Adopted Biennial Capital Improvement Plan Fiscal Years 2013-2022 COUNTY BOARD MARY HUGHES HYNES CHAIR J. WALTER TEJADA VICE CHAIR JAY FISETTE CHRISTOPHER ZIMMERMAN LIBBY GARVEY COUNTY MANAGER’S OFFICE BARBARA M. DONNELLAN COUNTY MANAGER Vision for Arlington County “Arlington will be a diverse and inclusive world-class urban community with secure, attractive residential and commercial neighborhoods where people unite to form a caring, learning, participating, sustainable community in which each person is important.” - Adopted by the Arlington County Board January 26, 2002 Table of Contents INTRODUCTION ........................................................................................................ 1 GUIDE TO READING THE CIP .............................................................................. 8 BUDGET CALENDAR ................................................................................................. 9 A. OVERVIEW CIP Message ........................................................................................................................... A-1 Supplementary CIP Guidance ............................................................................................. A-3 Adopted FY 2013 – FY 2022 CIP Board Report & Attachments ................................. A-5 Major Capital Projects from 2002 - 2012 ......................................................................... A-12 Financial & Debt Management Policies ........................................................................... A-16 2012 Bond Referenda Board Report ................................................................................ A-22 Bond Referenda History..................................................................................................... A-34 Bonds Authorized but Unissued ....................................................................................... A-45 Projects Underway .............................................................................................................. A-46 Impact on Future Operating Budgets .............................................................................. A-57 B. CAPITAL FUNDING CIP Program Summary ........................................................................................................ B-1 CIP Program and Funding Allocations .............................................................................. B-3 Debt Summary ....................................................................................................................... B-4 PAYG Summary .................................................................................................................... B-6 Comparison of Previously Adopted to Current Bond Program .................................... B-7 CIP Program Detail .............................................................................................................. B-9 Debt Capacity Analysis ....................................................................................................... B-15 Debt Ratio Analysis Chart ................................................................................................. B-17 Tax-Supported Debt Service to General Fund Expenditures Graph.......................... B-18 County General Obligation Bond Debt other Financings to Market Value Chart ... B-19 County General Obligation Bond Debt other Financings to Market Value Graph .. B-20 Tax Supported General Obligation Bond Debt to Income .......................................... B-21 C. GENERAL GOVERNMENT 1. MAINTENANCE CAPITAL Program Summary ...................................................................................................... C-1 2. REGIONAL PARTNERSHIPS Regional Partnerships ................................................................................................. C-6 3. LOCAL PARKS AND RECREATION PROGRAMS Program Summary ...................................................................................................... C-9 Maintenance Capital.................................................................................................. C-11 Parks Enhancement Grants ..................................................................................... C-17 Parks Land Acquisition and Open Space .............................................................. C-19 Synthetic Turf Program ............................................................................................ C-21 Park Master Plans ...................................................................................................... C-24 Long Bridge Park ................................................................................................. C-25 4. COMMUNITY CONSERVATION PROGRAMS Program Summary .................................................................................................... C-44 Neighborhood Conservation................................................................................... C-46 Penrose Square .......................................................................................................... C-48 Nauck Investment Fund .......................................................................................... C-51 Nauck Town Square ................................................................................................. C-53 5. ECONOMIC DEVELOPMENT PROGRAMS Program Summary .................................................................................................... C-55 Planning ...................................................................................................................... C-57 Public Art Program ................................................................................................... C-59 Public Benefit Spaces ................................................................................................ C-62 6. PUBLIC / GOVERNMENT FACILITIES Program Summary .................................................................................................... C-65 Facilities ...................................................................................................................... C-67 Maintenance Capital ............................................................................................ C-69 2020 Building Acquisition and Conversion ..................................................... C-73 Non-Parks Land Acquisition ................................................................................. C-123 Energy Efficiency .................................................................................................... C-126 7. COMMUNITY ENERGY PLAN Overview .................................................................................................................. C-129 D. INFORMATION TECHNOLOGY/EQUIPMENT PROGRAMS Program Summary ...................................................................................................... D-1 Enterprise Information Technology ........................................................................ D-3 Public Safety Information Technology .................................................................. D-12 ConnectArlington ..................................................................................................... D-21 E. METRO AND TRANSPORTATION 1. METRO Program Summary ...................................................................................................... E-1 2. TRANSPORTATION INITIATIVES Program Summary ...................................................................................................... E-3 Crystal City Plan Improvements ............................................................................... E-6 Transportation Capital Fund/Tax Increment Financing Fund-Fund Balance .. E-7 Transportation Funding Plan .................................................................................... E-9 Arlington Transit Program ...................................................................................... E-13 Columbia Pike Streetcar ..................................................................................... E-25 Rt. 1 Corridor Streetcar ...................................................................................... E-45 Complete Arlington Streets ..................................................................................... E-49 Fiber Project (Transportation)........................................................................... E-67 Local Initiatives ......................................................................................................... E-85 Paving Maintenance Capital .................................................................................... E-92 F. UTILITIES AND STORMWATER MANAGEMENT 1. UTILITIES Program Summary ....................................................................................................... F-1 Sanitary Sewer System Improvements ...................................................................... F-4 Water Distribution System ....................................................................................... F-12 WPCP Expansion ...................................................................................................... F-19 WPCP Non-Expansion ............................................................................................ F-25 Maintenance Capital................................................................................................... F-30 2. STORMWATER MANAGEMENT Program Summary ..................................................................................................... F-34 Environmental Quality .............................................................................................. F-37 Storm Drainage Improvements ............................................................................... F-51 Maintenance Capital................................................................................................... F-55 G. APPENDIX Schools FY 13 - FY22 CIP ........................................................................................ G-1 ^ ^ ^ ^ ^ $+ Arlington County Government Center Marine Corps War Memorial Arlington National Cemetery Pentagon National Airport Arlington County Trades Center SHIRLINGTON CIR INTERSTATE 66 MILITARY RD OLD DOMINION DR BOUNDARY DR LEE HWY COLUMBIA PIKE S GLEBE RD WILLIAMSBURG BLVD INTERSTATE 395 N VEITCH ST 23RD ST S LITT LE FALLS RD KEY BLVD 10TH ST N CHAIN B RIDGE RD N W ESTM ORELAND ST LEE HWY LEESBURG PIKE 15TH ST S LEE HWY PATRICK HENRY DR YORKTOWN BLVD INTERSTATE 395 HOV LANES N HARRISON ST COLUMBIA PIKE CLAR ENDON BLVD S JOYCE ST JOHN M AR SH ALL DR S KING ST FAIRFAX DR MEMORIAL DR KEY BRIDGE S FILLMO RE STN CARLIN SPRINGS RD SPOUT RUN PKWY S JEFFERSO N ST ROOSEVELT BLVD MEMORIAL BRIDGE S HAYES ST S CARLIN SPRINGS RD S W ASHINGTON BLVD N GLEBE RD FO RT M YER DR N LYNN ST S EADS ST CRYSTAL DR N SYCAM O RE ST JEFFERSO N DAVIS HW Y NELLY CUSTIS DR Q UAKER LN S W ALTER REED DR S ARLIN G TON RID G E RD GEORGE W ASHINGTON MEMORIAL PKWY ROUTE 110 ROUTE 110 LORCOM LN WILSON BLVD ARLINGTON BLVD WASHINGTON BLVD N Q UINCY ST FAIRFAX DR S GEORGE MASON DR WILSON BLVD S FOUR MILE RUN DR ROUTE 233 ARLINGTON BLVD N GLEBE RD WASHINGTON BLVD N GEORGE M ASON DR N PERSHING DR Arlington County, Virginia Arlington, Virginia Capital Improvement Plan Introduction A. Overview The Capital Improvement Plan (CIP) is one of the most significant planning processes for Arlington County and Arlington Publi c Schools. This plan identifies the capital needs of the c ommunity over a ten -year period. This plan not only identifies the immediate needs but also seeks to capture longer - term capital needs. The CIP is a planning document that is updated biennially and subject to change as the needs of the community beco me more defined and individual projects move along in their respective planning and budgeting processes. The effective use of a CIP process provides for co nsiderable advance project identification, planning, evaluation, scope definition, design, public discussion, cost estimating, and financial planning. The objectives used to develop the CIP include: To preserve and improve the infrastructure of Arlington through capital asset construction, rehabilitation and maintenance; To maximize the useful life of capital investments by scheduling major renovations and modifications at the appropriate time in the life- cycle of the facility; To identify and examine current and future infrastructure needs and establish priorities among projects so that available resources are used to the community’s best advantage; and To improve financial planning by comparing needs with resources, estimating future bond issues, and identifying potential fis cal implications. The CIP is the primary instrument for planning the fun ding and timing of the needs and priorities that have been approved by the County Board. The funding and implementation of CIP projects follow in the form of bond referenda; the annual appropriation of Pay -As-You-Go (PAYG) projects by the Board as part of the annual operating budget; and approval / receipt of other funding sources identified in this document. B. Capital Project Definition Capital projects result in economic activities that lead to the acquisition, construction, or extension of the useful life of capital assets. Capital assets include land, facilities, parks, playgrounds and outdoor structures, streets, bridges, pedestrian and bicycle systems, water and sewe r infrastructure, technology systems and equipment, traffic control devices, and other items of value from which the community derives benefit for a significant number of years. 1 Capital expenditures and operating expenditures are primarily differentiated by two characteristics: dollar amount of the exp enditure and the useful life of the asset acquired, constructed, or maintained. Capital expenditures will enhance, acquire or extend the useful life of assets t hrough a variety of activities. Generally, land acquisition, feasibility studies, planning, design, construction, asset rehabilit ation, enterprise technology acquisition, and project Implementation, are activities associated with capital projects. Capital projects are typically funded with a variety of Coun ty sources – the primary two of which include bond and PAYG. Bond funds are usually reserved for th e big ticket items such as new construction or major renovations or alterations with a useful life of at least ten years. PAYG funds are used for smaller scale renovations or maintenance type projects with a useful life of at least five years. In general, capital projects in the CIP: Have a total project cost in the range of $100,000 or more. Range from construction of new buildings to renovations, additions, or conversions, or demolition of existing facilities. Have a minimum useful life of five years, significantly extend the useful life of an asset, or significantly alter the nat ure and character of an asset (i.e. not to include annual asset maintenance costs, annual warranty cost or other ongoing costs). The CIP has also traditionally been the vehicle by which planning for technology capital investments occurs. In general, tech nology capital projects in the CIP: Have an estimated cost in excess of $25,000 and /or require six months or 1,000 hours for implementation or completion. Include applications systems, network design and implementation, telecommunications infrastructur e, enterprise hardware and software systems, web design and implementation services, document imaging, data base design and development, consulting services (bus iness process studies, requirements analysis or other studies), and technology associated with new construction and/or renovation and relocation projects. Have a minimum useful life of three years, significantly extend the useful life of an asset (i.e. not to include annual software and hardware maintenance and upgrade costs, warranty costs or other ongoing costs), provide a significant enhancement to functionality, or represent a change of platform or underlying structure. C. CIP Development Process Capital projects originate from a variety of sources. County Board appointed commissions, advisory gro ups, and task forces typically advise the Board or develop long -term plans that recommend certain types of improvements. In some cases, individual residents request improvements to their s treets, playgrounds or other County facilities. Neighborhood associ ations and business groups may also suggest projects and work with County staff on projects. Some projects are initiated by staff based on adopted County master plans, such as the Transportation Master Plan or the Storm Water Master Plan. Projects typically come forward through the sponsoring department that is responsible for their implementation but also come from staff tha t exercises operational control over County assets. Given that there are always more project proposals submitted than can be funde d in a given year, various criteria are used to assist in prioritizing capital projects. These criteria included a test for immediate safety, legislative, or ju dicial requirements, the project’s ability to be implemented in the timeline proposed, linkages to other approved and funded projects, linkages to an approved County master plan, other goals and 2 objectives of the County, and direct benefit to citizens. Other considerations include current and future fiscal impact, cos t of deferring a project, alternative funding sources, and County and private development goals and plans. Similar to the previous CIP formulation, staff organized into to a CIP Working Group to develop the CIP. The CIP Working Gro up included key leadership from all major areas of capital, including all deputy directors from DES, the Parks Planning Division chief, representatives from DTS and CPHD, (representing the Neighborhood Conservation program) along with public safety staff. The CIP Working Group reviewed al l initial departmental requests in a series of briefings in January and February. In March, the CIP Working Group went through a series of priorit ization and debt capacity exercises to form an initial recommendation to the County Manager. Working behind the scenes to su pport the Working Group was a Core Production Team, focused on organizing the process, schedule, and decisions needed to produce the CIP. The Core Production team consist s of the Director of DMF, the Deputy Director of Facilities and Engineering, and technical staff from DES and DMF. As discussed in more detail under “Financial & Debt Management Policies” below, t he consolidated recommendations were considered against various debt capacity scenarios to develop the final CIP. Throughout the process, the t eam consulted with program managers and other subject matter experts within the departments. D. Financial & Debt Management Policies The Board-adopted financial and debt management policies provide the parameters for the amounts and timing of bond -financed projects to be included in the CIP, ensuring that the CIP is financially sustainable and that it supports the County’s triple -A bond ratings. The County’s debt capacity policies are summarized below and a complete copy of the County’s financial policies are included later in this section: 1. The ratio of net tax-supported debt service to general expenditures should not exceed ten percent, within the ten-year projection. 2. The ratio of net tax-supported debt to full market value should not exceed four percent, within the ten-year projection. 3. The ratio of net tax-supported debt to income should not exceed six percent, within the ten-year projection. 4. Growth in debt service should be sustainable consistent with the projected growth of revenues. Debt serv ice growth over the ten year projection should not exceed the average ten year historical revenue growth. 5. The term and amortization structure of County debt will be based on an analysis of the useful life of the asset(s) being financed and the variability of the supporting revenue stream. The County will attempt to maximize the rapidity of principal repayment where possible. In no case will debt maturity exceed the useful life of the project. As part of the iterative process of analyzing debt capacit y and projected debt service growth of capital projects, staff analyzed cashflow projections for each project. These projections were matched against unspent bond proceeds from previous bond sales and authorized but not y et issued bond authority to develop reasonable new bond sale assumptions over the ten year period that live within the Board’s sustainable debt service growth policy. 3 E. Sources of Capital Funds Funding for capital improvements comes from a number of sources. These funds are generated th rough local taxes, fees, charges, outside funding or other similar sources. The availability of these funds is sensitive to economic cycles. Pay-As-You-Go (PAYG) comes from annual appropriations and is part of the adopted operating budget. PAYG fundin g provides the greatest flexibility since it is not constrained by tax -exempt bond requirements and historically has funded maintenance capital projects, regional partnership programs and other projects such as Neighborhood Conservation and Neighborhood Tr affic Calming. Projects that are typically smaller in scale as well as minor renovations are likely candidates for PAYG funding – as long as the project has an expected useful life of at least five years or more. PAYG also: Has no debt service cost that has to be paid on the expenditure; Is available at the start of the fiscal year; Must compete with operating programs for funding; Does not have to be approved through referendum; and Can be carried over at the end of each fiscal year. Also as part of PAYG budget a decal fee allocation was adopted by the Board on April 24, 2010 (part of the FY 2011 budget adoption), and was originally set at $1 million for bicycle pedestrian projects. However, the language as written has been interpreted to allow the amount to exceed $1 million annually when the revenues come in higher than anticipated, as was the case in FY 2011. The FY 2013 decal fee funded projects include: Bike Arlington, Improvements to corridors outside principal business districts, and Capital Bike Share. Bond financing refers to debt financing of projects. Arlington County most often sells general obligation bonds. Bond financing is generated through the borrowing of funds (principal) at a cost (interest) through the sale of municipal bonds. There are several types of bond financing: General obligation bonds - Arlington typically issues general obligation bonds, which must first be approved by the County’s voters and are secured by the full faith and credit of the County. Arlington’s practice is to schedule bond referenda for even -numbered calendar years, which correspond to the bond sale in odd-number fiscal years. Revenue bonds – Arlington has issued low interest rate revenue bonds through the Virginia Water Revolving Loan Fund (VRLF) run by the Virginia Resources Authority for improvements to the Water Pollution Control Plant. Revenue bonds are typically secured solely by user fees or projected revenues and include no pledge from the General Fund. Revenue bonds typically carry a higher interest rate than GO bonds and generally have debt service coverage and other financial restrictions. The FY 2013 – FY 2022 CIP includes revenue bond funding beginning in FY 2014 supported by the Transportation Capital Fund as well as revenue bond fundin g beginning in FY 2015 for the Route 1 streetcar and other transportation improvements supported by the Crystal City Tax Increment Financing Fund. Lease revenue or annual appropriation bonds – These types of bonds are secured by a “subject to appropriation” pledge by the County Board and do not require voter approval. (See “Lease -purchase finance” below) They generally require the use of a third party to execute the lease transaction, such as the Industrial Development Authority (IDA), Virginia Resources Authority, or Virginia Municipal League / Virginia Association of Counties. 4 One of the criteria used to determine which projects will be funded with bond proceeds is the useful life of the improvement. Projects funded with bond proceeds generally have a useful life that is similar in length to the repayment schedule of the bonds. Historically, Arlington has issued 20 -year general obligation serial bonds and paid the bonds using a two -year step-up schedule of principal repayment, and the average bond p rincipal is outstanding for approximately 11 years. The Board’s financial policies allow for longer term bonds as long as the term of the bonds does not exceed the useful life of the project, and also allows for alternative amortization structures such as level debt service to better match certain revenue streams. Another capital funding source is inter-jurisdictional payments. Arlington has agreed to provide services to other jurisdictions through contractual agreements. For example, wastewater treatment services for some areas of Alexandria, Falls Church, and Fairfax County are provided by Arlington’s Water Pollution Control Plant. These jurisdictions also share in the cost of capital improvements of this facility, thus reducing the cost to Arlington users. Lease-purchase finance (or Master Lease) represents another source of capital financing to acquire equipment, rolling stock, furniture and technology purchases that have useful lives ranging from three to ten years. Master lease financing is very f lexible, allowing the County to finance projects with minimal transaction costs and on an “as needed” basis over the term of the master lease. Because of the short -term maturities of master lease financing, interest rates are typically lower than rates on long-term bonds. The County typically procures equipment using temporary funding sources, and then draws funds from the master lease financing institution to reimburse the temporary sources. Infrastructure Availability (formerly hook-up) fees are another source of capital funding. These fees are assessed to developers and builders to join the water and sewer systems, based on the cost of capacity (volume) of the systems being “used up” by the customer. These funds are programmed during the annual budget process and can be used only for utilities projects. The Transportation Capital Fund is a source of funding authorized by the General Assembly in 2007 enabling the County to levy an additional real estate tax on industrial and commercial properties for transportation initiatives. In April 2008, the County Board adopted a tax of $0.125 per $100 of assessed value, yielding projected revenues of $24 million in FY 2013 for transportation projects. The commercial real estate tax is proposed, beginning in FY 2015, to support bond financing. Proceeds of the tax are held in a separate fund. The Crystal City – Potomac Yard – Pentagon City Tax Increment Financing Area was established in 2010 to support the infrastructure investment needed as part of the Crystal City Sector Plan as well as the neighboring areas of Potomac Yard and Pentagon City. Tax increment financing (TIF) is a mechanism used to support development and redevelopment by capturing the projected increase in property tax revenues in the a rea and investing those related infrastructure improvements. Unlike a special district, it is not an additional or new tax; rather, it redirects and segregates the increased property tax revenues that would normally flow to the General Fund. The amount of tax inc rement revenue is determined by setting a baseline assessed value of all property in the area on January 1, 2011 and in each subsequent year, tracking the incremental increase in assessed values rel ative to the base year, and segregating the incremental revenues in a separate fund. The County Board approved allocating 33 percent of the incremental revenues to the Crystal City – Potomac Yard – Pentagon City area. The Stormwater Management Fund relies on a source of funding adopted by the County Board in Ap ril 2008 to fund operating and capital costs to upgrade and expand the County’s stormwater drainage and sewer infrastructure. The Board adopted a County -wide sanitary district tax of $0.01 per $100 of assessed value. This rate was raised to $0.013 in Apr il 2010 and provides extra funds for capital projects. The sanitary district tax could ultimately be used to support bond financing. Proceeds of this tax are held in a separate fund. 5 Developer contributions are also an important source of funding. Th ese are contributions paid by developers to finance specific projects. Examples of these projects are utility undergrounding and street lighting. Finally, there are grants and reimbursements or other revenue from the state and federal governments. The se are funds provided by the Commonwealth of Virginia or the federal government for reimbursement of costs for certain capital improvements. Whenever pos sible, state or federal reimbursement is sought to offset County tax support and is included in the pl anning process. (See the Transportation & Pedestrian Initiatives section of the CIP for some current examples.) F. Definition of Terms Used in Capital Planning Arbitrage: Arbitrage is the gain a tax -exempt issuer may be able to obtain by borrowing at a ta x-exempt rate and investing at a taxable rate. The Tax Reform Act of 1986 and subsequent amendments relating to the issuance of tax -exempt debt and arbitrage regulations had a dramatic affect on all issuers of tax-exempt debt. Arbitrage Rebate: Refers to the requirement to rebate to the Federal government investment earnings derived with the proceeds of tax -exempt debt that are in excess of the earnings that would have been earned had the proceeds of the debt been invested at the same interest rate as that paid to the holders of the tax-exempt debt. Architecture and Engineering (A&E): Professional services performed to facilitate planning, development, designs, cost estimates and construction of buildings, parks, streets, utilities, and other capital infrastructure. Bond Funding: Funding derived from the public sale of bonds for which interest is paid to buyers for the use of the money. CIP programs and projects funded by bond financing are approved by the County Board for inclusion on a bond referendum. Voters approve each bond referendum. In Arlington, a bond referendum is placed on the ballot for voter approval every other November, concurrent with Congressional/Presidential elections. Funds cannot be spent until after the referendum is approved by the voters, the Board approves the authorization and the County has developed cash flow plans. Spending rules are established based on referendum language and IRS regulations. Bond Issuance Costs: Costs associated with the sale of bonds. Expenditu res include fees to bond rating agencies, administrative expenses, legal fees, etc. Capital Planning Process: The process of identifying, planning, evaluating and scoping projects, establishing performance standards, conducting public discussion, estimati ng costs and financial planning for capital projects. These processes should be completed for current year funding requests and underway for projects proposed in subsequent years. Full Time Equivalent (FTE) : The measure of authorized personnel. It is calculated by equating 2,080 hours of work per year (2,912 for uniformed firefighters) with the full-time equivalent of one position (referred to in the budget as an FTE). 6 Inflation Factor: An increased cost applied to out year projects in the CIP to acc ount for increases in costs over time; in the CIP, inflation is assumed at 3% annually. Out Years: All years after the current funding year. For example, in the FY 2013 – FY 2022 CIP, all years after FY 2013 are considered out years. Overhead: The capital project should bear the cost of staff time spent directly on the implementation of the projects funded. In certain cases, the project can also bear the cost of program planning or preliminary business processes used in advance of funding or bringing the project to completion of scope. Rules: This applies to limitations on the use of funds as a result of special revenue requirements. Inter -jurisdictional agreements for sewer construction reimbursement can only be applied to non -expansion costs of spe cific projects. Grants can only be spent under the terms and conditions provided with the grant. Bonds can only be used consistent with the language of the referendum and for items consistent with bond counsel determination, etc. Rules are not intended to imply administrative procedures, but rather legal requirements. Total Project Cost: The CIP reflects the full cost of each project. The total cost includes such items as design, construction, right -of-way, construction management, utility relocations , hardware and software purchases, equipment needed to make the improvement useful, and appropriate overhead and operating costs. 