Citizen Comments Received Through the Comment Portal
February 26, 2025, Board of Supervisors Meeting
Comment
Type
Comment Name District
Zoning
case -
24SN1209
(Deferred
from
1/22/2025)
- Magnolia
Green
Tract CC
Amendment
- Matoaca
As a resident of Magnolia
Green, I support the
proposed amendment related
to the Magnolia Green
commercial parcels. It
provides three key
components earning my
support: 1) ensuring that
current Magnolia Green
amenities (which are already
overcrowded) are not
accessible by any
residential built on the
properties 2) requires a
"village green" to allow for
a community gathering spot
3) it allows for more
commercial square footage to
be built. I think that we
severely lack commercial
options without having to
drive down severely
congested hull street and it
would be great if we had
more options to go to
connected to the community.
Arthur
Reeves
Matoaca
Unschedule
d matter
Could Chesterfield County
ask the developer of the
Chesterfield Mega Site data
centers to proffer turning
the former Tidewater and
Western Narrow Gauge
Railroad into a rail trail
between the Chesterfield
County Line with Powhatan
County and the Richmond Zoo.
The former railroad bed
originally had a 40 foot
wide easement back in 1917
but they could give it a 100
foot wide easement and have
the easement become a mini
park. Also could
Chesterfield County add the
former Tidewater and Western
Railroad to Chesterfield
County's Trails Master Plan
to become a spur of the Fall
Line Trail in Chesterfield.
Also since Chesterfield
County is talking about
property tax season. Could
Chesterfield County have
conversations about taxing
Carl
Schwendema
n
Midlothian
2/26/2025 Page 2 of 13
Comment
Type
Comment Name District
humanoid robots and self d
riving cars and drones like
the Tesla Optimus Robot and
self driving taxes at a 5 or
6 dollar personal property
rate to make up for lost
revenue in the future. In
that there are proposals for
companies to build 10,000 of
thousands of these humanoid
robots and self flying
drones and driving cars
cars. And Chesterfield
should prep to use these
things make up revenue lost
from humans losing their
jobs.
Zoning
case -
22SN0089
(Deferred
from
1/22/2025)
- Thackers
View
Rezoning
and
Exceptions
- Clover
Hill
Thank you for the work you
have already done. As a
Brandermill resident, I
understand the importance of
ensuring that the trees,
green space for the
ecosystem and the the
reservoir are well protected
when development occurs. We
have Bald Eagles, deer, and
many other species that live
near our reservoir and the
current neighborhoods
(Brandermill and Woodlake
specifically) have done
their part to make sure
there habitat is maintained.
Please ensure that the
Thacker's view project will
do the same. If you look at
the the tiny tree buffer
left on the project at the
corner of 288/Hull Street
(Cloverleigh project) and
all the new communities that
have been striped of trees,
you can see why the citizens
are concerned. Please
include clearly written
instructions in this project
to make sure those things do
not happen to our last
beautiful piece of property
on the reservoir. Please do
not vote to approve this
project unless everything is
written into the plan before
voting. Thank you.
Christy
Spence
Clover
Hill
2/26/2025 Page 3 of 13
Comment
Type
Comment Name District
Zoning
case -
22SN0089
(Deferred
from
1/22/2025)
- Thackers
View
Rezoning
and
Exceptions
- Clover
Hill
I’m writing to ask that the
zoning case for Thackers
View be deferred
indefinitely. Continued
approval for rezoning to
clear cut for residential
developments is inconsistent
with the County’s own
comprehensive plan, which
promotes orderly and
fiscally responsible growth
through adequate public
facilities and
infrastructure provision.
With additional strain being
put on public schools and
local roads especially, the
Board cannot in good faith
allow this rezoning case to
proceed. Children attending
elementary schools in
trailers and seeing the
queue to get to Tomahawk
Creek Middle each weekday
with no relief are a couple
of indicators that
infrastructure is not
keeping pace with
development. Please put
citizens first and defer
indefinitely.
Angel Reed Clover
Hill
Zoning
case -
22SN0089
(Deferred
from
1/22/2025)
- Thackers
View
Rezoning
and
Exceptions
- Clover
Hill
I am opposed to the
Townhomes and proposed
density in this development.
The % of townhomes to
residences is more than 3x
the ratio in adjoining
Woodlake.
The planned pavilion along
Rock Harbor is too large and
is not in keeping with the
pavilions in Woodlake and
nearby areas. It is too
large and too close to
existing and planned homes
creating a likely nuisance
for residents. A smaller
neighborhood pavilion is in
keeping with “a family
gathering place” and has
been the standard for years
along the reservoir.
