Arlington County, Virginia CIP
2025 − 2034
PUBLIC AND GOVERNMENT FACILITIES: ENERGY EFFICIENCY
PROGRAM
10 YEAR CATEGORY SUMMARY (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
1.County Facility Renewable
Energy Assessment and
300 1,263 1,248 1,133 1,145 606 657 707 758 808 8,625
2. Electric Vehicle Chargers-
Internal Accessibility
250 505 202 204 206 208 210 212 214 217 2,428
4. Electric Vehicle Chargers-
Public Accessibility
100 505 152 153 177 179 152 153 177 179 1,927
5. Energy Performance
Upgrades -County Buildings
475 707 606 612 591 556 561 480 505 556 5,649
6. Energy Resilience Planning
& Development
0 509 758 765 2,121 0 0 0 0 0 4,153
7. Lubber Run Resiliency Hub 1,250 1,212 0 0 0 0 0 0 0 0 2,462
Total Recommendation 2,375 4,701 2,966 2,867 4,240 1,549 1,580 1,552 1,654 1,760 25,244
CATEGORY FUNDING SOURCES (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
New Funding
Federal Funding 0 458 0 0 0 0 0 0 0 0 458
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
New Bond Issue 0 0 0 0 0 0 0 0 0 0 0
PAYG 2,375 4,243 2,966 2,867 4,240 1,549 1,580 1,552 1,654 1,760 22,324
Short Term Finance 0 0 0 0 0 0 0 0 0 0 0
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 1,250 0 0 0 0 0 0 0 0 0 2,462
Subtotal New Funding 2,375 4,701 2,966 2,867 4,240 1,549 1,580 1,552 1,654 1,760 25,244
Previously Approved Funding
Authorized but Unissued
Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved
Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding 0 0 0 0 0 0 0 0 0 0 0
Total Funding Sources 2,375 4,701 2,966 2,867 4,240 1,549 1,580 1,552 1,654 1,760 25,244
C - 74
PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan
Energy Efficiency FY 2025-2034
1.COUNTY FACILITY RENEWABLE ENERGY ASSESSMENT AND
SOLAR INSTALLATION
Project Highlights:
• Funds solar on four to five County sites annually through a
blended approach of third-party power purchase agreements
(PPA) and County-owned on-site installations.
• Installations can be phased in with resiliency technologies.
• Includes assessments for solar capacity, including financial
modeling.
• Identify third party Power Purchase Agreement and County
owned opportunities for solar installations.
• Possibility for public-private partnership.
• The strategy will focus onsite solar on new construction
followed by existing buildings that recently had roof
replacement.
• Key objectives: County goal for 100 percent renewable
electricity to power government operations' electricity was
achieved in 2023. As the County's electricity demand is
forecasted to increase from electrification, on -site solar will
support maintaining 10 0 percent renewable electricity for
County government (CEP Policies 3.1 and 3.4, CEP
Roadmap Strategy RE2.1).
Associated Plan(s):
Community Energy Plan
Critical Milestones:
• Contracts for Lubber Run Community
Center solar array executed.
Summer 2024
• GHG reduction anticipated of 110 tons
of CO2e annually.
Summer 2024
• Contract for Equipment Bureau for solar
array executed.
Winter 2024
• GHG reduction anticipated of 29 tons of
CO2eannually.
Winter 2024
• Contract for Central Library solar array
executed.
Summer 2025
• GHG reduction anticipated of 54 tons of
CO2e annually.
Summer 2025
• Complete on -site renewable energy
assessments for the next 6 -8 County
facilities.
Winter 2026
Changes from Prior CIP:
Funding increased to accelerate execution plan.
