Arlington County, Virginia CIP 2025 − 2034 PUBLIC AND GOVERNMENT FACILITIES: DESIGN AND CONSTRUCTION PROGRAM 1 0 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total 1. Ballston Public Parking Garage Floors 1 - 7 1,350 4,750 2,620 500 500 500 500 500 500 500 12,220 2. Carlin Springs Site 0 8,333 0 0 4,040 2,000 0 0 0 0 14,373 3. Columbia Pike Library 0 0 0 0 1,010 3,030 11,265 20,425 0 0 35,730 4. Courthouse Complex Renovations & Infrastructure 5,000 3,300 11,035 11,110 0 0 0 0 0 0 30,445 5. Courts/Police Building Improvements 8,150 5,335 3,585 2,525 5,050 2,545 2,020 2,050 4,445 3,955 39,660 6. Crystal City Library 0 0 0 300 600 5,400 0 0 0 0 6,300 7. Detention Facility Comprehensive Study 815 3,030 3,060 3,090 3,125 0 0 0 0 0 13,120 8. Facility Condition Assessments & Planning Studies 775 803 563 318 581 328 333 338 859 348 5,246 9. Facility Finishes, Furnishings & Equipment 0 657 758 333 298 263 283 303 323 343 3,561 10. Fire Logistics 9,950 0 0 0 0 0 0 0 0 0 9,950 11. Fire Station Replacements & Additions 4,100 0 0 0 0 3,535 35,350 255 0 0 43,240 12. Lease Program 0 0 0 0 0 0 0 0 0 0 0 13. Lee Community Center 250 0 0 0 0 0 1,215 14,140 0 0 15,605 14. Oakland Street Warehouse 1,355 0 0 0 0 0 0 0 0 0 1,355 15. Office Space Utilization & Systems Furniture 6,020 0 3,940 2,020 4,180 0 1,230 0 0 0 17,390 16. Situational Awareness Intelligence Unit, EOC & 4,003 4,040 4,850 0 0 0 0 0 0 0 12,893 17. Trade Center-NOC Relocation 0 0 0 0 6,060 0 0 0 0 0 6,060 18. Trade Center Optimization Plan 0 415 430 0 0 0 0 0 0 0 845 Total Recommendation 41,768 30,663 30,841 20,196 25,444 17,601 52,196 38,011 6,127 5,146 267,993 C - 46 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 1,000 0 0 0 0 0 0 0 0 0 1,000 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 300 600 5,400 0 0 0 0 6,300 New Bond Issue 20,105 20,900 19,500 18,745 23,465 7,825 51,080 36,870 4,445 3,955 206,890 PAYG 2,630 1,713 1,321 651 879 591 616 641 1,182 691 10,915 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 1,350 4,750 2,620 500 500 500 500 500 500 500 12,220 Subtotal New Funding 25,085 27,363 23,441 20,196 25,444 14,316 52,196 38,011 6,127 5,146 237,325 Previously Approved Funding Authorized but Unissued Bonds 10,550 800 7,400 0 0 3,285 0 0 0 0 22,035 Issued but Unspent Bonds 5,800 2,500 0 0 0 0 0 0 0 0 8,300 Other Previously Approved Funds 333 0 0 0 0 0 0 0 0 0 333 Subtotal Previously Approved Funding 16,683 3,300 7,400 0 0 3,285 0 0 0 0 30,668 Total Funding Sources 41,768 30,663 30,841 20,196 25,444 17,601 52,196 38,011 6,127 5,146 267,993 C - 47 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 1. BALLSTON PUBLIC PARKING GARAGE FLOORS 1 - 7 Project Highlights: • This project includes a structural engineering study and construction for the building façade. • Funding is also included for design and construction to address flooding / stormwater issues in the garage. Associated Plan(s): Ballston Sector Plan Neighborhood(s): Ballston-Virginia Square Funding Notes: Additional funding is added in FY 2025, FY 2026 and FY 2027 above the levels included in the last CIP. Estimates shown below are placeholders and will be refined after studies are complete. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Other Funding 1,350 4,750 2,620 500 500 500 500 500 500 500 12,220 Previous Funding Total Funding 1,350 4,750 2,620 500 500 500 500 500 500 500 12,220 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Design and Procurement of Flooding Remediation FY 2025 • Study to identify façade improvements FY 2025 • Repair / Replace Exterior Façade, new traffic membrane on level 6. FY 2025-FY 2026 • Stormwater Management remediation/ construction FY 2026-FY 2027 Changes from Prior CIP: Funding was increased to reflect the addition of the flooding remediation and facade evaluation studies and projects. C - 48 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 2. CARLIN SPRINGS SITE Project Highlights: • The County demolished and removed a large non-functional empty building at 601 S. Carlin Springs Rd in FY 2024 that was a nuisance and posed risks to the community. • This site is now vacant, providing flexibility for both interim and long-term uses. • Funding is provided for the anticipated phased redevelopment and efficient use of the site to include shared parking. Parking on site would be a shared cost between the County and Virginia Hospital Center assuming approval of an anticipated site plan for a behavioral health care facility. The parking set aside for County uses would be available capacity for future site developme nt with other partners and for