Reference the much smaller
15’x15’ size of nearby Rock
Lisa
Disselkamp
Clover
Hill
2/26/2025 Page 4 of 13
Comment
Type
Comment Name District
Harbor pavilion.
Thackers View ALREADY has
several gathering place
structures on the property.
I’m opposed to adding a
traffic light for the new
development. Prefer instead
for there to be merging
lanes built for incoming and
outgoing traffic along
Woolridge Road. “Michigan
left turns” could be added
to Woolridge Road to assist
residents of Thacker View
making a left-hand turn onto
Woolridge or into the new
development. Woolridge Road
is already over capacity and
traffic along this curve
makes a light and
traditional Left turns
dangerous.
The county Department of
transportation should add a
roundabout at the
intersection of Timber Bluff
and Lake Bluff Parkways to
accommodate greater traffic
coming through Woodlake to
reach Hull St Rd. The bulk
of traffic comes from Timber
Bluff, but is currently
blocked for left turns and
backed up by the lesser,
sporadic traffic along Lake
Bluff Pkwy.
Zoning
case -
22SN0089
(Deferred
from
1/22/2025)
- Thackers
View
Rezoning
and
Exceptions
- Clover
Hill
Thank you to Jessica
Schneider and the rest of
the BOS for your engagement
and willingness to listen.
I am a core member of the
Friends of Swift Creek
Reservoir and we would like
to see a few additional
environmental protections
before the case is approve
d:
1) Ensure that all
undisturbed buffer areas be
documented in legal
descriptions 2) Wetlands,
RPAs, buffers, 40% green
space, and 30% tree canopy
clearly identified on Scaled
Gregory
Herceg
Clover
Hill
2/26/2025 Page 5 of 13
Comment
Type
Comment Name District
Drawings with BOS
review/approval of
preliminary plat 3) BOS or
Planning Commission final
approval over any utility
placement in RPAs 4) FOSCR
should receive official
notification as required for
notifications to adjacent
property owners 5) We would
like to see mats used to
protect tree roots (if not
everywhere then at least
around the RPA) and we
believe that the developer
should be required to hire a
certified arborist to advise
throughout 6) Environmental
engineers should monitor all
tree protection and
replanting efforts 7) If the
40% greenspace commitment is
real, it should be proffered
and clearly discernable on
the scaled drawings. 8) We
would like assurances that
the Army Corps of Engineers
will not override the
wetland protections in this
project.
Zoning
case -
22SN0089
(Deferred
from
1/22/2025)
- Thackers
View
Rezoning
and
Exceptions
- Clover
Hill
I support the
recommendations made by
Friends of Swift Creek
Reservoir to clarify
additional elements of the
project before the official
vote is taken.
Jay Meyer Clover
Hill
Zoning
case -
22SN0089
(Deferred
from
1/22/2025)
- Thackers
View
Rezoning
and
Exceptions
- Clover
Hill
1. Protection of Buffers –
We request that all
undisturbed buffer areas be
documented in legal
descriptions to ensure long-
term protections are
achieved, due to lax
oversight for other SCR
properties (and elsewhere).
Proffers should be included
to state needed oversight to
protect trees in designated
buffers.
Stephen
Meeley
Clover
Hill
2/26/2025 Page 6 of 13
Comment
Type
Comment Name District
2. Clarity in Conceptual
Plan & Approval of
Preliminary Plat – Wetlands,
RPAs, buffers, 40% green
space, and the 30% tree
canopy composition must be
clearly identified on the
Conceptual Plan and/or in
to-scale drawings made
available to the public for
transparency and
accountability. We further
request a proffer be
included requiring BOS
review and approval of the
preliminary plat.
3. Utility Placement
Oversight – Given the
environmental sensitivity of
this site, the Board or
Planning Commission—not just
County staff—should have
final approval authority
over utility placements in
RPAs.
4. Community Notification –
FOSCR is a gateway to the
public's line of site on
this project and we ask that
FOSCR receive written notice
of any material changes or
updates at various phases,
just as adjacent property
owners do.
5. Tree Root Protections –
More must be done to prevent
long-term tree loss, such as
requiring protective mats in
RPAs. FOSCR has offered an
arborist's formal opinion
and onsite tours to
underscore the potential
tree failure issues.
Similarly, we recommend that
the developer include a
proffer to hire a certified
arborist to provide best
practices for tree and root
protection, as well as for
the assessment of replanting
efforts. Additionally, we
request that a thorough tree
2/26/2025 Page 7 of 13
Comment
Type
Comment Name District
survey be conducted to hold
all parties accountable and
ensure the number of trees
in the development is
preserved as promised.
