RecordWell Data

DES Budget Presentation(PDF, 9MB)

Arlington County · Arlington County · Budget documents

Open the original document More from Arlington County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

1 County Board Work Session March 12, 2024 | 3:00 p.m. 2 Vision Our service makes Arlington a leading community that is vibrant, accessible, and resilient, today and in the future. Mission To make Arlington County a vibrant, accessible and sustainable community through strategic transportation, environmental and capital investment projects, while providing excellent customer service, operations and maintenance in a safe and healthy environment for all. Department Overview Fiscal Year 2023 9 • Sustainability focused; $1M added to the Climate Action Fund • Budget additions in targeted areas • Maintenance for ART Operating and Maintenance Facility (AOMF) • Training for Collective Bargaining implementation • EV County fleet conversions • Transit balancing return to ART and Transit Strategic Plan initiatives within fiscal constraints • $2.3 million in Budget reductions across lines of business focused on minimizing service delivery impacts to our community • Only $780k of total cuts impact service delivery FY 2025 Budget Highlights 10 • $1 million to replenish Climate Action Fund • $1.5 million for PAYG energy management projects • $410k to continue County fleet EV conversion • Solid Waste Management Plan Update Spring/Summer 2024 • Street food scraps compost bin pilot for multi- family residents (spring/summer 2024) • Awards • LEED® Platinum City certification • Achieved (and exceeded) U.S. Department of Energy’s (DOE) energy savings goal in the Better Buildings Challenge • Carbon Disclosure Project rating: top 13% of more than 1400 CDP-registered cities worldwide. Sustainability New Food Scraps Composters Dept. of Energy Better Building Challenge Award at White House 11 Example of solar powered arc. Source: motortrend.com Commitment to Climate Action Fund (CAF) Building energy pilot for low income $250K Public EV charging in ROW pilot $100K Solar-Powered EV Charging Stations at Courthouse $200K LED light conversion at Courts Police $150K Oakland St. warehouse electrification $300K Additional $1M CAF Investment in FY 2025 • Public facing pilots • Piloting Solar- Powered charger for County public safety vehicles • Building electrification and energy improvements 12 Madison Community Center Public EV Chargers at Long Bridge • $215k: Madison Community Center energy efficiency upgrade: In design for conversion to electric heat pump • $350k: Public EV Charging; Public EV Charging; construction of EV chargers at Courthouse Plaza surface lot planned for March 2024 / completion in spring • $100k: Community Choice Aggregation: Feasibility study will be completed in spring • $335k: Unallocated for Future Investment Previous CAF Allocations 12 13 PAYG Energy Management Investments Renewable Energy Installation $300K EV Chargers for County Fleet $250K EV Chargers for Public Use $500K County Building Energy Performance Upgrades $475K $1.5M PAYG Investment • County Facility Renewable Energy Installation • EV Chargers for County Fleet • EV Chargers for public use • County Building Energy Performance Upgrades 14 • Government leading by example • Serves as a demonstration model for private sector to build out charging network • Ensuring equitable distribution of charging stations • Carbon Neutral Transportation Plan includes an EV charging siting analysis which will be further refined to support public and private expansion of charging network EV Chargers for Public Use Arlington Mill CC (2) Legend 1212 S Irving St (1) Long Bridge Aquatics Center (8) Fairlington CC (4) Courthouse Surface Lot (6) Central Library (12) Madison CC (6) Aurora Hill Rec. Center (4) Barcroft CC (24) Lubber Run CC (8) Walter Reed CC (8) County Building Community Center Library Installation Fiscal Year 2023 2024 2025 Map of EV Chargers for Public Use 15 New Public GHG Dashboards • New interactive greenhouse gas (GHG) dashboards now available. Visit: arlingtonva.us/Government/Programs/Office-of-Sustainability-and-Environment/AIRE/Dashboards 16 Number of Solar Panels Cumulative kW Production Investing in Solar 2023 2024 2025 2026Installation Projected solar kW production increases 1,423% from 2023 to 2026 Solar Panels by Building and Cumulative kW Production Installation Complete Future Installation *Central Library currently has 250 panels (60kW). An additional 55 panels (+70kW) will be installed in 2026. 286 34 113 392 394 119 152 540 55 0 200 400 600 800 1000 1200 0 100 200 300 400 500 600 Current 1212 S Irving FS-8 AOMF Garage AOMF Bus Parking Lot AOMF Bldg Equip Bureau LRCC Central Library* 17 Electric bikes for County fleet/employee pilot EV Fleet – Non-Public Safety Sedans EV Chargers (Non-public) Non-public safety EV sedans by FY 2025 18 Output and Outcome Measures Vision Zero Program Output Performance Measures CY 2022 Actuals CY 2023 Actuals CY 2024 Estimates CY 2025 Estimates Multimodal Engineering improvements 186 198 150 150 Pedestrian-Focused Improvements 166 136 120 120 Bicyclist-Focused Improvements 150 156 120 120 Safety-related Report-a-Problem (RAP) Requests Addressed* 5,084 5,909 5,500 5,500 Time to Close Report-a-Problem Requests (workdays) 42.9 days 33.7 days 33 days 33 days Outcome Measures Severe or Fatal Crashes (Correctable crashes only) 17 21 15 10 Pedestrian Severe Crashes (Correctable crashes only) 8 7 5 4 Bike Severe Crashes (Correctable crashes only) 3 1 1 1 Next Steps • Many outcome measures are already imbedded in the budget or tracked separately. • DES will work over future budget cycles to refocus budget measures and identify and eliminate gaps Service request types include: Scooter/Bike Parking Issues, Blocked Sidewalks, Streets, or Bike Lanes, Concrete/Sidewalk Repairs, In-street bollard damaged/missing, Leading Pedestrian Interval (LPI) issues, Maintenance of Traffic (MOT) Issue, Overall Condition, Parking Signs damaged/missing, potholes, signal maintenance, signal timing, signal upgrades, street surface damage, streetlight issue, suggest a parking corral, traffic signs damaged/missing, traffic signal issue, and transportation safety investigations. DES General Fund 20 FY 2024 Adopted FY 2025 Proposed Change % Change Expenses $119,265,119 $121,951,432 +$2,686,313 +2.3% Revenue $53,211,358 $55,769,310 +$2,557,952 +4.8% Staff 407.65 FTEs 401.32 FTEs - 6.33 FTEs -1.6% • Personnel increased $1.2 million due to salary increases, offset by savings from 6.33 less general fund employees (7.33 FTE reduction, addition of 1 building engineer) • Non-personnel increased $1.4 million, net of budget reductions • Budget is supplemented by $1 million of energy investments in the Climate Action Fund Summary of Proposed Changes 21 Net Tax Support Reduction General Fund Staff Impact Change staff funding to better align work portfolios with most appropriate source of funds $383,001 -2.83 FTEs Budget savings and efficiencies: laundry services, overtime, and building repair $58,600 - Eliminate a part-time vacant Communications Specialist $73,895 -0.5 FTE Reduce Facilities Corrective Maintenance $300,000 - Reduce Facilities Preventative Maintenance $350,000 - Convert two County Custodians to Contract* $30,000 -1.0 FTE Reduce Window Cleaning to Every Other Year $60,000 Summary of Budget Reductions *To coincide with expected retirements dates, one position will be eliminated partway through FY 2025. The coinciding FTE authorization will be adjusted in FY 2026 22 Net Tax Support Reduction General Fund Staff