DES Budget Presentation(PDF, 9MB)
Arlington County · Arlington County · Budget documents
Open the original document More from Arlington County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
1
County Board Work Session
March 12, 2024 | 3:00 p.m.
2
Vision
Our service makes Arlington a leading
community that is vibrant, accessible, and
resilient, today and in the future.
Mission
To make Arlington County a vibrant,
accessible and sustainable community
through strategic transportation,
environmental and capital investment
projects, while providing excellent
customer service, operations and
maintenance in a safe and healthy
environment for all.
Department
Overview
Fiscal Year 2023
9
• Sustainability focused; $1M added to the Climate Action Fund
• Budget additions in targeted areas
• Maintenance for ART Operating and Maintenance Facility (AOMF)
• Training for Collective Bargaining implementation
• EV County fleet conversions
• Transit balancing return to ART and Transit Strategic Plan initiatives
within fiscal constraints
• $2.3 million in Budget reductions across lines of business focused on
minimizing service delivery impacts to our community
• Only $780k of total cuts impact service delivery
FY 2025 Budget Highlights
10
• $1 million to replenish Climate Action Fund
• $1.5 million for PAYG energy management
projects
• $410k to continue County fleet EV conversion
• Solid Waste Management Plan Update
Spring/Summer 2024
• Street food scraps compost bin pilot for multi-
family residents (spring/summer 2024)
• Awards
• LEED® Platinum City certification
• Achieved (and exceeded) U.S. Department of
Energy’s (DOE) energy savings goal in the Better
Buildings Challenge
• Carbon Disclosure Project rating: top 13% of more
than 1400 CDP-registered cities worldwide.
Sustainability
New Food Scraps Composters
Dept. of Energy Better Building
Challenge Award at White House
11
Example of solar powered arc. Source: motortrend.com
Commitment to Climate Action Fund (CAF)
Building energy pilot for low
income
$250K
Public EV charging in ROW pilot
$100K
Solar-Powered EV Charging
Stations at Courthouse
$200K
LED light conversion at Courts
Police
$150K
Oakland St. warehouse
electrification
$300K
Additional $1M CAF
Investment in FY 2025
• Public facing pilots
• Piloting Solar-
Powered charger for
County public safety
vehicles
• Building electrification
and energy
improvements
12
Madison Community Center Public EV Chargers at Long Bridge
• $215k: Madison Community Center energy efficiency
upgrade: In design for conversion to electric heat pump
• $350k: Public EV Charging; Public EV Charging;
construction of EV chargers at Courthouse Plaza surface
lot planned for March 2024 / completion in spring
• $100k: Community Choice Aggregation: Feasibility study
will be completed in spring
• $335k: Unallocated for Future Investment
Previous CAF
Allocations
12
13
PAYG Energy Management Investments
Renewable Energy Installation
$300K
EV Chargers for County Fleet
$250K
EV Chargers for Public Use
$500K
County Building Energy
Performance Upgrades
$475K
$1.5M PAYG Investment
• County Facility Renewable
Energy Installation
• EV Chargers for County
Fleet
• EV Chargers for public use
• County Building Energy
Performance Upgrades
14
• Government leading by example
• Serves as a demonstration model
for private sector to build out
charging network
• Ensuring equitable distribution of
charging stations
• Carbon Neutral Transportation
Plan includes an EV charging siting
analysis which will be further
refined to support public and
private expansion of charging
network
EV Chargers for Public Use
Arlington
Mill CC (2)
Legend
1212 S Irving St (1)
Long Bridge
Aquatics
Center (8)
Fairlington
CC (4)
Courthouse
Surface Lot
(6)
Central
Library (12)
Madison CC (6)
Aurora Hill Rec.
Center (4)
Barcroft CC
(24)
Lubber Run
CC (8)
Walter Reed CC (8)
County Building
Community Center
Library
Installation Fiscal
Year
2023
2024
2025
Map of EV Chargers for Public Use
15
New Public GHG Dashboards
• New interactive greenhouse gas (GHG) dashboards now
available.
