Arlington County, Virginia CIP
2025 − 2034
TRANSPORTATION: COMPLETE ARLINGTON STREETS
PROGRAM
10 YEAR CATEGORY SUMMARY (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
1. Arlington View Trail
Connector
400 156 4,845 5,038 0 0 0 0 0 0 10,439
2. Army Navy Drive Complete
Street
7,100 2,000 0 0 0 0 0 0 0 0 9,100
3. BIKEArlington 1,307 1,344 4,776 4,432 4,749 4,520 4,177 4,592 8,920 8,582 47,399
4. Bridge Renovation /
Replacement
5,371 12,018 5,330 440 1,020 2,914 3,063 0 0 0 30,156
5. Capital Bikeshare 1,395 1,211 1,683 1,639 1,650 1,917 2,348 2,172 2,175 2,381 18,571
6. Columbia Pike Streets 40,027 3,588 532 255 0 0 0 0 0 0 44,402
7. Crystal City, Pentagon City,
Potomac Yard Streets
11,128 12,230 18,846 21,423 26,086 2,685 4,118 8,932 21,137 22,975 149,560
8. Improvements Outside
Major Corridors
15,349 16,069 17,787 16,748 5,974 8,682 8,754 7,494 17,637 10,474 124,968
9. Intelligent Transportation
Systems
6,387 3,290 1,913 2,456 619 1,229 657 1,304 696 1,383 19,934
10. Langston Blvd Multimodal
Improvements
400 200 800 2,250 2,000 4,800 12,940 15,100 9,700 3,500 51,690
11. Neighborhood Complete
Streets
3,599 1,343 1,467 1,690 1,804 1,823 1,878 1,924 1,980 2,037 19,545
12. Parking Meters 206 419 298 581 328 601 1,535 1,040 152 146 5,306
13. Parking Technology 646 1,130 888 566 586 596 616 783 651 677 7,139
14. Rosslyn-Ballston Arterial
Street Improvements
7,053 10,292 17,177 28,774 14,483 8,580 7,977 3,630 10,395 14,309 122,670
15. Strategic Network Analysis
and Planning
498 593 610 628 647 667 687 707 729 750 6,516
16. Street Lighting 2,506 1,896 2,023 2,133 1,530 1,633 1,807 1,669 1,783 1,974 18,954
17. Street Safety Improvements
(SSI)
2,502 2,283 2,348 2,418 2,492 2,569 2,644 2,724 2,808 2,892 25,680
18. Transportation Asset
Management
203 209 214 221 227 234 241 247 255 263 2,314
19. Transportation Systems &
Traffic Signals
6,908 3,346 4,486 4,904 3,046 2,550 2,627 2,706 2,787 2,871 36,231
20. WALKArlington 3,421 2,016 861 1,349 750 771 810 837 864 888 12,567
Total Recommendation 116,406 75,633 86,884 97,945 67,991 46,771 56,879 55,861 82,669 76,102 763,141
E - 24
CATEGORY FUNDING SOURCES (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
New Funding
Federal Funding 1,090 2,390 3,584 2,200 800 500 1,500 1,000 0 0 13,064
State Funding 1,228 1,716 8,633 13,977 6,636 3,277 2,993 2,000 3,000 3,000 46,460
Developer Contributions 850 867 2,280 5,695 4,393 3,845 3,577 0 0 0 21,507
New Bond Issue 1,555 1,495 2,190 2,305 2,435 2,755 2,940 1,295 1,350 1,430 19,750
PAYG 1,951 2,618 3,962 4,118 3,990 4,333 5,380 5,156 4,236 4,357 40,101
Short Term Finance 0 0 0 0 0 0 0 0 0 0 0
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 357 357 0 0 0 0 0 0 0 714
TCF - Commercial & Industrial
Tax (C&I) 2,486 8,276 14,372 24,157 14,136 10,421 8,686 4,970 6,891 11,094 105,489
TCF - NVTA Local 7,296 12,761 11,629 13,775 9,290 10,742 12,025 9,690 10,060 10,877 108,145
Regional Funding 500 500 7,400 12,400 18,300 7,300 14,440 27,620 44,920 31,940 165,320
TCF Bonds 0 0 0 0 0 0 0 0 0 0 0
Tax Increment Financing (TIF) 247 2,566 5,440 8,379 7,988 1,182 3,708 4,130 12,181 13,385 59,206
TIF Bonds 0 0 0 0 0 0 0 0 0 0 0
TCF for Operating Costs 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 17,203 33,546 59,847 87,006 67,968 44,355 55,249 55,861 82,638 76,083 579,756
Previously Approved Funding
Authorized but Unissued
Bonds 596 42 0 0 0 0 0 0 0 0 638
Issued but Unspent Bonds 1,387 617 713 0 0 0 0 0 0 0 2,717
TCF - Commercial & Industrial
Tax (C&I) 53,156 10,103 6,726 4,287 0 29 89 0 31 19 74,440
TCF - NVTA Local 11,119 3,993 1,658 0 0 0 0 0 0 0 16,770
Regional Funding 16,472 6,569 5,128 5,560 0 0 0 0 0 0 33,729
Tax Increment Financing (TIF) 3,786 3,240 5,143 862 23 2,387 1,541 0 0 0 16,982
Other Previously Approved
Funds 12,687 17,522 7,670 230 0 0 0 0 0 0 38,109
Subtotal Previously Approved
Funding 99,203 42,086 27,038 10,939 23 2,416 1,630 0 31 19 183,385
Total Funding Sources 116,406 75,632 86,885 97,945 67,991 46,771 56,879 55,861 82,669 76,102 763,141
E - 25
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
1. ARLINGTON VIEW TRAIL CONNECTOR
Project Highlights:
• The project will provide a new connection for bicycle and
pedestrian access between the Arlington View neighborhood
and the Army Navy Country Club driveway connection to
Army Navy Drive.
