Planning Commission Meeting Agenda
January 13, 2026
605 East Main Street
City Council Chambers
Charlottesville, Virginia 22902
Carl Schwarz, Chair
Danny Yoder, Vice Chair
Philip d'Oronzio
Hosea Mitchell
Betsy Roettger
Lyle Solla-Yates
Rory Stolzenberg
Michael Joy
I. Commission Pre-Meeting (Agenda discussion(s))
Beginning: 5:00 p.m. Location: (NDS Conference Room, 610 East Market Street, Charlottesville, VA
22902)
II. Commission Regular Meeting
Beginning: 5:30 p.m. Location: (Council Chambers, 605 E. Main Street, Charlottesville, VA 22902 and
Electronic/Virtual)
1. Commissioner's Reports
2. University of Virginia Report
3. Chair's Report
4. Department of NDS Report
a Tax Abatement Study
b ADU Manual and Student Housing Study
5. Matters to be Presented by the Public not on the Formal Agenda
6. Consent Agenda
a Minutes - October 28, 2025 Work Session
III. Planning Commission Public Hearing Items
Beginning: 6:00 p.m.
1. Development Code Text Amendments - Tiers 1 and 2
IV. Commission's Action Items
Beginning: following any public hearings
V. Future Meeting Schedule/Adjournment
Next Regular Session: Tuesday, February 10 - 5:30 PM
PLEASE NOTE: We are including suggested time frames on Agenda items. These times
are subject to change at any time during the meeting.
Individuals with disabilities who require assistance or special arrangements to participate in the
public meeting may call the ADA Coordinator at (434) 970-3185 or submit a request via email
to ada@charlottesville.gov. The City of Charlottesville requests that you provide a 48 hour notice
so that proper arrangements may be made.
Planning Commission premeeting and regular meetings are held in person and by Zoom webinar.
The webinar is broadcast on Comcast Channel 10 and on all the City's streaming platforms
including: Facebook, Twitter, and www.charlottesville.gov/streaming. Public hearings and other
matters from the public will be heard via the Zoom webinar which requires advanced registration
here: www.charlottesville.gov/zoom . You may also participate via telephone and a number is
provided with the Zoom registration or by contacting staff at 434-970-3182 to ask for the dial in
number for each meeting.
Page 1 of 143
Charlottesville
Affordable Housing Tax Abatement Study
Draft
December 5th, 2025
Page 2 of 143
Table of Contents
1
3
4
6
13
21
Executive Summary
Introduction
Background
Origins of the Affordable Housing Tax Abatement Study
Affordable Housing Tax Abatement Overview
Tax Abatement Analysis
Method Overview
Findings and Implications
Current Market Feasibility
Market Feasibility without Inclusionary Zoning
Tax Abatement Efficacy
Other Potential Incentives
Future Potential Analyses
Conclusion
Page 3 of 143
Executive Summary
The purpose of this study was to assess how tax abatement may affect the market feasibility
of new housing projects that include the required 10 percent affordable units in the new
inclusionary zoning ordinance. This entailed extensive data collection and analysis described
in the following sections, engagement with housing builders and advocates of affordable
housing, and finally the creation and refinement of a model known as the Charlottesville
Development Feasibility Assessment Tool. The process yielded several key findings,
summarized here:
• Market Conditions are Challenging Regardless of City Policy: The current market
conditions make many housing products difficult to build in 2025. Construction costs
have increased and interest rates are high. These conditions make it difficult for
developers to build larger housing projects even in the absence of the inclusionary
zoning ordinance. Adding the costs of the affordable units increases this financial
difficulty that even the presence of a tax abatement program may struggle to
overcome.
• Inclusionary Zoning is a Material Financial Burden: The inclusionary zoning policy
aims to alleviate the shortage of affordable housing units in Charlottesville. However, it
does have quantifiable, negative impacts on financial returns of housing development.
While projects may still earn a return on investment, the lenders that typically help
finance projects are weighing other investment options and the inclusionary zoning
ordinance substantively reduces the returns that can be realized from building 10-
plus unit housing projects in the Charlottesville market.
• A Traditional Tax Abatement 1 Provides Financial Relief, But Not Equivalent to the
Cost of Inclusionary Zoning: Through the process of modeling multiple levels of tax
abatement for several project types it became clear that in the current conditions
a traditional tax abatement model is unlikely to close the gap enough to entice
developers to build most housing products without assuming long-term risk to
city tax revenue. In general, the inclusionary zoning requirement impacts yields on
cost by around one-half of one percent, while traditional improvement-value based
abatements often contribute less than one-tenth of one percent to project yields. In
order to significantly improve the feasibility of housing construction, the traditional
abatement model would require long-term commitment of tax reductions based upon
a number of hard to predict variables such as land values, improvement values, and
1 Traditional tax abatement is defined as the calculation model that preserves the original pre-construction base tax rev-
enue as none of that original tax is eligible for abatement/credit relief. Rather, the abatement percentage, at whatever level
is only applied to the new increment tax revenue that is the result of the new construction finished product. This calcula-
tion, therefore, can fluctuate dramatically over time as it is based upon changing land values, improvement values, and tax
rates, all of which have multiple change drivers.
1
Page 4 of 143
tax rates. The greatest risk of a tax abatement program is the risk of providing an
abatement to a project that would have been built anyway. The traditional model that
is based on these variables exacerbates that risk and thus increases the risk to city
tax revenue.
• A Tax Abatement Based on a Rent Gap Approach Merits Consideration: An abatement
model that is based on the gap between market rent and affordable rent, similar to
Baltimore’s High-Performance Inclusionary Housing Tax Credit, is worth considering
in Charlottesville and by limiting the number of calculation variables, reduces the
long-term budget risks. Such an approach that is applied only to the affordable units
when using the accompanying feasibility model, essentially covers just the cost of
the financial loss attributed to inclusionary zoning and lowers the cost risk of over
subsidizing projects that may well have been built anyway. By addressing the rent
gap, this approach covers what is considered by some to be an unfunded mandate of
requiring a share of units to be offered at a reduced rent. This method also benefits
from the ease of administration in calculating the abatement and monitoring it over
time, as well as the ease of understanding by the public. And finally, with this model the
City’s cost will decrease going forward if market rate rents drop as the consequence
of building more housing units across the city and the gap between market rate and
affordable rent is reduced.
• Other Incentives and Policies Merit Consideration: As the initial results on tax
abatement came in, the study expanded to incorporate other potential incentives
into the Charlottesville Development Feasibility Assessment Tool. Approaches the
City can use - such as pre-development timeline reduction, gap financing, and loan
forgiveness - all have quantifiable benefits to development feasibility, and can be
used in combination or tailored to maximize utility in specific situations.
• Conditions Will Change and the Tool Has Lasting Utility: These findings represent
a snapshot in time. Costs and revenues are constantly changing in response to
market forces and government policy. The efficacy of tax abatement and other
policy interventions will change too as time rolls on. The Charlottesville Development
Feasibility Assessment Tool is transparent and usable by City staff for this very reason.
Steady upkeep of the tool will allow the City the best opportunity to be informed about
the efficacy and magnitude of any intervention
The analysis presented in this study comes with an important caveat. It assumes that the
primary obstacle to the construction of more mixed-income projects by the private sector is a
financial one. It is not clear that simply removing the financial burden will lead to construction
of mixed-income projects where 10 percent of the units are affordable to households at 60
percent of the area median income.
2
Page 5 of 143
This report documents the methods and findings of a study to assess the efficacy of tax
abatement to increase the production of affordable housing units in the City. The study also
considered other possible policy tools and strategies to understand their effectiveness.
The primary outcome of the study is a model, called the Charlottesville Development Feasibility
Assessment Tool, which the City can use to assess the effectiveness of various policies and
strategies for increasing the production of affordable housing units, with an emphasis on tax
abatement. The tool is non-proprietary, which means all the assumptions, inputs, and math
are visible to all and can be adjusted by staff, the development community, and the public at
large to test different levels of tax abatement and other policies. The intent is that the City
can maintain the tool by updating the inputs and use it on an ongoing basis to assess various
policies aimed at increasing affordable housing.
The tool is informed by a market analysis that identified and quantified the cost drivers and
income associated with housing development. For the purposes of this study the focus was
solely on for-rent housing products. However, the methods can be adjusted to account for
the for-sale market as well. This study also focused on housing projects with 10 or more
units, which are subject to the new inclusionary zoning ordinance, which requires that 10
percent of units be affordable for households at or below 60 percent of the area median
income. Additionally, the study considered submarkets to incorporate variations in cost and
rent differences across the different geographies of the City. The report documents these
inputs and provides instructions for how the City can update the data over time.
The study finds that the inclusionary zoning ordinance has a demonstrable financial impact on
development feasibility, but that even without inclusionary zoning development feasibility
within Charlottesville is limited due to a mismatch between development costs and
anticipated revenues. Moreover, the study finds that a tax abatement has quantifiable financial
benefits, and affords City decision-makers with a flexible development incentive. However,
an abatement alone is unlikely to immediately produce significant shifts in development
activity across all housing types due to the underlying market conditions mentioned above.
As the underlying conditions driving up costs change, tax abatement may become a stronger
incentive for affordable housing development, especially abatements designed to directly
address the rent gap between affordable and market rate units.
Introduction
3
Page 6 of 143
Origins of the Affordable Housing Tax Abatement Study. Charlottesville adopted
a new development code on December 18, 2023. The code became effective on February
19, 2024. The new code includes a requirement that any development project of 10 or more
residential dwelling units provides 10 percent of the units as affordable for households at
or below 60 percent of the area median income. These affordable dwelling units must be
income restricted for a minimum of 99 years. The requirement does not apply to projects in
the Residential A, Residential B, Residential C, and Residential Core Neighborhood zoning
districts.
The City adopted this inclusionary housing element of its zoning ordinance following a robust
planning and community engagement process that began with the creation of an Affordable
Housing Plan adopted by the City Council in 2021, and a Comprehensive Plan update also
adopted in 2021.
The City’s Affordable Housing Needs Assessment in 2018 informed the City’s policies included
in the Affordable Housing Plan, Comprehensive Plan, and inclusionary zoning ordinance. The
assessment found a need for 3,318 affordable housing units in 2017 and 4,020 by 2040. The
2021 Affordable Housing Plan found that more than 2,700 renter households in Charlottesville
pay more than 50 percent of their income on rent and utilities. These figures highlight the
need for more housing construction and more affordable units.
Charlottesville City Council has recognized the need for public investment in affordable
housing and committed $10 million per year for a decade to help the City achieve its affordable
housing goals. The tax abatement under consideration is being considered in this context. The
tax abatement policy can also help advance the Comprehensive Plan’s stated goal to “focus
and align subsidy programs with community-defined priorities and make changes to increase
the impact of public spending.”
Affordable Housing Tax Abatement Overview. Tax abatement is a temporary reduction
or exemption from taxes levied by a unit of government, typically to encourage a particular
activity. The purpose of the tax abatement under consideration in this study is to encourage
mixed income housing developments of 10 or more units, which are subject to the City’s
Affordable Dwelling Unit Ordinance. Local governments across the United States and Virginia,
including the City of Richmond and Albemarle County, have used tax abatement for similar
purposes. This study provides insights on the efficacy of varying levels and terms of abatement
based on conditions in the Charlottesville market.
An important caveat about tax abatement in Virginia is that state code does not allow abatement
of taxes to private entities for affordable housing development. However, Virginia Code §15.2-
Background
4
Page 7 of 143
4905 allows for financial incentives, including grants tied to affordable housing development.
Therefore, if Charlottesville were to adopt a tax abatement for affordable housing, the financial
incentive would be leveraged from the increase in value and the associated increase in real
estate tax revenue attributed to development, and reimbursed to the owner as a performance
grant.
The property owner would therefore pay the full real estate taxes on the entire post-
development assessed value, and then receive a reimbursement for some portion of the taxes
on the increase in assessed value, post-construction.
5
Page 8 of 143
Method Overview. The methods for the
study are oriented towards providing reliable
inputs to the Charlottesville Development
Feasibility Assessment Tool. The tool uses
inputs related to the costs and income
associated with housing development to
enable the evaluation of tax abatement, and
other policies, on the feasibility of general
housing projects.
In the tax abatement under consideration
by the City of Charlottesville, the abatement
would apply to the increase in property value
resulting from a development of 10 or more
units that includes affordable dwelling units.
The baseline, pre-development, value would
continue to be taxed as it was prior to the
development. Meanwhile, only a portion of
the increased value would be subject to real
estate taxes. The portion of the increased
value subject to real estate taxes, and the
time period for the abatement, is a policy
decision to be made by the City Council.
This study, and resulting Charlottesville
Development Feasibility Assessment Tool
for assessing the efficacy of tax abatement,
is intended to support informed decision
making.
The tool uses a generalized pro-forma
to summarize, for a “typical” project, the
fiscal impacts of developments costs and
revenues along traditional development
timelines. However, it also runs parallel
pro-formas for projects with and without
City policy interventions. This allows the
user to quantify the fiscal impacts of their
selected intervention. As property taxes are
Tax Abatement Analysis
6
Page 9 of 143
Housing Type # Floors Construction Materials Assumed Average Unit
Size (GSF)
High Rise 9+ Steel & concrete 900
Mid Rise 5-8 Wood & concrete 1,000
Low Rise 3-4 Wood 1,100
Garden Apartment 1-2 Wood 1,300
Townhouse 2 Brick & wood 1,800
Single Family 2 Brick & wood 2,000
traditionally incorporated in a pro-forma as an input to net operating income, a pro-forma
based evaluation for the impacts of a tax abatement is a natural fit.
The City first analyzed underlying development feasibility absent the inclusionary zoning
requirement. In other words, the study evaluated how feasible large-scale development
projects would be given current development costs and revenues with no affordable housing
units. These findings were then compared to the same set of large-scale development projects,
but with the 10 percent affordable units requirement. Finally, the development projects were
analyzed using both the inclusionary zoning requirement and a range of tax abatement options.
The differences in findings between these three general conditions (no inclusionary zoning,
with inclusionary zoning, with inclusionary zoning and tax abatements) reflects the financial
implications of the inclusionary zoning mandate and associated abatements.
Housing Types. This analysis looked at six common housing types. These housing types
are common in the City, except for high rise. The table below summarizes each type’s general
conditions. These conditions can be updated in the tool as needed. The following graphics
also give the reader a sense of what each “housing type” means.
7
Page 10 of 143
Figure 1 | Graphical Examples of Housing Types
8
Page 11 of 143
Submarkets. The tool allows the user to select a “submarket”
as part of the analysis. This is important because the feasibility
of a housing project is heavily influenced by its location, with
both costs (in the form of land prices) and revenues (in the
form of rents) being subject to location-specific variables that
can vary widely even within a single locality.
As such, this model provides five different price-based
“submarkets”, representing tiers of land costs and rents.
Importantly, these five submarkets are not tied directly to
Charlottesville neighborhoods. This is because neighborhood-
based prices in any specific neighborhood can change relative
to others over time.
However, the tool assumes that more expensive tiers would
typically be situated on smaller lots than less expensive tiers.
The tool assumes parcel sizes for tier 1 projects (most expensive
areas) are 1 to 2 acres, while parcel sizes for tier 5 (least
expensive) projects were 3 to 4 acres. As with all assumptions
in the tool, these can be changed to reflect changes in the
underlying conditions and typical development situations in the
City.
Tool Inputs. All model inputs are grouped into one of five
categories: hard costs, soft costs, land costs, revenues, and
other assumptions. Each category is described below:
Hard Costs. “Hard costs” include all costs associated with
the physical construction effort, including construction of the
building, parking, and site preparation. Initial estimates for
building construction costs are a blend of multiple sources.
Initial data was acquired from the online cost estimating
resource RSMeans Online, which provides total construction
and per square foot construction cost estimates for a wide
range of building types based on user inputs on materials and
dimensions.
The study developed estimates for each building type using
dimensions sourced from local examples, such that a “typical”
mid-size development in the model reflects an amalgam of
existing mid-size projects throughout the City. This data was
then vetted and adjusted via feedback from local developers
who contributed confidential financial data to this project.
9
Page 12 of 143
Notably, the estimates from RSMeans and local developers often aligned but not always. The
reasons for the cost differences between sources is elusive due to the many assumptions
required in any cost estimating. But in such cases, it was assumed that the local developer
input was more accurate as they are the local experts, and that data was used in place of
RSMeans.
Soft Costs. “Soft costs” include all costs primarily associated with the development and
approval of plans necessary for building permit approval, such as consultant fees and
municipal fees.
Municipal fees can vary by project and project type, but were set as 4 percent of total hard
cost estimates,
incorporating fees expected to be paid by typical projects from the building
inspection fee schedule and the City’s Neighborhood Development Services fee schedule.
Consultant fees cover services such as civil engineering, architecture, and legal. They are
sensitive both to project complexity and timeline. As such, the model uses assumptions for
standard (15 percent of hard costs) and minimum (12 percent of hard costs) consultant fees,
and applies the standard fee to a typical development timeline. The tool assumes that changes
to the typical predevelopment timeline would change the consultant fee.
Land Costs. “Land costs” relate exclusively to the cost of purchasing land in the City. Other
costs that may be considered land costs, such as site preparation, are included in hard costs.
Land costs are extremely sensitive to market conditions and land entitlements, and can vary
widely over time. While there was general consensus on hard costs and soft costs from the
local development community, there was less agreement on land costs. Additionally, there
have been too few land sales since the adoption of the new zoning code to fully assess the
effects of the code on land prices. As such, the model relied more heavily on tax assessor
data on assessed land values.
The process for developing typical land costs as an input to the tool started with comparing
recent land sales to current assessed land values. The study found that for the limited number
of 2024 and 2025 sales, sale prices were routinely 33% to 50% higher than assessed value,
while 2023 sales were nearly identical to assessed values.
Next the study assigned each building type to a primary land use code from the City assessor.
Each building type was also assigned an estimated units per acre. These assumptions allowed
for estimated per door land cost by parcel by primary land use code.
Land cost tiers were initially defined simply by the percentile rank of assessed land values for
all parcels with housing in the City. Next the study assigned a percentile rank to each tier as
outlined on the following page.
10
Page 13 of 143
In other words, a Tier 1 land cost is the equivalent of the 85th percentile per acre assessed
land value, Tier 2 is the equivalent of the 65th percentile per acre assessed land value, etc.
As a final step in the initial data-based land cost estimate, the study applied a sales-based
adjustment factor of 33 percent increase to reflect the difference between assessed values
and recent sales.
The developed land cost estimates were considered reasonable by some local developers,
but too high by others. As such, land costs were adjusted down as a middle ground between
estimates, but it is possible that land costs could be higher than those calculated based on
the method described in this section and incorporated into the model.
Revenues. “Revenues” include market rate and affordable rents. The study estimated
market rents by collecting existing asking rents across multiple online real estate platforms.
The collected rents were assumed to be generally consistent with the tier 2 submarket, as
the sources were generally from new or recent construction, and tended to have higher-end
amenities. A typical tier 2 rent was defined as the average of available median and maximum
asking rents. In the event there was insufficient data for a particular unit type, an estimate
was created based on professional experience. Rents for each of the five tiers were then
based on a proportion of that tier 2 rent, ranging from 85 percent (Tier 5) to 110 percent (Tier
1) of the tier 2 rents.
Affordable rents are set as 30 percent of gross income for the respective area median income
band (mid-point of the area’s income distribution). The City requires projects with 10 or more
units to include 10 percent of the units leased at rents affordable to incomes that are 60
percent of the are median income. However, the tool allows users to assess other levels of
income-based affordability.
The U.S. Department of Housing and Urban Development income limits are provided by
household size, not number of bedrooms. To convert from household size to bedrooms,
the study assumed that the bedrooms by household number was equivalent to one fewer
bedrooms than the number of persons in the household (so the affordable rent for a 2 bedroom
apartment equaled 30 percent of income for a 3-person household).
Tier Percentile
Tier 1 85th
Tier 2 65th
Tier 3 50th
Tier 4 35th
Tier 5 15th
11
Page 14 of 143
Other Assumptions. There are several other assumptions and necessary inputs to a pro-
forma model, including predevelopment and construction timelines, property taxes, typical
parcel sizes, unit mixes, and structures in a single development. Each was determined
based on professional experience and vetted through consultation with staff and the local
development community.
It is important to note that the tool is intended for use in assessing the effect of policy
interventions of a “typical” project and is not intended for use to assess a specific project on
a specific site. Such an analysis would require data on costs that are not accessible to the City
at a reasonable level of effort. Furthermore, that level of analysis is not necessary to answer
the key question of the City, which is about the effectiveness of tax abatement.
12
Page 15 of 143
Findings & Implications
Current Market Feasibility. An initial step in the study was to assess the feasibility of
various housing products under current conditions in the City, which includes the inclusionary
zoning ordinance, but not a tax abatement policy. The table below shows that new housing
construction feasibility is limited when applying the assumptions outlined earlier in this report.
There is evidence that high-rise housing construction has the highest yields and internal rate
of return (IRR), and may be feasible in some specific instances. Yet no housing product in any
submarket reached the threshold of “likely feasible”, defined as 7.0 percent yield on cost or
15 percent IRR. (See tables below for feasibility threshold definitions, but note that these are
merely suggested thresholds for visualization and summarization purposes.) No other housing
type had sufficient yields or IRR to suggest anything other than limited to unlikely feasibility,
meaning there would need to be some substantial change in either costs or revenues to
support investment.
Yield on Cost
Typology Tier 1
Highest value areas
Tier 2 Tier 3 Tier 4 Tier 5
Lowest value areas
High Rise 6.1% 5.9% 5.8% 5.5% 5.5%
Mid Rise 5.0% 4.8% 4.5% 4.3% 4.8%
Low Rise 4.4% 4.1% 4.2% 4.1% 4.1%
Garden Apartment 4.2% 3.9% 4.1% 4.0% 4.0%
Townhouse 4.4% 4.1% 4.2% 4.0% 3.9%
Single Family 5.1% 4.7% 4.8% 4.6% 4.4%
Likely Feasible 7%+
Possibly Feasible 5.5-7%
Not Likely Feasible <5.5%
IRR
Typology Tier 1
Highest value areas
Tier 2 Tier 3 Tier 4 Tier 5
Lowest value areas
High Rise 8% 8% 7% 6% 6%
Mid Rise 4% 3% 1% 0% 3%
Low Rise 1% 0% -1% 0% 0%
Garden Apartment -2% 0% -2% 0% 0%
Townhouse 0% -2% -1% -2% 0%
Single Family 4% 3% 4% 2% 1%
Likely Feasible 15%+
Possibly Feasible 10-15%
Not Likely Feasible <10%
13
Page 16 of 143
Market Feasibility without Inclusionary Zoning. A next step in the study was to assess
the market feasibility of various housing products without the inclusionary zoning ordinance.
Higher density developments, particularly with higher rents, would be most likely to reach
“possibly feasible” investment thresholds, while most other large-scale projects would struggle
to do so.
Yield on Cost
Typology Tier 1
Highest value areas
Tier 2 Tier 3 Tier 4 Tier 5
Lowest value areas
High Rise 6.6% 6.4% 6.2% 5.9% 5.9%
Mid Rise 5.3% 5.1% 4.8% 4.5% 5.0%
Low Rise 4.7% 4.3% 4.4% 4.3% 4.3%
Garden Apartment 4.4% 4.1% 4.2% 4.1% 4.2%
Townhouse 4.8% 4.4% 4.5% 4.3% 4.1%
Single Family 5.6% 5.1% 5.2% 5.0% 4.7%
Likely Feasible 7%+
Possibly Feasible 5.5-7%
Not Likely Feasible <5.5%
IRR
Typology Tier 1
Highest value areas
Tier 2 Tier 3 Tier 4 Tier 5
Lowest value areas
High Rise 10% 9% 9% 8% 8%
Mid Rise 6% 5% 3% 2% 5%
Low Rise 2% 0% 1% 0% 0%
Garden Apartment 0% -3% -1% -2% -1%
Townhouse 2% 0% 1% 0% -2%
Single Family 7% 5% 6% 5% 4%
Likely Feasible 15%+
Possibly Feasible 10-15%
Not Likely Feasible <10%
14
This suggests two important findings. First, development feasibility is difficult to achieve
under current market conditions even absent inclusionary zoning requirements. Second, the
inclusionary zoning requirement has a substantive effect on feasibility. The following table
compares returns with and without inclusionary zoning. The difference in yields are as large
as 0.5%, and the difference in IRRs reach close to 3% in some circumstances.
Page 17 of 143
INCLUSIONARY ZONING FEASIBILITY IMPACTS
Yield on Cost
Typology Tier 1
Highest value areas
Tier 2 Tier 3 Tier 4 Tier 5
Lowest value areas
High Rise -0.5% -0.5% -0.4% -0.4% -0.4%
Mid Rise -0.3% -0.3% -0.3% -0.2% -0.2%
Low Rise -0.3% -0.2% -0.2% -0.2% -0.2%
Garden Apartment -0.2% -0.2% -0.1% -0.1% -0.2%
Townhouse -0.4% -0.3% -0.3% -0.3% -0.2%
Single Family -0.5% -0.4% -0.4% -0.4% -0.3%
Tax Abatement Strategies. With a firm understanding of the housing market, both with and
without the inclusionary zoning ordinance, the focus shifted to modeling the effects of a tax
abatement policy. Tax abatement can take many forms, therefore, the model Charlottesville
Development
Feasibility Assessment Tool is built to allow users to explore many abatement
strategies.
Traditional tax abatements provide property tax relief for qualifying units. In general as
typical best practice, only affordable units qualify for the abatement, and that was assumed
for this analysis. (Note however, that for policy illustrations the Tool allows users to select
abatements to apply to either affordable units only or all units, though in the tax gap approach
the policy option to apply the abatement to “all” units violates the elegance of that model in
addressing only the direct financial impact of the ADU requirement.) Therefore, if the typical
approach were applied in Charlottesville it would mean that for projects meeting the minimum
inclusionary zoning requirement, only those 10 percent of units set aside as affordable would
be eligible for tax relief.
It bears reminding
that the underlying theory of tax abatement programs is that the abatement
applies only to the additional improvement value from the project and so it does not impact any
15
IRR
Typology Tier 1
Highest value areas
Tier 2 Tier 3 Tier 4 Tier 5
Lowest value areas
High Rise -2% -1% -2% -2% -2%
Mid Rise -2% -2% -2% 2% -2%
Low Rise -1% 0% -2% 0% 0%
Garden Apartment -2% -3% -1% -2% -1%
Townhouse -2% -2% -2% -2% -2%
Single Family -3% -2% -2% -3% -3%
Page 18 of 143
pre-development property taxes. The feasibility model assumes pre-development property
taxes would be equivalent to the property’s land sale price.
There are many ways a traditional abatement can be structured, with modifications to the
abatement proportion, the length of the abatement, or eligibility requirements as examples.
In discussions with local stakeholders and staff, several different abatement options were
mentioned as worthy of evaluation, including policies from Minneapolis, MN; Columbus, OH;
and Baltimore, MD. This is by no means an exhaustive list, nor was a thorough review of
existing abatement policies a purpose of this study (though the model can be used to evaluate
a wide range of policies at the City’s discretion). However, a brief summary of these three
programs is provided here for context.
Minneapolis, MN. Per the City of Minneapolis website, the 4d Affordable Housing Incentive
Program provides a 10-year reduction in property taxes on all qualified units, to 0.25% (compared
to around 1.2%), for property owners that agree to provide 20 percent of units affordable
to households making 50 percent or 60 percent of AMI for 10 years. Eligible properties are
offered additional incentives, including green infrastructure grants and rebates.
Columbus, OH. Program eligibility includes a geographic component, whereby the City
includes three area designations based on a mix of economic indicators, each with their own
set of requirements, generally targeting 20 percent or more of units available for 60 percent
to 100 percent of AMI. All taxes on improved value are waived under this program.
Baltimore, MD. In January of 2024, Baltimore instituted the High-Performance Inclusionary
Housing Tax Credit. This policy effectively serves as a rebate for all qualified affordable units,
based on the revenue gap between the affordable rent and the market rate rent the unit
otherwise would have commanded. Each year the program provides a tax credit equal to the
rent difference between affordable units and comparable market-rate units.
Tax Abatement Efficacy. The following tables summarize the feasibility impacts of example
abatement strategies.
The first example employs a traditional improvement-value-based tax abatement providing
30 years of abatement in a Mid-Rise tier 3 development, with 135 total units of which 14 are
affordable to households at 60 percent AMI. The following table shows the fiscal impacts of
abatements at four different rates, from 25% to 100% of estimated taxes on the affordable
units.
16
Page 19 of 143
*This calculation assumes that a project would not be developed without the abatement, and thus no tax revenue
would be generated.
The
Mid-Rise Tier 1 abatement provides generally similar impacts to yields and IRR, with
feasibility benefits increasing as the abatement percentage increases . However, the
monthly revenue loss associated with affordable unit provision is several thousand dollars
a month higher in the Tier 1 project than in the Tier 3 project, driven largely by the higher
market rate rents found in this tier (and thus larger gap between this project's market
rent and citywide affordable rent) . Additionally, the abatement "return" the City provides
in this scenario is several thousand dollars higher than the previous scenario. The result is
that while the tax revenue abated in this scenario is higher than in the Tier 3 scenario, that
extra abatement does not provide substantive improvements in development feasibility.
*This calculation assumes that a project would not be developed without the abatement, and thus no tax revenue
would be generated.
As the tax abatement increases the returns increase, as the tax revenue waived by the City is
accrued by the property owner.
But importantly, the gap between the revenue loss incurred by the property owner is never
matched by the value of the of the abatement. The inclusionary zoning requirement “cost” the
development more $13,000 in foregone market-rate revenue while returning no more than
$4,500 through the abatement.
Another analysis examined the impact of different submarkets to evaluate the locational
element of the Columbus example. The table below shows the findings of the same Mid-Rise
project but in a tier 1 submarket.
Mid-Rise
Tier 1
Abatement
Yield Change IRR Change Monthly
“Loss” for
Affordable
Units
Abatement
“Return” for
Affordable
Units
Annual
Revenue
“Waived”
New Tax
Revenue*
25% 0.03% 0.15% $17,285 $1,284 $15,412 $572,619
50% 0.05% 0.30% $17,285
$2,569 $30,824 $557,207
75% 0.08% 0.44% $17,285 $3,853 $46,236 $541,795
100%
0.10% 0.56% $17,285 $4,900 $58,803 $529,282
17
Mid-Rise
Tier 3
Abatement
Yield Change IRR Change Monthly
“Loss” for
Affordable
Units
Abatement
“Return” for
Affordable
Units
Annual
Revenue
“Waived”
New Tax
Revenue*
25% 0.02% 0.17% $13,636 $1,162 $13,944 $527,943
50% 0.05% 0.35% $13,636 $2,324 $27,888 $513,599
75% 0.07% 0.52% $13,636 $3,486 $41,382 $500,035
100% 0.09% 0.67% $13,636 $4,516 $54,189 $487,699
Page 20 of 143
18
Finally, the table below summarizes the impacts of a gap-based abatement on a Mid-Rise Tier
3 product. As in the examples on the previous page, four abatement percentages were used.