Visit: arlingtonva.us/Government/Programs/Office-of-Sustainability-and-Environment/AIRE/Dashboards
16
Number of Solar Panels
Cumulative kW Production
Investing in Solar
2023 2024 2025 2026Installation
Projected solar
kW production
increases
1,423% from
2023 to 2026
Solar Panels by Building and Cumulative kW Production
Installation Complete
Future Installation
*Central Library currently has 250 panels (60kW). An additional 55 panels (+70kW) will be
installed in 2026.
286
34
113
392 394
119
152
540
55
0
200
400
600
800
1000
1200
0
100
200
300
400
500
600
Current 1212 S
Irving
FS-8 AOMF
Garage
AOMF Bus
Parking Lot
AOMF Bldg Equip
Bureau
LRCC Central
Library*
17
Electric bikes for County
fleet/employee pilot
EV Fleet – Non-Public Safety Sedans
EV Chargers (Non-public)
Non-public safety EV
sedans by FY 2025
18
Output and Outcome Measures
Vision Zero Program
Output Performance Measures CY 2022
Actuals
CY 2023
Actuals
CY 2024
Estimates
CY 2025
Estimates
Multimodal Engineering improvements 186 198 150 150
Pedestrian-Focused Improvements 166 136 120 120
Bicyclist-Focused Improvements 150 156 120 120
Safety-related Report-a-Problem (RAP) Requests
Addressed*
5,084 5,909 5,500 5,500
Time to Close Report-a-Problem Requests (workdays) 42.9 days 33.7 days 33 days 33 days
Outcome Measures
Severe or Fatal Crashes (Correctable crashes only) 17 21 15 10
Pedestrian Severe Crashes (Correctable crashes only) 8 7 5 4
Bike Severe Crashes (Correctable crashes only) 3 1 1 1
Next Steps
• Many outcome
measures are
already imbedded
in the budget or
tracked separately.
• DES will work over
future budget
cycles to refocus
budget measures
and identify and
eliminate gaps
Service request types include: Scooter/Bike Parking Issues, Blocked Sidewalks, Streets, or Bike Lanes, Concrete/Sidewalk Repairs, In-street bollard
damaged/missing, Leading Pedestrian Interval (LPI) issues, Maintenance of Traffic (MOT) Issue, Overall Condition, Parking Signs damaged/missing, potholes, signal
maintenance, signal timing, signal upgrades, street surface damage, streetlight issue, suggest a parking corral, traffic signs damaged/missing, traffic signal issue,
and transportation safety investigations.
DES General Fund
20
FY 2024
Adopted
FY 2025
Proposed Change
%
Change
Expenses $119,265,119 $121,951,432 +$2,686,313 +2.3%
Revenue $53,211,358 $55,769,310 +$2,557,952 +4.8%
Staff 407.65 FTEs 401.32 FTEs - 6.33 FTEs -1.6%
• Personnel increased $1.2 million due to salary increases, offset by savings from 6.33
less general fund employees (7.33 FTE reduction, addition of 1 building engineer)
• Non-personnel increased $1.4 million, net of budget reductions
• Budget is supplemented by $1 million of energy investments in the Climate Action
Fund
Summary of Proposed Changes
21
Net Tax
Support
Reduction
General
Fund Staff
Impact
Change staff funding to better align work
portfolios with most appropriate source of funds $383,001 -2.83 FTEs
Budget savings and efficiencies: laundry
services, overtime, and building repair $58,600 -
Eliminate a part-time vacant Communications
Specialist $73,895 -0.5 FTE
Reduce Facilities Corrective Maintenance $300,000 -
Reduce Facilities Preventative Maintenance $350,000 -
Convert two County Custodians to Contract* $30,000 -1.0 FTE
Reduce Window Cleaning to Every Other Year $60,000
Summary of Budget Reductions
*To coincide with expected retirements dates, one position will be eliminated partway through FY 2025. The
coinciding FTE authorization will be adjusted in FY 2026
22
Net Tax
Support
Reduction
General
Fund Staff
Impact
Restructure ART 61 & 53 $316,940 -
Eliminate ART 62 $348,613 -
Eliminate Vacant Temp Assigned to Litter
Collection $40,000 -1.0 FTE
Transfer Protected Bike Lane Sweeping to
Stormwater Fund $24,705 -
Reduce Hours for Monthly Shredding and Inert
Material Drop-Off $14,000 -
Eliminate Vacant TE&O Engineering Technician
IV $119,394 -1.0 FTE
Summary of Budget Reductions, cont.