future parking as improvements are made to connect the site to the Nature Center. • Funding in FY 2029 and FY 2030 is included for future partnership on the portion of the land expected to remain with the County and improvements to connections to the Long Branch Nature Center and neighboring parkland. These amounts are placeholders and will be refined. Planning funds are included in FY 2026 to support development of these improvements. Funding is also included for a facilities condition assessment of the Long Branch Nature Center in FY 2026 (see the Facilities Condition Assessments and Planning Studies later in this section). Neighborhood(s): Glencarlyn New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 8,080 4,040 2,000 14,120 PAYG 253 253 Previous Funding Total Funding 0 8,333 0 0 4,040 2,000 0 0 0 0 14,373 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Consideration of site plan with VHC FY 2025 Changes from Prior CIP: Funding for the planning study has shifted to FY 2026. Project Links: • South Carlin Springs Property: https://www.arlingtonva.us/Government/Projects/Project- Types/County-Facilities/South-Carlin-Springs-Property C - 49 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 3. COLUMBIA PIKE LIBRARY Project Highlights: • As APS continues its Career Center site development and likely displacement of the current library location, the County has planned for the Columbia Pike Library to move to Columbia Pike in support of Columbia Pike revitalization and placemaking. A parcel was acquired in 2022 for this relocation and is currently being used as contractor parking for APS Career Center construction efforts. • Funding in FY 2029 will provide seed funds for initial planning and design of a replacement library facility with a potential mixed -use development with future construction funding in FY 2031 and FY 2032. • Timing and funding may need to be adjusted to address the final site plan. Associated Plan(s): Commercial Centers Form Based Code Neighborhood(s): Penrose Funding Notes: $1.0M for planning and $34M for design/construction for 15,000sf - 18,000sf of library program space. All estimates will be refined after planning is completed. The operating costs are estimates and will be finalized as the library program is further developed. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 1,010 3,030 11,265 20,425 35,730 Previous Funding Total Funding 0 0 0 0 1,010 3,030 11,265 20,425 0 0 35,730 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Personnel ($) 649 649 Non-Personnel ($) 39 39 Total Impact 0 0 0 0 0 0 0 0 0 688 688 Critical Milestones: • Start design & procurement FY 2029 & FY 2030 • Start construction FY 2031-FY 2032 • Opening FY 2033 Changes from Prior CIP: Timing for design has shifted to FY 2029. Project Links: • Commercial Centers Form Based Code: https://www.arlingtonva.us/Government/Programs/Buildin g/Permits/Form-Based-Code/Commercial C - 50 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 4. COURTHOUSE COMPLEX RENOVATIONS & INFRASTRUCTURE Project Highlights: • This request will provide funds for the design and renovation of two of the four unoccupied floors in 2020 N. 14th Street. • Funding is also included for windows, plumbing and other infrastructure improvements for the entire building. • Renovated floors can be used for hypothermia overflow for the homeless service center and relocating courts programs from Court Square West as a precursor to vacating that building within the next 5-7 years. • Renovated space can also be used to relocate a portion of Facilities Maintenance staff and storage from Court Square West. Associated Plan(s): Court House Sector Plan Neighborhood(s): Clarendon-Courthouse Courthouse New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 3,635 11,110 14,745 Previous Funding Authorized but Unissued Bonds 2,000 800 7,400 10,200 Issued but Unspent Bonds 3,000 2,500 5,500 Total Funding 5,000 3,300 11,035 11,110 0 0 0 0 0 0 30,445 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Window replacement and piping upgrades FY 2025 • Design for 4th and 5th floor FY 2025 - FY 2026 • Construction 4th and 5th floor FY 2027 - FY 2028 Changes from Prior CIP: In the previous CIP, the scope of this project was to move the Fire Marshall and Battalion Chiefs offices from 1020 N. Hudson Street to 2020 N. 14th Street. The Fire Marshall's office is now moving to the Bozman Government Center (BGC) and this project will focus on programmatic space needs for the Department of Human Services, Department of Environmental Services, and the Courts. Project Links: • Court House