RecordWell Data

Maintenance Capital Program(PDF, 1MB)

Arlington County · Arlington County · Budget documents

Open the original document More from Arlington County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Arlington County, Virginia CIP 2025 − 2034 WATER AND SEWER INFRASTRUCTURE: WS MAINTENANCE CAPITAL PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total 1. Sewer-Infiltration and Inflow 3,000 3,105 3,210 3,315 3,315 3,420 3,420 3,525 585 605 27,500 2. Sewer-Large Diameter Main Rehabilitation 2,780 2,185 4,140 2,550 3,090 2,340 100 4,220 1,040 2,050 24,495 3. Water-Large Diameter Main & Valve Rehabilitation 1,000 1,035 1,070 1,105 1,105 1,140 1,140 1,175 1,175 1,210 11,155 4. Water-Large Meter Vault Rehabilitation & Replacement 200 205 215 220 220 230 230 235 235 240 2,230 5. Manhole Rehabilitation 1,000 1,035 1,070 1,105 1,105 1,140 1,140 1,175 1,175 1,210 11,155 6. Water-Pump Station Rehabilitation 0 105 0 110 0 115 0 115 0 120 565 7. Sewer-Force Mains 2,100 155 160 165 165 170 170 175 175 180 3,615 8. Sewer-Main Replacement Program 2,000 2,590 3,210 3,315 3,315 3,420 3,420 3,525 3,525 3,630 31,950 9. Water-Small Diameter Valve Rehabilitation & Replacement 300 310 320 330 330 340 340 350 350 365 3,335 10. Technology Enhancements 725 1,365 60 2,630 2,735 2,935 3,050 65 65 65 13,695 11. Trades Center Equipment & Improvements 0 1,035 0 0 0 0 0 0 0 0 1,035 12. Washington Aqueduct Capital 7,800 8,075 8,345 8,620 8,620 8,890 8,890 67,915 9,165 9,440 145,760 13. Water-Main Cleaning and Lining Program 1,600 1,655 1,710 1,770 1,770 1,825 1,825 1,880 1,880 1,935 17,850 14. Water-Main Replacement Program 7,000 6,725 6,955 7,180 7,735 7,980 8,550 8,810 8,810 9,075 78,820 15. Water/Sewer Frames/Covers 1,000 1,035 1,070 1,105 1,105 1,140 1,140 1,175 1,175 1,210 11,155 16. Water-Tank Rehabilitation 100 0 105 2,320 830 115 0 115 0 120 3,705 Total Recommendation 30,605 30,615 31,640 35,840 35,440 35,200 33,415 94,455 29,355 31,455 388,020 F - 4 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 6,665 7,940 8,175 8,730 8,725 9,285 9,285 9,675 8,585 9,110 86,175 New Bond Issue 3,400 9,030 9,190 10,410 9,015 10,090 8,660 70,065 9,115 9,845 148,820 PAYG 6,008 9,305 14,220 13,215 17,315 15,425 16,170 13,205 11,460 11,870 128,193 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 3,010 1,115 1,640 815 385 400 400 410 405 420 9,000 Subtotal New Funding 19,083 27,390 33,225 33,170 35,440 35,200 34,515 93,355 29,565 31,245 372,188 Previously Approved Funding Authorized but Unissued Bonds 2,900 0 0 0 0 0 0 0 0 0 2,900 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 9,122 3,810 0 0 0 0 0 0 0 0 12,932 Subtotal Previously Approved Funding 12,022 3,810 0 0 0 0 0 0 0 0 15,832 Total Funding Sources 31,105 31,200 33,225 33,170 35,440 35,200 34,515 93,355 29,565 31,245 388,020 F - 5 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 1. SEWER-INFILTRATION AND INFLOW Project Highlights: • This program rehabilitates the small diameter (less than 15 - inch) sanitary sewer system to eliminate infiltration and inflow, the intrusion of rain, ground, or surface water into the County's sanitary sewer system. • The County's goal is to line two percent of the system annually. As of March 2024, over 58 percent of the system has been lined. Associated Plan(s): Sanitary Sewer Collection System Plan Neighborhood(s): VARIOUS Funding Notes: A portion of the annual funding will be from infrastructure availability fees (developer contributions). Other funding includes interest income. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Developer Contributions 2,100 2,275 2,355 2,485 2,485 2,620 2,620 2,700 295 300 20,235 PAYG 650 570 590 555 555 515 515 530 5 4,485 Other Funding 250 260 265 275 275 285 285 295 290 300 2,780 Previous Funding Total Funding 3,000 3,105 3,210 3,315 3,315 3,420 3,420 3,525 585 605 27,500 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: The last two years of the CIP reflect anticipated reductions in the small diameter relining program as program goals are achieved. F - 6 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 2. SEWER-LARGE DIAMETER MAIN REHABILITATION Project Highlights: • This program rehabilitates 15-inch