Arlington County, Virginia CIP 2025 − 2034 STORMWATER MANAGEMENT: STREAMS AND WATER QUALITY PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total 1. Concord Mews Pond Retrofit 250 1,545 0 0 0 0 0 0 0 0 1,795 2. Green Streets & Infrastructure Program 375 235 425 435 435 445 445 460 460 475 4,190 3. Gulf Branch and South Walter Reed Green Streets 540 0 0 0 210 0 0 0 0 0 750 4 Gulf Branch Stream Resiliency 800 2,320 0 0 0 0 0 0 0 0 3,120 5. Quebec Street Outfall Rehabilitation 450 0 0 0 0 0 0 0 0 0 450 6. Outfall Rehabilitation Program 925 1,725 1,305 875 1,475 1,510 1,510 1,555 1,555 1,595 14,030 7. Sparrow Pond Watershed Retrofit 450 0 0 0 0 0 0 0 0 0 450 8. Stream Resiliency Program 250 260 2,915 275 3,000 280 3,080 290 3,165 295 13,810 9. Washington Boulevard Pond Retrofit 0 155 795 0 0 0 0 0 0 0 950 10. Water Quality Project Feasibility & Concept Design 150 155 160 165 165 170 170 175 175 175 1,660 Total Recommendation 4,190 6,395 5,600 1,750 5,285 2,405 5,205 2,480 5,355 2,540 41,205 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 540 0 0 0 210 0 0 0 0 0 750 State Funding 0 0 1,750 0 0 0 0 0 0 0 1,750 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 0 155 795 1,335 4,825 2,045 4,955 2,180 5,105 2,285 23,680 PAYG 0 0 0 0 0 0 0 0 0 0 0 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 640 1,165 80 165 0 110 0 50 0 5 2,215 Other Funding 450 250 250 250 250 250 250 250 250 250 2,700 Subtotal New Funding 1,630 1,570 2,875 1,750 5,285 2,405 5,205 2,480 5,355 2,540 31,095 Previously Approved Funding Authorized but Unissued Bonds 2,560 4,825 2,725 0 0 0 0 0 0 0 10,110 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 2,560 4,825 2,725 0 0 0 0 0 0 0 10,110 Total Funding Sources 4,190 6,395 5,600 1,750 5,285 2,405 5,205 2,480 5,355 2,540 41,205 F - 76 STORMWATER MANAGEMENT Capital Improvement Plan Streams and Water Quality FY 2025-2034 1. CONCORD MEWS POND RETROFIT Project Highlights: • Project will restore the function of an existing 50 -year-old dry detention pond and address public safety, flood storage and nuisance concerns. • The project, located adjacent to the County's Department of Human Services Facility, supports the County's regulatory requirements under its Municipal Separate Storm Sewer System (MS4) permit. • The project supports Biophilic Cities goals with its location adjacent to heavily used W&OD Trail. Associated Plan(s): Storm Water Master Plan Neighborhood(s): Douglas Park Green Valley New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Previous Funding Authorized but Unissued Bonds 250 1,545 1,795 Total Funding 250 1,545 0 0 0 0 0 0 0 0 1,795 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Non-Personnel ($) 15 15 15 15 15 10 10 95 Bond Financing Costs Total Impact 0 15 15 15 15 15 10 10 0 0 95 Critical Milestones: • Design Spring 2025 • Construction Spring 2026 Changes from Prior CIP: Timing of expenditures has pushed out one year from the previous CIP. Project Links: • Concord Mews Pond Restoration: https://www.arlingtonva.us/Government/Projects/Project- Types/Environment-Projects/Concord-Mews-Pond- Restoration F - 77 STORMWATER MANAGEMENT Capital Improvement Plan Streams and Water Quality FY 2025-2034 2. GREEN STREETS & INFRASTRUCTURE PROGRAM Project Highlights: • This program includes re -construction and enhancement of existing stormwater ponds to improve water quality performance and "green streets" streetscape bioretention systems. A green street is a stormwater management approach that incorporates vegetation (perennials, shrubs, trees), soil, and engin eered systems (e.g., permeable pavements) to slow, filter, and cleanse stormwater runoff from impervious surfaces (e.g., streets, sidewalks). Green streets are designed to capture rainwater at its source, where rain falls. The projects within this program help offset the continued increase in impervious cover in our community. • This program helps the County address the nutrient and sediment reduction requirements of its MS4/Chesapeake Bay Total Maximum Daily Load (TMDL) regulatory mandate. • This program contributes to the County's overall resiliency to climate change by reducing heat island impacts and providing storage for stormwater and supports Biophilic Cities goals. Associated Plan(s): Storm Water Master Plan Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 435 435 445 445 460 460 475 3,155 Previous Funding Authorized but Unissued Bonds 375 235 425 1,035 Total Funding 375 235 425 435 435 445 445 460 460 475 4,190 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Non-Personnel ($) 5 10 20 30 45 45 45 45 245 Bond Financing Costs Total Impact 5 10 20 30 45 45 45 45 0 0 245 Changes from Prior CIP: Funding has decreased from the previous CIP based on a lower number of projects planned annually in FY 2026 - FY 2034. F - 78 STORMWATER MANAGEMENT Capital Improvement Plan Streams and