• Access will be restricted to bicycles and pedestrians.
• The Use Permit was approved in June 2010 and the public
use and access easement was recorded in March 2012. The
easement may terminate automatically if construction
contracts are not awarded within 20 years of that date.
Associated Plan(s):
Master Transportation Plan
Neighborhood(s):
Arlington Ridge
Arlington View
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
TCF - Commercial &
Industrial Tax (C&I) 109 2,423 2,519 5,051
TCF - NVTA Local 108 2,422 2,519 5,049
Previous Funding
TCF - Commercial &
Industrial Tax (C&I) 91 78 169
TCF - NVTA Local 92 78 170
Total Funding 400 156 4,845 5,038 0 0 0 0 0 0 10,439
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Cr
itical Milestones:
• Planning and Engineering Winter 2019 - Spring 2026
• Construction Fall 2026 - Summer 2028
Ch
anges from Prior CIP:
The County selected a hybrid stairs -runnel design approach,
which resulted in increased project costs compared to the previous
CIP. The project was named "Army Navy Country Club Trail
Connector" in the FY 2023 - FY 2032 CIP.
Pro
ject Links:
• Arlington View Trail Connector:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Army-Navy-Country-Club-
Trail-Connector
E - 26
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
2. ARMY NAVY DRIVE COMPLETE STREET
Project Highlights:
• The project rebuilds Army Navy Drive as a multimodal
complete street featuring enhanced bicycle, transit, and
pedestrian facilities and street trees.
• The reconstruction will provide a physically separated
two-way protected bicycle facility along the south side of
Army Navy Drive, in addition to shorter and safer pedestrian
crossings, and will accommodate future dedicated transit
lanes.
• The project will improve local connections between the
Pentagon and Crystal City and Pentagon City.
Associated Plan(s):
Master Transportation Plan
Vision Zero Action Plan
Neighborhood(s):
Arlington Ridge
Aurora Highlands
Crystal City
Pentagon City
Funding Notes: Other Previously Approved Funds are developer contributions from 400 Army Navy Drive site plan (#2). Regional
funding is from the Northern Virginia Transportation Authority (NVTA).
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Tax Increment Financing
(TIF) 886 886
Previous Funding
Regional Funding 7,100 527 7,627
Other Previously
Approved Funds 587 587
Total Funding 7,100 2,000 0 0 0 0 0 0 0 0 9,100
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Cr
itical Milestones:
• Construction Fall 2022 – Fall 2025
Ch
anges from Prior CIP:
Project is actively in construction. Total project cost is less than
the previous CIP based on awarded contract.
Pro
ject Links:
• Army Navy Complete Streets:
https://projects.arlingtonva.us/projects/army-navy-drive-
complete-street/
E - 27
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
3. BIKEARLINGTON
Project Highlights:
• The program aims to improve conditions for bicycling by
constructing new trails, renovating existing ones, and adding
bike lanes on streets.
• BIKEArlington also makes provisions for bicycle parking
and wayfinding signage, deploys/maintains counting
technology, and undertakes bike facility spot improvements.
• The largest project is the Arlington Memorial Trail that will
connect Memorial Avenue to Columbia Pike adjacent to
Arlington National Cemetery’s perimeter wall. This project
is currently in the planning stage ahead of National
Environmental Policy Act (NEPA) work.
• Other active projects include various Arlington Boulevard
Trail enhancements and development of Custis Trail
improvements. Some of these projects are not fully funded in
this CIP as the projects still need to be scoped.
Associated Plan(s):
Master Transportation Plan
Vision Zero Action Plan
Neighborhood(s):
VARIOUS
Funding Notes: Other Previously Approved Funds are PAYG. Regional funding ( from the NVTA) is anticipated for construction of
the Arlington Memorial Trail.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Federal Funding 290 230 115 200 800 500 1,500 1,000 4,635
State Funding 1,000 1,070 1,102 828 4,000
PAYG 50 183 229 204 229 206 212 230 238 244 2,025
TCF - Commercial &
Industrial Tax (C&I) 72 1,133 1,168 1,727 297 334 1,491 1,488 7,710
TCF - NVTA Local 82 288 336 138 1,450 606 1,275 1,025 5,200
Regional Funding 1,000 4,000 4,000 9,000
Tax Increment Financing
(TIF) 653 893 1,003 3,191 2,850 8,590
Previous Funding
TCF - Commercial &
Industrial Tax (C&I) 334 520 1,946 1,687 4,487
TCF - NVTA Local 528 122 1,078 1,728
Other Previously
Approved Funds 23 1 24
Total Funding 1,307 1,344 4,776 4,432 4,749 4,520 4,177 4,592 8,920 8,582 47,399
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
E - 28
Critical Milestones:
• Custis Trail rehabilitation scoping
and preliminary design
Summer 2025 - Spring 2026
• Arlington Boulevard Trail
Enhancements - Fairfax Drive
design
Summer 2023 - Spring 2026
• Arlington Boulevard Trail south
side improvements - Glebe Road
to George Mason Drive design
Summer 2024 - Fall 2026
Changes from Prior CIP:
This CIP includes a new project on Arlington Boulevard from
Jackson Street to George Mason Drive, resulting from the Arlington
Boulevard Trail study.
Project Links:
• Arlington Memorial Trail:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Arlington-Memorial-Trail
• Arlington Boulevard Trail Study:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Arlington-Boulevard-Trail-
Study
• Arlington Boulevard Trail - Granada Street to Edison Street:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Arlington-Boulevard-Trail-
Improvements-%E2%80%93-N.-Granada-Street-to-N.-
Edison-Street
• Custis Trail Needs Assessment:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Custis-Trail-Needs-
Assessment
E - 29
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
4. BRIDGE RENOVATION / REPLACEMENT
Project Highlights:
• This program rehabilitates, upgrades, or replaces the 36
bridges owned by Arlington County.
