RecordWell Data

Board of Historic and Architectural Review Regular Meeting Agenda (PDF)

City of Chesapeake · Chesapeake City County · meeting of Jan 8, 2026 · Agendas

Open the original document More from City of Chesapeake

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

H I S T O R I C & A R C H I T E C T U R A L R E V I E W B O A R D J a n u a r y 8 , 2 0 2 6 Board of Historic and Architectural Review January 8, 2026 Public Safety Operations Center 2130 S Military Hwy, Chesapeake, VA 23320 5:30 PM A. Call To Order B. Roll Call C. Approval of December 4 regular meeting minutes. D. Committee Reports E. Administrative Approvals F. Zoning Report G. Old and New Business H. Consent Agenda Items I. Regular Agenda Items 1. 1230 Chesapeake Avenue (PLN-CAPP-2025-118) After-the-fact installation of gutters. 1. Public Input 2. Legal Guidance 3. Adjournment These applications and related documents are available for public review on the Planning Department’s website through the following link: https://www.cityofchesapeake.net/AgendaCenter/Board-of-Historic- Architectural-Review-4 The City of Chesapeake will provide reasonable accommodations and services necessary for sensory- impaired and disabled persons by contacting the Facilities Maintenance Administrator, Public Works at (757) 382-8951 at least three-working days in advance and language assistance to individuals with limited English proficiency to the extent possible by contacting the Planning Department at (757) 382-6176 at least 10 days in advance of this meeting. *While this is not a public hearing, the public and any one or several members of the Chesapeake City Council may choose to attend. 1 Meeting Minutes Historic and Architectural Review Board (HARB) December 4, 2025 Portlock Galleries at South Norfolk ROLL CALL HARB Members Present: Chair Frank Lilley, Ervin Young, Dave Walski, Kaydee Moore Staff: Anna Nagorniuk, Recording Secretary – Planning Department; Adam Lantz, City Attorney – City Attorney’s Office; Carlos Rodriguez, Code Enforcement Officer – Developments and Permits; Nat McCormick, Community Designer Manager – Planning Department Chair F. Lilley called the meeting to order at 5:36 p.m. MINUTES Approval of November 20 special meeting minutes. Motion to approve November 20 minutes as written made by E. Young and seconded by K. Moore, with all members present voting for (4-0). COMMITTEE REPORTS None. ADMINISTRATIVE APPROVALS A. Nagorniuk reported three (3) administrative approvals since the November 20 meeting. ZONING REPORT None. OLD AND NEW BUSINESS None. CONSENT AGENDA None. REGULAR AGENDA 1. 1116 Rodgers Street (PLN-CAPP-2025-116) Reissue PLN-CAPP-2024-131 for new construction of a two-story single-family home with extended driveway, connection to sidewalk, and two-over-one windows.  Applicant discussed the desire to expand the width of the driveway from the originally approved plan. Board and City Attorney A. Lantz determined that this was outside of the scope of the reissue of the original COA as previously approved.  Motion to approve the reissue made by K. Moore and seconded by D. Walski, with all members present voting for (4-0). 2. 1436 Seaboard Avenue (PLN-CAPP-2025-106) Installation of composite rails on porch; paint porch boards in approved color.  C. Rodriguez provided photographic evidence that proposed railing would not meet Building Code; discussion among Board and applicant(s) regarding potential modifications to the application that would include an appropriate railing that meets the height code requirement.  Application was modified on the floor.  Motion, in agreement with the applicant and the Board, that the railing system would be 5-piece rail system 2 with a booster rail to bring it to Code as a change to the original COA, and Planning will give final approval to the modified COA; also included in this motion, remove any information on the back porch, paint the railing with approved Benjamin Moore Historical color and booster rail painted a darker color of the Benjamin Moore color collection, made by E. Young and seconded by K. Moore, with three (3) members present voting for and one against (3-1). 3. 1209 Holly Avenue (PLN-CAPP-2025-117) Installation of solar panels on existing roof.  Discussion of Power of Attorney/authority to represent the application; Planning staff received correspondence on December 2, 2025 that the application was to be withdrawn, but Ion Solar representative in attendance was unable to confirm.  Motion to continue the application to next month made by D. Walski and seconded by E. Young, with all members present voting for (4-0). PUBLIC INPUT None. LEGAL GUIDANCE None. ADJOURNMENT Motion to adjourn the meeting made by E. Young and seconded by F. Lilley, with all members present voting yes (4-0). Meeting adjourned at 6:43 p.m. MEETING MINUTES APPROVED: _____________ 1230 Chesapeake Avenue– PLN-CAPP-2025-118 1 Staff Report Version December 22, 2025 Proposal After-the-fact installation of gutters. Address 1230 Chesapeake Avenue, Chesapeake VA 23324 Year Built 1914(Contributing) Applicant Emma Hernandez After-the-Fact Yes ☒ No ☐ Owner Emma Hernandez Special Power of Attorney Yes ☐ No ☒ HARB Hearing Date January 8, 2026 Staff Planner Anna Nagorniuk Application Address 1230 Chesapeake Avenue Application Number PLN-CAPP-2025-118 Staff Recommendation Approval 1230 Chesapeake Avenue– PLN-CAPP-2025-118 2 Project Proposal Applicant is proposing after-the-fact installation of K-style gutters, located on the side elevations, the corner on the primary structure, and along the front columns of the porch. South Norfolk Design Guidelines Gutters and Downspouts  2) Gutters and downspouts may be installed on buildings where they did not historically exist. New gutters and downspouts should be installed in a way that does not permanently damage historic materials. Options for achieving this include sensitively installing the gutters to ensure Aerial Map Project Proposal Staff Analysis 1230 Chesapeake Avenue– PLN-CAPP-2025-118 3 they can be removed in the future without damaging historic materials or placing new gutters and downspouts on secondary elevations.  