RecordWell Data

Wetlands Board Meeting Packet (PDF)

City of Suffolk · Suffolk City County · meeting of Sep 17, 2026 · Agenda packets

Open the original document More from City of Suffolk

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

SUFFOLK WETLANDS BOARD WORK SESSION AGENDA FOR SEPTEMBER 17, 2026 PREPARED BY THE CITY OF SUFFOLK PLANNING DIVISION CASSIDY MCKELVIE, SUFFOLK WETLANDS BOARD SECRETARY A MEETING WILL BE HELD AT 6:00 P.M. IN THE SUFFOLK CITY COUNCIL CONFERENCE ROOM IN THE CITY HALL BUILDING IF YOU CANNOT ATTEND OR NEED SPECIAL ACCOMMODATIONS AT THE MEETING, PLEASE CALL OR EMAIL THE CITY OF SUFFOLK PLANNING DIVISION AT 757-514-4060 OR PLANNINGEMAIL@SUFFOLKVA.US PRIOR TO 12:00 NOON ON WEDNESDAY, SEPTEMBER 16, 2026 GEOFFREY HINSHELWOOD CHAIRMAN AGENDA SUFFOLK WETLANDS BOARD WORK SESSION September 17, 2026 6:00 P.M. I. Call to Order II. Roll Call III. Approval of Minutes of the July 16, 2026 meeting. IV. Work Session A. Meeting Procedures B. Draft Bylaws Amendment C. Draft Suffolk Wetlands Board Application D. Regulatory Updates – HB521 and HB237 E. Virginia Marine Resources Commission – Tidal Wetlands Guidance V. Old Business VI. New Business VII. Adjournment 1 MINUTES SUFFOLK WETLANDS BOARD July 16, 2026 6:00 P.M. The meeting of the Suffolk Wetlands Board was held on Thursday, July 16, 2026, at 6:00 p.m., in the City Council Chambers of the City Hall Building, 442 West Washington Street, Suffolk, Virginia. MEMBERS: Geoffrey Hinshelwood, Chairman Sidney Hazelwood Kathy Doerner Bryan Cattenhead Ellis Dallas STAFF: Cassidy McKelvie, Wetlands Board Secretary Margaret Pittenger, Assistant Director of Planning Jennifer Wilmoth, Assistant City Attorney Kirsten Travis, Virginia Marine Resources Commission ROLL CALL: The meeting was called to order by Chairman Hinshelwood. The roll was then called by Mrs. McKelvie, who informed Chai rman Hinshelwood that a quorum was present. APPROVAL OF THE MINUTES: The minutes of the previous meeting were approved as presented by a voice vote of 5 to 0. Minutes Suffolk Wetlands Board July 16, 2026 2 PUBLIC HEARING: VMRC2023-0895, submitted by David Spencer, applicant and property owner, for a permit to modify and extend an existing riprap revetment located at 6954 Respass Beach Road along the James River, further identified as Tax Map 7A(1)*3. Ms. McKelvie gave a presentation and overview of the project. Staff recommended approval of VMRC2023-0895 with the prop osed conditions outlined in the staff report. The public hearing was opened, and David Kledzik with Marine Engineering spoke in favor of the application. Ms. McKelvie informed the Board that preferred method of mitigation for impacted vegetated tidal wetlands, as of July 2025, is to purchase credits from a tidal wetlands mitigation bank, instead of replacement onsite as proposed with this application. Kirsten Travis with the Virginia Mari ne Resources Commission provided further clarification of the July 2025 regulations change for tidal wetlands mitigation. Beth Cross with the Nansemond River Preserv ation Alliance spoke in favor of the application. The floor was opened for those who were in opposition of the application, and there was no opposition. Minutes Suffolk Wetlands Board July 16, 2026 3 The public hearing was closed. Following discussion by the board, Board Member Hazelwood made a motion to approve VMRC2023-0895 with the proposed conditions. The motion was seconded by Board Member Dallas and was approved by a voice vote of 5 to 0. NEW BUSINESS: Ms. McKelvie presented a proposal to change the permit number identification system for Wetlands Board applications a nd permits. Applications are currently tracked under the VMRC permit number. The proposed change would identify and track permit numbers under a SWB number , representing the Suffolk Wetlands Board. There was no opposition to the proposed change. ADJOURNMENT: There being no further business, the meeting was adjourned. SUFFOLK WETLANDS BOARD DATE: JULY, 2026 , MT: Hazelwood 2 ND: Dallas TO: Approve with Conditions BOARD MEMBERS ATTENDANCE VMRC23-0895 VOTE: 5 - 0 PRESENT ABSENT YES NO Chairman Geoffrey Hinshelwood X X Vice-Chairman Darius Davenport X Sidney Hazelwood X X Bryan Cattenhead X X Richard Vroman X Kathy Doerner X X Kittrell Eberwine X Ellis Dallas - Alternate X X Kaitlyn Price - Alternate X Suffolk Wetlands Board Meeting Procedure 1. Chair calls meeting to order 2. Secretary calls the Roll – Quorum confirmed 3. Chair explains the purpose of the meeting and reads the opening statement: a. “The policy of the Commonwealth of Virginia and the City of Suffolk is clearly stated in the Virginia Wetlands Act (Sec. 28.2- 1301) as follows: “Shall preserve and prevent the despoliation and destruction of wetlands within its jurisdiction while accommodating necessary economic development in a manner consistent with wetlands preservation.” 