23
Net Tax
Support
Reduction
General
Fund Staff
Impact
Reduce Garage Contractual Support at
Arlington Mill and Lubber Run $81,000 -
Eliminate Vacant Real Estate Specialist $83,338 -1.0 FTE
Total $2,283,486 -7.33 FTEs
(Vacant)
Summary of Budget Reductions, cont.
Lubber Run Community Center
Parking Garage
24
Training (one-time)**:
$25,000
Operational costs
(ongoing and one-
time)*: $460,513
Includes 1.0 FTE, Building
Engineer
FY 2025 Budget Additions
New ART Facility Collective Bargaining Facilities
Corrective
maintenance for
Facilities Maintenance
Bureau (one-time):
$300,000
* AOMF Total FY 2025 Operational Costs = $657,875. Transportation Capital Fund is contributing 30%, or $197k.
** Collective bargaining training is a total of $50,000. Utilities Fund is contributing 50%, or $25k.
25
FY 2024 Adopted
Revenue
FY 2025
Proposed Revenue Budget Impact
Household Solid Waste $13,483,848 $13,802,900 +$319,052
Hauler Permitting $42,900 $85,800 +$42,900
Mulch Delivery $191,000 $241,000 +50,000
ART Bus Fares $2,122,314 $2,643,850 +$521,536
Parking Meter $9,404,290 $9,534,313 +$130,323
Permits $3,776,680 $4,194,200 +$417,520
FY 2025 Revenue Changes
26
Refuse Collection, Materials Recovery Increases Driving
Household Solid Waste Rate Increase
Proposed rate = $415.75 per household
Increase of $9.61 due to:
Household Solid Waste Rate (HSWR) Over Time
Fiscal Year FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25
Proposed
Rate $314.16 $316.16 $306.00 $319.03 $318.61 $307.89 $406.14 $415.75
% Change -- 1% -3% 4% 0% -3% 32% 2.40%
Expanded Housing Options (EHO) are proposed to be included in HSWR program.
Collection Costs
27
• HSWR proposed to increase
by $9.61 per household.
• Proposed rate is $415.75 per
household.
Household Solid Waste Rate (HSWR)
Proposed FY 2025 Solid Waste Fees in
Surrounding Jurisdictions
Rate FY 25 %
Increase
Arlington $415.75 2.4%
Alexandria $500.00 0%
Fairfax
County* $696.46 20.8%
*Fairfax County rates includes an additional assumed charge for leaf collection based on a rate of $0.019 per $100 of assessed
value for the average home.
Household Solid Waste Rates Over Time
$295.00
$345.00
$395.00
$445.00
$495.00
$545.00
$595.00
$645.00
$695.00
$745.00
FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
Proposed
Arlington Alexandria Fairfax
28
Solid Waste Fees
Increasing from $150 to $300 per vehicle
• Offsets administration of commercial
hauler permitting program which monitors
private waste collection haulers in County.
• Program obtains data for County’s
Recycling Rate Report submitting
annually to DEQ.
• Last increased in FY 2018.
• Increase brings us inline with Alexandria.
• Additional $43k in revenue
Hauler Permitting Fee Mulch Deliveries
Mulch delivery charges increasing:
• Half Load: $60 to $78
• Full Load: $75 to $93
Fee covers the cost of program
• Last increased in FY 2018
• High quality product
• Additional $50k in revenue
29
LITTER ZONE TEMP REDUCTION
Service Impacts Budget Impact
• No dedicated staff for Zone 4, which is
in the center of County (east of George
Mason Dr., South of Wilson Blvd, West
of Arlington Blvd, and North of
Columbia Pike)
• Litter collectors will be required to
rotate to cover duties in Zone 4.
• Overall cleanliness of the County may
be reduced proportionally as there
would be fewer staff available for
routine duties.
• May result in redrawing the boundaries
and reducing to six zones in the future.