Mid-Rise
Tier 3
Abatement
Yield Change IRR Change Monthly
“Loss” for
Affordable
Units
Abatement
“Return” for
Affordable
Units
Annual
Revenue
“Waived”
New Tax
Revenue*
25% 0.07% 0.51% $13,636 $3,409 $40,909 $500,797
50% 0.14% 0.99% $13,636 $6,818 $81,817 $460,070
75% 0.21% 1.45% $13,636 $10,227 $122,726 $419,162
100% 0.29% 1.90% $13,636 $13,636 $163,634 $378,253
The findings reveal several key distinctions between the traditional improvement-value based
and rent-gap based abatement styles:
•
At each abatement percentage, the fiscal impacts are higher in the Rent Gap method
than traditional abatements. With a gap o
f nearly $1,000 between estimated market
rates and affordable rates in this example project, even small gap closures have
significant implications. Even an abatement or reimbursement of 25 percent of the rent
gap in this example has a higher return per affordable unit and thus overall amount of
annual tax revenue waived.
•
The Rent Gap method provides the
opportunity to reimburse any proportion of
revenue lost in the inclusionary zoning requirements, including all or more of market
rent revenues lost.
•
The Rent Gap model tends to have larger financial implications on tax revenues
w
aived, making it a more “costly” intervention for the City.
• Qualification and enfo
rcement would be different, with the Rent Gap model relying on
market rents while other methods rely on assessed improvement values.
This last point is particularly notable, as the different methods create different theoretical
incentives for City action. In traditional improvement value-based abatement policies, changes
to property values have a positive effect on City tax revenue, but also increases the amount
of the abatement the City provides. However, in rent gap abatement policies, changes in
improvement value do not increase the amount of revenue “lost” through an abatement.
Furthermore, as market rate rents decline relative to areawide income, so too does the cost
of the abatement. In other words, lower housing costs lead to lower abatement “losses”.
*This calculation assumes that a project would not be developed without the abatement, and thus no tax revenue
would be generated.
Page 21 of 143
19
Other Potential Incentives. Recognizing that tax abatement alone is likely insufficient
to stimulate the development of mixed-income housing products, the study incorporated
other incentives for City exploration now and in the future. The list of incentives and basic
descriptions are provided below:
• Gap Financing: This would be a low-interest loan provided by the City that offsets
commercial construction or commercial loan costs. The model allows for a per-unit
loan at a user-defined amount and rate. Using the mid-rise tier 3 project example, a
$100,000 per unit affordable loan (totaling $1,400,000) at 1 percent interest would
generate an IRR improvement of 0.45%, an impact similar to a 75 percent traditional
improvement value-based tax abatement or 20 percent reimbursement in the Rent
Gap method.
• Land Provision: This incentive adjusts land costs by allowing users to set the
proportion of land costs that are waived by the prior landowner, thus reducing initial
land costs. Using the mid-rise tier 3 project example, if land were provided for free
(estimated value of approximately $1,600,000) it would generate an IRR improvement
of 1.4 percent.
• Reduced Review/Approval Timeline: This incentive provides time and soft cost
benefits by reducing the assumed timeline for construction permits. The model
formulas assume that soft costs like consultant fees are lower through fewer review
cycles or less onerous initial documentation requirements, while it also increases
net present value of revenue, as units become available for rent sooner. The model
allows for a user-determined timeline reduction in months. Using the mid-rise tier 3
project example, a 6-month reduction in the pre-development timeline generates an
IRR improvement of 0.9 percent and a yield under 0.1 percent.
• Forgivable Loans: This incentive presumes a grant or loan that is not repaid,
effectively reducing the project cost without incurring any additional downstream
repayments. The model allows for a per-unit forgivable loan amount. Using the
mid-rise tier 3 project example, a $1,500,000 forgivable loan would generate an IRR
improvement of 1.5 percent and a yield improvement of 0.1 percent.
Incentive Approach Incentive Amount Units IRR Impact
Gap Financing $1,400,000 1% Loan 0.45%
Land Provision $1,600,000 Land 1.40%
Reduced Review/Approval Timeline 6 months Time (Months) 0.90%
Forgivable Loans $1,500,000 Loan 1.50%
Page 22 of 143
20
Future Potential Analyses. During the course of this task, stakeholders suggested several
ideas for future analyses that may be beneficial to the City’s decision-making process but
were out of scope of this particular task. They include:
• Adding an analysis of w
orkforce gained through construction or otherwise lost by not
supporting construction
• Review
ing peer community permitting processes and recent activity
• Adding a voucher holder gap analysis
• Adding Oppo
rtunity Zone benefits to the model calculations
These are all potential future enhancements to the Charlottesville Development Feasibility
Assessment Tool.
Page 23 of 143
Tax abatement is one of many tools the City can use to increase the feasibility of housing
development. However, it likely will not in 2025 or 2026 help a project get to the threshold of
“likely feasible” on its own. The current market conditions and inclusionary zoning ordinance
are headwinds that are hindering the feasibility of projects with 10 or more units. The City may
need to look at additional incentives to get projects built. The good news is that conditions
can change quickly, and the City now has a tool it can use to assess the efficacy of various
policies now and in the future.
Conclusion
21
Page 24 of 143
Kellie Brown
Director
Neighborhood Development Services Department
ADU Manual In Lieu Fee/
Student Housing Study
Page 25 of 143
Development Code Amendments: Background
• The Current Development Code was Adopted on December 18, 2023 – Designed to
facilitate a more form-based zoning ordinance, increasing density in alignment with the 2021
Comprehensive Plan.
• Need for Amendments – Staff identified both minor and significant issues requiring revisions
to better support City goals.
• Three-Tier Approach:
• Tier 1 – Minor grammatical corrections, small adjustments, and state requirements.
• Tier 2 – Modifications addressing oversights and clarifications to support the Intent
sections of the code.
• Tier 3 – Policy changes requiring in-depth analysis and community engagement.
• Next Steps:
• Tier 1 & 2 – Advancing to Public Hearing with Planning Commission January 13, 2026,
then a Public Hearing with City Council later in the winter of 2026.
• Tier 3 – Considered in the broader FY26 NDS workplan and beyond.
• Ongoing Process – Annual updates for Tier 1 & 2 to ensure adaptability, best practices, and
sustainable growth.
Page 26 of 143
Tier 3 Amendments
• Purpose – Focuses on policy changes and confirmations requiring in-depth analysis and
broader community engagement.
• Scope – Significant amendments that impact long-term planning and require careful evaluation
of goals and implications.
• Community Input – Extensive outreach to gather feedback and ensure alignment with public
priorities.
• Process – Will be prioritized within the broader future NDS workplans, given the complexity
and resources required.
• Future Considerations – Helps shape long-term regulatory strategies to maintain an
adaptable and effective Development Code.
Page 27 of 143
Tier 3 Study: ADU Manual In Lieu Fee/Student Housing Study
Purpose of the Study
• Annual review and update of the Affordable Dwelling Unit (ADU) Monitoring
and Procedures Manual
• Focus on refining expectations for:
• In-lieu fee payments
• Bonus height projects
• Student housing
Page 28 of 143
Residential Districts:
• R-A, RN-A, R-B, R-C
Mixed Use Districts:
• Corridor: NX-3, NX-5, NX-8,
NX-10, DX
• Node: RX-3, RX-5
• Residential Mixed Use: CX-3,
CX-5, CX-8
Other Zoning Districts:
• Industrial Flex: IX-5, IX-8
• Special: CM, CV , Alternate
Forms
Zoning Categories and Overlay Districts
Overlay Districts (* Design
review required):
• Core Neighborhood
Corridors
• Entrance Corridors *
• Architectural Design
Control Districts *
• Historic Conservation
Districts *
• Individually Protected
Properties *
• Floodways and
Floodplains
Page 29 of 143
Residential Development:
• Projects ≥10 units provide 10% at ≤60% AMI or pay in-lieu fee
• Bonus height for units at ≤50% AMI or same fee
• In-lieu fee = average total cost per unit of developing a
residential unit in the Charlottesville market, based on
bedroom count up to 3 bedrooms
Student Housing
• Projects that rent by the bedroom within ½ mile of Campus
Grounds
• No on-site affordable units are required
• Bonus height may also be realized
• In-lieu fee is required
• In-lieu fee = difference between the value of a market
rate unit and that of an affordable unit (i.e. value
gap), based on bedroom count up to 3 bedrooms
Affordable Housing Requirements
Non-Student Housing
Student Housing
Page 30 of 143
Area within ½ Mile of GroundsUVA Grounds
Locations Where Affordable Housing Expectations for Student Housing Apply
Page 31 of 143
Residential Development (Non-Student Housing):
• Inconsistent in-lieu fee payment structure for bonus height
• Projects opting to pay the in-lieu fee are being charged for
bonus height as if the on-site requirement is 60% AMI,
not 50% AMI
Student Housing
• Lack of requirement for on-site units limits new affordable
housing where student housing is most financially feasible
reinvestment option
• Student housing have lower per-bedroom cost requirement
for in-lieu fee, which further incentives student housing
• No consideration for conversions to non-student housing
• No consideration for four-bedroom units
• Large geography applies this policy to neighborhoods where
displacement is a concern
Initial Observations and Concerns
Non-Student Housing
Student Housing
Page 32 of 143
Research and Analysis
• Do the current in-lieu fee payment structures accurately reflect constructioncosts (for non-student
housing) and the value gap (for student housing)?
• What are the approaches of other Virginia jurisdictions?
• What approach to requirements for in-lieu fee payments provide the best balance of incentivizing
production of on-site units without limiting development feasibility?
Goals and Guiding Principles
• What are the City's goals for in-lieu fee payment policies?
• What are the City's goals for student housing?
• Should affordable housing expectations be the same for student housing as fornon-student housing?
• Should in-lieu fee payments be greater for bonus height than for non-bonus height?
Key Study Questions
Page 33 of 143
• What do you believe is the most important outcome this policy should accomplish
for our community?
• What impacts or unintended consequences should we work (hardest) to prevent?
Key Questions for Stakeholder Engagement
Page 34 of 143
Timeline
• Do the current in-lieu fee payment structures accurately reflect construction costs and the value gap?
• What are the approaches of other Virginia jurisdictions?
• What approach to requirements for in-lieu fee payments best incentivize production of on-site units
without limiting development feasibility?
December 2025 – January 2026: Consultant Evaluation of Key Study Questions
• What are the most important things for the policy to achieve?
• What impacts do we want to avoid?
January 2026 – February 2026: Stakeholder Engagement
• Guiding Principles
• Policy Recommendations
• Manual and Development Code Amendments
March– May 2026: Develop Proposals and Commission and Council Review
Page 35 of 143
Thank You
Page 36 of 143
1
Planning Commission Work Session
October 28, 2025 5:00 PM to 7:00 PM
Hybrid Meeting – City Space Conference Room
Commissioners Present: Chairman Schwarz, Commissioner Joy, Commissioner d’Oronzio,
Commissioner Stolzenberg, Commissioner Roettger, Commissioner Yoder, Commissioner Mitchell,
Commissioner Solla-Yates
Staff Present: Patrick Cory, Missy Creasy, Tori Kanellopoulos, Brennen Duncan, Remy Trail, Dannan
O’Connell, Matt Alfele, Kristal Riddervold, Ose Akinlotan, Jason Mcllwee, Donald Schrager, Steven
Gaines
Chairman Schwarz called the Planning Commission Work Session to order at 5:02 PM
1. Environmental Regulations and Policy Review Project
Staff Presentation
Tori Kanellopoulos, Staff Report – This evening we have a work session on the environmental regulations
and policy review project. I am joined by many colleagues in Public Works, Utilities, Parks, Office of
Sustainability, and NDS to help answer questions that you might have this evening.
Next slide
I will start with the project objectives. That is what we are looking to achieve with this project. We will talk
about the background, why we are doing this project, and why at this time. I will talk about some of the related
city plans and programs: both that have been adopted and that are happening concurrently. I will go through
each of the 6 project topics at a high level and some of the key takeaways that we have identified to date. We
will open it up for your feedback on the draft project phasing and topics. What we are looking for at this work
session, now that we have completed an internal review of existing conditions and current policies and
regulations, is your feedback and Council’s direction on the proposed phasing of project topics. We want to
make sure that we are going in the right direction and see if anything is missing at this point. There will be
future opportunities for input as we dive deeper into more specific topics. This is looking at the overall project
scope.
Next Slide – Project Objectives
Objectives for the project include:
• balancing community and comprehensive plan priorities of housing choice and affordability with
protecting the natural and built environments.
• increasing community resilience especially to the risks identified in the community vulnerability
assessment, such as flooding and extreme heat.
• ensuring alignment between regulations and across the different topics.
• making sure prioritization and implementation are done equitably.
Potential project outcomes include:
• updates to the city codes including the Development Code.
• updated policies for the Comprehensive Plan.
• updated programs and policies.
Page 37 of 143
2
• Coordination across the various plans and programs.
Next Slide – Project Background
Why are we doing it now? It is relevant to both the Comprehensive Plan and the Development Code.
Comprehensive Plan priorities include implementing zoning changes that support housing choice and
affordability. Protect the natural environment, mitigate the effects of climate change, and increase walkability.
Implementing the climate action plan and preserving and enhancing the natural environment. From a
development code perspective, there have been some challenges with implementation, especially for some of
the smaller infill sites that have less room for required infrastructure and for other improvements. There are
some other identified challenges and opportunities to look at including mitigating and preparing for the impacts
of climate change, planning for infrastructure replacement and upgrades, and that coordination across the
different plans and policies.
Next Slide – Project Background
The top half of this slide may look familiar. This was from the NDS work plan for FY26. Since the work plan
presentation, NDS has been coordinating across various departments to document existing conditions, policies,
regulations, key takeaways, and areas for collaboration across all the project topics. NDS has met with staff
from the Office of Sustainability, Public Works, Utilities, and Parks. Additional departments will be involved at
key points, including the City Manager’s Office, City Attorney’s Office, Communications, and Emergency
Management. We held an internal project kickoff meeting in August.
Next Slide – Adopted and Ongoing Related Plans and Programs
The project scoping that we have been doing has included looking at the adopted and ongoing related plans and
programs and incorporating relevant initiatives. Resources from these plans and programs include maps and
data, community & development, developer input, and staff technical expertise. We also want to make sure that
we are being consistent across all of these. I did want to highlight in the climate action plan: actions include
updating recommendations and coordinating on land use and transportation. For the flood resilience plan that
was adopted in 2023, we have recently received a community flood preparedness fund grant to look at updating
the flood plain management program. Utilities has been working on stormwater modeling with the Moores
Creek watershed complete and Meadow Creek and Rivanna River in progress.
Next Slide – Concurrent Related Plans and Programs
These are additional related plans and programs that are going on right now. We will share recommendations
and knowledge across the different teams as these move forward. These are the main ones that we are tracking
along with our other ones that we will be paying attention to incorporating as relevant including the Regional
Solid Waste Plan update and the regional water supply update. As the community recently pointed out,
incorporating our recent initiative to join the biofilic cities network. I want to highlight the fund preparedness
fund grant and the urban forest management plan, which will be important to inform tree canopy and
preservation requirements and street tree requirements. This project will inform updates to the Comprehensive
Plan policies, which we will be reviewing next year.
Next Slide – Stormwater Management: Recommended Areas of Study
I will go through each of the 6 project topics in order of the proposed project phasing. These recommended
areas of study were put together based on our review of existing conditions and current regulations within input
across departments, Comprehensive Plan policies & recommendations, state code requirements, constraints, and
related city plans and programs as we just reviewed. While NDS is leading the coordination for this project, the
work that I am going to go through and describe is being completed by multiple staff across many departments.
I want to recognize their work and collaboration and how this effort spans across many staff.
Page 38 of 143
3
For stormwater management, we have identified looking at stormwater requirements. One thing that we have
heard input on is that for by-right infill development, smaller lots that require stormwater management may not
be large enough to fit by-right housing that is allowed and development lot coverage but also fit onsite
stormwater management. Developers can buy offsite nutrient credits to meet water quality requirements, which
benefits larger watersheds, but not necessarily our local waterways. That might be something we can better
incentivize and encourage. We will also look at stormwater management infrastructure needs including those
identified in the flood resilience plan and through community input.
Next Slide – Floodplain Management: Recommended Area of Study
For floodplain management, we would look at the city’s floodplain management program. That will be part of
that grant the city received in looking at floodplain development regulations. The city currently complies with
FEMA’s minimum requirements for the National Flood Insurance Program and cannot go below those
standards without risking compliance. The city can adopt higher standards, which would need to be balanced
with other city policies and goals. Changes must be justified on the grounds of protecting life and property from
flood risk and balancing allowed higher density that is allowed by-right with protecting the natural and built
environment.
Next Slide – Tree Canopy: Recommended Areas of Study
For the tree canopy, we would like to look at the city’s requirements for tree canopy, street trees, and tree
preservation. There have been comments from the development community about fitting in required trees to
meet canopy requirements on smaller infill sites. Those canopy percentages are set by each zoning district.
There are maximum percentage limits that are set by state code. We have also looked at the need for improved
guidance for tree protection and preservation including during construction. That would be led by the Parks
Department. We are looking at the preservation incentives, which do not seem sufficient for developers to
choose tree preservation versus planting new trees. We will also have updated data and recommendations from
the urban forest management plan looking at tree canopy and the urban heat island effect and how those vary by
each neighborhood. Canopy coverages range from 21 percent in 10th & Page to 67 percent in Barracks-Rugby.
All this work will include coordination with Tree Commission and build on work done by community partner
organizations such as RELEAF Charlottesville and the Tree Stewards.
Next Slide – Stream Buffers: Recommended Areas of Study
For stream buffers, we would look at the water protection ordinance and regulations for stream buffers. There
are 3 waterways that have a regulated stream buffer, which are the Rivanna River, Meadow Creek, and Moores
Creek. Those buffers must be 100 feet on each side of the stream and must be maintained and incorporated into
development design. If we made updates to those buffers or looked at other streams that should have buffers,
there would be a data driven rationale behind it. We would also need to consider administration, enforcement,
property impacts, and development impacts. We can also look at incentives and voluntary measures that protect
streams since there are many streams on private property and property that might never develop. That could be
a good opportunity to encourage more protection even if it is not required.
Next Slide – Critical Slopes: Recommended Areas of Study
Critical slopes are defined as 25 percent grade or greater area of 6,000 square feet or more and within 200 feet
of a waterway as shown on the critical slopes map. Generally, they are not allowed to be disturbed. There is a
special exception process for that request. We have looked at developing more objective and clear criteria for
that review process. The Comprehensive Plan also only has one recommendation related to critical slopes and
their value is clearly defined. That could be a good opportunity for a Comprehensive Plan policy update.
Next Slide – Energy Efficiency: Recommended Areas of Study
There are several initiatives happening related to energy efficiency including The Office of Sustainability
leading the development of high-performance building standards. There are a variety of existing tax incentives
Page 39 of 143
4
for certain energy efficient buildings. There may be more challenges with changes at the federal level for tax
incentives that could slow that uptake. Virginia localities cannot require energy efficiency requirements for
development that are more stringent than the building code. They can have higher standards for projects that
need legislative review and can offer incentives and model best practices. The city is working with a consultant
on an EV charging plan in anticipation of increased demand for EV charging in the city and regionally. That is
another opportunity for coordination.
Next Slide – Summary of Potential Project Outcomes
Final outcomes will depend on data and findings, best practices, staff technical expertise, Commission input,
Council direction, and community input where needed. For all these topics, we would expect increased
community resilience, equitable prioritization, implementation, and relative updates to the Comp Plan where
needed. I have most of these in previous sections. They would be focused on code and policy updates, such as
updated stormwater management requirements and updated floodplain management program, and tree canopy
and preservation requirements.
Next Slide – Draft Project Phasing
This is the proposed grouping and phasing of topics starting with stormwater management, floodplain
management, and tree canopy together with stream buffers fitting in as staff capacity allows. The proposed
phasing is based on input from staff alignment with related plans and programs and the impact on
Comprehensive Plan implementation including the Development Code. The first phase of topics is especially
important for addressing challenges with infill developing and with tracking parallel initiatives such as the
community flood preparedness fund grant and the urban forest management plan. A lot of these topics overlap
and are interconnected and can be addressed at the same time. We can make revisions based on the feedback we
hear from you and from City Council.
Next Slide – Planning Commission Discussion and Feedback
1. Do the recommended areas of study in Attachment 1 capture the key areas of needed study for the 6
topics identified for this project?
2. Are there additional topics or supporting information that should be included?
Next Slide – Next Steps
• Anticipated to be approximately a 2-year process moving parallel with related plans and programs.
• City Council work session on November 17, 2025.
• Scope more detailed work plans by topic, based on topic-grouping phasing.
• Establish staff internal stakeholder groups/technical committees.
o Technical expertise: data and best practices, develop and review draft recommendations.
o Participate in Planning Commission and City Council work sessions and community
engagement.
• Develop public engagement plan.
Planning Commission Discussion, Questions, and Feedback
Commissioner Mitchell – We put a lot of focus on water that comes from the sky. We are quiet about
droughts. We are quiet about the fires that happen when we have a lack of water. There is value in giving a little
more thought to what we do when we don’t get water. There have been many years since I have been in
Charlottesville that we have had water issues. Last year, there were a lot of local fires because of the lack of
water. I am wondering if we should give some thought to investment in drought mitigation, things like
groundwater recharging systems. What I would like us to do if we could is put together a drought management
Page 40 of 143
5
plan like they do in California. Every municipality in California has a drought management system. I would ask
that we give more thought to too little water.
Commissioner Joy – Was this topic in the pipeline? Are you going to bring it up at LUPEC or any of the 3-
party meetings? I am curious what kind of interface you have had with UVA people at Environmental
Resources or Sustainability to see if there is some alignment with the University and County.
Ms. Kanellopoulos – We have been doing more internal scoping. We would like to do regional collaboration
and engagement as we move forward. We have also been working with the Office of Sustainability and
coordinating on resilient together. That could be another good opportunity for regional coordination.
Commissioner Joy – Can I send your slides to my colleagues? I was thinking about the prioritization and the
work plans. It would be great if there was a cohesiveness to where people are focusing first.
Commissioner Mitchell – There was also a question about other groups that we might want to work with. The
Weldon Cooper Center is another group that we ought to be working closely with.
Chairman Schwarz – You guys are not looking for any sort of policy direction at this point. We are just
looking for topics that might be missing.
Ms. Kanellopoulos – That is correct. Basically, if we are going in the right direction, if anything is missing. If
there are clarifying questions or information that would be helpful for you to have at this point, we are happy to
answer questions. We have a lot of expertise here. I know that some of the current regulations can be very
detailed and convoluted. We are happy to answer those types of questions.
Commissioner d’Oronzio – With some of these topics, there is a sense of what we are thinking in the
particulars. For example, what sort of thought do we have about our floodplain issues? Where are we pointing
to this? Do we still want stricter guidelines? Is the present guideline about the 1-foot rise anywhere in the city
the appropriate one? How do we balance that for density? Have we started thinking and having those
conversations? In my industry the way The National Flood Insurance Program is described is that it is bad.
Does it make sense to self-insure for construction there? Can we meet and do better? By definition, the city is
better funded than the National Flood Insurance Program. What are we thinking of how we are going to
approach some of these? It seems that a lot of these things are dovetailing on infill lots. What is possible on
stormwater control on a 6000-square-foot lot? Is there a next level of how we are going to integrate these
things? What happens in what order? How do we start this analysis?
Kristal Riddervold, Office of Sustainability – All the things you just said are the same things that we have
said out loud in staff meetings. On the grant-supported floodplain program management, our goal is to start with
‘the lay of the land, baseline assessment.’ What are we doing? What are we not doing? Where are there some
gaps? What are some best practices in comparable communities? How is that relevant or not? We don’t know
what we don’t know about whether we should change things, or we shouldn’t. That is the entry point of that
project. What are the roles and responsibilities? Maybe we are saying we have a best of class program and
maybe not. If we don’t, where are the gaps? What are some strategies to fill those? What are some policy
options for the city to consider? Floodplains, as defined by the floodplain maps, are only one universe of
flooding. There is also the opportunity to talk about floodplains and stormwater management. That is where a
lot of the coordination on these different topics and lumping them together by some themes are going to be
efficient, hopefully.
Page 41 of 143
6
Commissioner d’Oronzio – It seemed that it might be a great benefit to grasp early on, what are the point and
shoot solutions available? What can we go to City Council? These 3 things in order accomplish this. We know
that we can do this. Are we looking for the fastest implementation?
Ms. Riddervold – I think we are still trying to tease apart the best opportunities. Are they programmatic or are
they policy? We still have not finalized a scope of work. This conversation is helpful. I would offer an invite. If
somebody says floodplains, what are the questions that come to mind? Now is the time to throw those in the
hopper, not when we come with what we think we should do.
Commissioner d’Oronzio – With floodplains, it is 7 percent of the city’s land. How much of it is otherwise
developable and buildable? What do we have to do in terms of guarding the floodplain for what it is, what it is
used for, and what utility we can get out of the dirt that is on it? If everything is density related, we might as
well ask that question. Can we go our own way if we elect to opt out of the National Flood Insurance Program?
There are methods of doing it. As far as I can tell, no locality has done it right. I view that as building houses on
floodplains.
Commissioner Solla-Yates – I would love more information on stormwater. I would love a whole work session
just on that topic. That would be spectacular.
With the items for number 2, capital spending. We can throw money at some of this. If there is high value and
low money, let’s throw the money. If you do or when you, please tell us.
With wildfire prevention, we have not had a bad wildfire so far. I would like that on the list. I expect the fire
department would feel the same way.
There are several people who have worked on this that I would like to mention. Kay Slaughter wrote the critical
slopes ordinance that we had. It was the first in the state. Everybody else copied it because it was way ahead of
its time. I think that she had a nightmare scenario in mind that she was trying to prevent. I don’t know what that
was. That might be helpful to know. Karen Firehock was a former planning commissioner. She is now on the
Albemarle County Planning Commission. She did a lot of work updating our Comprehensive Plan during her
time. Diane Dale served on our steering committee for the Comprehensive Plan. She was frustrated that we did
not get to it. We kept pushing it back. She has thought about this problem for years. The Nature Conservancy
does this work every day and would be a good resource for us.
Commissioner Stolzenberg – One thing that I would like you to think about, as you approach many of the
different objectives here, how to best utilize the public right-of-way. At this point, we have rigid standards for
what goes into the right-of-way and limited use of it. I am looking at the open data portal, green infrastructure
stormwater, and public infrastructure map. I think there is one bio-swale in the right-of-way that I can find. It is
the one on 5th Street across from Tonsler Park. That one was built over 10 years ago but is not well maintained.
I am not sure that there is a process to maintain it. I don’t know if there was any effort to keep inundation
tolerant plants in there. That would filter the water. When you have one swale, it is hard to have a process to do
that. Ideally, we could have many swales. When we are talking about stormwater management, tree canopy, and
our transportation plan & traffic calming, making smarter use of the right-of-way for a lot of this infrastructure
is going to be important to doing it well. It is also difficult and will require thinking through what the standards
should be, whether for public or private development of this infrastructure and when & how it can be accepted
and maintained by the city. You see other cities that have done a good job of this.
Some of this has touched on climate change. Adopting to climate change is important here. My hope is that it
will also be central to every piece of this as you think through it, and not just thinking about the specific costs
and benefits of each individual program or requirement, but it fits into that larger whole, citywide, regionwide,
Page 42 of 143
7
and globally. I appreciate that you put the regional context into your earlier presentation. It is critical. The
hardest thing about this whole effort is going to be all about balancing it. You are going to get a lot of pressure
from the public and even some appointed or elected officials. It is easy to focus on one thing and take one side.
It is a spectrum. We need to be landing somewhere in the middle, somewhere that takes all those costs and
benefits and trade-offs into account and lands somewhere that adequately addresses all of them. I do not envy
you in trying to thread that needle. I hope you will keep sight of that. It is a tricky needle to thread. We must be
balancing it in every part of this process.
Commissioner d’Oronzio – It came up on infill development. We must coordinate this infill development with
the possibility of where we are using stormwater. How do we fund the offsite credits for some people? Maybe
there is a way that the city can provide some assistance in upfronting some of that cost to be taken out on the
sale on the back end. These smaller infills are smaller operations doing them. At the same time, we are looking
at the development code. We are looking at the building code that we don’t have any power over. For all those
things to come together in a sensible way, we cannot be pinging people for stormwater fees. Threading that
needle is going be tricky. That is coming from every possible direction on that.
Commissioner Yoder – On question 1, one area that is closely related to many of these topics is resilience. I
wonder if there would be a way to incorporate thinking about resilience in terms of our infrastructure, how it
responds to different kinds of environmental disasters or effects of climate change. There is some interesting
research on one of the predictive factors of making it through a natural disaster well is your community. We all
know that the way our neighborhoods are built can impact how many friends you have that are neighbors. How
many neighbors you know impacts how well you do in a disaster. Maybe there are things we can take back to
the zoning code from a look at resilience. The main disaster that I think is power outages in the wintertime.
What happens if power goes out? In my mind, I can walk to that store and get some groceries. Do people have
access to things they need in certain situations? Is our zoning code making it harder for people to get things that
they need in a disaster?
Environmental issues are not limited to borders. There are a lot of regional things at play. We live in a
watershed with how many jurisdictions. I don’t know. I would suggest that, as you are cataloging things, doing
existing condition studies, if it is reasonable to take inventory on a regional level, I would encourage you to do
it. For example, thinking about tree canopy issues, there is a balance between us wanting infill in the city and
preserving our tree canopy. If infill development turns into green field development in the county, the tree
canopy hit is much greater than if you must clear a site in the city. What does that look like? There is ground
cover data. Does it come within the boundary of the city but comes in more of a grid? That is an idea looking at
general trends with population growth and tree canopies. I want to echo Commissioner Stolzenberg’s comment
about the public right-of-way. Thinking about trees and the biofilic cities, where you put things matters. A
backyard tree is good and benefits everyone. The sidewalk tree really benefits a lot of people who walk there.