6. Stronger Tree
Preservation & Replanting
Commitments – The Planning
Commission should have
oversight of replanting
efforts to ensure meaningful
restoration. One way to
achieve this would be a
proffer for Environmental
Engineering inspectors to
monitor all tree protection
and ensure that they remain
in place as shown on the
plans throughout
construction.
7. 40% Greenspace Commitment
– If this is a true
commitment as the community
heard from the
developer/applicant in
community meetings, it
should be explicitly
proffered and mapped before
any yes vote occurs.
We ask the Board - the only
5 people able to ensure
long-term protections of
this development - act to
ensure that all needed
protections are addressed
fully before any approval.
Zoning
case -
24SN1209
(Deferred
from
1/22/2025)
- Magnolia
Green
Tract CC
Amendment
- Matoaca
Can they ask them to build a
new trail along Route 360
and build a right turning
lane for Beaver Bridge Road.
Carl
Schwendema
n
Midlothian
2/26/2025 Page 8 of 13
Comment
Type
Comment Name District
Zoning
case -
22SN0089
(Deferred
from
1/22/2025)
- Thackers
View
Rezoning
and
Exceptions
- Clover
Hill
Chesterfield County needs to
ask the developer to build a
trail or sidewalk that
crosses the Swift Creek
Reservoir along the
Woolridge Road causeway to
link up to the proposed new
sidewalks being built as
part of the Woolridge Road
widening.
Carl
Schwendema
n
Midlothian
Zoning
case -
22SN0089
(Deferred
from
1/22/2025)
- Thackers
View
Rezoning
and
Exceptions
- Clover
Hill
I’m a resident in Woodlake.
I’m asking the Board to
carefully consider and abide
by the restrictions set
forth in the white letter
from the Woodlake Board of
Directors.
I have previously opposed
development near the
reservoir because of
environmental concerns. I’m
opposed to the development
of the Thacker property
primarily for that reason.
I’m also concerned that the
overdevelopment that is
taking place in Chesterfield
County is too taxing on our
schools, roads and water and
energy resources.
Supervisor Schneider has
worked diligently with
representatives from
Woodlake to address these
concerns. Please adopt the
recommendations outlined in
the letter.
Sincerely,
Candace Graham
6316 Walnut Bend Ter
Midlothian, VA 23112
Candace
Graham
Clover
Hill
22SN0089
(Deferred
from
1/22/2025)
- Thackers
View
Rezoning
and
Exceptions
- Clover
Hill
On behalf of the Friends of
Swift Creek Reservoir, we
ask the BOS require the
following protections be
added:
1. Protection of Buffers –
proffer that undisturbed
buffer areas should be
documented in legal
descriptions to ensure long-
term protections.
Kathleen
Medaries
Clover
Hill
2/26/2025 Page 9 of 13
Comment
Type
Comment Name District
2. Conceptual Plan &
Approval of Preliminary Plat
– wetlands, RPAs+depths,
buffers+depths, 40% green
space, and the 30% tree
canopy composition should be
identified on the Conceptual
Plan and/or in to-scale
drawings made available to
the public. Furthermore, a
proffer should be included
requiring BOS review and
approval of the preliminary
plat.
3. Utility Placement
Oversight – given the
environmental sensitivity of
this site, the Board or
Planning Commission—not just
County staff—should have
final approval authority
over utility placements in
RPAs. Given that the Army
Corps of Engineers may
override local decisions, we
ask for confirmation that
wetland protections
proffered will remain
intact.
4. Community Notification –
we request a proffer that
specifies that the County
notify FOSCR with a set of
plans at each review phase
to help provide the gateway
to community engagement.
5. Tree Root Protections –
more must be done to prevent
long-term tree loss such as
requiring protective mats in
RPAs. We request a tree
survey be conducted to
ensure protections and
preservations. A plan for
maintaining the health of
the trees post-construction
should also be included.
6. Stronger Tree
Preservation & Replanting
Commitments – require a
proffer for Environmental
Engineering inspectors to
monitor all tree protection
and ensure that they remain
in place as shown on the
plans throughout
construction.
7. 40% Greenspace Commitment
– the developer's promise to
the community of 40%
2/26/2025 Page 10 of 13
Comment
Type
Comment Name District
greenspace should be
included in proffers.