7 GUIDE TO READING THE FY 2013 – FY 2022 CAPITAL IMPROVEMENT PLAN The adopted FY 2013 – FY 2022 Capital Improvement Plan (CIP) provides comprehensive information on the near and longer-term facility and infrastructure capital improvements planned in the County over the next ten years. The book is organized by the following sections: an introductory section, overview, capital funding, and the program areas under which the projects reside. Each one of these sections represents a key component of the overall picture of the adopted FY 2013-2022 CIP:  The introductory section includes various information on the CIP process, policies and governance that help provide context and framework under which the CIP is formulated.  The Overview sets the tone for the adopted CIP with the Chairman’s CIP message and provides status of existing projects, including summaries of authorized unissued bonds and projects that are underway. This section also describes the impact of the adopted FY 2013-2022 CIP on the operating budget.  The Capital Funding section includes various financial summaries of the CIP by program and funding source. It also includes analysis of the County’s debt capacity as impacted by the adopted CIP. The remaining three sections are dedicated to describing specific programs and projects included under the general government section, metro and transportation section, and the utilities and stormwater section. These sections detail the projects by major programs.  The first part of each of the programs provides a summary overview of costs and funding sources. Also included is specific information on the impact bond/debt financing will have on annual debt service payments where applicable.  The following pages provide a detailed description of each project, associated master plan impact, project justification, cost schedules, funding schedules, changes from the last CIP, and operating impacts, if any. Like previous CIPs, the adopted FY 2013-2022 CIP is largely funded by debt, PAYG, and Master Lease Funding. In addition, the Transportation Capital Fund, the Crystal City, Potomac Yard and Pentagon City tax increment financing area and the Stormwater Management Fund are integrated in the comprehensive funding strategy for the CIP. Please note that cost estimates are subject to market pressures and may not accurately reflect the actual costs incurred at project implementation. As part of the County’s effort to make these processes more accessible to citizens and responsive to the needs of the community, the method by which the ten-year CIP is developed, considered, and adopted is continually being improved. Suggestions for changes or comments regarding the CIP are welcome and encouraged and should be directed to CIP@arlingtonva.us . 8 CIP CALENDAR NOVEMBER 2011  FY 2013 – FY 2022 Capital Improvement Plan (CIP) staff kick-off FEBRUARY 2012  County Manager presents FY 2013 PAYG Budget to the County Board MARCH  Staff submits FY 2013 – FY 2022 CIP recommendations to the County Manager’s Office  County Board holds a public hearing on the County Manager’s proposed FY 2013 budget, including the PAYG budget MARCH/APRIL  County Board holds budget work sessions on PAYG and the operating budget with County departments and the Fiscal Affairs Advisory Commission  County Manager’s Community Forum on the Operating Budget APRIL  County Board adopts FY 2013 Budget, PAYG Capital and Appropriations Resolutions for the County government and the public schools  On-line “Open Forum” opened to the public for on-line comments on the CIP MAY  Superintendent submits FY 2013 – FY 2022 Proposed CIP to the School Board on May 10  County Manager submits FY 2013 – FY 2022 Proposed CIP to the County Board at its May meeting  Joint worksession of the County Board and School Board – May 21  Various boards and commissions review the FY 2013 – FY 2022 Proposed CIP JUNE  School Board adopts the School’s FY 2013 – FY 2022 CIP  County Board worksessions on CIP – June 20 & June 28 JULY  County Board adopts the FY 2013 – FY 2022 CIP and approves the general obligation bond referenda resolutions and the language to be inserted on the ballot for the fall General Election 9 Arlington, Virginia Chairman’s CIP Message To the Citizens of Arlington County: I am pleased to present the County Board’s Adopted FY 2013-2022 Capital Improvement Plan. This plan strikes a balance between maintaining aging infrastructure and making strategic investments that will help us grow and prosper as a County. This CIP extends our planning period from six to ten years, allowing the County to reap the benefits of engaging in long -term planning and financial forecasting for major multi-year transportation and utilities projects. The ten year model also helps us make better linkages between other County maste r plans and the associated capital investment needed. Highlights of the Adopted CIP include: Increased funding for maintenance capital – paving, facilities, parks, technology and transportation infrastructure - reflecting the Board’s commitment to maintain what we have. Reflecting the results of the Customer Satisfaction Survey, the adopted CIP includes increased funding for street repaving. Design and construction funding for the Long Bridge Aquatics and Fitness Facility in FY 2013. Completion of this one -of-a-kind recreational, fitness, and competition facility will provide long-term value to our community and attract people regionally . The Board also asked the Manager to accelerate playground improvements at Long Bridge if one-time funding becomes available. Strategic investments in the Columbia Pike and Route 1 streetcars that will serve generations of Arlingtonians to come. Additional focus on parks and open space land acquisition, including direction for additional one-time funding where possible, to meet the needs of a growing population. Additional funding for upgrades and replacements to the water system , based on preliminary results of the water master planning process that is currently underway and will be completed in 2013. The stormwater master plan, which is scheduled to be completed in early 2013, will also inform future CIPs. Out-year funding to reinvest in core support facilities like our older fire stations that were built at a time of much smaller population and less density. Funding for the final phases of ConnectArlington and Intelligent Transportation System—the technology backbone that supports our daily business, public safety, and transportation network. A - 1 Funding for Metro and other major transportation infrastructure, providing support for residents and visitors to work, play and live in our community. Funding of the School Board’s Adopted CIP to address its space and capacity challenges, which includes the design and construction of new elementary schools and school facility additions. We look forward to continuing our work with Schools as they finalize their facility plans, working to ensure that the needs of the community are met in this once in a generation investment. While we embark on execution of key initia tives in this adopted CIP it is equally important that we continue to execute what was authorize d in previous CIPs. That’s why I am proud to share the progress we have made on some key projects since the last CIP was adopted two years ago . We completed and opened Fire Station 3 and three fields of Long Bridge Park – Phase 1. We are in the midst of construction of the new Arlington Mill Community Center, the Potomac Interceptor, and the Rosslyn Metro Station access improvements. We are well underway wit h the acquisition and planning process for a new year-round homeless shelter and associated County office space. We have made great progress on maintenance capital investments. We have much to be proud of. The fact that we are able to afford these nec essary capital projects while maintaining our AAA bond rating is something we should not take for granted. In order to accomplish this, the Adopted CIP stays within the Board’s financial and debt management policies, which benefit a ll County tax -payers through lower interest rates on our debt. The Board appreciates the input received from the commissions, advisory groups and other members of the public in developing this CIP and the work of staff. Sincerely, Mary Hughes Hynes Chair, Arlington County Board A - 2 Supplementary Guidance to the County Manager regarding the 2012-2022 CIP July 21, 2012 Land Acquisition Parks land acquisition & open space is a significant priority of the County Board. Through a combination of $14.4M in bond funding included in the FY2013-2022 CIP and future additional one-time funding that may become available the Manager is directed to present to the Board opportunities to increase total funding for parks land acquisition over the ten year period of the CIP. Playground at Long Bridge Park Initiate the planning and installation of the playground-type components at the S. 6th street locations identified in the Master Plan as soon as is possible using non-bond funds Reevesland Conduct the RFP process as planned. Bring recommendations regarding the building to the County Board following the completion of that process Missing Links The County Board is interested in restoring a sidewalk infill program to address County identified needs that would complement the neighborhood-driven process embedded in the Neighborhood Conservation Program. Provide a report to the County Board in the context of the development of the FY14 budget. Paving Conduct the paving program as planned for the next two years. As part of the FY14 CIP provide an update and recommendations on whether to raise the paving condition target. Streetcar Implementation Consistent with the 2010 direction given in conjunction with adoption of the Crystal City Sector Plan, and recognizing the need to expedite the implementation of the Streetcar projects and minimize costs, the County Board and the County Manager have investigated a range of alternative project delivery (APD) methods for major transit infrastructure projects. The County Board is interested in all steps that can be taken to expeditiously advance the design and construction of approved streetcar projects with a particular focus on the role of public-private partnerships. A - 3 It is the County Board's understanding that the County Manager will be undertaking a series of actions between now and the end of the calendar year to advance streetcar implementation as to meet critical infrastructure needs. These steps are listed below and are fully supported by the Board: A) Establish a schedule of regular information to the County Board members or briefings on program implementation (starting Fall 2012) B) Create an inter-departmental streetcar program implementation team to address property and right-of-way acquisitions, utility assessments and relocations, contracting and staffing (Fall 2012) C) Secure consultant services to advise the County on the procurement processes and legislative actions necessary to fully support the range of alternative project delivery methods that are available for use in the Commonwealth of Virginia (Fall 2012) D) Prepare amendments for Arlington’s procurement regulations, in accordance with the Virginia statutes, to enable the County to utilize the full range of alternative project delivery methods and partnerships for advertisement in October 2012 E) Bring a RFI or RFQ or RFP (Request for Information, or Qualifications, or Proposal) related to APD firms for Board consideration as soon as possible after engaging consultant services Arlington Public Schools The County Board has incorporated the School Board’s full funding request. The Manager is directed to work closely with APS to expeditiously and thoroughly address important land use questions in the context of each project review led by the Public Facilities Review Committee (PFRC). A - 4 County Manager: ##### County Attorney: ***** Staff: Michelle Cowan, DMF Greg Emanuel, DES Loan Hoang, DMF ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 21, 2012 DATE: July 5, 2012 SUBJECT: Fiscal Year (FY) 2013 - 2022 Capital Improvement Program (CIP) Adoption C. M. RECOMMENDATION: Adopt the Fiscal Year 2013 – 2022 Capital Improvement Plan presented in Attachments A-1 and A-2. ISSUES: How much capital investment can the County afford during the next ten year planning period and how should that capacity be allocated among community priorities? SUMMARY: The recommendation sets the parameters for the County’s bond referenda for 2012 and establishes a preliminary plan for capital investment through Fiscal Year 2022. The CIP reflected in Attachments A-1 and A-2 amends the County Manager’s Recommended CIP and reflects the following: 1. Accelerate the Long Bridge Park project identified as Phase IIIA, which includes play elements and entry features, from 2016 to FY 2013 with funding to be recommended by the County Manager. 2. Reallocate the $1.441 million identified in 2016 for the Long Bridge Park Phase IIIA to the parks land acquisition and open space program. BACKGROUND: The Capital Improvement Plan is one of the most significant planning processes for Arlington County and Arlington Public Schools. This plan identifies the immediate as well as longer-term capital needs of the community. In contrast to past plans which covered a six year period, the current CIP covers a ten year period from FY 2013 – FY 2022. As an historical reference, Attachment B portrays a list of capital projects completed during the last ten years. This demonstrates the significant progress made in reinvestment in the County’s infrastructure and facilities as a result of many CIP planning and funding cycles. As with past CIPs, this CIP is primarily a planning document, and includes both County government 45. A - 5 Subject: FY 2013 – 2022 CIP Adoption 2 and Schools project plans. As such, the CIP is subject to amendment and updating as the needs of the community change and become better known, and the proposed projects move closer to funding and final approval. Staff monitors changes in the community to be able to take advantage of opportunities that arise in scheduling and funding capital improvements in conjunction with private sector development and redevelopment. As priorities change and opportunities arise, staff reassesses the County's capital improvement program and proposes changes that will affect the timing and funding of projects. The CIP represents staff’s best evaluation, at this time, of overall capital needs at a level affordable to taxpayers. The County government portion of the CIP is prepared on an interdepartmental basis with staff expertise from each program area utilized to help prepare each segment of the proposed CIP. DISCUSSION: The County Manager’s Proposed FY 2013 – FY 2022 CIP was presented to the County Board in May 2012. Since the release of the proposed CIP, there have been four work sessions, County Board guidance and extensive community input. As a result of the CIP public process, the County Manager’s CIP is amended as follows: 1. Accelerate the Long Bridge Park project identified as Phase IIIA, which includes play elements and entry features, from 2016 to FY 2013 with funding to be recommended by the County Manager. 2. Reallocate the $1.441 million identified in 2016 for the Long Bridge Park Phase IIIA to the parks land acquisition and open space program. Through a combination of this level of bond funding and future additional one-time funding that may become available, the target is to increase total funding for parks land acquisition over the 10 year period of the CIP. The Arlington Public Schools adopted FY 2013 – FY 2022 CIP totals $537.7 million and will be reflected in the summary tables as part of the County’s adopted FY 2013 – FY 2022 CIP. The $537.7 million includes funding for three elementary school additions and two new elementary schools among other projects. The adopted CIP document historically has included the Schools’ adopted CIP for reference purposes. Additional changes to the Proposed CIP are of an administrative nature, such as updating financial tables and charts, correcting mathematical typos and do not affect the overall CIP total. The following table summarizes total costs under the Recommended CIP, with the changes as discussed above: FY 2013 – FY 2022 CIP Totals (in $000) Program County Manager’s Proposed CIP Revised CIP County $ 2,104,499 $ 2,104,499 Schools $ TBD $ 537,713 Utilities $ 301,577 $ 301,577 Stormwater $ 43,289 $ 43,289 TOTAL $ 2,449,365 $ 2,987,078 A - 6 Subject: FY 2013 – 2022 CIP Adoption 3 The table below presents the proposed amounts to be included on the general obligation bond referenda this November. This table excludes amounts to be financed through other financing vehicles, including Industrial Development Authority financing for Government office and comprehensive homeless services office building at 2020 North 14th Street (approximately $26.4 million) and temporary financing for Long Bridge Aquatics to be reimbursed by developer contribution (approximately $20.0 million). FY 2013 Bond Total (CY 2012 Bond Referendum) (in $000) Revised Recommendation Comments County $ 110,805 Metro, Paving and other Transportation projects, Long Bridge Aquatics, Parks and Facilities maintenance capital, parks land acquisition, Tyrol Hills design, Salt Facility design, Neighborhood Conservation, ConnectArlington and Intelligent Transportation System Schools $ 42,620 Design-Construction of new elementary schools, School facility additions and various School facility projects TOTAL $ 153,425 During the CIP development and consideration process, a significant amount of community input was sought. A CIP Public Forum was held on April 12, 2012 and OpenArlington, a forum for civic engagement was held online to elicit citizens’ priorities for the CIP. Since the proposed CIP was released in May, staff has met with 12 Commissions and Committees and provided information at five work sessions. Additionally, a CIP Public Hearing was held on June 26, 2012. The Adopted CIP will be published in hard copy and will also be available on the County website. FISCAL IMPACT: The impact of this CIP combined with past and current obligations can be found in Attachment C. It presents total estimated debt payments on an annual basis as well as the percentage increase in debt on a year-to-year basis. The plan is based on an average revenue growth of 3% in FY 2014 - FY 2016 and 4% in FY 2017 – FY 2022. The CIP also complies with the County Board’s debt policies found in Attachment C, resulting in projected debt levels that reinforce the County’s triple-A bond ratings. Summary of Attachments: Attachment A-1: Revised CIP Debt Summary Attachment A-2: Revised CIP Program Summary Attachment B: Ten Year Progress of Capital Projects Attachment C: Debt Management Policies and Ratios A - 7 Total LOCAL PARKS & RECREATION Long Bridge (Aquatics, Fitness Center and Design of Final Outdoor Phase)* 47,855 46,414 Parks Maintenance Capital 52,433 Land Acquisition & Open Space** 13,000 14,441 Tyrol Hill Park 1,776 Four Mile Run Near-Stream Improvements 15,408 Jennie Dean Park 25,560 Synthetic Turf Fields 2,185 Crystal City Parks and Open Space 6,945 Four Urban Parks in Ballston-Virginia Square 6,715 Mosaic Park 3,622 Glebe and Randolph Park 3,466 Ballston Pond 988 Sub-total 179,953 TRANSPORTATION Paving 74,516 Long Bridge Interchange 8,335 ART (Heavy Maintenance Facility) 3,183 WALKArlington, BikeArlington & Neighborhood Traffic Calming 7,383 Route 1 Streetcar 20,000 Bridge Renovation 9,034 Match for State & Federal Projects and other 3,626 Sub-total 126,077 METRO Metro 124,250 COMMUNITY CONSERVATION Neighborhood Conservation 57,000 Penrose Square 2,644 Nauck Town Square & Infrastructure 4,852 Sub-total 64,496 597 633 289 2,983 316 0 0 0 FY 13-22 Arlington, Virginia Revised FY 2013 - FY 2022 CIP Debt Summary (000s) GO & Other BOND Funding Proposed Proposed Proposed 2012 Referenda 2020 Referenda2018 Referenda2014 Referenda 2016 Referenda Proposed Proposed 11,000 12,986 17,510 12,000 0 298 2,346 0 0 1,688 3,164 0 11,000 11,000 12,000 12,000 39,000 22,900 22,750 25,000 11,941 6,5675,835 6,190 2,185 0 0 20,000 0 3,183 0 0 0 0 299 0 2,228 1,238 5,015 253 27,794 38,758 22,926 19,253 1,166 1,200 0 13,999 14,851 15,756 16,715 0 0 1441 0* 0 3,914 25,524 29,459 24,621 49,796 1,126 0 6,968 0 0 988 0 0 328 3,294 219 2,122 563 2,985 3,167 3,357 12,405 13,160 10,000 10,000 3,000 3,000 4,441 3,000 3,000 1,591 0 0 0 3,167 0 5,835 0 1,383 1,469 1,558 1,652 42,500 50,553 13,195 0 2,500 0 0 0 0 0 6,868 1,000 185 0 0 0 1,321 0 300 17,346 14,600 30 0 0 11,000 11,000 A - 8 Total FY 13-22 Arlington, Virginia Revised FY 2013 - FY 2022 CIP Debt Summary (000s) GO & Other BOND Funding Proposed Proposed Proposed 2012 Referenda 2020 Referenda2018 Referenda2014 Referenda 2016 Referenda Proposed Proposed PUBLIC / GOVERNMENT FACILITIES Facilities Maintenance Capital 30,625 North Side Salt Facility 2,391 Lubber Run Community Center 27,124 Non Parks Land Acquisition 11,000 Alternate Emergency Communication Center 3,500 Fire Stations 27,230 Courthouse Square 40,470 Trade Center Parking Deck & Storage Building 20,593 Courts/Police Building Interior Renovation 11,627 Court Square West Building Removal 1,770 Police and Sheriff Pistol Firing Range 2,500 Columbia Pike Library Replacement 1,284 Sub-total 180,114 INFORMATION TECHNOLOGY / PUBLIC SAFETY ConnectArlington and Intelligent Transportation System 17,500 SUBTOTAL GO Bond Referenda 692,390 2020 Building Acquisition and Conversion 30,150 Long Bridge - Developer Contribution 20,000 SUBTOTAL Other Bond Funding 50,150 Total BOND FUNDING* 742,540 * Excludes Revenue Bonds for Transportation Investment Fund Adopted Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Total Fire Defibrillators & Breathing Apparatus - - - - - 2,312 2,929 - - - 5,241 Enterprise IT Refreshment 3,325 5,488 3,719 3,065 2,000 4,536 5,218 4,532 5,238 4,431 41,552 Public Safety IT Refreshment 4,524 4,218 4,565 2,645 2,949 1,306 611 5,055 1,733 8,635 36,241 Auto Fund - Fire Vehicle Apparatus 2,862 2,460 - - - 2,679 - 1,754 1,409 2,817 13,981 Total Master Lease Funding 10,711 12,166 8,284 5,710 4,949 10,833 8,758 11,341 8,380 15,883 97,015 Total Debt Funding (excludes Schools) 839,555 * Funding for the Long Bridge play elements, originally planned for the 2016 referenda, could be funded with one-time funds from FY 2012 close-out. ** Parks land acquisition & open space is a significant priority of the County Board. Through a combination of this level of bond funding and future additional one-time funding that may become available, the target is to increase total funding for parks land acquisition over the 10 year period of the CIP. 0 0 154,588 159,150 0 0 0 0 3,725 0 0 0 0 0 FY 13-22FY 2020 FY 2021 13,475 110,805 46,425 26,425 FY 2022 8,610 17,220 123,707 144,140 0 66,781 53,101 1,284 16,364 40,037 2,000 3,000 3,000 3,000 0 0 15,873 24,597 0 1,400 3,000 0 0 500 7,000 6,000 7,000 7,000 2,185 0 0 0 0 1,414 25,710 0 154,588 3,625 206 0 0 0 0 0 1,770 0 0 0 2,500 0 0 0 Master Lease Funding FY 2013 FY 2014 FY 2019 4,025 0 3,831 0 0 0 5,039 6,588 4,679 15,914 0 0 0 0 3,725 174,687 178,851 FY 2015 FY 2016 FY 2017 FY 2018 180,107 141,426 159,922 0 127,432 144,140 154,588 157,230 20,000 0 0 0 0 A - 9 10 Year Program Category FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 Total Local Parks & Recreation 60,299 28,260 21,081 11,220 23,992 14,554 23,243 10,892 33,841 30,155 257,537 Transportation Initiatives 1 189,594 63,417 67,945 79,912 37,499 26,268 42,857 39,135 32,679 56,981 636,287 Crystal City (Route 1) Streetcar 2 2,000 5,990 19,080 37,265 37,265 30,975 13,230 - - - 145,805 Columbia Pike Streetcar 8 9,546 25,769 55,057 56,853 51,774 - - - - - 198,999 Metro 20,900 18,600 26,600 20,400 16,400 14,500 15,000 15,750 16,500 16,500 181,150 Community Conserv/Economic Develop 14,550 15,135 30,895 26,647 9,605 6,138 12,467 6,676 6,696 6,717 135,526 Public / Government Facilities 63,188 23,696 20,545 19,243 47,276 15,584 53,464 28,249 43,777 19,990 335,012 Ballston Garage 4 5,300 4,980 2,519 781 770 3,370 130 830 460 650 19,790 Information Technology & Public Safety 3 20,922 20,946 20,565 9,737 8,177 14,555 14,699 19,682 11,244 19,487 160,014 Regional Partnerships 1,135 1,192 1,262 1,332 1,405 1,313 1,340 1,367 1,395 1,424 13,165 Capital Contingent 3,214 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 21,214 Total County Capital 390,648 209,985 267,549 265,390 236,163 129,257 178,430 124,581 148,592 153,904 2,104,499 Water & Sewer Infrastructure 5 76,016 24,893 28,794 23,560 24,189 24,775 24,393 23,866 24,332 26,759 301,577 Stormwater Management 6 2,859 7,280 4,030 4,420 4,450 4,450 4,550 3,550 3,850 3,850 43,289 Total Program Cost 469,523 242,158 300,373 293,370 264,802 158,482 207,373 151,997 176,774 184,513 2,449,365 Attachment A-2 Arlington, Virginia 10 Year Capital Program Costs Summary (000s) Revised CIP Program Summary The FY 2013 - 2022 CIP includes typical capital projects such as maintenance capital, parks, transportation, metro, community conservation, government facilities, information technology and regionals . In addition, this CIP continues to address projects introduced in the previous CIP such as Crystal City and Columbia Pike streetcars, ConnectArlington (previously fiber optic communications network) and Ballston Garage. Unlike past CIPs, this is a 10 year CIP and includes funding that has been previously approved in prior CIPs to show the full expenditure by fiscal year of each capital project. Attachment A-2, page 1 A - 10 Arlington, Virginia Revised CIP Program Summary 10 Year Capital Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 Total New Funding Pay-As-You-Go (PAYG) 19,005 29,513 35,076 24,434 29,105 30,448 33,115 31,823 26,436 31,534 290,489 Master Lease Funding 11,032 12,425 8,636 5,710 4,949 10,833 8,758 11,341 8,380 15,883 97,947 GO Bond Referenda 52,647 58,159 76,096 57,581 88,309 44,390 99,042 55,546 95,626 63,522 690,918 State/Federal Funding 9,872 21,357 39,847 41,991 41,351 21,403 19,704 11,144 8,905 15,773 231,347 Developer Contributions and Partnerships 22,000 4,160 21,800 24,943 4,796 - 200 - - - 77,899 Ballston Garage Parking Revenues 4 2,200 3,080 2,519 781 770 3,370 130 830 460 650 14,790 Sanitary District Tax 6 2,619 3,480 3,900 4,420 4,450 4,450 4,550 3,550 3,850 3,850 39,119 Transportation Capital Fund 1, 8 21,981 20,287 23,406 20,092 22,732 11,871 10,835 11,697 6,635 10,024 159,560 Tax Increment Financing 2, 8 4,747 5,850 2,500 7,931 4,170 7,759 4,470 2,200 2,150 4,550 46,327 Transportation Revenue Bonds - 21,000 49,430 76,500 38,500 - - - - - 185,430 Utility Fund Transfer & Other Sources 5 18,069 22,833 22,182 23,560 24,189 24,775 24,393 23,866 24,332 26,759 234,958 Subtotal New Funding 164,172 202,144 285,392 287,943 263,321 159,299 205,197 151,997 176,774 172,545 2,068,784 Previously Approved Funding Authorized but Unissued Bonds 72,320 8,542 9,212 3,875 - - - - - - 93,949 Issued but Unspent Bonds 38,365 1,109 150 - - - - - - - 39,624 Other Previously Approved Funds 7 194,666 30,363 5,619 1,552 1,481 1,159 200 - - 11,968 247,008 Subtotal Previously Approved Funding 305,351 40,014 14,981 5,427 1,481 1,159 200 - - 11,968 380,581 Total Funding 469,523 242,158 300,373 293,370 264,802 160,458 205,397 151,997 176,774 184,513 2,449,365 (2) Crystal City Public Infrastructure is funded from tax increment financing on properties in the Crystal City, Potomac Yard, and Pentagon City areas of the County. The tax increment is currently set at 33 percent. (1) Transportation Capital Fund is supported by a commercial real estate tax of $0.125 per $100 of assessed value, yielding projected revenues for transportation projects. Beginning in 2014, the plan assumes revenue bonds, supported by the tax, will be issued. The Transportation Investment Fund is supplemented by County PAYG as well as state and federal revenues. 10 Year Capital Program Funding Sources Summary (000s) (8) The Columbia Pike streetcar is funded by the Transportation Capital Fund, revenue bonds, and state and federal funding. The Route 1 Corridor streetcar is funded by the Crystal City/Potomac Yard/Pentagon City Tax Increment Financing area fund, GO bonds, revenue bonds, and state funding. (7) Other previously approved funds: Any funds other than GO Bonds that were approved as part of prior CIPs that are to be spent during this FY13-FY22 CIP. (6) Stormwater Management Fund is funded from the Sanitary District Tax, Watershed Management Fund, State Grants and project cost sharing with US Army Corps of Engineers. The sanitary district tax was increased from $0.01 to $0.013 per $100 pf assessed value by the County Board on April 24, 2010. (3) ConnectArlington is included in the Information Technology & Public Safety category. Funding sources for this project includes federal grants, exiting IDA bond balances, as well as Schools' local funds for their respective allocation of the project costs. (5) Utilities fund other sources: Developer contributions and Inter Jurisdictional payments, interest revenue and existing bonds and fund balances. (4) Ballston Garage funding includes parking revenues, interest revenue and reserves. The table below presents the Pay-As-You-Go appropriations and Bond referenda approved by the voters each year since FY 1998. Carryover appropriation from previous years are not included. Appropriation rather than actual expenditures are presented because The Proposed FY 2005 - 2010 funding strategy includes 28.4 percent funding for PATG appropriations, which includes state grants and other sources of revenue and General Obligation Bonds will fund 71.6 percent of the CIP. The table below presents the Pay-As-You-Go appropriations and Bond referenda approved by the voters each year since FY 1998. Carryover appropriation from previous years are not included. Appropriation rather than actual expenditures are presented because The Proposed FY 2005 - 2010 funding strategy includes 28.4 percent funding for PATG appropriations, which includes state grants and other sources of revenue and General Obligation Bonds will fund 71.6 percent of the CIP. Attachment A-2, page 2 A - 11 County Projects 36 Energy Efficiency / Fresh Aire Projects completed, $11.0 M 174 Neighborhood Conservation Projects completed, $42.7 M 81 Neighborhood Traffic Calming Projects completed, $8.47 M 153 Complete Streets Projects completed 1 Green Streets Project (Patrick Henry Dr) completed, FY 2012 2 Stormwater capital projects (Little Pimmit Run culvert replacement & channel rehabilitation) completed, Ph. I – FY 2008 & Ph. II – FY 2011 26 Justice Center Facility Maintenance Capital projects completed 21 Fire Alarm/ Security System Upgrades/ Replacements completed 23 HVAC Repairs/ Replacements completed 11 Roof Repairs/ Replacements completed 40 Acres of new park land for a total of 937 acres 4 New Parks created 13 Synthetic fields created or replaced 17 Playgrounds created or replaced 18 Athletic fields replaced 6 Athletic field lighting replaced 8 Athletic court locations replaced 3 Picnic shelters renovated/replaced 86 Park Enhancement Projects completed ARLINGTON COUNTY – HISTORY OF PROGRESS MAJOR CAPITAL PROJECTS FROM 2002 TO 2012 School Projects Elementary Schools — 1 new school, 16 expanded/renovated/reconstructed (out of total 22) Middle Schools — 6 expanded/renovated/reconstructed (out of total 6) High Schools — 3 expanded/renovated/reconstructed (out of total 4) — Wakefield HS under construction; anticipated completion summer 2013 Other School Sites — 2 renovated/reconstructed (out of total 6) Attachment B A - 12 New/Replaced Langston Brown Community Center - 2003 Walter Reed Community Center – 2005 Renovated Aurora Hills Community Center Community Center Fairlington Community Center – 2007 Maury Arts Center – 2005 Lubber Run Amphitheater - 2011 New / Replaced Westover Library - 2009 Shirlington Library - 2007 Kettler Ice Plex - 2007 Parks Operations Building and Trades Center Facilities – 2006 Inspection Services/ Zoning Service Center – 2009 Human Services Operating Center at Sequoia Plaza – 2010 Artisphere Cultural Center - 2010 Renovated Courthouse Plaza & power upgrade - 2009 Fenwick Center - 2006 George Mason Center - 2006 Woodmont Community Center Site - 2009 New / Replaced Emergency Communications Center (ECC) –2008 Detention Facility security system - 2011 Mobile Data Computers - , 2003/2004, 2009/2010, 2012/2013 Fire pumpers (2002, 2005, 2006, 2007, and 2011) and rescue vehicles ( 2006 and 2007) Firefighter Breathing Apparatus – 2009 Fire Station # 5 – 2008 Fire Station # 3 - 2011 Portable (hand-held) Radios (in progress) Mobile (vehicle-installed) Radios 2011 ECC/ Alternative ECC (NICE) Recorders –2011 Computer-Aided-Dispatch (CAD) Equipment-2012 Public Safety Network (in progress) Detention Center Washer-Dryer Replacements – 2010 Fire Training Academy Additions - 2012 Fire Station #4 HVAC Replacement - 2012 Renovated Alternate ECC –2008 Justice Center Garage (Doors) –2008 Parks & Recreation Facilities County Libraries/ Government Facilities Utilities Public Safety New / Replaced Chain Bridge Water Mains - 2006 Gravity 3 Water Main - 2010 Commercial Automated Meters - 2009 Four Mile Run Relief Sewer - 2008 Potomac Interceptor Phase I - onging Fairlington Sanitary Sewer - 2011 Minor Hill Special pump station and pressure zone - 2009 Riverwood sanitary sewer force main - 2012 Water Main replacement program - 2011 and 2012 Developer related water and sewer improvements - 2011 and 2012 Renovated Lee Ground Storage