How do we get more things close to where people are and will benefit from those things?
Commissioner d’Oronzio – With regards to the resilience, the Planning District has done some work on that
recently on the regional level. One of the more interesting things about that is the perception of leadership on
how resilient they are or aren’t. Sometimes when you look at that and you look at the dispassionate responses,
are you kidding? Some of it is self-diluting in some respects. I can dig up what their work has last year for the
most part. Apparently, we use the word ‘resilience’ a lot in the commission packets. That is worth chasing. I
agree with how this plays into the resilience piece.
Commissioner Roettger – It is all great. With the Tree Commission, I like seeing all that. We have been
talking a lot about that. When you get to the community engagement part, I like the word ‘resilience,’ even
though it is overused. It could be human, systems. With talking to people and thinking about money, priorities,
and neighborhoods, I looked at the 81 pages. I wonder if there is a way to make some graphics that group these
Page 43 of 143
8
things. There are maybe scales to each of them like block scale or street scale versus regional scale in some way
where people are not overwhelmed. This works well with everyone in here. If it goes out to neighborhood
associations or people that have not thought through how these things intersect. There could be something to
make it digestible like a page of all the things that we are thinking about at these different scales. That was what
I was getting out of it. It is wonderful. If housing is an issue, what are the biggest hurdles? Some of the things
are important but maybe on a longer track in the way you will prioritize all this. I am thinking of the community
engagement part.
Chairman Schwarz – I want to echo the efficiency of the right-of-way and revisiting our Standards & Design
Manual as necessary. Are we working with the Fire Department in thinking specifically about trees? I am sure it
probably comes into play with other components of this. Even our best plans can be wrecked by fire regulations
are out of our control and making sure that they are a partner in all of this. Are we looking at redefining what a
steep slope is? I know there was talk about manmade versus natural. Is the 200 feet from a waterway the right
number?
There was an introduction of the different staff who attended the work session. The following city staff attended
the work session and provided input on their role with the environmental regulations and the policy review
project, the purpose of this work session:
• Dannan O’Connell, City Planner
• Don Shrager, Stormwater Utility Administrator
• Jason Mcllwee, Deputy Director of Utilities
• Matt Alfele, Development Planning Manager
• Ose Akinlotan, Long Range Planning Manager
• Kristel Riddervold, Office of Sustainability Director
• Steven Gaines, Urban Forester
• Brennen Duncan, City Engineer
Commissioner Stolzenberg – I wonder how we could structure incentives around credits or onsite treatment
and whether we can give zoning bonuses for doing onsite treatment, whether there is any way to incentivize
upstream credits versus downstream credits. You do sometimes see them getting it from Ivy Creek. It would
feed into the Rivanna River. It does help with our local water quality. I don’t know if there is a good lever to
pull to help with that.
With the utilities capacity and a capacity study, it would be helpful to everyone, to the city, to developers, and
to the public, for the results of that to be made public, to know where there is maybe spare capacity. We could
potentially tailor regulations to be looser when we have places where we have a lot of excess capacity and
tighter in places where we are running out of capacity and to focus infrastructure upgrades on places where we
need it most. I would love to see that made public. I would like to see the locations of underground utilities. I
know there is a map, and people can request snippets of the map. We don’t post it publicly.
When we talk about trees in the right-of-way, the thing that we hear all the time is that ‘we cannot do that
because there are underground utilities there.’ I have seen a couple of these snippet maps. There are some
corners where you could do a bump-out with a tree. The utilities are clustered to the other side of the street. It
would be great to try to identify potential locations for trees, for deep paving, and for bioswales across the city
more systematically. The only way I think you could do that would be with the map. Maybe we do that
internally within the city, so you don’t have to give it to the public.
Page 44 of 143
9
On the groups of phasing, it seems to me that stream buffers and critical slopes are in separate phases. They feel
like one thing. They are all about protecting the waterways. The critical slopes are defined as being near the
waterways. Critical slopes were before we had the state stormwater standards. That was how we prevented
erosion into our waterways, made sure slopes were stabilized. Every time we have a hearing where we have this
discretionary review of critical slopes, we say, ‘what would be some good conditions to apply?’ Mr. Duncan
says that we must make them do all these things for stormwater management by state regulations. Our goal in
2023 was to maybe try to differentiate places where we don’t want to be ever developed, such as stream buffers.
With slopes, we need to be careful about development and apply appropriate oversight and erosion sediment
control to make sure that it is done right. Originally, we needed a discretionary review because that was the only
way to impose those conditions. I think the plan back in 2023 was looking at seeing what is obsolete from
having the state terminal requirements in place and what needs to be done today. I thought that we would be
moving towards stream buffers and away from critical slopes rather than tweaking critical slopes at the margin.
Commissioner Joy – Both of these are about public outreach. I was thinking as you begin to draft how to
engage the public, one area that could be an exciting opportunity is to engage with some of the city schools and
some of our youngest residents in the city. I feel that you will have an excited audience there around these
topics. You could help cultivate the ground up the support for these environmental issues. You will have a lot of
fans within the schools. That would also be an interesting way to pressure parents.
On the topic of public appearances, I had the same issue when we were looking at the zoning and the phasing. I
understand that resources are finite. We must prioritize them. I feel that the graphics that we present are loaded.
I would suggest that instead of stacking it and saying that this was based on input from the staff, you may have
people who feel strongly certain communities think critical slopes are critical. There are developments that are
about to happen. The whole challenge that we have is around energy and that we need to decarbonize quickly.
Having good infrastructure is critical because we don’t have to worry about stormwater if we are not making as
much carbon. If there is a way to shift to a prioritization matrix or something that they are all equally important.
Some have more risk and some have more complexity. They are presented in a way that we are trying to
prioritize the ones with the highest risk and maybe the lowest complexity. Shift it away from these that were
subjectively ranked depending on who is looking at them. I wonder if there is a way optically to adjust the
graphic when it goes public.
Commissioner Solla-Yates – At issue, this relates to Commissioner Joy’s point. What might be helpful to
understand is feasibility. There are some areas that we are not going to see infill development. We might see
some in 2 years. Prioritizing those more feasible locations for review will be helpful and may get at the
neighborhood and specific concerns. We are putting substantial public resources and services in high land cost.
Maybe we want some revenue and some housing back. There are areas where we do want development.
Commissioner Stolzenberg – With all these other studies in play, we probably want to be making decisions
based on the best possible data. That might mean having to wait for the study to be complete before we make
decisions based on it. I think back to the 2022 canopy study. I have done some research into the data underneath
that. I was trying to understand the root of the 5 percent of the city’s land area in canopy loss the study was
claiming. Comparing the aggregate acreage of that versus the aggregate acreage of development or invasive
species clearing, I could not get it. I have concluded that it is methodologically flawed. I know we are doing a
new study with a different vendor that is hopefully close to completion and will hopefully be a lot better. I don’t
know what the timing is on when we should expect results of that. It seems like something that would be good
to have before start to dig into some of the tree stuff. You can do other parts of the tree stuff without thinking of
that broader picture. Do we have a timeline on that?
Mr. Gaines – Things were significantly delayed with the grant. That is now just getting back on track. We will
start making more headway quickly at this point. The reports that we were trying to generate have been
Page 45 of 143
10
generated. There is probably going to be significant surveying to see public opinion about what is important and
then recompiling some of the information.
Ms. Riddervold – There might have been some differences between the methodology in the different canopy
assessment years. One of the things we tasked the consultant with was to do an ‘apples-to-apples.’ Weed
intervention might have been part of one of the data sets. It does not mean that we are trending upward. It may
not be as precipitous as that last snapshot was telling us.
Commissioner Roettger – I don’t know if it would be worth doing outreach to small builders. Maybe it is
being able to walk in during advertised office hours. There might be an opportunity in advocating for single lots
that want to double or triple. I am thinking about being more encouraging working with whoever might be
interested.
Commissioner Stolzenberg – Beyond the high-level phasing of all the major different pieces, the more we can
find easy wins and implement them immediately rather than preparing a package, the better. I was looking back
at that work session where we reviewed the Development Review Manual. We had that discussion about when
stormwater management requirements apply and trying to figure out when they apply. The manual originally set
the line between minor and major at 6 units. We rolled it back to two based on the idea that stormwater
management requirements would trigger for 3 units. It sounds like that is not the case. Bumping up the unit
count but also putting in a 6000-square-foot threshold will allow some of those smaller developments to get
through without a major development plan. Some of the minor development plans will still be detailed.
Ms. Kanellopoulos – It has been helpful feedback. How would you like to be kept updated? Thinking about
previous work sessions you have had technical topics, what has worked well that we can keep in mind from a
timing or format standpoint and how we share information? Is it helpful to show up with a longer presentation
that goes into these topics? Is it better to have plenty of time for discussion?
Commissioner Mitchell – Detailed documentation taking us through what drove you to the conclusions you
got to would be helpful with a short presentation. We can speak to that.
Commissioner Stolzenberg – Make commissioners do the reading. I appreciate what you did with this one. I
did not realize that was what was happening. I was not sure if we were going to go back in the presentation.
Having those discussion topic slides like that is helpful for prompting things. For a complicated topic, having a
few points during the presentation where we stop and chat. The tricky part is that we are going to go off topic at
the first one. Don’t let us do that. Have a general time at the end so that everyone can get their general
comments out.
Mr. Schrager – With capacity studies, we are looking at those across all utilities right now. That will inform
our standards update. We are looking at that as we go through this zoning process and what changes we need to
make across all our utilities to allow for this increased zoning. We must finish these capacity studies first. With
the maps, I will visit that. I am not going to make any promises. With drought management, we do have a
drought management plan with the Rivanna that we have worked on. It was just submitted to the DEQ in 2025.
It is up to date. We must do that every 10 years as part of our permits. If we need to put any of that into this
document, we can work with Tori on what we need to do and what you would like to see there.
Commissioner Stolzenberg – With hydrant location and fire flow test results, I know they must do them every
year. I know it is easy to ask for it. For these small projects, it would be best having that in advance.
Mr. Schrager – The hard part about that is we do not do fire flow tests every year on every hydrant. We do
inspections. That is different than an actual flow test for fire capacity. That is the reason that we do have that
Page 46 of 143
11
request come in. We may not even have that flow information for the specific hydrant they are looking for. If
we have data that is within the past year, we sent that back to them as long as is within the last year. The fire
marshal can accept it. If we need to do a test, we must schedule that. We are happy to speed that process along
as fast as possible.
Commissioner Stolzenberg – Even just having outdated tests available will help people make decisions
quickly and less manual intervention from you guys.
Mr. Duncan – I have one final comment about stormwater facilities in the right-of-way. That has been a
citywide policy for as long as I have been here. We do not want private facilities in our public right-of-way that
the city must maintain. We don’t have the staff, resources, and expertise. Most of our Parks & Recreation staff
are doing the roadside mowing. We don’t want them inadvertently mowing down something that is supposed to
be planted over a specific species. That is the main reason for that. We have done some city projects where we
have done some kind. We have recently reverted to going the route of buying credits. We don’t have the space
to do it. It is a lot of money to buy eminent domain on somebody’s property to put a stormwater facility on that
rather than just buying the credits. It is something that I am willing to look at. That is a thread that if you pull
on, there is a lot more behind it as far as how much staff would need to do to facilitate allowing that in the right-
of-way.
Adjournment
The work session was adjourned at 6:20 PM.
Public Comments
There were no public comments submitted during this work session.
Page 47 of 143
Page 1 of 6
CITY OF CHARLOTTESVILLE
DEPARTMENT OF NEIGHBORHOOD DEVELOPMENT SERVICES
STAFF REPORT
PLANNING COMMISSION PUBLIC HEARING
REQUEST FOR A ZONING TEXT AMENDMENTS
APPLICATION NUMBER: PL-25-0172: A Comprehensive list of Tier 1 and Tier 2 Amendments
DATE OF HEARING: January 13, 2026
Project Planner: Matthew Alfele, AICP, Development Planning Manager
Date of Staff Report: December 16, 2025
Applicable City Code Provisions: Chapter 34 – Article 5, Division 5.2.5 and Articles 2, 3, 4, 5,6,
and 7.
Summary
On December 18, 2023, City Council adopted a new Development Code designed to facilitate a
more form-based zoning ordinance, allowing for increased density throughout the City in
alignment with the 2021 Comprehensive Plan. As with any evolving framework, staff has
identified both minor and significant issues within the code that require amendments to better
support the City’s stated goals.
These proposed amendments have been categorized into three tiers:
• Staff is proposing sixty-three (63) Tier 1 (Attachment A) amendments: The following Tier
1 Development Code Amendments are categorized into three distinct subcategories.
o The first subcategory addresses Scrivener errors, which are minor typographical
or clerical mistakes.
o The second subcategory includes changes necessitated by recent state
legislation, specifically under HB2660 and SB974. HB2660: Shortens the
timeframes for various local government approvals of subdivision plats and site
plans. Additionally, the bill calls on the Virginia Code Commission to convene a
work group consisting of various stakeholders to review existing provisions
related to the submission, review, and approval of subdivision plats and site
plans. The work group shall develop recommendations to (i) organize procedural
steps in a clear, logical, and sequential order to enhance ease of reference; (ii)
clarify the processes, requirements, and timelines applicable to each type of plat
or plan; (iii) standardize terminology to ensure consistency, reduce ambiguity,
and minimize misinterpretation; and (iv) identify and eliminate redundant or
Page 48 of 143
ZT25-01-01: A Comprehensive list of Tier 1 and Tier 2 Amendments
Page 2 of 6
duplicative provisions to streamline the Code and improve its usability and shall
submit a report to the General Assembly by November 1, 2025.
o SB974: Removes planning commission and governing body approval authority for
the administrative review process for plats and plans and assigns such authority
solely to a designated agent, defined in the bill. However, the bill provides that
the local planning commission may serve as the designated agent of any locality
with a population of 5,000 or less. The bill also expedites the review process by
shortening the timeframe for forwarding plats and plans to state agencies for
review.
o The final subcategory comprises minor amendments aimed at clarifying or
providing missing information that required minimal feedback from Planning
Commission. Each amendment includes a reference to the Working Document
designation, the Development Code Section, page number, the current existing
text, track changes to the text staff is suggesting, and finally a clean version of
the proposed amendment.
• Staff is proposing twenty-three (23) Tier 2 amendments (Attachment B): These
amendments include modifications/updates, additions, or removals that address
oversights or clarify existing provisions and were presented to Planning Commission at
the November 12, 2025, Work Session. As with Tier 1, each amendment includes a
reference to the Working Document designation, the Development Code Section, page
number, the current existing text, track changes to the text staff is suggesting, and
finally a clean version of the proposed amendment. In addition, each Tier 2 code
amendment include a detailed analysis explaining staff’s position and reason for the
change.
• Tier 3: Policy changes or confirmations that require in-depth analysis and a
comprehensive community engagement strategy. This Tier is not part of the proposed
amendments staff is presenting, but the issues expressed in this tier, along with
additional background information can be found in the attached (Attachment C)
Working Document.
Standard of Review
The role of the Planning Commission is to make an advisory recommendation to the City
Council, as to whether or not Council should approve a proposed zoning text amendment based
on the factors listed in the Charlottesville Development Code - Article 5, Division 5.2.5.D
1. Whether the proposed amendment conforms to the general guidelines and policies
contained in the Comprehensive Plan;
2. Whether the proposed amendment will further the purposes of this Chapter and public
necessity, convenience, general welfare, and good zoning practice require such
amendment;
Page 49 of 143
ZT25-01-01: A Comprehensive list of Tier 1 and Tier 2 Amendments
Page 3 of 6
3. Whether there is a need and justification for the change;
4. When pertaining to a change in the zoning district classification of property, the effect of
the proposed change, if any, on the property itself, on surrounding property, and on
public services and facilities. In addition, the Planning Commission must cons ider the
appropriateness of the property for inclusion within the proposed zoning district, relating
to the purposes set forth at the beginning of the proposed district classification; and
5. Such other considerations as permitted by law.
5.2.5.D.1 Whether the proposed amendment conforms to the general guidelines and policies
contained in the comprehensive plan.
Below are specific areas of the Comprehensive Plan for which the request is in compliance:
a. Land Use, Urban Form, and Historic & Cultural Preservation
Goal 1: Zoning Ordinance
With the community, create a new zoning ordinance to reinforce and implement the
vision for Charlottesville’s future as articulated in the Comprehensive Plan, Affordable
Housing Plan, Small Area Plans, Vision Plans, and the Standards and Design Manual.
b. Housing
Goal 2: Diverse Housing Throughout the City
Support a wide range of rental and homeownership housing choices that are integrated
and balanced across the City, and that meet multiple City goals including community
sustainability, walkability, bikeability, ADA accessibility, public transit use, increased
support for families with children and low-income households, access to food, access to
local jobs, thriving local businesses, and decreased vehicle use.
c. Transportation
Goal 2: Coordination with Land Use & Community Design
Improve quality of life and promote active living by reducing automobile use and
congestion and supporting multimodal options for safe and convenient travel in
conjunction with implementation of the Future Land Use Vision.
d. Environment, Climate, and Food Equity
Goal 6: Tree Canopy
Contribute to the creation, protection, and expansion of robust urban forests.
e. Community Engagement & Collaboration
Goal 3: Transparent Procedures
Establish and maintain transparent planning processes.
Page 50 of 143
ZT25-01-01: A Comprehensive list of Tier 1 and Tier 2 Amendments
Page 4 of 6
5.2.5.D.2: Whether the proposed amendment will further the purposes of this Chapter and
public necessity, convenience, general welfare, and good zoning practice require such
amendment.
These amendments are intended to be part of an annual process and should be regarded as
routine maintenance of the code. This approach ensures that the code remains up-to-date and
continues to serve the public necessity, convenience, general welfare, and good zoning
practice.
5.2.5.D.3: Whether there is a need and justification for the change.
The proposed amendment addresses current gaps and inconsistencies within the code,
ensuring it remains relevant and effective. This change will enhance the overall functionality
and applicability of the code, aligning it with the evolving needs of the community.
5.2.5.D.4: When pertaining to a change in the zoning district classification of property, the
effect of the proposed change, if any, on the property itself, on surrounding property, and on
public services and facilities. In addition, the Planning Commission must cons ider the
appropriateness of the property for inclusion within the proposed zoning district, relating to
the purposes set forth at the beginning of the proposed district classification; and
This zoning text amendment does not include a change in the zoning district classification of any
particular property.
5.2.5.D.5: Such other considerations as permitted by law.
No additional areas have been identified at this time.
Public Comment
Planning Commission held Work Sessions on the proposed Development Code Amendments on
May 27, 2025, October 14, 2025, and November 12, 2025. Comments from these meetings can
be found in the Working Document (Attachment C). In addition, staff has received comments
from the community regarding the Development Code and amendments needed. These
comments can also be found within the Working Document.
During the Planning Commission’s November 12, 2025, Work Session, commissioners discussed
various amendments and provided suggestions to staff. Below are some key points and how
they have been addressed:
• A.70 (now B.42) - Existing Structure Date The Planning Commission was concerned that
a fixed date might exclude new units from qualifying for the existing structure bonus.
Staff's proposed amendment aims to preserve and rehabilitate existing housing stock,
aligning with the affordable housing goals of the Comprehensive Plan and Charlottesville
Affordable Housing Plan. The current proposal uses the code adoption date (December
Page 51 of 143
ZT25-01-01: A Comprehensive list of Tier 1 and Tier 2 Amendments
Page 5 of 6
18, 2023) as the cutoff. A rolling allowance could undermine preservation efforts and
allow developers to exploit loopholes. Clear guidelines are needed to prevent new
homes from immediately qualifying for the bonus.
• B.1 - Side Setbacks and Attached Dwelling Units The Planning Commission expressed
concern that developers might only build one side of attached units. Staff reworked the
amendment to add minimum side lot line setbacks for attached structures in R- and RN-
districts, allowing for attached residential construction while preserving existing setback
requirements for other developments. Staff also added language to better define that
side lot line attached setbacks are only permitted with in a common project.
• B.28 - Fences and Walls The Planning Commission had concerns about changing the
definition of a fence and allowing 6-foot fences. Staff revised the amendment to provide
exceptions for small non-privacy fences, maintaining established standards while
introducing flexibility. Guardrails required by building codes or state regulations are
exempted, ensuring safety and compliance while reducing regulatory burdens.
Staff Recommendations
Staff recommends that the zoning text amendment s be recommended for approval by the
Planning Commission to City Council as written to amend and clarify the City of Charlottesville
Development Code.
Suggested Motion
1. Based on a finding that the proposed zoning text amendments will serve the public
necessity, convenience, general welfare, or good zoning practice. I move to recommend
approval of the batch of zoning text amendments as proposed by staff within this
report:
OR,
2. Based on a finding that the proposed zoning text amendments will serve the public
necessity, convenience, general welfare, or good zoning practice. I move to recommend
approval of the batch of zoning text amendments as with the following modifications:
a. …
b. …
c. …
OR,
3. I move to recommend denial of this batch of zoning text amendments on the basis that
the proposal would not service the interests of the general public and good zoning
practice.
Attachments
Page 52 of 143
ZT25-01-01: A Comprehensive list of Tier 1 and Tier 2 Amendments
Page 6 of 6
A. Tier 1 Amendments
B. Tier 2 Amendments
C. Working Document
Page 53 of 143
Tier 1 Amendments
Tier 1 Amendments
The following Tier 1 Development Code Amendments are categorized into three distinct subcategories.
The first subcategory addresses Scrivener errors, which are minor typographical or clerical mistakes. The
second subcategory includes changes necessitated by recent state legislation, specifically under HB2660
and SB974. The final subcategory comprises minor amendments aimed at clarifying or providing missing
information. Each amendment includes a reference to the Working Document designation, the
Development Code Section, page number, the current existing text, track changes to the text staff is
suggesting, and finally a clean version of the proposed amendment.
Scrivener Errors
Working Document A.1
Code Section: 34-4.3.2.B.1.a
Page Number: 4-10
Old Text:
...Administrator may allow once side of a block...
"Track Changes”
Version: ...Administrator may allow once one side of a block...
Clean Version:
...Administrator may allow one side of a block...
Working Document A.2
Code Section: 34-6.7.3.D.1.a.iii
Page Number: 6-15
Old Text:
See 5.2.7 Major Historic Review and 5.2.7 Major Historic Review.
"Track Changes” Version:
See 5.2.7 Major5.2.6. Minor Historic Review and 5.2.7 Major Historic Review.
Clean Version:
See 5.2.6 Minor Historic Review and 5.2.7 Major Historic Review.
Working Document A.18
Code Section: 34-2.10.2.B.2.b
Page Number: 2-104
Old Text:
...regardless of the width of the lot, provided, that all other requirements...
"Track Changes” Version:
...regardless of the width of the lot, provided, that all other requirements...
Clean Version:
...regardless of the width of the lot, provided that all other requirements...
Page 54 of 143
Tier 1 Amendments
Working Document A.48
Code Section: 34-5.2.15.C.1.c
Page Number: 5-55
Old Text:
When the property is within an ADC district, HC district, or an IPP, the Administrator will
refer the application to the BAR for review as to whether the proposed exception will have
an adverse impact on the district, and for recommendation reasonable conditions which, if
imposed, would mitigate any such impacts. The BAR must submit a written report of its findings
in support of its recommendation to City Council.
"Track Changes” Version:
When the property is within an ADC district, HC district, or an IPP, the Administrator will
refer the application to the BAR for review as to whether the proposed exception will have
an adverse impact on the district, and for recommendation as the to as to the reasonable
conditions which, if imposed, would mitigate any such impacts. The BAR must submit a written
report of its findings in support of its recommendation to City Council.
Clean Version:
When the property is within an ADC district, HC district, or an IPP, the Administrator will
refer the application to the BAR for review as to whether the proposed exception will have
an adverse impact on the district, and for recommendation as to the reasonable conditions
which, if imposed, would mitigate any such impacts. The BAR must submit a written report of its
findings in support of its recommendation to City Council.
Working Document A.49
Code Section: 34-5.2.16.C.1
Page Number: 5-57
Old Text:
Administrative Review
The Administrator will review the application for a Critical Slopes Special Exception and will
provide a staff report and recommendation to Planning Commission in advance of the public.
Prior to the preparation of the staff report, City staff may make recommendations to the
Administrator to include in the staff report.
"Track Changes” Version:
Administrative Review
The Administrator will review the application for a Critical Slopes Special Exception and will
provide a staff report and recommendation to Planning Commission in advance of the public
hearing meeting. Prior to the preparation of the staff report, City staff may make
recommendations to the Administrator to include in the staff report.
Clean Version:
Administrative Review
The Administrator will review the application for a Critical Slopes Special Exception and will
provide a staff report and recommendation to Planning Commission in advance of the public
Page 55 of 143
Tier 1 Amendments
meeting. Prior to the preparation of the staff report, City staff may make recommendations to
the Administrator to include in the staff report.
Working Document A.50
Code Section: 34-5.1.3.B.1
Page Number: 5-5
Old Text:
1. Review Authority
The Planning Commission is responsible for review and recommendation regarding:
a. Comprehensive Plan adoption and amendments;
b. Text amendments to this Development Code;
c. Map amendments to the official zoning map (rezoning);
d. Special Use Permits; and
e. Critical Slopes Special Exceptions.
"Track Changes” Version:
1. Review Authority
The Planning Commission is responsible for review and recommendation regarding:
a. Comprehensive Plan adoption and amendments;
b. Text amendments to this Development Code;
c. Map amendments to the official zoning map (rezoning);
d. Special Use Permits;
e. Special Exception Permits; and
f. Critical Slopes Special Exceptions.
Clean Version:
1. Review Authority
The Planning Commission is responsible for review and recommendation regarding:
a. Comprehensive Plan adoption and amendments;
b. Text amendments to this Development Code;
c. Map amendments to the official zoning map (rezoning);
d. Special Use Permits;
e. Special Exception Permits; and
f. Critical Slopes Special Exceptions.
Working Document A.52
Code Section: 34-5.3.3.B
Page Number: 5-62
Old Text:
Expansions
Expansions of a nonconforming structure must meet the requirements of this Development
Code with the following exceptions:
a. If the nonconforming structure does meet build-to width requirements of the zoning
district, the expansion must meet the requirements of this Section.
Page 56 of 143
Tier 1 Amendments
b. In a Residential (R-) District, a nonconforming structure that encroaches into the setback
may be expanded as long as the expansion will not result in an increase in the
encroachment
"Track Changes” Version:
Expansions Additions
Expansions of Additions to a nonconforming structure must meet the requirements of this
Development Code with the following exceptions:
a. If the nonconforming structure does meet build-to width requirements of the zoning
district, the expansion addition must meet the requirements of this Section.
b. In a Residential (R-) District, a nonconforming structure that encroaches into the setback
may be expanded as long as the expansion addition will not result in an increase in the
encroachment
Clean Version:
Additions
Additions to a nonconforming structure must meet the requirements of this Development Code
with the following exceptions:
a. If the nonconforming structure does meet build-to width requirements of the zoning
district, the addition must meet the requirements of this Section.
b. In a Residential (R-) District, a nonconforming structure that encroaches into the setback
may be expanded as long as the addition will not result in an increase in the
encroachment
Working Document A.53
Code Section: 34-5.3.3.B.2
Page Number: 5-63
Old Text:
If the nonconforming structure to be expanded is also a contributing structure in an ADC District
or HC District, or an Individually Protected Property, , then that structure is not required to meet
any development standard that would require modification of the structure itself, and the Board
of Architectural Review must approve a Certificate of Appropriateness for the proposed
expansion.
"Track Changes” Version:
If the nonconforming structure to be expanded is also a contributing structure in an ADC District
or HC District, or an Individually Protected Property, , then that structure is not required to meet
any development standard that would require modification of the structure itself, and the Board
of Architectural Review must approve a Certificate of Appropriateness for the proposed
expansion.
Clean Version:
If the nonconforming structure to be expanded is also a contributing structure in an ADC District
or HC District, or an Individually Protected Property, then that structure is not required to meet
any development standard that would require modification of the structure itself, and the Board
Page 57 of 143
Tier 1 Amendments
of Architectural Review must approve a Certificate of Appropriateness for the proposed
expansion.
Working Document A.54
Code Section: 34-5.2.8.A
Page Number: 5-34
Old Text:
A Corridor Review for a Certificate of Appropriateness is required for the following project
activities n on any property located in the Entrance Corridor District:
"Track Changes” Version:
A Corridor Review for a Certificate of Appropriateness is required for the following project
activities n on any property located in the Entrance Corridor District:
Clean Version:
A Corridor Review for a Certificate of Appropriateness is required for the following project
activities on any property located in the Entrance Corridor District:
Working Document A.55
Code Section: 34-5.2.9.D.1.a.iii
Page Number: 5-38
Old Text:
When the property is within an ADC District, HC District, or an Individually Protected Property, a
Certificate of Appropriateness may also be required. See 5.2.7 Minor Historic Review and 5.2.7.
Major Historic Review.
"Track Changes” Version:
When the property is within an ADC District, Entrance Corridor, HC District, or an Individually
Protected Property, a Certificate of Appropriateness may also be required. See 5.2.76. Major
Minor Historic Review and 5.2.7. Major Historic Review.
Clean Version:
When the property is within an ADC District, Entrance Corridor, HC District, or an Individually
Protected Property, a Certificate of Appropriateness may also be required. See 5.2.6. Minor
Historic Review and 5.2.7. Major Historic Review.
Working Document A.72
Code Section: 34-4.7.1.A.1
Page Number: 4-48
Old Text:
To protect and enhance the character and stability of neighborhoods the compatibility of new
development with its surrounding context where the scale of development changes between
lots of differing zoning districts; and
"Track Changes” Version:
Page 58 of 143
Tier 1 Amendments
To protect and enhance the character and stability of neighborhoods and the compatibility of
new development with its surrounding context where the scale of development changes
between lots of differing zoning districts; and
Clean Version:
To protect and enhance the character and stability of neighborhoods and the compatibility of
new development with its surrounding context where the scale of development changes
between lots of differing zoning districts; and
Working Document A.73
Code Section: 34-2.10.1.B.1.e
Page Number: 2-95
Old Text:
For lots that abut multiple streets, the Administrator will determine primary streets using the
following criteria listed from most important to less important:
(i) The street or streets with the highest classification according to the Street Typology
Map;
(ii) The established orientation of the block;
(iii) The street abutting the longest face of the block; and
(iii) The street parallel to an alley within the block.