• Bridge reconstruction may include upgrades to sidewalks,
bicycle facilities, transit stops, lighting, and facades.
• Arlington Ridge Road bridge construction is expected to start
in FY 2025; the City of Alexandria will pay 50 percent of the
cost not covered by grant funding.
• Following Arlington Ridge Road bridge replacement in
FY 2027 all bridges in Arlington County will be rated
Satisfactory to Good.
• Shirlington Road vehicular bridge over Four Mile Run was
recently upgraded with widened sidewalks on the west side
of the bridge in FY 2023. Construction is currently underway
for an additional separate pedestrian bridge, west of the
vehicular bridge, which will add a two -way
pedestrian/bicycle facility.
Associated Plan(s):
Master Transportation Plan
Neighborhood(s):
VARIOUS
Funding Notes: Other Previously Approved Funds include $2,845,000 from the City of Alexandria, $10,601,000 in state funding,
$6,346,000 in Federal funding, and $941,000 in PAYG.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
State Funding 400 1,449 1,493 3,342
New Bond Issue 640 440 620 1,465 1,570 4,735
Previous Funding
Issued but Unspent Bonds 574 697 1,271
TCF - Commercial &
Industrial Tax (C&I) 75 75
Other Previously
Approved Funds 5,296 11,444 3,993 20,733
Total Funding 5,371 12,018 5,330 440 1,020 2,914 3,063 0 0 0 30,156
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Arlington Ridge Road
Bridge Design
Design Summer 2022- Summer 2024
• Arlington Ridge Road
Bridge Construction
Winter 2024 (2Q FY25) - Spring 2026
• Shirlington Road
Bridge Construction
Summer 2023 - Fall 2024
Changes from Prior CIP:
No significant changes from the previous CIP.
Project Links:
• Shirlington Road Bridge:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Shirlington-Road-Bridge-
Maintenance-and-New-Pedestrian-Bicycle-Bridge
• Arlington Ridge Road Bridge replacement:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Arlington-Ridge-
RoadMount-Vernon-Avenue-Bridge
E - 30
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
5. CAPITAL BIKESHARE
Project Highlights:
• This program funds the expansion of the Capital Bikeshare
system in Arlington, including purchase of additional bikes,
e-bikes, and stations.
• The program also funds the replacement of bikes that have
reached the end of their useful life or are lost to theft as well
as decommissioning and replacement of 10-year-old stations
to maintain a state of good repair.
• As of March 2024, Arlington has 110 stations and 800
bicycles.
Associated Plan(s):
Master Transportation Plan
Neighborhood(s):
VARIOUS
Funding Notes: Federal funding in FY 2027 is from Congestion Mitigation & Air Quality (CMAQ). Developer contributions include
$35k in FY 2025 from the Pen Place site plan (#105) and $35k in FY 2026 from the Key Bridge Marriott site plan (#53).
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Federal Funding 469 469
Developer Contributions 35 35 70
TCF - Commercial &
Industrial Tax (C&I) 76 803 874 825 850 886 900 941 956 1,000 8,111
TCF - NVTA Local 591 373 340 814 800 1,031 1,448 1,231 1,219 1,381 9,228
Previous Funding
TCF - Commercial &
Industrial Tax (C&I) 693 693
Total Funding 1,395 1,211 1,683 1,639 1,650 1,917 2,348 2,172 2,175 2,381 18,571
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Non-Personnel ($) 328 440 545 626 708 793 877 972 1,052 1,052 7,393
Total Impact 328 440 545 626 708 793 877 972 1,052 1,052 7,393
Changes from Prior CIP:
Due to the popularity of the dockless e -bikes, the number of
expansion stations has decreased from an average of four per year
to one and the number of e-bikes has increased from 150 per year
to 200. As the e -bikes don't need to be docked at a station, their
start and end points are limitless.
E - 31
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
6. COLUMBIA PIKE STREETS
Project Highlights:
• The Columbia Pike Multimodal Streets Project will improve
transportation options for pedestrians, cyclists, motorists, and
transit riders along the three plus mile Columbia Pike corridor
and will be completed in 2025.
• The street will be reconstructed in multiple segments with
wider sidewalks, improved intersection configurations,
improved lighting, additional street trees, new pedestrian
crossings, decreased pedestrian crossing distances where
possible, and transit platforms with near-level boarding.
• This program includes funding through FY 2027 to provide
parallel bike improvements to the Columbia Pike Bike
Boulevards along 9th Street South and 12th Street South.
• A federally funded companion project that realigns the far
east end of Columbia Pike to provide more burial space for
Arlington National Cemetery is currently under construction
and estimated to complete in late 2025.
Associated Plan(s):
Master Transportation Plan
Vision Zero Action Plan
Neighborhood(s):
Alcova Heights
Arlington Heights
Arlington View
Barcroft
Columbia Forest
Columbia Heights
Columbia Heights West
Douglas Park
Foxcroft Heights
Penrose
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY
2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
TCF - Commercial &
Industrial Tax (C&I)
279 159 438
Previous Funding
TCF - Commercial &
Industrial Tax (C&I) 40,027 3,309 373 255 43,964
Total Funding 40,027 3,588 532 255 0 0 0 0 0 0 44,402
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY
2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Construction Start (Seg. F, Oakland to
Wakefield
Summer 2022
• Construction Start (Seg. A, Joyce to Orme) Spring 2023
• Construction Start (Seg. D, Courthouse to
Garfield)
Fall 2023
• Construction Start (Seg C, Quinn to
Courthouse)
Spring 2024
• All Construction Complete Winter 2025
(2Q FY25)
Changes from Prior CIP:
New to this CIP is the Columbia Pike Bike Boulevard study
which will kick off in Summer 2024 to identify near to long-term
improvements to the 9th and 12th Street Bike Boulevards. The
near-term improvements will be developed into a project in Fall
2025.
