RecordWell Data

Transportation(PDF, 4MB)

Arlington County · Arlington County · Budget documents

Open the original document More from Arlington County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

County Manager's Proposed FY 2025 Budget County Board Work Session April 4, 2024 Transportation 2 • Arlington Ridge Road / Mount Vernon Drive Bridge • ART Operations and Maintenance Facility • Army Navy Drive Complete Street • Army Navy Drive Protected Bike Lane Extension • Boundary Channel Drive Interchange • Bus Bay Expansion at East Falls Church Metro • Columbia Pike Streets - (Segments A, C, D, F) • Columbia Pike Transit Stations (first 8) • George Mason Drive at North Park Drive • Military Road at Nelly Custis Drive • North Ohio Street at 11th Street North • Pentagon City Metro Station Second Elevator • Shirlington Road Bridge (bike/ped bridge) • South Eads Street (Army Navy Drive to 15th Street) • Walter Reed Drive (6th Street S to Columbia Pike) • Wilson Boulevard (10th Street to North Lincoln Street) • 15th Street South and South Fern Street • 15th Street South (Route 1 to Crystal Drive) Projects highlighted blue = construction is underway Projects in black are planned to start construction in 2024 Construction in CY 2024 3 • Initial station siting in Metrorail corridors • Station planning evolved to include equity as a lens when siting stations • Currently siting two additional stations along western Columbia Pike • E-bikes in circulation: 200-250 per day • FY 2025 Funding: $3.3m in TCF for expansion and operations/maintenance Focus on Equity: Capital Bikeshare Capital Bikeshare Station Installations 4 Focus on Equity: Shared Mobility Shared Mobility Device Program • Pilot Program began in 2018 • Regulations adopted in November 2019 • SMD Program statistics: o 3 permitted vendors o 1,800 devices permitted to be deployed o 112 corrals • Report mis-parked / abandoned devices • SMD Program has deployment requirements to ensure coverage in Equity Emphasis Areas as defined for the program Corral by Gunston Middle School Map of SMD Corrals 5 Funding Source Restrictions on Use of Funding (per state code or other binding documentation) FY25 Funding $M Transportation Capital Fund (TCF) – Commercial and Industrial (C&I) Tax New or enhanced road / transit improvements that add capacity, service, or access, and capital or operating costs related to the new projects, that benefit the business community; eligible uses outlined in state code 83.1 TCF – NVTA Local Additional roadway construction, capital improvements that reduce congestion, projects in TransAction, or for public transportation purposes; eligible uses outlined in state code 24.9 Tax Increment Financing (TIF) Capital and public infrastructure improvements in the TIF area: Crystal City, Pentagon City, Potomac Yard 24.3 Federal Multiple programs, including small annual allocations for ongoing programs and highly competitive nationwide grants (0-20% match) 18.6 State Transit Formula Transit operations and capital improvements (match varies) 44.8State Smart Scale Multimodal roadway improvements, transit capacity expansion (no required match) State Revenue Sharing Multimodal roadway improvements (50% match) NVTA Regional Multimodal roadway and transit improvements included in the TransAction Regional Plan that provide greatest congestion reduction relative to cost (no match) 27.1I-66, I-395 Commuter Choice (NVTC) Multimodal improvements on parallel corridors that increase person throughput and benefit the toll-paying users of the facility (no match) Funding Sources $228m* in addition to PAYG and GO Bonds NVTA: Northern Virginia Transportation Authority NVTC: Northern Virginia Transportation Commission Local discretionary State competitive Regional competitive * Includes ~$5m in contributions from developers, WMATA, and City of Alexandria not shown in table above 6 Pay-As-You-Go Proposed Projects • PAYG supports transportation assets across the County • Request limited to programs and projects not eligible for TCF or TIF funding 7 Project Name ($ in 000s) PAYG Other Sources Total Slurry Seal and Micro-surfacing (Paving program) 1,300 1,389 2,689 Signals and ITS Maintenance 1,000 0 1,000 Street Safety Improvements 365 959 1,324 Sidewalk, Curb, Gutter Proactive Zone Maintenance 309 0 309 Bridge Maintenance 221 819 1,040 BIKEArlington 50 1,257 1,307 Transportation Asset Management 23 180 203 Street Lighting 0 1,736 1,736 WALKArlington 0 3,221 3,221 Neighborhood Complete Streets 0 3,179 3,179 Parking Meters 0 206 206 Trail Light Maintenance 0 20 20 Total Transportation Capital Program $3,268 FY 2025 PAYG Proposed Projects: Transportation Note: We will be requesting new GO Bonds in the upcoming CIP process. 