Adopted Biennial Capital Improvement Plan
Fiscal Years 2013-2022
COUNTY BOARD
MARY HUGHES HYNES
CHAIR
J. WALTER TEJADA
VICE CHAIR
JAY FISETTE
CHRISTOPHER ZIMMERMAN
LIBBY GARVEY
COUNTY MANAGER’S OFFICE
BARBARA M. DONNELLAN
COUNTY MANAGER
Vision for Arlington County
“Arlington will be a diverse and inclusive world-class urban
community with secure, attractive residential and commercial
neighborhoods where people unite to form a caring, learning,
participating, sustainable community in which each person is
important.”
- Adopted by the Arlington County Board January 26, 2002
Table of Contents
INTRODUCTION ........................................................................................................ 1
GUIDE TO READING THE CIP .............................................................................. 8
BUDGET CALENDAR ................................................................................................. 9
A. OVERVIEW
CIP Message ........................................................................................................................... A-1
Supplementary CIP Guidance ............................................................................................. A-3
Adopted FY 2013 – FY 2022 CIP Board Report & Attachments ................................. A-5
Major Capital Projects from 2002 - 2012 ......................................................................... A-12
Financial & Debt Management Policies ........................................................................... A-16
2012 Bond Referenda Board Report ................................................................................ A-22
Bond Referenda History..................................................................................................... A-34
Bonds Authorized but Unissued ....................................................................................... A-45
Projects Underway .............................................................................................................. A-46
Impact on Future Operating Budgets .............................................................................. A-57
B. CAPITAL FUNDING
CIP Program Summary ........................................................................................................ B-1
CIP Program and Funding Allocations .............................................................................. B-3
Debt Summary ....................................................................................................................... B-4
PAYG Summary .................................................................................................................... B-6
Comparison of Previously Adopted to Current Bond Program .................................... B-7
CIP Program Detail .............................................................................................................. B-9
Debt Capacity Analysis ....................................................................................................... B-15
Debt Ratio Analysis Chart ................................................................................................. B-17
Tax-Supported Debt Service to General Fund Expenditures Graph.......................... B-18
County General Obligation Bond Debt other Financings to Market Value Chart ... B-19
County General Obligation Bond Debt other Financings to Market Value Graph .. B-20
Tax Supported General Obligation Bond Debt to Income .......................................... B-21
C. GENERAL GOVERNMENT
1. MAINTENANCE CAPITAL
Program Summary ...................................................................................................... C-1
2. REGIONAL PARTNERSHIPS
Regional Partnerships ................................................................................................. C-6
3. LOCAL PARKS AND RECREATION PROGRAMS
Program Summary ...................................................................................................... C-9
Maintenance Capital.................................................................................................. C-11
Parks Enhancement Grants ..................................................................................... C-17
Parks Land Acquisition and Open Space .............................................................. C-19
Synthetic Turf Program ............................................................................................ C-21
Park Master Plans ...................................................................................................... C-24
Long Bridge Park ................................................................................................. C-25
4. COMMUNITY CONSERVATION PROGRAMS
Program Summary .................................................................................................... C-44
Neighborhood Conservation................................................................................... C-46
Penrose Square .......................................................................................................... C-48
Nauck Investment Fund .......................................................................................... C-51
Nauck Town Square ................................................................................................. C-53
5. ECONOMIC DEVELOPMENT PROGRAMS
Program Summary .................................................................................................... C-55
Planning ...................................................................................................................... C-57
Public Art Program ................................................................................................... C-59
Public Benefit Spaces ................................................................................................ C-62
6. PUBLIC / GOVERNMENT FACILITIES
Program Summary .................................................................................................... C-65
Facilities ...................................................................................................................... C-67
Maintenance Capital ............................................................................................ C-69
2020 Building Acquisition and Conversion ..................................................... C-73
Non-Parks Land Acquisition ................................................................................. C-123
Energy Efficiency .................................................................................................... C-126
7. COMMUNITY ENERGY PLAN
Overview .................................................................................................................. C-129
D. INFORMATION TECHNOLOGY/EQUIPMENT PROGRAMS
Program Summary ...................................................................................................... D-1
Enterprise Information Technology ........................................................................ D-3
Public Safety Information Technology .................................................................. D-12
ConnectArlington ..................................................................................................... D-21
E. METRO AND TRANSPORTATION
1. METRO
Program Summary ...................................................................................................... E-1
2. TRANSPORTATION INITIATIVES
Program Summary ...................................................................................................... E-3
Crystal City Plan Improvements ............................................................................... E-6
Transportation Capital Fund/Tax Increment Financing Fund-Fund Balance .. E-7
Transportation Funding Plan .................................................................................... E-9
Arlington Transit Program ...................................................................................... E-13
Columbia Pike Streetcar ..................................................................................... E-25
Rt. 1 Corridor Streetcar ...................................................................................... E-45
Complete Arlington Streets ..................................................................................... E-49
Fiber Project (Transportation)........................................................................... E-67
Local Initiatives ......................................................................................................... E-85
Paving Maintenance Capital .................................................................................... E-92
F. UTILITIES AND STORMWATER MANAGEMENT
1. UTILITIES
Program Summary ....................................................................................................... F-1
Sanitary Sewer System Improvements ...................................................................... F-4
Water Distribution System ....................................................................................... F-12
WPCP Expansion ...................................................................................................... F-19
WPCP Non-Expansion ............................................................................................ F-25
Maintenance Capital................................................................................................... F-30
2. STORMWATER MANAGEMENT
Program Summary ..................................................................................................... F-34
Environmental Quality .............................................................................................. F-37
Storm Drainage Improvements ............................................................................... F-51
Maintenance Capital................................................................................................... F-55
G. APPENDIX
Schools FY 13 - FY22 CIP ........................................................................................ G-1
^ ^
^
^
^
$+
Arlington County
Government Center
Marine Corps
War Memorial
Arlington
National
Cemetery
Pentagon
National
Airport
Arlington County
Trades Center
SHIRLINGTON
CIR
INTERSTATE 66
MILITARY RD
OLD
DOMINION
DR
BOUNDARY
DR
LEE HWY
COLUMBIA PIKE
S
GLEBE
RD
WILLIAMSBURG BLVD
INTERSTATE
395
N VEITCH ST
23RD ST S
LITT LE FALLS RD
KEY BLVD
10TH ST N
CHAIN
B RIDGE RD
N
W
ESTM
ORELAND
ST
LEE HWY
LEESBURG PIKE
15TH ST S
LEE HWY
PATRICK
HENRY DR
YORKTOWN BLVD
INTERSTATE
395
HOV
LANES
N
HARRISON ST
COLUMBIA PIKE
CLAR ENDON BLVD
S JOYCE
ST
JOHN
M
AR
SH
ALL
DR
S KING ST
FAIRFAX DR
MEMORIAL DR
KEY BRIDGE
S
FILLMO
RE
STN
CARLIN SPRINGS
RD
SPOUT RUN PKWY
S
JEFFERSO
N
ST
ROOSEVELT BLVD
MEMORIAL BRIDGE
S
HAYES
ST
S CARLIN
SPRINGS RD
S
W
ASHINGTON BLVD
N
GLEBE RD
FO
RT
M
YER
DR
N LYNN ST
S EADS ST
CRYSTAL
DR
N
SYCAM
O
RE
ST
JEFFERSO
N
DAVIS
HW
Y
NELLY CUSTIS DR
Q
UAKER
LN
S
W
ALTER
REED
DR
S
ARLIN
G
TON
RID
G
E
RD
GEORGE
W
ASHINGTON
MEMORIAL PKWY
ROUTE 110
ROUTE
110
LORCOM LN
WILSON BLVD
ARLINGTON BLVD
WASHINGTON BLVD
N
Q
UINCY
ST
FAIRFAX DR
S
GEORGE MASON DR
WILSON BLVD
S
FOUR
MILE
RUN DR
ROUTE 233
ARLINGTON BLVD
N GLEBE RD
WASHINGTON BLVD
N GEORGE M
ASON
DR
N PERSHING DR
Arlington County,
Virginia
Arlington, Virginia
Capital Improvement Plan
Introduction
A. Overview
The Capital Improvement Plan (CIP) is one of the most significant planning processes for Arlington County and Arlington Publi c Schools. This plan
identifies the capital needs of the c ommunity over a ten -year period. This plan not only identifies the immediate needs but also seeks to capture longer -
term capital needs.
The CIP is a planning document that is updated biennially and subject to change as the needs of the community beco me more defined and individual
projects move along in their respective planning and budgeting processes. The effective use of a CIP process provides for co nsiderable advance project
identification, planning, evaluation, scope definition, design, public discussion, cost estimating, and financial planning.
The objectives used to develop the CIP include:
To preserve and improve the infrastructure of Arlington through capital asset construction, rehabilitation and maintenance;
To maximize the useful life of capital investments by scheduling major renovations and modifications at the appropriate time in the life-
cycle of the facility;
To identify and examine current and future infrastructure needs and establish priorities among projects so that available resources are
used to the community’s best advantage; and
To improve financial planning by comparing needs with resources, estimating future bond issues, and identifying potential fis cal
implications.
The CIP is the primary instrument for planning the fun ding and timing of the needs and priorities that have been approved by the County Board. The
funding and implementation of CIP projects follow in the form of bond referenda; the annual appropriation of Pay -As-You-Go (PAYG) projects by the
Board as part of the annual operating budget; and approval / receipt of other funding sources identified in this document.
B. Capital Project Definition
Capital projects result in economic activities that lead to the acquisition, construction, or extension of the useful life of capital assets. Capital assets include
land, facilities, parks, playgrounds and outdoor structures, streets, bridges, pedestrian and bicycle systems, water and sewe r infrastructure, technology
systems and equipment, traffic control devices, and other items of value from which the community derives benefit for a significant number of years.
1
Capital expenditures and operating expenditures are primarily differentiated by two characteristics: dollar amount of the exp enditure and the useful life of
the asset acquired, constructed, or maintained. Capital expenditures will enhance, acquire or extend the useful life of assets t hrough a variety of activities.
Generally, land acquisition, feasibility studies, planning, design, construction, asset rehabilit ation, enterprise technology acquisition, and project
Implementation, are activities associated with capital projects. Capital projects are typically funded with a variety of Coun ty sources – the primary two of
which include bond and PAYG. Bond funds are usually reserved for th e big ticket items such as new construction or major renovations or alterations
with a useful life of at least ten years. PAYG funds are used for smaller scale renovations or maintenance type projects with a useful life of at least five
years. In general, capital projects in the CIP:
Have a total project cost in the range of $100,000 or more.
Range from construction of new buildings to renovations, additions, or conversions, or demolition of existing facilities.
Have a minimum useful life of five years, significantly extend the useful life of an asset, or significantly alter the nat ure and character of an
asset (i.e. not to include annual asset maintenance costs, annual warranty cost or other ongoing costs).
The CIP has also traditionally been the vehicle by which planning for technology capital investments occurs. In general, tech nology capital projects in the
CIP:
Have an estimated cost in excess of $25,000 and /or require six months or 1,000 hours for implementation or completion.
Include applications systems, network design and implementation, telecommunications infrastructur e, enterprise hardware and software
systems, web design and implementation services, document imaging, data base design and development, consulting services (bus iness
process studies, requirements analysis or other studies), and technology associated with new construction and/or renovation and relocation
projects.
Have a minimum useful life of three years, significantly extend the useful life of an asset (i.e. not to include annual software and hardware
maintenance and upgrade costs, warranty costs or other ongoing costs), provide a significant enhancement to functionality, or represent a
change of platform or underlying structure.
C. CIP Development Process
Capital projects originate from a variety of sources. County Board appointed commissions, advisory gro ups, and task forces typically advise the Board or
develop long -term plans that recommend certain types of improvements. In some cases, individual residents request improvements to their s treets,
playgrounds or other County facilities. Neighborhood associ ations and business groups may also suggest projects and work with County staff on projects.
Some projects are initiated by staff based on adopted County master plans, such as the Transportation Master Plan or the Storm Water Master Plan.
Projects typically come forward through the sponsoring department that is responsible for their implementation but also come from staff tha t exercises
operational control over County assets. Given that there are always more project proposals submitted than can be funde d in a given year, various criteria
are used to assist in prioritizing capital projects. These criteria included a test for immediate safety, legislative, or ju dicial requirements, the project’s ability
to be implemented in the timeline proposed, linkages to other approved and funded projects, linkages to an approved County master plan, other goals and
2
objectives of the County, and direct benefit to citizens. Other considerations include current and future fiscal impact, cos t of deferring a project,
alternative funding sources, and County and private development goals and plans.
Similar to the previous CIP formulation, staff organized into to a CIP Working Group to develop the CIP. The CIP Working Gro up included key
leadership from all major areas of capital, including all deputy directors from DES, the Parks Planning Division chief, representatives from DTS and
CPHD, (representing the Neighborhood Conservation program) along with public safety staff. The CIP Working Group reviewed al l initial departmental
requests in a series of briefings in January and February. In March, the CIP Working Group went through a series of priorit ization and debt capacity
exercises to form an initial recommendation to the County Manager. Working behind the scenes to su pport the Working Group was a Core Production
Team, focused on organizing the process, schedule, and decisions needed to produce the CIP. The Core Production team consist s of the Director of
DMF, the Deputy Director of Facilities and Engineering, and technical staff from DES and DMF.
As discussed in more detail under “Financial & Debt Management Policies” below, t he consolidated recommendations were considered against various
debt capacity scenarios to develop the final CIP. Throughout the process, the t eam consulted with program managers and other subject matter experts
within the departments.
D. Financial & Debt Management Policies
The Board-adopted financial and debt management policies provide the parameters for the amounts and timing of bond -financed projects to be included
in the CIP, ensuring that the CIP is financially sustainable and that it supports the County’s triple -A bond ratings. The County’s debt capacity policies are
summarized below and a complete copy of the County’s financial policies are included later in this section:
1. The ratio of net tax-supported debt service to general expenditures should not exceed ten percent, within the ten-year projection.
2. The ratio of net tax-supported debt to full market value should not exceed four percent, within the ten-year projection.
3. The ratio of net tax-supported debt to income should not exceed six percent, within the ten-year projection.
4. Growth in debt service should be sustainable consistent with the projected growth of revenues. Debt serv ice growth over the ten year
projection should not exceed the average ten year historical revenue growth.
5. The term and amortization structure of County debt will be based on an analysis of the useful life of the asset(s) being financed and the
variability of the supporting revenue stream. The County will attempt to maximize the rapidity of principal repayment where possible. In
no case will debt maturity exceed the useful life of the project.
As part of the iterative process of analyzing debt capacit y and projected debt service growth of capital projects, staff analyzed cashflow projections for
each project. These projections were matched against unspent bond proceeds from previous bond sales and authorized but not y et issued bond authority
to develop reasonable new bond sale assumptions over the ten year period that live within the Board’s sustainable debt service growth policy.
3
E. Sources of Capital Funds
Funding for capital improvements comes from a number of sources. These funds are generated th rough local taxes, fees, charges, outside funding or
other similar sources. The availability of these funds is sensitive to economic cycles.
Pay-As-You-Go (PAYG) comes from annual appropriations and is part of the adopted operating budget. PAYG fundin g provides the greatest flexibility
since it is not constrained by tax -exempt bond requirements and historically has funded maintenance capital projects, regional partnership programs and
other projects such as Neighborhood Conservation and Neighborhood Tr affic Calming. Projects that are typically smaller in scale as well as minor
renovations are likely candidates for PAYG funding – as long as the project has an expected useful life of at least five years or more. PAYG also:
Has no debt service cost that has to be paid on the expenditure;
Is available at the start of the fiscal year;
Must compete with operating programs for funding;
Does not have to be approved through referendum; and
Can be carried over at the end of each fiscal year.
Also as part of PAYG budget a decal fee allocation was adopted by the Board on April 24, 2010 (part of the FY 2011 budget adoption), and was originally
set at $1 million for bicycle pedestrian projects. However, the language as written has been interpreted to allow the amount to exceed $1 million annually
when the revenues come in higher than anticipated, as was the case in FY 2011. The FY 2013 decal fee funded projects include: Bike Arlington,
Improvements to corridors outside principal business districts, and Capital Bike Share.
Bond financing refers to debt financing of projects. Arlington County most often sells general obligation bonds. Bond financing is generated through the
borrowing of funds (principal) at a cost (interest) through the sale of municipal bonds. There are several types of bond financing:
General obligation bonds - Arlington typically issues general obligation bonds, which must first be approved by the County’s voters and are
secured by the full faith and credit of the County. Arlington’s practice is to schedule bond referenda for even -numbered calendar years,
which correspond to the bond sale in odd-number fiscal years.
Revenue bonds – Arlington has issued low interest rate revenue bonds through the Virginia Water Revolving Loan Fund (VRLF) run by
the Virginia Resources Authority for improvements to the Water Pollution Control Plant. Revenue bonds are typically secured solely by
user fees or projected revenues and include no pledge from the General Fund. Revenue bonds typically carry a higher interest rate than
GO bonds and generally have debt service coverage and other financial restrictions. The FY 2013 – FY 2022 CIP includes revenue bond
funding beginning in FY 2014 supported by the Transportation Capital Fund as well as revenue bond fundin g beginning in FY 2015 for
the Route 1 streetcar and other transportation improvements supported by the Crystal City Tax Increment Financing Fund.
Lease revenue or annual appropriation bonds – These types of bonds are secured by a “subject to appropriation” pledge by the County Board and
do not require voter approval. (See “Lease -purchase finance” below) They generally require the use of a third party to execute the lease
transaction, such as the Industrial Development Authority (IDA), Virginia Resources Authority, or Virginia Municipal League / Virginia
Association of Counties.
4
One of the criteria used to determine which projects will be funded with bond proceeds is the useful life of the improvement. Projects funded with bond
proceeds generally have a useful life that is similar in length to the repayment schedule of the bonds. Historically, Arlington has issued 20 -year general
obligation serial bonds and paid the bonds using a two -year step-up schedule of principal repayment, and the average bond p rincipal is outstanding for
approximately 11 years. The Board’s financial policies allow for longer term bonds as long as the term of the bonds does not exceed the useful life of the
project, and also allows for alternative amortization structures such as level debt service to better match certain revenue streams. Another capital funding
source is inter-jurisdictional payments. Arlington has agreed to provide services to other jurisdictions through contractual agreements. For example,
wastewater treatment services for some areas of Alexandria, Falls Church, and Fairfax County are provided by Arlington’s Water Pollution Control Plant.
These jurisdictions also share in the cost of capital improvements of this facility, thus reducing the cost to Arlington users.
Lease-purchase finance (or Master Lease) represents another source of capital financing to acquire equipment, rolling stock, furniture and technology
purchases that have useful lives ranging from three to ten years. Master lease financing is very f lexible, allowing the County to finance projects with
minimal transaction costs and on an “as needed” basis over the term of the master lease. Because of the short -term maturities of master lease financing,
interest rates are typically lower than rates on long-term bonds. The County typically procures equipment using temporary funding sources, and then
draws funds from the master lease financing institution to reimburse the temporary sources.
Infrastructure Availability (formerly hook-up) fees are another source of capital funding. These fees are assessed to developers and builders to join the
water and sewer systems, based on the cost of capacity (volume) of the systems being “used up” by the customer. These funds are programmed during
the annual budget process and can be used only for utilities projects.
The Transportation Capital Fund is a source of funding authorized by the General Assembly in 2007 enabling the County to levy an additional real
estate tax on industrial and commercial properties for transportation initiatives. In April 2008, the County Board adopted a tax of $0.125 per $100 of
assessed value, yielding projected revenues of $24 million in FY 2013 for transportation projects. The commercial real estate tax is proposed, beginning in
FY 2015, to support bond financing. Proceeds of the tax are held in a separate fund.
The Crystal City – Potomac Yard – Pentagon City Tax Increment Financing Area was established in 2010 to support the infrastructure investment
needed as part of the Crystal City Sector Plan as well as the neighboring areas of Potomac Yard and Pentagon City. Tax increment financing (TIF) is a
mechanism used to support development and redevelopment by capturing the projected increase in property tax revenues in the a rea and investing those
related infrastructure improvements. Unlike a special district, it is not an additional or new tax; rather, it redirects and segregates the increased property tax
revenues that would normally flow to the General Fund. The amount of tax inc rement revenue is determined by setting a baseline assessed value of all
property in the area on January 1, 2011 and in each subsequent year, tracking the incremental increase in assessed values rel ative to the base year, and
segregating the incremental revenues in a separate fund. The County Board approved allocating 33 percent of the incremental revenues to the Crystal City
– Potomac Yard – Pentagon City area.
The Stormwater Management Fund relies on a source of funding adopted by the County Board in Ap ril 2008 to fund operating and capital costs to
upgrade and expand the County’s stormwater drainage and sewer infrastructure. The Board adopted a County -wide sanitary district tax of $0.01 per $100
of assessed value. This rate was raised to $0.013 in Apr il 2010 and provides extra funds for capital projects. The sanitary district tax could ultimately be
used to support bond financing. Proceeds of this tax are held in a separate fund.
5
Developer contributions are also an important source of funding. Th ese are contributions paid by developers to finance specific projects. Examples of
these projects are utility undergrounding and street lighting.
Finally, there are grants and reimbursements or other revenue from the state and federal governments. The se are funds provided by the
Commonwealth of Virginia or the federal government for reimbursement of costs for certain capital improvements. Whenever pos sible, state or federal
reimbursement is sought to offset County tax support and is included in the pl anning process. (See the Transportation & Pedestrian Initiatives section of
the CIP for some current examples.)
F. Definition of Terms Used in Capital Planning
Arbitrage: Arbitrage is the gain a tax -exempt issuer may be able to obtain by borrowing at a ta x-exempt rate and investing at a taxable rate. The Tax
Reform Act of 1986 and subsequent amendments relating to the issuance of tax -exempt debt and arbitrage regulations had a dramatic affect on all issuers
of tax-exempt debt.
Arbitrage Rebate: Refers to the requirement to rebate to the Federal government investment earnings derived with the proceeds of tax -exempt debt that
are in excess of the earnings that would have been earned had the proceeds of the debt been invested at the same interest rate as that paid to the holders of
the tax-exempt debt.
Architecture and Engineering (A&E): Professional services performed to facilitate planning, development, designs, cost estimates and construction of
buildings, parks, streets, utilities, and other capital infrastructure.
Bond Funding: Funding derived from the public sale of bonds for which interest is paid to buyers for the use of the money.
CIP programs and projects funded by bond financing are approved by the County Board for inclusion on a bond referendum.
Voters approve each bond referendum. In Arlington, a bond referendum is placed on the ballot for voter approval every other November,
concurrent with Congressional/Presidential elections.
Funds cannot be spent until after the referendum is approved by the voters, the Board approves the authorization and the County has
developed cash flow plans.
Spending rules are established based on referendum language and IRS regulations.
Bond Issuance Costs: Costs associated with the sale of bonds. Expenditu res include fees to bond rating agencies, administrative expenses, legal fees,
etc.
Capital Planning Process: The process of identifying, planning, evaluating and scoping projects, establishing performance standards, conducting public
discussion, estimati ng costs and financial planning for capital projects. These processes should be completed for current year funding requests and
underway for projects proposed in subsequent years.
Full Time Equivalent (FTE) : The measure of authorized personnel. It is calculated by equating 2,080 hours of work per year (2,912 for uniformed
firefighters) with the full-time equivalent of one position (referred to in the budget as an FTE).
6
Inflation Factor: An increased cost applied to out year projects in the CIP to acc ount for increases in costs over time; in the CIP, inflation is assumed at
3% annually.
Out Years: All years after the current funding year. For example, in the FY 2013 – FY 2022 CIP, all years after FY 2013 are considered out years.
Overhead: The capital project should bear the cost of staff time spent directly on the implementation of the projects funded. In certain cases, the project
can also bear the cost of program planning or preliminary business processes used in advance of funding or bringing the project to completion of scope.
Rules: This applies to limitations on the use of funds as a result of special revenue requirements. Inter -jurisdictional agreements for sewer construction
reimbursement can only be applied to non -expansion costs of spe cific projects. Grants can only be spent under the terms and conditions provided with
the grant. Bonds can only be used consistent with the language of the referendum and for items consistent with bond counsel determination, etc. Rules
are not intended to imply administrative procedures, but rather legal requirements.
Total Project Cost: The CIP reflects the full cost of each project. The total cost includes such items as design, construction, right -of-way, construction
management, utility relocations , hardware and software purchases, equipment needed to make the improvement useful, and appropriate overhead and
operating costs.
7
GUIDE TO READING THE FY 2013 – FY 2022
CAPITAL IMPROVEMENT PLAN
The adopted FY 2013 – FY 2022 Capital Improvement Plan (CIP) provides comprehensive information on the near and longer-term facility and
infrastructure capital improvements planned in the County over the next ten years.
The book is organized by the following sections: an introductory section, overview, capital funding, and the program areas under which the projects reside.
Each one of these sections represents a key component of the overall picture of the adopted FY 2013-2022 CIP:
The introductory section includes various information on the CIP process, policies and governance that help provide context and framework
under which the CIP is formulated.
The Overview sets the tone for the adopted CIP with the Chairman’s CIP message and provides status of existing projects, including summaries of
authorized unissued bonds and projects that are underway. This section also describes the impact of the adopted FY 2013-2022 CIP on the
operating budget.
The Capital Funding section includes various financial summaries of the CIP by program and funding source. It also includes analysis of the
County’s debt capacity as impacted by the adopted CIP.
The remaining three sections are dedicated to describing specific programs and projects included under the general government section, metro and
transportation section, and the utilities and stormwater section. These sections detail the projects by major programs.
The first part of each of the programs provides a summary overview of costs and funding sources. Also included is specific information on the
impact bond/debt financing will have on annual debt service payments where applicable.
The following pages provide a detailed description of each project, associated master plan impact, project justification, cost schedules, funding
schedules, changes from the last CIP, and operating impacts, if any.
Like previous CIPs, the adopted FY 2013-2022 CIP is largely funded by debt, PAYG, and Master Lease Funding. In addition, the Transportation Capital
Fund, the Crystal City, Potomac Yard and Pentagon City tax increment financing area and the Stormwater Management Fund are integrated in the
comprehensive funding strategy for the CIP.
Please note that cost estimates are subject to market pressures and may not accurately reflect the actual costs incurred at project implementation.
As part of the County’s effort to make these processes more accessible to citizens and responsive to the needs of the community, the method by which the
ten-year CIP is developed, considered, and adopted is continually being improved. Suggestions for changes or comments regarding the CIP are welcome
and encouraged and should be directed to CIP@arlingtonva.us .
8
CIP CALENDAR
NOVEMBER 2011
FY 2013 – FY 2022 Capital Improvement Plan (CIP) staff kick-off
FEBRUARY 2012
County Manager presents FY 2013 PAYG Budget to the County Board
MARCH
Staff submits FY 2013 – FY 2022 CIP recommendations to the County Manager’s Office
County Board holds a public hearing on the County Manager’s proposed FY 2013 budget, including the PAYG budget
MARCH/APRIL
County Board holds budget work sessions on PAYG and the operating budget with County departments and the Fiscal Affairs Advisory Commission
County Manager’s Community Forum on the Operating Budget
APRIL
County Board adopts FY 2013 Budget, PAYG Capital and Appropriations Resolutions for the County government and the public schools
On-line “Open Forum” opened to the public for on-line comments on the CIP
MAY
Superintendent submits FY 2013 – FY 2022 Proposed CIP to the School Board on May 10
County Manager submits FY 2013 – FY 2022 Proposed CIP to the County Board at its May meeting
Joint worksession of the County Board and School Board – May 21
Various boards and commissions review the FY 2013 – FY 2022 Proposed CIP
JUNE
School Board adopts the School’s FY 2013 – FY 2022 CIP
County Board worksessions on CIP – June 20 & June 28
JULY
County Board adopts the FY 2013 – FY 2022 CIP and approves the general obligation bond referenda resolutions and the language to be inserted on
the ballot for the fall General Election
9
Arlington, Virginia
Chairman’s CIP Message
To the Citizens of Arlington County:
I am pleased to present the County Board’s Adopted FY 2013-2022 Capital Improvement Plan.
This plan strikes a balance between maintaining aging infrastructure and making strategic investments that will help us grow and prosper as a County.
This CIP extends our planning period from six to ten years, allowing the County to reap the benefits of engaging in long -term planning and financial
forecasting for major multi-year transportation and utilities projects. The ten year model also helps us make better linkages between other County maste r
plans and the associated capital investment needed.
Highlights of the Adopted CIP include:
Increased funding for maintenance capital – paving, facilities, parks, technology and transportation infrastructure - reflecting the Board’s
commitment to maintain what we have. Reflecting the results of the Customer Satisfaction Survey, the adopted CIP includes increased
funding for street repaving.
Design and construction funding for the Long Bridge Aquatics and Fitness Facility in FY 2013. Completion of this one -of-a-kind
recreational, fitness, and competition facility will provide long-term value to our community and attract people regionally . The Board also
asked the Manager to accelerate playground improvements at Long Bridge if one-time funding becomes available.
Strategic investments in the Columbia Pike and Route 1 streetcars that will serve generations of Arlingtonians to come.
Additional focus on parks and open space land acquisition, including direction for additional one-time funding where possible, to meet
the needs of a growing population.
Additional funding for upgrades and replacements to the water system , based on preliminary results of the water master planning
process that is currently underway and will be completed in 2013. The stormwater master plan, which is scheduled to be completed in
early 2013, will also inform future CIPs.
Out-year funding to reinvest in core support facilities like our older fire stations that were built at a time of much smaller population
and less density.
Funding for the final phases of ConnectArlington and Intelligent Transportation System—the technology backbone that supports our
daily business, public safety, and transportation network.
A - 1
Funding for Metro and other major transportation infrastructure, providing support for residents and visitors to work, play and live in
our community.
Funding of the School Board’s Adopted CIP to address its space and capacity challenges, which includes the design and construction of
new elementary schools and school facility additions. We look forward to continuing our work with Schools as they finalize their facility
plans, working to ensure that the needs of the community are met in this once in a generation investment.
While we embark on execution of key initia tives in this adopted CIP it is equally important that we continue to execute what was authorize d in previous
CIPs. That’s why I am proud to share the progress we have made on some key projects since the last CIP was adopted two years ago . We completed and
opened Fire Station 3 and three fields of Long Bridge Park – Phase 1. We are in the midst of construction of the new Arlington Mill Community Center,
the Potomac Interceptor, and the Rosslyn Metro Station access improvements. We are well underway wit h the acquisition and planning process for a new
year-round homeless shelter and associated County office space. We have made great progress on maintenance capital investments. We have much to be
proud of.
The fact that we are able to afford these nec essary capital projects while maintaining our AAA bond rating is something we should not take for granted.
In order to accomplish this, the Adopted CIP stays within the Board’s financial and debt management policies, which benefit a ll County tax -payers
through lower interest rates on our debt.
The Board appreciates the input received from the commissions, advisory groups and other members of the public in developing this CIP and the work of
staff.
Sincerely,
Mary Hughes Hynes
Chair, Arlington County Board
A - 2
Supplementary Guidance to the County Manager regarding the 2012-2022 CIP
July 21, 2012
Land Acquisition
Parks land acquisition & open space is a significant priority of the County Board.
Through a combination of $14.4M in bond funding included in the FY2013-2022 CIP and
future additional one-time funding that may become available the Manager is directed
to present to the Board opportunities to increase total funding for parks land acquisition
over the ten year period of the CIP.
