Arlington County, Virginia CIP
2025 − 2034
LOCAL PARKS AND RECREATION PROGRAMS: PARK MASTER
PLANS PROGRAM
10 YEAR CATEGORY SUMMARY (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
1. Arlington Boathouse 0 0 0 15,865 0 0 0 0 0 12,215 28,080
2. Crystal City Parks and Public
Space
1,038 6,682 2,695 7,040 660 4,820 0 0 0 0 22,935
3. Drew Park 0 305 115 1,820 0 0 0 0 0 0 2,240
4. Emerging Uses Program 1,500 0 1,010 0 505 0 1,010 0 1,010 0 5,035
5. Fairfax Drive Public Spaces 0 0 0 0 0 0 0 900 1,360 11,725 13,985
6. Gateway Park (Rosslyn) 1,400 0 29,685 0 0 0 0 0 0 0 31,085
7. Langston Boulevard Public
Space Improvements
0 0 0 0 0 0 0 0 0 2,020 2,020
8. Natural Resiliency Program 0 1,515 0 1,010 0 1,010 0 1,010 0 1,010 5,555
9. New Park at 26th Street N
and Old Dominion Drive
0 0 0 255 560 4,040 0 0 0 0 4,855
10. Parks Athletic Courts
Program
0 0 505 0 505 0 505 0 505 0 2,020
11. Penrose Square, Phase 2 0 0 0 0 0 0 795 0 0 3,965 4,760
12. Quincy Park 0 0 0 0 0 890 4,040 0 8,920 24,570 38,420
13. Shirlington Park 0 0 0 0 0 0 0 1,030 4,315 0 5,345
14. Short Bridge Park 0 0 0 0 0 0 5,690 0 0 0 5,690
15. Three Urban Parks 0 8,055 0 0 0 0 0 0 0 0 8,055
16. Virginia Highlands
Park/Nearby Public Space
0 0 0 0 0 0 0 0 0 1,485 1,485
Total Recommendation 3,938 16,557 34,010 25,990 2,230 10,760 12,040 2,940 16,110 56,990 181,565
C - 15
CATEGORY FUNDING SOURCES (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
New Funding
Federal Funding 0 0 0 0 0 0 0 0 0 0 0
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 1,400 3,000 18,895 6,310 0 0 0 0 0 5,000 34,605
New Bond Issue 1,500 9,875 12,760 11,940 1,065 5,940 11,535 2,940 15,605 49,990 123,150
PAYG 0 0 505 700 505 0 505 0 505 0 2,720
Short Term Finance 0 0 0 0 0 0 0 0 0 0 0
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 1,000 0 0 0 0 0 0 2,000 3,000
Tax Increment Financing (TIF) 0 200 850 7,040 660 4,820 0 0 0 0 13,570
Subtotal New Funding 2,900 13,075 34,010 25,990 2,230 10,760 12,040 2,940 16,110 56,990 177,045
Previously Approved Funding
Authorized but Unissued
Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 121 0 0 0 0 0 0 0 0 121
Tax Increment Financing (TIF) 1,038 3,061 0 0 0 0 0 0 0 0 4,099
Other Previously Approved
Funds 0 300 0 0 0 0 0 0 0 0 300
Subtotal Previously Approved
Funding 1,038 3,482 0 0 0 0 0 0 0 0 4,520
Total Funding Sources 3,938 16,557 34,010 25,990 2,230 10,760 12,040 2,940 16,110 56,990 181,565
C - 16
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
1. ARLINGTON BOATHOUSE
Project Highlights:
• This project has been in the planning process for more than
three decades.
• A major step forward occurred in May 2019 when the County
Board authorized the County Manager to sign a
Programmatic Agreement with the National Park Service,
National Capital Planning Commission, District of Columbia
State Historic Preservation Office and Virginia State Historic
Preservation Office for developing a boathouse and related
facilities on the Virginia side of the Potomac River on federal
land administered by the George Washington Memorial
Parkway.
• The County has ten years, until 2029, to construct the
boathouse on the Lower Rosslyn Site before the agreement
expires.