and larger sanitary sewer mains and appurtenances to eliminate infiltration and inflow, the intrusion of rain, ground, or surface water into the County's sanitary sewer system. • The County periodically performs condition inspections and assessments on the large diameter sanitary sewer mains to identify deficiencies and make recommendations on repairs. Associated Plan(s): Sanitary Sewer Collection System Plan Neighborhood(s): VARIOUS Funding Notes: County funding is set aside annually for these larger cost projects to accumulate sufficient funding while avoiding rate spikes. Other funding includes $2,030,000 of Inter -Jurisdictional (IJ) revenue for projects on the Four Mile Run Interceptor, with each IJ's portion based on its reserved capacity. Other funding also includes HUD Community Project Funding grants and $1,500 ,000 of federal funding. Other Previously Approved Funds include existing PAYG balances. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Developer Contributions 500 1,000 1,000 1,100 1,100 1,200 1,200 1,200 1,250 1,500 11,050 New Bond Issue 1,000 1,015 1,000 1,140 1,920 340 6,415 PAYG 65 865 990 1,920 Other Funding 1,070 750 1,275 435 3,530 Previous Funding Other Previously Approved Funds 1,210 370 1,580 Total Funding 2,780 2,185 4,140 2,550 3,090 2,340 1,200 3,120 1,250 1,840 24,495 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 64 129 193 266 266 389 389 1,696 Changes from Prior CIP: Projects originally scheduled for FY 2023 and FY 2024 have shifted to FY 2025 and FY 2026 (Four Mile Run Relief Route 50 to Columbia Pike; Rosslyn - Potomac Interceptor). This CIP also includes funding for additional large diameter sewer projects as focus shifts from small diameter to large diameter rehabilitations. F - 7 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 3. WATER-LARGE DIAMETER MAIN & VALVE REHABILITATION Project Highlights: • This program includes the rehabilitation of old (more than 50 years) large diameter (20 - 36-inch) water mains and the rehabilitation or replacement of 16 -inch or larger valves and pressure regulating valves. Associated Plan(s): Water System Master Plan Neighborhood(s): VARIOUS Funding Notes: A portion of the annual funding is from infrastructure availability fees (developer contributions). Other Previously Approved Funds include existing PAYG balances. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Developer Contributions 115 160 165 170 170 175 175 195 195 200 1,720 PAYG 680 875 905 935 935 965 965 980 980 1,010 9,230 Previous Funding Other Previously Approved Funds 205 205 Total Funding 1,000 1,035 1,070 1,105 1,105 1,140 1,140 1,175 1,175 1,210 11,155 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: Program costs have increased from the pr evious CIP based on the priority to rehabilitate and/or replace large water valves based on results from the large valve inspection program. These valves are critical to the operation of the drinking water system and enable control over transmission mains. F - 8 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 4. WATER-LARGE METER VAULT REHABILITATION & REPLACEMENT Project Highlights: • This program ensures that large commercial meters, which account for approximately 75 percent of the system revenue, remain in a good state of repair. • Large meter vault inspections and condition assessments are being conducted in conjunction with the large meter replacements to identify vaults requiring rehabilitation or replacement. Associated Plan(s): Water System Master Plan Neighborhood(s): VARIOUS Funding Notes: Other previously approved funds include existing PAYG balances. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 50 205 215 220 220 230 230 235 235 240 2,080 Previous Funding Other Previously Approved Funds 150 150 Total Funding 200 205 215 220 220 230 230 235 235 240 2,230 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: Program costs changed slightly from the previous CIP. F - 9 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 5. MANHOLE REHABILITATION Project Highlights: • This program provides for the rehabilitation of sanitary sewer manholes through epoxy lining and structural rebuilds when necessary. • Manhole rehabilitation occurs in conjunction with the Infiltration and Inflow (I&I) Program (sewer main relining) and the Large Diameter Sewer Rehabilitation Program. Associated Plan(s): Sanitary Sewer Collection System Plan Neighborhood(s): VARIOUS Funding Notes: Other Previously Approved Funds include existing PAYG balances. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 608 1,035 1,070 1,105 1,105 1,140 1,140 1,175 1,175 1,210 10,763 Previous Funding Other Previously Approved Funds 392 392 Total Funding 1,000 1,035 1,070 1,105 1,105 1,140 1,140 1,175 1,175 1,210 11,155 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: Investment in this program nearly doubled since the previous CIP based on the recently adopted Sanitary Sewer Collection System Plan. F - 10 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 6. WATER-PUMP STATION REHABILITATION Project Highlights: • This program includes maintenance capital and rehabilitation of various water pump stations throughout the County to keep the equipment and facilities properly functioning. Associated Plan(s): Water System Master Plan Neighborhood(s): VARIOUS Funding Notes: Other Previously Approved Funds include existing PAYG balances. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 30 110 115 115 120 490 Previous Funding Other Previously Approved Funds 75 75 Total Funding 0 105 0 110 0 115 0 115 0 120 565 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: No significant change from the previous CIP. F - 11 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 7. SEWER-FORCE MAINS Project Highlights: • This program rehabilitates and replaces the County's force main systems, which are necessary to convey sewage for much of the northern third of the County, which are at a lower elevation than the rest of the County. • Force mains are located at Donaldson Run, Gulf Run, Windy Run, and other sewage lift stations. Associated Plan(s): Sanitary Sewer Collection System Plan Neighborhood(s): VARIOUS Funding Notes: Other Previously Approved Funds include existing PAYG balances. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 510 155 160 165 165 170 170 175 175 180 2,025 Other Funding 1,590 1,590 Previous Funding Total Funding 2,100 155 160 165 165 170 170 175 175 180 3,615 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Gulf Run Force Main construction Fall 2024 - Summer 2025 Changes from Prior CIP: This CIP includes funding for rehabilitation of the Gulf Run Force Main in FY 2025. F - 12 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 8. SEWER-MAIN REPLACEMENT PROGRAM Project Highlights: • This program replaces smaller diameter sewer mains when lining sewer mains is not viable or recommended. • Traditional replacement may be necessary to address severely deteriorated or failed sanitary sewer mains. Associated Plan(s): Sanitary Sewer Collection System Plan Neighborhood(s): VARIOUS Funding Notes: A portion of the annual funding will be from infrastructure availability fees (developer contributions). Other Previously Approved Funds include existing PAYG balances. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Developer Contributions 750 830 855 885 885 910 910 940 2,205 2,150 11,320 PAYG 1,110 1,760 2,355 2,430 2,430 2,510 2,510 2,585 1,320 1,480 20,490 Previous Funding Other Previously Approved Funds 140 140 Total Funding 2,000 2,590 3,210 3,315 3,315 3,420 3,420 3,525 3,525 3,630 31,950 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: Program costs have increased from the previous CIP based on priority and to align with actual spending levels. F - 13 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 9. WATER-SMALL DIAMETER VALVE REHABILITATION & REPLACEMENT Project Highlights: • This program rehabilitates and/or replaces small diameter water valves throughout the County, as identified through the Valve Inspection and Exercise Program. • This program ensures the County's water distribution system valves are operable to minimize the extent and duration of water service outages during planned or emergency work. Associated Plan(s): Water System Master Plan Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 300 310 320 330 330 340 340 350 350 365 3,335 Previous