Playground at Long Bridge Park
Initiate the planning and installation of the playground-type components at the S. 6th
street locations identified in the Master Plan as soon as is possible using non-bond funds
Reevesland
Conduct the RFP process as planned. Bring recommendations regarding the building to
the County Board following the completion of that process
Missing Links
The County Board is interested in restoring a sidewalk infill program to address County
identified needs that would complement the neighborhood-driven process embedded in
the Neighborhood Conservation Program. Provide a report to the County Board in the
context of the development of the FY14 budget.
Paving
Conduct the paving program as planned for the next two years. As part of the FY14 CIP
provide an update and recommendations on whether to raise the paving condition
target.
Streetcar Implementation
Consistent with the 2010 direction given in conjunction with adoption of the Crystal City
Sector Plan, and recognizing the need to expedite the implementation of the Streetcar
projects and minimize costs, the County Board and the County Manager have
investigated a range of alternative project delivery (APD) methods for major transit
infrastructure projects. The County Board is interested in all steps that can be taken to
expeditiously advance the design and construction of approved streetcar projects with a
particular focus on the role of public-private partnerships.
A - 3
It is the County Board's understanding that the County Manager will be undertaking a
series of actions between now and the end of the calendar year to advance streetcar
implementation as to meet critical infrastructure needs. These steps are listed below
and are fully supported by the Board:
A) Establish a schedule of regular information to the County Board members or briefings
on program implementation (starting Fall 2012)
B) Create an inter-departmental streetcar program implementation team to address
property and right-of-way acquisitions, utility assessments and relocations, contracting
and staffing (Fall 2012)
C) Secure consultant services to advise the County on the procurement processes and
legislative actions necessary to fully support the range of alternative project delivery
methods that are available for use in the Commonwealth of Virginia (Fall 2012)
D) Prepare amendments for Arlington’s procurement regulations, in accordance with
the Virginia statutes, to enable the County to utilize the full range of alternative project
delivery methods and partnerships for advertisement in October 2012
E) Bring a RFI or RFQ or RFP (Request for Information, or Qualifications, or Proposal)
related to APD firms for Board consideration as soon as possible after engaging
consultant services
Arlington Public Schools
The County Board has incorporated the School Board’s full funding request. The
Manager is directed to work closely with APS to expeditiously and thoroughly address
important land use questions in the context of each project review led by the Public
Facilities Review Committee (PFRC).
A - 4
County Manager:
#####
County Attorney: *****
Staff: Michelle Cowan, DMF
Greg Emanuel, DES
Loan Hoang, DMF
ARLINGTON COUNTY, VIRGINIA
County Board Agenda Item
Meeting of July 21, 2012
DATE: July 5, 2012
SUBJECT: Fiscal Year (FY) 2013 - 2022 Capital Improvement Program (CIP) Adoption
C. M. RECOMMENDATION: Adopt the Fiscal Year 2013 – 2022 Capital Improvement Plan
presented in Attachments A-1 and A-2.
ISSUES: How much capital investment can the County afford during the next ten year planning
period and how should that capacity be allocated among community priorities?
SUMMARY: The recommendation sets the parameters for the County’s bond referenda for
2012 and establishes a preliminary plan for capital investment through Fiscal Year 2022.
The CIP reflected in Attachments A-1 and A-2 amends the County Manager’s Recommended
CIP and reflects the following:
1. Accelerate the Long Bridge Park project identified as Phase IIIA, which includes play
elements and entry features, from 2016 to FY 2013 with funding to be recommended by
the County Manager.
2. Reallocate the $1.441 million identified in 2016 for the Long Bridge Park Phase IIIA to
the parks land acquisition and open space program.
BACKGROUND: The Capital Improvement Plan is one of the most significant planning
processes for Arlington County and Arlington Public Schools. This plan identifies the
immediate as well as longer-term capital needs of the community. In contrast to past plans
which covered a six year period, the current CIP covers a ten year period from FY 2013 – FY
2022. As an historical reference, Attachment B portrays a list of capital projects completed
during the last ten years. This demonstrates the significant progress made in reinvestment in the
County’s infrastructure and facilities as a result of many CIP planning and funding cycles. As
with past CIPs, this CIP is primarily a planning document, and includes both County government
45.
A - 5
Subject: FY 2013 – 2022 CIP Adoption 2
and Schools project plans. As such, the CIP is subject to amendment and updating as the needs
of the community change and become better known, and the proposed projects move closer to
funding and final approval. Staff monitors changes in the community to be able to take
advantage of opportunities that arise in scheduling and funding capital improvements in
conjunction with private sector development and redevelopment. As priorities change and
opportunities arise, staff reassesses the County's capital improvement program and proposes
changes that will affect the timing and funding of projects. The CIP represents staff’s best
evaluation, at this time, of overall capital needs at a level affordable to taxpayers. The County
government portion of the CIP is prepared on an interdepartmental basis with staff expertise
from each program area utilized to help prepare each segment of the proposed CIP.
DISCUSSION: The County Manager’s Proposed FY 2013 – FY 2022 CIP was presented to the
County Board in May 2012. Since the release of the proposed CIP, there have been four work
sessions, County Board guidance and extensive community input. As a result of the CIP public
process, the County Manager’s CIP is amended as follows:
1. Accelerate the Long Bridge Park project identified as Phase IIIA, which includes play
elements and entry features, from 2016 to FY 2013 with funding to be recommended by
the County Manager.
2. Reallocate the $1.441 million identified in 2016 for the Long Bridge Park Phase IIIA to
the parks land acquisition and open space program. Through a combination of this level
of bond funding and future additional one-time funding that may become available, the
target is to increase total funding for parks land acquisition over the 10 year period of the
CIP.
The Arlington Public Schools adopted FY 2013 – FY 2022 CIP totals $537.7 million and will be
reflected in the summary tables as part of the County’s adopted FY 2013 – FY 2022 CIP. The
$537.7 million includes funding for three elementary school additions and two new elementary
schools among other projects. The adopted CIP document historically has included the Schools’
adopted CIP for reference purposes.
Additional changes to the Proposed CIP are of an administrative nature, such as updating
financial tables and charts, correcting mathematical typos and do not affect the overall CIP total.
The following table summarizes total costs under the Recommended CIP, with the changes as
discussed above:
FY 2013 – FY 2022 CIP Totals
(in $000)
Program
County Manager’s Proposed CIP
Revised CIP
County $ 2,104,499 $ 2,104,499
Schools $ TBD $ 537,713
Utilities $ 301,577 $ 301,577
Stormwater $ 43,289 $ 43,289
TOTAL $ 2,449,365 $ 2,987,078
A - 6
Subject: FY 2013 – 2022 CIP Adoption 3
The table below presents the proposed amounts to be included on the general obligation bond
referenda this November. This table excludes amounts to be financed through other financing
vehicles, including Industrial Development Authority financing for Government office and
comprehensive homeless services office building at 2020 North 14th Street (approximately $26.4
million) and temporary financing for Long Bridge Aquatics to be reimbursed by developer
contribution (approximately $20.0 million).
FY 2013 Bond Total
(CY 2012 Bond Referendum)
(in $000)
Revised Recommendation
Comments
County $ 110,805
Metro, Paving and other Transportation projects, Long Bridge
Aquatics, Parks and Facilities maintenance capital, parks land
acquisition, Tyrol Hills design, Salt Facility design,
Neighborhood Conservation, ConnectArlington and Intelligent
Transportation System
Schools
$ 42,620
Design-Construction of new elementary schools, School facility
additions and various School facility projects
TOTAL
$ 153,425
During the CIP development and consideration process, a significant amount of community input
was sought. A CIP Public Forum was held on April 12, 2012 and OpenArlington, a forum for
civic engagement was held online to elicit citizens’ priorities for the CIP. Since the proposed
CIP was released in May, staff has met with 12 Commissions and Committees and provided
information at five work sessions. Additionally, a CIP Public Hearing was held on June 26,
2012. The Adopted CIP will be published in hard copy and will also be available on the County
website.
FISCAL IMPACT: The impact of this CIP combined with past and current obligations can be
found in Attachment C. It presents total estimated debt payments on an annual basis as well as
the percentage increase in debt on a year-to-year basis. The plan is based on an average revenue
growth of 3% in FY 2014 - FY 2016 and 4% in FY 2017 – FY 2022. The CIP also complies with
the County Board’s debt policies found in Attachment C, resulting in projected debt levels that
reinforce the County’s triple-A bond ratings.
Summary of Attachments:
Attachment A-1: Revised CIP Debt Summary
Attachment A-2: Revised CIP Program Summary
Attachment B: Ten Year Progress of Capital Projects
Attachment C: Debt Management Policies and Ratios
A - 7
Total
LOCAL PARKS & RECREATION
Long Bridge (Aquatics, Fitness Center and Design of Final Outdoor
Phase)* 47,855 46,414
Parks Maintenance Capital 52,433
Land Acquisition & Open Space** 13,000 14,441
Tyrol Hill Park 1,776
Four Mile Run Near-Stream Improvements 15,408
Jennie Dean Park 25,560
Synthetic Turf Fields 2,185
Crystal City Parks and Open Space 6,945
Four Urban Parks in Ballston-Virginia Square 6,715
Mosaic Park 3,622
Glebe and Randolph Park 3,466
Ballston Pond 988
Sub-total 179,953
TRANSPORTATION
Paving 74,516
Long Bridge Interchange 8,335
ART (Heavy Maintenance Facility) 3,183
WALKArlington, BikeArlington & Neighborhood Traffic Calming 7,383
Route 1 Streetcar 20,000
Bridge Renovation 9,034
Match for State & Federal Projects and other 3,626
Sub-total 126,077
METRO
Metro 124,250
COMMUNITY CONSERVATION
Neighborhood Conservation 57,000
Penrose Square 2,644
Nauck Town Square & Infrastructure 4,852
Sub-total 64,496
597 633
289 2,983 316
0 0 0
FY 13-22
Arlington, Virginia
Revised FY 2013 - FY 2022 CIP Debt Summary
(000s)
GO & Other BOND Funding
Proposed Proposed Proposed
2012 Referenda 2020 Referenda2018 Referenda2014 Referenda 2016 Referenda
Proposed Proposed
11,000 12,986 17,510 12,000
0 298 2,346 0
0 1,688 3,164 0
11,000 11,000 12,000 12,000
39,000 22,900 22,750 25,000
11,941
6,5675,835 6,190
2,185 0
0 20,000 0
3,183 0 0
0 0 299
0
2,228 1,238 5,015 253
27,794 38,758 22,926 19,253
1,166 1,200
0
13,999 14,851 15,756 16,715
0
0 1441 0* 0 3,914
25,524 29,459 24,621 49,796
1,126
0
6,968
0 0
988
0 0 328 3,294
219 2,122
563 2,985 3,167
3,357
12,405 13,160 10,000 10,000
3,000 3,000 4,441 3,000 3,000
1,591 0 0 0
3,167
0
5,835 0
1,383 1,469 1,558 1,652
42,500
50,553
13,195
0
2,500
0
0
0
0
0
6,868
1,000
185
0
0
0
1,321
0
300
17,346
14,600
30
0
0
11,000
11,000
A - 8
Total
FY 13-22
Arlington, Virginia
Revised FY 2013 - FY 2022 CIP Debt Summary
(000s)
GO & Other BOND Funding
Proposed Proposed Proposed
2012 Referenda 2020 Referenda2018 Referenda2014 Referenda 2016 Referenda
Proposed Proposed
PUBLIC / GOVERNMENT FACILITIES
Facilities Maintenance Capital 30,625
North Side Salt Facility 2,391
Lubber Run Community Center 27,124
Non Parks Land Acquisition 11,000
Alternate Emergency Communication Center 3,500
Fire Stations 27,230
Courthouse Square 40,470
Trade Center Parking Deck & Storage Building 20,593
Courts/Police Building Interior Renovation 11,627
Court Square West Building Removal 1,770
Police and Sheriff Pistol Firing Range 2,500
Columbia Pike Library Replacement 1,284
Sub-total 180,114
INFORMATION TECHNOLOGY / PUBLIC SAFETY
ConnectArlington and Intelligent Transportation System 17,500
SUBTOTAL GO Bond Referenda 692,390
2020 Building Acquisition and Conversion 30,150
Long Bridge - Developer Contribution 20,000
SUBTOTAL Other Bond Funding 50,150
Total BOND FUNDING* 742,540
* Excludes Revenue Bonds for Transportation Investment Fund
Adopted Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Total
Fire Defibrillators & Breathing Apparatus - - - - - 2,312 2,929 - - - 5,241
Enterprise IT Refreshment 3,325 5,488 3,719 3,065 2,000 4,536 5,218 4,532 5,238 4,431 41,552
Public Safety IT Refreshment 4,524 4,218 4,565 2,645 2,949 1,306 611 5,055 1,733 8,635 36,241
Auto Fund - Fire Vehicle Apparatus 2,862 2,460 - - - 2,679 - 1,754 1,409 2,817 13,981
Total Master Lease Funding 10,711 12,166 8,284 5,710 4,949 10,833 8,758 11,341 8,380 15,883 97,015
Total Debt Funding
(excludes Schools)
839,555
* Funding for the Long Bridge play elements, originally planned for the 2016 referenda, could be funded with one-time funds from FY 2012 close-out.
** Parks land acquisition & open space is a significant priority of the County Board. Through a combination of this level of bond funding and future additional one-time funding that may become available, the target is to increase
total funding for parks land acquisition over the 10 year period of the CIP.
0 0
154,588 159,150
0
0 0 0
3,725 0 0 0
0 0
FY 13-22FY 2020 FY 2021
13,475
110,805
46,425
26,425
FY 2022
8,610 17,220
123,707 144,140
0
66,781 53,101
1,284
16,364 40,037
2,000 3,000 3,000 3,000
0 0 15,873 24,597
0 1,400
3,000 0 0 500
7,000 6,000 7,000 7,000
2,185 0 0 0
0 1,414 25,710 0
154,588
3,625
206
0
0
0
0
0 1,770 0 0
0 2,500 0 0
0
Master Lease Funding FY 2013 FY 2014 FY 2019
4,025
0
3,831
0
0
0
5,039 6,588
4,679 15,914 0
0 0 0
3,725
174,687 178,851
FY 2015 FY 2016 FY 2017 FY 2018
180,107 141,426 159,922
0
127,432 144,140 154,588 157,230
20,000
0
0
0
0
A - 9
10 Year
Program Category FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 Total
Local Parks & Recreation 60,299 28,260 21,081 11,220 23,992 14,554 23,243 10,892 33,841 30,155 257,537
Transportation Initiatives 1 189,594 63,417 67,945 79,912 37,499 26,268 42,857 39,135 32,679 56,981 636,287
Crystal City (Route 1) Streetcar 2 2,000 5,990 19,080 37,265 37,265 30,975 13,230 - - - 145,805
Columbia Pike Streetcar 8 9,546 25,769 55,057 56,853 51,774 - - - - - 198,999
Metro 20,900 18,600 26,600 20,400 16,400 14,500 15,000 15,750 16,500 16,500 181,150
Community Conserv/Economic Develop 14,550 15,135 30,895 26,647 9,605 6,138 12,467 6,676 6,696 6,717 135,526
Public / Government Facilities 63,188 23,696 20,545 19,243 47,276 15,584 53,464 28,249 43,777 19,990 335,012
Ballston Garage 4 5,300 4,980 2,519 781 770 3,370 130 830 460 650 19,790
Information Technology & Public Safety 3 20,922 20,946 20,565 9,737 8,177 14,555 14,699 19,682 11,244 19,487 160,014
Regional Partnerships 1,135 1,192 1,262 1,332 1,405 1,313 1,340 1,367 1,395 1,424 13,165
Capital Contingent 3,214 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 21,214
Total County Capital 390,648 209,985 267,549 265,390 236,163 129,257 178,430 124,581 148,592 153,904 2,104,499
Water & Sewer Infrastructure 5
76,016 24,893 28,794 23,560 24,189 24,775 24,393 23,866 24,332 26,759 301,577
Stormwater Management 6 2,859 7,280 4,030 4,420 4,450 4,450 4,550 3,550 3,850 3,850 43,289
Total Program Cost 469,523 242,158 300,373 293,370 264,802 158,482 207,373 151,997 176,774 184,513 2,449,365
Attachment A-2
Arlington, Virginia
10 Year Capital Program Costs Summary (000s)
Revised CIP Program Summary
The FY 2013 - 2022 CIP includes typical capital projects such as maintenance capital, parks, transportation, metro, community conservation, government
facilities, information technology and regionals . In addition, this CIP continues to address projects introduced in the previous CIP such as Crystal City
and Columbia Pike streetcars, ConnectArlington (previously fiber optic communications network) and Ballston Garage. Unlike past CIPs, this is a 10 year
CIP and includes funding that has been previously approved in prior CIPs to show the full expenditure by fiscal year of each capital project.
Attachment A-2, page 1
A - 10
Arlington, Virginia
Revised CIP Program Summary
10 Year
Capital Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 Total
New Funding
Pay-As-You-Go (PAYG) 19,005 29,513 35,076 24,434 29,105 30,448 33,115 31,823 26,436 31,534 290,489
Master Lease Funding 11,032 12,425 8,636 5,710 4,949 10,833 8,758 11,341 8,380 15,883 97,947
GO Bond Referenda 52,647 58,159 76,096 57,581 88,309 44,390 99,042 55,546 95,626 63,522 690,918
State/Federal Funding 9,872 21,357 39,847 41,991 41,351 21,403 19,704 11,144 8,905 15,773 231,347
Developer Contributions and Partnerships 22,000 4,160 21,800 24,943 4,796 - 200 - - - 77,899
Ballston Garage Parking Revenues 4 2,200 3,080 2,519 781 770 3,370 130 830 460 650 14,790
Sanitary District Tax 6 2,619 3,480 3,900 4,420 4,450 4,450 4,550 3,550 3,850 3,850 39,119
Transportation Capital Fund 1, 8 21,981 20,287 23,406 20,092 22,732 11,871 10,835 11,697 6,635 10,024 159,560
Tax Increment Financing 2, 8 4,747 5,850 2,500 7,931 4,170 7,759 4,470 2,200 2,150 4,550 46,327
Transportation Revenue Bonds - 21,000 49,430 76,500 38,500 - - - - - 185,430
Utility Fund Transfer & Other Sources 5 18,069 22,833 22,182 23,560 24,189 24,775 24,393 23,866 24,332 26,759 234,958
Subtotal New Funding 164,172 202,144 285,392 287,943 263,321 159,299 205,197 151,997 176,774 172,545 2,068,784
Previously Approved Funding
Authorized but Unissued Bonds 72,320 8,542 9,212 3,875 - - - - - - 93,949
Issued but Unspent Bonds 38,365 1,109 150 - - - - - - - 39,624
Other Previously Approved Funds 7 194,666 30,363 5,619 1,552 1,481 1,159 200 - - 11,968 247,008
Subtotal Previously Approved Funding 305,351 40,014 14,981 5,427 1,481 1,159 200 - - 11,968 380,581
Total Funding 469,523 242,158 300,373 293,370 264,802 160,458 205,397 151,997 176,774 184,513 2,449,365
(2) Crystal City Public Infrastructure is funded from tax increment financing on properties in the Crystal City, Potomac Yard, and Pentagon City areas of the County. The tax increment is
currently set at 33 percent.
(1) Transportation Capital Fund is supported by a commercial real estate tax of $0.125 per $100 of assessed value, yielding projected revenues for transportation projects. Beginning in 2014, the
plan assumes revenue bonds, supported by the tax, will be issued. The Transportation Investment Fund is supplemented by County PAYG as well as state and federal revenues.
10 Year Capital Program Funding Sources Summary (000s)
(8) The Columbia Pike streetcar is funded by the Transportation Capital Fund, revenue bonds, and state and federal funding. The Route 1 Corridor streetcar is funded by the Crystal
City/Potomac Yard/Pentagon City Tax Increment Financing area fund, GO bonds, revenue bonds, and state funding.
(7) Other previously approved funds: Any funds other than GO Bonds that were approved as part of prior CIPs that are to be spent during this FY13-FY22 CIP.
(6) Stormwater Management Fund is funded from the Sanitary District Tax, Watershed Management Fund, State Grants and project cost sharing with US Army Corps of Engineers. The
sanitary district tax was increased from $0.01 to $0.013 per $100 pf assessed value by the County Board on April 24, 2010.
(3) ConnectArlington is included in the Information Technology & Public Safety category. Funding sources for this project includes federal grants, exiting IDA bond balances, as well as
Schools' local funds for their respective allocation of the project costs.
(5) Utilities fund other sources: Developer contributions and Inter Jurisdictional payments, interest revenue and existing bonds and fund balances.
(4) Ballston Garage funding includes parking revenues, interest revenue and reserves.
The table below presents the Pay-As-You-Go appropriations and Bond referenda approved by the voters each year since FY 1998. Carryover appropriation from previous years are not included. Appropriation rather than actual expenditures are presented because The Proposed FY 2005 - 2010 funding strategy includes 28.4 percent funding for PATG appropriations, which includes state grants and other sources of revenue and General Obligation Bonds will fund 71.6 percent of the CIP. The table below presents the Pay-As-You-Go appropriations and Bond referenda approved by the voters each year since FY 1998. Carryover appropriation from previous years are not included. Appropriation rather than actual expenditures are presented because The Proposed FY 2005 - 2010 funding strategy includes 28.4 percent funding for PATG appropriations, which includes state grants and other sources of revenue and General Obligation Bonds will fund 71.6 percent of the CIP.
Attachment A-2, page 2
A - 11
County Projects
36 Energy Efficiency / Fresh Aire Projects completed, $11.0 M
174 Neighborhood Conservation Projects completed, $42.7 M
81 Neighborhood Traffic Calming Projects completed, $8.47 M
153 Complete Streets Projects completed
1 Green Streets Project (Patrick Henry Dr) completed, FY 2012
2 Stormwater capital projects (Little Pimmit Run culvert replacement & channel rehabilitation)
completed, Ph. I – FY 2008 & Ph. II – FY 2011
26 Justice Center Facility Maintenance Capital projects completed
21 Fire Alarm/ Security System Upgrades/ Replacements completed
23 HVAC Repairs/ Replacements completed
11 Roof Repairs/ Replacements completed
40 Acres of new park land for a total of 937 acres
4 New Parks created
13 Synthetic fields created or replaced
17 Playgrounds created or replaced
18 Athletic fields replaced
6 Athletic field lighting replaced
8 Athletic court locations replaced
3 Picnic shelters renovated/replaced
86 Park Enhancement Projects completed
ARLINGTON COUNTY – HISTORY OF PROGRESS
MAJOR CAPITAL PROJECTS FROM 2002 TO 2012
School Projects
Elementary Schools — 1 new school, 16 expanded/renovated/reconstructed (out of total 22)
Middle Schools — 6 expanded/renovated/reconstructed (out of total 6)
High Schools — 3 expanded/renovated/reconstructed (out of total 4)
— Wakefield HS under construction; anticipated completion summer 2013
Other School Sites — 2 renovated/reconstructed (out of total 6)
Attachment B
A - 12
New/Replaced
Langston Brown Community Center -
2003
Walter Reed Community Center –
2005
Renovated
Aurora Hills Community Center
Community Center
Fairlington Community Center – 2007
Maury Arts Center – 2005
Lubber Run Amphitheater - 2011
New / Replaced
Westover Library - 2009
Shirlington Library - 2007
Kettler Ice Plex - 2007
Parks Operations Building and
Trades Center Facilities – 2006
Inspection Services/ Zoning Service
Center – 2009
Human Services Operating Center at
Sequoia Plaza – 2010
Artisphere Cultural Center - 2010
Renovated
Courthouse Plaza & power upgrade -
2009
Fenwick Center - 2006
George Mason Center - 2006
Woodmont Community Center Site -
2009
New / Replaced
Emergency Communications Center
(ECC) –2008
Detention Facility security system - 2011
Mobile Data Computers - , 2003/2004,
2009/2010, 2012/2013
Fire pumpers (2002, 2005, 2006, 2007,
and 2011) and rescue vehicles ( 2006
and 2007)
Firefighter Breathing Apparatus – 2009
Fire Station # 5 – 2008
Fire Station # 3 - 2011
Portable (hand-held) Radios (in progress)
Mobile (vehicle-installed) Radios 2011
ECC/ Alternative ECC (NICE) Recorders
–2011
Computer-Aided-Dispatch (CAD)
Equipment-2012
Public Safety Network (in progress)
Detention Center Washer-Dryer
Replacements – 2010
Fire Training Academy Additions - 2012
Fire Station #4 HVAC Replacement -
2012
Renovated
Alternate ECC –2008
Justice Center Garage (Doors) –2008
Parks & Recreation Facilities
County Libraries/
Government Facilities Utilities Public Safety
New / Replaced
Chain Bridge Water Mains - 2006
Gravity 3 Water Main - 2010
Commercial Automated Meters -
2009
Four Mile Run Relief Sewer - 2008
Potomac Interceptor Phase I -
onging
Fairlington Sanitary Sewer - 2011
Minor Hill Special pump station and
pressure zone - 2009
Riverwood sanitary sewer force main
- 2012
Water Main replacement program -
2011 and 2012
Developer related water and sewer
improvements - 2011 and 2012
Renovated
Lee Ground Storage Tank Rehab -
2005
Lee Water Pump Station
Improvements – 2011
7 Miles/year Sanitary Sewer Rehab
Four Mile Run Gravity Line from the
Water Pollution Control Plant to
South Lang Street-2011
Four Mile Run Gravity Line from
Columbia Pike to Long Branch -
2011
Annual cleaning and cement lining of
pre 1960 water mains - 2010 and
2011
Lee Pump Station - 2011
New / Refreshed
Assessment and Collection System (ACE)
Human Services Financial System
Financial System
Network / Telephone System
PC Refreshment
Servers, , Video Conferencing
Primary Network Operating Center HVAC
Upgrades – 2009
2nd Network Operating Center – 2010
Board Reporting Agenda Support System
(BRASS)
Human Resources Performance Appraisal
Automation
Courthouse Audio Visual Technology
Modernization
DPR Online Camp Forms
Jury Summons System
Technology
A - 13
WPCB MP01 Upgrade and Expansion Project -
Demolition – 2007
New - Major Construction efforts began 9/2006
North Odor Control – 2008
Equalization Tanks (2) 11.7 mg – 2009
Aeration Tanks 5&6 – 2009
Clarifiers 7&8 – 2009
Blowers 3, 4, and 5 – 2009
Electrical System – 2009
Chemical Systems – 2009
Denitrification System – 2009
Clarifier #9 - 2010
Blower 1&2 - 2010
Foam Collection System – 2010
Process Control System – 2010
Renovated
Primary and Secondary Clarifiers – 2010
Aeration Tanks 1, 2, 3, &4 – 2010
Minor Construction efforts
Wastewater Lift Stations upgrade – 2012
New Standby Generator Facility – 2012
Maintenance Building Modifications – 2012
60” line replacement - 2012
Water Pollution Control Plant
Rosslyn Metro Station elevators under construction
5 Metrorail station canopies designed and installed
Pedestrian walkway canopy designed and installed
Shirlington Station bus transfer facility designed and constructed
Pentagon Metrorail Station bus transfer facility completely
reconstructed with 24 bus bays, elevators, escalators, fabric roofs,
roadways, and security enhancements
3 new Ballston-MU Metrorail Station elevators designed and
constructed
31 new ART ( Transit) buses acquired and put into service, with
another 12 on order for delivery in early FY2011
51 new ART bus shelters
47 SmarTrip fareboxes purchased and installed on ART buses, in
addition to vault, computer, and software
ART House bus storage and operations facility land acquired
24 Columbia Pike Super Stops completed planning and preliminary
design, first two prototypes under construction in 2012
55 Pike Ride bus stops improved
Modified Court House Metrorail Station vents
Real-time Bus Finders information system developed
and installed for ART system
Installed Signal Priority System for all MetroBuses
along the Columbia Pike corridor
4 Rosslyn Station bus bays and 4 bus bays improved
with real-time information displays, shelters, benches,
and supervisor kiosks
50 Capital Bikeshare Stations Installed
Projects in Design
32 ART bus stops
Potomac Yard Bus Transitway
Columbia Pike Transit Improvements
Metrorail Station pedestrian access tunnel
Bike Share stations
Transit Projects
A - 14
Attachment C
Debt Management Policies and Ratios
Revised CIP FY 2013 – FY 2022
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Debt Service to General Expenditures 10% Limit
Debt Per Capita to Per Capita Income 6% Limit
Outstanding Debt to Tax Base 4% Limit
Ceiling
Ceiling
Ceiling
Debt Service to General
Expenditures
Debt to Tax Base
Debt Per Capita/
Per Capita Income
Peaks at 9.6% in FY 2018
A - 15
Arlington, Virginia
Financial & Debt Management Policies
The County Board adopted expanded financial and debt management policies in April 2008. Each policy is restated below, including a
discussion of how the County has complied with the policies since their adoption. Beginning with the FY 2013 – FY 2022 CIP, the
forecasts will move from a six-year to a ten-year format.
Budgeting, Planning & Reserves
Balanced Budget: Arlington County will adopt an annual General Fund budget in which the budgeted revenues and expenditures are
equal (a balanced budget). Any one -time revenues will be used for one -time, non-recurring expenses such as capital, equipment, special
studies, debt reduction and reserve contributions.
Long-Term Financial Planning: The County will annually develop a six year forecast of General Fund revenues, expenditures and will
maintain a biennially updated, ten-year Capital Improvement Plan (CIP). The ten-year forecast will incorporate projected reserve levels and
impact of the CIP on the County’s debt ratios.
General Fund Operating Reserve: An Operating Reserve will be maintained at no less than three percent of the County’s General Fund
budget, with a goal of increasing the reserve or reserve -equivalent to five percent of the General Fund budget. The Operating Reserve
shall be shown as a designation of total General Fund balance. Appropriations from the Operating Reserve may only be made by a vote of
the County Board to meet a critical, unpredictable financial need. A “reserve equivalent” may consist of discretionary funds which have
been designated by the County for a non -essential purpose and which the County Board could reallocate for the same purposes as the
General Fund Operating Reserve.
Self-Insurance Reserve: The County will also maintain a self -insurance reserve equivalent to a pproximately one to two months’ claim
payments based on a five-year rolling average.
General Fund General Contingent: Each year’s budget will include a General Fund General Contingent appropriation to be used to
cover unforeseen expense items or new projects initiated after a fiscal year has begun. Funding may be allocated from this contingent only
with County Board approval.
A - 16
Retirement System Funding: The County will use an actuarially accepted method of funding its pension system to maintain a fully -
funded position. The County’s contribution to employee retirement costs will be adjusted annually as necessary to maintain f ull funding.
If the County reaches its actuarial -required contribution (defined as County and employee contributions that when ex pressed as a percent
of annual covered payroll are sufficient to accumulate assets to pay benefits when due), the County may reduce its contributi on provided
that the amount reduced from the annual actuarial requirement will only be used for one -time, non-recurring expenses in order to provide
the ability to increase contributions as may be required by future market conditions.
Other Post-Employment Benefits (OPEB) Funding: The County will use an actuarially accepted method of funding its other post -
employment benefits to maintain a fully -funded position. The County’s contribution to other post -employment benefit costs will be
adjusted annually as necessary to maintain full funding. If the County reaches its actuarial -required contribution (defined as County and
employee contributions that when expressed as a percent of annual covered payroll are sufficient to accumulate assets to pay benefits when
due), the County may reduce its contribution provided that the amount reduced from the annual actuarial requirement will only be used for
one-time, non-recurring expenses in order to provide the ability to increase contributions as may be required by future market conditions.
