Planning Commission Work Session — Agenda Packet
City of Charlottesville · Charlottesville City County · Planning Commission · meeting of Nov 25, 2025 · Agenda packets
Open the original document More from City of Charlottesville
This document is no longer listed on City of Charlottesville's website. We kept the copy we read.
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
November 18, 2025
Please Take Notice
The Charlottesville Planning Commission will hold a Work Session on
Tuesday November 25,2025, at 5pm City Space Main Conference
room (100 5th Street NE).
AGENDA
1. Capital Improvement Program
Materials for this meeting are available here: Planning Commission Work Session •
Agendas & Minutes • CivicClerk
Public comment will be accepted in writing at the meeting or by emailing comments
to creasym@charlottesville.gov during the meeting.
Individuals with disabilities who require assistance or special arrangements to
participate in the public meeting may call the ADA Coordinator at (434) 970-3185 or
submit a request via email to ada@charlottesville.gov . The City of Charlottesville
requests that you provide a 48 hour notice so that proper arrangements may be made.
CITY OF CHARLOTTESVILLE
Department of Neighborhood Development Services
City Hall Post Office Box 911
Charlottesville, Virginia 22902
Telephone 434-970-3182
Fax 434-970-3359
www.charlottesville.gov
CITY OF CHARLOTTESVILLE
To be a place where everyone thrives
To: Planning Commission
From: Krisy Hammill, Director, Budget and Grants Management
Date: November 18, 2025
Topic: FY 2027 5-Year Capital Improvement Plan (CIP)
Presented for the Planning Commission’s consideration is a draft of the Proposed FY 2027 –
2031 Capital Improvement Program (CIP).
Executive Summary – Draft CIP (FY 2027–2031)
• Financial Overview:
o FY 2027 revenues and expenses: $48.7M
o 5-year plan (FY 2027–2031): $201.5M
• Current Status:
o This draft CIP is preliminary and subject to revision until FY 2027 revenue and
expenditure forecasts are finalized.
o Adjustments are expected before the Proposed Budget is presented to City
Council in March.
• Next Steps:
o Discussion with the Planning Commission on the draft 5-year plan.
Work Session – November 25, 2025
Joint Public Hearing with City Council – December 9, 2025
• Materials
o Attachment I – FY 2027-2031 Proposed CIP Draft
o Online CIP Budget Book – available online November 18th
(www.charlottesville.gov)
o Budget Explorer – provides project financials for FY 2026 – 1st Quarter
• Contact:
o For questions or additional information prior to the Planning Commission
meeting, please reach out to hammillk@charlottesville.gov.
DRAFT
ATTACHMENT I
Still Under Discussion
Reflects a change from FY 26-30 Plan
New Project Added
Adopted
FY26
Projected
FY27
Projected
FY28
Projected
FY29
Projected
FY30
Projected
FY31
5 Year Total
Revenues
Transfer from General Fund 7,627,434 9,004,212 6,634,954 9,119,908 11,764,110 4,567,515 41,090,699
Transfer from General Fund - Mall Vendor Fees 100,000 100,000 100,000 100,000 100,000 100,000 500,000
Transfer from General Fund - VCF Allo cation 575,000 575,000 575,000 575,000 575,000 575,000 2,875,000
Contribution from Schools (Small Cap Pr ogram) 200,000 200,000 200,000 200,000 200,000 200,000 1,000,000
CIP Contingency (from prior year surplus) 0 1,964,486 0 716,749 0 0 2,681,235
PEG Fee Revenue 40,000 40,000 40,000 40,000 40,000 40,000 200,000
CY 2026 Bond Issue 27,445,252 00000 0
CY 2027 Bond Issue 0 36,789,5790000 3 6,789,579
CY 2028 Bond Issue 0 0 53,463,54 4000 5 3,463,544
CY 2029 Bond Issue 0 0 0 30,542,723 0 0 30,542,723
CY 2030 Bond Issue 0 0 0 0 17,670,057 17,670,057
