Arlington County, Virginia CIP 2025 − 2034 LOCAL PARKS AND RECREATION PROGRAMS: SYNTHETIC TURF PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total 1. Synthetic Turf Program 0 0 2,337 3,132 2,094 1,975 1,634 3,617 4,710 1,700 21,199 2. Greenbrier Park/Yorktown High Stadium Field 1,164 0 0 0 0 0 0 0 0 0 1,164 3. Kenmore Middle School Athletic Field Conversion 9,842 0 0 0 0 0 0 0 0 0 9,842 4. Long Bridge Park Synthetic Field #3 0 1,041 0 0 0 0 0 0 0 0 1,041 5. Thomas Jefferson Middle School Lower Field 819 0 0 0 0 0 0 0 0 0 819 Total Recommendation 11,825 1,041 2,337 3,132 2,094 1,975 1,634 3,617 4,710 1,700 34,065 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 2,400 0 0 0 0 0 0 0 0 0 2,400 PAYG 1,155 0 0 0 0 0 0 0 0 0 1,155 Short Term Finance 0 1,041 1,702 1,997 2,094 1,975 1,007 2,231 3,000 1,511 16,558 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 5,270 0 635 1,135 0 0 627 1,386 1,710 189 10,952 Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 8,825 1,041 2,337 3,132 2,094 1,975 1,634 3,617 4,710 1,700 31,065 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 3,000 0 0 0 0 0 0 0 0 0 3,000 Subtotal Previously Approved Funding 3,000 0 0 0 0 0 0 0 0 0 3,000 Total Funding Sources 11,825 1,041 2,337 3,132 2,094 1,975 1,634 3,617 4,710 1,700 34,065 C - 37 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Synthetic Turf Program FY 2025-2034 1. SYNTHETIC TURF PROGRAM Project Highlights: • Arlington County has invested significantly in the construction of synthetic turf fields to meet the demand for athletic fields that serve a wide variety of athletic programs and drop-in use. • The County has 15 rectangular fields with synthetic turf and two diamond fields with synthetic turf bringing the total number of synthetic fields to 17. • Synthetic turf typically has an eight-year useful life. Associated Plan(s): Long Bridge Park Master Plan (2013) Public Spaces Master Plan (PSMP) N eighborhood(s): VARIOUS Funding Notes: Replacement and conversion of fields through the Synthetic Turf Program are typically funded with bonds, short - term financing and other funding. Other funding includes contributions from Arlington Public Schools for their share of fields co - located at high schools and middle schools as well as contributions from Marymount University, George Washington University, and other partnerships. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Short Term Finance 1,702 1,997 2,094 1,975 1,007 2,231 3,000 1,511 15,517 Other Funding 635 1,135 627 1,386 1,710 189 5,682 Previous Funding Total Funding 0 0 2,337 3,132 2,094 1,975 1,634 3,617 4,710 1,700 21,199 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Turf Replacement Construction 3-4 Months • Turf Conversion Design and Construction 12-18 Months C hanges from Prior CIP: No significant change from the previous CIP. C - 38 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Synthetic Turf Program FY 2025-2034 2. GREENBRIER PARK/YORKTOWN HIGH STADIUM FIELD Project Highlights: • Design and construction for the replacement of the synthetic turf surfacing on the stadium athletic field. • Synthetic turf surfacing typically has an eight -year useful life. • The synthetic turf surfacing at all three high school stadium fields is laid over an underlayment pad to reduce the risk of injuries from falls to the surface. Associated Plan(s): Public Spaces Master Plan (PSMP) N eighborhood(s): Yorktown Funding Notes: Cost share with APS (50% County / 50% Schools). New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 582 582 Other Funding 582 582 Previous Funding Total Funding 1,164 0 0 0 0 0 0 0 0 0 1,164 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Design of Synthetic Turf Replacement Summer 2024 • Bidding for Synthetic Turf Replacement Fall/Winter 2024 • Construction of Synthetic Turf Replacement Spring 2025 C hanges from Prior CIP: No change from the previous CIP. C - 39 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Synthetic Turf Program FY 2025-2034 3. KENMORE MIDDLE SCHOOL ATHLETIC FIELD