• The project involves a Lower Rosslyn Site adjacent to the
Potomac River for direct water access and an Upper Rosslyn
Site for support facilities on land that the County already
owns.
• Master planning is anticipated to start in FY 2025 with design
of the facilities to follow in FY 2026. This schedule should
allow the project at the Lower Site to be under construction
by the 2029 agreement expiration date.
Associated Plan(s):
Forestry and Natural Resources Plan
Public Art Master Plan (PAMP)
Public Spaces Master Plan (PSMP)
Neighborhood(s):
VARIOUS
Critical Milestones:
• National Park Service completes
Environmental Impact Statement
2018
• Programmatic Agreement signed by
National Park Service, Arlington County
and others
2019
• Begin Master Plan development of Upper
and Lower Rosslyn site areas
2025
• Develop final design for Upper and Lower
Rosslyn Sites for Boathouse
2026
• Begin construction of Lower Rosslyn Site 2029
• Agreement Expiration Date 2029
Funding Notes: Assumes 60 percent County funding and 40 percent outside funding for construction of the Lower Rosslyn Site in
FY 2028. Construction of the Upper Rosslyn Site in FY 2034 assumes $5M in outside/developer funding.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Developer Contributions 6,310 5,000 11,310
New Bond Issue 9,555 7,215 16,770
Previous Funding
Total Funding 0 0 0 15,865 0 0 0 0 0 12,215 28,080
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Operations Costs (+/-) 122 125 129 133 137 646
Personnel ($) 116 119 123 127 130 615
Total Impact 0 0 0 0 0 238 244 252 260 267 1,261
Changes from Prior CIP:
Changes from the last CIP include construction of the Upper Rosslyn Site in a succeeding fiscal year from construction of the Lower
Rosslyn Site. Completion of the Lower Rosslyn Site is dictated by the Programmatic Agreement whereas completion of the Upper
Rosslyn Site does not have this time constraint.
C - 17
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
2. CRYSTAL CITY PARKS AND PUBLIC SPACE
Project Highlights:
• Three parks are anticipated to be constructed in Crystal City
by the end of the decade.
• The first park is Metro Market Square to be located at 18th
Street South and Crystal Drive at the site of a future Metro
station entrance.
• The second Crystal City project is Phase 1 of Center Park,
which will be a new, two -acre centrally located park,
programmed for active use and as the principal gathering
space for the community.
• The third Crystal City project is 15th Street Park, which is
bound by South Bell Street, 15th Street South, and Crystal
Drive.
• The timing and order of construction has been updated for
this CIP.
Associated Plan(s):
Crystal City Sector Plan
Public Spaces Master Plan (PSMP)
Neighborhood(s):
Crystal City
Critical Milestones:
• Master Planning of Metro Market Square 2024
• Design of Metro Market Square 2025
• Construction of Metro Market Square 2026-2027
• Master Planning of Center Park 2026
• Design of Center Park 2027
• Construction of Center Park 2028
• Master Planning of 15th Street Park 2028
• Design of 15th Street Park 2029
• Construction of 15th Street Park 2030
Changes from Prior CIP:
Changes from the previous CIP include a re-ordering of projects.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Developer Contributions 3,000 1,845 4,845
Tax Increment Financing
(TIF)
200 850 7,040 660 4,820 13,570
Previous Funding
Issued but Unspent Bonds 121 121
Tax Increment Financing
(TIF) 1,038 3,061 4,099
Other Previously
Approved Funds
300 300
Total Funding 1,038 6,682 2,695 7,040 660 4,820 0 0 0 0 22,935
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Operations Costs (+/-) 53 55 113 116 155 160 165 170 987
Personnel ($) 106 109 113 116 120 123 127 130 944
Total Impact 0 0 159 164 226 232 275 283 292 300 1,931
C - 18
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
3. DREW PARK
Project Highlights:
• The project includes developing a final park master plan,
final site design and construction of the new park.
• The new elementary school building displaced the former
park. The County has assembled a new park along S.
Kenmore Street to replace the former park. The new Drew
Park is comprised of acquisitions of several private parcels, a
YMCA-donated parcel , and an exchange of approximately
two acres of property with Arlington Public Schools.
