County Manager's Proposed
FY 2025 Budget
County Board Work Session
April 4, 2024
Transportation
2
• Arlington Ridge Road / Mount Vernon Drive Bridge
• ART Operations and Maintenance Facility
• Army Navy Drive Complete Street
• Army Navy Drive Protected Bike Lane Extension
• Boundary Channel Drive Interchange
• Bus Bay Expansion at East Falls Church Metro
• Columbia Pike Streets - (Segments A, C, D, F)
• Columbia Pike Transit Stations (first 8)
• George Mason Drive at North Park Drive
• Military Road at Nelly Custis Drive
• North Ohio Street at 11th Street North
• Pentagon City Metro Station Second Elevator
• Shirlington Road Bridge (bike/ped bridge)
• South Eads Street (Army Navy Drive to 15th Street)
• Walter Reed Drive (6th Street S to Columbia Pike)
• Wilson Boulevard (10th Street to North Lincoln Street)
• 15th Street South and South Fern Street
• 15th Street South (Route 1 to Crystal Drive)
Projects highlighted
blue = construction is
underway
Projects in black are
planned to start
construction in 2024
Construction in CY 2024
3
• Initial station siting in Metrorail corridors
• Station planning evolved to include equity
as a lens when siting stations
• Currently siting two additional stations
along western Columbia Pike
• E-bikes in circulation: 200-250 per day
• FY 2025 Funding: $3.3m in TCF for
expansion and operations/maintenance
Focus on Equity: Capital Bikeshare
Capital Bikeshare Station Installations
4
Focus on Equity: Shared Mobility
Shared Mobility Device Program
• Pilot Program began in 2018
• Regulations adopted in November 2019
• SMD Program statistics:
o 3 permitted vendors
o 1,800 devices permitted to be
deployed
o 112 corrals
• Report mis-parked / abandoned devices
• SMD Program has deployment
requirements to ensure coverage in
Equity Emphasis Areas as defined for the
program
Corral by Gunston
Middle School
Map of SMD Corrals
5
Funding Source
Restrictions on Use of Funding
(per state code or other binding documentation)
FY25
Funding $M
Transportation Capital Fund
(TCF) – Commercial and
Industrial (C&I) Tax
New or enhanced road / transit improvements that add capacity, service, or access, and
capital or operating costs related to the new projects, that benefit the business
community; eligible uses outlined in state code
83.1
TCF – NVTA Local Additional roadway construction, capital improvements that reduce congestion, projects
in TransAction, or for public transportation purposes; eligible uses outlined in state code 24.9
Tax Increment Financing
(TIF)
Capital and public infrastructure improvements in the TIF area: Crystal City, Pentagon
City, Potomac Yard 24.3
Federal Multiple programs, including small annual allocations for ongoing programs and highly
competitive nationwide grants (0-20% match) 18.6
State Transit Formula Transit operations and capital improvements (match varies)
44.8State Smart Scale Multimodal roadway improvements, transit capacity expansion (no required match)
State Revenue Sharing Multimodal roadway improvements (50% match)
NVTA Regional Multimodal roadway and transit improvements included in the TransAction Regional
Plan that provide greatest congestion reduction relative to cost (no match)
27.1I-66, I-395 Commuter
Choice (NVTC)
Multimodal improvements on parallel corridors that increase person throughput and
benefit the toll-paying users of the facility (no match)
Funding Sources
$228m* in addition to PAYG and GO Bonds
NVTA: Northern Virginia Transportation Authority
NVTC: Northern Virginia Transportation Commission
Local
discretionary
State
competitive
Regional
competitive
* Includes ~$5m in contributions from developers, WMATA, and City of
Alexandria not shown in table above
6
Pay-As-You-Go Proposed Projects
• PAYG supports
transportation assets
across the County
• Request limited to
programs and
projects not eligible
for TCF or TIF funding
7
Project Name ($ in 000s) PAYG Other
Sources Total
Slurry Seal and Micro-surfacing (Paving program) 1,300 1,389 2,689
Signals and ITS Maintenance 1,000 0 1,000
Street Safety Improvements 365 959 1,324
Sidewalk, Curb, Gutter Proactive Zone Maintenance 309 0 309
Bridge Maintenance 221 819 1,040
BIKEArlington 50 1,257 1,307
Transportation Asset Management 23 180 203
Street Lighting 0 1,736 1,736
WALKArlington 0 3,221 3,221
Neighborhood Complete Streets 0 3,179 3,179
Parking Meters 0 206 206
Trail Light Maintenance 0 20 20
Total Transportation Capital Program $3,268
FY 2025 PAYG Proposed Projects: Transportation
Note: We will be requesting
new GO Bonds in the
upcoming CIP process.