Funding Total Funding 300 310 320 330 330 340 340 350 350 365 3,335 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: A slight increase in annual funding from the previous CIP. F - 14 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 10. TECHNOLOGY ENHANCEMENTS Project Highlights: • Periodic upgrades and replacements for technology infrastructure and systems are necessary to maintain secure, efficient, and effective operation of the water distribution and sanitary sewer collection systems. • FY 2024 – FY 2025 includes funding for planned implementation of the next generation of meter reading technology, including piloting Advanced Metering Infrastructure (AMI). It also includes funding for a systemwide leak detection pilot (FY 2025 - FY 2027). Associated Plan(s): Community Energy Plan Water System Master Plan Neighborhood(s): VARIOUS Funding Notes: Other previously approved funds include existing PAYG balances. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 45 1,060 1,630 2,735 2,935 3,050 65 65 65 11,650 Previous Funding Other Previously Approved Funds 725 1,320 2,045 Total Funding 725 1,365 1,060 1,630 2,735 2,935 3,050 65 65 65 13,695 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Operations Costs (+/-) 21 56 108 197 301 404 455 455 455 2,452 Total Impact 0 21 56 108 197 301 404 455 455 455 2,452 Critical Milestones: • Piloting AMI Spring 2024 - Summer 2025 • Transition commercial accounts to AMI Fall 2025 - Fall 2026 • Transition residential accounts to AMI Fall 2028 - Spring 2031 Changes from Prior CIP: Costs for transition to Advanced Metering Infrastructure (AMI) increased in this CIP due to further refinement of technology planned to be implemented and the inclusion of meter replacements for those beyond their accuracy warranty period. Meter replacement costs are approximately 50 percent of the total AMI costs. F - 15 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 11. TRADES CENTER EQUIPMENT & IMPROVEMENTS Project Highlights: • Funding will be used for various equipment and facility improvements at the Trades Center in support of Utilities operations. • Funding is related to relocating staff at the Trades Center from trailers that are beyond their useful life to permanent facilities. Associated Plan(s): Community Energy Plan Water System Master Plan Neighborhood(s): Shirlington New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 535 535 PAYG 500 500 Previous Funding Total Funding 500 535 0 0 0 0 0 0 0 0 1,035 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: Expenditures are one year later than the previous CIP. F - 16 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 12. WASHINGTON AQUEDUCT CAPITAL Project Highlights: • This program provides the County's share of funding for capital improvements at the Washington Aqueduct, the County's wholesale water supplier, which is managed by the U.S. Army Corps of Engineers. • The Washington Aqueduct is currently the County's sole source of drinking water. • The Aqueduct’s capital budget is approved by its three customers (DC Water, Fairfax Water, and Arlington County) during the annual budget process. Arlington's contributions are based upon a prorate share of usage of the system. Associated Plan(s): Water System Master Plan Neighborhood(s): VARIOUS Funding Notes: Other previously approved funds include existing PAYG balances. The Aqueduct is owned and maintained by the U.S. Army Corps of Engineers. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 3,400 6,005 4,600 5,305 4,200 4,330 4,045 62,920 3,885 4,300 102,990 PAYG 2,070 3,745 3,315 4,420 4,560 4,845 4,995 5,280 5,140 38,370 Previous Funding Authorized but Unissued Bonds 2,900 2,900 Other Previously Approved Funds 1,500 1,500 Total Funding 7,800 8,075 8,345 8,620 8,620 8,890 8,890 67,915 9,165 9,440 145,760 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: The wholesale customers (DC Water, Fairfax Water, and Arlington County) approved increased funding to address previously deferred as well as currently planned capital investments in the Washington Aqueduct. Notional future amounts in FY 2032 are for regulatory changes and will be further refined in future CIPs. F - 17 