FY 2024: $343,011
FY 2025: $303,011
Change: -$40,000
Staff Impact
-1.0 Temp (vacant)
Litter Zone Temp Reduction
Current Litter Zone Collection Map
30
ART Ridership: Pandemic Recovery
ART Performance in Passengers
(YTD through January)
FY 2024
Adopted
Revenue
FY 2025
Proposed
Revenue
Budget
Impact
ART
Revenue $2,491,749 $3,059,498 $567,749
ART Monthly Ridership by Fiscal Year
FY19
FY20
FY21
FY22
FY23FY24
1,342,516
1,165,506
994,191
789,617
1,783,538
1,620,790
FY24
FY23
FY22
FY21
FY20
FY19
50,000
100,000
150,000
200,000
250,000
300,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
15% increase
YTD, 75% of
Pre-pandemic
ridership
31
Fare Increases to Align with WMATA
12.5% STAR FARE INCREASE12.5% ART FARE INCREASE
• Base Fare: $2.00 to $2.25
• Senior citizens and persons with
disabilities: $1.00 to $1.15
• Zone 1: $4.00 to $4.50
• Zone 2: $5.50 to $6.20
• Zone 3: $9.50 to $10.70
• County intends to adopt a fare increase for ART and STAR commensurate
with the WMATA increase.
• WMATA current proposal is for a 12.5% increase, they adopt their budget
on April 25.
Fares are rounded up to the nearest 5 cents
32
ART Operations and Maintenance Facility (AOMF)
State-of-the-ART
• Modern long-term facility for:
• Reliable transit service
• Support for long-term
growth and sustainability
of ART
• 7 maintenance bays; 1
steam bay
• Construction completion: fall
2024
• Projected operations in
2025 with phased
transitioning
• BEBs operational fall 2025
Budget Breakdown
• $658k added to fund partial
year of facility maintenance
• General Fund $460k, TCF
$197k
• $148k is one-time expense
• Assumes FMB begins
operating building fall 2024
• Includes addition of a
building engineer, building
maintenance, custodian
costs, utilities, and moving
expenses
It’s Electric!
• Up to 44 charging spaces,
with 2 quick chargers.
• Phase 1 will be able to
accommodate 12 BEB
buses (4 ordered; seeking
DRPT grant to purchase 8
summer 2024).
• Three solar arrays: garage
(159kW), roof of AOMF
(50kW) and site canopy
(188kW)
33
Transit Reduction
RESTRUCTURE ART 53 & 61
Service Impacts Budget Impact
• Eliminates service to the lowest
performing sections of both routes
• Maintains service for lower income
and minority neighborhoods
• A Title VI analysis has been completed
• Service still available south of Route 50
in the Ft Myer/Radnor Heights area
• APS students at The Heights still have
access to Route 45 & other Metrobus
routes that service the school
• ART 61 averages 3.4 passengers/ hour
• ART 53 averages 4.3 passengers/hour
• ART service standard is 5.1
passengers/hour
FY 2024: $990,015
FY 2025: $673,075
Change: -$316,940
34
Transit Reduction
ELIMINATE ART 62
Service Impacts Budget Impact
• Portions of route will be serviced by ART 52
and ART 53/61 combined routes
• Service along N. Kirkwood, Spout Run,
Lorcom Lane, Cherry Hill Rd, N. Utah St. 15
th
St. N and direct connection to Ballston
Metro will be eliminated
• Maintains service for lower income and
minority neighborhoods. Customers in the
area have the option to use Route 53 along
N Quincy St. or Route 72 along N Glebe Rd
• A Title VI analysis has been completed
• ART 62 averages 2.1 passengers/hour
• ART service standard is 5.1 passengers/hour
Change: -$348,613
35
Proposed Changes Proposed Future Route
Coverage
New ART 53 and 61
ART 62
ART 53
ART 61
36
• ART Fare-Free Rush Program
• Free rush-hour ART bus rides in peak
directions from Oct. 2023 to Jan. 2024
• Funded by NVTC Commuter Choice
Grant
• Preliminary results show program
generated about 6% increase in
ridership per month
• Average of 66k free rides per month
from October through January
• ART/WMATA Fare-Free Student Program
• 49.8% increase in student ridership
between 2022 and 2023
• 4,500+ student trips on Metrobus in
January 2024
Transit – Programs
37
Parking Meter Revenue
Parking Meter Revenue:
• $9.5M parking meter budget, $130k increase from
FY 2024.