4. Approval of the minutes (comments, questions, or corrections) 5. Chair/staff state the case number and present a brief description of the proposed project. VIMS report is noted if available. 6. Chair opens the public hearing. 7. Applicant and others are given an opportunity to speak. 8. Chair closes the public hearing 9. Chair asks for comments/discussion from the Board members. 10. Chair entertains a motion. 11. The Board can approve, approve with modification/conditions, deny or table the application. 12. Chair notes the time limit on the permit with the possibility of an extension if the work is not finished. 13. In the case of denials, the Chair informs the applicant of the right to appeal to VMRC within 10 days of the Board’s decision. 1 BYLAWS OF THE SUFFOLK WETLANDS BOARD ARTICLE I – Introduction and PurposeThe Wetlands Board SECTION 1. Name of Wetlands Board – The official name of the Wetlands Board s shall be the Suffolk Wetlands Board, hereinafter the “Wetlands Board.” The Suffolk Wetlands Board is established by the Code of the City of Suffolk. SECTION 2. Mission – It is the mission of the Wetlands Board to preserve and prevent the despoliation and destruction of wetlands within its jurisdiction while accommodating necessary economic development in a manner consistent w ith wetlands preservation and any standards set by the Commonwealth in addition to those identified in Code of Virginia, § 28.2-1308 to ensure protection of shorelines and sens itive coastal habitats from sea level rise and coastal hazards, including the provisions of guidelines and min imum standards promulgated by the Virginia Marine Resources Commission pursuant to Code of Virginia, § 28.2-1301. ARTICLE II – Members, Officers and Duties SECTION 1. Duties – the Suffolk Wetlands Board shall exercise all of the powers of a Wetlands Board as set forth in the Code of the City of Suffolk and as provided by state law. SECTION 2. Members / Election of Officers – The Wetlands Board shall consist of seven residents of the City of Suffol k, appointed by the Suffolk City C ouncil, plus at least one (1) but not more than three (3) altern ate members, also appointed by the Suffolk City Council. The qualifications, terms, and compensation of alternate members shall be the same as those of members. Members’ terms shall be for five (5) years. Members may serve successive terms. 2 SECTION 3. Election of Officers – Annually, at the regular meet ing of the Wetlands Board held in the month of July, the Wet lands Board shall elect a Chairman and, a Vice-Chairman, and shall appoint a Secretary who shall be a member of City staff . The officers may succeed themselves. The terms of office for each officer shall begin with the regular July meeting and shall be for a term of one (1) y ear. Members shall be notified in writing of the date, time, and place of the election of officers at least f ourifteen (1 45) days prior to the regular JulyMarch meeting. Each officer shall serve until relieved of his duties as herein provided. a) SECTION 3. a) Chairman – The Chairman shall preside at all meetings of the Wetlands Board and at other meetings and public h earings called by the Wetlands Board. The Chairman shall call a special meeting of the Wetlands Board when required, and shall transmit reports, plans and recommendations of the Wetla nds Board to the appropriate governing authority, and, in general, shall act as spokesman for the Wetlands Board. b) SECTION 4 . Vice-Chairman – The Vice-Chairman shall serve as Chairman in the absence or the disability of the Chairman. In the event of the deat h or resignation of the Chairman, the Vice-Chairman shall perform the Chairman’s duties until such time as the Wetlands Board shall elect a new Chairman. SECTION 45. Secretary – The Secretary shall be a member of City staff and will assist the Chairman in the preparation of the agenda fo r the Wetlands Board meetings, shall prepare and send out notice for regular and special meetings, shall prepar e and distribute minutes of Wetlands Board meetings, and shall es tablish and maintain the Wetlands Board’s files. The Secretary shall be encouraged to advise, upo n request, all members regarding the technical 3 aspects of matters before th e Wetlands Board. The Chairman may request the Secretary to prepare and present special reports as the need arises. SECTION 56. Additional Duties – The Chairman, Vice-Chairman and Secretary shall perform such other duties and functions as may from time to time be required by the Wetlands Board or by its Bylaws. ARTICLE III – Meetings SECTION 1. Regular Meetings – Regular meetings of the Wetlands Board shall be held on the third Thursday of each month at 6:00 p.m. (amended April 20, 2000) at City Hallin the Municipal Building, provided that if this should be a