3) Choose a gutter form that is compatible with the style of the building. (pg.65) General Analysis Based on Zoning Inspection photos (attached below), gutters were installed after-the-fact in October 2024. While the gutter style is appropriate, the mounting of the downspouts onto the front porch columns is inconsistent with the standards in the Design Guidelines. While this may be the case, the gutters have been in place for at least over a year and the removal/ relocation of the downspouts on the front columns risks further damage to the existing material and columns. Staff find the proposed work to be partially consistent with the Design Guidelines and recommend approval. Staff Findings Additional Photos 1230 Chesapeake Avenue– PLN-CAPP-2025-118 4 1230 Chesapeake Avenue– PLN-CAPP-2025-118 5 1230 Chesapeake Avenue– PLN-CAPP-2025-118 6 Adjacent residents were notified of the application and proposed scope of work in a letter sent on December 23, 2025. 1. eBUILD Application Supplemental Documents Public Notification City of Chesapeake Department of Planning Record Summary for Certificate of Appropriateness Record Detail Information Record Type: Certificate of Appropriateness Record Status: Pending Board Review File Date: November 9, 2025 Record Number: PLN-CAPP-2025-118 Record Name: 1230 Chesapeake Avenue Expiration Date: Description: Parent Record Number: Added white gutters to house Address: 1230 CHESAPEAKE AVE, CHESAPEAKE, VA 23324 Owner Information Primary Owner Name Owner Address Owner Phone HERNANDEZ EMMA RYes Parcel Information Parcel No: 1280000000280 Contact Information Organization NameName Contact Type Phone Emma Hernandez Applicant Address Application Specific Information NATURE OF THE APPLICATION Description Added white gutters to house, they match the entire neighborhood, didn’t know this was a thing (sorry) Zoning Sign Off No Economic Hardship No PLANNING STAFF TO COMPLETE Application After-the-Fact - After-the-Fact Fee Paid - Approved Administratively - Approving Planner - Approval Date - Certificate Number - See supplemental submittal requirements - Page 1 of 3 PLN-CAPP-2025-118 Board Approved Certificate Number - I, _______________, hereby grant permission for City Staff & members of the Historic Architectural Review Board to enter my site to view exterior areas related to theis Certificate of Appropriateness Application. - Structure Designation - GENERAL INFORMATION Year Structure Built 1914 Is this an After-the-Fact application? Yes $250 After the Fact fee, if required. CHECKED One original delivered to the Planning Department OR a copy attached to the on-line application CHECKED One disk containing all photos OR photos attached to on-line application UNCHECKED ? Completed and notarized power of attorney form if the applicant is not the property owner. UNCHECKED NEW CONSTRUCTION Completed application form. UNCHECKED Surveyed site plan (including proposed buildings, structure(s), parking, etc.) UNCHECKED Front and side elevations UNCHECKED Samples UNCHECKED Arrangement of proposed exterior lighting. UNCHECKED Photographs of the property and adjoining or opposite properties. CHECKED ADDITIONS TO EXIST. STRUCTURES Completed application form. UNCHECKED Surveyed site plan or city tax map UNCHECKED Elevations UNCHECKED Photographs of the existing structure and property. CHECKED Samples, photos, and brochures UNCHECKED Arrangement of proposed exterior lighting. UNCHECKED Proposed signs with appropriate detail as to character and location. UNCHECKED ALTERATIONS OR REPAIRS Completed application form. UNCHECKED Written description of work to be performed UNCHECKED Photographs of the building/structure. UNCHECKED 2 quotes each are required for the following: UNCHECKED Photos numerically keyed UNCHECKED RELOCATIONS Page 2 of 3 PLN-CAPP-2025-118 Completed application form UNCHECKED Photographs of the building or structure to be relocated and adjacent properties. UNCHECKED Photographs of the premises to which the building or structure will be relocated. UNCHECKED Written description of reasons for the relocation and the proposed use of the vacated property. UNCHECKED DEMOLITIONS Completed application form UNCHECKED Photographs of the building or structure to be demolished to illustrate its state of disrepair. UNCHECKED Written report on condition of building or structure. UNCHECKED Written description of work to be performed UNCHECKED SPECIAL POWER OF ATTORNEY Special Power of Attorney attached UNCHECKED METAL ROOFS Explanation UNCHECKED Info required to replace metal roof with metal roof. UNCHECKED Picture UNCHECKED Specification Sheet UNCHECKED Roof color sample UNCHECKED Info required to replace metal roof with architectural shingles. UNCHECKED Quotes UNCHECKED Roof color sample (asphalt) UNCHECKED Page 3 of 3 PLN-CAPP-2025-118

Source: City of Chesapeake website. First collected Nov 3, 2026.