• FY 2024 YTD (through January): 78% of pre-
pandemic revenue
• FY 2025 budgeted at 80% of pre-pandemic
levels
• Parking meter rates were last raised in FY 2019
Parking Meter Compliance:
• Additional Police parking enforcement staff
added:
• 3 Traffic Safety Specialists (TSS) and one
TSS Supervisor
• Compliance data from performance parking
pilot will be leveraged by Police to direct
resources
• Expected to increase compliance with paying
parking meters
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
FY19
FY20
FY21
FY22
FY23FY24
Performance Parking Pilot
• 4,500 sensors installed in metered parking
spaces in Rosslyn-Ballston and Richmond
Highway.
• Goal to improve customer experience by
providing real-time information.
• Rates may change quarterly based on data.
38
Permit Fee Review
• Cross department effort to evaluate fees charged through
development process
• Cost recovery approach based on direct staff time plus
overhead & indirect cost allocation
• Resulted in realignment of fees to more appropriately capture
cost recovery for permitting activities
• Scope included:
Civil
Engineering
Plan Fees
LDA & Erosion
and Sediment
Control
Public Right of
Way
Plat Review
and Bond
Administration
Zoning Fee
Schedule: “DES
Add-ons”
• Scope did not include Transportation Right of Way Fees
• These are user fees for various activities allowed by ROW permits
39
Permit Fee Review – Recommendations
•Exceptions based on market data, time estimate risk, or where further study is needed
Cost Recovery: Majority set at 100% cost recovery
•Fee Increases: For significant* changes, fees will be increased over 3 years to get to full recovery
•8 new fees, 16 replacement fees, and 36 fees being eliminated
Analysis resulted in fee increases, decreases, and elimination of fees
New 10% automation surcharge added to fund Permit Arlington technology needs
•General Fund: $225k in additional revenue
•$66K from fee realignments/recommendations and $159k from Inflationary fee increases for TROW
•Stormwater Fund: $260k decline due to fee changes in LDA program
•This is the 1st of a 3-year implementation.
•Due to fee decreases and removals in year one, revenue impact will be greater in year 2 and 3.
•CPHD Development Fund: $830k in additional revenue from addition of 10% of automation enhancement
surcharge
Revenue impact of fee changes:
*Significant is defined as either over $100 or over 100% increase. Or for quantity-based fees, where the likely dollar impact totals more
than $100.
40
Summary of Customer Impacts—DES Fees
Project Type Project Description
FY 24
Fees
FY 25
Proposed
Fees
Impact to
Customer
%
Change
Multi-family /
Commercial
20 story mixed use building with 3 levels of parking
garage (218 parking spaces); 423 units and 17,000
sq. ft of retail space $358,444 $370,498
$12,054 3%
Multi-family /
Commercial*
16 story mixed use building with 2 levels of parking
garage (75 parking spaces); 231 units and 3,500 sq.
ft of retail space
$194,123 $205,735 $11,612 6%
Townhouses By-right Subdivision project of 4 townhouses $54,671 $66,321 $11,650 21%
LDA Single Family
Home* Single Family Infill, Disturbed Area = 13,619 SF
$8,054 $6,548 $(1,506) -19%
LDA Single Family
Home Smaller Home Addition, Disturbed Area = 4,765 sf $6,285 $4,703
$(1,583) -25%
* Does not include the 10% technology surcharge or planning fee changes
41
Customer Impact: DES Commercial
• 20 story mixed use building with 3 levels of parking garage (218 parking spaces); 423 units
and 17,000 sq. ft of retail space
• Recommended FY 2025 Fee Changes result in 3% increase in permit fees, or $12k
• Full Cost Recovery in year one would result in a 18% increase, or $64k
Multi-family / Commercial
• 16 Story mixed use building with 2 level of parking, 231 units and 3,500 sq ft of retail space
• Recommended FY 2025 Fee Changes result in 6% increase in permit fees, or $12k
• Full Cost Recovery in year one would result in a 23% increase, or $45k
Multi-family / Commercial
• By-right subdivision project of 4 townhouses
• Recommended FY 2025 Fee Changes result in 21% increase in permit fees, or $12k
• Full Cost Recovery in year one would result in a 62% increase, or $34k
Townhouse Project
42
Customer Impact: DES & CPHD Combined
Project Type Project
Description
Total FY 24
Charge to
Customer
Total FY 25
Charge to
Customer
Impact to
Customer % Change
Residential Project
New 9295 Sq. Ft.