• As part of this project, the master plan will be updated and
forwarded for adoption to the County Board and then will be
followed by final design and construction of the park.
Associated Plan(s):
Forestry and Natural Resources Plan
Public Spaces Master Plan (PSMP)
Neighborhood(s):
VARIOUS
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 305 115 1,120 1,540
PAYG 700 700
Previous Funding
Total Funding 0 305 115 1,820 0 0 0 0 0 0 2,240
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Operations Costs (+/-) 13 13 13 13 13 65
Total Impact 0 0 0 0 0 13 13 13 13 13 65
Critical Milestones:
• Anticipate Master Planning to start Spring 2026
• Anticipate Design to start Spring 2027
• Anticipate Construction to start Spring 2028
• Anticipate Construction completion Spring 2029
Changes from Prior CIP:
This project is new to the FY 2025 – FY 2034 CIP following the
recent acquisition of the duplex property adjacent to this site.
C - 19
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
4. EMERGING USES PROGRAM
Project Highlights:
• This program is designed to respond to emerging recreational
and casual use activities in parks and recreation. The need to
accommodate new trends in recreation, such as pickleball,
mountain biking, skateboarding, and other recommendations,
is identified in the 2019 Public Spaces Master Plan (PSMP).
• The program will allow for the timely study, design and
exploration of biophilic principles as they relate to these
projects, and implementation of recreation and casual use
needs that impact limited park spaces and conflicts within the
County's park syste m. Biophilic principles focus on
integrating natural elements into the built environment.
• This program will address uses such as the design and
construction of a permanent pickleball facility, lining of
multi-use courts for tennis and pickleball, design of
improvements to natural surface trails, possible construction
of a mountain biking area or the creation of a pump track for
mountain biking.
• Future funding may address skateboarding, dog parks, casual
use spaces or other uses raised by the PSMP, community or
from various studies or policy changes.
Associated Plan(s):
Public Spaces Master Plan (PSMP)
Neighborhood(s):
VARIOUS
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 1,500 1,010 505 1,010 1,010 5,035
Previous Funding
Total Funding 1,500 0 1,010 0 505 0 1,010 0 1,010 0 5,035
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Design the reconstruction of existing tennis
courts at Walter Reed Community Center
for Pickleball
2024
• Reconstruction of the tennis courts at
Walter Reed Community Center for
Pickleball
2024
• Design of Improvements to natural surface
trails and mountain biking improvements
2025
Changes from Prior CIP:
No change from the previous CIP.
C - 20
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
5. FAIRFAX DRIVE PUBLIC SPACES
Project Highlights:
• The purpose of this project is to develop park master plans,
design and construction for several public spaces along
Fairfax Drive.
• These public spaces include the existing West End Plaza at
the corner of Washington Boulevard and Wilson Boulevard,
the existing Triangle Park and future planned expansion of
this park, and a new linear park that will replace the section
of Fairfax Drive b etween N. Kirkwood Road and the
Washington Boulevard and Wilson Boulevard intersection.
• These park master plans will be developed concurrently with
the goal of achieving a unified park experience.
Associated Plan(s):
Clarendon Sector Plan
Forestry and Natural Resources Plan
Public Spaces Master Plan (PSMP)
Neighborhood(s):
Ballston-Virginia Square
Clarendon-Courthouse
Lyon Village
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 900 1,360 11,725 13,985
Previous Funding
Total Funding 0 0 0 0 0 0 0 900 1,360 11,725 13,985
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Develop Park Master Plans for the three park
areas
2032
• Design improvement plans for the individual
parks
2033
• Construction of improvements to the parks
and plazas
2035
Changes from Prior CIP:
This project has been pushed out three years from the previous
CIP with the Master Planning process now beginning in FY 2032.
C - 21
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
6. GATEWAY PARK (ROSSLYN)
Project Highlights:
• Gateway Park is located over I -66 in Rosslyn and was
constructed in the 1980's.
• The current park is difficult and dangerous to access due to
the surrounding high-speed roadways.
