Arlington County, Virginia
STORMWATER MANAGEMENT
Program Description
The Stormwater Management Capital Program includes three capital program areas: Stormwater Infrastructure/ Capacity Improveme nts,
Streams & Water Quality, and Maintenance Capital. These programs address both infrastructure (replacement and rehabilitation to address
system condition, capacity, and flood risk reduction); and regulatory requirements (state/federal compliance and environmenta l quality
projects).
The overall goals of the program are:
1. Reduce the potential for stormwater threats to public health, safety, and property.
2. Reduce the impacts of new and existing urban development on Arlington streams, the Potomac River, and Chesapeake Bay.
3. Comply with State and federal water quality mandates,
4. Floodplain management regulations and programs; and
5. Manage risk for near- to long-term community resilience.
Program Summary
Climate change has increased storm intensity patterns and impacts across the nation and over the past several years created r epetitive
flooding and loss in the Mid-Atlantic region. The County's geological factors and development legacy reaching as far back as the 1940s have
exposed Arlington to public, commercial, infrastructure, and operational risk resulting from storms of dramatically increased intensity. At
the same time, the County must maintain aged stormwater network and related assets, expand the system's capacity to manage floods, and
meet regulatory benchmarks to improve water quality locally and downstream in the Chesapeake Bay. As laid out in the 2014 Stormwater
Master Plan and updated in this CIP, the program strives to execute responsive and responsible investments that are balanced between
water quality, and capacity improvements, and maintaining assets in a state of good repair (SGR).
In response to these challenges, the County has taken action to address the growing urgency for near-term upgrades and long-term resiliency.
By way of example:
• The County pivoted to an over-arching mission to establish Flood Resilient Arlington.
• Established a Stormwater Inter -Departmental Working Group to develop key recommendations for risk and emergency planning,
communications, diversifying engineering options and strategies, and developing climate and resiliency criteria and standards .
• Updated the Land Disturbance Activity (LDA) Program.
• Updated stormwater engineering to include distributed detention assets (such as the recently completed Cardinal Elementary School
Detention Vaults), addition of tertiary infrastructure, acquisition of property to provide overland relief, and co-location and multi-purposing
of projects (where project design and performance can serve other County master plans, programs, and initiatives).
• In FY 2024, the County completed a comprehensive stormwater Risk Assessment and Management Plan (RAMP), which serves as a
decision support tool for long-term capital planning.
SUBSTANTIAL INVESTMENTS IN STORMWATER INFRASTRUCTURE
The investment laid out in this CIP reflects the significant effort that will be required to update the County's stormwater i nfrastructure to
manage urgent needs and long -term resilience. The Adopted FY 2025 - FY 2034 CIP includes over $334 million, driven primarily by
watershed scale projects to minimize the risk of flooding. Given the significant funding required for Stormwater over the next 10 years, the
County Board has directed staff to implement a stormwater utility as a more equitable and fair way to recover costs. A stormwater utility is
billed based on each parcel's impervious area. It offers an alternative funding mechanism for recovery of the costs related t o the County's
stormwater program than the previous sanitary district tax based on assessed value. The County engaged a consultant, Raftelis, to perform
the utility implementation. The utility was adopted by the County Board in December 2023 and is effective starting in Calenda r Year 2024.
Information about this project, timeline, and ways to engage can be found here: Stormwater Utility Fee
It is anticipated some of this investment could be offset with future stormwater mitigation and flood prevention grant progra ms at either
the State or Federal level. Arlington County has been awarded State and federal grants reflected in the CIP and staff will continue to pursue
these funding sources, as it could partially offset utility fee increases necessary to fund investments into Arlington's Stor mwater
infrastructure.
To fund the near-term projected need, the County received approval from voters for a $50.84 million Bond Referenda in November 2020
and $39.76 million Bond Referenda in November 2022 which provided the authority to issue bonds to fund Stormwater capital pr ojects
that will be constructed over several years. Future bond referenda will be necessary to fund the entirety of this ten -year plan. These are
F - 43
substantial, long-term investments in the County's stormwater management system, with multiple generations of taxpayers benefiting so
utilizing bonds to spread the costs over the life of the assets is appropriate. Approval of the increased investment level in this Adopted
10-year CIP will require corresponding increases in the Stormwater Utility fee level over the 10 -year period.
STORMWATER INFRASTRUCTURE/ CAPACITY IMPROVEMENTS PROGRAM
The Stormwater Infrastructure/ Capacity Improvements program (previously named "Storm Drainage Improvements") funds capital
improvements which increase system capacity and minimize the risk of flooding. This component of the CIP was created pursuant to the
Stormwater Master Plan (2014) and includes programs and projects that increase system capacity (both pipes and open channels) and
establishes overland relief pathways to reduce the risk of residential and commercial flooding. The Stormwater Master Plan (2014) identified
initial critical flood risk locations to prioritize system capacity projects.
Many areas of the County's risk -designated watersheds are served by a legacy system that does not meet current storm standards under
increased occurrence of high-intensity storm events, sometimes equal to or more than the 100-year storm event. This CIP recognizes that
no reasonable amount of investment can prevent all flooding during all high intensity rainfall events in all types of topography. To achieve
a reasonable balance of risk sharing between public and private interests, County staff is utilizing b lended design strategies that considers
both the industry standard 10-year storm and the 100-year flood plain. Staff will at a minimum design to the 10 -year standard, updated for
more intense rainfall events associated with climate change. Ultimately, the goal of these public investments, when combined with private
investments, is to reduce flooding so that it does not impact building or home integrity, impede commercial/ business activit y, threaten
personal safety, damage other infrastructure, or interfere with the safe and timely transportation of people, goods, and services. It is
important to note that flood mitigation improvements will vary in immediate impact as the phases of the watershed scale projects progress
and that full watershed-scale improvements will take place over several years.
