SUFFOLK WETLANDS BOARD
AGENDA FOR
JULY 16, 2026
PREPARED BY THE CITY OF SUFFOLK PLANNING DIVISION
CASSIDY MCKELVIE, SUFFOLK WETLANDS BOARD SECRETARY
A MEETING WILL BE HELD AT 6:00 P.M. IN THE
SUFFOLK CITY COUNCIL CHAMBERS OF THE CITY HALL BUILDING
IF YOU CANNOT ATTEND OR NEED SPECIAL ACCOMMODATIONS AT THE
MEETING, PLEASE CALL OR EMAIL THE CITY OF SUFFOLK PLANNING DIVISION
AT 757-514-4060 OR PLANNINGEMAIL@SUFFOLKVA.US
PRIOR TO 12:00 NOON ON WEDNESDAY, JULY 15, 2026
GEOFFREY HINSHELWOOD
CHAIRMAN
AGENDA
SUFFOLK WETLANDS BOARD
July 16, 2026
6:00 P.M.
I. Call to Order
II. Roll Call
III. Annual Election of Officers
IV. Approval of Minutes from the February 19, 2026 meeting.
V. Public Hearing
A. VMRC2023-0895 submitted by David Spencer, a pplicant and owner, for a
permit to modify and extend an existi ng riprap revetment located at 6954
Respass Beach Road along the James Ri ver; further iden tified as Tax Map
7A(1)*3.
VI. Restoration Hearings - None
VII. Permit Extensions - None
VIII. Old Business - None
IX. New Business
A. Discussion of permit identification numbers
X. Compliance and Inspections – None
XI. Adjournment
1
MINUTES
SUFFOLK WETLANDS BOARD
February 19, 2026
6:00 P.M.
The meeting of the Suffolk Wetlands Boar d was held on Thursday, February 19,
2026, at 6:00 p.m., in the City Council Cham bers of the City Hall Building, 442
West Washington Street, Suffolk, Virginia.
MEMBERS:
Geoffrey Hinshelwood, Chairman
Darius Davenport, Vice-Chairman
Richard Vroman
Kathy Doerner
Kittrell Eberwine, III
Bryan Cattenhead
STAFF:
Cassidy McKelvie, Wetlands Board
Secretary
Margaret Pittenger, Assistant Director of
Planning
Rebecca Powers, Assistant City Attorney
III
ROLL CALL:
The meeting was called to order by Chairman Hinshelwood. The roll was then called
by Mrs. McKelvie, who informed Chai rman Hinshelwood that a quorum was
present.
APPROVAL OF THE MINUTES:
The minutes of the previous meeting were approved as presented by a voice vote of
6 to 0.
Minutes Suffolk Wetlands Board
February 19, 2026
2
PUBLIC HEARING:
VMRC2025-2641, submitted by Matthew Otto of Corblu Ecology Group, LLC,
applicant, on behalf of Colonial Pipelin e Company, owner, for a permit for the
maintenance of an existing 16-inch diamet er underground pipeline with associated
tidal wetland impacts to the Nansemond River, Chuckatuck Creek, Bennett’s Creek,
and their tributaries.
Ms. McKelvie gave a presentation and overview of the project. Staff recommended
approval of VMRC2025-2641as proposed.
The public hearing was opened, and Matt Wy ant, Senior Environmental Scientist
with Colonial Pipeline Company, spoke in favor of the application.
The floor was opened for those who were in opposition of the application, and there
was no opposition.
The public hearing was closed.
Following discussion by the board, Vice Chairman Davenport made a motion to
approve VMRC2025-2641 with the proposed conditions. The motion was seconded
by Board Member Eberwine and was approved by a voice vote of 6 to 0.
Minutes Suffolk Wetlands Board
February 19, 2026
3
PERMIT EXTENSION:
VMRC24-1833 submitted by Jullan Hernandez, Cr ofton Construction Services,
Inc., agent and applicant, on behalf of VP Properties LLC, Brent Mudd, property
owner, for a permit to replace a 350-foot portion of an existing 495-foot timber
bulkhead. This project does not qualify for a General Permit. The property is located
on 1500 Steeple Dr, along the Chuckatuck Cr eek; further identified as Zoning Map
5B*45, zoned M-1, Light Industrial Zoning District.
Ms. McKelvie gave a presentation and overview of the project and the reason for the
extension. Staff recommended approval of the permit extension for VMRC24-1833.
Following discussion by the board, Board Member Eberwine made a motion to
approve VMRC24-1833 with the proposed conditions. The motion was seconded
by Board Member Vroman and was approved by a voice vote of 6 to 0.
ADJOURNMENT:
There being no further business, the meeting was adjourned.
SUFFOLK WETLANDS BOARD
DATE: FEBRUARY 19, 2026
MT: Vice-Chairman
Davenport
2ND: Board Member Eberwine
TO: APPROVE W/
CONDITIONS
BOARD MEMBERS
ATTENDANCE
VMRC25-2641
VOTE: 6-0
PRESENT ABSENT YES NO
Chairman Geoffrey Hinshelwood X X
Vice-Chairman Darius Davenport X X
Sidney Hazelwood X
Bryan Cattenhead X X
Richard Vroman X X
Kathy Doerner X X
Kittrell Eberwine X X
Ellis Dallas - Alternate
Kaitlyn Price - Alternate
SUFFOLK WETLANDS BOARD
DATE: FEBRUARY 19, 2026
MT: Board Member Eberwine
2ND: Board Member Vroman
TO: APPROVE W/
CONDITIONS
BOARD MEMBERS
ATTENDANCE
VMRC24-1833
VOTE: 6-0
PRESENT ABSENT YES NO
Chairman Geoffrey Hinshelwood X X
Vice-Chairman Darius Davenport X X
Sidney Hazelwood X
Bryan Cattenhead X X
Richard Vroman X X
Kathy Doerner X X
Kittrell Eberwine X X
Ellis Dallas - Alternate
Kaitlyn Price - Alternate
CITY OF SUFFOLK
442 W. WASHINGTON STREET, P.O. BOX 1858, SUFFOLK, VIRGINIA 23439-1858
PHONE: (757) 514-4060 FAX: (757) 514-4099
July 16, 2026
Suffolk Wetlands Board
City of Suffolk, Virginia
Dear Board Members:
Attached for your consid eration is information pertaining to Joint Pe rmit Application (JPA)
VMRC23-0895, submitted by David Spencer, applicant and property owner, for a permit to modify
and extend an existing riprap revetment located at 6954 Respass Beach Road along the James
River, further identified as Tax Map 7A(1)*3.
Information and maps pertaining to this request are attached for your consideration. Please contact
me if you have any questions in advance of the July 16, 2026 meeting.
Respectfully submitted,
Cassidy McKelvie
Cassidy McKelvie
Wetlands Board Secretary
Attachments
DEPARTMENT OF
PLANNING & COMMUNITY DEVELOPMENT
Division of Planning
STAFF REPORT
DESCRIPTION
PROPOSED PROJECT: The applicant is requesting a Wetlands Board permit, VMRC23-0895,
to modify and extend an existing riprap revetment due to erosion and st ructural undermining. A
total of 6 square feet of ve getated tidal wetlands and 202 squa re feet of non-vegetated tidal
wetlands are proposed to be imp acted between mean low wate r (MLW) and mean high water
(MHW) with this project. Imp acted vegetation is proposed to be replaced along the toe of the
proposed riprap below 1.5x the Mean Tide Range (MTR).
APPLICANT: Submitted by David Spencer, applicant and property owner.
