Chesapeake
StormwaterCommitteeMeeting
June22,2026
ChesapeakeCityHall,HumanResourcesTrainingRoom
1.CalltoOrder:Themeetingwascalledtoorderat6:02PMwithnoobjection
(Waters)
2._‘RollCall:RollwascalledbyCaseyMagruder.
CommitteeMembersinAttendance:
BrennenWaters(Chair)
MichaelBattle
RichardBunton
MiltonJohnston
MichaelPoyner
VicNicholls
MarkiellaMoore
AudreyDoan(Alternate)
CaseyMagruder(PWEnvironmentalProgramManager)
JamesLomogda(OperationsAdministrator)
ReynaldoHernandez(PWStormwaterEngineerIV)
AbsentCommitteeMembers:
KevinWalker(Co-Chair)
—
Excused
TheresaHarris
—
Excused
RyanShrader(Alternate)
—
Excused
MatthewMorse(CAO)
—
Unexcused
OtherCityStaffinAttendance:
TonyaSnow(OfficeSpecialist)
-
minutes
CitizensinAttendance:
N/A
3.MeetingMinutes
Therewasaquorum,andtheApril2026meetingminuteswereapproved(Therewasno
May2026meeting).
Waters/Bunton/Battle
4,CitizenComments
—N/A
5. Operations Update / OPS Report
James Lomogda (Operations Administrator) gave the Operations Update for the month
of April 2026 stating that there were three hundred and thirty-two (332) work orders
received, three hundred and twenty-one (321) field completed, and one hundred and
twelve (112) still open.
The Field Completed Work Orders Service Goal Days Chart James showed was all green
(some of the usual categories such as cave-ins were light green but still green).
James then showed the CCTV List; sixteen (16) Work Orders including jobs from 829
Canal Drive to 400-408 Brnadon Way. The list also included a corrective maintenance
work order for Shea Drive (Contractual Services slip-lined a pipe).
James next showed before and after project pictures:
1. 1904 Foxwood (off Shillelagh)
“+ James: This job was for rear ditch work/drainage easement. Inmate crews
and OPS crews did a clear and clean of the ditch. Flooding was not noted
but water had been slowly draining for sure.
2. 5013 John Street (Suffolk Border off Wise Street)
** James: This job was for rear ditch work. An excavator was used for the
bigger blockages
—
culverts ultimately go under | 664.
Mr. Poyner: What is the size of the culverts?
James: Triples; 36x72...48x72..
Rey: At least 36x72.
James: Bridges crews inspect these types ofjobs as well.
Mr. Poyner: I’m used to seeing round culverts, what kind of culverts are
those?
James: Yes, these types are specific to going under highways, etc.
7
>
“e
%
>,“
~~
>,~~
°,“Ww
Next, James gave the Operations Update for the month of May 2026 stating that three
hundred and forty-three (343) Work Orders were received, three hundred and twenty-five
(325) field completed, and one hundred forty-eight (148) still open.
The Service Goal Days Chart showed all green except for Vegetation Control and Tree
Trimming. The Bucket Truck being down contributed to this.
James then showed the CCTV List including jobs from Checkerspot Way to Foxgrove
Lane and Glenview Road. This list included twenty-two (22) Work Orders; ten (10) of
which were for cave-ins.
James next showed before and after project pictures:
Stormwater Committee Meeting
6/22/2026
1.1211DominionLakesCourt(Cave-in)
James:Thehomeownerputinacomplaint.CrewsremovedaPVCpipe(a
poolpipe)thatwasinstalledunderasidewalk.
Casey:Allofthatdiatomaceousearthwasprobablybackwashedrightfrom
thepoolfilter.
James:Wetoldthehomeownerwecutthepopeattheright-of-wayline
andcappedit.Theycouldnotatthatpointdraintheirpoolintoourpipe.
Jamesshowedafterpicturesofthepipecrewsrepaireddepictinga
Fergusonwrapproductthathadaverystickycoatingwhichhelpedto
ensureasecureseal.
Mr.Bunton/MiltonJohnston:(Referringtothepipethatwasinstalledunder
thesidewalk)That’salotofworkinsteadofjustlayingyourhosedoutinthe
yard...
Audrey:Youdidn’tfinethem?
James:Thehomeownersweretherefortwo(2)years;Thiswasdoneabout
eight(8)yearsago.
2.409WoodardsFordRoadOff-RoadSideDitch)
James:SideDitchhadabuildupofleaves,etc.Fourtosixinchesof
sedimentwasremoved;dumptruckswereusedtohauldebrisaway.
Mr.Poyner:(Referringtoprojectpicture):Arethoserocksontopofthe
debrispile?