Capital Improvement Plan
1. The County Manager will biennially submit a ten year Capital Improvement Plan (CIP) to the County Board. The CIP will address
all known facility and infrastructure needs of the County, including the needs of the Arlington County Public Schools.
2. The CIP shall include a detailed description of each capital pr oject, identifying every source of funding, including pay -as-you-go
(PAYG), bond financing, and master lease financing. The source of funding will largely be determined based on the useful lif e of
the project. Bond-funded projects will typically have a u seful life at least as long as the period over which the bonds will be repaid
(generally twenty years). Master lease -financed projects will generally have useful lives of three to ten years and typically include
furniture, equipment, rolling stock and tec hnology purchases. PAYG funds provide greater flexibility and will be appropriated
annually from general fund revenues.
3. Each project budget shall identify the financial impact on the operating budget, if any.
4. In general, capital projects estimated t o cost $100,000 or more should be included in the CIP, including technology and equipment
purchases.
5. The County will balance the use of debt financing sources against the ability to utilize PAYG funding for capital projects. While
major capital facility projects will generally be funded through bonds, the County will attempt to maintain an appropriate balance of
PAYG vs. debt, particularly in light of the County’s debt capacity and analysis of maintenance capital needs. As part of eac h
biennial CIP process, the County will conduct a comprehensive assessment of its maintenance capital needs.
6. The CIP will include an analysis of the impact the CIP has on the County’s debt capacity, debt ratios and long-term financial plan.
A - 17
Debt Management
The County will prudently use debt instruments, including general obligation bonds, revenue bonds, industrial development authority
(IDA) revenue bonds, and master lease financing in order to provide re -investment in public infrastructure and to meet other public
purposes, including inter-generational tax equity in capital investment. The County will adhere to the following debt affordability criteria
(excluding overlapping and self-supporting debt).
1. The ratio of net tax-supported debt service to general expenditures should not exceed ten percent, within the ten-year projection.
2. The ratio of net tax-supported debt to full market value should not exceed four percent, within the ten-year projection.
3. The ratio of net tax-supported debt to income should not exceed six percent, within the ten-year projection.
4. Growth in debt service should be sustainable consistent with the projected growth of revenues. Debt service growth over the ten
year projection should not exceed the average ten year historical revenue growth.
5. The term and amortization structure of County debt will be based on an analysis of the useful life of the asset(s) being fina nced and
the variability of the supporting revenue stream. T he County will attempt to maximize the rapidity of principal repayment where
possible. In no case will debt maturity exceed the useful life of the project.
6. The County will refund debt when it is in the best financial interest of the County to do so. W hen a refunding is undertaken to
generate interest rate cost savings, the minimum aggregate present value savings will be three percent of the refunded bond
principal amount.
Variable Rate Debt
1. Unhedged variable rate debt exposure should not exceed approximately twenty percent of total outstanding debt. Cash, short-term
investments and variable rate debt for which the County has eliminated or reduced variable rate exposure through the use of
derivative products may serve as a hedge for variable rate debt and the County may increase variable rate debt over twenty percent
accordingly.
2. Debt service on variable rate bonds will be budgeted at a conservative rate.
3. Before issuing variable rate bonds, the County will determine how potential spikes in the debt service will be funded.
A - 18
4. Before issuing any variable rate bonds, the County will determine the impact of the bonds on the County’s total debt capacity under
various interest rate scenarios; evaluate the risk inherent in the County’s capital structure, giving consideration to both the County’s
assets and its liabilities; and develop a method for budgeting for debt service.
Derivatives
Interest rate swaps and options (Swaps or Derivatives) are appropriate management tools that can help the County meet important
financial objectives. Properly used, these instruments can help the County increase its financial flexibility, provide opportunities for interest
rate savings or enhanced investment yields, and help the County reduce its interest rate risk through better matching of assets and liabilities.
The County must determine if the use of any Swap is appropriate and warranted given the potential benefit, risks, and objecti ves of the
County.
1. The County may consider the use of a derivative product if it achieves one or more of the following objectives:
Provides a specific benefit not otherwise available;
Produces greater than expected interest rate savings or incremental yield over other market alternatives;
Results in an improved capital structure or better asset/liability matching
2. The County will not use derivative products that are speculative or create extraordinary leverage or risk; lack adequate liqu idity;
provide insufficient price transparency; or are used as investments.
3. The County will only do business with highly rated counterparties or counterparties whose obligations are supported by highly
rated parties.
4. Before utilizing a Swap, the County, its financial advisor and legal counsel shall re view the proposed Swap and outline any
associated considerations. Such review shall be provided to the Board and include analysis of potential savings and stress t esting of
the proposed transaction; fixed versus variable rate and swap exposure before and after the proposed transaction; maximum net
termination exposure; and legal constraints.
5. Financial transactions using Swaps or other derivative products used in lieu of a fixed rate debt issue should generate great er
projected savings than the typical structure used by the County for fixed rate debt.
6. The County will limit the total notional amount of derivatives to an amount not to exceed twenty percent of total outstanding debt.
7. All derivatives transactions will require County Board approval.
A - 19
Special Revenue / Enterprise Funds
It is the general policy of the County to avoid designation of discretionary funds in order to maintain maximum financial fle xibility. The
County may, however, create dedicated funding sources when there are compelling reason s based on state law or policy objectives, as
described below. The Utilities Fund was created as a self -sustaining, fee-based enterprise fund under state code to support and maintain
development of the County’s water and sewer infrastructure. The Transportation Capital Fund was created pursuant to state legislation for
new transportation funding. The Stormwater Management Fund is in lieu of a self-supporting, user fee-based enterprise fund.
Utilities Fund
1. The County will annually develop a six year forecast of projected water consumption, revenue, operating expenditures, reserve
requirements and capital needs for the Utilities Fund. The six year forecast will show projected water -sewer rate increases over the
planning period.
2. The County will implement water-sewer rate increases in a gradual manner, avoiding spike increases whenever possible.
3. The County will meet or exceed all requirements of any financing agreements or trust indentures.
4. The Utilities Fund will maintain a reserve equivalent to th ree months’ operations & maintenance expenses. The reserve may be
used to address emergencies and unexpected declines in revenue. If utilized, the reserve will be replenished over a two year period
to the minimum reserve level. This reserve is in addition to any financing agreement-required debt service reserve funds.
5. The Utilities Fund will maintain debt service coverage of at least 1.25 times on all debt service obligations.
6. The Utilities Fund will be self-supporting.
Transportation Capital Fund
1. New revenue shall not be used to supplant existing transportation funding commitments, e.g., Metro Matters. Existing
commitments are defined as those obligations made prior to adoption of the commercial real estate tax in April 2008.
2. Operating program enhancements (outside base program) that clearly document transportation benefits may be eligible for support
from the Transportation Capital Fund
3. No more than 3 -5 percent of annual funding should be used for project administration, indirect & overhead costs to support
capital projects.
A - 20
4. A reserve equivalent to ten to twenty percent of annual budgeted revenue will be established.
5. A five to ten year financial plan and model will be developed that integrates project cashflow forecasts, revenue projection s, and
financial / debt management policies and will factor in other non -County funding sources, including federal, state, regional, and
private funding.
6. The County will prudently balance the use of new transportation funding sources between pay -as-you-go funding and leveraging
through new bond issuance. Use of leveraging will be dependent on project size, cash flow, and timing projections.
7. If the County chooses to issue debt supported by dedicated transportation funding sources, such debt will be str uctured to be self-
supporting and will not count against the County’s general tax supported obligation debt ratios or capacity. Debt service co verage
on such debt will range from 1.10 to 1.50 times, depending on the type of debt issued. The term on such bonds will not exceed the
average useful life of the assets financed, and amortization will be structured to match the supporting revenue stream.
8. The Transportation Capital Fund will be self-supporting.
Stormwater Fund
1. The County will annually develop a six year projection of stormwater operating and capital expenses.
2. The County will prudently balance the use of new stormwater funding sources between pay -as-you-go funding and leveraging
through new bond issuance. Use of leveraging will be depende nt on project size, cashflow, and timing projections. If debt is
issued for stormwater projects, it will generally follow the debt issuance guidelines contained in this policy.
3. The Stormwater Fund will maintain a reserve equivalent to three months’ expenses to be built up over a multi-year period.
4. Stormwater financial policies will be reviewed as part of the Municipal Separate Storm Sewer System (MS4) permit renewal cycl e
(every five years).
5. The Stormwater Fund will be self-supporting.
A - 21
County Manager:
#####
County Attorney:
*****
Staff: Jason Friess, Department of Management & Finance
Michelle Cowan, Department of Management & Finance
ARLINGTON COUNTY, VIRGINIA
County Board Agenda Item
Meeting of July 21, 2012
DATE: June 26, 2012
SUBJECT: Approval of Resolutions and Questions to be included in the 2012 Bond Referenda
C. M. RECOMMENDATION:
1. Adopt the resolutions in Attachment A, as summarized below, and the explanation of
the referendum questions to appear in publications, at voter registration sites, and
polling places as detailed in Attachment B, in order to initiate and facilitate the
November 6 bond referenda.
a. Metro and Transportation $ 31,946,000
b. Local Parks and Recreation 50,553,000
c. Community Infrastructure 28,306,000
d. Arlington Public Schools 42,620,000
TOTAL $153,425,000
2. Request that the Electoral Board list the referenda on the ballot in the order detailed in
this report as shown in the Ballot Layout section on page 2.
3. Direct the County Manager to take all the steps necessary to ensure that the
information provided to voters by the County is printed in both English and Spanish.
ISSUE: Should the County Board approve the placement of capital projects, consistent with the
County and Schools’ Adopted Capital Improvement Programs (CIP), on the November 2012 ballot
for consideration by the voters for general obligation bond funding?
SUMMARY: The County Board will approve the FY 2013 - 2022 CIP on July 21, 2012 which
includes the Schools’ Adopted CIP, adopted by the School Board on June 19. The County’s
Adopted CIP includes various projects to be considered for a November 2012 County government
referenda of $110.805 million and a School referendum of $42.620 million.
46.
A - 22
- 2 -
DISCUSSION: The adopted CIP, which sets the parameters for the County’s bond referenda
requests, reflects a balance of strategic investments and maintaining our existing infrastructure.
The proposed referenda requests, which are summarized below, are consistent with the County’s
debt policies.
REFERENDA QUESTION PRIMARY PROJECTS AMOUNT
Metro and Transportation Metro Capital Improvements, Neighborhood
Traffic Calming, WalkArlington, Transportation
Match, BikeArlington, Paving
$31,946,000
Local Parks & Recreation Parks maintenance capital, Land acquisition &
Open Space, Long Bridge Aquatics, Health &
Fitness Facility & Park, design of Tyrol Hill Park
improvements
50,553,000
Community Infrastructure Neighborhood Conservation, Facilities
maintenance capital, ConnectArlington and
Intelligent Transportation System
28,306,000
Arlington Public Schools Design – Construction of new elementary
schools, School facility additions and various
School facility projects
42,620,000
TOTAL $153,425,000
Extensive information on the details of each of these projects can be found in the CIP document on
the County’s and Schools’ websites.
Attachment B includes the proposed bond questions and explanations as they would appear in
informational publications distributed by the County at polling places, other County facilities, and
on the County’s website. Consistent with state law, the actual ballot will reflect only the proposed
bond question.
BALLOT LAYOUT
It is recommended that the following four bond referenda questions be on one or more rows or
windows on the voting machines in the following order:
a. Metro and Transportation
b. Local Parks & Recreation
c. Community Infrastructure
d. Arlington Public Schools
BACKGROUND: The County government’s proposed bond totals are derived from a compilation
of individual projects contained in the adopted CIP. These projects are classified into separate
categories. If the bond referenda questions are approved by the voters, the County is legally
prohibited from reallocating funding from one referenda category to another. Within the referenda
categories, however, the County Board may make changes to specific projects; this flexibility is
A - 23
- 3 -
necessary because of potential rapid changes in construction pricing or other uncontrollable
factors. The County Board also has the option of issuing a lesser amount of bonds than that
approved by the voters or revising the specific projects, within the proposed authorizing language,
to be funded with bond proceeds. Attachment B is a draft of the bond questions and explanations
that would appear in informational publications. This information is also provided at voter
registration sites, posted at each individual polling place and the County’s website. Staff has
worked with bond counsel on the bond referenda language.
During the CIP process, a significant amount of community input was sought. During the CIP
development and consideration process, staff met with twelve Board-appointed Commissions and
Committees and provided information at four County Board work sessions. Additionally, a CIP
Public Hearing was held on June 26, 2012. The adopted CIP will be published in hard copy and
will be available on the County website later this summer.
FISCAL IMPACT: The estimated impact on the County’s General Fund from the proposed
bond financing plan included in the adopted CIP and the proposed referenda for the next two
fiscal years is shown below. It should be noted that the amount of debt service to be budgeted in
FY 2014 and FY 2015 will be determined after future project cash flow needs (and thus actual
bond issue amounts) are completed. The table below also includes all outstanding and future
subject-to-appropriation debt supported by the General Fund. In addition to debt service costs,
certain new projects in the CIP and referenda will result in increased operating costs. Additional
information on these costs can be found in the CIP document on the County’s website.
PROJECTED COUNTY AND SCHOOLS DEBT SERVICE
FY 2013 Adopted Budget and FY 2014 – 2015 Estimated
(In Millions of $)
BUDGETED
FY 2013
PROJECTED
FY 2014
PROJECTED
FY 2015
County 57.3 61.6 66.2
Schools 42.2
44.8 45.5
TOTAL $99.5 $106.4 $111.7
DESCRIPTION OF ATTACHMENTS
Attachment A - 2012 Bond Resolutions
Attachment B - 2012 Bond Questions and Explanation (as they will appear in publications)
A - 24
ATTACHMENT A
METRO AND TRANSPORTATION PROJECTS
WHEREAS, the County Board of Arlington County, Virginia, has determined that it is
advisable to support construction, acquisition, and rehabilitation of facilities by the Washington
Metropolitan Area Transit Authority (WMATA/Metro) and other transportation projects as
described below at an estimated cost of $31,946,000; and
WHEREAS, it appears that such improvements cannot be financed from current revenues;
BE IT RESOLVED BY THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA:
1. It is hereby determined that it is advisable for Arlington County to contract a debt
and issue its general obligation capital improvement bonds in the maximum principal amount of
$31,946,000 pursuant to the Public Finance Act of 1991, as amended, to finance, together with other
available funds, the cost of construction, acquisition, and rehabilitation of WMATA/Metro facilities
by the Washington Metropolitan Area Transit Authority, and to pay the costs of other transit,
transportation, paving, road and pedestrian enhancement projects across the County (the “Projects”).
2. The Circuit Court of Arlington County is hereby requested to order an election to be
held on November 6, 2012, provided that such date is at least 81 days after the date on which the
Court enters its order upon the question of contracting such debt and issuing bonds for such
purposes. The question on the ballot shall be in substantially the form shown in Attachment B.
3. The Clerk of this Board is hereby authorized and directed to cause a certified copy of
this resolution to be presented to the Circuit Court of Arlington County.
4. The County Board adopts this declaration of official intent under the Treasury
Regulations Section 15.150-2. The County Board reasonably expects to reimburse advances made
or to be made by the County to pay the costs of the Projects from the proceeds of its bonds.
5. This resolution shall take effect immediately.
A - 25
LOCAL PARKS & RECREATION
WHEREAS, the County Board of Arlington County, Virginia, has determined that it is
advisable to undertake local parks & recreation projects as described below at an estimated cost of
$50,553,000; and
WHEREAS, it appears that such improvements cannot be financed from current revenues;
BE IT RESOLVED BY THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA:
1. It is hereby determined that it is advisable for Arlington County to contract a debt
and issue its general obligation capital improvement bonds in the maximum principal amount of
$50,553,000 pursuant to the Public Finance Act of 1991, as amended, to finance, together with other
available funds, the cost of public improvements for Arlington County local parks & recreation,
open space and land acquisition projects (the “Projects”).
2. The Circuit Court of Arlington County is hereby requested to order an election to be held
on November 6, 2012, provided that such date is at least 81 days after the date on which the Court
enters its order upon the question of contracting such debt and issuing bonds for such purposes. The
question on the ballot shall be in substantially the form shown in Attachment B.
3. The Clerk of this Board is hereby authorized and directed to cause a certified copy
of this resolution to be presented to the Circuit Court of Arlington County.
4. The County Board adopts this declaration of official intent under the Treasury
Regulations Section 15.150-2. The County Board reasonably expects to reimburse advances made
or to be made by the County to pay the costs of the Projects from the proceeds of its bonds.
5. This resolution shall take effect immediately.
A - 26
COMMUNITY INFRASTRUCTURE
WHEREAS, the County Board of Arlington County, Virginia, has determined that it is
advisable to undertake neighborhood conservation projects, public facility improvements and
infrastructure improvements, as described below, at an estimated cost of $28,306,000; and
WHEREAS, it appears that such improvements cannot be financed from current revenues;
BE IT RESOLVED BY THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA:
1. It is hereby determined that it is advisable for Arlington County to contract a debt
and issue its general obligation capital improvement bonds in the maximum principal amount of
$28,306,000 pursuant to the Public Finance Act of 1991, as amended, to finance, together with other
available funds, the cost of public improvements for Arlington County, including neighborhood
conservation projects, information technology and public safety projects, and County facilities
needs including infrastructure and facilities maintenance capital (the “Projects”).
2. The Circuit Court of Arlington County is hereby requested to order an election to be
held on November 6, 2012, provided that such date is at least 81 days after the date on which the
Court enters its order upon the question of contracting such debt and issuing bonds for such
purposes. The question on the ballot shall be in substantially the form shown in Attachment B.
3. The Clerk of this Board is hereby authorized and directed to cause a certified copy of
this resolution to be presented to the Circuit Court of Arlington County.
4. The County Board adopts this declaration of official intent under the Treasury
Regulations Section 15.150-2. The County Board reasonably expects to reimburse advances made
or to be made by the County to pay the costs of the Projects from the proceeds of its bonds.
This resolution shall take effect immediately.
A - 27
ARLINGTON PUBLIC SCHOOLS PROJECTS
WHEREAS, the County Board of Arlington County, Virginia, has determined that it is
advisable to undertake certain capital projects for Arlington Public Schools, as described below; and
WHEREAS, it appears that $42,620,000 of such improvements cannot be financed from
current revenues; and
WHEREAS, the Arlington County School Board has requested by resolution adopted June
19, 2012, that the County Board request the Circuit Court of Arlington County to order an election
on the question of the proposed issuance of bonds to finance such projects;
BE IT RESOLVED BY THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA:
1. It is hereby determined that it is advisable for Arlington County to contract a debt
and issue its general obligation bonds in the maximum principal amount of $42,620,000 pursuant to
the Public Finance Act of 1991, as amended, to finance, together with other available funds, the
design and construction costs for new elementary schools, School facility additions and various
capital projects for Arlington Public Schools (the “Projects”).
2. The Circuit Court of Arlington County is hereby requested to order an election to be
held on November 6, 2012, provided that such date is at least 81 days after the date on which the
Court enters its order, upon the question of contracting such debt and issuing bonds for such
purposes. The question on the ballot shall be in substantially the form shown in Attachment B.
3. The Clerk of this Board is hereby authorized and directed to cause a certified copy of
this resolution to be presented to the Circuit Court of Arlington County.
A - 28
4. The County Board adopts this declaration of official intent under the Treasury
Regulations Section 15.150-2. The County Board reasonably expects to reimburse advances made
or to be made by the County to pay the costs of the Projects from the proceeds of its bonds.
5 This resolution shall take effect immediately.
A - 29
ATTACHMENT B
2012 Bond Referenda
1. Metro and Transportation
QUESTION: Shall Arlington County contract a debt and issue its general obligation
bonds in the maximum principal amount of $31,946,000 to finance, together with other
available funds, the cost of various capital projects for the Washington Metropolitan
Area Transit Authority and other transit, pedestrian, road or transportation projects?
EXPLANATION:
This proposal would fund a variety of transportation, road, pedestrian enhancement and transit
projects across the County. The largest component of this proposal would fund Arlington County’s
share of WMATA/Metro’s capital improvement program, including the Metro Capital Improvement
Program to improve regional mobility and accessibility and relieve traffic congestion. This
proposal would also provide matching funds for certain transportation projects that receive state and
federal funding. Proceeds of this proposal would also fund a portion of the costs for paving local
streets and roadways, as well as the WALKArlington, BikeArlington, and Neighborhood Traffic
Calming programs. The County Board may reallocate bond funds among the various projects to the
extent necessary or desirable.
A - 30
2012 Bond Referenda
2. Local Parks and Recreation
QUESTION: Shall Arlington County contract a debt and issue its general obligation
bonds in the maximum principal amount of $50,553,000 to finance, together with other
available funds, the cost of various capital projects for local parks & recreation, and
land acquisition for parks and open space?
EXPLANATION:
The proposed Local Parks & Recreation program would fund parks improvements and
enhancements, and land acquisition for parks and open space. The largest component of this
proposal would fund the design and construction of an aquatics, health and fitness center at Long
Bridge Park and improvements to the surrounding park. Approximately $1.0 million for the Land
Acquisition and Open Space programs is expected to fund strategic park acquisitions based on the
Public Spaces Master Plan or other parks related needs. This proposal would also fund maintenance
capital improvements such as playground, courts and other parks infrastructure improvements. The
County Board may reallocate bond funds among the various projects to the extent necessary or
desirable.
A - 31
2012 Bond Referenda
3. Community Infrastructure
QUESTION: Shall Arlington County contract a debt and issue its general obligation
bonds in the maximum principal amount of $28,306,000 to finance, together with other
available funds, the cost of various capital projects for County facilities, information
technology, and infrastructure?
EXPLANATION:
This proposal will provide funding for Board-approved Neighborhood Conservation projects.
The Neighborhood Conservation Program provides funding for a variety of neighborhood-
identified capital improvement projects including street improvements (sidewalk, curb and
gutter, drainage, paving), traffic management and pedestrian enhancements, park improvements,
street lighting, recreational facilities, landscaping, and beautification.
This proposal will also provide funding for the County’s information technology and public
safety needs through installation of a public safety network, and facilities maintenance capital
improvements, including design and construction of projects including but not limited to roofs,
electrical and heating / cooling systems and other facilities infrastructure. The County Board may
reallocate bond funds among the various projects to the extent necessary or desirable.
A - 32
2012 Bond Referenda
4. Arlington Public Schools
QUESTION: Shall Arlington County contract a debt and issue its general obligation
bonds in the maximum principal amount of $42,620,000 to finance, together with other
available funds, the costs of various capital projects for Arlington Public Schools?
EXPLANATION:
This proposal would make funds available for the Arlington Public Schools' capital improvement
program.
The proposed bonds will fund the design and construction of various School facility projects
including new elementary schools, building additions for additional classroom space and
maintenance capital projects . The School Board may reallocate bond funds among the various
projects to the extent necessary or desirable. A - 33
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
April 17, 1951
Schools $4,875,000 6,208 2,569 3,693 70.7
Total $4,875,000
November 6, 1951
Courts Building $ 505,000 4,086 7,475 3,389 64.7
Parking Lots 740,000 4,992 7,139 2,147 58.9
Parks and Playgrounds 882,000 6,334 5,595 739 53.1
Streets and Highways 1,318,000 7,465 4,651 2,814 61.6
Storm Drainage 1,382,000 7,330 4,790 2,540 60.5
Total $4,827,000
May 27, 1952
Schools $8,280,000 4,854 3,190 1,664 60.3
Total $8,280,000
November 3, 1953
Streets and Highways $1,720,000 7,035 4,588 2,447 60.5
Water 1,327,000 7,779 3,862 3,917 66.8
Storm Drainage 1,000,000 6,719 4,668 2,051 59.0
Total $4,047,000
November 2, 1954
Water $1,700,000 16,207 4,922 11,285 76.7
Incinerator 980,000 11,910 8,386 3,524 58.7
Fire Stations 470,000 13,138 7,271 5,867 64.4
Storm Drainage 200,000 13,196 7,524 5,672 63.7
County Building Sites 600,000 6,776 13,251 6,475 66.2
Swimming Pools 600,000 9,064 11,964 2,900 56.9
Total $4,550,000
A - 34
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
November 8, 1955
Sanitary Sewers $1,000,000 7,203 7,014 189 50.7
Streets and Highways 1,330,000 5,930 8,067 2,137 57.6
Storm Drainage 1,200,000 5,783 8,144 2,361 58.5
Total $3,530,000
February 2, 1956
Schools $9,430,000 5,720 6,658 938 53.8
Total $9,430,000
June 5, 1956
Court House $2,200,000 5,933 795 5,138 88.2
Schools 4,492,000 6,167 4,928 1,239 55.6
Total $6,692,000
May 13, 1958
Libraries $ 560,000 7,137 4,982 2,155 58.9
Streets and Highways 1,790,000 7,320 4,869 2,451 60.1
Sidewalks 330,000 6,907 5,145 1,762 57.3
County Building Sites 50,000 6,358 5,299 1,059 54.5
Parks and Playgrounds 293,000 6,701 5,313 1,388 55.8
Sanitary Sewer 770,000 7,762 4,318 3,444 64.3
Storm Drainage 673,000 7,399 4,649 2,750 61.4
Schools 3,500,000 7,391 4,807 2,584 60.6
Total $7,966,000
May 17, 1960
Storm Drainage $1,040,000 6,105 7,112 1,007 53.8
Regional Parks 130,000 5,593 7,642 2,049 57.7
Parks and Recreation Facilities 800,000 5,679 7,379 1,700 56.5
Libraries 250,000 6,275 6,918 643 52.4
Health Clinics 100,000 5,795 7,373 1,578 56.0
A - 35
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
Sidewalks 450,000 5,757 7,420 1,663 56.3
Schools 1,750,000 5,650 7,258 1,608 56.2
Streets and Highways 2,660,000 5,853 7,297 1,444 55.5
Fire Stations 400,000 6,493 6,654 161 50.6
Total $7,580,000
November 8, 1960
Water $2,172,000 20,535 11,733 8,802 63.6
Sanitary Sewers 675,000 21,434 11,972 9,462 64.2
Total $2,847,000
November 7, 1961
County Land Acquisition $ 500,000 8,493 8,589 96 50.3
Storm Water Drainage 900,000 10,007 7,419 2,588 57.4
Streets and Highways 2,500,000 9,874 7,614 2,260 56.5
Sidewalk 475,000 9,149 8,215 934 52.7
Recreation Facilities 225,000 9,029 8,189 840 52.4
Library 495,000 9,209 8,002 1,207 53.5
Firefighting Facilities 475,000 11,519 5,919 5,600 66.1
Schools 950,000 9,246 7,902 1,344 53.9
Total $6,520,000
November 5, 1963
Storm Water Drainage $1,000,000 12,523 7,494 5,029 62.6
Sewer 5,560,000 12,692 6,957 5,735 64.6
County Land Acquisition 1,000,000 10,409 8,914 1,495 53.9
Library 440,000 9,800 9,425 375 51.0
Schools 1,950,000 10,453 8,648 1,805 54.7
Total $9,950,000
November 2, 1965
Storm Water Drainage $ 1,250,000 14,223 8,067 6,156 63.8
A - 36
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
Streets and Highways 4,350,000 13,340 8,209 5,131 61.9
County Land Acquisition 1,000,000 12,814 9,321 3,493 57.9
Sidewalk 550,000 12,953 8,352 4,601 60.8
Schools 4,795,000 11,449 9,582 1,867 54.4
Schools, New Junior H.S. 4,250,000 8,413 13,153 4,740 61.0
Total $16,195,000
November 8, 1966
No. Virginia
Higher Education $3,000,000 21,100 10,401 10,699 67.0
Total $3,000,000
November 7, 1967
Streets and Sidewalk $7,100,000 15,047 8,031 7,016 65.2
Storm Water Drainage 1,100,000 14,813 7,173 7,640 67.4
Sewer 1,000,000 15,108 6,936 8,172 68.5
Total $9,200,000
June 11, 1968
Schools and Recreation $16,800,000 7,895 9,476 1,581 54.6
Total $16,800,000
November 5, 1968
Transit Facilities $54,000,000 42,721 11,659 31,062 78.6
Schools (W-L Library) 225,000 34,331 19,715 14,616 63.5
Schools (Elementary) 6,900,000 35,993 17,696 18,297 67.0
Schools (New Junior H.S.) 4,150,000 34,485 19,163 15,322 64.3
Recreation Facilities 2,500,000 32,832 19,979 12,853 62.2
Total $67,775,000
November 4, 1969
Paving $ 500,000 19,392 9,380 10,012 67.4
A - 37
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
Police Headqtrs.-Jail 2,500,000 20,618 9,562 11,056 68.3
Public Library 550,000 17,866 11,071 6,795 61.7
Swimming Pool 900,000 14,862 13,975 887 51.5
Storm Drainage 1,000,000 21,192 7,947 13,245 72.7
Water System 5,500,000 20,526 8,344 12,182 71.1
Neighborhood Conservation 800,000 16,793 11,611 5,182 59.1
Park Authority 2,160,000 1,654 11,247 9,593 87.2
Total $13,910,000
November 2, 1971
Sanitary Sewers $ 6,700,000 11,961 4,176 7,785 74.1
Waste Water Treatment 6,000,000 12,670 3,490 9,180 78.4
Recreation Facilities 3,000,000 9,873 5,999 3,874 62.2
Storm Water Drainage 2,500,000 12,215 4,114 8,101 74.8
Streets and Highways 1,000,000 16,675 10,211 6,464 62.0
Human Resources Center 850,000 15,347 11,520 3,827 57.1
Neighborhood Conservation 800,000 15,365 11,554 3,811 57.1
Technical Education Center 4,600,000 16,182 11,000 5,182 59.5
Schools 2,600,000 15,097 11,929 3,168 55.9
Library 470,000 14,742 11,98 2,758 55.2
Total $28,520,000
November 7, 1972
Ad. Waste Water Treatment $15,000,000 38,705 11,829 26,876 76.6
Schools 6,275,000 31,390 18,917 12,473 62.4
Total $21,275,000
*Referendum amended language of 1971 and 1972 referenda to expand how the $21.0 million could be used at the wastewater treatment plant.
November 6, 1973
Local and Regional Parks $ 5,000,000 11,186 5,736 5,450 66.1
Sanitary Sewerage 4,500,000 13,613 5,744 7,869 70.3
Streets and Highways 3,000,000 10,903 7,276 3,627 60.0
A - 38
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
Public Schools 2,350,000 14,647 15,843 1,196 52.0
Storm Water Drainage 1,500,000 20,034 10,286 9,748 66.1
Human Resources Center 1,000,000 17,462 12,660 4,802 58.0
County Property Yard 700,000 13,860 16,081 2,221 53.7
Nursing Home Sites 500,000 20,281 10,607 9,674 65.7
Fire Stations 300,000 20,867 9,925 10,942 67.8
Total $18,850,000
November 4, 1975
Wastewater Treatment* $21,000,000 11,020 8,600 2,420 56.2
Transit Facilities 25,000,000 7,543 11,880 4,337 61.2
County Maintenance and Service Facilities 1,500,000 5,003 13,968 8,965 73.6
Sidewalks, Curbs and Gutters,
Streets and Highways 3,000,000 7,923 20,553 12,630 72.2
Joint Community Theatre
and Schools Auditorium 1,300,000 5,169 23,612 18,443 82.0
Buildings and Building Sites 1,000,000 5,097 22,881 17,784 81.8
Park and Recreation
Acquisition and Development 6,000,000 9,036 20,140 11,104 69.0
Community Conservation 2,500,000 8,075 20,128 12,053 71.4
Total $61,300,000
November 8, 1977
Water Storage $ 6,200,000 21,464 11,959 9,505 64.2
Storm Drainage 1,000,000 20,433 13,300 7,133 60.6
Streets and Highways 3,000,000 19,942 13,973 5,969 58.8
Neighborhood Conservation 2,500,000 19,193 14,777 4,416 56.5
Local and Regional Parks 2,500,000 18,849 14,868 3,981 55.9
Total $15,200,000
*Referendum amended language of 1977 water bond to change from storage to distribution improvements as permitted use.
