Arlington County, Virginia CIP
2025 − 2034
STORMWATER MANAGEMENT: SM MAINTENANCE CAPITAL
PROGRAM
10 YEAR CATEGORY SUMMARY (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
1. Detention Vaults &
Overland Relief Maintenance
100 105 105 110 110 110 110 115 115 120 1,100
2. Dumbarton Street Culvert-
Downstream
3,000 1,545 0 0 0 0 0 0 0 0 4,545
3. Dumbarton Street Culvert-
Upstream
3,000 1,545 0 0 0 0 0 0 0 0 4,545
4. Floodplain Channel & Split
Stream Maintenance
100 105 105 110 110 110 110 115 115 120 1,100
5. Four Mile Run Flood
Control Project Maintenance
500 50 55 55 55 55 55 60 60 60 1,005
6. Manhole & Catch Basin
Rehabilitation
250 260 265 275 275 280 280 290 290 295 2,760
7. Military Road Culvert at Gulf
Branch
2,090 1,030 0 0 0 0 0 0 0 0 3,120
8. Sidewalk Underdrains 50 50 55 55 55 55 55 60 60 60 555
9. Stormwater Frames and
Covers
250 260 265 275 275 280 280 290 290 295 2,760
10. Stormwater Mains
Rehabilitation & Replacement
1,000 1,545 2,120 2,455 2,725 3,080 3,250 3,450 3,565 3,775 26,965
11. Terra Cotta/ Corrugated
Metal Pipe Upgrades
205 215 225 240 240 250 250 260 260 265 2,410
Total Recommendation 10,545 6,710 3,195 3,575 3,845 4,220 4,390 4,640 4,755 4,990 50,865
F - 46
CATEGORY FUNDING SOURCES (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
New Funding
Federal Funding 3,000 0 0 0 0 0 0 0 0 0 3,000
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
New Bond Issue 0 0 0 0 5 0 95 0 140 0 240
PAYG 0 0 0 0 0 0 0 0 0 0 0
Short Term Finance 0 0 0 0 0 0 0 0 0 0 0
Stormwater Utility Fee Revenue 2,455 2,590 3,195 3,575 3,840 4,220 4,295 4,640 4,615 4,990 38,415
Other Funding 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 5,455 2,590 3,195 3,575 3,845 4,220 4,390 4,640 4,755 4,990 41,655
Previously Approved Funding
Authorized but Unissued
Bonds 5,090 4,120 0 0 0 0 0 0 0 0 9,210
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved
Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding 5,090 4,120 0 0 0 0 0 0 0 0 9,210
Total Funding Sources 10,545 6,710 3,195 3,575 3,845 4,220 4,390 4,640 4,755 4,990 50,865
F - 47
STORMWATER MANAGEMENT Capital Improvement Plan
SM Maintenance Capital FY 2025-2034
1. DETENTION VAULTS & OVERLAND RELIEF MAINTENANCE
Project Highlights:
• Underground detention facilities and overland relief paths
require continued capital maintenance efforts to ensure they
remain effective.
• Funding is included for capital maintenance of the Cardinal
School vault and overland relief areas.
Associated Plan(s):
Storm Water Master Plan
Neighborhood(s):
VARIOUS
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Stormwater Utility Fee
Revenue 100 105 105 110 110 110 110 115 115 120 1,100
Previous Funding
Total Funding 100 105 105 110 110 110 110 115 115 120 1,100
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
No change from the previous CIP.
F - 48
STORMWATER MANAGEMENT Capital Improvement Plan
SM Maintenance Capital FY 2025-2034
2. DUMBARTON STREET CULVERT-DOWNSTREAM
Project Highlights:
• This project is a replacement of the existing Downstream
Dumbarton Street Culvert which was damaged in the August
2017 storm.
• Replacement is needed to expand capacity and replace
existing headwalls, end walls, and deteriorating culvert
barrels. The existing culvert overtops the road during extreme
storm events.
• Existing culvert is constructed of corrugated metal pipe,
which is deteriorating and requires replacement.
Associated Plan(s):
Storm Water Master Plan
Neighborhood(s):
Rock Spring
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Previous Funding
Authorized but Unissued
Bonds 3,000 1,545 4,545
Total Funding 3,000 1,545 0 0 0 0 0 0 0 0 4,545
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Design Spring 2023
• Construction Fall 2024
Changes from Prior CIP:
Timing of expenditures has pushed out two years from the
previous CIP.
