RecordWell Data

List of Projects under Parks Facilities Maintenance Program(PDF, 664KB)

Arlington County · Arlington County · Budget documents

Open the original document More from Arlington County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

FY 2025 List of Projects under Parks Facilities Maintenance Program Project Name Description Funded by (Dollars in Thousands) PAYG Bond Total Capital Asset Manager Staff resources to manage the Parks Capital Asset Program. $175 $175 Parks Field Fund The Parks Field Fund is supported by an annual fee assessed on official affiliated youth and adult sports teams playing on Arlington County rectangular and diamond fields. The fees assessed are directed to support replacement and construction of synthetic turf fields in the County and for specific diamond field enhancements, such as improved irrigation, batting cages or accelerated sod replacement. $290 $290 Public Spaces Master Plan Refresh The purpose of this project is to review and refresh several elements of the 2019 Public Spaces Master Plan (PSMP). Elements to be updated include conducting a needs assessment and performing a statistically valid survey, updating inventory and level of service analyses, reviewing land acquisition criteria, methodologies and priorities, and general narrative updates. $300 $300 Arlington Hall West Playground Replacement Design for the replacement of the playground, site circulation, site furnishings, landscaping, and stormwater management improvements at Arlington Hall West Park. This is one of the older playgrounds in the County and replacement parts are no longer available from the playground manufacturer. Portions of the playground are currently closed. Design funding is requested in FY 2025 and construction funding is requested in FY 2026. $605 $605 Doctors Run Park Playground Replacement Construction of the replacement of the children's playground and stone dust volleyball court, picnic shelter, site circulation and accessibility, site furnishings, landscaping, and stormwater management improvements at Doctors Run Park. This follows on design that was funded in FY 2024. $2,080 $2,080 Pooled Park Project Improvements During a park assessment conducted between 2020 -2023, some parks with few park assets received a low score due to a single park feature that needed to be replaced. Improvements are anticipated at multiple parks, including Dark Star Park, Kirkwood Road Park, Kirkwood Road Neighborhood Park, 18th Street North and North Lincoln Street Park, James W. Haley Park, and Lang Street Community Gardens. Project examples include a retaining wall or fence that needs to be replaced with a new wall or fence. Needs vary by park. $800 $800 Total $1,565 $2,685 $4,250 C - 13 FY 2026 List of Projects under Parks Facilities Maintenance Program Project Name Description Funded by (Dollars in Thousands) PAYG Bond Total Capital Asset Manager Staff resources to manage the Parks Capital Asset Program. $182 $182 Parks Field Fund The Parks Field Fund is supported by an annual fee assessed on official affiliated youth and adult sports teams playing on Arlington County rectangular and diamond fields. The fees assessed are directed to support replacement and construction of synthetic turf fields in the County and for specific diamond field enhancements, such as improved irrigation, batting cages or accelerated sod replacement. $273 $273 Arlington Hall West Playground Replacement Construction for replacement of the playground, site circulation, site furnishings, landscaping, and stormwater management improvements at Arlington Hall West Park. This is one of the older playgrounds in the County and replacement parts are no longer available from the playground manufacturer. Portions of the playground are currently closed. Design funding is requested in FY 2025 and construction funding in FY 2026. $1,845 $1,845 Equipment at DPR Facilities Purchase and replacement of equipment at DPR facilities. $101 $101 Cherrydale Park Playground Replacement Design for a playground replacement at Cherrydale Park. The project also includes replacement of retaining walls, site access, site circulation, site furnishings, landscaping, and stormwater management improvements. The playground at Cherrydale Park is one of the older playgrounds in the County. Portions of the playground are currently closed. Design funding is requested in FY 2026 and construction funding is requested in FY 2027. $677 $677 Douglas Park, Phase 2 Design and Construction Continuation of the full replacement of the amenities in Douglas Park. The Phase 1 improvements to Douglas Park include replacement of the picnic shelter, one pedestrian bridge, site furnishings, site circulation, stormwater management improvements, invasive removal in the forested area and reforestation plantings. The Phase 2 improvements include the remaining amenities, which include replacement of the playground, one additional pedestrian bridge, earthwork, site circulation and site furnishings, including benches, trash and recycling receptacles, picnic tables, signage, bicycle racks, landscaping, and storm water management facilities. $733 $733 Bon Air Park Picnic Shelter and Playground Design and construction for replacing the picnic shelter and playground at the rear of Bon Air Park. This picnic shelter and small playground have long been a favorite destination for group and family picnics. Both the picnic shelter and playground are intended to be redesigned in a manner that acknowledges and anticipates that the area will occasionally flood. $1,900 $1,900 Total $2,168 $3,745 $5,710 C - 14

Source: Arlington County website. First collected Oct 27, 2026.