RecordWell Data

Water Distribution Program(PDF, 876KB)

Arlington County · Arlington County · Budget documents

Open the original document More from Arlington County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Arlington County, Virginia CIP 2025 − 2034 WATER AND SEWER INFRASTRUCTURE: WATER DISTRIBUTION PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total 1. Finished Water Reliability & Interconnections 500 2,070 2,140 11,050 22,100 22,800 34,200 0 0 0 94,860 2. Water-Improvements for Development 500 520 535 550 550 570 570 585 585 605 5,570 3. Water-Pump Station Improvements 2,250 110 265 830 0 125 0 130 0 135 3,845 4. Regional Source Water Resiliency 0 0 0 0 0 0 0 0 0 60,500 60,500 5. Transmission Mains Resiliency 150 310 3,745 0 0 0 0 0 0 0 4,205 Total Recommendation 3,400 3,010 6,685 12,430 22,650 23,495 34,770 715 585 61,240 168,980 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 500 520 535 550 550 570 570 585 585 605 5,570 New Bond Issue 0 505 5,885 11,050 22,100 22,800 34,200 0 0 60,500 157,040 PAYG 835 474 1,070 25 0 125 0 130 0 135 2,794 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 1,335 1,499 7,490 11,625 22,650 23,495 34,770 715 585 61,240 165,404 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 2,065 1,511 0 0 0 0 0 0 0 0 3,576 Subtotal Previously Approved Funding 2,065 1,511 0 0 0 0 0 0 0 0 3,576 Total Funding Sources 3,400 3,010 7,490 11,625 22,650 23,495 34,770 715 585 61,240 168,980 F - 22 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan Water Distribution FY 2025-2034 1. FINISHED WATER RELIABILITY & INTERCONNECTIONS Project Highlights: • Projects will provide reliability and redundancy for Arlington County's finished water supply in the event of emergencies associated with the source water supply or the water distribution system. • This program covers enhancements to our current water supply system for resiliency as well as interconnections and associated improvements with neighboring jurisdictions to provide backup feed to/from Arlington in case of emergencies associated with the wa ter supply or the water distribution system. • Investments in FY 2028 -FY 2031 are roughly scaled for a large capacity redundancy interconnection project with Fairfax Water; numbers and timing are preliminary while alignment and feasibility studies are underway. Associated Plan(s): Water System Master Plan Neighborhood(s): VARIOUS Funding Notes: Other previously approved funds include existing PAYG balances. Future assets in this program may be owned by the County or others. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 505 2,140 11,050 22,100 22,800 34,200 92,795 PAYG 54 54 Previous Funding Other Previously Approved Funds 500 1,511 2,011 Total Funding 500 2,070 2,140 11,050 22,100 22,800 34,200 0 0 0 94,860 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Planning & Design Summer 2023 - Fall 2027 • Construction Spring 2028 - Summer 2031 Changes from Prior CIP: In previous CIPs, this program was called "Source Water" rather than "Finished Water." FY 2028 - FY 2031 is a notional placeholder for the construction of an additional interconnection, dependent upon the result of the source water study and regional planning processes. F - 23 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan Water Distribution FY 2025-2034 2. WATER-IMPROVEMENTS FOR DEVELOPMENT Project Highlights: • This program is identified in the Water Distribution System Master Plan to respond to opportunities to improve the water distribution system with adjacent developments for water quality, redundancy, and transmission capacity purposes. • Projects include funding for water main looping, which are projects to install mains necessary to complete a block or section where a developer may only be responsible for water mains immediately on the frontage of their site. This may also cover work to abandon existing mains and the completion of loops in prior developments. • Water main looping provides the following design and operational advantages: 1) The system becomes less vulnerable to water main breaks. When a single main breaks, it may be isolated, and water service may be continued in the area through alternate loops. 2) A greater quantity of water generally becomes available for firefighting purposes. Associated Plan(s): Water System Master Plan Neighborhood(s): VARIOUS Funding Notes: Funding will be from infrastructure availability fees (developer contributions). New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Developer Contributions 500 520 535 550 550 570 570 585 585 605 5,570 Previous Funding Total Funding 500 520 535 550 550 570 570 585 585 605 5,570 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: No change from the previous CIP. F - 24 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan Water Distribution FY 2025-2034 3. WATER-PUMP STATION IMPROVEMENTS Project Highlights: • This program upgrades or replaces various components at pump stations throughout the County, including motor control centers, pumps, and back-up generators. • Pump station reliability is essential to providing adequate fire flow and safe drinking water to customers. Associated Plan(s): Water System Master Plan Neighborhood(s): VARIOUS Funding Notes: Other previously approved funds include existing PAYG balance. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 835 110 1,070 25 125 130 135 2,430 Previous Funding Other Previously Approved Funds 1,415 1,415 Total Funding 2,250 110 1,070 25 0 125 0 130 0 135 3,845 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: This CIP includes funding in FY 2025 for improvements at Lee pump station and funding in FY 2028 for Minor Hill pump station. F - 25 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan Water Distribution FY 2025-2034 4. REGIONAL SOURCE WATER RESILIENCY Project Highlights: • This program allocates funds for the study and construction of regional projects to protect the County’s source water or provide access to emergency sources of water. • A placeholder amount is included in the FY 2034 outyear to reserve capacity and indicate the general scale of an anticipated County contribution to a regional project which has not yet been scoped, scaled, or designed. • Regional partners are also pursuing federal funding contributions which may also determine amount of County contribution. Associated Plan(s): Water System Master Plan Funding Notes: Future assets in this program may be owned by the County or others. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 60,500 60,500 Previous Funding Total Funding 0 0 0 0 0 0 0 0 0 60,500 60,500 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: This program replaces the "New River Crossing" program in the previous CIP. F - 26 WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan Water Distribution FY 2025-2034 5. TRANSMISSION MAINS RESILIENCY Project Highlights: • This program provides redundant water mains to back up existing transmission capacity. Associated Plan(s): Water System Master Plan Neighborhood(s): VARIOUS Funding Notes: Other Previously Approved Funds include existing PAYG balances. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 3,745 3,745 PAYG 310 310 Previous Funding Other Previously Approved Funds 150 150 Total Funding 150 310 3,745 0 0 0 0 0 0 0 4,205 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: This project was previously called Gravity Transmission Mains - B2 & B3 but has been renamed to support water resiliency and redundancy planned needs in the County. F - 27

Source: Arlington County website. First collected Oct 27, 2026.