Adopted FY 2023 – FY 2032 CIP(PDF, 15MB)
Arlington County · Arlington County · Budget documents
Open the original document More from Arlington County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Adopted Capital
Improvement Plan
Fiscal Years 2023 - 2032
COUNTY BOARD
KATIE CRISTOL
CHAIR
CHRISTIAN DORSEY
VICE CHAIR
MATT DE FERRANTI
LIBBY GARVEY
TAKIS KARANTONIS
COUNTY MANAGER’S OFFICE
MARK SCHWARTZ
COUNTY MANAGER
"Arlington will be a diverse and
inclusive world-class urban community
with secure, attractive residential and
commercial neighborhoods where
people unite to form a caring, learning,
participating, sustainable community in
which each person is important."
- Adopted by the Arlington County Board January 2002
Table of Contents
INTRODUCTION ........................................................................................................ 1
GUIDE TO READING THE CIP ................................................................................ 7
BUDGET CALENDAR ................................................................................................. 8
A. OVERVIEW
Financial & Debt Management Policies ............................................................................. A-1
Bonds Authorized but Unissued ......................................................................................... A-8
Bond Referenda History....................................................................................................... A-9
Adopted CIP Board Report ............................................................................................... A-18
County Board Guidance ..................................................................................................... A-34
Bond Referenda Board Report .......................................................................................... A-37
Projects Underway .............................................................................................................. A-53
B. CAPITAL FUNDING
CIP Program Summary ........................................................................................................ B-1
CIP Comparison by Program Category ............................................................................. B-3
CIP Comparison by Funding Category .............................................................................. B-4
Debt Summary ....................................................................................................................... B-5
PAYG Summary .................................................................................................................... B-8
Comparison of Previously Adopted to Current Bond Program .................................... B-9
Debt Capacity Analysis ....................................................................................................... B-11
Debt Ratio Analysis Chart ................................................................................................. B-13
Tax-Supported Debt Service to General Fund Expenditures Graph.......................... B-14
County General Obligation Bond Debt other Financings to Market Value Chart ... B-15
County General Obligation Bond Debt other Financings to Market
Value Graph ......................................................................................................................... B-16
Tax Supported General Obligation Bond Debt to Income .......................................... B-17
C. GENERAL GOVERNMENT
1. REGIONAL PARTNERSHIPS
Regional Partnerships & Contingencies .................................................................. C-1
Regional Partnerships & Contingencies .................................................................. C-3
Regional Partnerships & Contingencies .................................................................. C-6
2. LOCAL PARKS AND RECREATION PROGRAMS
Program Summary ................................ ..................................................................... C-8
Maintenance Capital.................................................................................................. C-10
Park Master Plans ...................................................................................................... C-23
Trail and Bridge Modernization .............................................................................. C-38
Parks Land Acquisition and Open Space .............................................................. C-40
Synthetic Turf ............................................................................................................ C-42
3. ARLINGTON NEIGHBORHOODS PROGRAMS
Program Summary .................................................................................................... C-53
Arlington Neighborhoods ....................................................................................... C-55
4. ECONOMIC DEVELOPMENT PROGRAMS
Program Summary .................................................................................................... C-62
Public Art Program/ ................................................................................................. C-63
5. PUBLIC / GOVERNMENT FACILITIES
Program Summary .................................................................................................... C-65
Facilities ...................................................................................................................... C-67
Energy Efficiency .................................................................................................... C-104
D. INFORMATION TECHNOLOGY/EQUIPMENT PROGRAMS
Program Summary ...................................................................................................... D-1
Enterprise Information Technology ........................................................................ D-4
Lines of Business Systems ....................................................................................... D-19
Detention Center Security ....................................................................................... D-25
Facility Improvements .............................................................................................. D-30
Public Safety Communications ............................................................................... D-33
Public Safety IT and Hardware ............................................................................... D-38
Response Equipment ................................................................................................ D-48
Public Safety Vehicles ............................................................................................... D-52
E. METRO AND TRANSPORTATION
1. METRO
Program Summary ...................................................................................................... E-1
Metro ............................................................................................................................. E-2
2. TRANSPORTATION INITIATIVES
Program Summary ...................................................................................................... E-3
Transportation Capital Fund/Tax Increment Financing Fund - Fund Balance E-7
Ten Year Transportation Funding Plan ................................................................... E-9
Complete Arlington Streets ..................................................................................... E-21
Transit Program ........................................................................................................ E-50
Maintenance Capital.................................................................................................. E-84
F. UTILITIES AND STORMWATER MANAGEMENT
1. UTILITIES
Program Summary ....................................................................................................... F-1
Water Sewer Maintenance Capital ............................................................................. F-1
Water Distribution System ......................................................................................... F-5
Sanitary Sewer System Improvements ...................................................................... F-7
WPCP Non-Expansion ............................................................................................ F-17
2. STORMWATER MANAGEMENT
Program Summary ..................................................................................................... F-29
Stormwater Management Maintenance Capital ..................................................... F-47
Watersheds Map ......................................................................................................... F-33
Stormwater Infrastructure/Capacity Improvements ............................................ F-47
Str eams and Water Quality ....................................................................................... F-51
G. APPENDIX
Report with Project Name, 10 Year Cost and Total Cost, ................................... G-1
Report with Project Name and Associated Master Plan ....................................... G-8
Report with Project Name and Associated Advisory Commissions ................. G-17
A. Ove
rview
Th
e Capital Improvement Plan (CIP) is one of the most significant planning processes for Arlington County and Arlington
Public Schools. This plan typically identifies the capital needs of the community over a ten-year period.
Th
e CIP is a planning document that is updated biennially and subject to change as the needs of the community become
more defined and individual projects move along in their respective planning and budgeting processes. The effective
use of a CIP process provides for considerable advance project identification, planning, evaluation, scope definition,
design, public discussion, cost estimating, and financial planning.
Th
e objectives used to develop the CIP include:
• To
preserve and improve the infrastructure of Arlington through capital asset construction,
rehabilitation and maintenance;
• To maximize the useful life of capital investments by sche duling major renovations and
modifications at the appropriate time in the lifecycle of the facility;
• To identify and examine current and future infrastructure needs and establish priorities among
projects so that available resources are used to the community’s best advantage; and
• To improve financial planning by comparing needs with resources, estimating future bond issues,
and identifying potential fiscal implications.
Th
e CIP is the primary instrument for planning the funding and timing of the needs and priorities that have been
approved by the County Board. The funding and implementation of CIP projects follow in the form of bond referenda,
the annual appropriation of Pay -As-You-Go (PAYG) projects by the Board as part of the annual operating budget, and
the approval / receipt of other funding sources identified in this document.
B. Ca
pital Project Definition
Cap
ital projects result in economic activities that lead to the acquisition, construction, or extension of the useful life of
capital assets. Capital assets include land, facilities, parks, playgrounds and outdoor structures, streets, bridges,
pedestrian and bicycle systems, water and sewer infrastructure, technology systems and equipment, traffic control
devices, and other items of value from which the community derives benefit for a significant number of years.
Cap
ital expenditures and operating expenditures are primarily differentiated by two characteristics: dollar amount of
the expenditure and the useful life of the asset acquired, constructed, or maintained. Capital expenditures will enhance,
acquire or extend the useful life of assets through a variety of activities. Generally, land acquisition, feasibility studies,
planning, design, construction, asset rehabilitation, enterprise technology acquisition, and project Implementation, are
activities associated with capital projects. Capital projects are typically funded with a variety of County sources – the
primary two of which include PAYG and bond funds. T hey have similar and distinct eligibility criteria in that they both
require that a project has an estimated useful life of at least ten years or more. However, they differ in scale and scope
of projects they typically fund. Bond funds are usually reserv ed for the big- ticket items such as new construction or
major renovations or alterations, while PAYG funds smaller scale renovations or maintenance type projects. In general,
capital projects in the CIP:
Arlington County, Virginia
CAPITAL IMPROVEMENT PLAN - INTRODUCTION
CIP
2023- 2032
1
• Have a total project cost in excess of $100,000.
• Range from construction of new buildings to renovations, additions, or conversions, or demolition of
existing facilities.
• Have a minimum useful life of 10 years, significantly extend the useful life of an asset, or significantly
alter the nature and character of an asset (i.e. not to include annual asset maintenance costs, annual
warranty cost or other ongoing costs).
The CIP has also traditionally been the vehicle by which planning for technology capital investments occurs. In general,
technology capital projects in the CIP:
• Have an estimated cost in excess of $25,000 and /or require six months or 1,000 hours for
implementation or completion.
• Include applications systems, network design and implementation, telecommunications infrastructure,
enterprise hardware and software systems, web design and implementation services, document
imaging, data base design and development, consulting services (business process studies,
requirements analysis or other studies), and technology associated with new construction and/or
renovation and relocation projects.
• Have a minimum useful life of three years, significantly extend the useful life of an asset (i.e. not to
include annual software and hardware maintenance and upgrade costs, warranty costs or other
ongoing costs), provide a significant enhancement to functionality, or represent a change of platform
or underlying structure.
C. CIP Development Process
Capital projects originate from a variety of sources. County Board appointed commissions, advisory groups, and tas k
forces typically advise the Board or develop long-term plans that recommend certain types of improvements. In some
cases, individual residents request improvements to their streets, playgrounds or other County facilities. Neighborhood
associations and business groups may also suggest projects and work with County staff on projects. Some projects are
initiated by staff based on adopted County master plans, such as the Transportation Master Plan or the Storm Water
Master Plan.
Projects typically come forward through the sponsoring department that is responsible for their implementation but
may also come from staff that exercises operational control over County asset. Investments were prioritized based on
the ability to deliver value to the County and their alignment with the priorities of key stakeholders such as the County
Board, County Government and the public.
As discussed in more detail under “Financial & Debt Management Policies” below, the consolidated recommendations
were considered against various debt capacity scenarios to develop the final adopted CIP. Throughout the process, the
team consulted with program managers and other subject matter experts within the departments.
2
D. Financial & Debt Management Policies
The Board-adopted financial and debt management policies provide the parameters for the amounts and timing of
bond-financed projects to be included in the CIP, ensuring that the CIP is financially sustainable and that it supports the
County’s triple-A bond ratings.
E. Sources of Capital Funds
Funding for capital improvements comes from a number of sources. These funds are generated through local taxes,
fees, charges, outside funding or other similar sources. The availability of these funds is sensitive to economic cycles.
Pay-As-You-Go (PAYG) comes from annual appropriations and is part of the adopted operating budget. PAYG funding
provides the greatest flexibility since it is not constrained by tax-exempt bond requirements and historically has funded
maintenance capital projects and regional partnership programs. Projects that are typically smaller in scale as well as
minor renovations are likely candidates for PAYG funding – as long as the project has an expected useful life of at least
10 years or more. PAYG also:
• Has no debt service cost that must be paid on the expenditure;
• Is available at the start of the fiscal year;
• Must compete with operating programs for funding;
• Does not have to be approved through referendum; and
• Can be carried over at the end of each fiscal year.
Bond financing refers to debt financing of projects. Arlington County most often sells general obligation bonds. Bond
financing is generated through the borrowing of funds (principal) at a cost (interest) through the sale of municipal bonds.
There are several types of bond financing:
• General obligation bonds - Arlington typically issues general obligation bonds, which must first be
approved by the County’s voters and are secured by the full faith and credit of the County. Arlington’s
practice is to schedule bond refer enda for even -numbered calendar years, which correspond to the
bond sale in odd-number fiscal years.
• Revenue and other types of bonds – Arlington has issued low interest rate revenue bonds through the
Virginia Water Revolving Loan Fund (VRLF) run by the Virginia Resources Authority for improvements
to the Water Pollution Control Plant. Revenue bonds are typically secured solely by user fees or
projected revenues and include no pledge from the General Fund. Revenue and other types of bonds
(including those backed by the County’s subject to appropriation pledge) typically carry a higher interest
rate than GO bonds and generally have debt service coverage and other financial restrictions.
• Lease revenue or annual appropriation bonds – These types of bond s are secured by a “subject to
appropriation” pledge by the County Board and do not require voter approval. (See “Lease -purchase
finance” below) They generally require the use of a third party to execute the lease transaction, such
as the Industrial Development Authority (IDA), Virginia Resources Authority, or Virginia Municipal
League / Virginia Association of Counties.
One of the criteria used to determine which projects will be funded with bond proceeds is the useful life of the
improvement. Projects funded with bond proceeds generally have a useful life that is similar in length to the repayment
schedule of the bonds. Historically, Arlington has issued 20 -year general obligation serial bonds and paid the bonds
using a two -year step -up schedule of principal repayment, and the average bond principal is outstanding for
approximately 11 years. The Board’s financial policies allow for longer term bonds as long as the term of the bonds
3
does not exceed the useful life of the project, and also allows for alternative amortization structures such as level debt
service to better match certain revenue streams.
Inter-jurisdictional payments are another source of funding in the capital program. Arlington has agreed to provide
services to other jurisdictions through contractual agreements. For example, wastewater treatment services for some
areas of Alexandria, Falls Church, and Fairfax County are provided by Arlington’s Water Pollution Control Plant. These
jurisdictions also share in the cost of capital improvements of this facility, thus reducing the cost to Arlington users.
Short-Term Finance represents another source of capital financing to acquire equipment and technology , and to
perform certain capital maintenance projects that result in a more limited extension to useful life. Because of the short-
term maturities of these financing vehicles, interest rates are typically lower than rates on long-term bonds. The County
typically procures the goods and services using temporary funding sources, and then draws funds from the financing
institution to reimburse the temporary sources.
Infrastructure Availability (formerly hook-up) fees are another source of capital funding. These fees are assessed to
developers and builders to join the water and sewer systems, based on the cost of capacity (volume) of the systems
being “used up” by the customer. These funds are programmed during the annual budget process and can be used only
for utilities projects.
The Transportation Capital Fund – Commercial & Industrial Tax is a source of funding authorized by the General
Assembly in 2007 enabling the County to levy an additional real estate tax on industrial and commercial properties for
transportation initiatives. In April 2008, the County Board adopted a tax of $0.125 per $100 of assessed value for
transportation projects. Proceeds of the tax are held in a separate fund.
The Transportation Capital Fund – NVTA 30% Local Funds is comprised of a 0.7% increase in the local sales tax approved
in 2013 by the G eneral Assembly as part of HB 2313. The Northern Virginia Transportation Authority (NVTA) receives
the proceeds of this tax and retains 70% for funding of projects that are regional in nature. The remaining thirty percent
of this tax is deposited in the Transportation Capital Fund along with the Commercial & Industrial tax. In 2018, The
General Assembly repealed two additional taxes and fees that were part of the original 2013 legislation and diverted
those funds to the Washington Metropolitan Area Transit Authority (WMATA) Capital Fund beginning in FY 2019.
The Northern Virginia Transportation Authority (NVTA) – All revenues from the tax adopted by the General Assembly
in 2013 as part of HB 2313 are distributed from the State to NVTA. Of these revenues, seventy percent (“Regional
Funds”) are retained by NVTA to fund regional transportation projects. By law, each locality’s long-term benefit must
be approximately equal to the proportion of the total fees and taxes generated in the locality divided by the total of
all fees and taxes received by NVTA. The remaining thirty percent (“Local Share”) will be returned on a pro rata basis
to the member localities based on the amount of revenue generated by the taxes and fees within the locality, to be
used for locally selected transportation projects and deposited into the Transportation Capital Fund. The NVTA Board
will approve projects for regional funding as part of its Six-Year Program (SYP).
The Crystal City – Potomac Yard – Pentagon City Tax Increment Financing Area was established in 2010 to support the
infrastructure investment needed as part of the Crystal City Sector Plan as well as the neighboring areas of Potomac
Yard and Pentagon City. Tax increment financing (TIF) is a mechanism used to support development and redevelopment
by capturing the projected increase in property tax revenues in the area and investing those related infrastructure
improvements. Unlike a special district, it is not an additional or new tax; rather, it redirects and segregates the
increased property tax revenues that would normally flow to the General Fund. The amount of tax increment revenue
is determined by setting a baseline assessed value of all property in the area on January 1, 2011 and in each subsequent
year, tracking the incremental increase in assessed values relative to the base year, and segregating the incremental
revenues in a separate fund. Beginning in FY 19, the County Board approved allocating 25% percent of the incremental
revenues to the Crystal City – Potomac Yard – Pentagon City area.
4
The Stormwater Management Fund relies on a source of funding originally adopted by the County Board in April 2008
to fund operating and capital costs to upgrade and expand the County’s stormwater drainage and sewer infrastructure.
Since then the Board has increased the sanitary district tax rate in FY 2011 to $0.013 per $100 of assessed value and
then again in FY 2022 to $0.017 per $100 of assessed value. Recognizing the significance of the stormwater investment
that is needed, the voters approved the November 2020 bond referendum for stormwater and watershed
infrastructure. This will be a substantial, long- term investment in the County’s stormwater management system, with
multiple generations of taxpayers benefiting. Proceeds of this tax are held in a separate fund.
Developer contributions are also an important source of funding. These are contributions paid by developers to finance
specific projects. Examples of these projects are utility undergrounding and street lighting.
Finally, there are grants and reimbursements or other revenue from the state and federal governments. These are
funds provided by the Commonwealth of Virginia or the federal government for reimbursement of costs for certain
capital improvements. Whenever possible, state or federal reimbursement is sought to offset County tax support and
is included in the planning process. (See the Transportation & Pedestrian Initiatives section of the CIP for some current
examples.)
F. Definition of Terms Used in Capital Planning
Arbitrage: Arbitrage is the gain a tax -exempt issuer may be able to obtain by borrowing at a tax -exempt rate and
investing at a taxable rate. The Tax Reform Act of 1986 and subsequent amendments relating to the issuance of tax-
exempt debt and arbitrage regulations had a dramatic effect on all issuers of tax-exempt debt.
Arbitrage Rebate: Refers to the requirement to rebate to the Federal government investment earnings derived with
the proceeds of tax-exempt debt that are in excess of the earnings that would have been earned had the proceeds of
the debt been invested at the same interest rate as that paid to the holders of the tax-exempt debt.
Architecture and Engineering (A&E): Professional services performed to facilitate planning, development, designs, cost
estimates and construction of buildings, parks, streets, utilities, and other capital infrastructure.
Bond Funding: Funding derived from the public sale of bonds for which interest is paid to buyers for the use of the
money.
• CIP programs and projects adopted for bond funding are approved by the County Board for inclusion on a
bond referendum.
• Voters approve each bond referendum. In Arlington, a bond referendum is placed on the ballot for voter
approval every other November, concurrent with Congressional/Presidential elections.
• Funds cannot be spent until after the referendum is a pproved by the voters, the Board approves the
authorization and the County has
developed cash flow plans.
• Spending rules are established based on referendum language and IRS regulations.
Bond Issuance Costs: Costs associated with the sale of bonds. Expenditures include fees to bond rating agencies,
administrative expenses, legal fees, etc.
Capital Planning Process: The process of identifying, planning, evaluating and scoping projects, establishing
performance standards, conducting public discussion, estimating costs and financial planning for capital projects. These
processes should be completed for current year funding requests and for projects underway included in subsequent
years.
Debt Service: The amount of principal and interest the County pays on its debt financing.
5
Full Time Equivalent (FTE): The measure of authorized personnel. It is calculated by equating 2,080 hours of work per year
(2,912 for uniformed firefighters until the Kelly Day schedule is fully implemented, and 2,600 thereafter) with the full-time
equivalent of one position (referred to in the budget as an FTE).
Out Years: All years after the current funding year. For example, in the FY 2023 – FY 2031 CIP, all years after
FY 2023 are considered out years.
Overhead: The capital project should bear the cost of staff time spent di rectly on the implementation of the projects
funded. In certain cases, the project can also bear the cost of program planning or preliminary business processes used
in advance of funding or bringing the project to completion of scope.
Rules: This appli es to limitations on the use of funds as a result of special revenue requirements. Interjurisdictional
agreements for sewer construction reimbursement can only be applied to non -expansion costs of specific projects.
Grants can only be spent under the terms and conditions provided with the grant. Bonds can only be used consistent
with the language of the referendum and for items consistent with bond counsel determination, etc. Rules are not
intended to imply administrative procedures, but rather legal requirements.
Total Project Cost: The CIP reflects the full cost of each project. The total cost includes such items as design,
construction, right-of-way, construction management, utility relocations, hardware and software purchases, equipment
needed to make the improvement useful, and appropriate overhead and operating costs.
6
GUIDE TO READING THE FY 2023 – FY 2032
CAPITAL IMPROVEMENT PLAN
The adopted FY 2023 – FY 2032 Capital Improvement Plan (CIP) provides comprehensive information on the near and
longer-term facility and infrastructure capital improvements planned in the County over the next ten years.
The book is organized by the following sections: an introductory section, overview, capital funding section, and the
program areas under which the projects reside. Each one of these sections represents a key component of the overall
picture of the adopted FY 2023 – 2032 CIP:
The Introductory section includes various information on the CIP process, policies , and governance that help
provide context and framework under which the CIP is formulated.
The Overview sets the tone for the adopted CIP with the Introduction and provides status of projects underway
and summaries of authorized unissued bonds.
The Capital Funding section includes various financial summaries of the CIP by program and funding source. It
also includes analysis of the County’s debt capacity as impacted by the adopted CIP.
The remaining four sections are dedicated to describing specific programs and projects included under the General
Government section, IT and Equipment section, Metro and Transportation section, and the Utilities and Stormwater
section. These sections detail the projects by major program areas.
The first part of each of the programs provides a summary overview of the program vision and description as
well as costs and funding sources.
The following pages provide a description of each project including project highlights, funding schedules, critical
milestones and operating impacts, if any. In addition, where applicable, the pages have a link to associated
master plans, other online project status pages, board reports, sector plans, etc.
Like previous CIPs, the adopted FY 2023 – 2032 CIP is largely funded by bond debt, PAYG, and short-term financing. In
addition, the Transportation Capital Fund, the Crystal City, Potomac Yard and Pentagon City tax increment financing
area, the Utilities Fund and the Stormwater Management Fund are integrated in the comprehensive funding strategy
for the CIP.
Please note that cost estimates are subject to market pressures and may not reflect the actual costs incurred at project
implementation.
7
CIP CALENDAR
FEBRUARY 2022
County Manager presents Proposed FY 2023 PAYG Budget to the County Board
FY 2023 – FY 2032 Capital Improvement Program (CIP) staff kick-off
APRIL 2022
Community submits early feedback on CIP Priorities online
MARCH - APRIL 2022
County Board holds budget work sessions on PAYG and the operating budget with County
departments and the Fiscal Affairs Advisory Commission
APRIL 2022
County Board adopts FY 2023 Budget, PAYG Capital and Appropriations Resolutions for
the County government and the public schools
MAY 2022
Superintendent submits FY 2023 – FY 2032 Proposed CIP to the School Board – May 12
County Manager submits FY 2023 – 2032 Proposed CIP to the County Board – May 17
Various boards and commissions review the FY 2023 – FY 2032 Proposed CIP
JUNE 2022
School Board adopts the School’s FY 2023 – FY 2032 CIP – June 23
County Board worksessions on CIP – June 7, June 14, June 28
CIP Public Hearing – June 28
JULY 2022
County Board wrap-up worksession – July 14
County Board adopts the FY 2023 – FY 2032 CIP – July 19
County Board approves the general obligation bond referenda resolutions and the language to
be inserted on the ballot for the fall General Election
8
B
udgeting, Planning, and Reserves
B
alanced Budget: Arlington County will adopt an annual General Fund budget in which the budgeted revenues and
expenditures are equal (a balanced budget). Any one -time revenues will be used for
one-time, non -recurring expenses such as capital, equipment, special studies, debt reduction, and reserve
contributions.
L
ong-Term Financial Planning: The County will annually develop a six -year forecast of General Fund revenues,
expenditures and will maintain a biennially updated, ten- year Capital Improvement Plan (CIP). T he ten-year forecast
will incorporate projected reserve levels and impact of the CIP on the County’s debt ratios.
G
eneral Fund Operating Reserve: An Operating Reserve will be maintained at no less than five and one-half percent of
the County’s General Fu nd budget. The Operating Reserve shall be shown as a designation of total General Fund
balance. Appropriations from the Operating Reserve require County Board approval and may only be made to meet a
critical, unpredictable financial need. Any draw on th e operating reserve will be replenished within the subsequent
three (3) fiscal years.
S
elf-Insurance Reserve: The County will also maintain a self-insurance reserve equivalent to approximately one to two
months’ claim payments based on a five-year rolling average. Any draw on the self-insurance reserve requires County
Board approval and will be replenished within the subsequent two (2) fiscal years.
S
tabilization Reserve: Consistent with past practice, the County will maintain a stabilization reserve t o address
unexpected, temporary events, such as major weather events or a local/regional emergency requiring immediate
incurrence of cost in response; revenue declines; new/unfunded state, regional or federal programs; unexpected capital
expenditures; and local or regional economic stress. Amounts, in most instances, would be used for one -time (vs. on-
going) needs in the course of a fiscal year, and are not intended to be a source of funds to balance the budget during
the annual budget development process.
U
se of contingent monies requires approval by the County Board. The minimum amount of the contingent will be 1%
of the General Fund Budget and will be revisited annually as part of the budget process. Any draw on the stabilization
reserve will be replenished within the subsequent two (2) fiscal years.
R
etirement System Funding: The County will use an actuarially accepted method of funding its pension system to
maintain a fully-funded position. The County’s contribution to employee retirement costs will be adjusted annually as
necessary to maintain full funding. If the County reaches its actuarial- required contribution (defined as County and
employee contributions that when expressed as a percent of annual covered payroll are sufficient to accumulate assets
to pay benefits when due), the County may reduce its contribution provided that the amount reduced from the annual
actuarial requirement will only be used for one-time, non-recurring expenses in order to provide the ability to increase
contributions as may be required by future market conditions.
O
ther Post-Employment Benefits (OPEB) Funding: The County will use an actuarially accepted method of funding its
other post- employment benefits to maintain a fully -funded position. The County’s contribution to other post -
employment benefit costs will be adjusted annually as necessary to maintain full funding. If the County reaches its
actuarial-required contribution (defined as County and employee contributions that when expressed as a percent of
Arlington County, Virginia
FINANCIAL & DEBT MANAGEMENT POLICIES
CIP
2023-2032
A - 1
annual covered payroll are sufficient to accumulate assets to pay benefits when due), the County may reduce its
contribution provided that the amount reduced from the annual actuarial requirement will only be used for one-time,
non-recurring expenses in order to provide the ability to increase contributions as may be required by future market
conditions.
Capital Improvement Plan
1. The County Manager will biennially submit a ten-year Capital Improvement Plan (CIP) to the County Board. The
CIP will address all known facility and infrastructure needs of the County, including the needs of the Arlington
County Public Schools.
2. The CIP shall include a detailed description of each capital project, identifying every source of funding, including
pay-as-you-go (PA YG), bond financing, and master lease financing. The source of funding will largely be
determined based on the useful life of the project. Bond-funded projects will typically have a useful life at least
as long as the period over which the bonds will be repaid (generally twenty years). Master lease -financed
projects will generally have useful lives of three to ten years and typically include furniture, equipment, rolling
stock and technology purchases. PAYG funds provide greater flexibility and will be appropriated annually from
general fund revenues.
3. Each project budget shall identify the financial impact on the operating budget, if any.
4. In general, capital projects estimated to cost $100,000 or more should be included in the CIP, including
technology and equipment purchases.
5. The County will balance the use of debt financing sources against the ability to utilize PAYG funding for capital
projects. While major capital facility projects will generally be funded through bonds, the County will attempt
to maintain an appropriate balance of PAYG versus debt, particularly in light of the County’s debt capacity and
analysis of maintenance capital needs. As part of each biennial CIP process, the County will conduct a
comprehensive assessment of its maintenance capital needs.
6. The CIP will include an analysis of the impact the CIP has on the County’s debt capacity, debt ratios and long-
term financial plan.
7. Voter referenda to authorize general obligation bonds should only be presented to voters when the analysis of
the County’s debt capacity demonstrates the ability of the County to fund the debt service for the bonds based
on the County’s “Financial and Debt Service Policies.” Absent a compelling reason to do otherwise, the County
should have the capacity to initiate construction projects within the two -year period before the next bond
referendum. There should also be a demonstrated capability for the County to complete any project approved
by referendum within the eight-year time period mandated under state law for sale of authorized bonds. The
term “County” in this specific policy includes the Arlington County Government and any entity that receives
bond funding from the County (such as the Arlington County Public Schools and the Washington Metropolitan
Area Transit Authority).
8. In the off -years of the biennial CIP process, the County will conduct a needs assessment that will reflect, as
appropriate, existing master plans and assessments (e.g., the Master Transportation Plan and others) . Given
the significant size and diversity of the County’s infrastructure responsibilities, this assessment process will be
implemented over the next four to six years.
A - 2
Debt Management
The County will prudently use debt instruments, including general obligation bonds, revenue bonds, industrial
development authority (IDA) revenue bonds, and master lease financing in order to provide re -investment in public
infrastructure and to meet other public purposes, including inter -generational tax equity in capital investment. The
County will adhere to the following debt affordability criteria (excluding overlapping and self-supporting debt).
1. The ratio of net tax-supported debt service to general expenditures should not exceed ten percent, within the
ten-year projection.
2. The ratio of net tax-supported debt to full market value should not exceed three percent, within the ten -year
projection.
3. The ratio of net tax-supported debt to income should not exceed six percent, within the
ten-year projection.
4. Growth in debt service should be sustainable and consistent with the projected growth of revenues. Debt
service growth over the ten-year projection should not exceed the average ten-year historical revenue growth.
5. The term and amortization structure of County debt will be based on an analysis of the useful life of the asset(s)
being financed and the variability of the supporting revenue stream. The County will attempt to maximize the
rapidity of principal repayment where possible. In no case will debt maturity exceed the useful life of the
project.
6. The County will refund debt when it is in the best financial interest of the County to do so. When a refunding
is undertaken to generate interest rate cost savings, the minimum aggregate present value savings will be three
percent of the refunded bond principal amount.
Variable Rate Debt
1. Variable rate debt exposure should not exceed twenty percent of total outstanding debt.
2. Debt service on variable rate bonds will be budgeted at a conservative rate.
3. Before issuing variable rate bonds, the County will determine how potential spikes in the debt service will be
funded.
4. Before issuing any variable rate bonds, the County will determine the impact of the bonds on the County’s total
debt capacity under various interest rate scenarios; evaluate the risk inherent in the County’s capital structure,
giving consideration to both the County’s assets and its liabilities; and develop a method for budgeting for debt
service.
Moral Obligation Debt or Support
On an infrequent basis, the County provides its “moral obligation” support for partners, including regional public safety
agencies and affordable housing partners, among others. A moral obligation exists when the County Board has made a
commitment to support the debt of another entity to prevent a potential default. The County’s moral obligation will
only be authorized after an evaluation of the risk to the County’s balance sheet and stress testing of the financial
assumptions underlying the proposed project.
A - 3
Derivatives
Interest rate swaps and options (Swaps or Derivatives) are appropriate management tools that can help the County
meet important financial objectives. Properly used, these instruments can help the County increase its financial
flexibility, provide opportunities for interest rate savings or enhanced investment yields, and help the County reduce its
interest rate risk through better matching of assets and liabilities. The County must determine if the use of any Swap is
appropriate and warranted given the potential benefit, risks, and objectives of the County.
1. The County may consider the use of a derivative product if it achieves one or more of the following objectives:
Provides a specific benefit not otherwise available;
Produces greater than expected interest rate savings or incremental yield over other market alternatives;
Results in an improved capital structure or better asset/liability matching.
2. The County will not use derivative products that are speculative or create extraordinary leverage or risk; lack
adequate liquidity; provide insufficient price transparency; or are used as investments.
3. The County will only do business with highly rated counterparties or counterparties whose obligations are
supported by highly rated parties.
4. Before utilizing a Swap, the County, its financial advisor and legal counsel shall review the proposed Swap and
outline any associated considerations. Such review shall be provided to the Board and include analysis of
potential savings and stress testing of the proposed transaction; fixed versus variable rate and swap exposure
before and after the proposed transaction; maximum net termination exposure; and legal constraints.
