City of Suffolk
HISTORIC LANDMARKS COMMISSION
August 13, 2026
THE REGULAR MEETING
OF THE
HISTORIC LANDMARKS COMMISSION
WILL BE HELD AT 9:00 A.M. IN
CITY COUNCIL CHAMBERS
CITY HALL BUILDING
Note: If You Cannot Attend This Meeting,
Please Notify the Planning Division
by 12:00 Noon,
Wednesday, August 12, 2026
(757) 514-4060
PREPARED BY THE CITY OF SUFFOLK
DEPARTMENT OF PLANNING & COMMUNITY DEVELOPMENT
DIVISION OF PLANNING
AGENDA
Historic Landmarks Commission Meeting
Thursday, August 13, 2026
9:00 a.m.
__________________________________________________________
I. Call to Order
II. Roll Call
III. Approval of the Minutes
IV. Cases to be Heard
A. Request for Certificate of Appropriateness HLC 2026-00011, submitted by G. Wayne
Rhoads on behalf of the City of Suffolk, applicant and property owner, to rehabilitate the
façade and storefront openings, and renovate the car parking lot at 157 N. Main Street. The
property is further identified as Zoning Map Number 34G18(A)*319, 34G18(5)*11,
34G18(5)*10, 34G18(A)*316, 34G18(5)*11A, 34G18(A)*318*320+, Suffolk Voting
Borough, zoned CBD, Central Business District, and HC, Historic Conservation Overlay
District
B. Request for Certificate of Appropriateness HLC2026 -00012, submitted by G. Wayne
Rhoads on behalf of the City of Suffolk, applicant and property owner, to rehabilitate the
car parking lot and develop a landscaped pedestrian area at 347 E. Washington Street. The
property is further identified as Zoning Map Number 34G25(A)*5, Suffolk Voting
Whaleyville, zoned FRRD, Fairgrounds Revitalizations and Redevelopment District, and
HC, Historic Conservation Overlay District.
V. Staff Reports
A. Administrative Approvals
B. Property Maintenance Update
C. Zoning Update
VI. Announcements
VII. Adjournment
MINUTES
HISTORIC LANDMARKS COMMISSION
March 12, 2026
9:00 A.M.
The regular meeting of the Historic Landmarks Commission was held on Thursday, March 12, 2026,
at 9:00 a.m., in the Council Chambers of Suffolk City Hall, 442 W. Washington Street, Suffolk,
Virginia, with the following persons present:
MEMBERS PRESENT: STAFF:
Susan Coley Meg Pittenger, Assistant Director of Planning
Keith Emerson Sean Dolan, Assistant City Attorney III
Oliver Hobbs Jonathan McBride, Comprehensive Planning Manager
Edward King Goncalo Borges, Senior Planner
Marsha Reid Darryl King, Housing/Property Maintenance Inspector
Brian Shaffer Jennifer Cobb, Assistant Director of CD
Vivian Turner
Chairman Hobbs called to order the March (2026) meeting of the Historic Landmarks Commission
at 9:00 a.m. Meg Pittenger called the roll, and Chairman Hobbs was informed that a quorum was
present.
APPROVAL OF THE MINUTES: The minutes of the previous meeting were approved as
presented.
NEW BUSINESS:
Request for Certificate of Appropriateness HLC2026-00005, submitted by Chris Shelton of Cure,
applicant on behalf of Elliott Apartments LLC, property owner, to install externally lighted marque
sign on the front façade at 177 N. Main Street. The property is further identified as Zoning Map
Number 34G18(A)*324, Suffolk Voting Borough, zoned CBD, Central Business District Zoning
District, and HC, Historic Conservation Overlay District.
The first item of business was introduced by Chairman Hobbs followed by a staff report from
Jonathan McBride, Comprehensive Planning Manager . Per Mr. McBride, t he subject property is a
portion of a contributing structure located at 181 N. Main Street as the primary structure (also known
as “Suffolk Towers Apartments, Elliot Hotel, or Elliot Apartments”), and it is within the Original
2
Suffolk District (1987) and the Suffolk Historic Conservation Overlay Zoning District. It is one of
the 4 commercial bays in that building. The applicant is proposing to install a black lighted sign
bracket to the front entryway façade near the entryway to the bay and suspend a PVC wood
appearance marquee sign, 30” long x 18” high, 3.75 sq ft, with engraved black lettering on a white
background. Based on the previous historic images from the 1930s and 1950s , this building had
awnings and signage. As far as changing the character of the frontage, there will be minimal impact.
Based on these findings, staff recommends approval of application, HLC2026-00005.
The public hearing was opened, and no one spoke in favor or opposition of the application. The
public hearing was closed and after a brief discussion, Commissioner Emerson made a motion to
accept staff’s recommendation for approval of application HLC2026-00005. The motion was
seconded by Commissioner Turner. The motion passed with a roll call vote of 7 to 0.
Request for Certificate of Appropriateness HLC2026 -00006, submitted by Thomas Powell,
applicant and property owner, to reopen and restore the original storefront window openings on the
front facade, and restore and repaint the existing windows and door at 155 E. Washington Street.
The property is further identi fied as Zoning Map Number 34G18(A)*281*B, Suffolk Voting
Borough, zoned CBD, Central Business District, and HC, Historic Conservation Overlay District.
The second item of business was introduced by Chairman Hobbs followed by a staff report from
Goncalo Borges, Senior Planner. Mr. Borges informed the Commission that the applicant is
proposing the following actions:
1. To reopen the superior window opening by carefully removing the non-historic materials
currently occupying the opening. 2. Installing new windows with clear glazing and dark metal
framing designed to match the historic commercial storefront proportions. The window size is 36”
in height by 15’ width and will have a window framing 3250 Series 3-1/4” Thermal Fixed,
Casement & Projected Windows manufactured by Winco. 3. The superior window will be painted
using the color Midnight Hour PPG1038-7 from the HLC’s approved PPG Paints’ Historic Paint
Color Collection. 4. Refurbish and paint the existing facade’s lower windows and door, inclusive
of frame and trim, by using the same selected color, Midnight Hour PPG1038-7. Based on the
HLC guidelines, the proposed work does not negatively impact the integrity of the district. Staff
recommends approval of application, HLC2026-00006.
3
The public hearing was opened, and Mr. Thomas Powell, the owner of 155 E. Washington Street,
spoke in favor of the application. Per Mr. Powell, the restoration is intended to return the storefront
closer to the original 1940s design. Mr. Powell also informed the Commission that the brick was not
going to be removed beyond what was necessary and all paint colors were from the city’s approved
historic pallet. With no other person speaking in favor or opposition of the application, the public
hearing was closed and after a brief discussion, Commissioner Emerson made a motion for approval
of application, HLC2026-00006. The motion was seconded by Commissioner King. The motion
passed with a roll call vote of 7 to 0.
National Registry Nomination of the Ames-Old Farm:
Johnathan McBride gave a staff report on the Ames-Old Farm, a 4.7-acre farm located near the city’s
northern boundary, which is intersected by the Nansemond River. The property fronts Knotts Creek.
To the north and west, the property is contiguous with a 281- acre parcel of undeveloped farmland
which is protected under a conservation easement held by the Virginia Outdoors Foundation. The
primary resource on the property is a two- and-a-half-story, three -bay frame dwelling originally
constructed circa 1820, with a series of historic additions dating from the mid-19th through the mid-
20th century. The property also includes six historic outbuildings that date from the mid-19 th to the
early-20th century: a barn, corncrib, garage, schoolhouse, potato cellar and a gas house. Staff
recommends support by the Commission o f the Ames-Old farm nomination for recognition on the
National Register of Historic Places as an individually contributing propert y. With the
recommendation, staff will provide comments to DHR that will include the Commission’s
nomination for the National Registry. Commissioner Emerson made a motion for approval and was
seconded by Commissioner King. The motion passed with a roll call vote of 7 to 0.
By-Laws Change:
Jonathan McBride gave a staff report on the new Historic Landmarks Commission By-Laws Change.
Mr. McBride informed the Commissioner that over the last few months, staff have been re-
evaluating the application process that would potentially help applicants as well as the Commission.
Three changes will be going into effect. First, according to the guidelines, the Historic Landmark
Commission is required to have a public meeting but not a public hearing. Staff recommends a
change to simplify this process to make sure that the process is focused on a public meeting. Public
notice will still be provided but it’s not provided as a public hearing; secondly while at the public
meeting, the applicant can speak on behalf of their application, but other speakers do not have to be
4
in attendance. The last change involves the timing of public meetings. In the past, if someone is
denied by the Commission, it would take almost 60 days for the application to come back before
them. A change will simplify this process so that the application can come back before the
Commission within 30 days. Commissioner Emerson made a motion for approval of application,
HLC2026-00006. The motion was seconded by Commissioner Shaffer . The motion passed with a
roll call vote of 7 to 0.
STAFF REPORTS:
HLC Administrative Approvals: Meg Pittenger
Property Maintenance Update: Darryl King
• Report included in March Meeting Agenda Packet
Zoning Update: Nathan Davidson
• Report included in March Meeting Agenda Packet
ANNOUNCEMENTS:
Ms. Pittenger informed the Commission that we will not have a meeting in April of 2026.
There being no further business, the meeting was adjourned.
HISTORIC LANDMARKS COMMISSION
March 12, 2026
Motion:
Approval of
HLC2026-
00005
Motion:
Approval of
HLC2026-00006
Motion:
Approval of
Ames-Old Farm
Motion of
Support
Motion:
Approval of
By-Laws
COMMISSIONERS
ATTENDANCE
1st: Emerson
2nd: Turner
1st: Emerson
2nd: King
1st: Emerson
2nd: King
1st: Emerson
2nd: Shaffer
PRESENT ABSENT YES NO YES NO YES NO YES NO
Bissell, William N.
Coley, Susan
Emerson, Keith
Hobbs, Oliver, Chairman
King, Edward L.
McCormally, Kristy
Reid, Marsha
Shaffer, Brian
Turner, Vivian
Quorum Present:
Yes
Vote: 7-0
Motion Approved
Vote: 7-0
Motion Approved
Vote: 7-0
Motion Approved
Vote: 7-0
Motion Approved
CITY OF SUFFOLK
442 W. WASHINGTON ST., P.O. BOX 1858, SUFFOLK, VIRGINIA 23439-1858
PHONE: (757) 514-4060 FAX: (757) 514-4099
DEPARTMENT OF
PLANNING & COMMUNITY DEVELOPMENT
Division of Planning
To: Historic Landmarks Commission
From: Goncalo Borges, Senior Planner
Date: August 13, 2026
Subject: Request for Certificate of Appropriateness HLC202 6-00011, submitted by G.
Wayne Rhoads , applicant and agent, on behalf of the City of Suffolk, property
owner, to paint the north, south, and west façades, repair the masonry on the east
façade, install new storefront openings, metal canopies, brick wall infill, and
renovate the parking lot at 157 N. Main Street. The property is further identified as
Zoning Map Number 34G18(A)*319, 34G18(5)*11, 34G18(5)*10,
34G18(A)*316, 34G18(5)*11A, 34G18(A)*318*320+, Suffolk Voting Borough,
zoned CBD, Central Business District, and HC, Historic Conservation Overlay
District.
STAFF REPORT
Overview and Proposed Actions
The subject property is located at 157 N. Main Street. The subject properties are the Virginia Pilot
Building, currently occupied by Suffolk’s Economic Development Authority, and an active public
parking lot that serves this office building and other adjacent businesses.
Per the National Register of Historic Places r ecords (East Washington Street District, 2002
expansion), the sequence of buildings from 151 to 161 North Main Street, of which the Virginia
Pilot Building is part, are contributing vernacular commercial buildings, developed between 1935
and 1949. The subject structure is 2 stories tall, with a solid poured concrete foundation, stretcher
bond brick structural system, and a flat roof. The building is currently characterized by an eastern
façade composed of blonde exposed brick, three doors and eight windows on the street level, and
ten windows on the first floor. The building also has painted (white) brick in the southern, western,
and northern façades . T he western façade (commonly perceived as the rear of the building)
currently includes one storefront, five doors, and three windows on the first floor. The southern
façade abuts the adjacent building and has no features other than painted brick.
HLC2026-00011
August 13, 2026
Page 2
The applicant is proposing the following actions:
• Paint the already painted (white) north, south, and west façades with PPG’s Paint
Collection: “New England Regional – Atrium White PPG 1020-1”.
• Repair the exposed blonde brick masonry on the east façade (facing North Main Street)
with in-kind materials -inclusive of tooth in new brick veneer, repoint brick as required to
achieve uniformity, and patch CMU and brick.
• Create a new opening and i nstall a new aluminum storefront window on the west façade
(facing the parking) matching the already existing door and storefront window, and open a
smaller window to its left.
• Install 4 metal canopies on the west façade and replace the existing ones.
• Brick wall infill to close an unused door in the west façade.
• Renovate the parking lot by paving it with heavy-duty asphalt, 6” wide concrete sidewalks,
and rearranging the parking spaces to create 48 new parking spaces.
• Plant 4 October Glory Maples, 8 Sawtooth Oaks, 16 Dwarf Burford Holly (shrubs), 69 Big
Blue Lilly Turf, 3,774 SF of Turf Seed, and 701 SF of Shredded Hardwood Mulch.
• Install 4 LSI Lighting “SLM” Series lights and poles in the parking area.
• Install 2 “TRP2” Series lights on the southern face (alleyway) of the structure.
Case History
• In 2002, the subject structure was included in the National Register of Historic Places at
the time of the East Washington Street District expansion.
• On June 2 nd, 2022, the subject property received a Certificate of Appropriateness (CoA,
HLC2022-00017) to install a handicap ramp; this ramp was not proposed to be attached to
the structure.
Public Notice
This request has been duly advertised in accordance with the public notice requirements in Section
15.2-2204 of the Code of Virginia, as amended, and with the applicable provisions of the Unified
Development Ordinance. A notice, containing a copy of the staff report, was also provided to the
applicant on August 7, 2026.
Applicable Regulations
A. Unified Development Ordinance (UDO)
• Section 31-413(f)(1)D, Issuance of Certificates: The Historic Landmarks Commission
shall not issue a Certificate of Appropriateness authorizing issuance of any permit if it
finds that the action proposed would adversely affect the primary character of the
district or the setting of structures and premises of substantial public interest.
• Section 31 -413(g)(2), General Considerations : The compatibility with the design,
development standards and criteria as included in the City’s adopted Historic District
Design Guidelines.
HLC2026-00011
August 13, 2026
Page 3
B. Suffolk Historic District Design Guidelines (8-16-2023 Version)
• Chapter 2, Masonry (pages 15 – 18).
• Chapter 2, Commercial Storefronts (pages 33 – 39).
• Chapter 4, New Construction (pages 70 – 75).
• Chapter 5, Site & Setting (pages 77 – 92).
C. The Secretary of the Interior’s Standards for Rehabilitation
• A property shall be used for its historic purpose or be placed in a new use that requires
minimal change to the defining characteristics of the building and its site and
environment.
• New additions, exterior alterations, or related new construction shall not destroy
historic materials that characterize the property. The new work shall be differentiated
from the old and shall be compatible with the massing , size, scale, and architectural
features to protect the historic integrity of the property and its environment.
• Designing new onsite parking, loading docks, or ramps when required by the new use
so that they are as unobtrusive as possible and assure the preservation of the historic
relationship between the building or buildings and the landscape.
• Complying with barrier -free access requirements, in such a manner that character -
defining spaces, features, and finishes are preserved.
• Not recommended: Removing or radically changing buildings and their features or site
features which are important in defining the overall historic character of the property
so that, as a result, the character is diminished.
• Not recommended: Introducing a new landscape feature, including plant material, that
is visually incompatible with the site, or that alters or destroys the historic site patterns
or vistas.
• Not recommended: Placing parking facilities directly adjacent to historic buildings
where automobiles may cause damage to the buildings or to important landscape
features.
Staff Analysis
Upon reviewing the application materials and proposed scope of work, staff finds that the proposed
work on the Virginia Pilot Building (157 N. Main Street) as well as the parking lot improvements
are in substantial alignment with the UDO, and with the Suffolk Historic District Design
Guidelines (8-16-2023 Version).
Façade work:
The applicant is proposing several actions on the different facades of the subject structure : paint
HLC2026-00011
August 13, 2026
Page 4
the already painted ( in white) north, south, and west façades with the pre-approved PPG’s Paint
Collection: “New England Regional – Atrium White PPG 1020-1”, repair the exposed blonde brick
masonry on the east façade (facing North Main Street) with in -kind materials - inclusive of tooth
in new brick veneer, repoint brick as required to achieve uniformity, and patch CMU and brick ,
create a new opening and install a new aluminum storefront window on the west façade (facing
the parking) matching the already existing door and storefront window, open a smaller window to
the left of the new opening, install four metal canopies on the west façade and replace the existing
ones, and execute a brick wall infill to close an unused door in the west façade.
Per Section 31-413(f)(1)D, the proposed façade improvements do not adversely affect the primary
character of the district or the setting of structures and premises of substantial public interest. Per
Section 31-413(g)(2), all the materials such as brick, mortar, and metal are considered appropriate
to this second-generation historic setting. Considering Chapter 2 of the Historic District Design
Guidelines, which guides masonry works and commercial façade treatment, the applicant is
correctly attempting to preserve the historical material found in the east façade, which is composed
of unpainted blonde brick. On this façade, the proposed actions aim to restore the original quality
of the façade, without altering the historic character of the structure or adding conflicting elements.
The applicant is proposing to use in-kind materials where replacements are needed, and the work
in the veneers is appropriate given that it maintains the original historic design. The proposed
actions on the east façade, facing North Main Street, accomplish the Historic District Guidelines
of preserving and restoring the visibility of historic materials, because the proposed brick matches
the historic in color, texture, size, and composition.
The north, west, and south facades are currently painted in white, and the west façade presents a
second-generation storefront that has been altered during the course of the last century. Since these
façades are already painted, the historic guidelines permit that such painted masonry can be
repainted. The proposed color is the New England Regional – Atrium White PPG 1020-1, which
is a pre -approved color by the Historic Conservation Overlay District/Historic Landmarks
Commission. Therefore, staff finds this treatment appropriate and in conformity with the Historic
District guidelines and generally with the Secretary of the Interior’s standards for rehabilitation.
The applicant is proposing to open a new storefront window just to the left of the existing
storefront, as well as opening a small new window to the left of the proposed opening . The
applicant is also aiming to infill a door that is located in the northwest corner of the façade and
install 4 metal canopies – matching the existing metal canopy. This façade is a second-generation
storefront with modern features , which shows evidence of alterations during the last century –
initially, the rear of this building does not appear to have been designed to have a storefront, but
instead back doors and service doors. The façade currently includes, on the first floor, 5 service
doors, a storefront door with windows, and 3 small windows on the second floor.
Per Chapter 2’s Commercial Storefronts section (pages 33 – 39), the details of a storefront provide
important information about the style and era of the structure. All eras of storefront designs feature
large windows for displaying goods, but the materials and details differ over time. The guidelines
also emphasize tha t storefronts are often updated to reflect current trends and marketing
techniques. Simultaneously, the guidelines recommend that if the existing storefront is modern
and requires repairs, the repairs should be accomplished with a matching finish and size. The
HLC2026-00011
August 13, 2026
Page 5
current guidelines direct that the historic materials, dimensions, and profile be replicated, as well
as suggest that property owners replicate any historic features, details, or ornament, and use clear
glass in a storefront.
Given the second-generation and already modernized west façade, the proposed actions to include
a new display storefront window, opening a smaller window, infill the unused door, and adding 4
metal canopies over the doors by using appropriate materials, designs, and textures that replicate
the existing second-generation features, are deemed appropriate by the guidelines. These actions
do change the west façade’s appearance, but the proposed additions are executed by using in-kind
materials; the design respects the existing second-generation character, and it is also adequate
given that the guidelines expect that storefronts are often updated to reflect current trends and
marketing techniques. It is staff opinion that the proposed actions , while changing the façade’s
design, it does so in a manner that is respectful of the historic materials, context , and character,
and it does improve the functionality and aesthetics of this second-generation and modernized
façade.
Parking lot improvements:
The applicant is proposing to redevelop the parking lot behind the Virginia Pilot Building to
include 48 spaces to serve this historic building and other surrounding businesses/institutions. This
work includes the following actions: Demolishing the existing pavement and sidewalks, repaving
the surface with heavy-duty asphalt, creating a total of 48 parking spaces, and installing a 6” wide
concrete sidewalk per VDOT standards.
These improvements have been designed not to interfere with , obstruct, or be adverse to the
adjacent historic Virginia Pilot Building, and to the district in general. Per Section 31-413(f)(1)D,
the proposed parking lot improvements do not adversely affect the primary character of the district
or the setting of structures and premises of substantial public interest. Per Section 31 -413(g)(2),
all the materials such as asphalt and concrete are considered appropriate to this use and setting.
These materials are already present in the Historic District, and the proposed features, such as the
asphalt parking surface and sidewalk, are compatible with the design, development standards, and
criteria as included in the City’s adopted Historic District Design Guidelines.
Considering Chapter 4 of the Historic District Design Guidelines, which guides new construction,
and the Secretary of the Interior’s Standards for Rehabilitation, the proposed parking lot
improvements are designed to maintain the historic character of the subject property by keeping
the design and choice of materials simple and without conflicting or risking damaging the Virginia
Pilot Building. The proposed features also match with other parking lots developed and maintained
by the City of Suffolk within the historic district.
In what concerns Chapter 5 (Site & Setting guidelines) and other recommendations by the
Secretary of the Interior, the proposed parking lot and its features provide an adequate transition
of public and private spaces between the public right of way and the adjacent structure. The
installation of sidewalks and two ADA accessible spaces offers accessibility to those using the
parking area and the building, and operates as a buffer between the parking area and the building.
HLC2026-00011
August 13, 2026
Page 6
These actions are proposed without negatively impacting the historic value of the historic structure
and the unified feel in the district. The installation of the proposed parking lot on the western side
(typically perceived as the rear) of the Virginia Pilot Building also assures compliance with the
Historic District guidelines.
Pedestrian and landscaping improvements:
The applicant is proposing a series of landscaping improvements that would revitalize the subject
property and offer beautification, necessary pervious surface, and shade to the parking area serving
the Virginia Pilot Building. Hence, the applicant is proposing to plant 4 October Glory Maples, 8
Sawtooth Oaks, 16 Dwarf Burford Holly (shrubs), 69 Big Blue Lilly Turf, 3,774 SF of Turf Seed,
and 701 SF of Shredded Hardwood Mulch. The applicant is also aiming to install 4 LSI Lighting
“SLM” Series lights and poles in the parking area, and install 2 “TRP2” Series on the southern
façade (alleyway) of the structure to illuminate the parking area and alleyway on the subject
property.
Per Section 31-413(f)(1)D, the proposed landscaping and lighting improvements do not adversely
affect the primary character of the district or the setting of structures and premises of substantial
public interest. Per Section 31-413(g)(2), all the materials and features, such as the trees, sod, and
lighting poles, are considered appropriate and already present in the historic district. All
landscaping and lighting features are compatible with the design, development standards, and
criteria as included in the City’s adopted Historic District Design Guidelines.
Per Chapters 4 and 5 of the Historic District guidelines, and considering the recommendations by
the Secretary of the Interior, the staff finds that the proposed concrete sidewalk with tree wells, the
streetlight pole and fixture , and the plantings (sod, shrubs, and trees) are consistent with the
Historic District character, thus offering a unified feel to the streetscape . These are compatible
with the materials and architecture of the adjacent structures in the vicinity; for reference, the “LSI
Lighting “SLM” Series ” streetlight pole and fixture are existing in the current parking lot site .
Essentially, the applicant would be replacing these items in kind. The arrangement of the
landscaping and lighting features (as well as of the parking lot) is consistent with those on the same
street block and accomplishes the goal of retaining the historic character of the streetscape and the
rhythm of solids and voids along the street.
These improvements have compatible materials, colors, and features with those present in the
Historic District, and simultaneously enhance North Saratoga streetscape/parking options and also
this parking area that will serve the Downtown with 48 parking spaces . Lastly, the proposed
improvements are proposed as unobtrusive to the Virginia Pilot Building and assure the
preservation of the historic relationship between this structure, adjacent structures, and the overall
landscape.
HLC2026-00011
August 13, 2026
Page 7
Recommendation
In sum, staff have reviewed the proposed actions with respect to the applicable requirements of
the HC Overlay zoning district and determined that the proposed project meets them. It is staff's
opinion that improving the subject property by repairing the masonry, painting, and improving the
western façade by adding a storefront windows, a small window, and metal canopies, as well as
renovating the adjacent parking area is appropriate since it aligns with the standards set by the
Historic District Guidelines and by the UDO, as well as follows the recommendations set by the
Secretary of the Interior’s Standards for Rehabilitation.
Based on the above findings-of-fact and conditions outlined above, staff recommends approval
of a Certificate of Appropriateness for the request sought under HLC2026-00011 for the actions
described in this staff report. Therefore, staff recommends approval of the following actions as
summarized below concerning HLC2026-00011 and as further detailed and specified in the COA
application:
• Paint the already painted (white) north, south, and west façades with PPG’s Paint
Collection: “New England Regional – Atrium White PPG 1020-1”.
• Repair the exposed blonde brick masonry on the east façade (facing North Main Street)
with in-kind materials -inclusive of tooth in new brick veneer, repoint brick as required to
achieve uniformity, and patch CMU and brick.
• Create a new opening and i nstall a new aluminum storefront window on the west façade
(facing the parking) matching the already existing door and storefront window, and open a
smaller window to its left.
• Install 4 metal canopies on the west façade and replace the existing ones.
• Brick wall infill to close an unused door in the west façade.
• Renovate the parking lot by paving it with heavy-duty asphalt, 6” wide concrete sidewalks,
and rearranging the parking spaces to create 48 new parking spaces.
• Plant 4 October Glory Maples, 8 Sawtooth Oaks, 16 Dwarf Burford Holly (shrubs), 69 Big
Blue Lilly Turf, 3,774 SF of Turf Seed, and 701 SF of Shredded Hardwood Mulch.
• Install 4 LSI Lighting “SLM” Series lights and poles in the parking area.
• Install 2 “TRP2” Series lights on the southern face (alleyway) of the structure.