Funding Notes: Operating costs include an additional FTE (1.0) to support the program.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
PAYG 300 1,263 1,248 1,133 1,145 606 657 707 758 808 8,625
Previous Funding
Total Funding 300 1,263 1,248 1,133 1,145 606 657 707 758 808 8,625
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Operations Costs (+/-) 25 40 50 60 70 85 95 110 120 120 775
Personnel ($) 68 70 72 74 76 79 81 84 86 89 779
Total Impact 93 110 122 134 146 164 176 194 206 209 1,554
Project Links:
• CEP:
https://arlingtonva.s3.amazonaws.com/wp-
content/uploads/sites/13/2019/10/Final-CEP-CLEAN-003.pdf
• CEP Roadmap:
https://www.arlingtonva.us/files/sharedassets/public/v/1/environm
ent/documents/clean-cep-roadmap-07-26-2022-with-cover.pdf
C - 75
PUBLIC AND GOVERNMENT FACILITIES
Capital Improvement Plan
Energy Efficiency FY 2025-2034
2.ELECTRIC VEHICLE CHARGERS-INTERNAL ACCESSIBILITY
Project Highlights:
• The project scope supports the County's electric vehicle (EV)
conversion.
• This effort will closely track the Equipment Bureau's EV
purchasing plan. Funding increase in FY 2026 supports the
EV infrastructure for the forecasted conversion of public
safety vehicles.
Associated Plan(s):
Community Energy Plan
Funding Notes: EV charger installations range from $12k-$30k per port, with the price per charging port varying based on site-
specific infrastructure. FY 2025 funding supports the eight charging port installations included in the Critical Milestones.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
PAYG 250 505 202 204 206 208 210 212 214 217 2,428
Previous Funding
Total Funding 250 505 202 204 206 208 210 212 214 217 2,428
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Adding eight charging ports for County
fleet vehicles based on gaps in the fleet
charging network
Summer 2025
Changes from Prior CIP:
FY 2026 includes $250k in additional funding to meet
public safety charging needs.
Project Links:
• Community Energy Plan (CEP):
https://arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/13/2
CEP-CLEAN-003.pdf
• CEP Roadmap:
https://www.arlingtonva.us/files/sharedassets/public/v/1/environmen
cep-roadmap-07-26-2022-with-cover.pdf
C - 76
PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan
Energy Efficiency FY 2025-2034
4. ELECTRIC VEHICLE CHARGERS-PUBLIC ACCESSIBILITY
Project Highlights:
• Siting and installation of community electric vehicle (EV)
chargers, aka, Electric Vehicle Supply Equipment (EVSE).
• Flexibility for fast-charging hubs.
• Possibility for public-private partnerships.
• Key objectives: Diverse public choices for EV charging,
promote/support private EV ownership; new use for public
facilities to support the CEP’s transportation sector emission
CO2e/capita/year targets
• The pending Carbon Neutral Transportation Master Plan
(CNTMP) includes an EV charging siting analysis which will
be further refined to support public and private expansion of
charging network.
Associated Plan(s):
Community Energy Plan
Comprehensive Master Transportation Plan (MTP) for Arlington
Funding Notes: Funding may be supplemented by General Fund appropriations and potential grant funding opportunities.
EV charger installations range from $12k-$30k per port, with the price per charging port varying based on site-specific
infrastructure. FY 2025 funding supports the eight charging port installations included in the Critical Milestones.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
PAYG 100 505 152 153 177 179 152 153 177 179 1,927
Previous Funding
Total Funding 100 505 152 153 177 179 152 153 177 179 1,927
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Install 8 publicly accessible
charging ports at County facilities.
Summer 2025
Changes from Prior CIP:
Cost updated from previous CIP to align with execution plans.
Project Links:
• Community Energy Plan (CEP):
https://arlingtonva.s3.amazonaws.com/wp-
content/uploads/sites/13/2019/10/Final-CEP-CLEAN-
003.pdf
• CEP Roadmap:
https://www.arlingtonva.us/files/sharedassets/public/v/
1/environment/documents/clean-cep-roadmap-07-26-
2022-with-cover.pdf
C - 77
PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan
Energy Efficiency FY 2025-2034
5. ENERGY PERFORMANCE UPGRADES -COUNTY BUILDINGS
Project Highlights:
• A long-standing partnership program between AIRE and
DES-Facilities to establish energy performance in design
and construction.
• Applies to new construction and remodeling.
• Key objectives: reduce operation and maintenance costs,
lead with energy-efficient buildings and resilient/healthy
buildings.
