County Manager's Proposed
FY 2025 Budget
County Board Work Session
April 4, 2024 | 3:00 p.m.
Department of
Technology Services
2
Mission Statement:
Provide excellent customer service
through technology leadership and expertise in support of
the strategic goals and priorities of Arlington County while
embracing existing and emerging technologies to achieve
better business outcomes incorporating innovation,
security, and sustainability.
3
Program Accomplishments
Network PC Replacement ConnectArlington (CA)
Unified Communications Life Cycle Refresh Server & Storage
• Replaced aging audio-visual
equipment in six conference
rooms:
• Equipment Bureau A/B
• Lubber Run 154, 222 & 223
• Bozman Gov’t Center 1030
• Parks Operations Center 226
• Launched the new Agenda Manager
application
• Enterprise Payment System (EPS)
• DES Outdoor Café Seating – Oct 2023
• Police False Alarm Invoice – Dec 2023
• Police Alarm Registration – Dec 2023
• Sheriff’s Office FOIA – Dec 2023
• DES Solid Waste (MFC Recycling
Program Fee) – Dec 2023
• Updated key systems including the
backups for enhanced data
protection.
• Enhanced DES Traffic Engineering
servers for better camera
management
• Created a new video data storage
system for Environmental Services.
• Completed the undergrounding
of aerial fiber at N Glebe
Rd/Chesterbrook intersection.
• Finished the core installation of
fiber in the Green Valley
neighborhood along Shirlington
Rd. (Art Bus Operations and
Maintenance Facility)
• Laptops: Total Units: 633
• Refreshed Units: 284 (45%)
• New Issuances: 270 (43%)
• Break-Fix: 79 (12%)
• Desktops: Total Units: 212
• Refreshed Units: 182 (86%)
• New Issuances: 16 (8%)
• Break-Fix: 14 (6%)
• Network Edge Refresh Project: Upgraded
165 network switches across the County.
• Wireless Access Point (WAP) Refresh
Project: Updated all ten Fire Stations,
the
Fairlington Community Center and Bozman
with new WAPs.
• DNA Center Implementation Project:
Connected 336 devices, enhancing network
security and compliance.
4
Programs Underway
Network ConnectArlington (CA)
Unified Communications Life Cycle Refresh
• Land Records System to the Cloud
• Go-Live: Spring 2024
• Enterprise Payment System
• Completion: Summer 2024
• Enterprise Finance and HR system
(PRISM) modernization
• Go-Live: Summer/Fall 2024
• Telephone System Modernization
• Two Depts migrated to the new system
• DTS & CPHD
• Nine Call Centers migrated to the new
system.
• DTS, CMO, HRD, CPHD, DPR
• DES (Customer Service,
Permitting, STAR, WSS)
• Preparing to bury aerial fiber cables at
Arlington Traditional and Claremont
Elementary schools.
• Planning a new fiber path to Sequoia
Plaza I and coordinating with the city
of Alexandria E911 Center.
• Wireless Access Point (WAP) Refresh
Project:
• 42 sites remaining
• Completion expected in FY 2024
• Wide Area Network Redesign and
Refresh Project:
• Awaiting equipment arrival
• Aims to replace end-of–life VPN
technologies at remote sites.
5
Asset Inventory: Hardware & Software
Desktop PCs
Desktops: 946
4 Year Lifecycle
Rolling Replacement
Laptop PCs
Laptops: 2,695
3.5 Year Lifecycle
Rolling Replacement
Fiber Optic Cables
70+ Miles
Refresh/Replace
As Needed
Servers: 40
Hosts: 31
7 Year Lifecycle
Refresh = Rolling
by End-of-Life
Core Network
Equipment
Core Switches: 2
5 Year Lifecycle
Distribution Network
(Hub-Sites)
Switches: 17
5 Year Lifecycle
Access Network
(In-Building)
Switches: 165
5 Year Lifecycle
Wi-Fi
WAPs: 983
3-5 Year Lifecycle
Refreshes 20% each year
UPS Power
Systems
UPS: 137
5 Year Lifecycle
Data Center
Infrastructure
Switches: 83
5 Year Lifecycle
Applications
Enterprise: 136
Dept/Agency: 317
Refresh = Rolling
By End-of-Life
6
FY 2024
Adopted
FY 2025
Proposed
Short-term Finance $4,658,000 $6,262,000
PAYG $2,645,000 $4,941,000
Bonds $7,575,000 $1,900,000
Total $14,878,000 $13,103,000
FY 2025 Budget Summary
7
FY25 Hardware Refreshment Proposed Programs
$2,166,000
$1,732,000
$780,000
$300,000
Workforce Device Modernization: This program manages the cyclical replacement of workforce
devices, planning to refresh 450 laptops, 400 desktops, and 400 peripherals (monitor, mouse &
Keyboard) in FY 2025.
Network Program: The annual program focuses on replacing and refreshing end-of-life equipment,
with the FY 2025 budget allocated for refreshing the network core, distribution sites, and single-mode
fiber.
Server Hardware & Storage: For FY 2025, the program will refresh server hosts, and procure backup
storage units for growing data demands.
County AV Equipment Replacement: The program for FY 2025 focuses on replacing and refreshing
end-of-life technology equipment in County conference rooms and courtrooms, including desktops,
various switches, and cameras.
8
FY25 Application Refreshment Proposed Projects
$4,500,000
$625,000
Revenue & Collections System: This project aims to comprehensively upgrade and enhance functionality,
security, and user experience, including a new digital assistant and features for improved staff efficiency
and customer engagement.
eGovernment Suite of Applications: This project aims to migrate eGovernment suite applications to the
public cloud, focusing on eight additional applications in FY 2025, including readiness assessment,
environment preparation, testing, application migration, and post-implementation evaluation.
Cloud Migration
9
FY25 Data Center & Fiber Proposed Projects
$1,850,000
$1,150,000
Data Center Consolidation: Phase I of the Data Center Consolidation set for FY 2025 involves relocating the
Bozman Data Center to a county owned facility, offering near-term benefits like outsourced maintenance and
staff reallocation, and long-term benefits such as reduced carbon footprint and repurposing of County space.
ConnectArlington: FY 2025 funding will focus on upgrading the County's fiber network by establishing new
fiber paths and completing the fiber ring for redundancy.
Begin the Construction phase:
• Forge an alternative conduit to 2100
Washington Blvd. Sequoia Plaza I
• Construction needed to synchronize with the
City of Alexandria for the E911 Fiber Circuit
• Underground aerial fiber at S Glebe/Richmond
Hwy intersection
Begin the Planning & Engineering Phase:
• Finalize the planning & engineering phase of the
fiber ring in N Arlington at Little Falls Rd.
10
• Infrastructure and Technology Modernization: Investment in
network, server, and AV improvements for long-term efficiency
and reduced downtime.
• System Upgrades and Cloud Migration: Investment in
application upgrades and cloud migration, aiming for improved
resilience and enhanced customer experience.
• Sustainable IT Development: Investment in data center
consolidation and fiber network balanced by long-term
environmental and economies of scale benefits.
Key Budget Considerations
County Manager's Proposed
FY 2025 Budget
County Board Work Session
April 4, 2024 | 3:00 p.m.
Department of
Technology Services
Source: Arlington County website. First collected Oct 27, 2026.