Arlington County, Virginia
Arlington County, Virginia CIP
2025 − 2034
PUBLIC AND GOVERNMENT FACILITIES: FACILITIES
MAINTENANCE PROGRAM
10 YEAR CATEGORY SUMMARY (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
1. Critical Systems
Infrastructure (CSI) Program
1,850 1,313 4,020 4,141 4,262 1,465 1,510 929 960 990 21,440
2. Public Facilities Maintenance
Program
8,900 8,181 5,359 5,713 5,766 8,800 9,408 10,222 10,730 11,238 84,317
Total Recommendation 10,750 9,494 9,379 9,854 10,028 10,265 10,918 11,151 11,690 12,228 105,757
CATEGORY FUNDING SOURCES (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
New Funding
Federal Funding 0 0 0 0 0 0 0 0 0 0 0
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
New Bond Issue 7,750 6,060 2,275 2,525 3,030 5,455 5,555 5,860 5,860 5,860 50,230
PAYG 3,000 3,434 7,104 7,329 6,998 4,810 5,363 5,291 5,830 6,368 55,527
Short Term Finance 0 0 0 0 0 0 0 0 0 0 0
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 10,750 9,494 9,379 9,854 10,028 10,265 10,918 11,151 11,690 12,228 105,757
Previously Approved Funding
Authorized but Unissued
Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved
Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding 0 0 0 0 0 0 0 0 0 0 0
Total Funding Sources 10,750 9,494 9,379 9,854 10,028 10,265 10,918 11,151 11,690 12,228 105,757
C - 68
Arlington County, Virginia
PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan
Facilities Maintenance FY 2025-2034
1. CRITICAL SYSTEMS INFRASTRUCTURE (CSI) PROGRAM
Project Highlights:
• The intent of the Critical Systems Infrastructure (CSI)
program is to centralize the monitoring and maintenance of
critical building systems (e.g., power, building envelope, fire
alarm) and support 24/7/365 mission critical facilities.
• This includes all facilities as they each support a function that
delivers services to the community, with an additional focus
on mission critical facilities such as the Emergency
Communications Center (ECC), Alternative Emergency
Communications Center (AE CC), Emergency Operations
Center (EOC), Network Operations Centers (NOCs),
Arlington County Detention Facility (ACDF), Public Safety
Radio Sites, and County Fire Stations.
• FY 2025 funding is for:
• Replacement of electrical switchgear at Court
Square West which has exceeded its useful life. The
existing switchgear is not code compliant, 58-years
old, and not compatible with replacement parts.
• Upgrades to the Alternative Emergency
Communications Center (ECC) ’s uninterruptible
power supply (UPS) system and controls to provide
redundant back-up power.
• FY 2026 funding is for:
• Replacement of the emergency generator at Fire
Station #4 that is nearing the end of its useful life
and requiring frequent corrective repairs. The
generator was installed in 1997. This also includes
installation of roll -up connections at sites for
emergency connection.
• Fire alarm replacement at Quincy III and Quincy
IV which have exceeded their useful life and
replacement parts are no longer available. The fire
alarms were installed in 1997.
• Outyears include continued systematic replacement of
generators and fire alarms including FY 2028 Courts Police
emergency generator replacement and FY 2028 fire alarm
replacements at Fire Station #3, #5, and #9.
Critical Milestones:
• Identify Requirements. on-going
• Develop scope of work and cost
estimate
3 months
• Planning and Prioritization 2 months
• Design 1 to 6 months
• Procurement 6 months
• Construction 3 to 24 months
Changes from Prior CIP:
Increased funding from the previous CIP has been included
to reflect the current planned projects.
New Funding FY
2025
FY
2026
FY
2027
FY
2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
PAYG 1,850 1,313 4,020 4,141 4,262 1,465 1,510 929 960 990 21,440
Previous Funding
Total Funding 1,850 1,313 4,020 4,141 4,262 1,465 1,510 929 960 990 21,440
Operating Impact FY
2025
FY
2026
FY
2027
FY
2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
C - 69
Court Square West
Electrical Switchboard
Replacement
The electrical switchgear at Court Square West (CSW) has
exceeded its useful life. The switchgear is the initial component
that receives power from the utility, provides a safeguard to
isolate power within the facility, and is a centralized collection of
breakers and fuses. The existing switchgear is not code compliant
nor is it compatible as a retrofit with updated replacement parts.
If the 58-year-old main breakers were to fail, the CSW Building
would need to be closed, including the Emergency
Communications Center's alternative site, until repairs could be
completed.