Sector Plan, Clarendon Sector Plan Update: https://arlingtonva.s3.amazonaws.com/wp- content/uploads/sites/31/2015/12/Courthouse_SectorPlanAdde ndum_FINAL-12_2_15.pdf C - 51 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 5. COURTS/POLICE BUILDING IMPROVEMENTS Project Highlights: • The project focuses on implementing priorities identified in the Courts Police study, which includes upgrading the remaining court rooms to include technology, furnishings, fixtures and equipment, and ADA upgrades at two courtrooms per year through FY 2030. • Funding is also included to expand the Commonwealth’s Attorney (CWA) office space. FY 2025 PAYG funding is allocated to provide near term space relief with a more permanent solution to follow, with design in FY 2026 and construction in FY 2027. • As part of the Commonwealth’s Attorney expansion, the Alcohol Safety Action Program (ASAP) will eventually be moved to the 2nd floor of the Courts Police building. Associated Plan(s): Court House Sector Plan Neighborhood(s): Clarendon-Courthouse Courthouse Funding Notes: The funding schedule includes $500k in PAYG and $2.87M in bonds for CWA / ASAP scope New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 5,650 5,335 3,585 2,525 5,050 2,545 2,020 2,050 4,445 3,955 37,160 PAYG 500 500 Previous Funding Authorized but Unissued Bonds 2,000 2,000 Total Funding 8,150 5,335 3,585 2,525 5,050 2,545 2,020 2,050 4,445 3,955 39,660 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Commonwealth's Attorney (CWA) near term Expansion FY 2025 • ASAP Relocation and CWA permanent expansion - Design FY 2026 • ASAP Relocation and CWA permanent expansion - Construction FY 2027 - FY 2028 • Renovate 2 Courtrooms per year FY 2025 - FY 2030 • Renovate Police Space FY 2030 - FY 2034 Changes from Prior CIP: Costs updated to reflect current execution plan and removal/ deferral of funding for level 1 Courthouse entry and security screening improvements. The ASAP Permanent Relocation accelerated timeline and the Commonwealth's Attorney Expansion are new in the FY 2025-2034 CIP. Project Links: • Courthouse Sector Plan Addendum: Courthouse Square (2015): https://arlingtonva.s3.amazonaws.com/wp- content/uploads/sites/31/2015/12/Courthouse_SectorPlanA ddendum_FINAL-12_2_15.pdf C - 52 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 6. CRYSTAL CITY LIBRARY Project Highlights: • In 2020, JBG Smith committed to provide a new library space on the ground floor of their building at 1901 S. Bell St. Due to operating and capital budget considerations as well as space limitations at the S. Bell site, this site plan agreement was terminated and , earlier this year, the County and JBG Smith came to a new agreement for JBG Smith to provide $6.3 million by 2030 to support library operations in Crystal City. Arlington Public Library has kicked off its Future Conversation, which will help inform the future services and offerings at the Crystal City Library Location. • The library site and programming have not yet been determined. Neighborhood(s): Crystal City Funding Notes: Operating costs are anticipated but are yet to be determined. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Developer Contributions 300 600 5,400 6,300 Previous Funding Total Funding 0 0 0 300 600 5,400 0 0 0 0 6,300 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Conclusion of Future of Libraries Study Winter 2024/2025 Changes from Prior CIP: This project is new to the FY 2025 - FY 2034 CIP. C - 53 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 7. DETENTION FACILITY COMPREHENSIVE STUDY Project Highlights: • The Detention Facility is 25 years old and requires a full comprehensive evaluation of the building systems and updates to the Detention Center operations areas. • Study to include a written report that identifies building deficiencies, improvements, equipment needs and remediation along with a cost estimate for CIP baseline planning per project phase. • Placeholder funding is included in the out years for implementation of recommendations. Neighborhood(s): Clarendon-Courthouse Courthouse New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 815 3,030 3,060 3,090 3,125 13,120 Previous Funding Total Funding 815 3,030 3,060 3,090 3,125 0 0 0 0 0 13,120 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Comprehensive Study FY 2025 • Implement Study Recommendations FY 2026 - FY 2030 Changes from Prior CIP: Added placeholder funding for study recommendations in FY 2026 - FY 2029. Project Links: • Court House Sector Plan Addendum : https://arlingtonva.s3.amazonaws.com/wp- content/uploads/sites/31/2015/12/Courthouse_SectorPlanAddend