required such employees and appointees to file the financial disclosure form with the Clerk to the Board of Supervisors. However, Chapter 504 of the 2026 Acts of Assembly amended Va. Code § 2.2-3115 as well as other statutes relating to the filing of financial disclosures. In accordance with the 2026 amendments, the designated employees and appointees are required to file the financial disclosure statements electronically with the Virginia Conflict of Interest and Ethics Advisory Council (Council) in 2028 and they have the option to file electronically with the Council in 2027. 59 Board Agenda Item October 27, 2026 The proposed amendments to Section 3-5-2.1 bring the County Code in line with the new State requirements and make additional housekeeping edits. EQUITY IMPACT: None. FISCAL IMPACT: None. ENCLOSED DOCUMENTS: Attachment 1: Proposed Ordinance to Amend The Code of the County of Fairfax, Chapter 3, County Employees, Article 5, Financial Disclosures, Section 3-5-2.1 (with amendment tracked) STAFF: Ellicia Seard-McCormick, Deputy County Executive Christina Peterson, Director, Department of Human Resources ASSIGNED COUNSEL: Daniel Robinson, Deputy County Attorney 60 AN ORDINANCE AMENDING 1 ARTICLE 5 OF CHAPTER 3 OF THE FAIRFAX COUNTY CODE, RELATING TO 2 FILING OF FINANCIAL DISCLOSURES 3 4 Draft of September 23, 2026 5 6 AN ORDINANCE to amend the Fairfax County Code by amending and 7 readopting Section 3-5-2.1, relating to Filing of Financial Disclosures. 8 9 Be it ordained by the Board of Supervisors of Fairfax County: 10 11 1. That Section 3-5-2.1 of the Fairfax County Code is amended and readopted as 12 follows: 13 14 CHAPTER 3 – County Employees. 15 16 Article 5. – Financial Disclosures. 17 18 Section 3-5-2.1. Disclosures of Financial Interest. 19 (a) As a condition to assuming or holding office or employment, members appointed by the 20 Board of Supervisors to the following entities shall file a disclosure statement of their personal 21 interests and other information as is specified in the form or forms identified in Virginia Code 22 §§ 2.2-3115 and 2.2-3117 at such times and for such periods as is required by state law: (1) the 23 Planning Commission, (2) the Board of Zoning Appeals, (3) the Fairfax County Economic 24 Development Authority, (4) the Fairfax County Industrial Development Authority, (5) the 25 Fairfax County Library Board, (6) the Fairfax County Employees' Retirement System Board of 26 Trustees, (7) the Fairfax County Police Officers Retirement System Board of Trustees, (8) the 27 Fairfax County Uniformed Retirement System Board of Trustees, (9) the Fairfax County Park 28 Authority, (10) the Fairfax County Redevelopment and Housing Authority, (11) the Fairfax 29 County Water Authority, (12) the Mosaic District Community Development Authority, (13) 30 the Fairfax County Wetlands Board, and (14) the Upper Occoquan Sewage Authority. 31 No person described in this subsection shall enter office and participate or vote as a member 32 of any board, authority, or commission until a completed disclosure form, as required by this 33 subsection, has been filed in accordance with Virginia Code § 2.2-3115.. For purposes of this 34 subsection, the word "appointment" shall include any person who is appointed directly by the 35 Board of Supervisors or any person whose appointment is confirmed after being elected, 36 nominated, or recommended by any community group or group of employees for any of the 37 boards, authorities, and commissions listed above. 38 (b) As a condition to assuming or holding office or employment, the following persons shall 39 file a disclosure statement of their personal interests and other information as is specified on 40 the form or forms identified in Virginia Code §§ 2.2-3115 and 2.2-3117 at such times and for 41 such periods as is required by state law: the County Executive, all Deputy County Executives, 42 the County Attorney and all deputy, senior assistant, and assistant county attorneys, all County 43 Commented [JA1]: Removed italics for Virginia Code throughout document. Deleted: with the Clerk for the Board of Supervisors44 Deleted: Virginia Code 45 Attachment 1 61 Department heads, and County employees who hold positions classified at or above the 46 following pay grades: A -1, M-1, S-33, P-27, F-29, and 0-28, except psychiatrists who are 47 employed as such by the Fairfax -Falls Church Community Services Board. 48 (c) As a condition to assuming or holding employment, the following employees also shall file 49 a disclosure statement of their personal interests and other information as is specified on the 50 form or forms identified in Virginia Code §§ 2.2-3115 and 2.2-3117 at such times and for such 51 periods as is required by state law: 52 (1) Health Department: Public Health Laboratory Director. 53 (2) Department of Finance: The Insurance Manager. 54 (3) Department of Transportation: All Transportation Planners V; all Engineers V. 55 (4) Retirement Administration Agency: All Senior Investment Managers. 56 (d) The individuals listed in subsections (a), (b) and (c) shall file a completed disclosure 57 form, as required by subsections (a), (b) and (c), in accordance with Virginia Code § 2.2 -3115 58 on or before the day such office or position of employment is assumed. 59 (e) The County Executive is hereby authorized and directed to issue procedural memoranda 60 governing the administration of the filing of the Statement of Economic Interests forms 61 identified in Virginia Code § 2.2-3117, the financial disclosure forms identified in Virginia 62 Code § 2.2-3118, and the real estate disclosure forms required under Virginia Code § 2.2-63 3115(G). The procedural memoranda shall address the filing of such forms by any individual 64 required to file by this Article, by designation by the Board of Supervisors or by state law. 65 2. That the provisions of this ordinance are severable, and if any provision of this 66 ordinance or any application thereof is held invalid, that invalidity will not affect the other 67 provisions or applications of this ordinance that can be given effect without the invalid 68 provision or application. 69 70 3. That this Ordinance will become effective on January 1, 2027. 71 72 73 GIVEN under my hand this ______ day of ______, 2026 74 75 _____________________________________ 76 77 Jill G. Cooper 78 Clerk to the Board of Supervisors 79 Deleted: 80 Deleted: Virginia Code 81 Deleted: with the Clerk for the Board of Supervisors 82 Deleted: Virginia Code 83 Deleted: Virginia Code 84 Deleted: Virginia Code 85 Attachment 1 62 Board Agenda Item October 27, 2026 ADMINISTRATIVE – 2 Authorization to Advertise a Public Hearing to Consider an Ordinance to Amend and Readopt Fairfax County Code Sections 7-2-5, 7-2-6, and 7-2-13, to Divide and Create Precincts in Hunter Mill and Dranesville Districts; Move Polling Places in Mason and Providence Districts; and Adjust Precinct Boundaries in Hunter Mill, Providence, and Sully Districts (Hunter Mill, Dranesville, Mason, Providence, and Sully Districts) ISSUE: Authorization to advertise a public hearing to consider an ordinance that proposes to amend and readopt Fairfax County Code Sections 7-2-5, 7-2-6, and 7-2-13 to divide Cameron Glen precinct and adjust the boundary of Reston #1 precinct to create a new precinct, Reston #4, in Hunter Mill District; divide Coates precinct to create a new precinct, Coppermine, in Dranesville District; move the polling places for Skyline and Holmes precincts in Mason District; move the polling place for Tysons precinct in Providence District; adjust precinct boundaries between Tysons and Jones Branch precincts in Providence District; and adjust the precinct boundaries between Green Trails and Old Mill precincts in Sully District. RECOMMENDATION: The County Executive recommends that the Board authorize the advertisement of a public hearing on Tuesday, December 8, 2026, at 4:30 p.m. to consider this ordinance. TIMING: Board action is requested on October 27, 2026, to provide sufficient time to advertise the proposed public hearing for adoption of this ordinance on December 8, 2026, at 4:30 p.m. BACKGROUND: The Virginia Code permits the governing body of each county and city to establish by ordinance as many precincts as it deems necessary with one polling place for each precinct. The Board of Supervisors is authorized to change polling place locations subject to the requirements of Virginia Code §§ 24.2-307, -310, and -310.1. Virginia Code § 24.2-129 also requires that certain “covered practices” go through either a statutorily specified public comment process or receive a Certification of No Objection from the Attorney General before the practices can be given effect. The public comment process takes a minimum of 75 days to complete, while the Attorney General 63 Board Agenda Item October 27, 2026 process takes a maximum of 60 days to complete. Among the “covered practices” identified are any changes that adjust precinct boundaries or relocate polling places in the County. The Board must first adopt an ordinance making the boundary and polling place changes. If and after the Board adopts the ordinance, the County Attorney will file a request for a Certification of No Objection with the Virginia Attorney General, in accordance with Virginia Code § 24.2-129(D). In Hunter Mill District, staff recommend dividing Cameron Glen precinct and adjusting the boundary of Reston #1 precinct, both of which currently have over 5,400 registered voters. This proposal will create a new precinct to be named “Reston #4,” and its polling place will be established at the Reston Teen Center located at 12196 Sunset Hills Road, Reston. The new precinct is expected to have 2,449 voters, reducing the size of Cameron Glen precinct by 2,021 voters, and Reston #1 precinct by 428 voters. The polling place for Cameron Glen voters will remain at the North County Human Services Building. The polling place for Reston #1 voters will remain at Lake Anne Elementary School. In Dranesville District, staff recommend dividing Coates precinct which currently has over 7,500 voters. This proposal will create a new precinct to be named “Coppermine,” and its polling place will be established at the Floris United Methodist Church, 13600 Frying Pan Road, Herndon. The new precinct will reduce the size of Coates precinct by approximately 2,200 voters. The polling place for Coates voters will remain at Coates Elementary School. In Mason District, staff recommend moving the polling place for Skyline precinct from Minnie H. Peyton Community Center at Bailey’s, 5920 Summers Lane, Falls Church, to Arlington Moose Lodge #1315, 5710 Scoville Street, Falls Church, to provide voters in Skyline precinct a polling place more proximate to the precinct boundaries. This change will remove one of the co-located precincts from the Minnie H. Peyton Community Center at Bailey’s, thus relieving parking congestion, and providing more flexibility at the center for choosing a voting room location. Also, in Mason District, with the anticipated completion of HVAC repair in early 2027, staff recommend returning the polling place for Holmes precinct from Bailey’s Elementary School, 6111 Knollwood Drive, Falls Church, to the Culmore Community Library, 6101 Knollwood Drive, Falls Church. In Providence District, staff recommend adjusting the boundaries of Tysons and Jones Branch precinct to move approximately 460 voters from Tysons to Jones Branch precinct because they live within walking distance of the Providence Committee Meeting Room, the polling place for Jones Branch precinct. Additionally, staff recommend moving the polling place for Tysons precinct currently located at The PARC at Tysons, 8508 Leesburg Pike, Vienna, to Boro Station, 1775 Greensboro Station Place, McLean. The PARC at Tysons has closed and therefore will no longer be available for voting. 64 Board Agenda Item October 27, 2026 In Sully District, staff recommend adjusting the precinct boundary between Green Trails and Old Mill precincts to move 27 voters from Green Trails precinct to Old Mill precinct. This small section of Green Trails precinct was created after the decennial redistricting in 2010. Relocating these 27 voters to Old Mill is expected to improve accessibility because these voters live closer to the Old Mill polling place, Centreville United Methodist Church, than to the Green Trails polling place, Centreville Elementary School. Additionally, the widening of Sully Road (Route 28) to six lanes and the installation of sound barrier walls that now impede access to Centreville Elementary School for these voters. EQUITY IMPACT: None. FISCAL IMPACT: Each new precinct is estimated to have a one-time cost of $29,653 and annual recurring costs of $9,224, resulting in a first-year total of $38,877 per precinct, or $77,754 for the two new precincts. ENCLOSED DOCUMENTS: Attachment 1: Virginia Code Pertaining to Election Precincts and Polling Places Attachment 2: Summary of Proposed Precinct and Polling Place Changes Attachment 3: Descriptions and Maps of Proposed Precinct and Polling Place Changes Attachment 4: Proposed Ordinance STAFF: Ellicia Seard-McCormick, Deputy County Executive Katherine K. Hanley, Chairman of the Fairfax County Electoral Board Beth Dixon Methfessel, Clerk to the Fairfax County Electoral Board ASSIGNED COUNSEL: Martin R. Desjardins, Assistant County Attorney 65 Attachment 1 1 § 24.2-129. Covered practices; actions required prior to enactment or administration. A. For the purposes of this section: "Certification of no objection" means a certification issued by the Attorney General that there is no objection to the enactment or administration of a covered practice by a locality because the covered practice neither has the purpose or effect of denying or abridging the right to vote based on race or color or membership in a language minority group nor will result in the retrogression in the position of members of a racial or ethnic group with respect to their effective exercise of the electoral franchise. "Covered practice" means: 1. Any change to the method of election of members of a governing body or an elected school board by adding seats elected at large or by converting one or more seats elected from a single- member district to one or more at-large seats or seats from a multi-member district; 2. Any change, or series of changes within a 12-month period, to the boundaries of the locality that reduces by more than five percentage points the proportion of the locality's voting age population that is composed of members of a single racial or language minority group, as determined by the most recent American Community Survey data; 3. Any change to the boundaries of election districts or wards in the locality, including changes made pursuant to a decennial redistricting measure; 4. Any change that restricts the ability of any person to provide interpreter services to voters in any language other than English or that limits or impairs the creation or distribution of voting or election materials in any language other than English; or 5. Any change that reduces the number of or consolidates or relocates polling places in the locality, except where permitted by law in the event of an emergency. "Voting age population" means the resident population of persons who are 18 years of age or older, as determined by the most recent American Community Survey data available at the time any change to a covered practice is published pursuant to subsection B. B. Prior to enacting or seeking to administer any voting qualification or prerequisite to voting, or any standard, practice, or procedure with respect to voting, that is a covered practice, the governing body shall cause to be published on the official website for the locality the proposed covered practice and general notice of opportunity for public comment on the proposed covered practice. The governing body shall also publicize the notice through press releases and such other media as will best serve the purpose and subject involved. Such notice shall be made at least 45 days in advance of the last date prescribed in the notice for public comment. Public comment shall be accepted for a period of no fewer than 30 days. During this period, the governing body shall afford interested persons an opportunity to submit data, views, and arguments in writing by mail, fax, or email, or through an online public comment forum on the official website for the locality if one has been established. The governing body shall conduct at least one public hearing during this period to receive public comment on the proposed covered practice. The governing body may make changes to the proposed covered practice in response to public comment received. If doing so, the revised covered practice shall be published and public 66 Attachment 1 2 comment shall be accepted in accordance with this subsection, except the public comment period shall be no fewer than 15 days. C. Following the public comment period or periods prescribed in subsection B, the governing body shall publish the final covered practice, which shall include a plain English description of the practice and the text of an ordinance giving effect to the practice, maps of proposed boundary changes, or other relevant materials, and notice that the covered practice will take effect in 30 days. During this 30-day waiting period, any person who will be subject to or affected by the covered practice, or any organization whose membership includes persons who will be subject to or affected by the covered practice, may challenge in the circuit court of the locality where the covered practice is to be implemented the covered practice as (i) having the purpose or effect of denying or abridging the right to vote on the basis of race or color or membership in a language minority group or (ii) resulting in the retrogression in the position of members of a racial or ethnic group with respect to their effective exercise of the electoral franchise. In such action, the court may, in its discretion, allow a private plaintiff a reasonable attorney fee as part of the costs, if such plaintiff is the prevailing party. D. The governing body of a locality seeking to administer or implement a covered practice, in lieu of following the provisions of subsections B and C, may submit the proposed covered practice to the Office of the Attorney General for issuance of a certification of no objection. Such practice shall not be given effect until the Attorney General has issued such certification. A certification of no objection shall be deemed to have been issued if the Attorney General does not interpose an objection within 60 days of the governing body's submission or if, upon good cause shown and to facilitate an expedited approval within 60 days of the governing body's submission, the Attorney General has affirmatively indicated that no such objection will be made. An affirmative indication by the Attorney General that no objection will be made or the absence of an objection to the covered practice by the Attorney General shall not bar a subsequent action to enjoin enforcement of such qualification, prerequisite, standard, practice, or procedure. 2021, Sp. Sess. I, cc. 528, 533; 2026, c. 717. § 24.2-307 (in part). Requirements for county and city precincts. The governing body of each county and city shall establish by ordinance as many precincts as it deems necessary. Each governing body is authorized to increase or decrease the number of precincts and alter precinct boundaries subject to the requirements of this chapter. At the time any precinct is established, it shall have no more than 5,000 registered voters. The general registrar shall notify the governing body whenever the number of voters who voted in a precinct in an election for President of the United States exceeds 4,000. Within six months of receiving the notice, the governing body shall proceed to revise the precinct boundaries, and any newly established or redrawn precinct shall have no more than 5,000 registered voters. At the time any precinct is established, each precinct in a county shall have no fewer than 100 registered voters and each precinct in a city shall have no fewer than 500 registered voters. Each precinct shall be wholly contained within a single congressional district, Senate district, House of Delegates district, and election district used for the election of one or more members of the governing body or school board for the county or city. The governing body shall establish by ordinance one polling place for each precinct. 67 Attachment 1 3 Code 1950, §§ 24-45, 24-46; 1954, c. 375; 1956, c. 378; 1962, cc. 185, 536; 1970, c. 462, §§ 24.1-36, 24.1-37; 1971, Ex. Sess., c. 119; 1976, c. 616; 1977, c. 30; 1978, c. 778; 1980, c. 639; 1992, c. 445; 1993, c. 641; 1999, c. 515; 2020, c. 1268. § 24.2-310. Requirements for polling places. A. The polling place for each precinct shall be located within the county or city and either within the precinct or within one mile of the precinct boundary, unless a waiver has been granted pursuant to subsection G. The polling place for a county precinct may be located within a city (i) if the city is wholly contained within the county election district served by the precinct or (ii) if the city is wholly contained within the county and the polling place is located on property owned by the county. The polling place for a town precinct may be located within one mile of the precinct and town boundary. For town elections held in November, the town shall use the polling places established by the county for its elections. B. The governing body of each county, city, and town shall provide funds to enable the general registrar to provide adequate facilities at each polling place for the conduct of elections. Each polling place shall be located in a public building whenever practicable. If more than one polling place is located in the same building, each polling place shall be located in a separate room or separate and defined space. C. Polling places shall be accessible to qualified voters as required by the provisions of the Virginians with Disabilities Act (§ 51.5-1 et seq.), the Voting Accessibility for the Elderly and Handicapped Act (52 U.S.C. § 20101 et seq.), and the Americans with Disabilities Act relating to public services (42 U.S.C. § 12131 et seq.). The State Board shall provide instructions to the local electoral boards and general registrars to assist the localities in complying with the requirements of the Acts. D. If an emergency makes a polling place unusable or inaccessible, the electoral board or the general registrar shall provide an alternative polling place and give notice of the change in polling place, including to all candidates, or such candidate's campaign, appearing on the ballot to be voted at the alternative polling place, subject to the prior approval of the State Board. The general registrar shall provide notice to the voters appropriate to the circumstances of the emergency. For the purposes of this subsection, an "emergency" means a rare and unforeseen combination of circumstances, or the resulting state, that calls for immediate action. E. It shall be permissible to distribute campaign and referendum materials on the election day on the property on which a polling place is located and outside of the building containing the room where the election is conducted except as specifically prohibited by law including, without limitation, the prohibitions of § 24.2-604 and the establishment of the "Prohibited Area" within 40 feet of any entrance to the polling place. However, and notwithstanding the provisions of clause (i) of subsection A of § 24.2-604, and upon the approval of the local electoral board, campaign and referendum materials may be distributed outside the polling place and inside the structure where the election is conducted, provided that the "Prohibited Area" (i) includes the area within the structure that is beyond 40 feet of any entrance to the polling place and the area within the structure that is within 40 feet of any entrance to the room where the election is conducted and (ii) is maintained and enforced as provided in § 24.2-604. The local electoral board may approve campaigning activities inside the building where the election is conducted when an entrance to the building is from an adjoining building, or if establishing the 40-foot prohibited area outside the polling place would hinder or delay a qualified voter from entering or leaving the building. 68 Attachment 1 4 F. Any local government, local electoral board, or the State Board may make monetary grants to any non-governmental entity furnishing facilities under the provisions of § 24.2-307 or 24.2-308 for use as a polling place. Such grants shall be made for the sole purpose of meeting the accessibility requirements of this section. Nothing in this subsection shall be construed to obligate any local government, local electoral board, or the State Board to appropriate funds to any non-governmental entity. G. The general registrar or the governing body of the locality may request from the Department of Elections a waiver to establish a polling place that does not meet the location requirements of subsection A in the event that there is no suitable building that could be used within the precinct or within one mile of the precinct boundary. The Department shall grant such a waiver and may impose any conditions on the waiver that it deems necessary or appropriate to ensure accessibility and security of the polling place and compliance with any other requirements of state or federal law. Code 1950, §§ 24-45, 24-46, 24-171, 24-179 through 24-181; 1954, c. 375; 1956, c. 378; 1962, cc. 185, 536; 1970, c. 462, §§ 24.1-36, 24.1-37, 24.1-92, 24.1-97; 1971, Ex. Sess., c. 119; 1976, c. 616; 1977, c. 30; 1978, c. 778; 1980, c. 639; 1981, c. 425; 1984, c. 217; 1985, c. 197; 1986, c. 558; 1992, c. 445; 1993, cc. 546, 641; 1994, c. 307; 2003, c. 1015; 2004, c. 25; 2005, c. 340; 2008, cc. 113, 394; 2010, cc. 639, 707; 2012, cc. 488, 759; 2016, cc. 18, 492; 2022, c. 5; 2025, c. 584. § 24.2-310.1. Polling places; additional requirement. The requirement stated in this section shall be in addition to requirements stated in §§ 24.2-307, 24.2-308, and 24.2-310, including the requirement that polling places be located in public buildings whenever practical. No polling place shall be located in a building which serves primarily as the headquarters, office, or assembly building for any private organization, other than an organization of a civic, educational, religious, charitable, historical, patriotic, cultural, or similar nature, unless the State Board has approved the use of the building because no other building meeting the accessibility requirements of this title is available. 