Attachments
• Site Maps
• Narrative
• Site Photography
• Virginia Pilot Building - Proposed Work Elevations
• Site Plans – Proposed Conditions, Landscaping, Photometric
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap
contributors, and the GIS User Community
01 . 534 . 560.75
Miles
^_
Author: KOSSAI
Date: 07-06-2026 ±
GENERAL LOCATION MAP
HLC2026-00011
Subject Property
VILLAGE
TRADITIONAL
NEIGHBORHOOD
SUBURBAN NEIGHBORHOOD
RIGHT OF WAY
RURAL NEIGHBORHOOD
RURAL CONSERVATION
RURAL AGRICULTURE
PARKS AND OPEN SPACE
OFFICE/INSTITUTIONAL
MIXED USE CORE
MULTIFAMILY
NEIGHBORHOOD
Employment Center
COMMERCIAL CORRIDOR
Central Growth Area
^_ SUBJECT PROPERTY
MARKET ST
W WASHINGTON ST
EWASHING
TON ST
CAROLINA RDCAROLINA R
D
BANK ST
PINE ST
S SARATOGA ST
CLAY ST
N SARATOGA ST
N MAIN ST
N SARATOGA ST
34G18(A)*319
350401000
34G18(A)*318*320+
352025000
34G18(A)*316
353327000
34G18(5)*10
353328000
34G18(5)*11
353329000
34G18(5)*11A
353747600
RU
CBD
RM
B-1
0 100 200 300 40050
Feet
Subject Property
Image: Suffolk Pictometry 2024
Author: KOSSAI
Date: 07-06-2026 ±
ZONING / LAND USE MAP
HLC2026-00011
MARKET ST
N MAIN ST
N SARATOGA ST
34G18(A)*319350401000
34G1
8(A
)*3
18*320+
352
025000
34G18(A)*316353327000
34G18(5)*10
353328000
34G18(5)*11
353329000
34G18(5)*11A
353747600
0 40 80 120 16020
Feet
EXHIBIT B
Subject Property
Author: KOSSAI
Date: 07-06-2026 ±
PROPERTY MAP
HLC2026-00011
N MAIN ST
MARKET
ST
ECONS
TANCE
RD
W
W
ASHINGTON
ST
CEDAR ST
E WASHINGTON ST
YORK ST
WELLONS ST
CAROLINA RD
FAYETTE ST
N SARATOGA
ST
FAYETTEST
PITCHKETTLE RD
SMITH ST
MARYLAND AVE
PITCHKETTLEVILLAGE
ST
JACKSON
ST
KATHERINE ST
CULLODEN ST
S SARATOGA ST
WHITE
MARSH RD
JOHNSON AVE
W
CONSTANCE
RD
BANK ST
CAROLINA RD
ELEY
CT
FACTORY ST
BUTE ST
W FINNEY AVE
RIVER
POINT
DR
LINDEN
AVE
MOUNT HOREB ST
NEWPORT
ST
FREENEY
AVE
MORGAN ST
MILITARY RD
HENLEYPL
BANK ST
EXT
AZALEA
CT
GARFIELD
AVE
JOHNSON
AVE
MULBERRY ST
WEST
ERN
AVE
NANSEMOND
AVE
CHURCH ST
HALL AVE
HILL ST
CEDAR
ST
SPUR
BEECH ST
CAMP
AVE
YORK CT
DAYST
TYNES ST
OAK ST
E PINNER ST
CHERRY ST
BROOK AVE
PINE ST
SPRING ST
OAKLAND ST
RIVER
POINT
DR
MA
DISONAVE
POPLAR AVE
FOREST
HILL
CRES
N BROAD ST
S DIVISION
ST
MOUNT
SINAI ST
NANSEMOND
AVE
TRADD
ST
DUMVILLE LN
ORCHARD AVE
GRAYSON
CT
CENTRAL AVE
RIVERVIEW
CT
BOAT
ST
CAUSEY AVE
KENNEDYCT
CLARYS DR
BETHLEHEM
ST
JOHNSONAVE
MASON AVE
HIGHLAND AVE
OAKDALE TER
PARKWAY
ABRAHAM
ST
NORTH ST
WILSON ST
RENOST
S BROAD ST
MAHAN ST
VIRGINIA
AVE
VIRGINIA AVE
S MAIN ST
POLKST
RICHARDSON
ST
ASHLEY AVE
LINDEN AVE
KNIGHTST
CANNON ST
PITCHKETTLE RD
RAILROAD AVE
DUKE
ST
TERRACE
CT
PINNER ST
HOLLADAY ST
W RIVERVIEW DR
COLLEGE CT
SECOND AVE
GRANBY ST
SUNSETAVE
COLLIEAVE
FIRST AVE
GRACE ST
THIRD AVE
WALNUT ST
SECOND AVE
MAPLE ST
MULBERRY ST
CAUSEY AVE
PENDER ST
GLOUCE
ST
ER
ST
N DIVISION
ST
RIDLE
YST
LINCOLN
AVE
BOSLEY AVE
LEXI
NGTON
AVE
FORT ST
VAN BUREN
AVE
JEFFERSON ST
ADAMS STLAKES
IDE
ST
EUGENIA
ST
KINGSBORO ST
ALLEN ST
GITTINGS ST
ELIZABETH ST
PARK
RD
JOHNSON LN
DOGWOOD
LN
FINNEY AVE
BATTERY AVEBROOK AVE
FREEMASON ST
HOWAR
D
PL
CAROLINA
AVE
NEVADA
ST
LEE ST
N & W AVE
COUNTY ST
WILLOWST
S
BROAD ST
SPRUCE ST
SAINT JAMES AVE
PEARL ST
COMMERCE
ST
SOUTH
ST
N LLOYD ST
JONES ST
DUMVILLE AVE
CHARLES ST
LINDEN AVE LINDEN AVE
BREWER AVE
FOREST ST
W
FINNEYAVE
WARWIC
K
ST
N
CAPITAL ST
SAINT JAMES AVE
FRANKLIN ST
CHESTNUT ST
PINE ST
ROANOKE ST
COMMERCE ST
FOURTH ST
CLAY ST
HENRY ST
RAILROAD
AVE
LIBERTY ST
N DIVISION ST
BUTLER AVE
N SARATOGA
ST
DARDEN AVE
N LLOYD ST
JEFFERSON
ST
ERIVERVIEW DR
HALIFAX ST
LOCUST
ST
SHIPWRIGHT
LN
PRENTIS ST
E RIVERVIEW
DR
FAIRGROUNDS
LN
E
CONSTANCE
RD
ECONST
AN
CE
RD
MOORE AVE
NANSEMOND RIVERLAKE MEADE
Disclaimer: THE CITY OF SUFFOLK MAKES NO
WARRANTY, REPRESENTATION, OR GUARANTEE OF ANY
KIND REGARDING EITHER ANY MAPS OR OTHER
INFORMATION PROVIDED HEREIN OR THE SOURCES OF
SUCH MAPS OR OTHER INFORMATION. THE CITY OF
SUFFOLK SPECIFICALLY DISCLAIMS ALL
REPRESENTATIONS OR WARRANTIES, EXPRESSED OR
IMPLIED, INCLUDING, WITHOUT LIMITATION, THE
IMPLIED WARRANTIES OF MERCHANTABILIY AND
FITNESS FOR A PARTICULAR PURPOSE.
The City of Suffolk assumes no liability for any errors,
omissions, or inaccuracies in the information provided
regardless of the cause of such or for any decision made ,
action taken, or action not taken by the user in reliance upon
any maps or information provided herein.
Parcel and Zoning information has been developed to provide
a graphic representation of the Real Estate Property Tax
Maps. The boundaries of any parcel may have been adjusted
to provide a more visually pleasing presentation. User should
refer to the instrument of transfer (deed or plat) for legal
boundary location and perimeter or area measurements.
Amended 8/16/2011 by Ordinance No. 11-O-073
0 0.1 0.2 0.3 0.40.05
Miles
SCALE: 1:10,000
Legend
BUILDING FOOTPRINTS
SUFFOLK HISTORIC CONSERVATION OVERLAY
NATIONAL REGISTER OF HISTORIC DISTRICTS
ORIGINAL SUFFOLK DISTRICT (1987)
NORTH MAIN STREET DISTRICT EXTENSION (1998)
EAST WASHINGTON STREET DISTRICT (2002)
WEST END DISTRICT (2004)
WEST END DISTRICT EXPANSION (2004)
SUFFOLK DISTRICT EXPANSION (2004)
CEDAR HILL DISTRICT (2006)
^_
Author: KOSSAI
Date: 07-06-2026
µ
Suffolk
Historic
Conservation
Overlay District &
National Register
GENERAL LOCATION MAP
HLC2026-00011
Subject Property
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
EXTERIOR PAINTING 099113 - 1
SECTION 099113 - EXTERIOR PAINTING
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes surface preparation and the application of paint systems on exterior substrates.
A. Clay Masonry (Brick Veneer)
B. Concrete masonry units (CMUs).
C. Steel and iron.
D. Galvanized metal.
B. Section includes surface preparation, painting, and finishing of exposed exterior items and
surfaces.
A. Surface preparation, priming, and finish coats specified in this section are in addition to
shop priming and surface treatment specified under other sections.
C. Paint all exposed surfaces whether or not colors are designated in "schedules," except where a
surface or material is specifically indicated not to be painted or is to remain natural. Where an
item or surface is not specifically mentioned, paint the same as similar adjacent materials or
surfaces. If color or finish is not designated, the Architect/Engineer will select from standard
colors or finishes available.
D. Painting is not required on prefinished items unless otherwise noted, finished metal surfaces,
concealed surfaces, operating parts, and Do Not Paint Labels.
A. Labels: Do not paint over Underwriter's Laboratories, Factory Mutual or other
code-required labels or equipment name, identification, performance rating, or
nomenclature plates.
E. Related Requirements:
A. Section 081113 “Hollow Metal Doors and Frames”.
B. Section 099123 “Interior Painting”.
1.3 DEFINITIONS
A. MPI Gloss Level 1: Not more than five units at 60 degrees and 10 units at 85 degrees, according
to ASTM D 523.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
EXTERIOR PAINTING 099113 - 2
B. MPI Gloss Level 3: 10 to 25 units at 60 degrees and 10 to 35 units at 85 degrees, according to
ASTM D 523.
C. MPI Gloss Level 4: 20 to 35 units at 60 degrees and not less than 35 units at 85 degrees, according
to ASTM D 523.
D. MPI Gloss Level 5: 35 to 70 units at 60 degrees, according to ASTM D 523.
E. MPI Gloss Level 6: 70 to 85 units at 60 degrees, according to ASTM D 523.
F. MPI Gloss Level 7: More than 85 units at 60 degrees, according to ASTM D 523.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product. Include preparation requirements and application
instructions.
A. Include printout of current "MPI Approved Products List" for each product category
specified, with the proposed product highlighted.
B. Indicate VOC content.
B. Samples for Initial Selection: For each type of topcoat product.
C. Samples for Verification: For each type of paint system and each color and gloss of topcoat.
D. Samples for verification purposes: Provide samples of each color and material to be applied, with
texture to simulate actual conditions, on representative samples of the actual substrate. Define
each separate coat, including block fillers and primers. Use representative colors when preparing
samples for review. Resubmit until required sheen, color, and textures are achieved.
A. Provide a list of material and application for each coat of each sample. Label each sample
as to location and application.
B. Submit samples on the following substrates for the Architect's review of color and texture
only:
a. Concrete Masonry: Provide three (3) 4- by-8-inch samples of masonry for each
finish and color.
b. Ferrous or Galvanized Metal: Provide three 4-inch-square samples of flat metal and
two 8-inch-long samples of solid metal for each color and finish.
c. The Contractor shall prepare samples at the job as required until colors and textures
are satisfactory. Samples of water base acrylic-epoxy shall be made on 2 feet 0
inches x 4 feet 0 inches x 1/4 plywood panels. Submit four samples. Provide a
listing of the material and application for each coat of each finish sample.
E. Product List: Cross-reference to paint system and locations of application areas. Use same
designations indicated on Drawings and in schedules. Include color designations.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
EXTERIOR PAINTING 099113 - 3
1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials, from the same product run, that match products installed and that are
packaged with protective covering for storage and identified with labels describing contents.
A. Paint: Provide 5 gal. of each material and color applied.
1.6 QUALITY ASSURANCE
A. MPI Standards:
A. Products: Complying with MPI standards indicated and listed in “MPI Approved Products
List.”
a. Preparation and Workmanship: Comply with requirements in “MPI Architectural
Painting Specification Manual” for products and paint systems indicated.
B. Single-Source Responsibility: Provide primers and undercoat paint produced by the same
manufacturer as the finish coats.
C. Coordination of Work: Review other sections in which primers are provided to ensure
compatibility of the total systems for various substrates. On request, furnish information on
characteristics of finish materials to ensure use of compatible primers.
A. Prior to submittals, notify the Architect of any problems anticipated using the materials
specified.
D. Field Samples: On wall surfaces and other exterior and interior components, duplicate finishes
of prepared samples. Provide full- coat finish samples on at least 100 sq. ft. of surface until
required sheen, color and texture are obtained; simulate finished lighting conditions for review of
in-place work.
A. Final acceptance of colors will be from job-applied samples.
B. Where colors selected are of a dark or vibrant color not capable of being mixed with a
particular manufacturer's paint type equal to paint type specified, provide an equal or better
paint type that can provide such color upon approval of the Architect.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials to the job site in the manufacturer's original, unopened packages and containers
bearing manufacturer's name and label and the following information:
A. Product name or title of material.
B. Product description (generic classification or binder type).
C. Federal Specification number, if applicable.
D. Manufacturer's stock number and date of manufacture.
E. Contents by volume, for pigment and vehicle constituents.
F. Thinning instructions.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
EXTERIOR PAINTING 099113 - 4
G. Application instructions.
H. Color name and number.
B. Store materials not in use in tightly covered containers in a well-ventilated area at a minimum
ambient temperature of 45 deg F. Maintain containers used in storage in a clean condition, free
of foreign materials and residue.
A. Protect from freezing. Keep storage area neat and orderly. Remove oily rags and waste
daily. Take necessary measures to ensure that workers and work areas are protected from
fire and health hazards resulting from handling, mixing, and application.
1.8 FIELD CONDITIONS
A. Apply solvent-thinned paints only when the temperature of surfaces to be painted and surrounding
air temperatures are between 45 deg F and 95 deg F.
B. Do not apply paint in snow, rain, fog, or mist, when the relative humidity exceeds 85 percent, at
temperatures less than 5 deg F above the dew point, or to damp or wet surfaces.
A. Painting may continue during inclement weather if surfaces and areas to be painted are
enclosed and heated within temperature limits specified by the manufacturer during
application and drying periods.
B. Do not apply paint until debris has been removed and spaces have been vacuumed to
remove all dust and dirt.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the
following:
A. Benjamin Moore & Co.
B. Duron, Inc.
C. Glidden Professional.
D. PPG Architectural Finishes, Inc.
E. Pratt & Lambert.
F. Sherwin-Williams Company (The).
B. Products: Subject to compliance with requirements, available products that may be incorporated
into the Work include, but are not limited to products listed in the Exterior Painting Schedule for
the paint category indicated.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
EXTERIOR PAINTING 099113 - 5
2.2 PAINT, GENERAL
A. MPI Standards: Products shall comply with MPI standards indicated and shall be listed in its
"MPI Approved Products Lists."
B. Material Compatibility:
A. Materials for use within each paint system shall be compatible with one another and
substrates indicated, under conditions of service and application as demonstrated by
manufacturer, based on testing and field experience.
B. For each coat in a paint system, products shall be recommended in writing by topcoat
manufacturers for use in paint system and on substrate indicated.
C. VOC Content: For field applications, paints and coatings shall comply with VOC content limits
of authorities having jurisdiction and the following VOC content limits:
A. Flat Paints and Coatings: 50 g/L.
B. Nonflat Paints and Coatings: 50 g/L.
C. Dry-Fog Coatings: 150 g/L.
D. Primers, Sealers, and Undercoaters: 100 g/L.
E. Rust-Preventive Coatings: 100 g/L.
F. Zinc-Rich Industrial Maintenance Primers: 100 g/L.
G. Pretreatment Wash Primers: 420 g/L.
H. Shellacs, Clear: 730 g/L.
I. Shellacs, Pigmented: 550 g/L.
J. Light Industrial Coatings: 400g/L.
D. Colors: Match Architect's samples.
2.3 SOURCE QUALITY CONTROL
A. Testing of Paint Materials: Owner reserves the right to invoke the following procedure:
A. Owner will engage the services of a qualified testing agency to sample paint materials.
Contractor will be notified in advance and may be present when samples are taken. If paint
materials have already been delivered to Project site, samples may be taken at Project site.
Samples will be identified, sealed, and certified by testing agency.
B. Testing agency will perform tests for compliance with product requirements.
C. Owner may direct Contractor to stop applying paints if test results show materials being
used do not comply with product requirements. Contractor shall remove noncomplying
paint materials from Project site, pay for testing, and repaint surfaces painted with rejected
materials. Contractor will be required to remove rejected materials from previously painted
surfaces if, on repainting with complying materials, the two paints are incompatible.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
EXTERIOR PAINTING 099113 - 6
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Applicator present, for compliance with requirements
for maximum moisture content and other conditions affecting performance of the Work.
B. Examine substrates and conditions under which painting will be performed for compliance with
requirements for application of paint. Do not begin paint application until unsatisfactory
conditions have been corrected.
A. Starting of painting work will be construed as Applicator's acceptance of surfaces and
conditions within any particular area and that the room has been completely vacuumed and
all airborne dust will not affect painting procedures or paint finish. If airborne dust can
migrate from other areas, Contractor shall provide dust partitions or doors to prohibit
migration.
B. Applicator must examine areas and conditions under which painting work is to be applied
and notify Contractor in writing of conditions detrimental to proper and timely completion
of work. Do not proceed with work until unsatisfactory conditions have been corrected in
a manner acceptable to Applicator. Beginning coating application constitutes Contractor’s
acceptance of substrates and conditions.
C. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions otherwise
detrimental to formation of a durable paint film.
D. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as
follows:
A. Masonry (Clay and CMUs): 12 percent.
E. Verify suitability of substrates, including surface conditions and compatibility, with existing
finishes and primers.
F. Proceed with coating application only after unsatisfactory conditions have been corrected.
A. Application of coating indicates acceptance of surfaces and conditions.
3.2 PREPARATION
A. General Procedures: Remove hardware and hardware accessories, plates, machined surfaces,
lighting fixtures, and similar items in place that are not to be painted, or provide surface-applied
protection prior to surface preparation and painting. Do not paint over labels of independent
testing agencies or equipment name, identification, performance rating, or nomenclature plates.
Remove these items if necessary for complete painting of the items and adjacent surfaces.
Following completion of painting operations in each space or area, have items reinstalled by
workers skilled in the trades involved.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
EXTERIOR PAINTING 099113 - 7
A. Clean surfaces before applying paint or surface treatments. Remove oil and grease prior
to cleaning. Schedule cleaning and painting so that dust and other contaminants from the
cleaning process will not fall on wet, newly painted surfaces.
B. Surface Preparation: Clean and prepare surfaces to be painted in accordance with the
manufacturer's instructions for each particular substrate condition and as specified.
A. Provide barrier coats over incompatible primers or remove and reprime. Notify
Architect/Engineer in writing of problems anticipated with using the specified finish-coat
material with substrates primed by others.
B. Cementitious Materials: Prepare concrete, concrete masonry block and cement plaster
surfaces to be painted. Remove efflorescence, chalk, dust, dirt, grease, oils, and release
agents. Roughen as required to remove glaze. If hardeners or sealers have been used to
improve curing, use mechanical methods of surface preparation.
a. Use abrasive blast-cleaning methods if recommended by the paint manufacturer.
b. Determine alkalinity and moisture content of surfaces by performing appropriate
tests. If surfaces are sufficiently alkaline to cause blistering and burning of finish
paint, correct this condition before application. Do not paint surfaces where
moisture content exceeds that permitted in manufacturer's printed directions.
c. Clean concrete floors to be painted with a 5 percent solution of muriatic acid or other
etching cleaner. Flush the floor with clean water to remove acid, neutralize with
ammonia, and rinse; allow to dry and vacuum before painting.
C. Ferrous Metals: Clean nongalvanized ferrous-metal surfaces that have not been shop
coated; remove oil, grease, dirt, loose mill scale, and other foreign substances. Use solvent
or mechanical cleaning methods that comply with recommendations of the Steel Structures
Painting Council.
a. Touch up bare areas and shop-applied prime coats that have been damaged.
Wire-brush, clean with solvents recommended by the paint manufacturer, and touch
up with the same primer as the shop coat.
D. Galvanized Surfaces: Clean galvanized surfaces with non-petroleum-based solvents so
that the surface is free of oil and surface contaminants. Remove pretreatment from
galvanized sheet metal fabricated from coil stock by mechanical methods.
C. Materials Preparation: Carefully mix and prepare paint materials in accordance with
manufacturer's directions.
A. Maintain containers used in mixing and application of paint in a clean condition, free of
foreign materials and residue.
B. Stir material before application to produce a mixture of uniform density; stir as required
during application. Do not stir surface film into material. Remove films and, if necessary,
strain material before using.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
EXTERIOR PAINTING 099113 - 8
3.3 APPLICATION
A. Apply paints according to manufacturer's written instructions and recommendations in "MPI
Architectural Painting Specification Manual."
A. Use applicators and techniques suited for paint and substrate indicated.
B. Paint surfaces behind movable items same as similar exposed surfaces. Before final
installation, paint surfaces behind permanently fixed items with prime coat only.
C. Paint both sides and edges of exterior doors and entire exposed surface of exterior door
frames.
D. Do not paint over labels of independent testing agencies or equipment name, identification,
performance rating, or nomenclature plates.
E. Primers specified in painting schedules may be omitted on items that are factory primed or
factory finished if acceptable to topcoat manufacturers.
B. Apply paint in accordance with manufacturer's directions. Unless otherwise indicated, paint
applications shall be by brush or roller. Walls may be spray applied with backrolling. Exposed
steel joists, hollow metal frames, and hollow metal doors shall be sprayed on with the final coat
brush or roller applied. Exposed metal decks and roll up doors will be allowed to have all coats
spray applied.
C. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to
formation of a durable paint film.
A. Paint colors, surface treatments, and finishes are indicated in the Color Schedule. Colors
not indicated shall be as selected by the Architect/Engineer. First coat of finish coatings
shall have slight tint variation from final coat to distinguish coat applications. Contractor
shall not provide second coat in any space until Owner is notified that first coat is complete.
Contractor shall maintain color coded chart/drawing in trailers of rooms and coat status.
Failure to notify Owner will be cause for additional coat of paint to be applied.
B. Provide finish coats that are compatible with primers used.
C. The number of coats and film thickness required is the same regardless of the application
method. Do not apply succeeding coats until the previous coat has cured as recommended
by the manufacturer. Sand between applications where sanding is required to produce an
even smooth surface in accordance with the manufacturer's directions.
D. Apply additional coats when undercoats, stains, or other conditions show through final coat
of paint until paint film is of uniform finish, color, and appearance. Give special attention
to ensure that surfaces, including edges, corners, crevices, welds, and exposed fasteners,
receive a dry film thickness equivalent to that of flat surfaces.
E. The term "exposed surfaces" includes areas visible when permanent or built-in fixtures,
convector covers, covers for finned tube radiation, grilles, and similar components are in
place. Extend coatings in these areas as required to maintain the system integrity and
provide desired protection.
F. Paint surfaces behind movable equipment and furniture same as similar exposed surfaces.
Paint surfaces behind permanently fixed equipment or furniture with prime coat only
before final installation of equipment.
G. Paint interior surfaces of ducts, where visible through registers or grilles, with a flat,
nonspecular black paint, specifically formulated for the application and complying with
requirements of ASHRAE 90.1 for ductwork interior coatings.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
EXTERIOR PAINTING 099113 - 9
H. Paint back sides of access panels and removable or hinged covers to match exposed
surfaces.
I. Follow manufacturer's recommendations and instructions carefully regarding special
coating product on concrete columns so as to provide the best quality work.
D. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise
prepared for painting as soon as practicable after preparation and before subsequent surface
deterioration.
A. Allow sufficient time between successive coats to permit proper drying. Do not recoat
until paint has dried to where it feels firm, and does not deform or feel sticky under
moderate thumb pressure and where application of another coat of paint does not cause
lifting or loss of adhesion of the undercoat. Do not recoat sooner than recommended by
paint manufacturer.
E. Minimum Coating Thickness: Apply materials at not less than the manufacturer's recommended
spreading rate. Provide a total dry film thickness of the entire system as recommended by the
manufacturer.
F. Mechanical and Electrical Work: Painting mechanical and electrical work is limited to items
exposed in mechanical equipment rooms and in occupied spaces.
G. Mechanical items to be painted include but are not limited to:
A. N/A
H. Electrical items to be painted include but are not limited to:
A. Conduit and fittings.
I. Block Fillers: Apply block fillers to concrete masonry block at a rate to ensure complete coverage
with pores filled.
J. Prime Coats: Before application of finish coats, apply a prime coat of material as recommended
by the manufacturer to material that is required to be painted or finished and has not been prime
coated by others. Recoat primed and sealed surfaces where evidence of suction spots or unsealed
areas in first coat appears, to assure a finish coat with no burn through or other defects due to
insufficient sealing. Factory primed materials shall not constitute the prime coat specified within
this specification section.
K. Pigmented (Opaque) Finishes: Completely cover to provide an opaque, smooth surface of
uniform finish, color, appearance, and coverage. Cloudiness, spotting, holidays, laps, brush
marks, runs, sags, ropiness, or other surface imperfections will not be acceptable.
L. Transparent (Clear) Finishes: Use multiple coats to produce a glass-smooth surface film of even
luster. Provide a finish free of laps, cloudiness, color irregularity, runs, brush marks, orange peel,
nail holes, or other surface imperfections.
A. Provide satin finish for final coats.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
EXTERIOR PAINTING 099113 - 10
M. Completed Work: Match approved samples for color, texture, and coverage. Remove, refinish,
or repaint work not in compliance with specified requirements.
3.4 FIELD QUALITY CONTROL
A. Dry Film Thickness Testing: Owner may engage the services of a qualified testing and inspecting
agency to inspect and test paint for dry film thickness.
A. Contractor shall touch up and restore painted surfaces damaged by testing.
B. If test results show that dry film thickness of applied paint does not comply with paint
manufacturer's written recommendations, Contractor shall pay for testing and apply
additional coats as needed to provide dry film thickness that complies with paint
manufacturer's written recommendations.
B. The Owner reserves the right to invoke the following test procedure at any time and as often as
the Owner deems necessary during the period when paint is being applied:
A. The Owner will engage the services of an independent testing laboratory to sample the
paint material being used. Samples of material delivered to the project will be taken,
identified, sealed, and certified in the presence of the Contractor.
B. The testing laboratory will perform appropriate tests for the following characteristics as
required by the Owner:
a. Quantitative materials analysis.
b. Abrasion resistance.
c. Apparent reflectivity.
d. Flexibility.
e. Washability.
f. Absorption.
g. Accelerated weathering.
h. Dry opacity.
i. Accelerated yellowness.
j. Recoating.
k. Skinning.
l. Color retention.
m. Alkali and mildew resistance.
C. If test results show material being used does not comply with specified requirements and
by specified manufacturer's requirements, the Contractor shall be directed to stop painting,
remove noncomplying paint, pay for testing, repaint surfaces coated with rejected paint,
and remove rejected paint from previously painted surfaces if, upon repainting with
specified paint, the two coatings are noncompatible. All corrective work will be at the
Contractor's expense.
3.5 CLEANING AND PROTECTION
A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from
Project site.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
EXTERIOR PAINTING 099113 - 11
B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing,
scraping, or other methods. Do not scratch or damage adjacent finished surfaces.
C. Protect work of other trades against damage from paint application. Correct damage to work of
other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and leave
in an undamaged condition.
D. At completion of construction activities of other trades, touch up and restore damaged or defaced
painted surfaces.
3.6 EXTERIOR PAINTING SCHEDULE
A. Clay Masonry Substrates:
A. High Performance Architectural Latex System:
a. Prime Coat: Alkali-resistant, water-based primer. MPI #17
b. Intermediate Coat: Matching topcoat.
c. Topcoat: Exterior, high performance architectural latex, low sheen. (MPI Gloss
Level 3-4), MPI #15.
B. CMU Substrates:
A. Latex System MPI EXT 4.2A:
a. Prime Coat: Block filler, latex, interior/exterior, MPI #4.
b. Intermediate Coat: Latex, exterior, matching topcoat.
c. Topcoat: Latex, exterior, low sheen (MPI Gloss Level 3-4), MPI #15.
C. Steel and Iron Substrates:
A. Water-Based Light Industrial Coating System MPI EXT 5.1C:
a. Prime Coat: Primer, zinc rich, inorganic, MPI #19.
b. Intermediate Coat: Light industrial coating, exterior, water based, matching topcoat.
B. Water-Based Light Industrial Coating over Epoxy System MPI EXT 5.1R:
a. Prime Coat: Primer, epoxy, anti-corrosive MPI #101.
b. Intermediate Coat: Epoxy, high build, low gloss MPI #108.
c. Topcoat: Light industrial coating, exterior, water based, semi-gloss (MPI Gloss
Level 5), MPI #163.
C. Aluminum Paint System MPI EXT 5.1K:
a. Prime Coat: Primer, alkyd, anti-corrosive, for metal, MPI #79.
b. Intermediate Coat: Aluminum paint, matching topcoat.
D. Galvanized-Metal Substrates:
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
EXTERIOR PAINTING 099113 - 12
A. Light Industrial Coating System:
a. Prime Coat: Tnemec Series 66 Hi-build Epoxoline applied at a dry film thickness of
not less than 0.5 mils.
b. Intermediate Coat: Light industrial coating, matching topcoat.
c. Topcoat: Tnemec Series 73 applied at a dry film thickness of not less than 5.0 mils.
1END OF SECTION 099113
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 1
084113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Storefront framing for punched openings.
B. Related Sections:
1. Division 7 Section “Joint Sealants” for installation of joint sealants installed with aluminum-framed
systems and for sealants to the extent not specified in this Section.
2. Division 8 Section “Door Hardware” for hardware to the extent not specified in this Section.
3. Division 8 Section “Glazing” for glazing requirements to the extent not specified in this Section
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include construction details, material descriptions, dimensions of individual components and profiles, and
finishes.
B. Shop Drawings: For aluminum-framed storefronts at punched openings. Include plans, elevations, sections,
full-size details, and attachments to other work.
1. Include details of provisions for assembly expansion and contraction and for draining moisture occurring
within the assembly to the exterior.
2. Include full-size isometric details of each vertical-to-horizontal intersection of aluminum- framed
entrances and storefronts, showing the following:
a. Joinery, including concealed welds.
b. Anchorage.
c. Expansion provisions.
d. Glazing.
e. Flashing and drainage.
f. Conduit configuration coordination with electronic hardware.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 2
3. Show connection to and continuity with adjacent thermal, weather, air, and vapor barriers.
C. Samples for Initial Selection: For units with factory-applied color finishes.
D. Samples for Verification: For each type of exposed finish required, in manufacturer's standard sizes.
1 . 4 F a b r i c a t i o n S a m p l e : N/A.INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer.
B. Energy Performance Certificates: For aluminum-framed storefronts at punched openings, accessories, and
components, from manufacturer.
1. Basis for Certification: NFRC-certified energy performance values for each aluminum- framed storefront.
C. Product Test Reports: For aluminum-framed storefronts, for tests performed by manufacturer and witnessed by
a qualified testing agency.
D. Quality-Control Program: Developed specifically for Project, including fabrication and installation, according
to recommendations in ASTM C 1401. Include periodic quality-control reports.
E. Source quality-control reports.
F. Welding certificates.
G. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for
aluminum-framed systems, indicating compliance with performance requirements.
H. Field quality-control reports.
I. Sample Warranties: For special warranties.
1.5 CLOSEOUT SUBMITTALS
A. Maintenance Data: For aluminum-framed storefronts to include in maintenance manuals.
B. Maintenance Data for Structural Sealant: For structural-sealant-glazed storefront to include in maintenance
manuals. Include ASTM C 1401 recommendations for post-installation-phase quality-control program.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 3
1.6 QUALITY ASSURANCE
A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by
manufacturer.
B. Testing Agency Qualifications: Qualified according to ASTM E 699 for testing indicated and accredited by
IAS or ILAC Mutual Recognition Arrangement as complying with ISO/IEC 17025.
C. Product Options: Information on Drawings and in Specifications establishes requirements for aesthetic effects
and performance characteristics of assemblies. Aesthetic effects are indicated by dimensions, arrangements,
alignment, and profiles of components and assemblies as they relate to sightlines, to one another, and to adjoining
construction.
1. Do not change intended aesthetic effects, as judged solely by Architect, except with Architect's approval.
If changes are proposed, submit comprehensive explanatory data to Architect for review.
D. Structural-Sealant Glazing: Comply with ASTM C 1401 for design and installation of storefront systems.
E. Source Limitations for Aluminum-Framed Systems: Obtain from single source from single manufacturer.
F. Welding Qualifications: Qualify procedures and personnel according to AWS D1.2, "Structural Welding Code
- Aluminum."