8 Transportation System Snapshot 1,058 Lane-miles of County maintained and managed roads 78 ART buses 990 Bus stops >330 Bus shelters 1 Transitway 1 Bus station 11 Metrorail stations Capital Bikeshare: 110 stations 802 bicycles Shared Micro-Mobility: 1,800 scooters 355 eBikes 36 County- maintained vehicular and pedestrian bridges 729 Multi-space parking meters 679 Single space meters 302 Signalized intersections 300 CCTV cameras 24 Permanent traffic count stations 1 Virginia Railway Express station 190 Uninterruptible power supply units 31 Speed indicator signs 7 Variable message signs 87 School zone flashers 97 Pedestrian flashing beacons 8,614 County-owned streetlights 52,709 Street signs 9 Assets: Paving • The 2023’s Overall PCI of 83.3 indicates “State of Good Repair” near “Excellent” • PAYG needed to maintain paved roads with slurry seal and micro-surfacing, while bonds pay for milling and overlay • Pothole repairs have decreased 67% in comparing annual average 2019-2023 vs. 2014-2018 59.0 10 Assets: Proactive Zone Maintenance Improving safety and accessibility for all users • 442.8 miles of County maintained sidewalk • Kicked off Tripping Hazard Blitz in FY23 to address sidewalk tripping hazards • Resolved over 32K hazards to date, including over 67% of those identified in the 2021 survey • Commenced concrete Zone Maintenance program in FY24 across 20 zones • 2 zones per year for a 10-year maintenance interval, one north of Route 50 and one south of Route 50 • Zones targeted for FY24 already completed with 12,722 linear feet (LF) of sidewalk and 8,723 LF of curb & gutter replaced • FY25 $1,030K proposed budget is funded with PAYG ($309K) and bond ($721K) Crews installing new sidewalk Example of sidewalk shaving Green = FY24 completed Orange = FY25 upcoming work FY 2021 Actual FY 2022 Actual FY 2023 Actual FY 2024 Estimate FY 2025 Estimate Curb, Gutter, and Sidewalks repaired and Replaced (Measured in Linear Feet 8,863 9,308 9,396 30,000 32,000 Tripping hazards treated by sidewalk grinding or jacking 9,180 3,437 16,235 15,000 5,000 11 Assets: Bridge Maintenance Funded with a mix of PAYG and Bonds • 36 county-maintained bridges. • Inspected biennially and rated on a scale of 0 to 9; county’s goal is between 6 and 7 (“Satisfactory” to “Good”) • Focused effort in recent years has cleared backlog of maintenance and repair work • Following replacement of Arlington Ridge Road bridge (anticipated in FY27), all bridges will be above 6; current average rating is 6.4 • FY25 proposed budget $1,040K lower than $1,400K in FY24 owing to cleared backlog and carryover balances • Proposed PAYG funding $221K vs. 700K in FY24 • No new bonds in FY25 (new bonds starting FY26 in CIP) SOUTH WALTER REED DRIVE OVER FOUR MILE RUN MILITARY ROAD OVER DONALDSON RUN CULVERT 12 Assets: Signals and ITS Maintenance • Covers inspection, repair, and maintenance of: • 302 signalized intersections, many with added devices (e.g., CCTV, video detection, battery back-up) • Flashing beacons (accelerated deployment in last 5-10 years) • Other devices (e.g., speed indicators, count stations) • Structural inspections of signal poles on 6-year cycle • Preventative maintenance every year on cabinet and every 2 years on overhead equipment and wiring • 25 to 35-year life per industry standard • Program funded with mix of PAYG and Bonds • Proposed FY25 budget of $1,355K • Supports either replacing according to industry standards or extending life with repair or component replacement Signal Pole Breakdown AfterBefore Signal Cabinet Repair 13 Street Safety Improvements • SSI Program ($365,000 FY 2025 PAYG): Vision Zero staff perform safety audits and implement safety treatments throughout the County; program scalable and could do more • Depending on engineering treatment identified, some locations are eligible for TCF/TIF, but pilot efforts and tactical projects typically require PAYG funds • Recent initiatives include school safety measures (rubber humps) and tactical deployments at intersections (hardened medians) 14 BIKEArlington, WALKArlington, NCS • BIKEArlington ($50,000 FY 2025 PAYG): funds are used to pay monthly data service for the bicycle counter program, as well as implement tactical and quick- build projects • Neighborhood Complete Streets (NCS) Program ($0 FY 2025 PAYG): funds are used for pilot projects or tactical applications; program has carryover to fund Shared Street Pilots • WALKArlington ($0 FY 2025 PAYG): funds are used to improve safety and accessibility at spot location; program is scalable 15 Asset Management in the Right-of-Way • Transportation Asset Management ($23,000 FY 2025 PAYG): funds asset inventory database management and updates based on current conditions in real-time • Parking Meters ($0 FY 2025 PAYG): funds routine maintenance and replacement; currently in a repair cycle, major repairs anticipated FY 2028 • Streetlights ($0 FY 2025 PAYG): funds major repairs and districting cleanup in accordance with the Streetlight Management Plan (SMP) • Trail Light Maintenance ($0 FY 2025 PAYG): funds minor repairs to trail lights 16 Transportation Capital Funds (TCF) Components • Funded from added tax of 0.125 per $100 of assessed value on commercial and industrial properties starting 2008 • Available for new construction/expansion of roads/transit • Has served as a basis for leveraging state, regional and federal transportation funds for major capital projects. • Vacancy