Citizen Comments Received Through the Comment Portal
April 9, 2025, Board of Supervisors Meeting
Comment
Type
Comment Name District
Unscheduled
matter
Dominion Power has a
proposal to build a 7 to 9
mile long new 230,000 volt
double circuit transmission
line called the Western
Chesterfield Project from
the Midlothian Substation
off of Dry Bridge Road and
Route 60 to a substation on
Duval Road near the
Richmond Zoo. Could the
Chesterfield Board of
Supervisors formally ask
Dominion Power to include
building a 10 foot wide
paved muti use trail along
the whole 7 to 9 mile
easement with pedestrian
bridges over the major
roads along it. And than
vdot could take over
ownership of it. In that
the power line runs though
Chesterfield County's
fastest growing area. Also
the proposed Duval Sub
Station is with in less
than a half a mile of the
former Tidewater and
Western Railroad bed in the
Chesterfield Mega Site.
Which would have to major
trails in this area.
Carl
Schwendeman
Midlothian