LOCATION: The subject property is located at 6954 Respass Beach Road (Tax Map 7A(1)*3)
along the James River and Streeter Creek.
PERMIT HISTORY: None. Based on aerial imagery, the ex isting riprap appears to have been
present as early as January 2006.
VIMS REPORT: An assessment from the Virginia In stitute of Marine Science (VIMS) was
provided for this application in June 2023. The letter with the asse ssment results is attached as
Exhibit “E”. The assessment found that no significant adverse environmental impacts are
anticipated due to the construction of the project.
The letter further states that saltmarsh cordgrass ( Sporobolus alterniflorus , formerly Spartina
alterniflora) almost exclusively grows between MTR and MHW. As such, VIMS has
recommended that the revegetation of the saltmarsh cordgrass be planted within their natural tide
range to provide the greatest likelihood of surviv al and growth. However, if the vegetation is
planted at the toe of the proposed riprap, below the 1.5xMTR, it is recommended that the relocated
vegetation be monitored for at least one year to determine the likelihood of survival.
PUBLIC NOTICE: This request has been duly advertised in accordance with the public notice
requirements set forth in Sectio n 28.2-1302 of the Code of Virgin ia, as amended, and with the
applicable provisions of the Un ified Development Ordinance. A copy of staff’s report was
provided to the applicant on July 2, 2026.
STAFF ANALYSIS
ISSUE
The applicant is requesting a permit from the Su ffolk Wetlands Board to modify and extend an
existing riprap revetment due to beach erosio n and structural undermin ing. The project will
include a total of 869 square feet of new riprap, most of which will be placed within the Resource
Protection Area (RPA) buffer. Th e existing return wall is propos ed to be lengthened by 52 feet
and widened up to 7 feet. Construction access w ill be taken from the driveway adjacent to the
project area.
A total of 6 square feet of vegetated tidal wetla nds and 202 square feet of non-vegetated tidal
wetlands are proposed to be impacted between MLW and MHW. Impacted vegetation is proposed
to be replaced along the toe of the proposed riprap below 1.5x MTR. The impacts to non-vegetated
Wetlands Board
July 16, 2026
VMRC23-0895
Page 2 of 5
wetlands are proposed to be self-compensating.
Vegetation and land disturbance wi thin the RPA buffer is proposed w ith this project and will be
covered separately through a Chesapeake Ba y Preservation Area ( CBPA) Encroachment
application filed with the Cit y.. A preliminary Water Quality Impact Assessment (WQIA) and
buffer restoration plan are provided in attached Exhibit “C”.
The project is anticipated to take approximately 90 days to complete. The first week will include
preparing the site for construction and removing an existing timber walkway. The installation of
the revetment is proposed in the following ten weeks. The final week will consist of
demobilization and stabilization.
Due to the project site being lo cated along the James River, ther e are approximately 27 miles of
open water fetch to the northwest and approximately 32 miles to the northeast. The applicant has
indicated that the wave energy expected from the amount of fetch would exceed the recommended
guidelines for a typical living shoreline involving a sill as ve getation and substrate would be at a
greater risk of washing out.
The installation of a breakwater was also considered as an alternative solution. The applicant has
indicated that the design and size of a breakwater for this site would need to be effective for fetch
approaching from two directions. The applicant stated that th e size and impacts from such a
structure would be larger and more significant than what is proposed for the revetment.
CONSIDERATIONS AND CONCLUSIONS
1. The VIMS assessment for this application found that no significant adverse environmental
impacts are anticipated, as less than 10 square feet of saltmarsh cordgrass are proposed to
be impacted and is intended to be replaced in-kind. VIMS expressed concern regarding
the likelihood of survival for the relocated vegetation. As such, monitoring of the relocated
vegetation for a period of no less than one year is proposed as a condition of approval for
this permit.
2. This project does not require authorizat ion from the Virginia Marine Resources
Commission (VMRC) as all proposed work is located landward of MLW. Permitting and
approvals from other agencies, including, but not limited to, the Virginia Department of
Environmental Quality and the Army Corps of Engineers, may be required prior to any
land disturbing activities. Ob taining all required permits a nd approvals is proposed as a
condition of approval for this permit.
3. The proposed 6 square feet of vegetated tidal wetland impacts are proposed to be replaced
in-kind on the subject property.
4. According to Section 31-415(d)(1)(D)(i)(d) of the City of Suffolk’s Unified Development
Ordinance, trees and woody vegetation may be removed, necessary control techniques
employed, and appropriate vege tation established to protect or stabilize a shoreline in
accordance with the best availa ble technical advice and app licable permit conditions or
requirements. This project is considered a shoreline erosion control project, which is a
Wetlands Board
July 16, 2026
VMRC23-0895
Page 3 of 5
permitted use within the RPA buffer. A CBPA Encroachment application will be required
for this project and is proposed as a condition of approval for the permit.
5. Pursuant to Section 34-325 of the Suffolk City Code, the Wetlands Board shall prevent the
despoliation and destruction of wetlands while accommodating necessary economic
development in a manner consistent with wetlands preservation. Section 34-327 states that
a Wetlands Permit may be issued by the Boar d only if the applican t demonstrates the
following:
a) The anticipated public and private benefi t of the proposed activity exceeds its
anticipated public and private detriment.
Benefits from the proposed project ar e anticipated to be greater than any
detriments, as the modification and extension of an existing revetment will reduce
the effect of erosion at the project site and protect the existing dwelling.
b) The proposed development conforms with the standards prescribed in Code of
Virginia, § 28.2-1308 and guidelines promulgated pursuant to Code of Virginia, §
28.2-1301.
i. Wetlands of primary ecological significance shall not be altered so that the
ecological systems in the wetlands are unreasonably disturbed.
All proposed wetland impacts are propos ed to be replaced on the subject
property. Therefore, no wetlands, nor their ecological systems, of primary
ecological significance are expected to be unreasonably disturbed.
ii. Development in Tidewater Virginia, to the maximum extent practical, shall
be concentrated in wetlands of lesser ecological significance, in vegetated
wetlands which have been irreversibl y disturbed before July 1, 1972, in
nonvegetated wetlands which have been irreversibly disturbed prior to
January 1, 1983, and in areas of Tidewater Virginia outside of wetlands.
Due to the presence of the existing riprap revetment, it is plausible that the
adjacent tidal wetlands were previously disturbed during prior construction.
Although the initial date of the re vetment is unknown, aerial imagery
suggests that it has been present for over 20 years. Furthermore, the project
goals of reducing erosion at the property, proximal to an existing dwelling,
could not be achieved if the project were relocated.
c) The proposed activity does not violate the purposes and intent of Chapter 13 Title
28.2 of the Code of Virginia, (§ 28.2-1300 et seq.) and of Article VIII of the Suffolk
Code of Ordinances.
The intent of these regulations and th e purpose of the Board is to allow for
necessary economic development in a manner consistent with wetlands
preservation. The proposed modificatio n and extension of the existing riprap
revetment is necessary to prevent further erosion of the subject property proximal
Wetlands Board
July 16, 2026
VMRC23-0895
Page 4 of 5
to the existing dwelling.
RECOMMENDATION
It is staff’s opinion that the pr oposed permit for the modificati on and extension of an existing
riprap revetment meets the requirements establis hed by Section 34-327 of Suffolk City Code.
