Planning Commission Meeting Agenda
October 27, 2026
100 5th Street Northeast
City Space Conference Room
Charlottesville, Virginia 22902
Carl Schwarz, Chair
Danny Yoder, Vice Chair
Ross Harness
Hosea Mitchell
Betsy Roettger
Lyle Solla-Yates
Josh Carp
Michael Joy
I. Commission Work Session
Beginning: 5:00 p.m. Location: (Cityspace, 100 5th Street NE, Charlottesville, VA 22902)
1. Code Amendments and Food Trucks
II. Future Meeting Schedule/Adjournment
Tuesday November 10 - 5:30 PM - Regular Meeting
Individuals with disabilities who require assistance or special arrangements to participate in the
public meeting may call the ADA Coordinator at (434) 970-3185 or submit a request via email
to ada@charlottesville.gov. The City of Charlottesville requests that you provide a 48 hour notice
so that proper arrangements may be made.
Planning Commission pre-meeting and regular meetings are held in person and by Zoom webinar.
The webinar is broadcast on Comcast Channel 10 and on all the City's streaming platforms
including: Facebook, Twitter, and www.charlottesville.gov/streaming. Public hearings and other
matters from the public will be heard via the Zoom webinar which requires advanced registration
here: www.charlottesville.gov/zoom . You may also participate via telephone and a number is
provided with the Zoom registration or by contacting staff at 434-970-3182 to ask for the dial in
number for each meeting. Written comments may be submitted via email to
planningcommission@charlottesville.gov.
Page 1 of 78
Page 1 of 3
TO: Charlottesville Planning Commission
FROM: Matthew Alfele, Development Planning Manager
DATE: November 10, 2026
SUBJECT: Planning Commission Work Session Food Trucks and Final Review of the 2026
Development Code Clean-Up Amendments
Introduction and Background
Neighborhood Development Services (NDS) staff is preparing a package of approximately
twenty-four (24) Development Code amendments for Planning Commission consideration in
advance of a scheduled joint Public Hearing on December 8, 2026. The proposed amendments
are part of the City's ongoing Development Code maintenance and refinement efforts and
include technical corrections, administrative clarifications, state-law conformity updates, and
targeted revisions intended to improve implementation of the Development Code while
maintaining its adopted policy framework. The amendment package addresses a range of
topics, including administrative procedures, zoning standards, subdivision regulations, historic
preservation processes, mapping and graphic clarifications, and development review
procedures.
Throughout 2026, staff has worked with the Planning Commission through a series of work
sessions, listening sessions, subcommittee meetings, and project-specific discussions to identify
issues and refine potential amendments. Feedback received from Commissioners, applicants,
property owners, preservation stakeholders, development professionals, and City staff has
informed the amendment package presented for review.
Each amendment has been summarized in an individual one-page summary sheet that
identifies the issue, explains the proposed amendment, and highlights anticipated
implementation effects. Several amendment sheets consolidate multiple related corrections or
clarifications into a single proposal where the changes address the same subject matter of the
Development Code. The attached one-pagers are intended to facilitate discussion and help
Commissioners provide direction on each proposed amendment.
Page 2 of 78
Page 2 of 3
The purpose of this work session is to provide the Planning Commission with an opportunity to
review the complete amendment package before the December Public Hearing, identify any
remaining concerns, and provide direction to staff regarding which amendments should
advance as proposed, be modified, or be deferred for future consideration.
Food Truck Discussion
In addition to reviewing the Development Code amendment package, staff requests Planning
Commission feedback regarding potential amendments related to food truck operations within
the City.
On October 6, 2026, staff convened an interdepartmental working group that included
representatives from several City departments and members of the Planning Commission to
discuss current food truck regulations and potential opportunities for amendments. The
discussion focused on how existing regulations align with current operating practices and
whether modifications could improve flexibility while maintaining compatibility with
surrounding properties and neighborhoods.
Topics discussed by the working group included the City's temporary use regulations,
limitations on the number of food trucks operating on a property, administrative and
permitting considerations, host-site responsibilities, distinctions between temporary food truck
operations and longer-term food truck gathering spaces (Food Truck Courts), and operational
standards related to utilities, waste management, circulation, and customer amenities.
The discussion generally supported exploring amendments that would provide additional
flexibility for food truck operations while establishing clear operational standards and
maintaining compatibility with surrounding properties. Staff has prepared a draft summary
sheet for Planning Commission review and is seeking feedback on potential approaches and
policy considerations before determining next steps.
Meeting Format and Requested Commission Direction
Staff proposes the following format for the work session:
Overview of the Amendment Package
Staff will provide a brief overview of the 2026 Development Code amendment package and
summarize any changes that have occurred since prior Planning Commission discussions.
Review of Amendment One-Pagers
Each proposed amendment has been prepared as an individual summary sheet. For each
amendment, staff requests that the Planning Commission identify one of the following
recommended actions:
• Advance as presented;
• Advance with modifications; or
• Defer for future consideration.
Page 3 of 78
Page 3 of 3
Staff will document Commissioner feedback and incorporate direction where appropriate.
Food Truck Policy Discussion
Staff will facilitate discussion regarding potential changes to food truck regulations and seek
Planning Commission feedback regarding overall policy direction, operational standards, and
implementation considerations.
Next Steps
Staff is currently completing final peer review and legal review of the proposed amendments.
Amendments receiving Planning Commission support at this work session will be incorporated
into the final Public Hearing package scheduled for December 8, 2026.
Staff anticipates that minor revisions resulting from this work session can be incorporated
without affecting the amendment schedule. More substantial revisions may require additional
research, public outreach, or drafting and may be more appropriately considered during a
future amendment cycle.
Attachments and Links:
• 2026 Amendment Log (dated October 13, 2026)
• Proposed Development Code Amendments One-Pagers
Page 4 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 1 of 19
This is a working document and is ONLY INTENDED to log of Development Code issues and proposed amendments to the City’s 2023 Development Code (Chapter 34). The outline is divided
into three categories to help distinguish different issues and is not intended as a priority list.
Clarifications & Technical Fixes (A)
This category includes grammatical edits and minor changes. Public engagement should be limited to Public Hearings at Planning Commission and City Council. This will also include updates to the Development Code
required to stay in compliance with State enabling legislation changes.
Refinements (B)
This category includes edits and/or changes to sections of the code that will better reflect the intent statement of each section. Public engagement should be limited to Public Hearings at Planning Commission and City
Council. This sections also include changes to supporting documents such as the Neighborhood Development Services (NDS) Fee Schedule.
Policy Changes or Major Amendments (C)
This category includes edits, additions, and/or removal of language that could change the intent of the code and/or change established policy. These changes require dedicated study and analysis. Public engagement should
involve community outreach and inclusion through Long Range Planning.
Additional Categories
The additional categories that fall after “C” are intended to capture comments and suggestions from other sources. The “source” is indicated in the title of each section.
Key Point of Housing Keeping. Once an issue is assigned a number, i.e. A.1 or B.11 it should not be moved. When new issues are added or more spaces is needed on a
Tier ALWAYS ADD THE NEW ROW TO THE END OF THE TIER. If an issue is moved or removed from a tier, only strike through the issue and do not delete the row.
Example: Planning Commission wants to move “Existing structure preservation bonus does not specify a timeframe to qualify as an existing structure.” From Tier 3 to
Tier 2. The issue is being “crossed out” on C.8 and added to B.70 (as that was the next open row in Tier 2.
Clarifications & Technical Fixes (A)
Number Page Code
Section
Current Language/Issue Suggested Language/Change Respons
ible Staff
Date
Adopted by
CC
A.1 5-41 5.2.10.A.1 The Tree Removal Permit does not distinguish between a stand alone permit to remove a tree and
tree removal related to a larger site development (going through Development Review). This is
causing two applications for Development Plans and FSP .
Add a “b. Trees being removed as part of a project required to go
through Development Review.”
Matt
A.2 Private Streets do not clearly indicate they must be on dedicated property and not easements over
underling private property. This is creating issues as the code uses a lot of “street side lot line”
which does not work well with easements.
2/10/26: Move to Tier 1 (needs to be addressed with the 2026 updates). Moved from B.11
Staff suggests updating the definition of Street under section 7 to
clearly state a street (public or private) is an independent parcel or
ROW.
Street: A street is a public or private way that provides a principal
means of access to abutting property and includes the roadway
and associated streetscape elements. Streets shall meet the
following criteria:
• Public Street: A street located entirely within a publicly
dedicated and accepted right-of-way, under the ownership
and maintenance of a governmental entity and design per
the City’s Standards and Design Manual.
Carrie
Page 5 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 2 of 19
Private Street: A street located on a separate, recorded lot or tract
that is not part of any abutting property. Private streets shall not
be established solely by easement across private property and
must comply with the City’s Standards and Design Manual and be
bonded to the same standards as a Public Street during
construction. Ownership and maintenance shall be the
responsibility of a private entity such as a homeowners’
association or other legally binding documents.
A.3 Yard designation details
This could be a Tier 1 as the change might only involve including “primary building”.
2/10/26: PC moved to Tier 1. Moved from C.4.
6/16/2026: Reviewed by staff and this is not an issue due to the updated language from 2025
regarding primary structures and uses.
This section refers to primary structures, but we should consider
changing to primary buildings. If structures, a raised deck (etc.)
would qualify and we should work through implications.
A.4 4-17 4.4.5.A.1 The Street Typology Map needs revision. The Local designation is not in the legend, and the green
marking on the Mall needs to be removed as it is not a category on the map.
2/10/26: PC moved from C.9.
6/16/2026: The paper map will be worked on with the goal of embedding the map into the GIS
viewer. No text amendment is needed but should be pointed out during adoption.
Map quality is also substandard. Not a code change, but we need a
better map.
Dannan
A.5 5-9 5.1.6.B.2 Add Special Exception Permits The Administrator reviews and provides a recommendation on
Special Exception Permits per 5.1.1.
Carrie
A.6 4-20 4.4.5.D.9.c Add “RN-” districts RN- districts were left out of several sections of the code where R-
districts are referenced
Carrie
A.7 6-13 6.7.1.A.2.a.iv Remove “Provision of expertise and technical assistance to the Planning Commission.” The Planning Commission no longer has authority over
subdivisions per changes to state code.
Carrie
A.8 Review all new state regulations post July 1st.
VA 15.2-2292.3 ADU (accessory dwelling units) must be permitted in all single family residential
districts by-right
This is an issue in the RN-A districts due to the preservation bonus
timing. Staff suggestion is to up the by-right density to 2 units and
you get a 3rd unit with the preservation bonus and a total of 6 for
affordable.
Full Team
and CAO
A.9 2.10.6 Build-
To
When permitted by the Zoning District, a project utilizing the Existing Structure. Preservation
Bonus for density will be deemed to comply with the Build-To requirements.
Update “utilizing” to “eligible”. Carrie
A.10 2-98 2.10.1.D B.10 on the 2025 list (did not move forward).
Yard designation details graphics.
2/10/26: No Comments from PC
6/16/2026: This is just a graphic fixt as the existing graphic shows a façade at 15’ that is not part of
the front yard. The graphic needs to be update to show the façade OVER 15’ away to not be part of
the front yard.
The text bases yard on street-facing facades, which are within 50-ft
of the lot line. It uses "the primary building's street-facing facade"
but it is not clear if it is the primary building or the primary facade
and how that is defined. So, the text reads that the yard is between
lot line and any facade which meets the street-facing facade
standard, or any facade within 15-ft of a street-facing facade. This
is inconsistent with the graphic.
Carrie
A.11 5-58 5.2.16.C.4 B.23 on the 2025 list (did not move forward).
City Council Decision details
“The City Council will conduct a public meeting on the application. The City Council may hold a joint
public meeting with the Planning Commission.”
8/12/2025: Staff note. Add this to next year’s (2026) review. Change Critical Slopes Planning
Commission and City Council action to match that of Special Exception Permit and/or what comes
out of the Long Range Planning Environmental study.
This language matches items such as SUPs which require a public
hearing, but not items like SEPs which require a public meeting
same as the Critical Slope SEP .
Carrie
Page 6 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 3 of 19
2/10/26: PC would like staff to have more administrative authority but also wants to see the
results of the Long Range Planning Environmental study to see what is says regarding Critical
Slopes.
6/16/2026: To match of permit types that do not require a Public Hearing, remove 5.2.16.C.2.
A.12 2-101,
2-126,
2-127
See G.1 for more details. This is a graphic fix to show finished grade over existing grade. Update the graphics. Carrie
A.13 The Development Code only speaks to Width limitations when it comes to a Lot that is split Zoned.
We need to establish the governing standards
Draft language: when a lot has more than one Zoning designation
the more restrictive District standards apply to the lot as a whole.
If we make this update, we should remove the section (34-
.2.10.10.A.3.a) as the “general” language would capture this too.
Matt
A.14 5-37 5.2.9.A.2.a New construction or addition activities for any project with no public improvements exept
Streetscape improvements…9/25/2026: This was a scrivener's error in the revisions to the code
which has since been corrected. Council adopted “except” in the ordinance.
New construction or addition activities for any project with no
public improvements except Streetscape improvements…
Carrie
A.15 5-70 5.4.4.A.d Contributing structures and protected properties are not allowed to fall into a state of disrepair
that could result in the deterioration of any exterior appurtenance or architectural feature so as to
produce a detrimental effect upon the character of a design district of the life and character of a
contributing structure or protected property.
Contributing structures and protected properties are not allowed
to fall into a state of disrepair that could result in the deterioration
of any exterior appurtenance or architectural feature so as to
produce a detrimental effect upon the character of a design district
or the life and character of a contributing structure or protected
property.
A.16 5-40 5.2.9.E.2.C This section is regarding revision to an approved Development Plan or Final Site Plan. This section
needs to be clearer in relation to the statues of an approved plan and also need to give the
Administrator more authority to allow revisions for additional small alterations that do not
fundamentally change the plan.
Update the language to state “Minor revisions to an vested
Development Plan or …”
Add “e) additional minor alterations that do not substantially alter
the vested plans as determined by the Administrator”.
Matt
A.17
Refinements (B)
Number Page Code
Section
Current Language or Problem Suggested Language or Issue in Question Respons
ible Staff
Date
Adopted by
CC
B.1 Sight
Distance
NA B.6 on the 2025 list (did not move forward).
Nothing in the new code provides details on a sight distance triangle.
May 27, 2025, Planning Commission Work Session: This needs more study as PC would not want
VDOT regs as it would create too large of a triangle.
9/9/2025: Due to timing this will be moved to the 2026 list.
2/10/26: No Comments from Planning Commission
Could use the section from the 2003 Code (Sec. 34-1121. - Sight
distance—Required sight triangle.) Collaboration with the City
Traffic Engineer before any change is made.
Brennen
B.2 2-98 2.10.1.D Moved to A.10
B.3 4-24 4.5.1.C.3 B.20 on the 2025 list (did not move forward).
Provides “linking” requirements before “direct” requirements, but this should be reversed to
match 4.5.1.C.2. Also not clear why we need a Type 1 and direct when they are one and the same
and vice versa.
10/7/2025: This amendment is not ready to move forward and will be placed on the 2026 list.
2/10/26: No Comments from PC
Reverse order and reconsider categories. Carrie
B.4 7-15 7.2 B.22 on the 2025 list (did not move forward).
Grade, finished.
9/9/2025: This needs additional study and will be moved to the 2026 list.
Additional clarifying language is needed. Is the intent to measure
at building footprint?
BK
Page 7 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 4 of 19
2/10/26: PC would like to know how the terrain of the City is taken into account. Is the issue
related to graphics within the code, or is it a larger issue related to terrain?
6/16/2026: This might just need a better definition of “Finished Grade”.
B.5 5-58 5.2.16.C.4 Moved to A.11
B.6 5-37 5.2.9 B.37 on the 2025 list (did not move forward).
Changes to the Development Code Process to allow more types of development to go straight to
Building Permit review
9/9/25 (more information will be provided after we meet with different departments and get
additional feedback).
2/10/26: PC is supportive and wants to see what comes out of the Missing Middle Round Table
discussions.
6/16/2026: This will not be worked on until after conclusion of the Missing Middle Working Group.
We are looking at two options. 1 would keep our current policy of
allowing one and two units to go straight to Building permit review
(codifying it). The other option (which is the one we are moving
forward) would allow development within the R districts (provided
certain standards are met) to go straight to Building Permit review
B.7 2-85 to
2-87
2.9.3.B Moved to ADC.1
B.8 4-27 4.5.2.C.1 B.41 on the 2025 list (did not move forward).
Required Bicycle Parking. The code is requiring Hotels to be treated as Commercial which is in turn
requires a unreasonable amount of bicycle parking.
2/10/26: Important issue to PC, but no guidance yet.
Staff reached out to Code Studio to make sure we were reading the
code section correctly and they responded in an email on
November 6, 2025 with: “Great question, under the current code
language, you are interpreting this correctly that a lodging use is a
commercial use and would be calculated as you have outlined.
This could be an opportunity for administrative relief, or a potential
text amendment where lodging uses get listed as a new line on the
bicycle parking table with lesser requirements. This could be per SF
or per room, for example, in Raleigh, NC we specified long-term
bike parking as 1 space per 20 rooms (4 min) and short-term bike
parking as 1 space per 40 rooms (4 min).Happy to brainstorm more
as needed, Christy”
Matt
B.9 Food truck courts (places in the City where multiple food trucks could gather. This came out of a
conversation that under the current Temporary Use section only one food truck is permitted per
lot. This is an issue, but it also prevents something like a food court for food trucks.
2/10/26: This is important to PC and something they want to be involved in (subcommittee)
10/6/26: Subcommittee meeting. The Food Truck Court issue may need to be pushed to next
year’s cycle. The focuses of this round will be to fix the regulations already in the code under
Temporary use.
An idea to address this is 1. Amend the temporary sections, and 2.
Look into the idea of an Alternant Form section for Food Truck
Courts.
PC/Sub/
Team/Cr
aig
B.10 2-108 2.10.4.C Outdoor Amenity Space. The requirements for outdoor amenity space is just a flat percentage and
does not take into account the quality of the space.
2/10/26: Not a priority to PC.
Could allow for less percentage if the amenity space is active
instead of passive. This is used in other localities and would take
some research.