CONVERSION Project Highlights: • Design and construction for the conversion of two diamond/rectangular combo fields on the campus of Kenmore Middle School. • The fields are currently natural turf and in poor condition. The goal of the project is to convert these fields to synthetic turf surfacing. • Costs include design development, excavation of existing soil to allow for the placement of new turf and installation of storm water management facilities, batting cages, backstops, shade structures, signage, spectator seating, athletic equipment, site fur nishings, accessible walkways, ADA improvements for all park amenities, sports field fencing, donor wall and landscaping. • The project also includes the replacement of existing athletic lighting and the installation of new LED sports lighting. Associated Plan(s): Public Spaces Master Plan (PSMP) N eighborhood(s): Glencarlyn Funding Notes: "Other Funds" include outside group fundraising ($2M), APS Cost Sharing at 70% County / 30% APS ($2.442M). "Other Previously Approved Funds" include Field Fund balances ($1M) and existing synthetic program contingency funds ($2M). New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 2,400 2,400 Other Funding 4,442 4,442 Previous Funding Other Previously Approved Funds 3,000 3,000 Total Funding 9,842 0 0 0 0 0 0 0 0 0 9,842 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Operations Costs (+/-) 11 11 12 12 12 13 13 84 Total Impact 0 0 0 11 11 12 12 12 13 13 84 Critical Milestones: • Anticipated start of Design Spring 2025 • Anticipated start of Construction Fall 2026 • Anticipated completion of Construction Summer 2027 Changes from Prior CIP: Funding distributions are updated to reflect outside sources and existing balances. C - 40 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Synthetic Turf Program FY 2025-2034 4. LONG BRIDGE PARK SYNTHETIC FIELD #3 Project Highlights: • Design and construction for the replacement of the synthetic turf surfacing on Field #3 at Long Bridge Park. • Synthetic turf surfacing typically has an eight -year useful life. • Costs include design development, replacement of the synthetic turf and infill, repairs to the base layer and under - drain system, replacement of field amenities and construction administration. Associated Plan(s): Public Spaces Master Plan (PSMP) N eighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Short Term Finance 1,041 1,041 Previous Funding Total Funding 0 1,041 0 0 0 0 0 0 0 0 1,041 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Design replacement of the synthetic turf surfacing. Fall 2025 • Bid replacement of the synthetic turf surfacing. Winter 2025 • Construction of the synthetic turf surfacing on Field #3 at Long Bridge Park. Spring 2026 C hanges from Prior CIP: No significant change from the previous CIP. C - 41 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Synthetic Turf Program FY 2025-2034 5. THOMAS JEFFERSON MIDDLE SCHOOL LOWER FIELD Project Highlights: • Design and construction for the replacement of the synthetic turf surfacing on the Lower Field at TJ. • Synthetic turf surfacing typically has an eight -year useful life. • Costs include design development, replacement of the synthetic turf and infill, repairs to the base layer and under - drain system, replacement of field amenities and construction administration. Associated Plan(s): Public Spaces Master Plan (PSMP) N eighborhood(s): Arlington Heights Funding Notes: Cost Share with APS (70% County/30% Schools). New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 573 573 Other Funding 246 246 Previous Funding Total Funding 819 0 0 0 0 0 0 0 0 0 819 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Design of the synthetic turf field. Winter 2024/2025 • Bidding of the replacement of the synthetic turf. Spring 2025 • Construction of the replacement of the synthetic turf on the Lower Field at TJ Community Center. Summer 2025 C hanges from Prior CIP: No change from the previous CIP. C - 42

Source: Arlington County website. First collected Oct 27, 2026.