CY 2031 Bond Issue 0 0000 1 4,676,397 14,676,397
TOTAL AVAILABLE REVENUES $35,987,686 $48,673, 277 $61,013,498 $41,294,380 $30, 349,167 $20,158,912 $201,489,233
Expenditures
BO
NDABLE PROJECTS
EDUCATION Adopted Projected Projected Projected Projected Projected 5 Year
Project FY26 FY27 FY28 FY29 FY30 FY31 Total
Lump Sum to Schools (City Contribution) 1,300,000 1,300,000 1,300,000 1,300,000 1,300,000 1,300,000 6,500,000
City Schools HVAC Repair 750,000 1,250,000 1,250,000 1,250,000 1,250,000 1,250,000 6,250,000
City Schools Priority Improvement Projects 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 7,000,000
Charlottesville High School Roof Replacement 2,357,489 00000 0
Charlottesville Walker Sc hool Pre-K Center (Oaklawn TBD) 4,000,000 10,000,000 26,000,000 0 0 0 36,000,000
Burnley-Moran Elementary School Roof Replacement 0 1,500,0000000 1 ,500,000
Jackson-Via Elementary School Roof Replacement 0 0 1,500,00 0000 1 ,500,000
Johnson Elementary School Roof Replacement 0 0 0 1,500,000 0 0 1,500,000
SUBTOTAL $9,807,489 $15,450,000 $31,450,000 $5,450,000 $3,950,000 $3,950,000 $60,250,000
FACILITIES CAPITAL PROJECTS Proposed Projected Projected Projected Projected Projected 5 Year
Project FY26 FY27 FY28 FY29 FY30 FY31 Total
Lump Sum to Facilities Capital Projects 1,319,956 1,159,155 1,193,930 1,217,809 1,242,165 1,279,430 6,092,488
City Facility HVAC Replacement 500,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 5,000,000
City and Schools Solar PV Program 75,000 00000
0
General District Court - FFE and Hearing Room 201,838 00000 0
Climate Action Initiatives 1,000,000 1,000,000 1,000,000 1,000,000 0 0 3,000,000
Jefferson-Madison Regional Library Renovations 0 857,109 0 9,676,141 0 0 10,533,250
McGuffey Roof Replacement 0 000 1,200,000 0 1,200,000
SUBTOTAL 3,096,794 4,016,264 3,193,930 12,893,950 3,442,165 2,279,430 25,825,738
PUBLIC SAFETY AND JUSTICE Proposed Projected Projected Projected Projected Projected 5 Year
Adopted Capital Improvement Program
FY 2027-2031
DRAFT
ATTACHMENT I
Still Under Discussion
Reflects a change from FY 26-30 Plan
New Project Added
Adopted
FY26
Projected
FY27
Projected
FY28
Projected
FY29
Projected
FY30
Projected
FY31
5 Year Total
Adopted Capital Improvement Program
FY 2027-2031
Project FY26 FY27 FY28 FY29 FY30 FY31 Total
Replacement Fire Apparatus 0 1,334,065 0 1,470,806 0 0 2,804,871
Replacement EMS Apparatus 458,918 0 481,864 0 505,958 0 987,822
Bypass Fire Station (old building) Repurpose/Upfit 200,000 00000 0
SUBTOTAL $658,918 $1,334,065 $481, 864 $1,470,806 $505,958 $0 $3,792,693
TRANSPORTATION AND ACCESS Proposed Projected Projected Projected Projected Projected 5 Year
Project FY26 FY27 FY28 FY29 FY30 FY31 Total
New Sidewalks 1,217,051 2,533,000 2,349,000 3,401,000 1,718,000 1,620,000 11,621,000
Sidewalk Repair 0 500,000 650,000 700,000 700,000 700,000 3,250,000
Small Area Plan Implementation 200,000 200,000 200,000 200,000 200,000 200,000 1,000,000
Small Area Plans 150,000 150,000 150,000 150,000 150,000 150,000 750,000
Street Milling and Paving 1,250,000 1,500,000 1,700,000 1,750,000 2,000,000 2,000,000 8,950,000
ADA Pedestrian Signal Upgrades 240,000 240,000 240,00 0000 480,000
Minor Bridge Repairs 225,000 225,000 225,00 0000 450,000
Traffic Signal Infrastructure Replacement 250,000 2,000,000 3,000,000 1,000,000 1,000,000 250,000 7,250,000
Stribling Avenue Sidewalk 600,000 00000 0
ADA Transition Plan 700,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000
Safe Routes to School 200,000 200,000 200,000 200,000 200, 000 200,000 1,000,000
Dominion Power Pole Remediation 0 100,000 100,000 100,000 100,000 100,000 500,000