B.11 7-21 7.2 Moved to A.2
B.12 2-9, 2-
13, and
3-4
2.2.2.A.B.1,
2.2.4.B.1, and
3.2.2
(3/13/2026) In the R districts (R-A and R-B) height is only restricted for Buildings with “units”. There
is no stated height for nonresidential uses and there are some nonresidential uses allowed in these
districts (Religious assemble and Day care,
Matt
B.13 4-11 4.3.2.B.2 Mid-block pedestrian pathways
2/10/26: PC would like to see more study. moved from Tier 3 (from C.7)
This section is set up on the assumption there is only 1 primary
street frontage, which is often not the case. Needs revision/study.
B.14 5-54 5.2.15.A A Special Exception Permits may be granted for physical dimensional standards described in the
following Division... needs revision to account for the determination that parking location and
other potential locations are permitted modifications allowed under SEP.
May 27, 2025, Planning Commission Work Session: PC did not feel removing or adjusting the SEP is
appropriate at this time.
Also consider removal of 5.2.15.A.2.a (Div 2.10 Rules for Zoning
Districts) per input from Freas on requiring a ZMA instead.
Staff would recommend changing 5.2.15.A.1 to state “The City
Council may grant a modification of any physical dimensional or
Matt
Page 8 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 5 of 19
The other issue is that Special Exception Permits are only for “physical dimensional standards” and
not the regulation for the standard. The example being a SEP could be requested to change the
dimensional standards of a bike parking space, but it could not be used to reduce the number of
spaces required.
2/10/26: PC moved this to Tier 2 (Moved from C.11).
numerical standard of this Development Code by Special Exception
Permit.”
B.15 7-10 7.1.2.E.3.b Sublot access
2/10/26: PC moved to Tier 2 (C.15).
Add clarifying language that easement may be through other
zoning lots.
Carrie
B.16 2-133 2.10.10B.2 Active Depth Applicability
Planning Commission has expressed an interest to reexamine active depth. They would like to have
a better definition and look at where active depth is needed and where it is not needed. An
example would be the current requirement on the mall that active depth is the full height of the
building along the façade.
2/10/26: This is a priority to PC and they moved to Tier 2. They would like to look at the required
depth, definition, should it be in the residential districts at all, should it be on all stories of a
building. This is their #1 priority for Tier 2. This is something for the subcommittee and could move
back to Tier 3 if it proves to be too complicated and needs community engagement. Gagrages
need to be part of this study too (from C. 18) Moved from C.16.
7/28/26: At the Work Session the PC wants to move forward with updates listed in the next box.
This section prevents structured parking as a standalone use, but
the structured parking section (4.5.5.C.7) provides screening
requirements which may imply the standalone use is okay.
Language on 2-133 is contradictory regarding ground floor. The
section states Active Depth is for the portion of the building use to
meet the minimum build to width requirement. But that
requirement is only for ground stories of a building.
7/28/26 PC Work Session:
• Exclude Active Depth requirements from Residential Units
• Only require Active Depth for the first two stories of the
Primary Street facing façade.
• Remove “Hall” from the definition of non-active space.
PC/Sub/
Team
B.17 2.10.5 and
2.10.6
Setbacks and Build-to. Planning Commission would like to do a deeper dive into the current
regulations related to Build-to and Setbacks.
2/10/26: This is number 2 priority to PC and something for the subcommittee to look into. Moved
to Tier 3. Moved from C.22.
Build-to width is creating a lot of issues. Utility requirements is a big issue as it takes away from
what can be done with sublots.
(October 14, PC work session)
2/10/26: This is creating a lot of issues, and we need to find a way to allow administrative relief. PC
moved to Tier 3 (Moved from G.14).
7/28/26 PC Work session. PC has the following changes to address the Build-to and setback issues
(related to nonconforming buildings). See the box next to this.
The new Development Code relies heavily on Build-to
requirements. This is very different from our old code, and it is
creating a lot of issues. It would be a big lift to redo the code to
remove Build-to regulations, but it might be worth studying where
there can be relief from the regulations. In 2025 we updated
sections of the code to allow relief for developments taking
advantage of the existing structure bonus. There might be an
opportunity to look at other such reliefs (buildings that are IPPs or
Contributing structures in the Design Districts).
7/28/26 PC Works Session:
• Allow primary buildings to be build behind non-conforming
buildings (do not make the nonconforming building first
meeting build-to before allowing this).
• Allow side additions to a nonconforming building of any
size provide it meets all other Development Code
requirements (only being allow to not meet Build-to and
front setbacks).
PC/Sub/
Team
B.18 2-132 2.10.10.A.5 2.10.10.A.5: Building Width Exception. “The depth of the open space must be at least equal to the
width of the open space or 30’, whichever is less.” I propose reducing that minimum depth to 25’.
A building built over a parking garage is 60’ wide (1’+18’+22’+18’+1’). If you have a double-loaded
corridor building above the parking garage, a 30’ deep open space will cut into the corridor. The
depth should be no deeper than an apartment depth.
2/10/26: PC wants this on Tier 2. Moved from D.5.
PC/Sub/
Team
B.19 4-103 4.12 Nothing in the Lighting section addresses athletic field lighting. The maximum fixture height is 15’
and that would not work for ball fields.
2/10/26: This is not a priority to PC at this time but should be looked at latter.
6/16/2026: There is room to permit field lighting, but we should update the code to be clear that
filed lights are permitted in Parks (public use).
Language in city's Standards & Design Manual should be inclusive. Dannan
Page 9 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 6 of 19
B.20 2-102 2.10.1.G This section defines average grade as calculated from the highest and lower elevation of existing
grade but should be set by finished grade.
Change “existing grade” to “finished grade.” Carrie
B.21
Policy Changes or Major Amendments (C)
Number Page Code
Section
Current Language Staff Notes
*Community Engagement and analysis will be required.
C.1 2-9
(etc.)
2.2.2.B.1
(etc.)
11/12/25: PC Work Session moved this back to Tier 3 as there needs to be a deeper dive into what
a Building is and if it is the Lot or the Building that needs to have more than one unit in it to get the
bonus height.
2/10/26: This could be a deeper conversation with PC.
Building height is for the number of units within the building. If you have one building and it
has more than one unit within the building, you get the additional height. If you have multiple
units on a site, but they are each in their own individual unit, you do not get the additional
height. This is problematic for R-A, R-B, and R-C.
C.2 2.10.10
Massing
11/12/25: PC Work Session moved this back to Tier 3 as there needs to be a deeper dive into what
a Building is and if it is the Lot or the Building that needs to have more than one unit in it to get the
bonus height.
Resolved 2025 with B.5 Accessory Uses/Structures and Nonconformity Build-to
2/10/26: Staff explained to PC that this was resolved with B.5 for buildings that cross a property
line (duplexes and townhomes) but not resolved for multiple buildings on one lot (building a large
SFD in the backyard of an existing SFD and getting the height bonus).
Building is not clearly defined when it comes to “Height” and “Massing”. The example is: If I
have seven townhomes along a primary street in the R-B, the massing and height is all
dependent on where the property lines are for each unit. If it is seven townhomes with no
property line at the shared wall (all seven are on one lot in a condo) the “building’ can only be
60’ long on the primary street, but it is a building with seven units in it and can be 3 stories
(and 40’). But, if there are property lines running through the shared walls, each unit is a
building and can, individually, be 60’ long, but only 2.5 stories (35’). From the outside they
would present very differently but the only difference is where the invisible property line is.
Staff believes this was resolved with the B.5 amendment as it added the definition of Primary
Building: “Building, Primary- The building or buildings occupied or designated for the
primary/principal use on a lot or site.” By adding “site” a building can now cross a property line
(duplex or townhouse) and be considered one “building” on a site for the purpose of bonus
height.
C.3 2-40 2.5.6.A.6 Will eventually reference Type B and D (in Category 1 as well).
Resolved 2025 with A.16
See Downtown Mall Management Plan for recommendations on transitions.
C.4 2-97 2.10.1.D Moved to A.3
C.5 2-104 2.10.2.B.3.c Lots having vehicular access from any street other than a primary street, or not having vehicular
access at all, must meet the minimum width required for lots with other vehicular access specified
by the zoning district.
2/10/26: More information is needed, but this could be a Tier 1.
Assuming this is meant to describe the "side/rear access" width in the districts, should this say:
"...from any side street, alley, easement, or other right-of-way not designated a primary
street..."? This seems confusing because it only says "from a street or no access" which leaves
out everything I listed out.
C.6 Various Various Structure, accessory structure, etc.
Resolved 2025 with B.5 Accessory Uses/Structures and Nonconformity Build-to
Deeper dive on structure, accessory structure, and associated requirements. Consistency
issues, as well as intent (interior non-conforming lots vs corner non-conforming lots).
C.7 4-11 4.3.2.B.2 Moved to B.13
C.8 4-5 4.2.1 Existing structure preservation bonus does not specify a timeframe to qualify as an existing
structure.
Moved to Tier 1 (A.70) by Planning Commission at the work session on May 27, 2025
Moved to Tier 2 (B. 42) by Planning Commission at the Work Session on November 12, 2025
Resolved 2025 with B.42
Code Studio has verbally stated that this is for structures pre-dating the code, but that is not
specified here. As written, someone can build a structure and then immediately use it to get
the bonus as an existing structure.
C.9 NA 4.4 Moved to A.4 Map quality is also substandard.
C.10 4-27 4.5.2.B.2 Projects with 1 to 4 dwelling units are not required to provide short-term or long-term bicycle
parking.
2/10/26: Not a priority to PC.
Consider whether this should be applied per lot or per project. Tie to discussion of definition of
project. Do we want project with 4 or fewer dwelling units to be exempt from short and long
term bicycle parking?
C.11 5-54 5.2.15.A Moved to B.14
Page 10 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 7 of 19
C.12 7-19 7.2 Project Any activity, including subdivisions, new construction, additions, site modifications, façade
modifications, changes of use, renovations, and maintenance and repair, on a parcel that is
controlled by this Development Code.
Staff determined that this is not an issue due to section 7.1.1.K.1.d Tenses and Plurals
2/10/26: Not an issue for PC.
Language implies this is only upon one parcel. Discuss intention and revision.
C.13 7-8 7.1.2.C.4 Site Modification
2/10/26: PC would like staff to look at this more, it is a little confusing and might not be an issue.
If you read this with what a "site" is under E on page 7-9, a Site Modification is only a change to
the land and not what is on it. We need something more like our old Site Plan Amendment.
Site: A single lot or group of connected lots owned or functionally controlled by the same
person or entity, assembled for the purpose of development.
Lot: A parcel, tract, or area of land established by a plat or other means as permitted by law,
which is to be used, developed, or built upon.
Site Modification: Any modification of an existing site that affects less than 50% of the existing
site area, up to 25,000 square feet of affected site area.
Staff recommends changing the definition of a Site to “A single lot, group of connected lots , or
improvements, owned or functionally controlled by the same person or entity, assembled for
the purpose of development.” Additional study is suggested.
C.14 7-9 7.1.2.E.2 Defining a lot
Staff determined that this is not an issue due to section 7.1.1.K.1.d Tenses and Plurals
2/10/26: Not an issue for PC.
This and the definition of parcel should be considered together.
Parcel. A contiguous portion of land that is assigned a unique identification number by the
Office of the Assessor. (7-19)
Lot: A parcel, tract, or area of land established by a plat or other means as permitted by law,
which is to be used, developed, or built upon. (7-9)
C.15 7-10 7.1.2.E.3.b Moved to B.15
C.16 2-133 2.10.10B.2 Moved to B.16
C.17 2-148 2.10.13 Entrances
2/10/26: Keep here and look at in the future.
Update to match previous determinations or better clarify.
C.18 4-43 4.5.7.C Moved to B.16
C.19 4-103 4.12 Move to B.19 Language in city's Standards & Design Manual should be inclusive.
C.20 4-32 4.5.3.D.2 This section contradicts 4.5.1.C.a.i.d which calls for all pedestrian paths to be physically separated
from the motor vehicle use.
2/10/26: Not an issue or priority for PC. They do not see small scale development having
pedestrian and vehicular traffic overlapping. Look at this in the future.
C.21 4-80 4.10.1.B.1 Critical Slope regulations are redundant given current VESMP regulations for larger developments,
which require engineered erosion and stormwater plans to be approved for land disturbance
greater than 6,000 square feet.
This is being studied as part of the Comprehensive Environmental Study and Update by NDS Long-
range Planning Division as part of the Department’s 2025/2026 Work Plan.
Add language: “Critical slope requirements apply to project sites not subject to Erosion and
Stormwater Management (ESM) Plans that include any portion of sloped area that has all of
the following criteria:”
C.22 2.10.5 and
2.10.6
Moved to B.17
C.23 Moved to B.17 and added to the setback issues.
C.24 The 6' Min/Max determination for ground story is too limiting for the topography in this area
leading to a need to break larger buildings into many modules which is very inefficient from a
construction perspective
Revert to the previous ground story definition of 50% of the floor above/below grade to define
ground story or provide administrative alleviation for larger sites on hills
Dan Bracey – Two Street Studio October 2025
2/10/26: PC believes the terrain of the City needs to be taken into consideration. Not a priority
now, but moved to Tier 3 (Moved from G.18).
Page 11 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 8 of 19
C.25 2/10/26: PC would like to do a deep study of “Nonconformity” (such as lots, uses, and buildings).
To see what can really be achieved with our current built environment. Not a priority now, but in
the future.
Clarify Nonconformities. Clarify Expansions (any addition) 7.1.2.c "Project Activity". What are
BAR definitions- these should be stated. Additon (ok), façade modification, but nowhere is
there 'Alteration', rehabilitation, maintenance and repair, restored (restoration)... Anything that
is not subdivision, new construction, or change of use. Under 5.3.3.b.2- If the activity
associated with a nonconforming structure is not a subdivision, new construction, or a change
of use, per 7.1.2.c, is also a contributing structure in an ADC district, HC District or an IPP
(remove double comma) then that structure is not required to meet any development standard
that would require modifications to the existing structure to make it conforming, and that
activity requires an approved CoA. Part II of this: Definitions are inconsistent. Ex: Renovation
can be rehabilitation and vice versa. Planning suggestion: what you are working on must
become conforming/must meet current standards. Suggests new section under
nonconformities that addresses rehabilitation/restoration. Parallel w/ historic signage.
C.26
C.27
C.28
C.29
Architectural Design Control
ADC.1 2-85 to
2-87
2.9.3.B-C.1 B.39 on the 2025 list (did not move forward).
Individually Protected Properties are represented as both a chart and an overlay on the official
Zoning map. This creates issues as any change (adding an IPP or removing and IPP) requires both a
Zoning Map amendment and a Zoning Text amendment
2/10/26: No Comments from PC
Staff recommends removing the chart and only using the overlay on the official Zoning Map.
Update June 2026: Leave IPP chart in Code. (No change requested)
ADC.2 5-34 5.2.8.a.c.i Under Applicability for Corridor Review, C. “Regardless of whether a building permit is required:”, i.
“Site modifications;” with no noted exceptions could be interpreted to mean all properties where
there are proposed site modifications (including residential less than 2 units) must be reviewed by
design staff or the ERB.
Insert similar language as written under 5.2.8.a.c.iii “other than those on projects with up to 2
dwelling units.”
Suggested change for 5.2.8.a.c.i - “Site modifications, excepting those for residential projects
with 2 dwelling units or less per lot;”
ADC.3 4-82 4.11.3.a.2 Current language: For signs within an ADC District, HC District, Entrance Corridor, or an IPP , a
Certificate of Appropriateness will be issued in lieu of a Sign Permit according to 5.2.6 Minor
Historic Review, 5.2.7 Major Historic Review, and 5.2.8 Corridor Review. Issue: In practice, design
review is accomplished as a review task within the sign permit workflow and issued by zoning.
Modify text to state a Sign Permit application is in lieu of CoA application and approval of the
sign permit constitutes an approved CoA. Because a sign must meet the sign regs (zoning)
elevating the CoA implies that it confers zoning approval, which we stress it does not for other
CoA requests. Design staff only reviews an application after zoning determines it meets code.
Resolve with 5.2.7.E
ADC.4 4-90 4.11.9.C Table for Maximum Sign Area; Issue #1) HC Districts & IPPs are not identified under Overlay
Districts in the Zoning Districts column, nor is a Total Sign Area (max) assigned for HC Districts or
IPPs.
Amend the row under Overlay Districts to include HC Districts and IPPs as having a maximum
total sign area of 12 square feet. HC Districts and the majority of IPPs are within residential
neighborhoods; the total sign area should therefore not exceed 12 SF.
ADC.5 4-90 4.11.9.C Table for Maximum Sign Area; Issue #2) Clarify max sign area where width of the building limits the
size, regardless of the maximum size permitted.
Confer with zoning on possible language
ADC.6 4-86 4.11.5.F.1 Regarding signs in ADC Districts, HC Districts, Entrance Corridors, and IPPs, this section does not
reference the applicable Design Guidelines (3 different sets) as adopted by Council.
Suggested revision: 4.11.5.F.1 “The character of all signs must be harmonious with the
character of the structure on which they are to be placed. Among other things, consideration
will be given to the following, including the appliable Design Guidelines:” [begin list a.-e.]
ADC.7 5-3; 5-4 5.1.1 Table for Review Authority: 1) Sign Permit has no designation under BAR. 2) ZTA & ZMA have no
designations under BAR. 3) SEP & SUP have no designations under BAR.
Amend the table to include BAR authority designations as appropriate: 1) “A” for Sign Permit;
2) “R” for ZTA & ZMA; 3) “R” for SEP & SUP .
ADC.8 2-112 2.10.5.C.3.a Existing Setback Range- When the zoning district specifies the primary street setback as “Existing
Range” the minimum and maximum primary street setback defining the build-to zone may be
modified as follows: a) The required primary street setback may be met within the range of existing
primary street setbacks, no closer than the smallest setback in the range and no further than the
Setbacks and summary of districts. Applies only in Residential, remedy is SEP or remove the
building. On corners, this is especially problematic. Suggest BAR should be allowed to do its job
in overlay districts regarding setbacks as each sub-area of a district is unique and should be
addressed on a case-by-case basis. Suggested language: In ADC/HC/IPP design overlays,
Page 12 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 9 of 19
largest setback in the range. Issue: As stated, this requirement conflicts with summary of districts
and subareas.
minimum and maximum setbacks are determined by BAR review using the City's Design
Guidelines per 2.10.9.3.a.3
ADC.9 2-84;2-
90
2.9.2.C.3/
2.9.3.B/
2.9.4.E
Clarity is needed/redefine “contributing structures”. 1)Refer to maps in Design Guidelines 2) Add language: Unless designated by Council no
structure less than 50 years old shall be a contributing structure. (This would alleviate BAR
review for demolitions of recent/modern buildings within an ADC/HC/IPP districts.) 3.