1.7 FIELD CONDITIONS
A. Field Measurements: Verify actual locations of structural supports for aluminum-framed systems by field
measurements before fabrication and indicate measurements on Shop Drawings.
1. Established Dimensions: Where field measurements cannot be made without delaying the Work, establish
dimensions and proceed with fabricating aluminum-framed systems without field measurements.
Coordinate construction to ensure that actual dimensions correspond to established dimensions.
2. The Contractor to coordinate wiring for Keyless Entry System hardware occurring within the aluminum
storefront system with the Section 087100 “Door Hardware.”
1.8 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace components of aluminum-framed storefronts that
do not comply with requirements or that fail in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 4
a. Structural failures including, but not limited to, excessive deflection.
b. Noise or vibration created by wind and thermal and structural movements.
c. Deterioration of metals, metal finishes, and other materials beyond normal weathering.
d. Water penetration through fixed glazing and framing areas.
e. Failure of operating components.
f. Adhesive or cohesive sealant features.
2. Warranty Period: 10 years from date of Substantial Completion.
B. Special Finish Warranty: Standard form in which manufacturer agrees to repair finishes or replace
aluminum that shows evidence of deterioration of factory-applied finishes or that found in materials or
workmanship within specified warranty period.
1. Deterioration includes, but is not limited to, the following:
a. Color fading more than 5 Hunter units when tested according to ASTM D 2244.
b. Chalking in excess of a No. 8 rating when tested according to ASTM D 4214.
c. Cracking, checking, peeling, or failure of paint to adhere to bare metal.
2. Warranty Period: 20 years from date of Substantial completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Delegated Design: Engage a qualified professional engineer, as defined in 014000 "Quality Requirements," to
design aluminum-framed storefronts.
B. General Performance: Comply with performance requirements specified, as determined by testing of
aluminum-framed storefronts representing those indicated for this Project without failure due to defective
manufacture, fabrication, installation, or other defects in construction.
1. Aluminum-framed entrances and storefronts shall withstand movements of supporting structure
including, but not limited to, story drift, twist, column shortening, long-term creep, and deflection
from uniformly distributed and concentrated live loads.
2. Failure also includes the following:
a. Thermal stresses transferring to building structure.
b. Glass breakage.
c. Noise or vibration created by wind and thermal and structural movements.
d. Loosening or weakening of fasteners, attachments, and other components.
e. Failure of operating units.
f. Deflection exceeding specified limits.
g. Sealant failure.
h. Framing members transferring stresses, including those caused by thermal and structural
movement to glazing.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 5
C. Structural Loads:
1. Wind Loads: As indicated on Drawings.
2. Other Design Loads: As indicated on Drawings.
D. Deflection of Framing Members: At design wind pressure loads and seismic loads as indicated on the structural
drawings, and as follows:
1. Deflection Normal to Wall Plane: Limited to edge of glass in a direction perpendicular to glass plane not
exceeding 1/175 of the glass edge length for each individual glazing lite or an amount that restricts edge
deflection of individual glazing lites to 3/4 inch, whichever is less.
2. Deflection Parallel to Glazing Plane: Limited to 1/360 of clear span or 1/8 inch, whichever is smaller.
3. Cantilever Deflection: Where framing members overhang an anchor point, as follows:
a. Perpendicular to Plane of Wall: No greater than 1/240 of clear span plus 1/4 inch for spans greater
than 11 feet 8-1/4 inches or 1/175 times span, for spans less than 11 feet 8-1/4 inches.
E. Structural: Test according to ASTM E 330 as follows:
1. When tested at positive and negative wind-load design pressures, assemblies do not evidence deflection
exceeding specified limits.
2. When tested at 150 percent of positive and negative wind-load design pressures, assemblies, including
anchorage, do not evidence material failures, structural distress, or permanent deformation of main
framing members exceeding 0.2 percent of span.
3. Test Durations: As required by design wind velocity, but not less than 10 seconds.
F. Air Infiltration: Test according to ASTM E 283 for infiltration as follows:
1. Fixed Framing and Glass Area:
a. Maximum air leakage of 0.06 cfm/sq. ft. at a static-air- pressure differential of 1.57 lbf/sq. ft.
G. Water Penetration under Static Pressure: Test according to ASTM E 331 as follows:
1. No evidence of water penetration through fixed glazing and framing areas when tested according to a
minimum static-air-pressure differential of 20 percent of positive wind- load design pressure, but not
less than 6.24 lbf/sq. ft.
H. Water Penetration under Dynamic Pressure: Test according to AAMA 501.1 as follows:
1. No evidence of water penetration through fixed glazing and framing areas when tested at dynamic pressure
equal to 20 percent of positive wind-load design pressure, but not less than 6.24 lbf/sq. ft.
2. Maximum Water Leakage: According to AAMA 501.1. Water leakage does not include water controlled
by flashing and gutters, or water that is drained to exterior.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 6
I. Energy Performance: Certified and labeled by manufacturer for energy performance as follows:
1. Thermal Transmittance (U-factor):
a. Fixed Glazing and Framing Areas: U-factor for the system of not more than 0.41 Btu/sq. ft. x h x
deg F as determined in accordance with NFRC 100.
b. Entrance Doors: U-factor of not more than 0.77 Btu/sq. ft. x h x deg F as determined in accordance
with NFRC 100.
2. Solar Heat-Gain Coefficient (SHGC):
a. Fixed Glazing and Framing Areas: SHGC for the system of not more than 0.25 as determined in
accordance with NFRC 200.
b. Entrance Doors: SHGC of not more than 0.25 as determined in accordance with NFRC 200.
3. Air Leakage:
a. Fixed Glazing and Framing Areas: Air leakage for the system of not more than 0.06 cfm/sq. ft. at a
static-air-pressure differential of 6.24 lbf/sq. ft. when tested in accordance with ASTM E283.
b. Entrance Doors: Air leakage of not more than 1.0 cfm/sq. ft. at a static-air-pressure differential of
1.57 lbf/sq. ft..
4. Condensation Resistance Factor (CRF):
a. Fixed Glazing and Framing Areas: CRF for the system of not less than 55 as determined in
accordance with AAMA 1503.
b. Entrance Doors: CRF of not less than 57 as determined in accordance with AAMA 1503.
J. Noise Reduction: Test in accordance with ASTM E90, with ratings determined by ASTM E1332, as follows.
1. Outdoor-Indoor Transmission Class: Minimum 34.
K. Thermal Movements: Allow for thermal movements resulting from ambient and surface temperature changes:
1. Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.
2. Thermal Cycling: No buckling; stress on glass; sealant failure; excess stress on framing, anchors, and
fasteners; or reduction of performance when tested according to AAMA 501.5.
a. High Exterior Ambient-Air Temperature: That which produces an exterior metal- surface
temperature of 180 deg F.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 7
b. Low Exterior Ambient-Air Temperature: 0 deg F.
c. Interior Ambient-Air Temperature: 75 deg F.
L. Structural-Sealant Joints:
1. Designed to carry gravity loads of glazing.
2. Designed to produce tensile or shear stress of less than 20 psi.
M. Structural Sealant: Capable of withstanding tensile and shear stresses imposed by structural- sealant-glazed
storefront system without failing adhesively or cohesively. When tested for preconstruction adhesion and
compatibility, cohesive failure of sealant shall occur before adhesive failure.
1. Adhesive failure occurs when sealant pulls away from substrate cleanly, leaving no sealant material
behind.
2. Cohesive failure occurs when sealant breaks or tears within itself but does not separate from each substrate
because sealant-to-substrate bond strength exceeds sealant's internal strength.
2.2 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. EFCO Corporation.
2. Kawneer North America; an Alcoa company.
3. YKK AP American, Inc.
B. Source Limitations: Obtain all components of the aluminum-framed entrance and storefront system, including
framing spandrel panels, entrances, sun control, and accessories, from single manufacturer.
2.3 FRAMING
A. Framing Members: Manufacturer’s extruded- or formed-aluminum framing members of thickness required
and reinforced as required to support imposed loads.
1. Construction: Thermally broken.
2. Glazing System: Retained mechanically with gaskets on four sides.
3. Glazing Plane: Front.
4. Finish: Exterior Storefront:
a. Exterior Storefront: Match existing exterior storefront finish
b. Interior Storefront: Clear Anodized
5. Fabrication Method: Field-fabricated stick system.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 8
B. Backer Plates: Manufacturer's standard, continuous backer plates for framing members, if not integral, where
framing abuts adjacent construction.
C. Brackets and Reinforcements: Manufacturer's standard high-strength aluminumwith
non-staining, nonferrous shims for aligning system components.
D. Materials:
1. Aluminum: Alloy and temper recommended by manufacturer for type of use and finish indicated.
a. Sheet and Plate: ASTM B 209.
b. Extruded Bars, Rods, Profiles, and Tubes: ASTM B 221.
c. Extruded Structural Pipe and Tubes: ASTM B 429/B 429M.
d. Structural Profiles: ASTM B 308/B 308M.
2. Steel Reinforcement: Manufacturer’s standard zinc- r i c h , c o r r o s i o n - r e s i s t a n t primer c o m p l y i n g w i t h
SSPC-PS Guide No. 12.00; applied immediately after surface preparation and pretreatment. Select surface
preparation methods according to recommendations in SSPC-SP COM, and prepare surfaces according
to applicable SSPC standard.
a. Structural Shapes, Plates, and Bars: ASTM A 36/A 36M.
b. Cold-Rolled Sheet and Strip: ASTM A 1008/A 1008M.
c. Hot-Rolled Sheet and Strip: ASTM A 1011/A 1011M.
2.4 GLAZING
A. Glazing: Comply with Section 08 8000 "Glazing."
B. Glazing Gaskets: Manufacturer’s standard sealed-corner pressure-gl azing system of black, re silient
elastomeric glazing gaskets, setting blocks, and shims or spacers.
C. Glazing Sealants: As recommended by manufacturer.
1. Sealant shall have a VOC content of 250 g/L or less.
D. Structural Glazing Sealan ts: ASTM C 1184, chemically curing s ilicone formulation that is compatible with
system components with which it comes in contact, specifically formulated and tested for use as structural
sealant and approved by structural-sealant manufacturer for use in storefront system indicated.
1. Color: As selected by the Architect from manufacturer’s full range of colors.
E. Weatherseal Sealants: ASTM C 920 for Type S; Grade NS; Class 25; Uses NT, G, A, and O; chemically
curing silicone formulation that is compatible with structural sealant and other system components with
which it comes in contact; recommended by structural-sealant, weatherseal-sealant, and structural-sealant-glazed
storefront manufacturers for this use.
1. Color: Match structural sealant.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 9
F. Spacers and Setting Blocks: Manufacturer’s standard elastomeric type.
2.5 ACCESSORIES
A. Fasteners and Accessories: Manufacturer's standard corrosion-resistant, non-staining, nonbleeding fasteners and
accessories compatible with adjacent materials.
1. Use self-locking devices where fasteners are subject to loosening or turning out from thermal and
structural movements, wind loads, or vibration.
2. Reinforce members as required to receive fastener threads.
3. Use of exposed fasteners is prohibited, except for application of hardware.
4. Use exposed fasteners with countersunk Phillips screw heads, fabricated from 300 series stainless steel.
B. Anchors: Three-way adjustable anchors with minimum adjustment of 1 inch (25.4 mm) that accommodate
fabrication and installation tolerances in material and finish compatible with adjoining materials and
recommended by manufacturer.
1. Concrete and Masonry Inserts: Hot-dip galvanized cast-iron, malleable-iron, or steel inserts complying
with ASTM A 123/A 123M or ASTM A 153/A 153M requirements.
C. Concealed Flashing: Dead-soft, minimum 0.018-inch thick stainless steel, ASTM A 240/A 240M of type
recommended by manufacturer.
D. Bituminous Paint: Cold-applied asphalt-mastic paint complying with SSPC-Paint 12 requirements except
containing no asbestos, formulated for 30-mil thickness per coat.
E. Flashing: Manufacturer's standard 26 gauge corrosion-resistant, non-staining, nonbleeding flashing compatible
with adjacent materials. Form exposed flashing from sheet aluminum finished to match framing and of sufficient
thickness to maintain a flat appearance without visible deflection.
F. Joint Sealants: For installation at perimeter of aluminum-framed systems, as specified in Section 079200 "Joint
Sealers."
G. Provide sealants for use inside of the weatherproofing system that have a VOC content of 250 g/L or less when
calculated according to 40 CFR 59, Subpart D (EPA Method 24).
2.6 FABRICATION
A. Form or extrude aluminum shapes before finishing.
B. Weld in concealed locations to greatest extent possible to minimize distortion or discoloration of finish.
Remove weld spatter and welding oxides from exposed surfaces by descaling or grinding.
C. Fabricate components that, when assembled, have the following characteristics:
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 10
1. Profiles that are sharp, straight, and free of defects or deformations.
2. Accurately fitted joints with ends coped or mitered.
3. Physical and thermal isolation of glazing from framing members.
4. Accommodations for thermal and mechanical movements of glazing and framing to maintain required
glazing edge clearances.
5. Provisions for field replacement of glazing from interior for vision glass and exterior for spandrel glazing
or metal panels.
6. Fasteners, anchors, and connection devices that are concealed from view to greatest extent possible.
7. Means to drain water passing joints, condensation occurring within framing members, and moisture
migrating within the system to exterior
D. Storefront Framing: Fabricate components for assembly using shear-block system.
E. After fabrication, clearly mark components to identify their locations in Project according to Shop Drawings.
2.7 ALUMINUM FINISHES
A. High-Performance Organic Finish (Three-Coat Fluoropolymer): AA-C12C40R1x (Chemical Finish: cleaned
with inhibited chemicals; Chemical Finish: conversion coatings; Organic Coating: manufacturer's standard
three-coat, thermo-cured system consisting of specially formulated inhibitive primer, fluoropolymer color coat,
and clear fluoropolymer topcoat, with both color coat and clear topcoat containing not less than 70 percent
flouropolymer resin by weight). Prepare, pretreat, and apply coating to exposed metal surfaces to comply with
AAMA 2605 and with coating and resin manufacturers' written instructions.
1. Color and Gloss: Custom color as selected by Architect.
2.8 SOURCE QUALITY CONTROL
A. Structural Sealant: Perform quality-control procedures complying with ASTM C 1401 recommendations
including, but not limited to, assembly material qualification procedures, sealant testing, and assembly fabrication
reviews and checks.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas, with Installer present, for compliance with requirements for installation tolerances and other
conditions affecting performance of the Work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 11
3.2 PREPARATION
A. Prepare surfaces that are in contact with structural sealant according to sealant manufacturer's written
instructions to ensure compatibility and adhesion. Preparation includes, but is not
3.3 INSTALLATION
A. General:
1. Comply with manufacturer's written instructions.
2. Do not install damaged components.
3. Fit joints to produce hairline joints free of burrs and distortion.
4. Rigidly secure nonmovement joints.
5. Install anchors with separators and isolators to prevent metal corrosion and electrolytic deterioration and to
prevent impeding movement of moving joints.
6. Seal perimeter and other joints watertight unless otherwise indicated.
7. Verify conduit for electronic hardware is open and has not been damaged or crimped that would impede
concealed wiring required for specified hardware
B. Metal Protection:
1. Where aluminum is in contact with dissimilar metals, protect against galvanic action by painting contact
surfaces with materials recommended by manufacturer for this purpose or by installing nonconductive
spacers.
2. Where aluminum is in contact with concrete or masonry, protect against corrosion by painting contact
surfaces with bituminous paint.
3. Install components to drain water passing joints, condensation occurring within framing members, and
moisture mitigating within the system to exterior.
C. Set continuous sill members and flashing in full sealant bed as specified in 079200 "Joint Sealants" to produce
weathertight installation.
D. Install components plumb and true in alignment with established lines and grades.
E. Install operable units level and plumb, securely anchored, and without distortion. Adjust weather-stripping
contact and hardware movement to produce proper operation.
F. Install glazing as specified in 088000 "Glazing."
G. Install weather seal sealant according to 079200 "Joint Sealants" and according to sealant manufacturer's written
instructions to produce weatherproof joints. Install joint filler behind sealant as recommended by sealant
manufacturer.
3.4 ERECTION TOLERANCES
A. Erection Tolerances: Install aluminum-framed storefronts to comply with the following maximum tolerances:
GODWIN - VIRGINIAN PILOT BUILDING PROJECT 10015069.02
RENOVATION
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 12
1. Plumb: 1/8 inch in 10 feet; 1/4 inch in 40 feet.
2. Level: 1/8 inch in 20 feet; 1/4 inch in 40 feet.
3. Alignment:
a. Where surfaces abut in line or are sep arated by reveal or protruding element up to 1/2 inch wide,
limit offset from true alignment to 1/16 inch.
b. Where surfaces are separated by reveal or protruding element from 1/2 to 1 inch wide, limit offset
from true alignment to 1/8 inch.
c. Where surfaces are separated by reveal or protruding element of 1 inch wide or more, limit offset
from true alignment to 1/4 inch.
d. Where surfaces meet at corners, limit offset from true alignment to 1/32 inch.
e. Diagonal measurements: Limit difference between diagonal measurement to 1/8 inch.
4. Location: Limit variation from plane to 1/8 inch in 12 feet; 1/2 inch over total length.
3.5 FIELD QUALITY CONTROL
A. Clean the completed system, inside and out, promptly after installation and immediately before requesting
Substantial Completion, exercising care to avoid damage to coatings.
B. Clean glass surfaces after installation, complying with requirements contained in Section 088000 “Glazing” for
cleaning and maintenance. Remove excess glazing and sealant compounds, dirt and other substances from
aluminum surfaces.
3.6 PROTECTION
A. Institute protective measures required throughout the remainder of the construction period to ensure that
aluminum storefront will be without damage or deterioration, other than normal weathering, at time of Substantial
Completion.
END OF SECTION 084113
),567)/225
6(&21')/225
1(,*+%25,1*%8,/',1*
7<37<3
$
$
72'(&.
/)
/)
/)
/)
/)
/)
),567)/225
6(&21')/225
%
72'(&.
'
$
),567)/225
6(&21')/225
1(,*+%25,1*%8,/',1*6) 6) 6) 6) 6) 6)
7<3
$
'
$
$
72'(&.
7<3
/)
/)
/)
/)
$
$
% 6)6)6)
&/&/&/
&/
(((
(
(;
$
$
'
$
/)
/)
5()(5726+((7 $$1' $)257<3,&$/6725()5217(/(9$7,216$1'
'(7$,/6
5()(5726+((7 $)25*/$=,1*/(*(1'
5()(5726+((7 $$$1' $)25'2256&+('8/($1''(7$,/6
3529,'()/$6+,1* &2817(5)/$6+,1*$7$//(;7(5,2523(1,1*6
35(6685(:$6+$//35(&$67&21&5(7($1'81'(56,'(2)(;,67,1*
&$123<213/$1($670$,167
,17(5,25*/$6635,9$&<),/0*)
&/($5,168/$7,1**/$667<3$7(;7(5,25812
)/2$7*/$667<3$7,17(5,25812
%$//,67,&),/0*)
&20%,1$7,212)%$//,67,&),/0$33/,('72,17(5,25
6,'(2)*/$66*)$1'35,9$&<),/0$33/,('72
(;7(5,256,'(2)*/$66*)
$5&+,7(&785( (1*,1((5,1* *(263$7,$/ɕɕ
&25325$7,21/$1(
68,7(
9,5*,1,$%($&+9$
$
%
&
'
(
6+((71$0(
352-(&712
'$7(,668('
6+((712
'(6,*1('%<
'5$:1%<
&+(&.('%<,668$1&(6&+('8/(
180%(5'$7('(6&5,37,21
3+$6(),567)/2255(129$7,21
$XWRGHVN'RFV6XIIRON9$&LW\3URMHFWV+8%B%B5*RGZLQ9LUJLQLDQ3LORWB5HQRB$5&+B5UYW
$0
%8,/',1*(/(9$7,216
1(::25.
$
1'81/(9<
0,-$/0,//(5
.%$5.(5
*2':,1 9,5*,1,$13,/27%8,/',1*
&,7<2)68))2/.9$
10$,16768))2/.9$/(*(1'6+((7.(<127(6*(1(5$/6+((7127(6
& 1257+(/(9$7,211(::25.
' ($67(/(9$7,211(::25.
% 6287+(/(9$7,211(::25.
' :(67(/(9$7,21
7227+,11(:%5,&.9(1((5
63/$6+%/2&.6((0(&+$1,&$/'5$:,1*6
0(&+$1,&$/(48,30(176((0(&+$1,&$/'5$:,1*6
0(7$/&$123<
5(32,17%5,&.$65(48,5('72$&+,(9(81,)250,03(59,286685 )$&(
( (;,67,1*$/80,1806725()5217:,1'2:6
( (;,67,1*$&&(66'225
%$6(%,'
35(35(32,17%5,&.$1'),//
&5$&.65(3$,173/$11257+
6287+$1':(67(;7(5,25:$//6
/($9,1*($67:$//)$&,1*0$,1
675((7(;,67,1*%/21'(%5,&.
&2/253$,17&2/25$66(/(&7('
%<2:1(5
$/7(51$7(%,',7(0
675,3$//3$,175(32,17%5,&.
$1'),//&5$&.65(3$,173/$1
1257+6287+$1':(67(;7(5,25
:$//6/($9,1*($67:$//)$&,1*
0$,1675((7(;,67,1*%/21'(
%5,&.&2/253$,17&2/25$6
6(/(&7('%<2:1(5
/LF1R
12/05/2025
),567)/225
62/,'685)$&(:,1'2:6722/
%5,&.9(1((5$7
6725()52176)
:%5,&.7,(6#2&
9(572&
&08:+25,=-2,17
5(,1)#2&9(57
07/)855,1*675,36
720$7&+(;,67,1*
*:%
%$6($66&+('8/('
67((//,17(/6((6758&785$/'5$:,1*6
%5,&.9(1((5&2856(6
(;,67,1*%5,&.9(1((5
$/80,1806725()5217
6+,0$1'%$&.(552'
%27+6,'(6
$/80,1806,//)/$6+,1*
(;,67,1*%5,&.9(1((5$1'
(;,67,1*&08$76)
07/)855,1*675,36
720$7&+(;,67,1**:%
(;,67,1*)/2256/$%
$
'
(;,67,1*&08
6&+('8/('0$18$/52//(5
6+$'(6$/,*1)5217)$&(2)
)$6&,$:,7++($'(5$%29(
)/8,'$33/,('9$325
3(50($%/($,5%$55,(5
&217,182866($/$17
&217,18286:'%/2&.,1*
),567)/225
%5,&.9(1((5720$7&+
$'-$&(17,17(5,25
&216758&7,21
(;,67,1*:$//&216758&7,21
(;,67,1*)/2256/$%
(;7(5,25%5,&.9(1((5
%5,&.9(1((5
:%5,&.7,(6#2&
9(572& &08:+25,=-2,17
5(,1)#2&9(57
),567)/225
07/)855,1*675,36
720$7&+(;,67,1*
*:%
(;,67,1*)/2256/$%
(;,67,1*%5,&.9(1((5
&08:+25,=-7
5(,1)#2&9(57
%5,&.9(1((5
:%5,&.7,(6#2&
9(572&
7223(1,1*
7+58(<(%2/7:
&2035(66,216/((9(
$1':$6+(56((6758&785$/
'5$:,1*6
(;,67,1*&08(;,67,1*%5,&.9(1((5
35((1*,1((5('
35(0$18)07/&$123<
*5287&(//62/,'
7+58(<(%2/7:
&2035(66,216/((9(
$1':$6+(56((6758&785$/
'5$:,1*6
(;,67,1*$/80,1806725()5217
6&+('8/('&(,/,1*
6((5()/(&7('&(,/,1*3/$1
07/678'6#2&
*:%
6(((/(9$7,21'$
)25%277202)&$123<
(/(9$7,216
),567)/225
67((//,17(/6((6758&785$/'5$:,1*6
%5,&.9(1((5&2856(6
(;,67,1*%5,&.9(1((5
07/)855,1*675,36
720$7&+(;,67,1*
*:%
(;,67,1*%5,&.9(1((5
(;,67,1*&08
$/80,1806725()5217
6+,0$1'%$&.(552'
%27+6,'(6
$/80,1806,//)/$6+,1*
07/)855,1*675,36
720$7&+(;,67,1**:%
%$6($66&+('8/('
(;,67,1*)/2256/$%
$
'
6,012
52//(5
6+$'(
&217,18286:'%/2&.,1*
),567)/225
%5,&.9(1((5&2856(6
(;,67,1*%5,&.9(1((5
(;,67,1*&08
67((//,17(/6((
6758&785$/'5$:,1*6
07/)855,1*675,36
720$7&+(;,67,1**:%
67((//,17(/3/$7(
6((6758&785$/'5$:,1*6
6($/$17$1'%$&.(552'
%27+6,'(6
)/(;,%/(7+58:$//
)/$6+,1*)250(1''$06
($&+6,'(2)23(1,1*
)/8,'$33/,('9$325
3(50($%/($,5%$55,(5
660(7$/'5,3:,7+
:((36$72&
&08623(,1),//:,7+
:(/'('7,(6#2&
$'')855,1**<3$1'&(,/,1*
6+,0
(;,67,1*6/$%
(;,67,1*&$123<6758&785(
(;,67,1*%5,&.9(1((5
(;,67,1*&$123<522),1*6<67(0
$&5</,&3/$67(5),1,6+6<67(021),%(5*/$660$7
)$&('6+($7+,1*210(7$/+$7&+$11(/6#2&
210(7$/&+$11(/6#2&
9(17('62)),75(9($/$//6,'(6)5<5(*/(7
'50)925(48$/35(),1,6+(':+,7(
(;,67,1*&$123<)$6&,$
9(17('62)),75(9($/$//6,'(6)5<5(*/(7'50)925(48$/35(),1,6+(':+,7(
$5&+,7(&785( (1*,1((5,1* *(263$7,$/ɕɕ
&25325$7,21/$1(
68,7(
9,5*,1,$%($&+9$
$
%
&
'
(
6+((71$0(
352-(&712
'$7(,668('
6+((712
'(6,*1('%<
'5$:1%<
&+(&.('%<,668$1&(6&+('8/(
180%(5'$7('(6&5,37,21
3+$6(),567)/2255(129$7,21
$XWRGHVN'RFV6XIIRON9$&LW\3URMHFWV+8%B%B5*RGZLQ9LUJLQLDQ3LORWB5HQRB$5&+B5UYW
$0
:$//6(&7,216
$
$*(181*
0,-$/0,//(5
.%$5.(5
*2':,1 9,5*,1,$13,/27%8,/',1*
&,7<2)68))2/.9$
10$,16768))2/.9$
$ :$//6(&7,21
$ :$//6(&7,21
$ :$//6(&7,21$76+$)7
' 7<30$3(6&$123<,167$//$7,21'(7$,/
$ :$//6(&7,21
$ :$//6(&7,21
'DWH 5HYLVLRQ
' &$123<'(7$,/
/LF1R
12/05/2025
1(,*+%25,1*%8,/',1*
1(,*+%25,1*%8,/',1*
$5&+,7(&785( (1*,1((5,1* *(263$7,$/ɕ ɕ
*2':,19,5*,1,$13,/27%8,/',1*
10$,16768))2/.9$
*5$3+,&6&$/(
($67(/(9$7,21
1257+(/(9$7,21
6287+(/(9$7,21
:(67(/(9$7,21
NORTH, SOUTH AND WEST
WALLS BRICK PAINT
NEW STOREFRONT FRAMES &
MULLIONS PAINTED HISTORIC
DISTRICT PPG NEW ENGLAND
COLLECTION BLACK MAGIC TO
MATCH EXISTING
11" ASH
15" ASH
14" ASH
12" ASH
11" FLOWERING
METAL POST
MULCH
MULCH
MULCH
MULCH
NORTHSARATOGA
STREET
NORTHSARATOGA
STREET
(4) FLEX
POSTS
5' POST ANDCHAIN FENCE
METAL POST STUB
30" OAK
METAL LP BASE
6' CLF
METAL HANDRAIL
4' POST AND CHAIN
FENCE, DAMAGED
CONC. WHEELSTOP (TYP.)
02
02
01
03
04
05
06
07
08
09
10
11
12
13
13
14
15
16
02
FORMERVIRGINIAN-PILOT
BUILDING
METAL HANDRAIL
07
07
"NEW JOINT ALLEY"
PERPETUAL
INGRESS/EGRESS
EASEMENT
D.B. 44 PG 96
APPROX. LOCATIONEXISTING DRAINAGE EASEMENT
DB. 16 PG 210 PARCELS (02) AND (10)
ARE SUBJECT TO A
WALL AGREEMENT
CREATED IN
DB. 16 PG 107
THE RIGHT TO USE PARCEL (09)
SUBJECT TO A PERPETUAL
DRAINAGE EASEMENT AS
DESCRIBED IN D.B. 25 PG 136.
DESCRIPTION INSUFFICIENT TO
SHOW EASEMENT GRAPHICALLY
THE RIGHT TO USE INCOMMON (WITH OTHERS)FOR PURPOSES OF INGRESSAND EGRESSINST. #000108410CONDOMINIUM DECLARATIONINST. #070165590
PARCEL (07) SUBJECT TO A CITY
OF SUFFOLK STORM DRAINAGE
EASEMENT AS DESCRIBED IN
D.B. 53 PG 519. DESCRIPTION
INSUFFICIENT TO SHOW
EASEMENT GRAPHICALLY
SEE
INSET
THE RIGHT TO USE IN COMMON(WITH OTHERS) FOR PURPOSESOF INGRESS AND EGRESSINST. #000108410CONDOMINIUM DECLARATIONINST. #070165590
VA PILOT BUILDING
RENOVATION
PREPARED FOR
WOOLPERT
SITE PLAN
CS100
©
NORTH
LEGEND
LIMITS OF DISTURBANCE
PROPERTY LINE
SIDEWALK CONCRETE
INTERSECTION SIGHT TRIANGLE
PAVEMENT LEGEND
STANDARD - DUTY ASPHALT
2" SURFACE ASPHALT VDOT SM-12.5A
8" AGGREGATE BASE VDOT 21-A
COMPACTED TO A DRY DENSITY OF AT LEAST
100% OF THE STANDARD PROCTOR MAXIMUM
DRY DENSITY.