Tank Rehab - 2005 Lee Water Pump Station Improvements – 2011 7 Miles/year Sanitary Sewer Rehab Four Mile Run Gravity Line from the Water Pollution Control Plant to South Lang Street-2011 Four Mile Run Gravity Line from Columbia Pike to Long Branch - 2011 Annual cleaning and cement lining of pre 1960 water mains - 2010 and 2011 Lee Pump Station - 2011 New / Refreshed Assessment and Collection System (ACE) Human Services Financial System Financial System Network / Telephone System PC Refreshment Servers, , Video Conferencing Primary Network Operating Center HVAC Upgrades – 2009 2nd Network Operating Center – 2010 Board Reporting Agenda Support System (BRASS) Human Resources Performance Appraisal Automation Courthouse Audio Visual Technology Modernization DPR Online Camp Forms Jury Summons System Technology A - 13 WPCB MP01 Upgrade and Expansion Project - Demolition – 2007 New - Major Construction efforts began 9/2006 North Odor Control – 2008 Equalization Tanks (2) 11.7 mg – 2009 Aeration Tanks 5&6 – 2009 Clarifiers 7&8 – 2009 Blowers 3, 4, and 5 – 2009 Electrical System – 2009 Chemical Systems – 2009 Denitrification System – 2009 Clarifier #9 - 2010 Blower 1&2 - 2010 Foam Collection System – 2010 Process Control System – 2010 Renovated Primary and Secondary Clarifiers – 2010 Aeration Tanks 1, 2, 3, &4 – 2010 Minor Construction efforts Wastewater Lift Stations upgrade – 2012 New Standby Generator Facility – 2012 Maintenance Building Modifications – 2012 60” line replacement - 2012 Water Pollution Control Plant Rosslyn Metro Station elevators under construction 5 Metrorail station canopies designed and installed Pedestrian walkway canopy designed and installed Shirlington Station bus transfer facility designed and constructed Pentagon Metrorail Station bus transfer facility completely reconstructed with 24 bus bays, elevators, escalators, fabric roofs, roadways, and security enhancements 3 new Ballston-MU Metrorail Station elevators designed and constructed 31 new ART ( Transit) buses acquired and put into service, with another 12 on order for delivery in early FY2011 51 new ART bus shelters 47 SmarTrip fareboxes purchased and installed on ART buses, in addition to vault, computer, and software ART House bus storage and operations facility land acquired 24 Columbia Pike Super Stops completed planning and preliminary design, first two prototypes under construction in 2012 55 Pike Ride bus stops improved Modified Court House Metrorail Station vents Real-time Bus Finders information system developed and installed for ART system Installed Signal Priority System for all MetroBuses along the Columbia Pike corridor 4 Rosslyn Station bus bays and 4 bus bays improved with real-time information displays, shelters, benches, and supervisor kiosks 50 Capital Bikeshare Stations Installed Projects in Design 32 ART bus stops Potomac Yard Bus Transitway Columbia Pike Transit Improvements Metrorail Station pedestrian access tunnel Bike Share stations Transit Projects A - 14 Attachment C Debt Management Policies and Ratios Revised CIP FY 2013 – FY 2022 0.00% 2.00% 4.00% 6.00% 8.00% 10.00% 12.00% 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Debt Service to General Expenditures 10% Limit Debt Per Capita to Per Capita Income 6% Limit Outstanding Debt to Tax Base 4% Limit Ceiling Ceiling Ceiling Debt Service to General Expenditures Debt to Tax Base Debt Per Capita/ Per Capita Income Peaks at 9.6% in FY 2018 A - 15 Arlington, Virginia Financial & Debt Management Policies The County Board adopted expanded financial and debt management policies in April 2008. Each policy is restated below, including a discussion of how the County has complied with the policies since their adoption. Beginning with the FY 2013 – FY 2022 CIP, the forecasts will move from a six-year to a ten-year format. Budgeting, Planning & Reserves Balanced Budget: Arlington County will adopt an annual General Fund budget in which the budgeted revenues and expenditures are equal (a balanced budget). Any one -time revenues will be used for one -time, non-recurring expenses such as capital, equipment, special studies, debt reduction and reserve contributions. Long-Term Financial Planning: The County will annually develop a six year forecast of General Fund revenues, expenditures and will maintain a biennially updated, ten-year Capital Improvement Plan (CIP). The ten-year forecast will incorporate projected reserve levels and impact of the CIP on the County’s debt ratios. General Fund Operating Reserve: An Operating Reserve will be maintained at no less than three percent of the County’s General Fund budget, with a goal of increasing the reserve or reserve -equivalent to five percent of the General Fund budget. The Operating Reserve shall be shown as a designation of total General Fund balance. Appropriations from the Operating Reserve may only be made by a vote of the County Board to meet a critical, unpredictable financial need. A “reserve equivalent” may consist of discretionary funds which have been designated by the County for a non -essential purpose and which the County Board could reallocate for the same purposes as the General Fund Operating Reserve. Self-Insurance Reserve: The County will also maintain a self -insurance reserve equivalent to a pproximately one to two months’ claim payments based on a five-year rolling average. General Fund General Contingent: Each year’s budget will include a General Fund General Contingent appropriation to be used to cover unforeseen expense items or new projects initiated after a fiscal year has begun. Funding may be allocated from this contingent only with County Board approval. A - 16 Retirement System Funding: The County will use an actuarially accepted method of funding its pension system to maintain a fully - funded position. The County’s contribution to employee retirement costs will be adjusted annually as necessary to maintain f ull funding. If the County reaches its actuarial -required contribution (defined as County and employee contributions that when ex pressed as a percent of annual covered payroll are sufficient to accumulate assets to pay benefits when due), the County may reduce its contributi on provided that the amount reduced from the annual actuarial requirement will only be used for one -time, non-recurring expenses in order to provide the ability to increase contributions as may be required by future market conditions. Other Post-Employment Benefits (OPEB) Funding: The County will use an actuarially accepted method of funding its other post - employment benefits to maintain a fully -funded position. The County’s contribution to other post -employment benefit costs will be adjusted annually as necessary to maintain full funding. If the County reaches its actuarial -required contribution (defined as County and employee contributions that when expressed as a percent of annual covered payroll are sufficient to accumulate assets to pay benefits when due), the County may reduce its contribution provided that the amount reduced from the annual actuarial requirement will only be used for one-time, non-recurring expenses in order to provide the ability to increase contributions as may be required by future market conditions. Capital Improvement Plan 1. The County Manager will biennially submit a ten year Capital Improvement Plan (CIP) to the County Board. The CIP will address all known facility and infrastructure needs of the County, including the needs of the Arlington County Public Schools. 2. The CIP shall include a detailed description of each capital pr oject, identifying every source of funding, including pay -as-you-go (PAYG), bond financing, and master lease financing. The source of funding will largely be determined based on the useful lif e of the project. Bond-funded projects will typically have a u seful life at least as long as the period over which the bonds will be repaid (generally twenty years). Master lease -financed projects will generally have useful lives of three to ten years and typically include furniture, equipment, rolling stock and tec hnology purchases. PAYG funds provide greater flexibility and will be appropriated annually from general fund revenues. 3. Each project budget shall identify the financial impact on the operating budget, if any. 4. In general, capital projects estimated t o cost $100,000 or more should be included in the CIP, including technology and equipment purchases. 5. The County will balance the use of debt financing sources against the ability to utilize PAYG funding for capital projects. While major capital facility projects will generally be funded through bonds, the County will attempt to maintain an appropriate balance of PAYG vs. debt, particularly in light of the County’s debt capacity and analysis of maintenance capital needs. As part of eac h biennial CIP process, the County will conduct a comprehensive assessment of its maintenance capital needs. 6. The CIP will include an analysis of the impact the CIP has on the County’s debt capacity, debt ratios and long-term financial plan. A - 17 Debt Management The County will prudently use debt instruments, including general obligation bonds, revenue bonds, industrial development authority (IDA) revenue bonds, and master lease financing in order to provide re -investment in public infrastructure and to meet other public purposes, including inter-generational tax equity in capital investment. The County will adhere to the following debt affordability criteria (excluding overlapping and self-supporting debt). 1. The ratio of net tax-supported debt service to general expenditures should not exceed ten percent, within the ten-year projection. 2. The ratio of net tax-supported debt to full market value should not exceed four percent, within the ten-year projection. 3. The ratio of net tax-supported debt to income should not exceed six percent, within the ten-year projection. 4. Growth in debt service should be sustainable consistent with the projected growth of revenues. Debt service growth over the ten year projection should not exceed the average ten year historical revenue growth. 5. The term and amortization structure of County debt will be based on an analysis of the useful life of the asset(s) being fina nced and the variability of the supporting revenue stream. T he County will attempt to maximize the rapidity of principal repayment where possible. In no case will debt maturity exceed the useful life of the project. 6. The County will refund debt when it is in the best financial interest of the County to do so. W hen a refunding is undertaken to generate interest rate cost savings, the minimum aggregate present value savings will be three percent of the refunded bond principal amount. Variable Rate Debt 1. Unhedged variable rate debt exposure should not exceed approximately twenty percent of total outstanding debt. Cash, short-term investments and variable rate debt for which the County has eliminated or reduced variable rate exposure through the use of derivative products may serve as a hedge for variable rate debt and the County may increase variable rate debt over twenty percent accordingly. 2. Debt service on variable rate bonds will be budgeted at a conservative rate. 3. Before issuing variable rate bonds, the County will determine how potential spikes in the debt service will be funded. A - 18 4. Before issuing any variable rate bonds, the County will determine the impact of the bonds on the County’s total debt capacity under various interest rate scenarios; evaluate the risk inherent in the County’s capital structure, giving consideration to both the County’s assets and its liabilities; and develop a method for budgeting for debt service. Derivatives Interest rate swaps and options (Swaps or Derivatives) are appropriate management tools that can help the County meet important financial objectives. Properly used, these instruments can help the County increase its financial flexibility, provide opportunities for interest rate savings or enhanced investment yields, and help the County reduce its interest rate risk through better matching of assets and liabilities. The County must determine if the use of any Swap is appropriate and warranted given the potential benefit, risks, and objecti ves of the County. 1. The County may consider the use of a derivative product if it achieves one or more of the following objectives:  Provides a specific benefit not otherwise available;  Produces greater than expected interest rate savings or incremental yield over other market alternatives;  Results in an improved capital structure or better asset/liability matching 2. The County will not use derivative products that are speculative or create extraordinary leverage or risk; lack adequate liqu idity; provide insufficient price transparency; or are used as investments. 3. The County will only do business with highly rated counterparties or counterparties whose obligations are supported by highly rated parties. 4. Before utilizing a Swap, the County, its financial advisor and legal counsel shall re view the proposed Swap and outline any associated considerations. Such review shall be provided to the Board and include analysis of potential savings and stress t esting of the proposed transaction; fixed versus variable rate and swap exposure before and after the proposed transaction; maximum net termination exposure; and legal constraints. 5. Financial transactions using Swaps or other derivative products used in lieu of a fixed rate debt issue should generate great er projected savings than the typical structure used by the County for fixed rate debt. 6. The County will limit the total notional amount of derivatives to an amount not to exceed twenty percent of total outstanding debt. 7. All derivatives transactions will require County Board approval. A - 19 Special Revenue / Enterprise Funds It is the general policy of the County to avoid designation of discretionary funds in order to maintain maximum financial fle xibility. The County may, however, create dedicated funding sources when there are compelling reason s based on state law or policy objectives, as described below. The Utilities Fund was created as a self -sustaining, fee-based enterprise fund under state code to support and maintain development of the County’s water and sewer infrastructure. The Transportation Capital Fund was created pursuant to state legislation for new transportation funding. The Stormwater Management Fund is in lieu of a self-supporting, user fee-based enterprise fund. Utilities Fund 1. The County will annually develop a six year forecast of projected water consumption, revenue, operating expenditures, reserve requirements and capital needs for the Utilities Fund. The six year forecast will show projected water -sewer rate increases over the planning period. 2. The County will implement water-sewer rate increases in a gradual manner, avoiding spike increases whenever possible. 3. The County will meet or exceed all requirements of any financing agreements or trust indentures. 4. The Utilities Fund will maintain a reserve equivalent to th ree months’ operations & maintenance expenses. The reserve may be used to address emergencies and unexpected declines in revenue. If utilized, the reserve will be replenished over a two year period to the minimum reserve level. This reserve is in addition to any financing agreement-required debt service reserve funds. 5. The Utilities Fund will maintain debt service coverage of at least 1.25 times on all debt service obligations. 6. The Utilities Fund will be self-supporting. Transportation Capital Fund 1. New revenue shall not be used to supplant existing transportation funding commitments, e.g., Metro Matters. Existing commitments are defined as those obligations made prior to adoption of the commercial real estate tax in April 2008. 2. Operating program enhancements (outside base program) that clearly document transportation benefits may be eligible for support from the Transportation Capital Fund 3. No more than 3 -5 percent of annual funding should be used for project administration, indirect & overhead costs to support capital projects. A - 20 4. A reserve equivalent to ten to twenty percent of annual budgeted revenue will be established. 5. A five to ten year financial plan and model will be developed that integrates project cashflow forecasts, revenue projection s, and financial / debt management policies and will factor in other non -County funding sources, including federal, state, regional, and private funding. 6. The County will prudently balance the use of new transportation funding sources between pay -as-you-go funding and leveraging through new bond issuance. Use of leveraging will be dependent on project size, cash flow, and timing projections. 7. If the County chooses to issue debt supported by dedicated transportation funding sources, such debt will be str uctured to be self- supporting and will not count against the County’s general tax supported obligation debt ratios or capacity. Debt service co verage on such debt will range from 1.10 to 1.50 times, depending on the type of debt issued. The term on such bonds will not exceed the average useful life of the assets financed, and amortization will be structured to match the supporting revenue stream. 8. The Transportation Capital Fund will be self-supporting. Stormwater Fund 1. The County will annually develop a six year projection of stormwater operating and capital expenses. 2. The County will prudently balance the use of new stormwater funding sources between pay -as-you-go funding and leveraging through new bond issuance. Use of leveraging will be depende nt on project size, cashflow, and timing projections. If debt is issued for stormwater projects, it will generally follow the debt issuance guidelines contained in this policy. 3. The Stormwater Fund will maintain a reserve equivalent to three months’ expenses to be built up over a multi-year period. 4. Stormwater financial policies will be reviewed as part of the Municipal Separate Storm Sewer System (MS4) permit renewal cycl e (every five years). 5. The Stormwater Fund will be self-supporting. A - 21 County Manager: ##### County Attorney: ***** Staff: Jason Friess, Department of Management & Finance Michelle Cowan, Department of Management & Finance ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 21, 2012 DATE: June 26, 2012 SUBJECT: Approval of Resolutions and Questions to be included in the 2012 Bond Referenda C. M. RECOMMENDATION: 1. Adopt the resolutions in Attachment A, as summarized below, and the explanation of the referendum questions to appear in publications, at voter registration sites, and polling places as detailed in Attachment B, in order to initiate and facilitate the November 6 bond referenda. a. Metro and Transportation $ 31,946,000 b. Local Parks and Recreation 50,553,000 c. Community Infrastructure 28,306,000 d. Arlington Public Schools 42,620,000 TOTAL $153,425,000 2. Request that the Electoral Board list the referenda on the ballot in the order detailed in this report as shown in the Ballot Layout section on page 2. 3. Direct the County Manager to take all the steps necessary to ensure that the information provided to voters by the County is printed in both English and Spanish. ISSUE: Should the County Board approve the placement of capital projects, consistent with the County and Schools’ Adopted Capital Improvement Programs (CIP), on the November 2012 ballot for consideration by the voters for general obligation bond funding? SUMMARY: The County Board will approve the FY 2013 - 2022 CIP on July 21, 2012 which includes the Schools’ Adopted CIP, adopted by the School Board on June 19. The County’s Adopted CIP includes various projects to be considered for a November 2012 County government referenda of $110.805 million and a School referendum of $42.620 million. 46. A - 22 - 2 - DISCUSSION: The adopted CIP, which sets the parameters for the County’s bond referenda requests, reflects a balance of strategic investments and maintaining our existing infrastructure. The proposed referenda requests, which are summarized below, are consistent with the County’s debt policies. REFERENDA QUESTION PRIMARY PROJECTS AMOUNT Metro and Transportation Metro Capital Improvements, Neighborhood Traffic Calming, WalkArlington, Transportation Match, BikeArlington, Paving $31,946,000 Local Parks & Recreation Parks maintenance capital, Land acquisition & Open Space, Long Bridge Aquatics, Health & Fitness Facility & Park, design of Tyrol Hill Park improvements 50,553,000 Community Infrastructure Neighborhood Conservation, Facilities maintenance capital, ConnectArlington and Intelligent Transportation System 28,306,000 Arlington Public Schools Design – Construction of new elementary schools, School facility additions and various School facility projects 42,620,000 TOTAL $153,425,000 Extensive information on the details of each of these projects can be found in the CIP document on the County’s and Schools’ websites. Attachment B includes the proposed bond questions and explanations as they would appear in informational publications distributed by the County at polling places, other County facilities, and on the County’s website. Consistent with state law, the actual ballot will reflect only the proposed bond question. BALLOT LAYOUT It is recommended that the following four bond referenda questions be on one or more rows or windows on the voting machines in the following order: a. Metro and Transportation b. Local Parks & Recreation c. Community Infrastructure d. Arlington Public Schools BACKGROUND: The County government’s proposed bond totals are derived from a compilation of individual projects contained in the adopted CIP. These projects are classified into separate categories. If the bond referenda questions are approved by the voters, the County is legally prohibited from reallocating funding from one referenda category to another. Within the referenda categories, however, the County Board may make changes to specific projects; this flexibility is A - 23 - 3 - necessary because of potential rapid changes in construction pricing or other uncontrollable factors. The County Board also has the option of issuing a lesser amount of bonds than that approved by the voters or revising the specific projects, within the proposed authorizing language, to be funded with bond proceeds. Attachment B is a draft of the bond questions and explanations that would appear in informational publications. This information is also provided at voter registration sites, posted at each individual polling place and the County’s website. Staff has worked with bond counsel on the bond referenda language. During the CIP process, a significant amount of community input was sought. During the CIP development and consideration process, staff met with twelve Board-appointed Commissions and Committees and provided information at four County Board work sessions. Additionally, a CIP Public Hearing was held on June 26, 2012. The adopted CIP will be published in hard copy and will be available on the County website later this summer. FISCAL IMPACT: The estimated impact on the County’s General Fund from the proposed bond financing plan included in the adopted CIP and the proposed referenda for the next two fiscal years is shown below. It should be noted that the amount of debt service to be budgeted in FY 2014 and FY 2015 will be determined after future project cash flow needs (and thus actual bond issue amounts) are completed. The table below also includes all outstanding and future subject-to-appropriation debt supported by the General Fund. In addition to debt service costs, certain new projects in the CIP and referenda will result in increased operating costs. Additional information on these costs can be found in the CIP document on the County’s website. PROJECTED COUNTY AND SCHOOLS DEBT SERVICE FY 2013 Adopted Budget and FY 2014 – 2015 Estimated (In Millions of $) BUDGETED FY 2013 PROJECTED FY 2014 PROJECTED FY 2015 County 57.3 61.6 66.2 Schools 42.2 44.8 45.5 TOTAL $99.5 $106.4 $111.7 DESCRIPTION OF ATTACHMENTS Attachment A - 2012 Bond Resolutions Attachment B - 2012 Bond Questions and Explanation (as they will appear in publications) A - 24 ATTACHMENT A METRO AND TRANSPORTATION PROJECTS WHEREAS, the County Board of Arlington County, Virginia, has determined that it is advisable to support construction, acquisition, and rehabilitation of facilities by the Washington Metropolitan Area Transit Authority (WMATA/Metro) and other transportation projects as described below at an estimated cost of $31,946,000; and WHEREAS, it appears that such improvements cannot be financed from current revenues; BE IT RESOLVED BY THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA: 1. It is hereby determined that it is advisable for Arlington County to contract a debt and issue its general obligation capital improvement bonds in the maximum principal amount of $31,946,000 pursuant to the Public Finance Act of 1991, as amended, to finance, together with other available funds, the cost of construction, acquisition, and rehabilitation of WMATA/Metro facilities by the Washington Metropolitan Area Transit Authority, and to pay the costs of other transit, transportation, paving, road and pedestrian enhancement projects across the County (the “Projects”). 2. The Circuit Court of Arlington County is hereby requested to order an election to be held on November 6, 2012, provided that such date is at least 81 days after the date on which the Court enters its order upon the question of contracting such debt and issuing bonds for such purposes. The question on the ballot shall be in substantially the form shown in Attachment B. 3. The Clerk of this Board is hereby authorized and directed to cause a certified copy of this resolution to be presented to the Circuit Court of Arlington County. 4. The County Board adopts this declaration of official intent under the Treasury Regulations Section 15.150-2. The County Board reasonably expects to reimburse advances made or to be made by the County to pay the costs of the Projects from the proceeds of its bonds. 5. This resolution shall take effect immediately. A - 25 LOCAL PARKS & RECREATION WHEREAS, the County Board of Arlington County, Virginia, has determined that it is advisable to undertake local parks & recreation projects as described below at an estimated cost of $50,553,000; and WHEREAS, it appears that such improvements cannot be financed from current revenues; BE IT RESOLVED BY THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA: 1. It is hereby determined that it is advisable for Arlington County to contract a debt and issue its general obligation capital improvement bonds in the maximum principal amount of $50,553,000 pursuant to the Public Finance Act of 1991, as amended, to finance, together with other available funds, the cost of public improvements for Arlington County local parks & recreation, open space and land acquisition projects (the “Projects”). 2. The Circuit Court of Arlington County is hereby requested to order an election to be held on November 6, 2012, provided that such date is at least 81 days after the date on which the Court enters its order upon the question of contracting such debt and issuing bonds for such purposes. The question on the ballot shall be in substantially the form shown in Attachment B. 3. The Clerk of this Board is hereby authorized and directed to cause a certified copy of this resolution to be presented to the Circuit Court of Arlington County. 4. The County Board adopts this declaration of official intent under the Treasury Regulations Section 15.150-2. The County Board reasonably expects to reimburse advances made or to be made by the County to pay the costs of the Projects from the proceeds of its bonds. 5. This resolution shall take effect immediately. A - 26 COMMUNITY INFRASTRUCTURE WHEREAS, the County Board of Arlington County, Virginia, has determined that it is advisable to undertake neighborhood conservation projects, public facility improvements and infrastructure improvements, as described below, at an estimated cost of $28,306,000; and WHEREAS, it appears that such improvements cannot be financed from current revenues; BE IT RESOLVED BY THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA: 1. It is hereby determined that it is advisable for Arlington County to contract a debt and issue its general obligation capital improvement bonds in the maximum principal amount of $28,306,000 pursuant to the Public Finance Act of 1991, as amended, to finance, together with other available funds, the cost of public improvements for Arlington County, including neighborhood conservation projects, information technology and public safety projects, and County facilities needs including infrastructure and facilities maintenance capital (the “Projects”). 2. The Circuit Court of Arlington County is hereby requested to order an election to be held on November 6, 2012, provided that such date is at least 81 days after the date on which the Court enters its order upon the question of contracting such debt and issuing bonds for such purposes. The question on the ballot shall be in substantially the form shown in Attachment B. 3. The Clerk of this Board is hereby authorized and directed to cause a certified copy of this resolution to be presented to the Circuit Court of Arlington County. 4. The County Board adopts this declaration of official intent under the Treasury Regulations Section 15.150-2. The County Board reasonably expects to reimburse advances made or to be made by the County to pay the costs of the Projects from the proceeds of its bonds. This resolution shall take effect immediately. A - 27 ARLINGTON PUBLIC SCHOOLS PROJECTS WHEREAS, the County Board of Arlington County, Virginia, has determined that it is advisable to undertake certain capital projects for Arlington Public Schools, as described below; and WHEREAS, it appears that $42,620,000 of such improvements cannot be financed from current revenues; and WHEREAS, the Arlington County School Board has requested by resolution adopted June 19, 2012, that the County Board request the Circuit Court of Arlington County to order an election on the question of the proposed issuance of bonds to finance such projects; BE IT RESOLVED BY THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA: 1. It is hereby determined that it is advisable for Arlington County to contract a debt and issue its general obligation bonds in the maximum principal amount of $42,620,000 pursuant to the Public Finance Act of 1991, as amended, to finance, together with other available funds, the design and construction costs for new elementary schools, School facility additions and various capital projects for Arlington Public Schools (the “Projects”). 2. The Circuit Court of Arlington County is hereby requested to order an election to be held on November 6, 2012, provided that such date is at least 81 days after the date on which the Court enters its order, upon the question of contracting such debt and issuing bonds for such purposes. The question on the ballot shall be in substantially the form shown in Attachment B. 3. The Clerk of this Board is hereby authorized and directed to cause a certified copy of this resolution to be presented to the Circuit Court of Arlington County. A - 28 4. The County Board adopts this declaration of official intent under the Treasury Regulations Section 15.150-2. The County Board reasonably expects to reimburse advances made or to be made by the County to pay the costs of the Projects from the proceeds of its bonds. 