5. Financial transactions using Swaps or other derivative products used in lieu of a fixed rate debt issue should
generate greater projected savings than the typical structure used by the County for fixed rate debt.
6. The County will limit the total no tional amount of derivatives to an amount not to exceed twenty percent of
total outstanding debt.
7. All derivatives transactions will require County Board approval.
Special Revenue / Enterprise Funds
It is the general policy of the County to avoid designation of discretionary funds in order to maintain maximum financial
flexibility. The County may, however, create dedicated funding sources when there are compelling reasons based on
state law or policy objectives, as described below. The Utilities Fund was created as a self- sustaining, fee -based
enterprise fund under state code to support and maintain development of the County’s water and sewer infrastructure.
The Transportation Capital Fund was adopted pursuant to state legislation for new transpo rtation funding. The
Stormwater Management Fund was adopted in lieu of a self- supporting, user fee -based enterprise fund. The CPHD
Development Fund was created as a self-sustaining, fee-based enterprise fund. Tax Increment Funds were established
to support redevelopment and preservation objectives associated with the County’s adoption of master plans, (e.g., the
Crystal City Sector Plan adopted in 2010 and the Columbia Pike Neighborhoods Plan adopted in 2013).
Utilities Fund
1. The County will annually develop a six -year forecast of projected water consumption, revenue, operating
expenditures, reserve requirements and capital needs for the Utilities Fund. The six- year forecast will show
projected water-sewer rate increases over the planning period.
A - 4
2. The County will implement water-sewer rate increases in a gradual manner, avoiding spike increases whenever
possible.
3. The County will meet or exceed all requirements of any financing agreements or trust indentures.
4. The Utilities Fund will maintain a reserve equivalent to three months’ operations and maintenance expenses.
The reserve may be used to address emergencies and unexpected declines in revenue. If utilized, the reserve
will be replenished over a three -year period to the minimum reserve level. This reserve is in addition to any
financing agreement-required debt service reserve funds.
5. The Utilities Fund will maintain debt service coverage of at least 1.25 times on all debt service obligations.
6. The Utilities Fund will be self-supporting.
Transportation Capital Fund
1. New revenue shall not be used to supplant existing transportation funding commitments, and capital
investments shall be compliant with state law restrictions on non -supplanting and maintenance of effort
requirements.
2. Operating program enhancements (outside base program) that clearly document transportation benefits may
be eligible for support from the Transportation Capital Fund.
3. N
o more than three to five percent of annual funding expenditures should be for project administration, indirect
& overhead costs to support capital projects.
4. A
reserve equivalent of ten to twenty percent of annual budgeted revenue will be established.
5. A five to ten-year financial plan and model will be developed that integrates project cashflow forecasts, revenue
projections, and financial / debt management policies and will factor in other non -County funding sources,
including federal, state, regional, and private funding.
6. The County will prudently balance the use of new transportation funding sources between pay -as-you-go
funding and leveraging through new bond issuance. Use of leveraging will be dependent on project size, cash
flow, and timing projections.
7. If the County chooses to issue debt supported by dedicated transportation funding sources, such debt will be
structured to be self-supporting and will not count against the County’s general tax supported obligation debt
ratios or capacity. Debt service coverage on such debt will range from 1.10 to 1.50 times, depending on the
type of debt issued. The term on such bonds will not exceed the average useful life of the assets financed, and
amortization will be structured to match the supporting revenue stream.
8. The Transportation Capital Fund will be self-supporting.
Tax Increment Funds
1. The intended use of TIF monies will be specified at the time of TIF creation; changes or additional uses will be
determined as part of the annual budget process.
2. The assessed value of TIF areas will not excee d 25 percent of the County’s total assessed valuation. As of
January 1, 2016, existing TIF assessed valuation totaled 20 percent of County-wide assessed valuation.
A - 5
3. The percent of TIF revenue available for the intended uses within a TIF area will be established at the creation
of the TIF and will be less than or equal to 40 percent. This percent will be evaluated annually as part of the
budget process.
4. The County will prudently balance the use of PAYG funding and leveraging through TIF bond issuances. Use of
leveraging will be dependent on project type, size, cashflow and timing projections. Leveraging will only be
used for capital projects that meet useful life and other requirements for bond issuance.
5. If the County leverages TIF revenue on its own behalf, it will target a minimum debt service coverage ratio of
2.0 times and establish an appropriate level of debt service reserves and / or other contingencies.
6. The County will establish additional policies pertaining to the leverage of TIF revenue by a private development
entity prior to any such issuance.
7. A reserve equivalent to ten percent of annual budgeted revenue will be established.
Stormwater Fund
1. The County will annually develop a six-year projection of stormwater operating and capital expenses.
2. The County will prudently balance the use of new stormwater funding sources between pay-as-you-go
funding and leveraging through new bond issuance. Use of leveraging will be dependent on project size,
cashflow, and timing projections. If debt is issued for stormwater projects, it will generally follow the debt
issuance guidelines contained in this policy.
3. The Stormwater Fund will maintain a reserve equivalent to three months’ operating and maintenance
expenses. The reserve may be used to address emergencies and unexpected declines in revenue. If utilized,
the reserve will be replenished over a three-year period to the minimum reserve level. This reserve is in
addition to any financing agreement-required debt service reserve funds.
4. If the County chooses to issue debt supported by the Stormwater Fund, such debt will be structured to be
self-supporting and will not count against the County’s general obligation debt ratios or capacity as long as
annual net debt service coverage remains above a minimum of 1.25 times. The term on such bonds will not
exceed the average useful life of the assets financed, and amortization will be structured to match the
supporting revenue stream.
5. Prior to each new issuance of stormwater debt, the County will prepare a projection of net debt service
coverage demonstrating that the forecasted future net debt service coverage will be no less than 1.35 times,
over the life of the bonds.
6. Stormwater financial policies will be reviewed on a periodic basis.
7. The Stormwater Fund will be self-supporting.
CPHD Development Fund
1. A contingent reserve will be established equivalent to thirty percent of the Fund’s total operating budget based
on the fiscal year. This amount is equivalent to three to four months of annual operating expenditures. The
reserve may be used to address emergencies and unexpected declines in revenue only after authorization from
the County Board.
2. The CPHD Development Fund will be self-supporting.
A - 6
Ballston Garage and Ballston Garage 8
th Level Funds
1. The County will annually develop a multi -year forecast of garage revenue, operating expenses, and capital
maintenance costs to be updated with each County CIP cycle.
2. An economic stability reserve equivalent to three months of annual parking revenues will be established to
address potential revenue variability, ramping up to this level over a four-year period beginning in FY 2019. Any
draws upon this reserve will be replenished within the subsequent three (3) fiscal years.
3. A maintenance reserve will be established based on an assessment of expected capital renewal needs over a
10-year period.
4. A reserve will be established for the ensuing year of debt service on the Series 2016B Ballston Quarter CDA
bonds allocable to garage improvements.
5. The County will meet or exceed all requirements of any financing agreements or trust indentures.
6. The County will target self- sufficiency in consideration of limits imposed on parking user fee raising ability in
the garage by the 1984 documents governing original and ongoing development of the garage.
A - 7
Parks
Arlington Boathouse 800,000
Trail and Bridge Modernization 1,000,000
Bluemont Park Tennis Complex Replacement 5,000,000
6,800,000
Community Conservation 13,000,000
Facilities Infrastructure/Land Acquisition
North Side Salt Facility Planning 800,000
Courthouse Complex Renovations & Infrastructure 10,000,000
Courts Police Building Improvements 1,730,000
Quincy Property Redevelopment 700,000
FMB - Detention Facility VAV Replacements 2,935,000
FMB - Equipment Bureau Roof Replacement 1,670,000
Total Facilities Infrastructure/Land Acquisition 17,835,000
Metro & Transportation
Metro 20,700,000
Bridge Maintenance 250,000
Bridge Renovation 250,000
Paving Program 20,500,000
Total Metro & Transportation 41,700,000
Total Authorized but Unissued - County 79,335,000
Utilities -
Stormwater 37,640,000
Schools 49,840,000
*Amounts include $83.7MM authorized unissued bonds included in planned 2022 GO bond sale in Fall 2022
BONDS AUTHORIZED BUT UNISSUED
Arlington County, Virginia
A - 8
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
April 17, 1951
Schools $4,875,000 6,208 2,569 3,693 70.7
T otal $4,875,000
N
ovember 6, 1951
Courts Building $ 505,000 4,086 7,475 3,389 64.7
Parking Lots 740,000 4,992 7,139 2,147 58.9
Parks and Playgrounds 882,000 6,334 5,595 739 53.1
Streets and Highways 1,318,000 7,465 4,651 2,814 61.6
Storm Drainage $1,382,000 7,330 4,790 2,540 60.5
T otal $4,827,000
M
ay 27, 1952
Schools $8,280,000 4,854 3,190 1,664 60.3
T otal $8,280,000
N
ovember 3, 1953
Streets and Highways $1,720,000 7,035 4,588 2,447 60.5
Water 1,327,000 7,779 3,862 3,917 66.8
Storm Drainage 1,000,000 6,719 4,668 2,051 59.0
T otal $4,047,000
N
ovember 2, 1954
Water $1,700,000 16,207 4,922 11,285 76.7
Incinerator 980,000 11,910 8,386 3,524 58.7
Fire Stations 470,000 13,138 7,271 5,867 64.4
Storm Drainage 200,000 13,196 7,524 5,672 63.7
County Building Sites 600,000 6,776 13,251 6,475 66.2
Swimming Pools 600 ,000 9,064 11,964 2,900 56.9
T otal $4,550,000
N
ovember 8, 1955
Sanitary Sewers $1,000,000 7,203 7,014 189 50.7
Streets and Highways 1,330,000 5,930 8,067 2,137 57.6
Storm Drainage 1,200,000 5,783 8,144 2,361 58.5
T otal $3,530,000
F
ebruary 2, 1956
Schools $9,430,000 5,720 6,658 938 53.8
T otal $9,430,000
Ju
ne 5, 1956
Court House $2,200,000 5,933 795 5,138 88.2
Schools 4,492 ,000 6,167 4,928 1,239 55.6
T otal $6,692,000
A - 9
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
May 13, 1958
Libraries $ 560,000 7,137 4,982 2,155 58.9
Streets and Highways 1,790,000 7,320 4,869 2,451 60.1
Sidewalks 330,000 6,907 5,145 1,762 57.3
County Building Sites 50,000 6,358 5,299 1,059 54.5
Parks and Playgrounds 293,000 6,701 5,313 1,388 55.8
Sanitary Sewer 770,000 7,762 4,318 3,444 64.3
Storm Drainage 673,000 7,399 4,649 2,750 61.4
Schools 3,500,000 7,391 4,807 2,584 60.6
Total $7,966,000
May 17, 1960
Storm Drainage $1,040,000 6,105 7,112 1,007 53.8
Regional Parks 130,000 5,593 7,642 2,049 57.7
Parks and Recreation Facilities 800,000 5,679 7,379 1,700 56.5
Libraries 250,000 6,275 6,918 643 52.4
Health Clinics 100,000 5,795 7,373 1,578 56.0
Sidewalks 450,000 5,757 7,420 1,663 56.3
Schools 1,750,000 5,650 7,258 1,608 56.2
Streets and Highways 2,660,000 5,853 7,297 1,444 55.5
Fire Stations 400,000 6,493 6,654 161 50.6
Total $7,580,000
November 8, 1960
Water $2,172,000 20,535 11,733 8,802 63.6
Sanitary Sewers 675,000 21,434 11,972 9,462 64.2
Total $2,847,000
November 7, 1961
County Land Acquisition $ 500,000 8,493 8,589 96 50.3
Storm Water Drainage 900,000 10,007 7,419 2,588 57.4
Streets and Highways 2,500,000 9,874 7,614 2,260 56.5
Sidewalk 475,000 9,149 8,215 934 52.7
Recreation Facilities 225,000 9,029 8,189 840 52.4
Library 495,000 9,209 8,002 1,207 53.5
Firefighting Facilities 475,000 11,519 5,919 5,600 66.1
Schools 950,000 9,246 7,902 1 ,344 53.9
Total $6,520,000
November 5, 1963
Storm Water Drainage $1,000,000 12,523 7,494 5,029 62.6
Sewer 5,560,000 12,692 6,957 5,735 64.6
County Land Acquisition 1,000,000 10,409 8,914 1,495 53.9
Library 440,000 9,800 9,425 375 51.0
Schools 1,950,000 10,453 8,648 1,805 54.7
Total $9,950,000
A - 10
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
November 2, 1965
Storm Water Drainage $ 1,250,000 14,223 8,067 6,156 63.8
Streets and Highways 4,350,000 13,340 8,209 5,131 61.9
County Land Acquisition 1,000,000 12,814 9,321 3,493 57.9
Sidewalk 550,000 12,953 8,352 4,601 60.8
Schools 4,795,000 11,449 9,582 1,867 54.4
Schools, New Junior H.S. 4,250,000 8,413 13,153 4,740 61.0
Total $16,195,000
November 8, 1966
No. Virginia
Higher Education $3,000 ,000 21,100 10,401 10,699 67.0
T otal $3,000,000
November 7, 1967
Streets and Sidewalk $7,100,000 15,047 8,031 7,016 65.2
Storm Water Drainage 1,100,000 14,813 7,173 7,640 67.4
Sewer 1,000,000 15,108 6,936 8,172 68.5
Total $9,200,000
June 11, 1968
Schools and Recreation $16,800,000 7,895 9,476 1,581 54.6
Total $16,800,000
November 5, 1968
Transit Facilities $54,000,000 42,721 11,659 31,062 78.6
Schools (W-L Library) 225,000 34,331 19,715 14,616 63.5
Schools (Elementary) 6,900,000 35,993 17,696 18,297 67.0
Schools (New Junior H.S.) 4,150,000 34,485 19,163 15,322 64.3
Recreation Facilities 2,500,000 32,832 19,979 12,853 62.2
Total $67,775,000
November 4, 1969
Paving $ 500,000 19,392 9,380 10,012 67.4
Police Headqtrs.-Jail 2,500,000 20,618 9,562 11,056 68.3
Public Library 550,000 17,866 11,071 6,795 61.7
Swimming Pool 900,000 14,862 13,975 887 51.5
Storm Drainage 1,000,000 21,192 7,947 13,245 72.7
Water System 5,500,000 20,526 8,344 12,182 71.1
Neighborhood Conservation 800,000 16,793 11,611 5,182 59.1
Park Authority 2,160,000 1,654 11,247 9,593 87.2
Total $13,910,000
A - 11
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
November 2, 1971
Sanitary Sewers $ 6,700,000 11,961 4,176 7,785 74.1
Waste Water Treatment 6,000,000 12,670 3,490 9,180 78.4
Recreation Facilities 3,000,000 9,873 5,999 3,874 62.2
Storm Water Drainage 2,500,000 12,215 4,114 8,101 74.8
Streets and Highways 1,000,000 16,675 10,211 6,464 62.0
Human Resources Center 850,000 15,347 11,520 3,827 57.1
Neighborhood Conservation 800,000 15,365 11,554 3,811 57.1
Technical Education Center 4,600,000 16,182 11,000 5,182 59.5
Schools 2,600,000 15,097 11,929 3,168 55.9
Library 470,000 14,742 11,98 2,758 55.2
Total $28,520,000
November 7, 1972
Ad. Waste Water Treatment $15,000,000 38,705 11,829 26,876 76.6
Schools 6,275,000 31,390 18,917 12,473 62.4
Total $21,275,000
*Referendum amended language of 1971 and 1972 referenda to expand how the $21.0 million could be used at the
wastewater treatment plant.
November 6, 1973
Local and Regional Parks $ 5,000,000 11,186 5,736 5,450 66.1
Sanitary Sewerage 4,500,000 13,613 5,744 7,869 70.3
Streets and Highways 3,000,000 10,903 7,276 3,627 60.0
Public Schools 2,350,000 14,647 15,843 1,196 52.0
Storm Water Drainage 1,500,000 20,034 10,286 9,748 66.1
Human Resources Center 1,000,000 17,462 12,660 4,802 58.0
County Property Yard 700,000 13,860 16,081 2,221 53.7
Nursing Home Sites 500,000 20,281 10,607 9,674 65.7
Fire Stations 300,000 20,867 9,925 10,942 67.8
Total $18,850,000
November 4, 1975
Wastewater Treatment* $21,000,000 11,020 8,600 2,420 56.2
Transit Facilities 25,000,000 7,543 11,880 4,337 61.2
County Maintenance
and Service Facilities 1,500,000 5,003 13,968 8,965 73.6
Sidewalks, Curbs and Gutters,
Streets and Highways 3,000,000 7,923 20,553 12,630 72.2
Joint Community Theatre
and Schools Auditorium 1,300,000 5,169 23,612 18,443 82.0
Buildings and Building Sites 1,000,000 5,097 22,881 17,784 81.8
Park and Recreation
Acquisition and Development 6,000,000 9,036 20,140 11,104 69.0
Community Conservation
2,500,000 8,075 20,128 12,053 71.4
Total $61,300,000
A - 12
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
November 8, 1977
Water Storage $ 6,200,000 21,464 11,959 9,505 64.2
Storm Drainage 1,000,000 20,433 13,300 7,133 60.6
Streets and Highways 3,000,000 19,942 13,973 5,969 58.8
Neighborhood Conservation 2,500,000 19,193 14,777 4,416 56.5
Local and R egional Parks 2,500,000 18,849 14,868 3,981 55.9
Total $15,200,000
*Referendum amended language of 1977 water bond to change from storage to distribution improvements as
permitted use.
November 6, 1979
Sanitary Sewerage $ 1,985,000 16,761 9,222 7,539 64.5
Streets and Highways 4,665,000 15,617 10,530 5,087 59.7
Local Parks 4,000,000 9,465 16,577 7,112 63.6
Regional Parks 1,705,000 9,780 16,200 6,420 62.4
Total $12,355,000
November 4, 1980
Water Distribution* $6,000,000 41,328 8,756 32,572 82.5
Total $6,000,000
November 3, 1981
Streets and Highways $ 3,000,000 23,751 12,583 11,168 65.4
Storm Drainage 1,800,000 22,652 13,420 9,232 62.8
Jail Expansion 2,100,000 25,485 11,251 14,234 69.4
Local and Regional Parks 3,000,000 22,886 13,465 9,421 63.0
Community Conservation 1,000,000 21,743 13,520 8,223 61.7
Total $10,900,000
November 8, 1983
Metrorail $13,000,000 21,221 6,615 14,606 76.2
Streets and Highways 3,100,000 20,756 6,922 13,834 75.0
Community Conservation 1,950,000 19,624 7,840 11,784 71.5
Water Distribution 3,100,000 20,048 7,159 12,889 73.7
Total $21,150,000 Average 74.1%
November 6, 1984
Local and
Regional Parks $ 4,035,000 38,785 21,771 17,014 64.1
Streets and Highways 6,140,000 39,644 20,630 19,014 65.8
Community Conservation 6,800,000 37,935 21,906 16,029 63.4
Metrorail 13,00 0,000 40,111 20,924 19,187 65.7
Total $29,975,000 Average 64.8%
A - 13
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
November 4, 1986
Local and Regional Parks $ 4,895,000 25,899 8,539 17,360 75.2
Streets and Highways 4,315,000 27,382 6,452 20,930 80.9
Community Conservation 10,835,000 25,626 8,741 16,885 74.6
Central Library Expansion 4,025,000 26,974 7,909 19,065 77.3
Total $24,070,000 Average 77.0%
November 8, 1988
Local and Regional Parks $ 3,900,000 50,367 14,344 36,023 77.8
Streets and Highways 2,400,000 49,077 12,688 36,389 79.5
Community Conservation 2,900,000 49,295 14,928 34,367 76.8
Public Schools 12,800,000 49,905 12,251 37,654 80.3
Jail 35,000,000 40,731 22,662 18,069 64.3
Wastewater Treatment 12,000,000 52,216 8,970 43,246 85.3
Total $69,000,000 Average 77.3%
November 6, 1990
Courts/Police Facility $53,850,000 25,061 17,381 7,680 59.0
Public Schools 23,000,000 31,367 11,833 19,534 72.6
Streets, Highways,
and Community
Conservation 10,930,000 28,357 11,980 16,377 70.3
Local and Regional
Parks and Recreation 4,220,000 27,857 12,544 15,313 69.0
Fire Station #3 2,500,000 28,642 11,319 17,323 71.7
Total $94,500,000 Average 68.5%
November 3, 1992
Metrorail $ 17,800,000 58,898 16,057 42,841 78.6
Public Schools 24,425,000 56,903 17,647 39,256 76.3
Higher Education 3,125,000 51,355 23,199 28,156 68.9
Local and Regional
Parks and Recreation 11,870,000 51,504 23,176 28,328 69.0
Streets, Highways and
Community Conservation 13,415,000 55,185 19,551 35,634 73.8
Wastewater Treatment P lant 36,000,000 61,741 13,243 48,498 82.3
Total $106,635,000 Average 74.8%
November 8, 1994
Metrorail $ 7,000,000 45,783 16,166 29,617 73.9
Public School 36,100,000 46,444 15,349 31,095 75.2
Fire Station #3 2,760,000 44,184 16,857 27,327 72.4
Local and Regional
Parks and Recreation 13,865,000 43,210 18,278 24,932 70.3
Streets, Highways and
Community Conservation 17,690,000 47,062 14,288 32,774 76.7
A - 14
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
Water Distribution and
Was tewater Treatment 12,200,000 50,049 10,885 39,164 82.1
Total $89,615,000 Average 75.1%
November 5, 1996
Metrorail $ 9,560,000 52,289 15,733 36,556 76.9
Public School 29,120,000 53,783 14,510 39,273 78.6
Local and Regional
Parks and Recreation 12,920,000 45,336 23,539 21,797 65.8
Streets, Highways and
C ommunity Conservation 21,305,000 53,260 14,372 38,888 78.7
T otal $72,905,000 Average 75.0%
November 3, 1998
Public Schools $50,705,000 35,552 9,721 25,831 78.5
Westover and Shirlington 8,000,000 34,298 10,760 23,538 76.1
Branch Libraries
Local and Regional Parks 17,055,000 34,438 10,651 23,787 76.4
And Recreation
Street, Highways, and
C ommunity Conservation 24,055,000 35,448 9,500 25,948 78.9
Total $99,815,000 Average 77.5%
November 7, 2000
Public Schools $ 42,612,500 61,252 14,564 46,688 80.8
Local and Regional Parks 25,875,000 58,973 16,104 42,869 78.6
And Recreation
Street, Highways and 34,291,000 63,797 12,583 51,214 83.5
Community Conservation
Government Fac.& Higher Ed. 7,210,000 53,571 22,023 31,548 70.9
Utilities 12,070,000 65,109 11,202 53,907 85.3
Total $122,058,500 Average 79.8%
November 5, 2002
Public Schools $ 78,996,000 43,877 12,258 31,619 78.2
Community Projects:
Community Conservation,
Parks, Public Safety,
Pedestrian Systems, Streets,
Highways, Transit, Metro,
Storm Drainage 67,428,500 44,592 11,320 33,272 79.8
Utilities 12,342,000 46,078 9,796 36,282 82.5
Total $158,766,500 Average 80.2%
A - 15
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
November 2, 2004
Public Schools $ 78,128,000 71,594 17,615 53,979 80.3
Local Parks and Recreation 78,395,000 67,588 21,450 46,138 75.9
Transportation & Community
Infrastructure 35,944,000 71,697 17,171 54,526 80.7
Metro 18,536 ,000 73,248 16,151 57,097 81.9
Total $208,003,000 Average 79.7%
November 7, 2006
Public Schools $ 33,712,000 54,130 16,609 37,521 76.5
Local Parks and Recreation 35,550,000 52,257 18,238 34,019 74.1
Community infrastructure 27,300,000 49,905 20,233 29,672 71.2
Metro and Transportation 31,500,000 58,058 11,709 46,349 82.0
Utilities 79,000 ,000 59,797 10,878 48,919 84.6
Total $207,062,000 Average 77.7%
November 4, 2008
Public Schools $ 99,425,000 76,325 25,360 50,965 75.1
Community infrastructure 10,800,000 68,967 31,321 37,646 68.8
Metro 10,000,000 79,178 22,713 56 ,465 77.7
Utilities 50,000 ,000 80,873 20,052 60,821 80.1
Total $170,225,000 Average 77.3%
November 2, 2010
Public Schools $ 102,888,000 46,869 14,350 32,519 7 6.6
Local Parks and Recreation 5,975,000 41,745 19,427 22,318 68.2
Community Infrastructure 18,065,000 37,943 22,807 15,136 6 2.5
Metro 34,100 ,000 44,896 16,334 28,562 7 3.3
Total $161,028,000 Average 70.2%
November 6, 2012
Public Schools $ 42,620,000 90,232 21,383 69,849 80.9
Local Parks and Recreation 50,553,000 70,920 40,039 30,881 6 3.9
Community Infrastructure 28,306,000 80,155 29,607 50,548 73.0
Metro and Transportation 31,946 ,000 89,000 22,101 66,899 80.1
Total $153,425,000 Average 74.5%
November 4, 2014
Public Schools $ 105,780,000 49,439 16,899 32,540 74.5
Local Parks and Recreation 13,070,000 46,703 19,501 27,202 70.5
Community Infrastructure 39,900,000 44,858 21,073 23,785 68.0
Metro and Transportation 60,240 ,000 46,807 19,344 27,463 70.8
Total $218,990,000 Average 71.0%
A - 16
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
November 8, 2016
Public Schools $138,830,000 92,158 23,773 68,385 79.5
Local Parks and Recreation 19,310,000 87,331 28,344 58,987 75.5
Community Infrastructure 98,850,000 85,837 29,339 56,498 74.5
Metro and Transportation 58,785 ,000 90,703 25,244 65,459 79.5
Total $315,775,000 Average 76.9%
November 6, 2018
Public Schools $103,000,000 85,576 18,912 66,664 81.9
Local Parks and Recreation 29,330,000 80,175 24,221 55,954 76.8
Community Infrastructure 37,015,000 76,772 27,089 49,683 73.9
Metro and Transportation 74,570 ,000 83,995 19,754 64,241 81.0
Total $243,915,000 Average 78.4%
November 3, 2020
Public Schools $52,650,000 98,756 25,757 72,999 79.3
Local Parks and Recreation 3,630,000 101,602 23,267 78,355 81.4
Community Infrastructure 7,485,000 91,759 31,903 59,856 74.2
Metro and Transportation 29,940,000 98,730 25,740 72,990 79.3
Stormwater 50,840 ,000 97,847 25,948 71,899 79.0
Total $144,545,000 Average 78.6%
November 2, 2021
Public Schools $23,010,000 73,028 20,014 53,014 78.5
Local Parks and Recreation 6,800,000 74,525 18,350 56,175 80.2
Community Infrastructure 17,035,000 65,805 26,790 39,015 71.1
Metro and Transportation 38,700 ,000 73,680 19,298 54,382 79.2
Total $85,545,000 Average 77.3%
A - 17
A - 18
County Manager: #####
County Attorney: *****
Staff: Karin Talley, Department of Management and Finance
ARLINGTON COUNTY, VIRGINIA
County Board Agenda Item
Meeting of July 16, 2022
DATE: July 15, 2022
SUBJECT: Fiscal Year (FY) 2023 – FY 2032 Capital Improvement Plan (CIP) Adoption.
C. M. RECOMMENDATIONS:
1. Adopt the Fiscal Year 2023 – FY 2032 Capital Improvement Plan.
2. Adopt the attached FY 2023 County Bond Funds Appropriations Resolution
(Attachment A).
3. Adopt the revised language to the Transportation Capital Fund section of the
Financial & Debt Management Policies.
4. Authorize the addition of one (1.0) full-time permanent FTE (full-time equivalent
employee) to support the implementation of the concrete program. The FTE will
reside in the General Fund and will charge their time to the sidewalk capital program.
ISSUES: This is a request for County Board consideration/adoption of the proposed FY 2023 –
FY 2032 Capital Improvement Plan and the appropriation of County bond funds.
SUMMARY: The adopted CIP provides a 10-year plan for investment in County and School
infrastructure and assets, totaling $4.4 billion. The funding sources for the CIP include federal
and state grants, bonds, pay-as-you-go (PAYG) funding, and dedicated funding sources such as
water-sewer revenues and dedicated transportation taxes.
BACKGROUND: This CIP marks the return to the first 10-year CIP since the Adopted FY 2019
– 2028 CIP. The adopted CIP covers FY 2023 – FY 2032 and includes investments in County
government and Schools capital assets. With a return to the 10-year CIP, there were
understandably many competing needs for investment. Given current economic and construction
market volatility, the CIP was prepared using conservative budget estimates with a primary goal
of financial sustainability. Investments over the 10-year planning period focus on community
priorities, county planning processes, and private sector development
40. A.
A - 19
- 2 -
Building on the three-year CIP adopted in FY 2022, this CIP continues major investment in the
Stormwater Management program. This CIP increases investment in stormwater by $298
million over the last 10-year Adopted CIP. Other major investments focus on Utilities,
Transportation, and Facilities programs.
DISCUSSION: The table below summarizes the allocation of funds for the FY 2023 – FY 2032
Capital Improvement Plan by program area. The County and School CIPs total $4.4 billion.
Program summaries can be found on the following pages.
Capital Program Area FY 2023 - 2032
FY 2023 -
2032
Proposed Adopted $ Change
Community Conservation 85,200 86,200 *1,000
Economic Development 399 399 -
Information
Technology/Equipment
192,432 192,432 -
Local Parks & Recreation Programs 271,905 270,578 **(1,327)
Metro 356,400 356,400 -
Public and Government Facilities 293,896 293,896 -
Regional Partnerships and
Contingencies
15,790 15,790 -
Transportation 1,755,079 1,755,079 -
Subtotal County CIP 2,971,101 2,970,774 (2,327)
Water and Sewer Infrastructure 617,395 617,395 -
Stormwater Management 331,335 331,335 -
Total County CIP 3,919,856 3,919,504 (56,327)
Schools Capital Program 388,230 474,540 ***86,310
Total County & Schools CIP 4,308,061 4,394,044 85,983
Changes made by the County Board between the proposed CIP and the adopted CIP include the
following.
*An additional $1 million added to the Arlington Neighborhoods Program (previously
Neighborhood Conservation)
**Savings gained from accelerating the Kenmore Fields Conversion project by not having to
account for cost inflation.
***The increase in School’s CIP is attributed to additional costs for their Kitchen and Entrance
Safety Renovations, the addition of funding for the Montessori School and placeholder funding
in the outyears for long-range planning to renovate existing facilities.
Additionally, the design of the first phase of Gateway Park was accelerated from 2025 to 2024,
but did not result in any change in funding amounts.
Community Conservation and Economic Development investments total $86.6 million. The
Arlington Neighborhoods Program (previously Neighborhood Conservation) includes a total
$86.2 million across the 10-year period for investments in neighborhood beautification, street
A - 20
- 3 -
improvements, park enhancements, and landscaping projects. Economic Development includes
investments of close to $400,000 to perform tasks related to maintaining the County’s public art
portfolio.
Information Technology and Public Safety investments cover a wide variety of technology
hardware, software, data management, and capital maintenance across all County departments
totaling $192.4 million in the adopted CIP. Funding for the County’s information technology
investments consist primarily of PAYG and short-term financing investments. This funding
allows for the replacement and/or refreshment of several County applications including the
County’s financial and human resource system (PRISM), Revenue and Collection System,
Enterprise Records Management System, Real Estate Assessment System and Telephone System
as well as the maintenance and replacement of workforce devices such as PCs and laptops,
servers, and network equipment. The adopted CIP also reinvests in public safety technology and
equipment -- including equipment replacement in the County Courthouse and Detention Center
as well as investments in public safety radios, Emergency Call Center (ECC) equipment, mobile
data computers, and Fire/Police/Sheriff records management systems.
Local Parks and Recreation revisions from the Proposed CIP include acceleration of the Gateway
Park planning and design of the east side of the park to FY 2024 from FY 2025 and acceleration
of the conversion of the Kenmore fields to synthetic turf from FY 2030 to FY 2023/FY 2025.
See Attachment B for more details.