1993, c. 904, § 24.1-37.1; 1993, c. 641. 69 Attachment 2 * VERIS registered voters as of 09/14/2026 - Reports Library_Statistics_Registrant_Counts_By_Locality DECEMBER 2026 SUMMARY OF PRECINCT AND POLLING PLACE CHANGES SUPERVISOR DISTRICT OLD PRECINCT(S) REGISTERED VOTERS* OLD POLLING PLACE(S) NEW PRECINCT(S) PROJECTED REGISTERED VOTERS NEW POLLING PLACE(S) NOTES ON CHANGES HUNTER MILL 238 Cameron Glen 208 Reston #1 5,484 5,445 North County Human Services Building Lake Anne Elementary School 238 Cameron Glen 208 Reston #1 246 Reston #4 3,463 5,017 2,449 North County Human Services Building Lake Anne Elementary School Reston Teen Center Divide Cameron Glen precinct and adjust boundary with Reston #1 precinct to create Reston #4 precinct. DRANESVILLE 332 Coates 7,571 Coates Elementary School 332 Coates 333 Coppermine 5,366 2,205 Coates Elementary School Floris United Methodist Church Divide Coates precinct to create Coppermine precinct MASON 520 Skyline 3,391 Minnie H. Peyton Community Center at Bailey’s 520 Skyline 3,391 Arlington Moose Lodge #1315 Move Skyline polling place to eliminate co-located precincts at Minnie Peyton CC MASON 506 Holmes 887 Bailey’s Elementary School 506 Holmes 887 Culmore Community Library Move polling place back to library since HVAC repair is complete. PROVIDENCE 738 Jones Branch 731 Tysons 2,898 3,750 Providence Committee Meeting Room The PARC 738 Jones Branch 731 Tysons 3,362 3,286 Providence Committee Meeting Room Boro Station Readjust Tysons and Jones Branch precinct boundaries; move polling place for Tysons precinct SULLY 925 Old Mill 919 Green Trails 2,107 5,025 Centreville United Methodist Church Centreville Elementary School 925 Old Mill 919 Green Trails 2,134 4,998 Centreville United Methodist Church Centreville Elementary School A boundary adjustment to move a small section of Green Trails precinct (27 voters) into Old Mill precinct to provide voters with a more accessible polling place 70 Attachment 3 208 RESTON #1 / December 2026 Commonwealth of Virginia COUNTY OF FAIRFAX HUNTER MILL District PRECINCT: 208 RESTON #1 CONGRESSIONAL DISTRICT: 11 VIRGINIA SENATORIAL DISTRICT: 38 HOUSE OF DELEGATES DISTRICT: 7 DESCRIPTION: Beginning at the intersection of Reston Parkway and Baron Cameron Avenue, thence with Baron Cameron Avenue in a northeasterly direction to its intersection with Village Road, thence with Village Road in a southeasterly direction to its intersection with North Shore Drive, thence with North Shore Drive in a generally southwesterly direction to its intersection with Fairway Drive, thence with Fairway Drive in a southerly, then easterly direction to its intersection with Wiehle Avenue, thence with Wiehle Avenue in a southerly direction to its intersection with the Washington Dulles Access and Toll Road, thence with the Washington Dulles Access and Toll Road in a westerly direction to its intersection with Reston Parkway, thence with Reston Parkway in a northerly direction to its intersection with Sunset Hills Road, thence with Sunset Hills Road in an easterly direction Dominion Energy’s utility easement thence with Dominion Energy’s utility easement in a northerly direction to its intersection with the service road of Plaza American Drive, thence with the service road of Plaza American Drive in a northerly direction to its intersection with Sunset Hills Road, thence with Sunset Hills Road in a westerly direction to its intersection with American Dream Way, thence with American Dream Way in a northerly, then westerly direction to its intersection with Old Reston Avenue, thence with Old Reston Avenue in a northwesterly direction to its intersection with Temporary Road, thence with Temporary Road in a westerly direction to its intersection with Reston Parkway, thence with Reston Parkway in a northerly direction to its intersection with Baron Cameron Avenue, point of beginning POLLING PLACE: Lake Anne Elementary School 11510 North Shore Dr, Reston NOTES: Established 1971 Precinct description revised and readopted – March 2003 Precinct divided – January 2008 Congressional District changed from 8th to 11th – January 2012 Senatorial and House Districts changed – December 2021 Boundary adjusted to create Reston #4 – December 2026 71 Attachment 3 238 CAMERON GLEN /December 2026 Commonwealth of Virginia COUNTY OF FAIRFAX HUNTER MILL District PRECINCT: 238 CAMERON GLEN CONGRESSIONAL DISTRICT: 11 VIRGINIA SENATORIAL DISTRICT: 38 HOUSE OF DELEGATES DISTRICT: 7 DESCRIPTION: Beginning at the intersection of the east corporate boundary of the Town of Herndon and Baron Cameron Avenue, thence with Baron Cameron Avenue in a easterly direction to its intersection with Reston Parkway, thence with Reston Parkway in a southerly direction to its intersection with Temporary Road, thence with Temporary Road in an easterly direction to its intersection with Old Reston Avenue, thence with Old Reston Avenue in a southeasterly direction to its intersection Sunset Hills Road, thence with Sunset Hills Road in a westerly direction to its intersection with Reston Parkway, thence with Reston Parkway in a southerly direction to its intersection with the Washington Dulles Access and Toll Road, thence with the Washington Dulles Access and Toll Road in a westerly direction to its intersection Market Street, thence with Market Street in a westerly direction to its intersection with Town Center Parkway, thence with Town Center Parkway in a northerly direction to its intersection with New Dominion Parkway, thence with New Dominion Parkway in a westerly direction to its intersection with the east corporate boundary of the Town of Herndon, thence with the corporate boundary of the Town of Herndon in a northeasterly direction (along the Fairfax County Parkway) to its intersection with Baron Cameron Avenue, point of beginning POLLING PLACE: North County Human Services Building 1850 Cameron Glen Dr, Reston NOTES: Established January 2008 Congressional District changed from 8th to 11th – January 2012 Senatorial and House Districts changed – December 2021 Precinct divided to create Reston #4 – December 2026 72 73 Attachment 3 246 Reston #4 / December 2026 Commonwealth of Virginia COUNTY OF FAIRFAX HUNTER MILL District PRECINCT: 246 RESTON #4 CONGRESSIONAL DISTRICT: 11 VIRGINIA SENATORIAL DISTRICT: 38 HOUSE OF DELEGATES DISTRICT: 7 DESCRIPTION: Beginning at the intersection of the east corporate boundary of the Town of Herndon and New Dominion Parkway, thence with New Dominion Parkway in an easterly direction to its intersection with Town Center Parkway, thence with Town Center Parkway in a southerly direction to its intersection with Market Street, thence with Market Street in a westerly direction to its intersection with the Reston Parkway, thence with the Reston Parkway in a northerly direction to its intersection with Temporary Road, thence with Temporary Road in an easterly direction to its intersection with Old Reston Avenue, thence with Old Reston Avenue in a southeasterly direction to its intersection with American Dream Way, thence with American Dream Way in an easterly, then southerly direction to its intersection with Sunset Hills Road, thence with Sunset Hills Road in an easterly direction to its intersection with the service road of Plaza American Drive, thence with the service road of Plaza American Drive to its intersection with Dominion Energy’s utility easement, thence with the Dominion Energy’s utility easement to its intersection with the Washington Dulles Access and Toll Road, thence with the Washington Dulles Access and Toll Road in a westerly direction to its intersection with the east corporate boundary of the Town of Herndon, thence with the corporate boundary of the Town of Herndon in a northeasterly direction (along the Fairfax County Parkway) to its intersection with New Dominion Parkway, point of beginning POLLING PLACE: Reston Teen Center 12196 Sunset Hills Road, Reston NOTES: Established December 2026 74 Attachment 3 332 COATES / December 2026 Commonwealth of Virginia COUNTY OF FAIRFAX DRANESVILLE District PRECINCT: 332 COATES CONGRESSIONAL DISTRICT: 11 VIRGINIA SENATORIAL DISTRICT: 38 HOUSE OF DELEGATES DISTRICT: 8 DESCRIPTION: Beginning at the intersection of the Loudoun County/Fairfax County Line and the Washington Dulles Access and Toll Road, thence with the Washington Dulles Access and Toll Road in an easterly direction to its intersection with the south corporate boundary of the Town of Herndon at Centreville Road, thence with the corporate boundary of the Town of Herndon in an easterly direction to its intersection with the Virginia Power Easement, thence with the Virginia Power Easement in a southwesterly direction to its intersection with Sunrise Valley Drive, thence with Sunrise Valley Drive in a generally westerly direction to its intersection with Centreville Road, thence with Centreville Road in a southwesterly direction to its intersection with Coppermine Road, thence with Coppermine Road in a northwesterly direction to its intersection with Sunrise Valley Drive, thence with Sunrise Valley Drive in a northeasterly direction to its intersection with a tribuary of Horsepen Run (stream), thence with the meanders of the tributary of Horsepen Run in a northwesterly direction to its intersection with the Loudoun County/Fairfax County Line, thence with the Loudoun County/Fairfax County Line in a northeasterly direction to its intersection with the Washington Dulles Access and Toll Road, point of beginning POLLING PLACE: Coates Elementary School 2480 River Birch Rd, Herndon NOTES: Established January 2009 Polling place relocated and precinct renamed – March 2010 Precinct moved from Hunter Mill District to Dranesville District – April 2011 Congressional District changed from 10th to 11th – January 2012 Senatorial and House Districts changed – December 2021 Precinct divided to create Coppermine precinct – December 2026 75 76 Attachment 3 333 COPPERMINE / December 2026 Commonwealth of Virginia COUNTY OF FAIRFAX DRANESVILLE District PRECINCT: 333 COPPERMINE CONGRESSIONAL DISTRICT: 11 VIRGINIA SENATORIAL DISTRICT: 38 HOUSE OF DELEGATES DISTRICT: 8 Beginning at the intersection of Centreville Road and Coppermine Road, thence with Centreville Road in a southerly direction to its intersection with Frying Pan Road, thence with Frying Pan Road in a westerly direction to its intersection with Frying Pan Branch (stream), thence with the meanders of Frying Pan Branch in a westerly direction to its intersection with Horsepen Run (stream), thence with the meanders of Horsepen Run in a northwesterly direction to its intersection with the Loudoun County/Fairfax County Line, thence with the Loudoun County/Fairfax County Line in a northeasterly direction to its intersection with a tribuary of Horsepen Run (stream), thence with the meanders of the tributary of Horsepen Run in a southeasterly direction to its intersection with Sunrise Valley Drive, thence with Sunrise Valley Drive in a southeasterly direction to its intersection with Coppermine Road, thence with Coppermine Road in a southeasterly direction to its intersection with Centreville Road, point of beginning POLLING PLACE: Floris United Methodist Church 13600 Frying Pan Road, Herndon NOTES: Established December 2026 77 Attachment 3 506 HOLMES / December 2026 Commonwealth of Virginia COUNTY OF FAIRFAX MASON District PRECINCT: 506 HOLMES CONGRESSIONAL DISTRICT: 8 VIRGINIA SENATORIAL DISTRICT: 39 HOUSE OF DELEGATES DISTRICT: 4 DESCRIPTION: Beginning at the intersection of Glenmore Drive and Leesburg Pike (Route 7), thence with Leesburg Pike (Route 7) in a southeasterly direction to its intersection with Columbia Pike at Bailey's Crossroads; thence with Columbia Pike in a southwesterly direction to its intersection with Blair Road; thence with Blair Road in a northwesterly direction to its intersection with Beachway Drive; thence with Beachway Drive in a northwesterly direction to its intersection with Nevius Street; thence with Nevius Street in a northeasterly direction to its intersection with Knollwood Drive; thence with Knollwood Drive in a southeasterly direction to its intersection with Glenmore Drive; thence with Glenmore Drive in a northeasterly direction to its intersection with Leesburg Pike (Route 7), the point of beginning. POLLING PLACE: Bailey’s Elementary School Culmore Community Library 6111 Knollwood Dr, Falls Church 6101 Knollwood Dr, Falls Church NOTES: Established July 2011 Precinct combined Holmes No. 1 and Holmes No. 2 – July 2011 Precinct re-divided – November 2014 Polling place moved – December 2015 Senatorial and House Districts changed – December 2021 Precinct combined Holmes #1 and Holmes #2 – March 2022 Precinct boundary adjusted to create Tripps precinct – March 2022 Polling place renamed – July 2024 Emergency relocation of polling place – February 2026 Polling place relocated – May 2026 Polling place moved – December 2026 78 79 Attachment 3 520 SKYLINE / December 2026 Commonwealth of Virginia COUNTY OF FAIRFAX MASON District PRECINCT: 520 SKYLINE CONGRESSIONAL DISTRICT: 8 VIRGINIA SENATORIAL DISTRICT: 39 HOUSE OF DELEGATES DISTRICT: 4 DESCRIPTION: Beginning at the intersection of Seminary Road and Leesburg Pike (Route 7) thence with Leesburg Pike in a southeasterly direction to its intersection with South George Mason Drive, thence with South George Mason Drive in a southwesterly direction to its intersection with an unnamed parking lot access road along the southwestern boundary of the Skyline Plaza property, thence with the access road and a projection of the access road along the Skyline Plaza property line in a southeasterly direction to its intersection with the corporate boundary of the City of Alexandria, thence with the Corporate Boundary of the City of Alexandria in a southwesterly direction to its intersection with Seminary Road, thence with Seminary Road in a generally northwesterly direction to its intersection with Leesburg Pike, point of beginning. POLLING PLACE: Minnie H. Peyton Community Center at Bailey’s Arlington Moose Lodge #1315 5920 Summers Ln, Falls Church 5710 Scoville Street, Falls Church NOTES: Established July 1981 Polling place moved from Skyline Mall – March 2003 Precinct description revised and readopted – March 2003 Polling place moved – March 2010 Boundary adjusted, polling place moved – July 2011 Senate District changed from 31st to 35th – July 2011 Delegate District changed from 46th to 49th – July 2011 Precinct divided – July 2013 Precinct divided – November 2014 Polling place moved – March 2021 Senatorial and House Districts changed – December 2021 Polling place name changed – July 2024 Polling place moved – December 2026 80 81 Attachment 3 731 TYSONS / December 2026 Commonwealth of Virginia COUNTY OF FAIRFAX PROVIDENCE District PRECINCT: 731 TYSONS CONGRESSIONAL DISTRICT: 11 VIRGINIA SENATORIAL DISTRICT: 37 HOUSE OF DELEGATES DISTRICT: 12 DESCRIPTION: Beginning at the intersection of Leesburg Pike (Route 7) and the Washington Dulles Access and Toll Road, thence with the Washington Dulles Access and Toll Road in an easterly direction to its intersection with Spring Hill Road, thence with Spring Hill Road in a southerly and then westerly direction to its intersection with Greensboro Drive, thence with Greensboro Drive in a southerly direction to its intersection with Westpark Drive, thence with Westpark Drive in a northeasterly and then southeasterly and then southerly direction to its intersection with Westbranch Drive, thence with Westbranch Drive in a southwesterly then southerly direction to its intersection ysons Boulevard, thence with Tysons Boulevard in a southerly direction to its intersection with Chain Bridge Road, thence with Chain Bridge Road in a northeasterly direction to its intersection with the Capital Beltway (Interstate 495), thence with the Capital Beltway in a southerly direction to its intersection with Leesburg Pike, thence with Leesburg Pike in a northwesterly direction to its intersection with the Washington Dulles Access and Toll Road, point of beginning. POLLING PLACE: The Parc at Tysons Boro Station 8508 Leesburg Pike, Vienna 1775 Greensboro Station Place, McLean NOTES: Established June 1991 Precinct description revised and readopted – March 2003 Polling place moved – July 2011 Boundary adjusted to conform to Congressional District line – July 2012 Delegate District changed from 34th to 35th - July 2011 Congressional District changed from 8th to 11th – July 2012 Precinct divided – July 2016 Boundary adjusted – July 2017 Senatorial and House Districts changed – December 2021 Precinct divided – March 2023 Polling place moved – March 2023 Polling place moved – December 2026 Boundary adjusted with Jones Branch precinct – December 2026 82 83 Attachment 3 738 JONES BRANCH / December 2026 Commonwealth of Virginia COUNTY OF FAIRFAX PROVIDENCE District PRECINCT: 738 JONES BRANCH CONGRESSIONAL DISTRICT: 11 VIRGINIA SENATORIAL DISTRICT: 37 HOUSE OF DELEGATES DISTRICT: 12 DESCRIPTION: Beginning at the intersection of the Washington Dulles Access and Toll Road and Spring Hill Road, thence with Spring Hill Road in a southerly direction to its intersection with Westpark Drive, thence with Westpark Drive in a northeasterly and then southeasterly and then southerly direction to its intersection with Westbranch Drive, thence with Westbranch Drive in a southwesterly then southerly direction to its intersection withTysons Boulevard, thence with Tysons Boulevard in a southerly direction to its intersection with Chain Bridge Road, thence with Chain Bridge Road in a northeasterly direction to its intersection with the Capital Beltway (Interstate 495), thence with the Capital Beltway in a northeasterly direction to its intersection with the Washington Dulles Access and Toll Road, thence with the Washington Dulles Access and Toll Road in a westerly direction to its intersection with Spring Hill Road, point of beginning, POLLING PLACE: Providence Committee Meeting Room 7921 Jones Branch Drive, McLean NOTES: Precinct established – March 2023 Precinct boundary adjusted with Tysons precinct – December 2026 84 Attachment 3 919 GREEN TRAILS / December 2026 Commonwealth of Virginia COUNTY OF FAIRFAX SULLY District PRECINCT: 919 GREEN TRAILS CONGRESSIONAL DISTRICT: 11 VIRGINIA SENATORIAL DISTRICT: 36 HOUSE OF DELEGATES DISTRICT: 10 DESCRIPTION: Beginning at the intersection of Centreville Road (Route 28) and New Braddock Road, thence with New Braddock Road in an easterly direction to its intersection with Little Rocky Run (stream), thence with the meanders of Little Rocky Run in a generally southwesterly direction to its intersection with the Virginia Power Easement, the Virginia Power Easement in a southerly direction to its intersection with the Virginia Power and Columbia Liquefied Natural Gas Easement, thence with the Virginia Power and Columbia Liquefied Natural Gas Easement in a northwesterly direction to its intersection with a projection of Hartwood Lane along a pathway between residences numbered 6700 and 6701, thence with this projection and Hartwood Lane in a southerly direction to its intersection with Hart Forest Drive, thence with Hart Forest Drive and a projection of Hart Forest Drive along the pipe_x0002_stem between residences numbered 14258 and 14259 in a westerly direction to its intersection with an unnamed stream, thence with the meanders of the unnamed stream in a southwesterly direction to its intersection with Compton Road, thence with Compton Road in a northwesterly direction to its intersection with Centreville Road, thence with Centreville Road in a northeasterly direction to its intersection with a projection of Grainery Road, thence with this projection and Grainery Road in a southwesterly direction to its intersection with Harvest Mill Court, thence with Harvest Mill Court in a generally northerly direction to its intersection with a pipe-stem driveway, thence with the pipe-stem driveway and a projection of the driveway between residences numbered 6513 and 6515 in an easterly direction to its intersection with Centreville Road, thence with Centreville Road in a northeasterly direction to its intersection with New Braddock Road, point of beginning POLLING PLACE: Centreville Elementary School 14330 Green Trails Blvd, Centreville NOTES: Established May 1993 Precinct description revised and readopted – March 2003 Precinct divided – July 2011 Boundary adjusted – July 2012 Senatorial and House Districts changed – December 2021 Boundary adjusted with Old Mill precinct – December 2026 85 Attachment 3 925 OLD MILL / December 2026 Commonwealth of Virginia COUNTY OF FAIRFAX SULLY District PRECINCT: 925 OLD MILL CONGRESSIONAL DISTRICT: 11 VIRGINIA SENATORIAL DISTRICT: 36 HOUSE OF DELEGATES DISTRICT: 10 DESCRIPTION: The precinct is bounded by I-66 on the north, a segment of Old Mill Rd on the east, Mount Olive Rd and Compton Rd on the south and is comprised of census blocks 2010 and 2012 of tract 491301 in their entirety. Beginning at the intersection Old Centreville Road and New Braddock Road, thence with New Braddock Road in an easterly direction to its intersection with Centreville Road (Route 28), thence with Centreville Road (Route 28) in a southwesterly direction to its intersection with a projection of a pipe- stem driveway from Harvest Mill Court, thence with this projection and the pipe-stem driveway in an westerly direction between residences numbered 6513 and 6515 to its intersection with Harvest Mill Court, thence with Harvest Mill Court in a generally southerly direction to its intersection with Grainery Road, thence with Grainery and a projection of Grainery Road in a northeasterly direction to its intersection with Centerville Road, thence with Centreville Road in a southwesterly direction to its intersection with the Prince William County/Fairfax County Line (Bull Run), thence with the Prince William County/Fairfax County Line in a southerly, then westerly direction to its intersection with Cub Run (stream), thence with the meanders of Cub Run in a generally northwesterly direction to its intersection with Interstate 66, thence with Interstate 66 in a northeasterly direction to its intersection with the Virginia Power Easement, thence with the Virginia Power Easement in a southeasterly direction to its intersection with the Colonial Pipe Line Company Easement, thence with the Colonial Pipe Line Company Easement in a northeasterly direction to its intersection with Old Mill Road, thence with Old Mill Road in a southeasterly direction to its intersection with Old Centreville Road, thence with Old Centreville Road in a northeasterly direction to its intersection with New Braddock Road, point of beginning POLLING PLACE: Centreville United Methodist Church 6400 Old Centreville Rd, Centreville NOTES: Established August 2001 Precinct description revised and readopted – March 2003 Boundary adjusted – July 2012 Congressional, Senatorial, and House Districts changed – December 2021 Boundary adjusted with Bull Run precinct – March 2022 Boundary adjusted with Green Trails precinct – December 2026 86 87 Attachment 4 AN ORDINANCE AMENDING AND READOPTING FAIRFAX COUNTY CODE 1 SECTIONS 7-2-5, 7-2-6, AND 7-2-13, TO DIVIDE AND CREATE PRECINCTS IN 2 HUNTER MILL AND DRANESVILLE DISTRICTS; MOVE POLLING PLACES IN 3 MASON AND PROVIDENCE DISTRICTS; AND ADJUST PRECINCT BOUNDARIES 4 IN HUNTER MILL, PROVIDENCE, AND SULLY DISTRICTS 5 6 7 AN ORDINANCE to amend the Fairfax County Code by amending and 8 readopting Sections 7-2-5, 7-2-6, and 7-2-13, to divide and create precincts 9 in Hunter Mill and Dranesville Districts; move polling places in Mason and 10 Providence Districts; and adjust precinct boundaries in Hunter Mill, 11 Providence, and Sully Districts. 12 13 Draft of October 27, 2026 14 15 Be it ordained by the Board of Supervisors of Fairfax County: 16 17 1. That Sections 7-2-5, 7-2-6, and 7-2-13 of the Fairfax County Code are amended and 18 readopted, as follows: 19 20 ARTICLE 2. – Election Districts for the Board of Supervisors. 21 22 Section 7-2-5. – Hunter Mill District. 23 24 The Hunter Mill District shall consist of these election precincts: Aldrin, Armstrong, 25 Cameron Glen, Colvin, Dogwood, Flint Hill No. 1, Flint Hill No. 2, Floris, Fox Mill No. 1, 26 Fox Mill No. 2, Frying Pan, Glade, Hughes, Hunters Woods, Madison, McNair, North Point, 27 Piney Run, Reston No. 1, Reston No. 2, Reston No. 3, Reston No. 4, South Lakes, Stuart, 28 Sunrise Valley No. 1, Sunrise Valley No. 2, Vienna No. 1, Vienna No. 2, Vienna No. 4, 29 Vienna No. 6, Westbriar No. 1, Westbriar No. 2, and Wolftrap. 30 31 Section 7-2-6. – Dranesville District. 32 33 The Dranesville District shall consist of these election precincts: Chain Bridge, 34 Chesterbrook, Churchill, Clearview, Coates, Cooper, Coppermine, El Nido, Forestville, Great 35 Falls, Haycock, Herndon No. 1, Herndon No. 2, Herndon No. 3, Hickory, Hutchison, 36 Kenmore, Kirby, Langley, Longfellow, McLean, Pimmit, Salona, Seneca, Shouse, Spring 37 Hill, Sugarland, Westhampton, and Westmoreland. 38 39 Section 7-2-13. – General Provisions. 