5 This resolution shall take effect immediately. A - 29 ATTACHMENT B 2012 Bond Referenda 1. Metro and Transportation QUESTION: Shall Arlington County contract a debt and issue its general obligation bonds in the maximum principal amount of $31,946,000 to finance, together with other available funds, the cost of various capital projects for the Washington Metropolitan Area Transit Authority and other transit, pedestrian, road or transportation projects? EXPLANATION: This proposal would fund a variety of transportation, road, pedestrian enhancement and transit projects across the County. The largest component of this proposal would fund Arlington County’s share of WMATA/Metro’s capital improvement program, including the Metro Capital Improvement Program to improve regional mobility and accessibility and relieve traffic congestion. This proposal would also provide matching funds for certain transportation projects that receive state and federal funding. Proceeds of this proposal would also fund a portion of the costs for paving local streets and roadways, as well as the WALKArlington, BikeArlington, and Neighborhood Traffic Calming programs. The County Board may reallocate bond funds among the various projects to the extent necessary or desirable. A - 30 2012 Bond Referenda 2. Local Parks and Recreation QUESTION: Shall Arlington County contract a debt and issue its general obligation bonds in the maximum principal amount of $50,553,000 to finance, together with other available funds, the cost of various capital projects for local parks & recreation, and land acquisition for parks and open space? EXPLANATION: The proposed Local Parks & Recreation program would fund parks improvements and enhancements, and land acquisition for parks and open space. The largest component of this proposal would fund the design and construction of an aquatics, health and fitness center at Long Bridge Park and improvements to the surrounding park. Approximately $1.0 million for the Land Acquisition and Open Space programs is expected to fund strategic park acquisitions based on the Public Spaces Master Plan or other parks related needs. This proposal would also fund maintenance capital improvements such as playground, courts and other parks infrastructure improvements. The County Board may reallocate bond funds among the various projects to the extent necessary or desirable. A - 31 2012 Bond Referenda 3. Community Infrastructure QUESTION: Shall Arlington County contract a debt and issue its general obligation bonds in the maximum principal amount of $28,306,000 to finance, together with other available funds, the cost of various capital projects for County facilities, information technology, and infrastructure? EXPLANATION: This proposal will provide funding for Board-approved Neighborhood Conservation projects. The Neighborhood Conservation Program provides funding for a variety of neighborhood- identified capital improvement projects including street improvements (sidewalk, curb and gutter, drainage, paving), traffic management and pedestrian enhancements, park improvements, street lighting, recreational facilities, landscaping, and beautification. This proposal will also provide funding for the County’s information technology and public safety needs through installation of a public safety network, and facilities maintenance capital improvements, including design and construction of projects including but not limited to roofs, electrical and heating / cooling systems and other facilities infrastructure. The County Board may reallocate bond funds among the various projects to the extent necessary or desirable. A - 32 2012 Bond Referenda 4. Arlington Public Schools QUESTION: Shall Arlington County contract a debt and issue its general obligation bonds in the maximum principal amount of $42,620,000 to finance, together with other available funds, the costs of various capital projects for Arlington Public Schools? EXPLANATION: This proposal would make funds available for the Arlington Public Schools' capital improvement program. The proposed bonds will fund the design and construction of various School facility projects including new elementary schools, building additions for additional classroom space and maintenance capital projects . The School Board may reallocate bond funds among the various projects to the extent necessary or desirable. A - 33 ARLINGTON COUNTY, VIRGINIA BOND REFERENDA HISTORY DATE REFERENDA ITEM AMOUNT OF ISSUE FOR AGAINST MARGIN FOR MARGIN AGAINST % FOR/ AGAINST April 17, 1951 Schools $4,875,000 6,208 2,569 3,693 70.7 Total $4,875,000 November 6, 1951 Courts Building $ 505,000 4,086 7,475 3,389 64.7 Parking Lots 740,000 4,992 7,139 2,147 58.9 Parks and Playgrounds 882,000 6,334 5,595 739 53.1 Streets and Highways 1,318,000 7,465 4,651 2,814 61.6 Storm Drainage 1,382,000 7,330 4,790 2,540 60.5 Total $4,827,000 May 27, 1952 Schools $8,280,000 4,854 3,190 1,664 60.3 Total $8,280,000 November 3, 1953 Streets and Highways $1,720,000 7,035 4,588 2,447 60.5 Water 1,327,000 7,779 3,862 3,917 66.8 Storm Drainage 1,000,000 6,719 4,668 2,051 59.0 Total $4,047,000 November 2, 1954 Water $1,700,000 16,207 4,922 11,285 76.7 Incinerator 980,000 11,910 8,386 3,524 58.7 Fire Stations 470,000 13,138 7,271 5,867 64.4 Storm Drainage 200,000 13,196 7,524 5,672 63.7 County Building Sites 600,000 6,776 13,251 6,475 66.2 Swimming Pools 600,000 9,064 11,964 2,900 56.9 Total $4,550,000 A - 34 ARLINGTON COUNTY, VIRGINIA BOND REFERENDA HISTORY DATE REFERENDA ITEM AMOUNT OF ISSUE FOR AGAINST MARGIN FOR MARGIN AGAINST % FOR/ AGAINST November 8, 1955 Sanitary Sewers $1,000,000 7,203 7,014 189 50.7 Streets and Highways 1,330,000 5,930 8,067 2,137 57.6 Storm Drainage 1,200,000 5,783 8,144 2,361 58.5 Total $3,530,000 February 2, 1956 Schools $9,430,000 5,720 6,658 938 53.8 Total $9,430,000 June 5, 1956 Court House $2,200,000 5,933 795 5,138 88.2 Schools 4,492,000 6,167 4,928 1,239 55.6 Total $6,692,000 May 13, 1958 Libraries $ 560,000 7,137 4,982 2,155 58.9 Streets and Highways 1,790,000 7,320 4,869 2,451 60.1 Sidewalks 330,000 6,907 5,145 1,762 57.3 County Building Sites 50,000 6,358 5,299 1,059 54.5 Parks and Playgrounds 293,000 6,701 5,313 1,388 55.8 Sanitary Sewer 770,000 7,762 4,318 3,444 64.3 Storm Drainage 673,000 7,399 4,649 2,750 61.4 Schools 3,500,000 7,391 4,807 2,584 60.6 Total $7,966,000 May 17, 1960 Storm Drainage $1,040,000 6,105 7,112 1,007 53.8 Regional Parks 130,000 5,593 7,642 2,049 57.7 Parks and Recreation Facilities 800,000 5,679 7,379 1,700 56.5 Libraries 250,000 6,275 6,918 643 52.4 Health Clinics 100,000 5,795 7,373 1,578 56.0 A - 35 ARLINGTON COUNTY, VIRGINIA BOND REFERENDA HISTORY DATE REFERENDA ITEM AMOUNT OF ISSUE FOR AGAINST MARGIN FOR MARGIN AGAINST % FOR/ AGAINST Sidewalks 450,000 5,757 7,420 1,663 56.3 Schools 1,750,000 5,650 7,258 1,608 56.2 Streets and Highways 2,660,000 5,853 7,297 1,444 55.5 Fire Stations 400,000 6,493 6,654 161 50.6 Total $7,580,000 November 8, 1960 Water $2,172,000 20,535 11,733 8,802 63.6 Sanitary Sewers 675,000 21,434 11,972 9,462 64.2 Total $2,847,000 November 7, 1961 County Land Acquisition $ 500,000 8,493 8,589 96 50.3 Storm Water Drainage 900,000 10,007 7,419 2,588 57.4 Streets and Highways 2,500,000 9,874 7,614 2,260 56.5 Sidewalk 475,000 9,149 8,215 934 52.7 Recreation Facilities 225,000 9,029 8,189 840 52.4 Library 495,000 9,209 8,002 1,207 53.5 Firefighting Facilities 475,000 11,519 5,919 5,600 66.1 Schools 950,000 9,246 7,902 1,344 53.9 Total $6,520,000 November 5, 1963 Storm Water Drainage $1,000,000 12,523 7,494 5,029 62.6 Sewer 5,560,000 12,692 6,957 5,735 64.6 County Land Acquisition 1,000,000 10,409 8,914 1,495 53.9 Library 440,000 9,800 9,425 375 51.0 Schools 1,950,000 10,453 8,648 1,805 54.7 Total $9,950,000 November 2, 1965 Storm Water Drainage $ 1,250,000 14,223 8,067 6,156 63.8 A - 36 ARLINGTON COUNTY, VIRGINIA BOND REFERENDA HISTORY DATE REFERENDA ITEM AMOUNT OF ISSUE FOR AGAINST MARGIN FOR MARGIN AGAINST % FOR/ AGAINST Streets and Highways 4,350,000 13,340 8,209 5,131 61.9 County Land Acquisition 1,000,000 12,814 9,321 3,493 57.9 Sidewalk 550,000 12,953 8,352 4,601 60.8 Schools 4,795,000 11,449 9,582 1,867 54.4 Schools, New Junior H.S. 4,250,000 8,413 13,153 4,740 61.0 Total $16,195,000 November 8, 1966 No. Virginia Higher Education $3,000,000 21,100 10,401 10,699 67.0 Total $3,000,000 November 7, 1967 Streets and Sidewalk $7,100,000 15,047 8,031 7,016 65.2 Storm Water Drainage 1,100,000 14,813 7,173 7,640 67.4 Sewer 1,000,000 15,108 6,936 8,172 68.5 Total $9,200,000 June 11, 1968 Schools and Recreation $16,800,000 7,895 9,476 1,581 54.6 Total $16,800,000 November 5, 1968 Transit Facilities $54,000,000 42,721 11,659 31,062 78.6 Schools (W-L Library) 225,000 34,331 19,715 14,616 63.5 Schools (Elementary) 6,900,000 35,993 17,696 18,297 67.0 Schools (New Junior H.S.) 4,150,000 34,485 19,163 15,322 64.3 Recreation Facilities 2,500,000 32,832 19,979 12,853 62.2 Total $67,775,000 November 4, 1969 Paving $ 500,000 19,392 9,380 10,012 67.4 A - 37 ARLINGTON COUNTY, VIRGINIA BOND REFERENDA HISTORY DATE REFERENDA ITEM AMOUNT OF ISSUE FOR AGAINST MARGIN FOR MARGIN AGAINST % FOR/ AGAINST Police Headqtrs.-Jail 2,500,000 20,618 9,562 11,056 68.3 Public Library 550,000 17,866 11,071 6,795 61.7 Swimming Pool 900,000 14,862 13,975 887 51.5 Storm Drainage 1,000,000 21,192 7,947 13,245 72.7 Water System 5,500,000 20,526 8,344 12,182 71.1 Neighborhood Conservation 800,000 16,793 11,611 5,182 59.1 Park Authority 2,160,000 1,654 11,247 9,593 87.2 Total $13,910,000 November 2, 1971 Sanitary Sewers $ 6,700,000 11,961 4,176 7,785 74.1 Waste Water Treatment 6,000,000 12,670 3,490 9,180 78.4 Recreation Facilities 3,000,000 9,873 5,999 3,874 62.2 Storm Water Drainage 2,500,000 12,215 4,114 8,101 74.8 Streets and Highways 1,000,000 16,675 10,211 6,464 62.0 Human Resources Center 850,000 15,347 11,520 3,827 57.1 Neighborhood Conservation 800,000 15,365 11,554 3,811 57.1 Technical Education Center 4,600,000 16,182 11,000 5,182 59.5 Schools 2,600,000 15,097 11,929 3,168 55.9 Library 470,000 14,742 11,98 2,758 55.2 Total $28,520,000 November 7, 1972 Ad. Waste Water Treatment $15,000,000 38,705 11,829 26,876 76.6 Schools 6,275,000 31,390 18,917 12,473 62.4 Total $21,275,000 *Referendum amended language of 1971 and 1972 referenda to expand how the $21.0 million could be used at the wastewater treatment plant. November 6, 1973 Local and Regional Parks $ 5,000,000 11,186 5,736 5,450 66.1 Sanitary Sewerage 4,500,000 13,613 5,744 7,869 70.3 Streets and Highways 3,000,000 10,903 7,276 3,627 60.0 A - 38 ARLINGTON COUNTY, VIRGINIA BOND REFERENDA HISTORY DATE REFERENDA ITEM AMOUNT OF ISSUE FOR AGAINST MARGIN FOR MARGIN AGAINST % FOR/ AGAINST Public Schools 2,350,000 14,647 15,843 1,196 52.0 Storm Water Drainage 1,500,000 20,034 10,286 9,748 66.1 Human Resources Center 1,000,000 17,462 12,660 4,802 58.0 County Property Yard 700,000 13,860 16,081 2,221 53.7 Nursing Home Sites 500,000 20,281 10,607 9,674 65.7 Fire Stations 300,000 20,867 9,925 10,942 67.8 Total $18,850,000 November 4, 1975 Wastewater Treatment* $21,000,000 11,020 8,600 2,420 56.2 Transit Facilities 25,000,000 7,543 11,880 4,337 61.2 County Maintenance and Service Facilities 1,500,000 5,003 13,968 8,965 73.6 Sidewalks, Curbs and Gutters, Streets and Highways 3,000,000 7,923 20,553 12,630 72.2 Joint Community Theatre and Schools Auditorium 1,300,000 5,169 23,612 18,443 82.0 Buildings and Building Sites 1,000,000 5,097 22,881 17,784 81.8 Park and Recreation Acquisition and Development 6,000,000 9,036 20,140 11,104 69.0 Community Conservation 2,500,000 8,075 20,128 12,053 71.4 Total $61,300,000 November 8, 1977 Water Storage $ 6,200,000 21,464 11,959 9,505 64.2 Storm Drainage 1,000,000 20,433 13,300 7,133 60.6 Streets and Highways 3,000,000 19,942 13,973 5,969 58.8 Neighborhood Conservation 2,500,000 19,193 14,777 4,416 56.5 Local and Regional Parks 2,500,000 18,849 14,868 3,981 55.9 Total $15,200,000 *Referendum amended language of 1977 water bond to change from storage to distribution improvements as permitted use. A - 39 ARLINGTON COUNTY, VIRGINIA BOND REFERENDA HISTORY DATE REFERENDA ITEM AMOUNT OF ISSUE FOR AGAINST MARGIN FOR MARGIN AGAINST % FOR/ AGAINST November 6, 1979 Sanitary Sewerage $ 1,985,000 16,761 9,222 7,539 64.5 Streets and Highways 4,665,000 15,617 10,530 5,087 59.7 Local Parks 4,000,000 9,465 16,577 7,112 63.6 Regional Parks 1,705,000 9,780 16,200 6,420 62.4 Total $12,355,000 November 4, 1980 Water Distribution* $6,000,000 41,328 8,756 32,572 82.5 Total $6,000,000 November 3, 1981 Streets and Highways $ 3,000,000 23,751 12,583 11,168 65.4 Storm Drainage 1,800,000 22,652 13,420 9,232 62.8 Jail Expansion 2,100,000 25,485 11,251 14,234 69.4 Local and Regional Parks 3,000,000 22,886 13,465 9,421 63.0 Community Conservation 1,000,000 21,743 13,520 8,223 61.7 Total $10,900,000 November 8, 1983 Metrorail $13,000,000 21,221 6,615 14,606 76.2 Streets and Highways 3,100,000 20,756 6,922 13,834 75.0 Community Conservation 1,950,000 19,624 7,840 11,784 71.5 Water Distribution 3,100,000 20,048 7,159 12,889 73.7 Total $21,150,000 Average 74.1% November 6, 1984 Local and Regional Parks $ 4,035,000 38,785 21,771 17,014 64.1 Streets and Highways 6,140,000 39,644 20,630 19,014 65.8 Community Conservation 6,800,000 37,935 21,906 16,029 63.4 Metrorail 13,000,000 40,111 20,924 19,187 65.7 Total $29,975,000 Average 64.8% A - 40 ARLINGTON COUNTY, VIRGINIA BOND REFERENDA HISTORY DATE REFERENDA ITEM AMOUNT OF ISSUE FOR AGAINST MARGIN FOR MARGIN AGAINST % FOR/ AGAINST November 4, 1986 Local and Regional Parks $ 4,895,000 25,899 8,539 17,360 75.2 Streets and Highways 4,315,000 27,382 6,452 20,930 80.9 Community Conservation 10,835,000 25,626 8,741 16,885 74.6 Central Library Expansion 4,025,000 26,974 7,909 19,065 77.3 Total $24,070,000 Average 77.0% November 8, 1988 Local and Regional Parks $ 3,900,000 50,367 14,344 36,023 77.8 Streets and Highways 2,400,000 49,077 12,688 36,389 79.5 Community Conservation 2,900,000 49,295 14,928 34,367 76.8 Public Schools 12,800,000 49,905 12,251 37,654 80.3 Jail 35,000,000 40,731 22,662 18,069 64.3 Wastewater Treatment 12,000,000 52,216 8,970 43,246 85.3 Total $69,000,000 Average 77.3% November 6, 1990 Courts/Police Facility $53,850,000 25,061 17,381 7,680 59.0 Public Schools 23,000,000 31,367 11,833 19,534 72.6 Streets, Highways, and Community Conservation 10,930,000 28,357 11,980 16,377 70.3 Local and Regional Parks and Recreation 4,220,000 27,857 12,544 15,313 69.0 Fire Station #3 2,500,000 28,642 11,319 17,323 71.7 Total $94,500,000 Average 68.5% November 3, 1992 Metrorail $ 17,800,000 58,898 16,057 42,841 78.6 Public Schools 24,425,000 56,903 17,647 39,256 76.3 Higher Education 3,125,000 51,355 23,199 28,156 68.9 Local and Regional Parks and Recreation 11,870,000 51,504 23,176 28,328 69.0 Streets, Highways and A - 41 ARLINGTON COUNTY, VIRGINIA BOND REFERENDA HISTORY DATE REFERENDA ITEM AMOUNT OF ISSUE FOR AGAINST MARGIN FOR MARGIN AGAINST % FOR/ AGAINST Community Conservation 13,415,000 55,185 19,551 35,634 73.8 Wastewater Treatment Plant 36,000,000 61,741 13,243 48,498 82.3 Total $106,635,000 Average 74.8% November 8, 1994 Metrorail $ 7,000,000 45,783 16,166 29,617 73.9 Public School 36,100,000 46,444 15,349 31,095 75.2 Fire Station #3 2,760,000 44,184 16,857 27,327 72.4 Local and Regional Parks and Recreation 13,865,000 43,210 18,278 24,932 70.3 Streets, Highways and Community Conservation 17,690,000 47,062 14,288 32,774 76.7 Water Distribution and Wastewater Treatment 12,200,000 50,049 10,885 39,164 82.1 Total $89,615,000 Average 75.1% November 5, 1996 Metrorail $ 9,560,000 52,289 15,733 36,556 76.9 Public School 29,120,000 53,783 14,510 39,273 78.6 Local and Regional Parks and Recreation 12,920,000 45,336 23,539 21,797 65.8 Streets, Highways and Community Conservation 21,305,000 53,260 14,372 38,888 78.7 Total $72,905,000 Average 75.0% November 3, 1998 Public Schools $50,705,000 35,552 9,721 25,831 78.5 Westover and Shirlington Branch Libraries 8,000,000 34,298 10,760 23,538 76.1 Local and Regional Parks and Recreation 17,055,000 34,438 10,651 23,787 76.4 Street, Highways, and Community Conservation 24,055,000 35,448 9,500 25,948 78.9 Total $99,815,000 Average 77.5% A - 42 ARLINGTON COUNTY, VIRGINIA BOND REFERENDA HISTORY DATE REFERENDA ITEM AMOUNT OF ISSUE FOR AGAINST MARGIN FOR MARGIN AGAINST % FOR/ AGAINST November 7, 2000 Public Schools $ 42,612,500 61,252 14,564 46,688 80.8 Local and Regional Parks and Recreation 25,875,000 58,973 16,104 42,869 78.6 Street, Highways and Community Conservation 34,291,000 63,797 12,583 51,214 83.5 Government Fac.& Higher Ed. 7,210,000 53,571 22,023 31,548 70.9 Utilities 12,070,000 65,109 11,202 53,907 85.3 Total $122,058,500 Average 79.8% November 5, 2002 Public Schools $ 78,996,000 43,877 12,258 31,619 78.2 Community Projects: Community Conservation, Parks, Public Safety, Pedestrian Systems, Streets, Highways, Transit, Metro, Storm Drainage 67,428,500 44,592 11,320 33,272 79.8 Utilities 12,342,000 46,078 9,796 36,282 82.5 Total $158,766,500 Average 80.2% November 2, 2004 Public Schools $ 78,128,000 71,594 17,615 53,979 80.3 Local Parks and Recreation 78,395,000 67,588 21,450 46,138 75.9 Transportation & Community Infrastructure 35,944,000 71,697 17,171 54,526 80.7 Metro 18,536,000 73,248 16,151 57,097 81.9 Total $208,003,000 Average 79.7% November 7, 2006 Public Schools $ 33,712,000 54,130 16,609 37,521 76.5 Local Parks and Recreation 35,550,000 52,257 18,238 34,019 74.1 Community Infrastructure 27,300,000 49,905 20,233 29,672 71.2 Metro and Transportation 31,500,000 58,058 11,709 46,349 82.0 A - 43 ARLINGTON COUNTY, VIRGINIA BOND REFERENDA HISTORY DATE REFERENDA ITEM AMOUNT OF ISSUE FOR AGAINST MARGIN FOR MARGIN AGAINST % FOR/ AGAINST Utilities 79,000,000 59,797 10,878 48,919 84.6 Total $207,062,000 Average 77.7% November 4, 2008 Public Schools $ 99,425,000 76,325 25,360 50,965 75.1 Community Infrastructure 10,800,000 68,967 31,321 37,646 68.8 Metro 10,000,000 79,178 22,713 56,465 77.7 Utilities 50,000,000 80,873 20,052 60,821 80.1 Total $170,225,000 Average 77.3% November 2, 2010 Public Schools $ 102,888,000 46,869 14,350 32,519 76.6 Local Parks and Recreation 5,975,000 41,745 19,427 22,318 68.2 Community Infrastructure 18,065,000 37,943 22,807 15,136 62.5 Metro 34,100,000 44,896 16,334 28,562 73.3 Total $161,028,000 Average 70.2% November 6, 2012 Public Schools $ 42,620,000 90,232 21,383 68,849 80.8 Local Parks and Recreation 50,553,000 70,920 40,039 30,881 63.9 Community Infrastructure 28,306,000 80,155 29,607 50,548 73.0 Metro 31,946,000 89,000 22,101 66,899 80.1 Total $153,425,000 Average 74.5% A - 44 Parks Land Acquisition 500,000 Metro 10,000,000 Community Conservation Neighborhood Conservation 7,600,000 Other Community Projects 530,000 Total Community Conservation 8,130,000 Transportation - Match for Federal / State Grants 1,250,000 Facilities Infrastructure/Land Acquisition ART House - Heavy Maintenance Facility 2,030,000 Office Space & Homeless Services Center 3,725,000 5,755,000 Total Authorized but Unissued - County 25,635,000 Utilities 11,350,000 Schools - Wakefield High School 32,219,000 *Amounts based on remaining authorized unissued after 2012 GO bond sale in June Arlington, Virginia Bonds Authorized but Unissued A - 45 Arlington, Virginia Projects Underway The County has many large projects that are in near-term implementation phases. Although not a comprehensive list of the broad programs and projects, a brief discussion of some of the larger projects underway is included below. Public Government Facilities: Fire Training Academy -Expected Completion: winter 2013 -The additions include a training tower, drafting station for testing and qualifying on-vehicle fire pumps, a confined space training facility and storage for fire apparatus used for training. The construction contract was awarded in February, 2012. Funding Sources: GO Bonds Arlington Mill Community Center -Expected Completion: summer 2013 -The Arlington Mill Community Center (AMCC) will provide a five-story building housing community-oriented programs sponsored by the Departments of Parks and Recreation, Human Services, and Libraries. The facility will include a full size gym and a 14,000 sf plaza. Construction of the community center started in September, 2011. Funding Sources: GO Bonds, IDA Revenue Bonds, PAYG Fire Station No. 4 HVAC Replacement -Expected Completion: winter, 2012 -The heating, ventilating and air conditioning (HVAC) equipment serving the common rooms and fire staff living quarters will be replaced to improve air quality in the building and improve energy performance. The station will be empty for approximately 3 months of the roughly seven month construction period and fire services coverage will be provided from Fire Station No. 3 on Old Dominion. Interior finishes and kitchen cabinets will also be upgraded as part of the project . Funding Sources: PAYG A - 46 ECC Electrical Power Upgrades -Expected Completion: fall 2012 -Current status and work completed to date. Long-lead equipment (UPS batteries, two UPS's, one ATS) ordered. Building permit for interior demolition received. Construction documents are currently in permit review process for building permit for interior alterations. 13th floor maintenance and custodial services relocation in process. -Future work Construction of 13th floor battery room and installation of new UPS's and ATS. Commissioning of installed systems. Funding Sources: 2006 Emergency Infrastructure Bond Funds Aurora Hills -Expected Completion: May, 2012 -The Aurora Hills Complex is undergoing modifications in the Lobby and Library to accommodate changes in program use. The Library changes will include new carpeting, paint and selected furniture along with new furniture and digital signage in the lobby. Funding Sources: PAYG Carlin Hall Structural Repairs and Exterior Upgrade -Expected Completion: fall 2012 -Structural repairs to building and roof replacement -Received 90% drawings for structural repairs Funding Sources: PAYG Detention Center Work Stations -Expected Completion: fall, 2012 -The Deputy workstations within the Detention Center units are to be replaced. The replacement will include newly designed workstations to accommodate updated equipment, provide better workflow, and secure supplies. Funding Sources: State Criminal Alien Assistant Program (SCAAP) Justice Dept. Grant Community Conservation: Neighborhood Conservation Program -In late FY 2012 and in FY 2013, the NC program will complete 15 Street Improvement projects and 5 Park Improvement projects. These projects will cost $8.6 million. Funding Sources: GO Bonds, PAYG A - 47 Stormwater, Water, and Sewer Infrastructure: Four Mile Run Tidal Corridor Restoration Project -Addition of tidal wetlands and stream bank bioengineering in tidal portion of Four Mile Run envisioned in Four Mile Run Restoration Master Plan. -Design contract awarded 2009. -Construction expected 2014. Funding Sources: Sanitary District Tax, State and Tribal Assistance Grants (STAG), US Army Corps of Engineers Williamsburg Blvd Median Watershed Retrofit Project -Creation of bioretention systems within two medians using engineered soils and specialized plantings to store and filter stormwater runoff from nearby streets and homes. -90% design completed early 2012. -Construction expected 2013. Funding Source: Sanitary District Tax John Marshall Drive at Lee Highway -Design of this storm sewer project is currently under review by VDOT, and includes approximately 430 linear feet of 72-inch storm sewer, 640 linear feet of sanitary sewer (identified in the Sanitary Sewer Master Plan and charged to the sanitary sewer improvements CIP, but incorporated into this project), related appurtenances, and restoration. This project is necessary to reduce the risk of flooding to multiple homes which were flooded in the storm of June 2006. -Construction expected Fall 2012 Funding Source: Sanitary District Tax Stormwater Master Plan -Work is currently underway on an update of the County’s Stormwater Master Plan. Upon its completion in 2013, County staff will have a better understanding of the cost, phasing, and scope of future stormwater management and infrastructure projects. The County's Municipal Separate Storm Sewer System (MS4) permit is also expected to be renewed for a five-year period by the state in calendar year 2012. The results of the new permit may require that future CIPs be adjusted to provide for the more stringent and aggressive requirements designed to improve the health of the Chesapeake Bay. Funding Sources: Sanitary District Tax, Watershed Management Fund, State and Tribal Assistance Grants (STAG), US Army Corps of Engineers Donaldson Run Tributary B Stream Restoration Project -Comprehensive restoration of 1,800 linear feet of degraded stream channel to control severe erosion, improve habitat, and protect threatened sanitary sewer and trail infrastructure. -Design is currently at 90% level, with construction expected in 2013. Funding Sources: Sanitary District Tax, Watershed Management Fund, State and Tribal Assistance Grants (STAG) A - 48 Potomac Interceptor Sanitary Sewer Phase 1 -Construction is scheduled to be completed in fall 2012/ winter 2013. -Will provide surcharge relief and increased wastewater capacity for Rosslyn. Funding Sources: GO bonds, PAYG Glebe Road Water Main -Construction is scheduled to be completed in September 2013 -This project will construct a parallel water main to provide a critical backup to the existing 36-inch water main. Funding Sources: GO bonds, PAYG South Four Mile Run Water Main -Construction is scheduled to be completed in September 2012 -Will replace an existing deteriorating 20-inch water main with a new one of the same size. Funding Sources: PAYG Automated Meter Reading Program (AMR) -Construction is scheduled to be completed in June 2013 -Plan is to install approximately 30,200 meters with AMR capability which will replace all residential meters. -Increases efficiency and accuracy in meter reading by replacing existing water meters with meters having AMR capability Funding Sources: PAYG Master Plan 2001 Update (MP01) -$568 million multi-year program to expand and upgrade the Water Pollution Control Plant -Two largest construction projects were substantially complete in CY 2010 Meeting goals of Total Nitrogen< 3 mg/l (from June 2010), no external bypasses (from April 2010) -Remaining elements of the project are scheduled to be completed in FY 2013 Funding Sources: Virginia Resources Authority loans, Water Quality Improvement Fund grant, GO Bonds, Inter-jurisdictional Partners contributions, Utilities Capital Wet Weather Filtration Facility -Retrofit of existing gravity filters at the Water Pollution Control Plant -Construction is underway, and is expected to be completed in FY 2013 Funding Sources: GO Bonds, Inter-jurisdictional Partners contributions A - 49 Transportation: Columbia Pike - South Wakefield Street to Four Mile Run -Upgrades to water and sewer lines were completed last year. The undergrounding of overhead utilities, street, sidewalk and related improvements along Columbia Pike between South Wakefield Street and Four Mile Run are underway. -The utility undergrounding work will be done first and will take approximately 15 months. -The street improvement work, which includes the realignment of the South Four Mile Run Drive and South Buchanan Street intersection will follow and is expected to be completed by the Fall of 2013. Funding Sources: GO bonds, PAYG, State grants Pentagon City Multi-modal Project – Hayes Street Improvements -The Pentagon City Multi-Modal Project will improve safety and access for pedestrians, transit riders, bicyclists and vehicles along South Hayes Street between Army Navy Drive and 15th Street South. This street and infrastructure improvement project will also enhance the appearance of the area and create a sense of place for all who visit and live in Pentagon City. -The planned improvements range from state-of-the-art traffic signals, mid-block crossings and ADA compliant features, to increased and improved environmentally-sensitive landscape features -Construction of the project will begin in June 2012 and will conclude by Winter 2013-2014. Funding Sources: GO bonds, Transportation Capital Funds, Federal Secondary Aid Crystal City Street Improvements – Two-Way Conversion of Crystal Drive -The Crystal City Street Improvements are a series of projects that will prepare the street network in Crystal City for redevelopment and transit improvements, including the future streetcar. The Crystal Drive Two-Way Conversion project will transform the one-directional portions of Crystal Drive into a two directional roadway. The street network in Crystal City will begin to be transformed by the first of three phases of two-way conversion projects along Crystal Drive, which will convert the road from one-direction to two-directions between 12th and 15th Street South. -The first phase of construction will begin in June 2012 and is expected to be completed by Winter 2012-2013. -Two additional phases of the Crystal Drive Two-Way Conversion project are planned for Crystal Drive. Phase 2 of the Crystal Drive two-way conversion project will occur between the intersection of Crystal Drive with 23rd Street South and 26th Street South and is expected to begin construction Summer or Fall of 2012. Phase 3 of the Crystal Drive two-way conversion is planned to occur between the intersections of 26th Street South to 27th Street South and should begin in the Spring of 2013. Funding Sources: Crystal City, Potomac Yard, Pentagon City Tax Increment Financing Funds, Transportation Capital Funds A - 50 Transportation Systems Management (TSM) Fiber Project -This project will upgrade the existing “ITS Management & CA-Net Plant” to a state-of-the art fiber optic technology in three phases. The overall project consists of replacing the existing 52 miles of outdated and unreliable twisted pair (copper) communication system with a more reliable, faster and scalable fiber optic system. The project is split into three phases. -Phase 1 is currently under construction and is expected to be completed by July 2012. -Phase 2 construction is expected to begin in June 2012. It will lay approximately ten miles of fiber optic cables connecting 101 traffic signals and will install two Variable Message Signs (VMS) along Arlington Boulevard. -Phase 3 is expected to begin construction in January 2013. It will provide an additional twenty miles of fiber optic cables connecting 103 traffic signals. Funding Sources: GO bonds, Transportation Capital Funds, Crystal City, Potomac Yard, Pentagon City Tax Increment Financing Funds, Federal grants Rosslyn Metro Station Access Improvements -Work is underway to install a second station entrance and includes three new high speed, high capacity elevators, a mezzanine, fare payment area, and emergency stairs. -The Board approved the construction contract in July 2010. -Construction work began in October 2010 with completion scheduled for July 2013. Funding Sources: Transportation Capital Fund, federal grants and earmarks, state matches and reimbursements, developer contributions Pentagon City Metro Station Second Elevator -Currently there is only one street-level elevator entrance at the Pentagon City Metrorail station which is among the most heavily utilized stations in Arlington County. The only elevator is located on the east side of S. Hayes St. A second elevator entrance on the west side of the street is necessary to improve general access and to ensure ADA accessibility. -The preliminary engineering contract for the second elevator is scheduled to be awarded in June 2012 and be completed by spring 2013. -Final design and construction are targeted for CY2013 and CY2014 respectively. Funding Sources: Federal grants, federal earmark, state match Columbia Pike Superstops -This project will construct new larger bus shelters that will provide passenger amenities to accommodate the increased number of passengers along the Columbia Pike corridor that are resulting from new enhanced bus services branded as the "Pike Ride" program. -Construction of the first prototype super stop began in early FY12 and is scheduled to be completed in summer 2012. A second prototype stop is scheduled to be constructed in fall 2012. -Plans call for 20 more super stops to be constructed between CY2013 and CY2016 in coordination with construction of street infrastructure improvements on the Pike. -The super stops will serve as streetcar stations in the future. Funding Sources: Prototype stops are funded by a federal grant and a GO bond match. Subsequent stops will be funded by a federal earmark, federal grants, and state match. A - 51 Crystal City-Potomac Yard Transitway -Final design plans were completed in spring 2012 for the construction of the bus transitway which includes dedicated right-of-way and seven station stops between Potomac Yard and the Crystal City Metrorail station. These capital improvements will provide the infrastructure for frequent, high capacity transit service necessary to meet the growing transportation needs of the new high-density, transit-oriented development occurring in Potomac Yard and Crystal City. -The environmental update was completed in December 2010. -The operations plan was completed in January 2012. -Additional right-of-way easements are needed and are expected to be completed during summer 2012. -Award of the construction contract is targeted for fall 2012 with construction work beginning in winter 2013 and finishing in spring 2014. -Project establishes high capacity transit service in anticipation of future streetcar service. Funding Sources: Federal grants, Transportation Capital Fund, GO bonds, state reimbursement, developer contributions. ART House -Facility improvements are underway for Arlington’s local transit system (ART) and will provide new operations/administration and maintenance facilities. -Office space at 2900 S. Eads Street is undergoing rehabilitation starting June 2012 for a new operations/administrative center and is scheduled to open in winter 2013. The Board approved the contract award in April 2012 for this construction work. -Design work started in January 2012 on the plan for site improvements, utilities, a CNG fueling station, a bus wash, and light maintenance facility to be located on the existing lot. Design work is scheduled to be completed in January 2013 and construction is targeted to begin by end of FY2013. Funding Sources: Transportation Capital Fund, GO bonds, state reimbursement grants Parks and Recreation Facilities: Barcroft Park -This project consists of a new baseball stadium in partnership with The George Washington University including a new synthetic turf baseball diamond, fencing, scoreboard, stadium seating, dugouts, batting cages, restrooms, concessions, plaza, signage, pedestrian access, parking lot, storm water management and landscaping. -Anticipated completion is summer 2012. Funding Sources: Permissive Use Agreement with The George