Impact Restructure ART 61 & 53 $316,940 - Eliminate ART 62 $348,613 - Eliminate Vacant Temp Assigned to Litter Collection $40,000 -1.0 FTE Transfer Protected Bike Lane Sweeping to Stormwater Fund $24,705 - Reduce Hours for Monthly Shredding and Inert Material Drop-Off $14,000 - Eliminate Vacant TE&O Engineering Technician IV $119,394 -1.0 FTE Summary of Budget Reductions, cont. 23 Net Tax Support Reduction General Fund Staff Impact Reduce Garage Contractual Support at Arlington Mill and Lubber Run $81,000 - Eliminate Vacant Real Estate Specialist $83,338 -1.0 FTE Total $2,283,486 -7.33 FTEs (Vacant) Summary of Budget Reductions, cont. Lubber Run Community Center Parking Garage 24 Training (one-time)**: $25,000 Operational costs (ongoing and one- time)*: $460,513 Includes 1.0 FTE, Building Engineer FY 2025 Budget Additions New ART Facility Collective Bargaining Facilities Corrective maintenance for Facilities Maintenance Bureau (one-time): $300,000 * AOMF Total FY 2025 Operational Costs = $657,875. Transportation Capital Fund is contributing 30%, or $197k. ** Collective bargaining training is a total of $50,000. Utilities Fund is contributing 50%, or $25k. 25 FY 2024 Adopted Revenue FY 2025 Proposed Revenue Budget Impact Household Solid Waste $13,483,848 $13,802,900 +$319,052 Hauler Permitting $42,900 $85,800 +$42,900 Mulch Delivery $191,000 $241,000 +50,000 ART Bus Fares $2,122,314 $2,643,850 +$521,536 Parking Meter $9,404,290 $9,534,313 +$130,323 Permits $3,776,680 $4,194,200 +$417,520 FY 2025 Revenue Changes 26 Refuse Collection, Materials Recovery Increases Driving Household Solid Waste Rate Increase Proposed rate = $415.75 per household Increase of $9.61 due to: Household Solid Waste Rate (HSWR) Over Time Fiscal Year FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 Proposed Rate $314.16 $316.16 $306.00 $319.03 $318.61 $307.89 $406.14 $415.75 % Change -- 1% -3% 4% 0% -3% 32% 2.40% Expanded Housing Options (EHO) are proposed to be included in HSWR program. Collection Costs 27 • HSWR proposed to increase by $9.61 per household. • Proposed rate is $415.75 per household. Household Solid Waste Rate (HSWR) Proposed FY 2025 Solid Waste Fees in Surrounding Jurisdictions Rate FY 25 % Increase Arlington $415.75 2.4% Alexandria $500.00 0% Fairfax County* $696.46 20.8% *Fairfax County rates includes an additional assumed charge for leaf collection based on a rate of $0.019 per $100 of assessed value for the average home. Household Solid Waste Rates Over Time $295.00 $345.00 $395.00 $445.00 $495.00 $545.00 $595.00 $645.00 $695.00 $745.00 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Proposed Arlington Alexandria Fairfax 28 Solid Waste Fees Increasing from $150 to $300 per vehicle • Offsets administration of commercial hauler permitting program which monitors private waste collection haulers in County. • Program obtains data for County’s Recycling Rate Report submitting annually to DEQ. • Last increased in FY 2018. • Increase brings us inline with Alexandria. • Additional $43k in revenue Hauler Permitting Fee Mulch Deliveries Mulch delivery charges increasing: • Half Load: $60 to $78 • Full Load: $75 to $93 Fee covers the cost of program • Last increased in FY 2018 • High quality product • Additional $50k in revenue 29 LITTER ZONE TEMP REDUCTION Service Impacts Budget Impact • No dedicated staff for Zone 4, which is in the center of County (east of George Mason Dr., South of Wilson Blvd, West of Arlington Blvd, and North of Columbia Pike) • Litter collectors will be required to rotate to cover duties in Zone 4. • Overall cleanliness of the County may be reduced proportionally as there would be fewer staff available for routine duties. • May result in redrawing the boundaries and reducing to six zones in the future. FY 2024: $343,011 FY 