40 41 All references to election precincts refer to those precincts, together with the descriptions and 42 maps of the boundaries and polling places for each of those precincts, which were adopted by 43 the Board of Supervisors on March 24, 2003, as amended on March 8, 2004, March 21, 2005, 44 March 27, 2006, March 26, 2007, September 10, 2007, March 10, 2008, January 12, 2009, 45 March 9, 2010, July 27, 2010, April 26, 2011, July 26, 2011, January 10, 2012, July 10, 2012, 46 88 Page 2 March 19, 2013, July 9, 2013, November 18, 2014, June 23, 2015, December 8, 2015, July 47 12, 2016, July 11, 2017, March 20, 2018, December 4, 2018, April 9, 2019, December 3, 48 2019, March 24, 2020, March 23, 2021, June 22, 2021, December 7, 2021, March 8, 2022, 49 June 7, 2022, March 7, 2023, December 5, 2023, March 19, 2024 , June 25, 2024 , 50 January 14, 2025; June 24, 2025; and May 5, 2026; and December 8, 2026, kept on file with 51 the clerk Clerk to for the Board of Supervisors. Whenever a road, a stream, or other physical 52 feature describes the boundary of a precinct, the center of such road, stream, or physical 53 feature is the dividing line between that precinct and any adjoining precinct. 54 55 2. That the election polling places for new precincts are established at: 56 57 Supervisor District Precinct Polling Place 58 Dranesville Coppermine Floris United Methodist Church 59 (New Precinct) 13600 Frying Pan Road 60 Herndon, VA 20171 61 62 Hunter Mill Reston No. 4 Reston Teen Center 63 (New Precinct) 12196 Sunset Hills Road 64 Reston, VA 20190 65 66 3. That the election polling place for the following existing precincts are established at: 67 68 Supervisor District Precinct Polling Place 69 Mason Holmes From: 70 (Polling Place Moved) Bailey’s Elementary School 71 6111 Knollwood Drive 72 Falls Church, VA 22041 73 74 To: 75 Culmore Community Library 76 6101 Knollwood Drive 77 Falls Church, VA 22041 78 79 Skyline From: 80 (Polling Place Moved) Minnie H. Peyton 81 Community Center at Bailey’s 82 5920 Summers Lane 83 Falls Church, VA 22041 84 85 To: 86 Arlington Moose Lodge #1315 87 5710 Scoville Street 88 Falls Church, VA 22041 89 90 89 Page 3 Providence Tysons From: 91 (Polling Place Moved) The PARC at Tysons 92 8508 Leesburg Pike 93 Vienna, VA 22182 94 95 To: 96 Boro Station 97 1775 Greensboro Station Place 98 McLean, VA 22102 99 100 101 4. That precinct boundary alterations depicted in the maps and descriptions, and the 102 GIS data on which both are based, held in the records of the Clerk for the Board of 103 Supervisors as part of the December 8, 2026, public hearing on this matter, and 104 related to the Hunter Mill, Dranesville, Providence, and Sully districts, are 105 established. 106 107 5. That this ordinance shall become effective upon adoption, and shall be given effect 108 after completion of the procedures set forth in Virginia Code § 24.2-129(D). 109 110 6. That the Clerk for the Board of Supervisors will send a certified copy of this 111 ordinance to the Fairfax County Electoral Board, and staff from the Office of 112 Elections will send a copy of this ordinance to the Virginia Department of Elections. 113 114 115 116 GIVEN under my hand this _____ day of ________________, 2026 117 118 119 _____________________________________ 120 Jill G. Cooper 121 Clerk for the Board of Supervisors 122 Department of Clerk Services 123 90 Board Agenda Item October 27, 2026 ADMINISTRATIVE – 3 Authorization to Advertise a Public Hearing to Adopt an Ordinance Establishing an Economic Revitalization Zone for Skyline Buildings 4, 5, and 6 (Mason District) ISSUE: Board authorization to advertise a public hearing to consider an ordinance establishing an Economic Revitalization Zone for Skyline Buildings 4, 5, and 6 at 5113, 5111, and 5109 Leesburg Pike under Chapter 4, Article 32 of the Fairfax County Code. RECOMMENDATION: The County Executive recommends that the Board authorize advertisement of a public hearing to occur on December 8, 2026, at 4:30 p.m. TIMING: Board action is requested on October 27, 2026, to allow sufficient time to advertise the proposed public hearing to occur on December 8, 2026, at 4:30 p.m. BACKGROUND: On May 5, 2026, the Board adopted Chapter 4, Article 32, establishing the Revitalization and Redevelopment Economic Incentive Program, effective May 6, 2026 known as the BUILD: Site Assembly and Redevelopment Program (Program). The Program is administered by the Department of Economic Initiatives (DEI), as the Director, Department of Planning and Development’s designee, in coordination with the Department of Tax Administration (DTA). Under Fairfax County Code 4-32-6(e), eligible applications are presented to the Board to consider the adoption of an ordinance establishing individual Economic Revitalization Zones (ERZs). Skyline 4 LLC, 5111 Leesburg LLC, and MTP-5109 Leesburg LLC (collectively, Applicant) propose an ERZ containing a newly proposed assemblage of three contiguous, separately owned parcels, which total approximately 6.52 acres. The site is located within the approved Bailey’s Crossroads/Seven Corners Incentive Area. The parcels are identified as tax map numbers 62-3((1)) 37B, 62-3((1)) 39B, and 62- 3((1))40A1 and all zoned Planned Development Commercial (PDC). On February 21, 2023, the Board approved an application by Skyline 4 LLC and 5111 Leesburg LLC for participation in the former Economic Incentive Program for Buildings 4 and 5. However, the approved conversions have not been completed, and neither 91 Board Agenda Item October 27, 2026 property has received tax benefits under that approval. The current proposal constitutes a distinct assemblage from the 2023 approval by incorporating Building 6, which was not included in the prior EIP approval. The applicant will rescind any benefits under the prior EIP approval if this application is approved. Staff recommends Board approval of this ERZ application serve to terminate the former EIP and extinguish all benefits available under that approval. The redevelopment proposal comprises commercial and multifamily residential development and combines the adaptive reuse of Buildings 4 and 5 with the renovation of Building 6. Under land use approvals PCA C-052-10 and CDPA C-052-03, the two existing nine-story office buildings will be converted to a combined maximum of 510 residential and live/work units. They will include at least 5,000 square feet of ground- floor amenities, retail, restaurant, personal service, or other activating uses. Building 6 is proposed for renovation and continued office use under the existing PDC zoning. The Department of Planning and Development has reviewed the proposal and determined that it is in conformance with the Comprehensive Plan. The applicant has identified the reasons for the ERZ application based upon prolonged office vacancy, elevated construction costs, and financing constraints challenging to redevelopment and has stated that the ERZ incentive will help secure the capital required to implement the approved development plans. The proposed ERZ effective date is January 1, 2030, with a termination date of December 31, 2039. Per Section 4-32-10, staff recommends an effective date that begins slightly beyond three years after adoption of the ERZ Ordinance so that it coincides with the beginning of the tax year. This prevents DTA from having to calculate and administer partial tax abatements at the beginning and end of the ERZ’s life cycle. Staff recommends that this constitutes good cause sufficient to allow the Board to adopt an effective date longer than three years after adoption of the ERZ Ordinance in accordance with Section 4-32-10. EQUITY IMPACT: The proposed development will provide 510 new rental housing units, including eight percent of the total dwelling units as Workforce Dwelling Units (WDUs). The WDUs are subject to maximum household income limits of 60-80 percent of Area Median Income, contributing to the County’s goal of expanding the supply of affordable housing. The project, located in the Baileys Crossroads Business Center, will expand housing opportunities in an area with high demand for rental housing and is accessible by bus and a future BRT route. This proposed project is consistent with the One Fairfax Policy’s Areas of Focus 2, 11, and 14, which emphasize establishing housing opportunities in accessible, mixed-use areas with multimodal transportation. 92 Board Agenda Item October 27, 2026 This reinvestment will support the revitalization of Baileys Crossroads while advancing Comprehensive Plan goals for reinvestment, economic development, and more efficient use of existing developed land. Together, the project will strengthen the area’s employment base, add housing options, and support continued revitalization. As the three buildings are vacant or largely vacant, the proposed redevelopment is not expected to displace existing residents or businesses. Reactivating long-vacant buildings will benefit the surrounding community through more foot traffic, new community-serving ground-floor retail and services, improved safety and appearance, and a stronger tax base over the long term. Although new market-rate development may contribute modestly to rising rents and property values in the surrounding area over time, the addition of up to 510 housing units, including WDUs, would also expand supply, which can help moderate housing cost pressures in the broader market. FISCAL IMPACT: Qualifying BUILD Program developments receive economic benefits including a reduction in site plan review fees of 10 percent and a partial tax exemption on the real estate tax, calculated as the difference between the pre-redevelopment (base) assessed value and the post-development assessed value in accordance with Virginia Code. As the County will continue to receive real estate tax revenues on the base (pre- redevelopment) assessed value of the site, the partial tax exemptions of the real estate tax will not reduce the General Fund. The Department of Tax Administration has determined that the 2026 base assessed value of the application property is $36,727,060, generating real estate taxes of $411,343 per year, with a base tax rate of $1.12 per $100 of assessed value. The applicant has estimated the post-development assessed value of the property to be $340,000,000. The partial tax abatement would be calculated on the $303,272,940 increment or difference between pre- and post-development values of the portion of the development. Thus, with a base tax rate of $1.12 per $100 of assessed value, the total tax abatement would be $3,396,657 per year for a maximum tax abatement of $33,966,569 over the maximum 10-year life of the program. Under the BUILD Program, each approved project receives an individual ERZ with individual 10-year incentive periods as of the start of the ERZ ordinance’s effective date. The program allows time for construction before the incentive period begins. Accordingly, qualifying developments are expected to receive the partial real estate tax exemption for the full 10-year period, subject to timely completion of improvements and compliance with program requirements. 93 Board Agenda Item October 27, 2026 ENCLOSED DOCUMENTS: Attachment 1 – Project Locator Map Attachment 2 – BUILD Application and Narrative for Skyline Buildings 4, 5, and 6, transmitted September 25, 2026 Attachment 3 – ERZ Parcel and Development Exhibit Attachment 4 – Staff Determination Letters Attachment 5 – Proposed Ordinance Establishing an Economic Revitalization Zone for Skyline Buildings 4, 5, and 6 STAFF: Jennifer Miller, Deputy County Executive Rebecca Moudry, Director, Department of Economic Initiatives JoAnne Fiebe, Division Manager, Department of Economic Initiatives Tracy Strunk, Director, Department of Planning and Development David Pellegrino, Assistant Director, Department of Tax Administration ASSIGNED COUNSEL: Cherie H. Mack, Assistant County Attorney Daniel Robinson, Deputy County Attorney 94 ATTACHMENT 1 Proposed ERZ for Skyline Buildings 4, 5, and 6 Leesburg Pike Legend Proposed Skyline ERZ Parcel Boundaries S George Mason Drive 95 Eligibility Application of Partial Tax Exemption for Economic Development (Effective May 6, 2026) Fairfax County, Virginia Dept. of Planning and Development Community Revitalization Section 12055 Government Center Parkway Suite 755 Fairfax, Virginia 22035 Telephone: 703-324-9300 TTY: 711 FAX: 703-653-1799 Visit our Web Site: www.fcrevit.org Prior to filing this application, contact the Community Revitalization Section (CRS) of the Department of Planning and Development (DPD) staff to review the ordinance eligibility requirements to determine if the proposed development may qualify. Improvements made prior to the Department of Tax Administration’s (DTA) base value appraisal inspection are not eligible for the partial tax abatement. Refer to the application procedures for additional information. Only properties located within a Revitalization and Redevelopment Economic Incentive Area are eligible. Refer to the ordinance at www.fcrevite.org/economic-incentive-program or contact CRS for assistance in verifying whether your property is located in a designated location. This application must include be complete and incl ude a paper or electronic copy of the plan for development as well as any additional schedules, plans, specifications that support the request, as well as an estimated fair market value of the proposed development once completed. Property Information Tax Map Reference #(s): Lot Size: Current Zoning: Proposed Zoning: Estimated Project Future Fair Market Value Note: For additional Tax Tap Numbers attach a separate sheet. Include all T parcels. Owner Information Tax Map Reference: _____________________________________________________________________ Owner’s Name: _______________________________________________________________________ Contact Person/Title: ___________________________________________________________________ Property Address: _____________________________________________________________________ Mailing Address: ______________________________________________________________________ _______________________________________________________________________ Work Phone Number: _______________________ ______________ E-mail: ___________________________________ ______________ 62-3((1))37B 3.001 AC PDC PDC 62-3((1))39B 1.799 AC PDC PDC 62-3((1))40A1 1.718 PDC PDC TBD 62-3((1))37B Skyline 4 LLC Robert Seldin, Managing Principal 5113 Leesburg Pike, Falls Church, VA 22041 1000 Maine Avenue, SW, Suite 300, Washington, D.C. 20024 678-428-6889 robseldin@2hsq.com Attachment 2 96 Note: Attach extra sheets, if necessary, for additional properties or owners. Note: Contact Person needs to be the person that DTA can call to arrange on-site inspections. Proposed Project: 1. What type of zoning application would the proposal require? Check all that apply. Rezoning/Proffered Condition Amendment: ______Special Exception: ______ Special Permit: ______ Site Plan: _______ 2. List the application number of any approved rezoning, special exception, special permit or site plans that currently governs development of each property. Separately, list the application number of any pending or concurrent zoning or site plan application. ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ 3. Describe the proposed property consolidation and how it meets the minimum two parcels, two owners, and two-acre requirements of the program? ________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ 4. Describe the proposed project. Please include details related to proposed uses, density/intensity, existing buildings to be retained, demolished and /or repurposed, and new buildings proposed. Please include additional sheets as necessary to fully describe the application. Please attach or send electronically one (1) copy of the proposed development plan (either the rezoning application or site plan). If the project will be built in phases, provide a phasing plan including estimated timeframes for the completion of each phase. Electronic copies can be sent to Revitalization@fairfaxcounty.gov ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ Tax Map Reference: _____________________________________________________________________ Owner’s Name: ________________________________________________________________________ Contact Person/Title: ___________________________________________________________________ Property Address: ______________________________________________________________________ Mailing Address: ______________________________________________________________________ _______________________________________________________________________ Work Phone Number: ______________________________________ E-mail: __________________________________________________ X Original Rezoning: RZ C-052 Governing Zoning: PCA C-052-10/CDPA C-052-03/FDPA C-052-16 As Built Site Plan: #4237-SP-01-02 Pending Site Plan: SP-2023-00057 See attached. See attached. 62-3((1))39B 5111 Leesburg LLC Robert Seldin, Managing Principal 5111 Leesburg Pike, Falls Church, VA 22041 1000 Maine Avenue, SW, Suite 300, Washington, D.C. 20024 678-428-6889 robseldin@2hsq.com X Attachment 2 97 Note: Attach extra sheets, if necessary, for additional properties or owners. Note: Contact Person needs to be the person that DTA can call to arrange on-site inspections. Tax Map Reference: _____________________________________________________________________ Owner’s Name: ________________________________________________________________________ Contact Person/Title: ___________________________________________________________________ Property Address: ______________________________________________________________________ Mailing Address: ______________________________________________________________________ _______________________________________________________________________ Work Phone Number: ______________________________________ E-mail: __________________________________________________ 62-3((1))40A1 MTP- 5109 LEESBURG LLC Brian Gribble, Manager, The Liberty Solution, LLC as court appointed receiver for MTP-5109 Leesburg, LLC 5109 Leesburg Pike, Falls Church, VA 22041 1464 Center Park Drive, Charlotte, NC 28217 704-599-1010 bgribble@lscarolinas.com Attachment 2 98 Attachment 2 99 5. A single parcel may contain multiple structures, bu t all structures must be fully contained within its parcel lot lines before the final inspection and valuation may be performed by the DTA. Based on the proposed concept plan, will parcels need to be created to meet this requirement? _____Yes _____ No Please Explain:________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ 6. Please provide any other information that you feel is pertinent to the review of this proposal below. _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ 7. Would you have completed this development/repurposing without the partial tax exemption? _____ Yes _____ No Please explain briefly how this incentive made the project possible: _____________________________ ___________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ We hereby request partial tax exemption from real estate taxes for qualifying property to be developed, redeveloped or repurposed as provided by Article 32 Chapter 4 of the Fairfax County Code. We certify that the statements and attachments contained in this application are true and correct to the best of our knowledge. We certify that we are the owners or have the authority of the owner to submit this application. SIGNATURE: Date of Application: _____________________Owner’s or Agent’s Signature: ________________________________ Print Name: _________________________________ Date of Application: _____________________Owner’s or Agent’s Signature: ________________________________ Print Name: _________________________________ Date of Application: _____________________Owner’s or Agent’s Signature: ________________________________ Print Name: _________________________________ Date of Application: _____________________Owner’s or Agent’s Signature: ________________________________ Print Name: _________________________________ NOTE: Failure to obtain signatures of all parties owni ng an interest in this real estate constitutes a material misstatement of fact. X See attached. X See attached. 9/3/2026 9/3/2026 William Sudlow, Skyline 4 LLC and 5111 Leesburg LLC Robert Seldin Digitally signed by Robert Seldin Date: 2026.09.04 10:42:17 -04'00' 9/3/2026 Robert Seldin, Skyline 4 LLC and 5111 Leesburg LLC Brian Gribble, MTP- 5109 LEESBURG LLC Attachment 2 100 Attachment 2 101 OFFICE USE ONLY Application #: ___________________ Date Application Submitted: __/__/__ Revitalization and Redevelopment Economic Incentive Area: ____________________ DPD Approval Date: __/__/__ Rezoning Case # __________________________ Rezoning Approval Date: __/__/__ Site Plan Case #: _________________ Site Plan Approval Date: _/__/__ Site Plan Fee Reduction: Yes or No Amount of Reduction: $___________________ Date Issued: __/__/__ Application/Attachments to DTA: Yes or No BOS Approval Date: __/__/__ Attachment 2 102 Attachment 1: Narrative Statement in Support of RREIP Eligibility Application Skyline Buildings 4, 5, and 6 This narrative statement is submitted as an attachment to the Application for Inclusion in the Revitalization and Redevelopment Economic Incentive Program (“RREIP”) on behalf of Skyline 4 LLC, 5111 Leesburg LLC, and MTP -5109 Leesburg LLC (collectively, the “Applicant”) for a coordinated revitalization initiative involving Skyline Buildings 4, 5, and 6 at 5111, 5113, and 5109 Leesburg Pike (Tax Map References 62- 3((1))37B, 62-3((1))39B, and 62-3((1))40A1). The subject properties are part of Skyline Center, a 97.98-acre mixed -use development originally rezoned under RZ C -052 in December 1969. All three parcels are zoned PDC and are located within the Bailey’s Crossroads and Seven Corners Commercial Revitalization District. This statement responds to paragraphs 3, 4, 6, and 7 of the RREIP Application Form. 3. Proposed Property Consolidation / Assemblage Requirements Qualifying Uses . Section 4- 32-7(a) permits commercial, industrial, or multifamily residential development, or any combination thereof, within a designated Revitalization and Redevelopment Economic Incentive Area. The Buildings 4 and 5 program proposes adaptive reuse of existing office buildings for residential and live/work units, together with ground- floor amenity, retail, restaurant, personal service, and similar activating uses. This mix of uses qualifies as multifamily residential development under Article 32, Section 4-32-2. Building 6’s existing commercial office use independently qualifies under Section 4 -32-7(a). For purposes of this application, Building 6 will initially proceed under the by-right redevelopment pathway in Section 4-32-6(e) as an office renovation, which is permitted by the existing PDC zoning. The RREIP is designed to cover either commercial or residential use. If the owner of Building 6 later elects to pursue a residential/live - work conversion prior to receiving any tax benefits under the program, that conversion will require a separate PCA and applicable zoning approvals. Three Contiguous Parcels; Separate Ownership; Two -Acre Minimum. The proposed assemblage includes Tax Map 62-3((1))37B (approximately 3.001 acres, owned by Skyline 4 LLC), Tax Map 62-3((1))39B (approximately 1.799 acres, owned by 5111 Leesburg LLC), and Tax Map 62- 3((1))40A1 (approximately 1.72 acres, owned by MTP -5109 Leesburg LLC). The parcels are contiguous, are held by three separate owners, and total approximately 6.5 acres, well above the two-acre minimum required by Section 4- 32-7(b). The three buildings are physically connected by ground-level corridors, an exterior portico, a common façade, internal courtyards, and a shared parking structure. The enclosed exhibits include a conceptual unified development plan. The revised boundaries and separate ownership structure reflected in the application present a newly proposed three-parcel assemblage implemented through a unified development plan. No Prior Rezoning or Site Plan Approval for the Proposed Conversion. The proposed three-parcel assemblage has not previously been approved for the proposed residential and live/work conversions. For Buildings 4 and 5, the 2023 approvals were limited to a proffer condition amendment, conceptual development plan amendment, and final development plan amendment. Building 6 was excluded from PCA C -052-10 and has no separate PCA or site plan related to its improvements. Attachment 2 103 2 Necessary Future Approvals. The Applicant will obtain all zoning, site plan, and other approvals required by the Zoning Ordinance and state and local law before receiving incentives, consistent with Section 4-32-7(d). Building 6’s inclusion in the assemblage does not depend on completing a residential/live -work conversion before Economic Revitalization Zone approval; its existing commercial office use independently satisfies Section 4 -32-7(a), and the existing PDC zoning permits the proposed by -right office renovation. If the Building 6 owner later elects to pursue a residential/live-work conversion, that conversion will require a separate PCA and applicable zoning approvals before incentives for Building 6 are received. 