Washington University Virginia Highlands Park -This Parks Maintenance Capital project includes replacement of the synthetic turf field carpet and addressing erosion issues adjacent to the field including walkway/stairs, landscaping and site furnishings. -Anticipated completion is summer 2012. Funding Sources: PAYG A - 52 Henry Wright Park -This new park in Buckingham includes a playground, open grassy areas, site furnishings, game tables, gazebo, landscaping and lighted walkways. -Anticipated completion is summer 2012. Funding Sources: IDA Revenue Bond Highview Park -The Parks Maintenance Capital project includes replacement of tot and school age play areas, picnic area, site furnishings, accessible paths, landscaping, retaining walls and signs. -Anticipated completion is fall 2012. Funding Sources: PAYG Long Bridge Park – Long Bridge Drive -The construction of Phase I of the new park, including three lighted synthetic turf fields, esplanade, rain garden, restrooms and storage buildings, public art, parking, landscaping, pathways and site furnishings was completed in October 2011. -The reconstruction of an approximately one-half mile section of Long Bridge Drive will implement a transportation corridor that provides park users, Arlington residents and the traveling public safe and efficient multimodal access to and through the Long Bridge Park recreation area. Long Bridge Drive from S. 12th Street to just south of Boundary Channel Drive will be completely reconstructed with new curb and gutter and a new storm drainage system. Enhancing the roadway improvements will be bicycle lanes, wide sidewalks, street trees, LED roadway lighting, landscaped medians, bus shelters and driveway aprons. -Anticipated completion is fall 2012. Funding Sources: GO Bonds Penrose Square Phase I -The County Board approved the Penrose Square Master Plan in July 2008. This new urban plaza includes a tree-covered upper terrace with movable tables and chairs, a flexible paved plaza in the central portion of the square, an interactive water feature, a unique two piece granite sculpture called “Echo”, and two mounded lawn areas shaded by trees for casual seating. -Anticipated completion is fall 2012. Funding Sources: GO Bonds, PAYG Mosaic Park Phase I -The County Board approved the Mosaic Park Master Plan in September 2009. This new urban park includes an interactive water feature, children’s play area, multi-purpose court, flexible use lawn area, large flexible urban plaza, centrally located casual plaza, rain garden, walkways and sidewalks, site furnishings and landscaping. The park design will have a focus on sustainable practices and features. -Anticipated completion of construction drawings is winter 2013. Funding Sources: Transfer of Development Rights (Founders’ Square Site Plan) A - 53 James Hunter Park -The County Board approved the James Hunter Park (formerly 13th & Herndon) Master Plan in December 2007. This new urban park includes a plaza terrace with focal feature, an open lawn area, native demonstration gardens, a community canine area, pedestrian circulation, sidewalks, public art, utilities, and site furnishings. The park will have a focus on sustainable features including managing and recycling storm water, alternative energy technologies, permeable paving surfaces and recycled materials. -Anticipated completion is spring 2013. Funding Sources: GO Bonds, PAYG Rocky Run Park -The Parks Maintenance Capital project consists of relocating and replacing the major features of the park as well as addressing ADA access throughout the park. The project includes new tot and school-age playgrounds, lighted basketball/multi-purpose courts, lighted synthetic turf field, public art, site furnishings, site circulation, landscaping, and storm water improvements. The picnic shelter will be relocated and renovated. -Anticipated completion is summer 2013. Funding Sources: GO Bonds, PAYG Information Technology and Equipment: Real Estate System Upgrade -Substantial Completion – September 2012 -The County’s real estate assessment system, both residential and commercial, is being upgraded and refreshed. Funding Sources: Master Lease Windows7 Upgrade -Substantial Completion – Fall, 2013 -The County’s inventory of personal computers will be upgraded to Microsoft’s Windows7 operating system from Windows XP. This involves extensive testing and some remediation of all applications that currently run on them. Funding Sources: PAYG ConnectArlington -Substantial Completion – Stage 1-Fall 2013, Stage 2-Fall 2015 -Since the franchise agreement that provides the current fiber network for the County and APS expires in July, 2013, the County is working with APS to build a new network called ConnectArlington. This will leverage ongoing investments in our new Intelligent Traffic Signal (ITS) network and the new Public Safety Radio Ring. When completed, the County and APS will share the maintenance costs of this new network. Funding Sources: Bonds, Cost Sharing with APS, Grants A - 54 Replace Computer-Aided Dispatch Equipment and Paging System -Expected Completion: October 2012 -The project will replace Computer-Aided-Dispatch equipment which is used in the Emergency Communications Center to route all communications to and from ECC Dispatchers as well as vital incident information to mobile data computers in all public safety vehicles. Funding Sources: ECC Bond Replace Portable Radios (Public Safety only) -Expected Completion: July 2012 -The project will replace portable radios which are hand-held radios that allow for two-way communication with the Emergency Communications Center and all public safety agencies within the National Capital Region. Funding Sources: ECC Bond Public Safety Ring -Expected Completion: December 2014 -The Public Safety Ring includes all of the fiber that has been, or will be, strategically laid throughout the County in order to provide diverse route fiber optic connectivity to key County locations plus many other County facilities. This is a three phase project; Phase 1 is complete and provides backbone fiber past the Ballston Place and Courthouse Plaza II radio sites. Phase 2 segments are preparing to begin construction, with target completion of June 30, 2013; at that time, all six radio sites will be connected. Phase 3 is still in design and is awaiting funding decisions, however once approved and funded, the full project and ring can be implemented by December 20, 2014. Funding Sources: ECC Bond Replace the Public Safety Network -Expected Completion: June 2012 -The project will replace the Public Safety Network which is the physical infrastructure connecting the various public safety information technology together and to the County network. The network includes firewalls, routers, servers, switches and cabling. This is a joint effort between the vendor, Police Department IT staff and DTS Network staff. Funding Sources: ECC Bond Replace Mobile Data Computers and Infrastructure -Expected Completion: December 2012 -The project will replace the mobile data computers which are essentially laptops that are used by public safety staff to communicate more efficiently with the Emergency Communications Center and other public safety officers in the County. These terminals or laptops permit data exchange via wireless technology to the Police, Fire and Sheriff’s departments and are located in public safety vehicles. The use of these devices increases the efficiency of information sharing, investigations, records management and all forms of communications. The project also includes replacement of infrastructure needed to support the devices including hardware, software and installation costs. Funding Sources: PAYG A - 55 Replace the Police/Sheriff Records Management System -Expected Completion: March 2014 Replace the Records Management System (RMS) used by the Police and Sheriff's Departments. The system stores critical response, case and inmate data. Funding Sources: Master Lease Replace Servers for Fire Records Management System -Expected Completion: June 2012 -The project will replace the servers used in the Fire Records Management System (FRMS). The application is used to electronically enter data into the National Fire Incident Reporting System (NFIRS) as required by the Federal Government. The system pulls data from the Computer-Aided-Dispatch system in the ECC in order to tracks incident and Fire company movements. The system also enables staff to submit incident and company reports electronically. Funding Sources: ECC Bond Replace Police In-Car Camera System -Expected Completion: June 2013 The project will replace the in-car camera system which is used in Police vehicles to record activities inside and around the vehicles. The cameras provide evidence of all traffic stops and other calls for service. The system provides an added layer of protection and accountability for public safety officers and the public. Upgrade Courthouse Security System -Expected Completion: June 2012 The project will upgrade components of the Courthouse Security System. These include upgrading the system’s Ethernet backbone as well as adding card readers to the telecomm closet doors to ensure access controls. Funding Sources: ECC Bond A - 56 Arlington, Virginia Impact of Capital Projects on Future Operating Budgets The FY 2013 – 2022 CIP recognizes that capital projects, particularly the opening of new capital facilities, have impact on future years’ budgets. Each project page includes a section on anticipated operating cost impact as appropriate for the specific circumstances of the project. The following list summarizes the major operating cost impacts of projects included in the adopted CIP; it should be noted that this list is not intended to be comprehensive and that estimates are very preliminary. FY 2014  Arlington Mill Community Center – New operating costs are projected to range from $2.8 – $3.3 million when this facility opens in late FY 2013 (impact in FY 2013 would be a pro rata amount depending on timing of opening).  Critical Systems Infrastructure - There are several 24/7/365 mission critical facilities essential to the operations of Public Safety and First Responders and require centralize d monitoring and maintenance of building systems (e.g. HVAC, power, building envelope, fire alarm). Operating costs, including additional staff support, is estimated to be $ 0.58 million per year, beginning in FY 2014.  ConnectArlington - The County’s plan to build out its own fiber connections will have corresponding operating costs such as project management, maintenance and restoration of fiber cables and other are related fiber costs.  Metro Silver Line – New operating costs related to the Silver Line e xpansion are expected to increase the County’s WMATA operating subsidy by $1.7 million in FY 2014 due to full revenue service not beginning until December 2013. Ongoing, full-year net operating subsidy related to the Silver Line is expected to be approximately $0.8 million annually.  2020 14th Street North – Upon acquisition of the 2020 14th Street North property, building maintenance costs currently estimated at $0. 6 million annually. This will be offset partially by lease revenue from existing t enants. Once the comprehensive homeless services center is constructed, expected in FY 2014, ongoing programmatic costs are projected to be $0.5 million or more based on the level of additional programming and will be developed in more detail in the coming months. A - 57 FY 2015  Long Bridge (Phase II) Aquatics Facility – Net new operating costs are projected to be in the range of $ 1.1 - $1.4 million annually. This includes 4.0 FTEs in FY 2015 and the balance of FTEs coming online in FY 2016. This estimate assumes significant user fee revenue ranging from $2.5 – $2.7 million annually.  Technology – Operating costs for the real estate tax assessment, ERP modules and asset management systems will impact the 2015 budget. As technology becomes more pr evalent in day to day County operations, the associated infrastructure and support costs may also increase.  DHS Consolidation – With the anticipation of consolidating DHS programs, there will be an estimated $2.3 million per year in lease rental beginning in FY 2015. FY 2016 and beyond  Stormwater – The County’s new stormwater permit is projected to be issued in calendar year 2013. Staff anticipates that additional staffing will be needed beginning around FY 2017 to accommodate the capital requi rements, however, this is a conservative projection and operating impacts will need to be re-evaluated once the MS4 permit is issued.  Columbia Pike & Route 1 Corridor Streetcar s – The Columbia Pike project is estimated to be completed in FY 201 7, resulting in projected new operating costs (net of farebox revenues) of approximately $ 3.6 million annually beginning in FY 2018 . Planning level operating costs for the Route 1 Corridor streetcar are projected to be between $3 .0 – $5.0 million annually starting in FY 2019, but will be revised as the project moves past the concept stage.  Other Parks Projects – New operating costs for Tyrol Hills Park operating costs are estimated at $0.06 million, starting in FY 2016. Penrose Square phase II operating costs are projected at $0.1 million, starting in FY2020.  Lubber Run Community Center – The new facility is expected to be completed in FY 2021 with a net square foot increase of 18,500sf. Starting in FY 2021, an annual estimated net increase c ost of $ 0.1 million can be assumed for operations of the facility. Additional programming costs will need to be determined.  Trade Center Parking Deck & Storage Facility – Beginning in FY 2016, operating costs are expected to start at $0.2 million to accommodate the new Parking Deck at the Trades Center. Beginning in FY 2018, the costs escalate to almost $0.8 million per year to include operation of a County-wide Storage Facility.  Fire Station #10 – The new Fire Station #10 will be part of a phased, mixed -use development. The new facility is expected to be larger than the current facility with a net increase of 12,000 sf. It is estimated that beginning in FY 2018, and additio nal $0.07 million will be needed to operate the facility. A - 58 Projects FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 1 Arlington Mill Community Center - 3,300 3,300 3,300 3,300 3,300 3,300 3,300 3,300 3,300 2 Long Bridge Phase 1 and Fire Station 3 400 400 400 400 400 400 400 400 400 400 3 Technology - - TBD TBD TBD TBD TBD TBD TBD TBD 4 ConnectArlington 317 478 500 596 609 621 634 652 670 716 5 Metro Silver Line - 1,700 800 800 800 800 800 800 800 800 6 Critical Systems Infrastructure 580 580 580 580 580 580 580 580 580 7 Long Bridge Aquatics Facility (net of revenue) - - 340 1,250 1,250 1,250 1,250 1,250 1,250 1,250 8 Other Parks 55 55 55 55 155 155 155 9 Office Building and Year Round Homeless Center 376 631 631 631 631 631 631 631 631 10 Lubber Run Community Center 111 111 11 Trade Center Parking Deck & Storage Facility 165 165 795 795 795 795 795 12 DHS Consolidation 2,343 2,343 2,343 2,343 2,343 2,343 2,343 2,343 13 Fire Station #10 72 72 72 72 72 14 Stormwater Management - - - - 440 440 440 660 660 660 15 Columbia Pike & Crystal City Streetcars - 0 - - - 3,600 5,600 7,600 7,600 7,600 717 6,834 8,894 10,120 10,573 14,887 16,900 19,238 19,367 19,413 Impact of Capital Projects on Future Operating Budgets ($ in 000s) TOTAL Notes: Annual operating costs for the Columbia Pike streetcar are $3.6 million annually. Planning level operating costs for the Crystal City streetcar are between $3 million and $5 million annually, but will be revised after the project moves past the concept stage. The operating costs for the Stormwater Management Fund are captured within the Stormwater Management Fund and are not reflected in the operating General Fund. A - 59 10 Year Program Category FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 Total Local Parks & Recreation 61,739 28,260 21,081 11,220 23,711 13,395 23,243 10,892 33,841 30,155 257,537 Transportation Initiatives 1 164,662 64,012 61,889 81,274 60,875 33,671 41,009 39,135 32,576 57,184 636,287 Crystal City (Route 1) Streetcar 2 2,000 5,990 19,080 37,265 37,265 30,975 13,230 - - - 145,805 Columbia Pike Streetcar 8 9,546 25,769 55,057 56,853 51,774 - - - - - 198,999 Metro 20,900 18,600 26,600 20,400 16,400 14,500 15,000 15,750 16,500 16,500 181,150 Community Conserv/Economic Develop 14,550 15,135 30,895 26,647 9,605 6,138 12,467 6,676 6,696 6,717 135,526 Public / Government Facilities 60,188 23,696 20,545 19,243 50,276 15,584 53,464 28,249 43,777 19,990 335,012 Ballston Garage 4 5,300 4,980 2,519 781 770 3,370 130 830 460 650 19,790 Information Technology & Public Safety 3 20,922 20,946 20,565 9,737 8,177 14,555 14,699 19,682 11,244 19,487 160,014 Regional Partnerships 1,135 1,192 1,262 1,332 1,405 1,313 1,340 1,367 1,395 1,424 13,165 Capital Contingent 3,214 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 21,214 Subtotal County Capital 364,156 210,580 261,493 266,752 262,258 135,501 176,582 124,581 148,489 154,107 2,104,499 Water & Sewer Infrastructure 5 76,016 24,893 28,794 23,560 24,189 24,775 24,393 23,866 24,332 26,759 301,577 Stormwater Management 6 2,859 7,280 4,030 4,420 4,450 4,450 4,550 3,550 3,850 3,850 43,289 Total County Capital 443,031 242,753 294,317 294,732 290,897 164,726 205,525 151,997 176,671 184,716 2,449,365 Schools Capital 62,879 55,567 53,453 39,001 75,073 40,151 61,374 41,583 57,756 51,956 538,793 Total Capital Improvement Plan 505,910 298,320 347,770 333,733 365,970 204,877 266,899 193,580 234,427 236,672 2,988,158 Arlington, Virginia 10 Year Capital Program Costs Summary (000s) Adopted CIP Program Summary The FY 2013 - 2022 CIP includes typical capital projects such as maintenance capital, parks, transportation, metro, community conservation, government facilities, information technology and regionals . In addition, this CIP continues to address projects introduced in the previous CIP such as Crystal City and Columbia Pike streetcars, ConnectArlington (previously fiber optic communications network) and Ballston Garage. Unlike past CIPs, this is a 10 year CIP and includes funding that has been previously approved in prior CIPs to show the full expenditure by fiscal year of each capital project. B - 1 Arlington, Virginia Adopted CIP Program Summary 10 Year Capital Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 Total New Funding Pay-As-You-Go (PAYG) 19,005 29,513 35,076 24,434 29,105 30,448 33,115 31,823 26,436 31,534 290,489 Master Lease Funding 11,032 12,425 8,636 5,710 4,949 10,833 8,758 11,341 8,380 15,883 97,947 GO Bond Referenda 110,806 133,677 132,699 154,588 159,148 690,918 State/Federal Funding 9,872 21,357 39,847 41,991 41,351 21,403 19,704 11,144 8,905 15,773 231,347 Developer Contributions and Partnerships 22,000 4,160 21,800 24,943 4,796 - 200 - - - 77,899 Ballston Garage Parking Revenues 4 2,200 3,080 2,519 781 770 3,370 130 830 460 650 14,790 Sanitary District Tax 6 2,619 3,480 3,900 4,420 4,450 4,450 4,550 3,550 3,850 3,850 39,119 Transportation Capital Fund 1, 8 21,981 20,287 23,406 20,092 22,732 11,871 10,835 11,697 6,635 10,024 159,560 Tax Increment Financing 2, 8 4,747 5,850 2,500 7,931 4,170 7,759 4,470 2,200 2,150 4,550 46,327 Transportation Revenue Bonds - 21,000 49,430 76,500 38,500 - - - - - 185,430 Utility Fund Transfer & Other Sources 5 18,069 22,833 22,182 23,560 24,189 24,775 24,393 23,866 24,332 26,759 234,958 Schools Fund Transfer 8,199 5,607 5,643 5,801 6,073 6,151 6,374 6,583 6,756 6,956 64,143 Schools General Obligation Bonds 42,620 81,010 103,000 90,000 96,000 412,630 Subtotal New Funding 273,150 149,592 429,626 236,163 416,784 121,060 357,117 103,034 343,052 115,979 2,545,557 Previously Approved Funding Authorized but Unissued Bonds 104,540 8,542 9,212 3,875 - - - - - - 126,169 Issued but Unspent Bonds 38,365 1,109 150 - - - - - - - 39,624 Other Previously Approved Funds 7 209,406 43,863 5,619 1,552 4,200 - 200 - - 11,968 276,808 Subtotal Previously Approved Funding 352,311 53,514 14,981 5,427 4,200 - 200 - - 11,968 442,601 Total Funding 625,461 203,106 444,607 241,590 420,984 121,060 357,317 103,034 343,052 127,947 2,988,158 (8) The Columbia Pike streetcar is funded by the Transportation Capital Fund, revenue bonds, and state and federal funding. The Route 1 Corridor streetcar is funded by the Crystal City/Potomac Yard/Pentagon City Tax Increment Financing area fund, GO bonds, revenue bonds, and state funding. (7) Other previously approved funds: Any funds other than GO Bonds that were approved as part of prior CIPs that are to be spent during this FY13-FY22 CIP. (6) Stormwater Management Fund is funded from the Sanitary District Tax, Watershed Management Fund, State Grants and project cost sharing with US Army Corps of Engineers. The sanitary district tax was increased from $0.01 to $0.013 per $100 of assessed value by the County Board on April 24, 2010. (3) ConnectArlington is included in the Information Technology & Public Safety category. Funding sources for this project includes federal grants, exiting IDA bond balances, as well as Schools' local funds for their respective allocation of the project costs. (5) Utilities fund other sources: Developer contributions and Inter Jurisdictional payments, interest revenue and existing bonds and fund balances. (4) Ballston Garage funding includes parking revenues, interest revenue and reserves. 10 Year Capital Program Funding Sources Summary (000s) (2) Crystal City Public Infrastructure is funded from tax increment financing on properties in the Crystal City, Potomac Yard, and Pentagon City areas of the County. The tax increment is currently set at 33 percent. (1) Transportation Capital Fund is supported by a commercial real estate tax of $0.125 per $100 of assessed value, yielding projected revenues for transportation projects. Beginning in 2014, the plan assumes revenue bonds, supported by the tax, will be issued. The Transportation Capital Fund is supplemented by County PAYG as well as state and federal revenues. The table below presents the Pay-As-You-Go appropriations and Bond referenda approved by the voters each year since FY 1998. Carryover appropriation from previous years are not included. Appropriation rather than actual expenditures are presented because The Proposed FY 2005 - 2010 funding strategy includes 28.4 percent funding for PATG appropriations, which includes state grants and other sources of revenue and General Obligation Bonds will fund 71.6 percent of the CIP. The table below presents the Pay-As-You-Go appropriations and Bond referenda approved by the voters each year since FY 1998. Carryover appropriation from previous years are not included. Appropriation rather than actual expenditures are presented because The Proposed FY 2005 - 2010 funding strategy includes 28.4 percent funding for PATG appropriations, which includes state grants and other sources of revenue and General Obligation Bonds will fund 71.6 percent of the CIP. B - 2 Program Category FYs 13-22 Parks & Recreation 257,537 Transportation Initiatives 636,287 Crystal City / Columbia Pike Streetcar 344,804 Metro 181,150 Community Conservation/Economic Dev 135,526 Public /Government Facilities 335,012 Ballston Garage 19,790 Information Technology & Public Safety 160,014 Regional Partnerships 13,165 Capital Contingency 21,214 Total County's Program Cost 2,104,499 Water & Sewer Infrastructure 301,577 Stormwater Management Fund 43,289 Schools Capital 538,793 Total CIP Program Cost 2,988,158 Capital Funding Sources FYs 13-22 New Funding Pay-As-You-Go (PAYG) 290,489 Master Lease Funding 97,947 GO Bond Referenda 690,918 State/Federal Funding 231,347 Developer Contributions and Partnerships 77,899 Ballston Garage Parking Revenues 14,790 Sanitary District Tax 39,119 Transportation Capital Fund 159,560 Tax Increment Financing 46,327 Transportation Revenue Bonds 185,430 Utility Fund Transfer & Other Sources 234,958 Schools Fund Transfer 64,143 Schools General Obligation Bonds 412,630 Subtotal New Funding 2,545,557 Previously Approved Funding Authorized but Unissued Bonds 126,169 Issued but Unspent Bonds 39,624 Other Previously Approved Funds 276,808 Subtotal Previously Approved Funding 442,601 Total Funding 2,988,158 CIP Program and Funding Allocation ($ in 000s) Arlington, Virginia Parks & Recreation 9% Transportation Initiatives 21% Crystal City & Columbia Pike Streetcar 12% Metro 6% Community Conservation/ Economic Dev 5% Public /Government Facilities 11% Ballston Garage 1% Information Technology & Public Safety 5% Regional Partnerships 0% Capital Contingency 1% Water & Sewer Infrastructure 10% Stormwater Management Fund 2% Schools Capital 18% Program Category Pay-As-You-Go (PAYG) 10% Master Lease Funding 3% GO Bond Referenda 23% State/Federal Funding 8% Developer Contributions and Partnerships 3% Ballston Garage Parking Revenues 0% Sanitary District Tax 1% Transportation Capital Fund 5% Tax Increment Financing 2% Transportation Revenue Bonds 6% Utility Fund Transfer & Other Sources 8% Schools Fund Transfer 2% Schools General Obligation Bonds 14% Previously Approved Funding 15% Funding Sources B - 3 page Total reference LOCAL PARKS & RECREATION C25 Long Bridge (Aquatics, Fitness Center and Design of Final Outdoor Phase) 46,414 C11 Parks Maintenance Capital 52,433 C19 Land Acquisition & Open Space 14,441 C28 Tyrol Hill Park 1,776 C32 Four Mile Run Near-Stream Improvements 15,408 C30 Jennie Dean Park 25,560 C21 Synthetic Turf Fields 2,185 C34 Crystal City Parks and Open Space 6,945 C36 Four Urban Parks in Ballston-Virginia Square 6,715 C38 Mosaic Park 3,622 C40 Glebe and Randolph Park 3,466 C42 Ballston Pond 988 Sub-total 179,953 TRANSPORTATION E92 Paving 74,516 E55 Long Bridge Interchange 8,335 E19 ART (Heavy Maintenance Facility) 3,183 E83,E53, E90 WALKArlington, BikeArlington & Neighborhood Traffic Calming 7,383 E44 Route 1 Streetcar 20,000 E88 Bridge Renovation 9,034 E70,E76 Match for State & Federal Projects and other 3,626 Sub-total 126,077 METRO E1 Metro 124,250 COMMUNITY CONSERVATION C46 Neighborhood Conservation 57,000 C48 Penrose Square 2,644 C51,53 Nauck Town Square & Infrastructure 4,852 Sub-total 64,496 6,868 1,000 185 0 0 0 1,321 0 42,500 50,553 13,195 0 2,500 0 0 0 0 0 300 17,346 14,600 30 0 0 11,000 11,000 12,405 13,160 10,000 10,000 3,000 4,441 3,000 3,000 1,591 0 0 0 3,167 0 0 0 3,914 25,524 29,459 24,621 49,796 1,126 0 6,968 0 0 988 0 0 328 3,294 219 2,122 563 2,985 3,167 0 5,835 0 1,383 1,469 1,558 1,652 0 13,999 14,851 15,756 16,715 0 2,228 1,238 5,015 253 27,794 38,758 22,926 19,253 1,166 1,200 5,835 6,190 2,185 0 0 20,000 0 3,183 0 0 0 0 299 39,000 22,900 22,750 25,000 11,941 6,567 0 298 2,346 0 0 1,688 3,164 0 11,000 11,000 12,000 12,000 11,000 12,986 17,510 12,000 FY 13-22 Arlington, Virginia FY 2013 - FY 2022 CIP Debt Summary (000s) GO & Other BOND Funding Adopted Proposed Proposed 2012 Referenda 2020 Referenda2018 Referenda2014 Referenda 2016 Referenda Proposed Proposed 0 3,357 597 633 289 2,983 316 0 0 0 B - 4 page Total reference FY 13-22 Arlington, Virginia FY 2013 - FY 2022 CIP Debt Summary (000s) GO & Other BOND Funding Adopted Proposed Proposed 2012 Referenda 2020 Referenda2018 Referenda2014 Referenda 2016 Referenda Proposed Proposed PUBLIC / GOVERNMENT FACILITIES C69 Facilities Maintenance Capital 30,625 C110 North Side Salt Facility 2,391 C78 Lubber Run Community Center 27,124 C121 Non Parks Land Acquisition 11,000 C104 Alternate Emergency Communication Center 3,500 C76 Fire Stations 27,230 C74 Courthouse Square 40,470 C82,102 Trade Center Parking Deck & Storage Building 20,593 C80 Courts/Police Building Interior Renovation 11,627 C117 Court Square West Building Removal 1,770 C96 Police and Sheriff Pistol Firing Range 2,500 C112 Columbia Pike Library Replacement 1,284 Sub-total 180,114 D21,E67 ConnectArlington and Intelligent Transportation System 17,500 SUBTOTAL GO Bond Referenda 692,390 C71 2020 Building Acquisition and Conversion 30,150 C26 Long Bridge - Developer Contribution 20,000 SUBTOTAL Other Bond Funding 50,150 Total BOND FUNDING* 742,540 * Excludes Revenue Bonds for Transportation Investment Fund Adopted Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Total D13 Fire Defibrillators & Breathing Apparatus - - - - - 2,312 2,929 - - - 5,241 D3 Enterprise IT Refreshment 3,325 5,488 3,719 3,065 2,000 4,536 5,218 4,532 5,238 4,431 41,552 D12 Public Safety IT Refreshment 4,524 4,218 4,565 2,645 2,949 1,306 611 5,055 1,733 8,635 36,241 D13 Auto Fund - Fire Vehicle Apparatus 2,862 2,460 - - - 2,679 - 1,754 1,409 2,817 13,981 Total Master Lease Funding 10,711 12,166 8,284 5,710 4,949 10,833 8,758 11,341 8,380 15,883 97,015 Total Debt Funding (excludes Schools) 839,555 174,687 183,413 INFORMATION TECHNOLOGY / PUBLIC SAFETY FY 2015 FY 2016 FY 2017 FY 2018 180,107 141,426 159,922 Master Lease Funding FY 2013 FY 2014 FY 2019 4,025 0 127,432 144,140 154,588 157,230 13,475 110,805 46,425 26,425 20,000 0 0 0 0 0 3,831 0 0 0 5,039 6,588 0 0 1,770 0 0 0 2,500 0 0 3,625 206 0 0 159,150 7,000 6,000 7,000 7,000 2,185 0 0 0 0 1,414 25,710 0 2,000 3,000 3,000 3,000 0 0 15,873 24,597 0 1,400 3,000 0 0 4,679 15,914 0 0 66,781 53,101 0 0 0 0 1,284 16,364 40,037 FY 13-22FY 2020 FY 2021 500 3,725 FY 2022 8,610 17,220 123,707 144,140 0 0 0 154,588 159,150 0 0 0 0 3,725 0 0 0 0 0 B - 5 page Adopted Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Total reference MAINTENANCE CAPITAL E3 Transportation (pg E18, 24, 64, 82, 87, 93) 2,087 2,613 5,936 6,281 6,493 6,712 6,940 6,986 7,017 7,385 58,449 C69 Public Facilities 3,204 5,828 6,470 3,657 4,000 4,034 3,500 3,500 3,500 3,500 41,193 C11 Parks and Recreation 3,722 2,253 2,253 2,253 2,253 2,253 2,253 2,253 2,253 2,253 23,995 D3 Enterprise Information Technology 90 1,123 1,283 962 991 876 1,284 835 861 854 9,157 D12 Public Safety IT and Equipment - 340 - 1,564 493 - 418 4,371 293 337 7,816 C106 Americans with Disabilities Act - 740 829 - - - - - - - 1,569 C125 Energy Efficiency 230 412 424 437 450 464 478 492 507 522 4,416 Sub-Total 9,333 13,308 17,195 15,153 14,680 14,338 14,872 18,436 14,429 14,850 146,593 REGIONAL PROGRAMS C7 Northern Va Community College 312 370 429 490 553 561 570 578 587 596 5,046 C7 Northern Va Regional Park Authority 527 533 550 566 583 601 619 638 657 677 5,951 C8 Peumansend Creek Regional Jail Authority 146 138 132 125 118 - - - - - 659 C7 Northern Va Criminal Justice Academy 151 151 151 151 151 151 151 151 151 151 1,510 Sub-Total 1,136 1,192 1,262 1,332 1,405 1,313 1,340 1,367 1,395 1,424 13,166 OTHER CAPITAL PROJECTS C46 Neighborhood Conservation 500 515 530 546 563 580 597 615 633 652 5,732 E90 Neighborhood Traffic Calming 100 103 106 109 113 116 119 123 127 130 1,146 E79 Streetlight Energy Efficiency 500 515 530 546 563 580 597 615 633 652 5,732 C17 Park Enhancement Grants 100 103 106 109 113 116 119 123 127 130 1,146 C55 Wayfinding, Theaters, Conference Facility and Public Art 50 1,288 465 601 56 58 60 61 63 65 2,768 C21 Synthetic Fields 1,185 691 1,286 130 1,256 1,857 2,506 2,270 2,651 4,097 17,929 E54,58,70 Bicycle and Pedestrian Safety Projects 1,151 1,186 1,221 1,258 1,295 1,334 1,374 1,416 1,458 1,502 13,194 E71 Parking Meters 200 942 1,061 481 - - - - - - 2,684 D8, 9 Real Estate Assessment & Oracle System 1,000 1,780 3,773 573 788 1,750 2,984 2,091 633 1,305 16,677 D7 Information and Data Management - 2,163 1,378 929 957 1,102 1,254 1,045 1,077 1,108 11,013 D10 Asset/Customer Service Management - - 2,000 - - - - - - - 2,000 C108 Facilities Master Planning - 458 500 250 500 250 250 250 250 250 2,958 C80 Courts/Police Interior Renovation - - - - 4,269 4,307 4,423 - - - 13,000 C114 Critical Systems Infrastructure - - 21 76 - 29 56 - - 70 252 C92 DHS Consolidation - 2,640 - - - - - - - - 2,640 C100 Facility Finishes and Furnishings 667 309 318 328 338 347 358 1,291 380 978 5,315 C76, 94 Fire Stations & FFE - - 554 142 338 - 334 - 709 - 2,079 C8 Capital Contingency 3,214 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 21,214 Sub-Total 8,667 14,693 15,851 8,079 13,148 14,427 17,033 11,900 10,742 12,940 127,480 Total PAYG Funding 19,136 29,193 34,308 24,564 29,234 30,078 33,245 31,703 26,566 29,214 287,239 FY 2019 Arlington, Virginia FY 2013 - FY 2022 CIP PAYG Summary (000s) FY 2020 FY 2021 FY 2022 FY13-22PAYG Funding FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 B - 6 PROGRAM CATEGORY 2010 2012 2014 2012 2014 2016 2018 2020 Bond Bond Bond TOTAL Bond Bond Bond Bond Bond TOTAL LOCAL PARKS & RECREATION Parks Maintenance Capital 1,000 4,000 4,875 9,875 6,868 12,405 13,160 10,000 10,000 52,433 Rocky Run; Herndon & 13th Park 2,975 - - 2,975 - Land Acquisition & Open Space 2,000 3,000 5,000 10,000 1,000 3,000 4,441 3,000 3,000 14,441 Long Bridge Park - 31,827 2,575 34,402 42,500 - - - 3,914 46,414 Tyrol Hill Park - 1,575 - 1,575 185 1,591 - - - 1,776 Synthetic Turf Field - - - - - 2,185 - - - 2,185 Four Mile Run Near-Stream Improvements - - - - - 219 2,122 1,126 11,941 15,408 Jennie Dean Park - - - - - 5,835 6,190 6,567 6,968 25,560 Crystal City Parks and Open Space - - - - - 289 2,983 316 3,357 6,945 Four Urban Parks in Ballston-Virginia Square - - - - - - 563 2,985 3,167 6,715 Mosaic Park - - - - - - - 328 3,294 3,622 Glebe and Randolph Park - - - - - - - 299 3,167 3,466 Ballston Pond - - - - - - - - 988 988 Total Project Cost 5,975 40,402 12,450 58,827 50,553 25,524 29,459 24,621 49,796 179,953 