Arlington County, Virginia CIP 2025 − 2034 TRANSPORTATION: ARLINGTON TRANSIT PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total 1. Army Navy Drive Transit Center 150 0 0 0 34 35 0 0 0 0 219 2. ART Fare Collection System 244 802 0 0 0 0 0 0 0 0 1,046 3. ART Fleet & Equipment Replacement 10,637 10,051 6,050 0 10,429 0 11,916 0 0 18,601 67,684 4. ART Fleet Transition to ZEB 900 930 37,920 1,103 30,542 5,474 21,274 3,764 5,221 27,048 134,176 5. ART Operations and Maintenance Facility 27,404 0 0 0 0 0 0 0 0 0 27,404 6. Ballston-MU Metrorail Station West Entrance 950 14,282 69,667 54,913 37,201 0 0 0 0 0 177,013 7. Bus Bay Expansion-East Falls Church Metro Station 8,190 394 0 0 0 0 0 0 0 0 8,584 8. Bus Stop Accessibility Improvements 926 883 921 954 985 1,020 1,056 1,099 1,133 1,182 10,159 9. Bus Stop and Shelter Program 627 645 556 522 538 560 603 645 664 687 6,047 10. Court House Metrorail Station New Elevators 206 64 3,730 2,933 12,265 24,425 13,848 0 0 0 57,471 11. Crystal City - Potomac Yard Transitway Upkeep 489 0 0 0 0 0 0 0 0 0 489 12. Crystal City Metro Station East Entrance 39,852 48,891 38,321 0 0 0 0 0 0 0 127,064 13. East Falls Church Metro Station Second Entrance 0 0 0 0 0 0 0 0 400 400 800 14. Microtransit Implementation Plan 70 500 0 0 0 0 0 0 0 0 570 15. Mobility Hub Pilot 565 0 0 0 0 0 0 0 0 0 565 16. Pentagon City Metro Station Second Elevator 3,893 0 0 0 0 0 0 0 0 0 3,893 17. Premium Transit Network (PrTN): ART Fleet Expansion 4,463 0 0 0 5,616 0 3,404 0 0 0 13,483 18. Premium Transit Network (PrTN): Columbia Pike Transit Stations 4,258 3,558 109 0 0 0 0 0 0 0 7,925 19. Premium Transit Network (PrTN): Transit ITS and Security Program 1,046 458 446 459 293 185 191 197 203 209 3,687 E - 51 20. Premium Network Transit (PrTN): Transitway Extension Potomac Ave - Alexandria 20 37 3,142 3,066 1,491 0 0 0 0 0 7,756 21. Premium Network Transit (PrTN): Transitway Extension to Pentagon City 7,431 12,106 4,271 0 0 0 0 0 0 0 23,808 22. Shirlington Bus Station Expansion 310 0 0 0 600 5,850 5,150 0 0 0 11,910 23. Transit Strategic Plan Updates 0 0 0 0 585 0 0 0 0 0 585 Total Recommendation 112,631 93,601 165,133 63,950 100,579 37,549 57,442 5,705 7,621 48,127 692,338 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 2,328 30,308 2,346 24,458 15,919 19,866 3,011 4,176 13,996 116,408 State Funding 13,912 9,871 39,474 2,504 11,074 4,087 12,129 1,320 1,560 14,261 110,192 Developer Contributions 0 0 0 6,865 0 0 0 0 0 0 6,865 New Bond Issue 0 0 0 0 0 0 0 0 0 0 0 PAYG 0 0 0 0 0 0 0 0 0 0 0 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 150 0 0 0 34 35 0 0 0 0 219 TCF - Commercial & Industrial Tax (C&I) 19,567 25,596 10,986 14,359 39,650 639 297 310 320 1,185 112,909 TCF - NVTA Local 580 1,088 3,993 324 5,094 281 5,804 573 1,058 9,132 27,927 Regional Funding 2,200 0 0 12,000 18,451 15,850 18,844 0 0 9,553 76,898 TCF Bonds 0 0 0 0 0 0 0 0 0 0 0 Tax Increment Financing (TIF) 19,362 13,598 145 0 0 738 502 492 506 0 35,343 TIF Bonds 0 0 0 0 0 0 0 0 0 0 0 TCF for Operating Costs 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 55,771 52,481 84,906 38,398 98,761 37,549 57,442 5,706 7,620 48,127 486,761 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 407 0 0 0 0 0 0 0 0 0 407 TCF - Commercial & Industrial Tax (C&I) 4,789 3,236 0 0 0 0 0 0 0 0 8,025 TCF - NVTA Local 5,081 3,543 778 147 327 0 0 0 0 0 9,876 Regional Funding 6,500 18,169 70,099 17,828 0 0 0 0 0 0 112,596 Tax Increment Financing (TIF) 421 91 0 0 0 0 0 0 0 0 512 Other Previously Approved Funds 39,662 16,081 9,350 7,577 1,491 0 0 0 0 0 74,161 Subtotal Previously Approved Funding 56,860 41,120 80,227 25,552 1,818 0 0 0 0 0 205,577 Total Funding Sources 112,631 93,601 165,133 63,950 100,579 37,549 57,442 5,706 7,620 48,127 692,338 E - 52 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 1. ARMY NAVY DRIVE TRANSIT CENTER Project Highlights: • Construction of a new multi -modal, multi -jurisdictional facility near the Pentagon by WMATA; County's role is limited to staff support during design and construction. • Establishes a central bus route connection and transfer hub in the busy Pentagon and Pentagon City travel markets. • Facilitates safe movement of people transferring between different services. • Expected to be fully funded and constructed by WMATA. Associated Plan(s): Master Transportation Plan Transit Strategic Plan Neighborhood(s): Pentagon City Funding Notes: WMATA will provide funding for this project. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Other Funding 150 34 35 219 Previous Funding Total Funding 150 0 0 0 34 35 0 0 0 0 219 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Construction begins Fall 2028 • Construction ends Spring 2030 Changes from Prior CIP: Construction start date moved from FY 2027 to FY 2029. E - 53 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 2. ART FARE COLLECTION SYSTEM Project Highlights: • ART buses are equipped with electronic fareboxes that connect to the regional SmarTrip fare collection system, making transfers more seamless. • Current fareboxes are nearing the end of their useful lives and need to be replaced with the next generation farebox being implemented by WMATA. Associated Plan(s): Transit Strategic Plan Neighborhood(s): VARIOUS Funding Notes: New funding is anticipated to include a combination of state and local funds. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total State Funding 545 545 TCF - NVTA Local 95 95 Previous Funding TCF - NVTA Local 244 162 406 Total Funding 244 802 0 0 0 0 0 0 0 0 1,046 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Upgrade light maintenance facility to be compatible with existing and new generation fareboxes. Spring 2026 Changes from Prior CIP: The project's name was changed from ART Bus Farebox Upgrade to ART Fare Collection System to align with the scope of the project. E - 54 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 3. ART FLEET & EQUIPMENT REPLACEMENT Project Highlights: • This program funds the replacement of buses that have reached the end of their useful life based on public transit standards, which is 12 years. • The program helps to maintain and improve the reliability, accessibility, and sustainability of ART service. • ART currently has a fleet of 78 Compressed Natural Gas (CNG) buses, and many will need to be replaced over the ten- year CIP period as they reach the end of their useful life. • Discussions with DRPT and other funding partners on zero- emission buses and related technology are ongoing. • The costs in FY 2026 reflect the purchase of eight Zero Emission Buses (ZEBs), specifically Battery Electric Buses (BEBs). • Future bus purchases are also expected to be BEBs; however, this CIP program reflects the replacement cost of buses at the CNG cost beyond FY 2026. The incremental costs associated with BEB technology are captured in the ART Fleet Transition to ZEB CIP program. Associated Plan(s): Community Energy Plan Master Transportation Plan Transit Strategic Plan ART Zero-Emissions Bus Study Neighborhood(s): VARIOUS Funding Notes: Other Previously Approved Funds consist of state grants. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total State Funding 6,835 4,114 7,092 8,103 12,648 38,792 TCF - NVTA Local 1,301 3,337 3,813 5,953 14,404 Previous Funding TCF - NVTA Local 3,404 3,216 635 7,255 Other Previously Approved Funds 7,233 7,233 Total Funding 10,637 10,051 6,050 0 10,429 0 11,916 0 0 18,601 67,684 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Fifteen 35-foot replacement buses Summer 2024 • Eight 40-foot replacement buses Spring 2026 • Eight 40-foot replacement buses Spring 2027 • Thirteen 40-foot replacement buses Spring 2029 • Fourteen 40-foot replacement buses Spring 2031 • Twenty 40-foot replacement buses Spring 2034 Changes from Prior CIP: Vehicle cost in the previous CIP reflected Battery Electric Buses (BEBs) in all fiscal years. E - 55 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 4. ART FLEET TRANSITION TO ZEB Project Highlights: • This program contains funding to transition the ART fleet to 100 percent Zero Emission Buses (ZEBs). • Program captures the incremental cost of purchasing Battery Electric Buses (BEBs) for planned vehicle purchases reflected in the ART Fleet Replacement and ART Fleet Expansion CIP programs – this includes the estimated cost differential as well as the need to purchase additional buses owing to range limitations of BEBs (1.3 BEBs are assumed for every 1.0 CNG bus). • Program provides infrastructure on -route, at ART’s Operations and Maintenance Facility (AOMF), and at ART’s Light Maintenance Facility (LMF). Infrastructure will include fast chargers, overhead pantograph chargers, charging cabinets, generators, switchgear , power blocks, utility upgrades, and other necessary items needed for charging. • This program will also provide for additional land and BEB infrastructure to meet ART’s future bus parking needs as identified in the Transit Strategic Plan. • Cost estimates provided are placeholder numbers as the market for BEB infrastructure is rapidly changing. Associated Plan(s): ART Zero-Emissions Bus Study Community Energy Plan Master Transportation Plan Transit Strategic Plan Neighborhood(s): VARIOUS C ritical Milestones: • Construct additional BEB infrastructure at AOMF Fall 2027 – Fall 2029 • Purchase Land Spring 2027 • Construct BEB infrastructure at LMF Fall 2031 - Fall 2034 C hanges from Prior CIP: Elements of this program were included in AOMF Phase II in the previous CIP; the program has been expanded to include all funding needs to help ART transition to 100 percent ZEBs. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Federal Funding 14,646 4,379 8,787 3,011 4,176 13,996 48,995 State Funding 540 577 25,154 601 26,872 TCF - Commercial & Industrial Tax (C&I) 104 10,310 415 2,178 357 853 14,217 TCF - NVTA Local 360 249 2,456 87 1,483 1,695 262 538 2,646 9,776 Regional Funding 12,235 10,290 9,553 32,078 Tax Increment Financing (TIF) 738 502 492 506 2,238 Previous Funding Total Funding 900 930 37,920 1,103 30,542 5,474 21,274 3,765 5,220 27,048 134,176 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 E - 56 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 CIP total Replacement (55 buses) Uses: Replacement Buses 0 0 4,303 0 7,419 0 8,476 0 0 13,231 33,428 Land and Infrastructure 250 260 2,516 920 7, 403 4,562 494 3,354 4,798 1,616 26,173 Total Uses 250 260 6,819 920 14,822 4,562 8,970 3,354 4,798 14,847 