4. Proposed Project The unified development plan combines the approved Buildings 4 and 5 program with Building 6 within one connected revitalization framework. Buildings 4 and 5 comprise the 2023- approved adaptive-reuse program for two existing nine -story office buildings tot aling approximately 572,724 square feet, with a maximum of 510 residential and live/work units and ground- floor amenity, retail, restaurant, personal service, and similar activating uses . Building 6 is an existing commercial office property that independently satisfies the qualifying -use requirement. It will initially proceed as a by-right office renovation because the existing PDC zoning permits that use, satisfying the by -right redevelopment pathway in Section 4 -32-6(e). The RREIP is designed to cover either commercial or residential use; if the Building 6 owner later elects a residential/live - work conversion, that conversion will require a separate PCA and applicable zoning approvals before incentives for Building 6 are received. Retained and Reused Infrastructure . The three -building complex includes shared access and parking infrastructure, supporting reinvestment across all three parcels under the unified development plan. Each building will retain and repurpose its existing structural systems as part of its applicable renovation or conversion. Building Improvements. For Buildings 4 and 5, the adaptive reuse generally retains the existing architectural structure, replaces windows with clear glass, provides an updated façade treatment, and replaces the existing office tenant improvements with residential/live -work improvements. Each building will include a minimum of 5,000 square feet of ground -floor space dedicated to amenities, retail, restaurants, personal service establishments, small -scale production, and/or similar activating uses. Building 6 will initially proceed as an office renovation under the by-right pathway—with a minimum of $75 million in building improvements and tenant improvement costs—and retains the option to pursue a residential/live-work conversion later through a separate PCA and applicable zoning approvals. Public Realm and Open Space. As part of the Buildings 4 and 5 program, the project includes new publicly accessible open spaces with active features such as sport courts, yoga areas, game tables, plaza seating, and a proposed pedestrian bridge to a proposed art park along George Mason Drive. All of these facilities will be available for use by tenants in Building 6 as well. Approximately one-third of the existing surface parking behind Buildings 4 and 5 will be removed and replaced with open space. The Buildings 4 and 5 development will provide at least 25 percent open space on-site, exceeding the 15 percent PDC District requirement, including approximately 1.38 acres of publicly accessible urban park space. Open space for Building 6 is currently in conf ormance Attachment 2 104 3 with requirements from its prior zoning approval and any proposed future changes will be addressed in connection with its future renovation plans. Phasing. Buildings 4 and 5 are expected to be renovated first, with Building 6 following as either a by-right office renovation or, if elected by the owner, a residential/live -work conversion after obtaining a separate PCA and applicable zoning approvals. Building 6 improvements may be phased to accommodate its longer development and prospective leasing timeline. Under Section 4-32-8(b), the tax exemption is recalculated for each parcel upon substantial completion and final inspection and valuation, allowing the unified development plan to proceed in phases. 6. Other Pertinent Information Policy Alignment. The unified development plan advances the stated purpose of the RREIP: to incentivize private entities to purchase, assemble, revitalize, and redevelop real property in economically challenged areas that conform with the Comprehensive Plan. Including Bui lding 6 completes the interconnected three- building complex and permits comprehensive reinvestment across three contiguous, separately owned parcels. No formal consolidation of ownership entities is required by the RREIP ordinance. Buildings 4 and 5 are ch ronically underutilized office assets that have experienced high vacancy rates for most of the last decade; their adaptive reuse will return substantial existing office space to productive use by creating much needed housing in this designated Revitalization Area. Building 6 has no natural assemblage partner other than Buildings 4 and 5; at approximately 1.72 acres, it cannot independently satisfy the two- acre assemblage requirement in Section 4-32-7(b). Market dynamics have demonstrated that an incentive is needed to attract the capital required for either an office renovation or a potential residential/live -work conversion—precisely the kind of outcome the RREIP was designed to support. Taken together, the unified development plan has the potential to attr act approximately $300 million of private investment to revitalize the three buildings in a federal Opportunity Zone. Location Within an Incentive Area . All three parcels —Tax Map References 62 -3((1))37B, 62- 3((1))39B, and 62- 3((1))40A1—are located within the Bailey’s Crossroads/Seven Corners Commercial Revitalization District, which Article 32, Section 4 -32-5(b) identifies as a Revitalization and Redevelopment Economic Incentive Area. The assemblage therefore satisfies the geographic requirement for inclusion in an Economic Revitalization Zone. Continuation of Proven Revitalization Concept . The unified development plan builds on the successful adaptive reuse of Skyline Buildings 1, 2, and 3, which were approved for conversion to 720 residential and live/work units in July 2020 and renovated and reopened in 2025 as Three Collective. Buildings 4 and 5 are the next phase of that revitalization strategy and received analogous land- use approvals in February 2023. Including Building 6 completes the interconnected complex and extends the proven adaptive -reuse model to the third contiguous parcel. Comprehensive Plan Consistency and Public Benefits. The 2023 approvals for Buildings 4 and 5 established a redevelopment program that conformed with the Comprehensive Plan and applicable Zoning Ordinance provisions, followed the Guidelines for Commercial Building Repurposing, complemented surrounding development, and provided a quality layout for the PDC District. The Attachment 2 105 4 2023 equity impact statement recognized that this program would provide needed rental opportunities in a high- demand area accessible by bus and a planned future BRT route, provide workforce dwelling units equal to eight percent of total units, and support the County’s goal of increasing affordable housing supply. Building 6 is located in the same PDC District, is physically connected to Buildings 4 and 5, and shares the site characteristics supporting the existing redevelopment program. A unified development plan for all three buildings therefore advances the same Comprehensive Plan and RREIP objectives. Prior EIP Approval . On February 21, 2023, the Board of Supervisors approved the inclusion of Buildings 4 and 5 in the prior Economic Incentive Program. Those properties have not received any tax benefits under that approval, and the Applicant proposes to disenroll or rescind any benefits under the prior EIP if the three -parcel assemblage is approved for inclusion in the 2026 RREIP. The prior EIP approval concerned Buildings 4 and 5; Building 6 is included here through the newly proposed three-parcel assemblage. 7. Necessity of Partial Tax Exemption The Buildings 4 and 5 program has not been completed or placed in service, and those properties have not utilized the benefits of the prior EIP approval. The partial real estate tax exemption available under the RREIP is necessary to support capitalization of the complex office -to- residential/live-work conversion of Buildings 4 and 5. Building 6 faces the same market conditions—elevated material and labor costs, rising interest rates, and capitalization -rate pressures—that make adaptive reuse financing difficult to obtain. These market dynamics demonstrate that an incentive is needed to attract the capital required for either an office renovation or a residential/live -work conversion—exactly the kind of outcome the RREIP was designed to support. The tax benefit is not triggered for a pa rcel until its improvements are substantially complete and final inspection and valuation are completed, and the start of the benefit period can be delayed on a parcel -by-parcel basis. That flexibility accommodates Building 6’s longer development timeline. The RREIP’s 10-year benefit period also aligns with the Opportunity Zone investment hold period, and that symmetry is a meaningful factor in attracting Opportunity Zone capital. The conversion of the two large, chronically vacant office buildings in the Buildings 4 and 5 program involves substantial construction complexity and cost. These challenges are compounded by elevated material and labor costs, rising interest rates, and capitalization-rate pressures that have materially affected the feasibility of adaptive reuse projects in the current market environment. Without the partial tax exemption, the Buildings 4 and 5 program could not achieve the financing structure necessary to support capitalization and proceed to construction. For the Buildings 4 and 5 parcels, the 2023 base assessed value was $34,875,310, and the estimated post-development value upon stabilization is approximately $260 million. These figures relate to the Buildings 4 and 5 program; the final RREIP Base Value and post-improvement valuations for each parcel will be determined by the Department of Tax Administration under Article 32. The RREIP benefit for each parcel is calculated on the increment between its Base Value and its fair market value after that parcel’s improvements are substantially complete. Attachment 2 106 VAN 5111 LEESBURG PIKE LOT 37B SKYLINE 4BLDG HT = 129.81' FF = 264.00' 5113 LEESBURG PIKE LOT 39B SKYLINE 5BLDG HT = 129.81' FF = 264.00' S. GEORGE MASON DRIVE - RTE 3449 (VARIABLE WIDTH PUBLIC R/W)POSTED SPEED LIMIT = 35 MPH VAN COURTYARD (FOR MORE INFORMATION SEE LA PLAN) COURTYARD (FOR MORE INFORMATION SEE LA PLAN) 5109 LEESBURG PIKE LOT 40A1 SKYLINE 6BLDG HT = 140' FF = 264.00' PROFESSIONAL SEAL FILE: Q:\Projects\5629\5629AT\CADD\ENGINEERING\EXHIBITS\WORKING\PBASE EXHIBITS\5629AT - 00.00 PBASE - SAVE AS.dwg USER: Kelly DATE: October 5, 2026 TIME: 4:17:51 PM LAYOUT: PBASE PLAN STATUSDATE DRAWN BY: DESIGNED BY: DATE ISSUED: SHEET NO. VIKA NO. DWG. SCALE: DATE POST-APPROVAL SHEET STATUS VIKA VIRGINIA, LLC 8180 Greensboro Dr., Suite 200 Tysons, VA 22102 703.442.7800 | vika.com FAIRFAX COUNTY, VIRGINIA THE INFORMATION, DESIGN, AND CONTENT OF THESE DRAWINGS AND/OR DOCUMENTS HERETO ARE PROPRIETARY TO VIKA VIRGINIA, L.L.C. AND CONSTITUTE ITS PROPRIETARY INTELLECTUAL PROPERTY. THESE DRAWINGS AND/OR DOCUMENTS MUST NOT BE DIGITALLY FORWARDED, SHARED OR COPIED, DIGITALLY CONVERTED, MODIFIED, OR USED FOR ANY DESIGN PURPOSE, IN ANY FORMAT, WITHOUT PRIOR WRITTEN AUTHORIZATION FROM VIKA VIRGINIA, L.L.C. VIOLATIONS MAY RESULT IN PROSECUTION. ONLY APPROVED, SIGNED AND SEALED PLANS OR DRAWINGS MAY BE UTILIZED FOR RECORDING AND/OR CONSTRUCTION PURPOSES. © 2021 VIKA VIRGINIA, L.L.C. 5629AT SKYLINE 4-6 10/05/2026 2 OF 2 1"=30' SITE PLAN EXHIBIT RREIP APPLICATION AREA: SKYLINE BUILDINGS 4, 5, AND 6 COLONADE SKYLINE 4 AND 5 - PHASE 1 SKYLINE 6 - PHASE 2 Attachment 3 107 APPROXIMATE LIMITS OF SKYLINE 4 GARAGE APPROXIMATE LIMITS OF SKYLINE 5 GARAGE APPROXIMATE LIMITS OF SKYLINE 6 GARAGE ONE UNIFIED GARAGE FOR ALL 3 BUILDINGS PROFESSIONAL SEAL FILE: Q:\Projects\5629\5629AT\CADD\ENGINEERING\EXHIBITS\WORKING\COMBINED GARAGE EXHIBIT.dwg USER: Kelly DATE: October 5, 2026 TIME: 4:19:32 PM LAYOUT: BORD PLAN STATUSDATE DRAWN BY: DESIGNED BY: DATE ISSUED: SHEET NO. VIKA NO. DWG. SCALE: DATE POST-APPROVAL SHEET STATUS VIKA VIRGINIA, LLC 8180 Greensboro Dr., Suite 200 Tysons, VA 22102 703.442.7800 | vika.com FAIRFAX COUNTY, VIRGINIA THE INFORMATION, DESIGN, AND CONTENT OF THESE DRAWINGS AND/OR DOCUMENTS HERETO ARE PROPRIETARY TO VIKA VIRGINIA, L.L.C. AND CONSTITUTE ITS PROPRIETARY INTELLECTUAL PROPERTY. THESE DRAWINGS AND/OR DOCUMENTS MUST NOT BE DIGITALLY FORWARDED, SHARED OR COPIED, DIGITALLY CONVERTED, MODIFIED, OR USED FOR ANY DESIGN PURPOSE, IN ANY FORMAT, WITHOUT PRIOR WRITTEN AUTHORIZATION FROM VIKA VIRGINIA, L.L.C. VIOLATIONS MAY RESULT IN PROSECUTION. ONLY APPROVED, SIGNED AND SEALED PLANS OR DRAWINGS MAY BE UTILIZED FOR RECORDING AND/OR CONSTRUCTION PURPOSES. © 2021 VIKA VIRGINIA, L.L.C. SKYLINE 4-6 10/05/2026 1 OF 2 1"=50' 5629 COMBINED GARAGE EXHIBIT SKYLINE 4 AND 5 PHASE 1 GARAGE REPAIR SKYLINE 6 PHASE 2 GARAGE REPAIR Attachment 3 108 initiatives County of Fairfax, Virginia To protect and enrich the quality of life for the e people, neighborhoods and diverse communities of Fairfax County October 5, 2026 Brian Gribble, Manager, The Liberty Solution LLC MTP-5109 Leesburg LLC 1464 Center Park Drive Charlotte, NC 28217 Tax Map Reference #(s): 62-3((1))40A1 Property Address(es): 5109 Leesburg Pike, Falls Church, VA 22041 Owner: MTP-5109 Leesburg LLC Tax Abatement Case #: MA-001 2026 RE: DETERMINATION LETTER FOR SKYLINE BUILDINGS 4, 5, AND 6 Dear Mr. Gribble, We have received your application for a partial real estate tax exemption under the Fairfax County BUILD Program, also known as the Revitalization and Redevelopment Economic Incentive Program, (Program) as provided by Article 32, Chapter 4 of the Fairfax County Code for the above referenced property(s). I have reviewed your application and find that the development as proposed is eligible for submission to the Board of Supervisors for consideration. Please note that, while the application does appear to conform with the statutory requirements of the program, final approval rests with the Board of Supervisors to determine whether the proposed development is a qualifying property under the ordinance. It is important to understand that the tax abatement is not guaranteed by virtue of the submission of this application. A public hearing is required to establish the Economic Revitalization Zone (ERZ) for your property(s). The Board of Supervisors may approve the ERZ Ordinance and your program application at one of their regularly scheduled meetings. Please work with my staff to determine your Board meeting date for this matter. If you have any questions, please contact JoAnne Fiebe at (703)324-9308 and/or joanne.fiebe@fairfaxcounty.gov. Rebec ou Department of ry, D ector cono c Initiatives cc: Jay Doshi, Director, Department of Tax Administration Vladimir Jadrijevic, Director of Real Estate, Department of Tax Administration David Pellegrino, Assistant Director, Department of Tax Administration Department of Economic Initiatives Director's Office 12015 Route 50, Suite 510 Fairfax, Virginia 22033 Phone 703-324-9300 https://www.fairfaxcounty.gov/economic-initiatives/ Attachment 4 109 Rebe Department ector mic Initiatives initiatives County of Fairfax, Virginia To protect and enrich the quality of life for the people, neighborhoods and diverse communities of Fairfax County October 5, 2026 Rob Seldin, Managing Principal 5111 Leesburg LLC 1000 Maine Avenue, SW, Suite 300 Washington, DC 20024 Tax Map Reference #(s): 62-3((1))39B Property Address(es): 5111 Leesburg Pike, Falls Church, VA 22041 Owner: 5111 Leesburg LLC Tax Abatement Case #: MA-001 2026 RE: DETERMINATION LETTER FOR SKYLINE BUILDINGS 4, 5, AND 6 Dear Mr. Seldin, We have received your application for a partial real estate tax exemption under the Fairfax County BUILD Program, also known as the Revitalization and Redevelopment Economic Incentive Program, (Program) as provided by Article 32, Chapter 4 of the Fairfax County Code for the above referenced property(s). I have reviewed your application and find that the development as proposed is eligible for submission to the Board of Supervisors for consideration. Please note that, while the application does appear to conform with the statutory requirements of the program, final approval rests with the Board of Supervisors to determine whether the proposed development is a qualifying property under the ordinance. It is important to understand that the tax abatement is not guaranteed by virtue of the submission of this application. A public hearing is required to establish the Economic Revitalization Zone (ERZ) for your property(s). The Board of Supervisors may approve the ERZ Ordinance and your program application at one of their regularly scheduled meetings. Please work with my staff to determine your Board meeting date for this matter. If you have any questions, please contact JoAnne Fiebe at (703)324-9308 and/or joanne.fiebe@fairfaxcounty.gov. cc: Jay Doshi, Director, Department of Tax Administration Vladimir Jadrijevic, Director of Real Estate, Department of Tax Administration David Pellegrino, Assistant Director, Department of Tax Administration Department of Economic Initiatives Director's Office 12015 Route 50, Suite 510 Fairfax, Virginia 22033 Phone 703-324-9300 https://www.fairfaxcounty.gov/economic-initiatives/ Attachment 4 110 fade. Ca.,' D., . b••••: economic initiatives County of Fairfax, Virginia To protect and enrich the quality of life for the people, neighborhoods and diverse communities of Fairfax County October 5, 2026 Rob Seldin, Managing Principal Skyline 4 LLC 1000 Maine Avenue, SW, Suite 300 Washington, DC 20024 Tax Map Reference #(s): 62-3((1))37B Property Address(es): 5113 Leesburg Pike, Falls Church, VA 22041 Owner: Skyline 4 LLC Tax Abatement Case #: MA-001 2026 RE: DETERMINATION LETTER FOR SKYLINE BUILDINGS 4, 5, AND 6 Dear Mr. Seldin, We have received your application for a partial real estate tax exemption under the Fairfax County BUILD Program, also known as the Revitalization and Redevelopment Economic Incentive Program, (Program) as provided by Article 32, Chapter 4 of the Fairfax County Code for the above referenced property(s). I have reviewed your application and find that the development as proposed is eligible for submission to the Board of Supervisors for consideration. Please note that, while the application does appear to conform with the statutory requirements of the program, final approval rests with the Board of Supervisors to determine whether the proposed development is a qualifying property under the ordinance. It is important to understand that the tax abatement is not guaranteed by virtue of the submission of this application. A public hearing is required to establish the Economic Revitalization Zone (ERZ) for your property(s). The Board of Supervisors may approve the ERZ Ordinance and your program application at one of their regularly scheduled meetings. Please work with my staff to determine your Board meeting date for this matter. If you have any questions, please contact JoAnne Fiebe at (703)324-9308 and/or joanne.fiebe@fairfaxcounty.gov. Reb Director Dep 'c Initiatives cc: Jay Doshi, Director, Department of Tax Administration Vladimir Jadrijevic, Director of Real Estate, Department of Tax Administration David Pellegrino, Assistant Director, Department of Tax Administration Department of Economic Initiatives Director's Office 12015 Route 50, Suite 510 Fairfax, Virginia 22033 Phone 703-324-9300 https://www.fairfaxcounty.gov/economic-initiatives/ Attachment 4 111 Attachment 5 Page 1 AN ORDINANCE AMENDING APPENDIX X OF THE FAIRFAX COUNTY CODE, 1 RELATING TO ECONOMIC REVITALIZATION ZONE ORDINANCES 2 Draft of October 6, 2026 3 AN ORDINANCE to amend the Fairfax County Code by amending and 4 readopting Appendix X, relating to Economic Revitalization Zone Ordinances 5 to include new Section X-1 establishing the Skyline 4, 5, and 6 Economic 6 Revitalization Zone. 7 8 Be it ordained by the Board of Supervisors of Fairfax County: 9 10 1. That Appendix X of the Fairfax County Code is amended and readopted as follows: 11 12 APPENDIX X. – Economic Revitalization Zone Ordinances. 13 The following ordinance has been adopted by the Board of Supervisors pursuant to Article 14 32 of Chapter 4 of the Code. 15 16 X-1. – Skyline 4, 5, and 6 Economic Revitalization Zone (MA-001 2026). 17 (a) Application Number MA-001 2026 is approved. The following parcels of land situated in 18 the Baileys Crossroads/Seven Corners Incentive Area as described in Sec. 4-32-5(b), and 19 more particularly described herein, comprise the Skyline 4, 5, and 6 Economic 20 Revitalization Zone and collectively constitute a Qualifying Property under Article 32: 21 22 Initial Owners: County Tax Map Parcel Number: Acreage (approx.): Skyline 4, LLC 62-3((1)) parcel 37B 3.001 acres 5111 Leesburg LLC 62-3((1)) parcel 39B 1.799 acres MTP-5109 Leesburg LLC 62-3((1)) parcel 40A1 1.718 acres 23 (a) The Skyline 4, 5, and 6 Economic Revitalization Zone ordinance is subject to the following 24 provisions: 25 1. The effective date of this ERZ will be January 1, 2030, and this ordinance will terminate 26 on the termination date, which is December 31, 2039. 27 2. The timeframe enumerated above constitutes the incentive period for the Skyline 4, 5, 28 and 6 Economic Revitalization Zone. Real estate tax incentives as set forth in Section 29 4-32-8 will be effective between January 1 of the tax year following the year in which 30 substantial completion occurs or the effective date, whichever is later, and will 31 terminate on the termination date. All incentives terminate no later than the termination 32 112 Attachment 5 Page 2 33 34 35 36 3. 37 38 39 40 4. 41 42 43 44 45 46 47 48 date for the Skyline 4, 5, and 6 Economic Revitalization Zone listed above, and subject to earlier termination as set forth in Article 32. The real estate assessment on the subject parcels will revert to full fair market value immediately after the termination date or earlier termination. That the provisions of this ordinance are severable, and if any provision of this ordinance or any application thereof is held invalid, that invalidity will not affect the other provisions or applications of this ordinance that can be given effect without the invalid provision or application. That this Ordinance will become effective on January 1, 2030. GIVEN under my hand this ______ day of ______, 2026 ____________________________ Jill G. Cooper Clerk for the Board of Supervisors 49 50 113 Board Agenda Item October 27, 2026 ADMINISTRATIVE – 4 Extension of Review Period for 2232 Application for AT&T Boulevard Estates Telecommunication Site (Braddock District) ISSUE: Extension of review period for 2232 application to ensure compliance with review requirements of Section 15.2-2232 of the Code of Virginia. PROJECT DESCRIPTION: General Dynamics is requesting 2232 approval to expand an existing telecommunication compound to install a diesel generator, concrete pad, and fencing. The extension period request is to allow the applicant, county agency review, and the Planning Commission sufficient time to complete the 2232 review. The review period for the following application should be extended: 2232-2026-BR-00006 General Dynamics Tax Map No. 56-4 ((1)) 20A 4904 Mattie Moore Ct, Fairfax, VA 20108 Braddock District Accepted September 16, 2026 Requesting extension to August 25, 2027 RECOMMENDATION: The County Executive recommends that the Board extend the review period for the following application: 2232-2026-BR-00006. TIMING: Board action is requested on October 27, 2026, to extend the review period for the application prior to the expiration of the review period on November 15, 2026. BACKGROUND: Subsection B of Section 15.2-2232 of the Code of Virginiastates: “Failure of the commission to act within 60 days of a submission, unless the time is extended by the governing body, shall be deemed approval.” The full length of an extension period may not be necessary, and any extension is not intended to set a date for final action. 114 Board Agenda Item October 27, 2026 EQUITY IMPACT: None. FISCAL IMPACT: None. ENCLOSED DOCUMENTS: None. STAFF: Jennifer Miller, Deputy County Executive Tracy Strunk, Director, Department of Planning and Development (DPD) Salem Bush, Branch Chief, Public Facilities and Development Review Branch, Planning Division, DPD Mohamed Ali, Planner II, Public Facilities and Development Review Branch, Planning Division, DPD 115 Board Agenda Item October 27, 2026 ADMINISTRATIVE – 5 Approval of a Resolution to Authorize Execution of a Low-No Emission Grant and Bus Transfer Agreement with the Washington Metropolitan Area Transit Authority ISSUE: Board of Supervisors’ (Board) approval of a resolution (Attachment 1) for Fairfax County to execute a Low-No Emission Grant and Bus Transfer Agreement with the Washington Metropolitan Area Transit Authority (WMATA) for the purchase of hybrid-electric replacement buses for the Connector Fleet. Board approval is also requested to authorize the Director (or designee) of the Fairfax County Department of Transportation (FCDOT) to execute the agreement, substantially in the form of Attachment 2. RECOMMENDATION: The County Executive recommends that the Board approve a resolution (Attachment 1) authorizing the Director of FCDOT (or designee) to execute an agreement (Attachment 2) with WMATA, for the purchase of hybrid-electric replacement buses. TIMING: Board approval is requested on October 27, 2026, so that hybrid-electric replacement buses can be procured for the Connector fleet, thus allowing the County to continue to meet customer demands for safe, affordable, and environmentally sustainable public transportation. BACKGROUND: On April 11, 2023, the Fairfax County Board of Supervisors authorized support for WMATA’s application to Federal Transit Administration’s (FTA) Low or No Emission Grant Program and Buses and Bus Facilities Competitive Grant Program to assist with the conversion of the Cinder Bed Garage from storing and maintaining diesel buses to battery-electric buses. At that time, the County had envisioned using battery-electric buses on the Richmond Highway Bus Rapid Transit (BRT) project and had identified the Cinder Bed Garage as the most appropriate, cost-effective location to maintain the BRT fleet. Through this action, the Board also authorized local share match financial support for the grant application in the amount of $4.3 million. 