Project Links:
• Columbia Pike Multimodal Street Improvements :
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Columbia-Pike-Multimodal-
Street-Improvements
• S. Oakland St to S. Wakefield St (Seg. F):
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Columbia-Pike-Multimodal-
Street-Improvements-S.-Wakefield-St-to-S.-Oakland-St
• Garfield to Quinn St (Seg. C&D):
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Columbia-Pike-Garfield-
Street-to-Quinn-Street
E - 32
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
7. CRYSTAL CITY, PENTAGON CITY, POTOMAC YARD STREETS
Project Highlights:
• This program supports ongoing major redevelopment activity
in Pentagon City, Crystal City, and Potomac Yard by
improving connectivity, accessibility, and safety for all
modes of travel. The program implements County
investments that complement redevelopment.
• The largest project in the program is the Crystal City to
Washington National Airport Multimodal Connection
(CC2DCA) that will provide a pedestrian connection from
Crystal City to National Airport.
• Other projects currently in or scheduled to begin construction
in the next year include improvements along South Clark-
Bell Street/15th Street South and South Eads Street, as well
as protected bike lane improvements along Army Navy Drive
from Joyce Street to Memorial Drive.
Associated Plan(s):
Crystal City Sector Plan
Master Transportation Plan
Pentagon City Sector Plan
Vision Zero Action Plan
Neighborhood(s):
Aurora Highlands
Crystal City
Pentagon City
Potomac Yard
Funding Notes: Regional funding is from the NVTA. Other Previously Approved Funds include $3,601,000 in federal grants and
$900,000 state grants for CC2DCA and $90,000 in developer contributions.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Regional Funding 500 500 7,400 12,400 18,300 6,050 12,400 12,700 70,250
Tax Increment Financing
(TIF) 47 1,474 5,228 8,161 7,763 298 2,577 2,882 8,737 10,275 47,442
Previous Funding
TCF - Commercial &
Industrial Tax (C&I) 3,175 2,860 154 6,189
Regional Funding 2,000 2,576 4,576
Tax Increment Financing
(TIF) 3,316 3,240 5,143 862 23 2,387 1,541 16,512
Other Previously
Approved Funds 2,090 1,580 921 4,591
Total Funding 11,128 12,230 18,846 21,423 26,086 2,685 4,118 8,932 21,137 22,975 149,560
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• 15th Street South/South Clark-Bell
Street Realignment construction
Fall 2024 - Winter 2027
(Q3 FY 2027)
• South Eads Street from Army Navy
Drive to 12th Street South
construction
Summer 2024 - Winter
2026 (Q3 FY 2026, with
Parks project)
• South Eads Street from 12th Street
South to 15th Street South
construction
Summer 2024 - Fall 2025
Project Links:
• 15th Street South/South Clark-Bell Street Realignment:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/15th-Street-Clark-Bell-
Street-Realignment
• Crystal City to Washington National Airport Multimodal
Connection (CC2DCA):
https://www.arlingtonva.us/Government/Projects/Project-
E - 33
• Army Navy Drive Protected Bike
Lane Missing Link construction
Winter 2025 - Spring 2026
• CC2DCA Multimodal Connection
30 percent design completion
Spring 2025
Changes from Prior CIP:
Construction estimates for CC2DCA Multimodal Connection have
changed upon identification and approval of the preferred alternative.
Types/Transportation-Projects/CC2DCA-Multimodal-
Connection-Study
• South Eads Street Complete Street: 12th Street South to
Army Navy Drive:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/South-Eads-Street-
Complete-Street
• South Eads Street Complete Street: 12th Street South to
15th Street South:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/South-Eads-Street-
Complete-Street-12th-Street-to-15th-Street
• Army Navy Drive Protected Bike Lane (PBL) Missing
Link:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Army-Navy-Drive-PBL-
Missing-Link
• Long Bridge Drive Multimodal Connection:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Long-Bridge-Drive-
Multimodal-Connection
E - 34
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
8. IMPROVEMENTS OUTSIDE MAJOR CORRIDORS
Project Highlights:
• The program includes multimodal accessibility and safety
enhancements to improve local pedestrian, bicycle, and
transit connectivity along well- traveled routes outside
primary business districts.
• Projects within this program are located along arterial streets
such as, but not limited to, Arlington Ridge Road, Glebe
Road, Pershing Drive, Shirlington Road, Walter Reed Drive,
and Military Road.
• The program is advancing preliminary design work for safety
improvements to the Washington Boulevard and Arlington
Boulevard Interchange in cooperation with Virginia
Department of Transportation.
• This program includes funding for the update to the Master
Transportation Plan, an element of the County’s
Comprehensive Plan.
Associated Plan(s):
Master Transportation Plan
Vision Zero Action Plan
Neighborhood(s):
VARIOUS
Funding Notes: Other Previously Approved Funds are $295,000 in PAYG. FY 2025 funding increased as part of Adopted CIP for
Carlin Springs planning.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Federal Funding 800 2,160 3,000 2,000 7,960
State Funding 443 900 5,354 6,713 3,708 500 1,500 1,500 20,618
PAYG 500 500
TCF - Commercial &
Industrial Tax (C&I) 913 3,589 6,040 3,895 760 524 747 1,077 1,576 1,577 20,698
TCF - NVTA Local 300 5,586 3,243 4,140 1,506 3,158 3,007 1,077 2,161 2,317 26,495
Regional Funding 5,000 5,000 4,840 12,400 5,080 32,320
Previous Funding
Issued but Unspent Bonds 552 552
TCF - Commercial &
Industrial Tax (C&I) 6,174 203 6,377
TCF - NVTA Local 5,272 3,631 150 9,053
Tax Increment Financing
(TIF) 100 100
Other Previously
Approved Funds 295 295
Total Funding 15,349 16,069 17,787 16,748 5,974 8,682 8,754 7,494 17,637 10,474 124,968
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
E - 35
Critical Milestones:
• Military & Nelly Custis construction start Fall 2024
• South Carlin Springs Road Interim
Pedestrian Improvements
2025
Changes from Prior CIP:
New projects in this CIP include: (1) Safety improvements at the
intersection of Lorcom Lane and Vacation Lane West with the
installation of a traffic signal, (2) Interim pedestrian
improvements to S. Carlin Springs Road, and (3) Pedestrian
improvements to the intersection of Wilson Boulevard and N.