Program investments include $270.6 million in funding for park trail and bridge modernization,
parks capital maintenance, synthetic turf replacements and parks master plans. Projects included
in the adopted CIP are in alignment with the adopted Public Spaces Master Plan. The CIP
continues the enhanced park trail and bridge program, including the replacement of pedestrian
bridges at Glencarlyn Park and Lubber Run Park, design for replacement of pedestrian bridges at
Alcova Heights Park and Bluemont Park, design and construction of trail improvements at 26th
Street North and Old Dominion Drive, milling and paving of Donaldson Run Trail, milling and
paving of a portion of the Four Mile Run Trail in Glencarlyn Park and a trail pavement condition
assessment study. Park capital maintenance projects include construction of Bluemont Park
tennis courts and related amenities, replacement of the Greenbrier Park running track, and
renovations at Monroe Park, Bailey’s Branch Park, Douglas Park and Woodmont Park. Funding
is also included for the FY2023 and FY2024 replacement of the existing synthetic turf fields at
Wakefield High School, Washington-Liberty High School and Williamsburg Middle School.
Conversion of two adjacent fields at Kenmore Middle School to synthetic turf is also planned.
The CIP also includes master plan program funds for Arlington Boathouse, Rosslyn Gateway
Park, Jennie Dean Park Phase 2, Penrose Square Phase 2, Quincy Park, Shirlington Park, Short
Bridge Park, Three Urban Parks, Virginia Highlands Park and Nearby Public Spaces, Crystal
City Parks and Public Space, Fairfax Drive Public Spaces, the Emerging Uses Program
(pickleball) and the Natural Resiliency Program.
Metro includes $356.4 million for our required Metro contribution which is in line with the
expenditures projected in the previous CIP.
A - 21
- 4 -
Public and Government Facilities includes investments of $293.9 million. Highlights include
capital maintenance of our 92 owned buildings to maintain them in a state of good repair (roof
replacements; heating, ventilation, air conditioning (HVAC) upgrades), increasing our electrical
energy commitments within county buildings to include solar ready, electric vehicle (EV)
charging, and equipment replacements. The CIP also includes renovation of the 27 year-old
Courts/Police building to include upgrades to courtrooms, addressing space inefficiencies, as
well as technology backbone infrastructure improvements. This CIP also continues critical Fire
Department investments, including funding to exercise an option to purchase land at 5519
Columbia Pike for construction of a new West End Fire station to address response needs and a
project to consolidate Fire Department regulatory and administration processes, infrastructure,
and interior improvements at the 2020 N. 14th St. building. Other facility highlights include
removal of the vacant and non-functional hospital building at the Carlin Springs site to eliminate
a potential hazard and funding to redevelop the recently purchased parcel at 3108 Columbia Pike
as a potential mixed-use partnership to relocate the Columbia Pike Library in anticipation of APS
growth in the next few years.
Transportation investments total $1,755.1 million including a number of significant investments
for bridge renovation, the Columbia Pike Multi-Modal program, Crystal City, Pentagon City and
Potomac Yards Streets program, Metro station entrances, ART facilities, Columbia Pike transit
facilities, and numerous other safety and accessibility projects throughout the county. The CIP
continues the County’s commitment to developing and managing a multimodal transportation
system that expands travel choices, provides equal access to all users, and supports community
sustainability goals. This CIP also reflects ongoing support for the implementation of the Vision
Zero Action Plan with the goal of eliminating all critical injury crashes in the public right-of-way
by 2030. It further ensures maintenance of the County’s transportation infrastructure in a state of
good repair. To this end, it includes $137.5 million for paving to achieve the targeted paving
condition index (PCI) of 75 – 80, as well as $11.6 million to fund proactive maintenance of
sidewalks, curbs, and gutters under a new CIP program that will be supported by an additional
FTE. The goals of the Transportation Master Plan are considered in the projects that are funded
in this adopted CIP.
Water and Sewer Infrastructure includes $617.4 million with an emphasis on maintenance
capital, wastewater treatment improvements, and drinking water redundancy and resiliency
projects. The CIP includes $244.8 million for water-sewer maintenance capital, $89.1 million for
water distribution, $8.9 million in sanitary sewer improvements, and $274.7 million to Water
Pollution Control Plant improvements. This program maintains a state of good repair for close to
1,000 miles of water and sanitary sewer lines across the county. The Water Distribution Master
Plan, Sanitary Master Plan, and Water Pollution Control Plant Solids Master Plan were all
pivotal in helping prioritize the projects included in the adopted CIP. $204 million is included for
the three-phase implementation of the Solids Master Plan (Re-Gen). Several significant projects
underway include the Fairfax Water Interconnection, Spout Run Sanitary Sewer Relining,
Gravity One Water Transmission Main (B1), and the Solids Master Plan (Re-Gen) projects.
Stormwater Management includes $331.3 million for capacity improvements, stream and water
quality projects and maintenance capital. The CIP includes $229.0 million for capacity
improvements, $52.1 million for water quality projects, and $50.2 million for a variety of
A - 22
- 5 -
maintenance capital projects. The program reflects the significant effort that will be required to
enhance and update the County’s stormwater infrastructure. Over $170 million is being invested
in four critical watersheds through the county which include Spout Run, Crossman Run, Lubber
Run, and Torreyson Run. The CIP also includes water quality projects to reduce pollutants in
adherence to the Virginia Department of Environmental Quality’s (DEQ) Municipal Separate
Storm Sewer System (MS4) Permit and the Chesapeake Bay Total Maximum Daily Loads
(TMDL). Projects underway include the Cardinal School Detention Vault, Donaldson Run
Tributary B stream restoration, and the Ballston Pond restoration.
Arlington Public Schools
adopted its FY 2023 – FY 2032 CIP on June 23, 2022. School’s Adopted
CIP increased by $86.3 million from their Proposed CIP. The additional funding is from additional
costs for their Kitchen and Entrance Safety Renovations, the addition of funding for the Montessori
School and placeholder funding in the outyears for long-range planning to renovate existing
facilities.
The program totals $474.5 million, including $23.01 million of general obligation bonds. The
Schools CIP includes funding for kitchen improvements and major HVAC replacements,
entrance and vestibule renovations, improvements to The Heights Building and synthetic
turf field replacements and the Career Center.
County Bond Funds Appropriations: Since a portion of the FY 2023 appropriation is for bond
funded projects to be approved on the November 8, 2022 Referenda, appropriation of those
projects is requested now but is contingent upon and will not occur until the respective
referendum for each project is approved by voters, has been filed with the Circuit Court, and the
required 30-day contest period has expired. All project expenditures being appropriated as
FY 2023 bond funds are as planned in the FY 2023 – FY 2032 CIP and are consistent with the
debt projections included in the CIP.
Change to Financial Policy - Transportation Capital Fund (TCF): The third policy for the TCF
has been amended to state that “No more than three to five percent of annual funding
expenditures should be used for project administration, indirect & overhead costs to support
capital projects.” Funding has been replaced with expenditures to correlate the limit to the
overall level of capital projects and activity undertaken annually in the TCF.
PUBLIC ENGAGEMENT: In the early phases of CIP engagement in March and early April,
over 2,400 people participated, with 1,500 of those being online. Fifteen pop-up engagements
were held around the county; this form of engagement helped reach a diverse population. From
the pop-ups, over 51% responded in Spanish and 11% responded in Mongolian.
In addition to online responses and feedback received at pop-ups, program specific information
was discussed at Board work sessions on June 7, June 14, and June 28; a Planning Commission
meeting on June 8 as well as other commissions (Park and Recreation commission, Sports
Commission, Forestry and Natural Resources Commission, Fiscal Affairs Advisory Commission,
C2E2 and the Transportation Commission); and finally, a CIP public hearing held on June 28.
FISCAL IMPACT: Should the CIP be adopted, the annual debt service included in both the
Schools’ Adopted CIP and the County’s CIP remains in compliance with the County Board’s
limitations on debt issuance and debt service as outlined in the Financial and Debt Management
A - 23
- 6 -
Policies. The planned issuance of new debt, combined with previously issued debt, maintains
debt and debt service levels that are intended to maintain the County’s triple-AAA bond ratings.
Debt service in FY 2023 is consistent with the amounts budgeted in the County and APS’
Adopted FY 2023 operating budgets, with moderate growth in annual debt service projected in
future fiscal years to support the planned issuance of new bonds over the 10 planning horizon.
A - 24
- 7 -
ATTACHMENT A
FISCAL YEAR 2023 COUNTY APPROPRIATIONS RESOLUTION
Be it resolved by the County Board of Arlington County, Virginia, that the following appropriations of
$17,060,000 are hereby made for the Fiscal Year 2023 for Authorized But Unissued Bonds; Be it
further resolved that the following appropriations of $56,720,000 will be made only upon approval by
voters at the November 8, 2022 ballot and after results have been certified and filed with the Circuit
Court and the required thirty day period for contesting each bond referendum has expired:
Authorized
But
COUNTY BOND FUNDS:
Unissued
Bonds 2022 Referenda1 Total
Appropriation Appropriation Appropriation
Street and Highway Bond Fund (314) - 1,010,000 1,010,000
Arlington Neighborhoods Bond Fund
(316) 500,000 - 500,000
Government Facility Bond Fund (317) 2,000,000 19,310,000 21,310,000
Parks & Recreation Bond Fund (324) - 6,550,000 6,550,000
Metro Bond Fund (333) - 21,100,000 21,100,000
TOTAL COUNTY BOND FUNDS
APPROPRIATIONS: $2,500,000 $47,970,000 $50,470,000
STORMWATER BOND FUND (322)
APPROPRIATIONS: $14,560,000 - $14,560,000
UTILITY BOND FUNDS:
Water Bond Fund (525) - 8,750,000 $8,750,000
Sanitary Sewer Bond (528) - - $0
AWT Plant Bond (530) - - $0
TOTAL UTILITY BOND FUNDS
APPROPRIATIONS: $0 $8,750,000 $8,750,000
TOTAL APPROPRIATIONS FOR
COUNTY $17,060,000 $56,720,000 $73,780,000
1 2022 Referenda will be appropriated upon approval by voters at the November 8, 2022 ballot and
after results have been certified and filed with the Circuit Court and the required thirty-day period for
contesting the bonds has expired.
A - 25
FY 23-32
LOCAL PARKS & RECREATION
Parks Maintenance Capital 36,960
Arlington Boathouse 12,385
FourThree Urban Parks in Ballston-Virginia Square 9,425
Jennie Dean Park 4,400
Parks Land Acquisition and Open Space 3,000
Synthetic Fields 12,723
Trail & Bridge Modernization 15,000
Shirlington Park 5,290
Gateway Park 15,635
Nature Resiliency Program 8,500
Virginia Highlands Park and Nearby Public Spaces 27,075
Emerging Uses Program 6,000
Fairfax Drive Public Spaces 13,840
Short Bridge Park 6,775
Quincy Park 2,865
Penrose Square Phase 2 4,710
Sub-total 175,773
TRANSPORTATION
Paving 107,920
Concrete Maintenance 6,410
Curb & Gutter Missing Links 1,210
Bridge Maintenance & Renovation 12,610
Street Lights 3,080
Neighborhood Complete Streets 4,595
Transportation Systems & Traffic Signals 2,380
WalkArlington 1,600
ITS Device Replacement
1,350
Sub-total 141,155 10,030 32,400 32,250 34,555 31,920
- 400 400 400 400
150 300 300 300 300
- 850 1,105 1,320 1,320
- 1,100 480 400 400
1,470 2,365 2,500 4,530 1,745
1,145 480 455 485 515
- 1,465 1,555 1,645 1,745
65 260 275 295 315
7,200 25,180 25,180 25,180 25,180
22,460 37,193 40,125 17,855 58,140
- - - - 2,865
- 785 3,925 - -
- - - 2,230 11,610
1,140 5,635 - - -
- - 1,470 2,075 23,530
2,000 1,500 1,000 500 1,000
1,785 1,785
10,270 - 1,795
2,000 3,500 1,000 1,000 1,000
1,500 4,400 4,000 3,050 2,050
- - - - 5,290
- - 1,000 1,000 1,000
300 5,398 - 7,025 -
1,450 7,975 - - -
4,400 - - - -
4,960 8,000 8,000 8,000 8,000
2,925 - 9,460 - -
Bond and Master Lease Funding
2030
Arlington County, Virginia
ATTACHMENT B Adopted Proposed FY 2023 - FY 2032 CIP Debt Summary
(in $thousands)
Proposed
2022 2024 2026 2028
Adopted Planning Total
A - 26
METRO
Metro (pg. E-1) 230,000
COMMUNITY CONSERVATION
Arlington Neighborhoods Program 65,000
Sub-total 65 ,000
PUBLIC / GOVERNMENT FACILITIES
Facilities Maintenance Capital 66,000
Fire Stations Replacements & Additions 35,300
Columbia Pike Library Refresh / Replacement 31,650
Nature Centers 500
Courts / Police Building Improvements 52,100
Courthouse Complex Renovations & Infrastructure 12,000
Facility Condition Assessments 350
Lee Community Center Demolition 250
Relocate Cultural Affairs Programs to 3700 3,050
Trade Center Optimization Plan Implementation 7,500
Quincy Site Planning 12,700
Sub-total 221,400
Total
FY 23-32
County General Obligation Bond Referenda 833,328
Proposed Total
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 FY 23-32
Tub Grinder Replacement - 1,200 1,200
Call Premise Equipment (CPE) 2,500 2,500
Breathing Apparatus 4,600 4,600
Fire Command Vehicle Technology 200 150 150 500
Synthetic Turf Program 1,155 1,357 1,691 1,985 2,073 1,955 798 2,218 13,232
Fire Portable Radios 3,609 4,200 7,809
Fire Records Management System 1,000 1,000
Voter Registration Voting Machines 2,000 2,000
Wakefield High School Stadium Synthetic Field 491 491
Land Record System 1,000 1,000
Short-Term Financing Planning
128,390 176,093 167,175 172,710 188,960
Total County Bond Referenda
Adopted
Proposed Planning
2022 2024 2026 2028 2030
48,300 50,400 35,000 56,700 31,000
2,000 2,000 - - 3,500
1,000 - 11,700 - -
250 - - - -
3,050 - - - -
12,000 - - - -
- - - 350
- - - - 500
13,100 9,000 6,000 15,000 9,000
7,400 24,900 - - 3,000
- 1,500 3,300 26,850 -
5,000 12,000 14,000 16,000 18,000
9,500 13,000 14,000 14,500 15,000
5,000 12,000 14,000 16,000 18,000
42,600 44,100 45,800 47,600 49,900
A - 27
Police & Sheriff Public Safety Radios 2,850 2,850 2,850 8,550
Fire Station Alerting 1,500 1,500
Justice Center Security System 1,000 1,000
Washington-Liberty High School Stadium Field 590 590
Real Estate Assessment System 1,000 1,000
Public Safety Radio System Upgrades 1,930 1,930
Real Time Tracking in Detention Center 400 400
Williamsburg Middle School Synthetic Fields 1,161 1,161
Data Center Consolidation and Refreshment 2,050 2,100 2,350 2,050 325 325 9,200
Mobile Data Computers 3,500 3,500 7,000
Enterprise Records Mgmt. System Modernization 1,000 1,250 1,250 250 3,750
Equipment at DPR Facilities 100 100 100 100 100 100 100 100 100 100 1,000
Public Safety VMWare/Servers 350 500 850
Video Trailers 350 350 700
Network Equipment and Power System 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 13,500
Greenbrier Park Track Replacement 715 715
Revenue and Collection System Enhancement 1,200 3,300 4,500
Server Hardware & Data Storage 585 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 9,585
Telephone System Study & Refreshment 2,300 1,000 3,300
Workforce Device Modernization 300 700 2,400 2,400 2,400 2,400 2,400 2,400 15,400
Total General Fund Master Lease Funding 14,630 12,701 16,655 14,307 12,391 7,310 4,998 18,805 7,298 10,868 119,963
Auto Fund Master Lease - Fire Vehicle Apparatus (pg. D-11) - 2,300 - - 6,400 - 8,000 - 6,200 - 22,900
Total
FY 23-32
Solids Master Plan (Re-Gen), Phase III 149,500
Washington Aqueduct Capital 26,300
Gravity Transmission Mains - B2 & B3 6,455
Pump Station Improvements 1,290
New River Crossing 32,700
Primary Clarifier Upgrades 1,750
Secondary Clarifiers 12,415
Source Water Reliability & Interconnections 31,800
Solids Master Plan (Re-Gen), Phase II 9,960
Total Utility Fund GO Bond Referenda 272,170
9,960 - - - -
177,360 24,715 37,395 32,700 -
- 12,415 - - -
- - 31,800 - -
- - - 32,700 -
- 1,750 - - -
2,900 3,555 - - -
- 1,290 - - -
149,500 - - - -
15,000 5,705 5,595 - -
Utilities GO Bond Funding Proposed Planning
2022 2024 2026 2028 2030
A - 28
Total
FY 23-32
33rd Street North to Williamsburg Capacity 4,180
Lubber Run Watershed Capacity Improvements 46,455
Outfall Rehabilitation Program 11,550
Miscellaneous Expansion/ Capacity Projects 1,290
North Thomas Street 1,910
Sparrow Pond Watershed Retrofit 1,275
Spout Run Watershed Capacity Improvements 58,395
Stream Resiliency Program 17,070
Stohman's Run Watershed Capacity Improvements 1,235
Washington Boulevard Pond Retrofit 940
Torreyson Run Watershed Capacity Improvements 12,225
Water Quality Project Feasibility & Concept De 1,260
Williamsburg at North Underwood Capacity 2,725
Capacity Project Feasibility Studies 1,035
Concord Mews Pond Retrofit 1,860
Columbia Pike at Greenbrier 14,475
Green Streets & Infrastructure Program 7,035
Crossman Run Watershed Capacity Improvements 26,180
Gulf Branch Green Streets 150
Gulf Branch Stream Resiliency 2,750
Flood Risk Reduction Program 13,075
Military Road Culvert at Gulf Branch 3,090
Langston Boulevard Culvert at North Sycamore 6,750
Lower Long Branch Flood Risk Reduction Project 6,075
Total Stormwater Fund GO Bond Referenda 242,985
Total GO Bond Referenda 1,347,483
Total Debt Funding 1,490,346 374,141 292,005 283,231 280,998 259,971
39,760 60,235 52,560 43,785 46,645
344,510 261,043 257,130 249,195 235,605
6,750 - - - -
- - 1,155 2,410 2,510
1,500 3,570 3,840 2,045 2,120
- 3,090 - - -
150 - - - -
2,750 - - - -
325 985 1,675 2,000 2,050
1,960 13,620 10,600 - -
225 1,635 - - -
1,465 8,240 4,770 - -
815 1,910 - - -
- 45 320 330 340
5,955 4,740 1,530 - -
- 270 320 330 340
1,235 - - - -
165 775 - - -
13,260 9,885 11,015 13,005 11,230
- 3,155 3,365 3,950 6,600
- 1,910 - - -
1,275 - - - -
880 2,030 2,750 2,890 3,000
- 310 320 325 335
1,050 2,005 1,125 - -
- 2,060 9,775 16,500 18,120
Stormwater GO Bond Funding Proposed Planning
2022 2024 2026 2028 2030
A - 29
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2023-2032
5. GATEWAY PARK (ROSSLYN)
Project Highlights:
• Gateway Park is located over I -66 in Rosslyn and was
constructed in the 1980's.
• The current park is difficult and dangerous to access due to
the surrounding high-speed roadways.
• The park is under -utilized yet presents great potential for
everyday park and recreation needs and for a diverse mix of
special events and program activities.
• Construction of the west side of the park occurs outside the
current CIP.
Associated Plan(s):
Public Art Master Plan (PAMP)
Public Spaces Master Plan (PSMP)
Neighborhood(s):
North Rosslyn
Funding Notes: “Other Funding” assumes outside contributions. DPR anticipates a contribution of $5 million from the adopted
Rosslyn Holiday Inn Development community benefits package. Of the $5 million contribution, $500k is in-hand and will provide
near-term funding for master planning, possible interim park uses and technical studies, while the remaining $4.5 million will
provide a portion of the required construction funding in FY 2027. Construction of the west side occurs outside the current CIP.
Operating costs cover landscaping, irrigation, tree care and maintenance.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Developer Contributions 4,500 4,500
New Bond Issue 1,785 1,785 10,270 1,795 13,850
Other Funding 1,000 1,000
Previous Funding
Total Funding 0 1,7850 1,785 0 15,770 0 0 0 0 1,795 19,350
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Operations Costs (+/-) 37 38 39 40 154
Total Impact 0 0 0 0 0 0 37 38 39 40 154
Critical Milestones:
• Develop Park Master Plan 2022
• Develop Final Park Design for the East Side 2025
2024
• Demolition and Construction of Improvements
for the East Side
2027
• Develop Final Park Design for the West Side 2029-2030
Changes from Prior CIP:
The total amount of the project has been adjusted outward several years
with construction of the east side independent of the design and
construction of the west side of the park. Project funding has been
revised to reflect an anticipated development contribution. The balance
of construction is to be funded through bonds. The public new bond
issue funding has been reduced to reflect these developer contributions.
Project Links:
• Projects & Planning page from the Arlington County
website.:
https://www.arlingtonva.us/Government/Projects/Project
-Types/Parks-Projects/Gateway-Park
Changes from the Proposed CIP:
The Proposed CIP included design funds in FY 2025 for the
east side of the park . However, the Adopted CIP provides
these funds in FY 2024. There are no changes to the
construction timeline.
A - 30
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Synthetic Turf Program FY 2023-2032
SYNTHETIC TURF PROGRAM
Project Highlights:
• Arlington County has invested significantly in the
construction of synthetic turf fields to meet the demand for
athletic fields that serve a wide variety of athletic programs
and drop-in use.
• The County has 15 rectangular fields with synthetic turf and
two diamond fields with synthetic turf bringing the total
number of synthetic fields to 17.
• Synthetic turf typically has an eight-year useful life.
Associated Plan(s):
Long Bridge Park Master Plan (2013)
Public Spaces Master Plan (PSMP)
Rosslyn Highlands Park + Master Plan (2016)
Neighborhood(s):
VARIOUS
Funding Notes: Replacement and conversion of fields through the Synthetic Turf Program is typically funded with bonds, short-term
financing, and other funding. Other funding includes contributions from Arlington Public Schools for their share of fields co- located
at high schools and middle schools as well as contributions from Marymount University, George Washington Univer sity, and other
partnerships. FY 202530 field conversion at Kenmore Middle School assumes $2.0 million will come from outside fundraising and
the remaining cost will be shared 70% County / 30% APS.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 300 5,398 7,025 7,025
5,698
Short Term Finance 1,155 1,357 1,691 1,985 2,073 1,955 798 2,218 13,232
Other Funding 5,270
828
629 1,127 5,011 798 1,377 9,201
9,770
Previous Funding
Total Funding 0
300 0 11,823
1,983 1,357 2,320 3,112 2,073 1,955
13,991 1,596 3,595 28,131
30,027
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Operations Costs (+/-) 54 56 58 60 62 64 66 420
130
Total Impact 0 0 0 540 560 580 600 620 64 66 420
130
Critical Milestones:
• Turf Replacement Construction 3-4 Months
• Turf Conversion Design and Construction 12-18 Months
Changes from Prior CIP:
With a total of 17 synthetic fields in the County inventory by the
end of 2022, the capital cost schedule anticipates the replacement
of approximately three fields per year. The three replacements for
the stadiums used by the high schools, as well as the three existing
fields at Long Bridge Park also include an underlayment pad.
Changes from Proposed CIP:
The Proposed CIP included funding for the conversion of fields
at Kenmore Middle School in FY 2030. However, this project
has been accelerated. The revised project timeline includes
$300,000 for planning in FY 2023 and $9,840,000 for final
design and construction in FY 2025.
A - 31
SYNTHETIC ATHLETIC FIELDS
Year of Last
Replacement FY2023 FY2024 FY2025 FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 FY2031
1 Long Bridge Park #1 2019 1,258,000
2 Long Bridge Park #4 2019 1,062,000
3 Gunston Park Community Field 2020 1,179,000
4 Barcroft Park Baseball Field #6 2019 1,933,000
5 Gunston Park Diamond Field 2019 1,094,000
6 Virginia Highlands Park Community Field 2021 979,000
7 Thomas Jefferson Park Upper Field 2022 996,000
8 Barcroft Park Community Field 2022 620,000
9 Rocky Run Park Community Field 2022 339,000
10 Rosslyn Highlands Park + 2023 350,000
11 Wakefield High School Stadium 2014 982,000 1,246,000
12 Washington-Liberty High School Stadium 2014 1,180,000 1,495,000
13 Williamsburg Middle School #1 2016 912,000 1,155,000
14 Williamsburg Middle School #2 2016 746,000 945,000
15 Greenbrier Park Stadium 2016 1,164,000
16 Thomas Jefferson Park Lower Field 2017 819,000
17 Gunston Park Bubble 2018 326,000
18/19 Kenmore Middle School #1/#2 (Conversion) 2025 300,000 9,840,000 12,036,000
Total Costs 1,282,000 2,838,000 11,823,000 326,000 2,320,000 3,112,000 2,073,000 1,955,000 1,596,000 3,595,000
SOURCES OF FUNDS
GO Bonds 300,000 5,398,000 12,036,000
Short Term Financing 491,000 1,751,000 1,155,000 1,357,000 1,691,000 1,985,000 2,073,000 1,955,000 798,000 2,218,000
Arlington Public Schools contribution 491,000 1,087,000 3,270,000 354,000 798,000 1,377,000
Marymount University contribution 629,000
George Washington University contribution 773,000
Other Partnership/Fundraising 2,000,000
Total Sources 1,282,000 2,838,000 11,823,000 1,357,000 2,320,000 3,112,000 2,073,000 1,955,000 1,596,000 3,595,000
NOTES: -
The above schedule is the anticipated schedule for sythetic turf replacement, however it is subject to change particularly as the County works with its partners on those fields with shared use.
An 8-year useful life is assumed for all synthetic fields. Some schedules have been adjusted to smooth out the funding with an eventual goal of two-three field replacements per year.
Costs include replacement of the synthetic turf and infill, repairs to the base layer and under-drain system, replacement of field amenities, field surveys, design and construction administration.
Replacment of synthetic turf on the three high school stadium fields shall be performed in separate years to accommodate scheduling of school events.
As funding allows, this program will consider conversion of additional fields through financial partnerships with Arlington Public Schools, universities and sports organizations.
PROJECTED SYNTHETIC FIELD REPLACEMENT SCHEDULE
CAPITAL COSTS FY2023 - FY2032
Atheltic fields at Arlington Public Schools assumes a 50/50 cost share at high schools and a 70/30 cost share at middle schools with the County paying 70% of the cost. Actual cost share splits are determined by
hours of use.
A - 32
Arlington County, Virginia
COMMUNITY CONSERVATION Capital Improvement Plan
Arlington Neighborhoods Program FY 2023-2032
1. ARLINGTON NEIGHBORHOODS PROGRAM
Project Highlights:
• This program enhances and preserves residential areas by
providing resident-initiated public improvements based upon
regularly updated neighborhood plans.
• This program funds street improvements, residential traffic
management, park enhancement, street lighting,
beautification, stormwater management, and landscaping
projects.
Neighborhood(s):
VARIOUS
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 2,000 3,000
2,000 6,000 6,000 7,000 7,000 8,000 8,000 9,000 9,000 65,000
64,000
PAYG 500 500 500 500 500 500 500 500 500 500 5,000
Previous Funding
Authorized but Unissued
Bonds 2,000 4,000 4,000 3,000 13,000
Issued but Unspent Bonds 3,000 3,000
Other Previously
Approved Funds 100 100 200
Total Funding 7,600 7,600
6,600 10,500 9,500 7,500 7,500 8,500 8,500 9,500 9,500 86,200
85,200
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
In 2021, a two year evaluation of the program was finalized, and
staff is now addressing the recommendations contained in the
evaluation report. This will be managed through a two- year
implementation framework, anticipated to conclude at the end of
2023. During this time, st aff will make improvements to all
aspects of the existing program, with an equity lens overlaid
throughout the entire process. The CIP submission for these next
two years reflect a balance between maintaining the existing
programmatic functions while still allowing bandwidth for staff to
make progress on the implementation framework. There is a
funding request in the out years, but once the implementation
framework is complete, staff will update the out years. That
request will be commensurate with the updated mission and goals
of the Arlington Neighborhoods Program.
Changes from Proposed CIP:
An
additional $1 million in new GO Bonds is added in FY 2024.
This additional funding increases the 2022 Bond Referenda by
$1 million.
A - 33
FY 2023 – 2032 Capital Improvement Plan
County Board Guidance
A
rlington Public Schools School Board Adopted CIP
The County Board’s adopted CIP aligns with the School Board’s adopted CIP, including the School
Board’s addition of $15 million in the final years of its program for the Career Center project. The CIP
also fully aligns on anticipated synthetic turf replacement at three high schools in partnership with APS,
and for the acceleration of Kenmore Fields as described below.
Kenmore Field Turf Conversion
In collaboration with Arlington Public Schools, the planned referenda request for conversion of Kenmore
Middle School fields from grass to synthetic turf will be accelerated from FY 2030 to FY 2025; the revised
funding estimate is $9.84 million, which is a reduction from the FY 2030 estimate of $12 million due to
less anticipated construction cost inflation. This acceleration will allow initial design and engineering to
proceed over the next two years which will better inform the final cost estimate for inclusion in the next
CIP. The County Board also recognizes that execution of this project at this accelerated schedule
anticipates a minimum of $2 million in contributions from private and non-profit partners.
Gateway Park
Design for the first phase (east side) of Gateway Park is accelerated from FY
2025 to FY 2024, with
design funding of $1.785 million to be included in the proposed November 2022 referenda. Pre-master
planning work is anticipated to begin in fall 2022 ($500,000 in hand via site plan contribution) with
public engagement in the master plan expected to begin in early CY 2023 with a projected completion
date by the end of CY 2023. Having design funding in FY 2024 would allow DPR to move smoothly from
County Board adoption of the master plan to design work in 2024. Construction would then commence
once funding is made available in FY 2027 as part of the next CIP. The County Board also supports
pursuing funding partnerships during this timeframe, and recognizes that the CIP assumes at least $1
million in outside funding for construction.
Boathouse
The ad
opted CIP continues the County’s commitment to advancing this project with the National Park
Service, with the goal of gain access to the Potomac for all Arlingtonians. The County Board strongly
supports funding partnerships with private and other governmental partners consistent with the 40
percent cost share as shown in the proposed CIP.
Pickleball
The County Board supports the new Emerging Uses Program and the County Manager’s proposal that
Walter Reed Tennis Courts become a dedicated pickleball facility. The County Board supports additional
engagement efforts with the pickleball community, Walter Reed Park and Community Center users,
neighboring civic associations and the broader community. Given the timeline needed for engagement,
design, legally required permitting and procurement requirements, and construction timeframe, it is
anticipated that the construction of this project will be complete in calendar year 2024.
A - 34
12th Street South Complete Streets Connection between South Monroe Street and Glebe Road
After evaluation of the multiple additional improvements along the Columbia Pike corridor needed to
deliver on the goals of Vision Zero and the Columbia Pike Neighborhoods Plan, the County Board
supports the indefinite deferral of this project and directs that the $2.7 million in allocated funding be
redirected to future priority projects within the Columbia Pike Bike Boulevard Program. Staff will
conduct additional feasibility and scoping work that would focus on completing the Bike Boulevards
throughout the Columbia Pike corridor and specifically addressing areas where gaps exist.
The County Board remains fully supportive of the principles laid out in the Master Transportation Plan
and the Columbia Pike Neighborhoods Plan – including street grid connectivity and multimodal safety –
in which the 12th Street South project originated. The Board further expects that this project may need
to be revisited in the future, triggered by changing conditions including development opportunities,
multimodal corridor needs, and other County priorities.
Army Navy Country Club Trail Project
The County Board supports additional analysis of design and engineering options that pursue a hybrid
approach to the two options presented as part of community engagement for this important
connection. This analysis should be completed before the next CIP cycle, and the County Board
recognizes that a hybrid option will require additional funding above the $5 million currently
programmed in the adopted CIP which will require reprioritization of other projects. To that end and as
an initial step, the County Board is interested in the possible deferral of the Airport Viaduct project in
the next CIP, which could free up $1.5 million for the Army Navy Country Club project. Staff is also asked
to evaluate possible state and federal grant funding opportunities for the trail project during this
timeframe.