James:No,thoseareleaves.
James:Trifoldswerelefttoletpeopleknowtheycan’tblowtheirleavesinto
streets/ditches.
Casey:Ourcrewshavealsodonealotofeducationoutthere.
3.EdgertonRoad
?,
“eoJames:Citizencalledinregardingpoordrainagealongroadway;no
drainagestructuresonEdgerton.
JamesshowedamapStatingthatthegreenlinesrepresentedsewer,the
bluelinesrepresentedwater,andthepurpleonesrepresentedstormwater
infrastructure.
James:OPScrewshadsurveyedthatareatoremovegrassthatwas
growingthroughthejointspaces,etc.Weedkillwasputdownandyards
wereedgedwherefloodingwashappening.
James:Peoplewerealsoaskedtobeawareofstreetsweepingschedules
andnottoparkstreetsideonthosedays.
James:We’vetalkedwithReyaboutaddingtotheunfundedlistfor
drainageimprovements.
Mr.Poyner:(ReferringtotheprojectphotosJamesshowed):So,wehave
ourowndronefortakingpictures?
James/Rey:No,GIS.
Markiella:Doyougetverymanyservicerequestsforthatarea?
StormwaterCommitteeMeeting
6/22/2026
James: Yes, and survey shots are important in helping us.
Mr. Poyner: When you do work like that and you come across a road that
needs repair, do you put in a request of ignore it?
James: If someone complains, Contractual Services will take a look about
resurfacing. Repaving roads are based on a set rating system.
James: ISG is a service we used years ago we used years ago who would
go along roads and document cracks on roads, etc. and rate from most
important.
Rey: Also has to do with ongoing projects.
James: Yeah, for example, Bainbridge Road has an HRSD project which is
about 50% done, so we wouldn't go out there while that’s going on.
Brennen thanked James for his report.
6. Engineering Update
Rey started by following up on Sam’s presentation from the last Stormwater
Committee meeting (April 2026), showing a ranked list of unfunded projects depicting
Sunlight Drive and Country Road under Newly Added Projects.
“+ Rey: The list is eight pages long and is broken down into categories such as
source of project (CSR, etc.), impacts of flooding, how often flooding occurs,
impacts on residents, impacts on businesses, etc. Categories also included
water quality benefits, population benefitted, etc.
Rey showed a Stormwater Projects Description of Ranking Scale with a 0-to-5-point
scale, 5 indicating living / finished space flooded/ arterial and collector streets flooded
above the curb and0 indicating no flooding at all.
“* Rey: The feasibility category is broken down into five subcategories:
. No displacement of residences /businesses required
.
Access the site without acquisition ofproperty rights
. Strong public support
. Acquire a permit/ mitigation
.
Correct the problem
The point system was discussed, Re: Relative Project Costs:
§ points for less than $200,000
3 points for $200,000 to $499,000
2 points for $500,000 to 1,000,000
1 point for over $1,000,000
Stormwater Committee Meeting
6/22/2026
>,
“~~Rey:Iftwo(2)projectsaretiedinpoints,thenavailableprogramfundingcould
determineoneprojectmovingforwardaheadofanotherproject.
Next,Reyshowedthelistoftoptenprojects.
“
,“
>>,*
,“
?,
O
>,
Ye
%O
Oe
>,~°
>,~°
>,“~e
o,~e
¢,+e
\2~~
°,~e
0,“°
¢,
¢,
~~
OO
Mr.Poyner:Doyouupdatethislisteveryyear?
Rey:Yes,otherprojectsgoingoninfluencethis.
Mr.Poyner:Howmanypeopleupdateit?
Rey:JustourStormwatergroup.
Mr.Poyner:That’salotofwork.
Rey:Yeah,Oliveisinvolvedwiththis.She’sveryknowledgeable.
Milton:Isitthenumberofhousesorthenumberofpeople?
Rey:Population.
Markiella:So,youentertheproject,doyouthenaddthepointsuporisitdone
asagroup?
Rey:Agroup.Wediscussallprojectshappening.
Markiella:Howdowatershedprojectsgetonthelistordothey?
Rey:Theydo.ReyshowedthelistagainpointingoutsomethathadanMD
abbreviation(MasterDrainage).
Markiella:So,MDmeansitstemmedfromawatershedstudy?
Rey:Basically,yes.
MarkiellaaskedReyifprojectsonlistwereinpriorityorder?
Rey:Forthemostpart;therehavebeenupdatesonsome.
Mr.Poyner:They'llbelockedinbyAugust.
BrennenthankedReyforhisreport.