Livingston Street. The CIP also advances the improvements
outlined in the George Mason Drive Multimodal Study.
Project Links:
• Pershing Drive Complete Street Improvements:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Pershing-Drive-Complete-
Street-Improvements
• South Walter Reed Drive Complete Streets Improvements:
5th Street S to Columbia Pike:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/South-Walter-Reed-Drive-
Complete-Street
• Military Road Safety Improvements:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Military-Road-Safety-
Improvements
E - 36
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
9. INTELLIGENT TRANSPORTATION SYSTEMS
Project Highlights:
• This program leverages technology to improve the efficiency
of transportation systems and operations throughout the
County.
• Includes equipment at signals as well as stand -alone
installations such as beacons and sensors.
Associated Plan(s):
Master Transportation Plan
Vision Zero Action Plan
Neighborhood(s):
VARIOUS
Funding Notes: Regional funding is from the NVTA and is for ITS improvements along major corridors.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
TCF - Commercial &
Industrial Tax (C&I) 249 727 282 601 299 638 316 677 335 718 4,842
TCF - NVTA Local 365 533 269 558 320 591 341 627 361 665 4,630
Previous Funding
TCF - Commercial &
Industrial Tax (C&I) 181 122 303
TCF - NVTA Local 112 52 33 197
Regional Funding 5,480 1,855 1,330 1,297 9,962
Total Funding 6,387 3,289 1,914 2,456 619 1,229 657 1,304 696 1,383 19,934
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• North Glebe Road ITS Corridor
improvements expected completion
Summer 2025
• Langston Boulevard ITS Corridor
improvements expected completion
Summer 2026
• Washington Boulevard ITS Corridor
Improvements Phase 1 expected completion
Summer 2025
Changes from Prior CIP:
The ITS corridor projects are delayed which shifts expenses
from FY 2023 and FY 2024 into the FY 2025 – FY 2034 CIP.
Project Links:
• https://projects.arlingtonva.us/projects/intelligent-
transportation-systems/
E - 37
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
10. LANGSTON BLVD MULTIMODAL IMPROVEMENTS
Project Highlights:
• This program will begin to implement the complete streets
improvements recommended by Plan Langston Boulevard.
• The program includes funding for two studies and anticipated
construction funding. The first study will analyze major
intersections identified for further analysis in Plan Langston
Boulevard, particularly where private development is
anticipated in the near-term. The second study will conduct a
multimodal corridor assessment of the east end of Langston
Boulevard from I -66 to Key Bridge and outlined in Plan
Langston Boulevard.
Associated Plan(s):
East Falls Church Area Plan
Lee Highway Cherrydale Revitalization Plan
Master Transportation Plan
Plan Langston Boulevard
Neighborhood(s):
Arlington-East Falls Church
Cherrydale
Colonial Village
Donaldson Run
Glebewood
John M. Langston
Leeway Overlee
Lyon Village
Maywood
North Highlands
North Rosslyn
Old Dominion
Waverly Hills
Yorktown
Funding Notes: State and Regional funding levels represent future requests to implement the outcomes of the two studies.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
State Funding 500 1,000 1,000 1,500 1,500 1,500 1,500 8,500
TCF - Commercial &
Industrial Tax (C&I) 300 150 700 1,650 900 1,400 1,500 1,400 1,500 1,500 11,000
TCF - NVTA Local 50 50 100 100 100 100 500 100 500 500 2,100
Regional Funding 2,300 9,440 12,100 6,200 30,040
Previous Funding
TCF - Commercial &
Industrial Tax (C&I) 50 50
Total Funding 400 200 800 2,250 2,000 4,800 12,940 15,100 9,700 3,500 51,690
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Develop Major Intersection
analysis
Summer 2024 - Winter 2025
(Q2 FY26)
• Develop Langston Blvd East
End study
Fall 2026 - Spring 2028
Changes from Prior CIP:
Forecast has increased following the adoption of Plan Langston
Boulevard which has helped to define expected scope of
program.
E - 38
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
11. NEIGHBORHOOD COMPLETE STREETS
Project Highlights:
• The purpose of this program is to improve walking
connectivity, upgrade street crossings, and modify
incomplete streets to improve safety.
• Complete Streets are streets designed and operated to allow
safe and comfortable use by all users. This program
implements improvements on neighborhood streets to
achieve this goal where feasible. The program also tests new
design concepts in locations that are constrained, such as the
"Shared Street Pilot".
• Locations are selected by the Neighborhood Complete
Streets Commission following a robust evaluation process
against a set of ranking guidelines accepted by the County
Board. Capital projects are developed at these locations and
recommended to the County Board on an annual basis.
