Planning Commission Meeting Packet (PDF)
City of Suffolk · Suffolk City County · meeting of Mar 17, 2026 · Agenda packets
Open the original document More from City of Suffolk
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
SUFFOLK PLANNING COMMISSION
AGENDA FOR
MARCH 17, 2026
PREPARED BY THE CITY OF SUFFOLK DEPARTMENT OF
PLANNING & COMMUNITY DEVELOPMENT
KEVIN WYNE, AICP, DIRECTOR OF PLANNING & COMMUNITY
DEVELOPMENT
THE REGULAR MEETING WILL BE HELD AT 2:00 P.M. IN
THE SUFFOLK CITY COUNCIL CHAMBERS OF THE CITY HALL BUILDING
IF YOU CANNOT ATTEND OR NEED SPECIAL ACCOMODATIONS AT THE
MEETING, PLEASE CALL THE CITY OF SUFFOLK DEPARTMENT OF PLANNING
& COMMUNITY DEVELOPMENT AT (757) 514-4060
PRIOR TO 12:00 NOON ON FRIDAY, MARCH 13, 2026.
MILLS STAYLOR
CHAIRMAN
Page 1
AGENDA
SUFFOLK PLANNING COMMISSION
March 17, 2026
2:00 P.M.
1. Call to Order
A. Invocation
B. Pledge of Allegiance
C. Roll Call
2. Approval of minutes from previous meeting
3. Public Hearings:
A. CONDITIONAL USE PERMIT REQUEST, CUP2025 -00020, Trailerworx
Services: submitted by Michael McLane, applicant and property owner, in accordance with
Section(s) 31- 306 and 31-406 of the Unified Development Ordinance, to grant a Conditional
Use Permit to establish an agribusiness use on property located at 2101 Holland Corner Road,
Zoning Map 52, Parcel 13A. The affected area is further identified as being located in
the Holy Neck Voting Borough, zoned A, Agricultural Zoning District. The 2045
Comprehensive Plan designates this area as outside the growth area, Rural Agriculture Land
Use Type.
B. ORDINANCE TEXT AMENDMENT OTA2026 -003, initiated by the City of Suffolk, for
amendments to S ection 31-416.2 of the Unified Development Ordinance of the City of Suffolk,
Virginia. The purpose of the text amendment is to update and refine the Code of the City of Suffolk,
Chapter 31, Unified Development Ordinance.
4. Old Business
5. New Business
A. Status Report - City Council Meeting, February 18, 2026
B. Status Report - Preliminary Plats Approved - None
6. Commissioner’s Comments
7. Adjournment
1
MINUTES
SUFFOLK PLANNING COMMISSION
February 17, 2026
2:00 P.M.
The meeting of the Suffolk Planning Commission was held on Tuesday, February 17,
2026, at 2:00 p.m., in the Council Chambers of the Municipal Building, 44 2 W.
Washington Street, Suffolk, Virginia, with the following persons present:
MEMBERS:
Mills Staylor, Chairman
Anita Hicks, Vice-Chairman
Mary Ellen Baur
Oliver Creekmore
Johnnie Edwards
Gerald Goodman
Thomas Powell
Selena Thornton-Manuel
STAFF:
William Hutchings, Jr., City Attorney
Kevin Wyne, Dir. of Planning & Com. Dev.
Margaret Pittenger, Asst. Dir. of Planning
Jennifer Cobb, Asst. Dir. of Com. Dev.
William Mellon, Zoning Administrator
Caitlin Aubut, Land Use Planning Manager
Jonathan McBride, Comp. Planning Manager
Goncalo Borges, Senior Planner
Cassidy McKelvie, Senior Planner
Isabella Reynolds, Planner I
Catina Myrick, Administrative Analyst
The meeting was called to order by Chairman Staylor. Commissioner Edwards
offered the Invocation and led the Pledge of Allegiance. The roll was called by Mr.
Wyne and the Chairman was informed that a quorum was present.