TRANSPORTATION INITIATIVES Paving 10,300 11,200 11,200 32,700 13,195 13,999 14,851 15,756 16,715 74,516 Long Bridge Interchange - 8,000 - 8,000 2,500 5,835 - - - 8,335 WALKArlington, BikeArlington, Neighborhood Traffic Calming 1,300 1,300 1,300 3,900 1,321 1,383 1,469 1,558 1,652 7,383 Bridge Renovation - 200 2,000 2,200 300 2,228 1,238 5,015 253 9,034 Match for State & Federal Projects & Other 2,500 2,500 2,500 7,500 30 1,166 1,200 597 633 3,626 Crystal City (Route 1) Public Infrastructure - - 20,250 20,250 - - 20,000 - - 20,000 ART (Heavy Maintenance Facility) - - - - - 3,183 - - - 3,183 Total Project Cost 14,100 23,200 37,250 74,550 17,346 27,794 38,758 22,926 19,253 126,077 Arlington, Virginia Adopted FY 2011 - FY 2016 to Adopted FY 2013 - FY 2022 Adopted FY 2011 - FY 2016 Adopted FY 2013 - FY 2022 General Obligation Bonds Referenda ($ in 000s) B - 7 Arlington, Virginia Adopted FY 2011 - FY 2016 to Adopted FY 2013 - FY 2022 Adopted FY 2011 - FY 2016 Adopted FY 2013 - FY 2022 General Obligation Bonds Referenda ($ in 000s) METRO 20,000 20,000 20,000 60,000 14,600 39,000 22,900 22,750 25,000 124,250 Total Project Cost 20,000 20,000 20,000 60,000 14,600 39,000 22,900 22,750 25,000 124,250 COMMUNITY CONSERVATION ConnectArlington and Intelligent Transportation System - 5,825 1,175 7,000 13,475 4,025 - - - 17,500 Neighborhood Conservation 9,000 9,000 9,000 27,000 11,000 11,000 11,000 12,000 12,000 57,000 Penrose Square - 3,350 - 3,350 - - 298 2,346 - 2,644 Nauck Town Square & Infrastructure - - 4,150 4,150 - - 1,688 3,164 - 4,852 Total Project Cost 9,000 12,350 13,150 34,500 24,475 15,025 12,986 17,510 12,000 81,996 PUBLIC / GOVERNMENT FACILITIES Facilities Maintenance Capital 2,675 4,150 13,411 20,236 3,625 7,000 6,000 7,000 7,000 30,625 Lubber Run Community Center - - 18,000 18,000 - - 1,414 25,710 - 27,124 Facilities Infrastructure & Non Parks Land Acquisition 6,390 6,000 8,472 20,862 - 2,000 3,000 3,000 3,000 11,000 Courthouse Square - 2,000 2,500 4,500 - - - 15,873 24,597 40,470 North Side Salt Facility - - - - 206 2,185 - - - 2,391 Alternate Emergency Communication Center - - - - - 500 3,000 - - 3,500 Fire Stations - - 1,400 8,610 17,220 27,230 Trade Center Parking Deck & Storage Building - 4,679 15,914 - - 20,593 Courts/Police Building Interior Renovation - - 5,039 6,588 - 11,627 Court Square West Building Removal - - 1,770 - - 1,770 Police and Sheriff Pistol Firing Range - - 2,500 - - 2,500 Columbia Pike Library Replacement - - - - 1,284 1,284 Total Project Cost 9,065 12,150 42,383 63,598 3,831 16,364 40,037 66,781 53,101 180,114 TOTAL COUNTY CAPITAL 58,140 108,102 125,233 291,475 110,805 123,707 144,140 154,588 159,150 692,390 B - 8 REGIONALS AND OTHER FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total New Funding State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 PAYG 4,349 3,192 3,262 3,332 3,405 3,313 3,340 3,367 3,395 3,424 34,379 New Bond Referenda 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 4,349 3,192 3,262 3,332 3,405 3,313 3,340 3,367 3,395 3,424 34,379 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 0 0 0 0 0 0 0 0 0 0 0 Total Funding Sources 4,349 3,192 3,262 3,332 3,405 3,313 3,340 3,367 3,395 3,424 34,379 LOCAL PARKS AND RECREATION PROGRAMS FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total New Funding State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 20,000 0 0 0 0 0 0 0 0 0 20,000 Other Funding 0 450 900 0 0 500 0 250 0 2,450 4,550 PAYG 4,877 2,917 3,515 2,362 3,492 4,096 4,748 4,516 4,901 6,350 41,774 New Bond Referenda 25,660 24,893 16,666 8,858 19,219 8,799 18,495 6,126 28,940 20,855 178,511 Subtotal New Funding 50,537 28,260 21,081 11,220 22,711 13,395 23,243 10,892 33,841 29,655 244,835 Previously Approved Funding Authorized but Unissued Bonds 8,000 0 0 0 0 0 0 0 0 0 8,000 Issued but Unspent Bonds 1,762 0 0 0 0 0 0 0 0 0 1,762 Other Previously Approved Funds 1,440 0 0 0 1,000 0 0 0 0 500 2,940 Subtotal Previously Approved Funding 11,202 0 0 0 1,000 0 0 0 0 500 12,702 Total Funding Sources 61,739 28,260 21,081 11,220 23,711 13,395 23,243 10,892 33,841 30,155 257,537 ARLINGTON, VIRGINIA FY 2013 - FY 2022 CIP PROGRAM DETAIL ($ in 000s) B - 9 ARLINGTON, VIRGINIA FY 2013 - FY 2022 CIP PROGRAM DETAIL ($ in 000s) COMMUNITY CONSERVATION FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total New Funding State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 1,500 0 0 0 0 0 1,500 Other Funding 0 0 0 0 0 0 0 0 0 0 0 PAYG 500 515 530 546 563 580 597 615 633 652 5,731 New Bond Referenda 5,500 5,500 5,500 5,500 7,486 5,500 11,510 6,000 6,000 6,000 64,496 Subtotal New Funding 6,000 6,015 6,030 6,046 9,549 6,080 12,107 6,615 6,633 6,652 71,727 Previously Approved Funding Authorized but Unissued Bonds 1,400 5,000 2,600 0 0 0 0 0 0 0 9,000 Issued but Unspent Bonds 7,100 932 0 0 0 0 0 0 0 0 8,032 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 8,500 5,932 2,600 0 0 0 0 0 0 0 17,032 Total Funding Sources 14,500 11,947 8,630 6,046 9,549 6,080 12,107 6,615 6,633 6,652 88,759 PUBLIC / GOVERNMENT FACILITIES FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total New Funding State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 2,000 2,260 0 4,943 3,296 0 0 0 0 0 12,499 Other Funding 2,200 3,080 2,519 781 770 3,370 130 830 460 650 14,790 PAYG 4,101 10,387 9,116 4,890 9,895 9,432 9,399 5,533 5,346 5,320 73,419 New Bond Referenda 1,038 2,793 10,679 5,685 33,885 6,152 44,065 22,716 38,431 14,670 180,114 Subtotal New Funding 9,339 18,520 22,314 16,299 47,846 18,954 53,594 29,079 44,237 20,640 280,822 Previously Approved Funding Authorized but Unissued Bonds 30,838 1,257 0 3,725 0 0 0 0 0 0 35,820 Issued but Unspent Bonds 12,900 0 0 0 0 0 0 0 0 0 12,900 Other Previously Approved Funds 12,411 8,899 750 0 3,200 0 0 0 0 0 25,260 Subtotal Previously Approved Funding 56,149 10,156 750 3,725 3,200 0 0 0 0 0 73,980 Total Funding Sources 65,488 28,676 23,064 20,024 51,046 18,954 53,594 29,079 44,237 20,640 354,802 B - 10 ARLINGTON, VIRGINIA FY 2013 - FY 2022 CIP PROGRAM DETAIL ($ in 000s) METRO FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total New Funding State/Federal Funding 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 40,000 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 PAYG 0 0 0 0 0 0 0 0 0 0 0 New Bond Referenda 0 14,600 22,600 16,400 12,400 10,500 11,000 11,750 12,500 12,500 124,250 Subtotal New Funding 4,000 18,600 26,600 20,400 16,400 14,500 15,000 15,750 16,500 16,500 164,250 Previously Approved Funding Authorized but Unissued Bonds 16,900 0 0 0 0 0 0 0 0 0 16,900 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 16,900 0 0 0 0 0 0 0 0 0 16,900 Total Funding Sources 20,900 18,600 26,600 20,400 16,400 14,500 15,000 15,750 16,500 16,500 181,150 TRANSPORTATION FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total New Funding State/Federal Funding 5,832 17,357 35,717 37,991 37,351 17,403 15,704 7,144 4,905 11,773 191,177 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 Other Funding 26,728 47,137 75,336 104,523 65,402 19,630 15,305 13,897 8,785 14,574 391,317 PAYG 4,038 5,358 8,854 8,676 8,466 8,747 9,030 9,140 9,234 9,669 81,212 New Bond Referenda 17,209 7,258 17,156 21,138 15,319 13,439 13,972 8,954 9,755 9,497 133,697 Subtotal New Funding 53,807 77,110 137,063 172,328 126,538 59,219 54,011 39,135 32,679 45,513 797,403 Previously Approved Funding Authorized but Unissued Bonds 4,200 225 0 150 0 0 0 0 0 0 4,575 Issued but Unspent Bonds 1,631 177 150 0 0 0 0 0 0 0 1,958 Other Previously Approved Funds 141,502 17,664 4,869 1,552 0 0 100 0 0 11,468 177,155 Subtotal Previously Approved Funding 147,333 18,066 5,019 1,702 0 0 100 0 0 11,468 183,688 Total Funding Sources 201,140 95,176 142,082 174,030 126,538 59,219 54,111 39,135 32,679 56,981 981,091 B - 11 ARLINGTON, VIRGINIA FY 2013 - FY 2022 CIP PROGRAM DETAIL ($ in 000s) WATER AND SEWER INFRASTRUCTURE FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total New Funding State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 3,200 5,110 5,303 5,462 5,628 5,797 5,971 6,149 6,334 6,523 55,477 Other Funding 4,113 1,482 819 823 848 873 899 926 954 982 12,719 PAYG 10,756 16,241 16,060 17,275 17,713 18,105 17,523 16,791 17,044 19,254 166,762 New Bond Referenda 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 18,069 22,833 22,182 23,560 24,189 24,775 24,393 23,866 24,332 26,759 234,958 Previously Approved Funding Authorized but Unissued Bonds 10,982 2,060 6,612 0 0 0 0 0 0 0 19,654 Issued but Unspent Bonds 11,927 0 0 0 0 0 0 0 0 0 11,927 Other Previously Approved Funds 35,038 0 0 0 0 0 0 0 0 0 35,038 Subtotal Previously Approved Funding 57,947 2,060 6,612 0 0 0 0 0 0 0 66,619 Total Funding Sources 76,016 24,893 28,794 23,560 24,189 24,775 24,393 23,866 24,332 26,759 301,577 STORMWATER MANAGEMENT FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total New Funding State/Federal Funding 40 0 130 0 0 0 0 0 0 0 170 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 Other Funding 2,619 3,480 3,900 4,420 4,450 4,450 4,550 3,550 3,850 3,850 39,119 PAYG 0 0 0 0 0 0 0 0 0 0 0 New Bond Referenda 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 2,659 3,480 4,030 4,420 4,450 4,450 4,550 3,550 3,850 3,850 39,289 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 200 3,800 0 0 0 0 0 0 0 0 4,000 Subtotal Previously Approved Funding 200 3,800 0 0 0 0 0 0 0 0 4,000 Total Funding Sources 2,859 7,280 4,030 4,420 4,450 4,450 4,550 3,550 3,850 3,850 43,289 B - 12 ARLINGTON, VIRGINIA FY 2013 - FY 2022 CIP PROGRAM DETAIL ($ in 000s) INFORMATION TECHNOLOGY/EQUIPMENT FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total New Funding State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 Other Funding 11,032 12,425 8,636 5,710 4,949 10,833 8,758 11,341 8,380 15,883 97,947 PAYG 1,090 5,406 8,434 4,027 3,228 3,722 5,941 8,341 2,864 3,604 46,657 New Bond Referenda 3,240 3,115 3,495 0 0 0 0 0 0 0 9,850 Subtotal New Funding 15,362 20,946 20,565 9,737 8,177 14,555 14,699 19,682 11,244 19,487 154,454 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 3,045 0 0 0 0 0 0 0 0 0 3,045 Other Previously Approved Funds 2,515 0 0 0 0 0 0 0 0 0 2,515 Subtotal Previously Approved Funding 5,560 0 0 0 0 0 0 0 0 0 5,560 Total Funding Sources 20,922 20,946 20,565 9,737 8,177 14,555 14,699 19,682 11,244 19,487 160,014 ECONOMIC DEVELOPMENT FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total New Funding State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 1,900 21,800 20,000 0 0 200 0 0 0 43,900 Other Funding 0 0 0 0 0 0 0 0 0 0 0 PAYG 50 1,288 465 601 56 58 60 61 63 65 2,767 New Bond Referenda 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 50 3,188 22,265 20,601 56 58 260 61 63 65 46,667 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 100 0 0 0 100 Subtotal Previously Approved Funding 0 0 0 0 0 0 100 0 0 0 100 Total Funding Sources 50 3,188 22,265 20,601 56 58 360 61 63 65 46,767 B - 13 ARLINGTON, VIRGINIA FY 2013 - FY 2022 CIP PROGRAM DETAIL ($ in 000s) Total For All Programs FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total State/Federal Funding 9,872 21,357 39,847 41,991 41,351 21,403 19,704 11,144 8,905 15,773 231,347 Developer Contributions 25,200 9,270 27,103 30,405 10,424 5,797 6,171 6,149 6,334 6,523 133,376 Other Funding 46,692 68,054 92,110 116,257 76,419 39,656 29,642 30,794 22,429 38,389 560,442 PAYG 29,761 45,304 50,236 41,709 46,818 48,053 50,638 48,364 43,480 48,338 452,701 New Bond Referenda 52,647 58,159 76,096 57,581 88,309 44,390 99,042 55,546 95,626 63,522 690,918 Subtotal New Funding 164,172 202,144 285,392 287,943 263,321 159,299 205,197 151,997 176,774 172,545 2,068,784 Authorized but Unissued Bonds 72,320 8,542 9,212 3,875 0 0 0 0 0 0 93,949 Issued but Unspent Bonds 38,365 1,109 150 0 0 0 0 0 0 0 39,624 Other Previously Approved Funds 193,106 30,363 5,619 1,552 4,200 0 200 0 0 11,968 247,008 Subtotal Previously Approved Funding 303,791 40,014 14,981 5,427 4,200 0 200 0 0 11,968 380,581 Total Funding 467,963 242,158 300,373 293,370 267,521 159,299 205,397 151,997 176,774 184,513 2,449,365 New Funding Previously Approved Funding B - 14 Arlington, Virginia Debt Capacity Analysis In developing the CIP, the County establishes its long-range plan for pay-as-you-go (PAYG) and bond/lease purchase financing of its ten-year capital program. In determining the level of capital projects to finance and the method of financing, the County considers its financial ability to undertake these projects. This analysis includes a review of debt capacity factors and the impact of the adopted CIP on these debt capacity factors. In April 2008, the County Board approved financial and debt management policies that affirmed the County’s existing debt capacity factors. The policies also included guidance on bond term and amortization, specifically that b ond-funded projects will typically have a useful life at least as long as the period over which the bonds will be repaid ( the average life of County bonds is 11 -12 years and final maturity is generally twenty years; however, longer terms may be considered on very long useful life projects). Fina lly, the Board’s policies provided guidance on the use of variable rate debt and derivatives. These policies serve as the financial framework for the CIP, and a full copy of the policies is included in this section. The bond rating agencies that rate the County’s debt for potential investors use these debt ratios, coupled with other County and community economic factors. The three major bond rating agencies, Moody’s Investors Service, Standard & Poor’s, and Fitch Ra tings currently rate the County Aaa/AAA /AAA (the highest possible). Arlington is one of a select national group of 35 counties that currently hold these coveted Aaa/AAA/AAA ratings from the three major rating agencies. The County's bond ratings were reaffirmed in June 2012 and historical County bond trading in the secondary market confirm that Arlington belongs within the very top group of municipal cre dits in the national bond market. The funding levels contained in this CIP would maintain this status . Moody’s has placed the County, along with 36 other Aaa-rated localities nationwide, on negative credit watch due to its concerns over federal debt and budget issues and potential impact on these localities. The County is actively working with Moody’s to address its concerns. While there is no legal limit in Virginia on the level of debt issued by Virginia counties, Arlington has issued and plans to iss ue its debt prudently. Arlington will remain within the acceptable range of debt capacity factors with the CIP based on conservati ve assumptions, as illustrated on the following pages. B - 15 Underlying Assumptions The projected ratios shown in the following tables are based on both the County’s and Schools’ adopted CIPs. It is important to note that the County’s financial and debt management policies view debt capacity on a combined basis (i.e., County and Schools) as do the bond rating agencies. The appendix to this document includes a brief summary of the School Board’s adopted CIP. The projected debt ratios are based on conservative revenue growth assumptions: 3% growth in FY 2014 – FY 2016 and 4% thereafter. Similarly conservative assumptions have been used for projected growth in market value of the County’s tax base (identical to revenue growth assumptions) and per capita income growth of 3 percent annually. It should be noted that these debt ratios include only general obligation and other tax-supported debt, including bonds issued through the Industrial Development Authority or other conduit issuers for County projects where debt service is paid for from the General Fund. For example, these ratios include the Buckingham Village 3 land acquisition financing and subject-to-appropriation debt planned for the acquisition and construction of new office space and year -round homeless shelter. The ratios do not include bonds where the Count y has provided a moral obligation pledge as credit support to a project (e.g., the Kettler Iceplex facility or the Gates of Ballston project). In charts C and D of this section, the customary general obligation debt to the tax base ratio chart has been amended to also show the effect of moral obligation or “subject-to-appropriation” backed capital financing. The ratios do not include debt that is supported by user fees from enterprise funds, including debt included for Utilities Fund and Ballston Garage. Finally, consistent with the County’s financial and debt management policies, this analysis does not include revenue bonds anticipated to be issued for transportation projects and supported by the commercial real estate tax or the Crystal City – Potomac Yard – Pentagon City tax increment financing area. Projected Debt Ratios Ratio of Debt Service to General Expenditures No Greater Than 10% -- Over the ten -year planning period, this ratio will range from 8.7% to 9.4%, peaking at 9.4% in FY 2018. Outstanding Debt as Percentage of Market Valuation of Tax Base No Greater than 4% -- The amount of debt that the County carries is moderate when compared to its tax base. For example, in FY 1978 the County's outstanding General Fund serviced tax-supported general obligation debt equaled 2.54%. At the end of FY 2012, this ratio is 1.26%. This ratio is projected to range from 1.39% to 1.64% over the ten year planning period. Ratio of Debt per Capita to Per Capita Income No Greater th an 6% -- The County estimates that the Debt to Income ratio will range from 5.1% to 5.4%, assuming 3% growth in per capita income. Growth in Debt Service over the Ten Year Planning Period No Greater than Ten -Year Historical Growth in Revenues – Average annual growth in debt service is estimated at 5.5% compared to historical average ten-year revenue growth of 5.7%. B - 16 Chart A Adopted Adopted FY2012 FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 AUTHORIZED UNISSUED BONDS - COMBINED COUNTY/SCHOOLS 100,742,000 48,969,000 4,630,000 4,255,000 - - - - - - - GENERAL OBLIGATION BOND ISSUANCE FY 13-22 CIP - COUNTY - 47,480,000 63,325,000 78,500,000 45,210,000 93,260,000 50,880,000 98,320,000 56,270,000 104,950,000 54,200,000 GENERAL OBLIGATION BOND ISSUANCE FY 13-22 CIP - SCHOOLS - 6,200,000 36,500,000 47,500,000 33,200,000 69,000,000 34,000,000 55,000,000 35,000,000 51,000,000 45,000,000 UTILITY FUND BOND ISSUANCE 8,500,000 11,350,000 - - - - - - - - - CRYSTAL CITY TIF BOND ISSUANCE 13,930,000 36,000,000 8,500,000 TRANSPORTATION CAPITAL FUND BOND ISSUANCE 21,000,000 35,500,000 41,500,000 30,000,000 GENERAL OBLIGATION BONDS RETIRED (1) 52,304,763 52,151,155 59,646,757 61,524,127 64,067,739 68,901,882 73,315,725 76,658,087 79,293,211 84,027,954 87,168,281 NET TAX-SUPPORTED GENERAL OBLIGATION BONDS AT END OF FISCAL YEAR 736,370,410 786,868,254 831,676,497 900,407,370 914,749,631 1,008,107,749 1,019,672,025 1,096,333,938 1,108,310,727 1,180,232,773 1,192,264,493 SUBJECT-TO-APPROPRIATION BOND ISSUANCE(8) 52,816,999 - SUBJECT-TO-APPROPRIATION BONDS RETIRED 6,676,769 7,135,155 8,108,540 9,061,926 4,399,756 4,496,819 4,597,558 4,670,589 4,733,966 4,802,343 4,874,429 NET TAX-SUPPORTED BONDS AT END OF FISCAL YEAR (2) 807,862,528 904,042,217 940,741,920 1,000,410,867 1,010,353,372 1,099,214,671 1,106,181,388 1,178,172,713 1,185,415,536 1,252,535,239 1,259,692,529 SCHOOLS DEBT SERVICE 38,262,647 42,200,088 44,808,301 45,548,415 47,823,690 49,604,657 54,027,312 55,470,502 57,135,420 58,430,514 60,319,041 COUNTY DEBT SERVICE (7) 56,855,410 59,114,491 63,056,912 67,865,378 66,918,538 70,701,271 74,931,631 76,685,766 81,711,871 85,732,516 90,760,304 TOTAL TAX SUPPORTED DEBT SERVICE 95,118,057 101,314,579 107,865,213 113,413,793 114,742,227 120,305,928 128,958,942 132,156,268 138,847, 291 144,163,030 151,079,345 % GROWTH IN TAX-SUPPORTED DEBT SERVICE - COUNTY 4.8% 4.0% 6.7% 7.6% -1.4% 5.7% 6.0% 2.3% 6.6% 4.9% 5.9% SIX-YEAR AND TEN-YEAR AVERAGES 5.4% 5.95% % GROWTH IN TAX-SUPPORTED DEBT SERVICE - COUNTY/SCHOOLS 8.7% 6.5% 6.5% 5.1% 1.2% 4.8% 7.2% 2.5% 5.1% 3.8% 4.8% SIX-YEAR AND TEN-YEAR AVERAGES 5.46% 5.46% GENERAL GOVERNMENT EXPENDITURES (3) 1,101,756,209 1,159,254,104 1,194,031,727 1,229,852,679 1,266,748,259 1,317,418,190 1,370,114,917 1,424,919,514 1,481,916,295 1,541,192,946 1,602,840,664 DEBT SERVICE AS % OF EXPENDITURES (NOT TO EXCEED 10%) 8.6% 8.7% 9.0% 9.2% 9.1% 9.1% 9.4% 9.3% 9.4% 9.4% 9.4% MARKET VALUATION OF TAXABLE PROPERTY (4) 63,964,821,700 65,244,118,134 66,549,000,497 67,879,980,507 69,237,580,117 70,622,331,719 72,034,778,353 73,475,473,921 74,944,983,399 76,443,883,067 77,972,760,728 NET TAX SUPPORTED DEBT AS % OF MARKET VALUATION 1.26% 1.39% 1.41% 1.47% 1.46% 1.56% 1.54% 1.60% 1.58% 1.64% 1.62% POPULATION (5) 211,700 214,613 217,525 220,438 223,350 226,263 229,175 232,088 235,000 236,180 237,360 DEBT PER CAPITA $3,816 $4,212 $4,325 $4,538 $4,524 $4,858 $4,827 $5,076 $5,044 $5,303 $5,307 INCOME PER CAPITA (6) $74,700 $79,967 $82,366 $84,837 $87,382 $90,004 $92,704 $95,485 $98,349 $101,300 $104,339 NET TAX-SUPPORTED GENERAL OBLIGATION DEBT TO INCOME (NOT TO EXCEED 6%) 5.1% 5.3% 5.3% 5.3% 5.2% 5.4% 5.2% 5.3% 5.1% 5.2% 5.1% (1) Excludes Utilities and Transportation Capital Fund bonds. Excludes Crystal City TIF bond issuance (2) Excludes credit support commitments on revenue bonds or lease-backed bond financings, includes IDA Bonds supported by the County's General Fund. For Subject to Appropriation debts, see Chart C. (3) Includes expenditures of General Fund and certain Special Revenue Funds of the County and School Board. 3 percent growth in FY 2014 - FY 2016. 4% beyond (4) Assumes 3 percent growth in FY 2014 - FY 2016, 4% beyond (5) Population growth as estimated by the Arlington County Planning Division. (6) Source: Per capita personal income was computed using Census Bureau midyear population estimates. Estimates for 2000-2010 reflect county population estimates available as of April 2012 (7) Includes both General Obligation and Subject to Appropriation debt, including debt for Buckingham Village 3 acquisition. Excludes costs of issuance. (8) FY2013 includes $33 million Buckingham Village 3 refinancing and $26 million issuance for 2020 acquisition Arlington County, Virginia Debt Ratio Forecast Adopted 2013 - 2022 Capital Improvement Program B - 17 6.0% 8.0% 10.0% 12.0% Ratio of Tax‐Supported Debt Service to General Expenditures Adopted FY 2013 ‐ FY 2022 CIP (NOT TO EXCEED 10%) Chart B 2000 2005 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Projection 7.9% 7.6% 8.2% 8.6% 8.6% 8.7% 9.0% 9.2% 9.1% 9.1% 9.4% 9.3% 9.4% 9.4% 9.4% Ceiling 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 0.0% 2.0% 4.0% B - 18 Chart C FY2012 FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 Tax-Supported General Obligation Debt $736,370,410 $786,868,254 $831,676,497 $900,407,370 $914,749,631 $1,008,107,749 $1,019,672,025 $ 1,096,333,938 $1,108,310,727 $1,180,232,773 $1,192,264,493 Tax-Supported Subject to Appropriation ("STA") Debt Capital Equipment Leases 28,792,511 20,145,997 20,787,904 22,128,687 22,341,828 20,025,817 17,079,059 16,974,858 17,687,544 19,140,109 18 ,413,282 Industrial Development Authority (IDA) Bonds (5) 81,605,000 74,155,000 66,425,000 58,305,000 55,110,000 51,885,000 48,625,000 45,325,000 41,985,000 38,600,000 35,165,000 Buckingham Village 3 Notes/Bonds (8) - 32,816,999 32,516,999 32,045,854 31,551,151 30,981,714 30,332,589 29,651,009 28,935,350 28,183,907 27,394,893 2020 14th St N Acquisition 26,425,000 25,896,500 24,839,500 23,459,528 22,079,556 20,699,583 19,319,611 17,939,639 16,559,667 15,179,694 Peumansend Creek Regional Jail 724,338 601,937 481,938 361,938 241,938 121,938 - - - - - No. Va. Criminal Justice Academy 256,932 256,389 256,883 257,130 256,947 266,324 - - - - - Subtotal $111,378,780 $154,401,322 $146,365,224 $137,938,109 $132,961,392 $125,360,349 $116,736,232 $111,270,478 $106,547,532 $102,483,68 3 $96,152,869 Project-Supported Subject to Appropriation ("STA") Debt (1) Ballston Public Parking Garage 11,300,000 10,800,000 10,300,000 9,800,000 9,300,000 8,800,000 8,300,000 7,800,000 7,300,000 6,800,000 6,300,000 IDA Lease Revenue Bonds (Ballston Skating Facility) (7) 29,190,000 28 ,245,000 27 ,275,000 26 ,280,000 25 ,255,000 24 ,195,000 23 ,095,000 21 ,945,000 20 ,740,000 19 ,480,000 18 ,155,000 Summary of Tax‐Supported General Obligation Bonds & Subject To Appropriation‐Type Financings (6) Ratio of Outstanding Debt to Market Value As of June 30  IDA Lease Revenue Bonds (Ballston Skating Facility) (7) 29,190,000 28,245,000 27,275,000 26,280,000 25,255,000 24,195,000 23,095,000 21,945,000 20,740,000 19,480,000 18,155,000 Waste-to-Energy Plant (2) 2,003,880 - - - - - - - - - - Gates of Ballston (3) 23,000,000 23,000,000 23,000,000 23,000,000 23,000,000 23,000,000 23,000,000 23,000,000 23,000,000 23,000,000 23,000,000 Subtotal 65,493,880 62,045,000 60,575,000 59,080,000 57,555,000 55,995,000 54,395,000 52,745,000 51,040,000 49,280,000 47,455,000 LESS: State Regional Jail Reimbursement (4) (1,126,000) (1,126,000) - - - - - - - - - Total Tax-Supported General Obligation (GO) & ALL STA Financings $912,117,070 $1,002,188,576 $1,038,616,721 $1,097,425,479 $1,105,26 6,023 $1,189,463,098 $1,190,803,257 $1,260,349,416 $1,265,898,260 $1,331,996,457 $1,335,872,362 Total Tax-Supported GO and Tax-Supported STA Financings $846,623,190 $940,143,576 $978,041,721 $1,038,345,479 $1,047,711,023 $1,133,468,098 $1,136,408,257 $1,207,604,416 $1,214,858,260 $1,282, 716,457 $1,288,417,362 Total Project-Supported STA Financings (2) $65,493,880 $62,045,000 $60,575,000 $59,080,000 $57,555,000 $55,995,000 $54,395,000 $52,745,000 $51,040,000 $49,280,000 $47,455,000 Market Value of Taxable Property $63,964,821,700 $65,244,118,134 $66,549,000,497 $67,879,980,507 $69,237,580,117 $70,622,331,719 $72,0 34,778,353 $73,475,473,921 $74,944,983,399 $76,443,883,067 $77,972,760,728 Total Tax-Supported GO & ALL STA Financings as Percent of Market Value (Not to Exceed 4%) 1.43% 1.54% 1.56% 1.62% 1.60% 1.68% 1.65% 1.72% 1.69% 1.74% 1.71% Total Tax-Supported GO & Tax-Supported STA Financings as Percent of Market Value 1.32% 1.44% 1.47% 1.53% 1.51% 1.60% 1.58% 1.64% 1.62% 1.68% 1.65% Total Project-Supported STA Financings (Credit Enhancement) as Percent of Market Value (2) 0.10% 0.10% 0.09% 0.09% 0.08% 0.08% 0.08% 0.07% 0.07% 0.06% 0.06% (1) Debt service on these financings is intended to be repaid by user fees or tenant rental income, not by County General Fund revenues. (2) Includes Arlington's share of the EPA-mandated retrofit of the waste-to-energy plant. (3) The County Board approved the credit support for the long-term financing of the Gates of Ballston for an amount not to exceed $23.0 million. (4) Includes principal only.(4) Includes principal only. (5) Includes the Series 2004 IDA Lease Revenue Bonds, and the Series 2009 and Series 2011 IDA Revenue Bonds (6) Excludes Self-supporting debt in the Utility and Transportation Investment Funds. (7) Includes the bonds issued by the IDA in 2010 to refinance the construction of two ice rinks, the office space, and the training facility on top of the 8th Level at the Ballston Parking Garage. (8) Buckingham Village 3 bank notes expire in December 2012. These will be refinanced as 30 year fixed rate bonds in FY2013 B - 19 2.00% 2.50% 3.00% 3.50% 4.00% 4.50% Ratio of Tax‐Supported & Subject to Appropriation Financing as a Percentage of Market Value  Adopted FY 2013‐ FY 2022 CIP  Chart D FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 Project‐Supported 0.10% 0.09% 0.09% 0.08% 0.08% 0.08% 0.07% 0.07% 0.06% 0.06% Tax‐Supported 1.44% 1.47% 1.53% 1.51% 1.60% 1.58% 1.64% 1.62% 1.68% 1.65% Not to Exceed 4% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 0.00% 0.50% 1.00% 1.50% Tax‐Supported Project‐Supported Not to Exceed 4% B - 20 5.3% 5.3% 5.3% 5.2% 5.4% 5.2% 5.3% 5.1% 5.2% 5.1% 3.0% 4.0% 5.0% 6.0% 7.0% Ratio of Tax‐Supported General Obligation Debt to Income Adopted FY 2013 ‐ FY 2022 CIP Not to Exceed 6% Chart E 0.0% 1.0% 2.0% FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 Tax‐Supported Debt to Income Not to Exceed 6% B - 21 Arlington, Virginia MAINTENANCE CAPITAL PROGRAM CIP 2013 − 2022 Maintenance capital (MC) is a broad program that seeks to achieve a long -stated goal to “maintain what we have”. The MC program in Arlington County is designed to protect assets from premature failure, minimize unnecessary risks and loss, and achieve the optimal useful life of assets. The goal is to ensure that existing capital assets are maintained in reliable, serviceable condition without significant variations in annual capital appropriations. The MC program focuses on non- expansion projects that do not change the footprint of a building, expand the size of a current asset, expand services, or increase the operating budget once complete. To qualify for funding in the MC program, projects must meet the criteria for a capital project and significantly extend the life of the asset. Arlington County makes critical investments in four maintenance capital areas: Transportation, Information Technology, Facilities, and Parks and Recreation. These components are essential to daily operation s and effective delivery of County s ervices, and over the years have received varying levels of funding. This past year signaled an important shift in approach to Maintenance Capital, especial ly for Facilities and Parks. The County Board appointed a citizen- led CIP Working Group, and that group worked carefully with staff to understand the nature and scope of the challenges in fac ilities and parks. As part of their recommendations to the County Board last fall, the CIP Working Group recommended a “catch up” and “keep up” philosophy, whereby we would seek to reduce identifi ed backlog gradually over several years (catch up), while remaining current with items due for replacement (keep up). S uch an approach requires additional sustained funding, as reflected in the details that follow. The County Board already took positive steps towards implementation of this strategy with the recent FY 2013 budget adoption process, where a n approximate ½ cent real estate tax increase was dedicated to baseline maintenance capital funding. This increase in baseline, when combined with the funding levels proposed via bonds and PAYG, will turn the tide on maintenance capital, and gradually draw down the backlog. While many variables will ultimately affect the timing of when we complete the backlog, we have set a path that leads us to a much better state of repair, particularly for our facilities and parks. Transportation The Transportation Maintenance Capital program maintains the transportation infrastructure by repaving streets, maintaining pedestrian and vehicle bridges, maintaining signals and signal infrastructure and replacing bus shelters. The County currently maintains over 960 la ne miles by a c ombination of resurfacing, rebuilding and slurry seal maintenance. The paving program utilizes a Pavement Condition Index (PCI) to track th e current street condition along with a replacement cycle based on industry standards to estimate what is required to maintain appropriate conditions. In addition, the Transportation MC program includes over 50 vehicular and pedestrian bridges and culverts, 215 bus shelters, and 280 signalized intersections . Finally, the Transportation MC program coordinates with the Par ks MC program on the maintenance of bicycle and pedestrian trails, since roughly half of the off -road bicycle network is outside park boundaries, and the off -street bicycle network investments must be jointly coordinated with the on- street bicycle network and pavement marking priorities . The County’s trail system is heavily used for recreation and by commuters and keeping these trails well maintained and connected is important. C - 1 Information Technology Maintenance Capital funding for Information Technology pr ovides the foundation to advance eGovernment Master Plan III initiatives. The systems and software serve the departments and typically reach the end of their useful life -expectancy between four and 10 years, at which point the systems become increasingly costly to maintain and difficult to exchange information with other systems. Priorities for determining which applications to replace first are driven by age, criticality of the system to operations, and availability of on -going support from the application’s vendor. Master lease financing is also a significant funding source for technology improvements. Facilities Over the life -cycle of facilities the roofs, finishes, mechanical, electrical, and other systems require replacement and renewal to maintain go od operating condition, a professional appearance, and to meet current code requirements. Projects do not substantially alter the characteristics or enlarge the footprint of the facility, but extend the useful life and may include improvements to safety systems and energy performance. Parks and Recreation The Parks Maintenance Capital Program funds the replacement or major renovation of different types of outdoor park and recreation facility assets including athletic fields and courts, lighting, playgrounds, picnic shelters, restrooms, site amenities, parking a nd specialty facilities such as the skate park. The program also addresses accessibility, safety and storm water improvements that are complementary to renovating or replaci ng assets. The Synthetic Turf Program (referenced in the Parks and Recreation Summary under General Government) covers both the replacement of synthetic turf under the Parks Maintenance Capital Program and the conversion of several existing grass fields to new synthetic turf fields. Maintenance Capital Strategy As an outgrowth of the 2011 -2016 CIP process, the County Board created a CIP Working Group that worked with staff extensively and culminated in a series of recommendations in the fall of 2011. Building on the condition assessments completed in 2008 – 2009, the group’s efforts were a catalyst for action and our funding approach in this CIP. Three major funding recommendations were included, paraphrased below: 1. Eliminate the maintenance capital backlog by the end of FY 2017, using a gradual ramp up funding approach on the backlog (catch-up) 2. To pay for catch -up and keep- up, determine what can be bonded, what is P AYG, and what is o perating. Bundle projects as total rehabs or renovations to reduce costs, reduce service disruptions and allow bonding. 