$1,500
ECC UPS Upgrades This project will replace and reconfigure the existing
uninterruptible power supply (UPS) system and controls to
provide redundant back-up power to the Emergency
Communications Center (ECC) alternate site. The existing UPS
unit does not provide redundant support to the ECC and is the
single point supplying power to the system making it susceptible
to disruption. The updated system will share the electrical loads
across multiple UPS units.
$350
Total $1,850
Generator Replacement
Program
Program to replace emergency generators and install roll-up
connections. FY 2026 funding will be used to replace generator at
Fire Station #4 that is nearing the end of its useful life and
requires more frequent repairs (Renovated 1997). This will also
install roll-up connections at sites for external emergency
connections. Future year planned replacements include:
- ACDF (FY27)
- Courts Police (FY28)
- Central Library (FY29)
- Lee Pumping Station Radio Site (FY29)
- Ballston Radio Site (FY30)
- Shirlington Radio Site (FY31)
$556
Fire Alarm Replacement
Program
Program to replace obsolete fire alarm systems that have
exceeded useful life and replacement parts are no longer
available. FY 26 funding will be used to replaced fire alarms at
Quincy III and Quincy IV . Future year planned replacements
include:
- The Thomas Building (2020 14th St) (FY27)
- Fire Stations #3, #5, and #9 (FY28)
- Fairlington Community Center (FY29)
- Fire Stations #1 and #2 (FY30)
- Cherrydale Library (FY31)
$758
Total $1,313
FY 2026 Critical Systems Infrastructure (CSI) Project List
FY 2025 Critical Systems Infrastructure (CSI) Project List
Project Name Description PAYG
(Dollars in Thousands)
C - 70
Arlington County, Virginia
PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan
Facilities Maintenance FY 2025-2034
2. PUBLIC FACILITIES MAINTENANCE PROGRAM
Project Highlights:
• The Facilities Maintenance program operates approximately
90 County-owned public facilities including office buildings,
fire stations, support, maintenance and logistic facilities ,
recreation centers, courts and more. This program maintains
facility components over the life cycle of the facility.
• Components typically requiring replacement or renewal
include roofs, mechanical, electrical, and other systems, and
interior/exterior finishes.
• The facility renewal strategy is based on both forecasting
when component replacement should occur to avoid failure
and 'bundling' to combine equipment replacements and
interior/exterior finish improvements.
• A Facility Condition Assessments (FCA) database is also
used to aide in long -term capital planning needs for the
facilities portfolio and lists each buildings' major components
including specific data regarding age, projected replacement
timing, and estimated costs for replacement materials.
• FCA data replacement projections are combined with staff
'on-the-ground' experience with ongoing maintenance and
repair needs, awareness of evolving safety and accessibility
standards, and whether equivalent equipment is available.
• Staff aggregates FCA data, current Building Code
requirements, and equipment issues to develop a program to
efficiently operate County facilities within the allocated
budgets.
• Every facility investment in the County includes an
assessment of energy goals to maximize the return on
investment.
• Specific projects are identified on a two-year horizon and are
included in the tables below. Specific projects for FY 2027
onward will be identified in future CIPs and budget
processes.
Associated Plan(s):
Community Energy Plan
Neighborhood(s):
VARIOUS
Critical Milestones:
• Identify Requirements on-going
• Develop scope of work and cost estimate 3 months
• Planning and Prioritization 2 months
• Design 1 to 6 months
• Procurement 6 months
• Construction 3 to 24 months
Changes from Prior CIP:
Annually funding requests are different from the previous CIP
based on the current recommended bundle of projects.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 7,750 6,060 2,275 2,525 3,030 5,455 5,555 5,860 5,860 5,860 50,230
PAYG 1,150 2,121 3,084 3,188 2,736 3,345 3,853 4,362 4,870 5,378 34,087
Previous Funding
Total Funding 8,900 8,181 5,359 5,713 5,766 8,800 9,408 10,222 10,730 11,238 84,317
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
C - 71
PAYG Bond Total
Central Library Roof and
Mechanical
Improvements
Central Library: Built 1959/Renovated 1992: Additional funding to replace the roof and
make solar-ready, replace and modernize the elevator systems, and HVAC systems in the
auditorium and historical preservation room. Additional funding results in a project total of
$6.8M.
3,000 $3,000
Detention Facility Fire
Alarm System Upgrade
The existing fire alarm system is obsolete and has reached the end of its useful life. The
equipment software is no longer supported by the manufacturer, and replacement devices
are not available.
