Arlington County, Virginia CIP
2025 − 2034
WATER AND SEWER INFRASTRUCTURE: WATER
DISTRIBUTION PROGRAM
10 YEAR CATEGORY SUMMARY (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
1. Finished Water Reliability &
Interconnections
500 2,070 2,140 11,050 22,100 22,800 34,200 0 0 0 94,860
2. Water-Improvements for
Development
500 520 535 550 550 570 570 585 585 605 5,570
3. Water-Pump Station
Improvements
2,250 110 265 830 0 125 0 130 0 135 3,845
4. Regional Source Water
Resiliency
0 0 0 0 0 0 0 0 0 60,500 60,500
5. Transmission Mains
Resiliency
150 310 3,745 0 0 0 0 0 0 0 4,205
Total Recommendation 3,400 3,010 6,685 12,430 22,650 23,495 34,770 715 585 61,240 168,980
CATEGORY FUNDING SOURCES (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
New Funding
Federal Funding 0 0 0 0 0 0 0 0 0 0 0
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 500 520 535 550 550 570 570 585 585 605 5,570
New Bond Issue 0 505 5,885 11,050 22,100 22,800 34,200 0 0 60,500 157,040
PAYG 835 474 1,070 25 0 125 0 130 0 135 2,794
Short Term Finance 0 0 0 0 0 0 0 0 0 0 0
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 1,335 1,499 7,490 11,625 22,650 23,495 34,770 715 585 61,240 165,404
Previously Approved Funding
Authorized but Unissued
Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved
Funds 2,065 1,511 0 0 0 0 0 0 0 0 3,576
Subtotal Previously Approved
Funding 2,065 1,511 0 0 0 0 0 0 0 0 3,576
Total Funding Sources 3,400 3,010 7,490 11,625 22,650 23,495 34,770 715 585 61,240 168,980
F - 22
WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan
Water Distribution FY 2025-2034
1. FINISHED WATER RELIABILITY & INTERCONNECTIONS
Project Highlights:
• Projects will provide reliability and redundancy for Arlington
County's finished water supply in the event of emergencies
associated with the source water supply or the water
distribution system.
• This program covers enhancements to our current water
supply system for resiliency as well as interconnections and
associated improvements with neighboring jurisdictions to
provide backup feed to/from Arlington in case of
emergencies associated with the wa ter supply or the water
distribution system.
• Investments in FY 2028 -FY 2031 are roughly scaled for a
large capacity redundancy interconnection project with
Fairfax Water; numbers and timing are preliminary while
alignment and feasibility studies are underway.
Associated Plan(s):
Water System Master Plan
Neighborhood(s):
VARIOUS
Funding Notes: Other previously approved funds include existing PAYG balances. Future assets in this program may be owned by
the County or others.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 505 2,140 11,050 22,100 22,800 34,200 92,795
PAYG 54 54
Previous Funding
Other Previously
Approved Funds 500 1,511 2,011
Total Funding 500 2,070 2,140 11,050 22,100 22,800 34,200 0 0 0 94,860
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Planning & Design Summer 2023 - Fall 2027
• Construction Spring 2028 - Summer 2031
Changes from Prior CIP:
In previous CIPs, this program was called "Source Water" rather than "Finished Water."
FY 2028 - FY 2031 is a notional placeholder for the construction of an additional
interconnection, dependent upon the result of the source water study and regional
planning processes.
F - 23
WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan
Water Distribution FY 2025-2034
2. WATER-IMPROVEMENTS FOR DEVELOPMENT
Project Highlights:
• This program is identified in the Water Distribution System
Master Plan to respond to opportunities to improve the water
distribution system with adjacent developments for water
quality, redundancy, and transmission capacity purposes.
• Projects include funding for water main looping, which are
projects to install mains necessary to complete a block or
section where a developer may only be responsible for water
mains immediately on the frontage of their site. This may also
cover work to abandon existing mains and the completion of
loops in prior developments.
• Water main looping provides the following design and
operational advantages:
1) The system becomes less vulnerable to water main
breaks. When a single main breaks, it may be isolated, and
water service may be continued in the area through
alternate loops.
2) A greater quantity of water generally becomes available
for firefighting purposes.
Associated Plan(s):
Water System Master Plan
Neighborhood(s):
VARIOUS
Funding Notes: Funding will be from infrastructure availability fees (developer contributions).
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Developer Contributions 500 520 535 550 550 570 570 585 585 605 5,570
Previous Funding
Total Funding 500 520 535 550 550 570 570 585 585 605 5,570
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
No change from the previous CIP.
F - 24
WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan
Water Distribution FY 2025-2034
3. WATER-PUMP STATION IMPROVEMENTS
Project Highlights:
• This program upgrades or replaces various components at
pump stations throughout the County, including motor
control centers, pumps, and back-up generators.
• Pump station reliability is essential to providing adequate fire
flow and safe drinking water to customers.
Associated Plan(s):
Water System Master Plan
Neighborhood(s):
VARIOUS
Funding Notes: Other previously approved funds include existing PAYG balance.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
PAYG 835 110 1,070 25 125 130 135 2,430
Previous Funding
Other Previously
Approved Funds 1,415 1,415
Total Funding 2,250 110 1,070 25 0 125 0 130 0 135 3,845
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
This CIP includes funding in FY 2025 for improvements at Lee
pump station and funding in FY 2028 for Minor Hill pump station.
F - 25
WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan
Water Distribution FY 2025-2034
4. REGIONAL SOURCE WATER RESILIENCY
Project Highlights:
• This program allocates funds for the study and construction
of regional projects to protect the County’s source water or
provide access to emergency sources of water.
• A placeholder amount is included in the FY 2034 outyear to
reserve capacity and indicate the general scale of an
anticipated County contribution to a regional project which
has not yet been scoped, scaled, or designed.
• Regional partners are also pursuing federal funding
contributions which may also determine amount of County
contribution.
Associated Plan(s):
Water System Master Plan
Funding Notes: Future assets in this program may be owned by the County or others.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 60,500 60,500
Previous Funding
Total Funding 0 0 0 0 0 0 0 0 0 60,500 60,500
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
This program replaces the "New River Crossing" program in the
previous CIP.
F - 26
WATER AND SEWER INFRASTRUCTURE Capital Improvement Plan
Water Distribution FY 2025-2034
5. TRANSMISSION MAINS RESILIENCY
Project Highlights:
• This program provides redundant water mains to back up
existing transmission capacity.
Associated Plan(s):
Water System Master Plan
Neighborhood(s):
VARIOUS
Funding Notes: Other Previously Approved Funds include existing PAYG balances.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
New Bond Issue 3,745 3,745
PAYG 310 310
Previous Funding
Other Previously
Approved Funds 150 150
Total Funding 150 310 3,745 0 0 0 0 0 0 0 4,205
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
This project was previously called Gravity Transmission Mains -
B2 & B3 but has been renamed to support water resiliency and
redundancy planned needs in the County.
F - 27