Associated Plan(s):
Master Transportation Plan
Vision Zero Action Plan
Neighborhood(s):
VARIOUS
Funding Notes: Other Previously Approved Funds are PAYG.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 420 435 450 670 670 670 670 670 670 670 5,995
PAYG 82 101 102 103 104 105 106 107 810
TCF - NVTA Local 1,087 808 916 919 1,032 1,050 1,104 1,149 1,204 1,260 10,529
Previous Funding
Authorized but Unissued
Bonds 399 399
TCF - NVTA Local 1,593 1,593
Other Previously
Approved Funds 100 100 19 219
Total Funding 3,599 1,343 1,467 1,690 1,804 1,823 1,878 1,924 1,980 2,037 19,545
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• 3 new “Shared Streets” Pilot
projects implemented
Summer 2024 -
Summer 2025
• South Irving Street sidewalk
construction start
Summer 2024
• South Irving streetlight
relocation construction start
Spring 2025
• 28th Street South
construction start
Fall 2024
• 14th Street North
construction start
Summer 2025
Project Links:
• Neighborhood Complete Streets Projects:
https://www.arlingtonva.us/Government/Projects/Programs/Neighborhood-
Complete-Streets-Program/NCS-Projects
• Shared Street Pilot:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/NCS-Shared-Street-Pilot
Changes from Prior CIP:
The program approves new projects on a yearly basis and new projects were
added since the previous CIP.
E - 39
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
12. PARKING METERS
Project Highlights:
• The annual capital cost schedule provides for replacement of
meters at the end of their useful life, assuming a ten-year life
span.
• It supports analysis of parking meter data and research into
and deployment of new technology to allow the County to
manage public curb space more efficiently or improve
customer convenience.
• Replacement strategies, such as replacing major meter
components, are applied to extend the life of equipment.
• Maintaining parking meters in a state of good repair ensures
steady collection of revenue, consistent operating and
maintenance costs, and quality customer experience.
Associated Plan(s):
Master Transportation Plan
Neighborhood(s):
VARIOUS
Funding Notes: Other Previously Approved Funds include $53,000 in Developer Contributions and $174,000 in PAYG. The
combination of carryover into FY 2024 and lower replacement needs in the early years means prior approved funds help cover program
needs and lowers required new funds in FY 2025 and FY 2026.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
PAYG 181 298 581 328 601 1,535 1,040 152 146 4,862
Previous Funding
Authorized but Unissued
Bonds 153 42 195
Issued but Unspent Bonds 22 22
Other Previously
Approved Funds 53 174 227
Total Funding 206 419 298 581 328 601 1,535 1,040 152 146 5,306
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
The FY 2025 - FY 2034 CIP reverts back to an annual capital cost
schedule which best reflects staff's estimate of expenses each year
based on the replacement cycle (vs. the prior CIP in which the
costs had been "smoothed" out across the ten years). This shift to
a more accurate depiction of costs by year has dramatically
reduced the budget required for FY 2025. Furthermore, due to the
fact that so many replacements were required for modem
upgrades in a short period between FY 2021 and FY 2022, this
acceleration "brought forward" replacement costs into this ten-
year CIP period, raising the total cost of this ten-year CIP vs. that
of the previous CIP (it also explains the cost jump in FY 2031 and
FY 2032). To defray this cost increase, this update continues to
assume meter door replacements rather than full meter
replacements through FY 2027 and splitting the replacements half
and half between full meter and door replacements from FY 2027
through FY 2034.
E - 40
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
13. PARKING TECHNOLOGY
Project Highlights:
• This program undertakes upgrades to technology systems
that support the County’s parking policies.
• Investments in hardware and software will improve
performance management of metered parking spaces and
support demand-based parking meter pricing using
in-pavement sensor equipment.
• Technology upgrades will allow the County to maintain and
improve residential permit parking (RPP) administration and
enable enforcement via license plate recognition (LPR)
technology.
• Developer-funded studies are separately tracked and
managed.
Associated Plan(s):
Master Transportation Plan
Neighborhood(s):
VARIOUS
Funding Notes: Other Previously Approved Funds include $1,456,000 in State funds (Innovation and Technology Transportation
Fund, or ITTF grant), $30,000 in developer funds and $332,000 in PAYG. The ITTF grant is funding the demand-based parking-meter
pricing pilot.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Developer Contributions 30 15 45
PAYG 801 566 586 596 616 783 651 677 5,276
Previous Funding
Other Previously
Approved Funds 616 1,115 87 1,818
Total Funding 646 1,130 888 566 586 596 616 783 651 677 7,139
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Demand-based parking pricing pilot
implementation
2023 to 2026
Changes from Prior CIP:
Staff has updated its cost estimates and timeline for the upgrade
to the RPP program's administrative software based on a contract
with a vendor and internal staff discussions.
Project Links:
• Report for Dec. 15, 2020 Board Meeting Re: Performance
Parking
E - 41
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
14. ROSSLYN-BALLSTON ARTERIAL STREET IMPROVEMENTS
Project Highlights:
• The program provides significant street and sidewalk safety
improvements along Clarendon Boulevard, Wilson
Boulevard, Fairfax Drive, Fort Myer Drive, and other nearby
intersections.
• Improvements include road reconfigurations, new
crosswalks, new signage and striping, bike lanes,
underground utilities, new streetlights, updated traffic
signals, street trees, and updated bus shelters.
• Active projects include Wilson Boulevard from 10th Street
North to North Kenmore Street, and Meade Street
multimodal improvements.
• The largest project in the portfolio is Fort Myer Drive. The
scope includes removal of the tunnel followed by two- way
conversion and addition of a cycle track. This project is
dependent on a series of discrete capital projects reaching
completion before the two-way conversion can be completed.
There are also developer contributions funding the project,
the receipt of which is dependent on redevelopment (outlined
in Funding Notes below).