A - 39
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
November 6, 1979
Sanitary Sewerage $ 1,985,000 16,761 9,222 7,539 64.5
Streets and Highways 4,665,000 15,617 10,530 5,087 59.7
Local Parks 4,000,000 9,465 16,577 7,112 63.6
Regional Parks 1,705,000 9,780 16,200 6,420 62.4
Total $12,355,000
November 4, 1980
Water Distribution* $6,000,000 41,328 8,756 32,572 82.5
Total $6,000,000
November 3, 1981
Streets and Highways $ 3,000,000 23,751 12,583 11,168 65.4
Storm Drainage 1,800,000 22,652 13,420 9,232 62.8
Jail Expansion 2,100,000 25,485 11,251 14,234 69.4
Local and Regional Parks 3,000,000 22,886 13,465 9,421 63.0
Community Conservation 1,000,000 21,743 13,520 8,223 61.7
Total $10,900,000
November 8, 1983
Metrorail $13,000,000 21,221 6,615 14,606 76.2
Streets and Highways 3,100,000 20,756 6,922 13,834 75.0
Community Conservation 1,950,000 19,624 7,840 11,784 71.5
Water Distribution 3,100,000 20,048 7,159 12,889 73.7
Total $21,150,000 Average 74.1%
November 6, 1984
Local and Regional Parks $ 4,035,000 38,785 21,771 17,014 64.1
Streets and Highways 6,140,000 39,644 20,630 19,014 65.8
Community Conservation 6,800,000 37,935 21,906 16,029 63.4
Metrorail 13,000,000 40,111 20,924 19,187 65.7
Total $29,975,000 Average 64.8%
A - 40
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
November 4, 1986
Local and Regional Parks $ 4,895,000 25,899 8,539 17,360 75.2
Streets and Highways 4,315,000 27,382 6,452 20,930 80.9
Community Conservation 10,835,000 25,626 8,741 16,885 74.6
Central Library Expansion 4,025,000 26,974 7,909 19,065 77.3
Total $24,070,000 Average 77.0%
November 8, 1988
Local and Regional Parks $ 3,900,000 50,367 14,344 36,023 77.8
Streets and Highways 2,400,000 49,077 12,688 36,389 79.5
Community Conservation 2,900,000 49,295 14,928 34,367 76.8
Public Schools 12,800,000 49,905 12,251 37,654 80.3
Jail 35,000,000 40,731 22,662 18,069 64.3
Wastewater Treatment 12,000,000 52,216 8,970 43,246 85.3
Total $69,000,000 Average 77.3%
November 6, 1990
Courts/Police Facility $53,850,000 25,061 17,381 7,680 59.0
Public Schools 23,000,000 31,367 11,833 19,534 72.6
Streets, Highways, and Community
Conservation 10,930,000 28,357 11,980 16,377 70.3
Local and Regional Parks and Recreation 4,220,000 27,857 12,544 15,313 69.0
Fire Station #3 2,500,000 28,642 11,319 17,323 71.7
Total $94,500,000 Average 68.5%
November 3, 1992
Metrorail $ 17,800,000 58,898 16,057 42,841 78.6
Public Schools 24,425,000 56,903 17,647 39,256 76.3
Higher Education 3,125,000 51,355 23,199 28,156 68.9
Local and Regional
Parks and Recreation 11,870,000 51,504 23,176 28,328 69.0
Streets, Highways and
A - 41
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
Community Conservation 13,415,000 55,185 19,551 35,634 73.8
Wastewater Treatment Plant 36,000,000 61,741 13,243 48,498 82.3
Total $106,635,000 Average 74.8%
November 8, 1994
Metrorail $ 7,000,000 45,783 16,166 29,617 73.9
Public School 36,100,000 46,444 15,349 31,095 75.2
Fire Station #3 2,760,000 44,184 16,857 27,327 72.4
Local and Regional Parks and Recreation 13,865,000 43,210 18,278 24,932 70.3
Streets, Highways and
Community Conservation 17,690,000 47,062 14,288 32,774 76.7
Water Distribution and
Wastewater Treatment 12,200,000 50,049 10,885 39,164 82.1
Total $89,615,000 Average 75.1%
November 5, 1996
Metrorail $ 9,560,000 52,289 15,733 36,556 76.9
Public School 29,120,000 53,783 14,510 39,273 78.6
Local and Regional Parks and Recreation 12,920,000 45,336 23,539 21,797 65.8
Streets, Highways and
Community Conservation 21,305,000 53,260 14,372 38,888 78.7
Total $72,905,000 Average 75.0%
November 3, 1998
Public Schools $50,705,000 35,552 9,721 25,831 78.5
Westover and Shirlington Branch Libraries 8,000,000 34,298 10,760 23,538 76.1
Local and Regional Parks and Recreation 17,055,000 34,438 10,651 23,787 76.4
Street, Highways, and
Community Conservation 24,055,000 35,448 9,500 25,948 78.9
Total $99,815,000 Average 77.5%
A - 42
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
November 7, 2000
Public Schools $ 42,612,500 61,252 14,564 46,688 80.8
Local and Regional Parks and Recreation 25,875,000 58,973 16,104 42,869 78.6
Street, Highways and
Community Conservation 34,291,000 63,797 12,583 51,214 83.5
Government Fac.& Higher Ed. 7,210,000 53,571 22,023 31,548 70.9
Utilities 12,070,000 65,109 11,202 53,907 85.3
Total $122,058,500 Average 79.8%
November 5, 2002
Public Schools $ 78,996,000 43,877 12,258 31,619 78.2
Community Projects:
Community Conservation, Parks,
Public Safety, Pedestrian Systems,
Streets, Highways, Transit, Metro,
Storm Drainage 67,428,500 44,592 11,320 33,272 79.8
Utilities 12,342,000 46,078 9,796 36,282 82.5
Total $158,766,500 Average 80.2%
November 2, 2004
Public Schools $ 78,128,000 71,594 17,615 53,979 80.3
Local Parks and Recreation 78,395,000 67,588 21,450 46,138 75.9
Transportation & Community
Infrastructure 35,944,000 71,697 17,171 54,526 80.7
Metro 18,536,000 73,248 16,151 57,097 81.9
Total $208,003,000 Average 79.7%
November 7, 2006
Public Schools $ 33,712,000 54,130 16,609 37,521 76.5
Local Parks and Recreation 35,550,000 52,257 18,238 34,019 74.1
Community Infrastructure 27,300,000 49,905 20,233 29,672 71.2
Metro and Transportation 31,500,000 58,058 11,709 46,349 82.0
A - 43
ARLINGTON COUNTY, VIRGINIA
BOND REFERENDA HISTORY
DATE
REFERENDA ITEM
AMOUNT
OF ISSUE FOR AGAINST MARGIN
FOR
MARGIN
AGAINST
% FOR/
AGAINST
Utilities 79,000,000 59,797 10,878 48,919 84.6
Total $207,062,000 Average 77.7%
November 4, 2008
Public Schools $ 99,425,000 76,325 25,360 50,965 75.1
Community Infrastructure 10,800,000 68,967 31,321 37,646 68.8
Metro 10,000,000 79,178 22,713 56,465 77.7
Utilities 50,000,000 80,873 20,052 60,821 80.1
Total $170,225,000 Average 77.3%
November 2, 2010
Public Schools $ 102,888,000 46,869 14,350 32,519 76.6
Local Parks and Recreation 5,975,000 41,745 19,427 22,318 68.2
Community Infrastructure 18,065,000 37,943 22,807 15,136 62.5
Metro 34,100,000 44,896 16,334 28,562 73.3
Total $161,028,000 Average 70.2%
November 6, 2012
Public Schools $ 42,620,000 90,232 21,383 68,849 80.8
Local Parks and Recreation 50,553,000 70,920 40,039 30,881 63.9
Community Infrastructure 28,306,000 80,155 29,607 50,548 73.0
Metro 31,946,000 89,000 22,101 66,899 80.1
Total $153,425,000 Average 74.5%
A - 44
Parks Land Acquisition 500,000
Metro 10,000,000
Community Conservation
Neighborhood Conservation 7,600,000
Other Community Projects 530,000
Total Community Conservation 8,130,000
Transportation - Match for Federal / State Grants 1,250,000
Facilities Infrastructure/Land Acquisition
ART House - Heavy Maintenance Facility 2,030,000
Office Space & Homeless Services Center 3,725,000
5,755,000
Total Authorized but Unissued - County 25,635,000
Utilities 11,350,000
Schools - Wakefield High School 32,219,000
*Amounts based on remaining authorized unissued after 2012 GO bond sale in June
Arlington, Virginia
Bonds Authorized but Unissued
A - 45
Arlington, Virginia
Projects Underway
The County has many large projects that are in near-term implementation phases. Although not a comprehensive list of the broad programs and projects,
a brief discussion of some of the larger projects underway is included below.
Public Government Facilities:
Fire Training Academy
-Expected Completion: winter 2013
-The additions include a training tower, drafting station for testing and qualifying on-vehicle fire pumps, a confined space training facility and storage for
fire apparatus used for training. The construction contract was awarded in February, 2012.
Funding Sources: GO Bonds
Arlington Mill Community Center
-Expected Completion: summer 2013
-The Arlington Mill Community Center (AMCC) will provide a five-story building housing community-oriented programs sponsored by the Departments
of Parks and Recreation, Human Services, and Libraries. The facility will include a full size gym and a 14,000 sf plaza. Construction of the community
center started in September, 2011.
Funding Sources: GO Bonds, IDA Revenue Bonds, PAYG
Fire Station No. 4 HVAC Replacement
-Expected Completion: winter, 2012
-The heating, ventilating and air conditioning (HVAC) equipment serving the common rooms and fire staff living quarters will be replaced to improve air
quality in the building and improve energy performance. The station will be empty for approximately 3 months of the roughly seven month construction
period and fire services coverage will be provided from Fire Station No. 3 on Old Dominion. Interior finishes and kitchen cabinets will also be upgraded
as part of the project .
Funding Sources: PAYG
A - 46
ECC Electrical Power Upgrades
-Expected Completion: fall 2012
-Current status and work completed to date.
Long-lead equipment (UPS batteries, two UPS's, one ATS) ordered.
Building permit for interior demolition received.
Construction documents are currently in permit review process for building permit for interior alterations.
13th floor maintenance and custodial services relocation in process.
-Future work
Construction of 13th floor battery room and installation of new UPS's and ATS.
Commissioning of installed systems.
Funding Sources: 2006 Emergency Infrastructure Bond Funds
Aurora Hills
-Expected Completion: May, 2012
-The Aurora Hills Complex is undergoing modifications in the Lobby and Library to accommodate changes in program use. The Library changes will
include new carpeting, paint and selected furniture along with new furniture and digital signage in the lobby.
Funding Sources: PAYG
Carlin Hall Structural Repairs and Exterior Upgrade
-Expected Completion: fall 2012
-Structural repairs to building and roof replacement
-Received 90% drawings for structural repairs
Funding Sources: PAYG
Detention Center Work Stations
-Expected Completion: fall, 2012
-The Deputy workstations within the Detention Center units are to be replaced. The replacement will include newly designed workstations to
accommodate updated equipment, provide better workflow, and secure supplies.
Funding Sources: State Criminal Alien Assistant Program (SCAAP) Justice Dept. Grant
Community Conservation:
Neighborhood Conservation Program
-In late FY 2012 and in FY 2013, the NC program will complete 15 Street Improvement projects and 5 Park Improvement projects. These projects will
cost $8.6 million.
Funding Sources: GO Bonds, PAYG
A - 47
Stormwater, Water, and Sewer Infrastructure:
Four Mile Run Tidal Corridor Restoration Project
-Addition of tidal wetlands and stream bank bioengineering in tidal portion of Four Mile Run envisioned in Four Mile Run Restoration Master Plan.
-Design contract awarded 2009.
-Construction expected 2014.
Funding Sources: Sanitary District Tax, State and Tribal Assistance Grants (STAG), US Army Corps of Engineers
Williamsburg Blvd Median Watershed Retrofit Project
-Creation of bioretention systems within two medians using engineered soils and specialized plantings to store and filter stormwater runoff from nearby
streets and homes.
-90% design completed early 2012.
-Construction expected 2013.
Funding Source: Sanitary District Tax
John Marshall Drive at Lee Highway
-Design of this storm sewer project is currently under review by VDOT, and includes approximately 430 linear feet of 72-inch storm sewer, 640 linear
feet of sanitary sewer (identified in the Sanitary Sewer Master Plan and charged to the sanitary sewer improvements CIP, but incorporated into this project),
related appurtenances, and restoration. This project is necessary to reduce the risk of flooding to multiple homes which were flooded in the storm of June
2006.
-Construction expected Fall 2012
Funding Source: Sanitary District Tax
Stormwater Master Plan
-Work is currently underway on an update of the County’s Stormwater Master Plan. Upon its completion in 2013, County staff will have a better
understanding of the cost, phasing, and scope of future stormwater management and infrastructure projects. The County's Municipal Separate Storm
Sewer System (MS4) permit is also expected to be renewed for a five-year period by the state in calendar year 2012. The results of the new permit may
require that future CIPs be adjusted to provide for the more stringent and aggressive requirements designed to improve the health of the Chesapeake Bay.
Funding Sources: Sanitary District Tax, Watershed Management Fund, State and Tribal Assistance Grants (STAG), US Army Corps of Engineers
Donaldson Run Tributary B Stream Restoration Project
-Comprehensive restoration of 1,800 linear feet of degraded stream channel to control severe erosion, improve habitat, and protect threatened sanitary
sewer and trail infrastructure.
-Design is currently at 90% level, with construction expected in 2013.
Funding Sources: Sanitary District Tax, Watershed Management Fund, State and Tribal Assistance Grants (STAG)
A - 48
Potomac Interceptor Sanitary Sewer Phase 1
-Construction is scheduled to be completed in fall 2012/ winter 2013.
-Will provide surcharge relief and increased wastewater capacity for Rosslyn.
Funding Sources: GO bonds, PAYG
Glebe Road Water Main
-Construction is scheduled to be completed in September 2013
-This project will construct a parallel water main to provide a critical backup to the existing 36-inch water main.
Funding Sources: GO bonds, PAYG
South Four Mile Run Water Main
-Construction is scheduled to be completed in September 2012
-Will replace an existing deteriorating 20-inch water main with a new one of the same size.
Funding Sources: PAYG
Automated Meter Reading Program (AMR)
-Construction is scheduled to be completed in June 2013
-Plan is to install approximately 30,200 meters with AMR capability which will replace all residential meters.
-Increases efficiency and accuracy in meter reading by replacing existing water meters with meters having AMR capability
Funding Sources: PAYG
Master Plan 2001 Update (MP01)
-$568 million multi-year program to expand and upgrade the Water Pollution Control Plant
-Two largest construction projects were substantially complete in CY 2010
Meeting goals of Total Nitrogen< 3 mg/l (from June 2010), no external bypasses (from April 2010)
-Remaining elements of the project are scheduled to be completed in FY 2013
Funding Sources: Virginia Resources Authority loans, Water Quality Improvement Fund grant, GO Bonds, Inter-jurisdictional Partners contributions, Utilities Capital
Wet Weather Filtration Facility
-Retrofit of existing gravity filters at the Water Pollution Control Plant
-Construction is underway, and is expected to be completed in FY 2013
Funding Sources: GO Bonds, Inter-jurisdictional Partners contributions
A - 49
Transportation:
Columbia Pike - South Wakefield Street to Four Mile Run
-Upgrades to water and sewer lines were completed last year. The undergrounding of overhead utilities, street, sidewalk and related improvements along
Columbia Pike between South Wakefield Street and Four Mile Run are underway.
-The utility undergrounding work will be done first and will take approximately 15 months.
-The street improvement work, which includes the realignment of the South Four Mile Run Drive and South Buchanan Street intersection will follow and
is expected to be completed by the Fall of 2013.
Funding Sources: GO bonds, PAYG, State grants
Pentagon City Multi-modal Project – Hayes Street Improvements
-The Pentagon City Multi-Modal Project will improve safety and access for pedestrians, transit riders, bicyclists and vehicles along South Hayes Street
between Army Navy Drive and 15th Street South. This street and infrastructure improvement project will also enhance the appearance of the area and
create a sense of place for all who visit and live in Pentagon City.
-The planned improvements range from state-of-the-art traffic signals, mid-block crossings and ADA compliant features, to increased and improved
environmentally-sensitive landscape features
-Construction of the project will begin in June 2012 and will conclude by Winter 2013-2014.
Funding Sources: GO bonds, Transportation Capital Funds, Federal Secondary Aid
Crystal City Street Improvements – Two-Way Conversion of Crystal Drive
-The Crystal City Street Improvements are a series of projects that will prepare the street network in Crystal City for redevelopment and transit
improvements, including the future streetcar. The Crystal Drive Two-Way Conversion project will transform the one-directional portions of Crystal
Drive into a two directional roadway. The street network in Crystal City will begin to be transformed by the first of three phases of two-way conversion
projects along Crystal Drive, which will convert the road from one-direction to two-directions between 12th and 15th Street South.
-The first phase of construction will begin in June 2012 and is expected to be completed by Winter 2012-2013.
-Two additional phases of the Crystal Drive Two-Way Conversion project are planned for Crystal Drive. Phase 2 of the Crystal Drive two-way
conversion project will occur between the intersection of Crystal Drive with 23rd Street South and 26th Street South and is expected to begin construction
Summer or Fall of 2012. Phase 3 of the Crystal Drive two-way conversion is planned to occur between the intersections of 26th Street South to 27th Street
South and should begin in the Spring of 2013.
Funding Sources: Crystal City, Potomac Yard, Pentagon City Tax Increment Financing Funds, Transportation Capital Funds
A - 50
Transportation Systems Management (TSM) Fiber Project
-This project will upgrade the existing “ITS Management & CA-Net Plant” to a state-of-the art fiber optic technology in three phases. The overall project
consists of replacing the existing 52 miles of outdated and unreliable twisted pair (copper) communication system with a more reliable, faster and scalable
fiber optic system. The project is split into three phases.
-Phase 1 is currently under construction and is expected to be completed by July 2012.
-Phase 2 construction is expected to begin in June 2012. It will lay approximately ten miles of fiber optic cables connecting 101 traffic signals and will
install two Variable Message Signs (VMS) along Arlington Boulevard.
-Phase 3 is expected to begin construction in January 2013. It will provide an additional twenty miles of fiber optic cables connecting 103 traffic signals.
Funding Sources: GO bonds, Transportation Capital Funds, Crystal City, Potomac Yard, Pentagon City Tax Increment Financing Funds, Federal grants
Rosslyn Metro Station Access Improvements
-Work is underway to install a second station entrance and includes three new high speed, high capacity elevators, a mezzanine, fare payment area, and
emergency stairs.
-The Board approved the construction contract in July 2010.
-Construction work began in October 2010 with completion scheduled for July 2013.
Funding Sources: Transportation Capital Fund, federal grants and earmarks, state matches and reimbursements, developer contributions
Pentagon City Metro Station Second Elevator
-Currently there is only one street-level elevator entrance at the Pentagon City Metrorail station which is among the most heavily utilized stations in
Arlington County. The only elevator is located on the east side of S. Hayes St. A second elevator entrance on the west side of the street is necessary to
improve general access and to ensure ADA accessibility.
-The preliminary engineering contract for the second elevator is scheduled to be awarded in June 2012 and be completed by spring 2013.
-Final design and construction are targeted for CY2013 and CY2014 respectively.
Funding Sources: Federal grants, federal earmark, state match
Columbia Pike Superstops
-This project will construct new larger bus shelters that will provide passenger amenities to accommodate the increased number of passengers along the
Columbia Pike corridor that are resulting from new enhanced bus services branded as the "Pike Ride" program.
-Construction of the first prototype super stop began in early FY12 and is scheduled to be completed in summer 2012. A second prototype stop is
scheduled to be constructed in fall 2012.
-Plans call for 20 more super stops to be constructed between CY2013 and CY2016 in coordination with construction of street infrastructure
improvements on the Pike.
-The super stops will serve as streetcar stations in the future.
Funding Sources: Prototype stops are funded by a federal grant and a GO bond match. Subsequent stops will be funded by a federal earmark, federal grants, and state match.
A - 51
Crystal City-Potomac Yard Transitway
-Final design plans were completed in spring 2012 for the construction of the bus transitway which includes dedicated right-of-way and seven station
stops between Potomac Yard and the Crystal City Metrorail station. These capital improvements will provide the infrastructure for frequent, high capacity
transit service necessary to meet the growing transportation needs of the new high-density, transit-oriented development occurring in Potomac Yard and
Crystal City.
-The environmental update was completed in December 2010.
-The operations plan was completed in January 2012.
-Additional right-of-way easements are needed and are expected to be completed during summer 2012.
-Award of the construction contract is targeted for fall 2012 with construction work beginning in winter 2013 and finishing in spring 2014. -Project
establishes high capacity transit service in anticipation of future streetcar service.
Funding Sources: Federal grants, Transportation Capital Fund, GO bonds, state reimbursement, developer contributions.
ART House
-Facility improvements are underway for Arlington’s local transit system (ART) and will provide new operations/administration and maintenance
facilities.
-Office space at 2900 S. Eads Street is undergoing rehabilitation starting June 2012 for a new operations/administrative center and is scheduled to open in
winter 2013. The Board approved the contract award in April 2012 for this construction work.
-Design work started in January 2012 on the plan for site improvements, utilities, a CNG fueling station, a bus wash, and light maintenance facility to be
located on the existing lot. Design work is scheduled to be completed in January 2013 and construction is targeted to begin by end of FY2013.
Funding Sources: Transportation Capital Fund, GO bonds, state reimbursement grants
Parks and Recreation Facilities:
Barcroft Park
-This project consists of a new baseball stadium in partnership with The George Washington University including a new synthetic turf baseball diamond,
fencing, scoreboard, stadium seating, dugouts, batting cages, restrooms, concessions, plaza, signage, pedestrian access, parking lot, storm water
management and landscaping.
-Anticipated completion is summer 2012.
Funding Sources: Permissive Use Agreement with The George Washington University
Virginia Highlands Park
-This Parks Maintenance Capital project includes replacement of the synthetic turf field carpet and addressing erosion issues adjacent to the field
including walkway/stairs, landscaping and site furnishings.
-Anticipated completion is summer 2012.
Funding Sources: PAYG
A - 52
Henry Wright Park
-This new park in Buckingham includes a playground, open grassy areas, site furnishings, game tables, gazebo, landscaping and lighted walkways.
-Anticipated completion is summer 2012.
Funding Sources: IDA Revenue Bond
Highview Park
-The Parks Maintenance Capital project includes replacement of tot and school age play areas, picnic area, site furnishings, accessible paths, landscaping,
retaining walls and signs.
-Anticipated completion is fall 2012.
Funding Sources: PAYG
Long Bridge Park – Long Bridge Drive
-The construction of Phase I of the new park, including three lighted synthetic turf fields, esplanade, rain garden, restrooms and storage buildings, public
art, parking, landscaping, pathways and site furnishings was completed in October 2011.
-The reconstruction of an approximately one-half mile section of Long Bridge Drive will implement a transportation corridor that provides park users,
Arlington residents and the traveling public safe and efficient multimodal access to and through the Long Bridge Park recreation area. Long Bridge Drive
from S. 12th Street to just south of Boundary Channel Drive will be completely reconstructed with new curb and gutter and a new storm drainage system.
Enhancing the roadway improvements will be bicycle lanes, wide sidewalks, street trees, LED roadway lighting, landscaped medians, bus shelters and
driveway aprons.
-Anticipated completion is fall 2012.
Funding Sources: GO Bonds
Penrose Square Phase I
-The County Board approved the Penrose Square Master Plan in July 2008. This new urban plaza includes a tree-covered upper terrace with movable
tables and chairs, a flexible paved plaza in the central portion of the square, an interactive water feature, a unique two piece granite sculpture called
“Echo”, and two mounded lawn areas shaded by trees for casual seating.
-Anticipated completion is fall 2012.
Funding Sources: GO Bonds, PAYG
Mosaic Park Phase I
-The County Board approved the Mosaic Park Master Plan in September 2009. This new urban park includes an interactive water feature, children’s play
area, multi-purpose court, flexible use lawn area, large flexible urban plaza, centrally located casual plaza, rain garden, walkways and sidewalks, site
furnishings and landscaping. The park design will have a focus on sustainable practices and features.
-Anticipated completion of construction drawings is winter 2013.
Funding Sources: Transfer of Development Rights (Founders’ Square Site Plan)
A - 53
James Hunter Park
-The County Board approved the James Hunter Park (formerly 13th & Herndon) Master Plan in December 2007. This new urban park includes a plaza
terrace with focal feature, an open lawn area, native demonstration gardens, a community canine area, pedestrian circulation, sidewalks, public art, utilities,
and site furnishings. The park will have a focus on sustainable features including managing and recycling storm water, alternative energy technologies,
permeable paving surfaces and recycled materials.
-Anticipated completion is spring 2013.
Funding Sources: GO Bonds, PAYG
Rocky Run Park
-The Parks Maintenance Capital project consists of relocating and replacing the major features of the park as well as addressing ADA access throughout
the park. The project includes new tot and school-age playgrounds, lighted basketball/multi-purpose courts, lighted synthetic turf field, public art, site
furnishings, site circulation, landscaping, and storm water improvements. The picnic shelter will be relocated and renovated.
-Anticipated completion is summer 2013.
Funding Sources: GO Bonds, PAYG
Information Technology and Equipment:
Real Estate System Upgrade
-Substantial Completion – September 2012
-The County’s real estate assessment system, both residential and commercial, is being upgraded and refreshed.
Funding Sources: Master Lease
Windows7 Upgrade
-Substantial Completion – Fall, 2013
-The County’s inventory of personal computers will be upgraded to Microsoft’s Windows7 operating system from Windows XP. This involves extensive
testing and some remediation of all applications that currently run on them.
Funding Sources: PAYG
ConnectArlington
-Substantial Completion – Stage 1-Fall 2013, Stage 2-Fall 2015
-Since the franchise agreement that provides the current fiber network for the County and APS expires in July, 2013, the County is working with APS to
build a new network called ConnectArlington. This will leverage ongoing investments in our new Intelligent Traffic Signal (ITS) network and the new
Public Safety Radio Ring. When completed, the County and APS will share the maintenance costs of this new network.
Funding Sources: Bonds, Cost Sharing with APS, Grants
A - 54
Replace Computer-Aided Dispatch Equipment and Paging System
-Expected Completion: October 2012
-The project will replace Computer-Aided-Dispatch equipment which is used in the Emergency Communications Center to route all communications to
and from ECC Dispatchers as well as vital incident information to mobile data computers in all public safety vehicles.
Funding Sources: ECC Bond
Replace Portable Radios (Public Safety only)
-Expected Completion: July 2012
-The project will replace portable radios which are hand-held radios that allow for two-way communication with the Emergency Communications Center
and all public safety agencies within the National Capital Region.
Funding Sources: ECC Bond
Public Safety Ring
-Expected Completion: December 2014
-The Public Safety Ring includes all of the fiber that has been, or will be, strategically laid throughout the County in order to provide diverse route fiber
optic connectivity to key County locations plus many other County facilities. This is a three phase project; Phase 1 is complete and provides backbone
fiber past the Ballston Place and Courthouse Plaza II radio sites. Phase 2 segments are preparing to begin construction, with target completion of June 30,
2013; at that time, all six radio sites will be connected. Phase 3 is still in design and is awaiting funding decisions, however once approved and funded, the
full project and ring can be implemented by December 20, 2014.
Funding Sources: ECC Bond
Replace the Public Safety Network
-Expected Completion: June 2012
-The project will replace the Public Safety Network which is the physical infrastructure connecting the various public safety information technology
together and to the County network. The network includes firewalls, routers, servers, switches and cabling. This is a joint effort between the vendor,
Police Department IT staff and DTS Network staff.
Funding Sources: ECC Bond
Replace Mobile Data Computers and Infrastructure
-Expected Completion: December 2012
-The project will replace the mobile data computers which are essentially laptops that are used by public safety staff to communicate more efficiently with
the Emergency Communications Center and other public safety officers in the County. These terminals or laptops permit data exchange via wireless
technology to the Police, Fire and Sheriff’s departments and are located in public safety vehicles. The use of these devices increases the efficiency of
information sharing, investigations, records management and all forms of communications. The project also includes replacement of infrastructure needed
to support the devices including hardware, software and installation costs.
Funding Sources: PAYG
A - 55
Replace the Police/Sheriff Records Management System
-Expected Completion: March 2014
Replace the Records Management System (RMS) used by the Police and Sheriff's Departments. The system stores critical response, case and inmate data.
Funding Sources: Master Lease
Replace Servers for Fire Records Management System
-Expected Completion: June 2012
-The project will replace the servers used in the Fire Records Management System (FRMS). The application is used to electronically enter data into the
National Fire Incident Reporting System (NFIRS) as required by the Federal Government. The system pulls data from the Computer-Aided-Dispatch
system in the ECC in order to tracks incident and Fire company movements. The system also enables staff to submit incident and company reports
electronically.
Funding Sources: ECC Bond
Replace Police In-Car Camera System
-Expected Completion: June 2013
The project will replace the in-car camera system which is used in Police vehicles to record activities inside and around the vehicles. The cameras provide
evidence of all traffic stops and other calls for service. The system provides an added layer of protection and accountability for public safety officers and
the public.
Upgrade Courthouse Security System
-Expected Completion: June 2012
The project will upgrade components of the Courthouse Security System. These include upgrading the system’s Ethernet backbone as well as adding card
readers to the telecomm closet doors to ensure access controls.
Funding Sources: ECC Bond
A - 56
Arlington, Virginia
Impact of Capital Projects
on Future Operating Budgets
The FY 2013 – 2022 CIP recognizes that capital projects, particularly the opening of new capital facilities, have impact on future
years’ budgets. Each project page includes a section on anticipated operating cost impact as appropriate for the specific
circumstances of the project. The following list summarizes the major operating cost impacts of projects included in the adopted
CIP; it should be noted that this list is not intended to be comprehensive and that estimates are very preliminary.
FY 2014
Arlington Mill Community Center – New operating costs are projected to range from $2.8 – $3.3 million when this facility
opens in late FY 2013 (impact in FY 2013 would be a pro rata amount depending on timing of opening).
Critical Systems Infrastructure - There are several 24/7/365 mission critical facilities essential to the operations of Public
Safety and First Responders and require centralize d monitoring and maintenance of building systems (e.g. HVAC, power, building
envelope, fire alarm). Operating costs, including additional staff support, is estimated to be $ 0.58 million per year, beginning in FY
2014.
ConnectArlington - The County’s plan to build out its own fiber connections will have corresponding operating costs such as
project management, maintenance and restoration of fiber cables and other are related fiber costs.
Metro Silver Line – New operating costs related to the Silver Line e xpansion are expected to increase the County’s WMATA
operating subsidy by $1.7 million in FY 2014 due to full revenue service not beginning until December 2013. Ongoing, full-year net
operating subsidy related to the Silver Line is expected to be approximately $0.8 million annually.