MAINTENANCE CAPITAL PROGRAM
The Maintenance Capital program focuses on the re-investment in the County's 270-mile storm drainage network and its tens of thousands
of stormwater structures. The Capital Maintenance component addresses projects and programs designed to rehabilitate or r eplace the
existing storm drainage system (e.g., outfall repair/replacement, relining pipes) and mixed infrastructure assets (such as cu lverts that also
provide transportation uses) and to address local drainage issues to resolve complaints. Maintenance of the Four Mile Run Flood Control
Project is also part of this program component.
To provide a more conclusive framework for future investment decision-making, DES has undergone a Risk Assessment and Management
Plan (RAMP) which is a performance -driven risk management and abatement model informed by a full asset inventory and gaps analysi s.
This approach will provide a more granular assessment of the system including a comprehensive system assessment (including location,
scale, constructed material, sensitivities with adjacent and/or articulated community elements and infrastructure, and age of all stormwater
assets. The assessment will serve as a meaningful decision-support tool for the system's programmatic, operational, and fiscal needs.
STREAMS AND WATER QUALITY PROGRAM
The projects selected and implemented under this program provide a suite of sustainability benefits, reflecting the goals and objectives of
the adopted Stormwater Master Plan, including local water quality improvements throughout the County, pollutant reductions to respond
to the County's MS4 Permit requirements and the Chesapeake Bay Total Maximum Daily Load (TMDL) - a regulatory pollution budget for
the Bay, and multiple co-benefits including but not limited to public safety, infrastructure protection, and ecological improvements. These
projects include investments in multiple forms of "green infrastructure". These include projects that improve the resiliency and
environmental performance of streams, ponds, and wetlands, along with "green streets" projects that provide storage and treatment for
polluted runoff in public rights-of-way. A growing emphasis of the program is creating resiliency to climate change. Projects are strategically
identified to align with infrastructure protection and integrity needs a nd address related public safety issues resulting from failed slopes,
eroded trails, exposed and broken sanitary sewer lines and collapsed outfalls.
The MS4 Permit requires the reduction of three specific pollutants -nitrogen, phosphorus, and sediment -in an accelerated approach over
three, five-year permit cycles to respond to the aggressive requirements for the cleanup of the Bay. Currently , Virginia DEQ continues to
require that the second (FY 2022 - FY 2026) and third (FY 2027 - FY 2031) permit cycles achieve a cumulative 40 percent and 100 percent
reduction, respectively.
F - 44
Arlington County, Virginia
STORMWATER MANAGEMENT
CIP
2025 − 2034
10
YEAR CATEGORY SUMMARY (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
SM Maintenance Capital 10,545 6,710 3,195 3,575 3,845 4,220 4,390 4,640 4,755 4,990 50,865
Stormwater Infrastructure/
Capacity Improvements
14,870 24,250 27,095 30,350 39,715 30,865 15,125 23,095 19,990 16,830 242,185
Streams and Water Quality 4,190 6,395 5,600 1,750 5,285 2,405 5,205 2,480 5,355 2,540 41,205
Total Recommendation 29,605 37,355 35,890 35,675 48,845 37,490 24,720 30,215 30,100 24,360 334,255
Implementation
Adjustment (5,920) (7,470) (7,180) (7,135) (9,770) (7,495) (4,945) (6,045) (6,020) (4,875) (66,855)
Adjusted CIP 23,685 29,885 28,710 28,540 39,075 29,995 19,775 24,170 24,080 19,485 267,400
P
ROGRAM FUNDING SOURCES (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
New Funding
Federal Funding 3,540 0 0 4,000 210 0 0 0 0 0 7,750
State Funding 0 0 1,750 0 0 0 0 0 0 0 1,750
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
New Bond Issue 0 155 23,825 27,480 44,545 32,740 20,175 25,100 25,235 18,940 218,195
PAYG 0 0 0 0 0 0 0 0 0 0 0
Short Term Finance 0 0 0 0 0 0 0 0 0 0 0
Stormwater Utility Fee Revenue 3,835 3,910 3,435 3,945 3,840 4,500 4,295 4,865 4,615 5,170 42,410
Other Funding 450 250 250 250 250 250 250 250 250 250 2,700
Subtotal New Funding 7,825 4,315 29,260 35,675 48,845 37,490 24,720 30,215 30,100 24,360 272,805
Previously Approved Funding
Authorized but Unissued
Bonds 21,780 33,040 6,630 0 0 0 0 0 0 0 61,450
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved
Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding 21,780 33,040 6,630 0 0 0 0 0 0 0 61,450
Total Funding Sources 29,605 37,355 35,890 35,675 48,845 37,490 24,720 30,215 30,100 24,360 334,255
Implementation Adjustment (5,920) (7,470) (7,180) (7,135) (9,770) (7,495) (4,945) (6,045) (6,020) (4,875) (66,855)
Adjusted CIP 23,685 29,885 28,710 28,540 39,075 29,995 19,775 24,170 24,080 19,485 267,400