7.EnvironmentalReport
CaseyMagrudergavetheEnvironmentalReportforAprilandMay2026,sayingthat
Aprilhadfifteen(15)complaints;spills,pooldischargesandtherewereonehundred
thirty-eight(138)BMPinspections.ForMay,therewerefifteen(15)CSRs(alotfrom
oilleaksincars);alsohadtheYadkinRoadtrainincidentwithaSpiveytruckgetting
obliterated.
,“~
“~
o+,%
o,“~e
o,“~e
+,~~
O~~
Soy%
Milton:Didthedriversurvive?
Casey:Theyneverfollowedup,butitdidn’tlookgood.
Brennen:Wasitduetoaconstructionproject?
Casey:No.
Audrey:Isthereagate?
Casey:No,theguyprobablyjusthadnoideahowfastitwasgoing.
Mr.Poyner:Whatdoyoudoaboutoilleaks?
Casey:Tellpeopletofixthecar,putkittylitterdown,callforittobetowedifit
isinoperable.
StormwaterCommitteeMeeting
6/22/2026
Casey gave further information on the report for May 2026.
Casey: There were one hundred sixty-seven (167) BMP inspections in May.
Casey: We had a Facebook post about algae on ponds in May and how to get a
handle on it.
Casey: Dave Mergen’s group is down three people. In April, there were one
hundred ninety-six (196) single family home sites open and three hundred thirty-
nine (339) inspections. One hundred thirty-three (133) commercial sites open and
two hundred ninety (290) inspections. 48 Hour Rain Events
—
four hundred thirty-
two (432).
Casey: They also issued five (5) Stop Work Orders in April (which is a lot).
Milton: All new construction?
Casey: Yes.
Casey: For May, there were one hundred ninety-seven (197) single family home
sites open; one hundred thirty-nine (139) commercial sites open and two hundred
eighty-four (284) inspections. 48 Hour Rain Events
—
four hundred forty-two (442).
Casey: They also issued Stop Work Order in May.
Mr. Poyner: Could one hundred fifty (150) inspections really have been one
hundred twenty (120) inspections with thirty (30) follow-ups?
Casey: Yes. We have to log every time we go out.
Milton: RE: Annual Report discussed at previous meeting/s: Is everything
wrapped with the EPA now?
Casey: | sent my comments. The audit was in December, the report came in April.
Annual reports are due October 1% every year.
Markiella: Which Facebook page had the post about algae?
Casey: City of Chesapeake.
?~
?,~o
?,~~
},~
Brennen thanked Casey for her report.
8. Unfinished / New Business
RE: Unfinished Business
Brennen: With Mr. Morse’sabsence tonight, there is no update for the appeals
process.
Markiella to James: How many bucket trucks are there?
James: For tree trimming
—
one (1), Expressway has one (1), Bridges has one
(1), Operations has three (3), so six all together.
Markiella: Do other people ask to borrow ours?
James: Rarely.
Markiella: Are there plans to add one more bucket truck for Stormwater?
James: A second truck for tree trimming could come out of either Enterprise or
Operational Budget.
Brennen: What is the estimate on one of those trucks?
James: Similar to forty feet? $250,000 to $300,000.
Stormwater Committee Meeting
6/22/2026
**Markiella:Projectsfundedbyabandonedprojects
—
canyouletusknowwhich
projectshavebeenabandoned?
“*Markiella:HowmuchistheStormwaterBudget?
RE:NewBusiness
Markiella(toCommitteemembers):Arey'allawarethatthereisaHazard
MitigationPlan?
Audrey:Yes,inNorfolk,it’sbrokendownintodivisions.
Markiella:Mainpointistoleteveryoneknow.Thehighesthazardthisplan
istryingtomitigateisflooding,so|thinkthatdirectlycorrelateswithus.
Markiella:Repetitivefloodareas.
Mr.Bunton:ClearingCooper’sDitchalongwithHillwell(ACOE)
—
arethere
anyupdates?
Casey:|thinkit’sintheprocessnow.
Audrey:ItwasdesignedwhennewdevelopmentscameinoffWhitehurst
Roadtwenty-fiveyearsago.
ReytoMarkiella:I’mnotinvolvedwithit,butI'llseewhat|canfind
—
might
bePhaseIl...
Mr.Bunton:Where|work(atthehospital),wehaveourownHazard
MitigationPlan.
Markiella:What’snumberone?
Mr.Bunton:Flooding.
Themeetingwasadjournedat7:04PM.
*PleasenotethatperArticleViloftheChesapeakeStormwaterCommittee
BylawsadoptedJune26,2023,therewasNOregularmeetingscheduledin
May2026.
ThenextmeetingisscheduledforJuly27,2026.
"Minutesapprovedbythe
cme
N
StormwaterCommitteeMeeting
6/22/2026