Bus Stop Accessibility
The County Board strongly supports the bus stop accessibility program and its goal of 100% ADA
accessibility. Acceleration and execution of this program depends on multiple factors, including
negotiations of easements and community engagement. The County Board directs that if opportunities
arise for acceleration of any ADA-related improvements, that funding should quickly be identified to
pursue these improvements as soon as feasible.
Arlington View Neighborhood
The County Board supports allocation of up to $100,000 in one-time funding (source to be determined
at the County Manager’s discretion) to provide beautification enhancements to Arlington View Park as
well as address spot improvements for transportation issues. The County Board strongly encourages the
continued participation of Arlington View in the updated Arlington Neighborhoods Program to prioritize
additional neighborhood improvements through this program and other programs as appropriate.
A - 35
Day Program Capacity for Developmentally Disabled Adults
Consistent with the County Board’s adopted FY 2023 budget guidance, the County Board confirms its
desire to support the developmentally disabled community. Using the County Board’s allocation of
$250,000, DHS is pursuing establishing an additional day program at the Sequoia complex as a local pilot
program that could serve from 10-15 clients and depending on design, construction, and procurement
requirements, and which could be open in CY 2023. As part of the next ten-year CIP, the County Board
directs the County Manager to identify additional opportunities for developmentally disabled locations
and programs in order to meet the needs of this growing population.
Transition to all-electric County Government Buildings
The default policy of the County is to use high efficiency electric heating, ventilation and air conditioning
(HVAC) systems, hot water systems, and appliances, in County owned facilities, when existing building
systems planned for replacement or part of new facility construction projects, where use of such
systems is feasible. The County Manager will provide a summary annually (by March 1) to the County
Board of the HVAC system approaches made on all projects during the previous fiscal year and will also
include a one year look-ahead for projects in design that include significant HVAC systems replacement.
This direction is consistent with the Community Energy Plan (CEP) Roadmap – “Strategy CG.6.1. Update
and implement relevant operations and sustainability plans for County projects” and the tools being
developed as part of this strategy will be used to inform on both the feasibility and how investments
should be made for the greatest greenhouse gas (GHG) reductions. This guidance also recognizes the
efforts staff has undertaken to initiate comprehensive reviews (supported by a facility decarbonization
tool) of 12 County facilities that will analyze all aspects of a building (including building envelope, HVAC
systems and controls, energy usage, etc.) to help prioritize future capital investments, meet the County’s
CEP goals, and inform the update of the Facility Sustainability Policy. The facility decarbonization tool is
anticipated to inform early design decisions for system replacements, and design of new facilities in the
CIP. Decarbonization study results for projects in design will be part of the annual report noted above.
This guidance is intended to inform the CIP process and the planned update of the County’s Facility
Sustainability to address building electrification, embodied carbon, and other issues related to energy
efficiency and reduction of Green House Emissions from County owned and controlled facilities.
A - 36
County Manager: #####
County Attorney: *****
Staff: Jason Friess, DMF
ARLINGTON COUNTY, VIRGINIA
County Board Agenda Item
Meeting of July 16, 2022
DATE: July 13, 2022
SUBJECT: Resolutions and Questions to be included in the 2022 Bond Referenda
C. M. RECOMMENDATIONS:
1. Adopt the resolutions in Attachment A, as summarized below, and the explanation of
the referendum questions to appear in publications, at voter registration sites, and
polling places as detailed in Attachment B, in order to initiate and facilitate the
November 8, 2022, bond referenda.
a. Metro and Transportation $ 52,630,000
b. Local Parks and Recreation 22,460,000
c. Community Infrastructure 53,300,000
d. Arlington Public Schools 165,010,000
e. Stormwater 39,760,000
f. Utilities 177,360,000
TOTAL $510,520,000
2. Request that the Electoral Board list the referenda on the ballot in the order detailed in
this report as shown in the Ballot Layout section on page 2.
3. Direct the County Manager to take all the steps necessary to ensure that the
information provided to voters by the County is printed in English. Spanish, Amharic
and Arabic.
ISSUE: This is a request for approval for the placement of capital projects, consistent with the
County and Schools’ Adopted Capital Improvement Programs (CIP), on the November 2022 ballot
for consideration by the voters for general obligation bond funding.
SUMMARY: The County Board will consider approval of the Fiscal Year (FY) 2023 – FY 2032
CIP at the July 16, 2022, County Board Meeting, which includes the Schools’ bond referendum
request, adopted by the School Board on June 23, 2022. The County’s Adopted CIP includes
40. B.
A - 37
- 2 -
various projects to be considered for a November 2022 County government referenda of $345.51
million and a Schools referendum of $165.01 million.
BACKGROUND: The County Government’s proposed bond totals are derived from a
compilation of individual projects contained in the Adopted CIP. These projects are classified into
separate categories. If the bond referenda questions are approved by the voters, the County is
legally prohibited from reallocating funding from one referenda category to another. Within the
referenda categories, however, the County Board may make changes to specific projects to the
extent permitted under the language; this flexibility is necessary because of potential rapid
changes in construction pricing or other uncontrollable factors. The County Board also has the
option of issuing a lesser amount of bonds than that approved by the voters. Attachment B is a draft
of the bond questions and explanations that would appear on the ballot and in informational
publications.
DISCUSSION: The County and Schools’ Adopted CIPs, which set the parameters for the
County and Schools bond referenda requests, reflect a balance of strategic investments and
maintaining existing infrastructure. The adopted referenda requests, which are summarized
below, are consistent with the County’s financial and debt management policies.
REFERENDUM
QUESTION PRIMARY PROJECTS / PROGRAMS AMOUNT
Metro and
Transportation
Metro Capital Improvements, Paving, Bridge Maintenance,
Street Lighting, ITS Device Replacement, Curb & Gutter
Missing Links
$52,630,000
Local Parks &
Recreation
Arlington Boathouse, Parks Maintenance Capital, Jennie
Dean Park Phase 2, Natural Resiliency Program, Trail &
Bridge Modernization, Synthetic Turf, Parks Master Plan
Projects
20,460,000
Community
Infrastructure
Neighborhood Conservation, Facilities Maintenance
Capital, Courthouse Complex Renovations &
Infrastructure, Courts/ Police Building Improvements,
Fire Station Replacements & Additions, Facilities Design
& Construction Projects
53,300,000
Arlington Public
Schools
Career Center Campus Project, Major Infrastructure
Projects, Kitchen and Entrance / Security Vestibule
Renovation Program
165,010,000
Stormwater Stormwater Maintenance Capital, Stormwater
Infrastructure / Capacity Improvements, Streams &
Water Quality Projects
39,760,000
Utilities Solids Master Plan, Water / Sewer Maintenance Capital,
Gravity One Transmission Main
177,360,000
TOTAL $510,520,000
A - 38
- 3 -
More detail on each of the programs and projects can be found in the CIP documents on the
County’s and Schools’ websites. The summary of County projects included in the 2022 bond
referenda can be found in the Appendix of the County’s Adopted FY 2023 - FY 2032 CIP, with
additional details in the remainder of the County’s CIP document. The Adopted CIP document will
be published on the County’s website no later than October 2022.
Attachment B includes the proposed bond questions and explanations as they would appear in
informational publications distributed by the County at polling places, other County facilities, and
on the County’s website. Limitations on the explanations are imposed by state law, including that
the explanations must be neutral and not present arguments in favor or against the bond questions.
Consistent with state law, the actual ballot will reflect only the proposed bond question.
BALLOT LAYOUT
It is recommended that the following six bond referenda questions be on one or more rows or
windows on the ballot in the following order:
a. Metro and Transportation
b. Local Parks & Recreation
c. Community Infrastructure
d. Arlington Public Schools
e. Stormwater
f. Utilities
PUBLIC ENGAGEMENT: The CIP engagement process included an online feedback form—in
both Spanish and English—that was available to community members between February 15 and
March 22, 2022. Paper forms will also be distributed to community centers and libraries. The
County also engaged members of the community through 15 pop-up engagements hosted at food
distribution centers, multi-family buildings and grocery stores, and were planned in coordination
with trusted community partners who helped broaden our reach. The outreach strategy included
social media efforts (Facebook, Instagram, and Twitter), press releases and County emails, as well
as the placement of 60 signs around the County containing QR codes linking to the online form,
resulting in 258 QR code scans. A total of 1,503 participants responded to the online engagement
form and 889 participated at the pop-up engagements. Over half of the pop-up participants
responded to the engagement questions in Spanish and 11% responded in Mongolian.
In addition to the on-line engagement, program specific information was discussed at on-line and
in-person CIP work sessions on June 7, June 14, and June 28; an in-person and on-line CIP public
hearing held on June 28, and a final Board wrap-up work session on July 14.
FISCAL IMPACT: The estimated impact on the County’s General Fund, Stormwater fund, and
Utility fund from the proposed bond financing plans included in the adopted CIP and the
proposed referenda are shown below for Fiscal Years 2023 and 2024. The table below includes
all outstanding general obligation and subject to appropriation bonds, planned bond issuance
from previously approved referenda, and the planned bonds and associated debt service to be
A - 39
- 4 -
approved as part of the 2022 Bond Referenda. All bonds planned in the CIP comply with the
County’s financial and debt management policies.
PROJECTED COUNTY, SCHOOLS, AND STORMWATER DEBT SERVICE
FY 2023 and FY 2024 Estimates
(In Millions of $)
PROJECTED
FY 2023
PROJECTED
FY 2024
County $78.1 $83.2
Schools 60.0 65.1
TOTAL $138.1 $148.3
Stormwater $0.9 $1.5
Utilities $28.0 $29.2
DESCRIPTION OF ATTACHMENTS
Attachment A - 2022 Bond Resolutions
Attachment B - 2022 Bond Questions and Explanations (as they will appear in publications)
A - 40
ATTACHMENT A
METRO AND TRANSPORTATION PROJECTS
WHEREAS, the County Board of Arlington County, Virginia, has determined that it is
advisable to support construction, acquisition, and rehabilitation of facilities by the Washington
Metropolitan Area Transit Authority (WMATA/Metro) and other transportation projects as
described below at an estimated cost of $52,630,000; and
WHEREAS, it appears that such improvements cannot be financed from current revenues;
BE IT RESOLVED BY THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA:
1. It is hereby determined that it is advisable for Arlington County to contract a debt
and issue its general obligation capital improvement bonds in the maximum principal amount of
$52,630,000 pursuant to the Public Finance Act of 1991, as amended, to finance, together with other
available funds, the cost of construction, acquisition, and rehabilitation of WMATA/Metro facilities
by the Washington Metropolitan Area Transit Authority, and to pay the costs of other transit,
transportation, paving, road and pedestrian enhancement projects across the County (the “Projects”).
2. The Circuit Court of Arlington County is hereby requested to order an election to be
held on November 8, 2022, provided that such date is at least 81 days after the date on which the
Court enters its order upon the question of contracting such debt and issuing bonds for such
purposes. The question on the ballot shall be in substantially the form shown in Attachment B.
3. The Clerk of this Board is hereby authorized and directed to cause a certified copy of
this resolution to be presented to the Circuit Court of Arlington County.
4. The County Board adopts this declaration of official intent under the Treasury
Regulations Section 1.150-2. The County Board reasonably expects to reimburse advances made or
to be made by the County to pay the costs of the Projects from the proceeds of its bonds.
5. This resolution shall take effect immediately.
A - 41
LOCAL PARKS & RECREATION
WHEREAS, the County Board of Arlington County, Virginia, has determined that it is
advisable to undertake local parks & recreation projects as described below at an estimated cost of
$22,460,000; and
WHEREAS, it appears that such improvements cannot be financed from current revenues;
BE IT RESOLVED BY THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA:
1. It is hereby determined that it is advisable for Arlington County to contract a debt
and issue its general obligation capital improvement bonds in the maximum principal amount of
$22,460,000 pursuant to the Public Finance Act of 1991, as amended, to finance, together with other
available funds, the cost of public improvements for Arlington County local parks & recreation (the
“Projects”).
2. The Circuit Court of Arlington County is hereby requested to order an election to be held
on November 8, 2022, provided that such date is at least 81 days after the date on which the Court
enters its order upon the question of contracting such debt and issuing bonds for such purposes. The
question on the ballot shall be in substantially the form shown in Attachment B.
3. The Clerk of this Board is hereby authorized and directed to cause a certified copy
of this resolution to be presented to the Circuit Court of Arlington County.
4. The County Board adopts this declaration of official intent under the Treasury
Regulations Section 1.150-2. The County Board reasonably expects to reimburse advances made or
to be made by the County to pay the costs of the Projects from the proceeds of its bonds.
5. This resolution shall take effect immediately.
A - 42
COMMUNITY INFRASTRUCTURE
WHEREAS, the County Board of Arlington County, Virginia, has determined that it is
advisable to undertake public facility improvements and other County infrastructure improvements,
as described below, at an estimated cost of $53,300,000; and
WHEREAS, it appears that such improvements cannot be financed from current revenues;
BE IT RESOLVED BY THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA:
1. It is hereby determined that it is advisable for Arlington County to contract a debt
and issue its general obligation capital improvement bonds in the maximum principal amount of
$53,300,000 pursuant to the Public Finance Act of 1991, as amended, to finance, together with other
available funds, the cost of public improvements for Arlington County facilities, including
infrastructure and facilities maintenance capital projects (the “Projects”).
2. The Circuit Court of Arlington County is hereby requested to order an election to be
held on November 8, 2022, provided that such date is at least 81 days after the date on which the
Court enters its order upon the question of contracting such debt and issuing bonds for such
purposes. The question on the ballot shall be in substantially the form shown in Attachment B.
3. The Clerk of this Board is hereby authorized and directed to cause a certified copy of
this resolution to be presented to the Circuit Court of Arlington County.
4. The County Board adopts this declaration of official intent under the Treasury
Regulations Section 1.150-2. The County Board reasonably expects to reimburse advances made or
to be made by the County to pay the costs of the Projects from the proceeds of its bonds.
5. This resolution shall take effect immediately.
A - 43
ARLINGTON PUBLIC SCHOOLS PROJECTS
WHEREAS, the County Board of Arlington County, Virginia, has determined that it is
advisable to undertake certain capital projects for Arlington Public Schools, as described below; and
WHEREAS, it appears that $165,010,000 of such improvements cannot be financed from
current revenues; and
WHEREAS, the Arlington County School Board has requested by resolution adopted June
23, 2022, that the County Board request the Circuit Court of Arlington County to order an election
on the question of the proposed issuance of bonds to finance such projects;
BE IT RESOLVED BY THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA:
1. It is hereby determined that it is advisable for Arlington County to contract a debt
and issue its general obligation bonds in the maximum principal amount of $165,010,000 pursuant
to the Public Finance Act of 1991, as amended, to finance, together with other available funds, the
design and construction costs for new schools, school facility additions and renovations, and various
capital projects for Arlington Public Schools (the “Projects”).
2. The Circuit Court of Arlington County is hereby requested to order an election to be
held on November 8, 2022, provided that such date is at least 81 days after the date on which the
Court enters its order, upon the question of contracting such debt and issuing bonds for such
purposes. The question on the ballot shall be in substantially the form shown in Attachment B.
3. The Clerk of this Board is hereby authorized and directed to cause a certified copy of
this resolution to be presented to the Circuit Court of Arlington County.
4. The County Board adopts this declaration of official intent under the Treasury
Regulations Section 1.150-2. The County Board reasonably expects to reimburse advances made or
to be made by the County to pay the costs of the Projects from the proceeds of its bonds.
5. This resolution shall take effect immediately.
A - 44
STORMWATER
WHEREAS, the County Board of Arlington County, Virginia, has determined that it is
advisable to undertake County stormwater projects at an estimated cost of $39,760,000; and
WHEREAS, it appears that such improvements cannot be financed from current revenues;
BE IT RESOLVED BY THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA:
1. It is hereby determined that it is advisable for Arlington County to contract a debt
and issue its general obligation capital improvement bonds in the maximum principal amount of
$39,760,000 pursuant to the Public Finance Act of 1991, as amended, to finance, together with other
available funds, the cost of public improvements for Arlington County stormwater projects,
including capacity improvement projects, water quality projects, and stormwater maintenance
capital projects (the “Projects”).
2. The Circuit Court of Arlington County is hereby requested to order an election to be
held on November 8, 2022, provided that such date is at least 81 days after the date on which the
Court enters its order upon the question of contracting such debt and issuing bonds for such
purposes. The question on the ballot shall be in substantially the form shown in Attachment B.
3. The Clerk of this Board is hereby authorized and directed to cause a certified copy of
this resolution to be presented to the Circuit Court of Arlington County.
4. The County Board adopts this declaration of official intent under the Treasury
Regulations Section 1.150-2. The County Board reasonably expects to reimburse advances made or
to be made by the County to pay the costs of the Projects from the proceeds of its bonds.
5. This resolution shall take effect immediately.
A - 45
UTILITIES
WHEREAS, the County Board of Arlington County, Virginia, has determined that it is
advisable to undertake projects for the expanding, improving, and renovating Arlington County’s
Water Pollution Control Plant, and the water and sewer systems serving the County, at an estimated
cost of $177,360,000; and
WHEREAS, it appears that such improvements cannot be financed from current revenues;
BE IT RESOLVED BY THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA:
1. It is hereby determined that it is advisable for Arlington County to contract a debt
and issue its general obligation bonds in the maximum amount of $177,360,000 pursuant to the
Public Finance Act of 1991, as amended, to finance, together with other available funds to
expand, improve, and renovate Arlington County’s Water Pollution Control Plant, and the water
and sewer systems serving the County (the “Projects”).
2. The Circuit Court of Arlington County is hereby requested to order an election to
be held on November 8, 2022, provided that such date is at least 81 days after the date on which
the Court enters its order upon the question of contracting such debt and issuing bonds for such
purposes. The question on the ballot shall be in substantially the form shown in Attachment B.
3. The Clerk of this Board is hereby authorized and directed to cause a certified copy of
this resolution to be presented to the Circuit Court of Arlington County.
4. The County Board adopts this declaration of official intent under the Treasury
Regulations Section 1.150-2. The County Board reasonably expects to reimburse advances made or
to be made by the County to pay the costs of the Projects from the proceeds of its bonds.
5. This resolution shall take effect immediately.
A - 46
ATTACHMENT B
2022 Bond Referenda
1. Metro and Transportation
QUESTION: Shall Arlington County contract a debt and issue its general obligation
bonds in the maximum principal amount of $52,630,000 to finance, together with other
available funds, the cost of various capital projects for the Washington Metropolitan
Area Transit Authority (WMATA) and other transit, pedestrian, road or
transportation projects?
EXPLANATION:
This proposal will fund a variety of transportation, road, pedestrian enhancement and transit projects
across the County. The anticipated costs of the projects that may be financed under this proposal
are $42.6 million to fund a portion of Arlington County’s share of WMATA / Metro’s capital
improvement program, $7.2 million to fund a portion of the costs for paving local streets and
roadways, $1.5 million to fund bridge maintenance, $1.1 million for street lighting, $0.2 million for
ITS intelligent transportation system device replacement, and $0.1 million for Curb & Gutter
Missing Links. The County Board may reallocate bond funds among other transportation projects
within the County’s Capital Improvement Plan, as amended from time to time, to the extent
necessary or desirable.
A - 47
2022 Bond Referenda
2. Local Parks and Recreation
QUESTION: Shall Arlington County contract a debt and issue its general obligation
bonds in the maximum principal amount of $22,460,000 to finance, together with other
available funds, the cost of various capital projects for local parks & recreation?
EXPLANATION:
This proposal will fund a variety of parks and recreation projects. The anticipated costs of the
projects that may be financed under this proposal are $10.8 million for parks maintenance capital
and master planning projects, $4.4 million for Jennie Dean Park Phase 2, $2.9 million for Arlington
Boathouse, $2.0 million for the Natural Resiliency Program, $2.0 million for the Emerging Uses
Program, and $0.3 for the synthetic turf program. The County Board may reallocate bond funds
among other parks and recreation projects within the County’s Capital Improvement Plan, as
amended from time to time, to the extent necessary or desirable.
A - 48
2022 Bond Referenda
3. Community Infrastructure
QUESTION: Shall Arlington County contract a debt and issue its general obligation
bonds in the maximum principal amount of $5253,300,000 to finance, together with
other available funds, the cost of various capital projects, including but not limited to
Neighborhood Conservation, facilities maintenance capital, facilities design and
construction, the Arlington Neighborhoods Program, and other County
infrastructure?
EXPLANATION:
This proposal will fund a variety of County infrastructure projects. The anticipated costs of the
projects that may be financed under this proposal are $13.1 million for Courts / Police building
improvements, $12.7 million for facilities design and construction, $12.0 million for Courthouse
Complex Renovations and Infrastructure, $7.4 million for fire station replacements and additions,
$54.0 million for Neighborhood Conservation, and $3.1 million for facilities maintenance capital.
The County Board may reallocate bond funds among other County and community infrastructure
projects within the County’s Capital Improvement Plan, as amended from time to time, to the extent
necessary or desirable.
A - 49
2022 Bond Referenda
4. Arlington Public Schools
QUESTION: Shall Arlington County contract a debt and issue its general obligation
bonds in the maximum principal amount of $165,010,000 to finance, together with
other available funds, the cost of various capital projects for Arlington Public Schools?
EXPLANATION:
This proposal will make funds available for the Arlington Public Schools' capital improvement
program. The anticipated costs of the projects that may be financed under this proposal are:
Career Center Campus Project ($135,970,000)
Kitchen and Entrance / Security Vestibule Renovation Program ($12,240,000)
Major Infrastructure Projects ($16,800,000)
The School Board may reallocate bond funds among other school projects within the School
Board’s Capital Improvement Plan, as amended from time to time, to the extent necessary or
desirable.
A - 50
2022 Bond Referenda
5. Stormwater
QUESTION: Shall Arlington County contract a debt and issue its general obligation
bonds in the maximum principal amount of $39,760,000 to finance, together with other
available funds, the cost of various capital projects for the County Stormwater
Program?
EXPLANATION:
This proposal will fund a variety of County stormwater projects. anticipated costs of the projects
that may be financed under this proposal are:
Capacity Improvements
Spout Run Watershed ($13,260,000)
Langston Boulevard / Sycamore Street Culverts ($6,750,000)
Torreyson Run Watershed ($5,955,000)
Other Capacity Improvement Projects ($8,025,000)
Water Quality Improvements
Gulf Branch Stream ($2,750,000)
Sparrow Pond Watershed ($1,275,000)
Other Water Quality Improvements ($1,745,000)
The County Board may reallocate bond funds among other stormwater projects within the
County’s Capital Improvement Plan, as amended from time to time, to the extent necessary or
desirable.
A - 51
2022 Bond Referenda
6. Utilities
QUESTION: Shall Arlington County contract a debt and issue its general obligation
bonds in the maximum amount of $177,360,000 to finance, together with other
available funds, the cost of designing, expanding, improving, and renovating Arlington
County’s Water Pollution Control Plant and the water and sewer systems serving the
County?
EXPLANATION:
This proposal funds significant improvements to the County’s wastewater treatment, water, and
sewer infrastructure. The anticipated costs of the projects that may be funded with bond funds
are $159.5 million for the Water Pollution Control Plant to meet more stringent environmental
regulations and will provide additional plant capacity to meet growing population and
development in the County, $15.0 million for improvements to the Washington Aqueduct
system, and $2.9 million for improvements to Gravity Transmission Mains. The County Board
may reallocate bond funds among other utility projects within the County’s Capital Improvement
Plan, as amended from time to time, to the extent necessary or desirable.
A - 52
Project Name Description Funding Source Project Cost Current Status Anticipated Completion
N. Oakland Street -Ashton
Heights Concrete curb and gutter, sidewalk Bonds $970,364 Closeout Fall 2022
N. Highland Street -Lyon Park Concrete curb and gutter, sidewalk Bonds $1,095,923 Closeout Fall 2022
N. Larrimore Street -Dominion
Hills Intersection improvement and bioretention Bonds $1,179,262 Construction Fall 2022
4th St. Street -Glencarlyn
Concrete curb and gutter, sidewalk Bonds $1,307,327 Construction Fall 2022
N. Monroe Street -Cherrydale Concrete curb and gutter, sidewalk Bonds $1,840,140 Design Spring 2023
12th Street - Madison Manor Installation of streetlights Bonds $348,987 Design Fall 2022
S. Oak, S. Ode Streets -
Foxcroft Heights Installation of streetlights Bonds $562,704 Closeout Fall 2022
Woodlands in Bluemont Park I nvasive plant removal, reforestation,
sidewalk connection Bonds $785,000 Construction Winter 2022
Lucky Run Stream/Four Mile
Run Stream Invasive plant removal and re-planting Bonds $376,000 Construction Winter 2022
6th Street N. & N. Edison
Street Intersection Improvement Bonds $658,637 Design Spring 2023
11th Street N. &
N. Danville St
12th Street S. &
S. Scott Street
The County is currently executing a wide variety of capital projects. These projects are in various phases of implementation with anticipated completion dates as soon
as Fall 2022 and as far out as several years in the future, depending on the project’s scale. The following table provides brief summaries and updates on the most
significant capital projects in progress.
ARLINGTON NEIGHBORHOOD PROGRAM & GREEN VALLEY TOWN SQUARE
Open Space Improvement Bonds
$492,338 Design Spring 2023
Intersection Improvement Bonds $500,000 Design Fall 2022
Arlington County, Virginia
PROJECTS UNDERWAY
CIP
2023-2032
A - 53
Project Name Description Funding Source Project Cost Current Status Anticipated Completion
S. Abingdon Street –
31st Street S. to 31st
Road S.
15th Street N. Street Improvement Bonds $1,764,833 Design Fall 2023
16th Street N. Intersection Improvement Bonds $712,341 Design Fall 2023
Hillside Park Park Bonds $326,788 Design Fall 2023
S. Buchanan Street Streetlights Bonds $324,243 Design Fall 2023
S. Manchester Street Street Improvement Bonds $660,000 Design Fall 2023
CAD is used to coordinate the dispatch of
various public safety personnel to the scene of
emergency situations.
Phase I – defining scope and timeline of
CAD
Design currently underway
Fire Station Alerting Upgrade technology used to alert and
dispatch Fire personnel and apparatus.
Short-Term
Financing $1,200,000 Final Testing Fall 2022
Computer Forensic Equipment Replacement of end-of-life forensic servers
and workstation infrastructure.
Short Term
Financing $85,000 Closeout Fall 2022
Police In-Car Cameras
Replacement of end-of-life servers for the
in-car camera video system used in Police
vehicles.
Short Term
Financing $65,000 Closeout Fall 2022
Body Worn Camera Courtroom
Upgrades
Upgrade the technology in two courtrooms
to support the Body Worn Camera program
Short-Term
Finance $210,000
Installation
Pending Receipt
of Equipment
Winter 2022
Prepare utilities poles to receive new fiber
at various school locations (aerial make-ready)
Handhole corrections
Extend fiber to APS Ed Center/Quincy
complex
In-Building Network Equipment
Courts Police Building (CTP)
INFORMATION TECHNOLOGY
Computer Aided Dispatch
(CAD) Assessment and
Replacement
PAYG $7,500,000 Planning Fall 2025
ConnectArlington Fiber
Network Bonds $1,179,00 Planning &
Construction Spring 2023
Core Network Maintenance -
Network Edge Refresh (CTP)
Short-Term
Financing
$550,000 Construction Fall 2022
Street Improvement Bonds $394,694 Design Spring 2023
Public Safety Servers Refresh of public safety servers and
VMWare licensing
Short Term
Financing $300,000 Closeout Fall 2022
A - 54
Project Name Description Funding Source Project Cost Current Status Anticipated Completion
In-Building Network Equipment
Countywide Upgrades
Electronic Payment Portal Common Payment Engine for County
Inbound Payments
Short-Term
Financing $2,000,000 Planning Summer 2023
Audio Visual Equipment for
Conference Rooms
Provide new or enhanced audio/visual
capabilities to conference rooms across the
County with particular emphasis on making in-
person meetings accessible virtually by others
unable to participate in person.
PAYG $1,000,000 Implementation Winter 2023
PARKS & RECREATION
Phases 1 and 2 of the park renovations Construction
Phase 1 includes replacement of one picnic
shelter, sand volleyball court, site amenities, Fall 2023
Phase 2 includes accessibility renovations
to restroom building, replacement of
basketball court and associated walkways,
signage, and landscaping.
Construction
Fall 2022
Design and construction to make
improvements to the existing 23rd Street South
and South Eads Street Park.
Design: Fall 2022
Construction: Winter
2023
ConstructionAlcova Heights Park
Renovation, Phases 1 and 2
This project will implement the design and
construction for the replacement of the
synthetic turf surfacing on the athletic field at
Barcroft Park. Project includes design
development, replacement of the synthetic
turf and infill, repairs to the under-drain
system, replacement of field amenities, and
construction administration.
Construction
Crystal City Parks and Public
Spaces; improvements to 23rd
Street South and S. Eads Park
TIF $500,000
Barcroft Park Synthetic Field
Replacement
Short-Term
Finance
$489,000
Bonds $4,090,000
Design
Core Network Maintenance -
Network Edge Refresh
(Countywide)
Short-Term
Financing $1,344,972 Construction Spring 2023
A - 55
Project Name Description Funding Source Project Cost Current Status Anticipated Completion
Gunston Bubble Replacement
Design and construction of a structure to
replace the air-supported structure (“the
Bubble”) over the indoor athletic field.
PAYG / Bonds $1,297,000 Construction Construction
Winter 2022
Design Winter 2022;
Construction Winter 2023
Project involves accessibility upgrades to
the restroom building and replacement of the
basketball court.
Design: Winter 2022;
Construction: Winter
2023
$225,000/
$900,000
Construction Completion
Spring 2023
Construction
Winter 2022
Design
Spring 2023
Construction
Fall/Winter 2022
Design
This project will provide design and
construction for a second bridge in the Lubber
Run Park for the two bridges lost in the storm
of July 2019.
Design
Replacement of tennis and basketball
courts and associated improvements. Construction
Design for the replacement of the
playground, site circulation, site furnishings
and stormwater management improvements.
Design
Rocky Run Park Synthetic Field
Replacement
Short-Term
Finance Construction
$268,000
Design and construction for the
replacement of the synthetic turf surfacing on
the athletic field. Project includes design
development, replacement of the synthetic
turf and infill, repairs to the base layer and
under-drain system, replacement of field
amenities, and construction administration.
Monroe Park Playground Bonds $236,000
Marcey Road Park
Tennis/Basketball Court Bonds $1,785,000
Lubber Run Park Pedestrian
Bridge #2 Replacement PAYG / Bonds
Lacey Woods Park
Improvements PAYG / Bonds $2,203,000
Gunston Park Playground and
Picnic Shelter Replacement Bonds $1,205,000 Project scope includes replacement of the
playground and picnic shelter. Design
A - 56
Project Name Description Funding Source Project Cost Current Status Anticipated Completion
Replacement of the children's playground Construction
Final asset to be replaced in the total
renovation of the park. Fall 2022
Construction
Winter 2022/Spring 2023
Conceptual Design only for the
replacement of the tennis courts, court
lighting, picnic shelter, restrooms, parking lot,
walkways, stormwater management, signage
and landscaping.
Design Completion
Spring 2023
Design Winter 2022;
Construction
Spring 2023
PUBLIC / GOVERNMENT FACILITIES
Courts Police Bldg. Automatic
Transfer Switches and
Generator Controls
Design & Construction: Electrical upgrade
design to replace all six Automatic Transfer
Switches (ATS's) and generator controls.
PAYG / Bond $1,241,000 Design Winter 2022
Interior upgrades to accommodate Police
and Fire vehicles and equipment which
includes lighting, electrical, ventilation for
vehicles, new overhead doors, and ADA
restrooms.
Site improvements to include asphalt ramp
to new overhead door, and minor parking lot
improvements (new drive lane and parking
spaces immediately in front of the building.
Tuckahoe Playground Safety
Surfacing Replacement PAYG $485,000
Construction
Design
Design
Design and construction for the
replacement of the synthetic playground
surfacing.