COMPACTED SUBGRADE
HEAVY - DUTY ASPHALT
2" SURFACE ASPHALT VDOT SM-12.5A
3" INTERMEDIATE ASPHALT VDOT BM-25.0A
8" AGGREGATE BASE VDOT 21-A
COMPACTED TO A DRY DENSITY OF AT LEAST 100% OF
THE STANDARD PROCTOR MAXIMUM DRY DENSITY.
COMPACTED SUBGRADE
VDOT CG-2 CURB
VDOT CG-6 CURB AND GUTTER
VDOT CG-12 DETECTABLE WARNING SURFACE
NOTES
1. ALL PARKING STALLS SHALL BE 9'X18'.
CONCRETE ENTRANCE
PAVED FLUME DETAIL
NOTE:
WIPEDOWN FULL CURB TO BE FLUSH WITH FINISH GRADE.
SEE SHEET CG100.
VA PILOT BUILDING
RENOVATION
PREPARED FOR
WOOLPERT
SITE PLAN DETAILS
CS500
©
PARKING LOT STRIPING DETAILS
ACCESSIBLE PARKING SYMBOL
ACCESSIBLE PARKING STALLS WHEEL STOP
CONSTRUCTION STANDARDS
●
●
●
●
●
●
TYPICAL BOLLARD
DETAIL
ACCESSIBLE PARKING SIGN
ROADWAY PAVEMENT MARKINGS
PAVED FLUME DETAIL
VDOT CG2VDOT CG2
NOTE:
WIPEDOWN FULL CURB TO BE FLUSH WITH FINISH GRADE.
SEE SHEET CG100.
11" ASH
15" ASH
14" ASH
12" ASH
11" FLOWERING
ELECT
ELECTRIC BOX
ELECTRIC BOX
BACKUP GENERATORON PLASTIC PAD
METAL POST
MULCH
MULCH
MULCH
MULCH
NORTHSARATOGA
STREET
NORTHSARATOGA
STREET
(4) FLEX
POSTS
5' POST ANDCHAIN FENCE
SAN #01
UPSTREAMSTRUCTURENOT FOUND
METAL POST STUB
30" OAK
METAL LP BASE
UC CONDUITS ENTERING GROUND (2)
LP #5
TPED #R/139TPED NO #
TPED #R/157
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLD
QLD
QLD
QLD
QLD
QLD
QLD
QLD
QLD
QLD
QLD
QLD
QLC
QLC
QLC
QLD
QLDQLC
QLD
QLD
6' CLF
METAL HANDRAIL
4' POST AND CHAIN
FENCE, DAMAGED
CONC. WHEELSTOP (TYP.)
SCO
SCO
LP #XA63
LP #XA71
LP #XO69
METERS, (5)METERS, (3)
QLC
QLC
QLD
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLCQLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
QLC
8" VCP, QLD
TPED NO #
QLD
QLD QLD
QLC
QLD
QLD
QLD
QLD
QLD
QLD
QLD
QLD
QLD
QLD
QLD
QLD
QLD
QLD
02
02
01
03
04
05
06
07
08
09
10
11
12
13
13
14
15
QLC
QLC
16
PL5 (DEED)
S67°19'38"W 102.30' (PLAT)
PL9 (DEED)
SOUTHWARDLY
27' 6" (DEED)
NORTHWARDLY
26' 6" (DEED)
PL11(DEED)
N68°32'W 48.00' (PLAT)
PL28 (DEED)
125.6' BUILDING (PLAT)
PROPERTY LINE PER GIS
18.5'
(PLAT)
PL2 (PLAT)
PL3 (DEED)
PL4(PLAT)
N31°30'30"E 72.51' (DEED)
NORTHWAR
(DEED)
SOUTHWARDLY 33'
(DEED)
QLC
N22°09'26"E
59.50' (PLAT)
02
N67°26'12"W 189.90' (PLAT)
N21°09'15"E
36.96'(PLAT)
N67°33'45"W 117.54'
(DEED)
PL12 (DEED) N67°33'45"W 131.85' (DEED)
7.30' (PLAT)
S67°34'02"
S22°31'06"W 70.60' (DEED)
WESTWARDLY 110' (DEED)S67°00'30"E 106.15' (DEED)
ASTWARDLY 110' (DEED)
07.58' (DEED)
N
(189.90')
FORMERVIRGINIAN-PILOT
BUILDING (S23°27'02"W)
(65.05')
(S23°2
N67°22'12"W 189.58' (PLAT)
S23°18'W 48.00' (DEED)
PL10 (PLAT)
METAL HANDRAIL
07
07 NORTHERLY
48' (DEED)
EASTERLY 222' +/- (DEED)
SOUTHERLY 48' (DEED)
PROPERTY LINESABANDONED BY D.B. 44 PG 96
SEE ALSO P.B. 3 PG 132
"NEW JOINT ALLEY"
PERPETUAL
INGRESS/EGRESS
EASEMENT
D.B. 44 PG 96
5.40' (PLAT)
APPROX. LOCATIONEXISTING DRAINAGE EASEMENT
DB. 16 PG 210 PARCELS (02) AND (10)
ARE SUBJECT TO A
WALL AGREEMENT
CREATED IN
DB. 16 PG 107
WESTERLY APPROX. 131' (DEED)
PL13 (DEED)
NORTHERLY
34' +/- (DEED)
N66°48'28"W 118.22' (PLAT)
S23°19'43"W 47.30'
(PLAT)
PL14 (PLAT)
NORTHERLY 47.30' (DEED)
EASTERLY 118.06' (DEED)
PL15
(DEED)
SOUTHERLY APPROX.
96.94' (DEED)
NORTHERLY
39.50' (DEED)
PL17 (DEED)
PL18 (PLAT)
S23°19'43"W
39.50' (PLAT)
126.2' +/-(PLAT)
S23°19'43"W
65.0' (PLAT)
PL19 (PLAT)
PL20
(DEED)
PL22 (PLAT)
PL21 (DEED)
5.14'(PLAT)
PL23
(DEED)
PL24
(DEED)
WESTWARDLY 83'
(DEED)
PL25(PLAT)
NORTHERLY
34' (DEED)
N23°19'43"E 34.22' (PLAT)
S66°21'33"E 189.90' (PLAT)
190.7' BUILDING (PLAT)
14.6'
(PLAT)
22.9'
(PLAT)
PROPERTY LINE PER GIS
THE RIGHT TO USE PARCEL (09)
SUBJECT TO A PERPETUAL
DRAINAGE EASEMENT AS
DESCRIBED IN D.B. 25 PG 136.
DESCRIPTION INSUFFICIENT TO
SHOW EASEMENT GRAPHICALLY
THE RIGHT TO USE INCOMMON (WITH OTHERS)FOR PURPOSES OF INGRESSAND EGRESSINST. #000108410CONDOMINIUM DECLARATIONINST. #070165590
SAN MANHOLE NOT FOUNDDURING FIELD EFFORTS.APPROX. LOCATIONSHOWN PER GIS DATARECEIVED FROM SUFFOLKPUBLIC UTILITIES
PL6 (DEED)
PARCEL (07) SUBJECT TO A CITY
OF SUFFOLK STORM DRAINAGE
EASEMENT AS DESCRIBED IN
D.B. 53 PG 519. DESCRIPTION
INSUFFICIENT TO SHOW
EASEMENT GRAPHICALLY
N6
N67°19'38"W 102.30' (DEED)
PL26 (DEED)
PL27 (DEED)
64.7' BUILDING (PLAT)
PL26 (DEED)
QLC
SEE
INSET
THE RIGHT TO USE IN COMMON(WITH OTHERS) FOR PURPOSESOF INGRESS AND EGRESSINST. #000108410CONDOMINIUM DECLARATIONINST. #070165590
QLB
B
A
QLB
QLB
A
= UNIDENTIFIED UTILITY PAINT,SUSPECTED ABANDONEDTELECOMMUNICATIONS LINE
B
= UNIDENTIFIED UTILITY PAINT,SUSPECTED SANITARYSEWER LINE
QLB
6" PVC PIPE,SUSPECTED SCO
PL1 (DEED)STM #11
METALTROUGH
STM #05 CONC.
CONC.
STM #06
CONC.
STM #07
IRON
CONC.
STM #08
CONC.
STM #09
CONC. W/
SLEEVESTM #10
CONC. O/S
CONC.
STM #12STM #13
CONC.CONC.
CONC.
METAL PLATE OVER
STM. JUNCTION
CONC.
DIP
STM #14
CONC.
STM #15
CONC.
20 sf - SH
20 sf - SH
20 sf - SH
20 sf - SH
20 sf - SH
20 sf - SH
20 sf - SH
17 - LL
62 sf - SH
32 - LL
121 sf - SH
74 sf - SH
20 - LL
(224 sf) SH
(1) QA
(2) QA
(2) QA
(1) QA
(1) QA
(1) QA
(4) AG
(16) IC
SYMBOL CODE QTY BOTANICAL NAME COMMON NAME ROOT CAL.
TREES
AG 4 ACER RUBRUM `OCTOBER GLORY` TM OCTOBER GLORY MAPLE B & B 1.5"-2" CAL. MIN.
QA 8 QUERCUS ACUTISSIMA SAWTOOTH OAK B&B 1.5"-2" CAL. MIN.
SYMBOL CODE QTY BOTANICAL NAME COMMON NAME ROOT SIZE
SHRUBS
IC 16 ILEX CORNUTA `BURFORDII NANA` DWARF BURFORD HOLLY CONT. 24" HT. MIN
SYMBOL CODE QTY BOTANICAL NAME COMMON NAME CONT SPACING SPACING
GROUND COVERS
LL 69 LIRIOPE MUSCARI `BIG BLUE BIG BLUE LILY TURF 1 GAL 24" o.c.
SEED 3,774 SF SEED TURF SEED SEED
SH 701 SF SHREDDED HARDWOOD MULCH BULK
PLANT SCHEDULE
VA PILOT BUILDING
RENOVATION
PREPARED FOR
WOOLPERT
PLANTING PLAN
CP100
©
NORTH
VA PILOT BUILDING
RENOVATION
PREPARED FOR
WOOLPERT
PLANTING PLAN
DETAILS
CP500
©
3"
1"
5"
PLANTING BED TRENCH EDGING NOTE:
1.
TRENCH EDGE SHALL BE LOCATED BETWEEN PLANTING BED AND ALL TURF /
SOD AREAS.
2.
MAINTAIN POSITIVE DRAINAGE IN ALL PLANTING BEDS.
3.
SEE NOTES THIS SHEET FOR TYPE OF MULCH.
MULCH 3" DEPTH
®
PLANTING SPECIFICATIONS
1. SOILS TESTING
A.All soil testing shall be done at the contractor's expense. soil tests shall be conducted by a state laboratory or recognized
commercial laboratory. each sample shall be extracted from a six-inch deep core and prepared in accordance with
recommendations of the soil-testing laboratory.
B.each soils test shall determine soil texture / particle size, organic matter (OM), soil pH, buffer pH, nitrogen (N),
phosphorus (P), potassium (K), calcium (Ca), iron (Fe), boron (B), zinc (Zn), copper (Cu), magnesium (Mg), manganese
(Mn), sulfur (S), sodium (Na), calculated cation exchange capacity (CEC), excess carbonate, electrical conductivity (EC)
and total dissolved solids (TDS), sodium adsorption ratio (SAR), AND soluble salts.
C.All new soils provided from off-site sources, obtain one soil test for each soil source per 500 cubic yards of soil and submit
soil test results and soil amendment recommendations to to the owner and engineer of record for review and acceptance
prior to distributing and amending soil.
D.For all existing stockpiled topsoil to be redistributed on site, obtain one soil test per 500 cubic yards of soil prior to
application. submit soil test results and soil amendment recommendations to the owner and engineer of record for review
and acceptance prior to redistributing and amending soil.
2. DELIVERY, HANDLING, AND STORAGE:
D. Deliver packaged materials in manufacturer's unopened containers or bundles, fully identified with name, brand, type, weight, and analysis. Store
packaged materials in such a manner as to prevent damage or intrusion of foreign matter.
E. Dig balled and burlapped (B& B) plants with firm, natural balls of earth, of a diameter not less than recommended by the American Standard for
Nursery Stock, and of sufficient depth to include the fibrous and feeding roots. B&B plants will not be accepted if the ball is cracked or broken
before or during planting operation.
F. Deliver trees and shrubs after preparations for planting have been completed. Do not bend, bind, or tie trees or shrubs in such a manner as to
damage bark, break branches or destroy natural shape. If planting is delayed more than 6 hours after delivery, set trees and shrubs in shade,
protect from weather and mechanical damage, and keep roots moist by heeling-in bare root stock and covering plant balls with soil, peat moss or
other acceptable material for balled stock. Plants shall be kept well watered and shall not remain unplanted for longer than ten (10) days after
delivery.
G. Plants shall be lifted and handled from the bottom of the ball only.
H. Do not remove container-grown stock from containers until planting time.
3. DRAINAGE: Before planting, determine that areas to receive plant material have adequate subdrainage.
A. The landscape contractor is responsible for drainage tests as necessary to identify any problems prior to beginning planting operations. Upon
commencement of planting operations the landscape contractor assumes responsibility for soil conditions.
B. Dig planting pits to full depth and dimensions indicated on drawings.
C. At bottom of planting pit, excavate rectangular pit 12 inches by 12 inches by 18 inches deep. Quickly pour water into pit to a depth of 6 inches
(approximately 3-3 3/4 gallon). Note time required for water to be completely absorbed. Divide time noted by 6 to achieve average rate of
absorption for 1 inch of water. Where rate of absorption exceeds 60 minutes per inch, notify owner immediately for directions on how to proceed.
4. PLANTING DATES: Planting shall be done only within the following dates except as approved by Owner.
A. Deciduous and Evergreen Trees, Shrubs, and Vines: October 1 to May 31 for un-irrigated sites except when the ground is frozen during the winter
months.
B. Planting of Deciduous and Evergreen Trees, Shrubs, and Vines during the months of June, July, August, and September is restricted to sites that
have automated irrigation systems.
C. All plant material shall be guaranteed by the Contractor for a period of 1 year from the date final acceptance to be in good, healthy and flourishing
condition.
5. MATERIALS FOR PLANTING:
A. Topsoil: shall be a fertile, friable natural loam, uniform in composition, free of stones, lumps, plants and their roots, debris and other extraneous
matter over 1 inch in diameter, capable of sustaining vigorous plant growth. Soil shall be harvested at a single source from the O and/or A horizons
of the soil profile.
1) Topsoil shall have a pH range of 5.5 to 7.5.
2) Topsoil shall contain 1.5-5% organic matter by dry weight .
3) Soil Texture: sandy loam, sandy clay loam with the following particle size distribution:
Gravel Less than 10%
Silt 15-30%
Clay 20-35%
Chemical Levels shall be:
Magnesium Mg100+ units
Phosphorus P205 150+ units
Potassium - K20 120+ units
4) Soluble Salts/ Conductivity - Not to exceed 900 ppm/0.9 mmhos/cm (in soil); not to exceed 3000 ppm/2.5 mmhos/cm (in high organic mix)
5) Cation exchange capacity shall be a minimum of 8 meq/100g.
B. Clay Loam to Sandy Clay Loam Soil: shall be a fertile, friable natural loam, uniform in composition, free of stones, lumps, plants and their roots,
debris and other extraneous matter over 1 inch in diameter, capable of sustaining vigorous plant growth.
1) Soil shall have a pH range of 5.5 to 6.5.
2) Soil shall contain 2-5% organic content by volume.
3) Soil Texture: Clay loam to sandy clay loam with the following particle size distribution:
Gravel Less than 10%
Sand 20-50%
Silt <35%%
Clay 20-40%
4) Chemical Levels shall be:
Magnesium Mg100+ units
Phosphorus P205 150+ units
Potassium - K20 120+ units
5) Soluble Salts/ Conductivity - Not to exceed 900 ppm/0.9 mmhos/cm (in soil); not to exceed 3000 ppm/2.5 mmhos/cm (in high organic mix)
6) Cation exchange capacity shall be 20-35 meq/100g.
C. Compost: Compost shall be mature, stable, weed free, and produced by aerobic decomposition of organic matter. Compost feedstock shall be plant
matter, such as high lignin forestry products or yard waste (leaves, brush and yard trimmings).
1) The product must not contain any visible refuse or other physical contaminants, substances toxic to plants, or over 5% sand, silt, clay or rock
material by dry weight.
2) Compost shall be sampled and tested as required by the Seal of Testing Assurance Program of the United States Composting Council (USCC)
and shall meet the physical requirements for compost as determined by USCC.
3) The product shall possess no objectionable odors. The product must meet all applicable USEPA CFR, Title 40, Part 503 Standards for Class A
biosolids.
4) The moisture level shall be such that no visible water or dust is produced when handling the material.
D. Composted Pine Bark Fines: Shall be approved composted, ground pine bark having no particle with a dimension greater than 3/4 inch. No more
than 10% shall be wood.
E. Sand: Shall be quartz based sharp concrete sand, ASTM C-33 Fine Aggregate, with a Fines Modulus Index between 2.8 and 3.2.
F. Perlite: Coarse horticultural grade expanded, volcanic perlite. Maximum density shall be 8 lb./ft3.
1) pH shall be 6.5 to 7.5.
2) Perlite shall be meet the Perlite Institute's Standards for Gradation for Horticultural Perlite for Coarse Perlite with no more than 70% passing
through a #16 Standard Sieve.
G. Humus: Shall be mature, stable, weed free, and produced by aerobic decomposition of organic matter. Compost feedstock shall be plant matter,
such as high lignin forestry products or yard waste (leaves, brush and yard trimmings).
1) Humus shall have a pH between 6 and 7.5.
2) Soluble Salt Concentration shall be less than 10dS/m.
3) Cation exchange capacity rate shall be 100-250.
4) The product must not contain any visible refuse or other physical contaminants, substances toxic to plants, or over 5% sand, silt, clay or rock
material by dry weight.
5) The product shall possess no objectionable odors. The product must meet all applicable USEPA CFR, Title 40, Part 503 Standards for Class A
biosolids.
6) The moisture level shall be such that no visible water or dust is produced when handling the material.
H. Trace Elements: Shall be commercially available slow release materials containing zinc (Zn), Molybdenum (Mo), Copper (Cu), Boron (B), and
Magnesium (Mn).
I. Fertilizer: A commercial fertilizer for ornamental trees, shrubs and ground cover with an analysis of 10% Nitrogen, 6% Phosp horus and 4%
Potassium shall be used. This fertilizer shall be granular with a minimum of 50% of the total Nitrogen in organic form. 14-14-14-Osmocote (or
approved equal) shall be applied at a rate of 10 lbs. per square foot, tilled to a depth of 8 inch, shall be used for perennials.
6.
PLANT MATERIALS: (Refer to the PLANT LIST on the drawings for specific types and quantities of plants):
A. Plants shall be nursery grown in accordance with good horticultural practices. Plants shall either be obtained from local nurseries and/or others,
which have soil and climatic conditions similar to those in the locality of the project.
B. Plants shall be true to species and variety and unless specifically noted otherwise, all plants shall be of specimen quality, exceptionally heavy,
symmetrical, tightly-knit plants, so trained or favored in their development and appearance as to be superior in form, number of branches,
compactness and symmetry.
C. Plants shall be sound, healthy and vigorous, well branched and densely foliated when in leaf, free of disease, insect pests, eggs or larvae and shall
have healthy, well-developed root systems. They shall be free from physical damage or any conditions that would prevent thriving health and the
desired appearance.
D. Trees, which have a damaged or crooked leader, or multiple leaders, unless specified in the plant list, will be rejected. Trees with abrasion of the
bark, sun scald, disfiguring knots, or pruning cuts more than 1 1/4 inch diameter which have not completely callused, will be rejected.
E. Plants shall conform to measurements specified in the plant schedules except that plants larger than specified may be used if acceptable to the
Landscape Architect or owner. Use of such plants shall not increase the contract price. If larger plants are accepted, the root ball shall be sized for
the larger plant.
F. Caliper Measurement: Shall be taken at a point on the trunk 6 inches above natural ground line for trees up to 4 inches diam eter, and at a point 12
inches above the natural ground line for trees over 4 inches diameter.
G. Plants shall be measured when branches are in the normal position. Height and spread dimensions specified refer to the main body of the plant
and not from branch tip to tip.
7. SOIL MIXING PROCEDURES:
A. Topsoil used in sand/soil mixes shall be screened or shredded prior to mixing in sands. Maximum clod inclusion for soil mixes shall not exceed:
Clod size (largest dimension) % of the soil mix volume
Less than 1” Unlimited
1 to 3 inches 20%
3 to 6 inches 5%
>6 inches Less than 2%
A. Source material and soil mix stockpiles shall be protected from rain by covering with filter cloth.
8. INSPECTION:
A. EXAMINE THE AREAS AND CONDITIONS WHERE SOIL MIX IS TO BE INSTALLED AND NOTIFY THE ENGINEER OF CONDITIONS DETRIMENTAL
TO THE PROPER AND TIMELY COMPLETION OF THE WORK. DO NOT PROCEED WITH THE WORK UNTIL UNSATISFACTORY CONDITIONS
ARE CORRECTED TO PERMIT PROPER INSTALLATION OF THE WORK.
B. COOPERATE WITH OTHER CONTRACTORS AND TRADES WORKING IN AND ADJACENT TO OTHER WORK AREAS. EXAMINE DRAWINGS
WHICH SHOW DEVELOPMENT OF ENTIRE PROJECT AND BECOME FAMILIAR WITH SCOPE OF OTHER WORK REQUIRED.
9. SOIL INSTALLATION - GENERAL PROCEDURES:
G. IF SUBGRADE SOIL COMPACTION EXCEEDS 80%, EXISTING SOIL SHALL BE RIPPED TO A DEPTH OF 12 INCH TO ALLEVIATE COMPACTION
WHICH HAS TAKEN PLACE DURING CONSTRUCTION. PRIOR TO LOOSENING OF SOIL, CONTRACTOR MUST LOCATE EXISTING UTILITIES
AND COORDINATE WITH OWNER OR OWNERS REPRESENTATIVE ANY UNDERGROUND ELECTRIC LINES, DRAINAGE PIPES, CONDUITS,
ETC.
H. PREPARE THE SUBGRADE BY ROUGHENING THE TOP 3” OF THE SUBSOIL BY DRAGGING THE TEETH OF A BACKHOE BUCKET ACROSS THE
SURFACE.
I. BEGIN SOIL INSTALLATION AS SOON AS SUBSOIL IS PREPARED. USE LOW IMPACT EQUIPMENT WITH TRACK BELTS, LARGE TIRES, OR
LOW TIRE PRESSURE TO LOWER COMPACTION AND SOIL DAMAGE DURING INSTALLATION.
J. MONITOR COMPACTION DURING INSTALLATION AND LOOSEN SOILS AS NEEDED IF COMPACTION EXCEEDS 80%.
10. SOIL INSTALLATION - GENERAL PROCEDURES CONTINUED:
K. Install specified soil in 12”-18” thick lifts. Compact each lift sufficiently to reduce settling but not enough to prevent the movement of water and feeder
roots through the soil. The soils in each lift should feel firm to the foot in all areas and make only slight heel prints.
11. INSTALLATION OF SOIL MIX FOR LAWN AREAS ON GRADE:
A. Soil Mix for Lawns on Grade: shall consist of 10% compost and 90% topsoil, by volume. These materials must meet specifications described in
Paragraph 6.
B. Loosen subgrade lawn areas to a minimum of 3”. Remove stones more than 1-1/2” in any dimension and sticks, roots, rubbish, and other extraneous
matter. Limit preparation to areas which will be planted promptly after preparation.
C. Spread soil mix for lawn areas on grade to a minimum depth of 4” as required to meet grade and elevations shown on drawings, after lightly rolling and
natural settlement. Allow for sod thickness in areas to be sodded.
12. INSTALLATION OF SOIL MIX FOR TREE PITS ON GRADE
A. Confirm that native subsoil drains at a rate of at least ½” per hour. If drainage is less than ½” per hour, provide subsurface drainage lines.
B. Install 30-36” of Soil Mix for Tree Pit Backfill on Grade:
1) Shall consist of clay loam to sandy clay loam soil, sand, and composted pine bark fines at a rate of 5:5:1 to 10:5:1.5 to achieve the following:
(a) Clay content of Soil Mix shall be 10-20% of the soil mix, by volume.
(b) Minimum amount of coarse to medium sand in the mix shall be 55%
(c) Minimum infiltration rate at 80-85% compaction shall be 1-3 inches per hour.
C. Composted pine bark fines shall not exceed 10% of the total soil mix by volume.
D. Till 4” of compost into the top 6” of the installed Soil Mix for Tree Pit Backfill on Grade.
13.
INSTALLATION OF SOIL MIX FOR MULCHED SHRUB AND PERENNIAL BEDS:
A. Confirm that native subsoil drains at a rate of at least ½” per hour. If drainage is less than ½” per hour, provide subsurface drainage lines.
B. Install 4” of Soil Mix for Mulched Shrub and Perennial Beds on Grade:
1) Shall consist of clay loam to sandy clay loam soil, sand, and composted pine bark fines at a rate of 5:5:1 to 10:5:1.5 to achieve the following:
(a) Clay content of Soil Mix shall be 10-20% of the soil mix, by volume.
(b) Minimum amount of coarse to medium sand in the mix shall be 55%
(c) Minimum infiltration rate at 80-85% compaction shall be 1-3 inches per hour.
2) Composted pine bark fines shall not exceed 10% of the total soil mix by volume.
C. Till 4” of compost into the top 6” of the installed Soil Mix for Tree Pit Backfill on Grade.
14.
GENERAL PLANT INSTALLATION:
A. Excavation: Excavate all tree pits and planting areas to the width and depth shown in the planting details.
B. Center plant in pit and orient for the best visual effect. Set plants plumb and hold rigidly in position until soil has been tamped firmly around root ball.
C. Mulch within 48 hours after planting and after applying the pre-emergent herbicide, except ground cover areas (which shall have organic material placed
before planting) with a 3" layer of mulch immediately after planting. All bed lines shall be cut with a smooth consistent edge to a minimum depth of 3
inches. Keep mulch out of the crowns of shrubs and off buildings, sidewalks, light standards, and other structures.
D. All planting areas to conform to specified grades after full settlement has occurred and mulch has been applied. Provide saucers around tree pits as
shown on planting details. Remove all tags, labels, strings, etc. from all plants.
15. MAINTENANCE AND GUARANTEE:
A. The landscape contractor shall be responsible for maintaining his work until final acceptance by the owner or the owner's representative. Maintenance
shall include watering, weeding, cultivating, mulching, removal of dead materials, resetting of plants to proper grades or upright positions, restoration of
earth berms, and other necessary operations. adequate protection for lawn areas against trespassing during planting operations and against damage of
any kind shall be provided. nothing in these notes is intended to relieve the contractor of his responsibility to repair existing lawn areas damaged by
workmen engaged in the completion of this project.
B. Inspection of the work to determine completion of the contract exclusive of the possible replacement of plantings during the warranty period, will be made
by the owner or the owner's representative at the conclusion of the installation period upon written notice requesting such inspection. Request shall be
submitted by contractor at least ten days prior to the anticipated date for inspection. After inspection, the contractor will be notified in writing by the
owner or the owner's representative of acceptance of the work or, if there are any deficiencies, the contractor will be notified of the requirements
necessary for completion of the work. Plantings shall not be considered accepted until all deficiencies have been corrected and approved in writing.
C. Nursery stock shall be fully guaranteed for one full year. All plants that fail to make new growth from a dormant condition or that die during the first year
after planting shall be replaced. All replacements shall conform with the original specifications as to size and type. All costs of replacements shall be
borne by the contractor.
D. The contractor shall be responsible for the removal of all unused materials, rubbish, debris, or plant material not planted from
the site upon completion of his work.
E. All other items necessary to make work complete shall be finalised prior to final inspection.
16. PERMANENT SEEDING:
A. Prior to seeding contractor shall provide and spread 4" of topsoil as specified on all areas to receive permanent seeding.
B. Topsoil that has become hard and compacted before permanent seeding has been applied shall be scarified to prepare seed bed for receiving seed.
C. The contractor shall seed all denuded areas and areas disturbed by construction that are not otherwise stabilized with paving, buildings, or planted and
mulched within the contract limits, unless specifically noted otherwise.
D. If a utility line is installed through a landscaped lawn the seeding shall be modified to restore ground cover comparable to the existing lawn
I. Seeding includes seedbed preparation, liming, fertilizing, seeding, and mulching of disturbed areas.
J. Seed shall be blue tag certified and shall be labeled in accordance with the state laws and the U.S. Department of Agricultur e rules and regulations under
the Federal Seed Act in effect on the date of invitations for bids. Bag tag figures are evidence of purity and germination.
K. Lawn Seed varieties shall be an improved turf-type variety known to perform well in the project area. Seed mixture shall be chosen to ensure the
development of plants during the season of planting, and to ensure future growth and permanent stabilization. Seed shall conform to the requirements of
the Virginia Crop Improvement Association (VCIA).
L. All seed shall conform to the current rules and regulations of the state where it is being used and shall be from the latest crop available.The seed shall be
State-certified to meet Virginia seed certification standards and specifications, absolutely true to varietal type, and free from weeds, fungus, insects and
disease of any kind.