Water Quality FY 2025-2034 3. GULF BRANCH AND SOUTH WALTER REED GREEN STREETS Project Highlights: • Four streetscape green infrastructure projects will be installed in the Gulf Branch Watershed downstream of Military Road; these projects will contribute to the watershed approach for Gulf Branch. Two additional projects will be installed on South Walter Reed Drive in coordinati on with street improvements. • A green street includes a rain garden and vegetated area along a street that reduces run -off and filters out pollutants to protect our local streams, the Potomac River, and the Chesapeake Bay. Green Streets help address environmental and regulatory stormwater needs. • This project provides Municipal Separate Storm Sewer System (MS4) and Chesapeake Bay Total Maximum Daily Load (TMDL) credit for the 2nd permit cycle. Associated Plan(s): Storm Water Master Plan Neighborhood(s): Arlington Heights Bellevue Forest Penrose New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Federal Funding 540 210 750 Previous Funding Total Funding 540 0 0 0 210 0 0 0 0 0 750 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Non-Personnel ($) 15 15 15 15 15 15 15 15 120 Total Impact 15 15 15 15 15 15 15 15 0 0 120 Critical Milestones: • Design South Walter Reed Facilities Fall 2024 • Construction Summer 2024 (GB) and Fall 2028 (S Walter Reed) Changes from Prior CIP: Timing of expenditures has pushed out two years from the previous CIP. Project description has been modified to reflect the expanded project scope of work awarded federal grant funding. Project Links: • Gulf Branch Green Streets: https://www.arlingtonva.us/Government/Projects/Project- Types/Environment-Projects/Gulf-Branch-Green-Streets F - 79 STORMWATER MANAGEMENT Capital Improvement Plan Streams and Water Quality FY 2025-2034 4 GULF BRANCH STREAM RESILIENCY Project Highlights: • Project improves 2,500 linear feet of Gulf Branch stream to provide for the long-term resiliency above Military Road. • Project addresses severe erosion, outfall repair, and sanitary sewer crossing protection. • Project will also protect Gulf Branch Nature Center. • Priority project for Chesapeake Bay Total Maximum Daily Load (TMDL) credits. Associated Plan(s): Storm Water Master Plan Neighborhood(s): Bellevue Forest Gulf Branch Old Glebe New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Previous Funding Authorized but Unissued Bonds 800 2,320 3,120 Total Funding 800 2,320 0 0 0 0 0 0 0 0 3,120 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Non-Personnel ($) 5 5 5 5 5 25 Bond Financing Costs Total Impact 0 5 5 5 5 5 0 0 0 0 25 Critical Milestones: • Final design Winter 2025 • Construction Summer 2025 - Spring 2026 Changes from Prior CIP: The timing of expenditures has pushed out one year from the previous CIP. Project Links: • Project web site: https://www.arlingtonva.us/Government/Projects/Project- Types/Environment-Projects/Gulf-Branch-Stream-Project F - 80 STORMWATER MANAGEMENT Capital Improvement Plan Streams and Water Quality FY 2025-2034 5. QUEBEC STREET OUTFALL REHABILITATION Project Highlights: • This project will rehabilitate the outfall and address slope erosion on Quebec Street adjacent to the Dover Run Pumping Station. • The July 2019 storm caused acute damage to this outfall. • This project may supply Chesapeake Bay Total Maximum Daily Load (TMDL) credits. Associated Plan(s): Storm Water Master Plan Funding Notes: Other funding is interest income New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Other Funding 450 450 Previous Funding Total Funding 450 0 0 0 0 0 0 0 0 0 450 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Construction Summer 2024 Changes from Prior CIP: The timing of expenditures has pushed out one year from the previous CIP. F - 81 STORMWATER MANAGEMENT Capital Improvement Plan Streams and Water Quality FY 2025-2034 6. OUTFALL REHABILITATION PROGRAM Project Highlights: • The Outfall Rehabilitation Program funds priority capital maintenance of outfalls, as identified in the Stormwater Master Plan. • Outfall rehabilitation and repair projects are necessary to protect other public and private infrastructure and increase the resiliency of the integrated stream and stormwater network. • Failed or failing outfalls are a source of erosion and sediment which degrades water quality. Stabilization of the outfalls reduces erosion and sedimentation and protects private and public property, as well as mature trees. Associated Plan(s): Storm Water Master Plan Neighborhood(s): VARIOUS Funding Notes: Other funding is interest income New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 625 1,225 1,260 1,260 1,305 1,305 1,345 8,325 Stormwater Utility Fee Revenue 490 1,030 1,520 Other Funding 250 250 250 250 250 250 250 250 250 2,250 Previous Funding Authorized but Unissued Bonds 435 445 1,055 1,935 Total Funding 925 1,725 1,305 