lega l holiday the meeting shall be held at the same time and place on the first succeeding day not a holiday. Each member shall be notified of each regular meeting at least five (5 ) days prior to the mee ting, via a written agenda, prepared by the Secretary to the Wetlands Board. SECTION 2. Special Meetings – Special meetings of the Wetlands Board may be called at any time by the Chairman or by two members upon written request to the Secretary. The Secretary shall providemail to all members, at least five (5) days in advance of a special meeting, a written notice fixing the time and place of the meeting and the purpose th ereof. Written notice of a special meeting is not required if the time of the sp ecial meeting has been fixed at a regular meeting, or if all members are present at the special meeting or file a written waiver of notice. SECTION 3. Cancellation – Whenever there is no business for the Wetlands Board, the Chairman may dispense with regular meeting by giving notice to all members at least fivetwo (52) days prior to the time set for the meeting. 4 SECTION 4. Quorum/Required Number of Affirmativ e Votes – A quorum shall be not less than four members of the Wetlands Board. If an application receives less than four affirmative votes from the Wetlands Board, the permit shall be denied. SECTION 5. Order of Business – The order of business at regular meetings shall be as follows: (1) Call to order and roll call; (2) Approval of mi nutes of previous meeting; (3) Public Hearings; (4) Old Business; (5) New Business; (6) Adjournment. SECTION 6. Meetings and Records Open – All meeti ngs of the Wetlands Board at which official action is taken shall be open to the public and all records of the Wetlands Board shall be public record. SECTION 7. Conduct of Members /Attendance at Meetings – Members of the Wetlands Board are expected to attend all meetings. Whenever any member missed four (4) meetings within any twelve (12) month period, without good cause shown, the Chairman shall report this information to the appropriate City Council me mber with a recommendation for retention or removal of said member of the Wetlands Board. Should that Council member fail to respond within 90 days, the Chairman shall submit its r ecommendation to the full C ouncil. When making such recommendation, the Chairman shall consider not only the reasons for the absence of the members, but also any deleterious affect said absence may have upon the Wetlands Board as a whole. ARTICLE IV – Rules of Order SECTION 1. Parliamentary Procedures – The Wetlands Board and its proceedings shall be governed by the latest edition of Robert’s Rules of Order, Newly Revised. ARTICLE V – Planning Staff 5 The Planning staff assigned to the Wetlands Bo ard shall be encouraged to advise, upon request, all members regarding the technical aspects of ma tters before the Board. Consultation between the staff and citizens who are interested in wetl ands questions shall also be encouraged. The Chairman may request the planning staff to prepare and present special reports as the need arises. ARTICLE VI – Amendments SECTION 1. Amendments – These Bylaws may, within the limits set by law, be amended at any regular meeting of the Wetlands Board by an affirmative vote of not less than four members present and voting, provided that such amendment shall have first been presented to all members in writing at least five (5) days prior to the meeting at which the vote is taken. These Bylaws were approved and adopted by the Suffolk Wetlands Bo ard on the ___ day of ____________, ________ ____________________________________________________ Geoffrey Hinshelwood, Chairman of the Suffolk Wetlands Board Adopted:__________________________ ________________________________ C h a i r m a n Amended: ________________________ _________________________________ Secretary Remit Application to: City of Suffolk Department of Planning and Community Development 442 West Washington Street • P.O. Box 1858, Suffolk, VA 23434 • (757) 514-4060 XX.XX.XX City of Suffolk Department of Planning APPLICATION FOR A PERMIT FROM THE SUFFOLK WETLANDS BOARD PART 2 – GENERAL INFORMATION: To be completed by applicant Important Notice: Only complete hard copy applications with original signatures are accepted. The intent of the Wetlands Ordinance is to preserve a nd prevent the despoliation and destruction of wetlands while accommodating necessa ry economic development in a mann er consistent with wetlands preservation. The jurisdiction of the Suffolk Wetlands Board is defined as the area between mean low water (MLW) and mean high water (MHW) for non-vegetated tidal wetlands or as the area between MLW and 1.5x the mean tide range (MTR ) for vegetated tidal wetlands. Select Application Type:  Wetlands Board Review – Application Fee of $262.50  Wetlands Board After the