APPROVAL OF MINUTES:
The minutes of the previous meeting were approved as written.
2
AMENDED AGENDA:
Kevin Wyne, Director of Planning and Community Development, advised that the
applicant for RZN2024-015, Hillpoint Trace, requested deferral until April 21, 2026.
Commissioner Hicks made a motion to defer this application until April 21, 2026,
seconded by Commissioner Creekmore and passed by a recorded vote of 8 to 0.
PUBLIC HEARINGS:
CONDITIONAL USE PERMIT REQUEST, CUP2025 -00015, Shoulders Hill
Road Condominium: submitted by Pete Alex Kotarides, Smith Farm Landing LLC,
applicant and property owner in accordance with Sections 31-306 and 31-406 of the
Unified Development Ordinance, to grant a Conditional Use Permit, to establish a
contractors and trade shops (outdoor storage and operations) use on property located
on Shoulders Hill Road, Zoning Map 20, Parcel 12. The affected area is further
identified as being located in the Sleepy Hole Voting Borough, zoned M1, Light
Industrial District Zoning District. The 2045 Comprehensive Plan designates this area
as outside of the Northern Growth Area, Employment Center Land Use Type.
The next item of business was introduced by the Chairman followed by a staff report
by Isabella Reynolds, Planner I . M s. Reynolds stated that this application is to
establish a storage yard to store construction and landscape materials, as well as
equipment. The proposed location of the storage yard is in the rear of the property.
The location of the storage yard will be sufficiently screened from the public right of
way, with existing buffers of the Norfolk Southern railroad and the existing forested
area. The storage yard shall be accessed from the private road (Innovators Place) that
serves the property. The applicant states the stored materials will consist of gravel
3
piles, pipes, wall blocks, Connex boxes, various tools, concrete blocks, mulch, plants,
and trees. The construction equipment stored will be small trailers and small tractors.
The applicant proposed the storage yard to be gravel. This is permitted in Section 31-
606 of the UDO, which states gravel may be permitted in a low traffic storage yard.
The UDO defines a low-traffic yard as a storage area generating less than 30 average
daily trips. The property owner did provide a letter stating that the storage yard is not
anticipated to generate more than 20 trips a day. In conclusion, this conditional use
permit does sufficiently satisfy the criteria as set forth in the UDO. The proposed
storage yard is located in the rear of the subject property and is sufficiently screened
from the public right of way. Additionally, the storage yard aligns with the intent of
the M1 zoning district, which is to promote orderly development and concentration of
industrial and manufacturing uses. Therefore, staff recommend ed approval of this
application with the conditions noted in the staff report.
The public hearing was opened and speaking in favor of this application was Ryan
Hambleton, Project Manager, 1120 Independence Blvd, Virginia Beach, VA.
There being no speakers in opposition, the public hearing was closed.
Commissioner Hicks made a motion to approve this application with the conditions,
seconded by Commissioner Goodman and passed by a recorded vote of 8 to 0.
CONDITIONAL USE PERMIT REQUEST, CUP2026-00001, Tiny Human
Society Daycare: submitted by Kathleen Lynch, applicant and property owner, in
4
accordance with Section(s) 31-306 and 31-406 of the Unified Development
Ordinance, to grant the Conditional Use Permit to establish a day care (family day
home for 5-12 children) on property located at 302 Edward Avenue, Zoning Map
25A, Parcel 1*J3. The affected area is further identified as being located in the Suffolk
Voting Borough, zoned RLM, Residential Low-Medium Zoning District. The 2045
Comprehensive Plan designates this area as part of the Central Growth Area,
Suburban Neighborhood Land Use Type.