rates impact revenues, resulting in tax fluctuations. • $24.4M anticipated in FY25, 5% lower than FY24 Adopted 1. Local Commercial and Industrial (C&I) Tax • Instated in 2013 by VA General Assembly,funded from 0.7 ppt increase in sales tax and from increment of the Grantor’s tax • 30 percent of revenues are returned to localities for eligible, locally selected transportation projects. • Available for new construction, capital improvements that reduce congestion, and public transportation purposes. • Has served as a basis for leveraging state, regional and federal transportation funds for major capital projects. • $11.8M anticipated in FY25, 1% higher than FY24 Adopted 2. NVTA Local (30% local allocation from HB 2313) 17 Key Programs Funded by TCF and TIF • Funding reflects TCF and TIF only; other sources, including grants, may also be available • TCF is the main source except in the case of Crystal City Streets and Crystal City Metro East Entrance where TIF is the dominant source $000 FY25 Funding Columbia Pike Streets 40,027 Crystal City, Pentagon City, Potomac Yard Streets 6,538 Improvements Outside Major Corridors 5,259 WALKArlington 2,927 Neighborhood Complete Streets 2,680 Rosslyn-Ballston Arterial Streets Improvement 2,581 BIKEArlington 944 Street Safety Improvements 915 Crystal City Metro East Entrance 19,362 ART Operations & Maintenance Facility 15,086 Pentagon City Metro Second Elevator 3,893 ART Fleet Expansion 1,428 Transit Operations 5,178 Program Administration 4,351 Capital Bikeshare * 3,267 * Includes $1.9m of O&M OTHER COMPLETE STREETSTRANSIT 18 TCF FY 2025 Projects ART Operations & Maintenance Facility (total cost $96.7m) Completion Anticipated Fall 2024 Bus Stop Improvement Program Arlington Blvd. & S. Montague St. Arlington Ridge / Lynn St. Improvements (total cost $1.2m) Almost Completed Columbia Pike – Segment F (total cost $45.1m) Completion Anticipated Summer 2025 19 ADA Bus Stops: Inventory Update “Level 1” Stops ~40% “Level 2” Stops ~35% • Initial inventory complete, contractor performing QA/QC and resurveying certain locations – numbers will change • 990 bus stops: roughly 60% are not compliant with current regulations, approximately 10% are not accessible • Working implementation strategy: Advance Level 1 immediately to bring into compliance while concurrently advancing design work on Level 2 and Level 3 to ready for construction • Will present final inventory and implementation strategy during FY 2025 – FY 2034 CIP Work Session Compliance = regrade sidewalk and install pad to curbCompliance = relocation of newspaper boxes Compliance = widen sidewalk/pad, curb ramps, crossings, regrading “Level 3” Stops ~25% Bottom line for Level 3: redesign and rebuild roadway/ sidewalk 20 FY 2025 Budget Summary – TCF • Fund balances and external funding sources will be used to cover a portion of FY 2024 and FY 2025 expenditures • FY 2025 Proposed Budget reflects 1.5 FTEs moved from the General Fund to TCF • Percent of TCF revenues directed to operations and program administration is 32% of proposed FY 2025 budget FY 2024 Adopted FY 2025 Proposed Change % Change Expenses $127,285,784 $128,727,500 +$1,441,716 +1.1% Revenue $37,374,864 $36,145,664 -$1,229,200 -3.3% Staff 41.0FTEs 42.5 FTEs +1.5 FTEs +4.0% 21 Crystal City Tax Increment Financing (TIF) • TIF fund pays for infrastructure improvements that further the redevelopment of Crystal City, Potomac Yard, and Pentagon City • Funded by redirecting 25% of increase in property taxes vs. 2011 baseline year • Projects funded via the TIF provide critical transportation and open space infrastructure needed to support future redevelopment Boundary Channel Drive Improvements ($17.6m) Completion anticipated late FY 2024 Army Navy Drive Construction ($15.3m) Completion anticipated fall 2025 22 FY 2025 Budget Summary – TIF • FY 2025 proposed revenue reflects TIF at an increment of 25% vs. Calendar Year 2011 (base year) • TIF revenues are paired with other internal and external funding sources to deliver capital program • Fund balances are used to cover a portion of FY 2024 and FY 2025 expenditures FY 2024 Adopted FY 2025 Proposed Change % Change Expenses $11,809,660 $27,880,800 +$16,071,140 +136.1% Revenue $4,379,860 $6,506,510 +$2,126,650 +48.6% Staff 6.5 FTEs 6.5 FTEs 23 • Constraints on PAYG results in budgetary pressures and uncertainties: • Limits ability to undertake pilot, tactical, and quick-build projects not eligible for TCF or TIF funding • Extends asset replacement timeline beyond recommended industry standards • ITS devices, for example, have been rapidly deployed at an increasing rate over the last 10 years and many require replacement • TCF continues to pay for new eligible operating expenditures • 32% of TCF will go towards operations and program administration in FY25 • Update to MTP will identify and define next set of transportation capital priorities Key Budget Considerations County Manager's Proposed FY 2025 Budget County Board Work Session April 4, 2024 Transportation

Source: Arlington County website. First collected Oct 27, 2026.