Alternately, work towards automatically identifying any building 100 years old as contributing
(formerly the City’s process, especially for IPP designations).
ADC.10 5-32 5.2.7.E Period of Validity, refine language; an update may be necessary regarding City Council’s or a court’s
approval. (Is that approval a CoA, and does it have a period of validity?)
See language from City Attorney's Office; update pending.
ADC.11 5-34 5.2.8 There is no Period of Validity for Entrance Corridor CoAs. See language from City Attorney's Office; insert new section as in 5.2.7.E
ADC.12 5-28 5.2.7.C City Council may approve a CoA. There is no provision in this section. Insert 5.2.7.C.3 City Council Review. Staff note: Also look at where "Must Approve" is
mentioned.
ADC.13 2-85 2.9.3/2.9.2 Naming conventions: Individually Protected Properties (-IPP); Architectural Design Control District
(-ADC). Within the IPP section there is no reference to the ADC District Design Guidelines.
Suggest referring to IPPs as Minor ADC Districts (and ADC Districts as Major ADC Districts), to
imply application of the ADC District Design Guidelines under 2.9.3.D
ADC.14 2-85 2.9.3.B Established Individually Protected Properties – the current table of IPPs should reflect recent
updates.
1)Update IPP table to match City Council Adoption in 2023; 2)Update IPP table to include 801
West Street (pending CC ZTA/ZMA on CC Agenda July 20)
ADC.15 2-85 2.9.3 The current TMP and Zoning Map designations for the IPPs are missing important historical
context; there should be definitions for what the overlay applies to. Example: where a “(portion)”
of a parcel is being referenced within the IPP table.
Historic documents (deeds, plats, etc.) along with the CC Resolution of Adoption should be
referenced as the definitive source of the IPP overlay. Methodologies and recordation
technologies advance, therefore the Zoning Map Overlay layers evolve, especially when parcel
data is updated. Defining the boundary as TMP on day of adoption (or similar), with reference
to NDS archives (as primary source documentation) should alleviate questions and concerns
when the Overlay and TMP do not exactly align, or where gaps or excluded portions exist.
ADC.16 2-125 2.10.9.A.3.a.ii In Downtown Mixed Use (DX), where the BAR has authority, the maximum height is determined
based on BAR review using their design guidelines. In areas outside of BAR authority, the maximum
height is determined by the maximum number of stories and feet allowed by the zoning district.
Issue: refine reference to the Design Guidelines; clarify intent.
Change “their design guidelines” to City Council’s adopted ADC District Design Guidelines.
Building height: Areas outside of BAR authority. This was intended to state heights in an EC
cannot be reduced by ERB. Is this intent clear?
ADC.17 5-7 5.1.5.B.5.c-d Composition (BAR seats) c. 2 owners of businesses or commercial property...; 1 owner of
residential property...
Is it necessary to clarify if these criteria include condominiums within a building?
ADC.18 The definition of expansions complicates development review applications for historic structures. See Preservation & Design Planner notes regarding expansions and project activities.
ADC.19
ADC.20
ADC.21
ADC.22
Department of Utilities
Util 1. 4.6.3.A Refers to Standards and Design Manual (SADM) but should also reference the SADM “and
Appendices.”
Util 2. 4.6.3.C Consider clearing up “public service line” to the “public portion of the utility extensions.”
Util 3. 4.6.5 Add a statement like 4.6.3 A to this section that references SADM and Appendices, and easements
for public stormwater systems as well.
Util 4. 4.6.7 First sentence, add Sanitary Sewer and Storm Sewer.
4.6.7 C, add Sanitary Sewer and Storm Sewer.
4.6.7 E convey easements
• Add the project developer must convey easements to #3
• the City for public utilities to serve sublot as defined in Dev Code
• Add the project developer must convey easements to #4
• private property owners, and/or common interest communities being served.
Page 13 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 10 of 19
Util 5. 6.1.2.B o Standards and Design Manual add “and Appendices”
o Utilities’ standard drawings should also be referenced.
Util 6. 6.1.4 • Off-site improvement contributions (further legal review and discussion)
o As it reads, the developer pays the City to make the improvements, but there are
issues with this precedence. This obligates City resources to make improvements
for private development. Theres a timing issue with this too, if we go too early and
the development fails, or the developer moves too quickly, and we can’t meet their
timeline. Also, developer plans change too frequently to comport with City design,
bidding, and contracting processes to complete work.
▪ SADM Appendix Part 3.01 A6 says offsite changes must be considered to
serve the entire watershed of the subdivision or development.
o The developer should be responsible for the offsite improvements necessary, and
the City can contribute to betterments, if we deem the betterments necessary.
▪ Sewer and Water Capacity models will be developed by the end of the year
and will provide guidance when off-site improvement may be necessary to
support the added demands.
o Further review of State Code
▪ § 15.2-2243. Payment by subdivider of the pro rata share of the cost of
certain facilities.
▪ How the state code interacts with off-site requirements needs some more
consideration and what obligations could be.
▪ We should have legal review of the State code as part of these discussions.
o Do we have any City ordinances already about offsite development and costs to
the developer or City?
▪ Do we need develop an ordinance or can we write it in the code at this Tier
level for code cleanup? Could these obligations require a public hearing
over a code cleanup?
o Should gas be mentioned in this section.
▪ Developer would not install but would reimburse the City to install gas
services if part of the development needs.
Util 7. 6.1.5.B • “sewerage system”, is inconsistent language with other areas. Please use Sanitary Sewer
and Storm Sewer
• What is a “public access street”, no definitions for this term?
Util 8. 6.1.5.C • Change Certificate to “Certification” of Completion (CoC) is for Utilities, what do streets
use?
• Consider rewording to reference Utilities only with the CoC
Util 9. 6.2.1.B • Permanent Access Easement also needs to include permanent water and sewer easement
at the very least. This could create islands where the back lot wants to develop first but
can’t get an easement sorted out with the lots in front and prevent access to water and
sewer and future occupancy. This would render the lot undevelopable if water and sewer
cannot be provided due to adjacent landowners that may not have been aware that their
lot needed to provide someone with sewer and water access.
Page 14 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 11 of 19
• Water and sewer easements are mentioned in 6.2.2 A 2, but it doesn’t designate it as
Permanent or requirement for the sublot.
Util 10. 6.2.2.A • #1 add “whether immediately proposed or necessary for adequate service in the future”
• Doesn’t specify gas currently. Needs to add Gas Service to easements.
• Does not currently specify public or private storm drainage facilities.
Util 11. 6.2.2.B Something to reflect access within the easement should be added
Util 12. 6.6.1.A “sewerage system”, is inconsistent language with other areas. Please use Sanitary Sewer and
Storm Sewer
Util 13. 6.6.1.B This should include Gas easements.
Util 14. 6.6.1.B.3 • Our understanding is after the Subdivision Plat is complete there will not be a Final Plat.
Currently, the deeds are being written along with the Subdivision Plat and recorded as part
of site plan approval processes.
• Do we expect to see Final Plats? How or when does this current language become
applicable?
Util 15. 6.6.1.C.1 This should be clarified to make the distinction between required “private” infrastructure and
“public” infrastructure that is necessary to drain ROW and/or public property. The ownership and
maintenance responsibility needs to be clarified in the easement language and noted on the plat.
Util 16. 6.6.1.C.2 • We have not been recording easements along streams since I have been here. We like this
requirement but are not sure how to implement, or to what extent along the stream the
easement would/should cover. Consider further discussion with Dan Frisbee and Brennen
Duncan.
• This should be expanded to clarify ownership and maintenance responsibilities. The
easement should be for city access, inspection and possible reconstruction. Long term day
to day maintenance should be the property owner’s responsibility. This and 6.6.1(C)(3)
should be worded to be in line with each other. Ownership and maintenance are also
referenced in 6.6.1(C)(6). All three should support each other.
Util 17. 6.6.1.C.6 • Our understanding is after the Subdivision Plat is complete there will not be a Final Plat.
Currently, the deeds are being written along with the Subdivision Plat and recorded as part
of site plan approval processes.
• Do we expect to see Final Plats? How or when does this current language become
applicable?
Util 18. 6.6.2 “Semipublic” is not a defined term. Please define or reword this.
Util 19. 6.6.4 • Needs cleaned up.
• Better reference to acceptance process.
• Gas is not mentioned.
Util 20. 6.7 • Plats and processes could use more direction.
• Permit portal has 5 different types of plats that can be submitted.
Planning Commission
Number Page Section Notes Staff Notes
D.1. 4-18 4.4.5.A.3 Before the code was approved, I had asked James what happens if you can’t fit the required greenscape and walk zones in
the right of way, and my understanding was that the building setbacks would be moved back to allow for them to be
installed. For example, if you have a maximum setback of 10’, and due to site constraints, the streetscape can’t fit, that
maximum setback would be moved back enough to allow it to fit. That’s how I interpret section 4.4.5.A.3. “When there is
not enough room in the public right of way for the required streetscape, the clear walk zone and greenscape zone must be
provided on-site as a permanent public access easement.” Are we enforcing this? In preliminary discussions with applicants
After reviewing with staff and the code. This interpretation is correct
and has been utilized by Planning staff. Other types of easements
such as utilities is not contemplated in the code but is being
addressed with this batch of amendments.
Page 15 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 12 of 19
to the BAR, we’ve had some say they spoke to staff and are unable to provide the required street trees because of the
maximum setbacks.
D.2. Doors swinging over the ROW. The building code actually prohibits this, but there have been instances where it has been
excused by our code officials because there’s not life safety issue. Can we add to the zoning code that doors should not swing
over the public sidewalk?
2/10/26: PC Chair would like this not to happen, but not a priority to the PC. No movement at this time.
D.3. Definition of an entry: I think you all are on this after the apartment project at 1609 Gordon Ave. Does an entrance have to
open to an active space? Should it be allowed to go to a garage, internal courtyard, or exterior stair? We should add some
clarity to the code on this.
2.10.13 Entrances (page 2-148) The Street-Facing Entry Spacing
states “A maximum distance between street-facing doors providing
access from the public realm to the interior of a building.” For this
project (RX-5) the code requires an “Entry Feature” and “A street
facing entry every 40’ or 60’ depending on the type of street. This
section of the code is very confusing and convoluted. It would need a
lot of thought and work. Alternate Viewpoint: Can we discuss the
intent of this provision? Why is this a requirement? Does an
entrance have to open onto an empty space? It seems to add a layer
of red tape, and is unnecessary aesthetically. Single use buildings
have controlled access. We want to avoid false elements in design.
Garden apartments should not have an entrance every x amount of
feet... they are designed as a one entrance plaza.
D.4. Active Depth – this seems to keep coming up as preventing buildings from providing internal parking. Is it too deep? Do we
need to consider some exceptions or methods for providing internal parking?
D.5. 2-132 2.10.10.A.5 2.10.10.A.5: Building Width Exception. “The depth of the open space must be at least equal to the width of the open space
or 30’, whichever is less.” I propose reducing that minimum depth to 25’. A building built over a parking garage is 60’ wide
(1’+18’+22’+18’+1’). If you have a double-loaded corridor building above the parking garage, a 30’ deep open space will cut
into the corridor. The depth should be no deeper than an apartment depth.
2/10/26: PC wants this on Tier 2. Moved to B.18.
D.6. Ground floor definitions seem to keep tripping people up on sloping sites. Are ours too strict?
D.7. 4-31 4.5.3.D.1.a.vii Driveway widths – there seem to be no regulations for driveway widths for single family and duplex lots. 4.5.3.D.1.vii seems
to show maximum widths, but I understand that staff interprets the code as there being no maximum width for single family
or duplex parcels.
Staff does enforce this requirement. The issue can arise from the
fact that “parking” space are not defined for any lot with less than
6 spaces.
D.8. Fences vs guardrails (I assume you all are already on this).
D.9. Existing buildings under BAR review – what changes are allowed: There seems to be a debate about the level to which
contributing buildings in ADCDs are subject to the zoning code. Under the nonconformities section 5.3.3.B.2:
“If the nonconforming structure to be expanded is also a contributing structure in an ADC District or HC District, or an
Individually Protected Property, then that structure is not required to meet any development standard that would require
modification of the structure itself, and the Board of Architectural Review must approve a Certificate of Appropriateness for
the proposed expansion.”
I read that section as saying that if you add onto a contributing structure, the existing structure doesn’t need to be modified
to meet the zoning code. In a couple of cases, it appears that staff has interpreted that as saying that the existing building
can also be modified in ways that are counter to the zoning code. This could be making it less compliant with transparency
requirements by removing windows or removing required entry features for instance. Can we clarify exactly what is allowed
to happen when a non-conforming contributing structure is modified and/or added onto?
Please let the BAR do their job. Nonconformities are linked in part
to our comments under C.25… we believe this is more of a concern
related to BAR and limited authority to address height in some
locations. (And we have a mechanism for that with very clear
instructions.)
D.10. See B.1: Side lot line (min) 4’
(R-A, RN-A, R-B, and R-C). This section is preventing single-family attached style housing on abutting Zoning lots.
May 27, 2025, PC work session: PC does not like the Alternate Form approach and finds that it could be cumbersome. Staff
will keep this in mind but is still focused on the Alternate Form as the best solution.
Page 16 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 13 of 19
D.11. See A.70: Existing structure preservation bonus does not specify a timeframe to qualify as an existing structure.
Moved by PC to Tire 2 (from Tire 3) at the May 27, 2025 Work Session. They want to use CodeStudio date of the code
adoption as the preservation date.
Remove preservation from the document (substitute as existing
structure retention bonus?) Utilize language consistent with the
profession; NRHP guidance is at least 50 years of age.
D.12. See B.6: Nothing in the new code provides details on a sight distance triangle.
May 27, 2025 Planning Commission Work Session: This needs more study as PC would not want VDOT regs as it would create
too large of a triangle.
D.13. See B.4: Lots with 1 dwelling unit do not have to provide street-facing entries.
May 27, 2025, Planning Commission Work Session: PC does not see this as an issue and suggests something more in line with
a street facing feature and not a entry.
Staff originally placed this on the list to highlight that “lots” with
only one dwelling do not need a street-facing entry. This is
regardless of Zoning District and a little ambiguous. Is this stating
that a lot with a commercial building AND one dwelling unit would
not need a street-facing entry? Staff may suggest:
“Lots in the R-A, RN-A, R-B, and R-C Zoning Districts do not have to
provide street-facing entries on a single unit residential dwelling
provided no additional dwellings or uses are provided.”
D.14. See B.13: Vehicle Access.
May 27, 2025, Planning Commission Work Session: PC does not see an issue with what is in the Development Code, and it
should not be changed to satisfy PWE or Fire.
D.15. See B.15: This section is only about Unit Bonus allowances in residential districts, but R-C also has a Height Bonus which is
not detailed.
May 27, 2025, Planning Commission Work Session: PC did not think the 50% AMI should apply and that this section is not in
line with the intent of the code.
D.16. See B.27: Canopy set at 10 years
May 27, 2025, Planning Commission Work Session: PC brought this up, but only acknowledged it was an issue with no more
explanation.
D.17. See C.11: A Special Exception Permits may be granted for physical dimensional standards described in the following
Division... needs revision to account for the determination that parking location and other potential locations are permitted
modifications allowed under SEP .
May 27, 2025, Planning Commission Work Session: PC did not feel removing or adjusting the SEP is appropriate at this time.
D.18. See B.14: Fence. A constructed vertical barrier of wood, masonry, wire, metal, or other manufactured material, or
combination of materials erected to enclose, screen, or separate areas. A fence differs from a wall in not having a solid
foundation along its entire length.
May 27, 2025, Planning Commission Work Session: PC thinks we could exclude guardrails or measure fence from floor
surface and allow 42-inch everywhere (should satisfy ABC). Also guardrail on a wall is exempt, use for elevated surfaces as
well (café example, elevated deck). B.17- confusing. There seems to be some standard that needs to apply. B.21- Fence type
x, think its about storage fencing? Or is this supposed to be landscape/transition requirement instead?
D.19. See B.17: Where existing streetscapes are determined to be in good condition by the Administrator, they may be used to
comply with clear walk zone and greenscape zone requirements provided they comply with all standards in this Division.
May 27, 2025, Planning Commission Work Session: PC found this language to be confusing and believes there needs to be a
standard.
D.20. See B.21: Fence Type X
May 27, 2025, Planning Commission Work Session: PC is not sure what this is for, fencing for storage, or for landscaping and
transition requirements.
D.21. See B.26: No building located on a lot may be wider than the maximum building width allowed by the zoning district.
May 27, 2025, Planning Commission Work Session: PC recommended requiring the owner to rezone the lots into one zoning
designation.
D.22. See B.5: At the November 12, 2026 PC work session, the PC wanted to add this (allowing more primary buildings on a lot
without first bringing it up to conformity in regards to Build-to) to a the list to look at in the future.
Page 17 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 14 of 19
D.23. 11/12/25 PC Work Session: PC would like to look into this more as active space and active depth created a lot of conversation
(with a lot of it around the term “hall”). For now PC is okay with staff language, but they would like to revisit the concept and
where is should be used. (B.24)
D.24. 1/12/26: PC Chair would like to look into more opportunities to find existing structures “in compliance” when it comes to
build-to and setbacks. This came out of B.38 which states “When permitted by the Zoning District, a project eligible for the
Existing Structure Preservation Bonus for density will be deemed to comply with the Building Setback requirements.” And
“When permitted by the Zoning District, a project utilizing the Existing Structure. Preservation Bonus for density will be
deemed to comply with the Build-To requirements.” The Chair would like to see this expanded to the Design Control Districts.
D.25. 6/23/26: Evergreen Builders – Building width requirements can conflict with Build-to requirements.
D.26. 6/23/26: Gennie Keller – Reminder that Historic Preservation is part of Development. R-B is confusing and scattered
throughout the City and might not make sense.