875 1,475 1,510 1,510 1,555 1,555 1,595 14,030 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Non-Personnel ($) 5 5 5 5 5 5 5 5 40 Bond Financing Costs Total Impact 5 5 5 5 5 5 5 5 0 0 40 Changes from Prior CIP: No change from the previous CIP. Project Links: • MS4 Permit: https://www.arlingtonva.us/Government/Programs/Sustainability- and-Environment/Stormwater/Stormwater-Watersheds/MS4- Permit F - 82 STORMWATER MANAGEMENT Capital Improvement Plan Streams and Water Quality FY 2025-2034 7. SPARROW POND WATERSHED RETROFIT Project Highlights: • Sparrow Pond is an existing wet pond requiring re - construction due to eroded sediment filling the pond. Re - vegetation will help to restore the pond's function and address concerns about public safety and flood storage. • Ultimately, this project will result in a wet pond that will be easier and less costly to maintain and will provide enhanced wetland habitat, which is relatively rare in Arlington. • This project provides significant Chesapeake Bay Total Maximum Daily Load (TMDL) credits. • This project supports Biophilic Cities goals with its location along the heavily used W &OD Trail and will also include new interpretive signage. Associated Plan(s): Storm Water Master Plan Neighborhood(s): Arlington Forest Barcroft New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Previous Funding Authorized but Unissued Bonds 450 450 Total Funding 450 0 0 0 0 0 0 0 0 0 450 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Non-Personnel ($) 15 15 15 15 15 10 10 10 105 Bond Financing Costs Total Impact 15 15 15 15 15 10 10 10 0 0 105 Critical Milestones: • Construction Summer 2024 Changes from Prior CIP: The timing of expenditures has pushed out one year from the previous CIP. Project Links: • Project web site: https://www.arlingtonva.us/Government/Projects/Project- Types/Environment-Projects/Sparrow-Pond-Restoration F - 83 STORMWATER MANAGEMENT Capital Improvement Plan Streams and Water Quality FY 2025-2034 8. STREAM RESILIENCY PROGRAM Project Highlights: • Stream resiliency projects repair eroding and acutely degraded stream channels and protect critical infrastructure such as sanitary sewer mains. • This program responds to concerns resulting from increased storm intensity and frequency. • Most cost -effective source of Chesapeake Bay Total Maximum Daily Load (TMDL) credits. Associated Plan(s): Storm Water Master Plan Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total State Funding 1,750 1,750 New Bond Issue 275 3,000 280 3,080 290 3,165 295 10,385 Previous Funding Authorized but Unissued Bonds 250 260 1,165 1,675 Total Funding 250 260 2,915 275 3,000 280 3,080 290 3,165 295 13,810 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Non-Personnel ($) 5 5 10 10 15 20 65 Bond Financing Costs Total Impact 0 0 5 5 10 10 15 20 0 0 65 Changes from Prior CIP: The timing of expenditures has pushed out one year from the previous CIP. F - 84 STORMWATER MANAGEMENT Capital Improvement Plan Streams and Water Quality FY 2025-2034 9. WASHINGTON BOULEVARD POND RETROFIT Project Highlights: • This project improves Washington Boulevard Pond, an existing dry detention pond, to enhance performance. • The project would increase stormwater quality treatment, and add co -benefits including habitat, sense of place and aesthetics, supporting Biophilic Cities goals (located adjacent to the County’s Department of Human Services facility). • The project supports the County's regulatory requirements under its Municipal Separate Storm Sewer System (MS4) permit. Associated Plan(s): Storm Water Master Plan Neighborhood(s): Penrose New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Authorized but Unissued 155 795 950 Bonds Previous Funding Total Funding 0 155 795 0 0 0 0 0 0 0 950 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Non-Personnel ($) 7 7 7 7 7 7 42 Bond Financing Costs Total Impact 0 0 7 7 7 7 7 7 0 0 42 Critical Milestones: • Design Summer 2025 • Construction Summer 2026 Changes from Prior CIP: The timing of expenditures has pushed out from the previous CIP. F - 85 STORMWATER MANAGEMENT Capital Improvement Plan Streams and Water Quality FY 2025-2034 10. WATER QUALITY PROJECT FEASIBILITY & CONCEPT DESIGN Project Highlights: • Planning and feasibility studies provide an integrated approach to proper scoping of potential projects. Associated Plan(s): Storm Water Master Plan Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 165 60 170 125 175 170 865 Stormwater Utility Fee Revenue 150 135 80 165 110 50 5 695 Previous Funding Authorized but Unissued Bonds 20 80 100 Total Funding 150 155 160 165 165 170 170 175 175 175 1,660 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Bond Financing Costs Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: No change from the previous CIP. F - 86

Source: Arlington County website. First collected Oct 27, 2026.