RecordWell Data

Public and Government Facilities(PDF, 763KB)

Arlington County · Arlington County · Budget documents

Open the original document More from Arlington County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Arlington County, Virginia PUBLIC AND GOVERNMENT FACILITIES P rogram Description This program provides facilities for both existing and evolving services and programs. It encompasses both significant modernization and planned replacement of facilities, based upon facility life cycles and changing program demands and services. It serves to provide a consistent, sustainable inventory of quality public facilities through systematic investment. The program is carefully integr ated with the Facilities Maintenance Capital program by planning for adequate maintenance on 89 buildings, that total over 2.4 M square feet, 32 of which are more than 50 years old. Maintenance is planned through the facilities life cycle and includes periodic renovation, and eventual replacement of obsolete facilities. This CIP continues investment in the Critical Systems Infrastructure program (CSI). CSI is focused on the 24/7/365 maintenance of backup generators, cooling systems, Uninterruptible Power Supplies, Automatic Transfer Switches, and associated monitoring equipment in support of public safety systems and technology. The CIP continues making investments in Facility Finishes, Furnishings, and Equipment (FF&E) as a separate line item within the Facilities Maintenance Program. This ongoing investment in FF&E acknowledges that interior spaces need more than periodic paint and carpet over the building's life cycle. The planning also includes replacement of freestanding furnishings, furniture, and appliances; all of which should integrate in a comprehensive interior design and building refresh. A separate line item is included for investments to transition to hoteling workspaces where appropriate to maximize efficient use of our buildings. The CIP also includes sustained investments in energy efficiency, electrification and decarbonization of buildings, installation of government and publicly accessible electric vehicle charging equipment, renewable energy resources, onsite solar, and energy resilience measures and mechanisms. The AIRE team developed and is implementing a decision-support tool to model energy performance upgrading existing County facilities capital projects in conjunction with energy tracking systems to greater inform building upgrades and retro-commissioning an d to measure progress toward County climate and greenhouse gas emissions reduction goals. P rogram Summary Facilities Management Bureau (FMB) and Facilities, Design and Construction (FDC) use the Facility Condition Assessments (FCA) to determine long-term capital planning needs for the County’s facilities portfolio. Each piece of equipment and building system is included in the database with specific data regarding age, ongoing maintenance required, upcoming repairs, and replacements per the ma nufacturer specifications and industry standards. FCAs are used to aid FMB on the projection of overall building maintenance and larger replacements included as capital projects. However, the FCA data is only one aspect of Capital Maintenance of the County's facilities. Staff compare the hard data, onsite real-time observations, manufacturer's support of equipment, and compatibility with new equipment while developing a program to continue to operate the County's facilities efficiently. M aster Plan Impact The public facilities projects included in the adopted CIP reflect strong linkages to master and other development plans that drive facility planning and acquisitions. Facility planning and design for the projects included in this CIP strive to reflect the guidance provided in the Community Facilities Study such as community participation and building up to extent possible to avoid further reductions in permeable surfaces. C - 44 Arlington County, Virginia PUBLIC AND GOVERNMENT FACILITIES CIP 2025 − 2034 10 YEA R CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total Design and Construction 41,768 30,663 30,841 20,196 25,444 17,601 52,196 38,011 6,127 5,146 267,993 Facilities Maintenance 10,750 9,494 9,379 9,854 10,028 10,265 10,918 11,151 11,690 12,228 105,757 Energy Efficiency 2,375 4,701 2,966 2,867 4,240 1,549 1,580 1,552 1,654 1,760 25,244 Total Recommendation 54,893 44,858 43,186 32,917 39,712 29,415 64,694 50,714 19,471 19,134 398,994 PROGR AM FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 1,000 458 0 0 0 0 0 0 0 0 1,458 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 300 600 5,400 0 0 0 0 6,300 New Bond Issue 27,855 26,960 21,775 21,270 26,495 13,280 56,635 42,730 10,305 9,815 257,120 PAYG 9,275 8,178 11,391 10,847 12,117 6,950 7,559 7,484 8,666 8,819 90,016 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 100 5,962 2,620 500 500 500 500 500 500 500 13,432 Subtotal New Funding 38,210 41,558 35,786 32,917 39,712 26,130 64,694 50,714 19,471 19,134 368,326 Previously Approved Funding Authorized but Unissued Bonds 10,550 800 7,400 0 0 3,285 0 0 0 0 22,035 Issued but Unspent Bonds 5,800 2,500 0 0 0 0 0 0 0 0 8,300 Other Previously Approved Funds 333 0 0 0 0 0 0 0 0 0 333 Subtotal Previously Approved Funding 16,683 3,300 7,400 0 0 3,285 0 0 0 0 30,668 Total Funding Sources 54,893 44,858 43,186 32,917 39,712 29,415 64,694 50,714 19,471 19,134 398,994 C - 45

Source: Arlington County website. First collected Oct 27, 2026.