Single Family
Dwelling w/2
car garage
$16,192 $19,694 +$3,502 22%
Commercial project
16 story mixed use
building with 2 levels
of parking garage (75
parking spaces); 231
units and 3,500 sq. ft
of retail space
$830,762 $990,761 +$159,999 19%
Includes 10% technology surcharge
43
Recommended route
restructuring and
elimination based on
performance overlayed
with impacts to transit
dependent communities
Focus on Equity
ART Service Employee Impacts
Approach to Budget Reductions:
Minimize Impacts to the Most Vulnerable
Reduce not Eliminate
Free shredding still
available, but with
reduced hours
Litter Zone reduction
maintains dedicated
staffing in all zones
except middle of the
County
Focused on
minimizing impacts to
filled positions
44
Future Considerations
Ongoing
challenges with
materials, delays
and
manufacturing
costs from
vehicles to
equipment
Sustainability
goals imbedded
in DES programs.
Balancing:
• Costs premiums
• Market
availability
• Maintenance
• Grid resiliency
Operationalizing
Collective
Bargaining
Agreement
01 02 03 04 05
ART first option
year contract
negotiation
begins soon.
Tracking cost
implications of
ART bus operator
potential
recertification of
union.
Designing
workspace and
managing office
space
effectively in
hybrid
environment.
DES
Stormwater Management
46
FY 2024
Adopted*
FY 2025
Proposed Change
%
Change
Operating
Expenses
$14,208,855 $15,350,293 +$1,141,438 +8%
Transfers
Out/ (In)
$2,336,552 $3,605,000 +$1,268,448 +54%
Revenue $16,545,407 $17,789,313 +$1,243,906 +8%
Staff 53.5 FTEs 54.5 FTEs +1.0 FTEs +2%
• FY 2025 is first full budget year funded by stormwater utility fee (adopted for CY 2024)
• Increasing operational & debt service costs and budget reduction measures in GF
• Strategic utilization of excess fund balance to mitigate rate
Summary of Proposed Changes
*FY 2024 Adopted revenues and expenses do not include appropriations for the transfer to Capital PAYG
47
Staffing & contractual support for LDA post-
construction compliance program:
$218,225 + 1.0 FTE
Budget Additions
LDA Program Support Oversight of Voluntary Land Acquisition
Maintenance oversight of voluntary land
acquisition properties:
$40,000
*SWMF = Storm Water Management Facility
6415 N. 24th St
48
Equivalent Residential Unit (ERU) = 2,400 square feet (SF) Impervious Area (IA)
Rate Structure for
Single-Family Residential (SF)
Rate Structure for
Multi-Family (MF)
• Charged based on
impervious area (IA) of
each property, per ERU
Single-Family Detached
Tier Impervious
Area Range
Billing
Unit
Fee
Tier 1 ≤ 1600 SF 0.60 ERU $154.80
Tier 2 1601 –
≤ 3600 SF
1.00 ERU $258.00
Tier 3 3601 –
≤ 4800 SF
1.70 ERU $438.60
Cap > 4800 SF Per ERU, like
NR
Varies
CY 2024 Adopted Rate = $258/ERU
Rate Structure for
Non-Residential (NR)
• Charged based on
number of units per
property
Single-Family Attached Billing
Unit
Fee
Includes Townhomes &
Duplexes
0.60 ERU $154.80
Multi-Family
Residential
Billing
Unit
Fee
Per Dwelling Unit 0.18
ERU
$46.44
per
unit
First bill coming in May
2024, due June 15, 2024
(included on Real Estate
bill)
49
Stormwater Utility Rate
Regional Comparison (Average Household)
In CY 2024, burden shifts from Real Estate Assessment-based stormwater tax to an Impervious Area-based Stormwater Utility Fee.