Therefore, staff recommends approval of permit application VM RC23-0895 with the following
conditions:
1. The Wetlands Permit for this project shall expire on July 16, 2027, after which time this
permit shall be void. Permit coverage may be extended by the Board, at its discretion,
provided that a written request describing the reasons for the extension and the requested
new expiration date is submitted to the Suffolk Planning Division no later than May 16,
2027.
2. The permittee shall notify the Board no later than 48 hours prior to the commencement of
any work under this permit.
3. Any vegetated tidal wetlands impacted during this project shall be replaced on the subject
property in kind. The applican t will notify the Board once all work is complete and the
relocated vegetation has been planted. The Suffolk Planning Divi sion will conduct an
initial inspection of the project site once co mpleted. The Suffolk Planning Division will
return to the site one year following the initial inspection date to ensure the survival of the
relocated vegetation. If the relocated vegetati on does not appear to be in good condition
during either inspection, an alternative mitigation plan shall be submitted by the applicant
for consideration by the Board.
4. The permittee shall comply with all applicab le laws, ordinances, rules, and regulations
affecting the conduct of the project. The gr anting of this permit shall not relieve the
permittee of the responsibility of obtaining any and all other permits or authority required
for the project, including but not limited to approvals from the Department of
Environmental Quality, the Virginia Marine Resources Commission, the Army Corps of
Engineers, and the City of Suffolk.
5. No work under this permit shall be conducted until a Chesapeake Bay Preservation Area
Encroachment application has been receiv ed and approved by the Suffolk Planning
Division for the proposed land disturbance an d vegetation removal within the Resource
Protection Area Buffer.
6. All phases of the project shall conform in all particulars to the permittee’s application for
Wetlands Permit. The duly authorized agents of the Board shall have the right to enter upon
the premises at any reasonable time for the purposes of inspecting the work being done
pursuant to this permit.
7. The permittee shall, to the greatest extent practical, minimize the adverse effects of the
project upon adjacent properties, wetlands, and the natural resources of the
Commonwealth.
Wetlands Board
July 16, 2026
VMRC23-0895
Page 5 of 5
8. This permit shall not be transferred without the prior written approval of the Board.
9. This permit may be revoked at any time by th e Board upon the failure of the permittee to
comply with any of the terms and conditions hereof.
Attachments
• Proposed Permit
• Exhibit A – Wetlands Board Application Checklist JPA Application
• Exhibit B – JPA Application
• Exhibit C – WQIA
• Exhibit D – VMRC Report
• Exhibit E – VIMS Report
• Exhibit F – Communications with applicant and agent
• Exhibit G – Site Photos
CITY OF SUFFOLK
WETLANDS BOARD
Wetlands Permit 23-0895
Granted July 16, 2026
Expires July 16, 2027
Pursuant to Chapter 13 of Title 28.2 of the Code of Virginia (1950, as amended) and the
City of Suffolk Wetlands Ordinance, the City of Suffolk Wetlands Board, hereinafter
referred to as the Board, hereby grants unto
David Spencer, applicant and property owner
herein after referred to as the permittee, pe rmission to undertake the following described
project.
Location: 6954 Respass Beach Road along the James River; further identified as
Tax Map 7A(1)*3.
Description
of Project: Modification and extension of an existing riprap revetment.
Conditions:
1. The Wetlands Permit for this project shall expire on July 16, 2027, after which
time this permit shall be void. Permit coverage may be extended by the Board, at
its discretion, provided that a written request describing the reasons for the
extension and the requested new expiration date is submitted to the Suffolk
Planning Division no later than May 16, 2027.
2. The permittee shall notify the Board no later than 48 hours prior to the
commencement of any work under this permit.
3. Any vegetated tidal wetlands impacted during this project shall be replaced on the
subject property in kind. The applican t will notify the Board once all work is
complete and the relocated vegetation has been planted. The Suffolk Planning
Division will conduct an initial inspection of the project site once completed. The
Suffolk Planning Division will return to the site one year following the initial
inspection date to ensure the survival of the relocated vegetation. If the relocated
vegetation does not appear to be in good condition during eith er inspection, an
alternative mitigation plan shall be submitted by the applicant for consideration by
the Board.
4. The permittee shall comply with all ap plicable laws, ordinances, rules, and
regulations affecting the conduc t of the project. The gran ting of this permit shall
not relieve the permittee of the responsibility of obtaining any and all other permits
or authority required for the project, including but not limited to approvals from the
Department of Environmental Quality, the Virginia Marine Resources
Commission, the Army Corps of Engineers, and the City of Suffolk.
5. No work under this permit shall be conducted until a Chesapeake Bay Preservation
Area Encroachment application has been received and approved by the Suffolk
Planning Division for the proposed land disturbance and vegetation removal within
the Resource Protection Area Buffer.
6. All phases of the project sh all conform in all particulars to the permittee’s
application for Wetlands Permit. The duly authorized agents of the Board shall have
the right to enter upon the premises at any reasonable time for the purposes of
inspecting the work being done pursuant to this permit.
7. The permittee shall, to the greatest extent practical, minimize the adverse effects of
the project upon adjacent properties, wetla nds, and the natural resources of the
Commonwealth.
8. This permit shall not be transferred without the prior written approval of the Board.
9. This permit may be revoked at any time by the Board upon the failure of the
permittee to comply with any of the terms and conditions hereof.
IN WITNESS WHEREOF, the City of Suffolk Wetlands Board has caused these presents
to be executed on its behalf by
CITY OF SUFFOLK
WETLANDS BOARD
By:__________________________________
(Chairman or designee)
-
DEQ: Permit application fees required for Virginia Water Protection permits – while detailed in
9
VAC25-20 – are conveyed to the applicant by the applicable DEQ office
(ht
tp://www.deq.virginia.gov/Locations.aspx). Complete the Permit Application Fee Form and
s
ubmit it per the instructions to the address listed on the form. Instructions for submitting any other
f
ees will be provided to the applicant by DEQ staff.
V
MRC: An application fee of $300 may be required for projects impacting tidal wetlands, beaches
a
nd/or dunes when VMRC acts as the LWB. VMRC will notify the applicant in writing if the fee is
r
equired. Permit fees involving subaqueous lands are $25.00 for projects costing $10,000 or less and
$100 f
or projects costing more than $10,000. Royalties may also be required for some projects. The
pr
oper permit fee and any required royalty is paid at the time of permit issuance by VMRC. VMRC
s
taff will send the permittee a letter notifying him/her of the proper permit fees and submittal
r
equirements.
L
WB: Permit fees vary by locality. Contact the LWB for your project area or their website for fee
i
nformation and submittal requirements. Contact information for LWBs may be found at
h
ttp://ccrm.vims.edu/permits_web/guidance/local_wetlands_boards.html.
FOR AGENCY USE ONLY
Notes:
JPA #
APPLICANTS
Part 1 – General Information
PLEASE PRINT OR TYPE ALL ANSWERS: If a question does not apply to your project, please
print N/A (not applicable) in the space provided. If additional space is needed, attach 8-1/2 x 11 inch
sheets of paper.
