RecordWell Data

Airport Advisory Board Meeting — Agenda Minutes

Chesterfield County · Chesterfield County · Airport Advisory Board · meeting of Jun 5, 2025 · Other

Open the original document More from Chesterfield County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Airport Advisory Board Meeting – June 5, 2025 Page 1 REGULAR MEETING MINUTES OF THE CHESTERFIELD COUNTY AIRPORT ADVISORY BOARD June 5, 2025 – 5:00 p.m. Hybrid Meeting – In-Person and via Microsoft Teams 1. Welcome and Opening Remarks: The meeting was called to order at 5:02 p.m. Airport Advisory Board (AAB) members present were Dunn Dillard (in-person), John Mazza (in-person), Jenna Wilson (virtual), General Services Director John Neal (in-person), and Airport Manager Jeremy Wilkinson (in-person). Rick Young was absent. 2. Approval of Minutes: Meeting minutes from March 13, 2025, were unanimously approved, as submitted. 3. Airport Manager’s Report and Project Updates – Jeremy Wilkinson: Southeast Apron Development – Wetland credits have been released. The county is working with New Field Inc., the contractor, to schedule preliminary start dates. Runway Extension – Design is underway. Federal and state grant applications are pending to fund the relocation of existing electrical and fiber optic lines and the existing natural gas valve station. Non-Aeronautical Development Area – No submissions were received in response to a Request for Proposals. Airport staff will work with Chesterfield Economic Development to evaluate the reason. Rates and Charges – Two fee proposals reviewed at the prior Airport Advisory Board meeting will be submitted to the Chesterfield County Board of Supervisors for approval. The first proposal is for increases to ramp and tie-down fees for overnight transient aircraft. The second proposal is to establish a fee structure for production, photo, or video requests at the airport. Dominion Aviation Leased Space – Dominion Aviation Services has requested 288 square feet of additional leased space in the airport terminal for line staff access and sight of the main ramp. The space currently houses the vending machine, ice maker, and refrigerator. This request is pending approval by the Chesterfield County Board of Supervisors. Airport Terminal Furniture and Finishes – Delivery of new furniture for the airport terminal lobby and second floor conference room is expected this summer. A state grant for updates to airport terminal finishes and fixtures will be considered by the Virginia Aviation Board in August. Updates are planned to bathrooms, walls, and décor in the airport terminal. Airport Advisory Board Meeting – June 5, 2025 Page 2 T-Hangar Taxilanes E and F Rehabilitation – A state grant for the rehabilitation of T-hangar taxilanes E and F was awarded in May. The rehabilitation includes mill and overlay of the asphalt and addresses drainage issues. Growth and Development Strategy – Delta Airport Consultants are working with county staff on a growth and development strategy plan. This plan consists of a comprehensive review of the industry growth to include a staffing plan to support the proposed areas of focus. Mr. Wilkinson shared a video from the Virginia Department of Aviation which showed that arrivals and departures from this airport in 2023 reached 48 states. Unforeseen Occurrences – There were two occurrences since the prior AAB meeting. First, an aircraft experienced nose gear failure upon landing. As the pilot taxied off the edge of the runway, the metal sparked leaked fuel and caught fire. There were no injuries. Second, a fire hydrant coupling failed underground causing a flood outside the airport terminal building. A portion of the sidewalk was damaged as a result. Airport Rules and Regulations Update – The next review for potential updates of the Airport Rules and Regulations is 2026. The county administrator is authorized to approve minor updates, with substantive changes requiring Chesterfield County Board of Supervisors approval. 4. Community Engagement and Events – Jeremy Wilkinson: The Chesterfield Police Activities League’s 5K on the Runway in May was a successful event with 139 runners participating. Ecoff Elementary School students visited the airport in May. Chesterfield Fire and EMS, Virginia State Police, Kings Korner Restaurant, and airport staff participated in the event for 130 students. Upcoming events are the airport school supply drive in July and August and a movie night and open house on October 11, 2025. The movie Top Gun (1986 version) will be featured. 5. Fixed Base Operator (FBO) Report – Dominion Aviation Services – Reese Meyer: Mr. Meyer provided the FBO report. 6. AAB Member Comments and Discussion: Mr. Mazza stated the airport is fortunate to have the infrastructure and services it has, and how teamwork is an important part. Mr. Dillard asked questions about the runway extension utility relocation and updates to the airport terminal which were answered by Mr. Wilkinson. 7. Public Comments: There were no public comments. Airport Advisory Board Meeting – June 5, 2025 Page 3 8. Adjournment: The meeting adjourned at 5:33 p.m. The next meeting is scheduled for September 18, 2025. Respectfully submitted: Faye Lewis, Scribe

Source: Chesterfield County website. First collected Oct 26, 2026.