D.27. 6/23/26: Neil Williamson - Affordable units should be for 30-years and not 99-years. SWM regulations need to go from 6,000
SF to 10,000 SF.
D.28. 6/23/26: Nicole Scro – Sublots should be allowed in the Corridor Districts (X) districts. Development review needs to be
predictable. Need reasonable easement requirements for things like utilities (current requirements call for too large of
easements). Front yard parking regulations should be relaxed.
D.29. 6/23/26: Valerie Long – Development Plans should not require a CoA. That should come during Final Site Plan approval.
D.30.
D.31.
D.32.
D.33.
D.34.
D.35.
D.36.
D.37.
D.38.
Tree Commission
Number Page Section Notes Staff Notes
E.1. Incentives for Tree Preservation - Reevaluate the city's current incentive structure for tree preservation to reward developers
who retain healthy, large trees on-site and to ensure that preservation of mature trees is seen not as an obstacle but as a
shared value and goal. The current incentive structure—where existing trees are allowed to contribute 1.50-4x canopy area
toward meeting minimum canopy requirements—is not effective at promoting overall tree canopy cover in the city. Consider,
for example, an incentive structure to reduce or waive stormwater fees as an incentive to preserve mature trees.
E.2. Bonds for Existing Plantings - Expand circumstances for when a bond is required to cover existing trees indicated for
preservation in site plans for 1 year after the completion of construction (see the cities of Falls Church, Fairfax, and Vienna for
precedents).
E.3. Tree Preservation Plans - Further define the existing preservation plan requirements to include tree canopies, trunks, critical
root zones, and tree protection measures drawn to scale (reference “Best Management Practices for Tree Preservation,
Transplanting, Removal, and Replacement”). Support a second Urban Forester position focused on plan review and
enforcement of preservation plans.
E.4.
E.5.
E.6.
E.7.
Page 18 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 15 of 19
EV Charging Plan
Number Page Section Notes Staff Notes
F.1 What: The City can make several changes to the current zoning ordinance to streamline the EV charger permitting process. It
can permit chargers as an allowable accessory use to parking lots in all zoning districts for both private and public charging.
Why: Public charging stations are accessory use in most instances. However, land use and zoning codes often do not
reference or properly categorize EVSE. Subjecting EV charger applications to a conditional or special use permit process
requiring additional approvals can add significant staff time to projects and create delays. Explicit directives can increase
efficiency to the process by which new EV charging infrastructure can be approved. Providing this information to the public
will not only clarify whether a type of charger can be installed but also show that the City supports public EV charging.
How: The City can amend Charlottesville Development Code Div. 3.5. Accessory Uses and Structures to establish
requirements concerning the siting of EV charging systems for Level 1 and Level 2 charging. The City can codify in the zoning
ordinance that EV charging stations are allowed by right in parking lots as an accessory use across residential, commercial,
industrial, and other major zoning categories. For DCFC installations, the City may wish to adopt specific provisions, explicitly
detailing when EV charging is considered a primary use.
The City may require that EV charging in City historic districts, architectural control districts (Figure 41), and entrance
corridors be conditional on a Certificate of Appropriateness to ensure that infrastructure additions, landscaping, and related
elements will complement the existing area. Providing specific guidance about what types of charging installations the City
permits in these zones and any project criteria will aid installation projects and preserve the character of protected areas.
See the CV Charging Plan and look at the City of Fairfax Link to
what they are doing
F.2
F.3
F.4
Builders and Developers
Number Page Section Notes Staff Notes
G.1 2-101 2.10.1.F Kevin Riddle: On a project at Cabell Avenue, we encountered a question about ground story interpretation. (See the attached
PDF for a graphic.)
A question arose about which building level should be classified as the ground level. The doors at the top of the metal stairs
are too far above grade— over 6 feet— to count as the ground story. So I determined the level below— accessed from the
terrace at the 994’ elevation— should be the ground story. Our architecture and civil engineering team debated this. Some
people read the Code to say that the lowest allowable floor elevation in RX-5 is 0’ above existing grade. I argued that it
should be interpreted as 0’ above finished grade, based on the language in Division 2.10.1.F.1.a and 2.10.1.F.1.b. (page 2-
101). I think the confusion arose in part because the supporting graphic in this section refers to existing grade. It’s in a very
small font, but it’s there, and it appears to conflict with the superseding language in the Code’s text.
(As an aside, I realize that the use of finished grade to define ground story could conceivably allow a strange— and typically
undesirable— scenario where finished grade at building face is very far below the adjacent right-of-way. I think, however,
such a scenario is exceedingly unlikely, because almost no owner would gain anything by creating this condition… and the
obvious downside of using existing grade at building face to define ground story in a hilly town like ours would be the far
more common scenario of a parcel where grade rises from the street: if an owner modified existing grade down to make a
front door accessible to a disabled resident, the ground floor would be out of compliance— more than 0’ below existing
grade. To instead locate the ground floor elevation at 0’ or higher above existing grade would create the need to ramp up to
the front door, which in many situations would be a significant burden, especially where a building face is very close to the
sidewalk. Allowing residents to define ground stories based on modified— ie, finished— grades seems entirely reasonable.)
Long story short, I assume the Code should be edited so the notes on the Ground Story graphic read finished grade.
Dannan O’Connell was part of this discussion, if you want to check in with him for his take.
Staff believes this is a Tier 1 (grammatical issue and can be address
with the current round of amendments or in the future). Staff
believes the code is clear that words outweighs graphical
information per section XXX
Page 19 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 16 of 19
(by email)
6/16/2026: Moved to A.12 as a graphic update.
G.2 2-132K 2.10.10.A.5 Kevin Riddle: We’ve studied several projects recently where new development is being considered on a parcel— or parcels--
that make up an entire block. In these cases, a single building may have streets on four sides, and all four sides are longer
than the building width maximum. In such a case, should one open space exception (page 2-132) be allowed on each street
face of the building rather just one exception for the entire building? With only one exception per building, as the Code
currently prescribes, an owner would have to separate one building into multiple buildings. While there may be upsides to
multiple buildings, it’s not obvious that a single building with nice fenestration, massing, materials, etc… would be worse than
multiple buildings… and wouldn’t multiple open space exceptions safeguard against a perception of a building looking too
massive?
(by email)
Staff does not believe this is an issue and the intent of the code is
to require developers to shrink their developments or to provide
new streets or other elements to breakup large projects. More
consideration may we warranted, but this would need to be a Tier
3 discussion.
G.3 Bicycle parking regulations need to be looked at. Currently the code calls form a lot of bicycle parking in areas that are not
bike friendly
(October 14, PC work session)
G.4 BAR is an issue and does not work with by-right. Active depth is an issue as although parking is not required, it is needed due
to financing. Administrative Modification need to be made larger (more than 10%). If you want more housing it needs to be
easy as posable and very standard. Developers need to know what they can do. Take away BAR authority and make as much
as possible not go to PC or CC.
(October 14, PC work session)
G.5 The code is too complicated. We need to think more about what lots are left in the City for development. Stormwater
regulations ae an issue and the affordability regulations need to be looked at on a yearly basis so they can be adjusted based
on real world changes.
(October 14, PC work session)
G.6 Max coverage regulations and max heights are an issue. Although parking is not required it is an issue for small lots as people
(Habitat) will have cars. Think about bringing back allowing front facing garages.
(October 14, PC work session)
2/10/26: More study is needed, but not at this time. Max coverage is an issue.
staff believes the max height issue will be resolved with the current
round of amendments).
G.7 From a Historic Preservation perspective, make existing buildings in the Historic District conforming. This would help with
preventing teardowns.
(October 14, PC work session)
This could be something to look at. Staff is already proposing that if
someone is using the “existing structure preservation” allowance,
things like build-to and setbacks are “conforming”. This could be
looked at for something broader in the Historic districts.
G.8 Changing the zoning along West Main to CX-3. Remove the pay for affordable housing and provide affordable within student
housing buildings.
(October 14, PC work session)
G.9 Up the amount of disturbed area for stormwater from 6,000 to 10,000. Change the major SD. Change the inclusionary
requirements. What we have is not working.
(October 14, PC work session)
2/10/26: This is being studied as part of Long Range Planning Environmental Study.
Under the current code we do not have major and minor SDs. We
only have SDs and staff is recommending a new application for
Sublots.
G.10 Look at adjusting the required AMI for affordable units and base it off the Zoning district and not uniformly across the City.
(October 14, PC work session)
G.11 Reevaluate the “activities” sections (i.e. New Construction, Addition, Site Modification…) to allow small changes to a site
without going through full Development Review.
(October 14, PC work session)
Staff is already proposing a process that will allow small changes
(below the threshold of Minor Site Plans) to be exempt from
Development Review through a code amendment to 34-5.2.9
G.12 The Building Code needs to be changed. When you do over 2 units it is now commercial and not residential. The Zoning code
is no longer the issue, and it is the Building Code.
(October 14, PC work session)
Page 20 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 17 of 19
G.13 We are a hilly City and that is not reflected in the code. 40’ requirement for entrances is an issue. Build-to requirement is for
partial blooks and not a development that is taking up the full block.
(October 14, PC work session)
G.14 Build-to width is creating a lot of issues. Utility requirements is a big issue as it takes away from what can be done with
sublots.
(October 14, PC work session)
2/10/26: This is creating a lot of issues, and we need to find a way to allow administrative relief. PC moved to Tier 3 (C.23).
G.15 1.1.6.C Effect
of Prior Code
1.1.7
Severability
In light of the issues with the ongoing lawsuit it seems like changing this section of the code to have a better fall back plan
would be prudent. I recognize that the ab initio judgement would not have been alleviated by an improved version of this
section, but it could help with issues in the future.
Allow the prior code to exist as a fall back and/or provide an expedited path to a special use permit for projects that are
under review and are impacted by judgements. If code readoption is required consider adopting on a district by district basis
rather than all at once
Dan Bracey – Two Street Studio October 2025
G.16 2.10.6 /
2.10.7
Build-to &
setbacks
Interactions with minimum primary street build-to widths and transition setbacks create undevelopable lots. For example in a
NX lot which has an 85% primary street minimum build to width that has a Type B 15' transition that overlaps with the build
to width, the minimum buildable site must have at least 100' of primary street frontage.
Provide build-to width alleviation for sites where transition setback zones overlap with build-to width zones
Dan Bracey – Two Street Studio October 2025
G.17 2.10.6.5.c.ii
Ped. outdoor
amenity
space
Meeting the 85% lot line or facade perimeter rule for pedestrian outdoor amenity space is very difficult on sites where the
sidewalk and streetscape zone are within the lot boundary.
Clarify or designate that the inner line of the required permanent public access easement for streetscape zones will be
treated as the street lot line for zoning calculations.
Dan Bracey – Two Street Studio October 2025
G.18 2.10.9.4.a.
Ground story
definition
The 6' Min/Max determination for ground story is too limiting for the topography in this area leading to a need to break
larger buildings into many modules which is very inefficient from a construction perspective
Revert to the previous ground story definition of 50% of the floor above/below grade to define ground story or provide
administrative alleviation for larger sites on hills
Dan Bracey – Two Street Studio October 2025
2/10/26: PC believes the terrain of the City needs to be taken into consideration. Not a priority now, but moved to Tier 3
(C.24).
G.19 2.10.10.A.3.b
Building
width
The intent of this section is to "promote fine-grained patterns of development and prevent long (should read "wide")
buildings that are out of context...by breaking wide buildings into multiple, clearly distinguished building widths. The
allowance for buildings to abut, but not share structure or components makes building cost and environmentally efficient
multifamily buildings on large sites very difficult.
175' (RX-3/NX) accommodates only 5-6 units per street facing facade, severely limiting multifamily buildings on some large
sites. 10-12 units per 275' street facing facade in RX-5 and CX is an improvement, but still very limiting on some lots.
Eliminate or increase the width restriction in higher density zonings, provide a path for administrative waiver, or provide a
path for longer buildings with mandated distinct facades
Dan Bracey – Two Street Studio October 2025
G.20 2.10.10.A.5
Open Space
Exception
Active depth requirements still apply to the facade that is pushed back to meet the open space requirement which creates an
issue in a multifamily building with a typical podium or deck wrap plan. Pushing the facade back ~30' would typically expose
either a corridor or a parking structure.
Do not apply the active depth requirements to the facade that is pushed back when using the open space exception.
Dan Bracey – Two Street Studio October 2025
Page 21 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 18 of 19
G.21 2.10.10.B.2
Active depth
and parking
Residential corridors and parking spaces do not meet the requirements of active depth. This makes typical podium or deck
wrap residential layouts very difficult to achieve on most lots that are big enough to support that style of high density
multifamily development.
Provide guidelines for allowable screening systems for parking areas within active depth zones, do not apply active depth to
all stories of primary frontages, or only apply active depth on the primary street frontage.
Dan Bracey – Two Street Studio October 2025
G.22 2.10.11
Ground Story
Height
Required ground story heights in mixed use buildings should be determined based on the predominant use of the building,
e.g. a single commercial frontage in a predominantly residential building should not be required to have a taller ground floor
height.
Change 2.10.11.A.2(b) to define ground story height based on the predominant use of a building.
Dan Bracey – Two Street Studio October 2025
G.23 2.10.11.B
Finished floor
elevation
0' minimum finished floor elevations are extremely limiting on many sites that have significant grade changes or require
vehicular access to garages on the same grade as the residential floors.
Provide negative finish floor elevations for all districts
Dan Bracey – Two Street Studio October 2025
G.24 2.10.13
Entry
requirements
The issues relating to setbacks, streetscape requirements, build-to, and finished floor elevation make it difficult or impossible
to provide access to entries on sites with grade changes along primary facades since there is not enough space to provide the
stairs and/or ramps required to access those entries while meeting build-to width requirements.
Provide alleviation or alternate for additional entries on sites where this is an issue.
Dan Bracey – Two Street Studio October 2025
G.25 3.5.1.b.1
amenity
bldgs as
accessory us
Residential development amenity buildings currently meet the definitions for administrative determination of accessory use,
but are not defined as such
Include residential amenity buildings in the Permitted Use Table
Dan Bracey – Two Street Studio October 2025
G.26 4.2.2.C.1.b.iii
distribution
of affordable
units
In multi-building residential projects, the requirement to evenly distribute affordable dwelling units throughout a project, i.e.
throughout multiple buildings vs centralized in one building, eliminates the ability to utilize funding sources specific to low
income/affordable housing
Allow projects that fit this case to concentrate units in one building, perhaps with stricter equivalency requirements or with
administrative approval.
Dan Bracey – Two Street Studio October 2025
G.27 4.4.5-A (1) /
4.4.5-A (3)
Setbacks,
streetscape,
& build-to
Interactions with primary and side street setbacks and streetscape requirements create situations where build-to
requirements cannot be met. Required streetscape zones occur within the property lines making it impossible or difficult to
meet 15' (RX) and 10' (CX/NX) maximum primary street setbacks.
Clarify or designate that the inner line of the required permanent public access easement for streetscape zones will be
treated as the street lot line for zoning calculations.
Dan Bracey – Two Street Studio October 2025
G.28 4.5.5.B.2
parking
structure
requirements
This states that a parking structure must meet the standards of this Section, however the section includes requirements for
continuous curbs, interior islands every 10 spaces, perimeter landscaping, and landscaping on islands and medians which are
not generally feasible in parking structures.
This is presumably an error that requires a formatting change to this section as parking structures should not and can not be
built with these features.
Dan Bracey – Two Street Studio October 2025
G.29 4.8.2.C.1.c
0' max wall
heights
Retaining walls in yards may not exceed the maximum fence/wall height for the district. Many districts have a 0' maximum
wall height which would make it difficult or impossible to develop sites that are above the grade of the sidewalk.
Provide exception for this case, restrict retaining walls separately from fences and walls, or do not have 0' maximum wall
heights.
Dan Bracey – Two Street Studio October 2025
Page 22 of 78
Development Code Proposed Amendments Working and Tracking Document 2026 (Updated October 13, 2026)
Page 19 of 19
G.30 1. The less certainty, the less development. 2. Not all sites are equal. 3. We only know what we know until we know more. 4.
Time kill deals. 5. Lawsuits are terrible for business. 6. Incentives work. 7. Markets always win out.
Reference Jeff Levien Letter dated October 21, 2025
G.31 Would like to see the idea of expanding Sublots to all Zoning Districts not just R and RN districts.
Nicole Scro (in different meetings through 2025)
G.32
G.33
G.34
G.35
G.36
G.37
G.38
G.39
G.40
G.41
G.42
G.43
G.44
G.45
G.46
G.47
G.48
G.49
G.50
Page 23 of 78
Proposed Amendment
Util.10 & 11 – Easements
Section 34-6.2.2
Page: 6-7 thru 6-8
Amendment Log Util.10 & 11
Existing Language:
6.2.2 Easements
A. Platted easements and deeded easements must be provided in locations and
dimensions required by the City in order to:
1. Allow for adequate storm drainage facilities;
2. Allow for proper installation of water and sewer lines, whether immediately
proposed or necessary for adequate service in the future;
3. Allow for cross-access between properties;
4. Allow for adequate pedestrian and bicycle access;
5. Allow for adequate right-of-way for street types;
6. Allow for adequate public access; and
7. Allow for adequate slope for roadway construction.
B. Easement widths are specified by the Standards and Design Manual as necessary to
accommodate existing and future needs as well as construction and repair of
facilities. For drainage easements, the widths must be sufficient to accommodate
areas anticipated to be inundated by stormwater.
Proposed Language:
6.2.2 Easements
A. Platted easements and deeded easements must clearly identify easement type and
ownership and be provided in locations and dimensions required by the City in order
to:
1. Allow for adequate storm drainage facilities;
2. Allow for proper installation and maintenance of water , sanitary sewer ,
stormwater and gas facilities and sewer lines, whether existing, immediately
proposed or necessary for adequate service in the future;
3. Allow for cross-access between properties;
4. Allow for adequate pedestrian and bicycle access;
5. Allow for adequate right-of-way for street types;
6. Allow for adequate public access; and
7. Allow for adequate slope for roadway construction.
B. Easement widths are specified by the Standards and Design Manual and its
aAppendices as necessary to accommodate existing and future needs as well as
access for maintenance, construction and repair of facilities. For drainage
easements, the widths must be sufficient to accommodate and provide access to
areas anticipated to be inundated by stormwater.