2025: $303,011 Change: -$40,000 Staff Impact -1.0 Temp (vacant) Litter Zone Temp Reduction Current Litter Zone Collection Map 30 ART Ridership: Pandemic Recovery ART Performance in Passengers (YTD through January) FY 2024 Adopted Revenue FY 2025 Proposed Revenue Budget Impact ART Revenue $2,491,749 $3,059,498 $567,749 ART Monthly Ridership by Fiscal Year FY19 FY20 FY21 FY22 FY23FY24 1,342,516 1,165,506 994,191 789,617 1,783,538 1,620,790 FY24 FY23 FY22 FY21 FY20 FY19 50,000 100,000 150,000 200,000 250,000 300,000 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 15% increase YTD, 75% of Pre-pandemic ridership 31 Fare Increases to Align with WMATA 12.5% STAR FARE INCREASE12.5% ART FARE INCREASE • Base Fare: $2.00 to $2.25 • Senior citizens and persons with disabilities: $1.00 to $1.15 • Zone 1: $4.00 to $4.50 • Zone 2: $5.50 to $6.20 • Zone 3: $9.50 to $10.70 • County intends to adopt a fare increase for ART and STAR commensurate with the WMATA increase. • WMATA current proposal is for a 12.5% increase, they adopt their budget on April 25. Fares are rounded up to the nearest 5 cents 32 ART Operations and Maintenance Facility (AOMF) State-of-the-ART • Modern long-term facility for: • Reliable transit service • Support for long-term growth and sustainability of ART • 7 maintenance bays; 1 steam bay • Construction completion: fall 2024 • Projected operations in 2025 with phased transitioning • BEBs operational fall 2025 Budget Breakdown • $658k added to fund partial year of facility maintenance • General Fund $460k, TCF $197k • $148k is one-time expense • Assumes FMB begins operating building fall 2024 • Includes addition of a building engineer, building maintenance, custodian costs, utilities, and moving expenses It’s Electric! • Up to 44 charging spaces, with 2 quick chargers. • Phase 1 will be able to accommodate 12 BEB buses (4 ordered; seeking DRPT grant to purchase 8 summer 2024). • Three solar arrays: garage (159kW), roof of AOMF (50kW) and site canopy (188kW) 33 Transit Reduction RESTRUCTURE ART 53 & 61 Service Impacts Budget Impact • Eliminates service to the lowest performing sections of both routes • Maintains service for lower income and minority neighborhoods • A Title VI analysis has been completed • Service still available south of Route 50 in the Ft Myer/Radnor Heights area • APS students at The Heights still have access to Route 45 & other Metrobus routes that service the school • ART 61 averages 3.4 passengers/ hour • ART 53 averages 4.3 passengers/hour • ART service standard is 5.1 passengers/hour FY 2024: $990,015 FY 2025: $673,075 Change: -$316,940 34 Transit Reduction ELIMINATE ART 62 Service Impacts Budget Impact • Portions of route will be serviced by ART 52 and ART 53/61 combined routes • Service along N. Kirkwood, Spout Run, Lorcom Lane, Cherry Hill Rd, N. Utah St. 15 th St. N and direct connection to Ballston Metro will be eliminated • Maintains service for lower income and minority neighborhoods. Customers in the area have the option to use Route 53 along N Quincy St. or Route 72 along N Glebe Rd • A Title VI analysis has been completed • ART 62 averages 2.1 passengers/hour • ART service standard is 5.1 passengers/hour Change: -$348,613 35 Proposed Changes Proposed Future Route Coverage New ART 53 and 61 ART 62 ART 53 ART 61 36 • ART Fare-Free Rush Program • Free rush-hour ART bus rides in peak directions from Oct. 2023 to Jan. 2024 • Funded by NVTC Commuter Choice Grant • Preliminary results show program generated about 6% increase in ridership per month • Average of 66k free rides per month from October through January • ART/WMATA Fare-Free Student Program • 49.8% increase in student ridership between 2022 and 2023 • 4,500+ student trips on Metrobus in January 2024 Transit – Programs 37 Parking Meter Revenue Parking