Fact Review – Application Fee of $315.00 Property Address: _________________________ Tax Map Number: _________________________ Account Number: _________________________ Total Site Acreage: __________________________ Area (sq ft) of vegetated impacts: ______________________________  Permanent  Temporary Area (sq ft) of non-vegetated impacts: __________________________  Permanent  Temporary Other Associated Permit or Application Number s (such as those VMRC, ACOE, DEQ, etc.): ____________________________________________________________________________________ ____________________________________________________________________________________ Brief Statement of Proposed Project (attach more sheets if needed): ______________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ PART 1 – OFFICE INFORMATION: To be completed by staff Application Number: Date Submitted: Project Address: Project Name: Tax Query: Current Delinquent Application Fee Paid: Decision: Approved Denied Date of Decision: Remit Application to: City of Suffolk Department of Planning and Community Development 442 West Washington Street • P.O. Box 1858, Suffolk, VA 23434 • (757) 514-4060 XX.XX.XX PART 3 – REQUIRED INFORMATION FOR APPLICATION: To be completed by applicant In accordance with Section 34-322 of the Suffolk Code of Ordinances, the Wetlands Board permit application shall include the following information. The applicant must INITIA L next to each item and ATTACH materials in the order that is listed below. 1. A narrative that describes: a) The need for the project; b) All land-disturbing activities, exterior work, and site improvements to be installed within the Wetlands Board jurisdiction; c) Type of equipment to be used and the means of equipment access to the activity site; d) A cost estimate; e) Anticipated project schedule; f) The public benefit to be derived from the proposed project; g) A complete description of measures to be taken during and after the alteration to reduce detrimental off-site effects; h) Mitigation plan if proposing to impact vegetated tidal wetlands. i) For shoreline erosion projects not pr oposing a living shoreline, provide scientific justification why a living shoreline design is not appropriate. _______ 2. A scaled site plan that includes: a) North arrow; b) Waterway name and ebb/flow direction; c) Limits of vegetated wetlands, MLW, MHW, and (if vegetated) 1.5xMTR; d) Parcel boundaries and adjacent property owner information; e) The names and addresses of owners of record of adja cent land and known claimants of water rights in or adjacent to the wetland of whom the applicant has notice; f) Dimensions of existing and proposed structures, labeled as such. Specifying existing structures as either to remain or be removed; g) Distances from proposed structures to fixed points of reference (benchmarks) and adjacent property lines; h) Construction access path(s) if by land; i) Provide tie-down distances to the seaward face of any proposed bulkhead or the toe of any proposed riprap revetment; j) Cross sections of any proposed structures; k) Erosion and sediment control measures; _______ 3. A resiliency assessment that analyzes the impacts of sea-level rise, climate change, and coastal resilience on the subject propert y as it relates to the proposed shoreline stabilization methods. ________ Remit Application to: City of Suffolk Department of Planning and Community Development 442 West Washington Street • P.O. Box 1858, Suffolk, VA 23434 • (757) 514-4060 XX.XX.XX PART 4 – CONTACT INFORMATION: To be completed by applicant, owners, and other contacts This application must be signed by the property owner(s) or must have attached to it written evidence of the owner’s consent, which may be in the form of a binding contract of sale or a letter signed by the owner(s) authorizing the applicant to act as his or her agent. Signing this application shall constitute the granting of authority of the City to enter onto the property for the purpose of conducting site analyses. 1. Applicant Information: Name: ________________________________ Company: _____________________________ Address: ______________________________ Phone Number: ________________________ Email: ________________________________ Fax Number: __________________________ Applicant Signature: ______________________________________ Date: __________________ 2. Property Owner(s) Information (Complete if different from applicant): Name: ________________________________ Company: _____________________________ Address: ______________________________ Phone Number: ________________________ Email: ________________________________ Fax Number: __________________________ Owner Signature 1: _______________________________________ Date: __________________ Name: ________________________________ Company: _____________________________ Address: ______________________________ Phone Number: ________________________ Email: ________________________________ Fax Number: __________________________ Owner Signature 2: _______________________________________ Date: __________________ 3. Other Contacts (Such as engineers, surveyors, architects, agents, attorneys, owners, etc.): Specify type of contact/relationship: ______________________________________________________ Name: ________________________________ Company: _____________________________ Address: ______________________________ Phone Number: ________________________ Email: ________________________________ Fax Number: __________________________ Signature: _______________________________________________ Date: __________________ Specify type of contact/relationship: ______________________________________________________ Name: ________________________________ Company: _____________________________ Address: ______________________________ Phone Number: ________________________ Email: ________________________________ Fax Number: __________________________ Signature: _______________________________________________ Date: __________________ VIRGINIA ACTS OF ASSEMBLY - 2026 SESSION + + + + + + + + + + + + + + + + + + + + + + + + + + CHAPTER 161 + + + + + + + An Act to amend and reenact §§ 28.2-1301 and 28.2-1308 of the Code of Virginia, relating to Marine Resources Commission; powers and duties; wetlands. + + + + + + + + + + + + + + + + [H 521] Approved April 6, 2026 + + + + + + + Be it enacted by the General Assembly of Virginia: 1. That §§ 28.2-1301 and 28.2-1308 of the Code of Virginia are amended and reenacted as follows: § 28.2-1301. Powers and duties of the Commission. A. The Commission may receive gifts, grants, bequests, and devises of wetlands and money which shall be held for the uses prescribed by the donor, grantor, or testator and in accordance with the provisions of this chapter. The Commission shall manage any wetlands it receives so as to maximize their ecological value as provided in Article 2 (§ 28.2-1503 et seq.) of Chapter 15 of this title. B. The Commission shall preserve and prevent the despoliation and destruction of wetlands while accommodating necessary economic development in a manner consistent with wetlands preservation and any standards set by the Commonwealth in addition to those identified in §  28.2-1308 to ensure protection of shorelines and sensitive coastal habitats from sea level rise and coastal hazards, including guidelines and minimum standards promulgated by the Commission pursuant to subsection C. C. In order to perform its duties under this section and to assist counties, cities, and towns in regulating wetlands, the Commission shall promulgate and periodically update (i) guidelines that scientifically evaluate vegetated and nonvegetated wetlands by type and describe the consequences of use of these wetlands types and (ii) minimum standards for protection and conservation of wetlands to achieve no net loss of existing wetland acreage and functions . The Virginia Institute of Marine Science shall provide advice and assistance to the Commission in developing these guidelines and minimum standards by evaluating wetlands by type and continuously maintaining and updating an inventory of vegetated wetlands. D. In developing guidelines, standards, or regulations under this chapter the Commission shall consult with all affected state agencies. Consistent with other legal rights, consideration shall be given to the unique character of the Commonwealth's tidal wetlands which are essential for the production of marine and inland wildlife, waterfowl, finfish, shellfish and flora; serve as a valuable protective barrier against floods, tidal storms and the erosion of the Commonwealth's shores and soil; are important for the absorption of silt and pollutants; and are important for recreational and aesthetic enjoyment of the people and for the promotion of tourism, navigation and commerce. § 28.2-1308. Standards for use and development of wetlands; utilization of guidelines. A. For the purposes of this section, "river watershed" means the Potomac River Basin, Shenandoah River Basin, James River Basin, Rappahannock River Basin, Roanoke and Yadkin Rivers Basin, Chowan River Basin (including the Dismal Swamp and Albemarle Sound), Tennessee River Basin, Big Sandy River Basin, Chesapeake Bay and its Small Coastal Basins, Atlantic Ocean, York River Basin, and the New River Basin. B. The following standards shall apply to the use and development of wetlands and shall be considered in the determination of whether any permit required by this chapter should be granted or denied: 1. Permits shall contain requirements for compensating impacts on wetlands sufficient to achieve no net loss of existing wetland acreage and functions; 2. Wetlands of primary ecological significance shall not be altered so that the ecological systems in the wetlands are unreasonably disturbed; and 2. 