Fee will continue to increase to support the debt service/bonds issued in support of CIP.
$-
$50
$100
$150
$200
$250
$300
$350
FY2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
Proposed
Annual cost ($)
Dashed lines indicate FY2025 rates have not yet been proposed
Fairfax County is the only jurisdiction still assessing a tax rate to fund stormwater.
Fairfax City transitioned to a utility in FY2023
Arlington$258
$287 District of Columbia
$324 Alexandria
$162
Fairfax County
Fairfax City
$242
$52 PW County
$281 Falls Church
Transitions from Tax to
Utility Fee for CY24
50
Stormwater Utility Fee – Project Status and Next Steps
November 1, 2023 –
January 31, 2024
November 11
2023
December 16
2023
June 15, 2024 –
October 5, 2024
• Credit program
application
• Advertised ordinances
and utility fee
• Adopted ordinances and
utility fee effective
January 1, 2024.
• Eliminate Sanitary
District Tax
• The stormwater utility fee will be billed
as a line item on real estate property
tax bill
• 1st bill due June 15, 2024
• 2nd bill due October 5, 2024
Ongoing
Continue informing the public about the
new utility fee, timeline, and credit program = we are here
51
• Looking ahead to CY 2025 Credit Program
• Feedback from current application
period will be used to identify
opportunities to clarify Credit Manual
• New tool: Creating an online interactive
tool to aid applicants in understanding
credit eligibility before applying
Voluntary Credit Program Summary
977 applications received
(applies to 4% of properties)*
Top 5 Approved Credit Types
264 credit
applications
approved
(27%)
Rainwater
collection
(121)
Permeable
Driveway
(50)
Conservation
Landscaping
(31)
Rain
Garden
(27)
Tree
Planting
(22)
149 (15%) in review process
133 withdrawn (14%)
431 denied (44%)
*Calculation counts every multi-family condo unit attached to an application
** Includes Single Family attached and detached homes
Class # Properties
w/ Credit
Median
Credit
Multi-Family 1,360 $5
Non-
residential
9
(8 churches) $335
Single-
family** 233 $13
Program intended to be a
thank you to our customers
DES
Utilities Fund
53
FY 2024
Adopted
FY 2025
Proposed Change
%
Change
Expenses $96,157,336 $102,060,122 +$5,902,786 +6%
Transfer Out $13,849,520 $8,404,417 -$5,445,103 -39%
Revenue $110,006,856 $113,231,820 +$3,224,964 +3%
Staff 254.95 FTEs 255.95 FTEs +1.0 FTE +<1%
• Increasing rate pressures due to decreasing consumption, increasing operational
costs related to water purchase, personnel, chemicals, and other contractual
increases.
• Mitigating rate increases through decreased transfer to PAYG
Summary of Proposed Changes
54
• Proposed to increase by 4.9% overall, driven primarily by:
• Investment in workforce, contractual increases, debtservice, and
water purchase
• Mitigated through decreased transfer to Utilities PAYG& CIP
implementation adjustment
Water-Sewer Fee Drivers
Rate Pressures:
• Customer water consumption not
recovering as quickly as
anticipated
• FY23 consumption steady
from FY22
• Decreasing consumption
from FY24 budget level
increases rate 2.4%
• Sufficiency of 90-day operating
reserve
+ $1.2M
Existing & New
Debt
- $5.3M
Transfer to
PAYG
+$1.2M
Pay (Collective
bargaining & general
employee compensation)
+$2.7M
90-day Reserve
Sufficiency
+$0.8M
Water
Purchase
+$2.1M
Chemicals &
Electricity
+4.9%
Water-Sewer
Impact*
*Annual impact to median homeowner
using 48 Thousand Gallons annually
55
Residential Regional Comparison
Median Annual Household Cost for Water & Sewer (48 Thousand Gallons (TG))
5-Year average
annual increase to
the median
homeowners
across other
jurisdictions is 5%.