Meter Revenue: • $9.5M parking meter budget, $130k increase from FY 2024. • FY 2024 YTD (through January): 78% of pre- pandemic revenue • FY 2025 budgeted at 80% of pre-pandemic levels • Parking meter rates were last raised in FY 2019 Parking Meter Compliance: • Additional Police parking enforcement staff added: • 3 Traffic Safety Specialists (TSS) and one TSS Supervisor • Compliance data from performance parking pilot will be leveraged by Police to direct resources • Expected to increase compliance with paying parking meters 0 200,000 400,000 600,000 800,000 1,000,000 1,200,000 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun FY19 FY20 FY21 FY22 FY23FY24 Performance Parking Pilot • 4,500 sensors installed in metered parking spaces in Rosslyn-Ballston and Richmond Highway. • Goal to improve customer experience by providing real-time information. • Rates may change quarterly based on data. 38 Permit Fee Review • Cross department effort to evaluate fees charged through development process • Cost recovery approach based on direct staff time plus overhead & indirect cost allocation • Resulted in realignment of fees to more appropriately capture cost recovery for permitting activities • Scope included: Civil Engineering Plan Fees LDA & Erosion and Sediment Control Public Right of Way Plat Review and Bond Administration Zoning Fee Schedule: “DES Add-ons” • Scope did not include Transportation Right of Way Fees • These are user fees for various activities allowed by ROW permits 39 Permit Fee Review – Recommendations •Exceptions based on market data, time estimate risk, or where further study is needed Cost Recovery: Majority set at 100% cost recovery •Fee Increases: For significant* changes, fees will be increased over 3 years to get to full recovery •8 new fees, 16 replacement fees, and 36 fees being eliminated Analysis resulted in fee increases, decreases, and elimination of fees New 10% automation surcharge added to fund Permit Arlington technology needs •General Fund: $225k in additional revenue •$66K from fee realignments/recommendations and $159k from Inflationary fee increases for TROW •Stormwater Fund: $260k decline due to fee changes in LDA program •This is the 1st of a 3-year implementation. •Due to fee decreases and removals in year one, revenue impact will be greater in year 2 and 3. •CPHD Development Fund: $830k in additional revenue from addition of 10% of automation enhancement surcharge Revenue impact of fee changes: *Significant is defined as either over $100 or over 100% increase. Or for quantity-based fees, where the likely dollar impact totals more than $100. 40 Summary of Customer Impacts—DES Fees Project Type Project Description FY 24 Fees FY 25 Proposed Fees Impact to Customer % Change Multi-family / Commercial 20 story mixed use building with 3 levels of parking garage (218 parking spaces); 423 units and 17,000 sq. ft of retail space $358,444 $370,498 $12,054 3% Multi-family / Commercial* 16 story mixed use building with 2 levels of parking garage (75 parking spaces); 231 units and 3,500 sq. ft of retail space $194,123 $205,735 $11,612 6% Townhouses By-right Subdivision project of 4 townhouses $54,671 $66,321 $11,650 21% LDA Single Family Home* Single Family Infill, Disturbed Area = 13,619 SF $8,054 $6,548 $(1,506) -19% LDA Single Family Home Smaller Home Addition, Disturbed Area = 4,765 sf $6,285 $4,703 $(1,583) -25% * Does not include the 10% technology surcharge or planning fee changes 41 Customer Impact: DES Commercial • 20 story mixed use building with 3 levels of parking garage (218 parking spaces); 423 units and 17,000 sq. ft of retail space • Recommended FY 2025 Fee Changes result in 3% increase in permit fees, or $12k • Full Cost Recovery in year one would result in a 18% increase, or $64k Multi-family / Commercial • 16 Story mixed use building with 2 level of parking, 231 units and 3,500 sq ft of retail space • Recommended FY 2025 Fee Changes result in 6% increase in permit fees, or $12k • Full Cost Recovery in year one would result in a 23% increase, or $45k Multi-family / Commercial • By-right subdivision project of 4 townhouses • Recommended FY 2025 Fee Changes result in 21% increase in permit fees, or $12k • Full Cost Recovery in year one would result in a 62% increase, or $34k Townhouse Project 42 Customer Impact: DES & CPHD Combined Project Type Project Description Total FY 24 Charge to Customer Total FY 25 Charge to Customer Impact to Customer % Change Residential Project New 9295 Sq. Ft. Single Family Dwelling w/2 car garage $16,192 $19,694 +$3,502 22% Commercial project 16 story mixed use building with 2 levels of parking garage (75 parking spaces); 231 units and 3,500 sq. ft of retail space $830,762 $990,761 +$159,999 19% Includes 10% technology surcharge 43  Recommended route restructuring and elimination based on performance overlayed with impacts to transit dependent communities Focus on Equity ART Service Employee Impacts Approach to Budget Reductions: Minimize Impacts to the Most Vulnerable Reduce not Eliminate  Free shredding still available, but with reduced hours  Litter Zone reduction maintains dedicated staffing in all zones except middle of the County  Focused on minimizing impacts to filled positions 44 Future Considerations Ongoing challenges with materials, delays and manufacturing costs from vehicles to equipment Sustainability goals imbedded in DES programs. Balancing: • Costs premiums • Market availability • Maintenance • Grid resiliency Operationalizing Collective Bargaining Agreement 01 02 03 04 05 ART first option year contract negotiation begins soon. Tracking cost implications of ART bus operator potential recertification of union. Designing workspace and managing office space effectively in hybrid environment. DES Stormwater Management 46 FY 2024 Adopted* FY 2025 Proposed Change % Change Operating Expenses $14,208,855 $15,350,293 +$1,141,438 +8% Transfers Out/ (In) $2,336,552 $3,605,000 +$1,268,448 +54% Revenue $16,545,407 $17,789,313 +$1,243,906 +8% Staff 53.5 FTEs 54.5 FTEs +1.0 FTEs +2% • FY 2025 is first full budget year funded by stormwater utility fee (adopted for CY 2024) • Increasing operational & debt service costs and budget reduction measures in GF • Strategic utilization of excess fund balance to mitigate rate Summary of Proposed Changes *FY 2024 Adopted revenues and expenses do not include appropriations for the transfer to Capital PAYG 47 Staffing & contractual support for LDA post- construction compliance program: $218,225 + 1.0 FTE Budget Additions LDA Program Support Oversight of Voluntary Land Acquisition Maintenance oversight of voluntary land acquisition properties: $40,000 *SWMF = Storm Water Management Facility 6415 N. 24th St 48 Equivalent Residential Unit (ERU) = 2,400 square feet (SF) Impervious Area (IA) Rate Structure for Single-Family Residential (SF) Rate Structure for Multi-Family (MF) • Charged based on impervious area (IA) of each property, per ERU Single-Family Detached Tier Impervious Area Range Billing Unit Fee Tier 1 ≤ 1600 SF 0.60 ERU $154.80 Tier 2 1601 – ≤ 3600 SF 1.00 ERU $258.00 Tier 3 3601 – ≤ 4800 SF 1.70 ERU $438.60 Cap > 4800 SF Per ERU, like NR Varies CY 2024 Adopted Rate = $258/ERU Rate Structure for Non-Residential (NR) • Charged based on number of units per property Single-Family Attached Billing Unit Fee Includes Townhomes & Duplexes 0.60 ERU $154.80 Multi-Family Residential Billing Unit Fee Per Dwelling Unit 0.18 ERU $46.44 per unit First bill coming in May 2024, due June 15, 2024 (included on Real Estate bill) 49 Stormwater Utility Rate Regional Comparison (Average