SUBTOTAL $5,032,051 $9,648,000 $10,814,000 $9,501,000 $8,068,000 $7,220,000 $45,251,000
PARKS AND RECREATION Proposed Projected Projected Projected Projected Projected 5 Year
Project FY26 FY27 FY28 FY29 FY30 FY31 Total
Downtown Mall Infrastructure Repairs 100,000 250,000 250,000 250,000 250,000 250,000 1,250,000
Parks Master Plan Implementation 500,000 500,000 500,000 500,000 500,000 500,000 2,500,000
Riverview Park Access Management 250,000 00000 0
Downtown Mall Tree Management Plan 315,000 591,250 1,773,750 476,967 953,934 476,967 4,272,868
SUBTOTAL $1,165,000 $1,341,250 $2,523,750 $1,226,967 $1,703,934 $1,226,967 $8,022,868
AFFORDABLE HOUSING Proposed Projected Projected Projected Projected Projected 5 Year
Project FY26 FY27 FY28 FY29 FY30 FY31 Total
Public Housing Redevelopment - (CRHA) 3 ,000,000 00000 0
Westhaven Redevelopment 5,000,000 5,000,000 5,000,00 0000 1 0 , 000,000
SUBTOTAL $8,000,000 $5,000,000 $5,000,000 $0 $0 $0 $10,000,000
TOTAL BONDABLE PROJECTS $27,760,252 $36,789, 579 $53,463,544 $30,542,723 $17, 670,057 $14,676,397 $153,142,299
NONBONDABLE PROJECTS
DRAFT
ATTACHMENT I
Still Under Discussion
Reflects a change from FY 26-30 Plan
New Project Added
Adopted
FY26
Projected
FY27
Projected
FY28
Projected
FY29
Projected
FY30
Projected
FY31
5 Year Total
Adopted Capital Improvement Program
FY 2027-2031
EDUCATION Proposed Projected Projected Projected Projected Projected 5 Year
Project FY26 FY27 FY28 FY29 FY30 FY31 Total
School Small Capital Improvements Pr ogram 200,000 200,000 200,000 200, 000 200,000 200,000 1,000,000
SUBTOTAL $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000
FACILITIES CAPITAL PROJECTS Projected Projected Projected Projected Projected Projected 5 Year
Project FY26 FY27 FY27 FY29 FY30 FY31 Total
HVAC Contingency Fund - City and School Facilities 50,000 50,000 50,000 50,000 50,000 50,000 250,000
SUBTOTAL $50,000 $50,000 $50, 000 $50,000 $50,000 $50,000 $250,000
PUBLIC SAFETY AND JUSTICE Proposed Projected Projected Projected Projected Projected 5 Year
Project FY26 FY27 FY28 FY29 FY30 FY31 Total
Police Mobile Data Terminals 82,000 84,400 86,000 88,000 90,000 91,300 439,700
Police Portable Radio Replacement 75,000 75,000 75,000 75,000 75,000 75,000 375,000
Police Car Portable Radio Replacem ent 68,000 68,000 68,000 68,000 68,000 68,000 340,000
Fire Portable Radio Replacement 75,000 75,000 75,000 75,000 75,000 75,000 375,000
Sheriff Portable Radio Replacem ent 40,000 40,000 40,000 40,000 40,000 40,000 200,000
Fire - Self-Contained Breathing Apparatus R eplacements 150,000 150,000 25,000 25,000 25,000 25,000 250,000
Fire - Protective Clothing/Turnout Gear Replacement 60,000 60,000 60,000 60,000 300,000 300,000 780,000
SUBTOTAL $550,000 $552,400 $429,000 $431,000 $673,000 $674,300 $2,759,700
TRANSPORTATION & ACCESS Proposed Projected Projected Projected Projected Projected 5 Year
Project FY26 FY27 FY28 FY29 FY30 FY31 Total
State Bridge and Highway Inspections 100,000 100,000 100,000 100,000 100,000 0 400,000
CAT Transit Bus Replacement Match 245,234 441,494 240,527 206,123 150,000 93,215 1,131,359
Intelligent Transportation System 185,000 285,000 285,000 300,000 300,000 300,000 1,470,000
City Wide Traffic Engineering Improv ements 150,000 150,000 150,000 150,000 150,000 0 600,000
Neighborhood Transportation Improvement s 100,000 100,000 100,000 100,000 100,000 100,000 500,000
Bicycle Infrastructure 100,000 100,000 100,000 100,000 100,000 100,000 500,000
Right of Way Appurtenance 100,000 150,000 150,000 150,000 150,000 150,000 750,000
Traffic Sign Retro Reflective Compliance 25,000 25,000 25,000 25,000 25,000 25,000 125,000
Historic District and Entrance Corridor Design Guidelines 0 150,000 0 0 0 0 150,000