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 13. WATER-MAIN CLEANING AND LINING PROGRAM Project Highlights: • This program rehabilitates small diameter (8-inch and below) pre-1960s cast iron water mains to restore flow capacity and improve water quality. In conjunction with the water main replacement program, this project will improve the overall condition of the County's water main assets. • The Water Distribution System Master Plan's goal is to rehabilitate the 250 miles of small diameter mains by 2040. Associated Plan(s): Water System Master Plan Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 1,600 1,655 1,710 1,770 1,770 1,825 1,825 1,880 1,880 1,935 17,850 Previous Funding Total Funding 1,600 1,655 1,710 1,770 1,770 1,825 1,825 1,880 1,880 1,935 17,850 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: Slight annual increases from the previous CIP. F - 18 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 14. WATER-MAIN REPLACEMENT PROGRAM Project Highlights: • This program replaces small diameter (8-inch and below) old cast iron water mains that are more susceptible to breaks with new ductile iron mains. In conjunction with the water main cleaning and lining program, this project will improve the overall condition of the County's water main assets. • The Water Distribution System Master Plan's goal is to rehabilitate the 250 miles of small diameter mains by 2040. • As necessary, pipes are upsized to provide appropriate water flow and pressure. Associated Plan(s): Water System Master Plan Neighborhood(s): VARIOUS Funding Notes: A portion of the annual funding will be from infrastructure availability fees (developer contributions). Other funding includes interest income. Other previously approved funds include existing PAYG balances. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Developer Contributions 2,200 2,640 2,730 2,985 2,980 3,245 3,250 3,470 3,465 3,750 30,715 New Bond Issue 2,490 3,590 4,090 3,815 4,620 4,615 5,225 5,230 5,205 38,880 PAYG 535 830 570 1,935 Other Funding 100 105 100 105 110 115 115 115 115 120 1,100 Previous Funding Other Previously Approved Funds 4,700 1,490 6,190 Total Funding 7,000 6,725 6,955 7,180 7,735 7,980 8,550 8,810 8,810 9,075 78,820 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: Funding reflects a slight increase from the previous CIP. F - 19 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 15. WATER/SEWER FRAMES/COVERS Project Highlights: • This project involves raising or lowering a casting or precast water valve or manhole frame top from its existing elevation to line up with the adjacent grade, pavement, curb, etc. • Water valve and manhole frames and covers are adjusted in conjunction with the annual street paving program. Associated Plan(s): Water System Master Plan Neighborhood(s): VARIOUS Funding Notes: A portion of the annual funding will be from infrastructure availability fees (developer contributions). New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Developer Contributions 1,000 1,035 1,070 1,105 1,105 1,135 1,130 1,170 1,175 1,210 11,135 PAYG 5 10 5 20 Previous Funding Total Funding 1,000 1,035 1,070 1,105 1,105 1,140 1,140 1,175 1,175 1,210 11,155 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: Funding increases to align funding with actual spending levels and pace of the paving program. F - 20 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan WS Maintenance Capital FY 2025-2034 16. WATER-TANK REHABILITATION Project Highlights: • Water tanks are inspected every five years. Painting and other maintenance work are programmed accordingly based on results. • The current funding schedule includes rehabilitation of Lee underground tank. Associated Plan(s): Water System Master Plan Neighborhood(s): VARIOUS Funding Notes: Other Previously Approved Funds includes existing PAYG balances. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 530 690 650 830 115 115 120 3,050 Previous Funding Other Previously Approved Funds 100 555 655 Total Funding 100 1,085 690 650 830 115 0 115 0 120 3,705 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: No change from the previous CIP. F - 21

Source: Arlington County website. First collected Oct 27, 2026.