Household) In CY 2024, burden shifts from Real Estate Assessment-based stormwater tax to an Impervious Area-based Stormwater Utility Fee. Fee will continue to increase to support the debt service/bonds issued in support of CIP. $- $50 $100 $150 $200 $250 $300 $350 FY2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Proposed Annual cost ($) Dashed lines indicate FY2025 rates have not yet been proposed Fairfax County is the only jurisdiction still assessing a tax rate to fund stormwater. Fairfax City transitioned to a utility in FY2023 Arlington$258 $287 District of Columbia $324 Alexandria $162 Fairfax County Fairfax City $242 $52 PW County $281 Falls Church Transitions from Tax to Utility Fee for CY24 50 Stormwater Utility Fee – Project Status and Next Steps November 1, 2023 – January 31, 2024 November 11 2023 December 16 2023 June 15, 2024 – October 5, 2024 • Credit program application • Advertised ordinances and utility fee • Adopted ordinances and utility fee effective January 1, 2024. • Eliminate Sanitary District Tax • The stormwater utility fee will be billed as a line item on real estate property tax bill • 1st bill due June 15, 2024 • 2nd bill due October 5, 2024 Ongoing Continue informing the public about the new utility fee, timeline, and credit program = we are here 51 • Looking ahead to CY 2025 Credit Program • Feedback from current application period will be used to identify opportunities to clarify Credit Manual • New tool: Creating an online interactive tool to aid applicants in understanding credit eligibility before applying Voluntary Credit Program Summary 977 applications received (applies to 4% of properties)* Top 5 Approved Credit Types 264 credit applications approved (27%) Rainwater collection (121) Permeable Driveway (50) Conservation Landscaping (31) Rain Garden (27) Tree Planting (22) 149 (15%) in review process 133 withdrawn (14%) 431 denied (44%) *Calculation counts every multi-family condo unit attached to an application ** Includes Single Family attached and detached homes Class # Properties w/ Credit Median Credit Multi-Family 1,360 $5 Non- residential 9 (8 churches) $335 Single- family** 233 $13 Program intended to be a thank you to our customers DES Utilities Fund 53 FY 2024 Adopted FY 2025 Proposed Change % Change Expenses $96,157,336 $102,060,122 +$5,902,786 +6% Transfer Out $13,849,520 $8,404,417 -$5,445,103 -39% Revenue $110,006,856 $113,231,820 +$3,224,964 +3% Staff 254.95 FTEs 255.95 FTEs +1.0 FTE +<1% • Increasing rate pressures due to decreasing consumption, increasing operational costs related to water purchase, personnel, chemicals, and other contractual increases. • Mitigating rate increases through decreased transfer to PAYG Summary of Proposed Changes 54 • Proposed to increase by 4.9% overall, driven primarily by: • Investment in workforce, contractual increases, debtservice, and water purchase • Mitigated through decreased transfer to Utilities PAYG& CIP implementation adjustment Water-Sewer Fee Drivers Rate Pressures: • Customer water consumption not recovering as quickly as anticipated • FY23 consumption steady from FY22 • Decreasing consumption from FY24 budget level increases rate 2.4% • Sufficiency of 90-day operating reserve + $1.2M Existing & New Debt - $5.3M Transfer to PAYG +$1.2M Pay (Collective bargaining & general employee compensation) +$2.7M 90-day Reserve Sufficiency +$0.8M Water Purchase +$2.1M Chemicals & Electricity +4.9% Water-Sewer Impact* *Annual impact to median homeowner using 48 Thousand Gallons annually 55 Residential Regional Comparison Median Annual Household Cost for Water & Sewer (48 Thousand Gallons (TG)) 5-Year average annual increase to the median homeowners across other jurisdictions is 5%. Arlington’s 5-year average annual increase is 4.5% 500 600 700 800 