um_FINAL-12_2_15.pdf C - 54 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 8. FACILITY CONDITION ASSESSMENTS & PLANNING STUDIES Project Highlights: • Feasibility studies focus on near term and intermediate range planning to define options in response to evolving facility needs, including opportunities for co- location, facilities consolidation, and repurposing. Examples of studies that may be conducted over the ten-year planning horizon include: • A warehouse study to better understand current utilization and needs in this area. • An office utilization study to understand impacts of telework and opportunities to consolidate space. • The timing and prioritization of each study may be adjusted according to County priorities. • Funding is also included in FY 2029 to update the Facility Condition Assessment (FCA), which was last completed in 2020. FCA is a tool that the County relies on for building specific data related to condition and maintenance costs to establish priorities f or allocating maintenance and capital funds to various projects and considering the following strategies: replacement versus renovation; long range development plan; facility master planning; and capital budgeting. Neighborhood(s): VARIOUS Funding Notes: Facility Condition Assessments are done every five to seven years. The most recent study was completed in FY 2020 and updates will be made in small portions for the next few years and a full update will be done again in FY 2029. FY 2025 funding increased as part of the Adopted CIP to include planning for Madison Community Center and Adult Changing Stations. In addition, a new FTE (1.0) and the associated funding is included to support planning efforts. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 775 803 563 318 581 328 333 338 859 348 5,246 Previous Funding Total Funding 775 803 563 318 581 328 333 338 859 348 5,246 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: Funding amounts and timing have shifted based on the current planning priorities. Project Links: • Community Facilities Study: https://www.arlingtonva.us/Government/Projects/Plans- Studies/Land-Use/Community-Facilities-Study C - 55 Ten Year Planned Facilities Studies FY 2025 • County Board Suite reconfiguration study • Lee Community Center • DPSCEM, Situational Awareness Intelligence Unit • Office Space Utilization Study • Detention Center Feasibility Study • Courthouse Complex (Bldg. 2020) • Court Square West Tenant relocation • Madison Community Center • Adult Changing Stations Site Study FY 2026 • Warehouse Study • Bozman Government Center Utilization Study • Carlin Springs Site • Long Branch Nature Center Facilities Condition Assessment • Trade Center Optimization Plan FY 2027 • Gulf Branch Nature Center Facilities Condition Assessment • Trade Center Optimization Plan FY 2028 • As needed for developing projects. • Crystal City Library FY 2029 • As needed for developing projects. • Columbia Pike Library FY 2030 • Fire Station #7 Replacement FY 2031 • As needed for developing projects. FY 2032 • FS#4 Replacement FY 2033 • As needed for developing projects. FY 2034 • As needed for developing projects. C - 56 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 9. FACILITY FINISHES, FURNISHINGS & EQUIPMENT Project Highlights: • This program provides for the scheduled re -investments in existing facilities interior/exterior finishes and furnishings, consisting of the following elements: interior maintenance capital, chair replacement, and systems furniture replacement. • Interior Maintenance Capital: In the current building inventory mix, there are significant quality and appearance disparities between newer buildings and existing buildings based on the intensity of use and resulting wear and tear. Interior maintenance is required for the upkeep of facilities for buildings of all ages. • Chair Replacement: Systematic annual program to replace chairs throughout County facilities. • Furniture Replacement: A modest amount of funding is included to allow partial replacement of furniture as needed. A separate program is included for the systematic replacement of end-of-life systems furniture beginning with the oldest systems in the County’s inventory. Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 0 657 758 333 298 263 283 303 323 343 3,561 Previous Funding Total Funding 0 657 758 333 298 263 283 303 323 343 3,561 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: No significant changes from prior CIP. C - 57 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 10. FIRE LOGISTICS Project Highlights: • Funding is to complete construction for relocation of Fire Logistics to the 1425 N. Quincy Street property (Building 1) from old Fire Station #5 at Aurora Highlands. • The scope includes replacing the roof, office buildout, and providing all electric heating systems for the Fire Logistics operation. Neighborhood(s): Ballston-Virginia Square New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 6,500 6,500 Previous Funding Authorized but Unissued Bonds 650 650 Issued but Unspent Bonds 2,800 2,800 Total Funding 9,950 0 0 0 0 0 0 0 0 0 9,950 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Fire Logistics Design (1425 N. Quincy) Summer 2024 • Fire Logistics Construction (1425 N. Quincy) Fall 2025 Changes from Prior CIP: Additional funding added to complete Building 1 renovation. C - 58 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 11. FIRE STATION REPLACEMENTS & ADDITIONS Project Highlights: • The County has made great progress in recent years for fire / emergency medical services, with the construction of Fire Station 10 in Rosslyn, and Fire Station 8 along Langston Boulevard, and investments to address additional Fire staffing and storage / de contamination functions at all fire stations. • The next priority for fire / EMS service investment is on the west end of Columbia Pike, given growing development along the Pike, the need to balance demand among fire stations, and improvement of current response times. • The CIP includes funding for a new fire station #7 at 5519 Columbia Pike, where the County has an option to acquire the parcel, which is located adjacent to the Serrano Apartments. • Planning and design funding is included in FY 2030. Construction funding is planned for FY 2031. Co-location of other services will be considered depending on site dynamics. • Funding is also included for a planning effort to determine the site for a replacement of the aged Fire Station #4. The Clarendon Sector Plan, revised in 2020, reserved the current Fire Station #4 site for a mixed residential and public use building. Fire station #4 is the oldest in the inventory, is overcrowded and in need of replacement given the building condition. Associated Plan(s): Neighborhoods Form Based Code Columbia Pike Neighborhoods Area Plan Columbia Pike Revitalization Plan Commercial Centers Form Based Code Neighborhood(s): Arlington Mill Ashton Heights Ballston-Virginia Square Clarendon-Courthouse Columbia Forest Lyon Park Lyon Village Funding Notes: $255k is included for Fire Station #4 planning in FY 2032. Operating costs are estimated and have not been inflated. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 250 35,350 255 35,855 Previous Funding Authorized but Unissued Bonds 4,100 3,285 7,385 Total Funding 4,100 0 0 0 0 3,535 35,350 255 0 0 43,240 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Facilities Costs (+/-) 119 119 119 357 Personnel ($) 1,800 3,500 3,500 3,500 12,300 Non-Personnel ($) 2,500 700 700 700 4,600 Total Impact 0 0 0 0 0 0 4,300 4,319 4,319 4,319 17,257 Critical Milestones: • Land Acquisition Fire Station West End Columbia Pike Summer 2024 • Fire Station West End Columbia Pike Design Spring 2030 Project Links: • Clarendon Sector Plan Update: https://www.arlingtonva.us/Government/Projects/Plans-Studies/Land- Use/Clarendon-Sector-Plan-Update C - 59 • Fire Station West End Columbia Pike Construction Spring 2031 Changes from Prior CIP: Planning and construction were moved from FY 2024 and FY 2025 to FY 2030 and FY 2031. • Pentagon City Planning Study: https://www.arlingtonva.us/Government/Projects/Plans-Studies/Land- Use/Pentagon-City-Planning-Study • Columbia Pike Revitalization Plan: https://arlingtonva.s3.amazonaws.com/wp- content/uploads/sites/31/2014/04/Columbia-Pike_Revitalization- Plan_Update-2005.pdf • Neighborhoods Form Based Code: https://www.arlingtonva.us/Government/Programs/Building/Permits/Form- Based-Code/Neighborhoods • Commercial Centers Form Based Code: https://www.arlingtonva.us/Government/Programs/Building/Permits/Form- Based-Code/Commercial • Columbia Pike Neighborhoods Area Plan: https://arlingtonva.s3.amazonaws.com/wp- content/uploads/sites/31/2015/04/Final-NAP-Version_WEB.pdf C - 60 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 12. LEASE PROGRAM Project Highlights: • The County leasing program acquires space for County programs that cannot be accommodated in owned facilities. • Leases are reviewed for appropriateness and cost effectiveness when long-term planning is undertaken and at lease renewal decision points. • The attached table indicates when various leased