8
Transportation System Snapshot
1,058 Lane-miles
of County
maintained and
managed roads
78 ART buses
990 Bus stops
>330 Bus shelters
1 Transitway
1 Bus station
11 Metrorail stations Capital Bikeshare:
110 stations
802 bicycles
Shared Micro-Mobility:
1,800 scooters
355 eBikes
36 County-
maintained
vehicular and
pedestrian bridges
729 Multi-space parking
meters
679 Single space meters
302 Signalized intersections
300 CCTV cameras
24 Permanent traffic count
stations
1 Virginia Railway Express
station
190 Uninterruptible power
supply units
31 Speed indicator signs
7 Variable message signs
87 School zone flashers
97 Pedestrian flashing beacons
8,614 County-owned streetlights
52,709 Street signs
9
Assets: Paving
• The 2023’s Overall PCI of 83.3
indicates “State of Good
Repair” near “Excellent”
• PAYG needed to maintain
paved roads with slurry
seal and micro-surfacing,
while bonds pay for milling
and overlay
• Pothole repairs have
decreased 67% in comparing
annual average 2019-2023 vs.
2014-2018
59.0
10
Assets: Proactive Zone Maintenance
Improving safety and accessibility for all users
• 442.8 miles of County maintained sidewalk
• Kicked off Tripping Hazard Blitz in FY23 to address sidewalk tripping hazards
• Resolved over 32K hazards to date, including over 67% of those identified
in the 2021 survey
• Commenced concrete Zone Maintenance program in FY24 across 20 zones
• 2 zones per year for a 10-year maintenance interval, one north of Route
50 and one south of Route 50
• Zones targeted for FY24 already completed with 12,722 linear feet (LF) of
sidewalk and 8,723 LF of curb & gutter replaced
• FY25 $1,030K proposed budget is funded with PAYG ($309K) and bond ($721K)
Crews installing new
sidewalk Example of sidewalk shaving
Green = FY24 completed
Orange = FY25 upcoming work
FY 2021
Actual
FY 2022
Actual
FY 2023
Actual
FY 2024
Estimate
FY 2025
Estimate
Curb, Gutter, and Sidewalks repaired
and Replaced (Measured in Linear
Feet
8,863 9,308 9,396 30,000 32,000
Tripping hazards treated by sidewalk
grinding or jacking
9,180 3,437 16,235 15,000 5,000
11
Assets: Bridge Maintenance
Funded with a mix of PAYG and Bonds
• 36 county-maintained bridges.