The next item of business was introduced by the Chairman followed by a staff report
by Caitlin Aubut, Land Use Planning Manager. Ms. Aubut stated that the applicant
currently operates a family day home for four children, aged six weeks to five years,
within their 1,450 square-foot single-family home. The applicant desires to expand
their daycare operation to accommodate up to 12 children under the age of five, with
daytime care hours from 6:30 AM to 6:00 PM, and overnight care from 6:00 PM to
6:30 AM. In-home daycare for up to four children – exclusive of the provider’s own
children and any children who reside in the home as residential occupancy by a single
family – is permitted as a matter of right. The applicant proposed to utilize 851.25
square feet of their 1,450 square foot home for the care of up to 12 children under the
age of five as depicted on the floor plan. The proposal meets the indoor space
requirements of UDO. Additionally, the applicant’s sketch plan, depicts a 1,407
square-foot outdoor play area within the northern portion of the rear yard of the
subject property. The applicant also provided photos showing outdoor play toys, a
small slide, and swings within the play area. For family day homes, the UDO requires
5
an outdoor play area of at least 1,000 square feet to be enclosed by a fence and located
in such a way to provide “maximum peace and tranquility to adjoining residential uses
and to protect the safety of the children”. There is a shed at the rear of the property
near the play area, which the applicant states will be locked at all times to prevent
access. The applicant’s photos depict a chain link fence on the northern side of the
play area, and pursuant to requirements of the UDO, a condition of approval is
proposed to require the play area to be fenced within the backyard. This proposal is
compatible with the Suburban Neighborhood designation in the 2045 Comprehensive
Plan and provides a critical service to parents and caregivers in the city. Considering
the size of the property and the proposed scale of the proposed home daycare
operation, staff believes the expanded operation would not have adverse impacts on
the surrounding area. Therefore, staff recommended approval of this application with
the conditions noted in the staff report.
The public hearing was opened and speaking in favor of this application was Kathleen
Lynch, property owner. She asked for the Commission’s approval of this application.
Also, speaking in favor of this application was Kim Clark, 4040 Godwin Blvd.,
Suffolk, VA.
There being no speakers in opposition, the public hearing was closed.
6
After discussion by the Commission, Commissioner Baur made a motion to approve
this application with the conditions, seconded by Commissioner Hicks and passed by
a recorded vote of 7 to 1.
ORDINANCE TEXT AMENDMENT OTA2026 -001, initiated by the City of
Suffolk, for amendment to Section 31-406, Table 406-1 and Section 31-702(c)(1) of
the Unified Development Ordinance. The purpose of the text amendment is to update
and refine the Code of the City of Suffolk, Chapter 31, Unified Development
Ordinance.
The next item of business was introduced by the Chairman followed by a staff report
by William Mellon, Zoning Administrator. Mr. Mellon stated that there has been a
desire among citizens expressed to allow commercial stables by-right in the RE, Rural
Estate zoning district. Currently, Agricultural animals (including horses) and
livestock are permitted in the Rural Estate district while the boarding of horses for
compensation requires a conditional use permit for commercial stable. A commercial
stable use is currently permitted as a matter of right in the A, Agricultural zoning
district and RR, Rural Residential zoning district. The proposed changes will be to
modify Table 406- 1 by changing the CUP currently required in the RE to a use
permitted as a matter of right. Additionally, a modification to language contained in
31-702 would remove the word “private” to ensure these regulations apply to all
stables. The current definition in Appendix A is not proposed to be changed. Staff
believes this use is compatible and appropriate for (RE) Rural Estate zoning district
7
and should be permitted by right. In that regard, staff recommended approval of this
ordinance text amendment.
The public hearing was opened. There being no speakers in favor or in opposition, the
public hearing was closed.
Commissioner Hicks made a motion to approve this ordinance text amendment,
seconded by Commissioner Thornton-Manuel and passed by a recorded vote of 8 to 0.
ORDINANCE TEXT AMENDMENT OTA2026 -002, initiated by the City of
Suffolk, for amendment to Section 31- 701(c) and Appendix A of the Unified
Development Ordinance. The purpose of the text amendment is to update and refine
the Code of the City of Suffolk, Chapter 31, Unified Development Ordinance.