Design
ConstructionTowers Park Playground
Replacement Bonds $1,065,000
1425 N. Quincy Bonds $2,995,000
"Teardrop Parcel" at South
Eads Street and Army-Navy
Drive in Crystal City
Developer
Funds $3,063,737
Upper Bluemont Park
Improvements Bonds $575,000
Fall 2022
Park master planning process is complete
and project design is underway. Construction
of the park will be managed by the County.
A - 57
Project Name Description Funding Source Project Cost Current Status Anticipated Completion
Roof replacement; HVAC replacement;
install building automation system (BAS);
Exterior work- loading dock concrete repairs.
The project includes relocation of staff;
replacing acoustical ceiling tile system; interior
painting; replacing flooring; kitchen counters
and cabinet refresh; complete refresh of 2
bathrooms and showers; replacement of
interior lighting.
Fire Station #8 Rebuild
Project is to replace the aged and
undersized existing Fire Station #8 at 4845 Lee
Highway.
PAYG / Bonds $25,040,000 Construction Spring 2024
Approximately 20,000 square feet and
including four apparatus bays and gender-
neutral accommodations for staff.
Fire Station #8 Rebuild
Temporary Station is now complete and
utilized one of the residential structures
acquired for dorms, offices and related support
spaces while constructing a two-bay apparatus
bay tent structure.
PAYG / Bonds $25,040,000 Construction Spring 2024
Conversion from gas to diesel of the Fuel
Station located at Fire Station No. 2 to provide
temporary service during the construction of
the new Fire Station No. 8 project.
Winter 2022
Solid Waste/Traffic
Engineering & Operations
Building – Finish and Systems
Replacements
Bond
$3,535,000 Design
A - 58
Project Name Description Funding Source Project Cost Current Status Anticipated Completion
Concepts under review given COVID-19. Tenant
Improvement
Looking to enhance technology equipped
conference rooms, increase elevator capacity
and security.
and Commission
Rebate
Lobby renovation to include a new
customer service model for most County
functions located in Bozman and an updated
library.
Renovations of County Fire Stations to
accommodate a fourth shift (Kelly Day).
Included are additional storage, living
space, locker room facilities and upgrading
decontamination areas.
Replacement of group home at 1212 S
Irving St to house six adults with
developmental disabilities
New group home designed to be net-zero.
601 S. Carlin Springs Rd.
Decoupling
Decoupling of VHC building at 601 South
Carlin Springs Rd. from Doctor’s Medical
building at 611 South Carlin Springs Rd.
Bonds $1,600,000 Construction Fall 2022
Provide a prototype Courtroom to renovate
and upgrade technology as basis of future
designs
Design of the 4th floor JDR courtrooms and
operational space
Design of the 12th floor Judges chambers
to enhance security and consolidate JDR
chambers
Design Summer 2023-24
Construction Early 2023
Courts/Police Renovations Bonds $4,000,000
1212 S. Irving Street Bonds / Grant $5,205,496
Design Spring 2023Fire Station Renovations (Kelly
Day) Bonds $3,545,000
Bozman (CHP) Renovation $25,500,000
Various phases
between design
and construction
Fall 2023
A - 59
Project Name Description Funding Source Project Cost Current Status Anticipated Completion
Arlington Childcare Center Renovate the interior of the childcare
facility at 1915 N. Uhle Street Bonds $1,625,000 Design Spring 2024
2700 S. Nelson Street
Demolish building located at 2700 S.
Nelson Street and 2700 S. Oakland Street and
development of new surface lot with paved
area and green space
Other (DMF
funded) $1,475,602 Design Spring 2023
3108 Columbia Pike
Demolition
Demolish building at 3108 Columbia Pike
and development of new surface parking lot
Other (DMF
funded) $1,510,882 Design Summer 2023
Fire Prevention/ Battalion
Chief’s Office Relocation 2020
N. 14th Street
Renovate the interior of the 7th floor at
2020 14th St for Fire Prevention & the
Battalion Chief’s Office
Bonds $1,500,000 Planning Fall 2024
STORMWATER MANAGEMENT
Spout Run Watershed Capacity
Infrastructure
Watershed- scale project with blended
engineering (distributed detention, pipe
improvements, tertiary assets installed, and
overland relief).
Bonds $76,990,000 Design Spring 2032
Collaborative project with APS for multi-
use of public lands (Schools, Parks) to expand
the stormwater capacity system (detention)
and mitigate flood impacts.
Detention is located below the grass field
and baseball diamond located at the
elementary school.
Provides enhanced water quality treatment
for over 400 acres that drain to Lubber Run
through the creation of a constructed wetland.
Improves aesthetics, interpretation, park
amenities, and wildlife habitat.
Ballston Pond Watershed
Retrofit $4,715,000 ConstructionGrants / Bonds Spring/ Summer 2023
Bonds / Other
Previously
Approved Funds
Spring/ Summer 2023
Cardinal Elementary School
Stormwater Detention &
Lexington Connection (project
formerly named Reed School
Detention)
$18,376,466 Design and
Construction
A - 60
Project Name Description Funding Source Project Cost Current Status Anticipated Completion
Sparrow Pond Watershed
Retrofit
Retrofit the pond to create a constructed
wetland and restore the pond’s volume,
improve stormwater treatment, provide
habitat, and be make subsequent maintenance
easier and less costly.
Bonds $3,135,000 Permitting Winter 2023
Rehabilitates failing critical assets and
improves channel capacity.
Stabilizes approximately 620 linear feet of
the channel and replaces existing deteriorating
headwall.
Capacity dredging and maintenance per
agreement with US Army Corps of Engineers.
Collaborative project with City of
Alexandria.
Replacement of two undersized culverts
that are in poor condition.
Stormwater
PAYG / Bonds $6,760,000 Design Spring 2024
A watershed-scale Vulnerability and Risk
Assessment.
Risk Assessment and
Management Plan (RAMP)
Extended to incorporate watersheds
determined to be vulnerable in Task 1-4
analyses; includes Social Vulnerability districts
and directly tied to RAMP Equity deliverables.
Stormwater /
PAYG $1,300,000 In Progress Spring 2023
TRANSPORTATION (Note: External funding may be under agreement, approved, or anticipated)
Army Navy Drive Complete
Street
Rebuild Army Navy Drive in Pentagon City
to include protected bike lanes, safer
pedestrian crossings, street trees, and the
ability to accommodate future high-capacity
transit.
NVTA Regional
funds, Federal
funds, TIF,
Developer
Contributions
$16,092,000 Construction
awarded Spring 2025
Donaldson Run Outfall /
Channel $1,635,000 Permitting
Stormwater
PAYG / Other
Previously
Approved Funds
Spring 2024
Dumbarton Culverts
Replacement
Stormwater
PAYG / Other
Previously
Approved Funds
Spring 2023
Four Mile Run
Restoration/Flood
Control/Dredging Project
$4,000,000 Contract Award
A - 61
Project Name Description Funding Source Project Cost Current Status Anticipated Completion
ART O&M Facility
Operations and maintenance facility for
growing fleet of ART buses. Project will include
parking for buses as well as space for
administration and O&M staff.
State capital
grants, NVTA
Regional funds,
TCF (C&I, NVTA
local),
Developer
Contributions
$96,565,000 Construction Fall 2024
Ballston Multimodal
Improvements
Expand and update transit bays, bus
shelters, pedestrian circulation, and bicycle
parking at the surface level around the Ballston-
MU Metro station.
State capital
grants, TCF C&I,
Federal funds,
GO bonds
$9,243,000 Construction Fall 2022
Ballston-MU Metro Station
West Entrance
Construct a new west entrance to the
Ballston-MU Metro station located at the
intersection of N. Fairfax Drive and N. Vermont
Street to improve Metrorail access.
State capital
grants, Regional
funds (NVTA,
NVTC), TCF (C&I,
NVTA local),
Developer
Contributions
$150,000,000 Design Summer 2026
Bike Arlington – Cemetery
Wall Trail Project
Construct a new 10'-wide, multi-use trail to
connect Memorial Avenue to new Columbia
Pike interchange being implemented by
Eastern Federal Lands Highway as part of the
Cemetery expansion.
Federal funds,
TCF (C&I, NVTA
local)
$24,903,000 Planning Fall 2027 (rough estimate)
A - 62
Project Name Description Funding Source Project Cost Current Status Anticipated Completion
Bridge Renovation: Arlington
Ridge / Mt. Vernon Bridge
Replace Arlington Ridge Road bridge over Four
Mile Run to address structural deficiencies that
have necessitated partial closure of sidewalks.
50%
Contribution
from the City of
Alexandria,
State capital
grants, Federal
funds, GO
Bonds, PAYG,
Underground
Utility Fund
$28,000,000 Design Summer 2025
Columbia Pike Transit Stations
Design and construct transit stations along
Columbia Pike to provide safer access to
transit, improved bus shelters, increased
seating and real-time bus arrival information.
TCF C&I, Federal
funds, State
capital grants,
and GO bonds
$14,635,000
Site work for 8
locations in
construction,
others in various
stages of design
Fall 2025
Crystal City Metro Station East
Entrance
Construct a new entrance at the east end
of the Crystal City metro station to provide
easier access from Crystal Drive, the Virginia
Railway Express (VRE) Station, and a Crystal
City Potomac Yard Transitway station (PPEA
Project).
Federal funds,
State capital
grants, NVTA
Regional funds,
TCF (C&I, NVTA
local), TIF
$94,891,000 Design Planning Fall 2025
Clark Bell extension at 15th Street. 4 projects:
Improvements along 23rd Street.
Rebuild 18th Street South between South
Fern Street and South Eads Street to continue
the existing South Hayes Street protected bike
lanes.
12th Street multimodal improvements to
support the Transitway Extension.
1 in Design,
3 in Construction Winter 2023- Summer
2024
NVTA Regional
funds, TCF C&I,
TIF
Crystal City Street
Improvements - Various
locations
$33,562,000
A - 63
Project Name Description Funding Source Project Cost Current Status Anticipated Completion
Crystal City to Washington
National Airport (CC2DCA)
Intermodal Connector
Construct a multimodal connection
between Crystal Drive and Ronald Reagan
Washington National Airport (DCA). The project
began the federal regulatory environmental
analysis study in 2021.
Federal Funds,
State funds,
NVTA Regional
funds, TCF C&I,
TIF
$35,861,000 Planning Summer 2029
Pentagon City Metro Station
Second Elevator
Provide a street-to-mezzanine elevator on
the west side of South Hayes Street to improve
access to the Metro station, improve ADA
access, and provide elevator redundancy.
Federal funds,
State capital
grants, GO
bonds, PAYG,
and TCF C&I
$10,450,000 Construction Winter 2022
Extend Crystal City-Potomac Yard
Transitway as a bus facility to Pentagon City.
Segment 1 – Summer
2023
Extension will serve local travel demand
within the corridor, including Amazon’s HQ2,
as well as enhance connections to Metrorail
and improve connections to Columbia Pike.
Segment 2a – Spring 2025
Reconstruct Washington Boulevard and
13th Street to remove the existing reversible
center lane and reorient the intersection to
become a conventional "T" intersection.
Redevelop the adjacent property into
County Parks and Recreation maintained open
space and integrate with recent improvements
at Clarendon Circle.
Street improvements on Wilson Blvd. from
N. Kenmore Street to 10th Street North, and on
10th Street N. from Fairfax/N. Jackson Street to
N. Ivy Street.
New curb gutter and wider sidewalks,
stormwater upgrades, new crosswalks, signal
upgrades, streetlights, signage, street trees and
paving.
Utility undergrounding along Wilson Blvd.
Rosslyn-Ballston Street
Improvements: Washington
Blvd and 13th Street North
$3,672,000 Construction Winter 2022
State capital
grants, NVTA
Regional funds,
TCF C&I, TIF
Developer
contributions
Rosslyn-Ballston Street
Improvements: Wilson Blvd,
10th St N to N. Kenmore
TCF C&I, PAYG,
developer
contributions
$11,083,000 Design
Premium Transit Network
(PrTN): Transitway Extension
to Pentagon City
$27,667,000 Construction/De
sign
Fall 2026
A - 64
Project Name Description Funding Source Project Cost Current Status Anticipated Completion
WATER & SEWER
Solids Master plan (Re-Gen),
Phase 1
Phase 1 Solids Master Plan projects address
immediate needs in replacing critical solids
handling equipment that are at the end of the
useful lives, including preliminary treatment
process replacements (bar screens and scum
concentrator), and ventilation improvements in
the Preliminary Treatment Building (PTB).
Bonds/ Other
Previously
Approved Funds
10,000,000 Construction Fall 2023
Solids Master Plan (Re-Gen),
Phase 2
Phase 2 projects focus on program
management and preparing the WPCP site for
future solids handling improvements including
relocation of existing building functions,
demolition of underutilized facilities, and
general site work in advance of the Solids
Master Plan (Phase 3).
Utilities PAYG /
GO Bonds $18,500,000 Planning Summer 2025
Rehabilitate three secondary clarifiers by
replacing the internal mechanisms, the solids
withdraw system, and ancillary improvements.
These were originally built in the 1960s and
have been out of service.
Improvements to Eads Street
Property
The Eads St. property serves as the WPCP’s
off-site warehouse. This project replaces the
failing retaining wall at the back of the
property.
Other Previously
Approved
Funds/ Other
Funding
$1,900,000 Construction Fall 2022
Secondary Clarifiers PlanningUtilities PAYG/
GO Bonds Spring 2027$16,710,000
A - 65
Project Name Description Funding Source Project Cost Current Status Anticipated Completion
Improvements at 31st Street
Lot
This project at the lot in the 500 block of
31st Street South expands the usable space in
order to accommodate Arlington Transit's
(ART) personal vehicle parking and the Water
Pollution Control Plant's needs during
upcoming construction of the Solids Master
Plan upgrades (Re-Gen) projects.
Other Previously
Approved
Funds/ Other
Funding
$2,400,000 Construction Winter 2023
Asset Management Software
Replacement
Replacement of the WPCP’s Asset
Management Software used to track
equipment repairs, work orders, warehouse
inventory, and purchases.
Utilities PAYG /
Other Previously
Approved Funds
/ Other Funding
$3,160,000 Planning Spring 2026
Gulf Run Sewer Force Main
Rehabilitation of approximately 2,191
linear feet of the 10-inch cast-iron force main
located uphill from the Gulf Run Pump Station.
Utilities PAYG $1,700,000 Design Fall 2023
Completes a water main that will provide
redundant transmission capacity through the
Gravity One pressure zone.
Project will provide an additional large
diameter supply for the Old Dominion,
Langston, Leeway, and Williamsburg areas.
Provides redundancy and additional
transmission capacity to pressure zones serving
much of the R-B corridor.
ConstructionUtilities PAYG /
GO bonds Summer / Fall 2022Gravity Transmission Mains -
B1 (Phase 2)
$3,900,000
A - 66
Project Name Description Funding Source Project Cost Current Status Anticipated Completion
Fairfax Water Interconnection Interconnection with adjacent water
system to provide an emergency water supply.
Other Previously
Approved
Funding
$2,135,000 Construction Summer 2022
Covers a 3,000-foot section of a 1930s
sewer main that runs under the North
Highlands neighborhood and is over 100 feet
deep in some areas.
The sewer line was inspected and will be
rehabilitated through trenchless technology,
including either conventional or ultra-violet
cured in-place (CIPP) lining methods.
Other Previously
Approved Funds Summer 2024Spout Run Sanitary Sewer
Relining
$7,068,000 Design
A - 67
Program Category FY 23 FY 24 FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 Total
Local Parks & Recreation 19,745 31,568 36,638 14,887 53,419 19,226 12,683 14,214 24,796 43,402 270,578
Transportation Initiatives 1 195,985 312,286 283,794 219,664 161,586 116,779 126,975 119,894 121,194 96,922 1,755,079
Metro 31,100 32,000 33,000 34,000 35,000 36,000 37,100 38,200 39,400 40,600 356,400
Community Conserv/Economic Develop. 7,774 7,625 10,525 9,525 7,525 7,525 8,525 8,525 9,525 9,525 86,599
Public / Government Facilities 39,033 33,710 46,823 18,725 20,945 26,290 48,350 18,765 19,140 22,115 293,896
Information Technology & Public Safety 29,760 30,540 25,471 15,488 19,005 7,890 16,177 19,283 18,026 10,792 192,432
Regional Partnerships 5,754 1,059 1,066 1,078 1,091 1,105 1,126 1,148 1,170 1,193 15,790
Water & Sewer Infrastructure 53,550 70,470 93,670 93,690 79,050 78,860 29,010 60,650 29,045 29,400 617,395
Stormwater Management 2 28,795 39,750 32,320 48,385 44,855 30,205 21,055 30,885 29,515 25,570 331,335
Total County Capital 411,496 559,008 563,307 455,442 422,476 323,880 301,001 311,564 291,811 279,519 3,919,504
Schools Capital 181,040 73,750 45,320 24,430 25,000 25,000 25,000 25,000 25,000 25,000 474,540
Total Program Cost 592,536 632,758 608,627 479,872 447,476 348,880 326,001 336,564 316,811 304,519 4,394,044
Arlington County, Virginia
Adopted CIP Program Summary
The Adopted FY 2023 - 2032 CIP includes typical capital projects such as maintenance capital, parks, transportation, metro, community conservation, government
facilities, information technology and regionals. It also includes Arlington Public Schools' Adopted FY 2023 - FY 2032 CIP. The 10 year CIP includes funding
that has been previously approved in prior CIPs to show the full expenditure by fiscal year of each capital project.
10 Year Capital Program Costs Summary (000s)
(1) Transportation Capital Fund is supported by a commercial real estate tax of $0.125 per $100 of assessed value and 30% of revenues from a regional sales tax collected at the Northern Virginia
Transportation Authority (NVTA). The Transportation Capital Fund is supplemented by County PAYG as well as state and federal revenues.
(2) Stormwater Management Fund is funded from the Sanitary District Tax, Watershed Management Fund, State Grants and project cost sharing with US Army Corps of Engineers. The sanitary district tax
was increased from $0.01 to $0.013 per $100 of assessed value by the County Board on April 24, 2010. In CY 2021, the Sanitary District tax rate was increased to $0.017 per $100
of assessed real property value.
(3) Local and Regional funding for transportation projects from the Northern Virginia Transportation Authority (NVTA) were approved by the General Assembly in 2013.
(4) Other previously approved funds: Any funds other than GO Bonds that were approved as part of prior CIPs that are to be spent during the FY23-FY32 CIP.
B - 1
FY 23 FY 24 FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 Total
8 ,405 22,172 24,710 16,545 16,476 17,037 19,636 16,957 20,113 17,100 179,151
14,630 15,001 16,655 14,307 18,791 7,310 12,998 18,805 13,498 10,868 142,863
49,970 75,920 110,298 68,295 88,435 78,740 100,305 72,405 84,400 104,560 833,328
51,900 73,750 45,320 24,430 25,000 25,000 25,000 25,000 25,000 25,000 345,400
16,725 14,810 18,300 16,030 16,705 17,830 17,820 16,520 17,320 17,275 169,335
8,750 28,165 55,075 56,435 44,015 47,030 - 32,700 - - 272,170
3,835 3,835 3,835 3,835 3,830 4,545 4,035 4,120 4,220 4,220 40,310
- 12,835 28,485 44,550 41,025 25,660 17,020 26,765 25,295 21,350 242,985
1,665 6,739 50,594 19,040 14,418 16,877 12,578 - - - 121,911
12,815 39,684 35,885 34,196 36,396 25,956 35,099 28,759 37,134 21,671 307,595
6,935 12,791 8,574 11,577 33,444 11,470 14,013 18,557 10,860 11,255 139,476
14,417 27,473 42,037 63,858 43,851 32,024 30,450 34,927 36,314 38,756 364,107
7,154 14,483 13,462 13,931 17,113 13,048 19,242 15,617 19,611 16,774 150,435
- 11,378 42,187 49,565 18,209 7,655 6,103 6,697 7,292 7,391 156,477
1,230 5,678 11,847 11,459 15,498 11,571 6,637 15,911 9,584 4,652 94,067
4,416 16,810 17,926 13,898 13,276 7,097 5,065 2,824 6,170 3,647 91,129
202,847 381,524 525,190 461,951 446,482 348,850 326,001 336,564 316,811 304,519 3,650,739
43,680 28,580 4,000 3,000 - - - - - - 79,260
107,301 4,367 2,363 904 - - - - - - 114,935
Capital Funding Sources
Pay-As-You-Go (PAYG)
Short-term Financing
General Fund GO Bond Issue
Schools GO Bond Issue
Utilities PAYG
Utility GO Bond Issue
Sanitary District Tax 2
Stormwater GO Bond Issue
Federal Funding
State Funding
Developer Contributions and Partnerships
Transportation Capital Fund (TCF) - C&I 1
TCF - HB2313 Local 3
HB2313 Regional 3
Tax Increment Financing
Other Funding
Subtotal New Funding
Previously Approved Funding
Authorized but Unissued Bonds
Issued but Unspent Bonds
Other Previously Approved Funds 4
238,708 218,287 77,074 14,017 994 30 - - - - 549,110
Subtotal Previously Approved Funding 389,689 251,234 83,437 17,921 994 30 - - - - 743,305
Total Funding 592,536 632,758 608,627 479,872 447,476 348,880 326,001 336,564 316,811 304,519 4,394,044
10 Year Capital Program Costs Summary (000s)
Arlington County, Virginia
Adopted CIP Program Summary
B - 2
Adopted Adopted 10-year 10-year
FY19-28 FY23-32 $ Change % Change
Parks and Recreation 223,181 270,578 47,397 21.2%
Transportation 1,326,337 1,755,079 428,742 32.3%
Metro 293,000 356,400 63,400 21.6%
Public/Government Facilities 197,033 293,896 96,863 49.2%
Information Technology & Public Safety 127,306 192,432 65,126 51.2%
Regional Partnerships & Contingencies 16,155 15,790 (365) - 2.3%
Community Conservation & Economic
Development 69,985 86,599 16,614 23.7%
Subtotal County Capital 2,252,997 2,970,774 717,777 31.9%
Water and Sewer Infrastructure 499,175 617,395 118,220 23.7%
Stormwater Management 33,207 331,335 298,128 897.8%
Total County CIP 2,785,379 3,919,504 1,134,125 40.7%
Schools Capital 613,560 474,540 (139,020) - 22.7%
Total CIP Program 3,398,939 4,394,044 995,105 29.3%
Arlington County, Virginia
CIP Comparison by Program Category
Parks and
Recreation
6%
Transportation
39%
Metro… Public/Government
Facilities… Information Technology
& Public Safety
4%
Regional Partnerships &
Contingencies
0%
Community
Conservation &
Economic …
Water and Sewer
Infrastructure
15%
Stormwater
Management
1%Schools Capital
18%
FY19-28 CIP
Parks and
Recreation
9%
Transportation
59%
Metro
12%
Public/Government
Facilities
10%
Information
Technology & Public
Safety
6%
Regional Partnerships
& Contingencies
1%
Community Conservation &
Economic Development
3%
FY23-32 CIP
B - 3
Adopted Adopted
FY19-28 FY23-32 $ Change % Change
199,639 429,506 229,867 115%
126,251 139,476 13,225 10%
708,860 833,328 124,468 18%
11,150 - (11, 150) -100%
217,555 272,170 54,615 25%
264,494 348,486 83,992 32%
91,781 142,863 51,082 56%
32,707 40,310 7,603 23%
- 242,985 242,985 -%
113,826 91,129 (22, 697) -20%
275,305 364,107 88,802 32%
81,683 150,435 68,752 84%
237,194 156,477 (80, 717) -34%
59,760 94,067 34,307 57%
New Funding
State/Federal Funding
Developer Contributions
General Fund GO Bond
Revenue Bond
Utilities GO Bond
PAYG
Short-term Financing
Sanitary District Tax
Stormwater GO Bond
Other Funding
Transportation Capital Fund (TCF)-C&I
TCF - HB2313 Local
TCF - HB2313 Regional
Tax Increment Financing (TIF)
Schools GO Bond 411,630 345,400 (66, 230) -16%
Subtotal New Funding 2,831,835 3,650,739 818,904 29%
Previously Approved Funding
Authorized but Unissued Bonds 27,969 79,260 51,291 183%
Issued but Unspent Bonds 21,961 114,935 92,974 423%
Other Previously Approved Funds 315,244 549,110 233,866 74%
Subtotal Previously Approved Funding 365,174 743,305 378,131 104%
Total Funding Sources 3,197,009 4,394,044 1,197,035 37%
Arlington County, Virginia
CIP Comparison by Funding Category
State/Federal
Funding
10%
Developer
Contributions
3%
General Fund
GO Bond
19%
Utilities GO
Bond
6% PAYG
8%
Short Term
Financing
3%
Sanitary
District Tax
1%
Stormwater
GO Bond
6%
Other Funding
2% Transportation
Capital Fund
(TCF)-C&I
8%
TCF - HB2313
Local
3%
Tax Increment
Financing (TIF)
2%
Authorized
but Unissued
Bonds
2%
Issued but
Unspent
Bonds…
Other
Previously
Approved
Funds
12%
FY23-32 CIP
State/Federal
Funding
6%
Developer
Contributions
4%
General Fund
GO Bond
22%
Utilities GO
Bond
7%
PAYG
8%
Short Term
Financing
3%
Sanitary
District Tax
1%
Other Funding
4%
Transportation
Capital Fund
(TCF)-C&I
9%
TCF - HB2313
Local
3%
TIF
7%
Tax Increment
Financing (TIF)
2%
Schools GO
Bond
13%
Authorized but
Unissued
Bonds
1%
Issued but
Unspent Bonds
1%
Other Previously
Approved Funds
10%
FY19-28 CIP
B - 4
Total
FY 23-32
LOCAL PARKS & RECREATION
Parks Maintenance Capital 36,960
Arlington Boathouse 12,385
FourThree Urban Parks in Ballston-Virginia Square 9,425
Jennie Dean Park 4,400
Parks Land Acquisition and Open Space 3,000
Synthetic Fields 5,698
Trail & Bridge Modernization 15,000
Shirlington Park 5,290
Gateway Park 13,850
Nature Resiliency Program 8,500
Virginia Highlands Park and Nearby Public Spaces 27,075
Emerging Uses Program 6,000
Fairfax Drive Public Spaces 13,840
Short Bridge Park 6,775
Quincy Park 2,865
Penrose Square Phase 2 4,710
Sub-total 175,773
TRANSPORTATION
Paving 107,920
Concrete Maintenance 6,410
Curb & Gutter Missing Links 1,210
Bridge Maintenance & Renovation 12,610
Street Lights 3,080
Neighborhood Complete Streets 4,595
Transportation Systems & Traffic Signals 2,380
WalkArlington 1,600
ITS Device Replacement 1,350
Sub-total 141,155
1,145
0
480
1,100
850
300
0 1,105
400
10,030 32,250 31,920
150
0
7,200
65
1,470
275
2,5002,365
1,555
25,180
32,400
400
300
455
480
300
0
1,785
0
1,140
2,000
2,000
0
Arlington County, Virginia
0
0
1,465
9,460
Adopted
4,400
0
1,500
0 0 0
3,500
22,460 37,193
295260
1,645
4,530
0
0
0
25,180
17,855
0 2,230
5,635 0
0
0
0
0
0
40,125
785 3,925
2026
1,0001,000
0 0
0 00
5,398
0
58,140
0
0
0
1,000
2,050
11,610
0
2,865
0
5,290
515
300
1,320
1,745
400
400
1,320
400
34,555
300
Adopted FY 2023 - FY 2032 CIP Debt Summary
(in $thousands)
4,000 3,0504,400
4,960 8,000 8,000 8,000 8,000
Bond and Short-term Finance Funding Planning
7,975 0
2022
2,925
1,450
0
2030
0
0
2024 2028
1,000 1,000 1,000
0 10,270 0 1,795
0 1,470 2,075 23,530
1,500 1,000 500 1,000
25,180
485
400
25,180
315
1,745
B - 5
Total
FY 23-32
Arlington County, Virginia
Adopted
2026
Adopted FY 2023 - FY 2032 CIP Debt Summary
(in $thousands)
Bond and Short-term Finance Funding Planning
2022 20302024 2028
METRO
Metro (pg. E-1) 230,000
COMMUNITY CONSERVATION
Neighborhood Conservation 65,000
Sub-total 65,000
PUBLIC / GOVERNMENT FACILITIES
Facilities Maintenance Capital 66,000
Fire Stations Replacements & Additions 35,300
Columbia Pike Library Refresh / Replacement 31,650
Nature Centers 500
Courts / Police Building Improvements 52,100
Courthouse Complex Renovations & Infrastructure 12,000
Facility Condition Assessments 350
Lee Community Center Demolition 250
Relocate Cultural Affairs Programs to 3700 3,050
Trade Center Optimization Plan Implementation 7,500
Quincy Site Planning 12,700
Sub-total 221,400
Total
FY 23-32
County General Obligation Bond Referenda 833,328
Adopted Total
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 FY 23-32
Tub Grinder Replacement 0 1,200 1,200
Call Premise Equipment (CPE) 2,500 2,500
Breathing Apparatus 4,600 4,600
Fire Command Vehicle Technology 200 150 150 500
Synthetic Turf Program 1,155 1,357 1,691 1,985 2,073 1,955 798 2,218 13,232
188,960
2030202820262024
Adopted
13,100 9,000 9,000
172,710
48,300 35,000
2022
3,050
2,000
1,000
128,390 176,093 167,175
Planning
Planning
250 0
0
0 0
31,000
42,600
5,000 14,000 18,000
0
350
0
0
12,000
0
9,500 14,000
6,000 15,000
12,000
0
0
Total County Bond Referenda
Short-term Financing
56,700
0 0
2,000 0
0
0
11,700 00
44,100 47,600
12,000 16,000
45,800
0
0
0
0
3,500
0
500
0
0
0
50,400
14,50013,000
5,000 14,000
16,000
0 1,500 3,300 26,850 0
7,400 24,900 0 0 3,000
49,900
18,000
15,000
B - 6
Total
FY 23-32
Arlington County, Virginia
Adopted
2026
Adopted FY 2023 - FY 2032 CIP Debt Summary
(in $thousands)
Bond and Short-term Finance Funding Planning
2022 20302024 2028
Fire Portable Radios 3,609 4,200 7,809
Fire Records Management System 1,000 1,000
Voter Registration Voting Machines 2,000 2,000
Wakefield High School Stadium Synthetic Field 491 491
Land Record System 1,000 1,000
Police & Sheriff Public Safety Radios 2,850 2,850 2,850 8,550
Fire Station Alerting 1,500 1,500
Justice Center Security System 1,000 1,000
Washington-Liberty High School Stadium Field 590 590
Real Estate Assessment System 1,000 1,000
Public Safety Radio System Upgrades 1,930 1,930
Real Time Tracking in Detention Center 400 400
Williamsburg Middle School Synthetic Fields 1,161 1,161
Data Center Consolidation and Refreshment 2,050 2,100 2,350 2,050 325 325 9,200