116 Board Agenda Item October 27, 2026 On August 30, 2023, FTA awarded WMATA $104.0 million in discretionary, Section 5339c (Low or No Emission Grant) funding to support the conversion of the Cinder Bed Garage to a battery-electric facility. On July 23, 2025, FTA sent letters to all Low or No Emission Grant Program recipients informing them that they would be allowed to convert their grant awards away from electric bus infrastructure and electric buses to support the purchase of hybrid-electric buses, due to “the infeasibility of employing zero- emission technology or the economic burden and operational challenges associated with use of such technology, along with an interest in making prudent investment decisions with public dollars.” In December 2025, WMATA leadership contacted the County Executive to confirm the County’s interest in remaining partners in the grant and offered the County the opportunity to join in the purchase of hybrid-electric vehicles, to which the County agreed. To facilitate the purchase and delivery of buses from WMATA to the County, WMATA explored alternatives with FTA. Based on those discussions, FCDOT staff believe it would be prudent to allow WMATA to purchase the buses on the County’s behalf, using the Connector’s specifications and FTA’s regulations to do so. On July 23, 2026, the WMATA Board approved a resolution to move forward with the purchase and transfer of hybrid-electric buses on behalf of the County. FTA is seeking a similar resolution from the County (Attachment 1) to verify the County’s intent to enter into an agreement with WMATA for the purchase and transfer of the vehicles. If approved, WMATA will immediately begin the procurement process on behalf of the County. EQUITY IMPACT: Fairfax Connector buses support the economic growth, health, congestion mitigation, and prosperity goals of Fairfax County. The bus replacement program exists to replace rolling stock which has reached the end of its useful life. This grant request would maintain existing service levels. As such, this Board item has no inequity concerns identified. FISCAL IMPACT: Grant funding up to $17.0 million from the Low or No Emission Grant Program will be used for the purchase of replacement buses for Fairfax Connector. The Local Cash Match (LCM) required, $3.0 million, is 17.6 percent of the award. Budgetary adjustments required to reflect the LCM in Fund 40000, County Transit Systems, 117 Board Agenda Item October 27, 2026 supported by state aid, will be made as part of a future quarterly budget review. There is no General Fund impact associated with entering into this agreement. ENCLOSED DOCUMENTS: Attachment 1: Resolution for the Execution of a Bus Transfer Agreement with the Washington Metropolitan Area Transit Authority (WMATA) Attachment 2: Low-No Emission Grant and Bus Transfer Agreement STAFF: Jennifer Miller, Deputy County Executive Gregg Steverson, Director, Fairfax County Department of Transportation (FCDOT) Martha Coello, Deputy Director, FCDOT Dwayne Pelfrey, Chief, Transit Services Division, FCDOT Noelle Dominguez, Chief, Coordination and Funding Division, FCDOT Vanessa Aguayo, Chief, Capital Projects Section, FCDOT ASSIGNED COUNSEL: Joanna Faust, Senior Assistant County Attorney 118 RESOLUTION AGREEMENT EXECUTION RESOLUTION A RESOLUTION FOR THE BOARD OF SUPERVISORS OF THE COUNTY OF FAIRFAX, VIRGINIA FOR THE EXECUTION OF A BUS TRANSFER AGREEMENT WITH THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY (WMATA) At a regular meeting of the Board of Supervisors of Fairfax County, Virginia, held in the Board Auditorium of the Government Center in Fairfax, Virginia, on Tuesday, October 27, 2026, at which meeting a quorum was present and voting, the following resolution was adopted: WHEREAS, Chapter IV , Section 3(r)(8)(a)(ii) of Federal Transit Administration (FTA) Circular 5010.1F requires a resolution from the Board of Supervisors for the transfer of rolling stock (e.g., transit vehicles); and WHEREAS, FTA awarded WMATA discretionary grant funding under the Section 5339c Low- No Emission Vehicle Discretionary Grant program to procure replacement buses (the “Award”); and WHEREAS, the Award includes $17,000,000.00 (the “Allocated Share”) towards the purchase of replacement buses (the “Buses”) for Fairfax County (the “County”); and WHEREAS, the County will provide the required local match in the amount of $3,000,000.00 (the “Local Match”); and WHEREAS, subject to FTA approval, and consistent with the requirements for the transfer of rolling stock to another transit entity set out in FTA Circular 5010.1F, WMATA and the County intend for WMATA to use the Allocated Share, including the Local Match, to purchase and subsequently transfer the Buses to the County. NOW, THEREFORE, BE IT RESOLVED, that the Board of Supervisors authorizes the transfer of replacement buses from WMATA to Fairfax County using $17,000,000 of the Section 5339c Low-No Emission Vehicle Discretionary Grant awarded to WMATA to procure replacement buses and, whereby, Fairfax County will provide the $3,000,000 local match. FURTHER BE IT RESOLVED, that the Board of Supervisors authorizes the Director of the Fairfax County Department of Transportation, or his designee, to execute the Bus Transfer Agreement with WMATA, substantially in the form of that attached hereto as Attachment 2, along with any resulting bill of sale or other documents needed to transfer the buses to Fairfax County. FURTHER BE IT RESOLVED, that to timely effectuate the transfer of the Buses to Fairfax County, this Resolution shall be effective immediately. ADOPTED this 27th day of October 2026. A Copy Teste: _____________________________ Jill G. Cooper Clerk to the Board of Supervisors 119 LOW-NO EMISSION GRANT & BUS TRANSFER AGREEMENT BETWEEN THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY AND FAIRFAX COUNTY, VIRGINIA THIS LOW-NO EMISSION GRANT & BUS TRANSFER AGREEMENT (this “Agreement”) is executed and made effective as of the date last set forth below (the “Effective Date”), by and between (i) WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY, an interstate compact agency and instrumentality of the District of Columbia, the Commonwealth of Virginia and the State of Maryland, created with the consent of the United States Congress (“ WMATA”); and (ii) FAIRFAX COUNTY, VIRGINIA, a Virginia body politic (the “County”) (WMATA and the County, each referred to by name or as a “Party” and collectively the “Parties”). WHEREAS, the Federal Transit Administration (“ FTA”) awarded WMATA the total amount of One Hundred Four Million and No/100 Dollars ($104,000,000.00) in discretionary grant funding under the Section 5339(c) Low-No Emission Vehicle Discretionary Grant program to procure replacement buses, as set forth in Exhibit A (the “Award”); and WHEREAS, the Award includes Eighty-Seven Million and No/100 Dollars ($87,000,000.00) for busesreplacementofpurchasethe WMATAfor and MillionSeventeen and No/100 Dollars ($17,000,000.00) “(the ShareAllocated ”) allocated towards ofpurchasethe replacement buses for the County (the “Fairfax Buses”); and WHEREAS, WMATA executed that certain Contract FBMNT233274 -BTK with New Flyer of America, Inc. (the “Vendor”) on or about November 24, 2024 for the procurement of buses (the “Purchase Contract”), and WMATA will exercise available Options to purchase the Fairfax Buses; and WHEREAS, the County will provide the required local match toward the Allocated Share, in the amount of Three Million and No/100 ($3,000,000.00) (the “Local Match”); and WHEREAS, WMATA will use the Allocated Share, including the Local Match provided by the County, to purchase and subsequently transfer the Fairfax Buses to the County, in accordance with FTA’s approval and consistent with the requirements, including without limitation, those requirements of FTA Circular 5010.1F Chapter III, Section 7.i. (the “Transfer”); and WHEREAS, the Parties desire to memorialize the terms and conditions under which the Transfer will occur in this Agreement; so NOW, THEREFORE, based on the foregoing understanding and in consideration of the mutual covenants, obligations, terms and conditions provided herein, the Parties hereby agree as follows: 1. LOCAL MATCH. Concurrently with the execution of this Agreement, the County shall provide the Local Match to WMATA. 2. PROCUREMENT. WMA TA shall maintain full control over the purchasing process set forth in the Purchase Contract. WMATA shall receive input from the County, but County shall not have the power to vote, select, or veto decisions related to the Purchase Contract. WMA TA will make reasonable efforts to obtain any applicable m odification, and FTA approval thereof, and to make any minor modifications, as may be allowed within the Purchase Contract, so long as such modification(s) do(es) not constitute a material or cardinal change under the terms of the Purchase Contract. Any other costs imposed under the Purchase Contract above and beyond the direct procurement of the Fairfax Buses, such as first article inspection and post-delivery audit, shall be at the cost and expense of the County. 3. PURCHASE. Upon receipt of the Award, execution of this agreement, and receipt of the Local Match, WMATA shall use the Allocated Share to purchase the Fairfax Buses. Attachment 2 120 4. ACCEPTANCE. WMATA and County representative shall perform a first article inspection (FAI) and review a first pilot bus at the Vendor’s manufacturer’s facility to confirm it matches the specifications that WMATA, the County, and the V endor have agreed (the “Specifications”) as well as an inspection of each of the Fairfax Buses by a resident inspector at the Vendor’s manufacturing facility. Upon acceptance for shipping and Vendor’s delivery to WMATA’s Carmen Turner Facility, WMATA will perform a post-delivery inspection. Upon WMATA’s and the County’s satisfaction that the Fairfax Buses meet the Specifications, WMATA shall, upon delivery and acceptance of the production, enter the Fairfax Buses into WMATA ’s inventory. 5. CONDITIONS PRECEDENT. WMATA shall thereafter transfer the Fairfax Buses to the County upon the satisfaction of all of the following conditions precedent: a. WMATA has received the Award. b. The County has provided the Local Match to WMATA and shall have certified to WMATA and (if required) the FTA, that the County has buses in the disposition process to ensure the County satisfies the requirement to dispose of buses for each of the new replacement Fairfax Buses. c. The Parties have satisfied all applicable requirements set forth in FTA Circular 5010.1F, the Award, and conditions of the FTA Master Agreement, including, without limitation, the requirement for documentation of a written request for approval to transfer vehicles, a board resolution from each recipient, a rolling stock status report, and FTA concurrence of the Transfer. d. The Parties have performed all of their respective obligations set forth in Sections 1-4 above. 6. TRANSFER. Upon satisfaction of all of the conditions precedent set forth in Section 5 above, WMATA shall thereafter transfer the Fairfax Buses, including the FTA obligations attached thereto, to the County. The County will immediately incorporate the Fairfax Buses into the County’s fleet status and provide documentation evidencing such incorporation to WMA TA and the FTA and confirming disposal of the buses that have been replaced. All FTA required terms and conditions of the Award shall follow the Fairfax Buses. The County will notify the FTA of the transfer of assets and comply with and assume all obligations associated with the transfer of federally -assisted assets including the Satisfactory Continuing Control requirements. The County will assume the federal interests, obligations and any and all FTA required terms and conditions of the Award. WMATA will not be responsible for any costs associated with this Agreement, including, without limitation, the Award, Fairfax Buses, Transfer or any other transaction or assurance contemplated hereunder. 7. TERM. This Agreement is effective as of the Effective Date and will terminate upon the County’s acceptance of the Fairfax Buses, provided, however, that the terms of Section 6 shall not terminate until the termination of the federal interest in the Fairfax Buses. 8. REPRESENTATIONS. The Parties represent to one another, each on behalf of themselves, as of the date of the execution of this Agreement, that (a) such Party has full power and authority to enter into the transactions contemplated by this Agreement and to carry out its obligations hereunder; (b) such Party has duly authorized the execution and delivery of this Agreement; (c) when executed and delivered by the Parties, this Agreement will constitute the legal, valid and binding obligation of the individual Party enforceable in accordance with its terms; and (d) no officer or employee of such Party who exercises or has exercised any functions or responsibilities over any procurement contract shall have or obtain a personal or financial interest or benefit from any activity in connection with any such procurement contract or have any interest in any contract, subcontract, or agreement with respect therewith during the term of this Agreement. 9. MISCELLANEOUS. Attachment 2 121 a. Governing Law . This Agreement shall be governed by the laws of the Commonwealth of Virginia, except where any law conflicts with the WMATA Compact, the Compact shall control. b. Disputes. Any disputes between the parties arising out of this Agreement may be disposed of by the Parties by written agreement and/or amendment of this Agreement. If the Parties cannot resolve the dispute, then the Party seeking a resolution shall provide written notice of the nature of the dispute and the issue(s) to the other Party. If the dispute is not resolved by the Parties within thirty (30) days of such notice, the Parties agree that the Director of the Fairfax County Department of Transportation/the County Executive and the general manager and chief executive officer of WMATA shall attempt to resolve such dispute without court action within thirty (30) days thereafter. If the dispute is not resolve within such thirty (30) days, either Party may commence a civil action for resolution of the dispute in the United States District Court for the Eastern District of Virginia, Alexandria Division. Notwithstanding any provision to the contrary contained in this Agreement, prejudgment interest shall not be paid by one Party to the other Party. c. No Waiver of Immunity. This Agreement shall not be construed as a waiver of either Party’s respective immunities, including, without limitation, municipal and sovereign immunity. d. Notices. Any notice required or permitted under this Agreement shall be in writing and shall be delivered by hand, sent by courier, sent by prepaid registered or certified mail with return receipt requested and addressed as appropriate to the following addresses (or to such other or further addresses as the Parties may designate by notice given in accordance with this paragraph), with copy sent by electronic mail, to the extent such recipient’s email address is provided below: If to WMATA: General Manager and CEO Washington Metropolitan Area Transit Authority 300 7th Street SW Washington, DC 20024 with copy to: Executive Vice President and Chief Financial Officer Washington Metropolitan Area Transit Authority 300 7th Street SW Washington, DC 20024 with copy to: Executive Vice President, Chief Legal Officer, and General Counsel Washington Metropolitan Area Transit Authority 300 7th Street SW Washington, DC 20024 with copy to: Executive Vice President and Chief Operations Officer Washington Metropolitan Area Transit Authority Attachment 2 122 300 7th Street SW Washington, DC 20024 If to the County: Director Fairfax County Department of Transportation 4050 Legato Road, Suite 400 Fairfax, V A 22033 with copy to: Office of the County Attorney 12000 Government Center Parkway, Suite 549 Fairfax, V A 22035 Such correspondence shall be deemed delivered, upon the earlier to occur of (i) the day delivered by hand delivery; (ii) the third day following the day on which the same shall have been mailed by U.S. registered or certified mail, return receipt requested, with all postal charges prepaid, to the respective addresses set forth below; (iii) the day delivered by email and acknowledged by the recipient; or (iv) actual receipt at the Parties’ addresses. e. Legislative Compliance. i. Civil Rights & Nondiscrimination . The County shall comply with the requirements set forth in the FTA Master Agreement, as applicable to the Award, and any successor thereto, including, without limitation, those requirements set forth in thereof. ii. Anti-Drug; Anti-Alcohol. The County shall comply with those federal laws, regulations, executive orders or guideline strictures regarding anti-drug and alcohol policy in transit work and operations, which include, but is not limited to, the following: "Drug -Free Workplace Act (DFWA) of 1988," 49 USC Sections 702 et seq.; “Requirements for a Drug-Free Workplace (Grants)," 49 C.F.R. Part 29; Prevention of Prohibited Drug Use in Transit Operations," 49 C.F.R. Part 653; and Prevention of Alcohol Misuse in Transit Operations," 49 C.F.R. Part 654. f. Entire Agreement. Nothing in this Agreement shall be construed to modify or diminish or supersede any existing rights, agreements, or arrangements between WMATA and the County. Except for the representations contained in this Agreement, WMA TA does not make, and hereby disclaims, any other representations. g. Amendments. Except as otherwise provided herein, any amendment or modification in any respect to the terms and conditions of this Agreement shall be made by an instrument in writing signed by both Parties. h. Relationship. This Agreement shall not be construed as creating a partnership, joint venture or other relationship between the Parties, it being understood that each Party shall be and remain a separate and independent entity for all purposes hereof. In no event shall WMATA be liable to the County or any third party, whether in contract or in tort or in any other legal theory (including, without limitation, strict liability, or negligence) for any claims, damages, losses, liabilities, or expenses arising out of or in connection with the performance of this Agreement. i. No Assignment. No transfer or assignment of this Agreement, or of any part thereof or interest therein, directly or indirectly, voluntarily or involuntarily, shall be made unless consent for such transfer or assignment is first approved in writing by the Parties Attachment 2 123 j. Headings. The headings throughout this Agreement are for convenience and reference only and shall in no way be held to explain, modify, amplify or aid in the interpretation, construction, or meaning of the provisions of this Agreement. k. Counterparts. This Agreement may be signed in one or more identical counterparts, whether transmitted by electronic mail or otherwise. Each such counterpart shall be deemed an original for purposes of this Agreement. IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date last set forth with their signatures hereto below. WMATA: THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY By: Executive Vice President and Chief Financial Officer Dated FAIRFAX COUNTY: FAIRFAX COUNTY, VIRGINIA By: Director, Fairfax County Department of Transportation Dated LIST OF EXHIBITS Exhibit A Low-No Emissions Grant Award Attachment 2 124 Board Agenda Item October 27, 2026 ADMINISTRATIVE – 6 Approval of Traffic Calming Measures as Part of the Residential Traffic Administration Program – Oak Drive (Mount Vernon District) ISSUE: Board endorsement of Traffic Calming measures as part of the Residential Traffic Administration Program (RTAP). RECOMMENDATION: The County Executive recommends that the Board approve a resolution (Attachment 1) endorsing a traffic calming plan for Oak Drive (Attachment 2), consisting of the following: ∑ Two Speed Humps on Oak Drive (Mount Vernon District) In addition, the County Executive recommends that the Fairfax County Department of Transportation (FCDOT) be requested to schedule the installation of the approved traffic calming measure(s) as soon as possible. TIMING: Board action is requested on October 27, 2026, to allow the proposed measure(s) to be installed as soon as possible. BACKGROUND: As part of RTAP, roads are reviewed for traffic calming when requested by a Board member on behalf of a homeowners or civic association. Traffic calming employs the use of physical devices such as speed humps, speed tables, raised pedestrian crosswalks, chokers, or median islands to reduce the speed of traffic on a residential street. Staff performs engineering studies documenting the attainment of qualifying criteria. Staff works with the local Supervisor’s office and community to determine the viability of the requested traffic calming measure to reduce the speed of traffic. Once the plan for the road under review is approved and adopted by staff, that plan is then submitted for approval to the residents within the ballot area in the adjacent community. On September 11, 2026, FCDOT received verification from the Mount Vernon District Supervisor’s office confirming community support for the Oak Drive traffic calming plan. 125 Board Agenda Item October 27, 2026 EQUITY IMPACT: None. FISCAL IMPACT: Funding in the amount of $41,000 is necessary to fund the traffic calming measures associated with this traffic calming project. Funds are currently available in Project 2G25-076-000, Traffic Calming Program, Fund 300-C30050, Transportation Improvements. ENCLOSED DOCUMENTS: Attachment 1: Traffic Calming Resolution for Oak Drive Attachment 2: Traffic Calming Plan for Oak Drive STAFF: Jennifer Miller, Deputy County Executive Gregg Steverson, Director, Fairfax County Department of Transportation (FCDOT) Martha Elena Coello, Deputy Director, FCDOT Eric Teitelman, Chief, Active Transportation, Capital Projects and Traffic Engineering Division, FCDOT Neil Freschman, Chief, Traffic Engineering Section, FCDOT Nicole Machacuay, Transportation Planner, Traffic Engineering Section, FCDOT Grace Vaughn, Planning Technician, Traffic Engineering Section, FCDOT 126 127 128 Board Agenda Item October 27, 2026 ADMINISTRATIVE – 7 Approval of Traffic Calming Measures as Part of the Residential Traffic Administration Program – Middle Run Drive (Springfield District) ISSUE: Board endorsement of Traffic Calming measures as part of the Residential Traffic Administration Program (RTAP). RECOMMENDATION: The County Executive recommends that the Board approve a resolution (Attachment 1) endorsing a traffic calming plan for Middle Run Drive (Attachment 2), consisting of the following: ∑ One Speed Hump on Middle Run Drive (Springfield District) In addition, the County Executive recommends that the Fairfax County Department of Transportation (FCDOT) be requested to schedule the installation of the approved traffic calming measure(s) as soon as possible. TIMING: Board action is requested on October 27, 2026, to allow the proposed measure(s) to be installed as soon as possible. BACKGROUND: As part of RTAP, roads are reviewed for traffic calming when requested by a Board member on behalf of a homeowners or civic association. Traffic calming employs the use of physical devices such as speed humps, speed tables, raised pedestrian crosswalks, chokers, or median islands to reduce the speed of traffic on a residential street. Staff performs engineering studies documenting the attainment of qualifying criteria. Staff works with the local Supervisor’s office and community to determine the viability of the requested traffic calming measure to reduce the speed of traffic. Once the plan for the road under review is approved and adopted by staff, that plan is then submitted for approval to the residents within the ballot area in the adjacent community. On September 17, 2026, FCDOT received verification from the Springfield District Supervisor’s office confirming community support for the Middle Run Drive traffic calming plan. 129 Board Agenda Item October 27, 2026 EQUITY IMPACT: None. FISCAL IMPACT: Funding in the amount of $28,000 is necessary to fund the traffic calming measures associated with this traffic calming project. Funds are currently available in Project 2G25-076-000, Traffic Calming Program, Fund 300-C30050, Transportation Improvements. ENCLOSED DOCUMENTS: Attachment 1: Traffic Calming Resolution for Middle Run Drive Attachment 2: Traffic Calming Plan for Middle Run Drive STAFF: Jennifer Miller, Deputy County Executive Gregg Steverson, Director, Fairfax County Department of Transportation (FCDOT) Martha Elena Coello, Deputy Director, FCDOT Eric Teitelman, Chief, Active Transportation, Capital Projects and Traffic Engineering Division, FCDOT Neil Freschman, Chief, Traffic Engineering Section, FCDOT Nicole Machacuay, Transportation Planner, Traffic Engineering Section, FCDOT Grace Vaughn, Planning Technician, Traffic Engineering Section, FCDOT 130 Attachment 1 RESOLUTION FAIRFAX COUNTY DEPARTMENT OF TRANSPORTATION RESIDENTIAL TRAFFIC ADMINISTRATION PROGRAM (RTAP) TRAFFIC CALMING MEASURES MIDDLE RUN DRIVE SPRINGFIELD DISTRICT At a regular meeting of the Board of Supervisors of Fairfax County, Virginia, held in the Board Auditorium of the Government Center in Fairfax, Virginia, on Tuesday, October 27, 2026, at which a quorum was present and voting, the following resolution was adopted: WHEREAS, the residents in the vicinity of Middle Run Drive have requested the Springfield District Supervisor’s Office of Fairfax County to consider remedial measures to reduce the speed of traffic on Middle Run Drive; and WHEREAS, an engineering study by the Fairfax County Department of Transportation (FCDOT) for Middle Run Drive indicates that all basic traffic calming criteria are met pertaining to functional classification of the roadway, identification of a significant speeding concern, and proof of community support; and WHEREAS, the proposed Traffic Calming Plan was properly presented to the community in the affected survey area for their review and consideration; and WHEREAS, the Traffic Calming Plan was subsequently approved by the occupied residences within the appropriate surveyed area; and WHEREAS, the intended source of funding for the Traffic Calming Plan is Fairfax County. NOW THEREFORE BE IT RESOLVED, that the Board of Supervisors endorses the proposed Traffic Calming Plan and requests that the Virginia Department of Transportation review and approve the feasibility of implementing traffic calming measures on Middle Run Drive as part of FCDOT's Residential Traffic Administration Program. ADOPTED this 27th day of October, 2026. A Copy Teste: . Jill G. Cooper Clerk for the Board of Supervisors 131 Attachment 2 Q o GROVELAND DR MIDDLE RUN DR TYROLEAN WAY § 0 250 Tax Map: 98-1 September 2026 'CDOT o Q or gO>Ns ST aco 500 Z) Feet 2 Q Fairfax County Department of Transportation Residential Traffic Administration Program Traffic Calming Plan Middle Run Drive Springfield District % $ £o u> o o I% EDWARD CARR CT Proposed Speed Hump adjacent to 8492 & 8493 Middle Run Drive KINGS RIDGE CT 132 Board Agenda Item October 27, 2026 ADMINISTRATIVE – 8 Approval of “$200 Additional Fine for Speeding” Signs as Part of the Residential Traffic Administration Program – Lacy Boulevard (Mason District) ISSUE: Board endorsement of “$200 Additional Fine for Speeding” signs as part of the Residential Traffic Administration Program (RTAP). RECOMMENDATION: The County Executive