SUBTOTAL $1,005,234 $1,501,494 $1,150, 527 $1,131,123 $1,075,000 $768,215 $5,626,359
PARKS & RECREATION Proposed Projected Projected Projected Projected Projected 5 Year
Project FY26 FY27 FY28 FY29 FY30 FY31 Total
Parks and Recreation Lump Sum Account 400,000 400,000 400,000 400,000 400,000 400,000 2,000,000
Parks and Schools Playground Renovations 200,000 250,000 200,000 387,500 387,500 200,000 1,425,000
DRAFT
ATTACHMENT I
Still Under Discussion
Reflects a change from FY 26-30 Plan
New Project Added
Adopted
FY26
Projected
FY27
Projected
FY28
Projected
FY29
Projected
FY30
Projected
FY31
5 Year Total
Adopted Capital Improvement Program
FY 2027-2031
Urban Tree Planting 125,000 125,000 125,000 125,000 125,000 125,000 625,000
Parkland and Trails Acquisition and Deve lopment 125,000 125,000 125,000 125,000 125,000 125,000 625,000
Oakwood Cemetery Drainage and Road Issues 150,000 00000 0
City/County Park Maintenance - Joint Parks 0 265,000 0000 265,000
Downtown Mall Trees Active Lifecycle Management 100,000 100,000 100,000 100,000 100,000 100,000 500,000
Invasive Plant Removal 150,000 150,000 150,000 150,000 150,000 150,000 750,000
SUBTOTAL $1,250,000 $1,415,000 $1,100,000 $1,287,500 $1,287,500 $1,100,000 $6,190,000
TECHNOLOGY INFRASTRUCTURE Proposed Projected Projected Projected Projected Projected 5 Year
Project FY26 FY27 FY28 FY29 FY30 FY31 Total
Communications Technology Account/Public Access 40,000 40,000 40, 000 40,000 40,000 40,000 200,000
City Wide IT Strategic Infrastruc ture 250,000 250,000 250,000 250,000 250,000 250,000 1,250,000
Voting Equipment Replacement 150,000 150,00 0000 150,000
SUBTOTAL $440,000 $440,000 $290,000 $290,000 $290,000 $290,000 $1,600,000
AFFORDABLE HOUSING Proposed Projected Projected Projected Projected Projected 5 Year
Project FY26 FY27 FY28 FY29 FY30 FY31 Total
Charlottesville Affordable Housing Fund (CAHF) 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 7,500,000
Supplemental Rental Assistance (CSRAP) 900,000 900,000 900,000 900,000 900,000 900,000 4,500,000
Friendship Court Infrastructure Improvements 0 650,000 350,000 1, 560,000 840,000 0 3,400,000
Friendship Court Redevelopment - Phase 3 0 2,047,500 1,102,50 0000 3 ,150,000
Friendship Court Redevelopment - Phase 4 0 0 0 2,925,000 1,575,000 0 4,500,000
PHA - 501 Cherry Avenue 1,000,000 2,150,0000000 2 ,150,000
Carlton Mobile Home Park 1,332,200 227,304 227,927 227,034 4,038,610 0 4,720,875
Salvation Army Low Barrier Shelter Oper ations Subsidy 0 250,000 250,000 250,000 250,000 0 1,000,000
SUBTOTAL $4,732,200 $7,724,804 $4,330,427 $7,362,034 $9,103,610 $2,400,000 $30,920,875
OTHER GOVERNMENTAL PROJECTS Proposed Projected Projected Projected Projected Projected 5 Year
Project FY26 FY27 FY28 FY29 FY30 FY31 Total
0 00000 0
SUBTOTAL $0 $0 $0 $0 $0 $0 $0
TOTAL NONBONDABLE PROJECTS $8,227,434 $11,883, 698 $7,549,954 $10,751,657 $12, 679,110 $5,482,515 $48,346,934
Nonbondable Contingency $0 $0 $0 $0 $0 $0 0
TOTAL NONBONDABLE EXPENDITURES $8,227,434 $11, 883,698 $7,549,954 $10,751,657 $12, 679,110 $5,482,515 $48,346,934
TOTAL PROJECT EXPENDITURES $35,987,686 $48,673, 277 $61,013,498 $41,294,380 $30, 349,167 $20,158,912 $201,489,233
New Sidewalks Plan
FY 2027 - 2031 CIP
Street Location Tier** Length (ft)
Sycamore Street North Tier 1 150
11th Street NW West Tier 1 200
10 1/2 Street NW East Tier 1 420
9th Street SW East Tier 2 760
9th Street NW Both Tier 2 450
Little High Street Both Tier 2 1050
Street Location Tier** Length (ft)
Orange Street West Tier 1 200
Orange Street East Tier 1 80
Albemarle Street Northwest Tier 2 1300
Greenleaf Lane North Tier 2 1400
Oakleaf Lane North Tier 2 650