M.No seed will be accepted with a test date of more than 9 months before the delivery date to the site.
N. Seed that has become wet, moldy, or otherwise damaged in transit or storage will not be accepted. The percent of noxious weed seed allowable shall be
as defined in the current State laws relating to agricultural seeds.
O. LIMING: Lime shall be applied separately and prior to the application of any fertilizer or seed and only on seedbeds, which have previously been prepared.
The lime shall be worked into the top 3 inches of soil after which the seedbed shall again be properly graded and dressed to a smooth finish. Lime shall
be applied at the rate specified by the soil test report recommendations.
P. FERTILIZING: Following advance preparations and cleanup, fertilizer shall be uniformly spread at the rate specified in the soil test report
recommendations.
Q. SEEDING: Grass seed shall be sown at the rate specified in the permanent seeding schedule and notes immediately after fertilizing and the fertilizer and
seed raked into the soil.Seeds shall be inoculated before mixing or sowing in accordance with the instructions of the seed provider and manufacturer of
the inoculant. When seeding is required at other than the seasons shown in the permanent seeding schedule, a cover crop shall be sown by the same
methods required for grass seeding and permanent seeding shall be sown during the following permanent seeding season.
R. Sow seed with spreader or seeding machine. Do not broadcast or drop seed when wind velocity exceeds 5 mph. Evenly distribute seed by sowing equal
quantities in two directions at right angles to each other. Do not seed against existing trees.
S. Rake seed and fertilizer lightly into top 1/8 inch of soil and water with fine spray.
T. MULCHING: Protect seeded areas with slopes not exceeding 3:1 by spreading straw mulch. Spread uniformly at a minimum rate of 2 tons/acre to form a
continuous blanket 1-1/2 inches in loose thickness over seeded areas. Spread by hand, blower, or other suitable equipment. Protect slopes 3:1 and
greater with erosion control mats and fasten as recommended by material manufacturer.
U. Straw mulch material--Straw mulch shall consist of wheat, barley, oat or rye straw. The mulch material shall be air-dry, reasonably light in color, and shall
not be musty, moldy, caked, or otherwise of low quality. The use of mulch that contains noxious weeds is not permitted.
V. Other mulch materials--Mulching materials, such as wood cellulose fiber mulch, synthetic fiber mulch, netting, and mesh, are other mulching materials that
may be required for specialized locations and conditions. These materials must be installed according to the manufacturer's recommendations for
methods of application.
W.After the seed has been properly covered, the seedbed shall be immediately compacted by means of an approved lawn roller weighing 40 to 65 pounds
per foot of width for clay soil (or any soil having a tendency to pack) or weighing 150 to 200 pounds per foot of width for sandy or light soils.
17. LAWN MAINTENANCE:
A. Within the contract limits, the contractor shall produce a dense, well established lawn. The contractor shall be responsible for maintaining the lawn until
acceptance by the owner or owner's authorized representative.
B. Maintenance shall include but may not be limited to watering, weeding, and fertilizing as necessary as well as the repair and re-seeding of all eroded,
sunken or bare spots (larger than 12"x12") until certification of acceptability by the owner or owner's representative. Repaired seeding shall be
accomplished as in the original work (including re-grading if necessary).
18. ACCEPTANCE:
A stand of permanent lawn grass as specified shall be considered acceptable when the turf cover is at least 95%. The Contractor shall overseed, and
otherwise maintain the grassed areas until the stand of grass has reached a uniform height of 3 to 4 inches and a state of uniform species maturity. Annual
grasses and grain weeds shall not be considered part of the cover percentage, and seeding stands shall not be considered acceptable until the stand
reaches a state of uniform post-seeding maturity for the specified species.
PERMANENT SEEDING SHALL BE BLUE TAG CERTIFIED AND SELECTED FROM THE CURRENT VIRGINIA
TURFGRASS VARIETY RECOMMENDATIONS AS PUBLISHED BY VIRGINIA TECH, VIRGINIA COOPERATIVE
EXTENSION.
SEED SELECTED SHALL BE OF A VARIETY KNOWN TO PERFORM WELL IN THE PROJECT AREA AND SHALL BE OF
A VARIETY THAT IS KNOWN TO BE TOLERANT OF FULL SUN, AND ONCE ESTABLISHED, TOLERANT OF PERIODS
OF INFREQUENT RAINFALL.
PERMANENT LAWN GRASS SEEDING OUTSIDE OF THE PREFERRED SEEDING DATES WILL NOT BE ACCEPTED
UNTIL THE FOLLOWING GROWING SEASON AND ONLY WHEN AN ACCEPTABLE STAND OF PERMANENT GRASS IS
ESTABLISHED AND ACCEPTED BY THE OWNER.
SPRING AND FALL SEEDING:
SEED SHALL CONSIST OF A BLEND OF THREE OF THE FOLLOWING VARIETIES KNOWN TO PERFORM WELL IN
THE PROJECT AREA. SELECTED VARIETIES SHALL BE SEEDED AT THE SPECIFIED RATES PER ACRE.
FOR ALL AREAS SEEDED WITH PERMANENT LAWN GRASS IN THE SPRING OR FALL (SEE SPECIFIED SEEDING
DATES BELOW):
TYPE OF GRASS SEEDING RATE SEEDING DATE
TALL FESCUE 5 - 7 LBS./1000 SQ. FT. SPRING SEEDING: FEBRUARY 28, TO MAY 15.
FALL SEEDING: AUGUST 1 TO NOVEMBER 1
NOTE: PREFERRED FESCUE SEEDING DATES ARE FROM AUGUST 1 TO NOVEMBER 1.
4TH MILLENNIUM SRP, ANNAPOLIS, AVENGER II4, AVENGER III, BIRMINGHAM1, BLACK TAIL, BLOODHOUND4,
BULLSEYE1, BULLSEYE LTZ, CATALYST, CROSSFIRE 4, DAYBREAK, DEGAS, DRAGSTER, DYNAMITE G-LS,
FANTASIA, FASTLANE, FAYETTE, FIREBIRD 2, FIRECRACKER G-LS, FIRECRACKER SLS, FIREHAWK SLT, FIRENZA
II, FIREWALL4, GAZELLE II4, GOLD MEDALLION4, GRANDE 3, GTO, GUARDIAN 41, HEMI, HOUNDOG 84, INFERNO4,
INTEGRITY4, JUSTICE4, LIFEGUARD, MAESTRO, MICHELANGELO, MONUMENT, MOONDANCE GLX, MUSTANG 44,
PARAMOUNT, PENN RK44, PRO GOLD, RAPTOR III, REBEL IV4, REBEL V4, REBEL XLR4, REBOUNDER4,
REFLECTION, REGENERATE, RENDITION RX4, ROCKWELL, ROWDY4, SALTILLO4, SCREAMER LS, SERENADE,
SPYDER LS4, SPYDER 2LS, SR 8650, STANDOUT4, STEALTH, SUNSET GOLD4, SUPERSONIC, SYMPHONY,
TECHNIQUE, TEMPLE, THOR, TITANIUM 2LS, TITANIUM G-LS, TITAN RX4, TRINITY, TURBO4, TURBO RZ4, VALKYRIE
LS, WICHITA, AND XTREMEGREEN4.
BATTLE HAWK, BENTLEY, BLADERUNNER 3, BONFIRE, BRAVO 2, CAPITAN, CLASH, ENDGAME, ESSENTIAL 2,
ESTRENA, EXTRAVAGANZA, FAIRFIELD, FALCON SUPREME, FINELAWN SUPREME, GALACTIC, GALLARDO, GLX
ACED, GLX REVIVE, GRO_PRO, HELLCAT GLR, HOUNDOG 9, KIZZLE, LAFAYETTE, MATISSE, MOTIF, NATURALLY
GREEN, OKEEFE, ORIOLE, PADRE 2, PROVIDENCE, RACEWAY, RAPTOR LS, ROVER, ROWDIER, SR 8700,
TALLADEGA II, TANK, TEACHER, TITAN GLX, TITAN MAX, TOUGH, TRIAD, VALSETZ, XANADU, AND ZION.
SEED WITH THE FOLLOWING MIXTURE(S) FOR SPECIFIED DATES OUTSIDE THOSE LISTED FOR FESCUE OR AS
LISTED BELOW:
TYPE OF GRASS SEEDING RATE SEEDING DATE
BERMUDA 2 LBS./ 1,000 SQ. FT.(HULLED SEED) FEBRUARY - MAY
7 LBS. / 1,000 SQ. FT. (HULLED SEED) AND AUGUST - JANUARY
5 LBS. / 1,000 SQ. FT. WINTER RYE
ONLY THE FOLLOWING VARIETIES OF BERMUDA SHALL BE ACCEPTABLE:
PRINCESS 77, ARDEN 154, MONACO, RIO, SUNQUEEN, AND SWI-10704.
ALL SEED SHALL HAVE A MINIMUM PURITY OF 95% AND AN 85% GERMINATION RATE.
1 234567
A
B
C
D
E
SHEET NAME:
PROJECT NO:
DATE ISSUED:
SHEET NO:
DESIGNED BY:
DRAWN BY:
CHECKED BY:ISSUANCE SCHEDULE
NUMBER DATE DESCRIPTION
4433 CORPORATION LANE
SUITE 125
VIRGINIA BEACH, VA 23462
800.414.1045
Autodesk Docs://City of Suffolk VA -Projects HUB_R24/_W_Saratoga East Parking Lot_ARCH_R24.rvt
9/9/2025 7:32:48 AM
TRN
JSB
TRN
1002400.28
03/03/2026
SARATOGA EAST PARKING LOT
CITY OF SUFFOLK
153 N. MAIN STREET
SUFFOLK, VA 23434
E001
AREA SITE LIGHTING FIXTURE
LIGHTING FIXTURE TYPE SYMBOL. SEE LIGHTING FIXTURE DETAILS.
ELECTRICAL CIRCUIT RUN IN CONDUIT AND CIRCUIT HOMERUN TO
PANELBOARD (PANEL AND CIRCUIT DESIGNATION AS INDICATED). AS A
MINIMUM CONDITION, EACH SINGLE PHASE CIRCUIT SHALL HAVE 1 #12 PHASE
CONDUCTOR, 1 #12 NEUTRAL CONDUCTOR AND 1 #12 GROUNDING CONDUCTOR
IN 1/2" CONDUIT. PROVIDE ADDITIONAL PHASE CONDUCTORS AS REQUIRED
FOR "MULTIPLE PHASED" ELECTRICAL LOADS. PROVIDE NEUTRAL CONDUCTOR
TO ALL WALL SWITCH OUTLET BOXES WHETHER REQUIRED OR NOT. PROVIDE
ADDITIONAL "SWITCH LEG" CONDUCTORS TO PROVIDE THE LIGHT FIXTURE
CONTROL INDICATED. MULTIPLE SINGLE PHASE CONDUCTORS MAY BE
GROUPED TOGETHER IN A COMMON CONDUIT IN ACCORDANCE WITH THE NEC
AND AT THE CONTRACTOR'S DISCRETION. GROUNDING CONDUCTORS MAY BE
SHARED AS ALLOWED BY THE NEC. NEUTRAL CONDUCTORS SHALL NOT BE
SHARED. MULTI-POLE BREAKERS SHALL BE PROVIDED IN ACCORDANCE WITH
THE NEC WHERE MULTI-WIRE BRANCH CIRCUITS ARE REQUIRED. CONDUIT
LARGER THAN 1/2" AND CONDUCTORS LARGER THAN #12 SHALL BE AS
INDICATED.
LIGHTING
POWER
GENERAL
WALL MOUNTED LIGHTING FIXTURE
NEW WORK NOTE SYMBOL
GENERAL ELECTRICAL NOTES ELECTRICAL LEGEND
AND
A
1
GENERAL: UNLESS SPECIFICALLY INDICATED OTHERWISE, ALL WORK
SHOWN ON ELECTRICAL DRAWINGS IS NEW WORK TO BE PROVIDED
UNDER THIS CONTRACT.
COORDINATION: COORDINATE AND COOPERATE WITH ALL TRADES ON
THE PROJECT. THE CONTRACTOR SHALL REVIEW ALL CONTRACT
DOCUMENTS INCLUDING CIVIL, STRUCTURAL, ARCHITECTURAL DRAWINGS
AND SPECIFICATIONS. CONTRACTOR SHALL COORDINATE AND ADJUST
ACCORDINGLY AS DIRECTED BY THE CONTRACTING OFFICER.
AS-BUILT DRAWINGS: SECURE AN EXTRA SET OF ELECTRICAL DRAWINGS
TO BE KEPT ON SITE AND MARK, DAILY, THE DRAWINGS IN RED AS THE
PROJECT PROGRESSES IN ORDER TO KEEP AN ACCURATE RECORD OF
ALL DEVIATIONS BETWEEN THE WORK SHOWN ON THE DRAWINGS AND
THE WORK WHICH IS ACTUALLY INSTALLED. THESE MARKED DRAWINGS
SHALL REFLECT ANY AND ALL CHANGES AND REVISIONS TO THE ORIGINAL
DESIGN WHICH EXISTS IN THE COMPLETED WORK. DELIVER THE MARKED
DRAWINGS TO THE OWNER AT PROJECT CLOSE-OUT.
TESTS: TEST ALL WIRING FOR CONTINUITY AND GROUNDS BEFORE
CONNECTING ANY FIXTURES OR DEVICES. PERFORM INSULATION
RESISTANCE TESTS ON ALL WIRING #6 OR LARGER TO ENSURE THAT ALL
PORTIONS ARE FREE FROM SHORT-CIRCUITS AND GROUNDS.
INSPECTIONS: ARRANGE ALL NECESSARY INSPECTIONS. DELIVER ALL
REQUIRED INSPECTION CERTIFICATES TO THE OWNER.
GROUNDING: PROVIDE GROUNDING IN ACCORDANCE WITH THE NEC FOR
THE ENTIRE ELECTRICAL SYSTEM INCLUDING EQUIPMENT FRAMES
CONDUITS, SWITCHES, CONTROLLERS, WIRE-WAYS, NEUTRAL
CONDUCTORS, AND OTHER EQUIPMENT. PROVIDE A GROUNDING
CONDUCTOR IN ALL POWER CONDUITS.
LABELS: PROVIDE LABELS FOR ALL PANELBOARDS. LABELS SHALL BE
MACHINE ENGRAVED, LAMINATED PLASTIC, PERMANENTLY ATTACHED
WITH SELF-TAPPING SCREWS OR RIVETS. DO NOT USE SELF-ADHESIVE
LABELS. LABEL SHALL INDICATE EQUIPMENT DESIGNATION AND
ASSOCIATED PANEL AND CIRCUIT THAT SERVES IT.
J-BOX LABELING: LABEL ALL JUNCTION BOXES WITH PERMANENT
MARKER IDENTIFYING CIRCUIT NUMBER AND PANELBOARD OF CIRCUITS
WITHIN.
PANEL DIRECTORY: PROVIDE TYPEWRITTEN PANELBOARD DIRECTORY
CARD IN EACH PANELBOARD WITH CIRCUIT LOAD INFORMATION AND
ROOM NUMBER CLEARLY IDENTIFIED. USE ACTUAL ROOM NUMBERS IN
THE BUILDING, NOT THE ROOM NUMBERS SHOWN ON THE CONTRACT
DRAWINGS, AS THEY ARE OFTEN DIFFERENT.
LIGHTING CONTROL TESTING: UPON COMPLETION OF THE INSTALLATION
OF ALL LIGHTING SYSTEMS AND CONTROL DEVICES, CONTRACTOR SHALL
RETAIN AN APPROVED AGENCY TO PERFORM FUNCTIONAL TESTING OF
THE LIGHTING CONTROL .THE TESTING SHALL CONFIRM THAT ALL
CONTROL HARDWARE AND SOFTWARE ARE CALIBRATED, ADJUSTED,
PROGRAMMED, AND IN PROPER WORKING CONDITION, IN ACCORDANCE
WITH THE CONSTRUCTION DOCUMENTS AND THE MANUFACTURER'S
INSTRUCTIONS. THE CONTRACTOR SHALL PROVIDE REPORT OF EVIDENCE
OF SUCCESSFUL FUNCTIONAL TESTING TO THE OWNER AND ENGINEER
PRIOR TO FINAL INSPECTION.
MOUNTING HEIGHTS: MOUNTING HEIGHTS INDICATED ARE FROM THE
FINISHED FLOOR TO THE CENTERLINE OF THE WIRING DEVICE UNLESS
OTHERWISE NOTED. MOUNTING HEIGHTS OF LIGHTING FIXTURES ARE TO
THE BOTTOM OF THE FIXTURE UNLESS OTHERWISE NOTED.
BARRIERS: WHERE A MULTIPLE-GANG BOX HAS CIRCUITS OF DIFFERENT
VOLTAGES OR SYSTEMS WHICH ARE REQUIRED TO BE SEPARATED,
PROVIDE THE CODE-REQUIRED SEPARATION USING A FULL HEIGHT AND
DEPTH BARRIER PLATE.
CLEAN UP: ON PROJECT CLOSE-OUT CLEAN ALL ELECTRICAL DEVICES,
LIGHTING FIXTURES, LENSES, AND REMOVE ALL PAINT SPATTERS FROM
DEVICES, FIXTURES AND PLATES. REPAIR ALL INOPERATIVE LIGHTING
FIXTURES.
ABBREVIATIONS
A AMPERE
AFG ABOVE FINISHED GRADE
AWG AMERICAN WIRE GAUGE
BFG BELOW FINISHED GRADE
C CONDUIT
CKT CIRCUIT
GFI GROUND FAULT INTERRUPTER
GND GROUND
KAIC THOUSAND AMPERE
INTERRUPTING CAPACITY
KVA KILO-VOLT-AMPERES
KW KILO-WATTS
LPW LUMENS PER WATT
LTG LIGHTING
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MFDM MULTI-FUNCTION DIGITAL METER
MFR MANUFACTURER
MIN MINIMUM
MLO MAIN LUGS ONLY
NEC NATIONAL ELECTRICAL CODE
P POLE
PL PROPERTY LINE
PNL PANEL
Ø PHASE
PVC POLYVINYL CHLORIDE
SCH SCHEDULE
SE SERVICE ENTRANCE
TYP TYPICAL
UFC UNIFIED FACILITIES CRITERIA
UGC UNDERGROUND CONDUIT
UON UNLESS OTHERWISE NOTED
V VOLT
W WATTS/WIRE
WP WEATHERPROOF
TELECOMMUNICATIONS
UNDERGROUND CONDUIT FOR LOW VOLTAGE CABLING, PROVIDE (1) 1" HDPE C.
WITH PULL STRING, BURIED MIN. 24" WITH MARKER TAPE MIN. 12" BFG
IP SURVEILLANCE CAMERA SYSTEM (PATHWAY INFRASTRUCTURE ONLY)
POLE MOUNTED SURVEILLANCE CAMERA
UGC
HH HANDHOLE, PROVIDE 12" X 24" X 24"D SIZED HANDHOLE. SEE DETAIL SHEET
E-501 FOR ADDITIONAL INFORMATION.
PHOTOMETRIC CALCULATION POINT - SUPERSCRIPT
INDICATES LIGHTING LEVEL IN FOOT-CANDLES
1.0
ELECTRICAL PANELBOARD
DEVICES AND CABLING PROVIDED BY SECURITY VENDOR
A5
A4
A4
B
B
ALLEYWAY
PROPERTY LINE
PARKING AREA
A5
0.7
2.0
1.0
2.7
4.4
4.2
0.3
1.4
3.4
5.6
0.4
2.1
4.0
4.3
0.6
2.7
4.3
3.2
1.2
3.5
3.9
2.6
0.4
1.7
3.7
4.3
2.1
5.0
6.3
3.6
3.4
2.4 1.6
0.3
1.4
2.1
2.4
0.9
1.4
2.1
3.1
4.9
0.9
1.2
1.6
2.4
3.6
5.3
4.6
4.9
2.1
1.1
1.4
1.7
2.3
3.3
4.7
5.4
5.9
4.8
3.3
1.8
0.9
1.0
1.4
1.7
1.8
2.0
2.4
3.1
4.0
4.5
3.8
3.1
2.3
2.0
2.3
2.5
1.2
1.6
2.2
2.4
2.4
2.3
2.7
3.1
3.0
2.7
2.5
2.7
3.2
4.8
4.9
2.6
0.9
1.3
2.0
3.1
3.7
3.5
2.6
2.3
2.3
2.4
2.3
2.3
2.7
3.5
5.1
5.7
3.0
0.7
1.0
1.5
2.5
4.1
5.7
4.6
3.3
2.5
2.1
2.0
2.0
2.1
2.4
3.2
4.4
5.3
5.8
4.8
3.3
1.8
1.7
2.9
5.0
6.8
5.6
3.6
2.4
1.9
1.9
1.9
1.9
2.0
2.4
2.9
3.6
4.3
3.8
2.9
2.0
0.6
0.9
1.2
1.9
3.2
5.1
6.5
6.6
4.9
3.0
2.1
1.7
1.7
1.8
1.9
2.0
2.1
2.2
2.5
2.8
2.8
2.3
1.7
1.1
0.7
0.7
0.9
1.2
1.7
2.6
3.7
4.6
5.1
3.9
2.5
1.8
1.5
1.6
1.7
2.0
2.4
2.8
2.8
2.4
2.3
1.9
1.5
1.0
0.4
0.6
0.9
1.1
1.3
1.7
2.3
2.8
3.1
2.7
2.0
1.5
1.4
1.5
1.6
2.2
3.2
4.2
3.3
3.1
2.3
1.7
1.3
0.9
0.3
0.5
0.7
0.8
0.9
1.1
1.5
2.0
2.1
1.9
1.5
1.4
1.3
1.4
1.6
2.4
3.9
5.9
3.9
2.5
1.6
1.1
0.7
0.4
0.5
0.6
0.8
1.2
1.9
1.9
1.6
1.3
1.3
1.4
1.7
2.6
4.3
6.5
6.0
3.8
2.3
1.4
1.0
0.6
1.3
2.6
2.5
1.1
1.3
1.7
2.6
4.2
5.8
6.3
5.4
3.3
2.0
1.3
0.9
3.2
2.7
0.6
0.8
1.0
2.1
2.9
3.6
4.1
3.8
2.7
1.7
1.1
0.8
1.0
1.1
1.2
2.1
2.3
2.3
1.9
1.4
0.9
1.1
1.2
1.4
1.4
1.4
1.1
0.9
0.9
1.0
0.9
0.6
0.7
0.7
0.4
0.4
0.10.10.10.10.10.10.10.10.10.1
0.1
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.1
0.1
0.0
0.1
0.1
0.1
0.1
0.2
0.2
0.4
0.3
0.4
0.4
0.3
0.2
0.2
0.1
0.1
0.2
0.2
0.2
0.3
0.3
0.5
0.5
0.3
0.2
0.2
0.2
0.2 0.4 0.6 0.6 0.7 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.5 0.4
0.3
0.4
0.4
1234 567
A
B
C
D
E
SHEET NAME:
PROJECT NO:
DATE ISSUED:
SHEET NO:
DESIGNED BY:
DRAWN BY:
CHECKED BY:ISSUANCE SCHEDULE
NUMBER DATE DESCRIPTION
4433 CORPORATION LANE
SUITE 125
VIRGINIA BEACH, VA 23462
800.414.1045
Autodesk Docs://City of Suffolk VA -Projects HUB_R24/_W_Saratoga East Parking Lot_ARCH_R24.rvt
9/9/2025 7:32:48 AM
TRN
JSB
TRN
1002400.28
03/03/2026
SARATOGA EAST PARKING LOT
CITY OF SUFFOLK
153 N. MAIN STREET
SUFFOLK, VA 23434
GRAPHIC SCALE:
E002
SITE PHOTOMETRIC PLAN
SCALE: 1" = 20'-0"
1" = 20'-0"
20' 10' 0' 40' 20' 60'
N
Statistics
Description Symbol Avg Max Min Max/Min Avg/Min
Parking Area 2.4 fc 6.8 fc 0.3 fc
Alleyway 2.8 fc 6.3 fc 0.3 fc
Property Line 0.3 fc 0.7 fc 0.0 fc
21.0:1 9.3:1
22.7:1 8.0:1
N/A N/A
A5
A4
A4
B
B
A5
1
1 3
2
HH
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
5
4
6
1234 567
A
B
C
D
E
SHEET NAME:
PROJECT NO:
DATE ISSUED:
SHEET NO:
DESIGNED BY:
DRAWN BY:
CHECKED BY:ISSUANCE SCHEDULE
NUMBER DATE DESCRIPTION
4433 CORPORATION LANE
SUITE 125
VIRGINIA BEACH, VA 23462
800.414.1045
Autodesk Docs://City of Suffolk VA -Projects HUB_R24/_W_Saratoga East Parking Lot_ARCH_R24.rvt
9/9/2025 7:32:48 AM
TRN
JSB
TRN
1002400.28
03/03/2026
SARATOGA EAST PARKING LOT
CITY OF SUFFOLK
153 N. MAIN STREET
SUFFOLK, VA 23434
GRAPHIC SCALE:
E003
1" = 20'-0"
20' 10' 0' 40' 20' 60'
1
2
3
4
5
6
7
ROUTE CIRCUIT THROUGH LIGHTING CONTROL PANEL "LCP" IN
GODWIN - VIRGINIA PILOT BUILDING.
CONNECT SITE LIGHTING CIRCUIT TO SPARE CIRCUIT MADE AVAILABLE
IN GODWIN - VIRGINIA PILOT BUILDING, PANEL MDP1-6.
CONNECT EXTERIOR LIGHTING CIRCUIT TO SPARE CIRCUIT MADE
AVAILABLE IN GODWIN - VIRGINIA PILOT BUILDING, PANEL MDP1-8.
2 #12, 1 #12 GND - 1"C ENTIRE LENGTH OF RUN.
2 #10, 1 #10 GND - 1"C ENTIRE LENGTH OF RUN.
APPROXIMATE LOCATION OF PANEL MDP1.
UNDERGROUND CONDUIT ROUTING IS DIAGRAMMATIC ONLY.
CONTRACTOR SHALL COORDINATE EXACT ROUTING IN FIELD.
NOTES THIS SHEET
ELECTRICAL SITE PLAN
SCALE: 1" = 20'-0"
N
1234 567
A
B
C
D
E
SHEET NAME:
PROJECT NO:
DATE ISSUED:
SHEET NO:
DESIGNED BY:
DRAWN BY:
CHECKED BY:ISSUANCE SCHEDULE
NUMBER DATE DESCRIPTION
4433 CORPORATION LANE
SUITE 125
VIRGINIA BEACH, VA 23462
800.414.1045
Autodesk Docs://City of Suffolk VA -Projects HUB_R24/_W_Saratoga East Parking Lot_ARCH_R24.rvt
9/9/2025 7:32:48 AM
TRN
JSB
TRN
1002400.28
03/03/2026
SARATOGA EAST PARKING LOT
CITY OF SUFFOLK
153 N. MAIN STREET
SUFFOLK, VA 23434
E501
CONCRETE BASE DETAIL
Ø 16"
42"
4"
24"
12"
1 #6 BARE
10'-0" LONG x
3/4" DIA.
COPPER CLAD
GROUND ROD
1" CHAMFER
PROVIDE NON-SHRINK
GROUT, PACKED UNDER
POLE BASE TO INSURE FULL
CONTACT WITH FOOTING
AND PREVENT LOOSENING
OF LEVELING NUTS.
PROVIDE WEEP HOLES FOR
DRAINAGE.
CAST ALUMINUM BASE COVER
LEVELING NUT
AND WASHER
POLE SHALL HAVE AN EPA
RATING GREATER THAN OR
EQUAL TO THE SUM OF ALL
FIXTURES MOUNTED TO IT, AT
AN ULTIMATE WIND RATING OF
110mph.
#3 (ASTM A615 GRADE 60)
HORIZONTAL REINFORCING
BARS AT 12" OC
#4 (ASTM A615 GRADE 60)
VERTICAL REINFORCING
BARS AT 6" OC
HOT DIPPED GALVANIZED
ANCHOR BOLTS, SIZE PER POLE
MANUFACTURER REQUIREMENTS
COARSE GRAVEL SETTING BED
CONCRETE, 28-DAY
COMPRESSIVE STRENGTH
NOT LESS THAN 4000 PSI
CIRCUIT CONDUCTORS & CONDUIT
TO POWER SOURCE OR NEXT
POLE. SEE PLAN SHEETS FOR SIZE
AND NUMBER OF CONDUITS INTO
FOUNDATION
LIGHTING FIXTURE, (TYP)
REINFORCED HANDHOLE WITH
COVER AND STAINLESS STEEL
SCREWS, 48"AFG.
TERMINATE CONDUIT
INTERNALLY, ADJACENT
TO HANDHOLE
STRAIGHT SQUARE POLE TO
MATCH LUMINAIRE FINISH
DETAIL BASED ON LSI LIGHTING, "SLM" SERIES
LED AREA LIGHTING FIXTURE
20'-0" AFG ON POLE2771354000K LED
TYPE IV
TYPE LUMENS LAMP TYPE VOLTAGE MOUNTING
18,908
INPUT WATTS
20'-0" AFG ON POLE2771614000K LED
TYPE V24,953
A4
A5
LUMINAIRE REQUIREMENTS
1. HOUSING SHALL BE DIE-CAST ALUMINUM. LED DRIVER COMPARTMENT SHALL BE
SEALED FOR WEATHER-TIGHT OPERATION.
2. LIGHTING OUTPUT PROVIDED BY LED LIGHT BARS, MINIMUM 70 CRI. PROVIDE WITH
INTEGRAL SURGE SUPPRESSOR.