recommends approval of the resolution (Attachment 1) for the installation of “$200 Additional Fine for Speeding” signs on the following road: ∑ Lacy Boulevard between Columbia Pike and Colfax Avenue (Mason District) In addition, the County Executive recommends that the Fairfax County Department of Transportation (FCDOT) be requested to schedule the installation of the approved “$200 Additional Fine for Speeding” signs (Attachment 2) as soon as possible. TIMING: Board action is requested on October 27, 2026, to help facilitate a prompt installation of the proposed signage. BACKGROUND: Section 46.2-878.2 of the Code of Virginia permits a maximum fine of $200, in addition to other penalties provided by law, to be levied on persons exceeding the speed limit on appropriately designated residential roadways. These residential roadways must have a posted speed limit of 35 mph or less and must be shown to have an existing speeding problem. To determine that a speeding problem exists, staff performs an engineering review to ascertain that certain speed and volume criteria are met. Lacy Boulevard (Mason District) meets the RTAP requirements for posting the “$200 Additional Fine for Speeding” signs. On August 18, 2026, FCDOT received verification from the Mason District Supervisor’s office confirming community support. EQUITY IMPACT: None. 133 Board Agenda Item October 27, 2026 FISCAL IMPACT: Funding in the amount of $600 is available in Fund 100-C10001, Signage: $200 Fine for Speeding. ENCLOSED DOCUMENTS: Attachment 1: “$200 Additional Fine for Speeding” Signs Resolution – Lacy Boulevard Attachment 2: Area Map of Proposed “$200 Additional Fine for Speeding” Signs – Lacy Boulevard STAFF: Jennifer Miller, Deputy County Executive Gregg Steverson, Director, Fairfax County Department of Transportation (FCDOT) Eric Teitelman, Chief, Active Transportation, Capital Projects and Traffic Engineering Division, FCDOT Neil Freschman, Chief, Traffic Engineering Section, FCDOT Steven K. Knudsen, Transportation Planner, Traffic Engineering Section, FCDOT Nicole Machacuay, Transportation Planner, Traffic Engineering Section, FCDOT Grace Vaughn, Planning Technician, Traffic Engineering Section, FCDOT 134 Attachment 1 RESOLUTION FAIRFAX COUNTY DEPARTMENT OF TRANSPORTATION RESIDENTIAL TRAFFIC ADMINISTRATION PROGRAM (RTAP) $200 ADDITIONAL FINE FOR SPEEDING SIGNS LACY BOULEVARD MASON DISTRICT At a regular meeting of the Board of Supervisors of Fairfax County, Virginia (“Board of Supervisors”), held in the Board Auditorium of the Government Center in Fairfax, Virginia, on Tuesday, October 27, 2026, at which a quorum was present and voting, the following resolution was adopted: WHEREAS, Section 46.2-878.2 of the Code of Virginia enables the Board of Supervisors to request signs alerting motorists of enhanced penalties for speeding on residential roads; and WHEREAS, the Fairfax County Department of Transportation has verified that a bona-fide speeding problem exists on Lacy Boulevard. Such road also being identified as a Major Collector; and WHEREAS, community support has been verified for the installation of "$200 Additional Fine for Speeding" signs on Lacy Boulevard; and WHEREAS, the intended source of funding for the signs is Fairfax County. NOW, THEREFORE BE IT RESOLVED that the Board of Supervisors endorses “$200 Additional Fine for Speeding” signs for Lacy Boulevard. AND FURTHER, the Virginia Department of Transportation is requested to allow Fairfax County to install "$200 Additional Fine for Speeding" signage. ADOPTED this 27th day of October, 2026. A Copy Teste: . Jill G. Cooper Clerk for the Board of Supervisors 135 Attachment 2 Fairfax County Department of Transportation Residential Traffic Administration Program Proposed $200 Additional Fine for Speeding Lacy Boulevard Mason District August 2026 'CDOT 136 Board Agenda Item October 27, 2026 ADMINISTRATIVE – 9 Authorization for the Office of Environmental and Energy Coordination to Apply for and Accept Grant Funding from Virginia Department of Energy to Support the Interconnection of Distributed Solar Energy Systems to the Electric Grid (Mount Vernon District) ISSUE: Board of Supervisors authorization is requested for the Office of Environmental and Energy Coordination (OEEC) to apply for and accept grant funding, if received, from the Virginia Department of Energy (Virginia Energy), in the amount of $600,000. Funding will cover a portion of costs for interconnecting ground-mount solar photovoltaic (PV) panels at the I-95 Landfill Complex to the electric grid. Dominion Energy Virginia (DEV) will impose the solar interconnection fee after it completes electric grid upgrades deemed necessary to support the additional electric demand from the Landfill solar system. The anticipated period of performance is six to 18 months from grant award. No Local Cash Match is required. Board authorization is also requested for the Chairman of the Board of Supervisors, the County Executive, and/or a designee appointed by the County Executive to enter into the grant agreement and any related agreements, including but not limited to Federal Subaward Agreements, on behalf of the County. If the actual award received is significantly different from the application amount, another item will be submitted to the Board requesting appropriation of grant funds. Otherwise, staff will process the award administratively as per Board policy. RECOMMENDATION: The County Executive recommends that the Board of Supervisors authorize the Office of Environmental and Energy Coordination to apply for and accept $600,000 in grant funding, if awarded, from Virginia Energy to cover a portion of the utility-imposed fee for interconnecting solar photovoltaic panels at the I-95 Landfill Complex to the electric grid. No Local Cash Match is required. The County Executive also recommends the Board authorize the Chairman of the Board of Supervisors, the County Executive, and/or a designee appointed by the County Executive to enter into the grant agreement and any related agreements, including but not limited to Federal Subaward Agreements, on behalf of the County. TIMING: Board approval is requested on October 27, 2026. Due to a grant application deadline of October 5, 2026, the application was submitted pending Board approval. This Board 137 Board Agenda Item October 27, 2026 item is being presented at the earliest subsequent Board meeting. If the Board does not approve this request, the application will be immediately withdrawn. The Board was also notified via email on October 1, 2026, of the agency’s intent to apply for this grant. BACKGROUND: The Office of Environmental and Energy Coordination is seeking $600,000 in grant funding through a Virginia Department of Energy funding opportunity established through Senate Bill 659 and House Bill 683 (2026) to address one of the barriers facing public-sector solar development: the cost of interconnecting distributed solar energy systems to the electric grid. The funding, if awarded, will cover a portion of utility-owned costs for interconnecting five-megawatt solar photovoltaic system at the I-95 Landfill Complex to the electric grid. Procured under a Power Purchase Agreement (PPA), the installing contractor owns and operates the solar PV panels and sells the electricity generated there to Fairfax County at a fixed dollar per kilowatt-hour rate (PPA rate) for a 30-year term. The PPA contract allows the County to purchase renewable energy generated on-site with little or no upfront or operational costs, thereby reducing the County’s greenhouse gas emissions and long-term electricity costs. Per the terms of the PPA, the PPA rate will be increased by a certain amount if the solar interconnection fee exceeds $500,000. Dominion Energy Virginia (DEV) estimated this fee to be $1,701,200. The $600,000 provided by the grant, if awarded, will mitigate the increase to the PPA rate significantly, actually resulting in more than $600,000 of additional savings over the 30-year term of the PPA. EQUITY IMPACT: This action supports the following One Fairfax areas of focus: a healthy and quality environment, and a quality built and natural environment. Installing solar photovoltaic panels on county property advances the goals and targets of the Operational Energy Strategy (OES). Adopted in 2021, the OES includes an overarching goal to achieve carbon neutrality in county government operations by 2040 and targets to produce 25 percent of county electricity from renewable energy generation by 2030 and 50 percent by 2040, using FY 2018 as the baseline. Through its efforts to achieve carbon neutrality, the county is significantly reducing its greenhouse gas emissions and doing its part to curb the regional impacts of climate change. Climate hazards, including extreme heat, flooding, and severe storms, often disproportionately harm certain populations, such as low-income, disabled, or elderly 138 Board Agenda Item October 27, 2026 populations, communities of color, those experiencing homelessness, and outdoor workers. This action does not address the direct impacts of climate change on vulnerable populations; such efforts are being conducted through the Resilient Fairfax program. However, implementation of the OES and related climate mitigation efforts is expected to reduce the severity of climate change, generating long-term benefits for the residents of Fairfax County. FISCAL IMPACT: Grant funding in the amount of $600,000 is being requested from Virginia Energy to cover a portion of the utility-imposed fee for interconnecting solar photovoltaic panels at the I-95 Landfill Complex to the electric grid. This action does not increase the expenditure level of the Federal-State Grant Fund as funds are held in reserve for unanticipated grant awards in FY 2027. No Local Cash Match is required. This grant does not allow the recovery of indirect costs. CREATION OF NEW POSITIONS: No new positions will be created by this grant. ENCLOSED DOCUMENTS: Attachment 1: Solar Interconnection Grant Program Guidelines STAFF: Jennifer Miller, Deputy County Executive Robert Sandoli, Director, Office of Environmental and Energy Coordination (OEEC) Kevin Smith, Division Manager, OEEC Christopher S. Herrington, Director, Department of Public Works and Environmental Services (DPWES) Eric Forbes, Deputy Director, Solid Waste Management Program, DPWES ASSIGNED COUNSEL: Patricia McCay, Deputy County Attorney 139 Solar Interconnection Grant Program Guidelines HB683 / SB659 2026 – State Energy Office Table of Contents Solar Interconnection Grant Program Background..................................................................... 2 Solar Interconnection Grant Program Overview ........................................................................ 3 Budget ......................................................................................................................................... 4 Prevailing Wage Law .................................................................................................................. 4 Reporting Procedure ................................................................................................................... 4 Contracting and Invoice Payment ............................................................................................... 5 FAQs ........................................................................................................................................... 6 Application.................................................................................................................................. 7 Help & Questions........................................................................................................................ 7 Applicant Info Tab (5pts) ............................................................................................................ 8 Project Summary Tab (20pts)...................................................................................................... 8 Project Details Tab (50pts).......................................................................................................... 9 Financial Details Tab (25 pts) ....................................................................................................11 Supporting Documents...............................................................................................................11 Evaluation and Scoring Criteria .................................................................................................11 Submit Your Application........................................................................................................... 12 This document serves as a guide to applying for the Solar Interconnection Grant Program. The Program Overview section provides the program objectives, eligibility, metrics, and funding details. The Application section provides guidance for applying for this grant using the Virginia Energy Grant Portal. Included as addendum is the Commonwealth of Virginia’s General Terms and Conditions. Applicants are not required to agree to these terms and conditions to submit an application for the award; however, acceptance of the terms and conditions will be required as a condition of proceeding with the award in the event their project is selected. Applications are due 11:59pm, October 2, 2026. Any questions related to your grant should be sent using the Help & Communications tab in the Grant Portal (far left tab on the application). Virginia Energy staff will respond within five days. The last day to submit questions is September 18, 2026. Attachment 1 140 Solar Interconnection Grant Program 2 Solar Interconnection Grant Program Background The Virginia General Assembly established the Solar Interconnection Grant Program through Senate Bill 659 and House Bill 683 (2026) to address one of the barriers facing public-sector solar development: the cost of interconnecting distributed solar energy systems to the electric grid. While the cost of solar equipment has declined substantially over the past decade, interconnection costs, including utility-required system upgrades, protection equipment, engineering studies, and other infrastructure improvements, have become an increasingly important factor affecting project feasibility. These costs can present a challenge for local governments, school divisions, and other public bodies that seek to invest in clean energy while remaining responsible stewards of taxpayer funds. Even projects with strong economic returns may be delayed, down sized, or cancelled when interconnection costs exceed available capital budgets or available grant funding. As a result, otherwise viable public solar projects may fail to move forward despite providing long - term energy savings. The Solar Interconnection Grant Program, administered by the Virginia Department of Energy (Virginia Energy), is intended to help offset these costs, enabling public bodies to pursue solar projects that reduce energy expenditures and increase the deployment of clean energy across the Commonwealth. The program also supports the Commonwealth's broader interest in understanding the nature and extent of interconnection challenges facing public-sector projects. In addition to providing financial assistance, the Program serves an important data collection and policy development function. Current information regarding interconnection costs, timelines, study requirements, and upgrade drivers is limited and often project specific. By collecting standardized information from grant applicants and recipients, Virginia Energy will develop a more comprehensive understanding of the barriers affecting public solar deployment. This information will support the Department's required reports to the General Assembly and may help inform future policy efforts related to distributed energy resource interconnection. Attachment 1 141 Solar Interconnection Grant Program 3 Solar Interconnection Grant Program Overview Solar Interconnection Grant Program offers grant funding to public bodies to offset costs associated with the interconnection of solar facilities located on previously developed project sites, as defined in § 56-576. Funding may be used for interconnection-related costs that are necessary to connect an eligible solar facility to the electric distribution system, including transformers, relays, direct transfer trip (DTT), SCADA/telemetry, metering modifications, protection equipment, engineering, and other utility-required infrastructure necessary to complete interconnection. Eligibility: Virginia public bodies, as defined in § 2.2-3701, installing distributed solar projects Total amount of funding available: Approximately $2,000,000 Anticipated Period of Performance: 6 -18 months Proposal Amount: The Virginia Department of Energy seeks grant applications to fund interconnection upgrade costs, up to 25% of the total solar project cost (i.e., total solar installation + total interconnection costs) or $600,000, whichever is less. Projects that do not meet these criteria may apply. The Virginia Department of Energy (Virginia Energy) may elect to partially award proposals at its discretion. Applications are due 11:59pm, October 2, 2026. All prospective awardees must maintain an active registration in eV A.virginia.gov. Final award approval is contingent upon review and authorization by the Virginia Department of Energy. Virginia Energy reserves the right to make an award to one or more applicants based upon the evaluation of applications in accordance with the requirements and evaluation criteria established in this solicitation. Virginia Energy may make a single award, multiple awards, or no award, as determined to be in the best interest of the Commonwealth and subject to the availability of funding. Virginia Energy reserves the right to award the full amount requested by an applicant, a portion of the amount requested, or amounts to multiple applicants, provided that such awards are consistent with the purposes of the grant opportunity, available funding, and applicable state and federal laws, regulations, and grant requirements. Awards will be made only to applicants determined to be eligible and responsive to the requirements of this solicitation and whose applications are determined to provide the greatest overall benefit to the Commonwealth, consistent with the evaluation criteria stated herein. Issuance of an award is contingent upon the applicant's continued eligibility, availability of funding, satisfactory completion of all required pre-award documentation, and execution of the applicable grant agreement or other required award documents. No applicant shall have a right to funding until the applicable award documents have been fully executed by the authorized representatives of the parties. Attachment 1 142 Solar Interconnection Grant Program 4 Virginia Energy also reserves the right to reject any or all applications, waive minor informalities or irregularities when permitted by applicable law, and cancel, modify, or amend this solicitation when determined to be in the best interest of the Commonwealth. Budget This grant opportunity allows for interconnection-related costs that are necessary to connect an eligible solar facility to the electric distribution system, including transformers, relays, direct transfer trip (DTT), SCADA/telemetry, metering modifications, protection equipment, engineering, and other utility-required infrastructure necessary to complete interconnection. Applicants must submit the budget spreadsheet provided detailing direct costs (specifically identifiable to the project), including personnel, fringe benefits, travel, equipment, supplies, and contractual services, and indirect costs (shared overhead expenses such as administrative salaries). Indirect costs must be limited to 10% or less of the applicant’s requested funding. This grant opportunity requires compliance with all relevant Virginia procurement laws. Prevailing Wage Law All awardees will be required to comply with Virginia laws per the terms and conditions of the award. Awardees are responsible for contractor and subcontractor compliance. Projects funded through this grant are subject to Virginia’s prevailing wage requirements, which mirror federal Davis-Bacon standards, requiring Department of Labor and Industry (DOLI) wage determinations. Awardees and their contractors must ensure that all laborers and mechanics are paid wages and fringe benefits at rates not less than those determined to be prevailing for the locality and type of work performed, in accordance with applicable state law (https://doli.virginia.gov/programs/labor-law/prevailing-wage-law/). Awardees will be responsible for maintaining payroll records and demonstrating compliance upon request. Reporting Procedure Projects will be required to submit quarterly reports that document completed work and applicable metrics listed above. Quarterly progress reports will be submitted using Virginia Energy’s quarterly report template which requires outlining work accomplishe d, challenges faced, and status of project timeline. Attachment 1 143 Solar Interconnection Grant Program 5 Each project proposal should include plans for documenting invoiced work and submitting quarterly progress reports summarizing the work completed, in addition to reporting included with invoices. Metrics to be used in reporting may consist of the following: • Project location(s) • Details on interconnection timing • KW of generation (+ storage capacity installed, if applicable) • Projected energy savings • Projected carbon emissions avoided • Community benefits achieved • Community demographics served • Stakeholders engaged • Details related to interconnection upgrades, including transformers, relays, direct transfer trip (DTT), SCADA/telemetry, metering modifications, protection equipment, engineering, and other utility-required infrastructure necessary to complete interconnection. Awardees must maintain and provide sufficient records to substantiate this information upon request. Upon project completion, awardees must provide lists and photos of any equipment installed using grant funding. Each project proposal should include plans for documentation of invoiced work as well as quarterly progress reports summarizing completed work and providing applicable information discussed above. Note: If the data is proprietary, generalized data and statistics should be provided to show the outcomes in the report. Contracting and Invoice Payment Grant awardees will be required to enter into a contract agreement with Virginia Energy after receiving the award. This agreement will include the required state terms and conditions. Contracts involving construction are subject to retainage amounts up to 5% of the total construction amount. Invoices are required at least once a month and must be received by the 15th of each month. Invoices will only be paid upon completion and acceptance by the agency of any portion of the contracted work and upon submission of a properly itemized invoice. Final payments may be withheld until final internal auditing of each contract is completed. Attachment 1 144 Solar Interconnection Grant Program 6 FAQs Can third parties support public bodies in their applications? Can third parties apply on behalf of public bodies? Third parties, such as solar installers, contractors, non-profits, and other entities, may support public bodies in their applications. However, the application must be submitted by the public body. If awarded, the public body would receive and administer the grant. Please note that this grant opportunity requires compliance with all relevant Virginia procurement laws. At what stage in the interconnection process can projects apply? Due to the timeline of funding, projects are highly recommended to have a completed interconnection study and understanding of the costs of upgrades required at the time of application. What types of projects are eligible? This grant is to fund interconnection upgrade related costs for distributed solar installation on Virginia public bodies (behind-the-meter or front-of-the-meter). Non-interconnection related costs are not eligible for funding through this grant. What is the timeline for selection? Once the applications close, Virginia Energy staff will work diligently to select projects. We expect to score, select, and begin financial vetting and contracting within ten to twelve weeks of the final deadline. Attachment 1 145 Solar Interconnection Grant Program 7 Application All grant applicants must use the application format provided and must apply via the Virginia Energy Grant Portal. If it is the first time using the system, applicants will be required to create a user account, or log into an existing account if the system has been used previously. Note that applications will be linked to the applicant’s account. While additional contacts may be listed on the application, the applicant should be the primary point of contact for all grant-related communication. At this time, applications created under a user account cannot be accessed by other members of the same organization. Follow word counts provided and note that any text longer than the provided word count will not be scored. Applications may include additional appendices or attachments to support the application, but these should be limited to essential information. Any non-essential information will not be considered in the applicant’s score. Carefully review the program guidelines and example terms and conditions. Proposals will be evaluated on a competitive basis and will be awarded based on the perceived highest merit and alignment with objectives identified in the guidelines. Awards will be made based on the scoring indicated in the application sections below. Note that all proposals are subject to the Freedom of Information Act (FOIA). Proposals for this funding will be accepted until 11:59pm, October 2, 2026. Only applications that are complete and submitted by the stated deadline will be considered for review. Help & Questions If you have a question on your application, enter it in the Help & Questions tab of your application (far left tab) and Virginia Energy