Druid Avenue Southwest Tier 2 1500
Poplar Street North Tier 2 570
6th Street SE West Tier 2 440
Street Location Tier** Length (ft)
Riverdale Drive Southwest Tier 1 120
Kelley Avenue East Tier 2 1000
Meade Ave West Tier 2 340
Rugby Ave North Tier 2 460
Cedar Hill Road Either Tier 2 1070
Street Location Tier** Length (ft)
Blenheim Avenue North Tier 1 260
Blenheim Avenue North Tier 2 435
Franklin Street Northwest Tier 2 1300
E Market Street South Tier 2 1400
6th Street SE West Tier 2 100
Montrose Avenue Northeast Tier 2 470
Street Location Tier** Length (ft)
Bolling Avenue Either Tier 1 470
Elliot Avenue North Tier 2 1320
Fairway Avenue Either Tier 2 400
Barracks Road Southwest Tier 2 530
Tarleton Dr Either Tier 2 1050
FY 2027 - $2,533,000
FY 2028 - $2,349,000
FY 2029 - $3,401,000
FY 2030 - $1,718,000
FY 2031 - $1,620,000
**Tier 1 is Design and Construction and Tier 2 is Design Only
Planning Commission Work Session
FY 2027 – 2031
Capital Improvement Plan Discussion
November 25, 2025
1
Overview
Overview of a Capital Improvement Program (CIP)?
Draft 5-Year Plan Review by Category
What’s Next?
Resources for More Information
2
What is a Capital Project?
Special characteristics:
Essential Public Purpose
Long Useful Life (5 year minimum)
Non-recurring/Non-Operational
Expensive (> $50,000)
3
What is a Capital Budget?
Multi-year plan(5) that forecasts spending (and revenues) for all anticipated
capital projects
Should build on the Comprehensive Plan
Addresses repair and maintenance of existing infrastructure and
development of new facilities
4
Operating vs Capital
Operating
Budget
Shorter
Duration
Day to Day
Expenses
Capital
Budget
Longer
Duration
Large
Investment
5
Why do a 5-year Plan?
Provides the framework to ensure long-term capital expenditures are
aligned with:
Community input and expectations
Priorities of City Council
The City’s financial capability to afford the plan
Plans for cooperation on regional projects (with Albemarle County, UVA)
6
CIP Planning Timeline
September
Budget Submissions
Nov/Dec
Planning
Commission Review
and Feedback
March
City Manager
Presents Proposed
Budget
April
City Council adopts
CIP along with
Operating Budget
7
Evaluation Considerations
Legal Mandate
Is the project required by actual law, regulation, court mandate, or other legal liability?
Public Health and Safety
Does the project eliminate or prevent an existing health, environmental, or safety
hazard?
City Council/Manager Strategic Work Plan
Does the project help meet the goals of the City Council/City Manager Strategic Work
Plan?
Comprehensive Plan
Does the project help meet the goals of the City of Charlottesville’s current
comprehensive Plan?
8
Evaluation Considerations (continued)
Environmental Sustainability
Does the project support the City of Charlottesville’s climate action goals and
commitments?
Infrastructure Investment/Protection
Does the project protect and preserve the City’s infrastructure?
Impact on City Operational Finances/Revenue Generation
Will the project have a positive, neutral, or negative impact on the City’s Operational
Finances?
9
Evaluation - Areas of Special Consideration
The project ties into other existing or proposed projects.
There is demonstrated public support for the project.
Leveraging of outside funding is available for the project.
The project will be done in partnership with one or more other organizations.
The project increases the level of service provided by the City.
10
Funding the CIP - Revenues
Budget must be Balanced: Planned Revenues must equal Planned Expenses
*All figures are subject to change until the City Manager’s Proposed Budget is released in March 2026.