3. FINISH COLOR SHALL BE DETERMINED BY OWNER.
4. LABELS: FIXTURE SHALL BE UL LISTED FOR WET LOCATIONS AND ENCLOSURE
CLASSIFIED IP66 PER IEC 529. AND TESTED IN ACCORDANCE WITH IESNA LM-79
AND LM-80 STANDARDS AND SURGE PROTECTION TESTED IN ACCORDANCE
WITH IEE C62.41.2 AND ANSI 62.41.2
5. PROVIDE FIXTURE WITH INTEGRAL PHOTOCELL.
DETAIL BASED ON CURRENT LIGHTING, "TRP2" SERIES
LED WALLPACK
SURFACE, WALL, 12'-0" AFG27745.14000K LED
TYPE LUMENS LAMP TYPE VOLTAGE MOUNTING
5,749
INPUT WATTS
LUMINAIRE DESCRIPTION:
1. FIXTURE SHALL BE DIE CAST ALUMINUM HOUSING.
2. FINISH SHALL BE SELECTED BY OWNER.
3. FIXTURE SHALL HAVE TYPE IV DISTRIBUTION.
4. FIXTURE SHALL BE UL LISTED FOR WET LOCATIONS.
16"
9"
B
6. PROVIDE INTEGRAL LOUVER WHERE INDICATED A4
PROVIDE PRE-DRILLED HOLES FOR
SECURITY VENDOR PROVIDED
CAMERAS. COORDINATE WITH
SECURITY VENDOR FOR
DIMENSIONS AND REQUIREMENTS
PROVIDE 12"x12" NEMA-3R RATED
ENCLOSURE WITH REMOVABLE
MOUNTING PLATE AND DIN RAIL
MOUNTING. (EQUIPMENT PROVIDED BY
SECURITY VENDOR IN THIS CONTRACT)
STAINLESS STELL METAL
STRAP FOR MOUNTING. (TYP)
1" EC PATHWAY FROM HAND
HOLE
1234 567
A
B
C
D
E
SHEET NAME:
PROJECT NO:
DATE ISSUED:
SHEET NO:
DESIGNED BY:
DRAWN BY:
CHECKED BY:ISSUANCE SCHEDULE
NUMBER DATE DESCRIPTION
4433 CORPORATION LANE
SUITE 125
VIRGINIA BEACH, VA 23462
800.414.1045
Autodesk Docs://City of Suffolk VA -Projects HUB_R24/_W_Saratoga East Parking Lot_ARCH_R24.rvt
9/9/2025 7:32:48 AM
TRN
JSB
TRN
1002400.28
03/03/2026
SARATOGA EAST PARKING LOT
CITY OF SUFFOLK
153 N. MAIN STREET
SUFFOLK, VA 23434
E701
ELECTRICAL SPECIFICATIONS
SECTION 260500 - GENERAL PROVISIONS
PART 1 - GENERAL
1.1 Codes and standards - the latest effective publications of all applicable standards, codes,
etc., as they apply, form part of these specifications as if were written fully herein and
constitute minimum requirements. The following will be referred to throughout in abbreviated
forms.
A. National Electrical Code, (NFPA 70) (NEC).
B. Institute of Electrical and Electronic Engineers (IEEE).
C. Rules and regulations of local electric utility company.
D. National Electrical Manufacturer's Association (NEMA).
E. American National Standards Institute (ANSI).
F. Applicable local codes.
G. Underwriter's Laboratories, Inc. (UL).
H. National Fire Protection Association (NFPA).
I. Virginia Uniform Statewide Building Code
1.2 Scope of work - provide all work required for this division including all labor,
materials, equipment, appurtenances and services to provide complete electrical systems as
shown on the drawings and specified in this division of the specifications. The word "provide"
shall mean "furnish and install complete and ready for use".
1.3 The Contractor shall visit the site prior to bid to determine the extent of the work. Lack
of knowledge of existing conditions will not be considered a basis for change orders. Prior to
ordering equipment, verify that equipment to be provided under this contract is acceptable and
can fit into bldg. and room. Expense incurred by the Contractor, which in the Engineer's
opinion could have been avoided by this step, shall not be a basis for change orders.
1.4 Drawings and specifications - the drawings are diagrammatic and indicate the general
extent, character and arrangement of equipment, fixtures and conduit and wiring systems. It is
the intention of these specifications and drawings to fully cover all work and materials for a
complete, first-class electrical installation, and any devices such as pull boxes and disconnect
switches, usually employed in this class of work, though not specifically mentioned or shown
on the drawings or in this specification, but which may be necessary for the satisfactory
completion of the work, shall be furnished and installed by the Contractor as a part of his total
work under this Division. Consult the specifications and drawings of all other trades and
perform all electrical work required therein. Cooperate with all other Contractors or
Subcontractors to furnish complete workable systems.
1.5 During construction, keep an accurate record of all deviations between the work as
shown on the contract drawings and that which is actually installed on a set of blue line prints
of the electrical drawings, and note changes thereon with red marks, in a neat and accurate
manner. When all revisions have been shown on these prints to indicate the work as finally
installed, the prints shall be delivered to the Owner, before final payment.
1.6 Permits, inspection and tests - the right is reserved to inspect and test any portion of the
installation/equipment during the progress of its installation. This Contractor shall test all
wiring for continuity and grounds before connecting any fixtures or devices. This Contractor
shall test the entire system when the work is finally completed to ensure that all portions are
free from short circuits and grounds.
1.7 Secure and pay for all required permits and inspections. Inspection certificates from
local authorities having jurisdiction shall be delivered to the Owner before final payment.
1.8 Submittals - submit shop drawings, product data and samples within thirty (30) days of
award of contract and in accordance with the general conditions and supplementary conditions.
Submittals are required for all items provided under this specification. Review of submittals
by the Engineer and any associated action taken by the Engineer does not relieve the
Contractor of any requirements set forth by the contract documents.
PART 2 - PRODUCTS
2.1 Manufacturing standards - materials shall be new and approved and labeled by UL
wherever standards have been established by that agency. Defective equipment or equipment
damaged in the course of installation or test shall be replaced or repaired in a manner meeting
the approval of the Owner. All items of the same type and rating shall be identical.
2.2 Trade names - unless specifically identified otherwise, manufacturers' names and
catalog numbers indicated herein and on the drawings are not intended to be proprietary
designations. They are to indicate general type and quality of materials and equipment
required. Equipment and materials by other manufacturers which in the opinion of the
Engineer are of equal quality and which will produce the same results will be considered
acceptable.
2.3 Obtain approved shop drawings showing wiring diagrams, connection diagrams,
roughing-in and hookup details, from other involved Contractors for all equipment and
comply therewith.
2.4 Reasonable amounts of electricity will be made available to the Contractor for the
project. The Contractor shall be responsible for extending electricity to the specific required
locations within the project.
2.5 Grounding - the entire electrical system, including equipment frames, conduit, switches,
controllers, wireways, neutral conductors, and all other such equipment shall be permanently
and effectively grounded in accordance with the NEC. Ground rods shall be copper clad steel,
3/4" diameter by 10'-0" long. Provide a separate ground conductor in all branch circuit
conduits sized in accordance with the NEC.
2.6 Schedule of work - the schedule of the electrical work shall be arranged to suit the
progress of work by the other trades and shall in no way retard progress of construction of the
project.
2.7 Work under this division shall proceed in advance of the work of others whenever
possible, eliminating all cutting and patching. When such procedure is impossible, cutting and
patching shall be done in an approved manner. Cutting shall not endanger structural integrity
in any way. Patching shall exactly match contiguous work. Actual work of cutting and
patching of existing surfaces shall be performed by the Subcontractor who originally prepared
these surfaces, e.g., cutting and patching of masonry wall will be performed by the masonry
Subcontractor. Costs of such cutting and patching shall be borne by the electrical
Subcontractor. Cutting shall be carefully done and damage to building, piping, wiring or
equipment as a result of cutting shall be repaired by skilled mechanics of trade involved.
2.8 Storage and materials - space will be assigned to the Contractor by the Owner for the
storage of materials. This Contractor will be responsible for the protection and safekeeping of
materials, tools, and equipment. All materials and equipment shall be kept in its assigned
place until the time of its installation. Excess materials, dirt and refuse shall be promptly
removed from the work site.
2.9 Labeling of equipment
A. All panelboards shall be identified by machine engraved laminated plastic designation
plates permanently attached thereto with self-tapping screws or rivets. All component parts of
each item of equipment or device shall bear the manufacturer's nameplate, giving name of
manufacturer, description, size, type, serial and model number and electrical characteristics in
order to facilitate maintenance or replacement.
B. All panelboards shall be field marked to warn personnel of the potential for Arc Flash.
Labels shall state "WARNING - ARC FLASH AND SHOCK HAZARD APPROPRIATE
PPE REQUIRED".
2.10 Coordination - cooperate and coordinate efforts with all Contractors on the project.
This verification must be executed regardless of information placed on the drawings. Any
cost incurred which in the opinion of the Owner, could have been avoided by this step shall be
the responsibility of the electrical Contractor.
2.11 Guarantee of work - Contractor guarantees by his acceptance of the contract that all
work installed is free from any and all defects in workmanship and/or materials, and that the
apparatus will develop capacities and characteristics specified, and that if, during the period of
one year or as otherwise specified, from date of certificate of completion and acceptance of the
work any such defects in workmanship, material or performance appear, he will, without cost
to the Owner, remedy such defects within a reasonable time to be specified in notice. In
default thereof, the Owner may have such work done and charge cost to Contractor.
Equipment guarantees from date of "start-up" will not be recognized.
PART 3 - EXECUTION
3.1 The installation shall be complete including but not limited to the requirements
indicated on the drawings and in these specifications.
3.2 Contractor shall thoroughly coordinate and comply with the manufacturer's
requirements. Coordination shall be accomplished prior to commencing work.
3.3 All work shall be accomplished in a neat and workmanlike manner consistent with
commercial construction practices, code requirements and the local authority having
jurisdiction.
SECTION 260519 - CONDUCTORS
A. Conductors and insulation - wire and cable shall be soft drawn, annealed copper with
600 volt color coded insulation. Minimum wire size shall be #12 awg. Insulation for branch
circuits and feeders shall be type THHN-2-THWN-2 or XHHW-2. Conductors No. 8 AWG
and larger diameter shall be stranded. Conductors No. 10 AWG and smaller diameter shall be
solid, except that conductors for remote-control and signal circuits, classes 1, 2, and 3, may be
stranded.
B. Provide a separate ground conductor in all raceways sized in accordance with the NEC.
C. Joints and terminations - for conductors #12 and #10 all fixture and branch circuits
joints in junction and outlet boxes shall be made with UL listed pressure type connectors rated
at 600 volts and 105 degrees C. Connectors shall be Ideal Industries "Wing-Nut" or
Buchannan "B-Cap", 3M "Scotch-Lok" connectors or equal. Wire #8 and larger shall be
joined or terminated with solderless pressure connectors properly taped in layers to form a
moisture-tight joint.
D. All wiring shall be in conduit unless otherwise noted.
SECTION 260533 - RACEWAY, FITTINGS AND BOXES
A. Raceways - conduit shall be hot-dipped, zinc coated or sherardized rigid steel (RS),
intermediate metal conduit (IMC), electrical metallic tubing (EMT), or Schedule 40 PolyVinyl
Chloride (PVC).
B. Flexible conduit shall be galvanized, continuous spiral, single strip type. Flexible
conduit shall be covered with PVC jacket in wet or damp locations. Provide suitable fittings
with ground connector.
C. Fittings - all conduit entering or leaving outlet, junction or pull boxes, and cabinets and
all conduit stubs shall have bushings. Provide insulating bushings where required by NEC.
Provide expansion fittings with bonding jumper where conduits cross expansion joints.
1. Fittings for RS and IMC shall be threaded type.
D. Fittings for PVC shall be PVC, primed and glued.
E. Non metallic outlet boxes may be provided in PVC raceway systems. Outlet boxes in
wet or damp locations shall be cast-metal, threaded hub-type with gaskets.
F. Raceway and fitting installation - run conduits concealed within finished walls, ceilings
and floors. Conduit 1" and smaller may be run in the floor slab where practicable.
G. Conduit run outside of building shall be buried a minimum of 24" below finished grade.
H. Do not install PVC in or through fire rated assemblies, in or through any walls, in or
through any ceilings, in hazardous areas, in areas subject to severe physical damage, or
exposed anywhere in the project.
I. Conduit run underground, under slab, or within concrete encasement may be polyvinyl
chloride (PVC) or RS or IMC conduit protected with 2 coats of bitumastic paint. Convert
PVC to RS or IMC before rising through floor slab or rising out of soil. Conduit run beneath
slab shall be properly suspended from slab such that sub-slab settlement will not adversely
affect electrical system.
SECTION 265100 - LIGHTING FIXTURES
A. Fixtures - fixtures shall be as indicated in schedule.
B. LED DRIVERS
1. LED Electronic Drivers shall be UL approved and shall have the following
characteristics:
a. Electronic with Input Voltage range as shown on the drawings ±10%, 50/60 Hz, with
primary fusing.
b. Output Drive Current shall be 350mA maximum, +/- 5%.
c. Power Factor shall be >90% at full load with THD <20% at full load
d. Load regulation shall be +/- 1% from no load to full load
e. Output shall be isolated
f. Case temperature shall be rated for -40°C through +80°C and provided with thermal
protection and self-limited short circuit and overload protection.
g. Driver Life Rating shall have less than 0.5% failure rate at the LED module's maximum
L70 rated life.
h. Dimming Range: 100 to
10 percent, unless otherwise noted, of rated lamp lumens.
2. Driver Manufacturer
Drivers shall be considered acceptable for approval as manufactured by the following LED
Driver manufacturers.
a. Advance Transformer Co.
b. Magtech
c. Thomas Research Products (TRP)
d. Osram/Sylvania
C. LED FIXTURES
1. Life Rating (L 70) - Provide L70 documentation, defined as time of operation (in hours)
to 30% lumen depreciation (70% lumen maintenance), derived from temperature measurement
testing under UL1598 environments and directly correlated to LED package manufacturers
IESNA LM-80-08 data.
2. Mechanical - Housing shall be designed specifically for use with LED components and
incorporate high performance Thermal Management methods, i.e. heat sink(s). No active
thermal management/cooling features (i.e. fans), etc. will be allowed. Luminaire configuration
shall allow for modular replacement and/or field repair of all electrical components (i.e. LED
modules, Drivers, etc.).
3. LED Module Manufacturers
LED modules considered acceptable for approval are as manufactured by the following LED
component (chip) manufacturers.
a. Nichia Corporation.
b. Cree, Inc
c. Philips LumiLED
d. Osram Opto Semiconductors
D. No fixtures shall be hung with zip-clips.
CITY OF SUFFOLK
442 W. WASHINGTON ST., P.O. BOX 1858, SUFFOLK, VIRGINIA 23439-1858
PHONE: (757) 514-4060 FAX: (757) 514-4099
DEPARTMENT OF
PLANNING & COMMUNITY DEVELOPMENT
Division of Planning
To: Historic Landmarks Commission
From: Goncalo Borges, Senior Planner
Date: August 13, 2026
Subject: Request for Certificate of Appropriateness HLC202 6-00012, submitted by G.
Wayne Rhoads , applicant and agent, on behalf of the City of Suffolk, property
owner, to pave the existing gravel parking lot and perform landscaping and
pedestrian improvements to support the historic Phoenix Bank of Nansemond at
347 E. Washington Street. The property is further identified as Zoning Map
Number 34G25(A)*5, Suffolk Voting Borough, zoned FRRD, Fairgrounds
Revitalization and Redevelopment District, and HC, Historic Conservation Overlay
District.
STAFF REPORT
Overview and Proposed Actions
The subject property is located at 347 E. Washington Street. This property is part of the East
Washington Street District (2002) of the Suffolk Historic Conservation Overlay District and is
located in the FRRD, Fairgrounds Revitalization and Redevelopment zoning district. This property
is currently vacant, it is not improved and therefore covered in gravel, and it is utilized as
(informal) parking for the Phoenix Bank of Nansemond and other buildings/uses in the vicinity.
This property is adjacent and complementary to the Phoenix Bank of Nansemond building . The
proposed paving, parking, and pedestrian amenities will offer support to the activities that will take
place at this City facility.
The Phoenix Bank of Nansemond building is one of twenty -one in the district classified as
commercial in style, reflecting their use, materials, and form rather than any given architectural
style. The building was built in 1921 and is a contributing structure within the district. The
building is also individually listed on the National and State registers. The district nomination
form describes the building as a representative example of the rise of African American commerce
in southeastern Virginia, and as the only African American bank in Suffolk at the time of its
construction.
HLC2026-00012
August 13, 2026
Page 2
The Fall 1990 issue of Notes on Virginia (Virginia Department of Historic Resources) notes that
the Phoenix Bank “stands as an important reminder of an age when it was necessary for blacks to
establish their own financial institutions to serve the black business community”.
The applicant is proposing the following actions:
• Paving the existing gravel surface with standard-duty asphalt.
• Mark a total of 8 parking spaces (including 1 ADA accessible parking space).
• Install 6” concrete curb per Virginia Department of Transportation (VDOT) standards.
• Install gutter per HRPD standards.
• ADA accessible ramps with detectable warning surface per VDOT standards.
• Install a concrete sidewalk to create a pedestrian area.
• Install 2 Dominion Energy 150W EQ. LED 40K Type 3 Cutoff Colonial Mounted at 14
FT.
• Install 8 tree wells in the pedestrian area/sidewalk.
• Install sod/turf between the pedestrian area/sidewalk and the parking area.
• Plant 9 Bosque Elms, 2 Sawtooth Oaks, and 21 shrubs (Dwarf Burford Holly).
Please note that, per the Historic Landmark Commission Guidelines (HLC Guidelines), the non -
illuminated interpretative sign listed in the application and shown on the site plan has been
administratively approved on July 14th, 2026, under case HLC2026-00013.
Case History
On October 20 th, 2010, a site plan for an improved parking lot (SP2010 -00016), designed to
support a potential Suffolk African American History Museum, was approved by the Department
of Planning and Community Development. The proposed improvements were never carried out.
On May 9th, 2024, the adjacent property where the historic Phoenix Bank of Nansemond is located
received approval from the Historic Landmarks Commission (HLC) (request for Certificate of
Appropriateness, HLC2024-00009) with conditions to execute the following works:
• On the north elevation/front entrance, clean and repair masonry, repair brass letter signage,
repair date stone, replace cast stone lintels over second-story windows, replace non-original
windows with windows based on original configuration, and replace non -original
storefront entrance to match original configuration as specified in the aforementioned COA
application.
• On the east elevation, repair and re-finish exposed steel, paint CMU, restore masonry, and
protect window opening as specified in the aforementioned COA application.
• On the south elevation/rear, clean, repair, and repoint brick masonry, install new doors,
protect window openings, repair wood fascia, and provide gutter and downspouts as
specified in the aforementioned COA application.
• On the west elevation, repair and repoint masonry and protect window openings as
specified in the aforementioned COA application.
HLC2026-00012
August 13, 2026
Page 3
On November 13th, 2025, the adjacent property where the historic Phoenix Bank of Nansemond is
located received approval from the HLC (request for Certificate of Appropriateness, HLC2025 -
00017) with conditions to execute the following works:
• North Elevation/Front Entrance: install a cornice made of in -kind material to the original
– based on the 1988 photographic evidence, and in compliance with the submitted plans
prepared by Hanbury, named “Cornice Details” and “Cornice – Elevations”, both d ated
September 8, 2025.
• The cornice shall be painted in the PPG1002 -7 – Phantom Mist - PPG Paints’ Regional
Color Collection: New England. The cornice shall be installed in the north façade using
the masonry pockets originally designed with the building (see attached “Proposed Sc ope
of Work – REVISED 09-24-2025” and “Historic Photographs, 09/24/2025, Phoenix Bank
COA Application” “Cornice – Elevations”, “Cornice – Details”).
Public Notice
This request has been duly advertised in accordance with the public notice requirements in Section
15.2-2204 of the Code of Virginia, as amended, and with the applicable provisions of the Unified
Development Ordinance. A notice, containing a copy of the staff report, was also provided to the
applicant on August 7, 2026.
Applicable Regulations
A. Unified Development Ordinance (UDO)
• Section 31-413(f)(1)D, Issuance of Certificates: The Historic Landmarks Commission
shall not issue a Certificate of Appropriateness authorizing issuance of any permit if it
finds that the action proposed would adversely affect the primary character of the
district or the setting of structures and premises of substantial public interest.
• Section 31 -413(g)(2), General Considerations : The compatibility with the design,
development standards and criteria as included in the City’s adopted Historic District
Design Guidelines.
B. Suffolk Historic District Design Guidelines (8-16-2023 Version)
• Chapter 4, New Construction (pages 70 – 75).
• Chapter 5, Site & Setting (pages 77 - 92).
C. The Secretary of the Interior’s Standards for Rehabilitation
• A property shall be used for its historic purpose or be placed in a new use that requires
HLC2026-00012
August 13, 2026
Page 4
minimal change to the defining characteristics of the building and its site and
environment.
• New additions, exterior alterations, or related new construction shall not destroy
historic materials that characterize the property. The new work shall be differentiated
from the old and shall be compatible with the massing, size, scale, and architectural
features to protect the historic integrity of the property and its environment.
• Designing new onsite parking, loading docks, or ramps when required by the new use
so that they are as unobtrusive as possible and assure the preservation of the historic
relationship between the building or buildings and the landscape.
• Complying with barrier -free access requirements, in such a manner that character -
defining spaces, features, and finishes are preserved.
• Not recommended: Removing or radically changing buildings and their features or site
features which are important in defining the overall historic character of the property
so that, as a result, the character is diminished.
• Not recommended: Introducing a new landscape feature, including plant material, that
is visually incompatible with the site, or that alters or destroys the historic site patterns
or vistas.
• Not recommended: Placing parking facilities directly adjacent to historic buildings
where automobiles may cause damage to the buildings or to important landscape
features.
Staff Analysis
1347 E. Washington Street (Zoning Map Number 34G25(A)*5) is currently vacant; its surface is
covered by gravel, and it does not have any historic structures (contributing or non-contributing)
or other historic features on it.
Upon reviewing the application materials and proposed scope of work, staff finds that the proposed
parking, pedestrian, and landscaping improvements to support the adjacent historic Phoenix Bank
of Nansemond building are in substantial alignment with the UDO, and with the Suffolk Historic
District Design Guidelines (8-16-2023 Version).
Parking lot improvements:
The applicant is proposing to develop a parking lot with eight spaces in the subject property. This
work includes the following actions: paving the existing gravel surface with standard-duty asphalt,
creating a total of 8 parking spaces (including 1 ADA accessible parking space) , installing a 6”
concrete curb per VDOT standards , and i nstalling a gutter per HRPD standards. These
improvements have been designed to not interfere, obstruct, or be adverse to the adjacent historic
structure, and to the district in general. Per Section 31 -413(f)(1)D, the proposed parking lot
improvements do not adversely affect the primary character of the district or the setting of
structures and premises of substantial public interest. Per Section 31 -413(g)(2), all the materials
such as asphalt and concrete are considered appropriate to this historic setting. These materials are
already present in the Historic District, and the proposed features, such as the asphalt parking
HLC2026-00012
August 13, 2026
Page 5
surface, curb, and gutter, are compatible with the design, development standards, and criteria as
included in the City’s adopted Historic District Design Guidelines.
Considering Chapter 4 of the Historic District Design Guidelines, which guides new construction,
and the Secretary of the Interior’s Standards for Rehabilitation, the proposed parking lot
improvements are designed to maintain the historic character of the subject property by keeping
the design and choice of materials simple and without conflicting or risking damaging the Phoenix
Bank of Nansemond structure. The proposed features also match with other parking lots developed
and maintained by the City of Suffolk within the historic district. These features are consistent
with the setbacks and scale of other existing structures in the historic district. Hence, the proposed
improvements are deemed consistent and compatible with the site’s character and its neighboring
structures.
In what concerns Chapter 5 (Site & Setting guidelines) and other recommendations by the
Secretary of the Interior, the proposed parking lot and its features provide an adequate transition
of public and private spaces between the public right of way and the adjacent structure. The
installation of ADA accessible ramps and other pedestrian features (to be discussed further in this
report) offers an inclusive and pedestrian-friendly space, which also operates as a buffer between
the parking area and the former bank building. This is proposed without negatively impacting the
historic value of the Phoenix Bank of Nansemond historic structure and the unified feel in the
district. The installation of the proposed parking lot on the eastern side of the Phoenix Bank of
Nansemond also assures compliance with the Historic District guidelines.
Pedestrian and landscaping improvements:
The applicant is proposing a series of pedestrian and landscaping improvements that would
revitalize the subject property and offer both a pedestrian-friendly area adjacent to the parking lot
that would serve the Phoenix Bank of Nansemond structure, as well as a small plaza for the
neighborhood that includes trees, shrubs, additional street lighting, and an interpretative sign .
Hence, the applicant is proposing to install a concrete sidewalk to create a pedestrian area, install
2 Dominion Energy 150W EQ. LED 40K Type 3 Cutoff Colonial Mounted at 14 feet high,
installing 8 tree wells in the pedestrian area/sidewalk , installing sod/turf between the pedestrian
area/sidewalk and the parking area, and planting 9 Bosque Elms, 2 Sawtooth Oak, and 21 shrubs
(Dwarf Burford Holly) on the subject property.
Per Section 31-413(f)(1)D, the proposed pedestrian, landscaping , and lighting improvements do
not adversely affect the primary character of the district or the setting of structures and premises
of substantial public interest. Per Section 31 -413(g)(2), all the materials and features, such as the
trees, sod, Colonial-style lighting poles, and concrete, are considered appropriate and already
present in the historic district. All landscaping and lighting features are compatible with the design,
development standards, and criteria as included in the City’s adopted Historic Dis trict Design
Guidelines.
Per Chapters 4 and 5 of the Historic District guidelines, and considering the recommendations by
the Secretary of the Interior, the staff finds that the proposed concrete sidewalk with tree wells, the
HLC2026-00012
August 13, 2026
Page 6
“Colonial Mounted” street light pole, and the plantings (sod, shrubs, and trees) are consistent with
the Historic District character, thus offering an unified feel to the streetscape, are compatible with
the materials and architecture of the adjacent Phoenix Bank of Nansemond and other structures in
the vicinity; for reference, the “Colonial Mounted” street light pole presents a design that it is a
common streetscape feature throughout the Historic District and other sections of the Downtown.
The arrangement of the landscaping and lighting features (as well as of the parking lot) is consistent
with those on the same street block and accomplishes the goal of retaining the historic character
of the streetscape and the rhythm of solids and voids along the street. The proposed improvements,
as a whole, positively contribute to the transition from the public right of way to the
private/commercial and institutional uses in the adjacent parcels . These improvements have
compatible materials, colors, and features with those present in the Historic District, and
simultaneously enhance East Washington Street’s streetscape while providing safe and accessible
pedestrian-friendly access to the Phoenix Bank of Nansemond.
Lastly, the proposed improvements are designed in a manner that they are unobtrusive to the
Phoenix Bank of Nansemond building, and to assure the preservation of the historic relationship
between the former bank structure, adjacent structures, and the overall landscape. Compliance with
barrier-free access requirements is also proposed in such a manner that the Phoenix Bank of
Nansemond’s character-defining spaces, features, and finishes are preserved.
Recommendation
In sum, staff have reviewed the proposed actions with respect to the applicable requirements of
the HC Overlay zoning district and determined that the proposed project meets them. It is staff's
opinion that improving the subject property, adjacent to the Phoenix Bank of Nansemond, with an
eight-space parking lot, a pedestrian -friendly area and sidewalk, and landscaping, is appropriate
because it aligns with the standards set by the Guidelines and by the UDO, as well as follows the
recommendations set by the Secretary of the Interior’s Standards for Rehabilitation.
Based on the above findings-of-fact and conditions outlined above, staff recommends approval
of a Certificate of Appropriateness for the request sought under HLC2026-00012 for the
development of a parking lot with eight spaces (inclusive of one accessible space), installation of
concrete sidewalk and pedestrian area, curb and gutter, and landscaping: which includes
installing eight tree wells in the pedestrian area/sidewalk, installing sod/turf between the
pedestrian area/sidewalk and the parking area, and planting nine Bosque Elms, two Sawtooth
Oak, and twenty-one shrubs (Dwarf Burford Holly).
Staff would also like to clarify that, per the Historic Landmark Commission Guidelines (HLC
Guidelines), the non-illuminated interpretative sign listed in the application and shown on the
site plan was administratively approved on July 14th, 2026, under case HLC2026-00013.
Therefore, staff recommend approval of the following actions as summarized below in regard to
HLC2026-00012 and as further detailed and specified in the COA application:
• Paving the existing gravel surface with standard-duty asphalt.
HLC2026-00012
August 13, 2026
Page 7
• Mark a total of 8 parking spaces (including 1 ADA accessible parking space).
• Install 6” concrete curb per Virginia Department of Transportation (VDOT) standards.
• Install gutter per HRPD standards.
• ADA accessible ramps with detectable warning surface per VDOT standards.
• Install a concrete sidewalk to create a pedestrian area.
• Install 2 Dominion Energy 150W EQ. LED 40K Type 3 Cutoff Colonial Mounted at 14
FT.
• Install 8 tree wells in the pedestrian area/sidewalk.
• Install sod/turf between the pedestrian area/sidewalk and the parking area.
• Plant 9 Bosque Elms, 2 Sawtooth Oak, and 21 shrubs (Dwarf Burford Holly).