office facilities will be up for renewal, relocation, or conversion. • Decisions on lease renewal typically predate expiration by at least 2 years, with even greater advance time for larger leases. • Leased facilities comprise a large portion of the County’s overall facility inventory and include core facilities like the home for the Department of Human Services (DHS) and the primary office building for the County Government, at Bozman Government Center. • While existing leases are funded through the annual operating budget process, the leasing program significantly impacts the capital program. The County performs ongoing leasing analyses that can provide significant facility upgrades without affecting debt capacity but still require capital funds. Property Name Address Total SF Term Exp Options/Years Department 1501 Wilson Blvd. 1501 Wilson Blvd. 11,132 11/30/2029 5-Jan Arlington Transportation Partners / Commuter Information Center 1501 Wilson Blvd. 1501 Wilson Blvd. 1,600 11/30/2029 5-Jan Storage Bozman 2100 Clarendon Blvd. 234,937 10/31/1933 Thru 2119 Headquarters Bozman 2100 Clarendon Blvd. 1,052 10/31/1933 Thru 2119 Storage - G4 Bozman 2100 Clarendon Blvd. 1,692 10/31/1933 12/31/2119 Storage - G1 Bozman 2300 Clarendon Blvd. 1,543 10/31/1933 12/31/2119 Storage - 2300 Sequoia Plaza 2100 Washington Blvd. 220,613 6/30/1930 1/5 or 10 Department of Human Services 3 Ballston Plaza 1100 N. Glebe Rd. 16,275 1/31/1934 5-Jan Arlington Economic Development Siena Park 2301 Columbia Pike 2,337 7/31/2028 5-Jan STAR C - 61 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 13. LEE COMMUNITY CENTER Project Highlights: • FY 2025 funding is to study options for the community center, which is partially utilized for a single art program that will be reallocated in CY 2025 • The study will provide conceptual cost estimates for work needed to reopen the existing building or portions, to public use standards within the existing footprint, and options for expanding the building's size. • The current building does not meet accessibility standards and contains asbestos, non-compliant restrooms and elevator, aging windows, and an HVAC system past its useful life. • Funding for design and construction is included for planning purposes in FY 2031 and FY 2032. Associated Plan(s): Plan Langston Boulevard Neighborhood(s): John M. Langston Leeway Overlee Tara-Leeway Heights Yorktown New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 250 1,215 14,140 15,605 Previous Funding Total Funding 250 0 0 0 0 0 1,215 14,140 0 0 15,605 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Feasibility Study FY 2025 • Study implementation FY 2031-FY 2032 Changes from Prior CIP: Design and construction placeholder funding added in FY 2031 and FY 2032. C - 62 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 14. OAKLAND STREET WAREHOUSE Project Highlights: • Renovation to the Oakland Street Warehouse to support Police logistics and other Police support functions. • Renovation will address current substandard conditions, including ensuring a watertight building envelope to address leaking, adding heat and plumbing, removing ramps and the loading dock, adding drive through access, and reconfiguring the fencing. • Project is needed to accommodate impacts from the Signature Theater building addition, resulting in a loss of about 7,000 SF of outdoor maneuvering area and storage. Includes costs for contaminated soils and soil vapor mitigation systems for Signature Theater. Neighborhood(s): Shirlington New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 1,355 1,355 Previous Funding Total Funding 1,355 0 0 0 0 0 0 0 0 0 1,355 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Construction completion. Summer 2025 Changes from Prior CIP: The project is new to the FY 2025 - 2034 CIP. C - 63 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 15. OFFICE SPACE UTILIZATION & SYSTEMS FURNITURE Project Highlights: • This project will replace 30-year-old systems furniture and couple the replacement with updates to office area configurations. • The current systems' furniture has exceeded its useful life. Replacement pieces are no longer available for purchase and the electrical components pose a safety risk. • This project includes hoteling implementation, which will be focused on the Bozman Government Center (BGC), where many County employees are eligible to telework a portion of the work week. • Hoteling will maximize utilization of BGC and ensure efficient use of space, through reducing the size of workspaces and increasing collaborative and privacy spaces, like huddle