2020 14th Street North – Upon acquisition of the 2020 14th Street North property, building maintenance costs currently
estimated at $0. 6 million annually. This will be offset partially by lease revenue from existing t enants. Once the comprehensive
homeless services center is constructed, expected in FY 2014, ongoing programmatic costs are projected to be $0.5 million or more
based on the level of additional programming and will be developed in more detail in the coming months.
A - 57
FY 2015
Long Bridge (Phase II) Aquatics Facility – Net new operating costs are projected to be in the range of $ 1.1 - $1.4 million
annually. This includes 4.0 FTEs in FY 2015 and the balance of FTEs coming online in FY 2016. This estimate assumes significant
user fee revenue ranging from $2.5 – $2.7 million annually.
Technology – Operating costs for the real estate tax assessment, ERP modules and asset management systems will impact the
2015 budget. As technology becomes more pr evalent in day to day County operations, the associated infrastructure and support
costs may also increase.
DHS Consolidation – With the anticipation of consolidating DHS programs, there will be an estimated $2.3 million per year
in lease rental beginning in FY 2015.
FY 2016 and beyond
Stormwater – The County’s new stormwater permit is projected to be issued in calendar year 2013. Staff anticipates that
additional staffing will be needed beginning around FY 2017 to accommodate the capital requi rements, however, this is a
conservative projection and operating impacts will need to be re-evaluated once the MS4 permit is issued.
Columbia Pike & Route 1 Corridor Streetcar s – The Columbia Pike project is estimated to be completed in FY 201 7,
resulting in projected new operating costs (net of farebox revenues) of approximately $ 3.6 million annually beginning in FY 2018 .
Planning level operating costs for the Route 1 Corridor streetcar are projected to be between $3 .0 – $5.0 million annually starting in
FY 2019, but will be revised as the project moves past the concept stage.
Other Parks Projects – New operating costs for Tyrol Hills Park operating costs are estimated at $0.06 million, starting in FY
2016. Penrose Square phase II operating costs are projected at $0.1 million, starting in FY2020.
Lubber Run Community Center – The new facility is expected to be completed in FY 2021 with a net square foot increase of
18,500sf. Starting in FY 2021, an annual estimated net increase c ost of $ 0.1 million can be assumed for operations of the facility.
Additional programming costs will need to be determined.
Trade Center Parking Deck & Storage Facility – Beginning in FY 2016, operating costs are expected to start at $0.2 million
to accommodate the new Parking Deck at the Trades Center. Beginning in FY 2018, the costs escalate to almost $0.8 million per
year to include operation of a County-wide Storage Facility.
Fire Station #10 – The new Fire Station #10 will be part of a phased, mixed -use development. The new facility is expected to
be larger than the current facility with a net increase of 12,000 sf. It is estimated that beginning in FY 2018, and additio nal $0.07
million will be needed to operate the facility.
A - 58
Projects FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022
1 Arlington Mill Community Center - 3,300 3,300 3,300 3,300 3,300 3,300 3,300 3,300 3,300
2 Long Bridge Phase 1 and Fire Station 3 400 400 400 400 400 400 400 400 400 400
3 Technology - - TBD TBD TBD TBD TBD TBD TBD TBD
4 ConnectArlington 317 478 500 596 609 621 634 652 670 716
5 Metro Silver Line - 1,700 800 800 800 800 800 800 800 800
6 Critical Systems Infrastructure 580 580 580 580 580 580 580 580 580
7 Long Bridge Aquatics Facility (net of revenue) - - 340 1,250 1,250 1,250 1,250 1,250 1,250 1,250
8 Other Parks 55 55 55 55 155 155 155
9 Office Building and Year Round Homeless Center 376 631 631 631 631 631 631 631 631
10 Lubber Run Community Center 111 111
11 Trade Center Parking Deck & Storage Facility 165 165 795 795 795 795 795
12 DHS Consolidation 2,343 2,343 2,343 2,343 2,343 2,343 2,343 2,343
13 Fire Station #10 72 72 72 72 72
14 Stormwater Management - - - - 440 440 440 660 660 660
15 Columbia Pike & Crystal City Streetcars - 0 - - - 3,600 5,600 7,600 7,600 7,600
717 6,834 8,894 10,120 10,573 14,887 16,900 19,238 19,367 19,413
Impact of Capital Projects on Future Operating Budgets
($ in 000s)
TOTAL
Notes:
Annual operating costs for the Columbia Pike streetcar are $3.6 million annually. Planning level operating costs for the Crystal City streetcar are between $3
million and $5 million annually, but will be revised after the project moves past the concept stage.
The operating costs for the Stormwater Management Fund are captured within the Stormwater Management Fund and are not reflected in the operating
General Fund.
A - 59
10 Year
Program Category FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 Total
Local Parks & Recreation 61,739 28,260 21,081 11,220 23,711 13,395 23,243 10,892 33,841 30,155 257,537
Transportation Initiatives 1 164,662 64,012 61,889 81,274 60,875 33,671 41,009 39,135 32,576 57,184 636,287
Crystal City (Route 1) Streetcar 2 2,000 5,990 19,080 37,265 37,265 30,975 13,230 - - - 145,805
Columbia Pike Streetcar 8 9,546 25,769 55,057 56,853 51,774 - - - - - 198,999
Metro 20,900 18,600 26,600 20,400 16,400 14,500 15,000 15,750 16,500 16,500 181,150
Community Conserv/Economic Develop 14,550 15,135 30,895 26,647 9,605 6,138 12,467 6,676 6,696 6,717 135,526
Public / Government Facilities 60,188 23,696 20,545 19,243 50,276 15,584 53,464 28,249 43,777 19,990 335,012
Ballston Garage 4 5,300 4,980 2,519 781 770 3,370 130 830 460 650 19,790
Information Technology & Public Safety 3 20,922 20,946 20,565 9,737 8,177 14,555 14,699 19,682 11,244 19,487 160,014
Regional Partnerships 1,135 1,192 1,262 1,332 1,405 1,313 1,340 1,367 1,395 1,424 13,165
Capital Contingent 3,214 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 21,214
Subtotal County Capital 364,156 210,580 261,493 266,752 262,258 135,501 176,582 124,581 148,489 154,107 2,104,499
Water & Sewer Infrastructure 5 76,016 24,893 28,794 23,560 24,189 24,775 24,393 23,866 24,332 26,759 301,577
Stormwater Management 6 2,859 7,280 4,030 4,420 4,450 4,450 4,550 3,550 3,850 3,850 43,289
Total County Capital 443,031 242,753 294,317 294,732 290,897 164,726 205,525 151,997 176,671 184,716 2,449,365
Schools Capital 62,879 55,567 53,453 39,001 75,073 40,151 61,374 41,583 57,756 51,956 538,793
Total Capital Improvement Plan 505,910 298,320 347,770 333,733 365,970 204,877 266,899 193,580 234,427 236,672 2,988,158
Arlington, Virginia
10 Year Capital Program Costs Summary (000s)
Adopted CIP Program Summary
The FY 2013 - 2022 CIP includes typical capital projects such as maintenance capital, parks, transportation, metro, community conservation, government
facilities, information technology and regionals . In addition, this CIP continues to address projects introduced in the previous CIP such as Crystal City
and Columbia Pike streetcars, ConnectArlington (previously fiber optic communications network) and Ballston Garage. Unlike past CIPs, this is a 10 year
CIP and includes funding that has been previously approved in prior CIPs to show the full expenditure by fiscal year of each capital project.
B - 1
Arlington, Virginia
Adopted CIP Program Summary
10 Year
Capital Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 Total
New Funding
Pay-As-You-Go (PAYG) 19,005 29,513 35,076 24,434 29,105 30,448 33,115 31,823 26,436 31,534 290,489
Master Lease Funding 11,032 12,425 8,636 5,710 4,949 10,833 8,758 11,341 8,380 15,883 97,947
GO Bond Referenda 110,806 133,677 132,699 154,588 159,148 690,918
State/Federal Funding 9,872 21,357 39,847 41,991 41,351 21,403 19,704 11,144 8,905 15,773 231,347
Developer Contributions and Partnerships 22,000 4,160 21,800 24,943 4,796 - 200 - - - 77,899
Ballston Garage Parking Revenues 4 2,200 3,080 2,519 781 770 3,370 130 830 460 650 14,790
Sanitary District Tax 6 2,619 3,480 3,900 4,420 4,450 4,450 4,550 3,550 3,850 3,850 39,119
Transportation Capital Fund 1, 8 21,981 20,287 23,406 20,092 22,732 11,871 10,835 11,697 6,635 10,024 159,560
Tax Increment Financing 2, 8 4,747 5,850 2,500 7,931 4,170 7,759 4,470 2,200 2,150 4,550 46,327
Transportation Revenue Bonds - 21,000 49,430 76,500 38,500 - - - - - 185,430
Utility Fund Transfer & Other Sources 5 18,069 22,833 22,182 23,560 24,189 24,775 24,393 23,866 24,332 26,759 234,958
Schools Fund Transfer 8,199 5,607 5,643 5,801 6,073 6,151 6,374 6,583 6,756 6,956 64,143
Schools General Obligation Bonds 42,620 81,010 103,000 90,000 96,000 412,630
Subtotal New Funding 273,150 149,592 429,626 236,163 416,784 121,060 357,117 103,034 343,052 115,979 2,545,557
Previously Approved Funding
Authorized but Unissued Bonds 104,540 8,542 9,212 3,875 - - - - - - 126,169
Issued but Unspent Bonds 38,365 1,109 150 - - - - - - - 39,624
Other Previously Approved Funds 7 209,406 43,863 5,619 1,552 4,200 - 200 - - 11,968 276,808
Subtotal Previously Approved Funding 352,311 53,514 14,981 5,427 4,200 - 200 - - 11,968 442,601
Total Funding 625,461 203,106 444,607 241,590 420,984 121,060 357,317 103,034 343,052 127,947 2,988,158
(8) The Columbia Pike streetcar is funded by the Transportation Capital Fund, revenue bonds, and state and federal funding. The Route 1 Corridor streetcar is funded by the Crystal City/Potomac Yard/Pentagon City
Tax Increment Financing area fund, GO bonds, revenue bonds, and state funding.
(7) Other previously approved funds: Any funds other than GO Bonds that were approved as part of prior CIPs that are to be spent during this FY13-FY22 CIP.
(6) Stormwater Management Fund is funded from the Sanitary District Tax, Watershed Management Fund, State Grants and project cost sharing with US Army Corps of Engineers. The sanitary district tax was increased
from $0.01 to $0.013 per $100 of assessed value by the County Board on April 24, 2010.
(3) ConnectArlington is included in the Information Technology & Public Safety category. Funding sources for this project includes federal grants, exiting IDA bond balances, as well as Schools' local funds for their
respective allocation of the project costs.
(5) Utilities fund other sources: Developer contributions and Inter Jurisdictional payments, interest revenue and existing bonds and fund balances.
(4) Ballston Garage funding includes parking revenues, interest revenue and reserves.
10 Year Capital Program Funding Sources Summary (000s)
(2) Crystal City Public Infrastructure is funded from tax increment financing on properties in the Crystal City, Potomac Yard, and Pentagon City areas of the County. The tax increment is currently set at 33 percent.
(1) Transportation Capital Fund is supported by a commercial real estate tax of $0.125 per $100 of assessed value, yielding projected revenues for transportation projects. Beginning in 2014, the plan assumes revenue
bonds, supported by the tax, will be issued. The Transportation Capital Fund is supplemented by County PAYG as well as state and federal revenues.
The table below presents the Pay-As-You-Go appropriations and Bond referenda approved by the voters each year since FY 1998. Carryover appropriation from previous years are not included. Appropriation rather than actual expenditures are presented because The Proposed FY 2005 - 2010 funding strategy includes 28.4 percent funding for PATG appropriations, which includes state grants and other sources of revenue and General Obligation Bonds will fund 71.6 percent of the CIP. The table below presents the Pay-As-You-Go appropriations and Bond referenda approved by the voters each year since FY 1998. Carryover appropriation from previous years are not included. Appropriation rather than actual expenditures are presented because The Proposed FY 2005 - 2010 funding strategy includes 28.4 percent funding for PATG appropriations, which includes state grants and other sources of revenue and General Obligation Bonds will fund 71.6 percent of the CIP.
B - 2
Program Category FYs 13-22
Parks & Recreation 257,537
Transportation Initiatives 636,287
Crystal City / Columbia Pike Streetcar 344,804
Metro 181,150
Community Conservation/Economic Dev 135,526
Public /Government Facilities 335,012
Ballston Garage 19,790
Information Technology & Public Safety 160,014
Regional Partnerships 13,165
Capital Contingency 21,214
Total County's Program Cost 2,104,499
Water & Sewer Infrastructure 301,577
Stormwater Management Fund 43,289
Schools Capital 538,793
Total CIP Program Cost 2,988,158
Capital Funding Sources FYs 13-22
New Funding
Pay-As-You-Go (PAYG) 290,489
Master Lease Funding 97,947
GO Bond Referenda 690,918
State/Federal Funding 231,347
Developer Contributions and Partnerships 77,899
Ballston Garage Parking Revenues 14,790
Sanitary District Tax 39,119
Transportation Capital Fund 159,560
Tax Increment Financing 46,327
Transportation Revenue Bonds 185,430
Utility Fund Transfer & Other Sources 234,958
Schools Fund Transfer 64,143
Schools General Obligation Bonds 412,630
Subtotal New Funding 2,545,557
Previously Approved Funding
Authorized but Unissued Bonds 126,169
Issued but Unspent Bonds 39,624
Other Previously Approved Funds 276,808
Subtotal Previously Approved Funding 442,601
Total Funding 2,988,158
CIP Program and Funding Allocation ($ in 000s)
Arlington, Virginia
Parks & Recreation
9%
Transportation
Initiatives
21%
Crystal City &
Columbia Pike
Streetcar
12% Metro
6%
Community
Conservation/
Economic Dev
5%
Public /Government
Facilities
11%
Ballston Garage
1%
Information
Technology & Public
Safety
5%
Regional
Partnerships
0%
Capital Contingency
1%
Water & Sewer
Infrastructure
10%
Stormwater
Management Fund
2%
Schools Capital
18%
Program Category
Pay-As-You-Go
(PAYG)
10%
Master Lease
Funding
3%
GO Bond Referenda
23%
State/Federal
Funding
8%
Developer
Contributions and
Partnerships
3%
Ballston Garage
Parking Revenues
0%
Sanitary District Tax
1% Transportation
Capital Fund
5%
Tax Increment
Financing
2%
Transportation
Revenue Bonds
6%
Utility Fund
Transfer & Other
Sources
8%
Schools Fund
Transfer
2%
Schools
General
Obligation
Bonds
14%
Previously
Approved Funding
15%
Funding Sources
B - 3
page Total
reference
LOCAL PARKS & RECREATION
C25
Long Bridge (Aquatics, Fitness Center and Design of Final Outdoor
Phase) 46,414
C11 Parks Maintenance Capital 52,433
C19 Land Acquisition & Open Space 14,441
C28 Tyrol Hill Park 1,776
C32 Four Mile Run Near-Stream Improvements 15,408
C30 Jennie Dean Park 25,560
C21 Synthetic Turf Fields 2,185
C34 Crystal City Parks and Open Space 6,945
C36 Four Urban Parks in Ballston-Virginia Square 6,715
C38 Mosaic Park 3,622
C40 Glebe and Randolph Park 3,466
C42 Ballston Pond 988
Sub-total 179,953
TRANSPORTATION
E92 Paving 74,516
E55 Long Bridge Interchange 8,335
E19 ART (Heavy Maintenance Facility) 3,183
E83,E53,
E90
WALKArlington, BikeArlington & Neighborhood Traffic Calming 7,383
E44 Route 1 Streetcar 20,000
E88 Bridge Renovation 9,034
E70,E76 Match for State & Federal Projects and other 3,626
Sub-total 126,077
METRO
E1 Metro 124,250
COMMUNITY CONSERVATION
C46 Neighborhood Conservation 57,000
C48 Penrose Square 2,644
C51,53 Nauck Town Square & Infrastructure 4,852
Sub-total 64,496
6,868
1,000
185
0
0
0
1,321
0
42,500
50,553
13,195
0
2,500
0
0
0
0
0
300
17,346
14,600
30
0
0
11,000
11,000
12,405 13,160 10,000 10,000
3,000 4,441 3,000 3,000
1,591 0 0 0
3,167
0 0 0 3,914
25,524 29,459 24,621 49,796
1,126
0
6,968
0 0
988
0 0 328 3,294
219 2,122
563 2,985 3,167
0
5,835 0
1,383 1,469 1,558 1,652
0
13,999 14,851 15,756 16,715
0
2,228 1,238 5,015 253
27,794 38,758 22,926 19,253
1,166 1,200
5,835 6,190
2,185 0
0 20,000 0
3,183 0 0
0 0 299
39,000 22,900 22,750 25,000
11,941
6,567
0 298 2,346 0
0 1,688 3,164 0
11,000 11,000 12,000 12,000
11,000 12,986 17,510 12,000
FY 13-22
Arlington, Virginia
FY 2013 - FY 2022 CIP Debt Summary
(000s)
GO & Other BOND Funding
Adopted Proposed Proposed
2012 Referenda 2020 Referenda2018 Referenda2014 Referenda 2016 Referenda
Proposed Proposed
0
3,357
597 633
289 2,983 316
0 0 0
B - 4
page Total
reference FY 13-22
Arlington, Virginia
FY 2013 - FY 2022 CIP Debt Summary
(000s)
GO & Other BOND Funding
Adopted Proposed Proposed
2012 Referenda 2020 Referenda2018 Referenda2014 Referenda 2016 Referenda
Proposed Proposed
PUBLIC / GOVERNMENT FACILITIES
C69 Facilities Maintenance Capital 30,625
C110 North Side Salt Facility 2,391
C78 Lubber Run Community Center 27,124
C121 Non Parks Land Acquisition 11,000
C104 Alternate Emergency Communication Center 3,500
C76 Fire Stations 27,230
C74 Courthouse Square 40,470
C82,102 Trade Center Parking Deck & Storage Building 20,593
C80 Courts/Police Building Interior Renovation 11,627
C117 Court Square West Building Removal 1,770
C96 Police and Sheriff Pistol Firing Range 2,500
C112 Columbia Pike Library Replacement 1,284
Sub-total 180,114
D21,E67 ConnectArlington and Intelligent Transportation System 17,500
SUBTOTAL GO Bond Referenda 692,390
C71 2020 Building Acquisition and Conversion 30,150
C26 Long Bridge - Developer Contribution 20,000
SUBTOTAL Other Bond Funding 50,150
Total BOND FUNDING* 742,540
* Excludes Revenue Bonds for Transportation Investment Fund
Adopted Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Total
D13 Fire Defibrillators & Breathing Apparatus - - - - - 2,312 2,929 - - - 5,241
D3 Enterprise IT Refreshment 3,325 5,488 3,719 3,065 2,000 4,536 5,218 4,532 5,238 4,431 41,552
D12 Public Safety IT Refreshment 4,524 4,218 4,565 2,645 2,949 1,306 611 5,055 1,733 8,635 36,241
D13 Auto Fund - Fire Vehicle Apparatus 2,862 2,460 - - - 2,679 - 1,754 1,409 2,817 13,981
Total Master Lease Funding 10,711 12,166 8,284 5,710 4,949 10,833 8,758 11,341 8,380 15,883 97,015
Total Debt Funding
(excludes Schools)
839,555 174,687 183,413
INFORMATION TECHNOLOGY / PUBLIC SAFETY
FY 2015 FY 2016 FY 2017 FY 2018
180,107 141,426 159,922
Master Lease Funding FY 2013 FY 2014 FY 2019
4,025 0
127,432 144,140 154,588 157,230
13,475
110,805
46,425
26,425
20,000
0
0
0
0
0
3,831
0
0
0
5,039 6,588 0
0 1,770 0 0
0 2,500 0 0
3,625
206
0
0
159,150
7,000 6,000 7,000 7,000
2,185 0 0 0
0 1,414 25,710 0
2,000 3,000 3,000 3,000
0 0 15,873 24,597
0 1,400
3,000 0 0
4,679 15,914 0 0
66,781 53,101
0
0 0 0 1,284
16,364 40,037
FY 13-22FY 2020 FY 2021
500
3,725
FY 2022
8,610 17,220
123,707 144,140
0
0 0
154,588 159,150
0
0 0 0
3,725 0 0 0
0 0
B - 5
page Adopted Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Total
reference
MAINTENANCE CAPITAL
E3 Transportation (pg E18, 24, 64, 82, 87, 93) 2,087 2,613 5,936 6,281 6,493 6,712 6,940 6,986 7,017 7,385 58,449
C69 Public Facilities 3,204 5,828 6,470 3,657 4,000 4,034 3,500 3,500 3,500 3,500 41,193
C11 Parks and Recreation 3,722 2,253 2,253 2,253 2,253 2,253 2,253 2,253 2,253 2,253 23,995
D3 Enterprise Information Technology 90 1,123 1,283 962 991 876 1,284 835 861 854 9,157
D12 Public Safety IT and Equipment - 340 - 1,564 493 - 418 4,371 293 337 7,816
C106 Americans with Disabilities Act - 740 829 - - - - - - - 1,569
C125 Energy Efficiency 230 412 424 437 450 464 478 492 507 522 4,416
Sub-Total 9,333 13,308 17,195 15,153 14,680 14,338 14,872 18,436 14,429 14,850 146,593
REGIONAL PROGRAMS
C7 Northern Va Community College 312 370 429 490 553 561 570 578 587 596 5,046
C7 Northern Va Regional Park Authority 527 533 550 566 583 601 619 638 657 677 5,951
C8 Peumansend Creek Regional Jail Authority 146 138 132 125 118 - - - - - 659
C7 Northern Va Criminal Justice Academy 151 151 151 151 151 151 151 151 151 151 1,510
Sub-Total 1,136 1,192 1,262 1,332 1,405 1,313 1,340 1,367 1,395 1,424 13,166
OTHER CAPITAL PROJECTS
C46 Neighborhood Conservation 500 515 530 546 563 580 597 615 633 652 5,732
E90 Neighborhood Traffic Calming 100 103 106 109 113 116 119 123 127 130 1,146
E79 Streetlight Energy Efficiency 500 515 530 546 563 580 597 615 633 652 5,732
C17 Park Enhancement Grants 100 103 106 109 113 116 119 123 127 130 1,146
C55
Wayfinding, Theaters, Conference Facility and
Public Art 50 1,288 465 601 56 58 60 61 63 65 2,768
C21 Synthetic Fields 1,185 691 1,286 130 1,256 1,857 2,506 2,270 2,651 4,097 17,929
E54,58,70 Bicycle and Pedestrian Safety Projects 1,151 1,186 1,221 1,258 1,295 1,334 1,374 1,416 1,458 1,502 13,194
E71 Parking Meters 200 942 1,061 481 - - - - - - 2,684
D8, 9 Real Estate Assessment & Oracle System 1,000 1,780 3,773 573 788 1,750 2,984 2,091 633 1,305 16,677
D7 Information and Data Management - 2,163 1,378 929 957 1,102 1,254 1,045 1,077 1,108 11,013
D10 Asset/Customer Service Management - - 2,000 - - - - - - - 2,000
C108 Facilities Master Planning - 458 500 250 500 250 250 250 250 250 2,958
C80 Courts/Police Interior Renovation - - - - 4,269 4,307 4,423 - - - 13,000
C114 Critical Systems Infrastructure - - 21 76 - 29 56 - - 70 252
C92 DHS Consolidation - 2,640 - - - - - - - - 2,640
C100 Facility Finishes and Furnishings 667 309 318 328 338 347 358 1,291 380 978 5,315
C76, 94 Fire Stations & FFE - - 554 142 338 - 334 - 709 - 2,079
C8 Capital Contingency 3,214 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 21,214
Sub-Total 8,667 14,693 15,851 8,079 13,148 14,427 17,033 11,900 10,742 12,940 127,480
Total PAYG Funding 19,136 29,193 34,308 24,564 29,234 30,078 33,245 31,703 26,566 29,214 287,239
FY 2019
Arlington, Virginia
FY 2013 - FY 2022 CIP PAYG Summary
(000s)
FY 2020 FY 2021 FY 2022 FY13-22PAYG Funding FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018
B - 6
PROGRAM CATEGORY 2010 2012 2014 2012 2014 2016 2018 2020
Bond Bond Bond TOTAL Bond Bond Bond Bond Bond TOTAL
LOCAL PARKS & RECREATION
Parks Maintenance Capital 1,000 4,000 4,875 9,875 6,868 12,405 13,160 10,000 10,000 52,433
Rocky Run; Herndon & 13th Park 2,975 - - 2,975 -
Land Acquisition & Open Space 2,000 3,000 5,000 10,000 1,000 3,000 4,441 3,000 3,000 14,441
Long Bridge Park - 31,827 2,575 34,402 42,500 - - - 3,914 46,414
Tyrol Hill Park - 1,575 - 1,575 185 1,591 - - - 1,776
Synthetic Turf Field - - - - - 2,185 - - - 2,185
Four Mile Run Near-Stream Improvements - - - - - 219 2,122 1,126 11,941 15,408
Jennie Dean Park - - - - - 5,835 6,190 6,567 6,968 25,560
Crystal City Parks and Open Space - - - - - 289 2,983 316 3,357 6,945
Four Urban Parks in Ballston-Virginia Square - - - - - - 563 2,985 3,167 6,715
Mosaic Park - - - - - - - 328 3,294 3,622
Glebe and Randolph Park - - - - - - - 299 3,167 3,466
Ballston Pond - - - - - - - - 988 988
Total Project Cost 5,975 40,402 12,450 58,827 50,553 25,524 29,459 24,621 49,796 179,953
TRANSPORTATION INITIATIVES
Paving 10,300 11,200 11,200 32,700 13,195 13,999 14,851 15,756 16,715 74,516
Long Bridge Interchange - 8,000 - 8,000 2,500 5,835 - - - 8,335
WALKArlington, BikeArlington, Neighborhood Traffic Calming 1,300 1,300 1,300 3,900 1,321 1,383 1,469 1,558 1,652 7,383
Bridge Renovation - 200 2,000 2,200 300 2,228 1,238 5,015 253 9,034
Match for State & Federal Projects & Other 2,500 2,500 2,500 7,500 30 1,166 1,200 597 633 3,626
Crystal City (Route 1) Public Infrastructure - - 20,250 20,250 - - 20,000 - - 20,000
ART (Heavy Maintenance Facility) - - - - - 3,183 - - - 3,183
Total Project Cost 14,100 23,200 37,250 74,550 17,346 27,794 38,758 22,926 19,253 126,077
Arlington, Virginia
Adopted FY 2011 - FY 2016 to Adopted FY 2013 - FY 2022
Adopted FY 2011 - FY 2016 Adopted FY 2013 - FY 2022
General Obligation Bonds Referenda
($ in 000s)
B - 7
Arlington, Virginia
Adopted FY 2011 - FY 2016 to Adopted FY 2013 - FY 2022
Adopted FY 2011 - FY 2016 Adopted FY 2013 - FY 2022
General Obligation Bonds Referenda
($ in 000s)
METRO 20,000 20,000 20,000 60,000 14,600 39,000 22,900 22,750 25,000 124,250
Total Project Cost 20,000 20,000 20,000 60,000 14,600 39,000 22,900 22,750 25,000 124,250
COMMUNITY CONSERVATION
ConnectArlington and Intelligent Transportation System - 5,825 1,175 7,000 13,475 4,025 - - - 17,500
Neighborhood Conservation 9,000 9,000 9,000 27,000 11,000 11,000 11,000 12,000 12,000 57,000
Penrose Square - 3,350 - 3,350 - - 298 2,346 - 2,644
Nauck Town Square & Infrastructure - - 4,150 4,150 - - 1,688 3,164 - 4,852
Total Project Cost 9,000 12,350 13,150 34,500 24,475 15,025 12,986 17,510 12,000 81,996
PUBLIC / GOVERNMENT FACILITIES
Facilities Maintenance Capital 2,675 4,150 13,411 20,236 3,625 7,000 6,000 7,000 7,000 30,625
Lubber Run Community Center - - 18,000 18,000 - - 1,414 25,710 - 27,124
Facilities Infrastructure & Non Parks Land Acquisition 6,390 6,000 8,472 20,862 - 2,000 3,000 3,000 3,000 11,000
Courthouse Square - 2,000 2,500 4,500 - - - 15,873 24,597 40,470
North Side Salt Facility - - - - 206 2,185 - - - 2,391
Alternate Emergency Communication Center - - - - - 500 3,000 - - 3,500
Fire Stations - - 1,400 8,610 17,220 27,230
Trade Center Parking Deck & Storage Building - 4,679 15,914 - - 20,593
Courts/Police Building Interior Renovation - - 5,039 6,588 - 11,627
Court Square West Building Removal - - 1,770 - - 1,770
Police and Sheriff Pistol Firing Range - - 2,500 - - 2,500
Columbia Pike Library Replacement - - - - 1,284 1,284
Total Project Cost 9,065 12,150 42,383 63,598 3,831 16,364 40,037 66,781 53,101 180,114
TOTAL COUNTY CAPITAL 58,140 108,102 125,233 291,475 110,805 123,707 144,140 154,588 159,150 692,390
B - 8
REGIONALS AND OTHER FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total
New Funding
State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 0 0 0 0 0 0 0
PAYG 4,349 3,192 3,262 3,332 3,405 3,313 3,340 3,367 3,395 3,424 34,379
New Bond Referenda 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 4,349 3,192 3,262 3,332 3,405 3,313 3,340 3,367 3,395 3,424 34,379
Previously Approved Funding
Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding
0 0 0 0 0 0 0 0 0 0 0
Total Funding Sources 4,349 3,192 3,262 3,332 3,405 3,313 3,340 3,367 3,395 3,424 34,379
LOCAL PARKS AND RECREATION
PROGRAMS
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total
New Funding
State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 20,000 0 0 0 0 0 0 0 0 0 20,000
Other Funding 0 450 900 0 0 500 0 250 0 2,450 4,550
PAYG 4,877 2,917 3,515 2,362 3,492 4,096 4,748 4,516 4,901 6,350 41,774
New Bond Referenda 25,660 24,893 16,666 8,858 19,219 8,799 18,495 6,126 28,940 20,855 178,511
Subtotal New Funding 50,537 28,260 21,081 11,220 22,711 13,395 23,243 10,892 33,841 29,655 244,835
Previously Approved Funding
Authorized but Unissued Bonds 8,000 0 0 0 0 0 0 0 0 0 8,000
Issued but Unspent Bonds 1,762 0 0 0 0 0 0 0 0 0 1,762
Other Previously Approved Funds 1,440 0 0 0 1,000 0 0 0 0 500 2,940
Subtotal Previously Approved
Funding
11,202 0 0 0 1,000 0 0 0 0 500 12,702
Total Funding Sources 61,739 28,260 21,081 11,220 23,711 13,395 23,243 10,892 33,841 30,155 257,537
ARLINGTON, VIRGINIA
FY 2013 - FY 2022 CIP PROGRAM DETAIL
($ in 000s)
B - 9
ARLINGTON, VIRGINIA
FY 2013 - FY 2022 CIP PROGRAM DETAIL
($ in 000s)
COMMUNITY CONSERVATION FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total
New Funding
State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 1,500 0 0 0 0 0 1,500
Other Funding 0 0 0 0 0 0 0 0 0 0 0
PAYG 500 515 530 546 563 580 597 615 633 652 5,731
New Bond Referenda 5,500 5,500 5,500 5,500 7,486 5,500 11,510 6,000 6,000 6,000 64,496
Subtotal New Funding 6,000 6,015 6,030 6,046 9,549 6,080 12,107 6,615 6,633 6,652 71,727
Previously Approved Funding
Authorized but Unissued Bonds 1,400 5,000 2,600 0 0 0 0 0 0 0 9,000
Issued but Unspent Bonds 7,100 932 0 0 0 0 0 0 0 0 8,032
Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding
8,500 5,932 2,600 0 0 0 0 0 0 0 17,032
Total Funding Sources 14,500 11,947 8,630 6,046 9,549 6,080 12,107 6,615 6,633 6,652 88,759
PUBLIC / GOVERNMENT FACILITIES FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total
New Funding
State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 2,000 2,260 0 4,943 3,296 0 0 0 0 0 12,499
Other Funding 2,200 3,080 2,519 781 770 3,370 130 830 460 650 14,790
PAYG 4,101 10,387 9,116 4,890 9,895 9,432 9,399 5,533 5,346 5,320 73,419
New Bond Referenda 1,038 2,793 10,679 5,685 33,885 6,152 44,065 22,716 38,431 14,670 180,114