Check all that apply
Pre-Construction Notification (PCN)
NWP # _____________________
(For Nationwide Permits ONLY - No DEQ-
VWP permit writer will be assigned)
Regional Permit 17 (RP-17)
County or City in which the project is located:_________________________________________
Waterway at project site:___________________________________________________________
PREVIOUS ACTIONS RELATED TO THE PROPOSED WORK (Include all federal, state, and local pre application
coordination, site visits, previous permits, or applications whether issued, withdrawn, or denied)
Historical information for past permit submittals can be found online with VMRC - https://webapps.mrc.virginia.gov/public/habitat/ - or VIMS
- http://ccrm.vims.edu/perms/newpermits.html
Agency Action / Activity Permit/Project number, including any
non-reporting Nationwide permits
previously used (e.g., NWP 13)
Date of
Action
If denied, give reason
for denial
Application Revised: October 2019 5
Received by VMRC April 14, 2023 /blh
23-0895
Part 1 - General Information (continued)
1. Applicant’s legal name* and complete mailing address: Contact Information:
Home (____)_____________
Work (____)_____________
Fax (____)_____________
Cell (____)_____________
e-mail __________________
State Corporation Commission Name and ID Number (if applicable) _____________
2. Property owner(s) legal name
* and complete address, if different from applicant: Contact Information:
Home (____)_____________
Work (____)_____________
Fax (____)_____________
Cell (____)_____________
e-mail __________________
State Corporation Commission Name and ID Number (if applicable) _____________
3. Authorized agent name
* and complete mailing Contact Information:
address (if applicable): Home (____)_____________
Work (____)_____________
Fax (____)_____________
Cell (____)_____________
e-mail __________________
State Corporation Commission Name and ID Number (if applicable) _____________
* If multiple applicants, property owners, and/or agents, each must be listed and each must sign the applicant
signature page.
4. Provide a detailed description of the project in the space below, including the type of project, its
dimensions, materials, and method of construction. Be sure to include how the construction site will
be accessed and whether tree clearing and/or grading will be required, including the total acreage. If
the project requires pilings, please be sure to include the total number, type (e.g. wood, steel, etc),
diameter, and method of installation (e.g. hammer, vibratory, jetted, etc). If additional space is
needed, provide a separate sheet of paper with the project description.
Application Revised: 2FWREHU 6
757 403-2860
Tyrostonehouse@gmail.com
757 477-4787
David@MarineEngineeringLLC.com
DAVID SPENCER
6954 RESPASS BEACH RD
SUFFOLK, VA 23435
N/A
MARINE ENGINEERING LLC C/O DAVID KLEDZIK
1932 CHARLA LEE LN
VIRGINIA BEACH, VA 23455
Construction to modify an existing riprap revetment to protect home from 27 mile NW fetch.
See elaborated justification in Rev 1 resubmittal email.
Length and width of existing quarrystone return wall to be increased due to erosion of beach and
structural undermining.
Five small trees (shown on plan), shrubs & ivy along bank to be removed for access and clearance
to install revetment return wall. Tree & vegetation replacement proposed in redeveloped planting
bed.
Two areas of vegetation (6 sf total) within riprap to be impacted by new quarrystone. Replacement
vegetation distributed along toe of proposed riprap below 1.5xMTR in compensation.
Non-vegetated, rock on rock or sand impacts are proposed to be self-compensating.
Construction to use shore based equipment and single accessway from stree t.
No grading or additional clearing is proposed.
Additional Information/Revisions Recieved by VMRC Aug 25, 2025 map
Part 1 - General Information (continued)
5. Have you obtained a contractor for the project? ___ Yes* ___ No. *If your answer is “Yes”
complete the remainder of this question and submit the Applicant’s and Contractor’s
Acknowledgment Form (enclosed)
Contractor’s name* and complete mailing address: Contact Information:
Home (____)_____________
Work (____)_____________
Fax (____)_____________
Cell (____)_____________
email __________________
State Corporation Commission Name and ID Number (if applicable) _____________________
* If multiple contractors, each must be listed and each must sign the applicant signature page.
6. List the name, address and telephone number of the newspaper having general circulation in the area
of the project. Failure to complete this question may delay local and State processing.
Name and complete mailing address: Telephone number
(____) __________________
7. Give the following project location information:
Street Address (911 address if available)_________________________________________
Lot/Block/Parcel#___________________________________________________________
Subdivision________________________________________________________________
City / County___________________________________ ZIP Code_____________________
Latitude and Longitude at Center Point of Project Site (Decimal Degrees):
________________________ / -________________________ (Example: 36.41600/-76.30733)
If the project is located in a rural area, please provide driving directions giving distances from the
best and nearest visible landmarks or major intersections. Note: if the project is in an undeveloped
subdivision or property, clearly stake and identify property lines and location of the proposed
project. A supplemental map showing how the property is to be subdivided should also be provided.
8. What are the primary and secondary purposes of and the need for the project? For example, the
primary purpose may be “to protect property from erosion due to boat wakes” and the secondary
purpose may be “to provide safer access to a pier.”
Application Revised: October 2019 7
Received by VMRC April 14, 2023 /blh
Part 1 - General Information (continued)
9. Proposed use (check one):
___ Single user (private, non-commercial, residential)
___ Multi-user (community, commercial, industrial, government)
10. Describe alternatives considered and the measures that will be taken to avoid and minimize impacts,
to the maximum extent practicable, to wetlands, surface waters, submerged lands, and buffer areas
associated with any disturbance (clearing, grading, excavating) during and after project construction.
Please be advised that unavoidable losses of tidal wetlands and/or aquatic resources may require
compensatory mitigation.
11. Is this application being submitted for after-the-fact authorization for work which has already begun
or been completed? ___Yes ___No. If yes, be sure to clearly depict the portions of the project which
are already complete in the project drawings.
12. Approximate cost of the entire project (materials, labor, etc.): $___________________________
Approximate cost of that portion of the project that is channelward of mean low water:
$____________
13. Completion date of the proposed work:________________________________-_____________
14. Adjacent Property Owner Information: List the name and complete mailing address, including zip
code, of each adjacent property owner to the project. (NOTE: If you own the adjacent lot, provide
the requested information for the first adjacent parcel beyond your property line.) Failure to provide
this information may result in a delay in the processing of your application by VMRC.
Application Revised: October 2019 8
Received by VMRC April 14, 2023 /blh
Received by VMRC April 14, 2023 /blh
Received by VMRC April 14, 2023 /blh
Part 3 – Appendices (continued)
Appendix B: Projects for Shoreline Stabilization in tidal wetlands, tidal waters and dunes/beaches
including riprap revetments and associated backfill, marsh toe stabilization, bulkheads and associated backfill,
breakwaters, beach nourishment, groins, jetties, and living shoreline projects. Answer all questions that apply.
Please provide any reports provided from the Shoreline Erosion Advisory Service or VIMS.
NOTE: It is the policy of the Commonwealth that living shorelines are the preferred alternative for stabilizing
tidal shorelines (Va. Code § 28.2-104.1). Information on non-structural, vegetative alternatives (i.e., Living
Shoreline) for shoreline stabilization is available at
http://ccrm.vims.edu/coastal_zone/living_shorelines/index.html.
1. Describe each revetment, bulkhead, marsh toe, breakwater, groin, jetty, other structure, or living
shoreline project separately in the space below. Include the overall length in linear feet, the amount of
impacts in acres, and volume of associated backfill below mean high water and/or ordinary high water in
cubic yards, as applicable:
2. What is the maximum encroachment channelward of mean high water?_______feet.
Channelward of mean low water?_______feet.
Channelward of the back edge of the dune or beach?_____feet.
3. Please calculate the square footage of encroachment over:
• Vegetated wetlands __________square feet
• Non-vegetated wetlands __________square feet
• Subaqueous bottom __________square feet
• Dune and/or beach __________square feet
4. For bulkheads, is any part of the project maintenance or replacement of a previously authorized, currently
serviceable, existing structure? ____ Yes____ No.
If yes, will the construction of the new bulkhead be no further than two (2) feet channelward of the existing
bulkhead? _____Yes ____No.