"Track Changes” Version:
For lots that abut multiple streets, the Administrator will determine primary streets using the
following criteria listed from most important to less important:
(i) The street or streets with the highest classification according to the Street Typology
Map;
(ii) The established orientation of the block;
(iii) The street abutting the longest face of the block; and
(iv) (iii) The street parallel to an alley within the block.
Clean Version:
For lots that abut multiple streets, the Administrator will determine primary streets using the
following criteria listed from most important to less important:
(i) The street or streets with the highest classification according to the Street
Typology Map;
(ii) The established orientation of the block;
(iii) The street abutting the longest face of the block; and
(iv) The street parallel to an alley within the block.
State Required Changes per HB2660 and SB974
HB2660: Shortens the timeframes for various local government approvals of subdivision plats and site
plans. Additionally, the bill calls on the Virginia Code Commission to convene a work group consisting of
various stakeholders to review existing provisions related to the submission, review, and approval of
subdivision plats and site plans. The work group shall develop recommendations to (i) organize
Page 59 of 143
Tier 1 Amendments
procedural steps in a clear, logical, and sequential order to enhance ease of reference; (ii) clarify the
processes, requirements, and timelines applicable to each type of plat or plan; (iii) standardize
terminology to ensure consistency, reduce ambiguity, and minimize misinterpretation; and (iv) identify
and eliminate redundant or duplicative provisions to streamline the Code and improve its usability and
shall submit a report to the General Assembly by November 1, 2025.
SB974: Removes planning commission and governing body approval authority for the administrative
review process for plats and plans and assigns such authority solely to a designated agent, defined in the
bill. However, the bill provides that the local planning commission may serve as the designated agent of
any locality with a population of 5,000 or less. The bill also expedites the review process by shortening
the timeframe for forwarding plats and plans to state agencies for review.
Working Document A.57
Code Section: 34-5.1.1
Page Number: 5-3
Old Text:
Summary of Review Authority Table giving Planning Commission Review and Appeal (A)
Authority over Development Review.
"Track Changes” Version: NA
Clean Version:
Remove Planning Commission as the Appeal (A) Authority over Development Review.
Working Document A.58
Code Section: 34-5.1.3.B.2
Page Number: 5-6
Old Text:
Authority
2. Approval Authority
The Planning Commission is responsible for final action regarding:
a. Review of Public Facilities;
b. Preliminary Plats; and
c. Appeals regarding Development Review, Subdivision Review, and Certificates of
Appropriateness subject to Corridor Review.
"Track Changes” Version:
Authority
2. Approval Authority
The Planning Commission is responsible for final action regarding:
a. Review of Public Facilities;
b. Preliminary Plats; and
c. Appeals regarding Development Review, Subdivision Review, and Certificates of
Appropriateness subject to Corridor Review.
Clean Version:
Authority
Page 60 of 143
Tier 1 Amendments
2. Approval Authority
The Planning Commission is responsible for final action regarding:
a. Review of Public Facilities; and
c. Appeals regarding Certificates of Appropriateness subject to Corridor Review.
Working Document A.63
Code Section: 34-6.7.3.D.1.a
Page Number: 6-15
Old Text:
Once the Subdivision Administrator determines the application is complete, the
Subdivision Administrator will notify the Planning Commission of the application and
review the application against the requirements of this Development Code and other
applicable technical requirements of the City.
"Track Changes” Version:
Once the Subdivision Administrator determines the application is complete, the
Subdivision Administrator will notify the Planning Commission of the application and
review the application against the requirements of this Development Code and other
applicable technical requirements of the City.
Clean Version:
Once the Subdivision Administrator determines the application is complete, the Subdivision
Administrator will review the application against the requirements of this Development Code
and other applicable technical requirements of the City.
Working Document A.64
Code Section: 34-6.7.3.D.1.b
Page Number: 6-15
Old Text:
Section b Planning Commission Decision
"Track Changes” Version: NA
Clean Version:
Section removed.
Working Document A.65
Code Section: 34-6.7.3.D.2.a
Page Number: 6-16
Old Text:
The applicant may appeal a decision of denial, or failure of the Subdivision Administrator or
Planning Commission to approve or deny the application, to the Circuit Court in accordance
with the Code of Virginia § 15.2-2259.
"Track Changes” Version:
The applicant may appeal a decision of denial, or failure of the Subdivision Administrator or
Planning Commission to approve or deny the application, to the Circuit Court in accordance
Page 61 of 143
Tier 1 Amendments
with the Code of Virginia § 15.2-2259.
Clean Version:
The applicant may appeal a decision of denial, or failure of the Subdivision Administrator to
approve or deny the application, to the Circuit Court in accordance with the Code of Virginia §
15.2-2259.
Working Document A.66
Code Section: 34-6.7.4.A
Page Number: 6-19
Old Text:
Whenever this Article contains provisions for variation or exception to a requirement, the
Subdivision Administrator or Planning Commission in considering a request for a variation or
exception, will consider whether, because of unusual size, topography, shape of the property,
location of the property or other unusual conditions (excluding the proprietary interests of the
subdivider) the requirement that is proposed to be varied or excepted would result in
substantial injustice or hardship and would not forward the purposes of this chapter or serve
the public interest.
"Track Changes” Version:
Whenever this Article contains provisions for variation or exception to a requirement, the
Subdivision Administrator or Planning Commission in considering a request for a variation or
exception, will consider whether, because of unusual size, topography, shape of the property,
location of the property or other unusual conditions (excluding the proprietary interests of the
subdivider) the requirement that is proposed to be varied or excepted would result in
substantial injustice or hardship and would not forward the purposes of this chapter or serve
the public interest.
Clean Version:
Whenever this Article contains provisions for variation or exception to a requirement, the
Subdivision Administrator in considering a request for a variation or exception, will consider
whether, because of unusual size, topography, shape of the property, location of the property
or other unusual conditions (excluding the proprietary interests of the subdivider) the
requirement that is proposed to be varied or excepted would result in substantial injustice or
hardship and would not forward the purposes of this chapter or serve the public interest.
Working Document A.67
Code Section: 34-6.7.4.A.4
Page Number: 6-19
Old Text:
A subdivider may appeal the Subdivision Administrator’s decision to deny a variation or
exception request to the Planning Commission. In reviewing the request, the Planning
Commission may approve or disapprove the request based on the applicable findings set forth in
this Section.
"Track Changes” Version:
Page 62 of 143
Tier 1 Amendments
A subdivider may appeal the Subdivision Administrator’s decision to deny a variation or
exception request to the Planning Commission Circuit Court in accordance with the Code of
Virginia § 15.2-2259. In reviewing the request, the Planning Commission Circuit Court may
approve or disapprove the request based on the applicable findings set forth in this Section.
Clean Version:
A subdivider may appeal the Subdivision Administrator’s decision to deny a variation or
exception request to the Circuit Court in accordance with the Code of Virginia § 15.2-2259. In
reviewing the request, the Circuit Court may approve or disapprove the request based on the
applicable findings set forth in this Section.
Working Document A.69
Code Section: 34-5.2.1.C.4.a
Page Number: 5-12
Old Text:
All applications must be complete before the City is required to review the application.
Once an application is received, the Administrator has 10 days to review and determine the
completeness of an application. An applicant will be notified of an incomplete application,
and the application will not proceed for review or decision.
"Track Changes” Version:
All applications must be complete before the City is required to review the application. Once an
application is received, the Administrator has 10 5 days to review and determine the
completeness of an application. An applicant will be notified of an incomplete application, and
the application will not proceed for review or decision.
Clean Version:
All applications must be complete before the City is required to review the application. Once an
application is received, the Administrator has 5 days to review and determine the completeness
of an application. An applicant will be notified of an incomplete application, and the application
will not proceed for review or decision.
Minor amendments aimed at clarifying or providing missing information
Working Document A.3
Code Section: 34-4.7.1.B.1
Page Number: 4-48
Old Text:
The Applicability table is missing the RN-A district.
"Track Changes”
Version: NA
Clean Version:
Add RN-A to the District of Lot Column after R-A and to the Abutting District Row after R-A.
Page 63 of 143
Tier 1 Amendments
Working Document A.4
Code Section: 34-2.3.2.B.1
Page Number: 2-19
Old Text:
With bonus
"Track Changes” Version:
With bonus Affordable Dwelling Unit Bonus
Clean Version:
Bonus: Affordable Dwelling Unit
Working Document A.5
Code Section: 34-2.3.3.B.1
Page Number: 2-21
Old Text:
With bonus
"Track Changes” Version:
With bonus Affordable Dwelling Unit Bonus
Clean Version:
Bonus: Affordable Dwelling Unit
Working Document A.6
Code Section: 34-2.4.2.B.1
Page Number: 2-25
Old Text:
With bonus
"Track Changes” Version:
With bonus Affordable Dwelling Unit Bonus
Clean Version:
With Affordable Dwelling Unit Bonus
Working Document A.7
Code Section: 34-2.4.3.B.1
Page Number: 2-27
Old Text:
With bonus
"Track Changes” Version:
With bonus Affordable Dwelling Unit Bonus
Clean Version:
With Affordable Dwelling Unit Bonus
Working Document A.8
Code Section: 34-2.4.4.B.1
Page 64 of 143
Tier 1 Amendments
Page Number: 2-29
Old Text:
With bonus
"Track Changes” Version:
With bonus Affordable Dwelling Unit Bonus
Clean Version:
With Affordable Dwelling Unit Bonus
Working Document A.9
Code Section: 34-2.5.2.B.1
Page Number: 2-33
Old Text:
With bonus
"Track Changes” Version:
With bonus Affordable Dwelling Unit Bonus
Clean Version:
With Affordable Dwelling Unit Bonus
Working Document A.10
Code Section: 34-2.5.3.B.1
Page Number: 2-35
Old Text:
With bonus
"Track Changes” Version:
With bonus Affordable Dwelling Unit Bonus
Clean Version:
With Affordable Dwelling Unit Bonus
Working Document A.11
Code Section: 34-2.5.4.B.1
Page Number: 2-37
Old Text:
With bonus
"Track Changes” Version:
With bonus Affordable Dwelling Unit Bonus
Clean Version:
With Affordable Dwelling Unit Bonus
Working Document A.12
Code Section: 34-2.5.5.B.1
Page Number: 2-39
Old Text: With bonus
Page 65 of 143
Tier 1 Amendments
"Track Changes” Version:
With bonus Affordable Dwelling Unit Bonus
Clean Version:
With Affordable Dwelling Unit Bonus
Working Document A.13
Code Section: 34-2.5.6.B.1
Page Number: 2-41
Old Text:
With bonus
"Track Changes” Version:
With bonus Affordable Dwelling Unit Bonus
Clean Version:
With Affordable Dwelling Unit Bonus
Working Document A.14
Code Section: 34-2.6.2.B.1
Page Number: 2-45
Old Text:
With bonus
"Track Changes” Version:
With bonus Affordable Dwelling Unit Bonus
Clean Version:
With Affordable Dwelling Unit Bonus
Working Document A.15
Code Section: 34-2.6.3.B.1
Page Number: 2-47
Old Text:
With bonus
"Track Changes” Version:
With bonus Affordable Dwelling Unit Bonus
Clean Version:
With Affordable Dwelling Unit Bonus
Working Document A.16
Code Section: 34-2.5.6.A.6.
Page Number: 2-40
Old Text:
Type X
"Track Changes” Version:
Type X B, D
Page 66 of 143
Tier 1 Amendments
Clean Version:
Type B, D
Working Document A.19
Code Section: 34-3.4.4.A
Page Number: 3-32
Old Text:
In a RX- District, commercial uses must not exceed 25% of the floor area on a lot.
"Track Changes
Version: This information needs to be within the RX- district pages in Division 2.
Clean Version:
2.3.2.B.7 Commercial Uses Section 3.4.4.A: (First Column) Commercial Uses per floor area per
lot (Second Column) max 25%
2.3.3.B.7 Commercial Uses Section 3.4.4.A: (First Column) Commercial Uses per floor area per
lot (Second Column) max 25%
Working Document A.20
Code Section: 34-4.2.1.B.1
Page Number: 4-5
Old Text:
The existing structure bonus applies to any project within Residential A (R-A) or Residential B (R-
B) zoning districts where a developer chooses to meet all of the standards of this Section in
order to receive a density bonus to the maximum allowed dwelling units per lot.
"Track Changes” Version:
The existing structure bonus applies to any project within Residential A (R-A), Residential Core
Neighborhood A (RN-A), Residential B (R-B), or Residential C (R-C) zoning districts where a
developer chooses to meet all of the standards of this Section in order to receive a density
bonus to the maximum allowed dwelling units per lot.
Clean Version:
The existing structure bonus applies to any project within Residential A (R-A), Residential B (R-
B), Residential C (R-C), or Residential Core Neighborhood A (RN-A) zoning districts where a
developer chooses to meet all of the standards of this Section in order to receive a density
bonus to the maximum allowed dwelling units per lot.
Working Document A.21
Code Section: 34-4.5.1.B.1.
Page Number: 4-22
Old Text:
The Applicability table is Missing RN-A
"Track Changes” Version:
NA
Clean Version:
Page 67 of 143
Tier 1 Amendments
All R- and RN- Districts Type 2
Working Document A.22
Code Section: 34-2.8.4.B
Page Number: 2-57
Old Text:
When allowed in Residential (R-) districts, the following principal uses may follow the Shopfront
House Form standards:
"Track Changes” Version:
When allowed in Residential (R-) and (RN-) districts, the following principal uses may follow the
Shopfront House Form standards:
Clean Version:
When allowed in Residential (R-) and (RN-) districts, the following principal uses may follow the
Shopfront House Form standards:
Working Document A.23
Code Section: 34-2.10.4.A.3.b
Page Number: 2-106
Old Text:
In Residential A (R-A), Residential B (R-B), and Residential C (R-C), the building coverage cannot
exceed the maximum allowed based on the number of units provided on the lot.
"Track Changes” Version:
In Residential A (R-A), Residential Core Neighborhood A (RN-A), Residential B (R-B), and
Residential C (R-C), the building coverage cannot exceed the maximum allowed based on the
number of units provided on the lot.
Clean Version:
In Residential A (R-A), Residential Core Neighborhood (RN-A), Residential B (R-B), and
Residential C (R-C), the building coverage cannot exceed the maximum allowed based on the
number of units provided on the lot.
Working Document A.24
Code Section: 34-2.10.9.B.2
Page Number: 2-130
Old Text:
Side wall height limitations apply to all lots in Residential A (R-A), and Residential B (R-B) zoning
districts.
"Track Changes” Version:
Side wall height limitations apply to all lots in Residential A (R-A), Residential Core
Neighborhood A (RN-A), and Residential B (R-B) zoning districts.
Clean Version:
Side wall height limitations apply to all lots in Residential A (R-A), Residential Core
Neighborhood (RN-A), and Residential B (R-B) zoning districts.
Page 68 of 143
Tier 1 Amendments
Working Document A.25
Code Section: 34-3.4.2.B
Page Number: 3-20
Old Text:
Residential treatment facilities for sex offender treatment services are not allowed in Residential
(R-)and Residential Mixed Use (RX-) districts.
"Track Changes” Version:
Residential treatment facilities for sex offender treatment services are not allowed in Residential
(R-), Residential Core Neighborhood (RN-), and Residential Mixed Use (RX-) districts.
Clean Version:
Residential treatment facilities for sex offender treatment services are not allowed in Residential
(R-), Residential Core Neighborhood (RN-), and Residential Mixed Use (RX-) districts.
Working Document A.26
Code Section: 34-3.4.4.B.1
Page Number: 3-32
Old Text:
When abutting a common lot line of any R-,or RX- District, a Low Impact Transition Screen is
required.
"Track Changes” Version:
When abutting a common lot line of any R-, RN-, or RX- District, a Low Impact Transition Screen
is required.
Clean Version:
When abutting a common lot line of any R-, RN-, or RX- District, a Low Impact Transition Screen
is required.
Working Document A.27
Code Section: 34-3.4.5.A.1.a
Page Number: 3-32
Old Text:
When abutting a common lot line or across an alley of a R-or RX- District, a Transition Type E is
required.
"Track Changes” Version:
When abutting a common lot line or across an alley of a R-, RN-, or RX- District, a Transition Type
E is required.
Clean Version:
When abutting a common lot line or across an alley of a R-, RN-, or RX- District, a Transition Type
E is required.
Working Document A.28
Code Section: 34-3.4.5.A.3.c
Page 69 of 143
Tier 1 Amendments
Page Number: 3-33
Old Text:
When abutting a common lot line or across an alley of a R-or RX- District, a Transition Type E is
required.
"Track Changes” Version:
When abutting a common lot line or across an alley of a R-, RN-, or RX- District, a Transition Type
E is required.
Clean Version:
When abutting a common lot line or across an alley of a R-, RN-, or RX- District, a Transition Type
E is required.
Working Document A.29
Code Section: 34-3.4.5.A.4.a
Page Number: 3-33
Old Text:
When abutting a common lot line or across an alley of a R-or RX- District, a Transition Type E is
required.
"Track Changes” Version:
When abutting a common lot line or across an alley of a R-, RN-, or RX- District, a Transition Type
E is required.
Clean Version:
When abutting a common lot line or across an alley of a R-, RN-, or RX- District, a Transition Type
E is required.
Working Document A.30
Code Section: 34-3.5.2.H.1
Page Number: 3-38
Old Text:
Outdoor entertainment areas must be a minimum of 150 feet from a R- District
"Track Changes” Version:
Outdoor entertainment areas must be a minimum of 150 feet from a R- District or RN- District.
Clean Version:
Outdoor entertainment areas must be a minimum of 150 feet from a R- District or RN- District.
Working Document A.31
Code Section: 34-3.5.2.I.3
Page Number: 3-39
Old Text:
When abutting a common lot line of a R-or RX- District, a Fence Type X is required.
"Track Changes” Version:
When abutting a common lot line of a R-, RN-, or RX- District, a Fence Type X High Impact
Transition Screen is required.
Page 70 of 143
Tier 1 Amendments
Clean Version:
When abutting a common lot line of a R-, RN-, or RX- District, a High Impact Transition Screen is
required.
Working Document A.32
Code Section: 34-3.6.2.C.3
Page Number: 3-42
Old Text:
Must not be approved to take place within 300 feet of a R- District.
"Track Changes” Version:
Must not be approved to take place within 300 feet of a R- or RN- District.
Clean Version:
Must not be approved to take place within 300 feet of a R- or RN- District.
Working Document A.33
Code Section: 34-3.6.2.F.3.c
Page Number: 3-45
Old Text:
All lighting associated with the site must meet the requirements of Div. 4.12. Outdoor Lighting
and must be screened from view from any rights-of-way, or Residential (R-) zoning district.
"Track Changes” Version:
All lighting associated with the site must meet the requirements of Div. 4.12. Outdoor Lighting
and must be screened from view from any rights-of-way, or Residential (R-) or Residential Core
Neighborhood (RN-) zoning district.
Clean Version:
All lighting associated with the site must meet the requirements of Div. 4.12. Outdoor Lighting
and must be screened from view from any rights-of-way, or Residential (R-) or Residential Core
Neighborhood (RN-) zoning district.
Working Document A.34
Code Section: 34-4.4.5.D.3
Page Number: 4-20
Old Text:
In Residential (R-) zoning districts, when the project fronts on an existing street and adjacent
property on either side of the project does not have an existing streetscape, the Administrator
may allow the project developer to contribute to a streetscape fund, maintained and
administered by the City, an amount equivalent to the cost of the dedication of land for and the
construction of the streetscape on the property.
"Track Changes” Version:
In Residential (R-) or Residential Core Neighborhood (RN-) zoning districts, when the project
fronts on an existing street and adjacent property on either side of the project does not have an
existing streetscape, the Administrator may allow the project developer to contribute to a
Page 71 of 143
Tier 1 Amendments
streetscape fund, maintained and administered by the City, an amount equivalent to the cost of
the dedication of land for and the construction of the streetscape on the property.
Clean Version:
In Residential (R-) or Residential Core Neighborhood (RN-) zoning districts, when the project
fronts on an existing street and adjacent property on either side of the project does not have an
existing streetscape, the Administrator may allow the project developer to contribute to a
streetscape fund, maintained and administered by the City, an amount equivalent to the cost of
the dedication of land for and the construction of the streetscape on the property.
Working Document A.35
Code Section: 34-4.5.5.C.7
Page Number: 4-37
Old Text:
Where a parking structure is visible from a street or a Residential (R-) district, the entire visible
portion must be screened with a permanent structure that meets the following standards:
"Track Changes” Version:
Where a parking structure is visible from a street, or a Residential (R-) district, or a Residential
Core Neighborhood (RN-) district, the entire visible portion must be screened with a permanent
structure that meets the following standards:
Clean Version:
Where a parking structure is visible from a street, a Residential (R-) district, or Residential Core
Neighborhood (RN-) district, the entire visible portion must be screened with a permanent
structure that meets the following standards:
Working Document A.36
Code Section: 34-4.5.7.C.2
Page Number: 4-43
Old Text:
The following requirements apply to a project in a Residential (R-) zoning district with a front- or
side-accessed driveway.
"Track Changes” Version:
The following requirements apply to a project in a Residential (R-) or Residential Core
Neighborhood (RN-) zoning district with a front- or side-accessed driveway.
Clean Version:
The following requirements apply to a project in a Residential (R-) or Residential Core
Neighborhood (RN-) zoning district with a front- or side-accessed driveway.
Working Document A.37
Code Section: 34-4.5.7.C.3
Page Number: 4-43
Old Text:
Page 72 of 143
Tier 1 Amendments
The following requirements apply to a project in a Residential (R-) zoning district with a rear-
accessed driveway.
"Track Changes” Version:
The following requirements apply to a project in a Residential (R-) or Residential Core
Neighborhood (RN-) zoning district with a rear-accessed driveway.
Clean Version:
The following requirements apply to a project in a Residential (R-) or Residential Core
Neighborhood (RN-) zoning district with a rear-accessed driveway.
Working Document A.39
Code Section: 34-4.11.3.B.2.e.ii
Page Number: 4-83
Old Text:
ii. Residential (R-) Districts, ADC Districts, and IPPs
In a R- District, ADC District, and IPPs, small temporary signs must meet the following standards:
"Track Changes” Version:
ii. Residential (R-) Districts, Residential Core Neighborhood (RN-), ADC Districts, and IPPs
In a R- District, RN- District, ADC District, and IPPs, small temporary signs must meet the
following standards:
Clean Version:
ii. Residential (R-) Districts, Residential Core Neighborhood (RN-), ADC Districts, and IPPs
In a R- District, RN- District, ADC District, and IPPs, small temporary signs must meet the
following standards:
Working Document A.40
Code Section: 34-4.11.6.A.2
Page Number: 4-86
Old Text:
Large temporary signs are not permitted in Residential (R-) Districts.
"Track Changes” Version:
Large temporary signs are not permitted in Residential (R-) or Residential Core Neighborhood
(RN-) Districts.
Clean Version:
Large temporary signs are not permitted in Residential (R-) or Residential Core Neighborhood
(RN-) Districts.
Working Document A.41
Code Section: 34-4.11.9.A
Page Number: 4-89
Old Text:
RN-A is missing from District Permissions
"Track Changes” Version: NA
Page 73 of 143
Tier 1 Amendments
Clean Version:
Under the zoning district row
Residential (R-) and (RN-)
Working Document A.42
Code Section: 34-4.11.9.C
Page Number: 4-90
Old Text: Maximum Sign Area is missing RN-A under the Residential Zoning Districts table.
"Track Changes” Version: NA
Clean Version:
Zoning Districts
Residential
All R- and RN- districts
Working Document A.43
Code Section: 34-4.11.11.B
Page Number: 4-101
Old Text:
Each outside lighting installation and each illuminated sign must be controlled by a time switch
or externally operable switch which will open all underground conductors and must be suitable
for conditions of installation, such as exposure to the weather. Illumination for any sign cannot
be directed toward any Residential (R-) or Residential Mixed Use (RX-) district or toward any
adjacent street.
"Track Changes” Version:
Each outside lighting installation and each illuminated sign must be controlled by a time switch
or externally operable switch which will open all underground conductors and must be suitable
for conditions of installation, such as exposure to the weather. Illumination for any sign cannot
be directed toward any Residential (R-), Residential Core Neighborhood (RN-), or Residential
Mixed Use (RX-) district or toward any adjacent street.
Clean Version:
Each outside lighting installation and each illuminated sign must be controlled by a time switch
or externally operable switch which will open all underground conductors and must be suitable
for conditions of installation, such as exposure to the weather. Illumination for any sign cannot
be directed toward any Residential (R-), Residential Core Neighborhood (RN-), or Residential
Mixed Use (RX-) district or toward any adjacent street.
Working Document A.44
Code Section: 34-4.12.2.C.4
Page Number: 4-103
Old Text:
Page 74 of 143
Tier 1 Amendments
Security lighting controlled by sensors, generating a maximum of 6,000 lumens per fixture, and
which provides illumination for 15 minutes or less. In Residential (R-) districts, security lighting
must not generate more than 3,000 lumens per fixture.
"Track Changes” Version:
Security lighting controlled by sensors, generating a maximum of 6,000 lumens per fixture, and
which provides illumination for 15 minutes or less. In Residential (R-) and Residential Core
Neighborhood (RN-) districts, security lighting must not generate more than 3,000 lumens per
fixture.
Clean Version:
Security lighting controlled by sensors, generating a maximum of 6,000 lumens per fixture, and
which provides illumination for 15 minutes or less. In Residential (R-) and Residential Core
Neighborhood (RN-) districts, security lighting must not generate more than 3,000 lumens per
fixture.
Working Document A.45
Code Section: 34-4.12.3.C.3
Page Number: 4-104
Old Text:
Light fixtures within 30 feet of any R-A, R-B or R-C District may be no higher than 12 feet.
"Track Changes” Version:
Light fixtures within 30 feet of any R-A, RN-A, R-B or R-C District may be no higher than 12 feet.
Clean Version:
Light fixtures within 30 feet of any R-A, RN-A, R-B or R-C District may be no higher than 12 feet.
Working Document A.46
Code Section: 5-62
Page Number: 34-5.3.3.B.1.b
Old Text:
In a Residential (R-) District, a nonconforming structure that encroaches into the setback may be
expanded as long as the expansion will not result in an increase in the encroachment.
"Track Changes” Version:
In a Residential (R-) or Residential Core Neighborhood (RN-) district, a nonconforming structure
that encroaches into the setback may be expanded as long as the expansion will not result in an
increase in the encroachment.
Clean Version:
In a Residential (R-) or Residential Core Neighborhood (RN-) district, a nonconforming structure
that encroaches into the setback may be expanded as long as the expansion will not result in an
increase in the encroachment.
Working Document A.47
Code Section: 34-7.1.2.E.3.a
Page Number: 7-9
Page 75 of 143
Tier 1 Amendments
Old Text:
Sublots are only permitted in Residential (R-) districts.
"Track Changes” Version:
Sublots are only permitted in Residential (R-) and Residential Core Neighborhood (RN-) districts.
Clean Version:
Sublots are only permitted in Residential (R-) and Residential Core Neighborhood (RN-) districts.
Working Document A.51
Code Section: 34-5.2.7.C.2.c
Page Number: 5-29
Old Text:
The BAR, or City Council on appeal, may require conditions of approval as are necessary or
desirable to ensure that any new construction or addition is compatible with the scale and
character of the Architecture Design Control District, Individually Protected Property, or Historic
Conservation District. Prior to attaching conditions to an approval, due consideration will be
given to the cost of compliance with the proposed conditions as well as the goals of the
Comprehensive Plan. Conditions may require a reduction in height or massing, consistent with
the City’s design guidelines and subject to the following limitations:
i. Along the Downtown Mall, the BAR may limit story height to within 2 stories of the
prevailing story height of the block;
ii. In all other areas subject to review, the BAR may reduce the allowed height by no
more than 2 stories; and
iii. The BAR may require upper story stepbacks of up to 25’.
"Track Changes” Version:
The BAR, or City Council on appeal, may require conditions of approval as are necessary or
desirable to ensure that any new construction or addition is compatible with the scale and
character of the Architecture Design Control District, Individually Protected Property, or Historic
Conservation District. Prior to attaching conditions to an approval, due consideration will be
given to the cost of compliance with the proposed conditions as well as the goals of the
Comprehensive Plan. Conditions may require a reduction in height or massing, consistent with
the City’s design guidelines and subject to the following limitations:
i. Along the Downtown Mall, the BAR may limit story height to within 2 stories of the
prevailing story height of the block;
ii. In all other areas subject to review, the BAR may reduce the allowed height by no
more than 2 stories; and
iii. The BAR may require upper story stepbacks of up to 25’.
Clean Version:
(This section is moved to) 2.9.2.D. ADC Certificate of Appropriateness
a. A Certificate of Appropriateness is required for certain projects in ADC Districts in
accordance with 5.2.6. Minor Historic Review and 5.2.7. Major Historic Review.
b. The BAR, or City Council on appeal, may require conditions of approval as are necessary
or desirable to ensure that any new construction or addition is compatible with the
Page 76 of 143
Tier 1 Amendments
scale and character of the Architecture Design Control District. Prior to attaching
conditions to an approval, due consideration will be given to the cost of compliance with
the proposed conditions as well as the goals of the Comprehensive Plan. Conditions may
require a reduction in height or massing, consistent with the City’s design guidelines and
subject to the following limitations:
i. Along the Downtown Mall, the BAR may limit story height to within 2 stories of
the prevailing story height of the block;
ii. In all other areas subject to review, the BAR may reduce the allowed height by
no more than 2 stories; and
iii. The BAR may require upper story stepbacks of up to 25’.
2.9.3.D. IPP Certificate of Appropriateness
a. A Certificate of Appropriateness is required for certain projects on Individually Protected
Properties in accordance with 5.2.6. Minor Historic Review and 5.2.7. Major Historic
Review.
b. The BAR, or City Council on appeal, may require conditions of approval as are necessary
or desirable to ensure that any new construction or addition is compatible with the
scale and character of the Individually Protected Property. Prior to attaching conditions
to an approval, due consideration will be given to the cost of compliance with the
proposed conditions as well as the goals of the Comprehensive Plan. Conditions may
require a reduction in height or massing, consistent with the City’s design guidelines and
subject to the following limitations:
a. Along the Downtown Mall, the BAR may limit story height to within 2 stories
of the prevailing story height of the block;
b. In all other areas subject to review, the BAR may reduce the allowed height
by no more than 2 stories; and
c. The BAR may require upper story stepbacks of up to 25’.