11
Projected
FY27
Projected
FY28
Projected
FY29
Projected
FY30
Projected
FY31
5 Year Total
Revenues
Transfer from General Fund 9,004,212 6,634,954 9,119,908 11,764,110 4,567,515 41,090,699
Transfer from General Fund - Mall Vendor Fees 100,000 100,000 100,000 100,000 100,000 500,000
Transfer from General Fund - VCF Allocation 575,000 575,000 575,000 575,000 575,000 2,875,000
Contribution from Schools (Small Cap Program) 200,000 200,000 200,000 200,000 200,000 1,000,000
CIP Contingency (from prior year surplus) 1,964,486 0 716,749 0 0 2,681,235
PEG Fee Revenue 40,000 40,000 40,000 40,000 40,000 200,000
CY 2026 Bond Issue 0 0 0 0 0 0
CY 2027 Bond Issue 36,789,579 0 0 0 0 36,789,579
CY 2028 Bond Issue 0 53,463,544 0 0 0 53,463,544
CY 2029 Bond Issue 0 0 30,542,723 0 0 30,542,723
CY 2030 Bond Issue 0 0 0 17,670,057 17,670,057
CY 2031 Bond Issue 0 0 0 0 14,676,397 14,676,397
TOTAL AVAILABLE REVENUES $48,673,277 $61,013,498 $41,294,380 $30,349,167 $20,158,912 $201,489,233
Aaa/AAA Bond Rating
The City is one of only 87 cities nationwide that maintains a “Aaa/AAA” General
Obligation rating from Moody’s and S&P
Only 10 Virginia cities maintain the distinction of being Aaa/AAA rated
12
The City’s Bond Rating
Credit ratings are an independent view on a municipalities creditworthiness and ability to
repay its debt
Charlottesville has maintained the highest possible general obligation credit ratings:
Aaa from Moody’s Investors Service since 1973
AAA by Standard & Poor’s since 1964
A high credit ratings allows the City to borrow funds at the lowest possible borrowing
cost and ensures more money is going toward capital projects than interest payments.
A high credit rating is also helpful in attracting economic development prospects.
The City talks with the rating agencies on an annual basis.
13
Summary
*All figures are subject to change until the City Manager’s Proposed Budget is released in March 2026.
14
FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Totals
Sources of Funds:
G eneral fund transfer 9,679,212$ 7,309,954$ 9,794,908$ 12,439,110$ 5,242,515$ 44,465,699$
CIP Contingency 1,964,486 - 716,749 - - 2,681,235$
Bond issues 36,789,579 53,463,544 30,542,723 17,670,057 14,676,397 153,142,299$
Contribution from Schools 200,000 200,000 200,000 200,000 200,000 1,000,000$
Other 40,000 40,000 40,000 40,000 40,000 200,000$
Total sources 48,673,277$ 61,013,498$ 41,294,380$ 30,349,167$ 20,158,912$ 201,489,233$
U ses of fund s:
Education $15,650,000 $31,650,000 $5,650,000 $4,150,000 $4,150,000 $61,250,000
Facilities Capital Projects $4,066,264 $3,243,930 $12,943,950 $3,492,165 $2,329,430 $26,075,738
Public safety and justice $1,886,465 $910,864 $1,901,806 $1,178,958 $674,300 $6,552,393
Transportation and access $11,149,494 $11,964,527 $10,632,123 $9,143,000 $7,988,215 $50,877,359
Parks and recreation $2,756,250 $3,623,750 $2,514,467 $2,991,434 $2,326,967 $14,212,868
Affordable Housing $12,724,804 $9,330,427 $7,362,034 $9,103,610 $2,400,000 $40,920,875
Technology Infrastructure $440,000 $290,000 $290,000 $290,000 $290,000 $1,600,000
Total uses 48,673,277$ 61,013,498$ 41,294,380$ 30,349,167$ 20,158,912$ $201,489,233
Funding Gap $0 $0 $0 $0 $0 $0
CITY MANAGER PROPOSED 5-YEAR PLAN
Education
$15,650,000 in FY 2027, $61.3M 5-year Total
*All figures are subject to change until the City Manager’s Proposed Budget is released in March 2026.
15
EDUCATION Projected Projected Projected Projected Projected 5 Year
Project FY27 FY28 FY29 FY30 FY31 Total
Lump Sum to Schools (City Contribution) 1,300,000 1,300,000 1,300,000 1,300,000 1,300,000 6,500,000
City Schools HVAC Repair 1,250,000 1,250,000 1,250,000 1,250,000 1,250,000 6,250,000
City Schools Priority Improvement
Projects
1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 7,000,000
Charlottesville Walker School Pre-K
Center (Oaklawn TBD)
10,000,000 26,000,000 0 0 0 36,000,000
Burnley-Moran Elementary School Roof 1,500,000 0 0 0 0 1,500,000
Jackson-Via Elementary School Roof 0 1,500,000 0 0 0 1,500,000
Johnson Elementary School Roof 0 0 1,500,000 0 0 1,500,000
School Small Capital Improvements Prog 200,000 200,000 200,000 200,000 200,000 1,000,000
SUBTOTAL $15,650,000 $31,650,000 $5,650,000 $4,150,000 $4,150,000 $61,250,000
Facilities Capital Projects
$4,066,264 in FY 2027, $26.1M 5-year Total
*All figures are subject to change until the City Manager’s Proposed Budget is released in March 2026.