The next item of business was introduced by the Chairman followed by a staff report
by Margaret Pittenger, Assistant Director of Planning. Ms. Pittenger stated that there
have been interest expressed by the manufacturing sector within the city to have the
ability to install a battery energy storage system (sometimes expressed as BESS) in
conjunction with their facilities. A battery energy storage is a type of energy storage
technology that uses a group of large batteries to store electrical energy. A battery
energy storage system captures and stores energy from various sources, such as the
grid or renewable energy systems, in rechargeable batteries. This stored energy can be
released during peak demand times or when renewable or other power sources are not
generating electricity, such as at night, during cloudy days, or in emergency situations.
8
Some of the benefits of these systems are reducing electricity costs and providing
backup power during outages. Some of the concerns with these systems including
challenges of battery recycling and proper disposal as well as safety risks associated
with lithium-ion batteries which can pose a fire risk if they are damaged or improperly
maintained, requiring careful handling and safety protocols. Staff proposed addition
of standards to Section 31- 701(c) to allow battery energy storage systems as an
accessory use to a permitted manufacturing use in the M -2 zoning district not to
exceed 18 MWh in total storage capacity per facility. Battery energy storage systems
would not be permitted in conjunction with any other uses including solar energy
facilities or in any other zoning district. The proposed regulations include
requirements which address the provision of an emergency response plan, controlling
noise generated by the facility, screening from off -site views, a decommissioning
agreement, financial assurance for the decommissioning of the facility, required
setbacks, operational requirements in accordance with local, state, and federal
regulations including fire codes, and provisions for notification of the city in the event
the ownership of the facility is transferred. Staff also proposed addition of a definition
to Appendix A, Definitions for Battery Energy Storage System (BESS). In that
regard, staff recommended approval of this ordinance text amendment.
The public hearing was opened. There being no speakers in favor or in opposition, the
9
public hearing was closed.
After discussion by the Commission, Commissioner Hicks made a motion to approve
this ordinance text amendment, seconded by Commissioner Goodman and passed by a
recorded vote of 7 to 1.
NEW BUSINESS:
Commissioner Hicks made a motion to initiate an ordinance text amendment in
reference to flood ordinance updates, seconded by Commissioner Creekmore and
passed by a recorded vote of 8 to 0.
STATUS UPDATE:
Mr. Wyne reported on the results of the January 21st City Council meeting.
ADJOURNMENT:
There being no further business, the meeting was adjourned.
MT: Hicks
2ND: Goodman
TO: Approve
w/conditions
MT: Baur
2
ND: Hicks
TO: Approve
w/conditions
MT: Hicks
2
ND: Thornton-
Manuel
TO: Approve
MT: Hicks
2ND: Goodman
TO: Approve
VOTE: 8-0
VOTE: 7-1
VOTE: 8-0
VOTE: 7-1
CUP2025-015 CUP2026-01 OTA2026-01 OTA2026-02
PRESENT
ABSENT
YES
NO
YES
NO
YES
NO
YES
NO
Baur, Mary Ellen X X X X X
Creekmore, Oliver X X X X X
Edwards, Johnnie X X X X X
Goodman, Gerald X X X X X
Hicks, Anita X X X X X
Powell, Thomas X X X X X
Staylor, Mills X X X X X
Thornton-Manuel, Selena X X X X X
PLANNING COMMISSION
MEETING
February 17, 2026
MT: Hicks
2ND: Creekmore
TO: Initiate ordinance
text amendment in
reference to flood
ordinance updates
MT:
2
ND:
TO:
MT:
2
ND:
TO:
MT:
2
ND:
TO:
VOTE: 8-0
VOTE:
VOTE:
VOTE:
PRESENT
ABSENT
YES
NO
YES
NO
YES
NO
YES
NO
Baur, Mary Ellen X X
Creekmore, Oliver X X
Edwards, Johnnie X X
Goodman, Gerald X X
Hicks, Anita X X
Powell, Thomas X X
Staylor, Mills X X
Thornton-Manuel, Selena X X
PLANNING COMMISSION
MEETING
February 17, 2026
STAFF REPORT
DESCRIPTION
CONDITIONAL USE PERMIT REQUEST : Conditional Use Permit request, CUP2025-020,
in accordance with Section s 31-306 and 31-406 of the Unified Development Ordinance , to
establish an agribusiness use (horse, livestock, and utility trailer maintenance and repair).