2.9.4.F. HC Certificate of Appropriateness
a. A Certificate of Appropriateness is required for certain projects in the HC Districts in
accordance with 5.2.6. Minor Historic Review and 5.2.7. Major Historic Review.
b. The BAR, or City Council on appeal, may require conditions of approval as are necessary
or desirable to ensure that any new construction or addition is compatible with the
scale and character of the Historic Conservation (-HC) District. Prior to attaching
conditions to an approval, due consideration will be given to the cost of compliance with
the proposed conditions as well as the goals of the Comprehensive Plan. Conditions may
require a reduction in height or massing, consistent with the City’s design guidelines and
subject to the following limitations:
iv. Along the Downtown Mall, the BAR may limit story height to within 2 stories of
the prevailing story height of the block;
v. In all other areas subject to review, the BAR may reduce the allowed height by
no more than 2 stories; and
vi. The BAR may require upper story stepbacks of up to 25’.
Page 77 of 143
Tier 2 Amendment
B.1 Side Setbacks and Attached Dwelling Units
Section 34-2.2.2.A.4, 34-2.2.3.A.4, 34-2.2.4.A.4, 34-2.2.5.A.4 and 34-2.10.5.C
Page: 2-8, 2-10, 2-12, 2-14, 2-112
Working Document reference: B.1
Section 34-2.2.2.A.4
Existing Language:
Proposed Language:
Graphics to be updated to reflect change to text.
Section 34-2.2.3.A.4:
Existing Language:
Page 78 of 143
Tier 2 Amendment
B.1 Side Setbacks and Attached Dwelling Units
Proposed Language:
Graphics to be updated to reflect change to text.
Section 34-2.2.4.A.4
Existing Language:
Proposed language:
Graphics to be updated to reflect change to text.
Page 79 of 143
Tier 2 Amendment
B.1 Side Setbacks and Attached Dwelling Units
Section 34-2.2.5.A.4
Existing language:
Proposed language:
Graphics to be updated to reflect change to text.
Section 34-2.10.5.C
Existing Language:
No existing language.
Proposed Language:
New Section 34-2.10.5.C.4
C. Standards
4. Side lot line, Detached/Attached
When Side Lot Line, Attached is permitted by the Zoning district, buildings within the
project site are permitted a zero setback when attached to an adjacent building within the
same project site. Any buildings side not attached within the project site must conform to
the Side Lot Line, Detached minimum requirement for that Zoning district.
Page 80 of 143
Tier 2 Amendment
B.1 Side Setbacks and Attached Dwelling Units
Analysis:
The current side setback requirements for R- and RN- districts make it impossible to
construct single-family attached residential structures which are divided by common lot
lines. The addition of the minimum side lot line setback for attached structures in those
districts will allow for attached residential construction, while preserving the existing
setback requirements for other types of development.
Page 81 of 143
Tier 2 Amendment
B.3 Critical Slopes and Lots of Record
Section 34-4.10.1.B
Page: 4-80
Working Document reference: B.3
Existing language:
B. Applicability
[…]
2. Where the Administrator determines that there is no reasonable alternative location or
alignment, and that the applicant has identified protective and restorative measures, the
following are exempt from the requirements of this Section:
a. Driveways;
b. Public utility lines and appurtenances;
c. Stormwater management facilities;
d. Other public facilities necessary to allow the use of the parcel; and
e. Environmental restoration projects.
Proposed language:
3. Any structure which was lawfully in existence prior to the effective date of these critical
slopes provisions, and which is nonconforming solely on the basis of the requirements of
these provisions, may be expanded, enlarged, extended, modified and/or reconstructed as
though such structure were a conforming structure. For the purposes of this section, the
term "lawfully in existence" shall also apply to any structure for which a site plan was
approved or a building permit was issued prior to the effective date of these provisions,
provided such plan or permit has not expired.
4. Any lot or parcel of record which was lawfully a lot of record on the effective date of this
chapter shall be exempt from the requirements of these critical slopes provisions for the
establishment of the first dwelling unit on such lot or parcel.
Analysis:
Current critical slopes provisions do not contain exemptions for lots of record, or for the
first dwelling unit constructed on a lot. Lack of these provisions would be considered a
taking under Virginia state law section 15.2-961.3.
Page 82 of 143
Tier 2 Amendment
B.4 Street Facing Entry and Single Dwelling Unit
Sections 34-2.10.13.A.2
Pages 2-148
Working Document reference: B.4
Existing language:
Applicability
a Street-facing entry spacing requirements apply to all ground story street-facing
facades.
b The maximum street-facing entry spacing requirements must be met for each
building and abutting buildings on a lot or within a project site, but are not
applicable to buildings unrelated to the project.
c Accessory structures do not have to provide a street-facing entry, and are not
included in the calculation of maximum street-facing entry spacing requirement.
d Lots with 1 dwelling unit do not have to provide street-facing entries.
Proposed language:
a Street-facing entry spacing requirements apply to all ground story street-facing
facades.
b The maximum street-facing entry spacing requirements must be met for each
building and abutting buildings on a lot or within a project site, but are not
applicable to buildings unrelated to the project.
c Accessory structures do not have to provide a street-facing entry, and are not
included in the calculation of maximum street-facing entry spacing requirement.
d A lot or sublot consisting of only 1 primary dwelling unit and no additional
primary/principal uses is not required to provide a street-facing entry.
Analysis:
With additional changes being proposed to building setbacks and meeting the build-to
requirement, staff recommend removing the exception that currently exempts accessory structures
from providing a street-facing entry. This ensures that any accessory building placed within a street-
facing yard maintains the same façade rhythm and aesthetic continuity as principal structures.
Staff also propose clarifying that only lots or sublots containing a single residential dwelling unit—
and no other uses—are exempt from the street-facing entry requirement. Under the previous
language, a lot with just one dwelling unit could have all its buildings bypass the entry standard,
creating an unintended loophole in mixed-use districts where residential and nonresidential uses
coexist.
Page 83 of 143
Tier 2 Amendment
B.5 Accessory Uses/Structures and Nonconformity Build-to
Sections 34-3.5.1.A. – Sec. 34-3.5.1.C., Sec. 34-5.3.3. and Sec. 7.2
Pages 3-34, 5-62 and 7-11 – 7-21
Working Document reference: B.5
Existing Language:
Div. 3.5. ACCESSORY USES AND STRUCTURES
3.5.1. General
A. Allowed Accessory Uses and Structures
The permitted use table in 3.2.2. Permitted Use Table establishes the allowed accessory uses and structures by
district. Multiple accessory uses are allowed on a lot when the uses are all allowed in the district and the standards
for all uses on the lot may be met.
B. Accessory Uses and Structures Not Listed
1. An accessory use or structure not specifically listed in 3.2.2. Permitted Use Table is not allowed unless the
Administrator determines the use:
a. Is clearly incidental to and customarily found in connection with an allowed principal use;
b. Is subordinate to and serving an allowed principal use;
c. s subordinate in area, extent and purpose to the principal use served; and
d. Is located on the same lot as the principal use served.
2. Electronic gaming cafes are prohibited as an accessory use.
C. Rules for All Accessory Uses and Structures
1. A permit is required for any accessory use or structure exceeding 256 square feet of gross floor area.
2. Accessory structures must comply with the dimensional requirements of the zoning district, unless listed
as an allowed encroachment in 2.10.5. Building Setbacks.
3. No accessory use or structure is permitted on the lot until after the principal use or structure is approved.
Proposed Language:
Div. 3.5. ACCESSORY USES, BUILDINGS AND STRUCTURES
3.5.1. General
A. Allowed Accessory Uses and Structures
The permitted use table in 3.2.2. Permitted Use Table establishes the allowed accessory uses and
structures by district. Multiple accessory uses are allowed on a lot when the uses are all allowed in the
district and the standards for all uses on the lot may be met. Accessory buildings and structures are
allowable as provided in this Division.
B. Rules for Accessory Uses and Structures Not Listed
1. An accessory use or structure not specifically listed in 3.2.2. Permitted Use Table is not allowed unless the
Administrator determines the use:
a. Is clearly incidental to and customarily found in connection with an allowed principal use;
b. Is subordinate to and serving an allowed principal use;
c. Is subordinate in area, extent and purpose to the principal use served; and
d. Is located on the same lot as the principal use served.
2. Electronic gaming cafes are prohibited as an accessory use.
Page 84 of 143
Tier 2 Amendment
B.5 Accessory Uses/Structures and Nonconformity Build-to
3. No accessory use is permitted on a site until after the principal use is established.
C. Rules for Accessory Uses and Buildings and Structures
1. A permit is required for any accessory use or structure exceeding 256 square feet of gross floor area.
1.2. Accessory buildings and structures must comply with the dimensional requirements of the zoning district,
unless listed as an allowed encroachment in 2.10.5. Building Setbacks.
2.3. No accessory use building or structure is permitted on the lot site until after the principal use or structure is
approved.
3. No accessory building or structure may be used for dwelling purposes.
4. Accessory buildings and structures are not exempt from Building Code requirements.
Existing Language:
Sec. 5.3.3 NONCONFORMING BUILDINGS AND STRUCTURES
5.3.3.C. Nonconforming Build-To Requirement
When an existing building is being expanded or a new building is being constructed, and the building or lot does not
meet the build-to width requirement, the following provisions apply:
1. New Buildings on an Interior Lot
All new construction buildings or structures must occupy the build-to zone until the build-to width
requirement has been met. Until all build-to width standards have been met, new buildings must occupy
the build-to zone for their entire building width.
2. Additions on an Interior Lot
a. Any additions to the front of an existing building must occupy the build-to zone. The addition does
not have to meet the required build-to width for the entire lot. Front additions with a maximum floor
area of 10% of the existing building footprint are allowed behind the build-to zone.
b. b. Side additions having a floor area less than 20% of the existing building footprint are allowed.
Once the build-to width standard has been met, side additions of any size are allowed.
c. c. Rear additions of any size are allowed. Transition setbacks may apply, see Div. 4.7. Transitions
and Screening.
Page 85 of 143
Tier 2 Amendment
B.5 Accessory Uses/Structures and Nonconformity Build-to
3. New Buildings on a Corner Lot
a. All new buildings must occupy the build-to zone until the build-to width requirement for both streets
have been met.
b. Once the build-to width requirement has been met for both streets, new buildings may be placed
behind the build-to zone.
4. Additions on a Corner Lot
a. Any addition to the front of an existing building must be located within the build-to zone on the primary
street. The addition does not have to meet the minimum build-to width for the entire lot. Front additions
with floor area no greater than 10% of the existing building footprint are allowed behind the build-to
zone.
b. Side additions with floor area no greater than 20% of the existing building footprint are allowed. Once
the build-to width standard has been met for both streets, side additions of any size are allowed.
c. Rear additions of any size, located behind the build-to zone, are allowed provided:
i. A landscape area at least 6 feet wide adjacent to the side street lot line is installed across the
entire length of the side street frontage. Breaks for pedestrian, bicycle, and vehicular access of
the minimum practical width are allowed.
Page 86 of 143
Tier 2 Amendment
B.5 Accessory Uses/Structures and Nonconformity Build-to
ii. The landscape area must include medium or large trees planted an average of 30 feet on center
along the entire landscape area.
iii. Trees should be planted offset from street trees to maximize space for canopy growth.
iv. All landscaping must meet the applicable standards of Div. 4.9. Landscaping.
Proposed Language:
Sec. 5.3.3 NONCONFORMING BUILDINGS AND STRUCTURES
5.3.3.C. Nonconforming Build-To Requirement
When an existing building is being expanded or a new building is being constructed, and the building or lot does not
meet the build-to width requirement, the following provisions apply:
1. New Primary Buildings on an Interior Lot
All new construction primary buildings or structures must occupy the build-to zone until the build-to width
requirement has been met. Until all build-to width standards have been met, all new primary buildings
must occupy the build-to zone for their entire building width.
GRAPHIC TO REMAIN
2. Additions on an Interior Lot
a. Any additions to the front of an existing primary building must occupy the build-to zone. The
addition does not have to meet the required build-to width for the entire lot. Front additions with a
maximum floor area of 10% of the existing building footprint are allowed behind the build-to zone.
b. Side additions having a floor area less than 20% of the existing primary building footprint are
allowed. Once the build-to width standards are met, side additions of any size are allowed.
c. Rear additions of any size are allowed. Transition setbacks may apply, see Div. 4.7. Transitions and
Screening.
GRAPHIC TO REMAIN
3. New Primary Buildings on a Corner Lot
a. All new primary buildings must occupy the build-to zone until the build-to width requirement for
both streets have been met.
b. Once the build-to width requirement has been met for both streets, new primary buildings may be
placed behind the build-to zone.
GRAPHIC TO REMAIN
4. Additions to Primary Buildings on a Corner Lot
Page 87 of 143
Tier 2 Amendment
B.5 Accessory Uses/Structures and Nonconformity Build-to
a. Any addition to the front of an existing primary building must be located within the build-to zone on
the primary street. The addition does not have to meet the minimum build-to width for the entire
lot. Front additions with floor area no greater than 10% of the existing primary building footprint are
allowed behind the build-to zone.
b. Side additions with floor area no greater than 20% of the existing primary building footprint are
allowed. Once the build-to width standard has been met for both streets, side additions of any size
are allowed.
GRAPHIC TO REMAIN
c. Rear additions of any size, located behind the build-to zone, are allowed provided:
i. A landscape area at least 6 feet wide adjacent to the side street lot line is installed across the
entire length of the side street frontage. Breaks for pedestrian, bicycle, and vehicular access of
the minimum practical width are allowed.
ii. The landscape area must include medium or large trees planted an average of 30 feet on center
along the entire landscape area.
GRAPHIC TO REMAIN
iii. Trees should be planted offset from street trees to maximize space for canopy growth.
iv. All landscaping must meet the applicable standards of Div. 4.9. Landscaping.
5. Exceptions
a. On any lot with an established Primary Building(s), Accessory Building(s) and structure(s) are
permitted without first requiring the Primary Building(s) to meet the build-to width requirement. This
exception only applies to lots and not sites.
Existing Language
Definitions: Div. 7.2
Building. A covered and enclosed structure, either temporary or permanent, intended for human occupation or
shelter of animals or property of any kind.
Building, accessory. A building or structure subordinate to the principal structure on a lot and used for purposes
incidental to the principal building or structure located on the same lot.
Building, primary. The building occupied or designated for the primary use.
Structure. Any constructed object more than 30 inches in height.
Proposed Language:
Definitions: Div. 7.2
Building. A covered and enclosed structure, either temporary or permanent, intended for human occupation or
shelter of animals or property of any kind.
Page 88 of 143
Tier 2 Amendment
B.5 Accessory Uses/Structures and Nonconformity Build-to
Building, accessory. A building subordinate to the primary building(s) on a lot or site and used for purposes
incidental to the primary building located on the same lot or site. An accessory building may not be utilized for
dwelling purposes.
Building, primary. The building or buildings occupied or designated for the primary/principal use on a lot or site.
Structure: Any constructed object more than 30 inches in height A constructed or erected object that is
permanently or temporarily located on the ground or attached to something having a permanent location on the
ground, and which is intended to support, shelter, or enclose persons, animals, or property. This includes buildings
and similar improvements, but does not include flatwork such as patios, sidewalks, driveways, or other at-grade
surfaces not intended for enclosure or occupancy.
Analysis:
The proposed amendments clearly separate accessory buildings from the nonconforming build-to requirements
that once forced homeowners to expand or reconstruct their primary façade before adding a shed or garage. By
adding subsection 5.3.3.C.5 and revising Division 3.5, accessory buildings are explicitly allowed without occupying
the build-to zone or requiring a front addition. Under the new language, an accessory building permit no longer
hinges on bringing the existing primary structure into conformity with build-to width standards. The updated
definitions in Section 7.2 further reinforce that accessory buildings remain subordinate to primary buildings and
may not serve as dwellings, preventing their reclassification as new primary structures. Overall, these changes
eliminate the prior barrier that effectively barred small outbuildings unless significant new construction occurred,
streamlining the permitting process for homeowners who simply wish to add a tool shed, workshop, or storage
structure
Page 89 of 143
Tier 2 Amendment
B.7 Transparency in the NX and DX Districts
Sections 34-2.5.2.B.4, 2.5.3.B.4, 2.5.4.B.4, 2.5.5.B.4, 2.5.6.B.4
Pages 2-33, 2-35, 2-37, 2-39, 2-41
Working Document reference: B.7
Existing language:
Primary St. Side St.
4. TRANSPARENCY Sec. 2.10.12.
H Ground story (min)
Primary street 70% 35%
Side street 50% 35%
Proposed language:
Primary St. Side St.
4. TRANSPARENCY Sec. 2.10.12.
H Ground story (min) 70% 35%
Primary street 70% 35%
Side street 50% 35%
Analysis:
Transparency standards for the NX- and DX districts contain redundant references to
Primary and Side Streets.
Page 90 of 143
Tier 2 Amendment
B.8 Stepbacks Graphic DX Districts
Section 34-2.5.6.B
Page 2-41
Working Document reference: B.8
Existing Language/Graphic
Proposed Language/Graphic
Update DX graphic to remove the stepback; implies the stepback is required. It also is
implying an additional 30’ and 15’ of active depth is required (shaded in red).
Analysis:
Stepbacks are only required in the DX district when a Transition per Section 34-4.7.1.B
apply (adjacent to R-, RN-, RX-3, CX-3, or NX-3). The current graphic displays building with
these stepbacks , but stepbacks would not be required on the majority of parcels currently
zoned DX. A revised graphic provides the zoning envelope applicable to most properties
within the DX zone. All DX parcels are within an ADC District, and subject to 2.9.2.D. In
approving a Certificate of Appropriateness, the BAR (or Council on appeal) may require
stepbacks per 5.2.7.C.2.c.
Page 91 of 143
Tier 2 Amendment
B.11 Side Setbacks Measurement
Sections 34-2.10.5.D
Pages 2-114
Working Document reference: B.11
Existing language:
3 Primary street setback is measured from the primary street lot line.
4 Side street setback is measured from the side street lot line.
5 Rear setback is measured from the rear lot line
a. For determining the rear setback for a triangular or gore-shaped lot, the rear
lot line is measured from a 10-foot wide line, parallel to the primary street lot
line that intersects two side lots lines at its endpoints.
b. For instances where the primary street lot line is not straight, the rear lot line
must be parallel to a line connecting the end points of the primary street lot
line.
Proposed language:
3 Primary street setback is measured from the primary street lot line.
4 Side street setback is measured from the side street lot line.
5 Rear setback is measured from the rear lot line
a. For determining the rear setback for a triangular or gore-shaped lot, the rear
lot line is measured from a 10-foot wide line, parallel to the primary street lot
line that intersects two side lots lines at its endpoints.
b. For instances where the primary street lot line is not straight, the rear lot line
must be parallel to a line connecting the end points of the primary street lot
line.
6 Side setback is measured from the side lot line.
Analysis:
The current code graphics show Primary street, Side street, Side, and Rear setbacks, but the text
only addresses Primary street, Side street, and Rear setbacks. Staff proposes adding text for Side
setbacks to match the graphics.
Page 92 of 143
Tier 2 Amendment
B.12 Pedestrian Access Types
Sections 34-4.5.1.C
Pages 4-23
Working Document reference: B.12
Existing language:
PEDESTRIAN ACCESS TYPE 2
Intended to ensure buildings are conveniently accessible from the public realm and to
promote walking as a safe and convenient mobility option to improve connectivity through
large sites.
ACCESS STANDARDS
Pedestrian accessway type Linked
Pedestrian accessway spacing (max) 100’
Distance from street intersection (max) 100’
Proposed language:
PEDESTRIAN ACCESS TYPE 2
Intended to ensure buildings are conveniently accessible from the public realm and to
promote walking as a safe and convenient mobility option to improve connectivity through
large sites.
Page 93 of 143
Tier 2 Amendment
B.12 Pedestrian Access Types
ACCESS STANDARDS
Pedestrian accessway type Linked
Pedestrian accessway spacing (max) 100’
Distance from street intersection (max) 100’
(For lots and developments not within
100’ of an intersection, only Pedestrian
accessway spacing applies)
Analysis:
All R districts currently require Pedestrian Access Type 2 under Section 34-4.5.1.B.1. Type 2 access
mandates that any sidewalk linking the development to the public right-of-way be located no more
than 100 feet from an intersection. However, this standard overlooks the many lots situated beyond
that 100-foot threshold. The staff’s draft amendment corrects this gap by clarifying that
developments outside the 100-foot radius need only comply with the Pedestrian Accessway
Spacing requirements.
Page 94 of 143
Tier 2 Amendment
B.15 Bonus Hight
Sections 34-4.2.2.C.3 and 34-4.2.2.C.4
Pages 4-8
Working Document reference: B.15
Existing language, Section 34-4.2.2.C.3:
3. Unit Bonus in Residential Districts Standards
a. In Residential A (R-A), Residential Core Neighborhood A (RN-A), Residential B (R-B),
and Residential C (R-C) zoning districts, a project must provide 100% of all bonus
units to households having a gross annual income at or below 80% AMI. Such
affordable dwelling units must be income-restricted for a minimum of 30 years. Deed
restrictions for affordable dwelling units must be recorded in the Charlottesville Land
Records.
b. When a project demonstrates the affordability goals of the Comprehensive Plan and
Affordable Housing Plan and the intent of this Section are met, such as through
reinvestment of resources in ongoing affordable housing, the Administrator may
accept modifications to the requirements in 4.2.2.
c. Projects in the Residential A (R-A) and Residential Core Neighborhood (RN-A) districts
are exempt from the equivalency of units and concurrency requirements in 4.2.2.C.
Standards.
Proposed language, Section 34-4.2.2.C.3:
3. Unit and Height Bonuses in Residential Districts Standards
a. In Residential A (R-A), Residential Core Neighborhood A (RN-A), Residential B (R-B),
and Residential C (R-C) zoning districts, a project must provide 100% of all bonus
units to households having a gross annual income at or below 80% AMI. Such
affordable dwelling units must be income-restricted for a minimum of 30 years. Deed
restrictions for affordable dwelling units must be recorded in the Charlottesville Land
Records.
b. When a project demonstrates the affordability goals of the Comprehensive Plan and
Affordable Housing Plan and the intent of this Section are met, such as through
reinvestment of resources in ongoing affordable housing, the Administrator may
accept modifications to the requirements in 4.2.2.
c. Projects in the Residential A (R-A) and Residential Core Neighborhood (RN-A) districts
are exempt from the equivalency of units and concurrency requirements in 4.2.2.C.
Standards.
d. Projects in a Residential (R-) or Residential Neighborhood Core (RN-) district where a
height bonus is permitted must provide at least one Affordable Dwelling Unit meeting
the requirements above to apply the height bonus to the project.
Page 95 of 143
Tier 2 Amendment
B.15 Bonus Hight
Existing language, Section 34-4.2.2.C.4:
4. Height Bonus in All Other Districts Standards
a. In any zoning district other than Residential A (R-A), Residential Core Neighborhood A
(RNA), Residential B (R-B), and Residential C (R-C), a project must provide 10% of all
residential units to households at or below 50% AMI or provide an in-lieu fee according
to the formula described in the ADU Manual.
b. To qualify for the bonus height, a project must have a residential use for a minimum of
40% of the total floor area.
Proposed language, Section 34-4.2.2.C.4:
4. Height Bonus in All Other Districts Standards
a. In any zoning district other than Residential A (R-A), Residential Core Neighborhood A
(RNA), Residential B (R-B), and Residential C (R-C), a project must provide 10% of all
residential units to households at or below 50% AMI or provide an in-lieu fee according
to the formula described in the ADU Manual.
b. To qualify for the bonus height, a project must have a residential use for a minimum of
40% of the total floor area.
c. When a project qualifies for the bonus height per the requirements above, the bonus
height may be applied to any building within the project.
Analysis:
The proposed amendment to Sections 34-4.2.2.C.3 and 34-4.2.2.C.4 aims to provide more
detailed and specific guidelines for the application of height bonuses in various residential
districts. The current language allows for height bonuses in the Residential C (R-C) district
but lacks clear parameters on how these bonuses should be applied. Additionally, it does
not specify how the height bonus in other districts can be applied to mixed-use projects,
leading to inconsistent application and potential misuse.
The amendment supports the existing language that projects in Residential A (R-A),
Residential Core Neighborhood A (RN-A), Residential B (R-B), and Residential C (R-C)
zoning districts must provide 100% of all bonus units to households with a gross annual
income at or below 80% AMI. These affordable dwelling units must be income-restricted
for a minimum of 30 years, with deed restrictions recorded in the Charlottesville Land
Records. The Administrator may accept modifications if the project demonstrates the
affordability goals of the Comprehensive Plan and Affordable Housing Plan. Projects in the
Residential A (R-A) and Residential Core Neighborhood (RN-A) districts are exempt from
Page 96 of 143
Tier 2 Amendment
B.15 Bonus Hight
the equivalency of units and concurrency requirements. Projects in a Residential (R-) or
Residential Neighborhood Core (RN-) district where a height bonus is permitted must
provide at least one Affordable Dwelling Unit meeting the above requirements to apply the
height bonus to the project.
In any zoning district other than Residential A (R-A), Residential Core Neighborhood A
(RNA), Residential B (R-B), and Residential C (R-C), a project must provide 10% of all
residential units to households at or below 50% AMI or provide an in-lieu fee according to
the formula described in the ADU Manual. To qualify for the bonus height, a project must
have a residential use for a minimum of 40% of the total floor area. When a project qualifies
for the bonus height per the requirements above, the bonus height may be applied to any
building within the project.
The proposed amendment will help by providing clear and specific guidelines for the
application of height bonuses, ensuring consistent and fair implementation across
different districts. By requiring affordable dwelling units and setting clear parameters for
the application of height bonuses, the amendment supports the goals of the
Comprehensive Plan and Affordable Housing Plan. It also ensures that the benefits of
height bonuses are aligned with the city's affordability goals, promoting equitable
development and addressing the housing needs of low- and moderate-income households
Page 97 of 143
Tier 2 Amendment
B.17 Streetscape Standards
Sections 34-4.4.5.D.2
Pages 4-20
Working Document reference: B.17
Existing language:
D. Existing Streetscapes
1. In areas with predominant patterns of existing streetscapes that conflict with the
requirements of this Division, where a project’s primary or side street lot line is less
than 100’ in length, the Administrator may allow for streetscapes to be constructed
to match existing clear walk zone and greenscape zone configurations.
2. Where existing streetscapes are determined to be in good condition by the
Administrator, they may be used to comply with clear walk zone and greenscape
zone requirements provided they comply with all standards in this Division.
3. In Residential (R-) zoning districts, when the project fronts on an existing street
and adjacent property on either side of the project does not have an existing
streetscape, the Administrator may allow the project developer to contribute to a
streetscape fund, maintained and administered by the City, an amount equivalent
to the cost of the dedication of land for and the construction of the streetscape on
the property.
E. Exceptions
The Administrator may vary or waive streetscape requirements. A request to vary or waive
the requirements of this Section must be made prior to or with the submittal of a
Development Plan or Preliminary Plat. The request must include a written statement of the
justification of the request. In reviewing a request, the Administrator must consider each of
the following criteria that are applicable to the request:
1. Whether a surface other than concrete is more appropriate for the project
because of the character of the proposed project and the surrounding
neighborhood;
2. Whether sidewalks on only one side of the street may be appropriate due to
environmental constraints such as streams, stream buffers, critical slopes,
floodplain, tree cover, or wetlands, or because lots are provided on only one side of
the street;
3. Whether the sidewalks can reasonably connect into an existing or future
pedestrian system in the area;
Page 98 of 143
Tier 2 Amendment
B.17 Streetscape Standards
4. Whether the length of the street is so short and the density of the project so low
that it is unlikely that a sidewalk would be used to an extent that it would provide a
public benefit;
5. Whether an alternate pedestrian system, including an alternative pavement,
could provide more appropriate access through the project and to adjoining lots,
based on a proposed alternative profile submitted by the project developer;
6. Whether the sidewalks would be publicly or privately maintained;
7. Whether the waiver promotes the goals of the Comprehensive Plan, including any
applicable neighborhood plan; and
8. Whether waiving the requirement would enable a different principle of the
neighborhood plan to be more fully achieved.
Proposed language:
Incorporate Existing Streetscapes into the Exception section.
D E. Exceptions
The Administrator may vary or waive streetscape requirements. A request to vary or waive
the requirements of this Section must be made prior to or with the submittal of a
Development Plan or Preliminary Plat. The request must include a written statement of the
justification of the request. In reviewing a request, the Administrator must consider each of
the following criteria that are applicable to the request:
1. Whether a surface other than concrete is more appropriate for the project
because of the character of the proposed project and the surrounding
neighborhood;
2. Whether sidewalks on only one side of the street may be appropriate due to
environmental constraints such as streams, stream buffers, critical slopes,
floodplain, tree cover, or wetlands, or because lots are provided on only one side of
the street;
3. Whether the sidewalks can reasonably connect into an existing or future
pedestrian system in the area;
4. Whether the length of the street is so short and the density of the project so low
that it is unlikely that a sidewalk would be used to an extent that it would provide a
public benefit;
5. Whether an alternate pedestrian system, including an alternative pavement,
could provide more appropriate access through the project and to adjoining lots,
based on a proposed alternative profile submitted by the project developer;
Page 99 of 143
Tier 2 Amendment
B.17 Streetscape Standards
6. Whether the sidewalks would be publicly or privately maintained;
7. Whether the waiver promotes the goals of the Comprehensive Plan, including any
applicable neighborhood plan; and
8. Whether waiving the requirement would enable a different principle of the
neighborhood plan to be more fully achieved.
9. Existing Streetscapes
a. In areas with predominant patterns of existing streetscapes that conflict
with the requirements of this Division, where a project’s primary or side
street lot line is less than 100’ in length, the Administrator may allow for
streetscapes to be constructed to match existing clear walk zone and
greenscape zone configurations.
b. Where existing streetscapes are determined to be in good condition by the
Administrator, they may be used to comply with clear walk zone and
greenscape zone requirements. provided they comply with all standards in
this Division.
c. In Residential (R-) zoning districts, when the project fronts on an existing
street and adjacent property on either side of the project does not have an
existing streetscape, the Administrator may allow the project developer to
contribute to a streetscape fund, maintained and administered by the City,
an amount equivalent to the cost of the dedication of land for and the
construction of the streetscape on the property.
Analysis:
The proposed amendment to Section 34-4.4.5.D.2 involves moving the "existing
streetscape" language to the exception section and removing the phrase "provided they
comply with all standards in this Division. " This change addresses the concern that the
original language made the section unenforceable by allowing the use of existing
streetscapes while also requiring them to meet all the standards of the Division.