If no, please provide an explanation for the purpose and need for the additional encroachment.
Application Revised: October 2019 17
Received by VMRC April 14, 2023 /blh
________________________________________________________
Part 3 – Appendices (continued)
5.
6.
7.
Describe the type of construction and all materials to be used, including source of backfill material, if
applicable (e.g., vinyl sheet-pile bulkhead, timber stringers and butt piles, 100% sand backfill from upland
source; broken concrete core material with Class II quarry stone armor over filter cloth).
NOTE: Drawings must include construction details, including dimensions, design and all
materials, including fittings if used.
If using stone, broken concrete, etc. for your structure(s), what is the average weight of the:
Core (inner layer) material__________ pounds per stone Class size ________
Armor (outer layer) material __________ pounds per stone Class size ________
For beach nourishment, including that associated with breakwaters, groins or other structures, provide the
following:
• Volume of material
• Area to be covered
___________ cubic yards channelward of mean low water
___________ cubic yards landward of mean low water
___________ cubic yards channelward of mean high water
___________ cubic yards landward of mean high water
___________ square feet channelward of mean low water
___________ square feet landward of mean low water
___________ cubic yards channelward of mean high water
___________ cubic yards landward of mean high water
• Source of material, composition (e.g. 90% sand, 10% clay):___________________________
• Method of transportation and placement:
• Describe any proposed vegetative stabilization measures to be used, including planting schedule,
spacing, monitoring, etc. Additional guidance is available at
http://www.vims.edu/about/search/index.php?q=planting+guidelines:
Application Revised: October 2019 18
Received by VMRC April 14, 2023 /blh
R=50.00'L=54.12'
SEQUENCE & TIME LINE OF CONSTRUCTION
(CONSTRUCTION TIMELINE 9/1/25 TO 12/31/25 SUBJECT TO CHANGE)
1. OBTAIN ALL NECESSARY PERMITS
2. HOLD PRECONSTRUCTION MEETING
4. INSTALL CONTRUCTION & ACCESSWAY LIMITS
5. INSTALL SILT FENCE SEAWARD OF SOIL DISTURBANCE
6. REMOVE TIMBER ACCESS RAMP & WALKWAY
7. TEMPORARILY REMOVE EXIST STONE AT TOE TO DRESS FABRIC
8. INSTALL RIPRAP AND EXTEND RETURN
9. RESTORE LIMITS WITH IN-KIND REPLACEMENT
10. REMOVE E&S CONTROLS AFTER LAND DISTURBANCE HAS BEEN STABILIZED
11. INSTALL BUFFER & PLANTS AT FIRST SEASONAL OPPORTUNITY.
80' 40' 0'
2025 MARINE ENGINEERING LLC - ALL RIGHTS RESERVED.C
PROPERTY LINE
#6954
EBB
FLOOD
PROPERTY LINE
SCALE: 1" = 80'
LOT 3
DAVID SPENCER
RESPASS BEACH RD
100.00' N 75°53'34" W
PIN (F)
±422' N 21°31'00" E
20'
JAMES RIVER
SITE PLAN OF PROPOSED RIPRAP PROJECT
EXISTING CONDITIONS (PROPOSED SHOWN AS LIGHT DASH)
STREETER CREEK
MLW
MHW
1.5XMTR
EXISTING TIMBER ACCESS RAMP & WALKWAY
TO BE REMOVED
PROPOSED REVETMENT RETURN EXTENSION
PIER WALKWAY REMNANTCONSTRUCTION ACCESS & LIMITS
2308 SF DISTURBANCEDRIVEWAY
EXISTING RIPRAP REVETMENT
EXISTING PIER REMNANT
GRAVEL PATHWAY
LOT 2
HARRY THOMPSON
LOTS 4&5
DAVID SPENCER
±605' N 56°18'06" W
LOT 2F
EARL BEASLEY
APO RIPRAP
CONTINUES
EBB
FLOOD
LOT 6*36 HRSD
15' EASEMENT
100' RPA
50' RPA
TURF/BED/NATURAL BORDER
RACK LINE
TURF
TURF
BED
BEDBED
NATURAL
Additional Information/Revisions Recieved by VMRC Aug 25, 2025 map
RIPRAP TIEDOWN
1 2
A 50' 71'
B 63' 56'
C 100' 80'
ANY DISTURBED GROUND COVER
OR VEGETATION (TURF, SHRUBS, OR TREES)
SHALL BE REPLACED IN-KIND.
SILT FENCE
AS NEEDED
SCALE: 1" = 20'
PROPOSED RIPRAP DETAILS
CONSTRUCTION MATERIALS FOR RIPRAP REVETMENT:
MARINE CONSTRUCTION GRADE MATERIALS
VDOT CLASS 1 , 2 & 3 GRANITE QUARRYSTONE RIPRAP
GEOTEXTILE FABRIC, SIMILAR TO US 670
CONCRETE, 3000 PSI
CONSTRUCTION ACCESS BY DRIVEWAY
X1
PROPOSED RIPRAP REVETMENT
A-B NEW STRUCTURE ALONG SLOPE
B-C STABILIZE EXISTING STRUCTURE
CLASS 2-3 ARMOR & CLASS 1-2 CORE
FILL VOIDS WITH CLASS 1
REDUCE SIZES TOWARD PT A
MHW
MLW
EXISTING RIPRAP REVETMENT
REMOVE EXISTING QUARRYSTONE AS NEEDED
TO DRESS FILTER CLOTH AND POSITION NEW RIPRAP
EXISTING GRAVEL PATH
DWELLING
2 SF VEG
IN RIPRAP
4 SF VEG
IN RIPRAP
1.5XMTR (RACK LINE)
22'
20'
20'
8'
B
A
C52' 47'
X3
CONSTRUCTION ACCESS AND LIMITS
X2
REMOVE 5 SMALL TREES,
BRUSH, SHRUBS, & IVY
ALONG BANK TO INSTALL RIPRAP
(REPLANT & REPLACE IN BUFFER)
PHRAGMITES
WETLAND IMPACTS:
6 SF VEGETATED
202 SF NON-VEGETATED
(STONE ON STONE OR SANDY
INTERTIDAL BOTTOM)
PVC 5'
1
2
TREE PROTECTION
RELOCATE DISPLACED
SPARTINA ALONG TOE
OF REVETMENT
BEACH
50' RPA 100' RPA
0' 20'10'
1.5XMTR
Additional Information/Revisions Recieved by VMRC Aug 25, 2025 map
S
A
UARRYSTONE RIPRAP
US 670
EWAY
EVETMENT
ONG SLOPE
TRUCTURE
S 1-2 CORE
TH CLASS 1
WARD PT A
REMO
TO D
2 SF VEG
IN RIPRAP
4 SF VEG
IN RIPRAP
)
20'
20'
B
C' 47'
X3
X2
S
DISPLACED
ALONG TOE
EVETMENT
BEACH
1.5XMTR
BORDER / GRADE9.7'
MLW0.00'
2.80' MHW
4.20' 1.5 X MTR
TOP OF BANK10'
MLW0.00'
2.80' MHW
4.20' 1.5 X MTR
BORDER / GRADE9.3'
MLW0.00'
2.80' MHW
4.20' 1.5 X MTR
0.00'
0.00'
0.00'
5'
10'
5'
10'
5'
0.00'
5'
10'
15'
20'
0.00'
5'
10'
15'
0.00'
5 '
10'
EXISTING GRADE
& CONCRETE BORDER
PROPOSED GRADE & CONCRETE BORDER
PROPOSED GRADE & CONCRETE BORDER
EXISTING GRADE
EXISTING GRADEREMOVE OVERBURDEN SOIL
EXISTING REVETMENT
PROPOSED TOE EXTENSION
PROPOSED RIPRAP REVETMENT
EXTEND NEW
TOE ON FABRIC
PULL EXISTING STONE TO REDRESS AND EXTEND FABRIC
REMOVE SOFT OVERBURDEN SOIL & SHARP OBJECTS
PREPARE SMOOTH BED FOR FABRIC AND STONE
MAX SLOPE
11
1.5
TOE 2' - 4' INTO FIRM SOIL
INTERTIDAL
BEACH
UPLAND
SECTION X3
SECTION X2
SECTION X1
PROPOSED RIPRAP DETAILS
SCALE: 1" = 5'
SILT FENCE
EXISTING SPARTINA TO BE DISPLACED
EXISTING SPARTINA
RELOCATED
BELOW 1.5XMTR
GENTLE & GRADUAL SLOPE FOR WAVE
ATTENUATION WITH LESS SCOUR AT
TOE & GREATER RETENTION OF
SUBSTRATE TO SUPPORT VEGETATION
15'
Additional Information/Revisions Recieved by VMRC Aug 25, 2025 map
SITE
Additional Information/Revisions Recieved by VMRC Aug 25, 2025 map
Cassidy L. Mckelvie A pril 14, 2026
City of Suffolk VA
Reference: WQIA for David Spencer at 6954 Respass Beach Rd
Dear Ms. Braziel, I have included a response in Italic for each item of the WQIA below.