Attachments
• Site Maps
• Narrative
• Site Photography
• Site Plan
• Interpretative Sign
• Planting Plan
• Planting Plan Details
• Lighting Plan
• Lighting Plan Details
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap
contributors, and the GIS User Community
0 1.5 3 4.5 60.75
Miles
^_
Author: KOSSAI
Date: 07-06-2026 ±
GENERAL LOCATION MAP
HLC2026-00012
Subject Property
VILLAGE
TRADITIONAL
NEIGHBORHOOD
SUBURBAN NEIGHBORHOOD
RIGHT OF WAY
RURAL NEIGHBORHOOD
RURAL CONSERVATION
RURAL AGRICULTURE
PARKS AND OPEN SPACE
OFFICE/INSTITUTIONAL
MIXED USE CORE
MULTIFAMILY
NEIGHBORHOOD
Employment Center
COMMERCIAL CORRIDOR
Central Growth Area
^_ SUBJECT PROPERTY
E WASHINGTON ST
HOLLAD
AY
ST
LIB
ERT
YS T
HALLA VE
N & W AVE
COUNTY ST
TYNES ST
34G25(A)*5
353650000
0 60 120 180 24030
Feet
EXHIBIT B
Subject Property
Author: KOSSAI
Date: 07-06-2026 ±
PROPERTY MAP
HLC2026-00012
E WASHINGTON ST
HOLLADAY ST
HALL
AV
E
LIBERTY ST
COUNTY ST
N & W AVE
TYNES ST
RM
RM
FRRD
M-2
CBD
CBD
34G25(A)*5353650000
0 60 120 180 24030
Feet
Subject Property
Image: Suffolk Pictometry 2024
Author: KOSSAI
Date: 07-06-2026 ±
ZONING / LAND USE MAP
HLC2026-00012
N MAIN ST
MARKET
ST
ECONS
TANCE
RD
W
W
ASHINGTON
ST
CEDAR ST
E WASHINGTON ST
YORK ST
WELLONS ST
CAROLINA RD
FAYETTE ST
N SARATOGA
ST
FAYETTEST
PITCHKETTLE RD
SMITH ST
MARYLAND AVE
PITCHKETTLEVILLAGE
ST
JACKSON
ST
KATHERINE ST
CULLODEN ST
S SARATOGA ST
WHITE
MARSH RD
JOHNSON AVE
W
CONSTANCE
RD
BANK ST
CAROLINA RD
ELEY
CT
FACTORY ST
BUTE ST
W FINNEY AVE
RIVER
POINT
DR
LINDEN
AVE
MOUNT HOREB ST
NEWPORT
ST
FREENEY
AVE
MORGAN ST
MILITARY RD
HENLEYPL
BANK ST
EXT
AZALEA
CT
GARFIELD
AVE
JOHNSON
AVE
MULBERRY ST
WESTERN
AVE
NANSEMOND
AVE
CHURCH ST
HALL AVE
HILL ST
CEDAR
ST
SPUR
BEECH ST
CAMPAVE
YORK CT
DAYST
TYNES ST
OAK ST
E PINNER ST
CHERRY ST
BROOK AVE
PINE ST
SPRING ST
OAKLAND ST
RIVER
POINT
DR
MADISON
AVE
POPLAR AVE
FOREST
HILL
CRES
N BROAD ST
S DIVISION
ST
MOUNT
SINAI ST
NANSEMOND
AVE
TRADD
ST
DUMVILLE LN
ORCHARD AVE
GRAYSON
CT
CENTRAL AVE
RIVERVIEW
CT
BOAT
ST
CAUSEY AVE
KENNEDYCT
CLARYS DR
BETHLEHEM
ST
JOHNSONAVE
MASON AVE
HIGHLAND AVE
OAKDALE TER
PARKWAY
ABRAHAM
ST
NORTH ST
WILSON ST
RENOST
S BROAD ST
MAHAN ST
VIRGINIA
AVE
VIRGINIA AVE
S MAIN ST
POLKST
RICHARDSON
ST
ASHLEY AVE
LINDEN AVE
KNIGHTST
CANNON ST
PITCHKETTLE RD
RAILROAD AVE
DUKE
ST
TERRACE
CT
PINNER ST
HOLLADAY ST
W RIVERVIEW DR
COLLEGE CT
SECOND AVE
GRANBY ST
SUNSETAVE
COLLIEAVE
FIRST AVE
GRACE ST
THIRD AVE
WALNUT ST
SECOND AVE
MAPLE ST
MULBERRY ST
CAUSEY AVE
PENDER ST
GLOUCEST
ER
ST
N DIVISION
ST
RIDLEY
ST
LINCOLN
AVE
BOSLEY AVE
LEXINGTONAVE
FORT ST
VAN BUREN
AVE
JEFFERSON ST
ADAMS STLAKESIDE
ST
EUGENIA
ST
KINGSBORO ST
ALLEN ST
GITTINGS ST
ELIZABETH ST
PARK
RD
JOHNSON LN
DOGWOOD
LN
FINNEY AVE
BATTERY AVEBROOK AVE
FREEMASON ST
HOWARD
PL
CAROLINA
AVE
NEVADA
ST
LEE ST
N & W AVE
COUNTY ST
WILLOWST
S
BROAD ST
SPRUCE ST
SAINT JAMES AVE
PEARL ST
COMMERCE
ST
SOUTH
ST
N LLOYD ST
JONES ST
DUMVILLE AVE
CHARLES ST
LINDEN AVE LINDEN AVE
BREWER AVE
FOREST ST
W
FINNEYAVE
WARWICKST
N
CAPITAL ST
SAINT JAMES
AVE
FRANKLIN ST
CHESTNUT ST
PINE ST
ROANOKE ST
COMMERCE ST
FOURTH ST
CLAY ST
HENRY ST
RAILROAD
AVE
LIBERTY ST
N DIVISION ST
BUTLER AVE
N SARATOGA ST
DARDEN AVE
N LLOYD ST
JEFFERSON
ST
ERIVERVIEW DR
HALIFAX ST
LOCUST
ST
SHIPWRIGHT
LN
PRENTIS ST
E RIVERVIEW
DR
FAIRGROUNDS
LN
E
CONSTANCE
RD
ECONSTAN
CE
RD
MOORE AVE
NANSEMOND RIVERLAKE MEADE
Disclaimer: THE CITY OF SUFFOLK MAKES NO
WARRANTY, REPRESENTATION, OR GUARANTEE OF ANY
KIND REGARDING EITHER ANY MAPS OR OTHER
INFORMATION PROVIDED HEREIN OR THE SOURCES OF
SUCH MAPS OR OTHER INFORMATION. THE CITY OF
SUFFOLK SPECIFICALLY DISCLAIMS ALL
REPRESENTATIONS OR WARRANTIES, EXPRESSED OR
IMPLIED, INCLUDING, WITHOUT LIMITATION, THE
IMPLIED WARRANTIES OF MERCHANTABILIY AND
FITNESS FOR A PARTICULAR PURPOSE.
The City of Suffolk assumes no liability for any errors,
omissions, or inaccuracies in the information provided
regardless of the cause of such or for any decision made ,
action taken, or action not taken by the user in reliance upon
any maps or information provided herein.
Parcel and Zoning information has been developed to provide
a graphic representation of the Real Estate Property Tax
Maps. The boundaries of any parcel may have been adjusted
to provide a more visually pleasing presentation. User should
refer to the instrument of transfer (deed or plat) for legal
boundary location and perimeter or area measurements.
Amended 8/16/2011 by Ordinance No. 11-O-073
0 0.1 0.2 0.3 0.40.05
Miles
SCALE: 1:10,000
Legend
BUILDING FOOTPRINTS
SUFFOLK HISTORIC CONSERVATION OVERLAY
NATIONAL REGISTER OF HISTORIC DISTRICTS
ORIGINAL SUFFOLK DISTRICT (1987)
NORTH MAIN STREET DISTRICT EXTENSION (1998)
EAST WASHINGTON STREET DISTRICT (2002)
WEST END DISTRICT (2004)
WEST END DISTRICT EXPANSION (2004)
SUFFOLK DISTRICT EXPANSION (2004)
CEDAR HILL DISTRICT (2006)
^_
Author: KOSSAI
Date: 07-06-2026
μ
Suffolk
Historic
Conservation
Overlay District &
National Register
GENERAL LOCATION MAP
HLC2026-00012
Subject Property
S16°09'27"W 88.01' (FIELD)
S16°10'58"W 87.87' (PLAT)
N74°14'10"W (FIELD)
N74°14'35"W 64.82' (PLAT)
S16°08'10"W 78.63' (FIELD)
S15°59'54"W 78.70' (PLAT)
S68°15'04"E (FIELD)
S68°18'42"E 89.14' (PLAT)
N16°11'25"E 88.89' (FIELD)
N16°10'58"E 88.82' (PLAT) N16°20'03"E (FIELD)
N16°10'58"E 89.15' (PLAT)
S16°19'28"W (FIELD)
S16°10'58"W 87.12' (PLAT)
N73°06'50"W 24.38' (FIELD)N73°04'28"W 24.36' (PLAT)
S68°21'19"E (FIELD)
S68°18'42"E 24.47' (PLAT)
STM #01
STM #02
8" CLAY
6" CLAY 8" CLAY
8" CLAY
8" CLAY
SAN #02
SAN #03
CITY OF SUFFOLK, VIRGINIA (GRANTEE)
0.267 ACRE (PLAT)
ACCOUNT # 353650000
TAX MAP #34G25(A)*5
ZONING: FRRD (FAIRGROUNDS
REVITALIZATION AND
REDEVELOPMENT DISTRICT); ALSO
HISTORIC OVERLAY DISTRICT
USE CODE: 740V - LOCAL GOVERNMENT
NOW OR FORMERLY
WILTON L & SHIRLEY B DAY
ACCOUNT # 351578000
TAX MAP #34G25(A)6*8
ZONING: FRRD (FAIRGROUNDS
REVITALIZATION AND
REDEVELOPMENT DISTRICT); ALSO
HISTORIC OVERLAY DISTRICT (PARTIAL)
USE CODE: 344C - OFFICE BUILDING
NOW OR FORMERLY
CARLITO HAMLIN
ACCOUNT # 353306000
TAX MAP #34G25(A)*2
ZONING: FRRD (FAIRGROUNDS
REVITALIZATION AND
REDEVELOPMENT DISTRICT); ALSO
HISTORIC OVERLAY DISTRICT
USE CODE: 353C - RETAIL STORE
01
02
NOW OR FORMERLY
CARLITO HAMLIN
ACCOUNT # 353306000
TAX MAP #34G25(A)*2
ZONING: FRRD (FAIRGROUNDS
REVITALIZATION AND
REDEVELOPMENT DISTRICT); ALSO
HISTORIC OVERLAY DISTRICT
USE CODE: 353C - RETAIL STORE
CITY OF SUFFOLK, VIRGINIA (GRANTEE)
INSTRUMENT #060002379
RECORDED FEBRUARY 2, 2006
GRANTOR: SUFFOLK REDEVELOPMENT
AND HOUSING AUTHORITY
INSTRUMENT #060124420 (PLAT)
0.267 ACRE (PLAT)
ACCOUNT # 353650000
TAX MAP #34G25(A)*5
ZONING: FRRD (FAIRGROUNDS
REVITALIZATION AND
REDEVELOPMENT DISTRICT); ALSO
HISTORIC OVERLAY DISTRICT
USE CODE: 740V - LOCAL GOVERNMENT
TYNES STREET
ASPHALT PAVEMENT
50' RIGHT-OF-WAY
(INST. #060124420)
EAST WASHINGTON STREET
ASPHALT PAVEMENT50' RIGHT-OF-WAY(INST. #060124420)
EAST WASHINGTON STREET
ASPHALT PAVEMENT50' RIGHT-OF-WAY(INST. #060124420)
CITY OF SUFFOLK, VIRGINIA (GRANTEE)
0.267 ACRE (PLAT)
ACCOUNT # 353650000
TAX MAP #34G25(A)*5
ZONING: FRRD (FAIRGROUNDS
REVITALIZATION AND
REDEVELOPMENT DISTRICT); ALSO
HISTORIC OVERLAY DISTRICT
USE CODE: 740V - LOCAL GOVERNMENT
S16°08'110"W 78.63' (FIELD)
S16°08'111110"W 78.63' (FIELD)
S16°08'110"W 78.63' (FIELD)
S15°59'545454544"W 78.70' (PLAT)
15 59 5444"W
CITY OF SUFFOLK, VIRGINIA (GRANTEE)
0.049 ACRE (PLAT)
ACCOUNT # 352674500TAX MAP #34G25(A)*3
ZONING: FRRD (FAIRGROUNDS
REVITALIZATION AND
REDEVELOPMENT DISTRICT); ALSO
HISTORIC OVERLAY DISTRICT
USE CODE: 740C - LOCAL GOVERNMENT
02
CITY OF SUFFOLK, VIRGINIA (GRANTEE)
0.010 ACRE (GIS)
ACCOUNT # 350866200TAX MAP #34G25(A)*7
ZONING: FRRD (FAIRGROUNDS
REVITALIZATION AND
REDEVELOPMENT DISTRICT); ALSO
HISTORIC OVERLAY DISTRICT
USE CODE: 740V - LOCAL GOVERNMENT
01
SUFFOLK PHOENIX
BANK PLAZA
PREPARED FOR
WOOLPERT
SITE PLAN
CS100
©
SITE LEGEND
NORTH
PAVEMENT SECTION
NOTE:
A-101
D4
A-101
D2
24" x 36" GRAPHIC PANEL WITH FRAME
GROUND LEVEL
0' - 0"
1' - 4" 4" 2' - 4"
4' - 0" 3' - 0"
2" x 4" SQUARE TUBING WELDED
TO EACH SIDE FRAME
4 (1/2") NUTS AND BOLTS
FASTEN 8" ALUM. AND STEEL
BASE PLATES
24" x 36" GRAPHIC PANEL WITH FRAME
2" 3' - 0" 2"
3' - 4"
2" x 4" SQUARE STEEL MOUNTING
POSTS WELDED TO 8" STEEL BASE
PLATE
2" X 4" SQUARE ALUM. TUBING WELDED
TO INTERPRETIVE SIGN FRAME WITH 8"
SQUARE ALUMINUM BASE PLATE
GROUND LEVEL
0' - 0"
30.00°
ARCHITECTURE ENGINEERING GEOSPATIALɕɕ
4454 IDEA CENTER BOULEVARD
DAYTON, OH 45430-1500
937.461.5660
1 2 3 4 5 6 7
A
B
C
D
E
ISSUANCE SCHEDULE
SHEET NAME:
PROJECT NO:
DATE ISSUED:
NUMBER DATE DESCRIPTION
SHEET NO:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
GENERAL NOTES:
Autodesk Docs://City of Suffolk VA -Projects HUB_R24/_W_10015069_Phoenix Bank Plaza_Historic Sign_R24.rvt
3/19/2026 8:49:46 AM
INTERPRETIVE SIGN PLAN
AND ELEVATIONS
A-101
ND
JM
ND
10015069.09
03/20/2026
PHOENIX BANK PLAZA
CITY OF SUFFOLK, VA
341 E WASHINGTON ST, SUFFOLK, VA
1/2" = 1'-0"
INTERPRETIVE SIGN - PLAN VIEWD1 1/2" = 1'-0"
FRONT ELEVATIOND2 1/2" = 1'-0"
SIDE ELEVATIOND4
6" = 1'-0"
24" x 36" GRAPHIC PANEL - BASIS OF DESIGNA1
0 1'6" 2' 3' 4' 5' 6'
1/2"=1'-0"
GRAPHIC SCALE
0 2" 3"1" 6"
6"=1'-0"
1. REFER TO CIVIL PLANS FOR DEMOLITION AND NEW CONSTRUCTION GENERAL
NOTES.
2. REFER TO CIVIL PLANS FOR ALL SITE WORK.
3. GRAPHIC PANEL SIGN SHOWN FOR REFERENCE ONLY. PANEL TO BE DESIGNED BY
INTERPRETIVE SIGN MANUFACTURER AND SUBMITTED AS A SHOP DRAWING TO BE
APPROVED BY ARCHITECT PRIOR TO FABRICATION.
4. CONTRACTOR TO NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO
COMMENCING WORK.
Lic. No. 013830
-$621$0,//(5
L
OC
INIGRIVFO
HT
AEWNOMM
A
A
HCR
DE
CERT
IIF
CET
T
I
-$6216-$66666-$6666$6--$6$$66-$6--$$6--$$$$$ $0,//(5
OOO
R
IIIIIIIII
VVVVVVVVVVVVVVVVVV
F
E
W
E
N
W
W
OOOOO
NNNN
N
M
O
O
MM
O
O
M
9:23:37
AM
03/19/2026
Lic. No. 0401013830
03/20/2026
S16°09'27"W 88.01' (FIELD)
S16°10'58"W 87.87' (PLAT)
N74°14'10"W (FIELD)
N74°14'35"W 64.82' (PLAT)
S16°08'10"W 78.63' (FIELD)
S15°59'54"W 78.70' (PLAT)
S68°15'04"E (FIELD)
S68°18'42"E 89.14' (PLAT)
N16°11'25"E 88.89' (FIELD)
N16°10'58"E 88.82' (PLAT) N16°20'03"E (FIELD)
N16°10'58"E 89.15' (PLAT)
S16°19'28"W (FIELD)
S16°10'58"W 87.12' (PLAT)
N73°06'50"W 24.38' (FIELD)N73°04'28"W 24.36' (PLAT)
S68°21'19"E (FIELD)
S68°18'42"E 24.47' (PLAT)
STM #01
STM #02
8" CLAY
6" CLAY 8" CLAY
8" CLAY
8" CLAY
SAN #02
SAN #03
CITY OF SUFFOLK, VIRGINIA (GRANTEE)
0.267 ACRE (PLAT)
ACCOUNT # 353650000
TAX MAP #34G25(A)*5
ZONING: FRRD (FAIRGROUNDS
REVITALIZATION AND
REDEVELOPMENT DISTRICT); ALSO
HISTORIC OVERLAY DISTRICT
USE CODE: 740V - LOCAL GOVERNMENT
NOW OR FORMERLY
WILTON L & SHIRLEY B DAY
ACCOUNT # 351578000
TAX MAP #34G25(A)6*8
ZONING: FRRD (FAIRGROUNDS
REVITALIZATION AND
REDEVELOPMENT DISTRICT); ALSO
HISTORIC OVERLAY DISTRICT (PARTIAL)
USE CODE: 344C - OFFICE BUILDING
NOW OR FORMERLY
CARLITO HAMLIN
ACCOUNT # 353306000
TAX MAP #34G25(A)*2
ZONING: FRRD (FAIRGROUNDS
REVITALIZATION AND
REDEVELOPMENT DISTRICT); ALSO
HISTORIC OVERLAY DISTRICT
USE CODE: 353C - RETAIL STORE
02
NOW OR FORMERLY
CARLITO HAMLIN
ACCOUNT # 353306000
TAX MAP #34G25(A)*2
ZONING: FRRD (FAIRGROUNDS
REVITALIZATION AND
REDEVELOPMENT DISTRICT); ALSO
HISTORIC OVERLAY DISTRICT
USE CODE: 353C - RETAIL STORE
TYNES STREET
ASPHALT PAVEMENT
50' RIGHT-OF-WAY
(INST. #060124420)
EAST WASHINGTON STREET
ASPHALT PAVEMENT50' RIGHT-OF-WAY(INST. #060124420)
EAST WASHINGTON STREET
ASPHALT PAVEMENT50' RIGHT-OF-WAY(INST. #060124420)
(1) QA
(1) UP
(1) QA
(8) UB
(1) ZG
(5) LL
(5) LL (5) LL
(5) LL
(1) ZG
(5) LL (5) LL
(2) ZG
(448 sf) SOD
(730 sf) SEED
(644 sf) SOD
(81 sf) SOD
(1) EX-1
(1) EX-1
(21) IC
(762 sf) SOD
(1) EX-2
CODE QTY BOTANICAL NAME COMMON NAME ROOT CAL.
TREES
QA 2 QUERCUS ACUTISSIMA SAWTOOTH OAK B&B 1.5"-2" CAL. MIN.
UB 8 ULMUS PARVIFOLIA `BOSQUE` BOSQUE ELM B&B 1.5"-2" CAL. MIN.
UP 1 ULMUS PARVIFOLIA `EVERCLEAR` BOSQUE ELM B&B 1.5"-2" CAL. MIN.
ZG 4 ZELKOVA SERRATA `GREEN VASE` GREEN VASE SAWLEAF ZELKOVA B & B 1.5"-2" CAL. MIN.
EXISTING TREES
EX-2 1 ACER SP.
TO REMAIN IN PLACE.
MAPLE EXISTING
EX-1 2 ZELKOVA SERRATA
TO REMAIN IN PLACE.
ZELKOVA EXISTING
CODE QTY BOTANICAL NAME COMMON NAME ROOT SIZE
SHRUBS
IC 21 ILEX CORNUTA `BURFORDII NANA` DWARF BURFORD HOLLY CONT. 24" HT. MIN.
SYMBOL CODE QTY BOTANICAL NAME COMMON NAME CONT SPACING SPACING
GROUND COVERS
LL 30 LIRIOPE MUSCARI `BIG BLUE BIG BLUE LILY TURF 1 GAL 24" o.c.
SEED 730 SF SEED TURF SEED SEED
SH 734 SF SHREDDED HARDWOOD MULCH BULK
SOD 1,935 SF
SOD
SOD SHALL BE HYBRID BERMUDA.
TAHOMA 31 OR EQUAL.
TURF SOD
PLANT SCHEDULE
KEYNOTES
LANDSCAPE NOTES
PLANT SUBSTITUTIONS
EXISTING UTILITIES
CITY OF SUFFOLK LANDSCAPE NOTES
SUFFOLK PHOENIX
BANK PLAZA
PREPARED FOR
WOOLPERT
PLANTING PLAN
CP100
©
NORTH
NOTE:
SUFFOLK PHOENIX
BANK PLAZA
PREPARED FOR
WOOLPERT
PLANTING PLAN
DETAILS
CP500
©
CLEANLINE INSTALLATION INSTRUCTIONS
1. Dig landscape trench 1" (25mm) deeper than the edging being set.
2. Set the edging into the landscape trench with the top 1/2" (12.5cm) above
what will become the compacted finish grade. (The installer can connect the
adjacent sections of the edging prior to or after the sections are placed in
the trench.) Where connections are needed on curves, the installer will find
that connecting sections prior to installing will allow for faster completion.
3. Start at the beginning of the bed area and begin driving the 12" (30.5cm)
aluminum stakes. (NOTE: There are more loops per section than stakes.
The additional loops are provided for greater versatility of staking based on
the design and application.)
4. Snap down the adjacent sections. (See ISOMETRIC VIEW A)
5. At the end of the bed area, cut the section to the desired length and stake
down. Begin your next bed area with the remaining portion of the cut
section. FORMING ANGLES: Cut the bottom of the edging halfway up
using a hacksaw, lay on a hard surface placing a brick or 4 x 4 over the cut.
6. Bend up to the desired angle using a hammer to stiffen angle. This forms
a 1/2" radius on top avoiding sharp corners. area, cut the section to the
desired length and stake down. Begin your next bed area with the remaining
portion of the cut section. (See Diagram B) FORMING ANGLES: Cut the
bottom of the edging halfway up using a hacksaw, lay on a hard surface
placing a brick or 4 x 4 over the cut. Bend up to the desired angle using a
hammer to stiffen angle. This forms a 1/2" radius on top avoiding sharp
corners.
PERMALOC CLEANLINE COMMERCIAL GRADE ALUMINUM LANDSCAPE EDGING
NOTE: ALUMINUM EDGING SHALL ONLY BE USED TO EDGE RIVER ROCK MULCH BEDS.
®
PERMALOC CORPORATION
13505 BARRY ST
HOLLAND, MI 49424
TOLL FREE: 1-800-356-9660
PHONE: (616) 399-9600
FAX: (616) 399-9770
www.permaloc.com
ISOMETRIC VIEW A
SIDE VIEW
PLANTING SPECIFICATIONS
1. SOILS TESTING
A.All soil testing shall be done at the contractor's expense. soil tests shall be conducted by a state laboratory or recognized
commercial laboratory. each sample shall be extracted from a six-inch deep core and prepared in accordance with
recommendations of the soil-testing laboratory.
B.each soils test shall determine soil texture / particle size, organic matter (OM), soil pH, buffer pH, nitrogen (N),
phosphorus (P), potassium (K), calcium (Ca), iron (Fe), boron (B), zinc (Zn), copper (Cu), magnesium (Mg), manganese
(Mn), sulfur (S), sodium (Na), calculated cation exchange capacity (CEC), excess carbonate, electrical conductivity (EC)
and total dissolved solids (TDS), sodium adsorption ratio (SAR), AND soluble salts.
C.All new soils provided from off-site sources, obtain one soil test for each soil source per 500 cubic yards of soil and submit
soil test results and soil amendment recommendations to to the owner and engineer of record for review and acceptance
prior to distributing and amending soil.
D.For all existing stockpiled topsoil to be redistributed on site, obtain one soil test per 500 cubic yards of soil prior to
application. submit soil test results and soil amendment recommendations to the owner and engineer of record for review
and acceptance prior to redistributing and amending soil.
2. DELIVERY, HANDLING, AND STORAGE:
D. Deliver packaged materials in manufacturer's unopened containers or bundles, fully identified with name, brand, type, weight, and analysis. Store
packaged materials in such a manner as to prevent damage or intrusion of foreign matter.
E. Dig balled and burlapped (B& B) plants with firm, natural balls of earth, of a diameter not less than recommended by the American Standard for
Nursery Stock, and of sufficient depth to include the fibrous and feeding roots. B&B plants will not be accepted if the ball is cracked or broken
before or during planting operation.
F. Deliver trees and shrubs after preparations for planting have been completed. Do not bend, bind, or tie trees or shrubs in such a manner as to
damage bark, break branches or destroy natural shape. If planting is delayed more than 6 hours after delivery, set trees and shrubs in shade,
protect from weather and mechanical damage, and keep roots moist by heeling-in bare root stock and covering plant balls with soil, peat moss or
other acceptable material for balled stock. Plants shall be kept well watered and shall not remain unplanted for longer than ten (10) days after
delivery.
G. Plants shall be lifted and handled from the bottom of the ball only.
H. Do not remove container-grown stock from containers until planting time.
3. DRAINAGE: Before planting, determine that areas to receive plant material have adequate subdrainage.
A. The landscape contractor is responsible for drainage tests as necessary to identify any problems prior to beginning planting operations. Upon
commencement of planting operations the landscape contractor assumes responsibility for soil conditions.
B. Dig planting pits to full depth and dimensions indicated on drawings.
C. At bottom of planting pit, excavate rectangular pit 12 inches by 12 inches by 18 inches deep. Quickly pour water into pit to a depth of 6 inches
(approximately 3-3 3/4 gallon). Note time required for water to be completely absorbed. Divide time noted by 6 to achieve average rate of
absorption for 1 inch of water. Where rate of absorption exceeds 60 minutes per inch, notify owner immediately for directions on how to proceed.
4. PLANTING DATES: Planting shall be done only within the following dates except as approved by Owner.
A. Deciduous Trees and Shrubs: March 1 to May 31 and October 15 to December 15.
B. Evergreen Trees, Shrubs and Vines: March 1 to May 31 and September 1 to November 15.
C. All plant material shall be guaranteed by the Contractor for a period of 1 year from the date final acceptance to be in good, healthy and flourishing
condition.
5. MATERIALS FOR PLANTING:
A. Topsoil: shall be a fertile, friable natural loam, uniform in composition, free of stones, lumps, plants and their roots, debris and other extraneous
matter over 1 inch in diameter, capable of sustaining vigorous plant growth. Soil shall be harvested at a single source from the O and/or A horizons
of the soil profile.
1) Topsoil shall have a pH range of 5.5 to 7.5.
2) Topsoil shall contain 1.5-5% organic matter by dry weight .
3) Soil Texture: sandy loam, sandy clay loam with the following particle size distribution:
Gravel Less than 10%
Silt 15-30%
Clay 20-35%
Chemical Levels shall be:
Magnesium Mg100+ units
Phosphorus P205 150+ units
Potassium - K20 120+ units
4) Soluble Salts/ Conductivity - Not to exceed 900 ppm/0.9 mmhos/cm (in soil); not to exceed 3000 ppm/2.5 mmhos/cm (in high organic mix)
5) Cation exchange capacity shall be a minimum of 8 meq/100g.
B. Clay Loam to Sandy Clay Loam Soil: shall be a fertile, friable natural loam, uniform in composition, free of stones, lumps, plants and their roots,
debris and other extraneous matter over 1 inch in diameter, capable of sustaining vigorous plant growth.
1) Soil shall have a pH range of 5.5 to 6.5.
2) Soil shall contain 2-5% organic content by volume.
3) Soil Texture: Clay loam to sandy clay loam with the following particle size distribution:
Gravel Less than 10%
Sand 20-50%
Silt <35%%
Clay 20-40%
4) Chemical Levels shall be:
Magnesium Mg100+ units
Phosphorus P205 150+ units
Potassium - K20 120+ units
5) Soluble Salts/ Conductivity - Not to exceed 900 ppm/0.9 mmhos/cm (in soil); not to exceed 3000 ppm/2.5 mmhos/cm (in high organic mix)
6) Cation exchange capacity shall be 20-35 meq/100g.
C. Compost: Compost shall be mature, stable, weed free, and produced by aerobic decomposition of organic matter. Compost feedstock shall be plant
matter, such as high lignin forestry products or yard waste (leaves, brush and yard trimmings).
1) The product must not contain any visible refuse or other physical contaminants, substances toxic to plants, or over 5% sand, silt, clay or rock
material by dry weight.
2) Compost shall be sampled and tested as required by the Seal of Testing Assurance Program of the United States Composting Council (USCC)
and shall meet the physical requirements for compost as determined by USCC.
3) The product shall possess no objectionable odors. The product must meet all applicable USEPA CFR, Title 40, Part 503 Standards for Class A
biosolids.