The amendment ensures that the section is enforceable and aligns with the suggested
changes. By moving the "existing streetscape" language to the exception section, the
Administrator now has the discretion to allow the use of existing streetscapes if they are in
good condition. This is considered an exception and must be approved by the
Administrator, providing a clear and enforceable process for applicants.
The amendment also maintains the flexibility for the Administrator to permit alignment with
existing streetscapes for projects with less than 100’ of frontage and provides a formal
process for applicants to request exceptions based on defined criteria. This ensures that
the regulation remains functional and aligned with the intent of the Development Code.
Page 100 of 143
Tier 2 Amendment
B.17 Streetscape Standards
Overall, the proposed changes improve the clarity and enforceability of the regulation,
ensuring that applicants can use existing streetscapes in good condition while providing a
clear process for exceptions to be approved by the Administrator.
Page 101 of 143
Tier 2 Amendment
B.24 Active Space
Sections 34-7.2
Pages 7-11
Working Document reference: B.24
Existing language:
Active space. Any occupiable space designed and intended for living, sleeping, eating, or
cooking. Restrooms, toilet rooms, closets, halls, storage or utility spaces, and similar areas
are not considered active space.
Proposed language:
Active space. Any occupiable space designed and intended for human activity such as
living, working, commerce, sleeping, eating, or cooking as determined by the Administrator.
Restrooms, toilet rooms, closets, halls, storage or utility spaces, and similar areas are not
considered active space.
Analysis:
The amendment expands “active space” to include a wider array of uses—living, working,
commerce, and social activities—ensuring the definition keeps pace with modern mixed-
use developments. Granting the Administrator discretion to interpret this definition
streamlines reviews and accommodates innovative programming without frequent text
amendments. Retaining exclusions for restrooms, closets, corridors, and utility spaces
preserves clear boundaries around true active areas.
Page 102 of 143
Tier 2 Amendment
B.26 Buildings Spaning Multiple Zoning Districts
Sections 34-.2.10.10.A.3.a
Pages 2-131
Working Document reference: B.26
Existing language:
No building located on a lot may be wider than the maximum building width allowed by the
zoning district.
Proposed language:
No building located on a lot may be wider than the maximum building width allowed by the
zoning district.
i. If a single building spans multiple zoning districts, the more restrictive Building
Width applies to the entirety of the building.
Analysis:
Nothing in this section takes into account buildings being in multiple zoning districts.
Page 103 of 143
Tier 2 Amendment
B.27 Tree Canopy
Sections 34-4.9.1.D.1.a
Pages 4-75
Working Document reference: B.27
Existing language:
All projects must include provisions for the preservation and planting of trees on the site to
the extent that, at 10 years from planting, minimum tree canopy cover will be provided as
follows:
Zoning Districts Percentage of Canopy Cover (min)
Residential
All R – districts
20%
Residential Mixed Use
All RX – districts
10%
Corridor Mixed Use
All CX – districts
10%
Node Mixed Us
All NX – districts
DX
10%
10%
Industrial
All IX – districts
10%
Special
All special districts
15%
Proposed language:
All projects must include provisions for the preservation and planting of trees on the site to
the extent that, at 20 years from planting, minimum tree canopy cover will be provided as
follows:
Zoning Districts Percentage of Canopy Cover (min)
Residential
All R and RN– districts
10%
Residential Mixed Use
All RX – districts
10%
Corridor Mixed Use
All CX – districts
10%
Node Mixed Us
All NX – districts
DX
10%
10%
Industrial
All IX – districts
10%
Page 104 of 143
Tier 2 Amendment
B.27 Tree Canopy
Special
All special districts
15%
Analysis:
Under the 2023/24 code, we had explicitly carried forward the June 25, 1990, tree canopy ordinance
to enforce a 10-year canopy standard—but the new zoning text omits that cross-reference link and
the current Code of Virginia (§ 15.2-961.3) now requires tree canopy to be measured at 20-years
standard over that of 10-years. This is particularly pressing as our updated zoning map’s higher
densities shift minimum canopy obligations from 10 percent to 20 percent due to § 15.2-961.3.B of
the state code outlining density ranges based in dwelling units per acre. The City Attorney has
reviewed the situation and confirms that, without the historic ordinance link, we no longer have
authority to maintain a 10-year requirement; we must comply with the state’s 20-year, 10 percent
standard. Staff therefore recommends updating our zoning ordinance to align with the current state
code.
Page 105 of 143
Tier 2 Amendment
B.28 Fences and Walls
Sections 34-4.8 Fences and Walls
Pages 4-70 to 4-75
Working Document reference: B.28
Existing Language:
No existing language.
Proposed language:
C. Exceptions
1. Fences and Guardrails
a. Any constructed vertical barrier of wood, masonry, wire, metal, or other
manufactured material, or combination of materials erected to enclose,
screen, or separate areas and not having a solid foundation, and with a
maximum height of four (4’) feet six (6”) is not considered a Fence or
Structure for the purposes of this division and is not required to follow the
regulations set forth.
b. Any guardrails, railings, or barriers, which are required by Building code to
prevent falls and ensure safety is not considered a Fence or Structure for the
purposes of this division and is not required to follow the regulations set
forth.
c. Any constructed vertical barrier of wood, masonry, wire, metal, or other
manufactured material, or combination of materials erected to enclose,
screen, or separate areas and not having a solid foundation, and required to
separate areas for compliance with state regulations, such as those enforced
by the Alcoholic Beverage Control (ABC) authority is not considered a Fence
or Structure for the purposes of this division and is not required to follow the
regulations set forth.
Analysis:
Existing fence regulations have generated significant confusion and placed a considerable
strain on staff resources, despite fences rarely presenting issues historically. By providing
exceptions for small non-privacy fences with detailed language on height, materials and
foundation type, we preserve the established fence and wall standards in each zoning
district while introducing greater flexibility for smaller enclosure elements. Additionally, by
exempting guardrails required by building codes or state regulations (such as ABC
regulations) from the Fence and Wall regulations, we ensure that essential safety measures
are not hindered by these standards. This approach maintains safety and compliance while
reducing unnecessary regulatory burdens, ultimately facilitating a more efficient and
effective regulatory framework.
Page 106 of 143
Tier 2 Amendment
B.30 Outdoor Lighting
Sections 34-4.12.3.B.3
Pages 4-104
Working Document reference: B.30
Existing language:
3. Lighting must not trespass onto adjacent properties, sidewalks, or rights-of-way and
the footcandles at the property line must be no more than 0.5.
Proposed language:
3. Lighting must not trespass onto adjacent properties, and sidewalks not within the
proposed development, or rights-of-way and the footcandles at the property line must
be no more than 0.5.
Analysis:
The existing language requires developments covering multiple lots to limit interior site
lighting at 0.5 footcandles along interior lot boundaries regardless of the physical layout of
the development. The amendment permits developments covering multiple lots to provide
adequate site lighting within the development without impacting rights-of-way or
properties outside of the development.
Page 107 of 143
Tier 2 Amendment
B.31 Critical Slope Definition
Sections 34- 4.10.1.C
Pages 4-80
Working Document reference: B.31
Existing language:
C. Standards
1. No buildings, structures, or other improvements are permitted in the part of a project site
with a grade of 25% or greater.
2. No land disturbance is permitted in the part of a project site with a grade of 25% or
greater.
Proposed language:
C. Standards
1. No buildings, structures, or other improvements are permitted in the part of a project site
within critical slope areas a grade of 25% or greater.
2. No land disturbance is permitted in the part of a project site within critical slope areas a
grade of 25% or greater.
Analysis:
Clarifies prohibitions on critical slope disturbance to be in line with the definition specified
in Section 34-4.10.1.B.1.
B. Applicability
1. Critical slope requirements apply to project sites that include any portion of sloped
area that has all of the following criteria:
a. A grade of 25% or greater;
b. A portion of the slope has a horizontal run of greater than 20 feet;
c. An area of 6,000 square feet or greater; and
d. A portion of the slope is within 200 feet of any waterway protected by the
Standard and Design Manual or Chapter 10 of the Charlottesville Code of
Ordinances, or shown on the map entitled “Properties Impacted by Critical
Slopes” , maintained by the Neighborhood Development Services.
Page 108 of 143
Tier 2 Amendment
B.32 Development Review
Section 34-5.2.9
Page: 5-37
Working Document reference: B.32
Existing language:
5.2.9. Development Review
A. Applicability
1. Development Review applies to any of the following project activities:
a. New construction;
b. Addition;
c. Site modification; and
d. Some changes of use.
2. Development Review is not required for a change of use provided that:
a. No additional site access, or alteration of existing site access is recommended by the
City, based on intensification of use; and
b. No additional site access, or alteration of existing site access is proposed.
3. Projects not requiring Development Review may require a Building Permit.
B. Application Requirements
1. Pre-Application Conference
Before submitting a Development Review application, an applicant must schedule a pre-
application conference with the Administrator to discuss the procedures, standards, and
regulations required for approval. This requirement may be waived at the discretion of the
Administrator.
2. Application Submittal
a. The required documents and drawings for Development Review are contained in the
Development Review Administration Manual.
b. Following the pre-application conference, an applicant may start the application
process. To begin, a complete application form, required plans, and review fees must be
filed with the Administrator. Other general submittal requirements for all applications are
listed in 5.2.1. Common Review Procedures.
C. General Development Review Process
1. Development Review consists of two separate approvals, a Development Plan and Final
Site Plan. A Development Plan and Final Site Plan are required for all projects that require
Development Review.
2. Development Plans and Final Site Plans may be reviewed simultaneously or may be
phased. An applicant may choose to apply for Development Plan approval and engineering
approval, and then apply for Final Site Plan approval and building approval in order to start
building construction. Development Plan and Final Site Plan reviews include the
Page 109 of 143
Tier 2 Amendment
B.32 Development Review
requirements of this Development Code, and engineering and building reviews include
requirements of separate Chapters of the City of Charlottesville Code and the Standards
and Design Manual.
3. Anything regulated by this Development Code will be reviewed for compliance by the
Administrator, with additional review by other City Departments.
D. Development Plan Review
1. Review and Decision Process
a. Administrator Decision
i. Once the Administrator determines the application is complete, the Administrator will
notify the Planning Commission of the application and review the application against the
requirements of this Development Code and other applicable technical requirements of
the City.
ii. In reviewing the application, the Administrator will distribute the application for
consultation and review by other City Departments.
iii. When the property is within an ADC District, HC District, or an Individually Protected
Property, a Certificate of Appropriateness may also be required. See 5.2.7. Major Historic
Review and 5.2.7. Major Historic Review.
iv. If, after the internal review, the Administrator finds that the application does not meet all
requirements of this Development Code, the Administrator will notify the applicant of the
specific provisions that have not been met and offer the applicant the opportunity to
amend the Development Plan.
v. Following review, the Administrator will approve, approve with conditions that bring the
application into conformance with this Development Code and other technical
requirements of the City, or deny the application.
b. Planning Commission Decision
i. The Planning Commission will take action on a Development Plan when:
a) The Administrator refers the application to the Planning Commission for review;
b) Two or more members of the Planning Commission request to review the application; or
c) The application is the subject of an appeal from a decision by the Administrator, as
allowed by this Section.
ii. When the Planning Commission takes action on a Development Plan, the Administrator
will review the application and provide a staff report and recommendation to the Planning
Commission in advance of the meeting. Prior to the preparation of the staff report, other
City staff may make recommendations to the Administrator to include in the staff report.
2. Action After Decision
a. Appeal of Administrative Decision
Page 110 of 143
Tier 2 Amendment
B.32 Development Review
i. The applicant may appeal the failure of the Administrator or Planning Commission to
either approve or deny the application to the Circuit Court in accordance with the Code of
Virginia § 15.2-2259.
ii. The applicant may appeal the denial of the application by the Administrator or Planning
Commission to the Board of Zoning Appeals within 30 days after the denial in accordance
with the Code of Virginia § 15.2-2309.
b. Expiration of a Development Plan
Once a Development Plan is approved, it is valid for a period of 5 years, as specified in the
Code of Virginia § 15.2-2260.
E. Engineering Review
1. Review and Decision Process
a. Upon approval of a Development Plan, applications for review and approval of
infrastructure permits required by separate Chapters of the City of Charlottesville Code
and the Standards and Design Manual may be prepared and submitted.
b. The Administrator will not sign any Final Site Plan, unless and until final plans and
approvals required by the City Code of Ordinances Chapter 10, Water Protection have been
obtained.
F . Final Site Plan Review
1. Review and Decision Process
a. Administrator Decision
i. The Administrator will review the Final Site Plan for compliance with the requirements of
this Development Code in effect at the time of Development Plan approval, except as
authorized by Code of Virginia § 15.2-2261. The Administrator must make a good faith effort
to identify all deficiencies, if any, during the review of the initial Final Site Plan submittal.
The Administrator must consider the recommendations and determinations made by the
plan reviewers.
ii. If the Administrator determines that the Final Site Plan complies with the requirements of
this Development Code and that all conditions of approval of the Development Plan have
been satisfied, the Administrator will sign the Final Site Plan.
iii. If the Administrator determines that the Final Site Plan does not comply with all
requirements of this Development Code or that all conditions of approval of the
Development Plan have not been satisfied, the Final Site Plan will be denied and the
Administrator will promptly inform the project developer of the denial by issuing a notice of
denial to the project developer.
2. Action After Decision
a. Permits for Construction
Page 111 of 143
Tier 2 Amendment
B.32 Development Review
Upon approval of a Final Site Plan, any applicable permits for construction required by the
City Code of Ordinances Chapter 5, Building Regulations; Property Maintenance may be
prepared and submitted.
b. Appeal of Administrative Decision
i. The applicant may appeal the failure of the Administrator to either approve or deny the
application to the Circuit Court in accordance with the Code of Virginia § 15.2-2259.
ii. The applicant may appeal the denial of the application by the Administrator to the Board
of Zoning Appeals within 30 days after the denial in accordance with the Code of Virginia §
15.2-2309.
c. Revisions to an Approved Development Plan or Final Site Plan
i. Minor revisions to an approved Development Plan or Final Site Plan may be approved by
the Administrator. The following revisions are considered minor:
a) Up to 10% increase in the gross floor area of a single building;
b) Any decrease in gross floor area of a single building;
c) Up to 10% reduction in the approved setbacks from street or common lot lines; and
d) Relocation of parking areas, internal driveways or structures where relocation occurs
more than 100 feet from street or common lot lines.
ii. All other changes to an approved Development Plan or Final Site Plan must be
resubmitted as a new application.
3. Expiration of Final Site Plan
a. An approved Final Site Plan will be valid for 5 years from the date of approval, or for a
longer period determined by the Administrator at the time of approval, taking into
consideration the size and phasing of the proposed project. A Final Site Plan will be
deemed final once it has been reviewed and approved, where the only requirement
remaining to be satisfied in order to obtain a building permit is the posting of required
bonds and escrows.
b. Upon application filed prior to expiration of a Final Site Plan, the Administrator, may grant
an extension of such approval, taking into consideration the size and phasing of the
proposed site and the laws, ordinances, and regulations in effect at the time of the request
for an extension.
Proposed language:
5.2.9. Development Review
A. Applicability
1. Development Review applies to any of the following
project activities:
a. New construction;
b. Addition;
Page 112 of 143
Tier 2 Amendment
B.32 Development Review
c. Site modification; and
d. Some changes of use.
2. Development Review is not required for the following project activities:
a. New construction or addition activities for any project with no public improvements
except Streetscape improvements per Article 4 Development Standards, no more than two
new dwelling units (Household Living), and no other principal uses proposed.
b. Site modification activities for any project with no new construction or addition activities
and no public improvements except Streetscape improvements per Article 4 Development
Standards and:
i. In a Residential (R-) or (RN-) district; or
ii. Proposing no modification to site elements regulated by Division 4.5 Access and Parking,
Division 4.6 Utilities, Division 4.7 Transitions and Screenings, Division 4.12 Outdoor
Lighting, and Section 34-2.10.4.C Outdoor Amenity Space.
c. Development Review is not required for a change of use provided that:
i. No additional site access, or alteration of existing site access is recommended by the
City, based on intensification of use; and
ii. No additional site access, or alteration of existing site access is proposed.
3. Projects not requiring Development Review may require a Building Permit.
B. Application Requirements
1. Pre-Application Conference
Before submitting a Development Review application, an applicant must schedule a pre-
application conference with the Administrator to discuss the procedures, standards, and
regulations required for approval. This requirement may be waived at the discretion of the
Administrator.
C. General Development Review Process
1. Development Review consists of two separate approvals, a Development Plan and Final
Site Plan. A Development Plan and Final Site Plan are required for all projects that require
Development Review.
2. Development Plans and Final Site Plans may be reviewed independently or
simultaneously or may be phased. An applicant may choose to apply for Development Plan
approval and engineering approval, and then apply for Final Site Plan approval and building
permit approval in order to start building construction. Development Plan and Final Site
Plan reviews include the requirements of this Development Code, and the engineering and
building reviews include requirements of separate Chapters of the City of Charlottesville
Code and the Standards and Design Manual.
3. Anything regulated by this Development Code will be reviewed for compliance by the
Administrator, with additional review by other City Departments.
D. Development Plan Review
Page 113 of 143
Tier 2 Amendment
B.32 Development Review
1. Review and Decision Process
a. Administrator Decision
i. Once the Administrator determines the application is complete, the Administrator will
notify the Planning Commission of the application and review the application against the
requirements of this Development Code and other applicable technical requirements of
the City.
ii. In reviewing the application, the Administrator will distribute the application for
consultation and review by other City Departments.
iii. When the property is within an ADC District, HC District, EC District, or an Individually
Protected Property, a Certificate of Appropriateness may also be required. See 5.2.67.
Major Minor Historic Review, and 5.2.7. Major Historic Review, and 5.2.8 Corridor Review.
iv. If, after the internal review, the Administrator finds that the application does not meet all
requirements of this Development Code, the Administrator will notify the applicant of
the specific provisions that have not been met and offer the applicant the opportunity to
amend the Development Plan.
v. Following review, the Administrator will approve, approve with conditions that bring
the application into conformance with this Development Code and other technical
requirements of the City, or deny the application.
b. Planning Commission Decision
i. The Planning Commission will take action on a Development Plan when:
a) The Administrator refers the application to the Planning Commission for review;
b) Two or more members of the Planning Commission request to review the application;
or
c) The application is the subject of an appeal from a decision by the Administrator, as
allowed by this Section.
ii. When the Planning Commission takes action on a Development Plan, the Administrator
will review the application and provide a staff report and recommendation to the Planning
Commission in advance of the meeting. Prior to the preparation of the staff report, other
City staff may make recommendations to the Administrator to include in the staff report.
2. Action After Decision
a. Appeal of Administrative Decision
i. The applicant may appeal the failure of the Administrator or Planning Commission to
either approve or deny the application to the Circuit Court in accordance with the Code
of Virginia § 15.2-2259.
ii. The applicant may appeal the denial of the application by the Administrator or Planning
Commission to the Board of Zoning Appeals within 30 days after the denial in accordance
with the Code of Virginia § 15.2-2309.
b. Expiration of a Development Plan
Once a Development Plan is approved, it is valid for a period of 5 years, as specified in the
Code of Virginia § 15.2-2260.
Page 114 of 143
Tier 2 Amendment
B.32 Development Review
34-5.2.9.E. Engineering Review
1. Review and Decision Process
a. Upon approval of a Development Plan, applications for review and approval of
infrastructure permits required by separate Chapters of the City of Charlottesville Code
and the Standards and Design Manual may be prepared and submitted.
b. The Administrator will not sign any Final Site Plan, unless and until final plans and
approvals required by the City Code of Ordinances Chapter 10, Water Protection have been
obtained.
EF. Final Site Plan Review
1. Review and Decision Process
a. Administrator Decision
i. The Administrator will review the Final Site Plan for compliance with the requirements
of this Development Code in effect at the time of Development Plan approval, except
as authorized by Code of Virginia § 15.2-2261. The Administrator must make a good
faith effort to identify all deficiencies, if any, during the review of the initial Final Site Plan
submittal. The City Engineer will review the Final Site Plan for compliance with the
engineering requirements of separate Chapters of the City of Charlottesville Code and the
Standards and Design Manual. The Administrator and City Engineer must consider the
recommendations and determinations made by the plan reviewers.
ii. If the Administrator determines that the Final Site Plan complies with the requirements of
this Development Code and that all conditions of approval of the Development Plan have
been satisfied, and the City Engineer determines that the Final Site Plan complies with all
engineering requirements of separate Chapters of the City of Charlottesville Code and
Standards and Design Manual, the Administrator will sign approve the Final Site Plan.
iii. If the Administrator determines that the Final Site Plan does not comply with all
requirements of this Development Code or that all conditions of approval of the
Development Plan have not been satisfied, or if the City Engineer determines that the Final
Site Plan does not comply with all engineering requirements of separate Chapters of the
City of Charlottesville Code and Standards and Design Manual, the Final Site Plan will be
denied and the Administrator will promptly inform the project developer of the denial by
issuing a notice of denial to the project developer.
2. Action After Decision
a. Permits for Construction
Upon approval of a Final Site Plan, any applicable permits for construction required by the
City Code of Ordinances Chapter 5, Building Regulations; Property Maintenance and City
Code of Ordinances Chapter 10, Water Protection may be prepared and submitted.
b. Appeal of Administrative Decision
i. The applicant may appeal the failure of the Administrator to either approve or deny the
application to the Circuit Court in accordance with the Code of Virginia § 15.2-2259.
ii. The applicant may appeal the denial of the application by the Administrator to the Board
Page 115 of 143
Tier 2 Amendment
B.32 Development Review
of Zoning Appeals within 30 days after the denial in accordance with the Code of Virginia
§ 15.2-2309.
c. Revisions to an Approved Development Plan or Final Site Plan
i. Minor revisions to an approved Development Plan or Final Site Plan may be approved by
the Administrator. The following revisions are considered minor:
a) Up to 10% increase in the gross floor area of a single building;
b) Any decrease in gross floor area of a single building;
c) Up to 10% reduction in the approved setbacks from street or common lot lines; and
d) Relocation of parking areas, internal driveways or structures where relocation occurs
more than 100 feet from street or common lot lines.
ii. All other changes to an approved Development Plan or Final Site Plan must be
resubmitted as a new application.
3. Expiration of Final Site Plan
a. An approved Final Site Plan will be valid for 5 years from the date of approval, or for a
longer period determined by the Administrator at the time of approval, taking into
consideration the size and phasing of the proposed project. A Final Site Plan will be
deemed final once it has been reviewed and approved, where the only requirement
remaining to be satisfied in order to obtain a building permit is the posting of required
bonds and escrows.
b. Upon application filed prior to expiration of a Final Site Plan, the Administrator, may grant
an extension of such approval, taking into consideration the size and phasing of the
proposed site and the laws, ordinances, and regulations in effect at the time of the request
for an extension.
Analysis:
This section has been updated to address recent state legislative changes, to codify the
City’s policy to exempt 1- and 2- unit projects from Development Review, and to implement
process changes to the Development Review procedures. Process changes to the
procedures will establish a modified process for Final Site Plan review, which must be
completed prior to moving forward to other required applications such as those in Chapter
10 (Water Protection). Process changes will also provide an opportunity for applicants to
submit a streamlined Development Plan focused on zoning compliance demonstration and
receive vesting approval prior to moving forward with a Final Site Plan application.
Page 116 of 143
Tier 2 Amendment
B.34 Low Density Residential Building Height
Sections 34-.2.2.2.B.1.A, 2.2.3.B.1.A, 2.2.4.B.1.A, and 2.2.5.B.1.A
Pages 2-9, 2-11, 2-13, 2-15
Working Document reference: B.34
Building Height
Existing language: (page 2-9)
Building height (max stories/feet)
1 unit 2.5 / 35’
More than 1 unit 3 / 40’
Proposed language: (page 2-9)
Building height (max feet)
1 unit 35’
More than 1 unit 40’
Existing language: (page 2-11)
Building height (max stories/feet) 2.5 / 35’
Proposed language: (page 2-11)
Building height (max feet) 35’
Existing language: (page 2-13)
Building height (max stories/feet)
1 unit 2.5 / 35’
More than 1 unit 3 / 40’
Proposed language: (2-13)
Building height (max feet)
1 unit 35’
More than 1 unit 40’
Existing language: (page 2-15)
Building height (max stories/feet)
Base 3.5 / 40’
Bonus: Affordable Dwelling Unit 4 / 52’
Proposed language:
Building height (max feet)
Base 40’
Bonus: Affordable Dwelling Unit 52’
Page 117 of 143
Tier 2 Amendment
B.34 Low Density Residential Building Height
Analysis:
Removing maximum story limits in low-density residential districts in favor of regulating height
strictly by feet addresses long-standing challenges with sloped terrain and the rigid definition of
“story” under Section 34-2.10.9.4.a. This change preserves the traditional scale of development
while giving builders more flexibility in interior design—especially for smaller infill projects—and
restores a height metric that historically functioned well without conflict.
Page 118 of 143
Tier 2 Amendment
B.35 Massing/Active Depth
Sections 34-2.10.10.B.2
Pages 2-133
Working Document reference: B.35
Existing language:
Applicability
a Active depth standards apply to the portions of a building used to meet the
minimum build-to width requirement. See 2.10.6. Build-To.
b On primary streets, the active depth applies to all stories.
c On side streets, the active depth requirement applies to the ground story only.
d Lots with 1 dwelling unit do not have to meet the active depth requirements
Proposed language:
a Active depth standards apply to the portions of a building used to meet the
minimum build-to width requirement. See 2.10.6. Build-To.
b On primary streets, the active depth applies to all stories.
c On side streets, the active depth requirement applies to the ground story only.
d A Primary Building on a lot or sublot consisting of a maximum of only 1 dwelling unit
and no additional primary/principal uses does not have to meet the active depth
requirements.
Analysis:
The proposed amendment sharpens the one-unit exemption by specifying that only a standalone
primary building on a lot or sublot containing a single dwelling unit—with no additional uses—is
exempt from active-depth standards. This replaces the broader “lots with 1 dwelling unit” language,
closing potential loopholes around accessory or mixed uses and clarifying the scope of
applicability without altering the remaining depth requirements. By adding in primary/principal uses
this allows secondary uses such as a accessory and/or temporary uses to be permitted and still
qualify for the exception for active depth.
Page 119 of 143
Tier 2 Amendment
B.36 Building Setbacks
Sections 34-2.10.5.D.1
Pages 2-113
Working Document reference: B.36
Existing language:
Measurement
1. All building setbacks are measured perpendicular to the applicable lot line.
2. Where a lot line abuts an access easement, the Administrator will determine
whether the setback may be measured from the interior edge of the access
easement rather than the lot line.
Proposed language:
Measurement
1. All building setbacks are measured perpendicular to the applicable lot line.
2. Where a lot line abuts an access a required easement would prevent standard
setbacks, the Administrator will determine whether the setback may be measured
from the interior edge of the easement rather than the lot line.
Analysis:
The current code provision grants the Administrator authority to modify setback requirements
solely in relation to the location of access easements. This narrow scope presents a concern, as it
overlooks other relevant easement categories—such as utility or sight distance easements—that
can significantly influence appropriate structure placement on a site. By limiting administrative
discretion to access easements alone, the regulation may inadvertently undermine considerations
necessary for safe, functional, or compliant development.
To address this gap, staff recommends eliminating the term “access” from the code language. This
revision would expand the Administrator’s purview, allowing setback adjustments in response to a
broader range of easement types. Such flexibility ensures that decisions reflect the full spectrum of
site constraints, ultimately supporting more informed and context-sensitive planning outcomes.
Page 120 of 143
Tier 2 Amendment
B.38 Existing Structure Preservation
Sections 34-.2.10.5.3.B & 2.10.6.A.2
Pages 2-112 & 2-117
Working Document reference: B.38
Existing language:
No existing language.
Proposed language:
2.10.5. Building Setbacks
B. Applicability
3. When permitted by the Zoning District, a project eligible for the Existing Structure
Preservation Bonus for density will be deemed to comply with the Building Setback
requirements.
2.10.6 Build-To
A.2
e. When permitted by the Zoning District, a project utilizing the Existing Structure.
Preservation Bonus for density will be deemed to comply with the Build-To requirements.
Analysis:
The proposed amendments to Sections 2.10.5.B and 2.10.6.A.2 would streamline adaptive-reuse
projects by deeming any development eligible for the Existing Structure Preservation Bonus
automatically compliant with Setback and Build-To requirements where allowed by the Zoning
District. This change reduces administrative hurdles and incentivizes the retention of existing
buildings, promoting sustainability and preserving neighborhood character.
Page 121 of 143
Tier 2 Amendment
B.40 Build-to Width
Sections 34- 2.10.6.A.2
Pages 2-117
Working Document reference: B.40
Existing language:
2. Applicability
a. The build-to width applies to all lots.
b. The build-to width requirements apply to the ground story of the building only. The
ground story is determined according to 2.10.9. Height.
c. Where sublots are permitted, build-to width is calculated for each lot, not
individual sublots.
d. For through lots, the Administrator may waive or vary the build-to width
requirement for one of the street lot lines. The Administrator will consider the
following standards when making the decision to waive or vary the requirement for
one street lot line:
i. The proposed number and arrangement of units on the lot to determine if
meeting the build-to width requirement is practical for all street lot lines; and
ii. The prevailing pattern of development on the surrounding parcels to
determine which street must meet the build-to requirement and which street
can waive or vary the requirement.
Proposed language:
2. Applicability
a. The build-to width applies to all lots.
b. The build-to width requirements apply to the ground story of the building only. The
ground story is determined according to 2.10.9. Height.
c. Where sublots are permitted, build-to width is calculated for each lot, not
individual sublots.
d. For through lots, the Administrator may waive or vary the build-to width
requirement for one of the street lot lines. The Administrator will consider the
following standards when making the decision to waive or vary the requirement for
one street lot line:
i. The proposed number and arrangement of units on the lot to determine if
meeting the build-to width requirement is practical for all street lot lines; and
ii. The prevailing pattern of development on the surrounding parcels to
determine which street must meet the build-to requirement and which street
can waive or vary the requirement.
e. For lots with existing easements that would prevent complying with the required
build-to width set by the Zoning district, the Administrator will determine an
appropriate build-to width based on the restraints of the existing conditions.
Page 122 of 143
Tier 2 Amendment
B.40 Build-to Width
Analysis:
The proposed revision to the development code enhances administrative flexibility by
introducing a new provision that explicitly addresses lots encumbered by existing
easements. While the original language provides limited discretion—primarily for through
lots—the updated version empowers the Administrator to determine an appropriate build-
to width when easements make strict compliance impractical. This change not only
acknowledges real-world site constraints but also streamlines the approval process,
allowing projects to meet the intent of the build-to width standard without resorting to
time-consuming alternatives like variances or Special Exception Permits.