• Inspected biennially and rated on a scale of 0 to 9;
county’s goal is between 6 and 7 (“Satisfactory” to
“Good”)
• Focused effort in recent years has cleared backlog of
maintenance and repair work
• Following replacement of Arlington Ridge Road
bridge (anticipated in FY27), all bridges will be
above 6; current average rating is 6.4
• FY25 proposed budget $1,040K lower than
$1,400K in FY24 owing to cleared backlog and
carryover balances
• Proposed PAYG funding $221K vs. 700K in FY24
• No new bonds in FY25 (new bonds starting FY26 in CIP)
SOUTH WALTER REED DRIVE OVER FOUR MILE RUN
MILITARY ROAD OVER DONALDSON RUN CULVERT
12
Assets: Signals and ITS Maintenance
• Covers inspection, repair, and maintenance of:
• 302 signalized intersections, many with added devices (e.g.,
CCTV, video detection, battery back-up)
• Flashing beacons (accelerated deployment in last 5-10 years)
• Other devices (e.g., speed indicators, count stations)
• Structural inspections of signal poles on 6-year cycle
• Preventative maintenance every year on cabinet and every 2
years on overhead equipment and wiring
• 25 to 35-year life per industry standard
• Program funded with mix of PAYG and Bonds
• Proposed FY25 budget of $1,355K
• Supports either replacing according to industry standards or
extending life with repair or component replacement
Signal Pole Breakdown
AfterBefore
Signal Cabinet Repair
13
Street Safety Improvements
• SSI Program ($365,000 FY 2025 PAYG): Vision
Zero staff perform safety audits and implement
safety treatments throughout the County;
program scalable and could do more
• Depending on engineering treatment
identified, some locations are eligible for
TCF/TIF, but pilot efforts and tactical projects
typically require PAYG funds
• Recent initiatives include school safety
measures (rubber humps) and tactical
deployments at intersections (hardened
medians)
14
BIKEArlington, WALKArlington, NCS
• BIKEArlington ($50,000 FY 2025
PAYG): funds are used to pay
monthly data service for the
bicycle counter program, as well
as implement tactical and quick-
build projects
• Neighborhood Complete Streets (NCS) Program
($0 FY 2025 PAYG): funds are used for pilot
projects or tactical applications; program has
carryover to fund Shared Street Pilots
• WALKArlington ($0 FY 2025 PAYG): funds are
used to improve safety and accessibility at spot
location; program is scalable
15
Asset Management in the Right-of-Way
• Transportation Asset Management ($23,000 FY
2025 PAYG): funds asset inventory database
management and updates based on current
conditions in real-time
• Parking Meters ($0 FY 2025 PAYG): funds routine
maintenance and replacement; currently in a
repair cycle, major repairs anticipated FY 2028
• Streetlights ($0 FY 2025 PAYG): funds major
repairs and districting cleanup in accordance
with the Streetlight Management Plan (SMP)
• Trail Light Maintenance ($0 FY 2025 PAYG):
funds minor repairs to trail lights
16
Transportation Capital Funds (TCF) Components
• Funded from added tax of 0.125 per $100 of assessed value on commercial and industrial properties starting 2008
• Available for new construction/expansion of roads/transit
• Has served as a basis for leveraging state, regional and federal transportation funds for major capital projects.
• Vacancy rates impact revenues, resulting in tax fluctuations.
• $24.4M anticipated in FY25, 5% lower than FY24 Adopted
1. Local Commercial and Industrial (C&I) Tax
• Instated in 2013 by VA General Assembly,funded from 0.7 ppt increase in sales tax and from increment of the
Grantor’s tax
• 30 percent of revenues are returned to localities for eligible, locally selected transportation projects.
• Available for new construction, capital improvements that reduce congestion, and public transportation purposes.
• Has served as a basis for leveraging state, regional and federal transportation funds for major capital projects.
• $11.8M anticipated in FY25, 1% higher than FY24 Adopted
2. NVTA Local (30% local allocation from HB 2313)
17
Key Programs Funded by TCF and TIF
• Funding reflects TCF and TIF
only; other sources, including
grants, may also be available
• TCF is the main source except in
the case of Crystal City Streets
and Crystal City Metro East
Entrance where TIF is the
dominant source
$000 FY25 Funding
Columbia Pike Streets 40,027
Crystal City, Pentagon City, Potomac Yard Streets 6,538
Improvements Outside Major Corridors 5,259
WALKArlington 2,927
Neighborhood Complete Streets 2,680
Rosslyn-Ballston Arterial Streets Improvement 2,581
BIKEArlington 944
Street Safety Improvements 915
Crystal City Metro East Entrance 19,362
ART Operations & Maintenance Facility 15,086
Pentagon City Metro Second Elevator 3,893
ART Fleet Expansion 1,428
Transit Operations 5,178
Program Administration 4,351
Capital Bikeshare * 3,267
* Includes $1.9m of O&M
OTHER COMPLETE STREETSTRANSIT
18
TCF FY 2025 Projects
ART Operations &
Maintenance Facility (total
cost $96.7m)
Completion Anticipated Fall
2024
Bus Stop
Improvement
Program
Arlington Blvd. & S.