Associated Plan(s):
Ballston Sector Plan
Clarendon Sector Plan
Court House Sector Plan
Master Transportation Plan
Vision Zero Action Plan
Neighborhood(s):
Ashton Heights
Ballston-Virginia Square
Bluemont
Clarendon-Courthouse
Colonial Village
Lyon Village
North Rosslyn
Radnor-Ft. Meyer Heights
Funding Notes: Projects are primarily funded with TCF-C&I but also benefit from developer contributions, including contributions into
the utility undergrounding fund. Funding from developer contributions includes approximately: $7,500,000 from the Rosslyn Gat eway
site plan (#419), $5,000,000 from the Ames Center site plan (#1), $4,500,000 from the Holiday Inn site plan (#79), and $5,000,000 from
the 1401 Wilson Boulevard site plan (#429). Other Previously Approved Funds reflect the remaining developer contribution bala nce
($206,000) from the Red Top site plan (#438) and the utility undergrounding fund ($4,638,000). Regional Funding is from the NVTA.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
State Funding 785 816 2,279 5,694 426 10,000
Developer Contributions 785 817 2,280 5,695 4,393 3,845 3,577 21,392
Other Funding 357 357 714
TCF - Commercial &
Industrial Tax (C&I) 510 2,348 2,106 10,916 9,664 4,735 4,400 475 4,149 39,303
Regional Funding 3,630 9,920 10,160 23,710
Previous Funding
TCF - Commercial &
Industrial Tax (C&I) 2,071 2,941 4,155 1,976 11,143
Regional Funding 1,892 1,611 3,798 4,263 11,564
Other Previously
Approved Funds 1,010 1,402 2,202 230 4,844
Total Funding 7,053 10,292 17,177 28,774 14,483 8,580 7,977 3,630 10,395 14,309 122,670
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
Project Links:
E - 42
• Wilson Boulevard - 10th Street to
North Kenmore Street construction
Fall 2024 - Summer
2027
• Wilson Boulevard and North
Rhodes Street Intersection Safety
Project
Fall 2023 - Spring 2026
Changes from Prior CIP:
New projects in this CIP include Wilson Boulevard and North
Rhodes Street intersection improvements and Clarendon
Boulevard and North Oak Street streetscape improvements.
• Wilson Boulevard Streetscape Improvements:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Wilson-Boulevard-
Streetscape-Improvements-Clarendon-Area
• Core of Rosslyn Transportation Study:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Core-of-Rosslyn-
Transportation-Study
E - 43
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
15. STRATEGIC NETWORK ANALYSIS AND PLANNING
Project Highlights:
• This program supports data analysis and management
activities, which guide decision -making to implement the
Vision Zero Action Plan and other transportation operations
programs. The program also supports transportation
planning, studies, community engageme nt, and performance
measurement with a focus on safety.
• Progress reporting is provided through the biannual Vision
Zero public reporting cycle, and a month- long community
engagement is hosted annually to review progress.
• Funding for these activities is critical to programming
transparent, equitable, and data -supported projects and
services for the community.
Associated Plan(s):
Master Transportation Plan
Vision Zero Action Plan
Neighborhood(s):
VARIOUS
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
TCF - NVTA Local 478 593 610 628 647 667 687 707 729 750 6,496
Previous Funding
TCF - NVTA Local 20 20
Total Funding 498 593 610 628 647 667 687 707 729 750 6,516
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
No significant change from the
previous CIP.
Project Links:
• https://www.arlingtonva.us/files/sharedassets/public/v/1/transportation/documents/action -
plan_revised_draft_v3.pdf
E - 44
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
16. STREET LIGHTING
Project Highlights:
• This program implements projects to achieve the goals stated
in the Streetlight Management Plan (SMP) that include
enhancing public safety and increasing the operational
service level of streetlights throughout the County.
• Major projects install lights where lighting does not exist or
is insufficient and are prioritized for high activity areas or
areas with safety considerations.
• This program also includes the conversion of Dominion
Energy (DE) owned lights to LED technology, which reduces
electricity consumption and increases service reliability.
Associated Plan(s):
Community Energy Plan
Master Transportation Plan
Vision Zero Action Plan
Neighborhood(s):
VARIOUS
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 770 610 640 410 85 115 185 90 125 190 3,220
PAYG 989 1,250 1,324 1,364 1,405 1,447 1,490 1,535 1,583 12,387
TCF - Commercial &
Industrial Tax (C&I)
30 81 84 86 89 92 182 644
Previous Funding
Issued but Unspent Bonds 30 21 51
TCF - Commercial &
Industrial Tax (C&I) 270 70 98 369 29 89 31 19 975
Tax Increment Financing
(TIF) 370 370
Other Previously
Approved Funds 1,066 206 35 1,307
Total Funding 2,506 1,896 2,023 2,133 1,530 1,633 1,807 1,669 1,783 1,974 18,954
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• LED Retrofit of DE lights
expected to be completed.
Winter 2025 (Q3 FY26)
Changes from Prior CIP:
No significant change from the previous CIP.
Project Links:
• https://www.arlingtonva.us/Government/Programs/Transporta
tion/Streets/Streetlights/Streetlight-Project
E - 45
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
17. STREET SAFETY IMPROVEMENTS (SSI)
Project Highlights:
• The Street Safety Improvements (SSI) Program funds capital
improvements identified through the County’s Vision Zero
Program which the County Board adopted in July 2019.
• SSI supports safety projects for pedestrians, bicyclists, transit
riders, or motorists as determined through a comprehensive
crash analysis. Examples include signage, pavement
markings, minor changes to curb, and deployment of
Rectangular Rapid Flashing Beacons (RRFBs).
• Projects that are initiated by Vision Zero Report -A-Problem
(R-A-P) and the Customer Care Communication (C3)
platform may be implemented through this program.
Associated Plan(s):
Master Transportation Plan
Vision Zero Action Plan
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 165 240 245 250 260 270 275 285 295 305 2,590
PAYG 1,378 1,004 1,034 1,066 1,097 1,130 1,165 1,199 1,235 1,271 11,579
TCF - Commercial &
Industrial Tax (C&I) 279 328 337 348 358 369 380 391 403 415 3,608
TCF - NVTA Local 636 711 732 754 777 800 824 849 875 901 7,859
Previous Funding
Authorized but Unissued
Bonds 44 44
Total Funding 2,502 2,283 2,348 2,418 2,492 2,569 2,644 2,724 2,808 2,892 25,680
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
Funding for this program has
increased significantly compared to
the previous CIP as a result of program
acceleration to meet community and
Board expectations.