900 1,000 1,100 1,200 1,300 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Proposed Annual water-sewer cost per household Arlington District of Columbia Falls Church Alexandria Fairfax City Fairfax County PG & MoCo Loudoun County PW County Dotted lines indicate no proposed sewer rate for FY 2025 yet; only the water rate has been proposed Assumes 11TG/quarter for Average Winter Water use $1,257 $1,016 $1,020 $844 $826 $720 $769 $734 $716 56 • Chemical and electricity costs • Operating impacts of upcoming capital projects: • Meter reading – Advanced Metering Infrastructure (AMI) • Re-Gen upgrades at the Plant • Washington Aqueduct • Growing operating and capital budgets – pay, chemicals, infrastructure maintenance and upgrades • Collective bargaining impacts Utilities – Future Rate Pressures & Concerns Bar Screen Replacements – Re-Gen Phase 1 Washington Aqueduct – Carbon Fiber installation between Cross Connects 2 & 3 Ballston Garages 58 FY 2024 Adopted FY 2025 Proposed Change % Change Floors 1 - 7 Expenses $3,396,603 $3,419,121 +$22,518 +0.7% Revenue $2,907,469 $2,982,149 +$74,680 +2.6% Summary of Proposed Changes Floor 8 Expenses $140,475 $136,151 -4,324 -3.1% Revenue $194,380 $237,164 +$42,784 +4% 59 • Major operational improvements in fall 2023 to improve customer experience and replace out-of-date equipment. • Improvements included: • New license plate reader (LPR) technology • Multiple payment options: cash and credit card and mobile payment • Removal of gates to prevent exit delays and maintenance • Elimination of paper tickets to reduce waste • Repeaters installed in February 2024 to improve cell phone access. • Signage improvements have also been made. Ballston Garage Improvements Ballston Garage New repeaters to improve cellular service Auto Fund 61 FY 2024 Adopted FY 2025 Proposed Change % Change Expenses $23,239,767 $18,974,924 -$4,264,843 -18.4% Revenue $23,217,501 $22,874,536 -$342,965 -1.5% Staff 58.00 FTEs 56.33 FTEs -1.67 FTEs -2.9% • Decrease in expense primarily due to planned fleet replacements and proposed reductions. • Cost pressures related to inflation and replacement of heavy-duty vehicles, such as dump trucks • One-time funds of $766k transferred from other funds for heavy equipment replacement inflationary increase and $410k for EV delta Summary of Proposed Changes 62 Continue Freezing 2nd Night Shift Supervisor Service Impacts Budget Impact • Equipment Bureau has reorganized to accommodate vacancy on the night shift. • Position recommended to be frozen as the position may be needed in future to support electric fleet. Change: -$131,094 Staff Impact Freeze 1.0 FTE (vacant) Detail of Proposed Reductions Eliminate Previously Frozen Welder Position Service Impacts Budget Impact • Welding position has historically maintained and fixed heavy equipment. • This work has been transitioned to on an outside contractor as these jobs have become more specialized and infrequent. Change: -$104,506 Staff Impact -1.0 FTE (vacant) 63 Electric Vehicle Conversion • EVs projected to be over 61% of sedan fleet by end of FY 2025 • FY 2025 includes up to 23 planned EV replacements • 3 battery electric school buses in fleet, submitted an EPA grant to purchase an additional 5 • One-time funding of $410k* (transfers from other funds) to pay for the incremental cost of EV replacement • Pursuing grant funding for EV replacements • Would reduce one-time funding need • Purchase of pursuit-rated EV Blazer for Police pilot *General Fund contribution is $298k 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% FY21 & Prior FY22 FY23 FY24 Projected FY25 Projected Electric Vehicles as a % of Fleet (non-public safety) Sedans Other Vans Small Trucks Over 61% of sedans EV Questions

Source: Arlington County website. First collected Oct 27, 2026.