Arlington County, Virginia
TRANSPORTATION
P
rogram Summary
The FY 2025 - FY 2034 Transportation Capital Improvement Plan (CIP) continues Arlington County's commitment to developing,
maintaining, and managing a multimodal transportation system that expands travel choices, provides equal access for all users, and su pports
the commitment to sustainability goals. During the next 10 years, Arlington plans to execute $1.5 billion in a range of capit al improvements
to enhance the safety, quality of life, and economic well-being of its residents, workers, and visitors. The plan balances maintenance of existing
infrastructure with investment in projects that have long-term positive community impact. The program includes a broad range of complete
street projects that improve connectivity, safety, and accessibility for all mod es; Metrorail station projects that expand access to transit and
safety for users; investments in the ART bus fleet and maintenance facilities; expansion of ART operations with higher freque ncy of service
particularly in off-peak hours; continued maintenance and reconstruction of County bridges and roadways; improvements to streetlights and
signals; and enhancements to parking technology. The CIP program reflects the goals and objectives set forth in Arlington's M aster
Transportation Plan and other County planning efforts.
The FY 2025 CIP includes new multi-use trails, sidewalk improvements and new sidewalks, expansion to Capital Bikeshare, transitway
extensions, and new entrances to metro stations, amongst other improvements. It continues a tradition of sustainable development which
has yielded significant sustainability benefits over the past 20+ years. From 1996 to 2022, daily vehicle traffic declined between 5% to 46%
in our major corridors while Arlington's population increased 35%. Annual vehicle miles traveled per Arlington County resident has fallen
from about 7,700 in 2010 to about 6,698 in 2022. Arlington residents drive alone less and use non-SOV modes more, making four times as
many bike and walk trips than the typical household in the region. Transit has been central to Arlington's success, as evidenced by 40 million
bus and rail trips taken annually in Arlington. The CIP also includes funding to update the Master Transportation Plan, a sub-element of the
County's Comprehensive Plan. It is envisioned that this update will continue policy guidance towards investment in multimodal travel options.
By expanding access to multimodal forms of transportation through the Complete Streets and Transit programs, the Transportati on CIP
continues to further the goals of the County's Community Energy Plan. These programs improve access to walking, biking, micr o-mobility
devices, and transit and, thereby reduce demand for single-occupant vehicles (SOV). Consequently, they collectively represent significant
investments in the environment. In addition to investing in multimodal and sustainable forms of transportation, the CIP also includes direct
investments in energy efficient technologies. The new ART Operations and Maintenance facility is being designed to adapt for future
electrification of the bus fleet and includes solar panels. The ART Fleet Transition to ZE B (Zero Emission Buses) program reflects the
objective to transition the ART Fleet to Battery Electric Buses (BEBs) and captures the incremental cost of BEBs and associat ed land and
infrastructure. The recently completed Zero Emissions Bus (ZEB) study will guide decision making on this front. The Streetlight program
continues LED conversion of Dominion Energy streetlights and plans upgrades of county -owned streetlights to next generation LEDs to
further increase energy savings.
Funding for the Transportation CIP program comes from a mix of federal, state, regional, and local sources. Two primary sources of local
revenues for this program are the Transportation Capital Fund (TCF) and Crystal City, Potomac Yard, and Pentagon City T ax Increment
Financing (TIF). The TIF uses a portion of incremental property tax revenue generated by new development and property appreciation in
Crystal City, Potomac Yard, and Pentagon City to fund infrastructure improvements in those areas. The TIF was initiated by the County
Board in October 2010 at an increment of 33 percent of the increase in assessed values relative to the baseline assessed valu e as of January
1, 2011; the increment used in the CIP is 25 percent, consistent with the County Board action as part of the FY 2019 Adopted Budget.