16
FACILITIES CAPITAL PROJECTS Projected Projected Projected Projected Projected 5 Year
Project FY27 FY28 FY29 FY30 FY31 Total
Lump Sum to Facilities Capital Projects 1,159,155 1,193,930 1,217,809 1,242,165 1,279,430 6,092,488
City Facility HVAC Replacement 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 5,000,000
Climate Action Initiatives 1,000,000 1,000,000 1,000,000 0 0 3,000,000
Jefferson-Madison Regional Library Reno 857,109 0 9,676,141 0 0 10,533,250
McGuffey Roof Replacement 0 0 0 1,200,000 0 1,200,000
HVAC Contingency Fund - City and Scho 50,000 50,000 50,000 50,000 50,000 250,000
SUBTOTAL 4,066,264 3,243,930 12,943,950 3,492,165 2,329,430 26,075,738
Public Safety and Justice
$1,886,465 in FY 2027, $6.6M 5-year Total
*All figures are subject to change until the City Manager’s Proposed Budget is released in March 2026.
17
PUBLIC SAFETY AND JUSTICE Projected Projected Projected Projected Projected 5 Year
Project FY27 FY28 FY29 FY30 FY31 Total
Replacement Fire Apparatus 1,334,065 0 1,470,806 0 0 2,804,871
Replacement EMS Apparatus 0 481,864 0 505,958 0 987,822
Police Mobile Data Terminals 84,400 86,000 88,000 90,000 91,300 439,700
Police Portable Radio Replacement 75,000 75,000 75,000 75,000 75,000 375,000
Police Car Portable Radio Replacement 68,000 68,000 68,000 68,000 68,000 340,000
Fire Portable Radio Replacement 75,000 75,000 75,000 75,000 75,000 375,000
Sheriff Portable Radio Replacement 40,000 40,000 40,000 40,000 40,000 200,000
Fire - Self-Contained Breathing Apparatu 150,000 25,000 25,000 25,000 25,000 250,000
Fire - Protective Clothing/Turnout Gear Re 60,000 60,000 60,000 300,000 300,000 780,000
SUBTOTAL $1,886,465 $910,864 $1,901,806 $1,178,958 $674,300 $6,552,393
Transportation and Access
$11,149,494 in FY 2027, $50.9M 5-year Total
*All figures are subject to change until the City Manager’s Proposed Budget is released in March 2026.
18
TRANSPORTATION AND ACCESS Projected Projected Projected Projected Projected 5 Year
Project FY27 FY28 FY29 FY30 FY31 Total
New Sidewalks 2,533,000 2,349,000 3,401,000 1,718,000 1,620,000 11,621,000
Sidewalk Repair 500,000 650,000 700,000 700,000 700,000 3,250,000
Small Area Plan Implementation 200,000 200,000 200,000 200,000 200,000 1,000,000
Small Area Plans 150,000 150,000 150,000 150,000 150,000 750,000
Street Milling and Paving 1,500,000 1,700,000 1,750,000 2,000,000 2,000,000 8,950,000
ADA Pedestrian Signal Upgrades 240,000 240,000 0 0 0 480,000
Minor Bridge Repairs 225,000 225,000 0 0 0 450,000
Traffic Signal Infrastructure 2,000,000 3,000,000 1,000,000 1,000,000 250,000 7,250,000
ADA Transition Plan 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000
Safe Routes to School 200,000 200,000 200,000 200,000 200,000 1,000,000
Dominion Power Pole Remediation 100,000 100,000 100,000 100,000 100,000 500,000
State Bridge and Highway Inspections 100,000 100,000 100,000 100,000 0 400,000
CAT Transit Bus Replacement Match 441,494 240,527 206,123 150,000 93,215 1,131,359
Intelligent Transportation System 285,000 285,000 300,000 300,000 300,000 1,470,000
City Wide Traffic Engineering Improveme 150,000 150,000 150,000 150,000 0 600,000
Neighborhood Transportation Improveme 100,000 100,000 100,000 100,000 100,000 500,000
Bicycle Infrastructure 100,000 100,000 100,000 100,000 100,000 500,000
Right of Way Appurtenance 150,000 150,000 150,000 150,000 150,000 750,000
Traffic Sign Retro Reflective Compliance 25,000 25,000 25,000 25,000 25,000 125,000
Historic District and Entrance Corridor De 150,000 0 0 0 0 150,000
SUBTOTAL $11,149,494 $11,964,527 $10,632,123 $9,143,000 $7,988,215 $50,877,359
Parks and Recreation
$2,756,250 in FY 2027, $14.2M 5-year Total
*All figures are subject to change until the City Manager’s Proposed Budget is released in March 2026.