Page 24 of 78
Proposed Amendment
Util.10 & 11 – Easements
Analysis:
The current Development Code lacks clarity and direction on the purpose, uses, ownership
and responsibility related to easements on subdivision plats. The proposed changes to
6.2.2.A provides additional guidance.
6.2.2.A subsections 1 & 2 are proposed to be combined for clarity, and include gas utilities
that were formerly missing so that water, sanitary sewer, stormwater and gas are mentioned
together for consistency with other proposed cleanup of the code.
6.2.2.B proposed language adds reference to the SADM appendices for utilities, and clarifies
the need for access and mentions maintenance along with construction/repair.
Page 25 of 78
Proposed Amendment
Util.12, 13, 15 & 19 – Fees & Dedications
Section 34-6.6
Page: 6-10 thru 6-12
Amendment Log Util.12, 13, 15 & 19
Existing Language:
6.6.1 Dedication of Infrastructure for Public Use
A. A project developer must dedicate to the City for public use every easement and right-
of-way located within the project, which has constructed or proposed to be
constructed any public street, curb, gutter, sidewalk, bicycle trail, drainage or
sewerage system, waterline as part of a public system, or other improvement
dedicated for public use and to be maintained by the City or another public agency,
as follows:
1. The City Council is not required to compensate the project developer for any
dedicated land or improvements.
2. The land and improvements to be dedicated must be set apart on the Final Plat
and must be identified by a note on the plat stating that the land is dedicated
for public use.
3. When a project abuts one side of an existing or platted street, the project
developer must dedicate at least 1/2 of the right-of-way necessary to make the
street comply with the minimum width required for the street as designated in
the Standards and Design Manual.
B. A project developer must dedicate to the City for public use all water and sewerage
facilities designed, constructed and approved to be dedicated as public water and
sewerage systems, and will require each project developer to establish an easement
on the land for such facilities, extending to any abutting property owned by the project
developer, if the facilities are required by this Development Code, as follows:
1. The City Council is not required to compensate the project developer for the
dedicated facilities or the establishment of any easement.
2. The facilities to be dedicated and any easement to be established must be
specifically identified and set apart on the Final Plat and must be identified by
a note on the plat stating that the facilities are dedicated to, and the easement
is established for, the City of Charlottesville.
3. All Final Plats containing proposed public easements must expressly
reference a declaration of the terms and conditions of such public easements
recorded with the subdivision plat in the City’s land records.
C. A project developer must establish easements for facilities for stormwater
management and drainage control, as follows:
Page 26 of 78
Proposed Amendment
Util.12, 13, 15 & 19 – Fees & Dedications
1. An easement for all stormwater management facilities and drainage control
improvements located on the property must be established whenever the
improvement is designed and constructed beyond a street right -of-way or
access easement and must extend from all drainage outfalls to an adequate
channel that satisfies minimum standards established by the Virginia
Department of Environmental Quality or the State Water Control Board, to the
boundary of the property.
2. An easement must be established along every natural stream, natural
drainage area to be preserved, and every man-made waterway located on the
property.
3. The area of each required easement must be sufficient, as determined by the
Subdivision Administrator, to: a.
a. Accommodate the facilities and the drainage characteristics from
each drainage outfall from a drainage control;
b. Allow access to a natural stream or man -made waterway to allow
widening, deepening, relocating, improving, or protecting the natural
stream or man-made waterway for drainage purposes; and
c. Meet applicable standards and requirements set forth within Water
Protection, Chapter 10 of the Code of the City of Charlottesville and the
Standards and Design Manual.
4. Each required easement must include a right of ingress and egress for
installation, maintenance, operation, repair and reconstruction of any
improvement within the easement. The Subdivision Administrator may require
that an easement be provided through abutting land under the same
ownership as the project.
5. The City Council is not required to compensate the project developer for any
easement or any improvements within the easement.
6. All Final Plats containing proposed public easements must expressly
reference a declaration of the terms and conditions of such public easements
recorded with the subdivision plat in the City’s land records.
7. No easement will be considered part of any required street width.
6.6.2 Dedication of Land for Public Use
A project developer may dedicate to the City any land within the project that is suitable for
parks, open space, stormwater management facilities and other public facilities, utilities
and other public or semipublic uses, as follows:
Page 27 of 78
Proposed Amendment
Util.12, 13, 15 & 19 – Fees & Dedications
A. The City Council is not required to compensate the project developer for the land
dedicated if the dedication is a gift, required by a proffer as part of a conditional
rezoning, required as a condition of a special use permit, variance or other approval,
or if the need for the land is substantially generated by the project. The determination
of whether the need for land is substantially generated by the project will be made in
the manner prescribed by 6.6.1. Dedication of Infrastructure for Public Use.
B. Land dedicated under this Section must be set apart on the Final Plat and identified
by a note on the plat stating that the land is dedicated for public use. The proposed
dedication will be subject to review as to consistency with the City’s Comprehensive
Plan, as required by Code of Virginia § 15.2- 2232.
C. A project developer’s proposed dedication of a stormwater management facility must
be reviewed and governed by the provisions of Water Protection, Chapter 10 of the
Code of the City of Charlottesville. No such dedication will be accepted unless and
until the City receives a financial guarantee, in the form of a bond or like surety, in an
amount sufficient for and conditioned upon the construction of such stormwater
management facilities in accordance with the standards and requirements set forth
within Chapter 10 and the Standards and Design Manual.
6.6.3 Reservation of Land
A project developer may reserve for future dedication to the City a part of the property
suitable for parks, schools, open space and other public facilities, utilities and other public
or semipublic uses, as follows:
A. The City Council is not required to compensate the project developer for the
reservation of land if the dedication is a gift, required by a proffer as part of a
conditional Zoning Map Amendment, required as a condition of a Special Use Permit,
Variance, or other approval, or if the need for the land is substantially generated by
the project. The determination of whether the need for land is substantially generated
by the project will be made in the manner prescribed by 6.6.1. Dedication of
Infrastructure for Public Use.
B. Land reserved under this Section must be set apart on the Final Plat and identified by
a note on the plat stating that the land is reserved for future dedication for public use.
C. The project developer may petition the City Council to release a reservation if the land
is not used for a public purpose, using the procedure set forth within Div. 6.7.
Administration.
D. Nothing in this Section precludes land being reserved for a public use which is not
included in the Comprehensive Plan, provided the land is acceptable to the City for
reservation.
Page 28 of 78
Proposed Amendment
Util.12, 13, 15 & 19 – Fees & Dedications
6.6.4 Transfer of Land Ownership
The recording of an approved Final Plat and deed of dedication will transfer dedicated land
and establish certain easements, as follows:
A. Recordation will operate to transfer, in fee simple, to the City that portion of the land
set apart on the plat and dedicated for public use.
B. Recordation will operate to transfer to the City any easement set apart on the plat and
dedicated to public use to create a public right of passage over the property.
C. Recordation will operate to transfer to the City, in fee simple, the water and sewer
facilities, and related easements, set apart on the plat and dedicated for public use.
D. Recordation will operate to terminate and extinguish all rights-of-way, easements or
other interests of the City in the property not shown on the plat, except that an interest
acquired by the City by eminent domain, by purchase for valuable consideration and
evidenced by a separate instrument of record, or streets, alleys or easements for
public passage subject to the provisions of the Code of Virginia § 15.2-2271 or 2272.
E. Recordation will not constitute acceptance of any improvement by the City.
Page 29 of 78
Proposed Amendment
Util.12, 13, 15 & 19 – Fees & Dedications
Proposed Language:
6.6.1 Dedication of Infrastructure for Public Use
A. A project developer must dedicate to the City for public use every easement and right-
of-way located within the project, which has constructed or proposed to be
constructed any public street, curb, gutter, sidewalk, bicycle trail, drainage or
sewerage system, waterline as part of a public system, or other improvement
dedicated for public use and to be maintained by the City or another public agency,
as follows:
1. The City Council is not required to compensate the project developer for any
dedicated land or improvements.
2. The land, easements, and improvements to be dedicated must be set apart on
the Final Plat and must be identified by a note on the plat stating that the land,
easement and/or improvement is dedicated for public use.
3. When a project abuts one side of an existing or platted street, the project
developer must dedicate at least 1/2 of the right-of-way necessary to make the
street comply with the minimum width required for the street as designated in
the Standards and Design Manual and Appendices.
B. A project developer must dedicate to the City for public use all water and sewerage
facilities water, sanitary sewer, stormwater and gas facilities designed, constructed
and approved to be dedicated for public ownership as public water and sewerage
systems, and will require each project developer to establish an easement on the
land for such facilities, extending to any abutting property owned by the project
developer, if the facilities are required by this Development Code, as follows:
1. The City Council is not required to compensate the project developer for the
dedicated facilities or the establishment of any easement.
2. The facilities to be dedicated and any easement to be established must be
specifically identified and set apart on the Final Plat and must be identified by
a note on the plat stating that the facilities are dedicated to, and the easement
is established for, the City of Charlottesville.
3. Each required easement must include a right of ingress and egress for
installation, maintenance, operation, repair and reconstruction of public
utility facilities within the easement.
4. All Final Plats containing proposed public easements must expressly
reference a declaration of the terms and conditions of such public easements
recorded with the subdivision plat in the City’s land records.
5. A project developer’s proposed dedication of public utility facilities for public
ownership must be reviewed and governed by the provisions of Utilities,
Chapter 31 of the Code of the City of Charlottesville. No such dedication will
be accepted unless and until the City receives a financial guarantee, in the
Page 30 of 78
Proposed Amendment
Util.12, 13, 15 & 19 – Fees & Dedications
form of a bond or like surety, in an amount sufficient for and conditioned upon
the construction of such public utility facilities in accordance with the
standards and requirements set forth within Chapter 31 and the Standards
and Design Manual and its aAppendices.
C. A project developer must establish easements for facilities for stormwater
management and drainage control, as follows:
(add the following after subsection 7)
8. A project developer’s proposed dedication of a stormwater management
facility for public ownership must be reviewed and governed by the provisions
of Water Protection, Chapter 10 of the Code of the City of Charlottesville. No
such dedication will be accepted unless and until the City receives a financial
guarantee, in the form of a bond or like surety, in an amount sufficient for and
conditioned upon the construction of such stormwater management facilities
in accordance with the standards and requirements set forth within Chapter
10 and the Standards and Design Manual and Appendices.
6.6.2 Dedication of Land for Public Use
A project developer may dedicate to the City any land within the project that is suitable for
parks, open space, utilities, stormwater management facilities, and other public facilities,
utilities and other public or semipublic uses in a manner consistent with 6.6.1. Dedication
of Infrastructure for Public Use, as follows:
A. The City Council is not required to compensate the project developer for the land
dedicated if the dedication is a gift, required by a proffer as part of a conditional
rezoning, required as a condition of a special use permit, variance or other approval,
or if the need for the land is substantially generated by the project. The determination
of whether the need for land is substantially generated by the project will be made in
the manner prescribed by 6.6.1. Dedication of Infrastructure for Public Use.
B. Land dedicated under this Section must be set apart on the Final Plat and identified
by a note on the plat stating that the land is dedicated for public use. The proposed
dedication will be subject to review as to consistency with the City’s Comprehensive
Plan, as required by Code of Virginia § 15.2- 2232.
C. A project developer’s proposed dedication of a stormwater management facility must
be reviewed and governed by the provisions of Water Protection, Chapter 10 of the
Code of the City of Charlottesville. No such dedication will be accepted unless and
until the City receives a financial guarantee, in the form of a bond or like surety, in an
amount sufficient for and conditioned upon the construction of such stormwater
management facilities in accordance with the standards and requirements set forth
within Chapter 10 and the Standards and Design Manual.
Page 31 of 78
Proposed Amendment
Util.12, 13, 15 & 19 – Fees & Dedications
6.6.3 Reservation of Land
A project developer may reserve for future dedication to the City a part of the property
suitable for parks, schools, open space , utilities, and other public facilities, utilities and
other public or semipublic uses in a manner consistent with 6.6.1. Dedication of
Infrastructure for Public Use, as follows:
A. The City Council is not required to compensate the project developer for the
reservation of land if the dedication is a gift, required by a proffer as part of a
conditional Zoning Map Amendment, required as a condition of a Special Use Permit,
Variance, or other approval, or if the need for the land is substantially generated by
the project. The determination of whether the need for land is substantially generated
by the project will be made in the manner prescribed by 6.6.1. Dedication of
Infrastructure for Public Use.
B. Land reserved under this Section must be set apart on the Final Plat and identified by
a note on the plat stating that the land is reserved for future dedication for public use.
C. The project developer may petition the City Council to release a reservation if the land
is not used for a public purpose, using the procedure set forth within Div. 6.7.
Administration.
D. Nothing in this Section precludes land being reserved for a public use which is not
included in the Comprehensive Plan, provided the land is acceptable to the City for
reservation.
6.6.4 Transfer of Land Ownership
The recording of an approved Final Plat and deed of dedication will transfer dedicated land
and establish certain easements, as follows:
A. Recordation will operate to transfer, in fee simple, to the City that portion of the land
set apart on the plat and dedicated for public use.
B. Recordation will operate to transfer to the City any easement set apart on the plat and
dedicated to public use to create a public right of passage over the property.
C. Recordation will operate to transfer to the City any easement set apart on the plat for
water, sanitary sewer, stormwater and gas facilities that are dedicated for public
ownership.
D. Recordation will operate to terminate and extinguish all rights-of-way, easements or
other interests of the City in the property not shown on the plat, except that an interest
acquired by the City by eminent domain, by purchase for valuable consideration and
evidenced by a separate instrument of record, or streets, alleys or easements for
public passage subject to the provisions of the Code of Virginia § 15.2-2271 or 2272.
E. Recordation will not constitute acceptance of any improvement by the City.
Page 32 of 78
Proposed Amendment
Util.12, 13, 15 & 19 – Fees & Dedications
Analysis:
The current Development Code is inconsistent in its references & requirements regarding
public utility infrastructure (and other public uses/improvements) throughout this section:
In 6.6.1.A, references to utilities are removed since they are already covered in 6.6.1.B. In
the subsequent terms, references to land, easements and improvements are updated for
consistency throughout.
In 6.6.1.B, the specific types of public utilities are clarified and expanded to include
stormwater and gas. In the subsequent terms, additions are made for (#3) describing the
requirements of the utility easements is added as item 3, which mirrors 6.6.1.C.4, and (#5)
outlining provisions for the dedication of public utility facilities referencing City Code, the
SADM and its appendices.
In 6.6.1.C, the provisions for the dedication of stormwater management facilities is moved
from 6.6.2.C (which concerns dedication of land) into th is section (#8) which is more
applicable (dedication of improvements).
In 6.6.2 and 6.6.3, the list of public uses is revised for clarity. Also, reference is made back to
6.6.1.
In 6.6.4, the proposed language clarifies that only the easements associated with utilities to
be owned & operated by the City (and not the facilities that will be contained within those
easements) are to be transferred to the City along with recordation of a plat, and removes
the “fee simple” re ference. This removes any potential contradiction with subsection E,
which states that recordation of a plat does not constitute acceptance of any improvement
by the City. The types of public utilities are also clarified and expanded to include stormwater
and gas.
Page 33 of 78
Proposed Amendment
Util.1 through 7 – Language
Section 34-All applicable sections
Page: All applicable pages
Amendment Log Util.1, 2, 3, 4, 5, 7,
General language and references to existing standards:
General language in Chapter 34 references the “Standards and Design Manual” forty-seven
(47) times throughout the document. The SADM also includes important appendices that
provide additional and important details and requirements, but it is frequently mentioned to
review staff that outside consultants were unaware of these Appendices.
Proposed language and references to existing standards:
Update all forty-seven references to the “Standards and Design Manual and Appendices”.
Existing Language:
1.1.3 Purpose and Intent
(E) Facilitate the provision of adequate police and fire protection, disaster evacuation, civil
defense, transportation, water, sewerage, flood protection, schools, parks, forests,
playgrounds, recreational facilities, airports and other public requirements;
Proposed Language:
1.1.3 E Purpose and Intent
(E) Facilitate the provision of adequate police and fire protection, disaster evacuation, civil
defense, transportation, water, sewerage system , sanitary sewer, storm water and gas
facilities, flood protection, schools, parks, forests, playgrounds, recreational facilities,
airports and other public requirements;
Existing Language:
4.6.3 Sanitary Sewer and Water Supply
(C) Public water and sanitary sewer service must be provided to each lot within a project,
consistent with the requirements of Chapter 31, Utilities of the Charlottesville City Code and
the Standards and Design Manual. Such systems must be constructed by t he project
developer to the point at which they will join public service lines. When a project does not
abut a public water or sanitary sewer system or main, the project developer is responsible
for extending the public water or sewer system or main from t he existing location to the
project site, and dedicate the extension of the public service line to the City.
Page 34 of 78
Proposed Amendment
Util.1 through 7 – Language
Proposed Language:
4.6.3 Sanitary Sewer and Water Supply
(C) Public water and sanitary sewer service must be provided to each lot within a project,
consistent with the requirements of Chapter 31, Utilities of the Charlottesville City Code and
the Standards and Design Manual and Appendices. Such systems must be constructed by
the project developer to the point at which they will join public service lines the public
portion of the utility system. When a project does not abut a public water or sanitary sewer
system or main, the project developer is responsible for extending the public water or sewer
system or main from the existing location to the project site, and dedicate the extension of
the public service lines public portion of the utility extensions to the City.
Existing Language:
4.6.7 Underground Utilities
All utilities, including but not limited to wires, cables, pipes, conduits and appurtenant
equipment for electricity, natural gas, water, sewer, telephone or similar service, must be
located within a project as follows:
Proposed Language:
4.6.7 Underground Utilities
All utilities, including but not limited to wires, cables, pipes, conduits and appurtenant
equipment for electricity, natural gas, water, sanitary sewer, stormwater, telephone or
similar service, must be located within a project as follows:
Existing Language:
4.6.7 Underground Utilities
(C) No utility easements or facilities, other than those of City -owned and operated utilities,
may be located within the right-of-way for any public street, except upon the approval by City
Council of a franchise ordinance or public right -of-way use permit or encroachment
agreement. If the project developer desires to construct in, on, under, or adjacent to any
public streets located in the project any natural gas, water, sewer or electric light or power
works, pipes, wires, fixtures or systems, they must present plans or specifications to the City
for approval.