will respond. Please allow 5 business days for a response. The last day to submit questions is September 18, 2026. Attachment 1 146 Solar Interconnection Grant Program 8 This document serves as a guide to the application section tabs in the Virginia Energy Grant Portal. Applications will be evaluated by committee based on a 100-point scale, outlined below. Save your responses in a master application document with the below headers (noting word count maximums) and submit the complete application document in the “Supporting Documents” section. From the master document , you may (but are not required to) copy your responses for each tab into the Grant Portal. Applicant Info Tab (5pts) Contact Information: Provide the name and all relevant contact information, including physical and email addresses and phone numbers, of the primary contact for purposes of application and administration of the grant. Address: Provide a mailing address for your organization. Secondary Contacts: Provide the name and all relevant contact information of any other staff you would like to receive correspondence about this application. Organizational Summary (5 pts): Describe the background of key organizational leadership, project leadership, organizational qualifications to execute program goals, financial history, and grant management capacity. Describe any recent grant administration your organization has completed (in the last 36 months). Project Summary Tab (20pts) Provide a Project Title. Using the header provided in bold in this section, copy your “Project Summary” into the section on the bottom of this tab. Limit each header section (I, II) to a maximum of 300 words. I. Project Introduction (10pts): Provide a brief introduction to your proposal, to include a clear and concise description of the project. The description should include: an overview of the project location, the type of solar installation, the specific proposal, financial request and interconnection upgrade costs to be covered, and a brief introduction to the project need and benefits of the project for the local community. Briefly mention any partners and/or selected contractors. II. Project Scope of Work and Timeline (10pts): Outline the proposed scope of work, including specific interconnection costs to be covered by this grant and timeline of work related to these interconnection costs. Include a brief description of your organization’s plans for documentation of invoiced work as well as quarterly progress reports summarizing completed work and providing applicable information discussed above. Attachment 1 147 Solar Interconnection Grant Program 9 Project Details Tab (50pts) The Grant Portal includes fields not used for this program; enter 'NA' for any required field not covered in Sections III–VIII below, except the proposed project start and end date, the county/city, and anticipated project partners (question a ). Using the headers provided in bold in this section, copy your “Project Details” in the open-ended narrative field on the bottom of this tab. For criteria that require documentation, upload the attachments with the provided naming convention. If you do not have the documentation, note that under the section header. Limit each header (III, IV, etc) section to a maximum of 300 words. III. Site Selection and Project Details (5pts): System designs or layouts are encouraged but not required. a. Project address/location (must be a previously developed project site, as defined in § 56-576) b. Type of solar installation (rooftop or ground mount, behind the meter or front of the meter) c. Total project size (kW) d. Total project cost e. Expected system production IV. Project Readiness (10pts) a. Executed PPA and/or Public Procurement Award (ProjectReadinessA) b. Site control documents (ProjectReadinessB) c. Is the local zoning and permitting completed or is the project allowed by right? Any documentation related to zoning and permitting may be included. (ProjectReadinessC) d. Behind the Meter Systems only: i. Is the roof in good condition and will not need to be replaced within the solar system life? Any documentation related to the roof age and condition may be included. (ProjectReadinessDI) ii. Provide an electricity bill from the site. (ProjectReadinessDII) V. Interconnection Study and Details (10pts) a. Interconnection Study (InterconnectionStudyA or InterconnectionStudyA1 etc.), which should include at a minimum: i. Utility cost estimate letter ii. Utility construction estimate Attachment 1 148 Solar Interconnection Grant Program 10 iii. Executed Feasibility, System Impact, and/or Facilities Study (if required and/or completed) iv. Interconnection Agreement (if executed) v. Other relevant details to the proposal provided in the Interconnection Study b. Interconnection Study Details form, using the Excel sheet provided, to gain a greater understanding of interconnection requirements, costs, and timelines. (InterconnectionStudyB) VI. Community Benefits (15 pts): Document clear benefit to the public achieved through the solar project. Briefly note how the applicant plans to utilize any cost savings or community benefits achieved through the solar project. Examples of benefits include, but are not limited to: a. Behind the Meter Systems: i. Estimated project lifetime savings from solar install ii. Estimated annual Solar Renewable Energy Certificates (SRECs) for the project b. Front of the Meter Systems: i. Lease and/or tax revenue benefits ii. Community Benefits Agreement (CBA) c. Other benefits could include: i. The solar project primarily serves/benefits a historically economically disadvantaged community (HEDC) or other underserved communities. ii. The solar project includes battery energy storage and provides resilience benefits. iii. The solar project powers critical public facilities. iv. The solar project is developed on a brownfield. v. The solar project fulfills local sustainability, energy, or climate goals (site local planning documents). VII. Project Need (10pts) a. Provide a brief explanation of how the interconnection costs materially affected the solar project economics, schedule, or design. b. Any documentation related to the capital budget available for the solar project compared to the interconnection costs required. (ProjectNeedB) Attachment 1 149 Solar Interconnection Grant Program 11 Financial Details Tab (25 pts) VIII. Financial Details (25pts): a. Submit a detailed budget using the provided budget justification worksheet. Include a brief budget narrative, including a brief summary of costs and any information on additional funding, grants, or tax incentives that will be leveraged to complete the project, in your complete application document. Note if there are interconnection costs that the applicant will be covering outside of this grant. b. Download, complete, and submit the OMB Financial Capabilities Questionnaire provided in the Financial Details tab. Supporting Documents Please save your responses in a master application document with the above headers and submit the complete application document in this section . This is the document that will ultimately be scored, along with any required attachments. Evaluation and Scoring Criteria Tab Criteria Possible Points Score Applicant Info Tab Organizational Summary 5 Project Summary Tab (20pts) Project Introduction 10 Project Scope of Work and Timeline 10 Project Details Tab (50pts) Site Selection and Project Details 5 Project Readiness 10 Interconnection Study and Details 10 Community Benefits 15 Project Need 10 Financial Details Tab Financial Details 25 Total 100 Attachment 1 150 Solar Interconnection Grant Program 12 Submit Your Application Once all required documentation has been submitted and the terms and conditions have been accepted, submit your application through the Virginia Energy Grant Portal. You will receive a confirmation of application submission. Submitted applications may be rescinded and revised until the application deadline. A rescinded and revised application MUST be resubmitted to be evaluated. Previous copies of applications will not be available for reference or evaluation. Virginia Energy will notify you whether your project has been selected for with Intent to Award or notification that your project has not been selected. Attachment 1 151 Board Agenda Item October 27, 2026 ADMINISTRATIVE – 10 Authorization for the Fairfax County Park Authority to Apply for Grant Funding from the U.S. National Park Service to Support the Reinvigoration of South Lakes Drive Park (Hunter Mill District) ISSUE: Board of Supervisors authorization is requested for the Fairfax County Park Authority (FCPA) to apply for $1,974,940 in federal grant funding from the U.S. National Park Service (NPS) for the modernization of South Lakes Drive Park. There is a local match requirement of $1,974,940 which would bring the total funding for the project to $3,949,880. Funding will be used to complete a comprehensive renovation of the South Lakes Drive Park to provide a safe, accessible, multi-generational neighborhood park. The park is located at 11851 South Lakes Drive, Reston in the Hunter Mill district. Successful applicants will be notified around May 2027 with an environmental compliance period of approximately six to 12 months to take place afterwards. Notice of financial award is expected by May 2028 with up to five years to complete the project. It is anticipated that the local match will be met through Park bond proceeds in Fund 30400, Park Authority Bond Construction. If the County is awarded funding, the specific bond funding will be identified, and another Board Item will be submitted to formally accept the award. RECOMMENDATION: The County Executive recommends that the Board of Supervisors authorize the FCPA to apply for $1,949,940 in federal grant funding from NPS for the redevelopment of South Lakes Drive Park. There is a local match requirement of $1,974,940 that will be met through Park bond proceeds. No new positions will be created. TIMING: Board approval is requested on October 27, 2026. BACKGROUND: On September 10, 2026, FCPA submitted a pre-application to the Virginia Department of Conservation and Recreation (DCR) for the Outdoor Recreation Legacy Partnership grant program entitled, “Safety, Accessibility and Recreation Modernization at South Lakes Drive Park.” On September 17, 2026, DCR invited FCPA to submit a full application to transform the 13.9-acre park. The final application is due to NPS on 152 Board Agenda Item October 27, 2026 November 1, 2026. The existing park facilities were planned and developed in the 1980’s as a central green and recreational space for three residential villages surrounding the park. While tall, mature trees within the park offer plentiful shade, the original decentralized sports court and playground are each surrounded by trees, reducing visibility and are the furthest distance from the primary designated parking area. The park site contains a rectangular grass sport field, a 60’ grass diamond sport field, a playground, a sport court, paved pedestrian paths and substantial wooded areas. South Lakes Drive forms the northern edge, with established residential development surrounding the park on the east, south and west. Currently, several park features have passed their life cycle and/or do not meet the Americans with Disabilities Act (ADA) standards for accessibility. Funding will be used to improve the rectangular sport field; relocate and replace the playground and sport court in a more visible location; add a community lawn and pavilion; construct a paved or natural surface loop trail and accessible connections; improve a nearby diamond sport field; and restore vacated facility areas. These improvements will create a safer, accessible, multi- generational neighborhood park. NPS expects to inform applicants of an award decision in May 2027. The project is a part of the FCPA 2026 Bond referendum workplan for the bond cycle. If the grant is not awarded, bond funds will be allocated for the entire cost of the project. EQUITY IMPACT: South Lakes Drive Park is a high priority target for a whole park renovation due to the poor condition of certain park amenities, lack of accessible features, and its location within a low-income area. Preliminary review identifies the park in or immediately associated with Fairfax County Census Tract 4823.02. The 2025 Federal Financial Institutions Examination Council’s (FFIEC) census data classify Tract 4823.02 as Low Income, with tract median family income equal to 49.55 percent of the applicable metropolitan median family income, which is well below the 80 percent threshold to qualify for the grant program. FISCAL IMPACT: Grant funding in the amount of $1,949,940 is being requested from NPS for the South Lakes Drive Park project. The local match requirement of $1,949,940 will be supported by Park bond proceeds in Fund 30400, Park Authority Bond Construction. The current total project estimate is $3,949,880 and no new General Fund resources are required. To maximize the proposal’s competitive position, indirect costs will not be included in the grant application. 153 Board Agenda Item October 27, 2026 CREATION OF NEW POSITIONS: There are no new grant positions associated with the application. ENCLOSED DOCUMENTS: Attachment 1: Grant Proposal Abstract from Pre- Application to VA DCR STAFF: Jessica Werder, Deputy County Executive Jai Cole, Director, Fairfax County Park Authority (FCPA) Nigel Fields, Deputy Directory, FCPA Sara Baldwin, Deputy Director, FCPA Joshua Colman, Business Administration Division Director, FCPA Richard Chandler, Chief Financial Officer, FCPA 154 2026 ORLP Grant – Safety, Accessibility and Recreation Modernization at South Lakes Drive Park (Each of these will need to be saved and submitted as separate files) - Please name all files with the Park Name followed by the document name. For example, Riverside Park-VA ORLP Preapplication Form and Riverside Park Project Abstract Summary Project Abstract Summary The Fairfax County Park Authority (FCPA) seeks Outdoor Recreation Legacy Partnership (ORLP) funding to comprehensively modernize South Lakes Drive Park in Reston, Virginia, and transform an underutilized13.9 acre neighborhood park into a safer, more accessible, and more inviting place for recreation. The award will modernize aging facilities and remove documented accessibility barriers at a site ranked among FCPA’s highest priorities for ADA improvements. Crime prevention through environmental design (CPTED) methods will be employed in collaboration with Fairfax County Police Department to address concerns of safety, visibility and illicit activities. The project will upgrade the 195' x 360' ft rectangular sport field by adding irrigation and a refreshed turf; relocate and replace the playground and sport court from the wooded periphery to a central, open area with clear sightlines; create a flexible 28,200 sq ft community lawn and pavilion for gatherings and casual play; build a paved, ADA accessible loop trail that links all major amenities to existing neighborhood paths; and restore 12,748 sq ft of the vacated playground and court footprints to native mixed hardwood forest. In partnership with Fairfax County’s Neighborhood and Community Services (NCS), FCPA will decommission the existing 60' ft diamond sport field to reorient and expand family recreation in a newly opened space for multigenerational use. An FCPA diamond sport field within four miles of South Lakes Drive Park will receive substantial upgrades to improve the experience and increase use for NCS youth sports organizations. Supporting work, such as new furnishings, signage, drainage and stormwater measures, and accessible connections, will combine these elements into a cohesive park experience. The project will deliver a visible,centrally organized recreation core with accessible routes throughout the park and more reliable field use for both community play and permitted sports. Ecological outcomes will include reforestation of the former facility areas, reduced pavement, increased tree canopy, and improved habitat connectivity. The intended beneficiaries are nearby residents, especially households that include a person with a disability, as well as the low-income, highly diverse, and densely populated community that relies on neighborhood parks for daily recreation and social connection. 155 Board Agenda Item October 27, 2026 ACTION – 1 Endorsement of Design Plans for the Rolling Road and Grigsby Drive Traffic Signal Project (Braddock and Springfield Districts) ISSUE: Board of Supervisors’ (Board) endorsement of the Virginia Department of Transportation’s (VDOT’s) design plans for the Rolling Road & Grigsby Drive Traffic Signal Project. The project will improve traffic operations and safety for students crossing at the intersection, especially during arrival and dismissal periods. RECOMMENDATION: The County Executive recommends that the Board endorse the design plans for the VDOT administered Rolling Road & Grigsby Drive Traffic Signal Project and authorizes the Director of the Fairfax County Department of Transportation (FCDOT) to transmit the Board’s endorsement to VDOT (Attachment 1). A Notice of Willingness to hold a Design Public Hearing (Attachment 2) was posted on January 8, 2026, with an expiration date of January 29, 2026. During that timeframe, the design plans were made available by VDOT. There was one Public Hearing request received from a resident whose main concern was the potential for congestion that could result from installing the signal along Rolling Road. However, staff coordinated with the resident, explaining to them that the traffic analysis showed Levels of Service ‘A’ and ‘B’ during peak periods and that the traffic signal will effectively control and manage the intersection’s approaches and crossings. After that discussion, the resident chose not to proceed with the request, stating their concerns were resolved. VDOT’s letter to FCDOT requesting Board approval of the project is included as Attachment 3. TIMING: Board approval is requested on October 27, 2026, to allow VDOT to proceed with final design as soon as possible. BACKGROUND: This project will construct a new traffic signal at the intersection of Rolling Road and Grigsby Drive / the entrance to West Springfield High School. Improvements for the intersection will include installing four pedestrian crosswalks with Accessible Pedestrian Signals (APS), as well as upgrading curb ramps for ADA (Americans with Disabilities Act) compliance. The signal will include a Flashing Yellow Arrow (FYA) configuration 156 Board Agenda Item October 27, 2026 for the northbound and southbound Rolling Road left-turn movements. Attachment 4 illustrates the concept plan for the project. Public Comment Period In accordance with the statutes of the Commonwealth of Virginia and policies of the Commonwealth Transportation Board, a Notice of Willingness to hold a Design Public Hearing was posted on January 8, 2026. The posting expired on January 29, 2026, and during that period, there was one request received for a public hearing. However, upon further coordination with the requesting citizen, their concerns were resolved and they chose not to proceed with the request. Project Schedule The tentative schedule for construction advertisement is late 2028, utilizing local funds for design, right of way, and construction. EQUITY IMPACT: The project falls between a low and an average vulnerability area, with 3.5% to 6.2% of households lacking access to a vehicle. Residents without a vehicle rely more heavily on walking, biking, and transit. A safety-focused traffic signal provides a direct benefit to county road users by reducing crossing risk at this intersection. This project supports the One Fairfax Policy’s focus on a multi-modal transportation system that promotes economic growth, public health, and congestion mitigation while improving accessible mobility. The project has the potential to advance equity by supporting equitable access to safe mobility for all residents in the area. FISCAL IMPACT: There is no General Fund impact associated with this Board item. The project is currently funded with $1,138,442 of local funds in Fund 30050, Transportation Improvements. ENCLOSED DOCUMENTS: Attachment 1: Endorsement Letter for the Rolling Road & Grigsby Drive Traffic Signal Project, UPC 127005 (October 27, 2026) Attachment 2: VDOT Public Notice Concerning Willingness to Hold a Public Hearing (January 8, 2026) Attachment 3: VDOT Letter Requesting Board Approval of the Rolling Road & Grigsby Drive Traffic Signal Project Design Plans, UPC No: 127005 (July 31, 2026) Attachment 4: Rolling Road and Grigsby Drive Traffic Signal Project Concept Plan 157 Board Agenda Item October 27, 2026 STAFF: Jennifer Miller, Deputy County Executive Gregg Steverson, Director, Fairfax County Department of Transportation (FCDOT) Martha Coello, Deputy Director, FCDOT Eric M. Teitelman, Chief, Active Transportation, Capital Projects and Traffic Engineering Division, FCDOT Vanessa Aguayo, Chief, Capital Projects Section, FCDOT Smitha Chellappa, Transportation Planner, FCDOT Nick Alexandrow, Transportation Planner, FCDOT Jay Lanigan, Transportation Planner, FCDOT 158 C o u n t y o f F a i r f a x , V i r g i n i a To protect and enrich the quality of life for the people, neighborhoods and diverse communities of Fairfax County Fairfax County Department of Transportation 4050 Legato Road, Suite 400 Fairfax, VA 22033-2895 Phone: (703) 877-5600 TTY: 711 Fax: (703) 877-5723 www.fairfaxcounty.gov/transportation October 27, 2026 Mr. William Cuttler, P.E., District Engineer Virginia Department of Transportation Northern Virginia District 4975 Alliance Drive Fairfax, Virginia 22030 Subject: Board of Supervisors Endorsement of Rolling Road & Grigsby Drive Traffic Signal Project, UPC 127005 Dear Mr. Cuttler: On October 27, 2026, the Fairfax County Board of Supervisors endorsed the design plans for the Rolling Road & Grigsby Drive Traffic Signal Project. The purpose of this project is to improve traffic operations and safety for students crossing at the intersection of Rolling Road and Grigsby Drive, especially during arrival and dismissal periods. The project will construct a new traffic signal at the intersection of Rolling Road and Grigsby Drive / the entrance to West Springfield High School. Improvements for the intersection will include installing four pedestrian crosswalks with Accessible Pedestrian Signals (APS), as well as upgrading curb ramps for ADA (Americans with Disabilities Act) compliance. The signal will include a Flashing Yellow Arrow (FYA) configuration for the northbound and southbound Rolling Road left-turn movements. The design plans were made available as part of a Notice of Willingness to hold a Design Public Hearing that was posted on January 8, 2026. The Notice of Willingness posting expired on January 29, 2026, with one request letter received. It is our understanding; however, that after VDOT met with the citizens, answered their questions, and alleviated their concerns, the request for a Public Hearing was withdrawn. Please call Jay Lanigan at (703) 324-9977, or me at (703) 877-5675, if you have any questions or need additional information. Thank you for your assistance with this important project. Sincerely, Gregg L. Steverson, P.E., PTOE Director cc: Martha Coello, Deputy Director, FCDOT Eric M. Teitelman, Chief, Active Transportation, Capital Projects and Traffic Engineering Division, FCDOT Attachment 1 159 Rolling Road and Grigsby Drive Traffic Signal Fairfax County Willingness to Hold a Public Hearing Find out about plans to construct a traffic signal at the intersection of Rolling Road (Route 638) and Grigsby Drive (Route 4179) /the main West Springfield High School entrance to improve traffic operations and safety for students crossing at the intersection, especially during school arrival and dismissal periods. The signal will have flashing yellow arrows for drivers turning left from northbound and southbound Rolling Road. The project also includes installing Accessible Pedestrian Signals at the three existing crosswalks, adding a fourth crosswalk with Accessible Pedestrian signals, and upgrading the curb ramps to be Americans with Disabilities Act (ADA) compliant. Pursuant with the National Environmental Policy Act (NEPA) and 23 CFR 771, a Programmatic Categorical Exclusion (PCE) is being prepared under agreement with the Federal Highway Administration. When completed, the PCE will be available on the project website listed below and upon request. In compliance with the National Historic Preservation Act, Section 106 and 36 CFR Part 800, information concerning the potential effects of the project on properties listed in or eligible for listing in the National Register of Historic Places will be included with the PCE. Review project information at https://www.vdot.virginia.gov/Grigsby or at VDOT’s Northern Virginia District Office, 4975 Alliance Drive, Fairfax, VA 22030. Please call ahead at 703-259-1778 or TTY/TDD 711 to make an appointment with appropriate personnel. If your concerns cannot be satisfied, VDOT is willing to hold a public hearing. You may request that a public hearing be held by sending a written request to Mr. Ahmad Al Kawabeh, EIT, Virginia Department of Transportation, 4975 Alliance Drive, Fairfax, VA 22030 on or prior to January 29, 2026. If upon receiving public comments it is deemed necessary to hold a public hearing, notice of date, time and place of the hearing will be posted. VDOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964, as amended. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact VDOT Civil Rights at 703-259-1775 or TTY/TDD 711. State Project: 0638-029-696, C501, P101, R201 UPC: 127005 Federal: STP-5B01(767) Attachment 2 160 DEPARTMENT OF TRANSPORTATION 4975 Alliance Drive Fairfax, Virginia 22030 Stephen C. Brich, P.E. Commissioner July 31, 2026 Mr. Jay Lanigan Capital Projects Section Fairfax County Department of Transportation 4050 Legato Road, Suite 400 Fairfax, VA 22033 SUBJECT: Rolling Road & Grigsby Drive Traffic Signal Project State Project: 0638-029-696 Federal Project: STP-5B01(767) UPC No: 127005 In accordance with the statutes of the Commonwealth of Virginia and policies of the Commonwealth Transportation Board, a Notice of Willingness to hold a Design Public Hearing was posted on the above -mentioned project on January 8, 2026. The posting expired on January 29, 2026. There is one Public Hearing request received but upon additional coordination with the resident, their concerns were resolved and they chose not to proceed with the request. Both the Springfield and Braddock District supervisors have been informed of the project improvements, and they have expressed their support for advancing the project. Additionally, Supervisor Herrity shared with us that there is broad community desire and support for this signal and the related improvements. The purpose of this project to improve traffic operations and safety for students crossing at the intersection, especially during arrival and dismissal periods. Improvements include installing new traffic signal and four (4) protected pedestrian crosswalks with Accessible Pedestrian Signals (APS), upgrading curb ramps in four quadrants to be ADA compliant, and install ing Flashing Yellow Arrow (FYA) for the northbound and southbound Rolling Road left -turn movements at the intersection. Attachment 3 161 Fairfax County Department of Transportation July 31, 2026 Page three The following information was available for review at posting: • The scope of this project meets the criteria for a Programmatic Categorical Exclusion (PCE) in accordance with the National Environmental Policy Act (NEPA). • The existing typical section for Rolling Rd provides one 11’ northbound through lane, one 11’ northbound left turn lane, one 12’ northbound shared through-right turn lane, two 12’ southbound through lanes, one 12’ southbound left turn lane, one 12’ southbound right turn lane, one 4’ sidewalk, and one 10’ shared use path. • The existing typical section for Grigsby Drive provides one 15’ eastbound shared through- right-and-left turn lane, one 16’ westbound shared through-right-and-left turn lane, and two 4’sidewalks. • The 2023 Annual Average Daily Traffic (AADT) on Rolling Road is 22,000 vehicles per day, and the 2019 AADT on Grigsby Drive is 620 vehicles per day. • The construction of the project will not displace any families, businesses or non -profit organizations. • The project cost based on 2022 pre-scoping estimate is $1,000 for preliminary engineering, $77,000 for right -of-way and utilities and $772,000 for construction, totaling $850,000. The current estimate, following Public Hearing posting, is $10,000 for preli minary engineering, $143,331 for right-of-way and utilities and $985,111 for construction, totaling $1,138,442. The updated project cost has been coordinated with Fairfax County, and funds have been secured by increasing the LNP to cover the deficit. • The tentative schedule for advertising for construction is late 2028, utilizing local funds for design, right of way, and construction based on VDOT Administered Project Administration Agreement with Fairfax County. This project is included in Statewide Transportation Improvement Program Grouping: Construction: Safety/ITS/Operational Improvements. The project has been processed in accordance with current VDOT policies and procedures. A Programmatic Categorical Exclusion (PCE) NEPA environmental document was obtained for this project on February 05, 2026. In light of the above information, it is requested that the Fairfax County Board of Supervisors endorse the subject project, by resolution, as proposed in the attached exhibit. If you have any questions or require additional information, you may reach me by phone at 703 -259-1778 or via email at ahmad.alkawabeh@vdot.virginia.gov. Sincerely, Ahmad Al Kawabeh, EIT Project Manager NOVA Traffic Operations Virginia Department of Transportation 162 Fairfax County Department of Transportation July 31, 2026 Page three CC: Minwoo Ha, PE Nick Dais, PE William Dunn, PE Attachments • Conceptual Exhibit 163 0638-029-696 6'WoodFence H CR H CR 6 'W ood F ence 3 'V inyl F ence Brk.Wall w/ Col. C onc. E nt. Conc.Wall 3 'V inyl F ence C onc.S id ew alk 2 .5 C onc.C & G 2 C onc.C & G 2 C onc.C & G 2 C onc.C & G 2 C onc.C & G Conc.Walk C onc.S id ew alk 8'WoodFence 6'WoodFence Brk.Wall w/ Col. 4'Wood Fence Brk. Col. Brk. Col. Brk. Col. 2 C onc.C & G 2 C onc.C & G 2 .5 C onc.C & G Conc.MedianConc.Median Conc.Median 0.5ConcCurb 0.5ConcCurb AsphaltSidewalk HCR S ign 2 .5 C onc.C & G 2 .5 C onc.C & G A sphalt E nt. Conc.Wall GravelShoulderGravelShoulder Conc.Sidewalk C onc.S id ew alk Brk. Col. Brk. Col. GravelShoulder H CR Brk. Col. Brk. Col. 8'WoodFence Brk.Col. 6'Chain Link F ence RollingRd Rt.638 Asphalt RollingRd Rt.638 Asphalt G rigsby D r. A sphalt Sign Sign Ipf Ipf C oncrete M arker Ipf Ipf Ipf (N 3 8°5 6'3 8"E 3 05 .00') Ex.ConservationEsmt. DB 24508 Pg1247 E x.15 'F .C .W .A .E sm t. D B 2 445 1 P g 2 160 Ex.PerpetualStreetEsmt.DB 23728 Pg970 Ex.20'C&P Esmt.DB 2598 Pg681Ex.20'C&P Esmt. DB 2598 Pg681 (S 5 6 °3 2 '2 5 "W 15 5 .0 0 ') (S 5 7°5 2 '3 2 "W 15 5 .0 0 ') (S 6 2 °3 8 '2 5 "W 15 5 .0 0 ') (S 6 3 °5 8 '3 2 "W 15 5 .0 0 ') N 3 8°5 6'3 8"E N 5 7°4 9 '2 5 "E N 6 2 °3 5 '18 "E Ex.R/W DB 2598PG 681 Ex.R/W DB 2598PG 681 Ex.R/W DB 23728PG 970 QUADRANT NORTHEAST QUADRANT SOUTHEAST QUADRANT SOUTHWEST QUADRANT NORTHWEST PROJECT FILE NO. SHEET NO. 0 SCALE 50'25' PLAN NO. REVISIONS Date Initial FAIRFAX COUNTY SPRINGFIELD HIGH SCHOOL NORTH ENTRANCE (NIS) ROLLING ROAD (RTE. 638) AND GRIGSBY DRIVE (RTE. 4179)/WEST TRAFFIC SIGNAL INSTALLATION CONCEPTUAL EXHIBIT Attachment 4 164 Board Agenda Item October 27, 2026 ACTION – 2 Authorization of an Amendment to the Amended and Restated Interim Real Estate Exchange Agreement Between the Fairfax County Board of Supervisors and Inova Health Care Services Regarding the Joint Redevelopment at Reston Town Center North (Hunter Mill District) ISSUE: Board of Supervisors (Board) authorization of the proposed Second Amendment to the Amended and Restated Interim Real Estate Exchange Agreement (Second Amendment) with Inova Health Care Services (Inova) for the purposes of enabling the Board and Inova to commence design work on certain shared infrastructure for the Reston Town Center North area. RECOMMENDATION: The County Executive recommends the Board approval of the Second Amendment, substantially in the form of Attachment 1, and the Board authorization for the Fairfax County (County) Executive to sign the Second Amendment. TIMING: The Board’s action is requested on October 27, 2026. BACKGROUND: The Board and Inova own irregularly shaped parcels that make up the Reston Town Center North (RTCN) redevelopment area of approximately 48 acres, generally comprised of Tax Map No. 17-1 ((1)), parcels 3F, 12, 13, 14A, 14B, 14C, 14D, 14E, and 14F, as well as Tax Map No. 17-1 ((17)), parcels 4 and 5A, as shown on Exhibit A of Attachment 1. The existing County facilities located within the RTCN area include the Reston Regional Library, the Embry Rucker Shelter, the North County Human Services Building, a police station, and the North County Government Center. The Board and Inova seek to re-subdivide or otherwise adjust the existing parcels into a grid of streets and developable blocks to promote the redevelopment of the overall site, as generally shown on Exhibit B of Attachment 1. To this end, the County staff and Inova have been coordinating on a joint redevelopment of this area since 2012. Pursuant to an Amended and Restated Interim Real Estate Exchange Agreement (IREEA), last approved by the Board in 2024, the County and Inova jointly pursued 165 Board Agenda Item October 27, 2026 certain initial land use approvals consisting of a “lot and block” plan (Initial Submission) that would establish the general boundaries of the new blocks and streets, the maximum possible building footprints on each block, details regarding the streetscape, and utility layouts. The Initial Submission does not, however, provide specific building footprints or designs; rather, each individual block would need further land use approvals before building development could proceed. The Board, in its governmental and regulatory capacity, recently approved the Initial Submission on September 15, 2026. The IREEA also envisioned that the County and Inova would work towards transactional documents necessary to effectuate the re-subdivision of the RTCN site and the design and construction of the shared infrastructure necessary for the redevelopment. The project teams continue to negotiate the terms of those documents which will be brought to the Board for approval at a subsequent meeting. The proposed Second Amendment to the IREEA amends the IREEA such that unspent and available funds under the IREEA budget could be used to commence engineering design of the shared infrastructure while the project teams continue to develop and negotiate the transactional documents. The proposed Second Amendment also extends the deadline within the IREEA for completion of the transactional documents to December 31, 2027. EQUITY IMPACT: Funding for the expansion of the public facilities including the shelter, library, and the human services center promotes focus area 10 of the One Fairfax Policy associated with a health and human services system where opportunities exist for all individuals and families for the provision of accessible, high quality, affordable and culturally appropriate services. FISCAL IMPACT: The Second Amendment will not oblige the County to provide additional funding. To date, $3,200,000 has been appropriated to the project to support the preliminary planning required for the joint zoning application and development agreement with Inova. The IREEA obligated the County for up to $1,020,285 in new obligations, in addition to the $469,833 in obligations already spent as part of the Original Agreement. This project and the associated County facilities are referenced in the FY 2027 – FY 2031 Adopted Capital Improvement Program (With Future Fiscal Years to FY 2036). ENCLOSED DOCUMENTS: Attachment 1: Second Amendment to the Amended and Restated Interim Real Estate Exchange Agreement. 166 Board Agenda Item October 27, 2026 STAFF: Jessica Werder, Deputy County Executive Jennifer Miller, Deputy County Executive Christina Jackson, Deputy County Executive/Chief Financial Officer Thomas Fleetwood, Director, Housing and Community Development Thomas Barnett, Deputy Director, Housing and Community Development Christopher Herrington, Director, Department of Public Works and Environmental Services (DPWES) Tiya Raju, Deputy Director, Capital Facilities, DPWES Vrushali Oak, Director, Capital Facilities, Building Design and Construction Division, DPWES ASSIGNED COUNSEL: Ryan Wolf, Senior Assistant County Attorney Emily Smith, Assistant County Attorney 167 1 SECOND AMENDMENT TO AMENDED AND RESTATED INTERIM REAL ESTATE EXCHANGE AGREEMENT THIS SECOND AMENDMENT TO AMENDED AND RESTATED INTERIM REAL ESTATE EXCHANGE AGREEMENT (this “Amendment”) is entered into as of the ___day of October, 2026, by and between INOVA HEALTH CARE SERVICES, a Virginia non-stock corporation, f/k/a Inova Health System Services, f/k/a Inova Services, Inc. (“Inova”) and the Board of Supervisors of Fairfax County, Virginia, a political subdivision of the Commonwealth of Virginia in its proprietary capacity and not in its governmental or regulatory capacity (“County”). Recitals R-1 Inova and County are parties to that certain Amended and Restated Interim Real Estate Exchange Agreement effective as of September 23, 2024, as modified by Letter Agreement dated October 18, 2024, and amended by the First Amendment to Amended and Restated Interim Real Estate Exchange Agreement dated December 9, 2025 (collectively, “IREEA 2.0”). Capitalized terms used but not otherwise defined in this Amendment have the meaning given to such terms in IREEA 2.0. R-2 The Phase I Zoning was approved by the Board of Supervisors of Fairfax County, acting in its governmental capacity, on September 15, 2026. As of the date of this Amendment, the parties have not yet completed negotiation of the REEA and the related definitive documents contemplated by IREEA 2.0. R-3 The parties have mutually agreed upon an update to Exhibit D showing a remaining, unspent balance as of September 30, 2026 of $823,405 (the “Remaining Funds”) under the total budget approved under IREEA 2.0, which Remaining Funds were not spent in support of the Phase I Zoning scope of work anticipated in IREEA 2.0. Inova and County desire to enter into this Amendment to (i) update the outside term of IREEA 2.0, (ii) apply the Remaining Funds to fund additional design work for a PI Plan (as defined below), as an expansion of the scope of the Phase I Zoning, and (iii) address other matters as set forth herein. NOW, THEREFORE, for and in consideration of the mutual promises of the parties and of other good and valuable consideration, receipt and sufficiency of which are hereby acknowledged, the parties intending to be legally bound to hereby agree as follows. 1. Recitals. The Recitals above are incorporated herein by reference. 2. Outside Term. The date “December 31, 2026” set forth in Section 6.a.(ii) of IREEA 2.0 is superseded and replaced with the date “December 31, 2027”. 3. Addition of Common Infrastructure Design Work. The County and Inova agree that it is in their mutual best interests to proceed with preliminary design work for a Public Improvement Attachment 1 168 2 Plan (the “PI Plan”) concurrent with negotiations on the terms of a final REEA. In furtherance thereof, County and Inova agree as follows: a. The heading of Section 3 of IREEA 2.0 is hereby deleted in its entirety and replaced with “Phase I Zoning and Common Infrastructure Design”. b. Section 3.a. of IREEA 2.0 is hereby amended to include the following text in a final paragraph to that section: “Common Infrastructure Design Work. The parties acknowledge and agree that it is in their mutual interest to proceed with initial design work, planning, and related permitting services (collectively, the “Common Infrastructure Design Work ”) for certain common infrastructure to be constructed in connection with “Anticipated Phase 1”, including without limitation certain segments of the “Grid of Streets”, the “Interim Central Green”, and stormwater management and other utilities and infrastructure (as each such capitalized term is defined in the Proffers approved in connection with the Phase I Zoning). The specific scope, deliverables, and level of design completion will be developed by the parties and set forth in one or more Common Consultant Contracts approved pursuant to the terms and conditions of IREEA 2.0. The scope of the Common Infrastructure Design Work may include, without limitation: (a) conceptual or approximately thirty percent (30%) design development; (b) preparation and submission of an initial or subsequent PI Plan; (c) responding to regulatory comments and supporting the parties’ eff orts to obtain approval of the PI Plan or issuance of a land disturbance permit; and (d) design of certain streets, wet and dry utilities, stormwater management facilities, water quality treatment facilities, and the Interim Central Green. The Interim Central Green design will include those elements described in the Proffers approved in connection with the Phase I Zoning.” c. Solely for purposes of the budgeting, submission, process, invoicing, and cost-sharing provisions of Section 3 of IREEA 2.0, the phrase “Phase I Zoning” shall be deemed to include the Common Infrastructure Design Work such that the Common Infrastructure Design Work is administered within the existing budgeting, submission, process, invoicing, and cost sharing structure that applies to Common Consultant Contracts and Common Consultant Work under IREEA 2.0. For the avoidance of doubt, the Common Infrastructure Design Work shall not be deemed part of the “Phase I Zoning” for purposes of Section 4 (Components of REEA) or Section 6 (Termination) of IREEA 2.0, and neither the commencement, approval, nor completion of the Common Infrastructure Design Work is a condition to, or alters the conditions to, the parties’ entry into the REEA. Nothing in this Amendment authorizes work outside an approved Common Consultant Contract or increases either Attachment 1 169 3 party’s financial obligations beyond the applicable budget limitations in IREEA 2.0. The parties acknowledge and agree that the Common Infrastructure Design Work is to be funded from the Remaining Funds, that this Amendment does not increase the County Common Consultant Budget Limit or the Inova Common Consultant Budget Limit, and that the aggregate amounts payable by Inova and reimbursable by the County under IREEA 2.0 shall not exceed those respective budget limits. d. In order to reflect the inclusion of the Common Infrastructure Design Work within the scope of Common Consultant Work under IREEA 2.0, the Exhibit D1 budget attached hereto is hereby made a part of IREEA 2.0 and, subject to Section 3(g), is intended to supersede and replace Exhibit D on a going forward basis such that Exhibit D1 is the operative budget for Common Consultant Work performed after the effective date of this Amendment. Exhibit D1 sets forth the estimated costs and line items for the Common Infrastructure Design Work and is funded from Remaining Funds; the amounts shown on Exhibit D1 as allocable to the County and to Inova are sub-allocations of, and do not increase or decrease, the County Common Consultant Budget Limit and the Inova Common Consultant Budget Limit, respectively. Notwithstanding such supersession and replacement, the County Common Consultant Budget Limit and the Inova Common Consultant Budget Limit remain as set forth in the First Amendment (i.e., $1,020,285 and $822,715, respectively), such budget limits are cumulative caps under IREEA 2.0 against which amounts previously spent, committed, or reimbursed under Exhibit D continue to count, and the references in Sections 3.e.iii and 3.e.iv of IREEA 2.0 to the estimated costs set forth on Exhibit D shall not be re-determined by reference to Exhibit D1. The parties acknowledge that further adjustment to the Exhibit D1 budget may be made as provided in IREEA 2.0 without requiring a formal amendment. e. The last sentence of Section 3.c.ii. of IREEA 2.0 is hereby deleted in its entirety and replaced with the following: “The parties may mutually agree to update Exhibit D or Exhibit D1 from time to time during the term of this IREEA 2.0 so as to reallocate estimated costs among Common Consultant line items.” f. The Schedule B to Exhibit F attached hereto and made a part hereof sets forth additional subjects and protections to be addressed in each Common Consultant Contract for Common Infrastructure Design Work, the substance of which will be included in the Common Consultant Contract(s) for Common Infrastructure Design Work entered into after the effective date of this Amendment. The terms and conditions set forth in Schedule B to Exhibit F are in addition to, not in lieu of, the terms and conditions set forth in Exhibit F to IREEA 2.0. Before approving a Common Consultant Contract, the parties shall determine whether the particular scope and anticipated value of the improvements warrant any project specific increase in the professional liability limits or coverage period stated in Schedule A to Exhibit F. Unless the parties mutually approve such an increase, the existing requirements of Attachment 1 170 4 Schedule A to Exhibit F shall apply. Reference is made to Section 3(d)(ii)(1) of IREEA 2.0 which provides that all costs resulting from the inclusion of the Exhibit F, Schedule A insurance requirements within the Common Consultant Contracts shall be borne entirely by the County and paid for out of the County Reserve Contingency, provided any such costs shall be demonstrated by reasonably sufficient evidence, including a certification from the Common Consultant as to exactly which changes to its insurance it had to obtain. Costs resulting from any project specific increase in the professional liability limits or coverage period stated in Schedule A to Exhibit F requested by the County pursuant to this Section 3(f) shall be handled in the same manner as set forth in the immediately preceding sentence. g. Notwithstanding the addition of Exhibit D1 and its supersession and replacement of Exhibit D under Section 3(d), all Common Consultant Work in process under IREEA 2.0 (as may be reflected on Exhibit D), and all Common Consultant invoices and payments in process under IREEA 2.0 (as may be reflected on Exhibit D), as of the effective date of this Amendment shall continue to be authorized, administered, invoiced, paid, and reimbursed under the applicable provisions of IREEA 2.0, notwithstanding the introduction of Exhibit D1. Amounts previously spent, committed, invoiced, or reimbursed under Exhibit D are unaffected by this Amendment. Once all Common Consultant Work, invoices, and payments in process under IREEA 2.0 (as may be reflected on Exhibit D) as of the effective date of this Amendment are complete, the parties will reconcile and, if necessary, amend Exhibit D and Exhibit D1 to reflect the completion of such work, invoices, and payments. 4. Ratification. Except as amended by the terms of this Amendment, the terms of IREEA 2.0 are ratified and confirmed. In the event of any conflict or inconsistency between this Amendment and IREEA 2.0, this Amendment shall control. 5. Counterparts. This Amendment may be executed in one or more counterparts and delivered electronically. [Signatures begin on following page] Attachment 1 171 5 IN WITNESS WHEREOF, the parties have executed this Amendment to be effective as of the day and year first above written. BOARD OF SUPERVISORS FOR COUNTY OF FAIRFAX, VIRGINIA, a political subdivision of the Commonwealth of Virginia By: ____________________________ Name: Bryan J. Hill Title: County Executive Date:___________________________ INOVA HEALTH CARE SERVICES, a Virginia non-stock corporation By: ____________________________ Name: H. Thomas McDuffie, Jr. Title: Senior Vice President Date:___________________________ Attachment 1 172 6 Note: There is no Exhibit A, B, or C to this Amendment. The only exhibits to this Amendment are labeled “Exhibit D1” and “Schedule B to Exhibit F” to correspond to the exhibit labelling in IREEA 2.0. Attachment 1 173 9/30/2026 Common Consultant Budget Amount Revision Revised Budget Amount Comments 1.1 Consultants Civil Engineer -Infrastructure PI Plan Preparation and processing of the Infrastructure PI plan Urban Proposed New Contract Task 1 A - Misc Survey $15,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE Task 1B - Subdivision Comments $5,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE Task 1C - Land Transaction Studies and Ownership Agreement Exhibits $5,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE Task 1D - Site Notices for Subdivision $6,000 Urban Proposal 26-428.R1, dated 9/24/2026 Task 2 - Preliminary Planning $15,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE Task 3 - Infrastructure Public Improvement Plan (PI Plan) $85,000 Urban Proposal 26-428.R1, dated 9/24/2026 Task 4 - SWM/BMP/Adequate Outfall $95,000 Urban Proposal 26-428.R1, dated 9/24/2026 Task 5A - Address PI Plan First Submission Comments $50,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE Task 6 - PI Plan Meetings and Coordination $12,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE Task 7 - Tree Preservation Plan $8,800 Urban Proposal 26-428.R1, dated 9/24/2026 Task 8 - Landscape Architect Meetings and Coordination $2,500 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE Task 9 - Civil Coordination with Dry Utility Consultant $10,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE Task 10 - Dry Utility Profiles $25,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE Task 11 - Proffer Compliance Coordination $10,000 Urban Proposal 26-428.R1, dated 9/24/2026, HNTE Additional Services/Wage escalation (5%) $17,200 Sittler Budget - 5% of tasks Reimbursables Budget $5,000 Sittler Budget Subtotal $366,500 $0 $366,500 Civil Engineer - Alternate Services Urban Task 31 - DRB Materials and Corrdination $3,500 Urban Proposal 26-428.R1 HNTE Task 32 - Updated Tree Inventory $23,000 Urban Proposal 26-428.R1 Subtotal $26,500 $0 $26,500 Landscape Architect - Initial Central Green Design LandDesign Proposed New Contract Phase 100 Pre-design/Project initiation $6,500 Budget from LandDesign Phase 120 Central Green Schematic Design Confirmation $15,000 Budget from LandDesign Phase 300 Limited PI Plan Design Advancement and Coordination $15,000 Budget from LandDesign Phase 020 PI Plan Landscape Architecture Sheets and First Submission Support $34,500 Budget from LandDesign Phase 070 Internal Project Meetings and coordination $7,500 HNTE - Budget from LandDesign Phase 071 Community, Stakeholder and RA DRB outreach $15,000 HNTE - Budget from LandDesign Phase 075 Presentation and Meeting Materials $15,000 HNTE - Budget from LandDesign Phase 032 Streetlight Location and Vendor Photometric Coordination $15,000 HNTE - Budget from LandDesign Additional Services/Wage escalation (15%) $7,900 Sittler Budget - 15% of Phases 070,071,075 & 032, Misc. Graphics, Color Plots and presentations $1,000 Sittler Budget Total Landscape Architect $132,400 $0 $132,400 Architect -Central Green Structures N/A $0 $0 Assumed Not Required Traffic Consultant - Zoning TIS Amendment Plan and Program Coordination Galloway $10,000 Sittler budget for PI Plan assistance Total Traffic Consultant $10,000 $0 $10,000 Signage/Wayfinding Consultant TBD $0 $0 $0 Assumed to be a REEDA cost Lighting Photometrics TBD $0 $0 $0 To Be Determined Geotech Consultant ECS Base Proposal $22,500 ECS proposal dated 9/18/2026 SWM vault - Block 3 Infiltration $3,500 ECS proposal dated 9/18/2026 SWM vault - Block 5 Infiltration $2,700 ECS proposal dated 9/18/2026 Preliminary CBRs $1,200 Sittler Budget - Assumes 2 at $600 each Meetings and Coordination $2,500 Sittler Budget Total Geotech $32,400 $0 $32,400 Noise Consultant TBD $0 $0 $

Text truncated. Open the original for the full document.

Source: Fairfax County website. First collected Oct 26, 2026.