Montague St.
Arlington Ridge / Lynn St.
Improvements (total cost
$1.2m)
Almost Completed
Columbia Pike –
Segment F (total cost
$45.1m)
Completion
Anticipated Summer
2025
19
ADA Bus Stops: Inventory Update
“Level 1” Stops ~40% “Level 2” Stops ~35%
• Initial inventory complete, contractor performing QA/QC and resurveying certain locations – numbers will change
• 990 bus stops: roughly 60% are not compliant with current regulations, approximately 10% are not accessible
• Working implementation strategy: Advance Level 1 immediately to bring into compliance while concurrently
advancing design work on Level 2 and Level 3 to ready for construction
• Will present final inventory and implementation strategy during FY 2025 – FY 2034 CIP Work Session
Compliance = regrade sidewalk and install
pad to curbCompliance = relocation of newspaper boxes Compliance = widen sidewalk/pad, curb
ramps, crossings, regrading
“Level 3” Stops ~25%
Bottom
line for
Level 3:
redesign
and
rebuild
roadway/
sidewalk
20
FY 2025 Budget Summary – TCF
• Fund balances and external funding sources will be used to cover a portion of FY 2024 and FY
2025 expenditures
• FY 2025 Proposed Budget reflects 1.5 FTEs moved from the General Fund to TCF
• Percent of TCF revenues directed to operations and program administration is 32% of
proposed FY 2025 budget
FY 2024
Adopted
FY 2025
Proposed Change
%
Change
Expenses $127,285,784 $128,727,500 +$1,441,716 +1.1%
Revenue $37,374,864 $36,145,664 -$1,229,200 -3.3%
Staff 41.0FTEs 42.5 FTEs +1.5 FTEs +4.0%
21
Crystal City Tax Increment Financing (TIF)
• TIF fund pays for infrastructure improvements that further the redevelopment of
Crystal City, Potomac Yard, and Pentagon City
• Funded by redirecting 25% of increase in property taxes vs. 2011 baseline year
• Projects funded via the TIF provide critical transportation and open space
infrastructure needed to support future redevelopment
Boundary Channel Drive
Improvements ($17.6m)
Completion anticipated late FY 2024
Army Navy Drive Construction
($15.3m)
Completion anticipated fall 2025
22
FY 2025 Budget Summary – TIF
• FY 2025 proposed revenue reflects TIF at an increment of 25% vs. Calendar Year 2011 (base
year)
• TIF revenues are paired with other internal and external funding sources to deliver capital
program
• Fund balances are used to cover a portion of FY 2024 and FY 2025 expenditures
FY 2024
Adopted
FY 2025
Proposed Change
%
Change
Expenses $11,809,660 $27,880,800 +$16,071,140 +136.1%
Revenue $4,379,860 $6,506,510 +$2,126,650 +48.6%
Staff 6.5 FTEs 6.5 FTEs
23
• Constraints on PAYG results in budgetary pressures and uncertainties:
• Limits ability to undertake pilot, tactical, and quick-build projects not eligible for TCF or TIF
funding
• Extends asset replacement timeline beyond recommended industry standards
• ITS devices, for example, have been rapidly deployed at an increasing rate over the last
10 years and many require replacement
• TCF continues to pay for new eligible operating expenditures
• 32% of TCF will go towards operations and program administration in FY25
• Update to MTP will identify and define next set of transportation capital
priorities
Key Budget Considerations
County Manager's Proposed
FY 2025 Budget
County Board Work Session
April 4, 2024
Transportation