Proposed Language:
4.6.7 Underground Utilities
(C) No utility easements or facilities, other than those of City -owned and operated utilities,
may be located within the right-of-way for any public street, except upon the approval by City
Council of a franchise ordinance or public right -of-way use permit or encroachment
Page 35 of 78
Proposed Amendment
Util.1 through 7 – Language
agreement. If the project developer desires to construct in, on, under, or adjacent to any
public streets located in the project any natural gas, water, sanitary sewer, stormwater,
electric light or power works, pipes, wires, fixtures or systems, they must present plans or
specifications to the City for approval.
Existing Language:
6.1.5 Construction Surety
(B) In either case, prior to issuance of any building permit, and prior to issuance of any permit
authorizing any land disturbing activity within the project, the project developer must provide
a financial performance guarantee for completion of the site -related improvements. Site -
related improvements include any of the following: public street, curb, gutter sidewalk,
bicycle trail, drainage or sewerage system, waterline as part of a public system, or other
improvement dedicated for public use and proposed to be maintained by the City or another
public agency; and other improvements required by this Development Code, and to be
financed by private funds, for: vehicular ingress and egress, including traffic signalization
and control, for public access streets, for structures necessary to ensure stability of critical
slopes, and for stormwater management facilities.
Proposed Language:
6.1.5 Construction Surety
(B) In either case, prior to issuance of any building permit, and prior to issuance of any permit
authorizing any land disturbing activity within the project, the project developer must provide
a financial performance guarantee for completion of the site -related improvements. Site -
related improvements include any of the following : public: street, curb, gutter sidewalk,
bicycle trail, water, sanitary sewer, stormwater, drainage or sewerage system, waterline as
part of a public system, or other improvement dedicated for public use and proposed to be
maintained by the City or another public agency; and other improvements required by this
Development Code, and to be financed by private funds, for: vehicular ingress and egress,
including traffic signalization and control, for public access streets, for structures necessary
to ensure stability of critical slopes, and for stormwater management facilities.
Page 36 of 78
Proposed Amendment
Util.1 through 7 – Language
Analysis:
The current Development Code lacks clarity and consistency with the language referring to
certain utilities and applicable standards. These amendments assure more consistency and
clear references to existing standards and requirements that are often overlooked due to
lack of reference.
Page 37 of 78
Proposed Amendment
Tree Removal Permit
Section 34-5.2.10.A.1
Page: 5-41
Amendment Log A.1
Section 34-5.2.10.A.1
Existing Language:
Tree Removal Permit. Applies to all properties and is required prior to the removal of any
tree with a diameter breast height (DBH) of 8 inches or more in accordance with 4.9.1. Tree
Preservation and Replacement
a. Trees of any size determined to be dead, dying, or hazardous by the Administrator
do not require a permit for removal.
Proposed Language:
Tree Removal Permit. Applies to all lots and parcels and is required prior to the removal of
any tree with a diameter breast height (DBH) of 8 inches or more in accordance with 4.9.1.
Tree Preservation and Replacement
a. Trees of any size determined to be dead, dying, or hazardous by the
Administrator do not require a permit for removal.
b. If a project is subject to Development Review, tree removal is reviewed within
that process, and no Tree Removal Permit is required.
Analysis:
The proposed amendment to Section 34-5.2.10.A.1 clarifies two important aspects of how
tree removal is regulated within the Development Code. First, the update replaces the term
“properties” with “lots and parcels, ” which improves consistency with the terminology
already used throughout the Development Code. The Code relies heavily on “lots, ”
“parcels, ” and other defined land-unit terms when establishing applicability for
development standards, review procedures, and submittal requirements. By making this
change, the Tree Removal Permit section now aligns with the established language
patterns of Chapter 34, reducing ambiguity and bringing the terminology into harmony with
the rest of the Code.
The second change addresses situations where an applicant is already undergoing
Development Review through a Development Plan or Final Site Plan. In current practice,
planners review all proposed tree removals associated with those applications to ensure
they comply with the applicable standards in Section 4.9.1, as well as any other relevant
portions of the Development Code. Because those removals are already being evaluated
within the Development Review process, requiring a separate Tree Removal Permit creates
an unnecessary second application for the same action. The proposed amendment
formally recognizes this by stating that when a project is subject to Development Review,
Page 38 of 78
Proposed Amendment
Tree Removal Permit
tree removal will be reviewed within that existing process, and no Tree Removal Permit is
required. This change does not alter the substantive standards for tree removal; it only
eliminates the redundant permit for projects that already undergo a comprehensive,
code-based review.
All other projects that are not subject to Development Review will continue to be required
to obtain a Tree Removal Permit before removing any tree eight inches DBH or greater.
Those applicants must still provide the information necessary to demonstrate that the
proposed removal complies with the applicable standards and exemptions described in
the Development Code. This maintains the existing protections and review requirements
for standalone tree removal while streamlining the process for projects already undergoing
a more extensive review. Overall, the amendment improves clarity, reduces duplicative
applications, and reinforces consistency in how land units and review processes are
referenced throughout the Code.
Page 39 of 78
Proposed Amendment
Private Streets
Section 34-7.2
Page: 7-21
Amendment Log A.2
Section 34-7.2
Existing Language:
Street. A public or private way that is publicly accessible and affords a principal means of
access to abutting property. Streets generally consist of roadways and streetscapes.
Proposed Language:
Street. A public or private way that is publicly accessible and affords provides a principal
means of access to abutting property and includes the roadway and associated
streetscape elements. Streets generally consist of roadways and streetscapes. Streets
shall meet the following criteria:
Public Street: A street located entirely within a publicly dedicated and accepted
right-of-way, under the ownership and maintenance of a governmental entity and
design per the City’s Standards and Design Manual.
Private Street: A street located on a separate, recorded lot or tract that is not part of
any abutting property. Private streets shall not be established solely by easement
across private property and must comply with the City’s Standards and Design
Manual and be bonded to the same standards as a Public Street during
construction. Ownership and maintenance shall be the responsibility of a private
entity such as a homeowners’ association or other legally binding documents.
Analysis:
The proposed amendment to Section 34-7.2 ensures both private and public streets are
established under the same standards. When private streets are permitted under
easements without separation from other property, the establishment of street lot lines per
Section 34-2.10.1.C is not clearly defined. Amending the definition of streets to ensure all
streets are separated from private land ensures development adjacent to all streets is
consistent and aligned with the purposes and intents of code sections regulating the form
of development along street frontages.
Page 40 of 78
Proposed Amendment
Administrator Review Authority
Section 34-5.1.6.B.2
Page: 5-9
Amendment Log A.5
Section 34-5.1.6.B.2
Existing Language:
2. Review Authority
The Administrator is responsible for review and recommendation regarding:
a. Comprehensive Plan adoption and amendments;
b. Review of Public Facilities;
c. Text amendments to this Development Code;
d. Map amendments to the official zoning map (rezoning);
e. Certificates of Appropriateness under Major Historic Review;
f. Variances;
g. Floodplain Variances;
h. Special Use Permits; and
i. Critical Slope Special Exceptions.
Proposed Language:
2. Review Authority
The Administrator is responsible for review and recommendation regarding:
a. Comprehensive Plan adoption and amendments;
b. Review of Public Facilities;
c. Text amendments to this Development Code;
d. Map amendments to the official zoning map (rezoning);
e. Certificates of Appropriateness under Major Historic Review;
f. Variances;
g. Floodplain Variances;
h. Special Use Permits; and
i. Special Exception Permits; and
ij. Critical Slope Special Exceptions.
Analysis:
Per the Summary of Review Authority in Section 34-5.1.1.1, the Administrator is
responsible for review and recommendation of Special Exception Permits. However, this
responsibility is not included in Section 34-5.1.6.B.2. Adding text to algin Section 34-
5.1.6.B.2 with Section 34-5.1.1. ensures consistency and clarity in the review process for
Special Exception Permits.
Page 41 of 78
Proposed Amendment
RN-A Reference in Streetscape Standards
Section 34-4.4.5.D.9.c
Page: 4-21
Amendment Log A.6
Section 34-5.1.6.B.2
Existing Language:
In Residential (R-) zoning districts, when the project fronts on an existing street and
adjacent property on either side of the project does not have an existing streetscape, the
Administrator may allow the project developmer to contribute to the streetscape fund,
maintained and administered by the City, an amount equivalent to the cost of the
dedication of land for and the construction of the streetscape on the property.
Proposed Language:
In Residential (R-) and Residential Core Neighborhood (RN-) zoning districts, when the
project fronts on an existing street and adjacent property on either side of the project does
not have an existing streetscape, the Administrator may allow the project developer
developmer to contribute to the streetscape fund, maintained and administered by the
City, an amount equivalent to the cost of the dedication of land for and the construction of
the streetscape on the property.
Analysis:
While the RN-A Residential Core Neighborhood zoning district is categorized as a
residential district under Article 34-2.2 along with R-A Residential A, R-B Residential B, and
R-C Residential C, the district is not included in the exception criteria for existing
streetscapes which are eligible for contribution to the streetscape fund in lieu of
construction.
Page 42 of 78
Proposed Amendment
State Changes to Planning Commission Authority
Section 34-6.7.1.A.2.a.iv
Page: 6-13
Amendment Log A.7
Section 34-5.1.6.B.2
Existing Language:
2. Authority
a. General
The functions and duties of the Subdivision Administrator under this Development
Code include:
i. Administration of provisions of this Development Code pertaining to the
subdivision of land;
ii. Delegation of any act authorized by this Development Code to be carried out by
the Subdivision Administrator to an appropriate designee;
iii. Enforcement of the provisions of this Development Code pertaining to the
subdivision of land; and
iv. Provision of expertise and technical assistance to the Planning Commission.
Proposed Language:
2. Authority
a. General
The functions and duties of the Subdivision Administrator under this Development
Code include:
i. Administration of provisions of this Development Code pertaining to the
subdivision of land;
ii. Delegation of any act authorized by this Development Code to be carried out by
the Subdivision Administrator to an appropriate designee; and
iii. Enforcement of the provisions of this Development Code pertaining to the
subdivision of land; and.
iv. Provision of expertise and technical assistance to the Planning Commission.
Analysis:
Virginia SB974 previously removed planning commission approval authority for the
administrative review process for subdivision review and assigned such authority solely to
a designated agent. The code amendment ensures the Development Code aligns with state
requirements.
Page 43 of 78
Proposed Amendment
State Regulations and RN-A Zoning
Section 34-2.2.1 and 34-2.2.3.A.2
Pages: 2-7 and 2-10
Amendment Log A.8
Section 34-2.2.1
Existing Language:
RN-A
25’ or 40’ lot width (min)
1 dwelling unit (max)
35’ height (max)
40’ building width (max)
Proposed Language:
RN-A
25’ or 40’ lot width (min)
2 dwelling unit (max)
35’ height (max)
40’ building width (max)
Section 34-2.2.3.A.2
Existing Language:
DENSITY
Base 1
With bonus:
Existing Structure Preservation 2
With bonus:
Affordable Dwelling Unit 6
Proposed Language:
DENSITY
Base 2
With bonus:
Existing Structure Preservation 3
With bonus:
Affordable Dwelling Unit 6
Analysis:
With Code of Virginia § 15.2-2292.3 now requiring all localities to permit an accessory
dwelling unit by-right on any single-family residential lot, Charlottesville must ensure that
every residential district—including RN-A—allows a principal dwelling and an additional
Page 44 of 78
Proposed Amendment
State Regulations and RN-A Zoning
unit without relying on discretionary bonuses. This new statewide mandate establishes a
clear baseline expectation: every lot must be able to host one accessory unit in addition to
the primary residence, and that allowance must be achievable by-right.
Under our current Development Code, the RN-A district provides only one dwelling unit by-
right, and any additional unit must come through a bonus mechanism. The most common
path is the existing structure preservation bonus, but that incentive applies only when a
building was constructed and occupied before December 18, 2023 and retains its primary
façade and envelope depth. On undeveloped RN-A lots, new subdivisions, or lots where
new construction replaces older structures, no qualifying building exists, so the
preservation bonus cannot be accessed. In those cases, the maximum by-right dwelling
count remains one, and a property owner cannot add a second unit unless it qualifies for
the Affordable Dwelling Unit bonus. Because the state law requires that every single-family
lot accommodate an accessory unit without depending on bonuses, RN-A’s one-unit base
becomes incompatible with § 15.2-2292.3 once the requirement takes effect.
At the same time, our Development Code already uses the term “ADU” exclusively to mean
“Affordable Dwelling Unit, ” and introducing a second meaning for “Accessory Dwelling
Unit” would create confusion, conflict with multiple code chapters, and complicate the
administration of affordability programs. Rather than redefining terminology or
restructuring the code’s use framework, the most straightforward and least disruptive
solution is to increase the RN-A base density from one unit to two. Doing so ensures that
every lot—regardless of development history—can support a principal dwelling and an
accessory unit as required by state law, while preserving the clarity of our existing
vocabulary and avoiding unnecessary revisions elsewhere in the code.
To maintain the purpose and value of the preservation bonus, it must be adjusted as well.
Increasing the preservation bonus from two units to three keeps it meaningful and
continues to reward projects that retain eligible existing structures. Keeping the Affordable
Dwelling Unit bonus at six units maintains the current affordability incentive structure
without interfering with the new state requirement. Together, these changes preserve
RN-A’s intent, keep the bonus hierarchy coherent, avoid introducing a new definition for
“ADU, ” and ensure that all RN-A lots comply with § 15.2-2292.3 by allowing an accessory
unit by-right.
Page 45 of 78
Proposed Amendment
Existing Structure Preservation Bonus Clarification
Section 34-2.10.6.A.2.e
Page: 2-117
Amendment Log A.9
Section 34-2.10.6.A.2.e
Existing Language:
e. When permitted by the Zoning District, a project utilizing the Existing Structure
Preservation Bonus for density will be deemed to comply with the Build-To requirements.
Proposed Language:
e. When permitted by the Zoning District, a project utilizing eligible for the Existing
Structure Preservation Bonus for density will be deemed to comply with the Build-To
requirements.
Analysis:
The current wording of this section creates confusion regarding the applicability of Build-To
requirements for developments with existing structures in a residential zoning district (R-A,
RN-A, R-B, and R-C). The amendment clarifies that existing structures meeting the
requirements of Section 34-4.2.1.C are deemed to comply with Build-to requirements
regardless of the application of bonus allowances per Section 34-4.2.1.B.
Page 46 of 78
Proposed Amendment
Alignment of Approval Processes
Section 34-5.2.16.C.2
Page: 5-57
Amendment Log A.11
Section 34-5.2.16.C.2
Existing Language:
C. Review and Decision Process
1. Administrative Review
The Administrator will review the application for a Critical Slopes Special Exception and will
provide a staff report and recommendation to Planning Commission in advance of the
public meeting. Prior to the preparation of the staff report, City staff may make
recommendations to the Administrator to include in the staff report.
2. Notice
Notice of the public meeting must be given in accordance with Code of Virginia § 15.2-
2204.
3. Planning Commission Review
The Planning Commission will review the application and report its findings and
recommendations to the City Council.
4. City Council Decision
a. The City Council will conduct a public meeting on the application. The City
Council may hold a joint public meeting with the Planning Commission.
b. If the City Council grants a Critical Slopes Special Exception, the Council can set
forth any reasonable conditions which apply to the approval granted.
Proposed Language:
C. Review and Decision Process
1. Administrative Review
The Administrator will review the application for a Critical Slopes Special Exception and will
provide a staff report and recommendation to Planning Commission in advance of the
public meeting. Prior to the preparation of the staff report, City staff may make
recommendations to the Administrator to include in the staff report.
2. Notice
Notice of the public meeting must be given in accordance with Code of Virginia § 15.2-
2204.
23. Planning Commission Review
The Planning Commission will review the application and report its findings and
recommendations to the City Council.
34. City Council Decision
a. The City Council will conduct a public meeting on the application. The City
Council may hold a joint public meeting with the Planning Commission.
Page 47 of 78
Proposed Amendment
Alignment of Approval Processes
b. If the City Council grants a Critical Slopes Special Exception, the Council can set
forth any reasonable conditions which apply to the approval granted.
Analysis:
The current wording of this section aligns with approval processes such as Special Use
Permits which require a public hearing and appropriate notice of public hearing(s).
However, Critical Slopes Special Exception Permits require a public meeting but not a
public hearing per Section 34-5.1.1. The code section recommended for removal creates
confusion as the referenced public hearing requirements do not apply to the Critical
Slopes Special Exception Permit. This removal aligns the Critical Slopes Special Exception
Permit section with the Special Exception Permit section in Section 34-5.2.15, which also
requires a public meeting but no public hearing.
Page 48 of 78
Proposed Amendment
Split Zoned Lots and Development Standards
Section 34-2.1.2.C
Page: 2-4
Amendment Log A.13
Section 34-2.1.2.C
Existing Language:
Where a Section is listed as applying, and the zoning district includes standards for that
requirement, all applicable standards must be met. The applicable standards may be
further modified by the applicability provisions for each set of standards in Div. 2.10. Rules
for Zoning Districts. Applicability may also be modified by Div. 5.3. Nonconformities.
Proposed Language:
Where a Section is listed as applying, and the zoning district includes standards for that
requirement, all applicable standards must be met. For split-zoned parcels (lots containing
multiple base zoning districts, excluding overlay districts), the more restrictive district
standards shall apply to the lot as a whole. The applicable standards may be further
modified by the applicability provisions for each set of standards in Div. 2.10. Rules for
Zoning Districts. Applicability may also be modified by Div. 5.3. Nonconformities.
Proposed Language to be removed:
Section 34-2.10.10.A.3.a.i
If a single building spans multiple zoning districts, the more restrictive Building Width
applies to the entirety of the building.
Analysis:
The Development Code does not currently provide clear direction on how district standards apply
to parcels that contain more than one base zoning district. While Section 34-2.10.10.A.3.a.i
addresses Building Width for structures spanning multiple zoning districts, other critical
standards—such as maximum building footprint, build-to requirements, height, and massing—
remain unaddressed. This creates ambiguity for applicants and staff when interpreting which
standards govern development on split-zoned parcels.