The Transportation Capital Fund is comprised of two revenue streams: the Commercial and Industrial (C&I) Tax and NVTA Local f unds
(below). The C&I tax is funded by an additional real estate tax on commercial and industrial properties for transportation initiatives; the rate
is currently set at $0.125 per $100 of assessed value. Eligible uses of these dedicated transportation funds are outlined in the state code,
enacted through House Bill 3202 by the 2007 Virginia General Assembly (and as amended by the 201 8 Virginia General Assembly), and
through the adoption of the tax by the County Board in 2008. Arlington's Transportation program also benefits from transportation funding
enacted by the 2013 Virginia General Assembly (House Bill 2313). This legislation ra ises transportation revenues for Northern Virginia
localities through a state -imposed regional sales tax. Revenues are collected by the state and distributed to the Northern Virginia
Transportation Authority (NVTA). Of these revenues, 70 percent (NVTA Regi onal) are retained by the NVTA to fund regional
transportation projects through a competitive selection process. The remaining 30 percent (NVTA Local) is returned to the member localities,
based on the amount of revenue generated by the sales tax within the locality. NVTA Local funds may be used for locally selected
transportation projects that comply with eligible uses outlined in the state code.
The availability of local sources of funds, including pay -as-you-go (PAYG) and general obligation (GO) bonds continues to be constrained.
As a result, the use of these funds in this CIP is primarily focused on maintaining the County's transportation infrastructure in a State of
Good Repair (SGR), which is not an eligible use of the sources listed above. Such SGR efforts include paving roadways, repairing, and
replacing bridges, and repairing and replacing traffic signals and streetlights. The County must ensure that existing transportation assets are
E - 3
maintained in good working condition and continue the ongoing sustainability of transportation programs. Some of these funds are also used
to test or pilot operational improvements in the right of way to improve safety and accessibility in pursuit of the County's Vision Zero goal.
Once a safety strategy is selected to address a safety deficiency, the permanent improvements can be funded with TCF or TIF a nd are
incorporated throughout the complete streets’ programs in the CIP.
This CIP continues investments from the previous CIPs to create a Premium Transit Network (PrTN) that will offer faster, more reliable,
and easier-to-use bus service connecting Columbia Pike, Pentagon City, Crystal City and Potomac Yard, which are major areas of growth
and economic development in the County. Projects supporting this effort include street improvements such as dedicated bus lanes and transit
signal priority, new transit stations, real-time bus arrival information, bus purchases, and development of bus maintenance/parking facilities.
The CIP also anticipates a variety of external funding sources over the 10-year period. These include several state sources - transit capital and
maintenance funding from the Virginia Department of Rail and Public Transportation (DRPT); and Smart Scale, state funding that is highly
competitive and available for roadway and transit projects. Both of those sources are programmed by the Commonwealth Transpor tation
Board (CTB). Additionally, the CIP anticipates seeking funding from both the I-66 Commuter Choice and I-395 Commuter Choice programs.
Both programs allocate revenues resulting from the tolled facilities and are managed by the Northern Virginia Transportation Commission
(NVTC) with oversight by the CTB. The CIP also includes federal funding anticipated from various programs in the Infrastructure
Investment and Jobs Act (IIJA). These include long -standing programs administered by the Commonwealth - the Highway Safety
Improvement Program and Transportation Alternatives Program - to myriad large, nationally competitive programs, including Rebuilding
American Infrastructure with Sustainability and Equity (RAISE), Safe Streets and Roads for All (SS4A), Active Transportation Infrastructure
Investment Program (ATIIP), and FTA Low or No Emission Vehicle Programs.