Project Links:
• Dumbarton St Culvert Replacement – Official Website of
Arlington County Virginia Government (arlingtonva.us):
https://www.arlingtonva.us/Government/Projects/Project-
Types/Environment-Projects/Dumbarton-St-Culvert-
Replacement
F - 49
STORMWATER MANAGEMENT Capital Improvement Plan
SM Maintenance Capital FY 2025-2034
3. DUMBARTON STREET CULVERT-UPSTREAM
Project Highlights:
• This project is a replacement of the existing Upstream
Dumbarton Street Culvert which was damaged in the August
2017 storm.
• Replacement is needed to expand capacity and replace
existing headwalls, end walls, and deteriorating culvert
barrels. The existing culvert overtops the road during major
storm events.
• Existing culvert is constructed of corrugated metal pipe,
which is deteriorating and requires replacement.
Associated Plan(s):
Storm Water Master Plan
Neighborhood(s):
Rock Spring
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Federal Funding 3,000 3,000
Previous Funding
Authorized but Unissued
Bonds
1,545 1,545
Total Funding 3,000 1,545 0 0 0 0 0 0 0 0 4,545
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Design Spring 2023
• Construction Fall 2024
Changes from Prior CIP:
Project cost has increased based on design and federal funding
requirements. Timing of construction has pushed out two years
from the previous CIP.
Project Links:
• Dumbarton St Culvert Replacement – Official Website of
Arlington County Virginia Government (arlingtonva.us):
https://www.arlingtonva.us/Government/Projects/Project-
Types/Environment-Projects/Dumbarton-St-Culvert-
Replacement
F - 50
STORMWATER MANAGEMENT Capital Improvement Plan
SM Maintenance Capital FY 2025-2034
4. FLOODPLAIN CHANNEL & SPLIT STREAM MAINTENANCE
Project Highlights:
• Floodplain channels must be maintained to ensure efficiency
of the existing conveyance system.
• Split streams are located at Gulf Branch, Little Pimmit Run,
and Lucky Run, where the County undergrounded these
streams into culverts and diverted a small man -made stream
on top for aesthetic and environmental purposes. The
diversion structures routinely clog and need maintenance.
Associated Plan(s):
Storm Water Master Plan
Neighborhood(s):
VARIOUS
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Stormwater Utility Fee
Revenue 100 105 105 110 110 110 110 115 115 120 1,100
Previous Funding
Total Funding 100 105 105 110 110 110 110 115 115 120 1,100
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
No change from the previous CIP.
F - 51
STORMWATER MANAGEMENT Capital Improvement Plan
SM Maintenance Capital FY 2025-2034
5. FOUR MILE RUN FLOOD CONTROL PROJECT MAINTENANCE
Project Highlights:
• Project is routine capital maintenance of the Four Mile Run
Flood Control Project area.
• Project is required by U.S. Army Corps of Engineers.
Associated Plan(s):
Storm Water Master Plan
Neighborhood(s):
Arlington Ridge
Long Branch Creek
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Stormwater Utility Fee
Revenue 500 50 55 55 55 55 55 60 60 60 1,005
Previous Funding
Total Funding 500 50 55 55 55 55 55 60 60 60 1,005
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Tree replacement planting Spring 2024
• Tree removal along Long Branch/Troy Park Fall 2024
Changes from Prior CIP:
Timing of expenditures has pushed out one year from the
previous CIP.
Project Links:
• Four Mile Run Channel Maintenance and Dredging Project
– Official Website of Arlington County Virginia
Government (arlingtonva.us):
https://www.arlingtonva.us/Government/Projects/Project-
Types/Environment-Projects/Four-Mile-Run-Channel-
Maintenance-and-Dredging-Project
F - 52
STORMWATER MANAGEMENT Capital Improvement Plan
SM Maintenance Capital FY 2025-2034
6. MANHOLE & CATCH BASIN REHABILITATION
Project Highlights:
• Project is for rehabilitation and replacement of manholes and
catch basins that have been damaged or need maintenance.
This is completed through lining and/or structural rebuilds
when necessary.
• The stormwater system inspection program identifies
structures that need to be replaced or rehabilitated. Major
storm events can damage structures which necessitate
actions.
• This work is necessary for the proper functioning of the
stormwater drainage system.
Associated Plan(s):
Storm Water Master Plan
Neighborhood(s):
VARIOUS
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Stormwater Utility Fee
Revenue 250 260 265 275 275 280 280 290 290 295 2,760
Previous Funding
Total Funding 250 260 265 275 275 280 280 290 290 295 2,760
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
No change from the previous CIP.