A minor water quality impact assessment pertains only to development within CBPAs which causes no
more than 10,000 square feet of land disturbance and requires any modification or reductions of the
landward 50 feet of the 100 foot buffer area. A minor assessment must demonstrate through acceptable
calculations that the remaining buffer area and necessary best management practices will result in
removal of no less than 75 percent of sediments and 40 percent of nutrients from post -development
stormwater runoff and that will prevent runoff and filter nonpoint source pollution the equivalent of the
full undisturbed 100- foot buffer. A minor assessment shall include a site drawing to scale which shows
the following:
Since the proposal includes modifications to the 50 ft seaward portion of the RPA, a minor WQIA
alone is insufficient but provided here to augment major WQIA that follows.
(1) Location of the components of the RPA, including the 100 foot buffer areas;
RPA lines are shown on site plan.
(2) Location and nature of the proposed encroachment into the buffer area, including: type of paving
material; areas of clearing or grading; location of any structures, drives for other impervious cover; and
sewage disposal systems or reserve drain field sites;
The proposed encroachment is a riprap revetment involving the extension and redevelopment of an existing return
wall with limited ground disturbance from temporary construction access way that extends from driveway. Removal
of small trees, shrubs, and ivy for access and installation of proposed revetment is needed. No paving or sewage
systems proposed.
(3) Type and location of proposed best management practices to mitigate the proposed encroachment.
Rooftop stormwater disconnection to surface of a/b soils and buffer installation arrangement shown on landscape
plan separate from JPA site plan .
(4) Location of existing vegetation and re -vegetated areas as shown on the site drawing
Upland vegetation on lot cons ists primarily of turfgrass , ivy, planting beds, trees, and naturally covered bank . The
construction access way and limits crossing the lawn would be replanted with turfgrass to restore to existing
condition. Disturbance to planting bed and natural bank is shown on siteplan and will be restored as detailed on
separate landscape plan.
A major water quality impact assessment shall be required for any development which (i) exceeds 10,000 square
feet of land disturbance within CBPA's and requires any modification or reduction of the landward 50 feet of the
100-foot buffer area; (ii) disturbs any portion of any other component of an RPA or disturbs any portion of the
buffer area within 50 feet of any other component of an RPA; or (iii) is located in an RMA and is deemed
necessary by the Planning and Community Development Director. The information required in this Section shall
Marine Engineering LLC
1932 Charla Lee Ln
Virginia Beach, VA 23455
757 477-4787
David@MarineEngineeringLLC.com
Page 2 May 6, 2026
be considered a minimum, unless the Director determines that some of the elements are unnecessary due to the
scope and nature of the proposed use and development of land. The following elements shall be included in the
preparation and submission of a major water quality assessment:
This project involves extending the return length of an existing quarrystone riprap revetment along an eroding bank
that is in close proximity to residential dwelling. The shoreline and beach have been scoured by waves and
currents from large fetch exceeding 27 miles . The existing return has been partially undermined and needs
redevelopment involving greater length and a deeper toe. The proposed riprap return wall extension and
redeveloped toe will impact 661 SF uplands and 208 SF wetlands respectively. Two timber access walkways will be
removed for construction access. 2308 SF of upland land disturbance to turfgrass and planting bed at top of bank
including ivy, shrubs, and trees in the 50 foot landward and seaward portions of the RPA is anticipated from
temporary construction access that extends from driveway. When original riprap revetment was designed, the
length of existing return structure did not extend far enough landward nor the proper toe depth to protect the bank
beside the home. The proposed revetment will provide containment of soils along bank face and the border will
provide a continuous barrier to prevent stormwater erosion from top of bank. The VRRM redevelopment worksheet
indicates required load reduction achieved using rooftop disconnection to a/b soils.
(1) All of the information required in a minor water quality impact assessment, as specified above;
Provided above in Minor WQIA section.
(2) A hydrogeological element that:
A. Describes the existing topography, soils, hydrology and geology of the site and adjacent lands.
The topography of the lot and surr ounding area is relatively level with a portion of runoff into wetlands. The soils
appear to be loam, sand, silt, & clay. The hydrology of the surface layer appears to be well-drained soil. The
geology of the area is coastal plain sediments.
B. Describes the impacts of the proposed development on topography, soils, hydrology and geology on the site
and adjacent lands.
Coastal plain soil to be excavated from proposed riprap toe to provide stability and resist scour from undermining
structure. Excavated soil if suitable or c lean sand is proposed as needed for backfill near point B to increase bank
angle for riprap to be installed. I mpacts are isolated and temporary, the global topography, soils, hydrology, and
geology will remain unchanged. The proposed riprap on face of bank does not appear to have any permanent
consequence to said features other than protection from erosion .
C. Indicates the following:
(i) Disturbance or destruction of wetlands and justification for such action;
The riprap revetment return is designed such that only an unavoidable minimum disturbance and destruction to
wetlands will occur. The majority of revetment is landward of wetlands to protect uplands adjacent to the existing
home. The impacts to wetlands include an area adjacent to the toe of the existing return to widen the structure, and
two isolated pockets of protected vegetation embedded in the existing riprap. The vegetation will be disturbed
because the riprap has become undermined and must be redeveloped to remain effective at protecting a residential
dwelling. The vegetation may be carefully removed and replanted as the stones are extracted and reinstalled
during construction. Then the same vegetation can be replanted at a similar elevation within the stones along toe of
the new structure.
(ii) Disruptions or reductions in the supply of water to wetlands, streams, lakes, rivers or other water bodies;
Site is located on relatively high ground and does not block watershed by impeding surface flow to water body.
Page 3 May 6, 2026
(iii) Disruptions to existing hydrology including wetland and stream circulation patterns;
Proposed riprap along face of bank does not disrupt hydrology of groundwater or tidal waters.
(iv) Source location and description of proposed fill material;
Coastal plain soil excavated from proposed riprap toe & bed or clean sand from upland as needed are proposed for
backfill near point B.