4) The moisture level shall be such that no visible water or dust is produced when handling the material.
D. Composted Pine Bark Fines: Shall be approved composted, ground pine bark having no particle with a dimension greater than 3/4 inch. No more
than 10% shall be wood.
E. Sand: Shall be quartz based sharp concrete sand, ASTM C-33 Fine Aggregate, with a Fines Modulus Index between 2.8 and 3.2.
F. Perlite: Coarse horticultural grade expanded, volcanic perlite. Maximum density shall be 8 lb./ft3.
1) pH shall be 6.5 to 7.5.
2) Perlite shall be meet the Perlite Institute's Standards for Gradation for Horticultural Perlite for Coarse Perlite with no more than 70% passing
through a #16 Standard Sieve.
G. Humus: Shall be mature, stable, weed free, and produced by aerobic decomposition of organic matter. Compost feedstock shall be plant matter,
such as high lignin forestry products or yard waste (leaves, brush and yard trimmings).
1) Humus shall have a pH between 6 and 7.5.
2) Soluble Salt Concentration shall be less than 10dS/m.
3) Cation exchange capacity rate shall be 100-250.
4) The product must not contain any visible refuse or other physical contaminants, substances toxic to plants, or over 5% sand, silt, clay or rock
material by dry weight.
5) The product shall possess no objectionable odors. The product must meet all applicable USEPA CFR, Title 40, Part 503 Standards for Class A
biosolids.
6) The moisture level shall be such that no visible water or dust is produced when handling the material.
H. Trace Elements: Shall be commercially available slow release materials containing zinc (Zn), Molybdenum (Mo), Copper (Cu), Boron (B), and
Magnesium (Mn).
I. Fertilizer: A commercial fertilizer for ornamental trees, shrubs and ground cover with an analysis of 10% Nitrogen, 6% Phosp horus and 4%
Potassium shall be used. This fertilizer shall be granular with a minimum of 50% of the total Nitrogen in organic form. 14-14-14-Osmocote (or
approved equal) shall be applied at a rate of 10 lbs. per square foot, tilled to a depth of 8 inch, shall be used for perennials.
6.
PLANT MATERIALS: (Refer to the PLANT LIST on the drawings for specific types and quantities of plants):
A. Plants shall be nursery grown in accordance with good horticultural practices. Plants shall either be obtained from local nurseries and/or others,
which have soil and climatic conditions similar to those in the locality of the project.
B. Plants shall be true to species and variety and unless specifically noted otherwise, all plants shall be of specimen quality, exceptionally heavy,
symmetrical, tightly-knit plants, so trained or favored in their development and appearance as to be superior in form, number of branches,
compactness and symmetry.
C. Plants shall be sound, healthy and vigorous, well branched and densely foliated when in leaf, free of disease, insect pests, eggs or larvae and shall
have healthy, well-developed root systems. They shall be free from physical damage or any conditions that would prevent thriving health and the
desired appearance.
D. Trees, which have a damaged or crooked leader, or multiple leaders, unless specified in the plant list, will be rejected. Trees with abrasion of the
bark, sun scald, disfiguring knots, or pruning cuts more than 1 1/4 inch diameter which have not completely callused, will be rejected.
E. Plants shall conform to measurements specified in the plant schedules except that plants larger than specified may be used if acceptable to the
Landscape Architect or owner. Use of such plants shall not increase the contract price. If larger plants are accepted, the root ball shall be sized for
the larger plant.
F. Caliper Measurement: Shall be taken at a point on the trunk 6 inches above natural ground line for trees up to 4 inches diam eter, and at a point 12
inches above the natural ground line for trees over 4 inches diameter.
G. Plants shall be measured when branches are in the normal position. Height and spread dimensions specified refer to the main body of the plant
and not from branch tip to tip.
7. SOIL MIXING PROCEDURES:
A. Topsoil used in sand/soil mixes shall be screened or shredded prior to mixing in sands. Maximum clod inclusion for soil mixes shall not exceed:
Clod size (largest dimension) % of the soil mix volume
Less than 1” Unlimited
1 to 3 inches 20%
3 to 6 inches 5%
>6 inches Less than 2%
A. Source material and soil mix stockpiles shall be protected from rain by covering with filter cloth.
8. INSPECTION:
A. EXAMINE THE AREAS AND CONDITIONS WHERE SOIL MIX IS TO BE INSTALLED AND NOTIFY THE ENGINEER OF CONDITIONS DETRIMENTAL TO
THE PROPER AND TIMELY COMPLETION OF THE WORK. DO NOT PROCEED WITH THE WORK UNTIL UNSATISFACTORY CONDITIONS ARE
CORRECTED TO PERMIT PROPER INSTALLATION OF THE WORK.
B. COOPERATE WITH OTHER CONTRACTORS AND TRADES WORKING IN AND ADJACENT TO OTHER WORK AREAS. EXAMINE DRAWINGS WHICH
SHOW DEVELOPMENT OF ENTIRE PROJECT AND BECOME FAMILIAR WITH SCOPE OF OTHER WORK REQUIRED.
9. SOIL INSTALLATION - GENERAL PROCEDURES:
G.IF SUBGRADE SOIL COMPACTION EXCEEDS 80%, EXISTING SOIL SHALL BE RIPPED TO A DEPTH OF 12 INCH TO ALLEVIATE COMPACTION WHICH
HAS TAKEN PLACE DURING CONSTRUCTION. PRIOR TO LOOSENING OF SOIL, CONTRACTOR MUST LOCATE EXISTING UTILITIES AND
COORDINATE WITH OWNER OR OWNERS REPRESENTATIVE ANY UNDERGROUND ELECTRIC LINES, DRAINAGE PIPES, CONDUITS, ETC.
H. PREPARE THE SUBGRADE BY ROUGHENING THE TOP 3” OF THE SUBSOIL BY DRAGGING THE TEETH OF A BACKHOE BUCKET ACROSS THE
SURFACE.
I. BEGIN SOIL INSTALLATION AS SOON AS SUBSOIL IS PREPARED. USE LOW IMPACT EQUIPMENT WITH TRACK BELTS, LARGE TIRES, OR LOW TIRE
PRESSURE TO LOWER COMPACTION AND SOIL DAMAGE DURING INSTALLATION.
J. MONITOR COMPACTION DURING INSTALLATION AND LOOSEN SOILS AS NEEDED IF COMPACTION EXCEEDS 80%.
10. SOIL INSTALLATION - GENERAL PROCEDURES CONTINUED:
K. Install specified soil in 12”-18” thick lifts. Compact each lift sufficiently to reduce settling but not enough to prevent the movement of water and feeder
roots through the soil. The soils in each lift should feel firm to the foot in all areas and make only slight heel prints.
11. INSTALLATION OF SOIL MIX FOR LAWN AREAS ON GRADE:
A. Soil Mix for Lawns on Grade: shall consist of 10% compost and 90% topsoil, by volume. These materials must meet specifications described in Paragraph 6.
B. Loosen subgrade lawn areas to a minimum of 3”. Remove stones more than 1-1/2” in any dimension and sticks, roots, rubbish, and other extraneous matter.
Limit preparation to areas which will be planted promptly after preparation.
C. Spread soil mix for lawn areas on grade to a minimum depth of 4” as required to meet grade and elevations shown on drawings, after lightly rolling and natural
settlement. Allow for sod thickness in areas to be sodded.
12. INSTALLATION OF SOIL MIX FOR TREE PITS ON GRADE
A. Confirm that native subsoil drains at a rate of at least ½” per hour. If drainage is less than ½” per hour, provide subsurface drainage lines.
B. Install 30-36” of Soil Mix for Tree Pit Backfill on Grade:
1) Shall consist of clay loam to sandy clay loam soil, sand, and composted pine bark fines at a rate of 5:5:1 to 10:5:1.5 to achieve the following:
(a) Clay content of Soil Mix shall be 10-20% of the soil mix, by volume.
(b) Minimum amount of coarse to medium sand in the mix shall be 55%
(c) Minimum infiltration rate at 80-85% compaction shall be 1-3 inches per hour.
C. Composted pine bark fines shall not exceed 10% of the total soil mix by volume.
D. Till 4” of compost into the top 6” of the installed Soil Mix for Tree Pit Backfill on Grade.
13.
INSTALLATION OF SOIL MIX FOR MULCHED SHRUB AND PERENNIAL BEDS:
A. Confirm that native subsoil drains at a rate of at least ½” per hour. If drainage is less than ½” per hour, provide subsurface drainage lines.
B. Install 4” of Soil Mix for Mulched Shrub and Perennial Beds on Grade:
1) Shall consist of clay loam to sandy clay loam soil, sand, and composted pine bark fines at a rate of 5:5:1 to 10:5:1.5 to achieve the following:
(a) Clay content of Soil Mix shall be 10-20% of the soil mix, by volume.
(b) Minimum amount of coarse to medium sand in the mix shall be 55%
(c) Minimum infiltration rate at 80-85% compaction shall be 1-3 inches per hour.
2) Composted pine bark fines shall not exceed 10% of the total soil mix by volume.
C. Till 4” of compost into the top 6” of the installed Soil Mix for Tree Pit Backfill on Grade.
14. GENERAL PLANT INSTALLATION:
A. Excavation: Excavate all tree pits and planting areas to the width and depth shown in the planting details.
B. Center plant in pit and orient for the best visual effect. Set plants plumb and hold rigidly in position until soil has been tamped firmly around root ball.
C. Mulch within 48 hours after planting and after applying the pre-emergent herbicide, except ground cover areas (which shall have organic material placed before
planting) with a 3" layer of mulch immediately after planting. All bed lines shall be cut with a smooth consistent edge to a minimum depth of 3 inches. Keep
mulch out of the crowns of shrubs and off buildings, sidewalks, light standards, and other structures.
D. All planting areas to conform to specified grades after full settlement has occurred and mulch has been applied. Provide saucers around tree pits as shown on
planting details. Remove all tags, labels, strings, etc. from all plants.
15. MAINTENANCE AND GUARANTEE:
A. The landscape contractor shall be responsible for maintaining his work until final acceptance by the owner or the owner's representative. Maintenance shall
include watering, weeding, cultivating, mulching, removal of dead materials, resetting of plants to proper grades or upright positions, restoration of earth berms,
and other necessary operations. adequate protection for lawn areas against trespassing during planting operations and against damage of any kind shall be
provided. nothing in these notes is intended to relieve the contractor of his responsibility to repair existing lawn areas damaged by workmen engaged in the
completion of this project.
B. Inspection of the work to determine completion of the contract exclusive of the possible replacement of plantings during the warranty period, will be made by the
owner or the owner's representative at the conclusion of the installation period upon written notice requesting such inspection. Request shall be submitted by
contractor at least ten days prior to the anticipated date for inspection. After inspection, the contractor will be notified in writing by the owner or the owner's
representative of acceptance of the work or, if there are any deficiencies, the contractor will be notified of the requirements necessary for completion of the
work. Plantings shall not be considered accepted until all deficiencies have been corrected and approved in writing.
C. Nursery stock shall be fully guaranteed for one full year. All plants that fail to make new growth from a dormant condition or that die during the first year after
planting shall be replaced. All replacements shall conform with the original specifications as to size and type. All costs of replacements shall be borne by the
contractor.
D. The contractor shall be responsible for the removal of all unused materials, rubbish, debris, or plant material not planted from the
site upon completion of his work.
E. All other items necessary to make work complete shall be finalised prior to final inspection.
16. PERMANENT SODDING FOR LAWN AREAS:
A. Sod shall be Tahoma hybrid Bermuda sod or equal. Sod shall only be installed during the warm season when Bermuda sod is actively growing. Out of season
lawn shall be a temporary lawn of winter rye.
B. Sod shall not be installed when ground is frozen.
C. Sod and subsoil shall be kept moist until sod is fully established.
D. Prior to laying sod contractor shall provide 4 inches of topsoil as specified on all areas to receive seed or sod.
E. The contractor shall sod all areas within the contract limits that are not paved or planted and mulched as designated on the drawings unless specifically noted
otherwise.
F. The sod shall be green tag certified to meet local state plant board specifications, absolutely true to varietal type, and free from weeds, fungus, insects and
disease of any kind.
G. Sod panels shall be laid tightly together so as to make a solid sodded lawn area. Sod panels shall be laid in a staggered pattern. Sod shall be laid uniformly
against the edges of all curbs and other hardscape elements, paved and planted areas. Immediately following sod laying, the lawn areas shall be rolled with a
lawn roller customarily used for such purposes, and then thoroughly irrigated. After rolling of sod any voids created by rolling shall be filled with strips of sod and
rolled.
H. During delivery, prior to, and during the planting of the lawn areas, the sod panels shall at all times be protected from excessive drying and unnecessary
exposure of the roots to the sun. Sod shall be installed immediately upon delivery to the site. Contractor shall ensure that all lawn areas to be sodded are fully
prepared prior to having sod delivered to the site. If sod has to be stored overnight is shall be unrolled and stored so as not to be damaged by sweating or
excessive heat and moisture. Sod shall not be left stacked or rolled.
17.
PERMANENT SEEDING:
A. Prior to seeding contractor shall provide and spread 4" of topsoil as specified on all areas to receive permanent seeding.
B. Topsoil that has become hard and compacted before permanent seeding has been applied shall be scarified to prepare seed bed for receiving seed.
C. The contractor shall seed all denuded areas and areas disturbed by construction that are not otherwise stabilized with paving, buildings, or planted and mulched
within the contract limits, unless specifically noted otherwise.
D. If a utility line is installed through a landscaped lawn the seeding shall be modified to restore ground cover comparable to the existing lawn
I. Seeding includes seedbed preparation, liming, fertilizing, seeding, and mulching of disturbed areas.
J. Seed shall be green tag certified and shall be labeled in accordance with the state laws and the U.S. Department of Agricultu re rules and regulations under the
Federal Seed Act in effect on the date of invitations for bids. Bag tag figures are evidence of purity and germination.
K. Lawn Seed varieties shall be an improved turf-type variety known to perform well in the project area. Seed mixture shall be chosen to ensure the development of
plants during the season of planting, and to ensure future growth and permanent stabilization. Seed shall conform to the requirements of the Virginia Crop
Improvement Association (VCIA).
L. All seed shall conform to the current rules and regulations of the state where it is being used and shall be from the latest crop available.The seed shall be
State-certified to meet Virginia seed certification standards and specifications, absolutely true to varietal type, and free from weeds, fungus, insects and disease
of any kind.
M.No seed will be accepted with a test date of more than 9 months before the delivery date to the site.
N. Seed that has become wet, moldy, or otherwise damaged in transit or storage will not be accepted. The percent of noxious weed seed allowable shall be as
defined in the current State laws relating to agricultural seeds.
O. LIMING: Lime shall be applied separately and prior to the application of any fertilizer or seed and only on seedbeds, which have previously been prepared. The
lime shall be worked into the top 3 inches of soil after which the seedbed shall again be properly graded and dressed to a smooth finish. Lime shall be applied at
the rate specified by the soil test report recommendations.
P. FERTILIZING: Following advance preparations and cleanup, fertilizer shall be uniformly spread at the rate specified in the soil test report recommendations.
Q. SEEDING: Grass seed shall be sown at the rate specified in the permanent seeding schedule and notes immediately after fertilizing and the fertilizer and seed
raked into the soil.Seeds shall be inoculated before mixing or sowing in accordance with the instructions of the seed provider and manufacturer of the inoculant.
When seeding is required at other than the seasons shown in the permanent seeding schedule, a cover crop shall be sown by the same methods required for
grass seeding and permanent seeding shall be sown during the following permanent seeding season.
R. Sow seed with spreader or seeding machine. Do not broadcast or drop seed when wind velocity exceeds 5 mph. Evenly distribute seed by sowing equal
quantities in two directions at right angles to each other. Do not seed against existing trees.
S. Rake seed and fertilizer lightly into top 1/8 inch of soil and water with fine spray.
T. MULCHING: Protect seeded areas with slopes not exceeding 3:1 by spreading straw mulch. Spread uniformly at a minimum rate of 2 tons/acre to form a
continuous blanket 1-1/2 inches in loose thickness over seeded areas. Spread by hand, blower, or other suitable equipment. Protect slopes 3:1 and greater with
erosion control mats and fasten as recommended by material manufacturer.
U. Straw mulch material--Straw mulch shall consist of wheat, barley, oat or rye straw. The mulch material shall be air-dry, reasonably light in color, and shall not be
musty, moldy, caked, or otherwise of low quality. The use of mulch that contains noxious weeds is not permitted.
V. Other mulch materials--Mulching materials, such as wood cellulose fiber mulch, synthetic fiber mulch, netting, and mesh, are other mulching materials that may
be required for specialized locations and conditions. These materials must be installed according to the manufacturer's recommendations for methods of
application.
W.After the seed has been properly covered, the seedbed shall be immediately compacted by means of an approved lawn roller weighing 40 to 65 pounds per foot
of width for clay soil (or any soil having a tendency to pack) or weighing 150 to 200 pounds per foot of width for sandy or light soils.
3"
1"
5"
PLANTING BED TRENCH EDGING NOTE:
1.
TRENCH EDGE SHALL BE LOCATED BETWEEN PLANTING BED AND ALL TURF /
SOD AREAS.
2.
MAINTAIN POSITIVE DRAINAGE IN ALL PLANTING BEDS.
3.
SEE NOTES THIS SHEET FOR TYPE OF MULCH.
MULCH 3" DEPTH
®
17. LAWN MAINTENANCE:
A. Within the contract limits, the contractor shall produce a dense, well established lawn. The contractor shall be responsible for maintaining the lawn until
acceptance by the owner or owner's authorized representative.
B. Maintenance shall include but may not be limited to watering, weeding, and fertilizing as necessary as well as the repair and re-sodding or re-seeding of
all eroded, sunken or bare spots (larger than 12"x12") until certification of acceptability by the owner or owner's representative. Repaired sodding shall be
accomplished as in the original work (including re-grading if necessary).
18. ACCEPTANCE:
A stand of permanent lawn grass as specified shall be considered acceptable when the turf cover is at least 95%. The Contractor shall sod or overseed,
and otherwise maintain the grassed areas until the stand of grass has reached a uniform height of 3 to 4 inches and a state of uniform species maturity.
Annual grasses and grain weeds shall not be considered part of the cover percentage, and seeding stands shall not be considered acceptable until the
stand reaches a state of uniform post-seeding maturity for the specified species.
PERMANENT SEEDING SHALL BE green tag CERTIFIED AND SELECTED FROM THE CURRENT VIRGINIA
TURFGRASS VARIETY RECOMMENDATIONS AS PUBLISHED BY VIRGINIA TECH, VIRGINIA COOPERATIVE
EXTENSION.
SEED SELECTED SHALL BE OF A VARIETY KNOWN TO PERFORM WELL IN THE PROJECT AREA AND SHALL
BE OF A VARIETY THAT IS KNOWN TO BE TOLERANT OF FULL SUN, AND ONCE ESTABLISHED, TOLERANT
OF PERIODS OF INFREQUENT RAINFALL.
PERMANENT LAWN GRASS SEEDING OUTSIDE OF THE PREFERRED SEEDING DATES WILL NOT BE
ACCEPTED UNTIL THE FOLLOWING GROWING SEASON AND ONLY WHEN AN ACCEPTABLE STAND OF
PERMANENT GRASS IS ESTABLISHED AND ACCEPTED BY THE OWNER.
SPRING AND FALL SEEDING:
SEED SHALL CONSIST OF A BLEND OF THREE OF THE FOLLOWING VARIETIES KNOWN TO PERFORM
WELL IN THE PROJECT AREA. SELECTED VARIETIES SHALL BE SEEDED AT THE SPECIFIED RATES PER
ACRE.
FOR ALL AREAS SEEDED WITH PERMANENT LAWN GRASS IN THE SPRING OR FALL (SEE SPECIFIED
SEEDING DATES BELOW):
TYPE OF GRASS SEEDING RATE SEEDING DATE
TALL FESCUE 5 - 7 LBS./1000 SQ. FT. SPRING SEEDING: FEBRUARY 28, TO MAY 15.
FALL SEEDING: AUGUST 1 TO NOVEMBER 1
NOTE: PREFERRED FESCUE SEEDING DATES ARE FROM AUGUST 1 TO NOVEMBER 1.
4TH MILLENNIUM SRP, ANNAPOLIS, AVENGER II4, AVENGER III, BIRMINGHAM1, BLACK TAIL,
BLOODHOUND4, BULLSEYE1, BULLSEYE LTZ, CATALYST, CROSSFIRE 4, DAYBREAK, DEGAS, DRAGSTER,
DYNAMITE G-LS, FANTASIA, FASTLANE, FAYETTE, FIREBIRD 2, FIRECRACKER G-LS, FIRECRACKER SLS,
FIREHAWK SLT, FIRENZA II, FIREWALL4, GAZELLE II4, GOLD MEDALLION4, GRANDE 3, GTO, GUARDIAN 41,
HEMI, HOUNDOG 84, INFERNO4, INTEGRITY4, JUSTICE4, LIFEGUARD, MAESTRO, MICHELANGELO,
MONUMENT, MOONDANCE GLX, MUSTANG 44, PARAMOUNT, PENN RK44, PRO GOLD, RAPTOR III, REBEL
IV4, REBEL V4, REBEL XLR4, REBOUNDER4, REFLECTION, REGENERATE, RENDITION RX4, ROCKWELL,
ROWDY4, SALTILLO4, SCREAMER LS, SERENADE, SPYDER LS4, SPYDER 2LS, SR 8650, STANDOUT4,
STEALTH, SUNSET GOLD4, SUPERSONIC, SYMPHONY, TECHNIQUE, TEMPLE, THOR, TITANIUM 2LS,
TITANIUM G-LS, TITAN RX4, TRINITY, TURBO4, TURBO RZ4, VALKYRIE LS, WICHITA, AND XTREMEGREEN4.
BATTLE HAWK, BENTLEY, BLADERUNNER 3, BONFIRE, BRAVO 2, CAPITAN, CLASH, ENDGAME, ESSENTIAL
2, ESTRENA, EXTRAVAGANZA, FAIRFIELD, FALCON SUPREME, FINELAWN SUPREME, GALACTIC,
GALLARDO, GLX ACED, GLX REVIVE, GRO_PRO, HELLCAT GLR, HOUNDOG 9, KIZZLE, LAFAYETTE,
MATISSE, MOTIF, NATURALLY GREEN, OKEEFE, ORIOLE, PADRE 2, PROVIDENCE, RACEWAY, RAPTOR LS,
ROVER, ROWDIER, SR 8700, TALLADEGA II, TANK, TEACHER, TITAN GLX, TITAN MAX, TOUGH, TRIAD,
VALSETZ, XANADU, AND ZION.
SEED WITH THE FOLLOWING MIXTURE(S) FOR SPECIFIED DATES OUTSIDE THOSE LISTED FOR FESCUE
ABOVE:
TYPE OF GRASS SEEDING RATE SEEDING DATE
BERMUDA 2 LBS./1000 SQ. FT.(HULLED SEED) MAY 15 - JUNE 30
ONLY THE FOLLOWING VARIETIES OF BERMUDA SHALL BE ACCEPTABLE:
PRINCESS 77, ARDEN 154, MONACO, RIO, SUNQUEEN, SWI-10704, OR AS OTHERWISE LISTED ON THE
VIRGINIA TURFGRASS VARIETY RECOMENDATIONS, LATEST EDITION AS PUBLISHED BY VIRGINIA
COOPERATIVE EXTENSION.
ALL SEED SHALL HAVE A MINIMUM PURITY OF 95% AND AN 85% GERMINATION RATE.
CITY OF SUFFOLK LANDSCAPE NOTES
STM #01
STM #02
SAN #02
SAN #03
TYNES STREET
ASPHALT PAVEMENT
50' RIGHT-OF-WAY
(INST. #060124420)
EAST WASHINGTON STREET
ASPHALT PAVEMENT50' RIGHT-OF-WAY(INST. #060124420)
EAST WASHINGTON STREET
ASPHALT PAVEMENT50' RIGHT-OF-WAY(INST. #060124420)
3.25.0
2.2
0.9
1.2
2.0
2.9
1.7
0.8
1.7
3.3
3.5
2.7
1.5
1.1
0.7
1.9
3.7
2.0
1.0
0.6
0.7
1.4
2.6
3.2
0.4
0.6
1.3
2.0
1.7
0.9
1.6
1.1
0.7
0.70.8
1.5
1.42.2
0.7
0.0
0.0
0.0
0.0
0.30.20.10.10.10.10.10.00.00.00.00.00.00.00.00.00.00.00.0
0.0
0.0
0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.5
0.4
0.2
0.4
0.5
0.5
0.2
0.0
0.1
0.1
0.5
1.0 2.0 3.5 3.0 2.4 3.6 2.1 1.2
SUFFOLK PHOENIX
BANK PLAZA
PREPARED FOR
WOOLPERT
LIGHTING PLAN
CL100
©
NORTH
0.5FC (TYP.)
PROPERTY BOUNDARY
CALCULATION ZONE
SIDEWALK PLAZA
CALCULATION ZONE
PARKING LOT
CALCULATION ZONE
PRPR
EX
EX
EX
LIGHTING GENERAL NOTES:
1. ALL PROPOSED LIGHT FIXTURES AND ALL NECESSARY LIGHTING FEEDER CIRCUITS
(CONDUITS, CONDUCTORS, AND SERVICE CONNECTIONS) ARE TO BE INSTALLED BY
DOMINION ENERGY. CONTRACTOR TO COORDINATE WITH DOMINION ENERGY FOR
ALL PROPOSED LIGHTING INSTALLATION.
2. LIGHT POLE FOUNDATIONS TO EXTEND 6" ABOVE GRADE. CONTRACTOR TO SUBMIT
FOUNDATION DESIGN TO ENGINEER FOR REVIEW.
3. ALL LIGHTS SHALL BE SHIELDED, FILTERED, AND DIRECTED TO MINIMIZE GLARE AND
REDUCE LIGHT POLLUTION.
4. ALL LIGHTING FIXTURES USED MUST BE FULL CUT-OFF DESIGN FILTERED WITH A FLAT
LENS AND PARALLEL TO THE GROUND.
5. SURVEY LABELS FROZEN ON THIS SHEET FOR CLARITY. SEE SHEETS SV100 AND
SV101 FOR DETAILED INFORMATION REGARDING EXISTING STRUCTURES.
ACCESSIBLE PARKING SIGN.
SEE SHEET CS501
HISTORICAL SIGN.
SEE SHEET A-101.
SUFFOLK PHOENIX
BANK PLAZA
PREPARED FOR
WOOLPERT
LIGHTING PLAN
DETAILS
CL500
©
EXISTING (EX) AND PROPOSED (PR) LIGHT FIXTURE SPECIFICATIONS
EXISTING (EX) LIGHT FIXTURE SPECIFICATIONS
PROPOSED (PR) LIGHT FIXTURE SPECIFICATIONS
ADMINISTRATIVE APPROVALS
March 2026 – July 2026
FILE NUMBER ADDRESS ALTERATIONS APPROVAL DATE
HLC2026-00007 404 N. Main Street New metal roof
4/6/2026
HLC2026-00008 109 St James Avenue New roof over the front & rear
porch
4/10/2026
HLC2026-00009 230 E. Washington Street Window replacement
5/18/2026
HLC2026-00010 213 Pearl Street Replace existing damaged roof
shingles, replace the existing
front entry door, replace the
existing damaged windows, and
to replace the existing vinyl
siding
6/18/2026
HLC2026-00013 347 E. Washington Street
Phoenix Bank
Install a non-illuminated sign
7/14/2026
1
HLC PROPERTY MAINTENANCE CODE ENFORCEMENT UPDATE
JULY, 2026
ADDRESS CODE VIOLATION(S) STATUS
223 BANK ST
PROPERTY MAINTENANCE
• WINDOWS DAMAGE
• ROOF DAMAGE
• DETERIORATED EXTERIOR WALL
• INTERIOR SURFACE DAMAGE
• DETERIORATED PORCH
PROPERTY STILL IN VIOLATION
PROPERTY IS NO LONGER FOR SALE
THE CITY IS LOOKING INTO AVILIABLE
OPTIONS FOR THE PROPERTY
112 W WASHINGTON ST PROPERTY MAINTENANCE
• ELEVATORS IN DISREPAIR
• FIRE / ELECTRICAL VIOLATIONS
VACANT BUILDING
OWNER HAVE MADE ALL REPAIRS
FROM THE RECENT ACCIDENT. AND
MAKING OTHER NECESSARY REPAIRS
221 BANK ST PROPERTY MAINTENANCE
• PEELING/CHIPPING PAINT
• INSECT SCREENS
WORK HAS STARTED
318 BANK ST PROPERTY MAINTENANCE
• PEELING PAINT
• OVERHANG IN DISREPAIR
• SURFACE COAT ROOF
APPEARS WORK HAS STALLED A NEW
PROPERTY MAINTENACE CASE WILL BE
OPENED
222 BANK ST PROPERTY MAINTENANCE
• FOUNDATION DAMAGE
• BROKEN RETENTION WALL
• BROKEN WINDOWS
• DETERIORATING WOOD ON
• OVERHANG
PROPERTY IS A WORK IN PROGRESS
219 CLAY ST • A TREE FELL ON THE GARAGE NOTICE OF VIOLATION HAVE BEEN
MAILED TO THE OWNER ON FILE TO
REMOVE THE GARAGE
July 31, 2026
Property Owner(s) Location Violation(s) Judgement Inspector
Parvati LLC 213 Pearl St COA Violation- Wrong siding color
Working with our office
to fix the issue Davidson
TOWNSEND, JEFFREY &
RENNEE 108 N Main COA Violation- No Permit for sign NOV Issued Davidson
155 E WASHINGTON LLC 155 E WashingtCOA Violation- Painted Brick NOV Issued Davidson