59,601 Sources: Local Funds 125 115 2,595 419 2,964 912 1,794 671 960 2,969 13,524 External Funds 125 145 4,224 501 11,857 3,649 7,176 2,683 3,839 11,878 46,077 Total 250 260 6,819 920 14,822 4, 562 8,970 3,354 4,798 14,847 59,601 Expansion (11 buses) Uses: Replacement B u s e s 0000 3 , 9 9 50 2 , 4 2 2000 6 , 4 1 6 Land and Infrastructure 263 271 9,990 184 1,481 912 99 410 422 323 14,355 Total Uses 263 271 9,990 184 5,475 912 2,520 410 422 323 20,771 Sources: Local Funds 100 100 3,279 84 296 182 20 82 84 65 4,292 External Funds 163 172 6,710 100 5,179 730 2,501 328 338 259 16,480 Total 263 271 9,990 184 5, 475 912 2,520 410 422 323 20,771 Contingency for 1.3:1 ratio (20 buses) Uses: Replacement Buses 0 0 3,107 0 8,241 0 7,868 0 0 9,553 28,769 Land and Infrastructure 387 399 18,004 0 2,005 0 1,914 0 0 2,324 25,034 Total Uses 387 399 21,111 0 10,246 0 9,783 0 0 11,878 53,803 Sources: Local Funds 135 139 6,891 0 401 0 383 0 0 465 8,415 External Funds 252 259 14,220 0 9,845 0 9,400 0 0 11,413 45,388 Total 387 399 21,111 0 10, 246 0 9,783 0 0 11,878 53,803 Total ‐ ART Fleet Transition to ZE B Uses: Replacement Buses 0 0 7,410 0 19,654 0 18,766 0 0 22,784 68,614 Land and Infrastructure 900 930 30,510 1,104 10, 889 5,474 2,507 3,763 5,220 4,264 65,562 Total Uses 900 930 37,920 1,104 30,543 5,474 21,273 3,763 5,220 27,048 134,176 Sources: Local Funds 360 354 12,766 503 3,662 1, 095 2,197 753 1,044 3,499 26,231 External Funds 540 577 25,154 601 26,881 4,379 19,076 3,011 4, 176 23,549 107,945 Total 900 930 37,920 1,104 30,543 5,474 21,273 3,763 5,220 27,048 134,176 Notes: > Cost of land, build‐out plus charging infrastructure, and mid‐life battery replacement have been distributed across the 3 categories based on vehicle count and additional factors > Local funds include TCF‐C&I, TCF‐NV TA  Local, and TIF. External Funds include Regional funding as well as State and Federal grants > Additional BEB costs captured in other CIP programs are not included here. These sum to $8.6m, bringing the total for the BEB transition to $143m. They include: > $4.5m for the 4 pilot BEBs (included in th e ART Fleet Expansion CIP program) > $4.1m for the incremental cost of BEB vs. RNG for 8 replacement buses for FY26 (included in the ART Fleet Replacement CIP program) ART Fleet Transition to ZEB Detail ($000) E - 57 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 5. ART OPERATIONS AND MAINTENANCE FACILITY Project Highlights: • This project addresses the need for an administrative, operations, and maintenance facility for Arlington Transit. • This facility replaces two leased facilities (Administration building on South Eads Street and a converted warehouse facility used for maintenance 9 miles south in Alexandria, VA). • Cost includes charging infrastructure for 12 Battery Electric Buses (BEBs), one fast charger, and solar panels on the roof of the O&M facility and parking garage. • Further expansion of BEB charging infrastructure is captured in the ART Fleet Transition to ZEB CIP program. Associated Plan(s): Community Energy Plan Transit Strategic Plan ART Zero-Emissions Bus Study Neighborhood(s): Green Valley VARIOUS Funding Notes: Operations costs for the facility includes a building engineer, building maintenance, utilities, security, cleaning, etc. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total State Funding 12,318 12,318 TCF - Commercial & Industrial Tax (C&I) 13,716 13,716 Previous Funding TCF - Commercial & Industrial Tax (C&I) 1,346 1,346 TCF - NVTA Local 24 24 Total Funding 27,404 0 0 0 0 0 0 0 0 0 27,404 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Personnel ($) 105 140 144 148 152 157 162 167 172 177 1,524 Non-Personnel ($) 553 332 342 352 363 374 385 397 409 421 3,928 Total Impact 658 472 486 500 515 531 547 564 581 598 5,452 Critical Milestones: • Substantial completion Fall 2024 • Construction completion with BEB infrastructure Fall 2025 Changes from Prior CIP: No change from the previous CIP. Project Links: • https://www.arlingtonva.us/Government/Projects/Project- Types/County-Facilities/ART-Operations-Maintenance- Facility E - 58 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 6. BALLSTON-MU METRORAIL STATION WEST ENTRANCE Project Highlights: • Project will add a new west entrance to the Ballston -MU Metrorail Station to be located at the intersection of North Fairfax Drive and North Vermont Street. • New entrance will include elevators in compliance with the American with Disabilities Act (ADA) and stairs. • New entrance will improve access from the Glebe Road area and the growing development in the western part of Ballston. • The County published the Request for Qualifications (RFQ) for a design- build delivery of the project in mid -May. Following qualification of firms, the County will issue a Request for Proposals (RFP) and anticipates reviewing responsive proposals in early 2025. Associated Plan(s): Master Transportation Plan Transit Strategic Plan Neighborhood(s): Ballston-Virginia Square Funding Notes: Regional funding includes $92,000,000 in NVTA and $4,500,000 in approved I -66 Commuter Choice funding and $12,000,000 in a future request to the I-66 Commuter Choice Program. Developer contributions are associated with the Spire Fairmont site plan (#331). Other Previously Approved Funds consist of $9,271,000 in state grants and $4,511,000 in developer contributions from the Marymount University site plan (#64). The asset will be owned and operated by WMATA once completed. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Developer Contributions 6,865 6,865 TCF - Commercial & Industrial Tax (C&I) 13,709 37,201 50,910 Regional Funding 12,000 12,000 Previous Funding Regional Funding 570 8,569 66,489 17,828 93,456 Other Previously Approved Funds 380 5,713 3,178 4,511 13,782 Total Funding 950 14,282 69,667 54,913 37,201 0 0 0 0 0 177,013 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Update previously developed 35% design documents Summer 2024 • Design-Build services procurement Spring 2024 - Spring 2025 • Design Build phase Summer 2025 - Spring 2029 • Acceptance testing Spring 2029 • Project closeout Summer 2029 Project Links: • https://www.arlingtonva.us/Government/Projects/Project- Types/Transportation-Projects/Ballston-MU-Metro-Station- West-Entrance Changes from Prior CIP: The project cost has been conservatively increased from $150M to $181M due to inflation and updated cost estimates for design/construction services based on an independent cost estimate and the County's experience on the Crystal City Metrorail Station East Entrance, a comparable project. E - 59 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 7. BUS BAY EXPANSION-EAST FALLS CHURCH METRO STATION Project Highlights: • This project will expand bus bay capacity at the East Falls Church metro station by adding three new bus bays. • This project will result in the replacement of the existing shelters in the off -street bus loop, improve bus operations, bus circulation, and pedestrian accessibility and safety. Associated Plan(s): East Falls Church Area Plan Transit Strategic Plan Neighborhood(s): Arlington-East Falls Church Funding Notes: Other Previously Approved Funds consist of $764,000 in state grants and $1,200,000 from WMATA. Regional Funding is I-66 Outside-the-Beltway Concessionaire funds. All new operating and maintenance costs that result from this project will be funded by Metro. The asset will be owned and operated by WMATA once completed. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Regional Funding 2,200 2,200 Previous Funding TCF - Commercial & Industrial Tax (C&I) 301 394 695 TCF - NVTA Local 1,245 1,245 Regional Funding 2,480 2,480 Other Previously Approved Funds 1,964 1,964 Total Funding 8,190 394 0 0 0 0 0 0 0 0 8,584 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Start construction Fall 2024 • Complete construction Spring 2026 Changes from Prior CIP: The project cost increased by $3.6M from the FY 2023 Adopted CIP driven primarily by changes in the required bus shelter design and increased costs for Maintenance of Traffic (MOT), construction management and inspection services, earthwork and landscaping work, and project contingency. Project Links: • https://www.arlingtonva.us/Government/Projects/Project- Types/Transportation-Projects/Bus-Bay-Expansion-at-East- Falls-Church-Metro-Station E - 60 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 8. BUS STOP ACCESSIBILITY IMPROVEMENTS Project Highlights: • On-going program to update the County's bus stops to improve accessibility. • Approximately 297 bus stops have been made ADA compliant since the program launched in FY 2014. • Of the 990 bus stops in the county, about 60 percent are not ADA-compliant but only 10 percent are not accessible. • Non-ADA-compliant bus stops may be possible to access with varying levels of difficulty, but do not comply with current federal guidance; non -accessible bus stops are not possible to access for those with different mobility abilities. Associated Plan(s): Transit Strategic Plan Neighborhood(s): VARIOUS Funding Notes: Funding plan assumes 68 percent state capital reimbursement grants. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total State Funding 630 600 626 649 670 694 718 748 771 804 6,910 TCF - Commercial & Industrial Tax (C&I) 148 142 148 152 157 163 169 175 181 189 1,624 TCF - NVTA Local 148 141 147 153 158 163 169 176 181 189 1,625 Previous Funding Total Funding 926 883 921 954 985 1,020 1,056 1,099 1,133 1,182 10,159 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Each fiscal year includes funding for the design of 20 to 25 bus stop improvements. Changes from Prior CIP: No significant change from the previous CIP. Project Links: • https://www.arlingtonva.us/Government/Projects/Project- Types/Uncategorised/Bus-Stop-Accessibility-Improvements E - 61 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 9. BUS STOP AND SHELTER PROGRAM Project Highlights: • As of April 2024, Arlington County had 990 bus stops, 308 of which include bus shelters. Some locations have multiple shelters, resulting in a total of 330 shelters. • Bus shelters have a useful life of 15 years, on average, but periodic repairs help extend life. • This program replaces existing bus shelters that are aging, installs new shelters where needed, and makes repairs and improvements. Associated Plan(s): Transit Strategic Plan Neighborhood(s): VARIOUS Funding Notes: Other Previously Approved Funds consist of $122,000 in state grants and $57,000 in PAYG. Funding plan assumes 68 percent state capital reimbursement grants. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total State Funding 304 439 378 355 367 382 409 438 451 467 3,990 TCF - Commercial & Industrial Tax (C&I) 72 103 89 83 85 89 97 104 107 110 939 TCF - NVTA Local 72 103 89 84 86 89 97 103 106 110 939 Previous Funding Other Previously Approved Funds 179 179 Total Funding 627 645 556 522 538 560 603 645 664 687 6,047 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Non-Personnel ($) 125 129 133 137 141 145 149 153 157 161 1,430 Total Impact 125 129 133 137 141 145 149 153 157 161 1,430 Critical Milestones: • Annual program goals: Replace 5-10 shelters and install up to 3 new shelters. Changes from Prior CIP: No significant change from the previous CIP. Project Links: • https://www.arlingtonva.us/Government/Projects/Project- Types/Uncategorised/Bus-Stop-and-Shelter-Program E - 62 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 10. COURT HOUSE METRORAIL STATION NEW ELEVATORS Project Highlights: • The Court House Metrorail Station has only one street elevator to the mezzanine that is small, slow, and heavily used. • This project will provide for design, engineering, and construction of two street level elevators (that will replace the current elevator and add an additional one). • Elevators will increase access to the station mezzanine and accommodate emergency services as well as those traveling with luggage, bicycles, strollers, or by wheelchair. Associated Plan(s): Court House Sector Plan Transit Strategic Plan Neighborhood(s): Courthouse Funding Notes: New funding plan consists of FTA and DRPT grants, and I66 Commuter Choice funding. Other Previously Approved Funds are developer contributions from the 2311 Wilson Boulevard site plan (#263) and the 2401 Wilson Boulevard site plan (#404). The asset will be owned and operated by WMATA once completed. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Federal Funding 825 2,346 9,812 11,540 11,079 35,602 State Funding 206 587 2,453 2,885 2,769 8,900 Regional Funding 10,000 10,000 Previous Funding Other Previously Approved Funds 206 64 2,699 2,969 Total Funding 206 64 3,730 2,933 12,265 24,425 13,848 0 0 0 57,471 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Complete preliminary engineering Spring 2027 • Complete final design Summer 2029 • Start early construction activities Summer 2028 • Complete construction Spring 2031 Changes from Prior CIP: The project cost has almost doubled based on a new cost estimate from the on-call estimation contractor. E - 63 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 11. CRYSTAL CITY - POTOMAC YARD TRANSITWAY UPKEEP Project Highlights: • This project will investigate the cause of glass breakage on the Transitway shelters and implement fixes. • This project will also undertake various other tasks relating to the transitway including replacing real time info signs/flags at all stations, implementing treatments to prevent bird nesting, investigating options to prevent cars from entering transit lan es, and repairing/replacing loose brick pavers. Associated Plan(s): Transit Strategic Plan Neighborhood(s): Crystal City Funding Notes: Other Previously Approved Funds consist of state grants. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Previous Funding Tax Increment Financing (TIF) 421 421 Other Previously Approved Funds 68 68 Total Funding 489 0 0 0 0 0 0 0 0 0 489 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Start design, construction, and equipment replacement Summer 2024 • Complete design, construction, and equipment replacement Winter 2025 Changes from Prior CIP: Cost decreased from the previous CIP following a study that scoped out the project. Project Links: • https://www.arlingtonva.us/Government/Projects/Project- Types/Uncategorised/Crystal-City-Potomac-Yard- Transitway E - 64 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 12. CRYSTAL CITY METRO STATION EAST ENTRANCE Project Highlights: • This project will provide a new entrance at the east end of the metro station to provide easier access from Crystal Drive, VRE Station, and Crystal Drive at 18th Street South. • New entrance will include elevators in compliance with the Americans with Disabilities Act and stairs. • This project will expand the walkshed for the station and connect high density commercial and residential development along Crystal Drive. • A Guaranteed Maximum Price proposal and Comprehensive Agreement for Final Design and Construction was approved by Arlington County Board in July 2023. Associated Plan(s): Crystal City Sector Plan Master Transportation Plan Transit Strategic Plan Neighborhood(s): Crystal City Funding Notes: Project funding includes $82.5 million allocated by the Commonwealth to meet its commitment to Amazon. That funding is a mix of federal and state funding. Other Previously Approved Funds consist of $10,804,000 in a federal grant and $18,233,000 in state grant. The asset will be owned and operated by WMATA once completed. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Federal Funding 2,328 29,483 31,811 State Funding 582 8,693 9,275 TCF - Commercial & Industrial Tax (C&I) 23,836 23,836 Tax Increment Financing (TIF) 19,362 13,598 145 33,105 Previous Funding Other Previously Approved Funds 20,490 8,547 29,037 Total Funding 39,852 48,891 38,321 0 0 0 0 0 0 0 127,064 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Final design Summer 2024 - Winter 2025 • Construction Fall 2024 - Spring 2027 • Project closeout Spring 2027 Changes from Prior CIP: Project cost increased by about 50 percent compared to the previous CIP as the prior CIP estimate was based only on conceptual planning work. Project Links: • https://www.arlingtonva.us/Government/Projects/Project- Types/Transportation-Projects/Crystal-City-Metro-Station- Second-Entrance E - 65 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 13. EAST FALLS CHURCH METRO STATION SECOND ENTRANCE Project Highlights: • This project will undertake the planning, design, and construction of a full second entrance to the East Falls Church Metrorail Station. • The project will improve pedestrian access to the station from points west. • It will be coordinated with the City of Falls Church. Associated Plan(s): East Falls Church Area Plan Transit Strategic Plan Neighborhood(s): Arlington-East Falls Church Funding Notes: The County anticipates submitting requests to external funding sources for design and construction, which will be reflected in the next CIP update. The asset will be owned and operated by WMATA once completed. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total State Funding 200 200 400 TCF - NVTA Local 200 200 400 Previous Funding Total Funding 0 0 0 0 0 0 0 0 400 400 800 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Planning Fall 2033 - Fall 2034 Changes from Prior CIP: Project start has been delayed two years. E - 66 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 14. MICROTRANSIT IMPLEMENTATION PLAN Project Highlights: • This project will study microtransit and implement a pilot. • Microtransit is a form of demand -responsive service that operates on a smaller scale than traditional public transit. • The pilot will be implemented in fall 2025 in zones defined by the planning process; the goal will be to determine if microtransit provides options for shared transport in areas where low performance ART routes are eliminated. Associated Plan(s): Transit Strategic Plan Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total State Funding 35 35 TCF - NVTA Local 500 500 Previous Funding TCF - NVTA Local 35 35 Total Funding 70 500 0 0 0 0 0 0 0 0 570 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Study complete Spring 2025 • Pilot start Fall 2025 Changes from Prior CIP: The project is new to the FY 2025 - FY 2034 CIP. E - 67 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 15. MOBILITY HUB PILOT Project Highlights: • This project is for the design and implementation of a Mobility Hub Pilot in the Court House Plaza area. • The pilot brings together various elements at one location including but not limited to: bus stops, shared mobility device corrals, bike parking, ADA compliant pedestrian facilities, wayfinding/information hubs, and parklets. • The goal is to provide greater access to multimodal transportation and improve public infrastructure. Associated Plan(s): Transit Strategic Plan Neighborhood(s): Courthouse New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Previous Funding TCF - Commercial & Industrial Tax (C&I) 565 565 Total Funding 565 0 0 0 0 0 0 0 0 0 565 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Design of the Mobility-Hub pilot Spring 2024 - Fall 2024 • Implementation of Mobility Hub pilot Spring 2025 Changes from Prior CIP: Project completion has been delayed a year to FY 2025. Project Links: • https://www.arlingtonva.us/Government/Projects/Plans- Studies/Transportation-Plans-Studies/Mobility-Hub- Guidebook E - 68 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 16. PENTAGON CITY METRO STATION SECOND ELEVATOR Project Highlights: • Construction of a second street to mezzanine elevator to provide access to the Pentagon City Metro Station from the west side of South Hayes Street. • Improves general access and compliance with the Americans with Disabilities Act (ADA). • Provides back-up ADA access when the other elevator is out of service for repairs or maintenance. Associated Plan(s): Master Transportation Plan Pentagon City Sector Plan Transit Strategic Plan Neighborhood(s): Pentagon City Funding Notes: The asset will be owned and operated by WMATA once completed. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total TCF - Commercial & Industrial Tax (C&I) 3,893 3,893 Previous Funding Total Funding 3,893 0 0 0 0 0 0 0 0 0 3,893 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Complete construction and open Summer 2024 • Project closeout Fall 2024 Changes from Prior CIP: Total project cost increased from $10.5M in the previous CIP to $17.3M due to a variety of factors including unforeseen site conditions, supply chain issues, and production delays. Milestone dates and costs reflect the current project schedule. Project Links: • https://www.arlingtonva.us/Government/Projects/Project- Types/Transportation-Projects/Pentagon-City-Metro- Station-Second-Elevator E - 69 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 17. PREMIUM TRANSIT NETWORK (PRTN): ART FLEET EXPANSION Project Highlights: • This program funds the purchase of additional buses to support the 10-year service plan for ART. • The costs in FY 2025 reflect the purchase of four Battery Electric Buses (BEBs) for a BEB pilot. • Future bus purchases are also expected to be BEBs; however, CNG costs are used in this CIP program as the incremental costs associated with ZEB technology are captured in the ART Fleet Transition to ZEB CIP program. Associated Plan(s): Community Energy Plan Transit Strategic Plan ART Zero-Emissions Bus Study Neighborhood(s): VARIOUS Funding Notes: Other Previously Approved Funds consist of state grants. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total TCF - Commercial & Industrial Tax (C&I) 1,428 1,428 Regional Funding 5,616 3,404 9,020 Previous Funding Other Previously Approved Funds 3,035 3,035 Total Funding 4,463 0 0 0 5,616 0 3,404 0 0 0 13,483 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Four Battery Electric Buses Spring 2025 • Procure 7 buses and related on-bus equipment Spring 2029 • Procure 4 buses and related on-bus equipment Spring 2031 Changes from Prior CIP: The addition of four BEBs for a pilot. Also, the vehicle cost for future year purchases in the previous CIP reflected BEBs. E - 70 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 18. PREMIUM TRANSIT NETWORK (PRTN): COLUMBIA PIKE TRANSIT STATIONS Project Highlights: • Design and construction of 23 Transit Stations at 12 locations along Columbia Pike. • The first eight shelters are operational; construction of the remaining stations will follow the Columbia Pike Multimodal project. • Transit Stations include shelters with seating, real -time information and near level boarding. Associated Plan(s): Master Transportation Plan Transit Strategic Plan Neighborhood(s): Alcova Heights Arlington Heights Arlington View Barcroft Columbia Forest Columbia Heights Columbia Heights West Douglas Park Penrose Funding Notes: Other Previously Approved Funds consist of $1,322,000 in federal grants and $212,000 in state grants. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total TCF - Commercial & Industrial Tax (C&I) 1,041 109 1,150 Previous Funding Issued but Unspent Bonds 407 407 TCF - Commercial & Industrial Tax (C&I) 2,317 2,517 4,834 Other Previously Approved Funds 1,534 1,534 Total Funding 4,258 3,558 109 0 0 0 0 0 0 0 7,925 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Non-Personnel ($) 58 82 110 138 150 155 159 164 169 170 1,355 Total Impact 58 82 110 138 150 155 159 164 169 170 1,355 Critical Milestones: • Phase 3 construction completion - Orme E&W Spring 2025 • Phase 4 construction completion - Thomas E, Taylor W, George Mason E&W, Oakland E Spring 2026 • Phase 5 construction completion - Walter Reed W, Barton E& W, Courthouse E&W, Scott E&W, Glebe E Spring 2026 Project Links: • https://www.arlingtonva.us/Government/Projects/Project- Types/Transportation-Projects/Columbia-Pike-Transit- Stations Changes from Prior CIP: The project phasing plan has been adjusted to better coordinate with the Columbia Pike Multimodal Street reconstruction project. TRANSPORTATION Capital Improvement Plan E - 71 Arlington Transit Program FY 2025-2034 19. PREMIUM TRANSIT NETWORK (PRTN): TRANSIT ITS AND SECURITY PROGRAM Project Highlights: • This program funds technology to improve transit operations and rider information systems. Disparate systems and data sources will be consolidated. Additional initiatives under this program are listed below. • Transit Signal Priority (TSP) implementation for better running times of buses in congested corridors, particularly on Columbia Pike and Langston Boulevard. • Text-based system for real time bus arrival information on mobile phones. • Preplanning for end -of-life replacements of current technology to maintain a state of good repair as required by FTA. • Video recorded on buses allowing for enhanced safety of customers and bus operators. Associated Plan(s): Master Transportation Plan Transit Strategic Plan Neighborhood(s): VARIOUS Critical Milestones: • Deployment of TSP on Langston Boulevard corridor Summer 2024 • Deployment of TSP on Columbia Pike corridor Summer 2025 • Issue RFP for business intelligence automation Summer 2025 • Issue RFP for text-based arrival system Winter 2025 • Deployment of TSP on Glebe Road corridor Spring 2026 • Deployment of TSP on Crystal City/Pentagon City corridor Spring 2027 Funding Notes: Other Previously Approved Funds consist of state grants. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total State Funding 85 293 303 312 199 126 130 134 138 142 1,862 TCF - Commercial & Industrial Tax (C&I) 29 30 31 31 32 33 186 TCF - NVTA Local 30 29 30 32 33 34 188 Previous Funding TCF - Commercial & Industrial Tax (C&I) 236 236 TCF - NVTA Local 129 165 143 147 35 619 Other Previously Approved Funds 596 596 Total Funding 1,046 458 446 459 293 185 191 197 203 209 3,687 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Personnel ($) 2 2 2 2 2 2 2 2 2 2 20 Non-Personnel ($) 147 254 266 269 271 386 388 389 392 392 3,154 Total Impact 149 256 268 271 273 388 390 391 394 394 3,174 Changes from Prior CIP: This program is ongoing from the previous CIP and includes updated schedule and cost estimates. Project Links: • https://www.arlingtonva.us/Government/Projects/Project- Types/Uncategorised/Transit-ITS-and-Security-Program E - 72 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 20. PREMIUM NETWORK TRANSIT (PRTN): TRANSITWAY EXTENSION POTOMAC AVE - ALEXANDRIA Project Highlights: • This project will construct the third segment (Segment C) of the transitway serving the Crystal City / Potomac Yard corridor connecting to the City of Alexandria. • Construction includes a dedicated transit -only southbound lane as well as bike and pedestrian improvements along Potomac Avenue. Associated Plan(s): Crystal City Sector Plan Master Transportation Plan Potomac Yards Design Guidelines Transit Strategic Plan Neighborhood(s): Potomac Yard Funding Notes: Other Previously Approved Funds consist of state grants. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Previous Funding Other Previously Approved Funds 20 37 3,142 3,066 1,491 7,756 Total Funding 20 37 3,142 3,066 1,491 0 0 0 0 0 7,756 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Design Spring 2025 - Spring 2027 • Start construction Summer 2028 Changes from Prior CIP: Project timeline has been delayed three years. E - 73 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 21. PREMIUM NETWORK TRANSIT (PRTN): TRANSITWAY EXTENSION TO PENTAGON CITY Project Highlights: • This project will extend the Crystal City Potomac Yard Transitway from Crystal City to Pentagon City. • It will provide dedicated transit lanes, five new transit stations, traffic signal modifications, and sidewalk / curb improvements. • Construction started in FY 2022 and the project is expected to be completed in segments by FY 2027. Associated Plan(s): Crystal City Sector Plan Master Transportation Plan Metropolitan Park Design Guidelines Pentagon Centre Site Guiding Principles Pentagon City Planning Task Force Report Pentagon City Sector Plan Transit Development Plan Neighborhood(s): Aurora Highlands Crystal City Pentagon City Funding Notes: Other Previously Approved Funds consist of $5,675,000 in state grants and $333,000 in developer contributions from the Pentagon Centre site plan (#297). New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total TCF - Commercial & Industrial Tax (C&I) 370 330 700 Previous Funding TCF - Commercial & Industrial Tax (C&I) 24 325 349 Regional Funding 3,450 9,600 3,610 16,660 Tax Increment Financing (TIF) 91 91 Other Previously Approved Funds 3,957 1,720 331 6,008 Total Funding 7,431 12,106 4,271 0 0 0 0 0 0 0 23,808 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Non-Personnel ($) 70 85 100 105 110 115 120 125 130 960 Total Impact 0 70 85 100 105 110 115 120 125 130 960 Critical Milestones: • Start construction Segment IIA Winter 2025 • Complete construction Segment IIA Spring 2026 Changes from Prior CIP: Due to the hold in construction for Pen Place, the design for segment IIA had to be revised at 100 percent design to incorporate additional corridor improvements on the north curb of 12th Street South. The anticipated impact on the project timeline due to this delay is 18 months. Project Links: • https://www.arlingtonva.us/Government/Projects/Project- Types/Uncategorised/Transitway-Extension-to-Pentagon- City E - 74 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 22. SHIRLINGTON BUS STATION EXPANSION Project Highlights: • Project focuses on adding bus bay(s) to the Shirlington Station to meet growing demand. Associated Plan(s): Transit Strategic Plan Neighborhood(s): Shirlington Funding Notes: Regional funding is NVTA. Minor operating costs anticipated for utilities, communications, snow removal, and cleaning. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total TCF - Commercial & Industrial Tax (C&I) 310 310 Regional Funding 600 5,850 5,150 11,600 Previous Funding Total Funding 310 0 0 0 600 5,850 5,150 0 0 0 11,910 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Non-Personnel ($) 6 6 6 6 24 Total Impact 0 0 0 0 0 0 6 6 6 6 24 Critical Milestones: • Planning study to identify opportunities to address project needs Winter 2024 - Fall 2024 • Engineering and final design Fall 2028 - Spring 2029 • Construction Fall 2029 - Spring 2031 Changes from Prior CIP: Cost has more than doubled from previous CIP due to scope changes. New application for design and construction submitted to NVTA for $11.6 million. E - 75 TRANSPORTATION Capital Improvement Plan Arlington Transit Program FY 2025-2034 23. TRANSIT STRATEGIC PLAN UPDATES Project Highlights: • Major update of Arlington's Transit Strategic Plan (ATSP) as required by the state every six years. Associated Plan(s): Master Transportation Plan Transit Strategic Plan Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total State Funding 293 293 Previous Funding TCF - NVTA Local 292 292 Total Funding 0 0 0 0 585 0 0 0 0 0 585 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 C ritical Milestones: • Complete ATSP update (Comprehensive Operational Analysis-COA) Summer 2028 C hanges from Prior CIP: This is a carryover from previous CIP and includes the addition of a comprehensive operational analysis of ART services. E - 76

Source: Arlington County website. First collected Oct 27, 2026.