• The park is under -utilized yet presents great potential for
everyday park and recreation needs and for a diverse mix of
special events and program activities.
Associated Plan(s):
Forestry and Natural Resources Plan
Public Art Master Plan (PAMP)
Public Spaces Master Plan (PSMP)
Neighborhood(s):
North Rosslyn
Funding Notes: Other Funding is from outside contributions. DPR anticipates an initial contribution of $5M from the adopted Rosslyn
Holiday Inn Development community benefits package. Of the $5M contribution, $500K is in-hand and will provide near-term funding
for master planning, possible interim park uses and technical studies, while the remaining $4.5M will provide a portion of the required
construction funding in FY 2027. Additional developer funds totaling $13.95M will also go towards construction in F Y 2027. In
partnership with the Rosslyn BID and other stakeholders, additional private fundraising is anticipated to support constructio n; a
preliminary estimate is $1M which will be refined over the next year.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Developer Contributions 1,400 17,050 18,450
New Bond Issue 11,635 11,635
Other Funding 1,000 1,000
Previous Funding
Total Funding 1,400 0 29,685 0 0 0 0 0 0 0 31,085
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Operations Costs (+/-) 84 87 90 93 96 99 549
Personnel ($) 238 249 260 272 284 297 1,600
Non-Personnel ($) 75 75
Total Impact 0 0 0 0 397 336 350 365 380 396 2,224
Critical Milestones:
• Develop Park Master Plan 2024
• Final Park Design anticipated to start 2025
• Final Park Design anticipated to be
completed
2026
• Demolition and Construction anticipated to
begin
2026
• Construction anticipated to be complete Fall 2028
Project Links:
• Projects & Planning page from the Arlington County
website.:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Parks-Projects/Gateway-Park
Changes from Prior CIP:
The previous CIP had construction of the east and west sides
happening independently. This CIP has construction of the east
and west sides occurring simultaneously.
C - 22
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
7. LANGSTON BOULEVARD PUBLIC SPACE IMPROVEMENTS
Project Highlights:
• This funding is set aside for currently unspecified future
public space project(s) on Langston Boulevard.
• It is envisioned that this project might be associated with a
future developer -funded project where public space is
granted to the County. This funding is for planning, design
and construction of this future public space(s).
• In 2023, the County Board adopted the Langston Boulevard
Area Plan. This Plan calls for evaluation of public space
needs periodically to address the changing context and to
meet the needs of an evolving Langston Boulevard
community.
• The Plan recommends that the County design and construct
public spaces occurring on public property, rights -of-way,
and other areas with public access agreements when it would
not be otherwise implemented through private
redevelopment.
Associated Plan(s):
Public Spaces Master Plan (PSMP)
Neighborhood(s):
VARIOUS
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 2,020 2,020
Previous Funding
Total Funding 0 0 0 0 0 0 0 0 0 2,020 2,020
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Anticipated start of Master Planning Summer 2033
• Anticipated completion of Construction Spring 2036
Changes from Prior CIP:
This project is new to the FY 2025 – FY 2034 CIP.
C - 23
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
8. NATURAL RESILIENCY PROGRAM
Project Highlights:
• This program will allow the Department of Parks and
Recreation to study and implement projects that manage
stormwater and natural resiliency.
• Projects in this program will provide recreational
opportunities and amenities in concert with addressing or
creating flood capacity.
• Projects in this program may include forest restoration,
stream improvements, large- scale invasive plant removal
projects, large-scale native plantings, implementing biophilic
principles as part of the County's commitments as a member
of the Biophilic Citi es Initiative or park renovation projects
that improve the County's sustainability, such as creating
flood control projects in parks where flooding is anticipated
and allowed to happen to prevent further downstream damage
from floodwaters.
• Biophilic principles focus on integrating natural design
elements into the built environment.