Project Links:
• https://projects.arlingtonva.us/projects/vision-zero-pilot-projects/
• https://www.arlingtonva.us/files/sharedassets/public/v/1/transportation/documents/action -
plan_revised_draft_v3.pdf
• https://www.arlingtonva.us/Government/Projects/Project-Types/Transportation-
Projects/Quick-Build-Safety-Projects
• https://www.arlingtonva.us/Government/Programs/Transportation/Vision-Zero/High-
Injury-Network-Corridor-Safety-Audits
• https://www.arlingtonva.us/Government/Programs/Transportation/Vision-Zero/Safety-
Before-After-Studies
• https://www.arlingtonva.us/Government/Programs/Transportation/Vision-Zero/Systemic-
Safety-Improvements
E - 46
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
18. TRANSPORTATION ASSET MANAGEMENT
Project Highlights:
• The program provides systems to maintain real -time
transportation assets, manage transportation data, and
develop a central traffic database.
• Program uses Cartegraph as the asset management and
inventory platform and continues to integrate additional
features available from the vendor.
• Includes tools to establish an inventory control system and
workorder system with asset and warehouse inventory so that
the assets are managed.
Associated Plan(s):
Master Transportation Plan
Neighborhood(s):
VARIOUS
Funding Notes: Other Previously Approved Funds are PAYG.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
PAYG 23 157 161 166 171 176 181 186 192 198 1,611
TCF - Commercial &
Industrial Tax (C&I) 50 52 53 55 56 58 60 61 63 65 573
Previous Funding
Other Previously
Approved Funds 130 130
Total Funding 203 209 214 221 227 234 241 247 255 263 2,314
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
No significant change from the previous CIP
E - 47
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
19. TRANSPORTATION SYSTEMS & TRAFFIC SIGNALS
Project Highlights:
• This program focuses on traffic signal rebuilds, infrastructure
replacement, and signal optimization.
• Projects improve accessibility, safety, efficiency, and remote
monitoring capabilities at signalized intersections.
• Signal optimization is an ongoing program that operates on a
three-year cycle to improve safety and reduce delays along
major corridors.
Associated Plan(s):
Master Transportation Plan
Vision Zero Action Plan
Neighborhood(s):
VARIOUS
Funding Notes: Other Previously Approved Funds include $2,380,000 in State Funding, $150,000 of Developer Contributions and
$510,000 of PAYG.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 315 570 885
TCF - Commercial &
Industrial Tax (C&I)
1,326 2,185 3,511
TCF - NVTA Local 2,581 2,433 2,334 2,404 2,476 2,550 2,627 2,706 2,787 2,871 25,769
Previous Funding
Issued but Unspent Bonds 805 16 821
TCF - NVTA Local 1,808 397 2,205
Other Previously
Approved Funds 1,714 913 413 3,040
Total Funding 6,908 3,346 4,486 4,904 3,046 2,550 2,627 2,706 2,787 2,871 36,231
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Non-Personnel ($) 33 44 55 66 77 88 99 110 121 132 825
Total Impact 33 44 55 66 77 88 99 110 121 132 825
Critical Milestones:
• Typical upgrade projects include 12 months
design, 4 months procurement, and 12
months construction
Changes from Prior CIP:
No significant changes from the previous CIP.
Project Links:
• Traffic Signal Upgrades:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Uncategorised/Traffic-Signal-Upgrades
E - 48
TRANSPORTATION Capital Improvement Plan
Complete Arlington Streets FY 2025-2034
20. WALKARLINGTON
Project Highlights:
• The WALKArlington program makes enhancements to
Arlington's sidewalk and pedestrian infrastructure in
coordination with other programs in the CIP. This includes
completion of the planned walkway network, making it fully
accessible for all users and improving pedestrian safety.
• The program focuses on arterial street sidewalk upgrades,
transit-access improvements, ancillary sidewalk projects to
support Arlington Public Schools safe routes to schools, and
stand-alone safety and accessibility upgrades.
Associated Plan(s):
Master Transportation Plan
Vision Zero Action Plan
Neighborhood(s):
VARIOUS
Funding Notes: Other Previously Approved Funds are PAYG.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 200 210 215 220 230 235 240 250 260 265 2,325
PAYG 104 107 110 113 116 120 123 127 131 1,051
TCF - NVTA Local 1,018 1,386 327 801 182 189 212 219 224 232 4,790
Tax Increment Financing
(TIF) 200 206 212 218 225 231 238 245 253 260 2,288
Previous Funding
TCF - Commercial &
Industrial Tax (C&I) 15 15
TCF - NVTA Local 1,694 110 1,804
Other Previously
Approved Funds 294 294
Total Funding 3,421 2,016 861 1,349 750 771 810 837 864 888 12,567
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
E - 49
Critical Milestones:
• N. Ohio Street safety
improvements construction
Summer 2024 - Spring 2025
• Rosslyn-Ballston corridor
accessibility improvements
construction complete
Summer 2024
• N. Park Drive and N.
George Mason Drive signal
improvements construction
Summer 2024 - Winter 2024
C
hanges from Prior CIP:
New projects in this CIP include N. Park Drive and N. George
Mason Drive signal improvements and John Marshall and Little
Falls Drive Intersection Improvements.
Project Links:
• N. Ohio Street at 12th Road N. and 14th Street N.
Improvements:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Ohio-Street-Safety-
Improvements
• N. Park Drive & N. George Mason Drive Intersection
Improvements:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Lorcom-Lane-Safety-
Project/N.-Park-Drive-and-N.-George-Mason-Drive-
Intersection-Improvements
• Lorcom Lane Safety Project:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Transportation-Projects/Lorcom-Lane-Safety-Project
E - 50