Subtotal New Funding 9,339 18,520 22,314 16,299 47,846 18,954 53,594 29,079 44,237 20,640 280,822
Previously Approved Funding
Authorized but Unissued Bonds 30,838 1,257 0 3,725 0 0 0 0 0 0 35,820
Issued but Unspent Bonds 12,900 0 0 0 0 0 0 0 0 0 12,900
Other Previously Approved Funds 12,411 8,899 750 0 3,200 0 0 0 0 0 25,260
Subtotal Previously Approved
Funding
56,149 10,156 750 3,725 3,200 0 0 0 0 0 73,980
Total Funding Sources 65,488 28,676 23,064 20,024 51,046 18,954 53,594 29,079 44,237 20,640 354,802
B - 10
ARLINGTON, VIRGINIA
FY 2013 - FY 2022 CIP PROGRAM DETAIL
($ in 000s)
METRO FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total
New Funding
State/Federal Funding 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 40,000
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 0 0 0 0 0 0 0
PAYG 0 0 0 0 0 0 0 0 0 0 0
New Bond Referenda 0 14,600 22,600 16,400 12,400 10,500 11,000 11,750 12,500 12,500 124,250
Subtotal New Funding 4,000 18,600 26,600 20,400 16,400 14,500 15,000 15,750 16,500 16,500 164,250
Previously Approved Funding
Authorized but Unissued Bonds 16,900 0 0 0 0 0 0 0 0 0 16,900
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding
16,900 0 0 0 0 0 0 0 0 0 16,900
Total Funding Sources 20,900 18,600 26,600 20,400 16,400 14,500 15,000 15,750 16,500 16,500 181,150
TRANSPORTATION FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total
New Funding
State/Federal Funding 5,832 17,357 35,717 37,991 37,351 17,403 15,704 7,144 4,905 11,773 191,177
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
Other Funding 26,728 47,137 75,336 104,523 65,402 19,630 15,305 13,897 8,785 14,574 391,317
PAYG 4,038 5,358 8,854 8,676 8,466 8,747 9,030 9,140 9,234 9,669 81,212
New Bond Referenda 17,209 7,258 17,156 21,138 15,319 13,439 13,972 8,954 9,755 9,497 133,697
Subtotal New Funding 53,807 77,110 137,063 172,328 126,538 59,219 54,011 39,135 32,679 45,513 797,403
Previously Approved Funding
Authorized but Unissued Bonds 4,200 225 0 150 0 0 0 0 0 0 4,575
Issued but Unspent Bonds 1,631 177 150 0 0 0 0 0 0 0 1,958
Other Previously Approved Funds 141,502 17,664 4,869 1,552 0 0 100 0 0 11,468 177,155
Subtotal Previously Approved
Funding
147,333 18,066 5,019 1,702 0 0 100 0 0 11,468 183,688
Total Funding Sources 201,140 95,176 142,082 174,030 126,538 59,219 54,111 39,135 32,679 56,981 981,091
B - 11
ARLINGTON, VIRGINIA
FY 2013 - FY 2022 CIP PROGRAM DETAIL
($ in 000s)
WATER AND SEWER
INFRASTRUCTURE
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total
New Funding
State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 3,200 5,110 5,303 5,462 5,628 5,797 5,971 6,149 6,334 6,523 55,477
Other Funding 4,113 1,482 819 823 848 873 899 926 954 982 12,719
PAYG 10,756 16,241 16,060 17,275 17,713 18,105 17,523 16,791 17,044 19,254 166,762
New Bond Referenda 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 18,069 22,833 22,182 23,560 24,189 24,775 24,393 23,866 24,332 26,759 234,958
Previously Approved Funding
Authorized but Unissued Bonds 10,982 2,060 6,612 0 0 0 0 0 0 0 19,654
Issued but Unspent Bonds 11,927 0 0 0 0 0 0 0 0 0 11,927
Other Previously Approved Funds 35,038 0 0 0 0 0 0 0 0 0 35,038
Subtotal Previously Approved
Funding
57,947 2,060 6,612 0 0 0 0 0 0 0 66,619
Total Funding Sources 76,016 24,893 28,794 23,560 24,189 24,775 24,393 23,866 24,332 26,759 301,577
STORMWATER MANAGEMENT FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total
New Funding
State/Federal Funding 40 0 130 0 0 0 0 0 0 0 170
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
Other Funding 2,619 3,480 3,900 4,420 4,450 4,450 4,550 3,550 3,850 3,850 39,119
PAYG 0 0 0 0 0 0 0 0 0 0 0
New Bond Referenda 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 2,659 3,480 4,030 4,420 4,450 4,450 4,550 3,550 3,850 3,850 39,289
Previously Approved Funding
Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved Funds 200 3,800 0 0 0 0 0 0 0 0 4,000
Subtotal Previously Approved
Funding
200 3,800 0 0 0 0 0 0 0 0 4,000
Total Funding Sources 2,859 7,280 4,030 4,420 4,450 4,450 4,550 3,550 3,850 3,850 43,289
B - 12
ARLINGTON, VIRGINIA
FY 2013 - FY 2022 CIP PROGRAM DETAIL
($ in 000s)
INFORMATION
TECHNOLOGY/EQUIPMENT
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total
New Funding
State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
Other Funding 11,032 12,425 8,636 5,710 4,949 10,833 8,758 11,341 8,380 15,883 97,947
PAYG 1,090 5,406 8,434 4,027 3,228 3,722 5,941 8,341 2,864 3,604 46,657
New Bond Referenda 3,240 3,115 3,495 0 0 0 0 0 0 0 9,850
Subtotal New Funding 15,362 20,946 20,565 9,737 8,177 14,555 14,699 19,682 11,244 19,487 154,454
Previously Approved Funding
Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 3,045 0 0 0 0 0 0 0 0 0 3,045
Other Previously Approved Funds 2,515 0 0 0 0 0 0 0 0 0 2,515
Subtotal Previously Approved
Funding
5,560 0 0 0 0 0 0 0 0 0 5,560
Total Funding Sources 20,922 20,946 20,565 9,737 8,177 14,555 14,699 19,682 11,244 19,487 160,014
ECONOMIC DEVELOPMENT FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY Total
New Funding
State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 1,900 21,800 20,000 0 0 200 0 0 0 43,900
Other Funding 0 0 0 0 0 0 0 0 0 0 0
PAYG 50 1,288 465 601 56 58 60 61 63 65 2,767
New Bond Referenda 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 50 3,188 22,265 20,601 56 58 260 61 63 65 46,667
Previously Approved Funding
Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved Funds 0 0 0 0 0 0 100 0 0 0 100
Subtotal Previously Approved
Funding
0 0 0 0 0 0 100 0 0 0 100
Total Funding Sources 50 3,188 22,265 20,601 56 58 360 61 63 65 46,767
B - 13
ARLINGTON, VIRGINIA
FY 2013 - FY 2022 CIP PROGRAM DETAIL
($ in 000s)
Total For All Programs FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year
Total
State/Federal Funding 9,872 21,357 39,847 41,991 41,351 21,403 19,704 11,144 8,905 15,773 231,347
Developer Contributions 25,200 9,270 27,103 30,405 10,424 5,797 6,171 6,149 6,334 6,523 133,376
Other Funding 46,692 68,054 92,110 116,257 76,419 39,656 29,642 30,794 22,429 38,389 560,442
PAYG 29,761 45,304 50,236 41,709 46,818 48,053 50,638 48,364 43,480 48,338 452,701
New Bond Referenda 52,647 58,159 76,096 57,581 88,309 44,390 99,042 55,546 95,626 63,522 690,918
Subtotal New Funding 164,172 202,144 285,392 287,943 263,321 159,299 205,197 151,997 176,774 172,545 2,068,784
Authorized but Unissued Bonds 72,320 8,542 9,212 3,875 0 0 0 0 0 0 93,949
Issued but Unspent Bonds 38,365 1,109 150 0 0 0 0 0 0 0 39,624
Other Previously Approved Funds 193,106 30,363 5,619 1,552 4,200 0 200 0 0 11,968 247,008
Subtotal Previously Approved
Funding
303,791 40,014 14,981 5,427 4,200 0 200 0 0 11,968 380,581
Total Funding 467,963 242,158 300,373 293,370 267,521 159,299 205,397 151,997 176,774 184,513 2,449,365
New Funding
Previously Approved Funding
B - 14
Arlington, Virginia
Debt Capacity Analysis
In developing the CIP, the County establishes its long-range plan for pay-as-you-go (PAYG) and bond/lease purchase financing of its
ten-year capital program. In determining the level of capital projects to finance and the method of financing, the County considers its financial
ability to undertake these projects. This analysis includes a review of debt capacity factors and the impact of the adopted CIP on these debt
capacity factors.
In April 2008, the County Board approved financial and debt management policies that affirmed the County’s existing debt capacity
factors. The policies also included guidance on bond term and amortization, specifically that b ond-funded projects will typically have a
useful life at least as long as the period over which the bonds will be repaid ( the average life of County bonds is 11 -12 years and final
maturity is generally twenty years; however, longer terms may be considered on very long useful life projects). Fina lly, the Board’s policies
provided guidance on the use of variable rate debt and derivatives. These policies serve as the financial framework for the CIP, and a full
copy of the policies is included in this section.
The bond rating agencies that rate the County’s debt for potential investors use these debt ratios, coupled with other County and
community economic factors. The three major bond rating agencies, Moody’s Investors Service, Standard & Poor’s, and Fitch Ra tings
currently rate the County Aaa/AAA /AAA (the highest possible). Arlington is one of a select national group of 35 counties that currently
hold these coveted Aaa/AAA/AAA ratings from the three major rating agencies. The County's bond ratings were reaffirmed in June 2012
and historical County bond trading in the secondary market confirm that Arlington belongs within the very top group of municipal cre dits
in the national bond market. The funding levels contained in this CIP would maintain this status . Moody’s has placed the County, along
with 36 other Aaa-rated localities nationwide, on negative credit watch due to its concerns over federal debt and budget issues and potential
impact on these localities. The County is actively working with Moody’s to address its concerns.
While there is no legal limit in Virginia on the level of debt issued by Virginia counties, Arlington has issued and plans to iss ue its
debt prudently. Arlington will remain within the acceptable range of debt capacity factors with the CIP based on conservati ve
assumptions, as illustrated on the following pages.
B - 15
Underlying Assumptions
The projected ratios shown in the following tables are based on both the County’s and Schools’ adopted CIPs. It is important to note
that the County’s financial and debt management policies view debt capacity on a combined basis (i.e., County and Schools) as do the bond
rating agencies. The appendix to this document includes a brief summary of the School Board’s adopted CIP.
The projected debt ratios are based on conservative revenue growth assumptions: 3% growth in FY 2014 – FY 2016 and 4%
thereafter. Similarly conservative assumptions have been used for projected growth in market value of the County’s tax base (identical to
revenue growth assumptions) and per capita income growth of 3 percent annually.
It should be noted that these debt ratios include only general obligation and other tax-supported debt, including bonds issued through
the Industrial Development Authority or other conduit issuers for County projects where debt service is paid for from the General Fund. For
example, these ratios include the Buckingham Village 3 land acquisition financing and subject-to-appropriation debt planned for the acquisition
and construction of new office space and year -round homeless shelter. The ratios do not include bonds where the Count y has provided a
moral obligation pledge as credit support to a project (e.g., the Kettler Iceplex facility or the Gates of Ballston project). In charts C and D of
this section, the customary general obligation debt to the tax base ratio chart has been amended to also show the effect of moral obligation or
“subject-to-appropriation” backed capital financing. The ratios do not include debt that is supported by user fees from enterprise funds,
including debt included for Utilities Fund and Ballston Garage. Finally, consistent with the County’s financial and debt management
policies, this analysis does not include revenue bonds anticipated to be issued for transportation projects and supported by the commercial
real estate tax or the Crystal City – Potomac Yard – Pentagon City tax increment financing area.
Projected Debt Ratios
Ratio of Debt Service to General Expenditures No Greater Than 10% -- Over the ten -year planning period, this ratio will
range from 8.7% to 9.4%, peaking at 9.4% in FY 2018.
Outstanding Debt as Percentage of Market Valuation of Tax Base No Greater than 4% -- The amount of debt that the County
carries is moderate when compared to its tax base. For example, in FY 1978 the County's outstanding General Fund serviced tax-supported
general obligation debt equaled 2.54%. At the end of FY 2012, this ratio is 1.26%. This ratio is projected to range from 1.39% to 1.64% over
the ten year planning period.
Ratio of Debt per Capita to Per Capita Income No Greater th an 6% -- The County estimates that the Debt to Income ratio
will range from 5.1% to 5.4%, assuming 3% growth in per capita income.
Growth in Debt Service over the Ten Year Planning Period No Greater than Ten -Year Historical Growth in Revenues –
Average annual growth in debt service is estimated at 5.5% compared to historical average ten-year revenue growth of 5.7%.
B - 16
Chart A
Adopted Adopted
FY2012 FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022
AUTHORIZED UNISSUED BONDS - COMBINED COUNTY/SCHOOLS 100,742,000 48,969,000 4,630,000 4,255,000 - - - - - - -
GENERAL OBLIGATION BOND ISSUANCE FY 13-22 CIP - COUNTY - 47,480,000 63,325,000 78,500,000 45,210,000 93,260,000 50,880,000 98,320,000 56,270,000 104,950,000 54,200,000
GENERAL OBLIGATION BOND ISSUANCE FY 13-22 CIP - SCHOOLS - 6,200,000 36,500,000 47,500,000 33,200,000 69,000,000 34,000,000 55,000,000 35,000,000 51,000,000 45,000,000
UTILITY FUND BOND ISSUANCE 8,500,000 11,350,000 - - - - - - - - -
CRYSTAL CITY TIF BOND ISSUANCE 13,930,000 36,000,000 8,500,000
TRANSPORTATION CAPITAL FUND BOND ISSUANCE 21,000,000 35,500,000 41,500,000 30,000,000
GENERAL OBLIGATION BONDS RETIRED (1) 52,304,763 52,151,155 59,646,757 61,524,127 64,067,739 68,901,882 73,315,725 76,658,087 79,293,211 84,027,954 87,168,281
NET TAX-SUPPORTED GENERAL OBLIGATION
BONDS AT END OF FISCAL YEAR 736,370,410 786,868,254 831,676,497 900,407,370 914,749,631 1,008,107,749 1,019,672,025 1,096,333,938 1,108,310,727 1,180,232,773 1,192,264,493
SUBJECT-TO-APPROPRIATION BOND ISSUANCE(8) 52,816,999 -
SUBJECT-TO-APPROPRIATION BONDS RETIRED 6,676,769 7,135,155 8,108,540 9,061,926 4,399,756 4,496,819 4,597,558 4,670,589 4,733,966 4,802,343 4,874,429
NET TAX-SUPPORTED BONDS AT END OF FISCAL YEAR (2) 807,862,528 904,042,217 940,741,920 1,000,410,867 1,010,353,372 1,099,214,671 1,106,181,388 1,178,172,713 1,185,415,536 1,252,535,239 1,259,692,529
SCHOOLS DEBT SERVICE 38,262,647 42,200,088 44,808,301 45,548,415 47,823,690 49,604,657 54,027,312 55,470,502 57,135,420 58,430,514 60,319,041
COUNTY DEBT SERVICE (7) 56,855,410 59,114,491 63,056,912 67,865,378 66,918,538 70,701,271 74,931,631 76,685,766 81,711,871 85,732,516 90,760,304
TOTAL TAX SUPPORTED DEBT SERVICE 95,118,057 101,314,579 107,865,213 113,413,793 114,742,227 120,305,928 128,958,942 132,156,268 138,847, 291 144,163,030 151,079,345
% GROWTH IN TAX-SUPPORTED DEBT SERVICE - COUNTY 4.8% 4.0% 6.7% 7.6% -1.4% 5.7% 6.0% 2.3% 6.6% 4.9% 5.9%
SIX-YEAR AND TEN-YEAR AVERAGES 5.4% 5.95%
% GROWTH IN TAX-SUPPORTED DEBT SERVICE - COUNTY/SCHOOLS 8.7% 6.5% 6.5% 5.1% 1.2% 4.8% 7.2% 2.5% 5.1% 3.8% 4.8%
SIX-YEAR AND TEN-YEAR AVERAGES 5.46% 5.46%
GENERAL GOVERNMENT EXPENDITURES (3) 1,101,756,209 1,159,254,104 1,194,031,727 1,229,852,679 1,266,748,259 1,317,418,190 1,370,114,917 1,424,919,514 1,481,916,295 1,541,192,946 1,602,840,664
DEBT SERVICE AS % OF EXPENDITURES (NOT TO EXCEED 10%) 8.6% 8.7% 9.0% 9.2% 9.1% 9.1% 9.4% 9.3% 9.4% 9.4% 9.4%
MARKET VALUATION OF TAXABLE PROPERTY (4) 63,964,821,700 65,244,118,134 66,549,000,497
67,879,980,507 69,237,580,117 70,622,331,719 72,034,778,353 73,475,473,921 74,944,983,399 76,443,883,067 77,972,760,728
NET TAX SUPPORTED DEBT AS % OF MARKET VALUATION 1.26% 1.39% 1.41% 1.47% 1.46% 1.56% 1.54% 1.60% 1.58% 1.64% 1.62%
POPULATION (5) 211,700 214,613 217,525 220,438 223,350 226,263 229,175 232,088 235,000 236,180 237,360
DEBT PER CAPITA $3,816 $4,212 $4,325 $4,538 $4,524 $4,858 $4,827 $5,076 $5,044 $5,303 $5,307
INCOME PER CAPITA (6) $74,700 $79,967 $82,366 $84,837 $87,382 $90,004 $92,704 $95,485 $98,349 $101,300 $104,339
NET TAX-SUPPORTED GENERAL OBLIGATION
DEBT TO INCOME (NOT TO EXCEED 6%) 5.1% 5.3% 5.3% 5.3% 5.2% 5.4% 5.2% 5.3% 5.1% 5.2% 5.1%
(1) Excludes Utilities and Transportation Capital Fund bonds. Excludes Crystal City TIF bond issuance
(2) Excludes credit support commitments on revenue bonds or lease-backed bond financings, includes IDA Bonds supported by the County's General Fund. For Subject to Appropriation debts, see Chart C.
(3) Includes expenditures of General Fund and certain Special Revenue Funds of the County and School Board. 3 percent growth in FY 2014 - FY 2016. 4% beyond
(4) Assumes 3 percent growth in FY 2014 - FY 2016, 4% beyond
(5) Population growth as estimated by the Arlington County Planning Division.
(6) Source: Per capita personal income was computed using Census Bureau midyear population estimates. Estimates for 2000-2010 reflect county population estimates available as of April 2012
(7) Includes both General Obligation and Subject to Appropriation debt, including debt for Buckingham Village 3 acquisition. Excludes costs of issuance.
(8) FY2013 includes $33 million Buckingham Village 3 refinancing and $26 million issuance for 2020 acquisition
Arlington County, Virginia
Debt Ratio Forecast
Adopted 2013 - 2022 Capital Improvement Program
B - 17
6.0%
8.0%
10.0%
12.0%
Ratio of Tax‐Supported Debt Service
to General Expenditures
Adopted FY 2013 ‐ FY 2022 CIP
(NOT TO EXCEED 10%)
Chart B
2000 2005 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Projection 7.9% 7.6% 8.2% 8.6% 8.6% 8.7% 9.0% 9.2% 9.1% 9.1% 9.4% 9.3% 9.4% 9.4% 9.4%
Ceiling 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0%
0.0%
2.0%
4.0%
B - 18
Chart C
FY2012 FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022
Tax-Supported General Obligation Debt $736,370,410 $786,868,254 $831,676,497 $900,407,370 $914,749,631 $1,008,107,749 $1,019,672,025 $ 1,096,333,938 $1,108,310,727 $1,180,232,773 $1,192,264,493
Tax-Supported Subject to Appropriation ("STA") Debt
Capital Equipment Leases 28,792,511 20,145,997 20,787,904 22,128,687 22,341,828 20,025,817 17,079,059 16,974,858 17,687,544 19,140,109 18 ,413,282
Industrial Development Authority (IDA) Bonds (5) 81,605,000 74,155,000 66,425,000 58,305,000 55,110,000 51,885,000 48,625,000 45,325,000 41,985,000 38,600,000 35,165,000
Buckingham Village 3 Notes/Bonds (8) - 32,816,999 32,516,999 32,045,854 31,551,151 30,981,714 30,332,589 29,651,009 28,935,350 28,183,907 27,394,893
2020 14th St N Acquisition 26,425,000 25,896,500 24,839,500 23,459,528 22,079,556 20,699,583 19,319,611 17,939,639 16,559,667 15,179,694
Peumansend Creek Regional Jail 724,338 601,937 481,938 361,938 241,938 121,938 - - - - -
No. Va. Criminal Justice Academy 256,932 256,389 256,883 257,130 256,947 266,324 - - - - -
Subtotal $111,378,780 $154,401,322 $146,365,224 $137,938,109 $132,961,392 $125,360,349 $116,736,232 $111,270,478 $106,547,532 $102,483,68 3 $96,152,869
Project-Supported Subject to Appropriation ("STA") Debt (1)
Ballston Public Parking Garage 11,300,000 10,800,000 10,300,000 9,800,000 9,300,000 8,800,000 8,300,000 7,800,000 7,300,000 6,800,000 6,300,000
IDA Lease Revenue Bonds (Ballston Skating Facility) (7) 29,190,000 28 ,245,000 27 ,275,000 26 ,280,000 25 ,255,000 24 ,195,000 23 ,095,000 21 ,945,000 20 ,740,000 19 ,480,000 18 ,155,000
Summary of Tax‐Supported General Obligation Bonds & Subject To Appropriation‐Type Financings (6)
Ratio of Outstanding Debt to Market Value
As of June 30
IDA Lease Revenue Bonds (Ballston Skating Facility) (7) 29,190,000 28,245,000 27,275,000 26,280,000 25,255,000 24,195,000 23,095,000 21,945,000 20,740,000 19,480,000 18,155,000
Waste-to-Energy Plant (2) 2,003,880 - - - - - - - - - -
Gates of Ballston (3) 23,000,000 23,000,000 23,000,000 23,000,000 23,000,000 23,000,000 23,000,000 23,000,000 23,000,000 23,000,000 23,000,000
Subtotal 65,493,880 62,045,000 60,575,000 59,080,000 57,555,000 55,995,000 54,395,000 52,745,000 51,040,000 49,280,000 47,455,000
LESS: State Regional Jail Reimbursement (4) (1,126,000) (1,126,000) - - - - - - - - -
Total Tax-Supported General Obligation (GO) & ALL STA Financings $912,117,070 $1,002,188,576 $1,038,616,721 $1,097,425,479 $1,105,26 6,023 $1,189,463,098 $1,190,803,257 $1,260,349,416 $1,265,898,260 $1,331,996,457 $1,335,872,362
Total Tax-Supported GO and Tax-Supported STA Financings $846,623,190 $940,143,576 $978,041,721 $1,038,345,479 $1,047,711,023 $1,133,468,098 $1,136,408,257 $1,207,604,416 $1,214,858,260 $1,282, 716,457 $1,288,417,362
Total Project-Supported STA Financings (2) $65,493,880 $62,045,000 $60,575,000 $59,080,000 $57,555,000 $55,995,000 $54,395,000 $52,745,000 $51,040,000 $49,280,000 $47,455,000
Market Value of Taxable Property $63,964,821,700 $65,244,118,134 $66,549,000,497 $67,879,980,507 $69,237,580,117 $70,622,331,719 $72,0 34,778,353 $73,475,473,921 $74,944,983,399 $76,443,883,067 $77,972,760,728
Total Tax-Supported GO & ALL STA Financings
as Percent of Market Value (Not to Exceed 4%) 1.43% 1.54% 1.56% 1.62% 1.60% 1.68% 1.65% 1.72% 1.69% 1.74% 1.71%
Total Tax-Supported GO & Tax-Supported STA Financings
as Percent of Market Value 1.32% 1.44% 1.47% 1.53% 1.51% 1.60% 1.58% 1.64% 1.62% 1.68% 1.65%
Total Project-Supported STA Financings (Credit Enhancement)
as Percent of Market Value (2) 0.10% 0.10% 0.09% 0.09% 0.08% 0.08% 0.08% 0.07% 0.07% 0.06% 0.06%
(1) Debt service on these financings is intended to be repaid by user fees or tenant rental income, not by County General Fund revenues.
(2) Includes Arlington's share of the EPA-mandated retrofit of the waste-to-energy plant.
(3) The County Board approved the credit support for the long-term financing of the Gates of Ballston for an amount not to exceed $23.0 million.
(4) Includes principal only.(4) Includes principal only.
(5) Includes the Series 2004 IDA Lease Revenue Bonds, and the Series 2009 and Series 2011 IDA Revenue Bonds
(6) Excludes Self-supporting debt in the Utility and Transportation Investment Funds.
(7) Includes the bonds issued by the IDA in 2010 to refinance the construction of two ice rinks, the office space, and the training facility on top of the 8th Level at the Ballston Parking Garage.
(8) Buckingham Village 3 bank notes expire in December 2012. These will be refinanced as 30 year fixed rate bonds in FY2013
B - 19
2.00%
2.50%
3.00%
3.50%
4.00%
4.50%
Ratio of Tax‐Supported & Subject to Appropriation Financing
as a Percentage of Market Value
Adopted FY 2013‐ FY 2022 CIP
Chart D
FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022
Project‐Supported 0.10% 0.09% 0.09% 0.08% 0.08% 0.08% 0.07% 0.07% 0.06% 0.06%
Tax‐Supported 1.44% 1.47% 1.53% 1.51% 1.60% 1.58% 1.64% 1.62% 1.68% 1.65%
Not to Exceed 4% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00%
0.00%
0.50%
1.00%
1.50%
Tax‐Supported
Project‐Supported Not to Exceed 4%
B - 20
5.3% 5.3% 5.3%
5.2%
5.4%
5.2% 5.3%
5.1% 5.2%
5.1%
3.0%
4.0%
5.0%
6.0%
7.0%
Ratio of Tax‐Supported General Obligation Debt to Income
Adopted FY 2013 ‐ FY 2022 CIP
Not to Exceed 6%
Chart E
0.0%
1.0%
2.0%
FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022
Tax‐Supported Debt to Income Not to Exceed 6%
B - 21
Arlington, Virginia
MAINTENANCE CAPITAL PROGRAM CIP
2013 − 2022
Maintenance capital (MC) is a broad program that seeks to achieve a long -stated goal to “maintain what we have”. The MC program in Arlington County
is designed to protect assets from premature failure, minimize unnecessary risks and loss, and achieve the optimal useful life of assets. The goal is to ensure
that existing capital assets are maintained in reliable, serviceable condition without significant variations in annual capital appropriations. The MC program
focuses on non- expansion projects that do not change the footprint of a building, expand the size of a current asset, expand services, or increase the
operating budget once complete. To qualify for funding in the MC program, projects must meet the criteria for a capital project and significantly extend
the life of the asset. Arlington County makes critical investments in four maintenance capital areas: Transportation, Information Technology, Facilities, and
Parks and Recreation. These components are essential to daily operation s and effective delivery of County s ervices, and over the years have received
varying levels of funding.
This past year signaled an important shift in approach to Maintenance Capital, especial ly for Facilities and Parks. The County Board appointed a citizen-
led CIP Working Group, and that group worked carefully with staff to understand the nature and scope of the challenges in fac ilities and parks. As part
of their recommendations to the County Board last fall, the CIP Working Group recommended a “catch up” and “keep up” philosophy, whereby we
would seek to reduce identifi ed backlog gradually over several years (catch up), while remaining current with items due for replacement (keep up). S uch
an approach requires additional sustained funding, as reflected in the details that follow. The County Board already took positive steps towards
implementation of this strategy with the recent FY 2013 budget adoption process, where a n approximate ½ cent real estate tax increase was dedicated to
baseline maintenance capital funding. This increase in baseline, when combined with the funding levels proposed via bonds and PAYG, will turn the tide
on maintenance capital, and gradually draw down the backlog. While many variables will ultimately affect the timing of when we complete the backlog, we
have set a path that leads us to a much better state of repair, particularly for our facilities and parks.
Transportation
The Transportation Maintenance Capital program maintains the transportation infrastructure by repaving streets, maintaining pedestrian and vehicle
bridges, maintaining signals and signal infrastructure and replacing bus shelters. The County currently maintains over 960 la ne miles by a c ombination of
resurfacing, rebuilding and slurry seal maintenance. The paving program utilizes a Pavement Condition Index (PCI) to track th e current street condition
along with a replacement cycle based on industry standards to estimate what is required to maintain appropriate conditions. In addition, the Transportation
MC program includes over 50 vehicular and pedestrian bridges and culverts, 215 bus shelters, and 280 signalized intersections . Finally, the Transportation
MC program coordinates with the Par ks MC program on the maintenance of bicycle and pedestrian trails, since roughly half of the off -road bicycle
network is outside park boundaries, and the off -street bicycle network investments must be jointly coordinated with the on- street bicycle network and
pavement marking priorities . The County’s trail system is heavily used for recreation and by commuters and keeping these trails well maintained and
connected is important.
C - 1
Information Technology
Maintenance Capital funding for Information Technology pr ovides the foundation to advance eGovernment Master Plan III initiatives. The systems and
software serve the departments and typically reach the end of their useful life -expectancy between four and 10 years, at which point the systems become
increasingly costly to maintain and difficult to exchange information with other systems. Priorities for determining which applications to replace first are
driven by age, criticality of the system to operations, and availability of on -going support from the application’s vendor. Master lease financing is also a
significant funding source for technology improvements.
Facilities
Over the life -cycle of facilities the roofs, finishes, mechanical, electrical, and other systems require replacement and renewal to maintain go od operating
condition, a professional appearance, and to meet current code requirements. Projects do not substantially alter the characteristics or enlarge the footprint
of the facility, but extend the useful life and may include improvements to safety systems and energy performance.
Parks and Recreation
The Parks Maintenance Capital Program funds the replacement or major renovation of different types of outdoor park and recreation facility assets
including athletic fields and courts, lighting, playgrounds, picnic shelters, restrooms, site amenities, parking a nd specialty facilities such as the skate park.