Associated Plan(s):
Forestry and Natural Resources Plan
Public Spaces Master Plan (PSMP)
Storm Water Master Plan
Neighborhood(s):
VARIOUS
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 1,515 1,010 1,010 1,010 1,010 5,555
Previous Funding
Total Funding 0 1,515 0 1,010 0 1,010 0 1,010 0 1,010 5,555
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Design of low-water ford and stream repair
in Barcroft Park
2024
• Design Plans for reforestation and removal
of invasive plants and m eadow
establishment
2025
• Installation of reforestation plantings and
removal of invasive plants and meadow
establishment
2025
• Repair of low-water ford and stream
restoration in Barcroft Park
2025
• Scoping of flood resilient project 2026
• Design of flood resilient project 2026
Changes from Prior CIP:
Reduced FY 2026 request from $3.5M to $1.5M to better reflect
The current rate of execution for projects under this program
utilizing FY 2024 funds.
C - 24
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
9. NEW PARK AT 26TH STREET N AND OLD DOMINION DR
Project Highlights:
• The purpose of this project is to master plan, design and
construct an approximately one -acre park on County- owned
land.
• The site is located at 26th Street North and Old Dominion
Drive near Marymount University and near the trailhead for
the Zachary Taylor Trail.
• The site has potential for active and passive recreation
activities.
Associated Plan(s):
Forestry and Natural Resources Plan
Public Spaces Master Plan (PSMP)
Neighborhood(s):
Donaldson Run
Old Dominion
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 255 560 4,040 4,855
Previous Funding
Total Funding 0 0 0 255 560 4,040 0 0 0 0 4,855
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Non-Personnel ($) 19 20 21 21 81
Total Impact 0 0 0 0 0 0 19 20 21 21 81
Critical Milestones:
• Master Plan for new park 2028
• Design for new park based upon Master Plan 2029
• Construction completion for new park 2031
Changes from Prior CIP:
This project is new to the FY 2025 – FY 2034 CIP.
C - 25
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
10. PARKS ATHLETIC COURTS PROGRAM
Project Highlights:
• Court Sports are an important part of the recreation
experience for many park users.
• Court sports include basketball, tennis, pickleball, futsal,
volleyball and any other sports that use a hard surface or
synthetic surface court.
• This program will go into effect after the Public Spaces
Master Plan (PSMP) update that is included in FY 2025.
• From the recommendations within the PSMP, courts will be
improved, upgraded and new courts provided based upon
siting criteria from the PSMP.
Associated Plan(s):
Public Spaces Master Plan (PSMP)
Neighborhood(s):
VARIOUS
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
PAYG 505 505 505 505 2,020
Previous Funding
Total Funding 0 0 505 0 505 0 505 0 505 0 2,020
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Refresh of the Public Spaces Master Plan Fall 2025
• Define program to upgrade existing courts
and provide new courts where appropriate
Fall 2026
Changes from Prior CIP:
This project is new to the FY 2025 – FY 2034 CIP.
C - 26
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
11. PENROSE SQUARE, PHASE 2
Project Highlights:
• Penrose Square is the first and largest of three squares
planned within the Columbia Pike Town Center node.
• Phase 1 of Penrose Square opened in November 2012 and
includes a tree-covered terrace with movable seats and tables,
a centrally located paved plaza, a low seating wall, a zero -
depth interactive water fountain, mounded lawn areas for
casual seating and a public art installation.
• Phase 2 will complete the build -out of the Phase 1 features
and allow for additional flexible program space.
Associated Plan(s):
Penrose Square Park Master Plan (2008)
Public Art Master Plan (PAMP)
Public Spaces Master Plan (PSMP)
Neighborhood(s):
Arlington Heights
Columbia Heights
Penrose
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 795 3,965 4,760
Previous Funding
Total Funding 0 0 0 0 0 0 795 0 0 3,965 4,760
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Developer to convey Phase 2 parcel to the
County
Unknown
• Design of Penrose Square, Phase 2 2031
• Construction Completion of Penrose
Square, Phase 2
2035
Changes from Prior CIP:
This project has been pushed out five years from the previous CIP
with the d esign process now beginning in FY 2031 and
construction in FY 2034.
C - 27
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
12. QUINCY PARK
Project Highlights:
• Quincy Park and Central Library are located adjacent to one
another and together form an almost 18-acre block of land.