F - 53
STORMWATER MANAGEMENT Capital Improvement Plan
SM Maintenance Capital FY 2025-2034
7. MILITARY ROAD CULVERT AT GULF BRANCH
Project Highlights:
• Project will replace Military Road Culvert at Gulf Branch to
expand capacity and replace the deteriorating structure.
• The culvert frequently overtops during storms, flooding the
area including the nearby Gulf Run pump station building.
• Project will be done in conjunction with the adjacent Gulf
Branch Stream Resiliency project.
Associated Plan(s):
Storm Water Master Plan
Neighborhood(s):
Gulf Branch
Old Glebe
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Previous Funding
Authorized but Unissued
Bonds 2,090 1,030 3,120
Total Funding 2,090 1,030 0 0 0 0 0 0 0 0 3,120
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Design Spring 2023
• Construction Summer 2024
Changes from Prior CIP:
Timing of expenditures has pushed out one year from the
previous CIP.
F - 54
STORMWATER MANAGEMENT Capital Improvement Plan
SM Maintenance Capital FY 2025-2034
8. SIDEWALK UNDERDRAINS
Project Highlights:
• Project installs underdrains on sidewalks, which are
necessary in some locations to prevent unsafe conditions on
sidewalks and reduces hazards to pedestrians.
• Drainage from hillsides, sump pumps, and other poorly
drained areas often seeps across sidewalks and can cause
slippery conditions due to algae growth in warm months and
icing conditions in cold months.
Associated Plan(s):
Storm Water Master Plan
Neighborhood(s):
VARIOUS
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Stormwater Utility Fee
Revenue 50 50 55 55 55 55 55 60 60 60 555
Previous Funding
Total Funding 50 50 55 55 55 55 55 60 60 60 555
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
No change from the previous CIP.
F - 55
STORMWATER MANAGEMENT Capital Improvement Plan
SM Maintenance Capital FY 2025-2034
9. STORMWATER FRAMES AND COVERS
Project Highlights:
• This program funds the required adjustments to stormwater
structure frames and covers in conjunction with annual
paving operations.
• Adjustments involve raising or lowering a casting or precast
top from its existing elevation to align with the adjacent
grade, pavement, curb, etc.
Associated Plan(s):
Storm Water Master Plan
Neighborhood(s):
VARIOUS
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Stormwater Utility Fee
Revenue 250 260 265 275 275 280 280 290 290 295 2,760
Previous Funding
Total Funding 250 260 265 275 275 280 280 290 290 295 2,760
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
No significant change from the previous CIP.
F - 56
STORMWATER MANAGEMENT Capital Improvement Plan
SM Maintenance Capital FY 2025-2034
10. STORMWATER MAINS REHABILITATION & REPLACEMENT
Project Highlights:
• This program funds the rehabilitation and replacement of
existing storm drainage pipes within the system.
• Systematic rehabilitation and replacement of system assets
will strengthen system integrity and reliability, protects
public health and safety, reduces impacts on interconnected
infrastructure, and increases long-term cost-effectiveness.
Associated Plan(s):
Storm Water Master Plan
Neighborhood(s):
VARIOUS
Funding Notes: Funding is available for a nominal number of projects, depending on scale.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 5 95 140 240
Stormwater Utility Fee
Revenue 1,000 1,545 2,120 2,455 2,720 3,080 3,155 3,450 3,425 3,775 26,725
Previous Funding
Total Funding 1,000 1,545 2,120 2,455 2,725 3,080 3,250 3,450 3,565 3,775 26,965
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
Funding in the first half of the CIP is less than the previous CIP
based on updated program priorities and other planned/ funded
projects.
F - 57
STORMWATER MANAGEMENT Capital Improvement Plan
SM Maintenance Capital FY 2025-2034
11. TERRA COTTA/ CORRUGATED METAL PIPE UPGRADES
Project Highlights:
• This program funds replacement of existing, poor condition
terra cotta (TC) and corrugated metal pipe (CMP) with
reinforced concrete pipe or other modern pipe materials,
which have longer life spans. Failure of existing, aged TC and
CMP is a leading cause of various maintenance activities.
• Replacement of TC and CMP within the stormwater
conveyance system is a program goal.TC & CMP pipe are
often in poor condition due to age, limitations of the pipe
material, and shorter lifespan than reinforced concrete pipe.
Associated Plan(s):
Storm Water Master Plan
Neighborhood(s):
VARIOUS
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Stormwater Utility Fee
Revenue 205 215 225 240 240 250 250 260 260 265 2,410
Previous Funding
Total Funding 205 215 225 240 240 250 250 260 260 265 2,410
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
No change from the previous CIP.
F - 58