19
PARKS AND RECREATION Projected Projected Projected Projected Projected 5 Year
Project FY27 FY28 FY29 FY30 FY31 Total
Downtown Mall Infrastructure Repairs 250,000 250,000 250,000 250,000 250,000 1,250,000
Parks Master Plan Implementation 500,000 500,000 500,000 500,000 500,000 2,500,000
Downtown Mall Tree Management Plan 591,250 1,773,750 476,967 953,934 476,967 4,272,868
Parks and Recreation Lump Sum 400,000 400,000 400,000 400,000 400,000 2,000,000
Parks and Schools Playground 250,000 200,000 387,500 387,500 200,000 1,425,000
Urban Tree Planting 125,000 125,000 125,000 125,000 125,000 625,000
Parkland and Trails Acquisition and Deve 125,000 125,000 125,000 125,000 125,000 625,000
City/County Park Maintenance - Joint Par 265,000 0 0 0 0 265,000
Downtown Mall Trees Active Lifecycle Ma 100,000 100,000 100,000 100,000 100,000 500,000
Invasive Plant Removal 150,000 150,000 150,000 150,000 150,000 750,000
SUBTOTAL $2,756,250 $3,623,750 $2,514,467 $2,991,434 $2,326,967 $14,212,868
Affordable Housing
$12,724,804 in FY 2027, $40.9M 5-year Total
*All figures are subject to change until the City Manager’s Proposed Budget is released in March 2026.
20
AFFORDABLE HOUSING Projected Projected Projected Projected Projected 5 Year
Project FY27 FY28 FY29 FY30 FY31 Total
Westhaven Redevelopment 5,000,000 5,000,000 0 0 0 10,000,000
Charlottesville Affordable Housing Fund 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 7,500,000
Supplemental Rental Assistance 900,000 900,000 900,000 900,000 900,000 4,500,000
Friendship Court Infrastructure Improveme 650,000 350,000 1,560,000 840,000 0 3,400,000
Friendship Court Redevelopment - Phase 2,047,500 1,102,500 0 0 0 3,150,000
Friendship Court Redevelopment - Phase 0 0 2,925,000 1,575,000 0 4,500,000
PHA - 501 Cherry Avenue 2,150,000 0 0 0 0 2,150,000
Carlton Mobile Home Park 227,304 227,927 227,034 4,038,610 0 4,720,875
Salvation Army Low Barrier Shelter Opera 250,000 250,000 250,000 250,000 0 1,000,000
SUBTOTAL $12,724,804 $9,330,427 $7,362,034 $9,103,610 $2,400,000 $40,920,875
Technology Infrastructure
$440,000 in FY 2027, $1.6M 5-year Total
*All figures are subject to change until the City Manager’s Proposed Budget is released in March 2026.
21
TECHNOLOGY INFRASTRUCTURE Projected Projected Projected Projected Projected 5 Year
Project FY27 FY28 FY29 FY30 FY31 Total
Communications Technology Account/Public Access 40,000 40,000 40,000 40,000 40,000 200,000
City Wide IT Strategic Infrastructure 250,000 250,000 250,000 250,000 250,000 1,250,000
Voting Equipment Replacement 150,000 0 0 0 0 150,000
SUBTOTAL $440,000 $290,000 $290,000 $290,000 $290,000 $1,600,000
What’s Next?
Proposed CIP
presented to City
Council
Recommendations
to City Manager
Public Hearing
December 9th
22
CIP Resources
23
Budget Explorer Tool
Current CIP Funding by Project
Online CIP Budget Book
Story pages for each project included in 5-year plan
City Comprehensive Plan
https://charlottesville.gov/1111/Comprehensive-Plan
City of Charlottesville Budget Webpage
https://charlottesville.gov/budget
Important Budget Dates
Work Sessions
March 5
March 12
March 26
April 2
Public
Hearings
March 16
(Tax Rates)
April 7
(Budget)
Community
Budget Forum
March 19
Budget
Adoption
April 9
24
Questions and Discussion
www.Charlottesville.gov/budget