Page 123 of 143
Tier 2 Amendment
B.42 Existing Structure Date
Sections 34-4.2.1.B
Pages 4-5
Working Document reference: B.42
Existing language:
B. Standards
1. To be considered an existing structure, a project must maintain the primary street-facing
building facade and the exterior building envelope for a minimum distance of 25 feet
behind the primary street-facing building facade. Interior reconfiguration in this area is
permitted.
2. A project must maintain any existing entry features, such as a porch, raised entry, or
forecourt.
3. Minor modifications to the exterior building envelope or entry features for repair or
reconstruction are allowed when the modifications are the same or substantially similar to
the design of the original structure, as determined by the Administrator.
Proposed language:
1. To be considered an existing structure the building must have been constructed and
occupied prior to the adoption of this code (December 18, 2023), and the lot must maintain
the primary street-facing building facade and the exterior building envelope for a minimum
distance of 25 feet behind the primary street-facing building facade. Interior
reconfiguration in this area is permitted.
2. A project must maintain any existing entry features, such as a porch, raised entry, or
forecourt.
3. Minor modifications to the exterior building envelope or entry features for repair or
reconstruction are allowed when the modifications are the same or substantially similar to
the design of the original structure, as determined by the Administrator.
Analysis:
The proposed amendment to Sections 34-4.2.1.B, specifically focusing on the Existing
Structure Preservation Bonus, aims to incentivize the preservation and rehabilitation of
existing housing stock while implementing the affordable housing goals of the adopted
Comprehensive Plan and Charlottesville Affordable Housing Plan. The current proposal
stipulates that to be considered an existing structure, the building must have been
constructed and occupied before the adoption of this code (December 18, 2023).
There is a need for future discussions regarding whether structures built after the adoption
of the code should be eligible for the preservation bonus. The Planning Commission (PC)
has suggested a rolling allowance every 8 years. However, staff currently prefers to use the
Page 124 of 143
Tier 2 Amendment
B.42 Existing Structure Date
adoption date of the code as the cutoff. A rolling allowance could undermine the intent to
preserve buildings that existed at the time the code was adopted. Staff is concerned that a
rolling date could allow developers to exploit a loophole. For instance, a developer could
remove an older home that the City would have valued the preservation of, build a new one,
wait a few years, and then qualify for the preservation bonus. This scenario may contradict
the intent of preserving existing units and could lead to the loss of historical and
architectural value in the community.
There is currently no context provided for why existing units are being preserved. If the goal
is to allow a structure to receive the bonus after being in place for a certain period, it is
essential to determine what that period (X) should be. Alternatively, the density allowed
could be increased to achieve the same goal. For now, it is crucial to have clear guidelines
to prevent developers from building new homes today and immediately qualifying for the
preservation bonus. The intent of the bonus is to provide an incentive for the preservation
and rehabilitation of existing housing stock, aligning with the affordable housing goals of
the Comprehensive Plan and Charlottesville Affordable Housing Plan.
The proposed amendment is a step in the right direction to preserve and rehabilitate
existing housing stock. However, it is essential to address the concerns mentioned above
to ensure the effectiveness and integrity of the preservation bonus. Future discussions and
potential adjustments to the proposal will be necessary to refine the criteria and prevent
exploitation of the bonus system.
Page 125 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 1 of 18
This is a working document and provides an outline of Development Code issues and proposed amendments to the City’s 2023 Development Code (Chapter 34). The outline is divided into three categories to help prioritize
amendments and desired outcomes. This is a living document and only intended for tracking and note taking. Comments within this document are not formal recommendations or actions presented by staff but only
intended to track and work through issues in preparing any formal future recommendations. Please note that this document only reflects comments up to December 16, 2025.
Tier 1
This category includes grammatical edits and small changes that will clarify selected code language without altering the intent of each section. Public engagement should be limited to Public Hearings at Planning
Commission and City Council. This will also include updates to the Development Code required to stay in compliance with State enabling legislation changes.
Tier 2
This category includes edits and/or changes to sections of the code that will better reflect the intent statement of each section. Public engagement should be limited to Public Hearings at Planning Commission and City
Council. This sections also include changes to supporting documents such as the Neighborhood Development Services (NDS) Fee Schedule.
Tier 3
This category includes edits, additions, and/or removal of language that could change the intent of the code. These changes require dedicated study and analysis. Public engagement should involve community outreach and
inclusion.
*PP (Planning Commission Suggestions)
* (Tree Commission Suggestions)
Key Point of Housing Keeping. Once an issue is assigned a number, i.e. A.1 or B.11 it should not be moved. When new issues are added or more spaces is needed on a
Tier ALWAYS ADD THE NEW ROW TO THE END OF THE TIER. If an issue is moved or removed from a tier, only strike through the issue and do not delete the row.
Example: Planning Commission wants to move “Existing structure preservation bonus does not specify a timeframe to qualify as an existing structure.” From Tier 3 to
Tier 2. The issue is being “crossed out” on C.8 and added to B.70 (as that was the next open row in Tier 2.
Tier 1 (A)
Number Page Code Section Current Language/Issue Suggested Language/Change In the 2025
Staff Report?
(mark “Yes”)
Date
Adopted by
CC
A.1 4-10 4.3.2.B.1.A “...Administrator may allow once side of a block...” “...Administrator may allow one side of a block...”
A.2 6-15 6.7.3.D.1.a.iii “See 5.2.7 Major Historic Review and 5.2.7 Major Historic Review.” “ See 5.2.6 Minor Historic Review and 5.2.7 Major Historic Review.”
A.3 4-48 4.7.1.B.1 Transition matrix is missing the RN-A district. Add RN-A to the “R” list in both columns.
A.4 2-19 2.3.2.B.1 “With bonus” “Bonus: Affordable Dwelling Unit”
A.5 2-21 2.3.3.B.1 “With bonus” “Bonus: Affordable Dwelling Unit”
A.6 2-25 2.4.2.B.1 “With bonus” “Bonus: Affordable Dwelling Unit”
A.7 2-27 2.4.3.B.1 “With bonus” “Bonus: Affordable Dwelling Unit”
A.8 2-29 2.4.4.B.1 “With bonus” “Bonus: Affordable Dwelling Unit”
A.9 2-33 2.5.2.B.1 “With bonus” “Bonus: Affordable Dwelling Unit”
A.10 2-35 2.5.3.B.1 “With bonus” “Bonus: Affordable Dwelling Unit”
A.11 2-37 2.5.4.B.1 “With bonus” “Bonus: Affordable Dwelling Unit”
A.12 2-39 2.5.5.B.1 “With bonus” “Bonus: Affordable Dwelling Unit”
Page 126 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 2 of 18
A.13 2-41 2.5.6.B.1 “With bonus” “Bonus: Affordable Dwelling Unit”
A.14 2-45 2.6.2.B.1 “With bonus” “Bonus: Affordable Dwelling Unit”
A.15 2-47 2.6.3.B.1 “With bonus” “Bonus: Affordable Dwelling Unit”
A.16 2-40 2.5.6.A.6 “Type X” “Type B, D”
A.17 2-87 2.9.3.B Chart entry: 104 Stadium Road. This IPP was removed by City Council as part of the VERVE
rezoning.
This does not need to go to CC as we already have the Ordinance stating this. We just need to
update the code.
Remove 104 Stadium Road from chart. *Not an amendment.
A.18 2-104 2.10.2.B.2.b “...regardless of the width of the lot, provided, that all other requirements...” “...regardless of the width of the lot, provided that all other
requirements...”
A.19 3-32 3.4.4.A “In a RX- District, commercial uses must not exceed 25% of the floor area on a lot.” This information needs to be within the RX- district pages in Division
2.
A.20 4-5 4.2.1.B.1 “The existing structure bonus applies to any project within Residential A (R-A) or Residential B
(R-B) zoning districts where a developer chooses to meet all of the standards of this Section in
order to receive a density bonus to the maximum allowed dwelling units per lot.”
Needs to include RN-A and R-C, as both districts provide allowances
for existing structure bonuses.
A.21 4-22 4.5.1.B.1 Is missing RN-A Add to Residential category.
A.22 2-57 2.8.4.B Is missing RN-A
A.23 2-106 2.10.4.A.3.b Is missing RN-A
A.24 2-130 2.10.9.B.2 Is missing RN-A
A.25 3-20 3.4.2.B Is missing RN-A
A.26 3-32 3.4.4.B.1 Is missing RN-A Tie to updates to Transition section (must be added there as well).
A.27 3-32 3.4.5.A.1.a Is missing RN-A Tie to updates to Transition section (must be added there as well).
A.28 3-33 3.4.5.A.3.c Is missing RN-A Tie to updates to Transition section (must be added there as well).
A.29 3-33 3.4.5.A.4.a Is missing RN-A Tie to updates to Transition section (must be added there as well).
A.30 3-38 3.5.2.H.1 Is missing RN-A
A.31 3-39 3.5.2.I.3 Is missing RN-A
A.32 3-42 3.6.2.C.3 Is missing RN-A
A.33 3-45 3.6.2.F.3.c Is missing RN-A
A.34 4-20 4.4.5.D.3 Is missing RN-A
A.35 4-37 4.5.5.C.7 Is missing RN-A
A.36 4-43 4.5.7.C.2 Is missing RN-A
A.37 4-43 4.5.7.C.3 Is missing RN-A
A.38 4-75 4.9.1.D.1 Is missing RN-A
A.39 4-83 4.11.3.B.2.e.ii Is missing RN-A
A.40 4-86 4.11.6.A.2 Is missing RN-A
A.41 4-89 4.11.9.A Is missing RN-A
A.42 4-90 4.11.9.C Is missing RN-A
A.43 4-101 4.11.11.B Is missing RN-A
A.44 4-103 4.12.2.C.4 Is missing RN-A
A.45 4-104 4.12.3.C.3 Is missing RN-A
A.46 5-62 5.3.3.B.1.b Is missing RN-A
A.47 7-9 7.1.2.E Is missing RN-A
Page 127 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 3 of 18
A.48 5-55 5.2.15.C.1.c “When the property is within an ADC district… recommendation as the to reasonable
conditions which, if imposed, would mitigate any such impacts…”
“…recommendation as to the reasonable conditions….”
A.49 5-57 5.2.16.C.1 “… Planning Commission in advance of the public hearing…” A public hearing is not required per 5.1.1. Update to public
meeting.
A.50 5-5 5.1.3.B.1 List of recommendation authority is missing Special Exception Permit Planning Commission also makes a recommendation on Special
Exception Permits per 5.1.1 and 5.2.15.
A.51 5-29 5.2.7.C.2.c Move this section to Section 2.9 and provide a reference here to Overlay Districts. Design standard information is included here but would make more
sense to be within Section 2.9 (Overlay Districts).
A.52 5-62 5.3.3.B Expansions The code otherwise uses Addition for this activity. Update to
Additions for consistency.
A.53 5-63 5.3.3.B.2 … or an Individually Protected Property, , then that structure… Remove extra comma and space.
A.54 5-34 5.2.8.A A Corridor Review for a Certificate of Appropriateness is required for the following project
activities n on any property located in the Entrance Corridor District:
Remove the extra “n” from sentence.
A.55 5-38 5.2.9.D.1.a.iii A Certificate of Appropriateness is also required for 5.2.8 Corridor Review. Add information regarding COA for Entrance Review.
A.56 Throug
hout
SB974 Removes Planning Commission as the approval authority for
administrative review for Subdivisions, Site Plans, and Development
Plans. Staff is in the process of identifying the required edits
conform to the new regulation.
A.57 5-3 5.1.1 The Planning Commission is designated as the Appeal body for Development Review. State authority has been removed. Remove Planning Commission as
the Appeal authority.
A.58 5-4 5.1.3.B.2 The Planning Commission is given authority over preliminary plats and appeals of Development
and Subdivision review.
State authority has been removed. Remove Planning Commission
authority for Preliminary Plats, Development Review and
Subdivision Review. The Commission appears to retain authority
over Comp Plan and Entrance Corridor COAs (group/AO to confirm).
A.59 5-38 5.2.9.D.1.a.i Planning Commission receives notice of application. Remove “notify the Planning Commission of the application and” as
the Commission no longer has authority over Development Review.
A.60 5-38 5.2.9.D.1.b Planning Commission is given authority over Development Review appeals. State authority has been removed. Remove this section. The revised
state code does not appear to give Council appeal authority either?
A.61 5-39 5.2.9.D.2.a.i Planning Commission is listed as an authority on Development Review. State authority has been removed. Remove reference to Planning
Commission.
A.62 5-39 5.2.9.D.2.a.ii Planning Commission is listed as an authority on Development Review. State authority has been removed. Remove reference to Planning
Commission.
A.63 6-15 6.7.3.D.1.a Planning Commission receives notice of application. Remove “notify the Planning Commission of the application and” as
the Commission no longer has authority over Development Review.
A.64 6-15 6.7.3.D.1.b Planning Commission is listed as authority for preliminary plats. State authority has been removed. Remove this section. The revised
state code does not appear to give Council appeal authority either?
A.65 6-16 6.7.3.D.2.a Planning Commission is listed as an authority on Subdivision Review. State authority has been removed. Remove reference to Planning
Commission.
A.66 6-19 6.7.4.A Planning Commission is listed as an authority on Subdivision Review. State authority has been removed. Remove reference to Planning
Commission.
A.67 6-19 6.7.4.A.4 Planning Commission is listed as an authority on Subdivision Review. State authority has been removed. Remove reference to Planning
Commission.
A.68 Throug
hout
HB2660 Review timelines have been reduced for Subdivisions, Site Plans,
and Development Plans. Most of this information is in the City’s
Development Review Procedures Manual and not subject to
requiring a code amendment. Acceptance of applications has been
Page 128 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 4 of 18
shortened from 10 days to 5 days, and this will need to be amended
in the Development Code. Page 5-12 (5.2.1.C.4.a)
A.69 5-12 5.2.1.C.4.a “All applications must be complete before the City is required to review the application. Once an
application is received, the Administrator has 10 days to review and determine the
completeness of an application. An applicant will be notified of an incomplete application, and
the application will not proceed for review or decision.”
“All applications must be complete before the City is required to
review the application. Once an application is received, the
Administrator has 5 days to review and determine the
completeness of an application. An applicant will be notified of an
incomplete application, and the application will not proceed for
review or decision.”
A.70 4-5 4.2.1.C Existing structure preservation bonus does not specify a timeframe to qualify as an existing
structure.
Moved by PC to Tier 1 (from Tier 3) at the May 27, 2025, Work Session. They want to use Code
Studio date of the code adoption as the preservation date.
Moved to Tier 2 (B. 42) by Planning Commission at the Work Session on November 12, 2025
Code Studio has verbally stated that this is for structures pre-dating
the code, but that is not specified here. As written, someone can
build a structure and then immediately use it to get the bonus as an
existing structure.
Could add a 4.2.1.C.4 “To be considered existing, the structure must
have been built and issued a Certificate of Occupancy prior to
December 18, 2025.”
A.71 3-39 3.5.2.I.3 Fence Type X.
May 27, 2025, Planning Commission Work Session: PC is not sure what this is for, fencing for
storage, or for landscaping and transition requirements. (moved up from B.21)
Change Fence Type X to “High Impact Transition Screens”
A.72 4-48 4.7.1.A.1. To protect and enhance the character and stability of neighborhoods the compatibility of new
development with its surrounding context where the scale of development changes between
lots of differing zoning districts; and
Missing comma or conjunction
To protect and enhance the character and stability of
neighborhoods and the compatibility of new development with its
surrounding context where the scale of development changes
between lots of differing zoning districts; and
A.73 2-95 2.10.1.B.1.e. Miss labelled roman numerals
A.74 2-41 2.5.6.B Existing graphic.
9/9/2025: Moved from B.8
Update DX graphic to remove the stepback; implies the stepback is
required. It also is implying an additional 30’ and 15’ of active depth
is required (shaded in red).
A.75 2-97 2.10.1.D Yard designation details
9/9/2025: Moved from B.9
Based on text, if a site has 2 primary street frontages, they have 2
front yards but there is no graphic demonstrating this or clear
language confirming this.
A.76
A.77
A.78
A.79
A.80
A.81
A.82
A.83
A.84
A.85
A.86
Tier 2 (B)
Number Page Code Section Current Language or Problem Suggested Language or Issue in Question Date
Adopted by
CC
Page 129 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 5 of 18
B.1 2-8, 2-
10, 2-
12, 2-
14
2.2.2.A.4.F,
2.2.3.A.4.F,
2.2.4.A.4.G,
2.2.5.A.4.G
Side lot line (min) 4’
(R-A, RN-A, R-B, and R-C). This section is preventing single-family attached style housing on
abutting Zoning lots.
May 27, 2025 PC work session: PC does not like the Alternate Form approach and finds that
it could be cumbersome. Staff will keep this in mind, but is still focused on the Alternate
Form as the best solution.
11/12/25 PC Work Session: PC does not like the Alternate Form approach.
Staff has updated the proposed amendment to provide the allowance in the rules section for
applicable zoning districts instead of an Alternate Form addition to move forward to January
2026.
Side lot line (min) 4’
Where permitted, Dwelling Unit-Attached with a shared property
line may encroach to 0’.
Or is could be added to Section 34-2.10.5.E.1 (Exceptions) Dwelling
Unit-Attached (this would need a definition under Section 34-
7.1.2.A.2)
Dwelling Unit-Attached: A dwelling unit that is located on a
separate Zoning Lot or Sublot and shares a common wall or one or
both sides with a neighboring dwelling. Duplexes and Townhomes
are examples of Dwelling Unit-Attached.
Working towards an Alternate Form concept.
B.2 Fee Fees Update Fee language to match what we are doing with Amendments and the Development
Review process.
Staff is working on to move forward to City Council in February or March 2026.
Remove Development Plan Review Minor and Major; Amend Final
Site Plan to Major; add Final Site Plan Minor, Development Plan,
Sublots, Easement Plat, Revisions to an Approved Development Plan
or Final Site Plan; and Remove or Edit Title under Chapter 10 as
PWE.
B.3 4-80 4.10.1.B.2 The code is missing exemptions for the first unit and for lots of record. This would be
considered a taking under state regulations.
Add in :” Any structure which was lawfully in existence prior to the
effective date of these critical slopes provisions, and which is
nonconforming solely on the basis of the requirements of these
provisions, may be expanded, enlarged, extended, modified and/or
reconstructed as though such structure were a conforming
structure. For the purposes of this section, the term "lawfully in
existence" shall also apply to any structure for which a site plan was
approved, or a building permit was issued prior to the effective date
of these provisions, provided such plan or permit has not expired.”
And
“Any lot or parcel of record which was lawfully a lot of record on the
effective date of this chapter shall be exempt from the
requirements of these critical slopes provisions for the
establishment of the first dwelling unit on such lot or parcel;
however, subparagraph (5)(b) above, shall apply to such lot or
parcel if it contains adequate land area in slopes of less than 25%
for the location of such structure.”
B.4 2-148 2.10.13.A.2.d Lots with 1 dwelling unit do not have to provide street-facing entries.
May 27, 2025, Planning Commission Work Session: PC does not see this as an issue and
suggests something more in line with a street facing feature and not a entry.
11/12/25 PC Work Session: PC wants to add something along the lines of “and no additional
primary/principal use…”
This might need more study, but staff may suggest striking this
language from the code.
B.5 Sheds
and
accesso
ry
buildin
gs
5-64 &
65
7-12
Multiple Code
Sections
within 5.3.3.C
7.2
As the code is written, it is almost impossible to have an accessory structure (shed, garage,
pavilion…) on a lot before the build-to requirements are meet.
Due to the definition of Building and Structure this section is preventing accessory structures
on nonconforming lots.
11/12/25 PC Work Session: PC is not concerned with accessory uses or buildings in the front
yard. Staff is updating. The fix from staff will only allow accessory buildings to be built without
bringing the primary building into conformity. PC would like to look into this in more detail in
the future as it would take a deeper look at the code as a whole. The goal of the code is to
bring building up to the street. PC is oaky with the half fix, but wants to look at it more. (D.22)
(5.3.3.C Sections) Add “…Primary Building…” to many of these
sections.
(7.2 Definition Section) “Building, primary. The Building(s) occupied
or designated for the primary use.”
Page 130 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 6 of 18
B.6 Sight
Distanc
e
NA Nothing in the new code provides details on a sight distance triangle.
May 27, 2025, Planning Commission Work Session: This needs more study as PC would not
want VDOT regs as it would create too large of a triangle.
9/9/2025: Due to timing this will be moved to the 2026 list.
Could use the section from the 2003 Code (Sec. 34-1121. - Sight
distance—Required sight triangle.) Collaboration with the City
Traffic Engineer before any change is made.
B.7 2-33
(etc.)
2.5.2.B.4 (etc.) Double reference to primary/side. Update “Ground Story (Min)” row to show 70% for Primary Street
and 35% for Side Street. Delete 2 rows: “Primary Street” and “Side
Street”. This needs correction for NX-3, NX-5, NX-8, NX-10 and DX.
B.8 2-41 2.5.6.B Existing graphic.
9/9/2025: Moved to A.74
Update DX graphic to remove the stepback; implies the stepback is
required. It also is implying an additional 30’ and 15’ of active depth
is required (shaded in red).
B.9 2-97 2.10.1.D Yard designation details
9/9/2025: Moved to A.75
Based on text, if a site has 2 primary street frontages, they have 2
front yards but there is no graphic demonstrating this or clear
language confirming this.
B.10 2-98 2.10.1.D Yard designation details graphic The text bases yard on street-facing facades, which are within 50-ft
of the lot line. It uses "the primary building's street-facing facade"
but it is not clear if it is the primary building or the primary facade
and how that is defined. So, the text reads that the yard is between
lot line and any facade which meets the street-facing facade
standard, or any facade within 15-ft of a street-facing facade. This is
inconsistent with the graphic.
B.11 2-114 2.10.5.D Measurements based on lot line. The code provides for “Primary Street”, “Side Street”, and “Rear”
setbacks. No text for “Side lot line” setback. This measurement not
defined.
B.12 4-23 4.5.1.C Pedestrian Access Type 2 Pedestrian Access Type 2: This type of pedestrian access is required
in all Residential districts. The standards call for “distance from
street intersection (max) to be 100’”. No consideration is given for
lots that are more than 100’ from an intersection.
B.13 4-31 4.5.3.D Vehicle Access.
May 27, 2025, Planning Commission Work Session: PC does not see an issue with what is in the
Development Code, and it should not be changed to satisfy PWE or Fire.
Maximum lane widths contradict fire code and the Standards and
Design Manual (SADM). 4.5.3.C.1 outlines the conflict. “All vehicle
access designs must be approved by the Administrator and must
conform to the provisions of the Standards and Design Manual.”
Traffic and Fire view “lanes” within a parking lot as travel lanes and
what a minimum of 10’ and not 8’.
B.14 7-14 7.2 Fence Fence. A constructed vertical barrier of wood, masonry, wire, metal, or other manufactured
material, or combination of materials erected to enclose, screen, or separate areas. A fence
differs from a wall in not having a solid foundation along its entire length.
May 27, 2025, Planning Commission Work Session: PC thinks we could exclude guardrails or
measure fence from floor surface and allow 42-inch everywhere (should satisfy ABC). Also
guardrail on a wall is exempt, use for elevated surfaces as well (café example, elevated deck).
B.17- confusing. There seems to be some standard that needs to apply. B.21- Fence type x,
think its about storage fencing? Or is this supposed to be landscape/transition requirement
instead?
Moved to B.28
This is too vague. Deck railings required by the building code meet
this definition, which should not be our intent. We need a better
definition of Fence, or we should stop regulating fences (we did not
regulate them under the old code).
B.15 4-8 4.2.2.C.3 This section is only about Unit Bonus allowances in residential districts, but R-C also has a
Height Bonus which is not detailed.
May 27, 2025, Planning Commission Work Session: PC did not think the 50% AMI should apply
and that this section is not in line with the intent of the code.
A new section or subsection should be added to provide standards
for height bonus in R-C. Match standards to the Height Bonus in
other districts (50% AMI).
Page 131 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 7 of 18
8/12/2025: staff note: Might need to combine language with B.16.
B.16 4-9 4.2.2.C.4 Current language is not clear that 50% requirement replaces 60% requirement for affordable
units. Combined with B.15 above.
Add clarifying language.
B.17 4-20 4.4.5.D Where existing streetscapes are determined to be in good condition by the Administrator, they
may be used to comply with clear walk zone and greenscape zone requirements provided they
comply with all standards in this Division.
May 27, 2025, Planning Commission Work Session: PC found this language to be confusing and
believes there needs to be a standard.
11/12/25 PC Work Session: PC suggests removing this section as staff suggest, but adding it to
the exemption criteria under 4.4.5.E
Comply with all standards is confusing. Interpreted to mean the
standards within 4.4.5.D (100-ft max frontage from 4.4.5.D.1).
Removed 4.4.5.D.2 as it is not applicable due to having the
exception section.
B.18 2-113 2.10.5.D.2 Where a lot line abuts an access easement, the Administrator will determine whether the
setback may be measured from the interior edge of the access easement rather than the lot
line.
Moved and combined with B-36.
Language should be clearer . Define access easement types allowed
(pedestrian, vehicular, etc.) to be clear other types of easements do
not qualify.
B.19 3-36 3.5.2.D.17.k Refers to kennels.
9/9/2025: Staff determined that we have enough language in the code to address. No change
needed.
Kennel is not otherwise defined or used. Consider updating to
match other language.
B.20 4-24 4.5.1.C.3 Provides “linking” requirements before “direct” requirements, but this should be reversed to
match 4.5.1.C.2. Also not clear why we need a Type 1 and direct when they are one and the
same and vice versa.
10/7/2025: This amendment is not ready to move forward and will be placed on the 2026 list.
Reverse order and reconsider categories.
B.21 3-39 3.5.2.I.3 Fence Type X.
May 27, 2025, Planning Commission Work Session: PC is not sure what this is for, fencing for
storage, or for landscaping and transition requirements.
Tie to larger fence discussions?
B.22 7-15 7.2 Grade, finished.
9/9/2025: This needs additional study and will be moved to the 2026 list.
Additional clarifying language is needed. Intent to measure at
building footprint?
B.23 5-58 5.2.16.C.4 City Council Decision details
“The City Council will conduct a public meeting on the application. The City Council may hold a
joint public meeting with the Planning Commission.”
8/12/2025: Staff note. Add this to next years (2026) review. Change Critical Slopes Planning
Commission and City Council action to match that of Special Exception Permit and/or what
comes out of the Long Range Planning Environmental study.
This language matches items such as SUPs which require a public
hearing, but not items like SEPs which require a public meeting
same as the Critical Slope SEP .
B.24 7-11 7.2 Active
Space
Active space. Any occupiable space designed and intended for living, sleeping, eating, or
cooking. Restrooms, toilet rooms, closets, halls, storage or utility spaces, and similar areas are
not considered active space.
11/12/25 PC Work Session: PC would like to look into this more as active space and active
depth created a lot of conversation (with a lot of it around the term “hall”). For now PC is okay
with staff language, but they would like to revisit the concept and where is should be
used.(D.23)
We need a better definition of "Active Space" or a Determination of
"Living". The current definition and interpenetration of living
prevents a lot of activities from being allowed in the active space
depth. These include retail, bookstores, office, CVS... Building
suggested using "habitable" space, but that building code section
only applies to residential and not commercial spaces.
B.25 2-133 2.10.10.B.2.d Lots with 1 dwelling unit do not have to meet the active depth requirements.
(Moved to B.35)
This is creating a lot of confusion. Should this say, "single unit
dwellings do not have to meet the active depth requirements". Or
something along the lines of "Buildings with only one dwelling unit
on a lot or sublot do not have to meet the active depth
requirements." We might need to also add something for existing
buildings.
B.26 2-131 2.10.10.A.3.a No building located on a lot may be wider than the maximum building width allowed by the
zoning district.
This section does not contemplate buildings spanning more than
one zoning district. Revision or clarification needed.
Page 132 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 8 of 18
May 27, 2025, Planning Commission Work Session: PC recommended requiring the owner to
rezone the lots into one zoning designation.
B.27 4-75 4.9.1.D.1 Canopy set at 10 years
May 27, 2025, Planning Commission Work Session: PC brought this up, but only acknowledged
it was an issue with no more explanation.
Previous code included language to allow us to continue with 10
years (state code is at 20 years), which was not included in this
development code. Further study needed.
B.28 4-70 4.8.1 Fences and Walls
11/2/25 PC Work Session: Planning Commission would like to adjust staff’s recommendation
from 8’ to 4’ and have an exception for guardrails/handrails and barriers required by state
regulations or building code. Staff is working on updates.
Staff updated the amendment to focus more on exceptions and not redefining what a “Fence”
is. The update language now excepts fences under 4.5’, guardrails, and enclosures required by
the state.
Section does not contemplate requirements such as ADC district
guidelines.
I believe we can address the “fence” issue(s) by:
Define Fence (7.2) as A constructed vertical barrier of wood,
masonry, wire, metal, or other manufactured material, or
combination of materials erected to enclose, screen, or separate
areas and is a minimum of six (6’) in height or taller. A fence differs
from a wall in not having a solid foundation along its entire length.
Remove 4’ or 0’ Fence reference from R-A, RN-A, R-B, R-C, RX-3, RX-
5, CX-3, CX-5, CX-8, NX-3, NX-5, NX-8, NX-10, DX, CM, CV, Shopfront
House, and Civic Institution with “not allowed”.
OR:
Just remove “Fence” from the Fences and Walls in each district
under Article 2. Example page 2-15 2.2.5.6 Change Fences and Walls
to just Walls. We would also need to change 4.8 to “Walls”. Keep
4.8.1 the same.
B.29 4-9 4.2.2.C.3.c Bonuses in Residential Districts Standards
9/9/25: Studied by staff and this is not an issue.
Does this section conflict with the ADU manual requiring a
certification for ALL residential projects? Does not conflict so long as
“0” or “N/A” certification forms are accepted. OCS staff have
accepted these certifications for recent projects. Perhaps the
certification form could be adapted to make this easier?
B.30 4-104 4.12.3.B.3 Lighting must not trespass onto adjacent properties, sidewalks, or rights-of-way and the
footcandles at the property line must be no more than 0.5.
“Lighting must not trespass onto adjacent properties and sidewalks
not within the proposed development, public rights-of-way and the
…”
B.31 4-80 4.10.1.C.1 & 2 1. No buildings, structures, or other improvements are permitted in the part of a project site
with a grade of 25% or greater.