• Quincy Park is the largest park in the Rosslyn -Ballston
Corridor and is one of the County's most heavily used parks.
• The lighted athletic fields and athletic courts in Quincy Park
accommodate the needs for County recreation, drop- in play
and also serve the needs of the Washington- Liberty High
School baseball and tennis teams.
• Quincy Park currently has a picnic shelter, shaded picnic
area, playground, walking paths and surface parking.
• Quincy Park has approached the age where full replacement
and modernization is necessary, which also provides the
opportunity to reorganize the placement of the facilities and
consolidate parking to create additional open space.
Associated Plan(s):
Ballston Sector Plan
Forestry and Natural Resources Plan
Public Art Master Plan (PAMP)
Public Spaces Master Plan (PSMP)
Neighborhood(s):
Ballston-Virginia Square
Funding Notes: "Other funding" includes $2M for APS cost-share for Washington-Liberty's diamond field located in the park.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 890 4,040 8,920 22,570 36,420
Other Funding 2,000 2,000
Previous Funding
Total Funding 0 0 0 0 0 890 4,040 0 8,920 24,570 38,420
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Develop Master Plan for Quincy Park 2030
• Develop Design improvements for Park
renovation
2031
• Anticipated project completion 2035
Changes from Prior CIP:
The name of this project has changed from previous CIPs to place
the focus on the park component. A major maintenance capital
renovation of Quincy Park has been in the CIP since FY 2015 -
FY 2024. Funding to develop a master plan for Quincy Park and
fund implementation of the park improvements was in the adopted
FY 2017 - FY 2026 CIP and FY 2019 - FY 2028 CIP. This CIP
continues to provide future funding for the master planning effort
and programs future funding for design and implementation of the
Quincy Park improvements. This project has been moved up one
year from the previous CIP, with Master Planning now beginning
in 2030.
C - 28
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
13. SHIRLINGTON PARK
Project Highlights:
• This project will implement the adopted Shirlington Park
Master Plan and Design Guidelines which grew out of the
Four Mile Run Valley Initiative.
• The project focuses on adding park amenities, including
strengthening the primary entries at S. Walter Reed Drive and
S. Shirlington Road.
• Suggested park amenities include adding several overlooks
with educational/interpretive components, riparian pathways,
plaza areas, enhancements to the existing pedestrian bridge,
signage, site furnishings, public art, landscaping, invasive
plant removal and storm water management improvements.
Associated Plan(s):
Four Mile Run Policy Framework Plan (2018)
Public Spaces Master Plan (PSMP)
Neighborhood(s):
Green Valley
Shirlington
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 1,030 4,315 5,345
Previous Funding
Total Funding 0 0 0 0 0 0 0 1,030 4,315 0 5,345
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Develop Park Master Plan and Design
Guidelines
2016-2018
• Design of park improvements 2031
• Construction of park improvements 2033
Changes from Prior CIP:
This project has been pushed out three years from the previous
CIP with the Master Planning process now beginning in FY 2032.
C - 29
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
14. SHORT BRIDGE PARK
Project Highlights:
• The project in this CIP will implement the planning and
development of the 3.5- acre Short Bridge Park at the mouth
of Four Mile Run.
• Implementing the Short Bridge Park Master Plan will occur
in two phases. The first phase is associated with a Department
of Environmental Services (DES) multi -use trail connection
that links Richmond Highway to the Four Mile Run Trail.
The second phase completes the park improvements.
• The project includes an interpretive plaza, dog run, casual use
lawn area, walkways, public art, site furnishings and
significant landscaping and stormwater management
facilities.