Supervisor Schneider has
worked tirelessly and heard
our concerns. We ask that
the BOS not approve an
application that doesn't
fully address the needed
protections to ensure a
final development we all can
be very proud of. Thank you.
22SN0089
(Deferred
from
1/22/2025)
- Thackers
View
Rezoning
and
Exceptions
- Clover
Hill
I support the Friends of the
Swift Creek Reservoir
comments made.
I want to reinforce while
certain standards may be
allowed today, they may not
necessarily be the most
appropriate for this site
and this legacy waterfront
development in an
environmentally sensitive
area. We have the
opportunity to pursue higher
standards that would better
benefit the project and the
surrounding environment. For
instance, placing sewer and
utility lines under the
pavement in the street ways
may not be required, but if
deemed appropriate by the
environmental engineering
team, it would be a
desirable approach rather
than through the RPA. FOSCR
does not want this project
to be remembered as a time
when exceptions were made at
the expense of the Swift
Creek Reservoir and the
surrounding environment. Our
goal is to prevent any
future missteps or lack of
oversight that could arise
from what the developer is
allowed to disturb in the
resource-protected area
governed by the Chesapeake
Bay Act.
I strongly recommend that
the developer hire a
certified arborist to ensure
that best practices are
followed for tree and root
protection, as well as for
the assessment of replanting
Paula
Gordon
Clover
Hill
2/26/2025 Page 11 of 13
Comment
Type
Comment Name District
efforts. Additionally, we
request that a thorough tree
survey be conducted to hold
all parties accountable and
ensure the number of trees
in the development is
preserved as promised. This
survey should also include a
plan for maintaining the
health of the trees post-
construction and outline the
expected duration of their
viability.
It's important that the
community receives
assurances starting at the
local level that the
wetlands will be preserved,
regardless of federal or
state protections. This
ensures that the site's
unique environmental
features are safeguarded
throughout the development
process. Given that the Army
Corps of Engineers has the
authority to override local
decisions, we need
confirmation that wetland
protections will remain
intact throughout this
application, ensuring that
the wetlands are properly
safeguarded at all levels.
22SN0089
(Deferred
from
1/22/2025)
- Thackers
View
Rezoning
and
Exceptions
- Clover
Hill
The Friends of the Swift
Creek Reservoir (FOSCR)
thanks the Board of
Supervisors, planning staff,
the developer/applicant, and
Supervisor Schneider for
their engagement and
willingness to listen to
citizen concerns throughout
this process.
While we recognize
significant progress has
been made, key environmental
protections still need to be
included to make this a
complete application all
stakeholders can support. We
ask the Board of Supervisors
to request these protections
before the vote. Doing so
ensures these protections
are given enhanced oversight
during the planning and
construction phases –
without which oversight rest
Kim Owens Matoaca
2/26/2025 Page 12 of 13
Comment
Type
Comment Name District
solely on County Staff who
are not elected officials.
The Need Protections We See
1. Protection of Buffers –
We request that all
undisturbed buffer areas be
documented in legal
descriptions to ensure long-
term protections are
achieved. 2. Clarity in
Conceptual Plan & Approval
of Preliminary Plat –
Wetlands, RPAs, buffers, 40%
green space, and the 30%
tree canopy composition must
be clearly identified on the
Conceptual Plan and/or in
to-scale drawings made
available to the public for
transparency and
accountability. 3. Utility
Placement Oversight – Given
the environmental
sensitivity of this site,
the Board or Planning
Commission—not just County
staff—should have final
approval authority over
utility placements in RPAs.
4. Community Notification –
FOSCR is a gateway to the
public's line of site on
this project and we ask that
FOSCR receive written notice
of any material changes or
updates at various phases,
just as adjacent property
owners do. 5. Tree Root
Protections – More must be
done to prevent long-term
tree loss, such as requiring
protective mats in RPAs.
FOSCR has offered an
arborist's formal opinion
and onsite tours to
underscore the potential
tree failure issues. 6.
Stronger Tree Preservation &
Replanting Commitments – The
Planning Commission should
have oversight of replanting
efforts to ensure meaningful
restoration. 7. 40%
Greenspace Commitment – If
this is a true commitment as
the community heard from the
developer/applicant in
community meetings, it
should be explicitly
proffered and mapped before
2/26/2025 Page 13 of 13
Comment
Type
Comment Name District
any vote occurs.8. Wetland
Protections & Oversight –
Given that the Army Corps of
Engineers has the authority
to override local decisions,
we need confirmation that
wetland protections will
remain intact throughout
this application, ensuring
that the wetlands are
properly safeguarded at all
levels.