The program also addresses accessibility, safety and storm water improvements that are complementary to renovating or replaci ng assets. The Synthetic
Turf Program (referenced in the Parks and Recreation Summary under General Government) covers both the replacement of synthetic turf under the
Parks Maintenance Capital Program and the conversion of several existing grass fields to new synthetic turf fields.
Maintenance Capital Strategy
As an outgrowth of the 2011 -2016 CIP process, the County Board created a CIP Working Group that worked with staff extensively and culminated in a
series of recommendations in the fall of 2011. Building on the condition assessments completed in 2008 – 2009, the group’s efforts were a catalyst for
action and our funding approach in this CIP. Three major funding recommendations were included, paraphrased below:
1. Eliminate the maintenance capital backlog by the end of FY 2017, using a gradual ramp up funding approach on the backlog (catch-up)
2. To pay for catch -up and keep- up, determine what can be bonded, what is P AYG, and what is o perating. Bundle projects as total rehabs or
renovations to reduce costs, reduce service disruptions and allow bonding.
3. Ensure all the required resources (staffing, planning, design, and procurement) are sufficient to address identified catch up and keep up needs,
building requirements into base budgets, and considering close-out funds and new funds as other options.
Staff and the working group cautioned that the backlogs identified in the assessment s were ROUGH ESTIMATES, to be used as a starting point , since
they did not include certain project delivery cost items (e.g., design, staff chargebacks, permit fees, construction administration, stormwater improvements
(for parks) and third party inspection when needed) , and many factors actually affect project costs after they are fully scoped, designed, and bid. Partially
offsetting this effect, they did include som e items that are normally addressed with operating funds. Additionally, the assessments did not account for
underutilized or vacant assets, planned replacements, appropriate deferrals , and the positive effects of bundling . While total need s over time ar e thus
influenced by factors that can either increase or decrease the bottom line reflected in the database , it will remain a very useful tool for both budgeting and
C - 2
project planning. And it will remain dynamic as both unit costs and inventory changes over time, including additions to the inventory such as Arlington
Mill and Long Bridge . With that as context, the following is an illustration of how our proposed funding will affect the backlog that was identified at a
point in time for analysis by the CIP working group last fall. As a rough approximation of the costs and inventory not currently included in the
assessments, the table below includes a 20 percent adjustment factor to account for any difference.
(In $1,000s)
Facilities Maintenance Capital
FY PAYG Bonds PAYG/Bonds
Total Assess Results
**Assessments
Adjusted 20%
(See Footnote)
Cumulative
Funding vs.
Identified
Need
Cumulative
Percent of
Identified
Need
Funded
Cumulative
Percent of
Identified
Need
Unfunded
13 4,659 1,038 5,697 9,235* 11,082 (5,385) 51% 49%
14 5,828 2,587 8,415 6,009 7,211 (4,181) 77% 23%
15 6,470 3,500 9,970 9,613 11,536 (5,747) 81% 19%
16 3,657 3,500 7,157 14,672 17,606 (16,196) 66% 34%
17 4,000 3,000 7,000 2,733 3,280 (12,476) 75% 25%
18 4,000 3,000 7,000 4,700 5,640 (11,116) 80% 20%
Total 28,614 16,625 45,239 46,962 56,354
Notes:
*Original backlog of $15.7 million adjusted to $9.2 based upon a number of facilities that are deemed to be subject to reuse, repurposing, or
deconstruction.
**20% adjustment to account for associated cost not captured in the EMG data based such as design fees, permitting, and other soft costs.
For facilities, t his illustrates that our funding plan makes measurable progress on the backlog, but suggests caution on sufficient funding for keep up ,
particularly when the assessments recommend a high level of investment in one particular year, as indicated in FY 16 . While a concern, we must also be
cautious to not over rely on this one indicator, but rather use the indicator carefully. Therefore, we plan to update and record results of the database at a
set point every year, so we can have a consistent basis for plotting trends. The an nual reading will reflect the accumulated effect of completed projects,
appropriate deferrals, changes in unit costs from actual bid experience, any changes in our assumptions on useful life of cer tain elements, and any changes
in inventory. Another indi cator will be contractor -assisted updates to the condition assessments, where actual conditions in the field will be reassessed.
We believe a four year cycle is appropriate for facilities and parks.
C - 3
(In $1,000s)
Parks Maintenance Capital
FY PAYG Bonds PAYG/Bonds
Total Assess Results
*Assessments
Adjusted 20%
(See Footnote)
Cumulative
Funding vs.
Identified
Need
Cumulative
Percent of
Identified
Need
Funded
Cumulative
Percent of
Identified
Need
Unfunded
13 4,777 3,225 8,002 29,200 35,040 (27,038) 23% 77%
14 2,253 3,643 5,896 6,420 7,704 (28,846) 33% 67%
15 3,281 6,240 9,521 5,554 6,665 (25,990) 47% 53%
16 2,253 6,165 8,418 4,761 5,713 (23,285) 58% 42%
17 2,253 6,483 8,736 3,300 3,960 (18,509) 69% 31%
18 3,367 6,677 10,044 4,300 5,160 (13,625) 79% 21%
Total 18,184 32,433 50,617 53,535 64,242
Note:
*20% adjustment to account for associated cost not captured in the EMG data based such as stormwater, design fees, and other soft costs.
For parks, this also illustrates steady progress on the identified backlog. However, interpretation and judgment is needed, since this was the first
assessment on parks, and the assessments did not include costing for items such as storm water, permitting, design, construction admin, and bringing up to
standards. After applying judgment, our target is to get through 70- 80% of the backlog by FY 18 for parks . Over time, the plan is to achieve a long
term sustainable balance with a minimal backlog.
The MC funding strategy outlined above relies on a combination of funding sources:
• Bonds – This CIP continues the practice of funding MC projects from bonds when projects meet bond capitalization criteria – minimum cost of
$100,000 and the useful life is not less than the average life of the bonds (typically 10- 11 years). The adopted 2013-2022 CIP reflects an increased
level of bond funding for parks and facilities, totaling $10.5 million in the November 2012 referenda (which includes FY 2013 & 2014 in the tables
above) compared to $8.1 million in the last CIP. Out-year 2014 (FYs 2015 and 2016) and 2016 (FYs 2017 and 2018) are programmed at $19.4 and
$19.1 million respectively.
• PAYG -- The CIP includes increased levels of PAYG funding for parks and facilities, reflecting both historic levels of baseline PAYG funding as
well as the recent increase in real estate taxes that yields an additional $2.8 million in ongoing funding. To fully realize the PAYG amounts noted
in the tables above, additional one-time money, ranging from $2 million -$4 million annually could be needed.
Finally, the overall PAYG plan assumes continued funding of a capital contingent ($2 million) to addre ss any unanticipated events that require capital
investment. Having an adequate contingent will allow staff to address emergency or unforeseen issues without having to repri oritize or delay already
planned work.
C - 4
Another important element of a successful maintenance capital program noted by the CIP Working Group is staffing. Recognizing this and to meet the
opportunities provided by increased funding, over strengths were added to Parks in the fall of 2011, and additional over strengths were added to Facilities
in 2012. The facilities positions include one project programmer position that will solely focus on efficient project scoping, estimating, and
documentation—using the database as a starting point, but taking into consideration all the other fact ors that influence smart investment decisions. A
similar programmer position is being considered for parks. The costs of these positions are largely funded out of MC project budgets. As staff executes
the plan, we will continue to reassess staffing levels to insure they remain appropriate with project execution targets.
To support and illustrate our near term funding request, we are also including a proposed project plan over the next 4 years (FY 13 -16). This list will
remain dynamic; only the immediate following year (in this case FY 13) should be taken as a firm project listing. The plans are placed directly behind the
parks and facilities pages. The projects were prioritized using the prioritization guidelines previously endorsed by the County Board, summarized in the
tables below. The yearly plan will remain dynamic, but indicates what we are specifically planning for execution in the near term. The CIP also estimates
levels of funding in FY 17 -22 based on our best judgment of how increased investments will affect the inventory, and what we anticipate will be needed
for sustainment over time.
Facilities Maintenance Capital
Prioritization Methodology
• Items that require immediate action
(leaking roofs)
Urgency (50%)
• Corrections to prevent failures of
life/safety systems (fire alarms)
• Reliability of HVAC, electrical and
plumbing components or systems
Facility Condition (30%)
• Preventing accelerated deterioration
• Components or systems that require
replacement to meet changing program
goals, energy efficiency goals, etc.
Special Considerations (20%)
• Timely combination with other
projects or component replacements
Parks Maintenance Capital
Prioritization Methodology
• Age and life safety
Condition (50%)
• Ordinance and policy compliance
• Americans with Disabilities Act
(ADA) and Consumer Product Safety
Commission (CPSC)
• Usage, community need, program
demand
Program Adequacy (30%)
• Industry standards, County standards
• Project synergies, economies of
Special Considerations (20%)
scale, project readiness, adopted
master plans, and County Board
priorities
C - 5
Arlington, Virginia
REGIONAL PARTNERSHIPS AND OTHER: PROGRAM FUNDING SUMMARY CIP
2013 − 2022
Arlington annually contributes capital funding to several regional organizations, which provide beneficial services to Arling ton residents and visitors.
10 YEAR CATEGORY SUMMARY (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year
Total
Northern Virginia Regional Park Authority 526 533 550 566 583 601 619 638 657 677 5,950
Northern Virginia Community College
312 370 429 490 553 561 570 578 587 596 5,046
Northern Virginia Criminal Justice Academy
151 151 151 151 151 151 151 151 151 151 1,510
Peumandsend Creek Regional Jail Authority
146 138 132 125 118 0 0 0 0 0 659
Capital Contingency 3214 2000 2000 2000 2000 2000 2000 2000 2000 2000 21,214
Total Recommendation 4,349 3,192 3,262 3,332 3,405 3,313 3,340 3,367 3,395 3,424 34,379
CATEGORY FUNDING SOURCES (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year
Total
New Funding
State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 PAYG 4,349 3,192 3,262 3,332 3,405 3,313 3,340 3,367 3,395 3,424 34,379 New Bond Referenda 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 4,349 3,192 3,262 3,332 3,405 3,313 3,340 3,367 3,395 3,424 34,379 Previously Approved Funding
Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 0 0 0 0 0 0 0 0 0 0 0 Total Funding Sources 4,349 3,192 3,262 3,332 3,405 3,313 3,340 3,367 3,395 3,424 34,379
C - 6
REGIONAL PARTNERSHIPS
REGIONAL PARTNERSHIPS MAINTENANCE CAPITAL
2013 − 2022 CIP
Northern Virginia Regional Park Authority
Northern Virginia Regional Park Authority owns and protects more than 10,000 acres of land in 19 parks, including Potomac Overlook, Upton Hill and the W&OD Regional Pa rks in
Arlington. Funds are used to preserve, improve, expand, renovate and enhance the parks and facilities. This program helps to improve the quality of the parks, encourage greater usage
and continue to serve the needs of the public. This augments the Public Spaces Master Plan (PSMP) and as well as complements open space, cultural and recreational programs of
Arlington County and five other member jurisdictions.
Arlington is one of six jurisdictions that share costs associated with NVRPA's capital program. The County's share is based o n the percentage distribution of population estimates
provided by the US Bureau of the Census. Arlington’s capital contribution is from PAYG funding that is appropriated annually as part of the operating budget. The operating
contribution is included as part of the general fund’s regional partnerships operating budget.
Northern Virginia Community College
This represents the County's ongoing capital contribution to the Northern Virginia Community College (NVCC) for land acquisit ion and site development of all campuses; and, as
determined by the Northern Virginia Community College Board, certain temporary and permanent buildings. The goal of this project is to support Northern Virginia Community
College in the land acquisition and site developments associated with its capital development plan. Resolutions were passed b y Arlington and eight other jurisdictions to support
Northern Virginia Community College. Every dollar leverages 29 dollars in state funds back to Northern Virginia.
Arlington is one of nine jurisdictions that share costs associated with NVCC's capital program based on the original Fai r Share Allocation. The CIP for FY 2013 reflects an allocation of
$1.50 for each person living in each particular jurisdiction. For FY 2014 - 2017, allocations reflect an additional $0.25 per capita each year for a maximum rate of $2.50 per capita in FY
2017 through FY 2022. Population figures are from the Weldon Cooper Center for Public Service. Arlington ’s capital contribution is from PAYG funding that is appropriated annually as
part of the operating budget. The operating contribution is included as part of the General Fund’s regional partnerships operating budget. It is anticipated that members of the County
Board and School Board will meet with NVCC to discuss their future capital program and the County’s commitment to that program. The Arlington Public Schools have several ongoing
programs with NVCC including the new Transitional College Program.
Northern Virginia Criminal Justice Academy
In 2006, the principal members agreed to fund the construction of the Emergency Vehicle Operations Center (EVOC). The bond financing contributions towards the NVCJTA
partnership continues through 2026. The Northern Virginia Criminal Justice Training Academy is dedicated to advancing competence and professionalism in law enfor cement. The
Academy is the largest regional law enforcement training facility in Virginia. Every person employed as a full -time law enforcement officer must meet compulsory minimum training
standards. Individuals must first be hired by a supporting agency as a police officer or deputy sheri ff before coming to the Academy for training. The training must be obtained from a
state certified law enforcement training facility and must be completed within 12 months of the date of appointment.
The Academy receives state funding as well as support from the jurisdictions it serves. Arlington is also one of ten supporting jurisdictions that provide a proportionate share of the
Academy's operating budget based on its sworn population in relation to the total sworn population of all participating agenc ies. Arlington’s capital contribution is from PAYG funding
that is appropriated annually as part of the operating budget and pays for our share of debt service on the bonds for the Eme rgency Vehicle Operations Center.
C - 7
Peumandsend Creek Regional Jail Authority
The Peumansend Creek Regional Jail (PCRJ) is a 336-bed facility that is an extension facility for cities of Alexandria, Richmond and counties of Arlington, Prince William, Loud oun and
Caroline. The bond financing contributions towards the PCRJ continues through 2017. The regional jail provides detention services and related operations deemed necessary for the
protection of society and the health and custody of the inmates. Faced with overcrowding in the local jails, Arlington, and f ive other jurisdictions, reduces their populations by forwarding
a select group of inmates to the Peumansend Creek Regional Jail. PCRJ offers programs and services, to include a jail industr y, to assist with reintegrating the inmates into society.
Arlington is one of six jurisdictions that participate in this partnership but is only one of four jurisdictions who share in the bond financing for the regional jail. The County's annual share
of the capital cost is based on current bed allocation and is projected at 24.0 percen t. This is based on the 60 beds allocated to Arlington of the total 250 beds that participated in the
bond financing. Arlington’s capital contribution is from PAYG funding that is appropriated annually as part of the operating budget. The operating contri bution is included as part of the
general fund’s regional partnerships operating budget.
Capital Contingency
One-time funds are available as contingent for unforeseen capital project costs or pending capital requirements. Of this amount, $3.0 million is set aside in FY13 as seed money for a
Police and Sheriff firearms training facility. Staff is currently assessing the available options and locations for either bu ilding a county-owned facility or co-building a facility with a
surrounding jurisdiction.
C - 8
Arlington, Virginia
LOCAL PARKS AND RECREATION PROGRAMS PROGRAMS
Program Description
The Local Parks and Recreation capital improvement program consists of key projects and program elements that will provide for the construction of new park facilities and major upgrades or
renovations of existing park facilities. The program represents an implementation plan and strategies based upon sound planning to ensure that capital funding is invested strategically for the
benefit of the County and its residents.
Program Summary
The Local Parks and Recreation projects focus on completing or furthering parks that have Board -adopted park master plans or have undergone significant community planning efforts.
The FY2013 - FY2022 CIP contains funding to complete significant phases or final completion of several important projects including Long Bridge Park, Tyrol Hills Park, Four Mile
Run Near-Stream Improvements and Mosaic Park. The ten-year CIP also includes funding for master planning, design and construction of new parks including several parks identified
in the Crystal City Sector Plan, Jennie Dean Park, Glebe and Randolph Park and several neighborhood parks in the Ball ston-Virginia Square area. The program also focuses on funding
for four ongoing program elements: Parks Capital Maintenance Program, Synthetic Turf Program, Parks Land Acquisition and Open Space Program and Park Enhance ment Grants
Program. The four programs are summarized on this page.
The Parks Maintenance Capital Program provides for recurring, systematic reinvestment in existing outdoor facilities to insure efficient, safe, high quality park and recreation f acilities.
The program funds the replacement or major renovation of different elements of outdoor park and recreation facility asse ts including athletic fields and courts, lighting, playgrounds,
picnic shelters, restrooms, site amenities, trails, parking, and specialty facilities such as the skate park. The program als o addresses accessibility, safety and storm water improvements
that are complementary to renovating the assets.
The Synthetic Turf Program is largely focused on replacement of existing synthetic fields that are approaching the end of the ir useful life. At the end of 2013, the County will have
twelve synthetic turf fields, including the three fields added in 2011 at Long Bridge Park, the County's first synthetic baseball diamond at Barcroft Pa rk added in 2012 and the
community field at Rocky Run Park which will be finished in 2013. The funding for FY2013 -FY2022 also identifies the opportunity to convert four grass fields to synthetic turf.
Conversion costs involve installation of synthetic grass, in-fill underground drainage systems, lighting, and site amenities including site furnishings, pathways, landscaping and permane nt
or portable restrooms as needed. Due to the additional playability of synthetic grass fields, the new synthetic fields would be lighted so that they are available for evening play.
The Parks and Land Acquisition and Open Space Program funds the acquisition of strategic parcels of park land. Potential acquisition sites are identified in the Public Spaces Master
Plan and the Land Acquisition and Preservation Policy (anticipated adoption fall 2012).
The Park Enhancement Grant (PEG) Program enhances parks by providing citizen-initiated projects in a timely manner. The goal of this program is to enable Arlington residents to
initiate small capital improvement and beautification projects for parks and recreation facilities in their respective neighb orhoods. The PEG Program encourages community
involvement and fosters pride by enabling creative improvements in parks and recreation facilities. Community -proposed projects are submitted annually to the Arlington County Park
and Recreation Commission for review, who then recommends a list of projects to the County Board for final approval. The current individual project limit is $15,00 0. Since the
program began in 1978, more than 240 projects have been funded. These include projects such as park furniture, pathway s, fencing, public art, educational and interpretive signage as
well as sports and building amenities.
Master Plan Impact
The 2005 Public Spaces Master Plan is an element of the County's Comprehensive Plan. The PSMP will be updated within the time frame of this ten year CIP. In addition, the Land
Acquisition and Preservation Policy is currently under development and should be adopted by the County Board in 2012.
C - 9
Arlington, Virginia
LOCAL PARKS AND RECREATION PROGRAMS: PROGRAM FUNDING
SUMMARY
CIP
2013 − 2022
10 YEAR PROGRAMMED CATEGORY SUMMARY (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year
Total
Maintenance Capital 6,947 5,896 8,493 8,418 8,736 8,930 7,253 7,253 7,253 7,253 76,432
Parks Enhancement Grants 100 103 106 109 113 116 119 123 127 130 1,146
Parks Land Acquisition and Open Space 1,000 0 3,000 0 4,440 0 3,000 0 3,000 0 14,440
Synthetic Turf Program 1,055 1,011 2,056 2,185 2,126 2,227 2,376 2,390 2,521 6,917 24,864
Park Master Plans 51,197 21,250 7,426 508 9,736 2,122 10,495 1,126 20,940 15,855 140,655
Total Recommendation 60,299 28,260 21,081 11,220 25,151 13,395 23,243 10,892 33,841 30,155 257,537
PROGRAM FUNDING SOURCES (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year
Total
New Funding
Developer Contributions 20,000 0 0 0 0 0 0 0 0 0 20,000 Other Funding 0 450 900 0 0 500 0 250 0 2,450 4,550 PAYG 4,877 2,917 3,515 2,362 3,492 4,096 4,748 4,516 4,901 6,350 41,774 New Bond Referenda 25,660 24,893 16,666 8,858 20,659 8,799 18,495 6,126 28,940 20,855 179,951 Subtotal New Funding 50,537 28,260 21,081 11,220 24,151 13,395 23,243 10,892 33,841 29,655 246,275 Previously Approved Funding
Authorized but Unissued Bonds 8,000 0 0 0 0 0 0 0 0 0 8,000 Issued but Unspent Bonds 1,762 0 0 0 0 0 0 0 0 0 1,762 Other Previously Approved Funds 0 0 0 0 1,000 0 0 0 0 500 1,500 Subtotal Previously Approved Funding 9,762 0 0 0 1,000 0 0 0 0 500 11,262 Total Funding Sources 60,299 28,260 21,081 11,220 25,151 13,395 23,243 10,892 33,841 30,155 257,537
FINANCING IMPACT (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
Bond Financing Cost (P&I) 0 1,796 4,026 5,928 7,052 8,624 9,607 11,091 11,724 13,779
C - 10
Arlington, Virginia
LOCAL PARKS AND RECREATION PROGRAMS: MAINTENANCE CAPITAL CIP
2013 − 2022
01 Parks Maintenance Capital
Project Description
The Parks Maintenance Capital Program provides for recurring, systematic reinvestment in existing outdoor facilities to insure efficient, safe, high quality park and recreation facilities for
the community to enjoy. The program funds the replacement or major renovation of outdoor park and recreation facility assets including athletic fields and courts, lighting, playgrounds,
picnic shelters, restrooms, site amenities, trails, parking, and specialty facilities such as the skate park. The program als o addresses bringing facilities up to current standards, accessibility,
safety requirements, storm water improvements and the protection of natural resources that are complementary to renovating the assets. The County utiliz es a base level of pay-as-you-go
allocations and local parks and recreation bonds to fund the program. Beginning in FY2013, the Co unty Board enhanced the pay-as-you-go funding by adopting a one-half cent tax
increase that will support the program by adding ongoing funding. These additional funds will go toward working through a pre ssing backlog of maintenance of County facilities and
infrastructure that has built up over the years.
Associated Master Plan: Public Spaces Master Plan (PSMP)
Advisory Commission: Park and Recreation Commission, Sports Commission
Neighborhood(s): VARIOUS
Project Justification
A consultant completed an asset management assessment for the outdoor parks and recreation infrastructure in 2009. The assessment identified a substant ial backlog of maintenance
needs and projected a sustained need for investment over time in order to maintain the County’s extensi ve outdoor park and recreation facilities investment. The study included
compiling a digital inventory of park assets, developing a management database, establishing life cycle replacement standards for the various facilities, and establishing projected estimated
costs across a twenty year timeframe. The assessment database is being used as a planning tool to support budgetary, planning , and policy making decisions. In 2011, the Board-appointed
Capital Improvement Plan Working Group evaluated this information and provided a road map that addresses both the pressing backlog of maintenance projects and the need to
increase the base level of funding for on-going capital maintenance. The focus of the Parks Capital Maintenance Program over the first six years of the FY2013-FY2022 CIP is on
reducing the substantial backlog of projects by “catching-up” on maintenance that has been deferred on the park assets. The “catching up” portion will be accomplished by initially
focusing on the major existing deteriorating assets that have been deferred. The Parks Maintenance Capital program will bring balance to the three heavily used elements that represent
significant areas of investment: athletic fields, athletic courts, and playgrounds. FY2013-FY2017 projects will work towards catching up on seventy-eighty percent of these assets. Where
appropriate, the assets will be bundled with other similar features in the park that need replacing in the same time frame and have similar construction characteristics or are similarly
located in the park. For example, basketball courts, tennis courts and parking may be bundled together into one project to be mor e efficient and effective. Other program elements will
begin to be addressed during the first six years and will ramp up towards a sustainable level in the out-years. The long term goal over the ten year CIP is to bring the Parks Maintenance
Capital Program components into a maintainable balance that can be sustained in the future. The first asset program component to be maintained to keep up with maintenance
requirements are the synthetic turf fields (referenced separately in this CIP under Synthetic Turf Program). As new parks or facilities are added to the inventory, their assets will be
entered into the asset management database and placed into the keep up program. The recently opened Long Bridge Park Phase I (2011) and Penrose Square Plaza, which is cur rently
under construction (2012), are the most recent examples of new outdoor park and recreation assets.
Changes from Prior CIP
A major change in the FY2011 - FY2016 CIP was transitioning the funding of a portion of the maintenance capital to bond funds. A combination of PAYG and bon d funding is
programmed throughout the 10-year program to address the substantial maintenance capital needs where projects meet useful life and project size criteria.
C - 11
01 Parks Maintenance Capital
Capital Cost Schedule (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
A & E 635 884 1,274 1,263 1,310 1,340 1,088 1,088 1,088 1,088 11,058
Land Acquisition 0 0 0 0 0 0 0 0 0 0 0
Construction 6,312 5,012 7,219 7,155 7,426 7,590 6,165 6,165 6,165 6,165 65,374
Relocation and Temp Facilities 0 0 0 0 0 0 0 0 0 0 0
Equipment and Furnishings 0 0 0 0 0 0 0 0 0 0 0
Total Project Cost 6,947 5,896 8,493 8,418 8,736 8,930 7,253 7,253 7,253 7,253 76,432
Notes on Cost Estimates
Funding Schedule (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
New Funding
State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 0 0 0 0 0 0 0
PAYG 3,722 2,253 2,253 2,253 2,253 2,253 2,253 2,253 2,253 2,253 23,999
New Bond Referenda 3,225 3,643 6,240 6,165 6,483 6,677 5,000 5,000 5,000 5,000 52,433
Subtotal New Funding 6,947 5,896 8,493 8,418 8,736 8,930 7,253 7,253 7,253 7,253 76,432
Previously Approved Funding
Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding
Total Revenues 6,947 5,896 8,493 8,418 8,736 8,930 7,253 7,253 7,253 7,253 76,432
Notes on Funding Schedule
Synthetic and grass turf fields are funded
through PAYG. Other program elements
including playgrounds, athletic courts,
lighting, picnic shelters, restrooms, trails and
parking lots may be funded through either
PAYG or bond referenda
Projected Additional Operating Costs (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
Anticipated FTEs (+/-) 0 0 0 0 0 0 0 0 0 0 0
Operations Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0
Facilities Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0
Master Lease Financing Cost 0 0 0 0 0 0 0 0 0 0 0
Maintenance Capital Impact 0 0 0 0 0 0 0 0 0 0 0
Bond Financing Cost (P & I Payments) 0 0 0 0 0 0 0 0 0 0 0
Gross Operating Costs 0 0 0 0 0 0 0 0 0 0 0
Less Fees 0 0 0 0 0 0 0 0 0 0 0
Net Operating Cost 0 0 0 0 0 0 0 0 0 0 0
Notes on Operating Costs
Operating costs are anticipated to be minimal
as a result of Capital Maintenance.
C - 12
PARKS MAINTENANCE CAPITAL
FY2013 PROJECT LIST
Project Name – Description Cost
Estimate
1. Towers Park Modernization – construction to replace four tennis courts, two practice tennis courts, one
basketball court, court lighting on all courts, electric panel box, gazebo, site amenities, site drainage, site
circulation, ADA. Project was designed in FY2012
$1,350,000
PAYG
2. Synthetic Turf Program - construction at Barcroft Park for full replacement of the rectangular synthetic turf
community field which includes addressing site grading, the under drain system, the synthetic fiber infill,
adjacent slope issues. Project was designed in FY2012
$1,055,000
PAYG
3. Gunston Park Modernization – design and construction for replacement of basketball court and lighting,
walkways, parking lot resurfacing, site furnishings, drainage, ADA
$800,000
PAYG
4. Stratford Park Modernization – design and construction for replacement of basketball and tennis courts,
lighting, walkways, site furnishings, retaining walls drainage, ADA
$910,000
PAYG
5. Powhatan Springs - design and construction for full replacement of athletic field sod 87,000
PAYG
6. Consultants – update of the Parks Maintenance Capital asset database 75,000
PAYG
7. Consultants – development of design standards and specifications for outdoor park and recreation assets 200,000
PAYG
8. Program Contingency – unanticipated changes in design and construction and program management $300,000
PAYG
9. Athletic Field Fund – fund from youth sports affiliate group assessments $130,000
PAYG
10. Quincy Park Modernization – construction for full replacement of the playground equipment with universal
project features, safety surfacing, site amenities, site circulation, drainage, landscaping, ADA, full replacement
of the sand volleyball court. Project was designed in FY2012
$1,175,000
Bond
11. Fort Barnard Park Modernization – construction for full replacement of the playground equipment, safety
surfacing, site amenities, site circulation, drainage, landscaping, ADA. Project was designed in FY2012
$650,000
Bond
12. Highview Park Modernization – design and construction for full replacement of rectangular and diamond
athletic field sod, new irrigation, athletic field lights, restroom, storage building, stage, picnic shelter, site
amenities, site circulation, drainage, landscaping, ADA
$1.400,000
Bond
TOTAL $8,132,000
C - 13
PARKS MAINTENANCE CAPITAL
FY2014 PROJECT LIST
Project Name – Description Cost
Estimate
1. Lacey Woods Modernization – design and construction for full replacement of athletic field sod, new
irrigation, site amenities, site circulation, ADA
$253,000
PAYG
2. Woodstock Park Modernization – construction for full replacement of the playground equipment, safety
surfacing, site amenities, site circulation, drainage, landscaping, parking lot, ADA. Project was designed in
FY2012
$727,000
PAYG
3. Chestnut Hills Park Modernization – construction for full replacement of the tot lot equipment, safety
surfacing, site amenities, site circulation, fencing, drainage, landscaping and ADA. Project was designed in
FY2012
$685,000
PAYG
4. Shirlington Park Modernization – design and construction for trail milling and paving, asphalt repair,
replacement of fitness course, site amenities, drainage, landscaping and ADA
$313,000
PAYG
5. Oakgrove Park Modernization – design and construction for full replacement of athletic field sod, new
irrigation, site amenities
$275,000
PAYG
6. Synthetic Turf Program – design and construction at Wakefield High School for replacement of synthetic turf
field. (*assumes APS cost sharing at $450,000 for total project cost of $1,011,000)
$561,000
PAYG
7. Athletic Field Fund – fund from youth sports affiliate group assessments $130,000
PAYG
8. Virginia Highlands Park Modernization – design and construction for full replacement of athletic field sod,
new irrigation, site amenities, site circulation, ADA and construction for full replacement of the six tennis
courts, two basketball courts, court lighting on all courts, site amenities, drainage, site circulation, ADA. Court
project was designed in FY2012
$1,963,000
Bond
9. TJ Modernization – design and construction for replacement of lighted tennis & lighted basketball courts,
fencing, electric panel box, site furnishings, site circulation, drainage, ADA
$1,680,000
Bond
TOTAL $6,587,000
C - 14
PARKS MAINTENANCE CAPITAL
FY2015 PROJECT LIST
Project Name – Description Cost
Estimate
1. Quincy Park Modernization – develop the updated layout plan for future renovation of the park features,
including potential realignment of existing park features and materials to reflect its urban location
$325,000
PAYG
2. Benjamin Banneker Park Modernization – design and construction for replacement of playground, safety
surfacing, milling and repaving parking lot, site circulation, site furnishings, athletic field sod, new irrigation,
fencing, drainage, ADA
$1,306,000
PAYG
3. Madison Manor Park Modernization – design and construction to replace restroom, drinking fountain, site
circulation, site furnishings, landscaping, ADA
$622,000
PAYG
4. Synthetic Turf Modernization – design and construction at Greenbrier Park for replacement of synthetic turf
field. (*assumes APS cost sharing at $450,000 for total project cost of $1,028,000)
$578,000
PAYG
5. Synthetic Turf Modernization – design and construction at W&L High School for replacement of synthetic
turf field. (*assumes APS cost sharing at $450,000 for total project cost of $1,028,000)
$578,000
PAYG
6. Athletic Field Fund – fund from youth sports affiliate group assessments $130,000
PAYG
7. TJ Modernization – design and construction for full replacement of the playground equipment, safety
surfacing, site amenities, site circulation, fitness trail equipment, trail, lighting, drainage, landscaping, ADA
$1,960,000
Bond
8. Fairlington Modernization – design and construction for full replacement of the playground equipment, safety
surfacing, site amenities, stage, fitness trail equipment, site circulation, drainage, landscaping and ADA
$1,375,000
Bond
9. Zachary Taylor Park Modernization – design and construction for pedestrian trail milling and paving, stone
dust, drainage, site furnishings, landscaping, ADA
$300,000
Bond
10. Bon Air Park (front of park) Modernization – design and construction for full replacement of the playground
equipment, safety surfacing, lighted basketball court, restroom, parking lot, lower picnic area, site amenities,
trail, site circulation, drainage, landscaping, ADA
$2,605,000
Bond
TOTAL $9,779,000
C - 15
PARKS MAINTENANCE CAPITAL
FY2016 PROJECT LIST
Project Name – Description Cost
Estimate
1. Henry Clay Park Modernization – design and construction for full replacement of athletic field sod, new
irrigation, site amenities, site circulation, ADA
$235,000
PAYG
2. Barcroft Park Modernization – design and construction for full replacement of athletic field sod on four
diamond fields
$250,000
PAYG
3. Virginia Highlands Park Modernization - design and construction for full replacement of two diamond fields
including athletic field sod, new irrigation, site amenities, site circulation, ADA
$300,000
PAYG
4. Alcova Heights Park Modernization - design and construction for full replacement of athletic field sod, new
irrigation, site amenities, site circulation, ADA
$225,000
PAYG
5. Stratford Park Modernization -design and construction for full replacement of baseball and rectangular fields
including athletic field sod, new irrigation, site amenities, site circulation, ADA
$370,000
PAYG
6. Fort C.F. Smith Park Modernization – design and construction for renovation of stone dust pedestrian path,
site circulation, milling and repaving parking lot, repair maintenance road
$600,000
PAYG
7. Custis Trail – design and construction for milling and paving, asphalt repair, drainage and site furnishings $273,000
PAYG
8. Athletic Field Fund – fund from youth sports affiliate group assessments $130,000
PAYG
9. Tyrol Hills Park Modernization – design and construction for full replacement of the playground equipment,
safety surfacing, site amenities, site circulation, drainage, landscaping and ADA
$685,000
Bond
10. Dawson Terrace Park Modernization – design and construction for full replacement of the playground
equipment, safety surfacing, basketball court, lights, athletic field, fence, parking lot, site amenities, site
circulation, drainage, landscaping, ADA
$1,340,000
Bond
11. Marcey Road Park Modernization – design and construction to replace two lighted tennis courts, lighted
basketball court, electric panel box, gazebo, repointing and renovation of retaining walls, address erosion issues,
site amenities, site drainage, site circulation, ADA
$1,400,000
Bond
12. Eads Park Modernization - design and construction for full replacement of the playground equipment, gazebo,
safety surfacing, site amenities, site circulation, drainage, landscaping and ADA
$850,000
Bond
13. Quincy Park Modernization – design and construction for full replacement of 6 lighted tennis courts, fencing,
site furnishings
$1,890,000
Bond
TOTAL $8,548,000
C - 16
LOCAL PARKS AND RECREATION
PROGRAMS
PARKS ENHANCEMENT GRANTS LOCAL PARKS AND
RECREATION PROGRAMS
2013 − 2022 CIP
02 Park Enhancement Grants
Project Description
The Park Enhancement Grant (PEG) Program enhances parks by providing citizen-initiated projects in a timely manner. The goal of this program is to enable Arlington residents to
initiate small capital improvement and beautification projects for parks and recreation facilities in their respective neighb orhoods. The PEG Program encourages community involvement
and fosters pride by enabling creative improvements in parks and recreation facilities. Community -proposed projects are submitted annually to the Arlington County Park and Recreation
Commission for review, who then recommends a list of projects to the County Board for final approval. The current individual project limit is $15,000. Since the pr ogram began in 1978,
more than 250 projects have been funded. These include projects such as park furniture, pathways, fencing, pub lic art, educational and interpretive signage, and invasives removal as well
as sports and building amenities.