Mobile Data Computers 3,500 3,500 7,000
Enterprise Records Mgmt. System Modernization 1,000 1,250 1,250 250 3,750
Equipment at DPR Facilities 100 100 100 100 100 100 100 100 100 100 1,000
Public Safety VMWare/Servers 350 500 850
Video Trailers 350 350 700
Network Equipment and Power System 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 13,500
Greenbrier Park Track Replacement 715 715
Revenue and Collection System Enhancement 1,200 3,300 4,500
Server Hardware & Data Storage 585 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 9,585
Telephone System Study & Refreshment 2,300 1,000 3,300
Workforce Device Modernization 300 700 2,400 2,400 2,400 2,400 2,400 2,400 15,400
Total General Fund Short-term Finance Funding 14,630 12,701 16,655 14,307 12,391 7,310 4,998 18,805 7,298 10,868 119,963
Auto Fund Short-term Finance - Fire Vehicle Apparatus
(pg. D-11)
0 2,300 0 0 6,400 0 8,000 0 6,200 0 22,900
B - 7
Total
FY 23-32
Arlington County, Virginia
Adopted
2026
Adopted FY 2023 - FY 2032 CIP Debt Summary
(in $thousands)
Bond and Short-term Finance Funding Planning
2022 20302024 2028
Total
FY 23-32
Solids Master Plan (Re-Gen), Phase III 149,500
Washington Aqueduct Capital 26,300
Gravity Transmission Mains - B2 & B3 6,455
Pump Station Improvements 1,290
New River Crossing 32,700
Primary Clarifier Upgrades 1,750
Secondary Clarifiers 12,415
Source Water Reliability & Interconnections 31,800
Solids Master Plan (Re-Gen), Phase II 9,960
Total Utility Fund GO Bond Referenda 272,170
Total
FY 23-32
33rd Street North to Williamsburg Capacity 4,180
Lubber Run Watershed Capacity Improvements 46,455
Outfall Rehabilitation Program 11,550
Miscellaneous Expansion/ Capacity Projects 1,290
North Thomas Street 1,910
Sparrow Pond Watershed Retrofit 1,275
Spout Run Watershed Capacity Improvements 58,395
Stream Resiliency Program 17,070
Stohman's Run Watershed Capacity Improvements 1,235
Washington Boulevard Pond Retrofit 940
Torreyson Run Watershed Capacity Improvements 12,225
Water Quality Project Feasibility & Concept De 1,260
Williamsburg at North Underwood Capacity 2,725
Capacity Project Feasibility Studies 1,035
Concord Mews Pond Retrofit 1,860
Columbia Pike at Greenbrier 14,475
9,960 0 0 0 0
0 0 31,800 0 0
149,500 0 0 0 0
0
0
0
0
0
0
2030
PlanningUtilities GO Bond Funding Adopted
2022 2024 2026 2028
0
0 0
0
0 12,415
1,750 0
2,900 3,555 0 0
0 1,290
0 0 32,7000
0 0
177,360 24,715 37,395 32,700 0
15,000 5,705 5,595 0
Stormwater GO Bond Funding Adopted Planning
2022 2024 2026 2028 2030
325 335
0 270 320 330 340
815 1,910 0 0 0
0 45 320 330 340
225 1,635 0 0
5,955 4,740 1,530 0 0
1,050 2,005 1,125 0 0
0 2,060 9,775 16,500 18,120
880 2,030 2,750 2,890 3,000
0 310 320
0 1,910 0 0 0
1,275 0 0 0 0
13,260 9,885 11,015 13,005 11,230
1,235 0 0 0 0
165 775 0 0 0
0 3,155 3,365 3,950 6,600
0
1,465 8,240 4,770 0 0
B - 8
Total
FY 23-32
Arlington County, Virginia
Adopted
2026
Adopted FY 2023 - FY 2032 CIP Debt Summary
(in $thousands)
Bond and Short-term Finance Funding Planning
2022 20302024 2028
Green Streets & Infrastructure Program 7,035
Crossman Run Watershed Capacity Improvements 26,180
Gulf Branch Green Streets 150
Gulf Branch Stream Resiliency 2,750
Flood Risk Reduction Program 13,075
Military Road Culvert at Gulf Branch 3,090
Langston Boulevard Culvert at North Sycamore 6,750
Lower Long Branch Flood Risk Reduction Project 6,075
Total Stormwater Fund GO Bond Referenda 242,985
Total GO Bond Referenda 1,348,483
Total Debt Funding 1,491,346375,141 292,005 283,231 280,998 259,971
325 985 1,675 2,000 2,050
1,960 13,620 10,600 0 0
150 0 0 0 0
0 0
6,750 0 0 0 0
2,750 0 0 0 0
1,500 3,570 3,840 2,045 2,120
345,510 261,043 257,130 249,195 235,605
0 0 1,155 2,410 2,510
39,760 60,235 52,560 43,785 46,645
0 3,090 0
B - 9
Adopted Total Adopted Total
2016 2018 2020 2022 2024 FY 17-26 2022 2024 2026 2028 2030 FY 23-32
LOCAL PARKS & RECREATION
Parks Maintenance Capital 8,585 12,500 13,500 14,000 14,635 63,220 4,960 8,000 8,000 8,000 8,000 36,960
Arlington Boathouse 0 500 0 2,245 0 2,745 2,925 0 9,460 0 0 12,385
Four Mile Run Near-Stream Improvements 0 0 6,325 0 0 6,325 0 0 0 0 0 0
FourThree Urban Parks in Ballston-Virginia Square 0 0 0 0 750 750 1,450 7,975 0 0 0 9,425
Jennie Dean Park 16,180 0 0 0 0 16,180 4,400 0 0 0 0 4,400
Parks Land Acquisition and Open Space 0 1,345 0 3,530 0 4,875 0 0 1,000 1,000 1,000 3,000
Synthetic Fields 0 3,135 2,150 0 0 5,285 300 5,398 0 0 0 5,698
Trail & Bridge Modernization 1,115 1,185 1,255 1,335 1,415 6,305 1,500 4,400 4,000 3,050 2,050 15,000
Rosslyn Highlands Park 3,450 4,235 0 0 0 7,685 0 0 0 0 0 0
Shirlington Park 0 0 0 3,030 0 3,030 0 0 0 0 5,290 5,290
Long Bridge Park 0 0 0 0 2,375 2,375 0
Gateway Park 0 500 0 0 20,415 20,915 1,785 0 10,270 0 1,795 13,850
Mosaic Park - Phases I and II 0 0 0 0 5,680 5,680 0 0 0 0 0 0
Drew Park 0 0 0 1,280 0 1,280 0 0 0 0 0 0
Nature Resiliency Program 0 0 0 0 0 0 2,000 3,500 1,000 1,000 1,000 8,500
Virginia Highlands Park and Nearby Public Spaces 0 0 0 0 0 0 0 1,470 2,075 23,530 27,075
Emerging Uses Program 0 0 0 0 0 0 2,000 1,500 1,000 500 1,000 6,000
Fairfax Drive Public Spaces 0 0 0 0 0 0 0 0 0 2,230 11,610 13,840
Short Bridge Park 0 0 0 0 0 0 1,140 5,635 0 0 0 6,775
Quincy Park 0 0 0 0 0 0 0 0 0 0 2,865 2,865
Penrose Square Phase 2 0 0 0 0 0 0 0 785 3,925 0 0 4,710
Sub-total 29,330 23,400 23,230 25,420 45,270 146,650 22,460 37,193 40,125 17,855 58,140 175,773
TRANSPORTATION
Paving 21,360 22,030 23,750 25,200 26,745 119,085 7,200 25,180 25,180 25,180 25,180 107,920
Concrete Maintenance 0 0 0 0 0 0 0 1,465 1,555 1,645 1,745 6,410
Curb & Gutter Missing Links 215 225 245 260 275 1,220 65 260 275 295 315 1,210
Boundary Channel Drive Interchange 3,340 0 0 0 0 3,340 0 0 0 0 0 0
East Falls Church Streets 380 650 1,000 0 0 2,030 0 0 0 0 0 0
Army Navy Country Club Emergency Access Drive 60 65 0 0 0 125 0 0 0 0 0 0
Traffic Calming Device Replacement 255 325 345 360 385 1,670 0 0 0 0 0 0
Parking Meters 430 1,750 650 565 1,500 4,895 0 0 0 0 0 0
Bridge Maintenance & Renovation 610 2,395 1,050 2,125 1,700 7,880 1,470 2,365 2,500 4,530 1,745 12,610
Street Lights 2,435 3,915 1,210 1,260 1,460 10,280 1,145 480 455 485 515 3,080
Neighborhood Complete Streets 295 580 805 850 905 3,435 0 850 1,105 1,320 1,320 4,595
Transportation Asset Management 210 245 245 285 315 1,300 0 0 0 0 0 0
Transportation Systems & Traffic Signals 850 1,000 1,740 1,730 1,050 6,370 0 1,100 480 400 400 2,380
WalkArlington 360 350 1,075 1,135 1,205 4,125 400 400 400 400 1,600
Adopted FY 2019 - FY 2028 CIP
Arlington County, Virginia
General Obligation Bonds (000s)
Adopted FY 2023 - FY 2032 CIP
Planning Planning
General Obligation Bond Referenda
Adopted FY 2019 - FY 2028 to Adopted FY 2023 - FY 2032
B - 10
Adopted Total Adopted Total
2016 2018 2020 2022 2024 FY 17-26 2022 2024 2026 2028 2030 FY 23-32
Adopted FY 2019 - FY 2028 CIP
Arlington County, Virginia
General Obligation Bonds (000s)
Adopted FY 2023 - FY 2032 CIP
Planning Planning
General Obligation Bond Referenda
Adopted FY 2019 - FY 2028 to Adopted FY 2023 - FY 2032
BikeArlington 50 110 120 135 140 555 0 0 0 0 0 0
ITS Device Replacement 200 330 355 385 415 1,685 150 300 300 300 300 1,350
Sub-total 31,050 33,970 32,590 34,290 36,095 167,995 10,030 32,400 32,250 34,555 31,920 141,155
METRO
Metro 43,520 41,305 45,935 47,980 48,790 227,530 42,600 44,100 45,800 47,600 49,900 230,000
COMMUNITY CONSERVATION
Arlington Neighborhoods Program 5,000 4,000 8,000 8,000 12,000 37,000 5,000 12,000 14,000 16,000 18,000 65,000
Penrose Square 0 0 0 580 4,405 4,985 0 0 0 0 0 0
Nauck Town Square 1,200 0 0 0 0 1,200 0 0 0 0 0 0
Sub-total 6,200 4,000 8,000 8,580 16,405 43,185 5,000 12,000 14,000 16,000 18,000 65,000
PUBLIC / GOVERNMENT FACILITIES
Facilities Maintenance Capital 8,000 9,500 12,000 13,000 14,000 56,500 9,500 13,000 14,000 14,500 15,000 66,000
Fire Station 8 14,000 0 0 0 0 14,000 0
Fire Stations Replacements & Additions 0 0 0 22,115 0 22,115 7,400 24,900 0 0 3,000 35,300
Re-envisioning Quincy Park and Central Library 0 0 2,800 12,400 0 15,200 0
Columbia Pike Library Refresh / Replacement 0 0 0 0 2,810 2,810 0 1,500 3,300 26,850 0 31,650
Government Facilities Planning & Construction 1,500 0 0 0 0 1,500 0
Land Acquisition 0 3,710 0 0 0 3,710 0
1212 S Irving Street Replacement 3,320 0 0 0 0 3,320 0
Facility Needs and Condition Assessments 1,000 0 350 0 0 1,350 0
Buck Property Redevelopment 2,995 0 0 0 0 2,995 0
Nature Centers 0 0 0 0 0 0 0 0 0 0 500 500
Courts / Police Building Improvements 0 0 0 0 0 0 13,100 9,000 6,000 15,000 9,000 52,100
Courthouse Complex Renovations & Infrastructure 0 0 0 0 0 0 12,000 0 0 0 0 12,000
Facility Condition Assessments 0 0 0 0 0 0 0 0 0 350 0 350
Lee Community Center Demolition 0 0 0 0 0 0 250 0 0 0 0 250
Relocate Cultural Affairs Programs to 3700 0 0 0 0 0 0 3,050 3,050
Trade Center Optimization Plan Implementation 0 0 0 0 0 0 2,000 2,000 0 0 3,500 7,500
Quincy Site Planning 0 0 0 0 0 0 1,000 0 11,700 0 0 12,700
Sub-total 30,815 13,210 15,150 47,515 16,810 123,500 48,300 50,400 35,000 56,700 31,000 221,400
TOTAL GO & REVENUE BONDS 140,915 115,885 124,905 163,785 163,370 708,860 128,390 176,093 167,175 172,710 188,960 833,328
B - 11
Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Total
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY23-32
MAINTENANCE CAPITAL
Transportation (pg E- ) 2,084 2,765 3, 014 3, 108 3, 206 3, 307 3, 410 3, 520 3, 633 3, 746 31, 793
Public Facilities (pg C- ) 2,435 2,720 3, 000 3, 000 3, 000 3, 000 3, 040 3, 040 3, 040 3, 090 29, 365
Parks and Recreation (pg C- ) 225 1,225 1,225 1, 225 1, 425 1, 425 1, 625 1, 625 1, 825 1, 825 13, 650
Enterprise Information Technology (D- ) 533 5,472 5,062 997 422 772 1, 172 589 3, 922 422 19, 363
Americans with Disabilities Act (C- ) 250 150 - - - - - - - - 400
Energy Efficiency (C- ) 325 1,820 1, 385 1, 625 1, 995 1, 890 1, 210 1, 325 1, 200 1, 125 13, 900
Sub-Total 5,852 14,152 13,686 9,955 10,048 10,394 10,457 10,099 13,620 10,208 108,471
REGIONAL PROGRAMS
Northern Va Regional Park Authority (pg C- ) 672 660 667 679 692 706 727 749 771 794 7, 117
Northern Va Criminal Justice Academy (pg C- ) 134 139 139 139 139 139 139 139 139 139 1, 385
Sub-Total 806 799 806 818 831 845 866 888 910 933 8,502
OTHER CAPITAL PROJECTS
Transportation (pg. E- ) 1,463 1,843 2, 761 3, 191 3, 144 3, 130 3, 353 3, 241 3, 289 3, 342 28, 757
Public Facilities (C- ) 2,063 2,180 2,038 600 450 400 400 400 400 400 9, 331
Parks and Recreation (C- ) 1,003 470 475 480 485 490 495 500 505 512 5, 415
Information Technology & Public Safety (D- ) 8,688 1,943 4,159 716 733 993 3,280 1,044 604 920 23,080
Arlington Neighborhoods Program (pg C- ) 500 500 500 500 500 500 500 500 500 500 5,000
Economic Development 174 25 25 25 25 25 25 25 25 25 399
Capital Contingent (pg C- ) 4,948 260 260 260 260 260 260 260 260 260 7, 288
Sub-Total 18,839 7,221 10,218 5,772 5,597 5,798 8,313 5,970 5,583 5,959 79,270
Total PAYG Funding 25,497 22,172 24, 710 1 6,545 1 6,476 1 7,037 1 9,636 1 6,957 20, 113 1 7,100 1 96,243
PAYG Funding
Arlington County, Virginia
Adopted FY 2023 - FY 2032 PAYG Summary
CIP
2023-2032
B - 12
I
n developing the CIP, the County establishes its long-range plan for pay-as-you-go (PAYG) and bond/lease purchase financing of its ten-
year capital program. In determining the level of capital projects to finance and the method of financing, the County considers its financial ability
to undertake these projects. This analysis includes a review of debt capacity factors and the impact of the adopted CIP on these debt capacity
factors.
I
n April 2008, the County Board approved financial and debt management policies that affirmed the County’s existing debt capacity
factors. The policies also included guidance on bond term and amortization, specifically that bond-funded projects will typically have a useful
life at least as long as the period over w hich the bonds will be repaid (the average life of County bonds is 11 -12 years and final maturity is
generally twenty years; however, longer terms may be considered on very long useful life projects). Finally, the Board’s pol icies provided
guidance on the use of variable rate debt and derivatives. The Board has periodically adopted revisions to the financial and debt management
policies, most recently as part of the Adopted FY 2022 Operating Budget. These policies serve as the financial framework for the CIP, and
a full copy of the adopted policies is included in the Financial & Debt Management Policies section.
T
he bond rating agencies that rate the County’s debt for potential investors use these debt ratios, coupled with other County and
community economic factors. The three major bond rating agencies, Moody’s Investors Service, Standard & Poor’s, and Fitch Ra tings
currently rate the County Aaa/AAA /AAA (the highest possible). Arlington is one of a select national group of counties that currently hold
these coveted Aaa/AAA/AAA ratings from the three major rating agencies. The County's bond ratings were reaffirmed in May 2021 and
historical County bond trading in the secondary market confirm that Arlington belongs within the very top group of municipal credits in the
national bond market. The funding levels contained in this CIP are intended to maintain this status.
W
hile there is no legal limit in Virginia on the level of debt issued by Virginia counties, Arlington has issued and plans to issue its
debt prudently. Arlington will remain within the acceptable range of debt capacity factors with the CIP based on conservative assumptions,
as illustrated on the following pages.
Arlington County, Virginia
DEBT CAPACITY ANALYSIS
CIP
2023-2032
B - 13
Underlying Assumptions
The projected ratios shown in the following tables are based on the County’s Proposed FY 2023 – FY 2032 CIP. It is important to note
that the County’s financial and debt management policies view debt capacity on a combined basis (i.e., County and Schools) as do the bond rating
agencies.
The projected debt ratios are based on conservative revenue growth assumptions: 2.0% growth in FY 2024, slowly escalating to 2.5% in
FY 2027 and thereafter. Similarly conservative assumptions have been used for projected growth in market value of the County’s tax base
(identical to revenue growth assumptions) and per capita income growth of 2.4% annually in FY 2024 – FY 2026, escalating to 3.0% in FY 2027
and beyond.
It should be noted that these debt ratios include only general obligation and other tax-supported debt, including bonds issued through
the Industrial Development Authority (IDA) or other conduit issuers for County projects where debt service is paid for from the General Fund.
For example, these ratios include the subject-to-appropriation Series 2017 IDA revenue bonds issued in October 2017 for the acquisition of the
Buck property, and for acquisition, design, and construction of the Head Start facility at 2920 South Glebe Road. The ratios do not include bonds
where the County has provided a moral obligation pledge as credit support to a project (e.g., the Kettler Iceplex facility or the Gates of Ballston
project). In charts C and D of this section, the customary general obligation debt to the tax base ratio chart has been amended to also show the
effect of moral obligation or “subject-to-appropriation” backed capital financing. The ratios do not include debt for the Stormwater Fund or
for enterprise funds, including debt included for the Utilities Fund that is supported by user fees.
Projected Debt Ratios
Ratio of Debt Service to General Expenditures No Greater Than 10% -- Over the ten-year planning period, this ratio will range
from 8.5% to 9.9%, peaking in FY 2030.
Outstanding Debt as Percentage of Market Valuation of Tax Base No Greater than 3% -- The amount of debt that the County
carries is moderate when compared to its tax base. This ratio is projected to range from 1.3% to 1.6% over the ten-year planning period.
Ratio of Debt per Capita to Per Capita Income No Greater than 6% -- The County estimates that the Debt-to-Income ratio will
range from 4.5% to 5.9%, assuming 2.4% annual growth in per capita income.
Growth in Debt Service over the Ten -Year Planning Period No Greater than Ten -Year Historical Growth in Revenues –
Average annual growth in total County and APS debt service is estimated at 3.6% compared to historical average ten-year revenue growth of
4.5%.
B - 14
Chart A
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032
Adopted
GENERAL OBLIGATION BONDS ISSUED - COUNTY (1) 83,470,000 78,920,000 110,300,000 68,295,000 88,435,000 78,740,000 100,305,000 72,405,000 84,400,000 72,405,000
GENERAL OBLIGATION BONDS ISSUED - SCHOOLS (1) 56,020,000 73,750,000 45,320,000 24,430,000 25,000,000 25,000,000 25,000,000 25,000,000 25,000,000 25,000,000
GENERAL OBLIGATION BONDS RETIRED 82,845,200 89,978,900 94,454,700 98,375,289 105,599,378 110,091,306 114,255,022 117,541,794 122,289,472 127,039,572
NET TAX-SUPPORTED GENERAL OBLIGATION
BONDS AT END OF FISCAL YEAR (2) 1,253,274,829 1,315,965,929 1,377,131,229 1,371,480,940 1,379,316,562 1,372,965,257 1,384,015,235 1,363,878,440 1,350,988,968 1,321,354,396
SUBJECT-TO-APPROPRIATION BOND ISSUANCE - - - - - - - - - -
SUBJECT-TO-APPROPRIATION BONDS RETIRED 6,060,000 6,110,000 6,185,000 5,105,000 8,380,000 8,610,000 8,850,000 9,075,000 9,295,000 9,340,000
NET TAX-SUPPORTED BONDS AT END OF FISCAL YEAR (3) 1,491,784,829 1,548,365,929 1,603,346,229 1,592,590,940 1,592,046,562 1,577,085,257 1,579,285,235 1,550,073,440 1,527,888,968 1,488,914,396
SCHOOLS DEBT SERVICE 60,026,573 65,051,233 66,926,754 67,295,568 70,269,302 70,256,469 69,029,016 69,402,470 69,784,111 68,740,553
COUNTY DEBT SERVICE (4) 78,117,659 83,164,337 89,209,599 94,872,324 99,438,892 104,835,934 110,706,899 114,950,275 119,138,279 124,789,872
BARCROFT DEBT SERVICE 3,375,000 4,125,000 4,875,000 5,625,000 8,627,500 7,758,225 7,761,525 7,768,300 7,768,100 7,770,700
TOTAL TAX SUPPORTED DEBT SERVICE 141,519,232 152,340,570 161,011,352 167,792,892 178,335,695 182,850,627 187,497,439 192,121,046 196,690,490 201,301,125
% GROWTH IN TAX-SUPPORTED DEBT SERVICE 3.9% 6.5% 7.3% 6.3% 4.8% 5.4% 5.6% 3.8% 3.6% 4.7%
COUNTY ONLY 5.4% 5.2%
% GROWTH IN TAX-SUPPORTED DEBT SERVICE 4.7% 7.6% 5.7% 4.2% 6.3% 2.5% 2.5% 2.5% 2.4% 2.3%
COUNTY / SCHOOLS 4.2% 3.8%
Proposed CIP General Government Expenditures (2.6% less $7MM) 1,514,194,106 1,559,619,929
GENERAL GOVERNMENT EXPENDITURES (5) 1,665,590,448 1,698,902,257 1,732,880,302 1,767,537,908 1,811,726,356 1,857,019,515 1,903,445,003 1,951,031,128 1,999,806,906 2,049,802,079
growth assumptions 4.70% 2.00% 2.00% 2.00% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50%
DEBT SERVICE AS % OF EXPENDITURES 8.50% 8.97% 9.29% 9.49% 9.84% 9.85% 9.85% 9.85% 9.84% 9.82%
MARKET VALUATION OF TAXABLE PROPERTY (6) 86,391,421,658 88,464,815,778 90,764,900,988 93,124,788,414 95,918,532,066 98,796,088,028 101,759,970,669 104,812,769,789 107,957,152,883 111,195,867,469
Consistent with FY2016 Adopted Budget 2.40% 2.40% 2.60% 2.60% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00%
NET TAX SUPPORTED DEBT AS % OF MARKET VALUATION (3%) 1.7% 1.8% 1.8% 1.7% 1.7% 1.6% 1.6% 1.5% 1.4% 1.3%
POPULATION (7) 237,740 239,980 242,220 244,570 246,920 249,270 251,620 253,970 256,320 258,670
DEBT PER CAPITA $6,275 $6,452 $6,619 $6,512 $6,448 $6,327 $6,276 $6,103 $5,961 $5,756
INCOME PER CAPITA (8) $105,721 $108,258 $110,856 $113,517 $116,241 $119,031 $121,888 $124,813 $127,808 $130,876
Consistent with FY2016 Adopted Budget 2.40% 2.40% 2.40% 2.40%
NET TAX-SUPPORTED GENERAL OBLIGATION
DEBT TO INCOME (NOT TO EXCEED 6%) 5.94% 5.96% 5.97% 5.74% 5.55% 5.32% 5.15% 4.89% 4.66% 4.40%
(1) Updated for 2021 GO Bond Issuance. Includes bonds planned in APS' Adopted FY 2023 - FY 2032 CIP
(2) Excludes General Obligation bonds issued for the Utilities Fund
(3) Excludes credit support commitments on revenue bonds or lease-backed bond financings. Includes subject to appropriation bonds supported by the County's General Fund. For all subject to appropriation debts, see Chart C.
(4) Includes both General Obligation and Subject to Appropriation debt service. Excludes Utilities Fund and Transportation Capital Fund Debt Service and other debt costs. Includes AHIF bonds
(5) Includes expenditures of General Fund and certain Special Revenue Funds of the County and School Board. Assumes 1.0% growth in FY 2023 and FY 2024, increasing to 2.5% in FY2027 and beyond
(6)
Includes real, personal property, and public property. Assumes 2.4% growth in FY 2023, increasing up to 3.0% in FY2027 and beyond
(7) Population as of 2020 Census (April 1, 2020) with growth as estimated by MWCOG Round 8.4 Forecasts.
(8) Source: Bureau of Economic Analysis 2020 estimates, with growth of 2.4% consistent with PCPI annual growth in Virginia from 2010 - 2020
Arlington County, Virginia
Adopted FY 2023 - FY 2032 CIP
Debt Ratio Forecast
B - 15
FY2023 FY2024 FY2025 FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 FY2032
Projection 8.50% 8.97% 9.29% 9.49% 9.84% 9.85% 9.85% 9.85% 9.84% 9.82%
Ceiling 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
Ratio of Tax-Supported Debt Service
to General Expenditures
Adopted FY 2023 - FY 2032 Capital Improvement Plan
(NOT TO EXCEED 10%)
Chart B
B - 16
Chart C
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032
Adopted
Tax-Supported General Obligation Debt $1,253,274,829 $1,314,292,529 $1,366,885,212 $1,354,495,707 $1,354,543,223 $1,346,983,029 $1,360,724,618 $1,340,779,435 $1,329,157,673 $1,354,672,673
Tax-Supported Subject to Appropriation ("STA") Debt
Capital Equipment Short Term Financing (2) 25,451,636 34,464,471 42,829,379 48,290,857 56,049,621 49,770,786 50,277,607 55,657,286 54,852,357 51,271,429
Industrial Development Authority (IDA) Bonds (3) 85,455,000 79,345,000 73,160,000 68,055,000 62,865,000 57,585,000 52,215,000 46,780,000 41,285,000 36,275,000
Subtotal $110,906,636 $113,809,471 $115,989,379 $116,345,857 $118,914,621 $107,355,786 $102,492,607 $102,437,286 $96,137,357 $87,546,429
Project-Supported Subject to Appropriation ("STA") Debt (4)
IDA Revenue Refunding Bonds (Ballston Skating Facility) (5) 19,710,000 17,945,000 15,800,000 13,635,000 11,445,000 9,225,000 6,975,000 4,690,000 2,365,000 -
Subtotal 19,710,000 17,945,000 15,800,000 13,635,000 11,445,000 9,225,000 6,975,000 4,690,000 2,365,000 -
Total Tax-Supported General Obligation (GO) & ALL STA Financings 1,383,891,465 1,446,047,000 1,498,674,591 1,484,476,564 1,484,902,845 1,463,563,815 1,470,192,225 1,447,906,720 1,427,660,031 1,442,219,102
Total Tax-Supported GO and Tax-Supported STA Financings 1,364,181,465 1,428,102,000 1,482,874,591 1,470,841,564 1,473,457,845 1,454,338,815 1,463,217,225 1,443,216,720 1,425,295,031 1,442,219,102
Total Project-Supported STA Financings 19,710,000 17,945,000 15,800,000 13,635,000 11,445,000 9,225,000 6,975,000 4,690,000 2,365,000 0
Market Value of Taxable Property 86,391,421,658 88,464,815,778 90,764,900,988 93,124,788,414 95,918,532,066 98,796,088,028 101,759,970,669 104,812,769,789 107,957,152,883 111,195,867,469
Total Tax-Supported GO & ALL STA Financings
as Percent of Market Value (Not to Exceed 4%) 1.60% 1.63% 1.65% 1.59% 1.55% 1.48% 1.44% 1.38% 1.32% 1.30%
Total Tax-Supported GO & Tax-Supported STA Financings
as Percent of Market Value 1.58% 1.61% 1.63% 1.58% 1.54% 1.47% 1.44% 1.38% 1.32% 1.30%
Total Project-Supported STA Financings (Credit Enhancement)
as Percent of Market Value (2) 0.02% 0.02% 0.02% 0.01% 0.01% 0.01% 0.01% 0.00% 0.00% 0.00%
(1) Excludes Self-supporting debt in the Utility Fund
(2) Includes existing and planned capital equipment short term financing in the General Fund, Auto Fund, Utilities Fund and Schools Fund
(3) Includes the Series 2013, 2017 IDA Bonds, the 2020A IDA Bonds, and $11.23MM of Series 2020B IDA bonds issued to refund the Series 2011 IDA bonds
(4) Debt service on these financings is intended to be repaid by user fees or tenant rental income, not by County General Fund revenues.
(5) Includes $19.71 million of Series 2020B IDA revenue refunding bonds issued to refinance the construction of two ice rinks, the office space, and the training facility on top of the 8th Level at the Ballston Parking Garage.
Summary of Tax-Supported General Obligation Bonds & Subject To Appropriation-Type Financings (1)
Ratio of Outstanding Debt to Market Value
Adopted FY 2023 - FY 2032 Capital Improvement Plan
As of June 30
B - 17
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032
Project-Supported 0.02% 0.02% 0.02% 0.01% 0.01% 0.01% 0.01% 0.00% 0.00% 0.00%
Tax-Supported 1.58% 1.61% 1.63% 1.58% 1.54% 1.47% 1.44% 1.38% 1.32% 1.30%
Not to Exceed 3% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00%
0.00%
0.50%
1.00%
1.50%
2.00%
2.50%
3.00%
3.50%
Ratio of Tax-Supported & Subject to Appropriation Financing
as a Percentage of Market Value
Adopted FY 2023 - FY 2032 Capital Improvement Plan
Tax-Supported
Project-Supported Not to Exceed 3%
Chart D
B - 18
5.94% 5.96% 5.97%
5.74%
5.55%
5.32%
5.15%
4.89%
4.66%
4.40%
0.00%
1.00%
2.00%
3.00%
4.00%
5.00%
6.00%
7.00%
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032
Ratio of Tax-Supported General Obligation Debt to Income
Adopted FY 2023 - FY 2032 Capital Improvement PLan
Not to Exceed 6%
Tax-Supported Debt to Income
Chart E
B - 19
P
rogram Description
Arlington annually contributes capital funding to several regional organizations which provide benefits to Arlington resident s and visitors.
Program Summary
Northern Virginia Regional Park Authority
Northern Virginia Regional Park Authority owns and protects more than 10,000 acres of land in 19 parks, including Potomac Ove rlook,
Upton Hill, and the W&OD Regional Parks in Arlington. Funds are used to preserve, improve, expand, renovate, and enhance the parks and
facilities. This program helps to improve the quality of the parks, encourage greater usage, and continue to serve the needs of the public. This
augments the Public Spaces Master Pl an (PSMP) and as well as complements open space, cultural and recreational programs of Arlington
County and five other member jurisdictions.
Arlington is one of six jurisdictions that share costs associated with NVRPA's capital program. The County's share is based on the percentage
distribution of population estimates provided by the US Bureau of the Census. Arlington's capital contribution is from PAYG funding that
is appropriated annually as part of the operating budget. The operating contribution is included as part of the general fund's regional
partnerships operating budget.
N
orthern Virginia Criminal Justice Academy
In 2006, the principal members agreed to fund the construction of the Emergency Vehicle Operations Center (EVOC). The bond financing
contributions towards the NVCJTA partnership continues through 2026. The Northern Virginia Criminal Justice Training Academy is
dedicated to advancing competence and professionalism in law enforcement. The Academy is the largest regional law enforcement training
facility in Virginia. Every person employed as a full-time law enforcement officer must meet compulsory minimum training standards.
Individuals must first be hired by a supporting agency as a police officer or deputy sheriff before coming to the Academy for training. The
training must be obtained from a state certified law enforcement training facility and must be completed within 12 months of the date of
appointment.
The Academy receives state funding as well as support from the jurisdictions it serves. Arlington is also one of ten supporting jurisdictions
that provide a proportionate share of the Academy's operating budget based on its sworn population in relation to the total sworn population
of all participating agencies. Arlington's capital contribution is from PAYG funding that is appropriated annually as part of the operating
budget and pays for our share of debt service on the bonds for the Emergency Vehicle Operations Center. The bond financing contributions
continue through 2026.
C
apital Administration
The current CIP continues funding for administrative support of capital projects tracking and reporting in the Department of Management
and Finance. This section also includes a capital contingent to fund unforeseen capital project costs or emergency capital needs.