Associated Plan(s):
Four Mile Run Design Guidelines
Four Mile Run Restoration Master Plan (2006)
Public Spaces Master Plan (PSMP)
Short Bridge Park Master Plan (January 2018)
Neighborhood(s):
VARIOUS
Funding Notes: Bonds Previous Funding: FY 2023 $1.14M (design)
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 5,690 5,690
Previous Funding
Total Funding 0 0 0 0 0 0 5,690 0 0 0 5,690
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Operations Costs (+/-) 12 13 13 38
Total Impact 0 0 0 0 0 0 0 12 13 13 38
Critical Milestones:
• Adoption of Short Bridge Park Master Plan
and design guidelines
2018
• Construction of the Short Bridge Park trail
by DES began December 2021
2021
• Construction of Short Bridge Park trail
completed 2022
2022
• Final Design of improvements at Short
Bridge Park
2025
• Construction of improvements at Short
Bridge Park
2031
Changes from Prior CIP:
Construction for this project has been pushed out from FY 2025
to FY 2031.
C - 30
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
15. THREE URBAN PARKS
Project Highlights:
• Maury Park, Herselle Milliken Park and Gum Ball Park are
three small parks located in the Virginia Square Planning
Area and in the Ashton Heights Civic Association.
• This project is to develop park master plans for these parks,
which currently have a minimum level of amenities.
• The project will master plan all three parks simultaneously to
identify community needs and priorities while taking into
consideration that the parks are located in close proximity
and should have complementary rather than duplicative
features.
Associated Plan(s):
Public Spaces Master Plan (PSMP)
Virginia Square Sector Plan
Neighborhood(s):
Ashton Heights
Ballston-Virginia Square
Funding Notes: Bonds Previous Funding: FY 2023 $500K (master planning) and FY 2024 $950K (design)
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 8,055 8,055
Previous Funding
Total Funding 0 8,055 0 0 0 0 0 0 0 0 8,055
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Operations Costs (+/-) 16 16 17 17 18 18 19 20 141
Total Impact 0 0 16 16 17 17 18 18 19 20 141
Critical Milestones:
• Develop park master plans for Maury Park,
Herselle Milliken Park and Gum Ball Park
2024
• Develop designs for the Maury Park,
Herselle Milliken Park and Gum Ball Park
2026
• Construction of improvements for Maury
Park, Herselle Milliken Park and Gum Ball
Park
2027
Changes from Prior CIP:
Previous CIP had construction in FY 2025, but this has been
pushed out to FY 2027, per timelines based on current design
process.
C - 31
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2025-2034
16. VIRGINIA HIGHLANDS PARK/NEARBY PUBLIC SPACE
Project Highlights:
• The purpose of this project is to develop park master plans
for three sites located in the Pentagon City area. These
include the existing Virginia Highlands Park, a new park to
be planned at 20th Street South and South Ives Street and a
new parcel to be planned at the former Dominion Substation
site.
• The project includes master planning these three closely
associated sites simultaneously. This allows for a
comprehensive plan to provide a mix of recreational and
casual use opportunities to ensure the community continues
to enjoy a high level of public space service. This approach
also minimizes overlapping amenities and creates flexibility
to accommodate existing and future public uses in the area.
Associated Plan(s):
Forestry and Natural Resources Plan
Public Spaces Master Plan (PSMP)
N
eighborhood(s):
Arlington Ridge
Aurora Highlands
Pentagon City
Funding Notes: All bonds: Virginia Highlands Master Plan $1.47M (FY 2034) , Virginia Highlands Design $2.077M (FY 2035) ,
20th/Ives Design $133K (FY 2035) , Dominion Substation Design $95K (FY 2035) , Virginia Highlands Construction $22.258M
(FY 2037), 20th/Ives Construction $580K (FY 2037), and Dominion Substation Construction $481K (FY 2037)
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 1,485 1,485
Previous Funding
Total Funding 0 0 0 0 0 0 0 0 0 1,485 1,485
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Master plan Virginia Highlands Park and the
two new parcels
2034
• Design improvements at Virginia Highlands
Park
2035
• Design improvements at 20th Street S. and
S. Ives Street
2035
• Design improvements at the former
Dominion substation site
2035
• Construction of improvements at Virginia
Highlands Park
2037
• Construction of improvements at 20th Street
S. and S. Ives Street
2037
• Construction of improvements at former
Dominion substation site
2037
Changes from Prior CIP:
Master Planning has been pushed out from FY 2028 to FY 2034.
Design and construction funding have been pushed out beyond
this ten-year CIP.