Arlington’s 5-year
average annual
increase is 4.5%
500
600
700
800
900
1,000
1,100
1,200
1,300
FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
Proposed
Annual water-sewer cost per household Arlington
District of
Columbia
Falls Church
Alexandria
Fairfax City
Fairfax County
PG & MoCo
Loudoun County
PW County
Dotted lines indicate no proposed sewer rate for FY 2025 yet; only the water rate has been proposed
Assumes 11TG/quarter for Average Winter Water use
$1,257
$1,016
$1,020
$844
$826
$720
$769
$734
$716
56
• Chemical and electricity costs
• Operating impacts of upcoming capital
projects:
• Meter reading – Advanced Metering
Infrastructure (AMI)
• Re-Gen upgrades at the Plant
• Washington Aqueduct
• Growing operating and capital budgets
– pay, chemicals, infrastructure
maintenance and upgrades
• Collective bargaining impacts
Utilities – Future Rate Pressures & Concerns
Bar Screen
Replacements –
Re-Gen Phase 1
Washington Aqueduct –
Carbon Fiber installation between
Cross Connects 2 & 3
Ballston Garages
58
FY 2024
Adopted
FY 2025
Proposed Change
%
Change
Floors 1 - 7
Expenses $3,396,603 $3,419,121 +$22,518 +0.7%
Revenue $2,907,469 $2,982,149 +$74,680 +2.6%
Summary of Proposed Changes
Floor 8
Expenses $140,475 $136,151 -4,324 -3.1%
Revenue $194,380 $237,164 +$42,784 +4%
59
• Major operational improvements in fall 2023 to
improve customer experience and replace
out-of-date equipment.
• Improvements included:
• New license plate reader (LPR) technology
• Multiple payment options: cash and credit
card and mobile payment
• Removal of gates to prevent exit delays
and maintenance
• Elimination of paper tickets to reduce
waste
• Repeaters installed in February 2024 to improve
cell phone access.
• Signage improvements have also been made.
Ballston Garage Improvements
Ballston Garage
New repeaters to improve
cellular service
Auto Fund
61
FY 2024
Adopted
FY 2025
Proposed Change
%
Change
Expenses $23,239,767 $18,974,924 -$4,264,843 -18.4%
Revenue $23,217,501 $22,874,536 -$342,965 -1.5%
Staff 58.00 FTEs 56.33 FTEs -1.67 FTEs -2.9%
• Decrease in expense primarily due to planned fleet replacements and proposed
reductions.
• Cost pressures related to inflation and replacement of heavy-duty vehicles, such as
dump trucks
• One-time funds of $766k transferred from other funds for heavy equipment
replacement inflationary increase and $410k for EV delta
Summary of Proposed Changes
62
Continue Freezing 2nd Night Shift Supervisor
Service Impacts Budget Impact
• Equipment Bureau has reorganized to
accommodate vacancy on the night shift.
• Position recommended to be frozen as the
position may be needed in future to
support electric fleet.
Change: -$131,094
Staff Impact
Freeze 1.0 FTE (vacant)
Detail of Proposed Reductions
Eliminate Previously Frozen Welder Position
Service Impacts Budget Impact
• Welding position has historically
maintained and fixed heavy equipment.
• This work has been transitioned to on an
outside contractor as these jobs have
become more specialized and infrequent.
Change: -$104,506
Staff Impact
-1.0 FTE (vacant)
63
Electric Vehicle Conversion
• EVs projected to be over 61% of
sedan fleet by end of FY 2025
• FY 2025 includes up to 23 planned
EV replacements
• 3 battery electric school buses in
fleet, submitted an EPA grant to
purchase an additional 5
• One-time funding of $410k* (transfers
from other funds) to pay for the
incremental cost of EV replacement
• Pursuing grant funding for EV
replacements
• Would reduce one-time funding need
• Purchase of pursuit-rated EV Blazer
for Police pilot
*General Fund contribution is $298k
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
FY21 & Prior FY22 FY23 FY24
Projected
FY25
Projected
Electric Vehicles as a % of Fleet
(non-public safety)
Sedans Other Vans Small Trucks
Over 61% of
sedans EV
Questions
Source: Arlington County website. First collected Oct 27, 2026.