rooms. • With the implementation of hoteling, BGC will be able to accommodate a portion of the employees currently assigned to Court Square West. This is an important step to vacate that building within the next seven to ten years. Neighborhood(s): Claremont Courthouse New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 6,020 3,940 2,020 4,180 1,230 17,390 Previous Funding Total Funding 6,020 0 3,940 2,020 4,180 0 1,230 0 0 0 17,390 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Replace systems furniture in all county buildings. Initial focus on the Courts Police Building. FY 2025 - FY 2031 • Design and procurement for hoteling in Bozman FY 2025 - FY 2026 • Construction for BGC Hoteling FY 2026 - FY2029 Changes from Prior CIP: The project is new to the FY 2025 - 2034 CIP. Project Links: • https://www.arlingtonva.us/Home C - 64 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 16. SITUATIONAL AWARENESS INTELLIGENCE UNIT, EOC & DPSCEM CONSOLIDATION Project Highlights: • This project will construct a Situational Awareness Intelligence Unit (SAIU) on the 6th floor of the Bozman Government Center (BGC). A SAIU allows various public safety partners to co -locate in a shared space to monitor, filter, and disseminate key information during a critical public safety event or special event such as a weather emergency or a large- scale public event. This project also expands current watch desk capabilities. • Costs for this project include technology to outfit the new center including back-end computing, servers, workstations, monitors, video, and public safety radio and communications equipment. • Once construction is complete, funding is included to move all Department of Public Safety Communications and Emergency Management (DPSCEM) from Court Square West to the 6th floor of BGC. Neighborhood(s): Clarendon-Courthouse Courthouse New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Federal Funding 1,000 1,000 New Bond Issue 870 4,040 4,850 9,760 Previous Funding Authorized but Unissued Bonds 1,800 1,800 Other Previously Approved Funds 333 333 Total Funding 4,003 4,040 4,850 0 0 0 0 0 0 0 12,893 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Architectural and Engineering Design FY 2025 • Construction Start FY 2026 • DPSCEM Consolidation FY 2027 Changes from Prior CIP: The costs and timing of the project have been updated to reflect current project timing and the newly identified location of the SAIU, as well as cost to consolidate DPSCEM. C - 65 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 17. TRADE CENTER-NOC RELOCATION Project Highlights: • Funding is included to relocate the County’s Network Operations Center (NOC) from its current location at the Trades Center to an alternative location. Options being considered are moving to the cloud, alternate locations within the County, and a different location within the Trades Center site. • Relocating the NOC is a preliminary step required to provide the space needed at the Trades Center to add required parking facilities for APS Battery Electric School Bus (BESB) parking. Neighborhood(s): Douglas Park Fairlington-Shirlington Green Valley Shirlington New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 6,060 6,060 Previous Funding Total Funding 0 0 0 0 6,060 0 0 0 0 0 6,060 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • DTS NOC Relocation at Trades Center FY 2029 Changes from Prior CIP: The project is new to the FY 2025 - 2034 CIP. C - 66 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 18. TRADE CENTER OPTIMIZATION PLAN Project Highlights: • This funding is the next step in the joint study with APS to explore alternatives to accommodate parking space for the APS school buses. The study will look at options for structured parking and other alternatives, along with targeted site planning to accommodate converting the APS school bus fleet from diesel to battery electric powered. Associated Plan(s): Shirlington Design Book Neighborhood(s): Douglas Park Fairlington-Shirlington Green Valley Shirlington New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 415 430 845 Previous Funding Total Funding 0 415 430 0 0 0 0 0 0 0 845 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Phase 2 Study FY 2026 - FY 2027 Changes from Prior CIP: Additional dollars to study parking alternatives have been added. Implementation dollars have been removed pending results and coordination with APS. The study will provide a plan that could leverage federal funding opportunities in the future for APS. C - 67

Source: Arlington County website. First collected Oct 27, 2026.