Because dimensional and form standards vary significantly between zoning districts, consistent
application is essential to maintaining predictable outcomes and ensuring equitable administration
of the Code. Establishing that the more restrictive district standard applies across the entirety of a
split-zoned lot provides necessary clarity and avoids selective application of standards based
solely on internal parcel boundaries. This approach also encourages applicants to resolve
underlying split-zoning conditions through appropriate zoning actions rather than relying on
fragmented standards during development review.
Page 49 of 78
Proposed Amendment
Split Zoned Lots and Development Standards
This amendment applies only to district standards and does not alter how uses are regulated under
Section 34-3.1. Each portion of a split-zoned lot may continue to accommodate uses permitted
within its respective zoning district. By placing this general rule within Section 34-2.1.2.C, staff
recommends removing Section 34-2.10.10.A.3.a.i, as its narrow language becomes redundant
once a broader governing principle for split-zoned parcels is established.
Page 50 of 78
Proposed Amendment
Revisions to an Approved Development Plan or Final Site Plan
Sections 34-5.2.9.E.2.c
Page: 5-40
Amendment Log A.16
Existing Language:
c. Revisions to an Approved Development Plan or Final Site Plan
i. Minor revisions to an approved Development Plan or Final Site Plan may be
approved by the Administrator. The following revisions are considered minor:
a) Up to 10% increase in the gross floor area of a single building;
b) Any decrease in gross floor area of a single building;
c) Up to 10% reduction in the approved setbacks from street or common lot
lines; and
d) Relocation of parking areas, internal driveways or structures where
relocation occurs more than 100 feet from street or common lot lines.
ii. All other changes to an approved Development Plan or Final Site Plan must be
resubmitted as a new application.
Proposed Language:
c. Revisions to an Approved Development Plan or Final Site Plan
i. Minor revisions to an approved Development Plan or Final Site Plan during the
period of validity may be granted by the Administrator after completion of the
appropriate review. Minor revisions per this section do not constitute a waiver nor
extend the period of validity of the plan. The following revisions are considered
minor:
a) Up to 10% increase in the gross floor area of a single building;
b) Any decrease in gross floor area of a single building;
c) Up to 10% reduction in the approved setbacks from street or common lot
lines;
d) Relocation of parking areas, internal driveways or structures where
relocation occurs more than 100 feet from street or common lot lines; and
e) additional unlisted minor revisions that do not substantially alter the
vested plans as determined by the Administrator.
ii. All other changes to an approved Development Plan or Final Site Plan must be
resubmitted as a new application.
Analysis:
This amendment is intended to align the City’s Development Code with Virginia Code
§ 15.2-2261(D), which governs the validity of approved plats and site plans and clarifies
that minor modifications made during that validity period do not extend or waive any rights
associated with the approved plan. Updating our local language to mirror these
Page 51 of 78
Proposed Amendment
Revisions to an Approved Development Plan or Final Site Plan
requirements ensures legal consistency, reduces ambiguity for applicants, and
strengthens our administrative practices.
The amendment also addresses a practical limitation in the current Code. While several
specific thresholds define “minor revisions, ” they do not encompass the broader range of
small, non-material adjustments routinely needed as projects move from approval toward
construction. Without a clear mechanism for approving these unlisted but truly minor
changes, applicants can be forced into unnecessary resubmittals, creating delays and
administrative inefficiencies. Granting the Administrator limited discretion to approve
additional minor revisions—when they do not materially alter the approved plan—provides
the flexibility needed to keep projects on track while maintaining appropriate safeguards.
This update is also forward-looking. The Development Code is still new, and staff are only
beginning to see how applicants will navigate revisions once projects receive initial
approvals. At this moment, we are receiving very few revision requests simply because
most plans are still early in the development pipeline. However, as projects advance over
the next one to two years, we anticipate a growing need for a predictable and streamlined
path for minor adjustments prior to or during construction. Establishing this framework
now positions the City to manage those future revisions efficiently and consistently.
Overall, the amendment strengthens legal compliance, improves administrative clarity,
and prepares the City for the expected increase in minor modifications as newly approved
projects progress toward construction.
Page 52 of 78
Proposed Amendment
Sign Permits & Certificate of Appropriateness (CoA) Applications
Section 34-4.11.3.a.2
Page 4-82
Amendment Log ADC.3
Section 34-4.11.3.a.2
Existing Language:
For signs within an ADC District, HC District, Entrance Corridor, or an IPP, a Certificate of
Appropriateness will be issued in lieu of a Sign Permit according to 5.2.6 Minor Historic
Review, 5.2.7 Major Historic Review, and 5.2.8 Corridor Review.
Proposed Language:
For signs located within an ADC District, HC District, Entrance Corridor, or an IPP, required
design review shall be conducted as part of the sign permit process. In these overlay
districts, the approved sign permit serves in lieu of a Certificate of Appropriateness for
sign-related work.
Analysis:
The current code language incorrectly states that a Certificate of Appropriateness (CoA)
will be issued in lieu of a sign permit for signs within the ADC, HC, Entrance Corridor, or IPP
overlay districts. In practice, this does not reflect how sign applications are reviewed or
approved. Several problems arise from this mismatch between code language and real-
world procedures, making revision necessary.
First, design review for signs is conducted within the sign permit workflow, not as a
separate CoA process. Zoning staff determines whether a proposed sign meets the
applicable sign regulations before design review staff evaluate its design. Only after zoning
confirms compliance does design review occur, and its approval allows the sign permit to
be issued. The existing language reverses this order by implying the CoA is the primary
approval mechanism.
Second, issuing a CoA for a sign creates the false impression that the CoA itself confers
zoning compliance, even though it does not. In all other contexts, a CoA addresses only
Page 53 of 78
Proposed Amendment
Sign Permits & Certificate of Appropriateness (CoA) Applications
design considerations and never substitutes for zoning approval. Maintaining an exception
for signs inadvertently elevates the CoA beyond its intended purpose and could mislead
applicants or reviewers into believing that historic or corridor approval overrides the
underlying zoning rules.
Third, the current code language does not acknowledge how integrated and
interdependent zoning and design review are for sign approvals. Signs must meet both
zoning regulations and design standards, and the existing wording disrupts that
relationship by suggesting an alternate approval path that does not align with actual
regulatory requirements or workflow sequencing.
Finally, revising the language restores consistency with both staff practice and regulatory
intent. By clarifying that design review approval must occur before issuance of a sign
permit, and that the sign permit serves in lieu of a CoA, the code better reflects established
procedures. This helps eliminate confusion for applicants, ensures internal alignment
between zoning and design review staff, and prevents misinterpretation that could lead to
procedural errors or improper approvals.
In short, the revision is necessary to ensure the ordinance accurately describes the real
approval pathway, maintains clear distinctions between zoning and design authority, and
supports a coherent and predictable permitting process.
Page 54 of 78
Proposed Amendment
Review and Approval Authority Table
Section 34-5.1.1
Page 5-3; 5-4
Amendment Log ADC.7
Section 34-5.1.1
Existing Language:
The following table summarizes the review and approval authority of various review bodies
and officials that implement and administer this Development Code.
Page 55 of 78
Proposed Amendment
Review and Approval Authority Table
Proposed Language:
The following table summarizes the review and approval authority of various review bodies
and officials that implement and administer this Development Code.
Page 56 of 78
Proposed Amendment
Review and Approval Authority Table
Analysis:
These corrections to the Review and Approval Authority table accurately reflect authorities of
the Board of Architectural Review as provided within the text of the Development Code.
Included below are the corresponding code sections for each proposed revision to the table.
Zoning Text Amendment and Zoning Map Amendment review authority, see 34-5.2.5.C.1.b:
When the property is within an ADC District, HC District, or an Individually Protected Property,
the Administrator will refer the application to the BAR for review as to whether the proposed
application will have an adverse impact on the district, and for recommendation as to
reasonable conditions which, if imposed, would mitigate any such impacts. The BAR may submit
a written report of its findings in support of its recommendation to the Planning Commission
and City Council.
Sign Permit review authority, see 34-5.2.10.A.3.a:
Signs in an Architectural Design Control District, Historic Conservation District, or an Individual
Protected Property are required to apply for a Certificate of Appropriateness according to 5.2.7.
Major Historic Review or 5.2.7. Major Historic Review instead of review under this Section.
Special Use Permit review authority, see 34-5.2.14.C.1.b:
When the property is within an ADC District, HC District, or an Individually Protected Property,
the Administrator will refer the application to the BAR for review as to whether the proposed
application will have an adverse impact on the district, and for recommendation as to
reasonable conditions which, if imposed, would mitigate any such impacts. The BAR must
submit a written report of its findings in support of its recommendation City Council.
Special Exception Permit review authority, see 34-5.2.15.C.1.c:
When the property is within an ADC district, HC district, or an IPP, the Administrator will refer
the application to the BAR for review as to whether the proposed exception will have an adverse
impact on the district, and for recommendation as the (sic.) to reasonable conditions which, if
imposed, would mitigate any such impacts. The BAR must submit a written report of its findings
in support of its recommendation to City Council.
Page 57 of 78
Proposed Amendment
Established Individually Protected Properties
Section 34-2.9.3.B
Page 2-85
Amendment Log ADC.14
Section 34-2.9.3.B
Existing Language:
Following is a list of landmarks, buildings and structures outside the City’s ADC Districts,
which are deemed by City Council to be of special historic, cultural, or architectural value.
Page 58 of 78
Proposed Amendment
Established Individually Protected Properties
Proposed Language: (Revisions to the list of established Individually Protected Properties are
shown in red.)
Street Number Street Name Tax Map Number Parcel Number
901 Emmet Street N. Tax Map 1 Parcel 1 (portion)
Street Number Street Name Tax Map Number Parcel Number
209 and 211 Sprigg Lane Tax Map 8 Parcel 28
Page 59 of 78
Proposed Amendment
Established Individually Protected Properties
Street Number Street Name Tax Map Number Parcel Number
1328 Riverdale Drive Tax Map 50 Parcel 5
Street Number Street Name Tax Map Number Parcel Number
104 Stadium Road Tax Map 16 Parcel 2
Street Number Street Name Tax Map Number Parcel Number
801 West Street Tax Map 31 Parcel 42
Analysis:
The proposed corrections to the list of established Individually Protected Properties (IPPs) are
necessary to improve address clarity, to remove demolished IPPs which were left on the list by
error during adoption in December 2023, and to amend the table by adding the most recently
designated property.
Page 60 of 78
Proposed Amendment
B.08 Bicycle Parking and Lodging
Section 34-4.5.2.C.1
Page: 4-27
Amendment Log B.08
Section 34-4.5.2.C.1
Existing Language:
Required Bicycle Parking
Bicycle parking must be provided in accordance with the following table:
Proposed Language:
Update Commercial by adding a subcategory for “Lodging”
Spaces Required (min)
Uses Short-Term Spaces Long-Term Spaces
Commercial
All uses 1 / 2,500 SF of gross floor
area, 2 min
1 / 5,500 SF of gross floor
area, 2 min
Lodging 1 / 2,500 SF of gross floor area not
intended for lodging, 2 min
1 Space per 40 rooms,
2 min
Analysis:
The current Development Code requires all Commercial uses to provide bicycle parking
according to a gross-floor-area formula. While this approach works for most commercial
activity, lodging uses (such as hotels) are unique: they typically have very large building
footprints but generate bicycle parking demand based on guests, employees, and the size
of publicly accessible non-lodging spaces rather than the overall square footage. Applying
the generic Commercial GFA ratios to lodging has resulted in bicycle parking requirements
Page 61 of 78
Proposed Amendment
B.08 Bicycle Parking and Lodging
far exceeding real-world demand, creating outcomes that are disproportionate and
inconsistent with multimodal best practices.
The proposed amendment uses two simple ratios: short-term spaces tied to non-lodging
areas of the building, and long-term spaces tied to the number of guest rooms. This
approach follows national guidance from the Association of Pedestrian and Bicycle
Professionals (APBP), which emphasizes that bicycle parking should be assigned based on
the nature of the users rather than total building size. APBP also distinguishes short-term
and long-term demand, noting that visitor trips tend to cluster around publicly accessible
spaces, while employees and overnight guests generate predictable long-term storage
needs. Similarly, the NACTO Urban Bikeway Design Guide encourages cities to adopt
context-sensitive ratios that respond to expected bicycle activity rather than applying
uniform formulas across all uses.
Peer practice further reinforces this direction. Cities with modern multimodal standards,
including Raleigh, use room-based ratios for hotel bicycle parking because room count
strongly correlates with employee and guest demand, while short-term visitor demand
aligns with the building’s active public spaces. Industry-specific guidance for hotel design
also supports this distinction, noting that secure long-term storage has become an
essential amenity for employees and cycling travelers, but that demand remains modest
and consistent across room counts rather than varying with building square footage.
The specific numbers selected for this amendment reflect these established patterns. The
short-term standard applies the existing Commercial ratio only to the portion of the
building that generates visitor trips, while the long-term standard uses a room-based ratio
common in other cities and consistent with national guidance on lodging-use behavior. The
minimum of two spaces for each type ensures that even small lodging uses provide basic
bicycle access and maintains consistency with the minimums applied across other
Commercial uses.
Page 62 of 78
Proposed Amendment
Food Trucks
Section 34-3.6.1 and 34-3.6.2.D
Page: 3-40 to 3-43
Amendment Log B.9
Section 34-3.6.1.B.7
Existing Language:
7. Only One Temporary use permit will be active on any lot or parcel at any time.
Proposed Language:
Remove line 7.
7. Only one temporary use permit will be active on any lot or parcel at any time.
8 7. All temporary uses and any appurtenant structures, signs, goods and other features
must be set back from an adjacent right-of-way by at least 20 feet.
9 8. All activities to be conducted pursuant to a temporary use permit must be in
compliance with:
a. The standards set forth in this Division, as applicable; and
b. All applicable city ordinances, permits and approvals, including, without
limitation: Occupancy permits, peddler’s licenses, sign permits, BAR certificates of
appropriateness, etc.
10 9. Use of all buildings and structures must be in compliance with all applicable building
code regulations.
11 10. A temporary use permit may be revoked by the Administrator at any time, due to the
failure of the permit holder to comply with all requirements of this Chapter. Notice of
revocation must be made in writing to the permit holder. Any person aggrieved by such
notice may appeal the revocation to the Board of Zoning Appeals.
Section 34-3.6.2.D
Existing Language:
Mobile Food Unit
A mobile food unit located on private property authorized by a temporary use permit is
subject to the following regulations:
1. No mobile food unit may be operated on private property without the mobile food unit
owner or their designee having first been issued a temporary use permit pursuant to this
section.
2. A temporary use permit allows the permittee to operate at up to 10 different properties.
An applicant may apply for more than one temporary use permit.
3. Applicants for a temporary use permit authorizing a mobile food unit to operate on
private property must provide:
Page 63 of 78
Proposed Amendment
Food Trucks
a. A City business license (or a statement from the commissioner of revenue that no
City business license is required).
b. A valid health permit from the Virginia Health Department stating that the mobile
food unit meets all applicable standards. A valid health permit must be maintained
for the duration of the temporary use permit.
c. Written permission from the owner of the private properties upon which the
permittee will operate.
d. A site diagram to be approved by the Administrator for each property, illustrating
access to the site, all parking areas, routes for ingress and egress, placement of the
mobile food unit, distance from property lines, garbage receptacles and any other
feature associated with the mobile food unit.
4. A mobile food unit temporary use permit is valid for one year from the date of issuance.
5. A mobile food unit operator cannot:
a. Sell anything other than food and non-alcoholic beverages and items incidental to
the product and its consumption;
b. Set up more than one covered 10 × 10 table to provide condiments to patrons;
c. Play any music that is audible outside of the vehicle;
d. Place or utilize any sign that is not permanently affixed to the mobile food unit;
e. Fail to provide receptacles and properly dispose of all trash, refuse, compost and
garbage that is generated by the use; and
f. Cause any liquid wastes to be discharged from the mobile food unit.
Proposed Language:
Mobile Food Unit
A mobile food unit located on private property authorized by a temporary use permit is
subject to the following regulations:
1. No mobile food unit may be operated on private property without the mobile food unit
owner or their designee having first been issued a temporary use permit pursuant to this
section.
2. A temporary use permit allows the permittee to operate at up to 10 different properties.
An applicant may apply for more than one temporary use permit.
3. Applicants for a temporary use permit authorizing a mobile food unit to operate on
private property must provide:
a. A City business license (or a statement from the commissioner of revenue that no
City business license is required).
b. A valid health permit from the Virginia Health Department stating that the mobile
food unit meets all applicable standards. A valid health permit must be maintained
for the duration of the temporary use permit.
Page 64 of 78
Proposed Amendment
Food Trucks
c. Written permission from the owner of the private properties upon which the
permittee will operate.
d. A site diagram to be approved by the Administrator for each property, illustrating
access to the site, all parking areas, routes for ingress and egress, placement of the
mobile food unit, distance from property lines, garbage receptacles and any other
feature associated with the mobile food unit.
e. Location of Mobile Food Unit when not in use
4. A mobile food unit temporary use permit is valid for one year from the date of issuance.
5. A mobile food unit operator cannot:
a. Sell anything other than food and non-alcoholic beverages and items incidental
to the product and its consumption;
b. Set up more than one covered 10 × 10 table to provide condiments to patrons;
c. b. Play any music that is audible outside of the vehicle;
d. c. Place or utilize any sign that is not permanently affixed to the mobile food unit;
e. d. Fail to provide receptacles and properly dispose of all trash, refuse, compost
and garbage that is generated by the use; and
f. e. Cause any liquid wastes to be discharged from the mobile food unit.
Analysis:
Mobile food units were previously regulated through a provisional use permit process that
allowed operators to obtain annual authorization to operate from multiple private
properties throughout the City. When the Development Code was adopted, mobile food
units were incorporated into the Temporary Uses section with many of the same
operational requirements. In doing so, a conflict was created between Section 34-
3.6.1.B.6, which allows multiple temporary use permits to be issued for the same lot, and
Section 34-3.6.1.B.7, which limits a property to only one active temporary use permit at a
time. As a result, multiple food truck operators may obtain permits to operate from the
same property, but only one may legally operate at any given time. This provision has
created administrative challenges for staff, confusion for applicants, and limitations on
commercial properties seeking to accommodate multiple food vendors as a temporary
use.