Associated Master Plan:
Public Spaces Master Plan (PSMP)
Critical Milestones:
Information Workshop June
Letter of Intent June
Meet with Park and Recreation
Commissioner
July-August
Application Development. August-October
Presentation to Commission October
Commission Evaluation and
Recommendations
October-December
County Board Approval January
Project Implementation February-December
Advisory Commission:
Park and Recreation Commission
Neighborhood(s):
VARIOUS
Project Justification
The program enables Arlington residents to initiate small capital improvement and beautification projects for parks and recre ation facilities which can be completed without going
through the normal County budget process. Eligible applicants include civic and homeowners associations, community non -profit organizations, civic service clubs, school-related groups
and ad-hoc neighborhood-based groups. The Park and Recreation Commission evaluates the program criteria annually.
C - 17
02 Park Enhancement Grants
Capital Cost Schedule (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
A & E 18 18 18 18 19 19 19 20 20 20 189
Land Acquisition 0 0 0 0 0 0 0 0 0 0 0
Construction 82 85 88 91 94 97 100 103 107 110 957
Relocation and Temp Facilities 0 0 0 0 0 0 0 0 0 0 0
Equipment and Furnishings 0 0 0 0 0 0 0 0 0 0 0
Total Project Cost 100 103 106 109 113 116 119 123 127 130 1,146
Notes on Cost Estimates
This program is funded and spent annually.
There are adopted guidelines for the program.
Funding Schedule (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
New Funding
State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 0 0 0 0 0 0 0
PAYG 100 103 106 109 113 116 119 123 127 130 1,146
New Bond Referenda 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 100 103 106 109 113 116 119 123 127 130 1,146
Previously Approved Funding
Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding 0 0 0 0 0 0 0 0 0 0 0
Total Revenues 100 103 106 109 113 116 119 123 127 130 1,146
Notes on Funding Schedule
Funded annually through PAYG. Projects
do not meet criteria for bond funds.
Projected Additional Operating Costs (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
Anticipated FTEs (+/-) 0 0 0 0 0 0 0 0 0 0 0
Operations Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0
Facilities Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0
Master Lease Financing Cost 0 0 0 0 0 0 0 0 0 0 0
Maintenance Capital Impact 0 0 0 0 0 0 0 0 0 0 0
Bond Financing Cost (P & I Payments) 0 0 0 0 0 0 0 0 0 0 0
Gross Operating Costs 0 0 0 0 0 0 0 0 0 0 0
Less Fees 0 0 0 0 0 0 0 0 0 0 0
Net Operating Cost 0 0 0 0 0 0 0 0 0 0 0
Notes on Operating Costs
Net operating and maintenance capital
impact is minimal and unpredictable since
this is a grant program and specific projects
are unknown.
C - 18
LOCAL PARKS AND RECREATION
PROGRAMS
PARKS LAND ACQUISITION AND OPEN SPACE LOCAL PARKS AND
RECREATION PROGRAMS
2013 − 2022 CIP
03 Parks Land Acquisitions and Open Space
Project Description
Arlington County is nationally recognized for the quality and diversity of its open spaces and public recreational opportunities. Maintaining that high level of stewardshi p and
responsiveness to community needs is a continual challenge because of the county’s small size, its high population density, a nd the pressures and impacts of urban growth on surviving
natural areas and open land. The purpose of the Parks Land Acquisition and Open Space program is to have reserves on hand tha t allow the County to strategically acquire real property
for parks and open space based on recommendations in the Public Spaces Master Plan and Land Acquisition and Preservation Policy. Land may also be acquired through site plan
contributions, such as the recent Penrose Square acquisition, or Transfer of Development Rights. As part of CIP adoption, the County Board noted that parks land acquisition is a
significant priority and that if additional one-time funding became available, that funding for parks and open space land acquisition be increased.
Associated Master Plan:
Land Acquisition and Preservation Policy (LAPP), Public
Spaces Master Plan (PSMP)
Critical Milestones:
County Board adoption of Land
Acquisition and Preservation Policy
(LAPP)
December 2012
Advisory Commission:
Park and Recreation Commission
Neighborhood(s):
VARIOUS
Project Justification
Potential acquisitions are based on the compatibility to a number of program goals and criteria identified in the Land Acquisition and Preservation Policy and Public Spaces Master Plan.
In addition to the acquisition, the program funds ancillary activities (appraisals, surveys, environmental assessments, dem olition, and site restoration).
Changes from Prior CIP
C - 19
03 Parks Land Acquisitions and Open Space
Capital Cost Schedule (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
A & E 0 0 0 0 0 0 0 0 0 0 0
Land Acquisition 1,000 0 3,000 0 4,440 0 3,000 0 3,000 0 14,440
Construction 0 0 0 0 0 0 0 0 0 0 0
Relocation and Temp Facilities 0 0 0 0 0 0 0 0 0 0 0
Equipment and Furnishings 0 0 0 0 0 0 0 0 0 0 0
Total Project Cost 1,000 0 3,000 0 4,440 0 3,000 0 3,000 0 14,440
Notes on Cost Estimates
Funding Schedule (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
New Funding
State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 0 0 0 0 0 0 0
PAYG 0 0 0 0 0 0 0 0 0 0 0
New Bond Referenda 1,000 0 3,000 0 4,440 0 3,000 0 3,000 0 14,440
Subtotal New Funding 1,000 0 3,000 0 4,440 0 3,000 0 3,000 0 14,440
Previously Approved Funding
Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding 0 0 0 0 0 0 0 0 0 0 0
Total Revenues 1,000 0 3,000 0 4,440 0 3,000 0 3,000 0 14,440
Notes on Funding Schedule
Bonds are typically sold as needed.
Projected Additional Operating Costs (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
Anticipated FTEs (+/-) 0 0 0 0 0 0 0 0 0 0 0
Operations Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0
Facilities Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0
Master Lease Financing Cost 0 0 0 0 0 0 0 0 0 0 0
Maintenance Capital Impact 0 0 0 0 0 0 0 0 0 0 0
Bond Financing Cost (P & I Payments) 0 0 0 0 0 0 0 0 0 0 0
Gross Operating Costs 0 0 0 0 0 0 0 0 0 0 0
Less Fees 0 0 0 0 0 0 0 0 0 0 0
Net Operating Cost 0 0 0 0 0 0 0 0 0 0 0
Notes on Operating Costs
Operating costs will vary by the each
individual acquisition site. They typically
involve mowing and trash removal, as well as
other incidental costs.
C - 20
LOCAL PARKS AND RECREATION
PROGRAMS
SYNTHETIC TURF PROGRAM LOCAL PARKS AND
RECREATION PROGRAMS
2013 − 2022 CIP
04 Synthetic Turf Program
Project Description
The synthetic turf program is largely focused on replacement of existing synthetic turf fields that are approaching the end of their useful life. At the end of 2011, the County had ten
synthetic turf athletic fields, and by the end of 2013, the County will have 12 fields with the addition of the baseball fiel d at Barcroft Park and the community field at Rocky Run Park.
The secondary component of the program is the conversion of existing grass turf to synthetic turf. The CIP includes the possi ble addition of two fields in 2016 & 2017, funded through
bonds, PAYG, and funds generated from youth sports affiliate group fees (Field Fund), as well as the possible addition of two more fields in FY 2022 to be funded by a combination of
PAYG and new partnerships with universities, sports organization or other donors. County staff is curre ntly developing principles for County Board consideration that would govern
and encourage future partnerships; a draft is expected to be released early fall of 2012. An additional field is also planned beyond the FY2013-FY2022 CIP for Long Bridge Park.
Associated Master Plan:
Public Spaces Master Plan (PSMP)
Critical Milestones:
Construction Plans 90 - 120 days
Permitting and Bidding 60 - 90 days
Substantial Completion 120 - 160 days
Ribbon Cutting 30 - 45 days
Advisory Commission:
Sports Commission
Neighborhood(s):
VARIOUS
Project Justification
Synthetic grass has a similar feel, foot movement, ball response, and appearance to natural grass. Since Arlington installed its first synthetic field in 2002, it has proved to be a very
effective artificial surface that can sustain significant hours of play all year round, no matter what the weather. Synthetic turf has outstanding field performance, durability, safety for the
athletes and is environmentally friendly. Due to the additional playability of synthetic grass fields, the goal is to light all synthetic turf fields so that they are available for evening play,
thereby maximizing the investment. Conversion costs involve installation of synthetic grass, in -fill underground drainage systems, lighting, and site amenities including site furnishings,
pathways, landscaping and permanent or portable restrooms as needed.
Changes from Prior CIP
The FY2011 - FY2016 CIP showed the replacement of one existing synthetic field per year at a cost of $1.4 million. Based on experience and efficiencies developed with the first two
field replacements at Gunston and Virginia Highlands, the price per field replacement has been reduced. With a total of 12 sy nthetic fields in the County inventory by the end of FY
2013, the capital cost schedule anticipates the replacement of approximately 2 fields per year.
C - 21
04 Synthetic Turf Program
Capital Cost Schedule (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
A & E 0 100 205 218 213 222 238 239 252 692 2,379
Land Acquisition 0 0 0 0 0 0 0 0 0 0 0
Construction 1,055 911 1,851 1,967 1,913 2,005 2,138 2,151 2,269 6,225 22,485
Relocation and Temp Facilities 0 0 0 0 0 0 0 0 0 0 0
Equipment and Furnishings 0 0 0 0 0 0 0 0 0 0 0
Total Project Cost 1,055 1,011 2,056 2,185 2,126 2,227 2,376 2,390 2,521 6,917 24,864
Notes on Cost Estimates
FY2013 includes full replacement of the
existing synthetic field at Barcroft Park
including under drain system, carpet, adjacent
slopes and site amenities. Partnerships to
share capital and operating costs such as the
recent successes with Marymount and George
Washington Universities are desirable.
Funding Schedule (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
New Funding
State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 450 900 0 0 500 0 250 0 2,450 4,550
PAYG 1,055 561 1,156 0 1,126 1,727 2,376 2,140 2,521 3,967 16,629
New Bond Referenda 0 0 0 2,185 0 0 0 0 0 0 2,185
Subtotal New Funding 1,055 1,011 2,056 2,185 1,126 2,227 2,376 2,390 2,521 6,417 23,364
Previously Approved Funding
Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved Funds 0 0 0 0 1,000 0 0 0 0 500 1,500
Subtotal Previously Approved
Funding 0 0 0 0 1,000 0 0 0 0 500 1,500
Total Revenues 1,055 1,011 2,056 2,185 2,126 2,227 2,376 2,390 2,521 6,917 24,864
Notes on Funding Schedule
Replacement of fields through the Parks
Maintenance Capital Program is funded
primarily through PAYG. Other funding
includes contribution from Schools for their
share of fields co-located at high schools as
well as contributions from Marymount and
other partnerships. Other previously approved
funds are the youth sports affiliate group fees
collected annually. New synthetic conversions
and new field locations include field lighting
and other long term infrastructure and are
funded through local parks and recreation
bonds.
Projected Additional Operating Costs (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
Anticipated FTEs (+/-) 0 0 0 0 0 0 0 0 0 0 0
Operations Costs (+/-) 0 0 0 40 80 80 80 80 80 160 600
Facilities Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0
Master Lease Financing Cost 0 0 0 0 0 0 0 0 0 0 0
Maintenance Capital Impact 0 0 0 0 0 0 0 0 0 0 0
Bond Financing Cost (P & I Payments) 0 0 0 0 0 0 0 0 0 0 0
Gross Operating Costs 0 0 0 40 80 80 80 80 80 160 600
Less Fees 0 0 0 0 0 0 0 0 0 0 0
Net Operating Cost 0 0 0 40 80 80 80 80 80 160 600
Notes on Operating Costs
Replacement of existing synthetic turf fields
should have minimal impact to operating
costs. New conversions and new field
locations have an anticipated operating cost
impact of $40k annually.
C - 22
SOCCER FIELDS
Year
Installed FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022
1 Barcroft Park* 2005 1,055 1,261
2 Wakefield Stadium 2004 1,011 1,259
3 W&L Stadium 2005 1,028
4 Greenbrier Park 2005 1,028
5 TJ Park 2010 1,114
6 Long Bridge Park #1 2011 1,114
7 Long Bridge Park #3 2011 1,188
8 Long Bridge Park #4 2011 1,188
9 Gunston Park 2011 1,195
10 Barcroft Park Baseball 2012 1,195
11 Va. Highlands Park 2012 1,261
12 Rocky Run 2013 1,259
13 Field Location TBD New 2,185
14 Field Location TBD New 2,126
15 Field Location TBD *** New 2,200
16 Field Location TBD *** New 2,200
Total Costs 1,055 1,011 2,056 2,185 2,126 2,227 2,376 2,390 2,521 6,917
SOURCES OF FUNDS Total
GO Bonds - - - 2,185 - - - - - - 2,185
PAYG 1,055 561 1,156 - 1,126 1,727 2,376 2,140 2,521 3,967 16,629
Field Fund - - - - 1,000 - - - - 500 1,500
Schools contribution - 450 900 - - - - - - 450 1,800
Partnership or other contribution - - - - - 500 - 250 - 2,000 2,750
Total Sources 1,055 1,011 2,056 2,185 2,126 2,227 2,376 2,390 2,521 6,917 24,864
Assumes 8 year useful life. Some schedules have been adjusted to even out the funding with an eventual goal of two field replacements per year.
Assumes inflation of 3% starting in FY 2014, compounded annually
Cost includes replacement of the carpet, repairs to under drain system, site amenities, repair of adjacent slopes, design, testing,/surveying, and construction administration.
*Barcroft Park FY2013 includes full replacement of field including regrading and under drain system in addition to the above.
***As funding allows this program will consider the conversion of additional fields through potential financial partnerships with Arlington Public Schools, universities and sports organizations.
PROJECTED SYNTHETIC FIELD REPLACEMENT SCHEDULE
CAPITAL COSTS FY 2013 - FY 2022
C - 23
Arlington, Virginia
LOCAL PARKS AND RECREATION PROGRAMS: PARK MASTER PLANS CIP
2013 − 2022
10 YEAR CATEGORY SUMMARY (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year
Total
05 Long Bridge Park
51,012 21,250 0 0 0 0 0 0 0 3,914 76,176
06 Tyrol Hills Park
185 0 1,591 0 0 0 0 0 0 0 1,776
07 Jennie Dean Park
0 0 5,835 0 6,190 0 6,567 0 6,967 0 25,559
08 Four Mile Run Near-Stream Improvements 0 0 0 219 0 2,122 0 1,126 0 11,941 15,408
09 Crystal City Parks and Open Space
0 0 0 289 2,983 0 316 0 3,357 0 6,945
10 Four Urban Parks in Ballston-Virginia Square
0 0 0 0 563 0 2,985 0 3,167 0 6,715
11 Mosaic Park
0 0 0 0 0 0 328 0 3,294 0 3,622
12 Glebe and Randolph Park
0 0 0 0 0 0 299 0 3,167 0 3,466
13 Ballston Pond
0 0 0 0 0 0 0 0 988 0 988
Total Recommendation 51,197 21,250 7,426 508 9,736 2,122 10,495 1,126 20,940 15,855 140,655
CATEGORY FUNDING SOURCES (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 10 Year
Total
New Funding
Developer Contributions 20,000 0 0 0 0 0 0 0 0 0 20,000 New Bond Referenda 21,435 21,250 7,426 508 9,736 2,122 10,495 1,126 20,940 15,855 110,893 Subtotal New Funding 41,435 21,250 7,426 508 9,736 2,122 10,495 1,126 20,940 15,855 130,893 Previously Approved Funding
Authorized but Unissued Bonds 8,000 0 0 0 0 0 0 0 0 0 8,000 Issued but Unspent Bonds 1,762 0 0 0 0 0 0 0 0 0 1,762 Subtotal Previously Approved Funding 9,762 0 0 0 0 0 0 0 0 0 9,762 Total Funding Sources 51,197 21,250 7,426 508 9,736 2,122 10,495 1,126 20,940 15,855 140,655
C - 24
LOCAL PARKS AND RECREATION
PROGRAMS
PARK MASTER PLANS LOCAL PARKS AND
RECREATION PROGRAMS
2013 − 2022 CIP
05 Long Bridge Park
Project Description
The new 30-acre Long Bridge Park is located at the north end of Crystal City. The park master plan, which was adopted by the County Boar d in 2004 and will be updated in 2012 to
reflect the recent exchange of property with Monument Realty, provides a blueprint for development of this former industrial site into a world-class park and recreation area. The new
park will help transform the area into a showplace of environmentally sound redevelopment, with a central expanse of attracti ve public green spaces and high quality indoor and outdoor
recreation facilities that provide a comprehensive destination and are conveniently linked with the nearby urban corridor. Th e final design and construction of the park is planned in four
phases over more than a decade. Construction of Phase I of the park was completed in November 2011. Phase II, the aquatics, health and fitness facility and surro unding 10-acre park
area, is currently under design with construction funding adopted for FY2013. Phase IIIA, the S. 6th Street entry features at the south end of the park, is identified for FY 2013 funding
from capital sources to be recommended by the County Manager. Phase IIIB, the final components of the outdoor park, is planned for design in FY2020. Construction of Phase IIIB
and design and construction of Phase IV, the final components of the health and fitness portion of the building, are beyond the w indow of the FY2013-FY2022 CIP.
Associated Master Plan:
Public Spaces Master Plan (PSMP)
Critical Milestones:
Completion of construction drawings Phase
II
Winter 2013
Permitting and bid award Phase II Spring 2013
Construction start Phase II Summer 2013
Construction completion of Phase IIIA Summer 2013
Construction completion Phase II Summer 2015
Advisory Commission:
Arlington Commission for the Arts, Disability
Advisory Commission, Environment and Energy
Conservation Commission, Park and Recreation
Commission, Sports Commission, Transportation
Commission Neighborhood(s):
VARIOUS
Project Justification
The Phase II and III projects advance the design and construction of the next two phases of the park. The County completed Ph ase I in November 2011, which included three full size,
lighted synthetic turf athletic fields, esplanade, walkways throughout the park, site furnishings, restrooms and storage buildings, parking, landscaping, rain gardens, environmental
remediation, major utility work and reconstruction of Long Bridge Drive and S. 6th Street. Phase II is currently under final design and includes the initial phase of the aquatics, health and
fitness center featuring a 50-meter X 25-yard competition pool, teaching pool, family leisure pool, therapy pool and wet classrooms/party rooms. In addition to the ma jor aquatics
component, Phase II includes an indoor fitness area for cardiovascular equipment and weight training, fitness classes, and community space as well as developmen t of the surrounding
ten-acre park including surface parking, continuation of the esplanade, public art and a variety of outdoor pu blic spaces. Phase III finishes off the outdoor components of the park. Phase
III construction is divided into Phase IIIA, which finishes off the S. 6th Street entry features including the play element, and Phase IIIB, which includes a fourth synthetic turf field,
structured parking, second storage building, and an observation bridge and raised walkway over the CSX railroad tracks. Phase IV finishes off the building with a large multi-sport activity
center, climbing wall, elevated track, rooms for racquet sports, and additional fitness and community spaces.
Changes from Prior CIP
The FY2011 - FY2016 CIP included construction funds for Phase II construction and Phase III design. These numbers have been updated to inc lude inflation for both phases and
additional dollars for current technologies related to energy efficiency for the mechanical systems for the Phase II building.
C - 25
05 Long Bridge Park
Capital Cost Schedule (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
A & E 281 0 0 0 0 0 0 0 0 3,914 4,195
Land Acquisition 0 0 0 0 0 0 0 0 0 0 0
Construction 52,171 21,250 0 0 0 0 0 0 0 0 73,421
Relocation and Temp Facilities 0 0 0 0 0 0 0 0 0 0 0
Equipment and Furnishings 0 0 0 0 0 0 0 0 0 0 0
Total Project Cost 52,452 21,250 0 0 0 0 0 0 0 3,914 77,616
Notes on Cost Estimates
Phase II includes building and site
construction, environmental remediation,
public art, FFE and administration/project
management. Phase IIIA includes design
costs, construction, and
administration/project management. Phase
IIIB includes design costs and
administration/project management.
Construction of Phase IIIB is outside the
timeline of the FY2013 - FY2022 CIP.
Funding Schedule (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
New Funding
State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 20,000 0 0 0 0 0 0 0 0 0 20,000
Other Funding 0 0 0 0 0 0 0 0 0 0 0
PAYG 0 0 0 0 0 0 0 0 0 0 0
New Bond Referenda 21,250 21,250 0 0 0 0 0 0 0 3,914 46,414
Subtotal New Funding 41,250 21,250 0 0 0 0 0 0 0 3,914 66,414
Previously Approved Funding
Authorized but Unissued Bonds 8,000 0 0 0 0 0 0 0 0 0 8,000
Issued but Unspent Bonds 1,762 0 0 0 0 0 0 0 0 0 1,762
Other Previously Approved Funds 1,440 0 0 0 0 0 0 0 0 0 1,440
Subtotal Previously Approved
Funding 11,202 0 0 0 0 0 0 0 0 0 11,202
Total Revenues 52,452 21,250 0 0 0 0 0 0 0 3,914 77,616
Notes on Funding Schedule
Funding of the four phases of the park
master plan is based on a combination of FY
2012 close-out funds, local parks and
recreation bond funds combined with private
funding from partnership(s) and the sale of
density from the park site to a developer(s).
Because the timing of these contributions is
uncertain, the CIP assumes interim financing
(e.g., short-term notes) that would allow
construction to proceed. Principal borrowed
would be repaid by outside contributions.
Projected Additional Operating Costs (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
Anticipated FTEs (+/-) 0 0 0 0 0 0 0 0 0 0 0
Operations Costs (+/-) 0 0 340 1,250 1,250 1,250 1,250 1,250 1,250 1,250 8,750
Facilities Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0
Master Lease Financing Cost 0 0 0 0 0 0 0 0 0 0 0
Maintenance Capital Impact 0 0 0 0 0 0 0 0 0 0 0
Bond Financing Cost (P & I Payments) 0 0 0 0 0 0 0 0 0 0 0
Gross Operating Costs 0 0 0 0 0 0 0 0 0 0 0
Less Fees 0 0 0 0 0 0 0 0 0 0 0
Net Operating Cost 0 0 340 1,250 1,250 1,250 1,250 1,250 1,250 1,250 8,750
Notes on Operating Costs
Net operating impact for Phase II is
anticipated to be in the range of $1.1 to $1.4
million annually. Operations costs include
both the aquatics, health and fitness facility
and the surrounding 10-acre park, including
staffing, programming, vendors, utilities, and
maintenance. The operations financial model
will be revised and refined in preparation for
the programs and operations launch as the
project progresses. 4 FTE's in FY2015 will
bring on board the general manager, plant
engineer, aquatics operator and business
manager in advance of completion of the
facility and park. Additional FTEs will
come on line in FY2016.
C - 26
05 Long Bridge Park
Associated Costs and Funding Sources
Construction of phase IIIB as well as design and construction of phase IV are beyond this planning horizon.
Project/Phase
Phase I $ 36.9 M
Phase II $ 79.2 M
Phase IIIA $ 1.4 M
Phase IIIB design $ 3.9 M
Total Long Bridge Park Costs $121.4 M
Funding History
2004 GO Bonds $ 50.0 M
Developer Contribution $ 3.6 M
Subtotal $ 53.6 M
Anticipated Funding
Developer Contribution $ 20.0 M
2012 GO $ 42.5 M
Capital Funds $ 1.4 M
2020 GO $ 3.9 M
Subtotal $ 67.8 M
Total Funding $121.4 M
C - 27
LOCAL PARKS AND RECREATION
PROGRAMS
PARK MASTER PLANS LOCAL PARKS AND
RECREATION PROGRAMS
2013 − 2022 CIP
06 Tyrol Hills Park
Project Description
Tyrol Hills Park is heavily used, serving as the major outdoor gathering space for the Columbia Heights West and Forest Glen neighborhoods. The park is used for basketball and
volleyball games, picnics, playing on the playground and informal gatherings and also hosts many programmed recreational activities, camps and community events. The project
completes the implementation of the Tyrol Hills Park Master Plan, adopted by the County Board in December 2003. This is the third and final phase.
Associated Master Plan:
Public Spaces Master Plan (PSMP)
Critical Milestones:
Park Master Plan December 2003
Completion of construction drawings June 2014
Construction start Summer 2015
Construction complete Spring 2016
Advisory Commission:
Park and Recreation Commission
Neighborhood(s):
VARIOUS
Project Justification
The project is for the design and build-out of the final phase of the Tyrol Hills Park Master Plan. The project elements include A&E, comfort station, drinking fount ain, picnic shelter,
paved plaza, site furnishings, and landscaping. Two other phases of the master plan have been implemented through the Neighbo rhood Conservation Program.
Changes from Prior CIP
Costs have been updated to reflect inflation for the last two years at 3% annually.
C - 28
06 Tyrol Hills Park
Capital Cost Schedule (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
A & E 185 0 0 0 0 0 0 0 0 0 185
Land Acquisition 0 0 0 0 0 0 0 0 0 0 0
Construction 0 0 1,591 0 0 0 0 0 0 0 1,591
Relocation and Temp Facilities 0 0 0 0 0 0 0 0 0 0 0
Equipment and Furnishings 0 0 0 0 0 0 0 0 0 0 0
Total Project Cost 185 0 1,591 0 0 0 0 0 0 0 1,776
Notes on Cost Estimates
Costs are shown in 2012 dollars.
Funding Schedule (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
New Funding
State/Federal Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 0 0 0 0 0 0 0
PAYG 0 0 0 0 0 0 0 0 0 0 0
New Bond Referenda 185 0 1,591 0 0 0 0 0 0 0 1,776
Subtotal New Funding 185 0 1,591 0 0 0 0 0 0 0 1,776
Previously Approved Funding
Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved
Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously
Approved Funding 0 0 0 0 0 0 0 0 0 0 0
Total Revenues 185 0 1,591 0 0 0 0 0 0 0 1,776
Notes on Funding Schedule
Projected Additional Operating Costs (in $1,000s)
FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
10 Year
Total
Anticipated FTEs (+/-) 0 0 0 0 0 0 0 0 0 0 0
Operations Costs (+/-) 0 0 0 55 55 55 55 55 55 55 385
Facilities Costs (+/-) 0 0 0 0 0 0 0 0 0 0 0
Master Lease Financing Cost 0 0 0 0 0 0 0 0 0 0 0
Maintenance Capital Impact 0 0 0 0 0 0 0 0 0 0 0
Bond Financing Cost (P & I Payments) 0 0 0 0 0 0 0 0 0 0 0
Gross Operating Costs 0 0 0 55 55 55 55 55 55 55 385
Less Fees 0 0 0 0 0 0 0 0 0 0 0
Net Operating Cost 0 0 0 55 55 55 55 55 55 55 385
Notes on Operating Costs
Operations costs are projected to include
utilities, restroom cleaning, landscape
maintenance and some staff time.
C - 29
LOCAL PARKS AND RECREATION
PROGRAMS
PARK MASTER PLANS LOCAL PARKS AND
RECREATION PROGRAMS
2013 − 2022 CIP
07 Jennie Dean Park
Project Description
The Shirlington area is undergoing significant redevelopment, bringing new residents and businesses to an area that was once industrial. Over the last ten years, the
Text truncated. Open the original for the full document.