(v) Location of dredge material and location of dumping area for such material;
There is no dredge material with the proposed quarrystone riprap revetment.
(vi) Location of and impacts on shellfish beds, submerged aquatic vegetation, and fish spawning areas;
There is no anticipated impact to shellfish beds, SAV, or fish spawning with the proposed quarrystone riprap
revetment.
(vii) Estimation of pre- and post-development pollutant loads in runoff;
Based on the VRRM, the post development pollutant loads in runoff are below allowable limits .
Predevelopment Total Phosphorus (TP) available for removal = 0.05 lbs/yr
TP reduction required (0.0 2 lbs/yr)
Postdevelopment TP calculated = 0.03 lbs/yr due to rooftop disconnection with sheetflow on pervious soil.
(viii) Estimation of percent increase in impervious surface on site and types of surfacing materials used;
Existing impervious 27%
0.9% increase may be due to quarrystone riprap along face of bank.
(ix) Percent of site to be cleared for project;
1.7% along bank for access and riprap installation.
(x) Anticipation, duration and phasing schedule of construction project;
Duration of project anticipated to be 90 days. First week to install construction limits for access and remove timber
ramp / walkway. Following 10 weeks to install revetment. Final week for demobilization & stabilizing ground.
(xi) Listing of all requisite permits from all applicable agencies necessary to develop project.
JPA submitted and permit under review by Corps and VMRC.
(xii) Describes the proposed mitigation measures for the potential hydrogeological impacts. Potential mitigation
measures include:
1. Proposed erosion and sediment control concepts; concepts may include minimizing the extent of the cleared
area, perimeter controls, reduction of runoff velocities, measures to stabilize disturbed areas, schedule and
personnel for site inspection;
Page 4 May 6, 2026
Minimizing c onstruction limits & use of silt fence extending along top of bank seaward of disturbance s.
2. Proposed stormwater management system;
Sheet flow infiltration in grass strip & planting beds
3. Creation of wetlands to replace those lost;
Impacted sandy and rocky wetlands along toe of existing revetment will be replaced by rocky wetlands
4. Minimizing cut and fill.
(3) A landscape element that:
Applicant will select plant species from native list arranged with mulch to be shown on landscape plan.
A. Identifies and delineates the location of all significant plant material, including all trees on site six (6) inches or
greater diameter at breast heights. Where there are groups of trees, stands may be outlined.
Tree groups, planting beds, & turf grass areas are delineated.
B. Describes the impacts the development or use will have on the existing vegetation. Information should include:
(i) General limits of clearing, based on all anticipated improvements, including buildings, drives and utilities;
Construction access from driveway and proposed riprap along bank to impact turfgrass , planting be d, small trees,
and natural scrub vegetation along bank as shown on site plan.
(ii) Clear delineation of all trees which will be removed;
5 small trees along the bank to be removed are indicated on the site plan.
(iii) Description of plant species to be disturbed or removed.
Turfgrass, planted shrubs, small volunteer trees,& natural scrub vegetation on bank.
(iv) Describes the potential measures for mitigation. Possible mitigation measures include:
1. Replanting schedule for trees and other significant vegetation removed for construction, including a list of
possible plants and trees to be used;
Based on guidance of the riparian manual, up to 6 planting units are proffered for the 2308 square feet of
disturbance including temporary disturbance if required ; 6 canopy trees, 12 understory trees, & 18 shrubs. The
Applicant will select particular species which will be included on separate landscape plan .
2. Demonstration that the design of the plan will preserve to the greatest extent possible any significant trees and
vegetation on the site and will provide maximum erosion control and overland flow benefits from such vegetation.
No significant trees or vegetation are proposed for removal. Planting bed & vegetation will be replaced that provides
upland runoff flow protection for the areas temporarily impacted and will slow overland stormwater sheetflows
providing for greater percolation and less runoff. The proposed revetment will further protect from erosion of bank
due to stormwater overland runoff and elevated sea wave action.
3. Demonstration that indigenous plants are to be used to the greatest extent possible.
Page 5 May 6, 2026
The plants proposed are to be selected from the Riparian Buffer Manual plant list.
(4) A wastewater element, where applicable, that:
A. Includes calculations and locations of anticipated drain field or wastewater irrigation areas;
No wastewater element is proposed or impacted for this project.
B. Provides justification for sewer line locations in environmentally sensitive areas, where applicable, and
describes construction techniques and standards;
No wastewater element is proposed or impacted for this project.
C. Discusses any proposed on-site collection and treatment systems, their treatment levels, and impacts on
receiving watercourses.
No wastewater element is proposed or impacted for this project.
D. Describes the potential impacts of the proposed wastewater systems, including the proposed mitigative
measures for these impacts.
No wastewater element is proposed or impacted for this project.
E. Identification of the existing characteristics and conditions of sensitive lands included as components of
Chesapeake Bay Preservation Areas, as defined in this Article.
The existing characteristics of the RPA is residentially developed uplands with high bank actively eroding and
scoured intertidal zone facing open water with significant fetch from two directions. .
F. Identification of the natural processes and ecological relationships inherent in the site, and an assessment of the
impact of the proposed use and development of land on these processes and relationships.
This site location is part of a developed residential neighborhoo d adjacent to a marsh and open water. Other than a
riprap revetment for protection, no change in use or development is proposed that may impact existing natural
processes and ecological relationships . The high bank of subject site has been susceptible to erosion which is
encroaching toward dwelling. The small trees along the bank are subject to wave action & scour with soil losses into
waterbody. The proposed revetment is anticipated to protect these resources.
I hope these responses provide sufficient information for your review.
Sincerely,
David Kledzik, PE
SCALE: 1" = 40'
LANDSCAPE
PLANTING PLAN
B
A
C52' 47'
PHRAGMITES
EXISTING TREES
BEACH
0' 40'20'
RESTORE TURFGRASS
BUFFER & BED RESTORATION
PLANTED WITH NATIVE PLANTS SUCH
AS FROM APPENDIX A OF THE
RIPARIAN BUFFERS GUIDANCE
MANUAL TO COMPENSATE FOR 2308 SF
OF TEMPORARY CONSTRUCTION
ACCESS AND PERMANENT RIPRAP ON
BANK:
6 CANOPY
12 UNDERSTORY
18 SHRUBS
RESTORE TURFGRASS
PLANT LEGEND
CANOPY
UNDERSTORY
SHRUBS
2026 MARINE ENGINEERING LLC - ALL RIGHTS RESERVED.C
#6954
PROPERTY LINE
LOT 3
DAVID SPENCER
RESPASS BEACH RD
MLW
MHW
PROPOSED REVETMENT
RETURN EXTENSION ABC
DRIVEWAY
EXISTING RIPRAP REVETMENT
GRAVEL PATHWAY
LOTS 4&5
DAVID SPENCER
100' RPA
50' RPA
TURF/BED/NATURAL
BORDER
RACK LINE
TURF
TURF
BED & TREES
1.5XMTR
Virginia Marine Resources Commission
Permit Application 20230895
Printed: Wednesday October 1, 2025 3:50 PM
Applicant: David Spencer
6954 Respass Beach Road
Suffolk, VA 23435
Application Number: 20230895 Engineer: Kirsten Travis
Application Date: April 14, 2023 Locality: Suffolk
Permit Type: No VMRC Permit Nec. Waterway: James River
Permit Status: No Permit Nec Expiration Date:
Wetlands Board Action: Public Hearing Date:
Project Description: Revetment
Virginia Marine Resources Commission
Photos for Permit Application 20230895
Printed: Wednesday October 1, 2025 3:50 PM
Date Photo Taken: 2023:06:15 15:05:16
Date Photo Taken: 2023:06:15 15:05:25
June 29, 2023
Ms. Lauren Chartrand
Environmental Engineer
Virginia Marine Resources Commission
380 Fenwick Road, Bldg. 96
Fort Monroe, VA 23651
Dear Ms. Chartrand:
I have completed my assessment of the proposal by David Spencer to widen and lengthen a portion of an
existing riprap revetment along the James River (VMRC 2023-0895) and find no significant adverse
environmental impacts resulting from the project as proposed. The project will impact less than 10 square
feet of saltmarsh cordgrass (Sporobolus alterniflorus, formerly Spartina alterniflora) embedded within the
revetment, but relocation of this vegetation is planned near the toe of the new revetment section. The
application states that the saltmarsh cordgrass will be replanted at an elevation below 1.5 times the mean
tide range; however, saltmarsh cordgrass almost exclusively grows between the elevations of mean tide
and mean high water. If relocation is authorized we recommend planting only within their natural tide
range to provide the greatest likelihood of survival and growth.