3. Ensure all the required resources (staffing, planning, design, and procurement) are sufficient to address identified catch up and keep up needs, building requirements into base budgets, and considering close-out funds and new funds as other options. Staff and the working group cautioned that the backlogs identified in the assessment s were ROUGH ESTIMATES, to be used as a starting point , since they did not include certain project delivery cost items (e.g., design, staff chargebacks, permit fees, construction administration, stormwater improvements (for parks) and third party inspection when needed) , and many factors actually affect project costs after they are fully scoped, designed, and bid. Partially offsetting this effect, they did include som e items that are normally addressed with operating funds. Additionally, the assessments did not account for underutilized or vacant assets, planned replacements, appropriate deferrals , and the positive effects of bundling . While total need s over time ar e thus influenced by factors that can either increase or decrease the bottom line reflected in the database , it will remain a very useful tool for both budgeting and C - 2 project planning. And it will remain dynamic as both unit costs and inventory changes over time, including additions to the inventory such as Arlington Mill and Long Bridge . With that as context, the following is an illustration of how our proposed funding will affect the backlog that was identified at a point in time for analysis by the CIP working group last fall. As a rough approximation of the costs and inventory not currently included in the assessments, the table below includes a 20 percent adjustment factor to account for any difference. (In $1,000s) Facilities Maintenance Capital FY PAYG Bonds PAYG/Bonds Total Assess Results **Assessments Adjusted 20% (See Footnote) Cumulative Funding vs. Identified Need Cumulative Percent of Identified Need Funded Cumulative Percent of Identified Need Unfunded 13 4,659 1,038 5,697 9,235* 11,082 (5,385) 51% 49% 14 5,828 2,587 8,415 6,009 7,211 (4,181) 77% 23% 15 6,470 3,500 9,970 9,613 11,536 (5,747) 81% 19% 16 3,657 3,500 7,157 14,672 17,606 (16,196) 66% 34% 17 4,000 3,000 7,000 2,733 3,280 (12,476) 75% 25% 18 4,000 3,000 7,000 4,700 5,640 (11,116) 80% 20% Total 28,614 16,625 45,239 46,962 56,354 Notes: *Original backlog of $15.7 million adjusted to $9.2 based upon a number of facilities that are deemed to be subject to reuse, repurposing, or deconstruction. **20% adjustment to account for associated cost not captured in the EMG data based such as design fees, permitting, and other soft costs. For facilities, t his illustrates that our funding plan makes measurable progress on the backlog, but suggests caution on sufficient funding for keep up , particularly when the assessments recommend a high level of investment in one particular year, as indicated in FY 16 . While a concern, we must also be cautious to not over rely on this one indicator, but rather use the indicator carefully. Therefore, we plan to update and record results of the database at a set point every year, so we can have a consistent basis for plotting trends. The an nual reading will reflect the accumulated effect of completed projects, appropriate deferrals, changes in unit costs from actual bid experience, any changes in our assumptions on useful life of cer tain elements, and any changes in inventory. Another indi cator will be contractor -assisted updates to the condition assessments, where actual conditions in the field will be reassessed. We believe a four year cycle is appropriate for facilities and parks. C - 3 (In $1,000s) Parks Maintenance Capital FY PAYG Bonds PAYG/Bonds Total Assess Results *Assessments Adjusted 20% (See Footnote) Cumulative Funding vs. Identified Need Cumulative Percent of Identified Need Funded Cumulative Percent of Identified Need Unfunded 13 4,777 3,225 8,002 29,200 35,040 (27,038) 23% 77% 14 2,253 3,643 5,896 6,420 7,704 (28,846) 33% 67% 15 3,281 6,240 9,521 5,554 6,665 (25,990) 47% 53% 16 2,253 6,165 8,418 4,761 5,713 (23,285) 58% 42% 17 2,253 6,483 8,736 3,300 3,960 (18,509) 69% 31% 18 3,367 6,677 10,044 4,300 5,160 (13,625) 79% 21% Total 18,184 32,433 50,617 53,535 64,242 Note: *20% adjustment to account for associated cost not captured in the EMG data based such as stormwater, design fees, and other soft costs. For parks, this also illustrates steady progress on the identified backlog. However, interpretation and judgment is needed, since this was the first assessment on parks, and the assessments did not include costing for items such as storm water, permitting, design, construction admin, and bringing up to standards. After applying judgment, our target is to get through 70- 80% of the backlog by FY 18 for parks . Over time, the plan is to achieve a long term sustainable balance with a minimal backlog. The MC funding strategy outlined above relies on a combination of funding sources: • Bonds – This CIP continues the practice of funding MC projects from bonds when projects meet bond capitalization criteria – minimum cost of $100,000 and the useful life is not less than the average life of the bonds (typically 10- 11 years). The adopted 2013-2022 CIP reflects an increased level of bond funding for parks and facilities, totaling $10.5 million in the November 2012 referenda (which includes FY 2013 & 2014 in the tables above) compared to $8.1 million in the last CIP. Out-year 2014 (FYs 2015 and 2016) and 2016 (FYs 2017 and 2018) are programmed at $19.4 and $19.1 million respectively. • PAYG -- The CIP includes increased levels of PAYG funding for parks and facilities, reflecting both historic levels of baseline PAYG funding as well as the recent increase in real estate taxes that yields an additional $2.8 million in ongoing funding. To fully realize the PAYG amounts noted in the tables above, additional one-time money, ranging from $2 million -$4 million annually could be needed. Finally, the overall PAYG plan assumes continued funding of a capital contingent ($2 million) to addre ss any unanticipated events that require capital investment. Having an adequate contingent will allow staff to address emergency or unforeseen issues without having to repri oritize or delay already planned work. C - 4 Another important element of a successful maintenance capital program noted by the CIP Working Group is staffing. Recognizing this and to meet the opportunities provided by increased funding, over strengths were added to Parks in the fall of 2011, and additional over strengths were added to Facilities in 2012. The facilities positions include one project programmer position that will solely focus on efficient project scoping, estimating, and documentation—using the database as a starting point, but taking into consideration all the other fact ors that influence smart investment decisions. A similar programmer position is being considered for parks. The costs of these positions are largely funded out of MC project budgets. As staff executes the plan, we will continue to reassess staffing levels to insure they remain appropriate with project execution targets. To support and illustrate our near term funding request, we are also including a proposed project plan over the next 4 years (FY 13 -16). This list will remain dynamic; only the immediate following year (in this case FY 13) should be taken as a firm project listing. The plans are placed directly behind the parks and facilities pages. The projects were prioritized using the prioritization guidelines previously endorsed by the County Board, summarized in the tables below. The yearly plan will remain dynamic, but indicates what we are specifically planning for execution in the near term. The CIP also estimates levels of funding in FY 17 -22 based on our best judgment of how increased investments will affect the inventory, and what we anticipate will be needed for sustainment over time. Facilities Maintenance Capital Prioritization Methodology • Items that require immediate action (leaking roofs) Urgency (50%) • Corrections to prevent failures of life/safety systems (fire alarms) • Reliability of HVAC, electrical and plumbing components or systems Facility Condition (30%) • Preventing accelerated deterioration • Components or systems that require replacement to meet changing program goals, energy efficiency goals, etc. Special Considerations (20%) • Timely combination with other projects or component replacements Parks Maintenance Capital Prioritization Methodology • Age and life safety Condition (50%) • Ordinance and policy compliance • Americans with Disabilities Act (ADA) and Consumer Product Safety Commission (CPSC) • Usage, community need, program demand Program Adequacy (30%) • Industry standards, County standards • Project synergies, economies of Special Considerations (20%) scale, project readiness, adopted master plans, and County Board priorities C - 5 Arlington, Virginia REGIONAL PARTNERSHIPS AND OTHER: PROGRAM FUNDING SUMMARY CIP 2013 − 2022 Arlington annually contributes capital funding to several regional organizations, which provide beneficial services to Arling ton residents and visitors. 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total Northern Virginia Regional Park Authority 526 533 550 566 583 601 619 638 657 677 5,950 Northern Virginia Community College 312 370 429 490 553 561 570 578 587 596 5,046 Northern Virginia Criminal Justice Academy 151 151 151 151 151 151 151 151 151 151 1,510 Peumandsend Creek Regional Jail Authority 146 138 132 125 118 0 0 0 0 0 659 Capital Contingency 3214 2000 2000 2000 2000 2000 2000 2000 2000 2000 21,214 Total Recommendation 4,349 3,192 3,262 3,332 3,405 3,313 3,340 3,367 3,395 3,424 34,379 CATEGORY FUNDING SOURCES (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total New Funding State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 PAYG 4,349 3,192 3,262 3,332 3,405 3,313 3,340 3,367 3,395 3,424 34,379 New Bond Referenda 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 4,349 3,192 3,262 3,332 3,405 3,313 3,340 3,367 3,395 3,424 34,379 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 0 0 0 0 0 0 0 0 0 0 0 Total Funding Sources 4,349 3,192 3,262 3,332 3,405 3,313 3,340 3,367 3,395 3,424 34,379 C - 6 REGIONAL PARTNERSHIPS REGIONAL PARTNERSHIPS MAINTENANCE CAPITAL 2013 − 2022 CIP Northern Virginia Regional Park Authority Northern Virginia Regional Park Authority owns and protects more than 10,000 acres of land in 19 parks, including Potomac Overlook, Upton Hill and the W&OD Regional Pa rks in Arlington. Funds are used to preserve, improve, expand, renovate and enhance the parks and facilities. This program helps to improve the quality of the parks, encourage greater usage and continue to serve the needs of the public. This augments the Public Spaces Master Plan (PSMP) and as well as complements open space, cultural and recreational programs of Arlington County and five other member jurisdictions. Arlington is one of six jurisdictions that share costs associated with NVRPA's capital program. The County's share is based o n the percentage distribution of population estimates provided by the US Bureau of the Census. Arlington’s capital contribution is from PAYG funding that is appropriated annually as part of the operating budget. The operating contribution is included as part of the general fund’s regional partnerships operating budget. Northern Virginia Community College This represents the County's ongoing capital contribution to the Northern Virginia Community College (NVCC) for land acquisit ion and site development of all campuses; and, as determined by the Northern Virginia Community College Board, certain temporary and permanent buildings. The goal of this project is to support Northern Virginia Community College in the land acquisition and site developments associated with its capital development plan. Resolutions were passed b y Arlington and eight other jurisdictions to support Northern Virginia Community College. Every dollar leverages 29 dollars in state funds back to Northern Virginia. Arlington is one of nine jurisdictions that share costs associated with NVCC's capital program based on the original Fai r Share Allocation. The CIP for FY 2013 reflects an allocation of $1.50 for each person living in each particular jurisdiction. For FY 2014 - 2017, allocations reflect an additional $0.25 per capita each year for a maximum rate of $2.50 per capita in FY 2017 through FY 2022. Population figures are from the Weldon Cooper Center for Public Service. Arlington ’s capital contribution is from PAYG funding that is appropriated annually as part of the operating budget. The operating contribution is included as part of the General Fund’s regional partnerships operating budget. It is anticipated that members of the County Board and School Board will meet with NVCC to discuss their future capital program and the County’s commitment to that program. The Arlington Public Schools have several ongoing programs with NVCC including the new Transitional College Program. Northern Virginia Criminal Justice Academy In 2006, the principal members agreed to fund the construction of the Emergency Vehicle Operations Center (EVOC). The bond financing contributions towards the NVCJTA partnership continues through 2026. The Northern Virginia Criminal Justice Training Academy is dedicated to advancing competence and professionalism in law enfor cement. The Academy is the largest regional law enforcement training facility in Virginia. Every person employed as a full -time law enforcement officer must meet compulsory minimum training standards. Individuals must first be hired by a supporting agency as a police officer or deputy sheri ff before coming to the Academy for training. The training must be obtained from a state certified law enforcement training facility and must be completed within 12 months of the date of appointment. The Academy receives state funding as well as support from the jurisdictions it serves. Arlington is also one of ten supporting jurisdictions that provide a proportionate share of the Academy's operating budget based on its sworn population in relation to the total sworn population of all participating agenc ies. Arlington’s capital contribution is from PAYG funding that is appropriated annually as part of the operating budget and pays for our share of debt service on the bonds for the Eme rgency Vehicle Operations Center. C - 7 Peumandsend Creek Regional Jail Authority The Peumansend Creek Regional Jail (PCRJ) is a 336-bed facility that is an extension facility for cities of Alexandria, Richmond and counties of Arlington, Prince William, Loud oun and Caroline. The bond financing contributions towards the PCRJ continues through 2017. The regional jail provides detention services and related operations deemed necessary for the protection of society and the health and custody of the inmates. Faced with overcrowding in the local jails, Arlington, and f ive other jurisdictions, reduces their populations by forwarding a select group of inmates to the Peumansend Creek Regional Jail. PCRJ offers programs and services, to include a jail industr y, to assist with reintegrating the inmates into society. Arlington is one of six jurisdictions that participate in this partnership but is only one of four jurisdictions who share in the bond financing for the regional jail. The County's annual share of the capital cost is based on current bed allocation and is projected at 24.0 percen t. This is based on the 60 beds allocated to Arlington of the total 250 beds that participated in the bond financing. Arlington’s capital contribution is from PAYG funding that is appropriated annually as part of the operating budget. The operating contri bution is included as part of the general fund’s regional partnerships operating budget. Capital Contingency One-time funds are available as contingent for unforeseen capital project costs or pending capital requirements. Of this amount, $3.0 million is set aside in FY13 as seed money for a Police and Sheriff firearms training facility. Staff is currently assessing the available options and locations for either bu ilding a county-owned facility or co-building a facility with a surrounding jurisdiction. C - 8 Arlington, Virginia LOCAL PARKS AND RECREATION PROGRAMS PROGRAMS Program Description The Local Parks and Recreation capital improvement program consists of key projects and program elements that will provide for the construction of new park facilities and major upgrades or renovations of existing park facilities. The program represents an implementation plan and strategies based upon sound planning to ensure that capital funding is invested strategically for the benefit of the County and its residents. Program Summary The Local Parks and Recreation projects focus on completing or furthering parks that have Board -adopted park master plans or have undergone significant community planning efforts. The FY2013 - FY2022 CIP contains funding to complete significant phases or final completion of several important projects including Long Bridge Park, Tyrol Hills Park, Four Mile Run Near-Stream Improvements and Mosaic Park. The ten-year CIP also includes funding for master planning, design and construction of new parks including several parks identified in the Crystal City Sector Plan, Jennie Dean Park, Glebe and Randolph Park and several neighborhood parks in the Ball ston-Virginia Square area. The program also focuses on funding for four ongoing program elements: Parks Capital Maintenance Program, Synthetic Turf Program, Parks Land Acquisition and Open Space Program and Park Enhance ment Grants Program. The four programs are summarized on this page. The Parks Maintenance Capital Program provides for recurring, systematic reinvestment in existing outdoor facilities to insure efficient, safe, high quality park and recreation f acilities. The program funds the replacement or major renovation of different elements of outdoor park and recreation facility asse ts including athletic fields and courts, lighting, playgrounds, picnic shelters, restrooms, site amenities, trails, parking, and specialty facilities such as the skate park. The program als o addresses accessibility, safety and storm water improvements that are complementary to renovating the assets. The Synthetic Turf Program is largely focused on replacement of existing synthetic fields that are approaching the end of the ir useful life. At the end of 2013, the County will have twelve synthetic turf fields, including the three fields added in 2011 at Long Bridge Park, the County's first synthetic baseball diamond at Barcroft Pa rk added in 2012 and the community field at Rocky Run Park which will be finished in 2013. The funding for FY2013 -FY2022 also identifies the opportunity to convert four grass fields to synthetic turf. Conversion costs involve installation of synthetic grass, in-fill underground drainage systems, lighting, and site amenities including site furnishings, pathways, landscaping and permane nt or portable restrooms as needed. Due to the additional playability of synthetic grass fields, the new synthetic fields would be lighted so that they are available for evening play. The Parks and Land Acquisition and Open Space Program funds the acquisition of strategic parcels of park land. Potential acquisition sites are identified in the Public Spaces Master Plan and the Land Acquisition and Preservation Policy (anticipated adoption fall 2012). The Park Enhancement Grant (PEG) Program enhances parks by providing citizen-initiated projects in a timely manner. The goal of this program is to enable Arlington residents to initiate small capital improvement and beautification projects for parks and recreation facilities in their respective neighb orhoods. The PEG Program encourages community involvement and fosters pride by enabling creative improvements in parks and recreation facilities. Community -proposed projects are submitted annually to the Arlington County Park and Recreation Commission for review, who then recommends a list of projects to the County Board for final approval. The current individual project limit is $15,00 0. Since the program began in 1978, more than 240 projects have been funded. These include projects such as park furniture, pathway s, fencing, public art, educational and interpretive signage as well as sports and building amenities. Master Plan Impact The 2005 Public Spaces Master Plan is an element of the County's Comprehensive Plan. The PSMP will be updated within the time frame of this ten year CIP. In addition, the Land Acquisition and Preservation Policy is currently under development and should be adopted by the County Board in 2012. C - 9 Arlington, Virginia LOCAL PARKS AND RECREATION PROGRAMS: PROGRAM FUNDING SUMMARY CIP 2013 − 2022 10 YEAR PROGRAMMED CATEGORY SUMMARY (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total Maintenance Capital 6,947 5,896 8,493 8,418 8,736 8,930 7,253 7,253 7,253 7,253 76,432 Parks Enhancement Grants 100 103 106 109 113 116 119 123 127 130 1,146 Parks Land Acquisition and Open Space 1,000 0 3,000 0 4,440 0 3,000 0 3,000 0 14,440 Synthetic Turf Program 1,055 1,011 2,056 2,185 2,126 2,227 2,376 2,390 2,521 6,917 24,864 Park Master Plans 51,197 21,250 7,426 508 9,736 2,122 10,495 1,126 20,940 15,855 140,655 Total Recommendation 60,299 28,260 21,081 11,220 25,151 13,395 23,243 10,892 33,841 30,155 257,537 PROGRAM FUNDING SOURCES (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total New Funding Developer Contributions 20,000 0 0 0 0 0 0 0 0 0 20,000 Other Funding 0 450 900 0 0 500 0 250 0 2,450 4,550 PAYG 4,877 2,917 3,515 2,362 3,492 4,096 4,748 4,516 4,901 6,350 41,774 New Bond Referenda 25,660 24,893 16,666 8,858 20,659 8,799 18,495 6,126 28,940 20,855 179,951 Subtotal New Funding 50,537 28,260 21,081 11,220 24,151 13,395 23,243 10,892 33,841 29,655 246,275 Previously Approved Funding Authorized but Unissued Bonds 8,000 0 0 0 0 0 0 0 0 0 8,000 Issued but Unspent Bonds 1,762 0 0 0 0 0 0 0 0 0 1,762 Other Previously Approved Funds 0 0 0 0 1,000 0 0 0 0 500 1,500 Subtotal Previously Approved Funding 9,762 0 0 0 1,000 0 0 0 0 500 11,262 Total Funding Sources 60,299 28,260 21,081 11,220 25,151 13,395 23,243 10,892 33,841 30,155 257,537 FINANCING IMPACT (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 Bond Financing Cost (P&I) 0 1,796 4,026 5,928 7,052 8,624 9,607 11,091 11,724 13,779 C - 10 Arlington, Virginia LOCAL PARKS AND RECREATION PROGRAMS: MAINTENANCE CAPITAL CIP 2013 − 2022 01 Parks Maintenance Capital Project Description The Parks Maintenance Capital Program provides for recurring, systematic reinvestment in existing outdoor facilities to insure efficient, safe, high quality park and recreation facilities for the community to enjoy. The program funds the replacement or major renovation of outdoor park and recreation facility assets including athletic fields and courts, lighting, playgrounds, picnic shelters, restrooms, site amenities, trails, parking, and specialty facilities such as the skate park. The program als o addresses bringing facilities up to current standards, accessibility, safety requirements, storm water improvements and the protection of natural resources that are complementary to renovating the assets. The County utiliz es a base level of pay-as-you-go allocations and local parks and recreation bonds to fund the program. Beginning in FY2013, the Co unty Board enhanced the pay-as-you-go funding by adopting a one-half cent tax increase that will support the program by adding ongoing funding. These additional funds will go toward working through a pre ssing backlog of maintenance of County facilities and infrastructure that has built up over the years. Associated Master Plan: Public Spaces Master Plan (PSMP) Advisory Commission: Park and Recreation Commission, Sports Commission Neighborhood(s): VARIOUS Project Justification A consultant completed an asset management assessment for the outdoor parks and recreation infrastructure in 2009. The assessment identified a substant ial backlog of maintenance needs and projected a sustained need for investment over time in order to maintain the County’s extensi ve outdoor park and recreation facilities investment. The study included compiling a digital inventory of park assets, developing a management database, establishing life cycle replacement standards for the various facilities, and establishing projected estimated costs across a twenty year timeframe. The assessment database is being used as a planning tool to support budgetary, planning , and policy making decisions. In 2011, the Board-appointed Capital Improvement Plan Working Group evaluated this information and provided a road map that addresses both the pressing backlog of maintenance projects and the need to increase the base level of funding for on-going capital maintenance. The focus of the Parks Capital Maintenance Program over the first six years of the FY2013-FY2022 CIP is on reducing the substantial backlog of projects by “catching-up” on maintenance that has been deferred on the park assets. The “catching up” portion will be accomplished by initially focusing on the major existing deteriorating assets that have been deferred. The Parks Maintenance Capital program will bring balance to the three heavily used elements that represent significant areas of investment: athletic fields, athletic courts, and playgrounds. FY2013-FY2017 projects will work towards catching up on seventy-eighty percent of these assets. Where appropriate, the assets will be bundled with other similar features in the park that need replacing in the same time frame and have similar construction characteristics or are similarly located in the park. For example, basketball courts, tennis courts and parking may be bundled together into one project to be mor e efficient and effective. Other program elements will begin to be addressed during the first six years and will ramp up towards a sustainable level in the out-years. The long term goal over the ten year CIP is to bring the Parks Maintenance Capital Program components into a maintainable balance that can be sustained in the future. The first asset program component to be maintained to keep up with maintenance requirements are the synthetic turf fields (referenced separately in this CIP under Synthetic Turf Program). As new parks or facilities are added to the inventory, their assets will be entered into the asset management database and placed into the keep up program. The recently opened Long Bridge Park Phase I (2011) and Penrose Square Plaza, which is cur rently under construction (2012), are the most recent examples of new outdoor park and recreation assets. Changes from Prior CIP A major change in the FY2011 - FY2016 CIP was transitioning the funding of a portion of the maintenance capital to bond funds. A combination of PAYG and bon d funding is programmed throughout the 10-year program to address the substantial maintenance capital needs where projects meet useful life and project size criteria. C - 11 01 Parks Maintenance Capital Capital Cost Schedule (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total A & E 635 884 1,274 1,263 1,310 1,340 1,088 1,088 1,088 1,088 11,058 Land Acquisition 0 0 0 0 0 0 0 0 0 0 0 Construction 6,312 5,012 7,219 7,155 7,426 7,590 6,165 6,165 6,165 6,165 65,374 Relocation and Temp Facilities 0 0 0 0 0 0 0 0 0 0 0 Equipment and Furnishings 0 0 0 0 0 0 0 0 0 0 0 Total Project Cost 6,947 5,896 8,493 8,418 8,736 8,930 7,253 7,253 7,253 7,253 76,432 Notes on Cost Estimates Funding Schedule (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total New Funding State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 PAYG 3,722 2,253 2,253 2,253 2,253 2,253 2,253 2,253 2,253 2,253 23,999 New Bond Referenda 3,225 3,643 6,240 6,165 6,483 6,677 5,000 5,000 5,000 5,000 52,433 Subtotal New Funding 6,947 5,896 8,493 8,418 8,736 8,930 7,253 7,253 7,253 7,253 76,432 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding Total Revenues 6,947 5,896 8,493 8,418 8,736 8,930 7,253 7,253 7,253 7,253 76,432 Notes on Funding Schedule Synthetic and grass turf fields are funded through PAYG. Other program elements including playgrounds, athletic courts, lighting, picnic shelters, restrooms, trails and parking lots may be funded through either PAYG or bond referenda Projected Additional Operating Costs (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total Anticipated FTEs (+/-) 0 0 0 0 0 0 0 0 0 0 0 Operations Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0 Facilities Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0 Master Lease Financing Cost 0 0 0 0 0 0 0 0 0 0 0 Maintenance Capital Impact 0 0 0 0 0 0 0 0 0 0 0 Bond Financing Cost (P & I Payments) 0 0 0 0 0 0 0 0 0 0 0 Gross Operating Costs 0 0 0 0 0 0 0 0 0 0 0 Less Fees 0 0 0 0 0 0 0 0 0 0 0 Net Operating Cost 0 0 0 0 0 0 0 0 0 0 0 Notes on Operating Costs Operating costs are anticipated to be minimal as a result of Capital Maintenance. C - 12 PARKS MAINTENANCE CAPITAL FY2013 PROJECT LIST Project Name – Description Cost Estimate 1. Towers Park Modernization – construction to replace four tennis courts, two practice tennis courts, one basketball court, court lighting on all courts, electric panel box, gazebo, site amenities, site drainage, site circulation, ADA. Project was designed in FY2012 $1,350,000 PAYG 2. Synthetic Turf Program - construction at Barcroft Park for full replacement of the rectangular synthetic turf community field which includes addressing site grading, the under drain system, the synthetic fiber infill, adjacent slope issues. Project was designed in FY2012 $1,055,000 PAYG 3. Gunston Park Modernization – design and construction for replacement of basketball court and lighting, walkways, parking lot resurfacing, site furnishings, drainage, ADA $800,000 PAYG 4. Stratford Park Modernization – design and construction for replacement of basketball and tennis courts, lighting, walkways, site furnishings, retaining walls drainage, ADA $910,000 PAYG 5. Powhatan Springs - design and construction for full replacement of athletic field sod 87,000 PAYG 6. Consultants – update of the Parks Maintenance Capital asset database 75,000 PAYG 7. Consultants – development of design standards and specifications for outdoor park and recreation assets 200,000 PAYG 8. Program Contingency – unanticipated changes in design and construction and program management $300,000 PAYG 9. Athletic Field Fund – fund from youth sports affiliate group assessments $130,000 PAYG 10. Quincy Park Modernization – construction for full replacement of the playground equipment with universal project features, safety surfacing, site amenities, site circulation, drainage, landscaping, ADA, full replacement of the sand volleyball court. Project was designed in FY2012 $1,175,000 Bond 11. Fort Barnard Park Modernization – construction for full replacement of the playground equipment, safety surfacing, site amenities, site circulation, drainage, landscaping, ADA. Project was designed in FY2012 $650,000 Bond 12. Highview Park Modernization – design and construction for full replacement of rectangular and diamond athletic field sod, new irrigation, athletic field lights, restroom, storage building, stage, picnic shelter, site amenities, site circulation, drainage, landscaping, ADA $1.400,000 Bond TOTAL $8,132,000 C - 13 PARKS MAINTENANCE CAPITAL FY2014 PROJECT LIST Project Name – Description Cost Estimate 1. Lacey Woods Modernization – design and construction for full replacement of athletic field sod, new irrigation, site amenities, site circulation, ADA $253,000 PAYG 2. Woodstock Park Modernization – construction for full replacement of the playground equipment, safety surfacing, site amenities, site circulation, drainage, landscaping, parking lot, ADA. Project was designed in FY2012 $727,000 PAYG 3. Chestnut Hills Park Modernization – construction for full replacement of the tot lot equipment, safety surfacing, site amenities, site circulation, fencing, drainage, landscaping and ADA. Project was designed in FY2012 $685,000 PAYG 4. Shirlington Park Modernization – design and construction for trail milling and paving, asphalt repair, replacement