During discussions regarding food truck regulations, staff, Planning Commissioners, and
other City departments identified several provisions that warrant clarification or
modification. The proposed amendment removes the restriction allowing only one active
temporary use permit on a property at a time and eliminates the provision authorizing a
covered 10-by-10-foot table for condiment service. Removal of the table provision
reinforces the temporary nature of mobile food unit operations by eliminating an accessory
feature that is not necessary for food truck operations and is inconsistent with the intent of
Page 65 of 78
Proposed Amendment
Food Trucks
a temporary use. These changes provide additional flexibility for food truck operators while
maintaining existing requirements related to licensing, health permits, site plans, signage,
waste management, and other operational standards. The amendment does not establish
regulations for food truck courts or permanent food truck facilities and does not alter the
requirement that mobile food units operate pursuant to a temporary use permit.
The amendment also adds a requirement for applicants to identify the location of a mobile
food unit when it is not in operation. This information will assist staff in administering
permits and monitoring compliance with temporary use regulations by providing a clearer
understanding of where mobile food units are stored between operating periods. Together,
these revisions remove unnecessary regulatory conflicts, improve permit administration,
and preserve the distinction between temporary mobile food unit operations and more
permanent food service establishments while maintaining the City's ability to regulate
these uses as temporary activities.
Page 66 of 78
Proposed Amendment
Nonresidential Height in the R-A and R-B Districts
Sections 34-2.2.2.A.B.1 and 2.2.4.B.1
Page: 2-9 and 2-13
Amendment Log B.12
Sections 34-2.2.2.A.B.1 and 2.2.4.B.1
Existing Language:
No existing language for maximum height for nonresidential structures in the R-A and R-B,
Zoning Districts.
Proposed Language:
34-2.2.2.A.B.1 and 2.2.4.B.1
A. Building height (feet)
1 unit and nonresidential 35’
B. Side wall height (max)
1 unit and nonresidential 28’
Analysis:
In the R-A and R-B Zoning Districts, the maximum allowable height is currently specified only for
residential structures. However, these districts permit several nonresidential uses, such as
religious assembly and day care facilities. While Section 34-2.8 (Alternate Forms) provides
additional height and form options, it does not presently apply to the nonresidential uses allowed
under Section 34-3.1. Should the Alternate Forms provisions be expanded in the future, further
analysis will be needed to determine appropriate height and form standards for those uses.
To address the current gap in the code, staff recommends establishing maximum height and side
wall height standards for nonresidential uses that match those of one-unit residential structures.
This approach provides clarity, maintains consistency within the districts, and ensures reasonable
development standards until a more comprehensive review can be conducted.
Page 67 of 78
Proposed Amendment
Special Exception Permits
Sections 34-5.2.15.A
Page: 5-54
Amendment Log B.14
Sections 34-5.2.15.A
Existing Language:
1. The City Council may grant a modification of any physical dimensional standard of this
Development Code by Special Exception Permit.
2. A Special Exception Permits may be granted for physical dimensional standards
described in the following Divisions:
Proposed Language:
34-2.2.2.A.B.1 and 2.2.4.B.1
1. The City Council may grant a modification of any physical dimensional or numerical
standard of this Development Code by Special Exception Permit.
2. A Special Exception Permits may be granted for physical dimensional or numerical
standards described in the following Divisions:
Analysis:
The current language in Section 34-5.2.15.A limits Special Exception Permits (SEPs) to
modifications of physical dimensional standards. While this is appropriate for many provisions
within the Development Code, it creates a gap for circumstances where relief from numerical
standards is warranted to support feasibility, innovation, or site-specific constraints. For example,
under the existing language, City Council could modify the physical dimensional requirements for
short- or long-term bicycle storage but would not have the ability to adjust the number of required
bicycle parking spaces.
Expanding SEP eligibility to include numerical standards provides a more complete and functional
tool for addressing practical challenges encountered in development proposals. Allowing City
Council to consider modifications to both physical dimensional and numerical standards ensure a
more flexible, context-sensitive approach to evaluating unique project conditions, while still
maintaining alignment with the broader objectives of the Development Code and the
Comprehensive Plan. This change enhances the City’s ability to support well-designed projects that
meet community needs without imposing unnecessary barriers when strict application of
numerical requirements may not be appropriate.
Page 68 of 78
Proposed Amendment
Sublot Access Clarification
Section 34-7.1.2.E.3.b
Page: 7-10
Amendment Log B.15
Section 34-7.1.2.E.3.b
Existing Language:
b. A sublot is not required to abut a primary street, side street, or alley but must abut a
permanent access easement that meets the requirements of Article 6. Subdivision.
Proposed Language:
b. A sublot is not required to abut a primary street, side street, or alley but must abut a
permanent access easement that meets the requirements of Article 6. Subdivision. A
permanent access easement through abutting zoning lots is permitted when the easement
meets the requirements of Article 6. Subdivision.
Analysis:
The current wording of this section does not clearly articulate access easements for
sublots may be provided on adjacent zoning lots. The proposed amendment provides
clarity for property owners and developers regarding the allowances for sublot creation.
Page 69 of 78
Proposed Amendment
Active Depth
Section 34-2.10.10.B.2.b, 34-2.10.10.B.2.d, and 34-7.2
Page: 2-133 and 7-11
Amendment Log B.16
Section 34-2.10.10.B.2.b
Existing Language:
On primary streets, the active depth applies to all stories.
Proposed Language:
On primary streets, the active depth applies to the first two stories.
Section 34-2.10.10.B.2.d
Existing Language:
A Primary Building on a lot or sublot consisting of a maximum of only 1 dwelling unit and no
additional primary/principal uses does not have to meet the active depth requirements.
Proposed Language:
Remove existing language.
A Primary Building on a lot or sublot consisting of a maximum of only 1 dwelling unit and no
additional primary/principal uses does not have to meet the active depth requirements.
Section 34-7.2
Existing Language:
Active space. Any occupiable space designed and intended for human activity such as
living, working, commerce, sleeping, eating, or cooking as determined by the Administrator.
Restrooms, toilet rooms, closets, halls, storage or utility spaces, and similar areas are not
considered active space.
Proposed Language:
Active space. Any occupiable space designed and intended for human activity such as,
working, commerce, sleeping, eating, or cooking as determined by the Administrator.
Examples of active space include Residential Uses including Householding Living and
Group Living. Vehicle uses related to Residential Uses are not considered active space
Other examples of nonactive space include nonresidential restrooms, closets, storage
spaces, utility spaces, and similar spaces not intended for human activity.
Analysis:
These amendments refine how the Development Code regulates active depth and active space by
addressing implementation challenges repeatedly encountered during site plan review, applicant
consultations, and Planning Commission work sessions. The updates bring greater clarity and
Page 70 of 78
Proposed Amendment
Active Depth
flexibility while aligning Code language with the Planning Commission’s stated priorities for the
2026 amendment cycle.
First, the revision to Section 34-2.10.10.B.2.b, limiting active depth applicability on Primary Streets
to the first two stories, responds to concerns raised by both applicants and commissioners that
requiring active depth on every story creates upper-story floorplates that are difficult or impractical
to design—particularly in DX districts where the active depth requirement can reach 30 feet. During
the July 9th Code Clean-up Subcommittee meeting and July 28th Work Session, commissioners
emphasized that upper-story active depth does little to contribute to street activation and often
results in unusable or excessively constrained interior spaces. This amendment preserves the
pedestrian-oriented purpose of active depth at the street level while reducing unnecessary
constraints on higher floors.
Second, with the update to the Active Space definition to clearly include residential units, section
34-2.10.10.B.2.d is redundant and can be removed. By removing this code section, the code will
remain consistent and less prone to future consistence issues.
Finally, the amendment to Section 34-7.2 (Active Space definition) makes the most substantive
change in this set by:
1. Removing “halls” from the list of excluded non-active spaces, consistent with PC feedback
that hallways can serve important transitional or human-use functions and should not be
categorically excluded.
2. Adding explicit examples of active space, including “Residential Uses including
Householding Living and Group Living, ” which clarifies that standard residential interior
living areas meet the definition of active space.
3. Clarifying that vehicle-related areas associated with Residential Uses are not active space,
ensuring garages and similar areas remain outside the definition without relying on a
separate exception section.
These refinements directly respond to concerns raised in multiple subcommittee meetings that the
previous phrasing of “hall” and other excluded spaces was creating confusion when applying active
depth to multifamily layouts, especially where circulation spaces could qualify as active space
depending on context. Incorporating examples strengthens administrative clarity and helps
applicants more easily understand how their interior programming interacts with active depth
requirements.
Together, these amendments improve predictability for applicants, clarify ambiguities uncovered
during real-world code application, and refine the active depth and active space standards to
better match the Planning Commission’s policy direction. By focusing active depth on the building’s
street-facing lower stories, refining the single-unit exemption, and updating the definition of active
space, these changes produce a more functional and context-appropriate regulatory framework—
one that supports the city’s goals for activated streetscapes while ensuring practical feasibility for
residential and mixed-use development.
Page 71 of 78
Proposed Amendment
Nonconforming Buildings and Structures
Section 34-5.3.3.
Page: 5-62 to 5-66
Amendment Log B.17
Section 34-5.3.3.C.1
Existing Language:
New Primary Buildings on an Interior Lot
All new primary buildings must occupy the build-to zone until the build-to width
requirement has been met. Until all build-to width standards have been met, all new
primary buildings must occupy the build-to zone for their entire building width.
Proposed Language:
New Primary Buildings on an Interior Lot
New primary buildings and structures on interior lots are permitted as follows:
a. Rear Yard: New primary buildings and structures are permitted in the rear yard of the
existing nonconforming primary building. Transition setbacks may apply, see Div. 4.7
Transitions and Screening.
b. Side Yard: New primary buildings and structures are permitted in the side yard of the
existing nonconforming primary building. Transition setbacks may apply, see Div. 4.7
Transitions and Screening.
c. Side Street Yard: See New Primary Building on a Corner Lot.
d. Front Yard: All new front yard primary buildings must occupy the build-to zone until
the build-to width requirement has been met. Once the build-to requirements have
been met, a new front yard will be established based on the additional buildings.
Prior to the build-to width requirements being satisfied, the front yard will remain all
portions of the lot between the primary street lot line and the initial existing
nonconforming building. Transition setbacks may apply, see Div. 4.7 Transitions and
Screening.
Page 72 of 78
Proposed Amendment
Nonconforming Buildings and Structures
Graphics to be removed.
Section 34-5.3.3.C.2.b
Additions on an Interior Lot
Existing Language:
b. Side additions having a floor area less than 20% of the existing building footprint are
allowed. Once the build-to width standard has been met, side additions of any size
are allowed.
Proposed Language:
b. Side additions of any size allowed. Transition setbacks may apply, see Div. 4.7
Transitions and Screening.
Graphics to be removed.
Section 34-5.3.3.C.3
New Primary Buildings on a Corner Lot
Existing Language:
a. All new primary buildings must occupy the build-to zone until the build-to width
requirement for both streets have been met.
b. Once the build-to width requirement has been met for both streets, new primary
buildings may be placed behind the build-to zone.
Proposed Language:
New Primary Buildings on a Corner Lot
New primary buildings and structures on a corner lots are permitted as follows:
Page 73 of 78
Proposed Amendment
Nonconforming Buildings and Structures
a. Rear Yard: New primary buildings and structures are permitted in the rear yard of the
existing nonconforming primary building. Transition setbacks may apply, see Div. 4.7
Transitions and Screening.
b. Side Yard: New primary buildings and structures are permitted in the side yard of the
existing nonconforming primary building. Transition setbacks may apply, see Div. 4.7
Transitions and Screening.
c. Side Street Yard: All new side street yard primary buildings must occupy the build-to
zone until the build-to width requirement has been met. Once the build-to
requirements have been met, a new side street yard will be established based on
the additional buildings. Prior to the build-to width requirements being satisfied, the
side street yard will remain all portions of the lot between the side street lot line and
the initial existing nonconforming building. Transition setbacks may apply, see Div.
4.7 Transitions and Screening.
d. Front Yard: All new front yard primary buildings must occupy the build-to zone until
the build-to width requirement has been met. Once the build-to requirements have
been met, a new front yard will be established based on the additional buildings.
Prior to the build-to width requirements being satisfied, the front yard will remain all
portions of the lot between the primary street lot line and the initial existing
nonconforming building. Transition setbacks may apply, see Div. 4.7 Transitions and
Screening.
Graphics to be removed.
Section 34-5.3.3.C.4.b
Additions to Primary Buildings on a Corner Lot
Existing Language:
b. Side additions with floor area no greater than 20% of the existing primary building
footprint are allowed. Once the build-to width standard has been met for both
streets, side additions of any size are allowed.
Proposed Language:
b. Side additions of any size allowed. Transition setbacks may apply, see Div. 4.7
Transitions and Screening.
Graphics to be removed.
Section 34-5.3.3.C.4.c
Additions to Primary Buildings on a Corner Lot
Existing Language:
c. Rear additions of any size, located behind the build-to zone, are allowed provided:
Page 74 of 78
Proposed Amendment
Nonconforming Buildings and Structures
i. A landscape area at least 6 feet wide adjacent to the side street lot line is
installed across the entire length of the side street frontage. Breaks for
pedestrian, bicycle, and vehicular access of the minimum practical width are
allowed.
ii. The landscape area must include medium or large trees planted an
average of 30 feet on-center along the entire landscape area.
iii. Trees should be planted offset from street trees to maximize space for
canopy growth.
iv. All landscaping must meet the applicable standards of Div. 4.9.
Landscaping.
Proposed Language:
c. Rear additions of any size allowed. Transition setbacks may apply, see Div. 4.7
Transitions and Screening.
Graphics to be removed.
Analysis:
The proposed amendments to Section 34-5.3.3 of the Development Code respond to
specific concerns raised by the Planning Commission regarding how the existing build-to
requirements affect infill development, density goals, and the clarity of the nonconforming
building provisions. Under current language, new primary buildings on interior and corner
lots must first satisfy build-to width requirements before they may be constructed outside
the build-to zone. While this requirement is intended to reinforce street-related urban form,
the Planning Commission views it as unintentionally restrictive—particularly on lots
containing nonconforming primary buildings where the City seeks to encourage additional
units and site efficiency.
A significant source of confusion has been the distinction between rear additions to an
existing nonconforming primary building—which are allowed without meeting build-to
width—and new primary buildings placed behind the existing structure, which are treated
Page 75 of 78
Proposed Amendment
Nonconforming Buildings and Structures
differently. Several Commissioners have expressed that the Code creates a
counterproductive incentive: an applicant may construct a large rear addition by-right, but
if they instead choose a more flexible site layout that separates that volume into an
additional building, the Code forces them to meet build-to requirements before doing so.
This distinction, while technically consistent with the structure of the Code, is not intuitive
and has been interpreted as contradictory to overall density and housing production
objectives.
These amendments clarify and expand where new primary buildings and structures may be
located on both interior and corner lots. By explicitly permitting new buildings in rear, side,
and (for corner lots) side-street yards of an existing nonconforming building—subject only
to transition setback requirements—the revisions provide a more intuitive and permissive
framework for infill development. This supports the City’s goals by allowing additional units
or structures without forcing every project to front-load density at the street edge before
any other development can occur.
A key improvement in the proposed language is the clarification of yard establishment.
Under the amendments, the front yard and street-facing yard remain unchanged until the
build-to width requirement is fully met. No new front or side-street yard is established until
compliance occurs. This prevents partial build-to situations—such as only half the frontage
being built out—from inadvertently creating a new yard condition that could enable
undesirable site layouts, including the possibility of placing parking or vehicular areas in
locations the City intends to reserve for building frontage and pedestrian-oriented form.
Maintaining the original yard definitions until full build-to compliance ensures consistency
and protects the integrity of the street environment.
The amendments also remove percentage-based limits on side additions and eliminate
graphics that attempted to illustrate placement and build-to rules. With clearer, more
direct text, these graphics are no longer necessary and often caused interpretive
confusion. Their removal streamlines the code and improves usability for applicants, staff,
and the Planning Commission.
Overall, these revisions make Section 5.3.3 more permissive, clearer, and better aligned
with the City’s density, housing production, and urban design objectives. By resolving
ambiguities, supporting more flexible infill options, and ensuring yard conditions remain
appropriately regulated until build-to requirements are met, the amendments strengthen
the Development Code and reflect the Planning Commission’s policy direction.
Page 76 of 78
Tier 2 Amendment
Section 34-4.12.3.D
Page: 4-105
Working Document reference: B.19
Existing language:
D. Flood Lights and Flood Lamps
All flood lighting must be activated only by motion-sensors, and must be on a timer limiting
the illumination to a maximum of 15 minutes at a time.
Proposed language:
All flood lighting, except athletic field lighting in the Civic (CV) and Campus (CM) districts,
must be activated only by motion-sensors, and must be on a timer limiting the illumination
to a maximum of 15 minutes at a time.
Analysis:
Current timer provisions for flood lights do not in practice allow for athletic field lighting.
Adding an exemption to field lighting in the CV and CM districts would permit athletic field
lights within City parks, school grounds and the University of Virginia. These lights would
still have to comply with mounting and shielding requirements, as well as color
temperature and light trespass requirements which apply to all outdoor light fixtures.
Page 77 of 78
Proposed Amendment
Average Grade Clarification
Section 34-2.10.1.G
Page: 2-102
Amendment Log B.20
Section 34-2.10.1.G
Existing Language:
2. Full Building Method
For the full building method, a average grade is calculated by averaging the highest and
lowest elevation of existing grade within 5 feet of the building perimeter.
3. Building Module Method
For the building module method, average grade is calculated independent for each building
module by averaging the highest and lowest elevation of existing grade within 5 feet of the
perimeter of each building module.
Proposed Language:
2. Full Building Method
For the full building method, a average grade is calculated by averaging the highest and
lowest elevation of existing finished grade within 5 feet of the building perimeter.
3. Building Module Method
For the building module method, average grade is calculated independent for each building
module by averaging the highest and lowest elevation of existing finished grade within 5
feet of the perimeter of each building module.
Analysis:
Per Section 34-7.2, the existing grade is the grade prior to any site modification.
Requirements such as building height per Section 34-2.10.9.A.4.b are measured from the
average grade. Basing the average grade on existing grade requires a building’s height to be
measured from a grade which no longer exists due to site modification as a part of the
project and creates an inconsistent pattern of development.
Page 78 of 78