Arlington County · Arlington County · Budget documents

Open the original document More from Arlington County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Arlington County, Virginia CIP 2025 − 2034 TRANSPORTATION: MAINTENANCE CAPITAL PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total 1. Bridge Maintenance 1,040 986 1,026 1,068 1,101 1,134 1,167 1,205 1,238 1,276 11,241 2. Curb & Gutter Missing Links 129 130 135 140 145 150 155 160 165 170 1,479 3. Paving 13,489 12,980 13,488 13,661 14,192 14,374 14,933 15,124 15,712 15,911 143,864 4. Sidewalk, Curb, Gutter Proactive Zone Maintenance 1,029 1,071 1,106 1,141 1,171 1,207 1,243 1,284 1,320 1,357 11,929 5. Signals & ITS Maintenance 1,355 1,440 1,506 1,586 1,666 1,752 1,842 1,927 2,017 2,108 17,199 6. Trail Light Maintenance Program 20 21 21 22 23 23 24 25 26 26 231 Total Recommendation 17,062 16,628 17,282 17,618 18,298 18,640 19,364 19,725 20,478 20,848 185,943 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 11,985 13,045 13,825 14,060 14,635 14,870 15,485 15,735 16,375 16,630 146,645 PAYG 2,830 3,336 3,436 3,536 3,645 3,770 3,879 3,990 4,103 4,218 36,743 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 TCF - Commercial & Industrial Tax (C&I) 0 0 0 0 0 0 0 0 0 0 0 TCF - NVTA Local 0 0 0 0 0 0 0 0 0 0 0 Regional Funding 0 0 0 0 0 0 0 0 0 0 0 TCF Bonds 0 0 0 0 0 0 0 0 0 0 0 Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0 TIF Bonds 0 0 0 0 0 0 0 0 0 0 0 TCF for Operating Costs 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 14,815 16,381 17,261 17,596 18,280 18,640 19,364 19,725 20,478 20,848 183,388 Previously Approved Funding Authorized but Unissued Bonds 1,882 226 0 0 0 0 0 0 0 0 2,108 Issued but Unspent Bonds 151 0 0 0 0 0 0 0 0 0 151 TCF - Commercial & Industrial Tax (C&I) 0 0 0 0 0 0 0 0 0 0 0 TCF - NVTA Local 0 0 0 0 0 0 0 0 0 0 0 Regional Funding 0 0 0 0 0 0 0 0 0 0 0 Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 214 21 21 22 18 0 0 0 0 0 296 Subtotal Previously Approved Funding 2,247 247 21 22 18 0 0 0 0 0 2,555 Total Funding Sources 17,062 16,628 17,282 17,618 18,298 18,640 19,364 19,725 20,478 20,848 185,943 E - 77 TRANSPORTATION Capital Improvement Plan Maintenance Capital FY 2025-2034 1. BRIDGE MAINTENANCE Project Highlights: • Ongoing cyclical inspection, maintenance, and rehabilitation of 36 vehicular and pedestrian bridges in Arlington County to ensure safety of the structures for pedestrians and vehicular traffic. • This program maintains the overall rating of the c ounty’s bridges between "Satisfactory" and "Good" and is necessary to ensure safety for the traveling public. Associated Plan(s): Master Transportation Plan Neighborhood(s): VARIOUS Funding Notes: Other Previously Approved Funding are PAYG. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 530 790 825 850 875 900 930 955 985 7,640 PAYG 221 230 236 243 251 259 267 275 283 291 2,556 Previous Funding Authorized but Unissued Bonds 474 226 700 Issued but Unspent Bonds 151 151 Other Previously Approved Funds 194 194 Total Funding 1,040 986 1,026 1,068 1,101 1,134 1,167 1,205 1,238 1,276 11,241 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 C ritical Milestones: • Barcroft Neighborhood/Glencarlyn Park pedestrian bridge construction completion Fall 2024 • South Glebe Road at Water Pollution Control Plant construction completion Fall 2024 C hanges from Prior CIP: No change from the previous CIP. E - 78 TRANSPORTATION Capital Improvement Plan Maintenance Capital FY 2025-2034 2. CURB & GUTTER MISSING LINKS Project Highlights: • Program constructs curb & gutter along street sections where they are missing to resolve drainage issues. • Projects are prioritized based on flooding risk, presence of nearby curb and gutter, and particular site constraints. • If new sidewalk is feasible to add, program works with the Arlington Neighborhoods program. Associated Plan(s): Master Transportation Plan Storm Water Master Plan Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 110 130 135 140 145 150 155 160 165 170 1,460 Previous Funding Authorized but Unissued Bonds 19 19 Total Funding 129 130 135 140 145 150 155 160 165 170 1,479 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: No significant change from the previous CIP. E - 79 TRANSPORTATION Capital Improvement Plan Maintenance Capital FY 2025-2034 3. PAVING Project Highlights: • The County maintains and manages 1,058 lane miles of paved streets. • The goal is to achieve a Pavement Condition Index (PCI) between 75 and 80 (considered "good" by the Army Corps of Engineers). The 2023 PCI was 83.3 indicating a state of good repair near “Excellent.” • The County uses a mix of strategies under the Paving program to achieve this goal in a cost -effective manner: hot- mix resurfacing, slurry seal, micro-surfacing, and rebuilding. Associated Plan(s): Master Transportation Plan Neighborhood(s): VARIOUS Funding Notes: Program is entirely funded by a mix of PAYG and bonds. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 10,800 11,235 11,690 11,810 12,285 12,410 12,910 13,040 13,565 13,700 123,445 PAYG 1,300 1,745 1,798 1,851 1,907 1,964 2,023 2,084 2,147 2,211 19,030 Previous Funding Authorized but Unissued Bonds 1,389 1,389 Total Funding 13,489 12,980 13,488 13,661 14,192 14,374 14,933 15,124 15,712 15,911 143,864 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: The only change versus the previous CIP is a reduction in bond funding and a small reduction in PAYG funding in light of the high 2023 PCI. Impact on road conditions will be monitored over time to ensure roads are maintained in an adequate manner. Project Links: • https://www.arlingtonva.us/Government/Programs/Transportation/Streets/Street- Maintenance E - 80 TRANSPORTATION Capital Improvement Plan Maintenance Capital FY 2025-2034 4. SIDEWALK, CURB, GUTTER PROACTIVE ZONE MAINTENANCE Project Highlights: • Program funds proactive inspection and maintenance of County-maintained, curb, gutter, and sidewalks. It remediates and improves sidewalk condition to encourage use of sidewalks and increase safety. • The County is divided into 20 concrete zones and the program’s goal is to undertake proactive maintenance of two zones a year, for a ten-year maintenance interval. • Program will pursue low carbon concrete pilot installations. Associated Plan(s): Master Transportation Plan Vision Zero Action Plan Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 720 750 775 800 820 845 870 900 925 950 8,355 PAYG 309 321 331 341 351 362 373 384 395 407 3,574 Previous Funding Total Funding 1,029 1,071 1,106 1,141 1,171 1,207 1,243 1,284 1,320 1,357 11,929 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: No significant change from the previous CIP. E - 81 TRANSPORTATION Capital Improvement Plan Maintenance Capital FY 2025-2034 5. SIGNALS & ITS MAINTENANCE Project Highlights: • This program covers the inspection, maintenance, and repair of the county’s 302 signalized intersections as well as ITS devices such as push buttons, CCTV, video detection, battery back-up, flashing beacons, and speed indicators. • Program pays for structural inspections of signal poles, undertaken on a six-year cycle. Associated Plan(s): Master Transportation Plan Vision Zero Action Plan Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 355 400 435 485 535 590 650 705 765 825 5,745 PAYG 1,000 1,040 1,071 1,101 1,131 1,162 1,192 1,222 1,252 1,283 11,454 Previous Funding Total Funding 1,355 1,440 1,506 1,586 1,666 1,752 1,842 1,927 2,017 2,108 17,199 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: In the previous CIP cycle, this program consisted of ITS device replacements only, and was named as such. In this CIP, proactive structural inspections, and preventative maintenance of signals (and related repairs) are included. All capital maintenance activities related to signals and ITS devices are now centralized in this CIP program. E - 82 TRANSPORTATION Capital Improvement Plan Maintenance Capital FY 2025-2034 6. TRAIL LIGHT MAINTENANCE PROGRAM Project Highlights: • The program covers minor operations and maintenance repairs for trail lighting. Associated Plan(s): Master Transportation Plan Neighborhood(s): VARIOUS Funding Notes: Other Previously Approved Funds are PAYG. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 5 23 24 25 26 26 129 Previous Funding Other Previously Approved Funds 20 21 21 22 18 102 Total Funding 20 21 21 22 23 23 24 25 26 26 231 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: Project cost has been updated to reflect lower volume of service requests more accurately. E - 83

Source: Arlington County website. First collected Oct 27, 2026.