of fitness course, site amenities, drainage, landscaping and ADA $313,000 PAYG 5. Oakgrove Park Modernization – design and construction for full replacement of athletic field sod, new irrigation, site amenities $275,000 PAYG 6. Synthetic Turf Program – design and construction at Wakefield High School for replacement of synthetic turf field. (*assumes APS cost sharing at $450,000 for total project cost of $1,011,000) $561,000 PAYG 7. Athletic Field Fund – fund from youth sports affiliate group assessments $130,000 PAYG 8. Virginia Highlands Park Modernization – design and construction for full replacement of athletic field sod, new irrigation, site amenities, site circulation, ADA and construction for full replacement of the six tennis courts, two basketball courts, court lighting on all courts, site amenities, drainage, site circulation, ADA. Court project was designed in FY2012 $1,963,000 Bond 9. TJ Modernization – design and construction for replacement of lighted tennis & lighted basketball courts, fencing, electric panel box, site furnishings, site circulation, drainage, ADA $1,680,000 Bond TOTAL $6,587,000 C - 14 PARKS MAINTENANCE CAPITAL FY2015 PROJECT LIST Project Name – Description Cost Estimate 1. Quincy Park Modernization – develop the updated layout plan for future renovation of the park features, including potential realignment of existing park features and materials to reflect its urban location $325,000 PAYG 2. Benjamin Banneker Park Modernization – design and construction for replacement of playground, safety surfacing, milling and repaving parking lot, site circulation, site furnishings, athletic field sod, new irrigation, fencing, drainage, ADA $1,306,000 PAYG 3. Madison Manor Park Modernization – design and construction to replace restroom, drinking fountain, site circulation, site furnishings, landscaping, ADA $622,000 PAYG 4. Synthetic Turf Modernization – design and construction at Greenbrier Park for replacement of synthetic turf field. (*assumes APS cost sharing at $450,000 for total project cost of $1,028,000) $578,000 PAYG 5. Synthetic Turf Modernization – design and construction at W&L High School for replacement of synthetic turf field. (*assumes APS cost sharing at $450,000 for total project cost of $1,028,000) $578,000 PAYG 6. Athletic Field Fund – fund from youth sports affiliate group assessments $130,000 PAYG 7. TJ Modernization – design and construction for full replacement of the playground equipment, safety surfacing, site amenities, site circulation, fitness trail equipment, trail, lighting, drainage, landscaping, ADA $1,960,000 Bond 8. Fairlington Modernization – design and construction for full replacement of the playground equipment, safety surfacing, site amenities, stage, fitness trail equipment, site circulation, drainage, landscaping and ADA $1,375,000 Bond 9. Zachary Taylor Park Modernization – design and construction for pedestrian trail milling and paving, stone dust, drainage, site furnishings, landscaping, ADA $300,000 Bond 10. Bon Air Park (front of park) Modernization – design and construction for full replacement of the playground equipment, safety surfacing, lighted basketball court, restroom, parking lot, lower picnic area, site amenities, trail, site circulation, drainage, landscaping, ADA $2,605,000 Bond TOTAL $9,779,000 C - 15 PARKS MAINTENANCE CAPITAL FY2016 PROJECT LIST Project Name – Description Cost Estimate 1. Henry Clay Park Modernization – design and construction for full replacement of athletic field sod, new irrigation, site amenities, site circulation, ADA $235,000 PAYG 2. Barcroft Park Modernization – design and construction for full replacement of athletic field sod on four diamond fields $250,000 PAYG 3. Virginia Highlands Park Modernization - design and construction for full replacement of two diamond fields including athletic field sod, new irrigation, site amenities, site circulation, ADA $300,000 PAYG 4. Alcova Heights Park Modernization - design and construction for full replacement of athletic field sod, new irrigation, site amenities, site circulation, ADA $225,000 PAYG 5. Stratford Park Modernization -design and construction for full replacement of baseball and rectangular fields including athletic field sod, new irrigation, site amenities, site circulation, ADA $370,000 PAYG 6. Fort C.F. Smith Park Modernization – design and construction for renovation of stone dust pedestrian path, site circulation, milling and repaving parking lot, repair maintenance road $600,000 PAYG 7. Custis Trail – design and construction for milling and paving, asphalt repair, drainage and site furnishings $273,000 PAYG 8. Athletic Field Fund – fund from youth sports affiliate group assessments $130,000 PAYG 9. Tyrol Hills Park Modernization – design and construction for full replacement of the playground equipment, safety surfacing, site amenities, site circulation, drainage, landscaping and ADA $685,000 Bond 10. Dawson Terrace Park Modernization – design and construction for full replacement of the playground equipment, safety surfacing, basketball court, lights, athletic field, fence, parking lot, site amenities, site circulation, drainage, landscaping, ADA $1,340,000 Bond 11. Marcey Road Park Modernization – design and construction to replace two lighted tennis courts, lighted basketball court, electric panel box, gazebo, repointing and renovation of retaining walls, address erosion issues, site amenities, site drainage, site circulation, ADA $1,400,000 Bond 12. Eads Park Modernization - design and construction for full replacement of the playground equipment, gazebo, safety surfacing, site amenities, site circulation, drainage, landscaping and ADA $850,000 Bond 13. Quincy Park Modernization – design and construction for full replacement of 6 lighted tennis courts, fencing, site furnishings $1,890,000 Bond TOTAL $8,548,000 C - 16 LOCAL PARKS AND RECREATION PROGRAMS PARKS ENHANCEMENT GRANTS LOCAL PARKS AND RECREATION PROGRAMS 2013 − 2022 CIP 02 Park Enhancement Grants Project Description The Park Enhancement Grant (PEG) Program enhances parks by providing citizen-initiated projects in a timely manner. The goal of this program is to enable Arlington residents to initiate small capital improvement and beautification projects for parks and recreation facilities in their respective neighb orhoods. The PEG Program encourages community involvement and fosters pride by enabling creative improvements in parks and recreation facilities. Community -proposed projects are submitted annually to the Arlington County Park and Recreation Commission for review, who then recommends a list of projects to the County Board for final approval. The current individual project limit is $15,000. Since the pr ogram began in 1978, more than 250 projects have been funded. These include projects such as park furniture, pathways, fencing, pub lic art, educational and interpretive signage, and invasives removal as well as sports and building amenities. Associated Master Plan: Public Spaces Master Plan (PSMP) Critical Milestones: Information Workshop June Letter of Intent June Meet with Park and Recreation Commissioner July-August Application Development. August-October Presentation to Commission October Commission Evaluation and Recommendations October-December County Board Approval January Project Implementation February-December Advisory Commission: Park and Recreation Commission Neighborhood(s): VARIOUS Project Justification The program enables Arlington residents to initiate small capital improvement and beautification projects for parks and recre ation facilities which can be completed without going through the normal County budget process. Eligible applicants include civic and homeowners associations, community non -profit organizations, civic service clubs, school-related groups and ad-hoc neighborhood-based groups. The Park and Recreation Commission evaluates the program criteria annually. C - 17 02 Park Enhancement Grants Capital Cost Schedule (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total A & E 18 18 18 18 19 19 19 20 20 20 189 Land Acquisition 0 0 0 0 0 0 0 0 0 0 0 Construction 82 85 88 91 94 97 100 103 107 110 957 Relocation and Temp Facilities 0 0 0 0 0 0 0 0 0 0 0 Equipment and Furnishings 0 0 0 0 0 0 0 0 0 0 0 Total Project Cost 100 103 106 109 113 116 119 123 127 130 1,146 Notes on Cost Estimates This program is funded and spent annually. There are adopted guidelines for the program. Funding Schedule (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total New Funding State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 PAYG 100 103 106 109 113 116 119 123 127 130 1,146 New Bond Referenda 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 100 103 106 109 113 116 119 123 127 130 1,146 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 0 0 0 0 0 0 0 0 0 0 0 Total Revenues 100 103 106 109 113 116 119 123 127 130 1,146 Notes on Funding Schedule Funded annually through PAYG. Projects do not meet criteria for bond funds. Projected Additional Operating Costs (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total Anticipated FTEs (+/-) 0 0 0 0 0 0 0 0 0 0 0 Operations Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0 Facilities Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0 Master Lease Financing Cost 0 0 0 0 0 0 0 0 0 0 0 Maintenance Capital Impact 0 0 0 0 0 0 0 0 0 0 0 Bond Financing Cost (P & I Payments) 0 0 0 0 0 0 0 0 0 0 0 Gross Operating Costs 0 0 0 0 0 0 0 0 0 0 0 Less Fees 0 0 0 0 0 0 0 0 0 0 0 Net Operating Cost 0 0 0 0 0 0 0 0 0 0 0 Notes on Operating Costs Net operating and maintenance capital impact is minimal and unpredictable since this is a grant program and specific projects are unknown. C - 18 LOCAL PARKS AND RECREATION PROGRAMS PARKS LAND ACQUISITION AND OPEN SPACE LOCAL PARKS AND RECREATION PROGRAMS 2013 − 2022 CIP 03 Parks Land Acquisitions and Open Space Project Description Arlington County is nationally recognized for the quality and diversity of its open spaces and public recreational opportunities. Maintaining that high level of stewardshi p and responsiveness to community needs is a continual challenge because of the county’s small size, its high population density, a nd the pressures and impacts of urban growth on surviving natural areas and open land. The purpose of the Parks Land Acquisition and Open Space program is to have reserves on hand tha t allow the County to strategically acquire real property for parks and open space based on recommendations in the Public Spaces Master Plan and Land Acquisition and Preservation Policy. Land may also be acquired through site plan contributions, such as the recent Penrose Square acquisition, or Transfer of Development Rights. As part of CIP adoption, the County Board noted that parks land acquisition is a significant priority and that if additional one-time funding became available, that funding for parks and open space land acquisition be increased. Associated Master Plan: Land Acquisition and Preservation Policy (LAPP), Public Spaces Master Plan (PSMP) Critical Milestones: County Board adoption of Land Acquisition and Preservation Policy (LAPP) December 2012 Advisory Commission: Park and Recreation Commission Neighborhood(s): VARIOUS Project Justification Potential acquisitions are based on the compatibility to a number of program goals and criteria identified in the Land Acquisition and Preservation Policy and Public Spaces Master Plan. In addition to the acquisition, the program funds ancillary activities (appraisals, surveys, environmental assessments, dem olition, and site restoration). Changes from Prior CIP C - 19 03 Parks Land Acquisitions and Open Space Capital Cost Schedule (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total A & E 0 0 0 0 0 0 0 0 0 0 0 Land Acquisition 1,000 0 3,000 0 4,440 0 3,000 0 3,000 0 14,440 Construction 0 0 0 0 0 0 0 0 0 0 0 Relocation and Temp Facilities 0 0 0 0 0 0 0 0 0 0 0 Equipment and Furnishings 0 0 0 0 0 0 0 0 0 0 0 Total Project Cost 1,000 0 3,000 0 4,440 0 3,000 0 3,000 0 14,440 Notes on Cost Estimates Funding Schedule (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total New Funding State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 PAYG 0 0 0 0 0 0 0 0 0 0 0 New Bond Referenda 1,000 0 3,000 0 4,440 0 3,000 0 3,000 0 14,440 Subtotal New Funding 1,000 0 3,000 0 4,440 0 3,000 0 3,000 0 14,440 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 0 0 0 0 0 0 0 0 0 0 0 Total Revenues 1,000 0 3,000 0 4,440 0 3,000 0 3,000 0 14,440 Notes on Funding Schedule Bonds are typically sold as needed. Projected Additional Operating Costs (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total Anticipated FTEs (+/-) 0 0 0 0 0 0 0 0 0 0 0 Operations Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0 Facilities Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0 Master Lease Financing Cost 0 0 0 0 0 0 0 0 0 0 0 Maintenance Capital Impact 0 0 0 0 0 0 0 0 0 0 0 Bond Financing Cost (P & I Payments) 0 0 0 0 0 0 0 0 0 0 0 Gross Operating Costs 0 0 0 0 0 0 0 0 0 0 0 Less Fees 0 0 0 0 0 0 0 0 0 0 0 Net Operating Cost 0 0 0 0 0 0 0 0 0 0 0 Notes on Operating Costs Operating costs will vary by the each individual acquisition site. They typically involve mowing and trash removal, as well as other incidental costs. C - 20 LOCAL PARKS AND RECREATION PROGRAMS SYNTHETIC TURF PROGRAM LOCAL PARKS AND RECREATION PROGRAMS 2013 − 2022 CIP 04 Synthetic Turf Program Project Description The synthetic turf program is largely focused on replacement of existing synthetic turf fields that are approaching the end of their useful life. At the end of 2011, the County had ten synthetic turf athletic fields, and by the end of 2013, the County will have 12 fields with the addition of the baseball fiel d at Barcroft Park and the community field at Rocky Run Park. The secondary component of the program is the conversion of existing grass turf to synthetic turf. The CIP includes the possi ble addition of two fields in 2016 & 2017, funded through bonds, PAYG, and funds generated from youth sports affiliate group fees (Field Fund), as well as the possible addition of two more fields in FY 2022 to be funded by a combination of PAYG and new partnerships with universities, sports organization or other donors. County staff is curre ntly developing principles for County Board consideration that would govern and encourage future partnerships; a draft is expected to be released early fall of 2012. An additional field is also planned beyond the FY2013-FY2022 CIP for Long Bridge Park. Associated Master Plan: Public Spaces Master Plan (PSMP) Critical Milestones: Construction Plans 90 - 120 days Permitting and Bidding 60 - 90 days Substantial Completion 120 - 160 days Ribbon Cutting 30 - 45 days Advisory Commission: Sports Commission Neighborhood(s): VARIOUS Project Justification Synthetic grass has a similar feel, foot movement, ball response, and appearance to natural grass. Since Arlington installed its first synthetic field in 2002, it has proved to be a very effective artificial surface that can sustain significant hours of play all year round, no matter what the weather. Synthetic turf has outstanding field performance, durability, safety for the athletes and is environmentally friendly. Due to the additional playability of synthetic grass fields, the goal is to light all synthetic turf fields so that they are available for evening play, thereby maximizing the investment. Conversion costs involve installation of synthetic grass, in -fill underground drainage systems, lighting, and site amenities including site furnishings, pathways, landscaping and permanent or portable restrooms as needed. Changes from Prior CIP The FY2011 - FY2016 CIP showed the replacement of one existing synthetic field per year at a cost of $1.4 million. Based on experience and efficiencies developed with the first two field replacements at Gunston and Virginia Highlands, the price per field replacement has been reduced. With a total of 12 sy nthetic fields in the County inventory by the end of FY 2013, the capital cost schedule anticipates the replacement of approximately 2 fields per year. C - 21 04 Synthetic Turf Program Capital Cost Schedule (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total A & E 0 100 205 218 213 222 238 239 252 692 2,379 Land Acquisition 0 0 0 0 0 0 0 0 0 0 0 Construction 1,055 911 1,851 1,967 1,913 2,005 2,138 2,151 2,269 6,225 22,485 Relocation and Temp Facilities 0 0 0 0 0 0 0 0 0 0 0 Equipment and Furnishings 0 0 0 0 0 0 0 0 0 0 0 Total Project Cost 1,055 1,011 2,056 2,185 2,126 2,227 2,376 2,390 2,521 6,917 24,864 Notes on Cost Estimates FY2013 includes full replacement of the existing synthetic field at Barcroft Park including under drain system, carpet, adjacent slopes and site amenities. Partnerships to share capital and operating costs such as the recent successes with Marymount and George Washington Universities are desirable. Funding Schedule (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total New Funding State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 450 900 0 0 500 0 250 0 2,450 4,550 PAYG 1,055 561 1,156 0 1,126 1,727 2,376 2,140 2,521 3,967 16,629 New Bond Referenda 0 0 0 2,185 0 0 0 0 0 0 2,185 Subtotal New Funding 1,055 1,011 2,056 2,185 1,126 2,227 2,376 2,390 2,521 6,417 23,364 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 1,000 0 0 0 0 500 1,500 Subtotal Previously Approved Funding 0 0 0 0 1,000 0 0 0 0 500 1,500 Total Revenues 1,055 1,011 2,056 2,185 2,126 2,227 2,376 2,390 2,521 6,917 24,864 Notes on Funding Schedule Replacement of fields through the Parks Maintenance Capital Program is funded primarily through PAYG. Other funding includes contribution from Schools for their share of fields co-located at high schools as well as contributions from Marymount and other partnerships. Other previously approved funds are the youth sports affiliate group fees collected annually. New synthetic conversions and new field locations include field lighting and other long term infrastructure and are funded through local parks and recreation bonds. Projected Additional Operating Costs (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total Anticipated FTEs (+/-) 0 0 0 0 0 0 0 0 0 0 0 Operations Costs (+/-) 0 0 0 40 80 80 80 80 80 160 600 Facilities Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0 Master Lease Financing Cost 0 0 0 0 0 0 0 0 0 0 0 Maintenance Capital Impact 0 0 0 0 0 0 0 0 0 0 0 Bond Financing Cost (P & I Payments) 0 0 0 0 0 0 0 0 0 0 0 Gross Operating Costs 0 0 0 40 80 80 80 80 80 160 600 Less Fees 0 0 0 0 0 0 0 0 0 0 0 Net Operating Cost 0 0 0 40 80 80 80 80 80 160 600 Notes on Operating Costs Replacement of existing synthetic turf fields should have minimal impact to operating costs. New conversions and new field locations have an anticipated operating cost impact of $40k annually. C - 22 SOCCER FIELDS Year Installed FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 1 Barcroft Park* 2005 1,055 1,261 2 Wakefield Stadium 2004 1,011 1,259 3 W&L Stadium 2005 1,028 4 Greenbrier Park 2005 1,028 5 TJ Park 2010 1,114 6 Long Bridge Park #1 2011 1,114 7 Long Bridge Park #3 2011 1,188 8 Long Bridge Park #4 2011 1,188 9 Gunston Park 2011 1,195 10 Barcroft Park Baseball 2012 1,195 11 Va. Highlands Park 2012 1,261 12 Rocky Run 2013 1,259 13 Field Location TBD New 2,185 14 Field Location TBD New 2,126 15 Field Location TBD *** New 2,200 16 Field Location TBD *** New 2,200 Total Costs 1,055 1,011 2,056 2,185 2,126 2,227 2,376 2,390 2,521 6,917 SOURCES OF FUNDS Total GO Bonds - - - 2,185 - - - - - - 2,185 PAYG 1,055 561 1,156 - 1,126 1,727 2,376 2,140 2,521 3,967 16,629 Field Fund - - - - 1,000 - - - - 500 1,500 Schools contribution - 450 900 - - - - - - 450 1,800 Partnership or other contribution - - - - - 500 - 250 - 2,000 2,750 Total Sources 1,055 1,011 2,056 2,185 2,126 2,227 2,376 2,390 2,521 6,917 24,864 Assumes 8 year useful life. Some schedules have been adjusted to even out the funding with an eventual goal of two field replacements per year. Assumes inflation of 3% starting in FY 2014, compounded annually Cost includes replacement of the carpet, repairs to under drain system, site amenities, repair of adjacent slopes, design, testing,/surveying, and construction administration. *Barcroft Park FY2013 includes full replacement of field including regrading and under drain system in addition to the above. ***As funding allows this program will consider the conversion of additional fields through potential financial partnerships with Arlington Public Schools, universities and sports organizations. PROJECTED SYNTHETIC FIELD REPLACEMENT SCHEDULE CAPITAL COSTS FY 2013 - FY 2022 C - 23 Arlington, Virginia LOCAL PARKS AND RECREATION PROGRAMS: PARK MASTER PLANS CIP 2013 − 2022 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total 05 Long Bridge Park 51,012 21,250 0 0 0 0 0 0 0 3,914 76,176 06 Tyrol Hills Park 185 0 1,591 0 0 0 0 0 0 0 1,776 07 Jennie Dean Park 0 0 5,835 0 6,190 0 6,567 0 6,967 0 25,559 08 Four Mile Run Near-Stream Improvements 0 0 0 219 0 2,122 0 1,126 0 11,941 15,408 09 Crystal City Parks and Open Space 0 0 0 289 2,983 0 316 0 3,357 0 6,945 10 Four Urban Parks in Ballston-Virginia Square 0 0 0 0 563 0 2,985 0 3,167 0 6,715 11 Mosaic Park 0 0 0 0 0 0 328 0 3,294 0 3,622 12 Glebe and Randolph Park 0 0 0 0 0 0 299 0 3,167 0 3,466 13 Ballston Pond 0 0 0 0 0 0 0 0 988 0 988 Total Recommendation 51,197 21,250 7,426 508 9,736 2,122 10,495 1,126 20,940 15,855 140,655 CATEGORY FUNDING SOURCES (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total New Funding Developer Contributions 20,000 0 0 0 0 0 0 0 0 0 20,000 New Bond Referenda 21,435 21,250 7,426 508 9,736 2,122 10,495 1,126 20,940 15,855 110,893 Subtotal New Funding 41,435 21,250 7,426 508 9,736 2,122 10,495 1,126 20,940 15,855 130,893 Previously Approved Funding Authorized but Unissued Bonds 8,000 0 0 0 0 0 0 0 0 0 8,000 Issued but Unspent Bonds 1,762 0 0 0 0 0 0 0 0 0 1,762 Subtotal Previously Approved Funding 9,762 0 0 0 0 0 0 0 0 0 9,762 Total Funding Sources 51,197 21,250 7,426 508 9,736 2,122 10,495 1,126 20,940 15,855 140,655 C - 24 LOCAL PARKS AND RECREATION PROGRAMS PARK MASTER PLANS LOCAL PARKS AND RECREATION PROGRAMS 2013 − 2022 CIP 05 Long Bridge Park Project Description The new 30-acre Long Bridge Park is located at the north end of Crystal City. The park master plan, which was adopted by the County Boar d in 2004 and will be updated in 2012 to reflect the recent exchange of property with Monument Realty, provides a blueprint for development of this former industrial site into a world-class park and recreation area. The new park will help transform the area into a showplace of environmentally sound redevelopment, with a central expanse of attracti ve public green spaces and high quality indoor and outdoor recreation facilities that provide a comprehensive destination and are conveniently linked with the nearby urban corridor. Th e final design and construction of the park is planned in four phases over more than a decade. Construction of Phase I of the park was completed in November 2011. Phase II, the aquatics, health and fitness facility and surro unding 10-acre park area, is currently under design with construction funding adopted for FY2013. Phase IIIA, the S. 6th Street entry features at the south end of the park, is identified for FY 2013 funding from capital sources to be recommended by the County Manager. Phase IIIB, the final components of the outdoor park, is planned for design in FY2020. Construction of Phase IIIB and design and construction of Phase IV, the final components of the health and fitness portion of the building, are beyond the w indow of the FY2013-FY2022 CIP. Associated Master Plan: Public Spaces Master Plan (PSMP) Critical Milestones: Completion of construction drawings Phase II Winter 2013 Permitting and bid award Phase II Spring 2013 Construction start Phase II Summer 2013 Construction completion of Phase IIIA Summer 2013 Construction completion Phase II Summer 2015 Advisory Commission: Arlington Commission for the Arts, Disability Advisory Commission, Environment and Energy Conservation Commission, Park and Recreation Commission, Sports Commission, Transportation Commission Neighborhood(s): VARIOUS Project Justification The Phase II and III projects advance the design and construction of the next two phases of the park. The County completed Ph ase I in November 2011, which included three full size, lighted synthetic turf athletic fields, esplanade, walkways throughout the park, site furnishings, restrooms and storage buildings, parking, landscaping, rain gardens, environmental remediation, major utility work and reconstruction of Long Bridge Drive and S. 6th Street. Phase II is currently under final design and includes the initial phase of the aquatics, health and fitness center featuring a 50-meter X 25-yard competition pool, teaching pool, family leisure pool, therapy pool and wet classrooms/party rooms. In addition to the ma jor aquatics component, Phase II includes an indoor fitness area for cardiovascular equipment and weight training, fitness classes, and community space as well as developmen t of the surrounding ten-acre park including surface parking, continuation of the esplanade, public art and a variety of outdoor pu blic spaces. Phase III finishes off the outdoor components of the park. Phase III construction is divided into Phase IIIA, which finishes off the S. 6th Street entry features including the play element, and Phase IIIB, which includes a fourth synthetic turf field, structured parking, second storage building, and an observation bridge and raised walkway over the CSX railroad tracks. Phase IV finishes off the building with a large multi-sport activity center, climbing wall, elevated track, rooms for racquet sports, and additional fitness and community spaces. Changes from Prior CIP The FY2011 - FY2016 CIP included construction funds for Phase II construction and Phase III design. These numbers have been updated to inc lude inflation for both phases and additional dollars for current technologies related to energy efficiency for the mechanical systems for the Phase II building. C - 25 05 Long Bridge Park Capital Cost Schedule (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total A & E 281 0 0 0 0 0 0 0 0 3,914 4,195 Land Acquisition 0 0 0 0 0 0 0 0 0 0 0 Construction 52,171 21,250 0 0 0 0 0 0 0 0 73,421 Relocation and Temp Facilities 0 0 0 0 0 0 0 0 0 0 0 Equipment and Furnishings 0 0 0 0 0 0 0 0 0 0 0 Total Project Cost 52,452 21,250 0 0 0 0 0 0 0 3,914 77,616 Notes on Cost Estimates Phase II includes building and site construction, environmental remediation, public art, FFE and administration/project management. Phase IIIA includes design costs, construction, and administration/project management. Phase IIIB includes design costs and administration/project management. Construction of Phase IIIB is outside the timeline of the FY2013 - FY2022 CIP. Funding Schedule (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total New Funding State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 20,000 0 0 0 0 0 0 0 0 0 20,000 Other Funding 0 0 0 0 0 0 0 0 0 0 0 PAYG 0 0 0 0 0 0 0 0 0 0 0 New Bond Referenda 21,250 21,250 0 0 0 0 0 0 0 3,914 46,414 Subtotal New Funding 41,250 21,250 0 0 0 0 0 0 0 3,914 66,414 Previously Approved Funding Authorized but Unissued Bonds 8,000 0 0 0 0 0 0 0 0 0 8,000 Issued but Unspent Bonds 1,762 0 0 0 0 0 0 0 0 0 1,762 Other Previously Approved Funds 1,440 0 0 0 0 0 0 0 0 0 1,440 Subtotal Previously Approved Funding 11,202 0 0 0 0 0 0 0 0 0 11,202 Total Revenues 52,452 21,250 0 0 0 0 0 0 0 3,914 77,616 Notes on Funding Schedule Funding of the four phases of the park master plan is based on a combination of FY 2012 close-out funds, local parks and recreation bond funds combined with private funding from partnership(s) and the sale of density from the park site to a developer(s). Because the timing of these contributions is uncertain, the CIP assumes interim financing (e.g., short-term notes) that would allow construction to proceed. Principal borrowed would be repaid by outside contributions. Projected Additional Operating Costs (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total Anticipated FTEs (+/-) 0 0 0 0 0 0 0 0 0 0 0 Operations Costs (+/-) 0 0 340 1,250 1,250 1,250 1,250 1,250 1,250 1,250 8,750 Facilities Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0 Master Lease Financing Cost 0 0 0 0 0 0 0 0 0 0 0 Maintenance Capital Impact 0 0 0 0 0 0 0 0 0 0 0 Bond Financing Cost (P & I Payments) 0 0 0 0 0 0 0 0 0 0 0 Gross Operating Costs 0 0 0 0 0 0 0 0 0 0 0 Less Fees 0 0 0 0 0 0 0 0 0 0 0 Net Operating Cost 0 0 340 1,250 1,250 1,250 1,250 1,250 1,250 1,250 8,750 Notes on Operating Costs Net operating impact for Phase II is anticipated to be in the range of $1.1 to $1.4 million annually. Operations costs include both the aquatics, health and fitness facility and the surrounding 10-acre park, including staffing, programming, vendors, utilities, and maintenance. The operations financial model will be revised and refined in preparation for the programs and operations launch as the project progresses. 4 FTE's in FY2015 will bring on board the general manager, plant engineer, aquatics operator and business manager in advance of completion of the facility and park. Additional FTEs will come on line in FY2016. C - 26 05 Long Bridge Park Associated Costs and Funding Sources Construction of phase IIIB as well as design and construction of phase IV are beyond this planning horizon. Project/Phase Phase I $ 36.9 M Phase II $ 79.2 M Phase IIIA $ 1.4 M Phase IIIB design $ 3.9 M Total Long Bridge Park Costs $121.4 M Funding History 2004 GO Bonds $ 50.0 M Developer Contribution $ 3.6 M Subtotal $ 53.6 M Anticipated Funding Developer Contribution $ 20.0 M 2012 GO $ 42.5 M Capital Funds $ 1.4 M 2020 GO $ 3.9 M Subtotal $ 67.8 M Total Funding $121.4 M C - 27 LOCAL PARKS AND RECREATION PROGRAMS PARK MASTER PLANS LOCAL PARKS AND RECREATION PROGRAMS 2013 − 2022 CIP 06 Tyrol Hills Park Project Description Tyrol Hills Park is heavily used, serving as the major outdoor gathering space for the Columbia Heights West and Forest Glen neighborhoods. The park is used for basketball and volleyball games, picnics, playing on the playground and informal gatherings and also hosts many programmed recreational activities, camps and community events. The project completes the implementation of the Tyrol Hills Park Master Plan, adopted by the County Board in December 2003. This is the third and final phase. Associated Master Plan: Public Spaces Master Plan (PSMP) Critical Milestones: Park Master Plan December 2003 Completion of construction drawings June 2014 Construction start Summer 2015 Construction complete Spring 2016 Advisory Commission: Park and Recreation Commission Neighborhood(s): VARIOUS Project Justification The project is for the design and build-out of the final phase of the Tyrol Hills Park Master Plan. The project elements include A&E, comfort station, drinking fount ain, picnic shelter, paved plaza, site furnishings, and landscaping. Two other phases of the master plan have been implemented through the Neighbo rhood Conservation Program. Changes from Prior CIP Costs have been updated to reflect inflation for the last two years at 3% annually. C - 28 06 Tyrol Hills Park Capital Cost Schedule (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total A & E 185 0 0 0 0 0 0 0 0 0 185 Land Acquisition 0 0 0 0 0 0 0 0 0 0 0 Construction 0 0 1,591 0 0 0 0 0 0 0 1,591 Relocation and Temp Facilities 0 0 0 0 0 0 0 0 0 0 0 Equipment and Furnishings 0 0 0 0 0 0 0 0 0 0 0 Total Project Cost 185 0 1,591 0 0 0 0 0 0 0 1,776 Notes on Cost Estimates Costs are shown in 2012 dollars. Funding Schedule (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total New Funding State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 PAYG 0 0 0 0 0 0 0 0 0 0 0 New Bond Referenda 185 0 1,591 0 0 0 0 0 0 0 1,776 Subtotal New Funding 185 0 1,591 0 0 0 0 0 0 0 1,776 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 0 0 0 0 0 0 0 0 0 0 0 Total Revenues 185 0 1,591 0 0 0 0 0 0 0 1,776 Notes on Funding Schedule Projected Additional Operating Costs (in $1,000s) FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year Total Anticipated FTEs (+/-) 0 0 0 0 0 0 0 0 0 0 0 Operations Costs (+/-) 0 0 0 55 55 55 55 55 55 55 385 Facilities Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0 Master Lease Financing Cost 0 0 0 0 0 0 0 0 0 0 0 Maintenance Capital Impact 0 0 0 0 0 0 0 0 0 0 0 Bond Financing Cost (P & I Payments) 0 0 0 0 0 0 0 0 0 0 0 Gross Operating Costs 0 0 0 55 55 55 55 55 55 55 385 Less Fees 0 0 0 0 0 0 0 0 0 0 0 Net Operating Cost 0 0 0 55 55 55 55 55 55 55 385 Notes on Operating Costs Operations costs are projected to include utilities, restroom cleaning, landscape maintenance and some staff time. C - 29 LOCAL PARKS AND RECREATION PROGRAMS PARK MASTER PLANS LOCAL PARKS AND RECREATION PROGRAMS 2013 − 2022 CIP 07 Jennie Dean Park Project Description The Shirlington area is undergoing significant redevelopment, bringing new residents and businesses to an area that was once industrial. Over the last ten years, the

Text truncated. Open the original for the full document.

Source: Arlington County website. First collected Oct 27, 2026.