Associated Plan(s):
Community Energy Plan
Neighborhood(s):
VARIOUS
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
PAYG 475 707 606 612 591 556 561 480 505 556 5,649
Previous Funding
Total Funding 475 707 606 612 591 556 561 480 505 556 5,649
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact -48 -120 -180 -240 -300 -360 -400 -450 -500 -550 -3,148
Critical Milestones:
• Courts Police/Justice Center lighting
retrofits completed.
Fall 2025
• Fairlington Community Center
lighting retrofits
Fall 2026
Changes from Prior CIP:
Analytics enhanced for decarbonization and GHG
emissions reductions. Methodology for total impact
quantification updated from previous CIP.
Project Links:
• Community Energy Plan (CEP):
https://arlingtonva.s3.amazonaws.com/wp-
content/uploads/sites/13/2019/10/Final-CEP-CLEAN-003.pdf
• CEP Roadmap:
https://www.arlingtonva.us/files/sharedassets/public/v/1/environment/
documents/clean-cep-roadmap-07-26-2022-with-cover.pdf
C - 78
PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan
Energy Efficiency FY 2025-2034
6. ENERGY RESILIENCE PLANNING & DEVELOPMENT
Project Highlights:
• Model microgrid and resiliency hubs that support key service
and operational centers.
• Key objectives: Enhance County ability to overcome
disruptions from extreme weather, deliberate attacks, climate
change, load demand and grid sensitivity, and other
influences or vulnerabilities.
Associated Plan(s):
Community Energy Plan
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Federal Funding 458 458
PAYG 51 758 765 2,121 3,695
Previous Funding
Total Funding 0 509 758 765 2,121 0 0 0 0 0 4,153
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Begin study of the feasibility of implementing
microgrids and energy resilience hub.
FY 2026
• Begin implementing microgrids and energy
resilience hub from feasibility study.
FY 2027
Changes from Prior CIP:
Application submitted (but not yet awarded) for Federal
grant.
Project Links:
• Community Energy Plan (CEP):
https://arlingtonva.s3.amazonaws.com/wp-
content/uploads/sites/13/2019/10/Final-CEP-CLEAN-003.pdf
• CEP Roadmap:
https://www.arlingtonva.us/files/sharedassets/public/v/1/enviro
nment/documents/clean-cep-roadmap-07-26-2022-with-
cover.pdf
• Energy Assurance Plan:
https://www.arlingtonva.us/files/content/public/v/10/governme
nt/programs/office-of-sustainability-and-
environment/aire/resiliency/eap/eap-final-for-webpage.pdf
C - 79
PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan
Energy Efficiency FY 2025-2034
7. LUBBER RUN RESILIENCY HUB
Project Highlights:
• This project funds additional investments for Lubber Run
Community Center to become a resiliency hub to serve the
community during an event, such as a long -term power
disruption.
• Lubber Run Community Center was chosen due to its central
location, ample protected parking, planned solar roof
installation, and sufficient space to support general assembly.
• Funding will be used to expand the battery storage system to
support the peak energy demand of the facility for up to eight
hours or a reduced load for critical life safety for up to four
days. The battery system will be connected to a photovoltaic
(PV) sy stem allowing for recharging and storage of PV
generated power.
• Funding is also included for an auxiliary natural gas
generator to provide facility emergency power beyond the
capabilities of the battery storage system and for mobile
platforms for constituent use for low consumption devices,
like cell phones and laptops.
Neighborhood(s):
Arlington Forest
Bluemont
Buckingham
Funding Notes: FY 2026 funding is shifted from the Climate Action Fund (CAF) to PAYG as part of the Adopted CIP.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
PAYG 1,212 1,250
Other Funding 1,250 1,212
Previous Funding
Total Funding 1,250 1,212 0 0 0 0 0 0 0 0 2,462
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Expand battery energy storage system FY 2025
• Install natural gas generator and mobile
platforms
FY 2026
Changes from Prior CIP:
The project is new to the FY 2025 - 2034 CIP.
C - 80