Arlington County, Virginia
REGIONAL PARTNERSHIPS AND CAPITAL
ADMINISTRATION
C - 1
10 YEAR PROGRAMMED CATEGORY SUMMARY (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
Contingency 4,948 260 260 260 260 260 260 260 260 260 7,288
Regional Partnerships
806 799 806 818 831 845 866 888 910 933 8,502
Total Recommendation 5,754 1,059 1,066 1,078 1,091 1,105 1,126 1,148 1,170 1,193 15,790
PROGRAM FUNDING SOURCES (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
New Funding
Federal Funding 0 0 0 0 0 0 0 0 0 0 0
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
New Bond Issue 0 0 0 0 0 0 0 0 0 0 0
PAYG 1,373 1,059 1,066 1,078 1,091 1,105 1,126 1,148 1,170 1,193 11,409
Short Term Finance 0 0 0 0 0 0 0 0 0 0 0
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 1,373 1,059 1,066 1,078 1,091 1,105 1,126 1,148 1,170 1,193 11,409
Previously Approved Funding
Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved Funds 4,381 0 0 0 0 0 0 0 0 0 4,381
Subtotal Previously Approved
Funding 4,381 0 0 0 0 0 0 0 0 0 4,381
Total Funding Sources 5,754 1,059 1,066 1,078 1,091 1,105 1,126 1,148 1,170 1,193 15,790
Arlington County, Virginia
REGIONAL PARTNERSHIPS & CAPITAL
ADMINISTRATION: PROGRAM FUNDING SUMMARY
CIP
2023-2032
C - 2
Arlington County, Virginia
10 Y
EAR CATEGORY SUMMARY (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
1. Northern Virginia Criminal
Justice Academy
134 139 139 139 139 139 139 139 139 139 1,385
2. Northern Virginia Regional
Park Authority
672 660 667 679 692 706 727 749 771 794 7,117
Total Recommendation 806 799 806 818 831 845 866 888 910 933 8,502
CATEGORY FUNDING SOURCES (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
New Funding
Federal Funding 0 0 0 0 0 0 0 0 0 0 0
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
New Bond Issue 0 0 0 0 0 0 0 0 0 0 0
PAYG 806 799 806 818 831 845 866 888 910 933 8,502
Short Term Finance 0 0 0 0 0 0 0 0 0 0 0
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 806 799 806 818 831 845 866 888 910 933 8,502
Previously Approved Funding
Authorized but Unissued
Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved
Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding 0 0 0 0 0 0 0 0 0 0 0
Total Funding Sources 806 799 806 818 831 845 866 888 910 933 8,502
Arlington County, Virginia
REGIONAL PARTNERSHIPS AND CONTINGENCIES/
REGIONAL PARTNERSHIPS
CIP
2023-2032
C - 3
Arlington County, Virginia
REGIONAL PARTNERSHIPS AND CONTINGENCIES Capital Improvement Plan
Regional Partnerships FY 2023-2032
1. NORTHERN VIRGINIA CRIMINAL JUSTICE ACADEMY
Project Highlights:
• In 2006, the principal members agreed to fund the
construction of the Emergency Vehicle Operations Center
(EVOC).
• The bond financing contributions towards the NVCJTA
partnership continues through 2026.
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
PAYG 134 139 139 139 139 139 139 139 139 139 1,385
Previous Funding
Total Funding 134 139 139 139 139 139 139 139 139 139 1,385
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
C - 4
Arlington County, Virginia
REGIONAL PARTNERSHIPS AND CONTINGENCIES Capital Improvement Plan
Regional Partnerships FY 2023-2032
2. NORTHERN VIRGINIA REGIONAL PARK AUTHORITY
Project Highlights:
• Northern Virginia Regional Park Authority owns and
protects more than 10,000 acres of land in 19 parks, including
Potomac Overlook, Upton Hill and the W&OD Regional
Parks in Arlington. Funds are used to preserve, improve,
expand, renovate and enhance the parks and facilities.
• Funds are used to preserve, improve, expand, renovate, and
enhance the parks and facilities.
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
PAYG 672 660 667 679 692 706 727 749 771 794 7,117
Previous Funding
Total Funding 672 660 667 679 692 706 727 749 771 794 7,117
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
C - 5
Arlington County, Virginia
10 YEAR CATEGORY SUMMARY (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
Capital Administration &
Contingency
4,948 260 260 260 260 260 260 260 260 260 7,288
Total Recommendation 4,948 260 260 260 260 260 260 260 260 260 7,288
CATEGORY FUNDING SOURCES (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
New Funding
Federal Funding 0 0 0 0 0 0 0 0 0 0 0
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
New Bond Issue 0 0 0 0 0 0 0 0 0 0 0
PAYG 567 260 260 260 260 260 260 260 260 260 2,907
Short Term Finance 0 0 0 0 0 0 0 0 0 0 0
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 567 260 260 260 260 260 260 260 260 260 2,907
Previously Approved Funding
Authorized but Unissued
Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved
Funds 4,381 0 0 0 0 0 0 0 0 0 4,381
Subtotal Previously Approved
Funding 4,381 0 0 0 0 0 0 0 0 0 4,381
Total Funding Sources 4,948 260 260 260 260 260 260 260 260 260 7,288
Arlington County, Virginia
REGIONAL PARTNERSHIPS AND CONTIGENCIES/
CONTINGENCIES
CIP
2023-2032
C - 6
Arlington County, Virginia
REGIONAL PARTNERSHIPS AND CONTINGENCIES Capital Improvement Plan
Contingency FY 2023-2032
CAPITAL ADMINISTRATION & CONTINGENCY
Project Highlights:
• One-time funds are available as contingent for unforeseen
capital project costs or pending capital requirements.
Funding Notes: The Previous "Other" funding includes $1.8 million for land acquisition added at adoption of the FY 2023
Operating Budget.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
PAYG 567 260 260 260 260 260 260 260 260 260 2,907
Previous Funding
Other Previously
Approved Funds 4,381 4,381
Total Funding 4,948 260 260 260 260 260 260 260 260 260 7,288
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
C - 7
Program Description
The Local Parks and Recreation Capital Improvement Program consists of key projects and program elements that provide for the design
and construction of new park facilities and major upgrades or renovations of existing park facilities. The program represents an
implementation plan and strategies based upon sound planning to ensure that capital funding is invested strategically for the benefit of the
County and its residents.
Pro
gram Summary
Local Parks and Recreation projects fall into seven main program categories: Parks Maintenance Capital Program, Parks Master Plan
Program, Synthetic Turf Program, Trail and Bridge Modernization Program, Parks Land Acquisition and Public Space Program, Emerging
Uses Program and Natural Resiliency Program. The last two of these programs are new to the CIP this year and information abou t those
programs can be found in the Parks Master Plan Program narrative. The FY 2023 - FY 2032 CIP focuses on funding that supports critical
maintenance for existing park amenities as well as the continuation of work on parks that have park master plans that have be en adopted
by the County Board or have undergone significant community planning efforts.
The Parks Maintenance Capital Program provides for recurring, systematic reinvestment in existing outdoor facilities to ensur e efficient,
safe, high-quality facilities. The program funds the replacement or major renovation of outdoor park and recreation facility assets, including
athletic fields and courts, field and court lighting, playgrounds, picnic shelters, restrooms, parking and other miscellaneou s park and
recreation facilities. The program also addresses accessibility, safety and storm water improvements that are complementary to renovating
the facilities.
The ten-year CIP includes Park Master Plan Program funding for several projects in the Crystal City area, including Metro Market Squa re
and Center Park. The CIP also includes funding for Arlington Boathouse per the existing Programmatic Agreement with the National Park
Service, National Capital Planning Commission, District of Columbia State Historic Preservation Office, and Virginia State Historic
Preservation Office for the development of a boathouse and related facilities on the Virginia side of the Potomac River.
The Trail and Bridge Modernization Program is largely focused on replacement and major renovation of the County's 39.7 miles of
off-street, multi-purpose trails that are approaching the end of their useful life. The other component of this program focuses on the repair
or replacement of pedestrian bridges and low-water fords on multi-purpose trails and hiking trails.
The purpose of the Parks Land Acquisition and Public Space Program is to have reserves on hand that allow the County to strat egically
acquire real property for parks and public spaces based on recommendations in the Public Spaces Master Plan. In addition to the acquisition
of real property for park land, the program funds ancillary activities, such as project management, appraisals, surveys, environmental
assessments, demolition, site restoration and fees to change the general land use plan and zoning classification.
The Synthetic Turf Program is primarily focused on replacement of existing synthetic turf athletic fields that are approaching the end of
their useful life. Turf replacement typically involves removal of the existing turf and infill, verification of subgrade drainage and planarity,
installation of new turf and field lines and backfilling with a turf infill. The funding for FY 2023 - FY 2032 also seeks to identify opportunities
to convert grass fields to synthetic turf. Conversion involves excavation and exportation of existing soil, installation of drainage base
materials, installation of athletic field drainage systems, improved stormwater management, installation of synthetic turf and in- fill, and
installation of lighting and site amenities, including site furnishings, pathways, landscaping and permanent or portable restrooms, as needed.
The FY 2023 - FY 2032 CIP includes funding for two new program areas: the Emerging Uses Program and the Natural Resiliency Program.
The Emerging Uses Program is aimed at addressing the recreational needs of users for new recreational activities, previously not provided
among the assets within the County. The purpose of the Natural Resiliency Program area is to provide funding for the preservation,
conservation and renovation of Arlington's natural resources and the design and installation of modifications within various parks to allow
temporary flooding and inundation of parkland in prevention of downstream destruction by floodwaters.
Mas
ter Plan Impact
The Public Spaces Master Plan (PSMP), adopted in April 2019, is an element of the County's Comprehensive Plan.
Arlington County, Virginia
LOCAL PARKS AND RECREATION PROGRAM
C - 8
10 YEAR PROGRAMMED CATEGORY SUMMARY (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
1. Maintenance Capital
8,738 6,110 5,800 5,805 6,010 6,015 6,220 6,794 6,430 6,437 64,359
2. Park Master Plans
5,995 19,220 15,640 5,725 42,089 8,099 1,390 4,415 14,720 32,370 149,663
3. Trail and Bridge Modernization 1,730 3,400 3,375 2,000 2,000 2,000 2,000 1,050 1,050 1,000 19,605
4. Parks Land Acquisition and
Open Space
2,000 0 0 0 1,000 0 1,000 0 1,000 0 5,000
5. Synthetic Turf Program
1,282 2,838 11,823 1,357 2,320 3,112 2,073 1,955 1,596 3,595 31,951
Total Recommendation 19,745 31,568 36,638 14,887 53,419 19,226 12,683 14,214 24,796 43,402 270,578
PROGRAM FUNDING SOURCES (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
New Funding
Federal Funding 0 0 0 0 0 0 0 0 0 0 0
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 4,845 0 0 10,810 0 0 0 0 0 15,655
New Bond Issue 6,550 15,910 26,908 10,285 27,730 12,395 8,390 9,465 20,770 37,370 175,773
PAYG 590 1,695 1,700 1,705 1,910 1,915 2,120 2,125 2,330 2,337 18,427
Short Term Finance 1,306 1,851 1,255 1,457 1,791 2,085 2,173 2,055 898 2,318 17,189
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 491 1,837 5,270 0 1,629 1,127 0 569 798 1,377 13,098
Tax Increment Financing (TIF) 0 2,529 230 1,440 9,549 1,704 0 0 0 0 15,452
Subtotal New Funding 8,937 28,667 35,363 14,887 53,419 19,226 12,683 14,214 24,796 43,402 255,594
Previously Approved Funding
Authorized but Unissued Bonds 7,000 0 0 0 0 0 0 0 0 0 7,000
Issued but Unspent Bonds 1,730 2,200 975 0 0 0 0 0 0 0 4,905
Tax Increment Financing (TIF) 1,440 701 0 0 0 0 0 0 0 0 2,141
Other Previously Approved Funds 638 0 300 0 0 0 0 0 0 0 938
Subtotal Previously Approved
Funding 10,808 2,901 1,275 0 0 0 0 0 0 0 14,984
Total Funding Sources 19,745 31,568 36,638 14,887 53,419 19,226 12,683 14,214 24,796 43,402 270,578
Arlington County, Virginia
LOCAL PARKS AND RECREATION PROGRAM:
PROGRAM FUNDING SUMMARY
CIP
2023-2032
C - 9
10
YEAR CATEGORY SUMMARY (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
1. Bailey's Branch Park
Renovations
398 1,490 0 0 0 0 0 0 0 0 1,888
2. Bluemont Park Tennis
Complex Replacement
5,000 0 0 0 0 0 0 0 0 0 5,000
3. Capital Asset Manager 165 170 175 180 185 190 195 200 205 212 1,877
4. Douglas Park, Phase 1 565 1,800 0 0 0 0 0 0 0 0 2,365
5. Equipment at DPR Facilities 100 100 100 100 100 100 100 100 100 100 1,000
6. Feasibility Studies &
Implementation
200 300 300 300 300 300 300 300 300 300 2,900
7. Field Fund 225 225 225 225 225 225 225 225 225 225 2,250
8. Greenbrier Park Track
Replacement
715 0 0 0 0 0 0 0 0 0 715
9. Monroe Park Playground
Replacement
1,130 0 0 0 0 0 0 0 0 0 1,130
10. Woodmont Park
Playground
240 1,025 0 0 0 0 0 0 0 0 1,265
11. Parks Maintenance Capital
Program
0 1,000 5,000 5,000 5,200 5,200 5,400 5,969 5,600 5,600 43,969
Total Recommendation 8,738 6,110 5,800 5,805 6,010 6,015 6,220 6,794 6,430 6,437 64,359
Arlington County, Virginia
LOCAL PARKS AND RECREATION PROGRAM:
PARKS MAINTENANCE CAPITAL PROGRAM
CIP
2023-2032
C - 10
CATEGORY FUNDING SOURCES (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
New Funding
Federal Funding 0 0 0 0 0 0 0 0 0 0 0
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
New Bond Issue 1,695 3,265 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 36,960
PAYG 590 1,695 1,700 1,705 1,910 1,915 2,120 2,125 2,330 2,337 18,427
Short Term Finance 815 100 100 100 100 100 100 100 100 100 1,715
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 750 0 0 0 0 0 569 0 0 1,319
Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 3,100 5,810 5,800 5,805 6,010 6,015 6,220 6,794 6,430 6,437 58,421
Previously Approved Funding
Authorized but Unissued
Bonds 5,000 0 0 0 0 0 0 0 0 0 5,000
Issued but Unspent Bonds 0 300 0 0 0 0 0 0 0 0 300
Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved
Funds 638 0 0 0 0 0 0 0 0 0 638
Subtotal Previously Approved
Funding 5,638 300 0 0 0 0 0 0 0 0 5,938
Total Funding Sources 8,738 6,110 5,800 5,805 6,010 6,015 6,220 6,794 6,430 6,437 64,359
C - 11
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Maintenance Capital FY 2023-2032
PARKS MAINTENANCE CAPITAL PROGRAM
Project Highlights:
• The Parks Maintenance Capital Program provides for
recurring, systematic reinvestment in existing outdoor
facilities to ensure efficient, safe, high -quality park and
recreation facilities.
• The program provides for replacement of existing facilities
that are at or near the end of their useful life.
Associated Plan(s):
Public Spaces Master Plan (PSMP)
Neighborhood(s):
VARIOUS
Funding Notes: Grass turf fields are funded through PAYG. Other program elements including playgrounds, athletic courts,
lighting, picnic shelters, restrooms, and parking lots may be funded through either PAYG or Bond referenda. Trails, bridges, and
synthetic turf fields are funded through separate programs.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 32,000
PAYG 1,000 1,000 1,000 1,200 1,200 1,400 1,400 1,600 1,600 11,400
Other Funding 569 569
Previous Funding
Total Funding 0 1,000 5,000 5,000 5,200 5,200 5,400 5,969 5,600 5,600 43,969
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
C - 12
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Maintenance Capital FY 2023-2032
1. BAILEY'S BRANCH PARK RENOVATIONS
Project Highlights:
• Design and construction for the replacement of the
playground at Bailey's Branch Park.
• Project includes replacement of both a pre-school playground
(ages 2-5) and a school-age playground (ages 5-12) that exist
in this park.
• The project also address es site circulation, site furnishings,
stormwater improvements, invasive removal in the forested
area and provide reforestation plantings.
Associated Plan(s):
Natural Resources Management Plan (NRMP)
Public Spaces Master Plan (PSMP)
Urban Forest Master Plan (UFMP)
Neighborhood(s):
Columbia Forest
Funding Notes: "Other Previously Approved Funds" in FY 2023 represents bond premium. "Other Funding" in FY 2024 represents
Arlington Neighborhood Program's contribution to this project.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 740 740
Other Funding 750 750
Previous Funding
Other Previously
Approved Funds 398 398
Total Funding 398 1,490 0 0 0 0 0 0 0 0 1,888
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Scoping for the Playground Replacement at
Bailey's Branch Park
Fall 2022
• Design for the Playground Replacement at
Bailey's Branch Park
Winter 2022 -
Winter 2023
• Construction for the Playground
Replacement at Bailey's Branch Park
Spring 2024 -
Winter 2024
C - 13
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Maintenance Capital FY 2023-2032
2. BLUEMONT PARK TENNIS COMPLEX REPLACEMENT
Project Highlights:
• Replacement and upgrade to the Tennis Complex in
Bluemont Park.
• Replacement of the tennis courts, court lighting, restroom
building, picnic shelter and parking lot.
• Improvements to site amenities, walkways, landscaping,
stormwater management and other associated park amenities.
Associated Plan(s):
Public Spaces Master Plan (PSMP)
Neighborhood(s):
Bluemont
Boulevard Manor
Dominion Hills
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Previous Funding
Authorized but Unissued
Bonds 5,000 5,000
Total Funding 5,000 0 0 0 0 0 0 0 0 0 5,000
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Design for the Tennis Complex
Replacement at Bluemont Park
Summer 2022 - Winter 2023
• Construction for the Tennis
Complex Replacement at Bluemont
Park
Spring 2024 - Fall 2025
Project Links:
• Projects & Planning page from the Arlington County
website.:
https://www.arlingtonva.us/Government/Projects/Projec
t-Types/Parks-Projects/Upper-Bluemont-Project
C - 14
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Maintenance Capital FY 2023-2032
3. CAPITAL ASSET MANAGER
Project Highlights:
• This funding provides for staff to manage the Parks Capital
Asset Program.
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
PAYG 165 170 175 180 185 190 195 200 205 212 1,877
Previous Funding
Total Funding 165 170 175 180 185 190 195 200 205 212 1,877
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
C - 15
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Maintenance Capital FY 2023-2032
4. DOUGLAS PARK, PHASE 1
Project Highlights:
• Design and construction of Phase 1 park renovations for
Douglas Park.
• The existing amenities in Douglas Park are in need of
replacement before these assets fail.
• The improvements to Douglas Park are anticipated to include
replacement of the picnic shelter, one pedestrian bridge, site
furnishings, site circulation, stormwater management
improvements, invasive removal in the forested area and
reforestation plantings.
Associated Plan(s):
Natural Resources Management Plan (NRMP)
Public Spaces Master Plan (PSMP)
Urban Forest Master Plan (UFMP)
Neighborhood(s):
Douglas Park
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 565 1,500 2,065
Previous Funding
Issued but Unspent Bonds 300 300
Total Funding 565 1,800 0 0 0 0 0 0 0 0 2,365
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Scoping for Phase 1 Improvements
at Douglas Park
Fall 2022 - Spring 2023
• Design of Phase 1 Improvements
at Douglas Park
Spring 2023 - Spring 2024
• Construction of Phase 1
Improvements at Douglas Park
Spring 2024 - Summer 2025
Changes from Prior CIP:
This project is new for the FY 2023 CIP.
C - 16
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Maintenance Capital FY 2023-2032
5. EQUIPMENT AT DPR FACILITIES
Project Highlights:
• Funding for the purchase and replacement of equipment at
various Department of Parks and Recreation facilities.
Neighborhood(s):
VARIOUS
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Short Term Finance 100 100 100 100 100 100 100 100 100 100 1,000
Previous Funding
Total Funding 100 100 100 100 100 100 100 100 100 100 1,000
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
C - 17
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Maintenance Capital FY 2023-2032
6. FEASIBILITY STUDIES & IMPLEMENTATION
Project Highlights:
• Feasibility and planning funds provide for the ability to
conduct timely and relevant analysis for new initiatives that
may be outside current CIP projects.
Neighborhood(s):
VARIOUS
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
PAYG 200 300 300 300 300 300 300 300 300 300 2,900
Previous Funding
Total Funding 200 300 300 300 300 300 300 300 300 300 2,900
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Milestones are developed for each study.
Changes from Prior CIP:
The annual program level has been increased to respond to the
increase in feasibility study requests.
C - 18
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Maintenance Capital FY 2023-2032
7. FIELD FUND
Project Highlights:
• The Parks Field Fund is supported by an annual fee assessed
on official affiliated youth and adult sports teams playing on
Arlington County rectangular and diamond fields.
• The fees assessed for rectangular fields are directed to
support replacement and construction of synthetic turf fields
in the County.
• The fees assessed on diamond fields are to be used for
specific diamond field enhancements, such as improved
irrigation, batting cages or accelerated sod replacement.
Neighborhood(s):
VARIOUS
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
PAYG 225 225 225 225 225 225 225 225 225 225 2,250
Previous Funding
Total Funding 225 225 225 225 225 225 225 225 225 225 2,250
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Changes from Prior CIP:
Revenues in FY 2022 were reduced to reflect the impacts of the
pandemic on programming. FY 2023 funding assume a return to
historical levels.
C - 19
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Maintenance Capital FY 2023-2032
8. GREENBRIER PARK TRACK REPLACEMENT
Project Highlights:
• Design and construction for the replacement of the running
track surface and long jump pit within the stadium field
complex at Greenbrier Park/Yorktown High School.
Associated Plan(s):
Public Spaces Master Plan (PSMP)
Neighborhood(s):
Yorktown
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Short Term Finance 715 715
Previous Funding
Total Funding 715 0 0 0 0 0 0 0 0 0 715
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Design/Bidding for the Track
Replacement at Greenbrier Park
Fall/Winter 2022
• Construction for the Track
Replacement at Greenbrier Park
Summer 2023
C - 20
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Maintenance Capital FY 2023-2032
9. MONROE PARK PLAYGROUND REPLACEMENT
Project Highlights:
• Design and construction for the replacement of the
playground at Monroe Park.
• The existing playground is a multi -age playground serving
children ages 2 -12. The proposed playground is anticipated
to have separate play areas serving pre-school children (ages
2-5) and school-age children (ages 5-12).
• The project also provide s improvements to site circulation,
site furnishings, park amenities and stormwater management
improvements.
Associated Plan(s):
Public Spaces Master Plan (PSMP)
Neighborhood(s):
Douglas Park
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 1,130 1,130
Previous Funding
Total Funding 1,130 0 0 0 0 0 0 0 0 0 1,130
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Design for the Playground
Replacement at Monroe Park
Summer 2022 - Summer 2023
• Construction for the Playground
Replacement at Monroe Park
Fall 2023 - Summer 2024
C - 21
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Maintenance Capital FY 2023-2032
10. WOODMONT PARK PLAYGROUND
Project Highlights:
• Design and construction for the replacement of the
playground at Woodmont Center.
• The existing playground in this park serves primarily pre -
school children (ages 2 -5). The replacement playground is
being designed to serve pre -school children and offer some
components for school-age children (ages 5-12).
• The project address es site circulation, site furnishings,
stormwater improvements, invasive removal in the forested
area and provide reforestation plantings.
Associated Plan(s):
Public Spaces Master Plan (PSMP)
Ne
ighborhood(s):
Woodmont
Funding Notes: "Other Funding" represents bond premium.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 1,025 1,025
Previous Funding
Other Previously
Approved Funds 240 240
Total Funding 240 1,025 0 0 0 0 0 0 0 0 1,265
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Scoping for the Playground
Replacement at Woodmont Center
Fall 2022
• Design for the Playground
Replacement at Woodmont Center
Winter 2022 - Winter 2023
• Construction for the Playground
Replacement at Woodmont Center
Spring 2024 - Winter 2024
C - 22
10
YEAR CATEGORY SUMMARY (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
1. Arlington Boathouse 0 2,925 0 0 15,770 0 0 0 0 0 18,695
2. Crystal City Parks and Public
Space
1,440 8,075 530 1,440 9,549 1,704 0 0 0 0 22,738
3. Emerging Uses Program 2,000 0 1,500 0 1,000 0 500 0 1,000 0 6,000
4. Fairfax Drive Public Spaces 0 0 0 0 0 0 890 1,340 11,610 0 13,840
5. Gateway Park (Rosslyn) 0 1,785 0 0 15,770 0 0 0 0 1,795 19,350
6. Jennie Dean Park, Phase 2 915 3,485 0 0 0 0 0 0 0 0 4,400
7. Natural Resiliency Program 0 2,000 0 3,500 0 1,000 0 1,000 0 1,000 8,500
8. Penrose Square, Phase 2 0 0 0 785 0 3,925 0 0 0 0 4,710
9. Quincy Park 0 0 0 0 0 0 0 0 880 1,985 2,865
10. Shirlington Park 0 0 0 0 0 0 0 0 1,020 4,270 5,290
11. Short Bridge Park 1,140 0 5,635 0 0 0 0 0 0 0 6,775
12. Three Urban Parks 500 950 7,975 0 0 0 0 0 0 0 9,425
13. Virginia Highlands
Park/Nearby Public Space
0 0 0 0 0 1,470 0 2,075 210 23,320 27,075
Total Recommendation 5,995 19,220 15,640 5,725 42,089 8,099 1,390 4,415 14,720 32,370 149,663
CATEGORY FUNDING SOURCES (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
New Funding
Federal Funding 0 0 0 0 0 0 0 0 0 0 0
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 4,845 0 0 10,810 0 0 0 0 0 15,655
New Bond Issue 4,555 11,145 15,110 4,285 20,730 6,395 1,390 4,415 14,720 32,370 115,115
PAYG 0 0 0 0 0 0 0 0 0 0 0
Short Term Finance 0 0 0 0 0 0 0 0 0 0 0
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 1,000 0 0 0 0 0 1,000
Tax Increment Financing (TIF) 0 2,529 230 1,440 9,549 1,704 0 0 0 0 15,452
Subtotal New Funding 4,555 18,519 15,340 5,725 42,089 8,099 1,390 4,415 14,720 32,370 147,222
Previously Approved Funding
Authorized but Unissued
Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Tax Increment Financing (TIF) 1,440 701 0 0 0 0 0 0 0 0 2,141
Other Previously Approved
Funds 0 0 300 0 0 0 0 0 0 0 300
Subtotal Previously Approved
Funding 1,440 701 300 0 0 0 0 0 0 0 2,441
Total Funding Sources 5,995 19,220 15,640 5,725 42,089 8,099 1,390 4,415 14,720 32,370 149,663
Arlington County, Virginia
LOCAL PARKS AND RECREATION PROGRAM:
PARKS MASTER PLANS PROGRAM
CIP
2023-2032
C - 23
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2023-2032
1. ARLINGTON BOATHOUSE
Project Highlights:
• This project has been in the planning process for nearly three
decades.
• A major step forward occurred in May 2019 when the County
Board authorized the County Manager to sign a
Programmatic Agreement with the National Park Service,
National Capital Planning Commission, District of Columbia
State Historic Preservation Office and Virginia State Historic
Preservation Office for developing a boathouse and related
facilities on the Virginia side of the Potomac River on federal
land administered by the George Washington Memorial
Parkway.
• The County has ten years, until 2029, to co nstruct the
boathouse before the agreement expires.
• The project involves a Lower Rosslyn site adjacent to the
Potomac River for direct water access and an Upper Rosslyn
site for support facilities on land that the County already
owns.
• An operation and management study is expected to start in
FY 2023 with master planning to start once the study has been
completed. Design anticipated to start in FY 2024 and
construction of the Lower site to start in FY 2027. This
schedule should allow the project at t he lower site to be
completed by the 2029 agreement expiration date.
Associated Plan(s):
Public Art Master Plan (PAMP)
Public Spaces Master Plan (PSMP)
Neighborhood(s):
VARIOUS
Funding Notes: Assumes 60% County funding and 40% outside funding for construction of the Lower Rosslyn site in FY 2027.
Construction of the Upper Rosslyn site not included in the 10 -year CIP. The operating costs cover the maintenance of two new land
parcels with new buildings and new amenities and services, landscape maintenance, and building utilities. Operating costs also reflect
a minimum need of two (2) new FTEs.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Developer/Other
Contributions
6,310 6,310
New Bond Issue 2,925 9,460 12,385
Previous Funding
Total Funding 0 2,925 0 0 15,770 0 0 0 0 0 18,695
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Operations Costs (+/-) 335 346 356 1,037
Total Impact 0 0 0 0 0 0 0 335 346 356 1,037
C - 24
Critical Milestones:
• National Park Service completes
Environmental Impact Statement
2018
• Programmatic Agreement signed by
National Park Service, Arlington County
and others
2019
• Master Plan development of Upper and
Lower Rosslyn site areas
2022
• Develop final design for Upper and Lower
Rosslyn sites for Boathouse
2024
• Begin construction of Lower Rosslyn site 2027
• Deadline for Completion of Construction of
Boathouse
2029
Changes from Prior CIP:
Changes from the last CIP include construction of the Upper
Rosslyn site in a succeeding fiscal year from construction of the
Lower Rosslyn site. Completion of the Lower Rosslyn site is
dictated by the Programmatic Agreement whereas completion of
the Upper Rosslyn site does not have this time constraint.
C - 25
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2023-2032
2. CRYSTAL CITY PARKS AND PUBLIC SPACE
Project Highlights:
• Three parks are anticipated to be constructed in Crystal City
by the end of the decade.
• The first park is Metro Market Square to be located at 18th
Street South and Crystal Drive at the site of a future Metro
station entrance.
• The second Crystal City project is Phase 1 of Center Park,
which includes a new, two -acre centrally located park,
programmed for active use and as the principal gathering
space for the community.
• The third Crystal City project is Phase 1 of the 23rd St reet
Plaza, which is located on the northeast corner of 23rd and
Clark-Bell Streets.
• The timing and order of construction has been updated for
this CIP.
Associated Plan(s):
Crystal City Sector Plan
Public Spaces Master Plan (PSMP)
Neighborhood(s):
Crystal City
Funding Notes: "Other Previously Approved Funding" in FY 2025 represents $300k in developer funds for Center Park received in
FY 2022. The operating costs cover maintenance of a new land parcel, including landscaping, new amenities and services.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Developer Contributions 4,845 4,845
Tax Increment Financing
(TIF)
2,529 230 1,440 9,549 1,704 15,452
Previous Funding
Tax Increment Financing
(TIF) 1,440 701 2,141
Other Previously
Approved Funds
300 300
Total Funding 1,440 8,075 530 1,440 9,549 1,704 0 0 0 0 22,738
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Operations Costs (+/-) 58 60 61 127 170 175 180 185 1,016
Total Impact 0 0 58 60 61 127 170 175 180 185 1,016
Critical Milestones:
• Pedestrian and Green Corridors Study 2022
• Design of Metro Market Square 2023
• Construction of Metro Market Square 2024
• Design of Center Park 2025
• Design of 23rd Street Plaza, Phase 1 2026
• Construction of Center Park 2027
• Construction of 23rd Street Plaza, Phase 1 2027
Changes from Prior CIP:
Changes from the prior CIP include a re-ordering of projects.
C - 26
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2023-2032
3. EMERGING USES PROGRAM
Project Highlights:
• This program is designed to respond to emerging recreational
activities and casual use spaces in parks and recreation. The
need to accommodate new trends in recreation, such as
pickleball, mountain biking, skateboarding, and other
recommendations are identified in the 2019 Public Spaces
Master Plan (PSMP).
• The program allow s for the timely study, design, and
exploration of biophilic principles as they relate to these
projects, and implementation of recrea tion and casual use
needs that impact limited park spaces and conflicts within the
County's park system. Biophilic principles focus on
integrating natural elements into the built environment.
• This program address es uses such as the design and
construction of a permanent pickleball facility, lining of
multi-use courts for tennis and pickleball, design of
improvements to natural surface trails, possible construction
of a mountain biking area or the creation of a pump track for
mountain biking, and repair of natural use trails.
• Future year funding may address skateboarding, dog parks,
casual use spaces, or other uses raised by the PSMP,
community, or from various studies or policy changes.