2,000 $2,000
Madison Community
Center Roof and
Windows
Additional funding from FY 2024 to include the replacement of the roof and windows at
Madison Community Center. This is in conjunction with the replacement of the entire HVAC
system which currently has window air conditioning for cooling in most of the building. This
project will replace the roof to address the deterioration and leaking into the facility and
also modify the roof to increase the insulation and R-value. The single pane windows are
also in need of replacement to address infiltration causing heat losses and energy
inefficiencies. Both items were also identified as energy efficiency improvements through
the decarbonization tool. Additional funding results in a project total of $4.715M
2,500 $2,500
Central Library Plaza
Repairs
To address water intrusion, this project includes the installation of a perimeter drainage
system and regrading of the plaza surrounding the facility. This will also address potential
safety concerns from tripping and fall hazards. The space will also be re-evaluated with
Libraries and DPR for other potential layout and use opportunities.
(FY25 and FY26 funding for total project request of $2.27M)
250 $250
Argus House Window
Replacement
The Argus House is a community-based group home for at-risk boys ages 13-17 and is
operated 24/7. The existing windows are single pane and original to the building.
Replacement parts are no longer available to repair the operating mechanisms. The window
replacement will increase energy efficiency, extend the life of the HVAC system, quiet
outside noise, and help enhance the customer experience within the facility.
600 $600
Fire Station #9 -
Apparatus Bay
Circulation System
This project will install an air circulation system in the fire station apparatus bay. Currently,
the apparatus bay does not have a system to circulate and promote air movement within
the space. The system is essential for reducing summer temperatures in the apparatus bay,
which will prevent overheating of critical materials and medicines stored in the Fire
Department's response units and increase staff comfort and health.
300 $300
ACDF Air Compressor
Replacement
The existing air compressors servicing the Detention Facility are original and have exceeded
their useful life. These units provide compressed air for multiple critical mechanical systems
within the facility. Corrective repairs have been performed but the system continues to fail
and malfunction.
250 $250
Total $1,150 $7,750 $8,900
Central Library Plaza
Repairs
To address water intrusion and installation of a perimeter drainage system and regrading
of the plaza surrounding the facility. This will also address potential safety concerns from
tripping and fall hazards. (FY 2025 and FY 2026 Funding)
2,020 $2,020
Fire Station #5 Bay Door The project will replace the existing roll-up doors with new bi-fold doors that activate faster
allowing for quicker response times and less opportunity for accidental damage. 1,010 $1,010
Equipment Bureau - Door
Replacements
Existing roll-up doors have reached the end of their useful life and experience more
frequent failures. Existing doors have no R-value (insulation), resulting in no ability to
maintain the space temperature. New doors will be more energy efficient and will also
allow for more outside natural light. The doors were identified for replacement in a 2022
facility condition assessment.
1,768 $1,768
Walter Reed Boiler
Electrification
Replacement of existing gas fired boilers with electric resistance units to reduce GHG
emissions. The gas fired boiled is approaching the end of its useful life and has required
some major repairs.
1,263 $1,263
Court Square West Fan
Coil Unit Replacement
All fan coil units (FCUs) within Court Square West have reached the end of their useful life
and are not connected to the building automation system (BAS). Replacement of the FCUs
will include increasing energy efficiency, additional isolation valves for future maintenance
work, and connection to the BAS.
859 $859
Cherrydale Library Heat
Pump Replacement
The heat pumps serving the library spaces have reached the end of their useful life
requiring frequent compressor replacement. System failure would result in areas of the
library to become unconditioned.
202 $202
Museum of
Contemporary Art
(MoCA) Gallery Air Units
Existing five self contained HVAC units are obsolete and can no longer be serviced. Recent
repairs have become harder due to parts no longer being available. Minor corrective work
has been performed by custom fabrication of replacement parts, but is becoming more
costly. The units were installed in 2003 and have exceeded their useful life.
758 $758
FY 2026 Public Facilities Maintenance Program Project List
FY 2025 Public Facilities Maintenance Program Project List
Project Name Description Request (Dollars in Thousands)
C - 72
PAYG Bond Total
FY 2025 Public Facilities Maintenance Program Project List
Project Name Description Request (Dollars in Thousands)
Justice Center Security
System
This program will be used for security projects to maintain proper access and safety to
Dention facilities and Courthouse Area to protect staff, inmates, and the public. These
projects include Command Control centers, new camera replacements, card readers,
software licensing, and other equipment that controls all doors, alarms and intercoms.
303
Total $2,121 6,060 $7,878
C - 73
Source: Arlington County website. First collected Oct 27, 2026.