3. Development in Tidewater Virginia, to the maximum extent practical, shall be concentrated in wetlands of lesser ecological significance, in vegetated wetlands which have been irreversibly disturbed before July 1, 1972, in nonvegetated wetlands which have been irreversibly disturbed prior to January 1, 1983, and in areas of Tidewater Virginia outside of wetlands. C. The provisions of guidelines and minimum standards promulgated by the Commission pursuant to § 28.2-1301 shall be considered in applying the standards listed in subsection B. D. When any activity authorized by a permit issued pursuant to this chapter is conditioned upon compensatory mitigation for adverse impacts to wetlands, the applicant may be permitted to satisfy all or part of such mitigation requirements by the purchase or use of credits from any wetlands mitigation bank, including any banks owned by the permit applicant, that has been approved and is operating in accordance with applicable federal and state guidance, laws, or regulations for the establishment, use and operation of mitigation banks as long as (i) the bank is in the same fourth order subbasin, as defined by the hydrologic unit boundaries of the National Watershed Boundary Dataset or by the hydrologic unit system or dataset utilized and depicted or described in the bank's approved mitigation banking instrument, as the impacted site, or in an adjacent subbasin within the same river watershed, as the impacted site, or it meets all the conditions found in clauses (a) through (d) and either clause (e) or (f); (ii) the bank is ecologically preferable to practicable on- site and off-site individual mitigation options, as defined by federal wetland regulations; and (iii) the banking instrument, if approved after July 1, 1996, has been approved by a process that included public review and comment. When the bank is not located in the same subbasin or adjacent subbasin within the same river watershed as the impacted site, the purchase or use of credits shall not be allowed unless the applicant demonstrates to the satisfaction of the Commission that (a) the impacts will occur as a result of a Virginia Department of Transportation linear project or as the result of a locality project for a locality whose jurisdiction encompasses multiple river watersheds; (b) there is no practical same river watershed mitigation alternative; (c) the impacts are less than one acre in a single and complete project within a subbasin; (d) there is no significant harm to water quality or fish and wildlife resources within the river watershed of the impacted site; and either (e) impacts within the Chesapeake Bay watershed are mitigated within the Chesapeake Bay watershed as close as possible to the impacted site or (f) impacts within subbasins 02080108, 02080208, and 03010205, as defined by the National Watershed Boundary Dataset, are mitigated in-kind within those subbasins as close as possible to the impacted site. After July 1, 2002, the provisions of clause (f) shall apply only to impacts within subdivisions of the listed subbasins where overlapping watersheds exist, as determined by the Department of Environmental Quality, provided the Department has made such a determination by that date. For the purposes of this subsection, the hydrologic unit boundaries of the National Watershed Boundary Dataset or other hydrologic unit system may be adjusted by the Department of Environmental Quality to reflect site-specific geographic or hydrologic information provided by the bank sponsor. E. Where an agreed-upon permit condition requires the contribution of in-lieu fees to offset permitted wetland losses, the wetlands board shall credit the applicant for any in-lieu fee payments made to the Virginia Aquatic Resources Trust Fund or another dedicated wetlands restoration fund with reference to the same activity. F. Notwithstanding any provision of this section restricting the location of the source of credits, an applicant may be permitted to purchase or use credits from a tidal wetland mitigation bank located in an adjacent river watershed when such bank contains the same plant community type and salinity regime as the impacted wetlands, which shall be the preferred form of compensation. This subsection shall apply only (i) to tidal wetland mitigation banks with a polyhaline salinity regime located in subbasins 02080102, 02080107, 02080108, and 02080208 and (ii) when a tidal wetland mitigation bank with the same plant community type and salinity regime as the impacted wetlands is not available in the same river watershed as the impacted wetland. 