Although this is a small amount of tidal wetlands vegetation growing within the revetment, which can
affect their level of habitat and water quality functions, we forward the following recommendations for
consideration. The success of vegetation relocation is suspect since the plants will be placed in a situation
of greater exposure to wave energy (the rock substrate currently provides some protection to the roots and
lower stems). Also, natural communities of saltmarsh cordgrass have not naturally established in the
target relocation area even though there are local seed sources. We recommend consideration of
monitoring the relocated vegetation for a period of at least one year to determine the likelihood of
survival. If relocation fails we recommend consideration of alternative methods of compensatory
mitigation. Alternative compensatory mitigation methods may also be considered if relocation is not
considered an appropriate strategy.
Please contact me if you have questions or require further information.
Sincerely,
Lyle Varnell
Associate Director for Advisory Services
Received by VMRC June 29, 2023 /blh
Outlook
VMRC 23-0895 associated documents for 6954 Respass Beach Rd
FromDavid@marineengineeringllc.com <info@marineengineeringllc.com>
DateThu 5/7/2026 9:15 AM
To Cassidy L. Mckelvie <cmckelvie@suffolkva.us>
6 attachments (3 MB)
VMRC23-0895 - Plan Comments - 1st Submittal.pdf; Respass Beach Rd #6954 Landscape Buffer Planting.pdf; Respass Beach Rd #6954 Wetlands Checklist
.pdf; Respass Beach Rd #6954 WQIA.pdf; VMRC23-0895 - Comments - 2nd Submittal.pdf; JPA - VMRC23-0895 - AddInfo_Rev2 - 6954 Respass Beach Rd.pdf;
You don't often get email from info@marineengineeringllc.com. Learn why this is important
Good Morning Cassidy, I have resubmitted the JPA Revision 2 through CENOA and have attached these associated files for you including theJPA. I’ve tried to address all the previous comments and hope this gets the project back on track. I did not get anacknowledgement for my responses to the second submittal comments and I hope you were able to recheck the redand purple colored envelope lines drawn on my site plan and see that they deviated from the lines of what I hadproposed to cove a larger area than what I put on application. Please contact me to clarify if needed.
Revision 1 of site plan addressed redline comments on the 1st submittal and reduced the width of the riprap returnwall.Revision 2 of site plan clarifies impact of riprap to non-vegetated beach. I have also attached the WQIA, Landscape Planting Plan, checklist, and JPA resubmittal Rev2 (also formallysubmitted to CENAO) Updated responses to Grace’s comments: Additional justification for the proposed riprap revetment as best alternative for shoreline protection in lieu of a livingshoreline combined with a sill or breakwater structure.There are 27 miles of open water fetch to the NW toward Williamsburg and 32 miles to the NE towards CapeCharles. These distances greatly exceed recommended guidelines for a typical living shore involving a sill since winddriven water levels and breaking waves would easily overtop the sill to wash out plants & substrate. Anotheralternative considered was installing a breakwater to protect shoreline from wave energy. The design would need tobe effective for fetch approaching from two directions. To accomplish this the size of the structure would be muchlarger than the proposed revetment. Unfortunately, the cost would be prohibitive for a residential budget. Additionally, the impacts associated with construction access and footprint would be much more. Such a largeproject would also include greater risks such as scour to surrounding bottom and wetlands from currents & waves. Entrapment of debris could layer over plants, presenting a maintenance issue for habitat health. Considering thehigh cost, much greater disturbance from installation, greater impacts to bottom and intertidal related to size of thebreakwater, and the risks associated with larger structures clarifies that a revetment is more suited to this project thana breakwater or living shore. Sequence and timeline revised.(Construction timeline 9/1/26 TO 12/31/29 (subject to change) Please let me know you received this and advise if I should be sending to another address. Thank you. Sincerely, David KledzikMarine Engineering LLCManager(757) 477-4787
From: David Kledzik
To: MRC - jpa Permits
Subject: JPA - VMRC23-0895 - AddInfo_Rev1 - 6954 Respass Beach Rd
Date: Monday, August 25, 2025 2:21:26 PM
Attachments: JPA - VMRC23-0895 - AddInfo_Rev1 - 6954 Respass Beach Rd.pdf
Dear VMRC,
Please accept this JPA Rev 1 resubmittal to revise / add info and forward to all as needed.
In response to Suffolk planning comments, additional justifications to support the necessity of
proposed revetment are provided and additional information has been added to the site plan.
There are 27 miles of open water fetch to the NW toward Williamsburg and 32 miles to the NE
towards Cape Charles.
These distances greatly exceed recommended guidelines for a typical living
shore involving a sill since wind driven water levels and breaking waves would easily overtop the sill
to wash out plants & substrate. Another alternative considered was installing a breakwater to
protect shoreline from wave energy. The design would need to be effective for fetch approaching
from two directions. To accomplish this the size of the structure would be much larger than the
proposed revetment. The cost for a breakwater project such as this would be prohibitive for a
typical residential home owner and the impacts associated with construction access and footprint
would be much more too. Such a large project would also include greater risks such as scour to
surrounding bottom and wetlands from currents & waves. Entrapment of debris could layer over
plants, presenting a maintenance issue for habitat health. Considering the high cost, much greater
disturbance from installation, greater impacts to bottom and intertidal related to size of the
breakwater, and the risks associated with larger structures clearly shows that a revetment is more
suited to this project than a breakwater.
The width of proposed return extension has been reduced between points A-B, to lessen the
footprint of additional riprap.
RPA lines, timeline notes, additional scale and north arrow info have
been added to the site plan.
The reduction of riprap is in the RPA, therefore there are no changes of quantitative impacts to
wetlands or beach previously included in JPA.
Sincerely,
David Kledzik, PE
Manager
Marine Engineering LLC
757 477-4787
Additional Information/Revisions Recieved by VMRC Aug 25, 2025 map
S
A
UARRYSTONE RIPRAP
US 670
EWAY
EVETMENT
ONG SLOPE
TRUCTURE
S 1-2 CORE
TH CLASS 1
WARD PT A
REMO
TO D
2 SF VEG
IN RIPRAP
4 SF VEG
IN RIPRAP
)
20'
20'
B
C' 47'
X3
X2
S
DISPLACED
ALONG TOE
EVETMENT
BEACH
1.5XMTR