E - 4
Arlington County, Virginia
TRANSPORTATION
CIP
2025 − 2034
10 YEAR CATEGORY SUMMARY (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
Complete Arlington Streets 116,406 75,633 86,884 97,945 67,991 46,771 56,879 55,861 82,669 76,102 763,141
Arlington Transit Program 112,631 93,601 165,133 63,950 100,579 37,549 57,442 5,705 7,621 48,127 692,338
Maintenance Capital 17,062 16,628 17,282 17,618 18,298 18,640 19,364 19,725 20,478 20,848 185,943
Transportation Capital Program
Administration
4,873 5,019 5,169 5,324 5,483 5,648 5,817 5,991 6,170 6,356 55,850
Operating Costs 8,670 10,619 11,382 13,712 15,961 17,294 19,073 19,702 20,345 20,978 157,736
Total Recommendation 259,642 201,500 285,850 198,549 208,312 125,902 158,575 106,984 137,283 172,411 1,855,008
Implementation Adjustment (68,220) (48,268) (65,690) (55,192) (58,308) (8,360) (12,976) (7,417) (7,812) (12,066) (344,308)
Adjusted CIP 191,422 153,232 220,160 143,357 150,004 117,542 145,599 99,567 129,471 160,345 1,510,700
PROGRAM FUNDING SOURCES (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
New Funding
Federal Funding 1,090 4,718 33,892 4,546 25,258 16,419 21,366 4,011 4,176 13,996 129,472
State Funding 15,140 11,587 48,107 16,481 17,710 7,364 15,122 3,320 4,560 17,261 156,652
Developer Contributions 885 902 2,315 12,595 4,428 3,880 3,612 35 0 0 28,652
New Bond Issue 13,540 14,540 16,015 16,365 17,070 17,625 18,425 17,030 17,725 18,060 166,395
PAYG 4,781 5,954 7,398 7,654 7,635 8,103 9,259 9,146 8,339 8,575 76,844
Short Term Finance 0 0 0 0 0 0 0 0 0 0 0
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 150 357 357 0 34 35 0 0 0 0 933
TCF - Commercial & Industrial
Tax (C&I) 29,747 42,541 35,966 50,021 65,971 25,645 25,561 22,594 26,536 32,200 356,782
TCF - NVTA Local 11,618 17,717 19,270 17,965 18,425 15,203 22,175 14,781 15,873 24,913 177,940
Regional Funding 4,100 2,873 9,082 27,459 41,346 26,686 36,591 30,803 46,693 43,320 268,953
TCF Bonds 0 0 0 0 0 0 0 0 0 0 0
Tax Increment Financing (TIF) 20,131 16,702 6,139 8,950 8,576 2,526 4,834 5,265 13,349 14,067 100,539
TIF Bonds 0 0 0 0 0 0 0 0 0 0 0
TCF for Operating Costs 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 101,182 117,891 178,541 162,036 206,453 123,486 156,945 106,985 137,251 172,392 1,463,162
Previously Approved Funding
Authorized but Unissued
Bonds 2,478 268 0 0 0 0 0 0 0 0 2,746
Issued but Unspent Bonds 1,945 617 713 0 0 0 0 0 0 0 3,275
TCF - Commercial & Industrial
Tax (C&I) 58,095 13,494 6,750 4,287 0 29 89 0 31 19 82,794
TCF - NVTA Local 16,200 7,536 2,436 147 327 0 0 0 0 0 26,646
Regional Funding 22,972 24,738 75,227 23,388 0 0 0 0 0 0 146,325
Tax Increment Financing (TIF) 4,207 3,331 5,143 862 23 2,387 1,541 0 0 0 17,494
Other Previously Approved
Funds 52,563 33,624 17,041 7,829 1,509 0 0 0 0 0 112,566
Subtotal Previously Approved
Funding 158,460 83,608 107,310 36,513 1,859 2,416 1,630 0 31 19 391,846
Total Funding Sources 259,642 201,499 285,851 198,549 208,312 125,902 158,575 106,985 137,282 172,411 1,855,008
Implementation Adjustment (68,220) (48,268) (65,690) (55,192) (58,308) (8,360) (12,976) (7,417) (7,812) (12,066) (344,308)
Adjusted CIP 191,422 153,232 220,160 143,357 150,004 117,542 145,599 99,567 129,471 160,345 1,510,700
E - 5