2. That the Secretary of Natural and Historic Resources (the Secretary) shall convene a stakeholder work group to address mitigation requirements for tidal nonvegetated wetlands. The stakeholder work group shall include mitigation banking representatives, local government representatives, including wetlands board members, planning district commissions, the Virginia Association of Counties, the Chesapeake Bay Foundation, the Virginia Maritime Association, the Department of Environmental Quality, the Habitat Management Division of the Marine Resources Commission, and any other stakeholders deemed necessary by the Secretary. The stakeholder work group shall address the need to provide mitigation of tidal nonvegetated wetlands that ensures no net loss of wetland acreage and functions, considering a range of mitigation alternatives, including mitigation banks, in-lieu fee programs, permittee-responsible mitigation, or other approaches. In addressing such options, the stakeholder work group shall consider (i) the water quality, habitat, and ecological functions of each mitigation technique; (ii) the cost and practicability of mitigation options; (iii) the necessity, flexibility, and effectiveness of in-lieu fee, permittee-responsible, and out-of-kind mitigation; and (iv) other considerations deemed necessary by the Secretary. The stakeholder work group shall submit a report of its findings and recommendations to the Chairs of the House Committee on Agriculture, Chesapeake and Natural Resources and the Senate Committee on Agriculture, Conservation and Natural Resources no later than July 1, 2027. 2 of 2 VIRGINIA ACTS OF ASSEMBLY - 2026 SESSION + + + + + + + + + + + + + + + + + + + + + + + + + + CHAPTER 915 + + + + + + + An Act to amend and reenact § 10.1-658 of the Code of Virginia, relating to Virginia Coastal Resilience Master Plan. + + + + + + + + + + + + + + + + [H 237] Approved April 13, 2026 + + + + + + + Be it enacted by the General Assembly of Virginia: 1. That § 10.1-658 of the Code of Virginia is amended and reenacted as follows: § 10.1-658. State interest in resilience and flood control. A. The General Assembly declares that storm events and rising tidal waters cause recurrent flooding of Virginia's land resources and result in the loss of life, damage to property, unsafe and unsanitary conditions and the disruption of commerce and government services, placing at risk the health, safety and welfare of those citizens living in flood-prone areas of the Commonwealth. Flood waters disregard jurisdictional boundaries, and the public interest requires the management of flood-prone areas in a manner which prevents injuries to persons, damage to property and pollution of state waters. B. The General Assembly supports and encourages those measures which prevent, mitigate, and alleviate the effects of sea level rise, stormwater surges, and all causes of recurrent flooding and declares that the expenditure of public funds and any obligations incurred in the development of flood control and other civil works projects, the benefits of which may accrue to any county, municipality, or region in the Commonwealth, are necessary expenses of local and state government. The General Assembly shall prioritize measures that use community-scale and regional-scale planning, protect and enhance natural and nature- based approaches, address socioeconomic inequities, and enhance equity through flood resilience and preparedness. C. The General Assembly supports and encourages flood resilience through implementation of the Virginia Coastal Resilience Master Plan and implementation of the Virginia Flood Protection Master Plan developed pursuant to § 10.1-602. D. The Department shall be responsible for the implementation of the Virginia Coastal Resilience Master Plan and Virginia Flood Protection Master Plan and shall serve as the lead administrator. E. The Virginia Coastal Resilience Master Plan shall be updated at least every five years; shall, at a minimum, be a place-specific plan for mitigating severe and repetitive flooding; and shall, at a minimum, (i) base decision making on the best-available science; (ii) identify and address socioeconomic inequities and strive to enhance equity through the adaptation and protection measures by considering all areas of recurrent flooding; (iii) recognize the importance of protecting and enhancing natural infrastructure and nature-based approaches to flood mitigation, when possible , and identify areas where marshes may migrate in the face of sea level rise ; (iv) utilize community and regional scale planning to the maximum extent possible, seeking region-specific approaches tailored to the needs of individual communities; and (v) include an understanding of fiscal realities and focus on cost-effective solutions for the protection and adaptation of communities, businesses, and critical infrastructure.

Source: City of Suffolk website. First collected Oct 26, 2026.