2. No land disturbance is permitted in the part of a project site with a grade of 25% or greater.
1. No buildings, structures, or other improvements are permitted in
the part of a project site within Critical Slopes a grade of 25% or
greater.
2. No land disturbance is permitted in the part of a project site
within Critical Slopes. grade of 25% or greater.
B.32 5.2.9. development review rework to match development update processes
B.33 2-9
(etc.)
2.2.2.B.1 (etc.)
And
2.10.10
Massing
Height is based on unit count. Moved from C.1 and C.2
11/12/25: PC Work Session moved this back to Tier 3 (C.1 and C.2) as there needs to be a
deeper dive into what a Building is and if it is the Lot or the Building that needs to have more
than one unit in it to get the bonus height.
Building height is for the number of units within the building. If you
have one building and it has more than one unit within the building,
you get the additional height. If you have multiple units on a site,
but they are each in their own individual unit, you do not get the
additional height. This is problematic for R-A, R-B, and R-C.
Building is not clearly defined when it comes to “Height” and
“Massing”. The example is: If I have seven townhomes along a
primary street in the R-B, the massing and height is all dependent
on where the property lines are for each unit. If it is seven
townhomes with no property line at the shared wall (all seven are
on one lot in a condo) the “building’ can only be 60’ long on the
Page 133 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 9 of 18
primary street, but it is a building with seven units in it and can be 3
stories (and 40’). But, if there are property lines running through
the shared walls, each unit is a building and can, individually, be 60’
long, but only 2.5 stories (35’). From the outside they would present
very differently but the only difference is where the invisible
property line is.
Proposes updating the definition of Building to: A covered and
enclosed structure, either temporary or permanent, used or
intended for human occupancy or for the sheltering of animals or
property of any kind. For the purposes of this Code—including
determination of lot coverage, unit count, setbacks, and height—
any such structure shall be considered a single building even if it is
situated on or spans more than one lot or sublot.
B.34 R-A,
RN-A,
R-B,
and R-C
2-9, 2-11, 2-
13, and 2-15
Remove stories from the low density R district and only have height in feet Suggested change is just to use feet for max height in R-A, RN-A, R-
B, and R-C
B.35 2-133 2.10.10.B.2.d Update Lots with 1 dwelling unit do not have to meet the active depth requirements.
11/12/25 PC Work Session: PC suggest adding “and no additional primary/principal use…”
Change language to match that of the 1 dwelling unit section for
entry feature.
B.36 2-113 2.10.5.D.2 Where a lot line abuts an access easement, the Administrator will determine whether the
setback may be measured from the interior edge of the access easement rather than the lot
line.
Moved B-18 down to this slot to work into the solution.
This only applies to “access easements” and does not consider
other types of easements that would prevent building being placed
in the required build-to area. Change language to just easement but
keep the determination with the Administrator.
B.37 5-37 5.2.9 Changes to the Development Code Process to allow more types of development to go straight
to Building Permit review
9/9/25 (more information will be provided after we meet with different departments and get
additional feedback).
We are looking at two options. 1 would keep our current policy of
allowing one and two units to go straight to Building permit review
(codifying it). The other option (which is the one we are moving
forward) would allow development within the R districts (provided
certain standards are met) to go straight to Building Permit review
B.38 2-112
& 2-
117
2.10.5.B &
2.10.6.A.2
Applicants are running into issues trying to utilize the Existing Structure Preservation bonus
with meeting the Building Setbacks and Built-to regulations.
11/12/25 PC Works Session: Change “utilizing” to “eligible”.
Update the Building Setbacks and Build-to sections to indicate that
if an applicant is utilizing the Existing Structure Preservation bonus,
they automatically meet the Setbacks and Build-to requirements.
B.39 2-85 to
2-87
2.9.3.B Individually Protected Properties are represented as both a chart and a overlay on the official
Zoning map. This creates issues as any change (adding an IPP or removing and IPP) requires
both a Zoning Map amendment and a Zoning Text amendment
Staff recommends removing the chart and only using the overlay on
the official Zoning Map.
B.40 2-177 2.10.6.A.2 Running into an issue where an easement my prevent a building from meeting the required
Build-to width. The only relief is a variance for SEP .
Update the code to allow the Administrator to set a different build-
to width based on existing easements.
B.41 4-27 4.5.2.C.1 Required Bicycle Parking. The code is requiring Hotels to be treated as Commercial which is in
turn requires a unreasonable amount of bicycle parking.
Staff reached out to Code Studio to make sure we were reading the
code section correctly and they responded in an email on
November 6, 2025 with: “Great question, under the current code
language, you are interpreting this correctly that a lodging use is a
commercial use and would be calculated as you have outlined.
This could be an opportunity for administrative relief, or a potential
text amendment where lodging uses get listed as a new line on the
bicycle parking table with lesser requirements. This could be per SF
or per room, for example, in Raleigh, NC we specified long-term bike
parking as 1 space per 20 rooms (4 min) and short-term bike parking
Page 134 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 10 of 18
as 1 space per 40 rooms (4 min).Happy to brainstorm more as
needed, Christy”
B.42 4.5 4.2.1 Existing structure preservation bonus does not specify a timeframe to qualify as an existing
structure.
11/12/25 PC Work Session: PC would like to have the a moving date of 8 years to allow new
units that are built to use the existing structure preservation bonus. This is moved from C.8 and
A.70.
CodeStudio has verbally stated that this is for structures pre-dating
the code, but that is not specified here. As written, someone can
build a structure and then immediately use it to get the bonus as an
existing structure.
B.43
B.44
B.45
B.46
B.47
B.48
Tier 3 (C)
Number Page Code Section Current Language Staff Notes
*Community Engagement and analysis will be required.
C.1 2-9
(etc.)
2.2.2.B.1 (etc.) Height is based on unit count. (moved to B.33)
11/12/25: PC Work Session moved this back to Tier 3 as there needs to be a deeper dive into
what a Building is and if it is the Lot or the Building that needs to have more than one unit in it
to get the bonus height.
Building height is for the number of units within the building. If you have one building and it has
more than one unit within the building, you get the additional height. If you have multiple units on a
site, but they are each in their own individual unit, you do not get the additional height. This is
problematic for R-A, R-B, and R-C.
C.2 2.10.10
Massing
This dovetails into the item C.1 (moved to B.33)
11/12/25: PC Work Session moved this back to Tier 3 as there needs to be a deeper dive into
what a Building is and if it is the Lot or the Building that needs to have more than one unit in it
to get the bonus height.
Building is not clearly defined when it comes to “Height” and “Massing”. The example is: If I have
seven townhomes along a primary street in the R-B, the massing and height is all dependent on
where the property lines are for each unit. If it is seven townhomes with no property line at the
shared wall (all seven are on one lot in a condo) the “building’ can only be 60’ long on the primary
street, but it is a building with seven units in it and can be 3 stories (and 40’). But, if there are
property lines running through the shared walls, each unit is a building and can, individually, be 60’
long, but only 2.5 stories (35’). From the outside they would present very differently but the only
difference is where the invisible property line is.
C.3 2-40 2.5.6.A.6 Will eventually reference Type B and D (in Category 1 as well). See Downtown Mall Management Plan for recommendations on transitions.
C.4 2-97 2.10.1.D Yard designation details This section refers to primary structures, but we should consider changing to primary buildings. If
structures, a raised deck (etc.) would qualify and we should work through implications.
C.5 2-104 2.10.2.B.3.c Lots having vehicular access from any street other than a primary street, or not having
vehicular access at all, must meet the minimum width required for lots with other vehicular
access specified by the zoning district.
Assuming this is meant to describe the "side/rear access" width in the districts, should this say:
"...from any side street, alley, easement, or other right-of-way not designated a primary street..."?
This seems confusing because it only says "from a street or no access" which leaves out everything I
listed out.
C.6 Various Various Structure, accessory structure, etc. Deeper dive on structure, accessory structure, and associated requirements. Consistency issues, as
well as intent (interior non-conforming lots vs corner non-conforming lots).
C.7 4-11 4.3.2.B.2 Mid-block pedestrian pathways This section is set up on the assumption there is only 1 primary street frontage, which is often not the
case. Needs revision/study.
C.8 4-5 4.2.1 Existing structure preservation bonus does not specify a timeframe to qualify as an existing
structure.
Moved to Tier 1 (A.70) by Planning Commission at the work session on May 27, 2025
Moved to Tier 2 (B. 42) by Planning Commission at the Work Session on November 12, 2025
CodeStudio has verbally stated that this is for structures pre-dating the code, but that is not specified
here. As written, someone can build a structure and then immediately use it to get the bonus as an
existing structure.
C.9 NA 4.4 The Street Typology Map needs revision. The Local designation is not in the legend, and the
green marking on the Mall needs to be removed as it is not a category on the map.
Map quality is also substandard.
Page 135 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 11 of 18
C.10 4-27 4.5.2.B.2 Projects with 1 to 4 dwelling units are not required to provide short-term or long-term bicycle
parking.
Consider whether this should be applied per lot or per project. Tie to discussion of definition of
project.
C.11 5-54 5.2.15.A A Special Exception Permits may be granted for physical dimensional standards described in
the following Division... needs revision to account for the determination that parking location
and other potential locations are permitted modifications allowed under SEP.
May 27, 2025, Planning Commission Work Session: PC did not feel removing or adjusting the
SEP is appropriate at this time.
Also consider removal of 5.2.15.A.2.a (Div 2.10 Rules for Zoning Districts) per input from Freas on
requiring a ZMA instead.
C.12 7-19 7.2 Project Any activity, including subdivisions, new construction, additions, site modifications,
façade modifications, changes of use, renovations, and maintenance and repair, on a parcel
that is controlled by this Development Code.
Language implies this is only upon one parcel. Discuss intention and revision.
C.13 7-8 7.1.2.C.4 Site Modification If you read this with what a "site" is under E on page 7-9, a Site Modification is only a change to the
land and not what is on it. We need something more like our old Site Plan Amendment.
Site: A single lot or group of connected lots owned or functionally controlled by the same person or
entity, assembled for the purpose of development.
Lot: A parcel, tract, or area of land established by a plat or other means as permitted by law, which
is to be used, developed, or built upon.
Site Modification: Any modification of an existing site that affects less than 50% of the existing site
area, up to 25,000 square feet of affected site area.
C.14 7-9 7.1.2.E.2 Defining a lot This and the definition of parcel should be considered together.
Parcel. A contiguous portion of land that is assigned a unique identification number by the Office of
the Assessor. (7-19)
Lot: A parcel, tract, or area of land established by a plat or other means as permitted by law, which is
to be used, developed, or built upon. (7-9)
C.15 7-10 7.1.2.E.3.b Sublot access Add clarifying language that easement may be through other zoning lots.
C.16 2-133 2.10.10B.2 Active Depth Applicability This section prevents structured parking as a standalone use, but the structured parking section
(4.5.5.C.7) provides screening requirements which may imply the standalone use is okay. Language
on 2-133 is contradictory regarding ground floor. The section states Active Depth is for the portion of
the building use to meet the minimum build to width requirement. But that requirement is only for
ground stories of a building.
C.17 2-148 2.10.13 Entrances Update to match previous determinations or better clarify.
C.18 4-43 4.5.7.C Active depth vs. garage. Link to active depth. Further study needed.
C.19 4-103 4.12 Nothing in the Lighting section addresses athletic field lighting. The maximum fixture height is
15’ and that would not work for ball fields.
C.20 4-32 4.5.3.D.2 This section contradicts 4.5.1.C.a.i.d which calls for all pedestrian paths to be physically
separated from the motor vehicle use.
C.21 4-80 4.10.1.B.1 Critical Slope regulations are redundant given current VESMP regulations for larger
developments, which require engineered erosion and stormwater plans to be approved for
land disturbance greater than 6,000 square feet.
Add language: “Critical slope requirements apply to project sites not subject to Erosion and
Stormwater Management (ESM) Plans that include any portion of sloped area that has all of the
following criteria:”
C.22 (10/30/2025) Food truck courts (areas in the City where multiple food trucks could gather. This
came out of a conversation that under the current Temporary Use section only one food truck
is permitted per lot. This is an issue, but it also prevents something like a food court for food
trucks.
An idea to address this is 1. Amend the temporary sections, and 2. Look into the idea of an
Alternant Form section for Food Truck Courts.
C.23
C.24
C.25
Page 136 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 12 of 18
C.26
C.27
C.28
Planning Commission
Number Page Section Notes: Some PC notes are found within Section B if it is related to a specific amendment Staff Notes
D.1. 4-18 4.4.5.A.3 Before the code was approved, I had asked James what happens if you can’t fit the required greenscape and walk zones in the
right of way, and my understanding was that the building setbacks would be moved back to allow for them to be installed. For
example, if you have a maximum setback of 10’, and due to site constraints, the streetscape can’t fit, that maximum setback
would be moved back enough to allow it to fit. That’s how I interpret section 4.4.5.A.3. “When there is not enough room in the
public right of way for the required streetscape, the clear walk zone and greenscape zone must be provided on-site as a
permanent public access easement.” Are we enforcing this? In preliminary discussions with applicants to the BAR, we’ve had
some say they spoke to staff and are unable to provide the required street trees because of the maximum setbacks.
After reviewing with staff and the code. This interpretation is correct
and has been utilized by Planning staff. Other types of easements
such as utilities is not contemplated in the code, but is being
addressed with this batch of amendments.
D.2. Doors swinging over the ROW. The building code actually prohibits this, but there have been instances where it has been
excused by our code officials because there’s not life safety issue. Can we add to the zoning code that doors should not swing
over the public sidewalk?
D.3. Definition of an entry: I think you all are on this after the apartment project at 1609 Gordon Ave. Does an entrance have to
open to an active space? Should it be allowed to go to a garage, internal courtyard, or exterior stair? We should add some
clarity to the code on this.
2.10.13 Entrances (page 2-148) The Street-Facing Entry Spacing
states “A maximum distance between street-facing doors providing
access from the public realm to the interior of a building.” For this
project (RX-5) the code requires an “Entry Feature” and “A street
facing entry every 40’ or 60’ depending on the type of street. This
section of the code is very confusing and convoluted. It would need a
lot of thought and work.
D.4. Active Depth – this seems to keep coming up as preventing buildings from providing internal parking. Is it too deep? Do we
need to consider some exceptions or methods for providing internal parking?
D.5. 2-132 2.10.10.A.5 2.10.10.A.5: Building Width Exception. “The depth of the open space must be at least equal to the width of the open space or
30’, whichever is less.” I propose reducing that minimum depth to 25’. A building built over a parking garage is 60’ wide
(1’+18’+22’+18’+1’). If you have a double-loaded corridor building above the parking garage, a 30’ deep open space will cut
into the corridor. The depth should be no deeper than an apartment depth.
D.6. Ground floor definitions seem to keep tripping people up on sloping sites. Are ours too strict?
D.7. 4-31 4.5.3.D.1.a.vii Driveway widths – there seem to be no regulations for driveway widths for single family and duplex lots. 4.5.3.D.1.vii seems to
show maximum widths, but I understand that staff interprets the code as there being no maximum width for single family or
duplex parcels.
Staff does enforce this requirement. The issue can arise from the
fact that “parking” space are not defined for any lot with less than
6 spaces.
D.8. Fences vs guardrails (I assume you all are already on this).
D.9. Existing buildings under BAR review – what changes are allowed: There seems to be a debate about the level to which
contributing buildings in ADCDs are subject to the zoning code. Under the nonconformities section 5.3.3.B.2:
“If the nonconforming structure to be expanded is also a contributing structure in an ADC District or HC District, or an
Individually Protected Property, then that structure is not required to meet any development standard that would require
modification of the structure itself, and the Board of Architectural Review must approve a Certificate of Appropriateness for the
proposed expansion.”
I read that section as saying that if you add onto a contributing structure, the existing structure doesn’t need to be modified to
meet the zoning code. In a couple of cases, it appears that staff has interpreted that as saying that the existing building can also
be modified in ways that are counter to the zoning code. This could be making it less compliant with transparency
requirements by removing windows or removing required entry features for instance. Can we clarify exactly what is allowed to
happen when a non-conforming contributing structure is modified and/or added onto?
D.10. See B.1: Side lot line (min) 4’
(R-A, RN-A, R-B, and R-C). This section is preventing single-family attached style housing on abutting Zoning lots.
Page 137 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 13 of 18
May 27, 2025, PC work session: PC does not like the Alternate Form approach and finds that it could be cumbersome. Staff will
keep this in mind but is still focused on the Alternate Form as the best solution.
D.11. See A.70: Existing structure preservation bonus does not specify a timeframe to qualify as an existing structure.
Moved by PC to Tire 2 (from Tire 3) at the May 27, 2025 Work Session. They want to use CodeStudio date of the code adoption
as the preservation date.
D.12. See B.6: Nothing in the new code provides details on a sight distance triangle.
May 27, 2025 Planning Commission Work Session: This needs more study as PC would not want VDOT regs as it would create
too large of a triangle.
D.13. See B.4: Lots with 1 dwelling unit do not have to provide street-facing entries.
May 27, 2025, Planning Commission Work Session: PC does not see this as an issue and suggests something more in line with a
street facing feature and not a entry.
Staff originally placed this on the list to highlight that “lots” with
only one dwelling do not need a street-facing entry. This is
regardless of Zoning District and a little ambiguous. Is this stating
that a lot with a commercial building AND one dwelling unit would
not need a street-facing entry? Staff may suggest:
“Lots in the R-A, RN-A, R-B, and R-C Zoning Districts do not have to
provide street-facing entries on a single unit residential dwelling
provided no additional dwellings or uses are provided.”
D.14. See B.13: Vehicle Access.
May 27, 2025, Planning Commission Work Session: PC does not see an issue with what is in the Development Code, and it
should not be changed to satisfy PWE or Fire.
D.15. See B.15: This section is only about Unit Bonus allowances in residential districts, but R-C also has a Height Bonus which is not
detailed.
May 27, 2025, Planning Commission Work Session: PC did not think the 50% AMI should apply and that this section is not in line
with the intent of the code.
D.16. See B.27: Canopy set at 10 years
May 27, 2025, Planning Commission Work Session: PC brought this up, but only acknowledged it was an issue with no more
explanation.
D.17. See C.11: A Special Exception Permits may be granted for physical dimensional standards described in the following Division...
needs revision to account for the determination that parking location and other potential locations are permitted modifications
allowed under SEP .
May 27, 2025, Planning Commission Work Session: PC did not feel removing or adjusting the SEP is appropriate at this time.
D.18. See B.14: Fence. A constructed vertical barrier of wood, masonry, wire, metal, or other manufactured material, or combination
of materials erected to enclose, screen, or separate areas. A fence differs from a wall in not having a solid foundation along its
entire length.
May 27, 2025, Planning Commission Work Session: PC thinks we could exclude guardrails or measure fence from floor surface
and allow 42-inch everywhere (should satisfy ABC). Also guardrail on a wall is exempt, use for elevated surfaces as well (café
example, elevated deck). B.17- confusing. There seems to be some standard that needs to apply. B.21- Fence type x, think its
about storage fencing? Or is this supposed to be landscape/transition requirement instead?
D.19. See B.17: Where existing streetscapes are determined to be in good condition by the Administrator, they may be used to
comply with clear walk zone and greenscape zone requirements provided they comply with all standards in this Division.
May 27, 2025, Planning Commission Work Session: PC found this language to be confusing and believes there needs to be a
standard.
D.20. See B.21: Fence Type X
May 27, 2025, Planning Commission Work Session: PC is not sure what this is for, fencing for storage, or for landscaping and
transition requirements.
D.21. See B.26: No building located on a lot may be wider than the maximum building width allowed by the zoning district.
May 27, 2025, Planning Commission Work Session: PC recommended requiring the owner to rezone the lots into one zoning
designation.
Page 138 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 14 of 18
D.22. See B.5: At the November 12, 2026 PC work session, the PC wanted to add this (allowing more primary buildings on a lot
without first bringing it up to conformity in regards to Build-to) to a the list to look at in the future.
D.23. 11/12/25 PC Work Session: PC would like to look into this more as active space and active depth created a lot of conversation
(with a lot of it around the term “hall”). For now PC is okay with staff language, but they would like to revisit the concept and
where is should be used. (B.24)
D.24.
D.25.
D.26.
D.27.
D.28.
D.29.
D.30.
D.31.
Tree Commission
Number Page Section Notes Staff Notes
E.1. Incentives for Tree Preservation - Reevaluate the city's current incentive structure for tree preservation to reward developers
who retain healthy, large trees on-site and to ensure that preservation of mature trees is seen not as an obstacle but as a
shared value and goal. The current incentive structure—where existing trees are allowed to contribute 1.50-4x canopy area
toward meeting minimum canopy requirements—is not effective at promoting overall tree canopy cover in the city. Consider,
for example, an incentive structure to reduce or waive stormwater fees as an incentive to preserve mature trees.
E.2. Bonds for Existing Plantings - Expand circumstances for when a bond is required to cover existing trees indicated for
preservation in site plans for 1 year after the completion of construction (see the cities of Falls Church, Fairfax, and Vienna for
precedents).
E.3. Tree Preservation Plans - Further define the existing preservation plan requirements to include tree canopies, trunks, critical
root zones, and tree protection measures drawn to scale (reference “Best Management Practices for Tree Preservation,
Transplanting, Removal, and Replacement”). Support a second Urban Forester position focused on plan review and
enforcement of preservation plans.
E.4.
E.5.
E.6.
E.7.
EV Charging Plan
Number Page Section Notes Staff Notes
F.1 What: The City can make several changes to the current zoning ordinance to streamline the EV charger permitting process. It
can permit chargers as an allowable accessory use to parking lots in all zoning districts for both private and public charging.
Why: Public charging stations are accessory use in most instances. However, land use and zoning codes often do not reference
or properly categorize EVSE. Subjecting EV charger applications to a conditional or special use permit process requiring
additional approvals can add significant staff time to projects and create delays. Explicit directives can increase efficiency to the
process by which new EV charging infrastructure can be approved. Providing this information to the public will not only clarify
whether a type of charger can be installed but also show that the City supports public EV charging.
How: The City can amend Charlottesville Development Code Div. 3.5. Accessory Uses and Structures to establish requirements
concerning the siting of EV charging systems for Level 1 and Level 2 charging. The City can codify in the zoning ordinance that
EV charging stations are allowed by right in parking lots as an accessory use across residential, commercial, industrial, and other
See the CV Charging Plan and look at the City of Fairfax Link to
what they are doing
Page 139 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 15 of 18
major zoning categories. For DCFC installations, the City may wish to adopt specific provisions, explicitly detailing when EV
charging is considered a primary use.
The City may require that EV charging in City historic districts, architectural control districts (Figure 41), and entrance corridors
be conditional on a Certificate of Appropriateness to ensure that infrastructure additions, landscaping, and related elements
will complement the existing area. Providing specific guidance about what types of charging installations the City permits in
these zones and any project criteria will aid installation projects and preserve the character of protected areas.
F.2
F.3
F.4
Builders and Developers
Number Page Section Notes Staff Notes
G.1 2-101 2.10.1.F Kevin Riddle: On a project at Cabell Avenue, we encountered a question about ground story interpretation. (See the attached
PDF for a graphic.)
A question arose about which building level should be classified as the ground level. The doors at the top of the metal stairs are
too far above grade— over 6 feet— to count as the ground story. So I determined the level below— accessed from the terrace
at the 994’ elevation— should be the ground story. Our architecture and civil engineering team debated this. Some people read
the Code to say that the lowest allowable floor elevation in RX-5 is 0’ above existing grade. I argued that it should be
interpreted as 0’ above finished grade, based on the language in Division 2.10.1.F.1.a and 2.10.1.F.1.b. (page 2-101). I think the
confusion arose in part because the supporting graphic in this section refers to existing grade. It’s in a very small font, but it’s
there, and it appears to conflict with the superseding language in the Code’s text.
(As an aside, I realize that the use of finished grade to define ground story could conceivably allow a strange— and typically
undesirable— scenario where finished grade at building face is very far below the adjacent right-of-way. I think, however, such a
scenario is exceedingly unlikely, because almost no owner would gain anything by creating this condition… and the obvious
downside of using existing grade at building face to define ground story in a hilly town like ours would be the far more common
scenario of a parcel where grade rises from the street: if an owner modified existing grade down to make a front door
accessible to a disabled resident, the ground floor would be out of compliance— more than 0’ below existing grade. To instead
locate the ground floor elevation at 0’ or higher above existing grade would create the need to ramp up to the front door, which
in many situations would be a significant burden, especially where a building face is very close to the sidewalk. Allowing
residents to define ground stories based on modified— ie, finished— grades seems entirely reasonable.)
Long story short, I assume the Code should be edited so the notes on the Ground Story graphic read finished grade.
Dannan O’Connell was part of this discussion, if you want to check in with him for his take.
(by email)
Staff believes this is a Tier 1 (grammatical issue and can be address
with the current round of amendments or in the future). Staff
believes the code is clear that words outweighs graphical
information per Section 34-7.1.1.D.
G.2 2-132K 2.10.10.A.5 Kevin Riddle: We’ve studied several projects recently where new development is being considered on a parcel— or parcels--
that make up an entire block. In these cases, a single building may have streets on four sides, and all four sides are longer than
the building width maximum. In such a case, should one open space exception (page 2-132) be allowed on each street face of
the building rather just one exception for the entire building? With only one exception per building, as the Code currently
prescribes, an owner would have to separate one building into multiple buildings. While there may be upsides to multiple
buildings, it’s not obvious that a single building with nice fenestration, massing, materials, etc… would be worse than multiple
buildings… and wouldn’t multiple open space exceptions safeguard against a perception of a building looking too massive?
(by email)
Staff does not believe this is an issue and the intent of the code is
to require developers to shrink their developments or to provide
new streets or other elements to breakup large projects. More
consideration may we warranted, but this would need to be a Tier
3 discussion.
G.3 Bicycle parking regulations need to be looked at. Currently the code calls form a lot of bicycle parking in areas that are not bike
friendly
(October 14, PC work session)
G.4 BAR is an issue and does not work with by-right. Active depth is an issue as although parking is not required, it is needed due to
financing. Administrative Modification need to be made larger (more than 10%). If you want more housing it needs to be easy
Page 140 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 16 of 18
as posable and very standard. Developers need to know what they can do. Take away BAR authority and make as much as
possible not go to PC or CC.
(October 14, PC work session)
G.5 The code is too complicated. We need to think more about what lots are left in the City for development. Stormwater
regulations ae an issue and the affordability regulations need to be looked at on a yearly basis so they can be adjusted based on
real world changes.
(October 14, PC work session)
G.6 Max coverage regulations and max heights are an issue. Although parking is not required it is an issue for small lots as people
(Habitat) will have cars. Think about bringing back allowing front facing garages.
(October 14, PC work session)
Staff believes the max height issue will be resolved with the current
round of amendments).
G.7 From a Historic Preservation perspective, make existing buildings in the Historic District conforming. This would help with
preventing teardowns.
(October 14, PC work session)
This could be something to look at. Staff is already proposing that if
someone is using the “existing structure preservation” allowance,
things like build-to and setbacks are “conforming”. This could be
looked at for something broader in the Historic districts.
G.8 Changing the zoning along West Main to CX-3. Remove the pay for affordable housing and provide affordable within student
housing buildings.
(October 14, PC work session)
G.9 Up the amount of disturbed area for stormwater from 6,000 to 10,000. Change the major SD. Change the inclusionary
requirements. What we have is not working.
(October 14, PC work session)
Under the current code we do not have major and minor SDs. We
only have SDs and staff is recommending a new application for
Sublots.
G.10 Look at adjusting the required AMI for affordable units and base it off the Zoning district and not uniformly across the City.
(October 14, PC work session)
G.11 Reevaluate the “activities” sections (i.e. New Construction, Addition, Site Modification…) to allow small changes to a site
without going through full Development Review.
(October 14, PC work session)
Staff is already proposing a process that will allow small changes
(below the threshold of Minor Site Plans) to be exempt from
Development Review through a code amendment to 34-5.2.9
G.12 The Building Code needs to be changed. When you do over 2 units it is now commercial and not residential. The Zoning code is
no longer the issue, and it is the Building Code.
(October 14, PC work session)
G.13 We are a hilly City and that is not reflected in the code. 40’ requirement for entrances is an issue. Build-to requirement is for
partial blooks and not a development that is taking up the full block.
(October 14, PC work session)
G.14 Build-to width is creating a lot of issues. Utility requirements is a big issue as it takes away from what can be done with sublots.
(October 14, PC work session)
G.15 1.1.6.C Effect
of Prior Code
1.1.7
Severability
In light of the issues with the ongoing lawsuit it seems like changing this section of the code to have a better fall back plan
would be prudent. I recognize that the ab initio judgement would not have been alleviated by an improved version of this
section, but it could help with issues in the future.
Allow the prior code to exist as a fall back and/or provide an expedited path to a special use permit for projects that are under
review and are impacted by judgements. If code readoption is required consider adopting on a district by district basis rather
than all at once
Dan Bracey – Two Street Studio October 2025
G.16 2.10.6 / 2.10.7
Build-to &
setbacks
Interactions with minimum primary street build-to widths and transition setbacks create undevelopable lots. For example in a
NX lot which has an 85% primary street minimum build to width that has a Type B 15' transition that overlaps with the build to
width, the minimum buildable site must have at least 100' of primary street frontage.
Provide build-to width alleviation for sites where transition setback zones overlap with build-to width zones
Dan Bracey – Two Street Studio October 2025
G.17 2.10.6.5.c.ii Meeting the 85% lot line or facade perimeter rule for pedestrian outdoor amenity space is very difficult on sites where the
sidewalk and streetscape zone are within the lot boundary.
Page 141 of 143
Development Code Proposed Amendments Working and Tracking Document 2025
Page 17 of 18
Ped. outdoor
amenity space
Clarify or designate that the inner line of the required permanent public access easement for streetscape zones will be treated
as the street lot line for zoning calculations.
Dan Bracey – Two Street Studio October 2025
G.18 2.10.9.4.a.
Ground story
definition
The 6' Min/Max determination for ground story is too limiting for the topography in this area leading to a need to break larger
buildings into many modules which is very inefficient from a construction perspective
Revert to the previous ground story definition of 50% of the floor above/below grade to define ground story or provide
administrative alleviation for larger sites on hills
Dan Bracey – Two Street Studio October 2025
G.19 2.10.10.A.3.b
Building width
The intent of this section is to "promote fine-grained patterns of development and prevent long (should read "wide") buildings
that are out of context...by breaking wide buil