Associated Plan(s):
Public Spaces Master Plan (PSMP)
Neighborhood(s):
VARIOUS
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 2,000 1,500 1,000 500 1,000 6,000
Previous Funding
Total Funding 2,000 0 1,500 0 1,000 0 500 0 1,000 0 6,000
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Design the reconstruction of existing tennis
courts at Walter Reed Community Center
for Pickleball use
2023
• Reconstruction of the tennis courts at
Walter Reed Community Center for
Pickleball use
2023
• Installation of Pickleball Court Lines on
Multi-use Courts (location TBD)
2023
• Design of Improvements to Natural Surface
Trails and Mountain Biking Improvements
2023
Changes from Prior CIP:
This is a new program for the FY 2023 CIP.
C - 27
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2023-2032
4. FAIRFAX DRIVE PUBLIC SPACES
Project Highlights:
• The purpose of this project is to develop park master plans
for several public spaces along Fairfax Drive.
• These public spaces include the existing West End Plaza at
the corner of Washington Boulevard and Wilson Boulevard,
the existing Triangle Park an d future planned expansion of
this park, and a new linear park that replaces the section of
Fairfax Drive between N. Kirkwood Road and the
Washington Boulevard and Wilson Boulevard intersection.
• The park master plans are being developed concurrently with
the goal to achieve a unified park experience.
Associated Plan(s):
Clarendon Sector Plan
Public Spaces Master Plan (PSMP)
Neighborhood(s):
Ballston-Virginia Square
Clarendon-Courthouse
Lyon Village
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 890 1,340 11,610 13,840
Previous Funding
Total Funding 0 0 0 0 0 0 890 1,340 11,610 0 13,840
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Develop Park Master Plans for the Three
Park Areas
2029
• Design Improvement Plans for the
Individual Parks
2030
• Construction of Improvements to the Parks
and Plazas
2031
Changes from Prior CIP:
This is a new project for the FY 2023 CIP.
C - 28
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2023-2032
5. GATEWAY PARK (ROSSLYN)
Project Highlights:
• Gateway Park is located over I -66 in Rosslyn and was
constructed in the 1980's.
• The current park is difficult and dangerous to access due to
the surrounding high-speed roadways.
• The park is under -utilized yet presents great potential for
everyday park and recreation needs and for a diverse mix of
special events and program activities.
• Construction of the west side of the park occurs outside the
current CIP.
Associated Plan(s):
Public Art Master Plan (PAMP)
Public Spaces Master Plan (PSMP)
Neighborhood(s):
North Rosslyn
Funding Notes: “Other Funding” assumes outside contributions. DPR anticipates a contribution of $5 million from the adopted
Rosslyn Holiday Inn Development community benefits package. Of the $5 million contribution, $500k is in-hand and will provide
near-term funding for master planning, possible interim park uses and technical studies, while the remaining $4.5 million will
provide a portion of the required construction funding in FY 2027. Construction of the west side occurs outside the current CIP.
Operating costs cover landscaping, irrigation, tree care and maintenance.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Developer Contributions 4,500 4,500
New Bond Issue 1,785 10,270 1,795 13,850
Other Funding 1,000 1,000
Previous Funding
Total Funding 0 0 1,785 0 15,770 0 0 0 0 1,795 19,350
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Operations Costs (+/-) 37 38 39 40 154
Total Impact 0 0 0 0 0 0 37 38 39 40 154
Critical Milestones:
• Develop Park Master Plan 2022
• Develop Final Park Design for the East Side 2025
• Demolition and Construction of Improvements
for the East Side
2027
• Develop Final Park Design for the West Side 2029-2030
Changes from Prior CIP:
The total amount of the project has been adjusted outward several years
with construction of the east side independent of the construction of the
west side of the park. Project funding has been revised to reflect an
anticipated development contribution. The balance of construction is to
be funded through bonds. The public new bond issue funding has been
reduced to reflect these developer contributions.
Project Links:
• Projects & Planning page from the Arlington County
website.:
https://www.arlingtonva.us/Government/Projects/Project
-Types/Parks-Projects/Gateway-Park
C - 29
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2023-2032
6. JENNIE DEAN PARK, PHASE 2
Project Highlights:
• The County reached an agreement to purchase the property
where WETA is currently located adjacent to Jennie Dean
Park.
• The project calls for WETA to lease back the building until
they have finished constructing new facilities in Shirlington.
• Phase Two of the project is to demolish the existing WETA
building, two parking lots and a portion of 27th Street South
to incorporate these lands into the existing Jennie Dean Park.
• Phase Two complete s the design and development of the
portions of the Park Master Plan located within the former
WETA parcel a demolition of the WETA building . This
includes the installation of a new lighted basketball court,
conversion of the previous basketball court to a tennis court,
pathways, landscaping, site furnishings, grading, drainage ,
and stormwater management improvements.
Associated Plan(s):
Four Mile Run Policy Framework Plan (2018)
Jennie Dean Park Master Plan and Design Guidelines (2018)
Public Spaces Master Plan (PSMP)
Neighborhood(s):
Green Valley
Shirlington
Funding Notes: Operating costs cover increases in landscape maintenance, tree care and replacements, an increased footprint in the
playground, and additional amenities in the park.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 915 3,485 4,400
Previous Funding
Total Funding 915 3,485 0 0 0 0 0 0 0 0 4,400
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Operations Costs (+/-) 63 65 67 69 71 73 76 78 562
Total Impact 0 0 63 65 67 69 71 73 76 78 562
Critical Milestones:
• Adoption of Jennie Dean Park Master Plan
and Design Guidelines
2018
• Acquisition of the 3620 27th Street South 2020
• Demolition of Existing Improvements 2024
• Construction of Phase 2 of Jennie Dean
Park Improvements
2025
Changes from Prior CIP:
This is a new project for Jennie Dean Park that funds the
demolition of the existing improvements at 3620 27th Street
South, including the existing WETA building, two parking lots
and a portion of 27th Street South and construction of the second
phase of improvements within the park.
Project Links:
• Jennie Dean Park Phase 1 Projects & Planning page from
the Arlington County website.:
https://www.arlingtonva.us/Government/Projects/Project-
Types/Parks-Projects/Jennie-Dean-Park
C - 30
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2023-2032
7. NATURAL RESILIENCY PROGRAM
Project Highlights:
• This program allow s DPR to study and implement projects
that manage stormwater and natural resiliency.
• Projects in this program provide recreational opportunities
and amenities in concert with addressing or creating flood
capacity.
• Projects in this program may include forest restoration,
stream improvements, large-scale invasive removal projects,
large-scale native plantings, implementing biophilic
principles as part of the County's commitments as a member
of the Biophilic Cities initiative or park renovation pr ojects
that improve the County's sustainability, such as creating
flood control projects in parks where flooding is anticipated
and allowed to happen to prevent further downstream damage
from floodwaters.
• Biophilic principles focus on integrating natura l design
elements into the built environment.
Associated Plan(s):
Natural Resources Management Plan (NRMP)
Public Spaces Master Plan (PSMP)
Storm Water Master Plan
Urban Forest Master Plan (UFMP)
Neighborhood(s):
VARIOUS
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 2,000 3,500 1,000 1,000 1,000 8,500
Previous Funding
Total Funding 0 2,000 0 3,500 0 1,000 0 1,000 0 1,000 8,500
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Design Plans for Reforestation and
Removal of Invasive Plants
2024
• Installation of Reforestation Plantings and
Removal of Invasive Plants
2024
• Scoping of Flood Resilient Project that
Facilitates Flooding
2024
• Design of Flood Resilient Project 2026
• Construction of Flood Resilient Project 2026
Changes from Prior CIP:
This is a new program for the FY 2023 CIP.
C - 31
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2023-2032
8. PENROSE SQUARE, PHASE 2
Project Highlights:
• Penrose Square is the first and largest of three squares
planned within the Columbia Pike Town Center node.
• Phase 1 of Penrose Square opened in November 2012 and
includes a tree-covered terrace with movable seats and tables,
a centrally located paved plaza, a low seating wall, a
zero-depth interactive water fountain, mounded lawn areas
for casual seating and a public art installation.
• Phase 2 completes the build-out of the Phase 1 features and
allow for additional flexible program space.
Associated Plan(s):
Penrose Square Park Master Plan (2008)
Public Art Master Plan (PAMP)
Public Spaces Master Plan (PSMP)
Neighborhood(s):
Arlington Heights
Columbia Heights
Penrose
Funding Notes: The operating costs cover additional expenses to maintain a new land parcel including new park amenities and
services.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 785 3,925 4,710
Previous Funding
Total Funding 0 0 0 785 0 3,925 0 0 0 0 4,710
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Operations Costs (+/-) 44 46 47 137
Total Impact 0 0 0 0 0 0 0 44 46 47 137
Critical Milestones:
• Developer to convey Phase 2 Parcel to the
County
2025
• Design of Penrose Square, Phase 2 2026
• Construction of Penrose Square, Phase 2 2028
C - 32
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2023-2032
9. QUINCY PARK
Project Highlights:
• Quincy Park and Central Library are located adjacent to one
another and together form an almost 18-acre block of land.
• Quincy Park is the largest park in the Rosslyn -Ballston
corridor and one of the County's most heavily used parks.
• The lighted athletic fields and athletic courts in Quincy Park
accommodate the needs for County recreation, drop -in play
and the needs of the Washington- Liberty High School
baseball and tennis teams.
• Quincy Park also has a picnic shelter, shaded picnic area,
playground, walking paths and surface parking.
• Quincy Park has approached the age where full replacement
and modernization is necessary, which also provides the
opportunity to reorganize the placement of the facilities and
consolidate the parking to create additional open space.
Associated Plan(s):
Ballston Sector Plan
Public Art Master Plan (PAMP)
Public Spaces Master Plan (PSMP)
Urban Forest Master Plan (UFMP)
Neighborhood(s):
Ballston-Virginia Square
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 880 1,985 2,865
Previous Funding
Total Funding 0 0 0 0 0 0 0 0 880 1,985 2,865
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Develop Master Plan for Quincy Park 2031
• Develop Design Improvements for Park
Renovation
2032
Changes from Prior CIP:
The name of this project has changed from prior CIPs to place the
focus on the park component. A major maintenance capital
renovation of Quincy Park has been in the CIP since FY 2015 -
FY 2024. Funding to develop a master plan for Quincy Park and
fund implementation of the park improvements was in the adopted
FY 2017 - FY 2026 CIP and FY 2019- FY 2028 CIP. This CIP
continues to provide future funding for the master planning effort
and programs future funding for design and implementation of the
Quincy Park improvements.
C - 33
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2023-2032
10. SHIRLINGTON PARK
Project Highlights:
• This project implements the adopted Shirlington Park Master
Plan and Design Guidelines which grew out of the Four Mile
Run Valley Initiative.
• The project focuses on adding park amenities, including
strengthening the primary entries at S. Walter Reed Drive and
S. Shirlington Road.
• Suggested park amenities include adding several overlooks
with educational/interpretive components, riparian pathways,
plaza areas, enhancements to the existing pedestrian bridge,
signage, site furnishings, public art, landscaping, invasive
plant removal and storm water management improvements.
Associated Plan(s):
Four Mile Run Policy Framework Plan (2018)
Public Spaces Master Plan (PSMP)
Neighborhood(s):
Green Valley
Shirlington
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 1,020 4,270 5,290
Previous Funding
Total Funding 0 0 0 0 0 0 0 0 1,020 4,270 5,290
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Develop Park Master Plan and Design
Guidelines
2016-2018
• Design of Park Improvements 2031
• Construction of Park Improvements 2032
Changes from Prior CIP:
Design and construction of improvements has been pushed out
several years to FY 2031 and FY 2032 in this CIP from the prior
CIP.
C - 34
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2023-2032
11. SHORT BRIDGE PARK
Project Highlights:
• The project in this CIP implement s the planning and
development of the 3.5-acre Short Bridge Park at the mouth
of Four Mile Run.
• Implementing the Short Bridge Park Master Plan occur s in
two phases. The first phase is associated with a Department
of Environmental Services (DES) multi -use trail connection
that links Richmond Highway to the Four Mile Run Trail.
The second phase completes the park improvements.
• The project includes an interpretive plaza, dog run, casual use
lawn area, walkways, public art, site furnishings and
significant landscaping and stormwater management
facilities.
• Phase 2 also includes the creation of an overlook that allows
for park and trail users to get closer to the water and out of
the way of cyclists.
Associated Plan(s):
Four Mile Run Design Guidelines
Four Mile Run Restoration Master Plan (2006)
Public Spaces Master Plan (PSMP)
Short Bridge Park Master Plan (January 2018)
Neighborhood(s):
VARIOUS
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 1,140 5,635 6,775
Previous Funding
Total Funding 1,140 0 5,635 0 0 0 0 0 0 0 6,775
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Operations Costs (+/-) 72 74 76 78 70 82 84 86 622
Total Impact 0 0 72 74 76 78 70 82 84 86 622
Critical Milestones:
• Adoption of Short Bridge Park Master Plan
and Design Guidelines
2018
• Construction of the Short Bridge Park trail
by DES began December 2021
2021
• Construction of Short Bridge Park trail
anticipated to be complete Summer 2022
2022
• Design of Improvements at Short Bridge
Park
2023
• Construction of Improvements at Short
Bridge Park
2025
Changes from Prior CIP:
The name of the program has been changed to Short Bridge Park
and was previously known as Four Mile Run Near -Stream
Improvements. The new name reflects the current project within
the greater planning initiative. Project costs have been updated to
reflect design and construction costs for a portion of the work that
was previously to be funded by the Department of Environmental
Services and has been shifted to the Department of Parks and
Recreation and the addition of stormwater and the Federal
Emergency Management Agency requirements for working
within the Four Mile Run floodway and potential adjustments to
the Flood Insurance Rate Map.
C - 35
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2023-2032
12. THREE URBAN PARKS
Project Highlights:
• Maury Park, Herselle Milliken Park, and Gum Ball Park are
three small parks located in the Virginia Square Planning
Area and in the Ashton Heights Civic Association.
• This project is to develop park master plans for these parks,
which currently have a minimum level of amenities.
• The project will master plan all three parks simultaneously to
identify community needs and priorities while taking into
consideration that the parks are located in close proximity
and should have complementary rather than duplicative
features.
Associated Plan(s):
Ballston Sector Plan
Ne
ighborhood(s):
Ashton Heights
Ballston-Virginia Square
Funding Notes: The operating costs cover maintenance costs for landscaping and new park amenities.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 500 950 7,975 9,425
Previous Funding
Total Funding 500 950 7,975 0 0 0 0 0 0 0 9,425
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Operations Costs (+/-) 83 86 89 91 94 97 540
Total Impact 0 0 0 0 83 86 89 91 94 97 540
Critical Milestones:
• Develop park master plans for Maury Park,
Herselle Milliken Park and Gum Ball Park
2023
• Develop designs for the Maury Park,
Herselle Milliken Park and Gum Ball Park
2024
• Construction of improvements for Maury
Park, Herselle Milliken Park and Gum Ball
Park
2025
Changes from Prior CIP:
Changes from prior CIPs include advancement of master planning
the project to FY 2023, as well as design and construction funding
to immediately follow the master planning effort. Also, the name
of the project has been modified to acknowledge that the parks are
located within the Ashton Heights Civic Association, though also
lying within the Virginia Square Planning Area.
C - 36
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Park Master Plans FY 2023-2032
13. VIRGINIA HIGHLANDS PARK/NEARBY PUBLIC SPACE
Project Highlights:
• The purpose of this project is to develop park master plans
for three sites located in the Pentagon City area. These
include the existing Virginia Highlands Park, a new park to
be planned at 20th Street South and South Ives Street and a
new parcel to be planned at the former Dominion Substation
site.
• The project includes master planning these three closely
associated sites simultaneously to provide a plan with a mix
of recreational and casual use opportunities and
accommodate existing and future public uses in the area.
Associated Plan(s):
Natural Resources Management Plan (NRMP)
Public Spaces Master Plan (PSMP)
Urban Forest Master Plan (UFMP)
Ne
ighborhood(s):
Arlington Ridge
Aurora Highlands
Pentagon City
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 1,470 2,075 210 23,320 27,075
Previous Funding
Total Funding 0 0 0 0 0 1,470 0 2,075 210 23,320 27,075
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Master plan Virginia Highlands Park and
the two new parcels
2028
• Design improvements at Virginia Highlands
Park
2030
• Design improvements at 20th Street S. and
S. Ives Street
2031
• Design improvements at the former
Dominion substation site
2031
• Construction of improvements at Virginia
Highlands Park
2032
• Construction of improvements at 20th
Street S. and S. Ives Street
2032
• Construction of improvements at former
Dominion substation site
2032
Changes from Prior CIP:
This is a new project for the FY 2023 CIP.
C - 37
10 YEAR CATEGORY SUMMARY (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
1. Trail and Bridge
Modernization Program
1,730 3,400 3,375 2,000 2,000 2,000 2,000 1,050 1,050 1,000 19,605
Total Recommendation 1,730 3,400 3,375 2,000 2,000 2,000 2,000 1,050 1,050 1,000 19,605
CATEGORY FUNDING SOURCES (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
New Funding
Federal Funding 0 0 0 0 0 0 0 0 0 0 0
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
New Bond Issue 0 1,500 2,400 2,000 2,000 2,000 2,000 1,050 1,050 1,000 15,000
PAYG 0 0 0 0 0 0 0 0 0 0 0
Short Term Finance 0 0 0 0 0 0 0 0 0 0 0
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 0 0 0 0 0 0 0
Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 0 1,500 2,400 2,000 2,000 2,000 2,000 1,050 1,050 1,000 15,000
Previously Approved Funding
Authorized but Unissued
Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 1,730 1,900 975 0 0 0 0 0 0 0 4,605
Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved
Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding 1,730 1,900 975 0 0 0 0 0 0 0 4,605
Total Funding Sources 1,730 3,400 3,375 2,000 2,000 2,000 2,000 1,050 1,050 1,000 19,605
Arlington County, Virginia
LOCAL PARKS AND RECREATION PROGRAM:
TRAIL AND BRIDGE MODERNIZATION PROGRAM
CIP
2023-2032
C - 38
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Trail and Bridge Modernization FY 2023-2032
1. TRAIL AND BRIDGE MODERNIZATION PROGRAM
Project Highlights:
• The Trail and Bridge Modernization Program is focused on
replacement and major renovation of the 39.7 miles of off -
street, multi- purpose trails in the County, as well as
replacement or repair of the 56 pedestrian bridges and 11
low-water fords in the DPR inventory.
Associated Plan(s):
Public Spaces Master Plan (PSMP)
Ne
ighborhood(s):
VARIOUS
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 0 1,500 2,400 2,000 2,000 2,000 2,000 1,050 1,050 1,000 15,000
Previous Funding
Issued but Unspent Bonds 1,730 1,900 975 4,605
Total Funding 1,730 3,400 3,375 2,000 2,000 2,000 2,000 1,050 1,050 1,000 19,605
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Construction for replacement of a Bridge in
Glencarlyn Park
2022
• Trail Pavement Condition Assessment 2022
• Design and Construction of trail
improvements at 26th Street North and Old
Dominion Drive
2022
• Milling and Paving of Donaldson Run Trail 2022
• Design and Construction for replacement of
a Bridge in Lubber Run Park
2022
• Design for replacement of one Bridge in
Alcova Heights Park
2022
• Design for replacement of one Bridge in
Bluemont Park
2022
Changes from Prior CIP: Bridge projects recently completed
under this program include the replacement of the northernmost
bridge in Lubber Run Park in 2020, a bridge in Glencarlyn Park
in 2022, which was lost in the 2019 storm, and design of a second
bridge in Lubber Run Park to replace one of the two bridges lost
in the 2019 storm. Design work occurs
in 2022 to replace a
pedestrian bridge in Alcova Heights Park and a pedestrian bridge
in Bluemont Park.
C - 39
10
YEAR CATEGORY SUMMARY (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
1. Parks Land Acquisition and
Public Space Program
2,000 0 0 0 1,000 0 1,000 0 1,000 0 5,000
Total Recommendation 2,000 0 0 0 1,000 0 1,000 0 1,000 0 5,000
CATEGORY FUNDING SOURCES (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
New Funding
Federal Funding 0 0 0 0 0 0 0 0 0 0 0
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
New Bond Issue 0 0 0 0 1,000 0 1,000 0 1,000 0 3,000
PAYG 0 0 0 0 0 0 0 0 0 0 0
Short Term Finance 0 0 0 0 0 0 0 0 0 0 0
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 0 0 0 0 0 0 0
Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 0 0 0 0 1,000 0 1,000 0 1,000 0 3,000
Previously Approved Funding
Authorized but Unissued
Bonds 2,000 0 0 0 0 0 0 0 0 0 2,000
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved
Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding 2,000 0 0 0 0 0 0 0 0 0 2,000
Total Funding Sources 2,000 0 0 0 1,000 0 1,000 0 1,000 0 5,000
Arlington County, Virginia
LOCAL PARKS AND RECREATION PROGRAM:
PARKS LAND ACQUISITION AND PUBLIC SPACE PROGRAM
CIP
2023-2032
C - 40
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Parks Land Acquisition and Open Space FY 2023-2032
1. PARKS LAND ACQUISITION AND PUBLIC SPACE PROGRAM
Project Highlights:
• The purpose of the Parks Land Acquisition and Public Space
Program is to strategically acquire real property for parks and
public spaces to provide stewardship of natural resources and
to be responsive to the recreational and public space needs of
the County's urban community.
• A priority action in the Public Sp aces Master Plan is a
recommendation that 30 acres of new public space be added
to County Park and public space inventory over the next ten
(10) years.
Associated Plan(s):
Public Spaces Master Plan (PSMP)
Ne
ighborhood(s):
VARIOUS
Funding Notes:
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 1,000 1,000 1,000 3,000
Previous Funding
Authorized but Unissued
Bonds 2,000 2,000
Total Funding 2,000 0 0 0 1,000 0 1,000 0 1,000 0 5,000
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Annual review of progress towards
achieving goals of PSMP
Annually in
January of
each year
Changes from Prior CIP:
The name of the program has been changed to Parks Land
Acquisition and Public Space Program to reflect the definitions
used in the 2019 Public Spaces Master Plan. The funding level has
been increased to align with the goal of acquiring 30 acres of new
public space over the next ten years as set in the Public Spaces
Master Plan.
C - 41
10 YEA
R CATEGORY SUMMARY (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
1. Wakefield High School
Stadium Synthetic Field
982 0 0 0 0 0 0 0 0 0 982
2. Washington-Liberty High
School Stadium Field
0 1,180 0 0 0 0 0 0 0 0 1,180
3. Williamsburg Middle School
Synthetic Fields
0 1,658 0 0 0 0 0 0 0 0 1,658
4. Synthetic Turf Program 300 0 11,823 1,357 2,320 3,112 2,073 1,955 1,596 3,595 28,131
Total Recommendation 1,282 2,838 11,823 1,357 2,320 3,112 2,073 1,955 1,596 3,595 31.951
CATEGORY FUNDING SOURCES (in $1,000s)
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 10 Year
Total
New Funding
Federal Funding 0 0 0 0 0 0 0 0 0 0 0
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
New Bond Issue 300 0 5,398 0 0 0 0 0 0 0 5,698
PAYG 0 0 0 0 0 0 0 0 0 0 0
Short Term Finance 491 1,751 1,155 1,357 1,691 1,985 2,073 1,955 798 2,218 15,474
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 491 1,087 5,270 0 629 1,127 0 0 798 1,377 10,779
Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 1,282 2,838 11,823 1,357 2,320 3,112 2,073 6,966 1,596 3,595 31,951
Previously Approved Funding
Authorized but Unissued
Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved
Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding 0 0 0 0 0 0 0 0 0 0 0
Total Funding Sources 1,282 2,838 11,823 1,357 2,320 3,112 2,073 1,955 1,596 3,595 31,951
Arlington County, Virginia
LOCAL PARKS AND RECREATION PROGRAM:
SYNTHETIC TURF PROGRAM
CIP
2023-2032
C - 42
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Synthetic Turf Program FY 2023-2032
SYNTHETIC TURF PROGRAM
Project Highlights:
• Arlington County has invested significantly in the
construction of synthetic turf fields to meet the demand for
athletic fields that serve a wide variety of athletic programs
and drop-in use.
• The County has 15 rectangular fields with synthetic turf and
two diamond fields with synthetic turf bringing the total
number of synthetic fields to 17.
• Synthetic turf typically has an eight-year useful life.
Associated Plan(s):
Long Bridge Park Master Plan (2013)
Public Spaces Master Plan (PSMP)
Rosslyn Highlands Park + Master Plan (2016)
Neighborhood(s):
VARIOUS
Funding Notes: Replacement and conversion of fields through the Synthetic Turf Program is typically funded with bonds, short-term
financing, and other funding. Other funding includes contributions from Arlington Public Schools for their share of fields co- located
at high schools and middle schools as well as contributions from Marymount University, George Washington University, and othe r
partnerships. FY 2025 field conversion at Kenmore Middle School assumes $2.0 million will come from outside fundraising and the
remaining cost are shared 70% County / 30% APS.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
New Bond Issue 300 5,398 5,698
Short Term Finance 1,155 1,357 1,691 1,985 2,073 1,955 798 2,218 13,232
Other Funding 5,270 629 1,127 798 1,377 9,201
Previous Funding
Total Funding 300 0 11,823 1,357 2,320 3,112 2,073 1,955 1,596 3,595 28,131
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Operations Costs (+/-) 54 56 58 60 62 64 66 420
Total Impact 0 0 0 54 56 58 60 62 64 66 420
Critical Milestones:
• Turf Replacement Construction 3-4 Months
• Turf Conversion Design and Construction 12-18 Months
Changes from Prior CIP:
With a total of 17 synthetic fields in the County inventory by the
end of 2022, the capital cost schedule anticipates the replacement
of approximately three fields per year. The three replacements for
the stadiums used by the high schools, as well as the three existing
fields at Long Bridge Park also include an underlayment pad.
C - 43
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Synthetic Turf Program FY 2023-2032
1. WAKEFIELD HIGH SCHOOL STADIUM SYNTHETIC FIELD
Project Highlights:
• Design and construction for the replacement of the synthetic
turf surfacing on the stadium athletic field.
• Synthetic turf surfacing typically has an eight -year useful
life.
• The synthetic turf surfacing at all three high school stadium
fields is laid over an underlayment pad to reduce the risk of
injuries from falls to the surface.
Associated Plan(s):
Public Spaces Master Plan (PSMP)
Neighborhood(s):
Claremont
Funding Notes: "Other Funding" is the cost share with APS (50%/50%) on high school fields.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Short Term Finance 491 491
Other Funding 491 491
Previous Funding
Total Funding 982 0 0 0 0 0 0 0 0 0 982
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Design/Procurement for Synthetic Turf
Replacement
Summer 2022
• Construction for Synthetic Turf
Replacement
Fall/Winter 2022
C - 44
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Synthetic Turf Program FY 2023-2032
2. WASHINGTON-LIBERTY HIGH SCHOOL STADIUM FIELD
Project Highlights:
• Design and construction for the replacement of the synthetic
turf surfacing on the stadium athletic field.
• Synthetic turf surfacing typically has an eight -year useful
life.
• The synthetic turf surfacing at all three high school stadium
fields is laid over an underlayment pad to reduce the risk of
injuries from falls to the surface.
Associated Plan(s):
Public Spaces Master Plan (PSMP)
Nei
ghborhood(s):
Ballston-Virginia Square
Funding Notes: "Other Funding" is the cost share with APS (50%/50%) for high school fields.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Short Term Finance 590 590
Other Funding 590 590
Previous Funding
Total Funding 0 1,180 0 0 0 0 0 0 0 0 1,180
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Design for Synthetic Turf Replacement Summer 2023
• Bidding for Synthetic Turf Replacement Fall/Winter 2023
• Construction for Synthetic Turf
Replacement
Summer 2024
C - 45
LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan
Synthetic Turf Program FY 2023-2032
3. WILLIAMSBURG MIDDLE SCHOOL SYNTHETIC FIELDS
Project Highlights:
• Design and construction for the replacement of the synthetic
turf surfacing on the two athletic fields at Williamsburg
Middle School.
• Synthetic turf surfacing typically has an eight -year useful
life.
• The synthetic turf surfacing at all three high school stadium
fields is laid over an underlayment pad to reduce the risk of
injuries from falls to the surface.
Associated Plan(s):
Public Spaces Master Plan (PSMP)
Nei
ghborhood(s):
Williamsburg
Funding Notes: "Other Funding" is the cost share with APS (70%/30%) for middle school fields.
New Funding FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Short Term Finance 1,161 1,161
Other Funding 497 497
Previous Funding
Total Funding 0 1,658 0 0 0 0 0 0 0 0 1,658
Operating Impact FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Design for Synthetic Turf Replacement Summer 2023
• Bidding for Synthetic Turf Replacement Fall/Winter 2023
• Construction for Synthetic Turf
Replacement
Summer 2024
C - 46
SYNTHETIC ATHLETIC FIELDS
Year of Last
Replacement FY2023 FY2024 FY2025 FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 FY2032
1 Long Bridge Park #1 2019 1,258,000
2 Long
Bridge Park #4 2019 1,062,000
3 Gunston Park Community Field 2020 1,179,000
4 Barcroft Park Baseball Field #6 2019 1,933,000
5 Gunston Park Diamond Field 2019 1,094,000
6 Virginia Highlands Park Community Field 2021 979,000
7 Thomas Jefferson Park Upper Field 2022 996,000
8 Barcroft Park Community Field 2022 620,000
9 Rocky Run Park Community Field 2022 339,000
10 Rosslyn Highlands Park + 2023 350,000
11 Wakefield High School Stadium 2014 982,000 1,246,000
12 Washington-Liberty High School Stadium 2014 1,180,000 1,495,000
13 Williamsburg Middle School #1 2016 912,000 1,155,000
14 Williamsburg Middle School #2 2016 746,000 945,000
15 Greenbrier Park Stadium 2016 1,164,000
16 Thomas Jefferson Park Lower Field 2017 819,000
17 Long Bridge Park #3 2018 1,031,000
18 Gunston Park Bubble 2018 326,000
19/20 Kenmore Middle School #1/#2 (Conversion) 2025 300,000 9,840,000
Total Costs 1,282,000 2,838,000 11,823,000 1,357,000 2,320,000 3,112,000 2,073,000 1,955,000 1,596,000 3,595,000
SOURCES OF FUNDS
GO Bonds 300,000 5,398,000
Short Term Financing 491,000 1,751,000 1,155,000 1,3 57,000 1,691,000 1,985,000 2,073,000 1,955,000 798,000 2,218,000
Arlington Public Schools contribution 491,000 1,087,000 3,270,000 354,000 798,000 1,377,000
Marymount University contribution 629,000
George Washington University contribution 773,000
Other Partnership/Fundraising 2,000,000
Total Sources 1,282,000 2,838,000 11,823,000 1,357
,000 2,320,000 3,112,000 2,073,000 1,955,000 1,596,000 3,595,000
NOTES: -
The above schedule is the anticipated schedule for sythetic turf replacement, however it is subject to change particularly as the County works with its partners on those fields with shared use.
An 8-year useful life is assumed for all synthetic fields. Some schedules have been adjusted to smooth out the funding with an eventual goal of two-three field replacements per year.
Costs include replacement of the synthetic turf and infill, repairs to the base layer and under-drain system, replacement of field amenities, field surveys, design and construction administration.
Replacment of synthetic turf on the three high school stadium fields shall be performed in separate years to accommodate scheduling of school events.
Atheltic fields at Arlington Public Schools assumes a 50/50 cost share at high schools and a 70/30 cost share at middle schools with the County paying 70% of the cost. Actual cost share splits are determined by hours of use.
As funding allows, this program will consider conversion of additional fields through financial partnerships with Arlington Public Schools, universities and sports organizations.
PROJECTED SYNTHETIC FIELD REPLACEMENT SCHEDULE
CAPITAL COSTS FY2023 - FY2032
C - 47
P
rogram Description
This program will improve the quality and appearance of public areas in Arlingto
Text truncated. Open the original for the full document.
Source: Arlington County website. First collected Oct 27, 2026.