APPLICANT: Submitted by Michael and Audrey McLane, applicants and property owners.
LOCATION: The subject property is located at 2101 Holland Corner Road, further identified as
Zoning Map 52, Parcel 13A.
PRESENT ZONING: The subject property (T.M. 52*13A) is zoned A, Agricultural.
EXISTING LAND USE: T.M. 52*13A is a landlocked parcel 1.5 acres in size. The property is
developed with a 2,703 square-foot single-family detached dwelling, a 1,526 square-foot detached
garage, a private well, a septic system, and a gravel driveway.
PROPOSED LAND USE: The applicant proposes to establish an agribusiness on the property ,
with said business specifically providing repair and maintenance services for horse, livestock, and
utility trailers.
SURROUNDING LAND USES:
North: Cropland and undeveloped wooded land zoned A, Agricultural zoning district.
South: Cropland, a detached single -family home and farm structures zoned A, Agricultural
zoning district.
East: Cropland and detached single -family homes along Holland Corner Road zoned A,
Agricultural zoning district.
West: Undeveloped wooded land and single -family homes beyond along Longstreet Lane
zoned A, Agricultural zoning district.
COMPREHENSIVE PLAN: The City’s 2045 Comprehensive Plan designates this area as
outside the growth area, Rural Agriculture Land Use Type.
CHESAPEAKE BAY PRESERVATION AREA DESIGNATION: The subject parcel is
located outside of the City’s Chesapeake Bay Preservation Area Overlay District (CBPA).
FLOOD PLAIN: The subject parcel is within Flood Zone X (areas of minimal risk) as shown on
Flood Insurance Rate Map (FIRM) Panel No. 510160215D of the City of Suffolk, Virginia 2015
Flood Map.
PUBLIC NOTICE: This request has been duly advertised in accordance with the public notice
requirements set forth in Section 15.2- 2204 of the Code of Virginia, as amended, and with the
applicable provisions of the Unified Development Ordinance. Notice to the applicant, containing
a copy of the staff report, was also sent March 13, 2026.
CASE HISTORY: There is no case history for this application.
Planning Commission
March 17, 2026
CUP2025-020
Page 2 of 6
STAFF ANALYSIS
ISSUE
The applicant currently resides within the single -family home on the subject property, and, per
their attached narrative, proposes to establish an on-site business that will provide repair services
and perform maintenance of horse, livestock, and utility trailers. Such a business is classified
within the Unified Development Ordinance as an “agribusiness”, as further detailed in this report.
Proposed business operations and customer/client contact will occur within a detached garage,
which the applicant proposes to expand from 1,536 square feet to 2,560 square feet upon approval
of the Conditional Use Permit request. The applicant has submitted a narrative, sketch plan, and
access agreement in support of this request.
CONSIDERATIONS AND CONCLUSIONS
1. Section 31-306 of the Unified Development Ordinance (UDO) requires a Conditional Use
Permit (CUP) to be obtained for any agribusiness use proposed within the A, Agricultural
zoning district. An “agribusiness” is defined within the UDO as a “business and/or
commercial use operated primarily for the support of agricultural needs. It may consist of
products, materials, and equipment servicing and sales; storage and/or processing of
agricultural products and/or animals; medical and/or technical s upport services.” Given the
applicant’s proposed horse and livestock trailer repair and servicing business is located
within an agricultural area and is intended to service equipment associated with agricultural
operations, the proposed business was determined to qualify as a “agribusiness” under the
provisions of the UDO.
2. The applicant’s narrative states that the proposed business would include repairing and
servicing horse, livestock, and utility trailers within a 2,560 square -foot detached garage .
Work on customer trailers will occur indoors within a detached garage, and trailers stored
indoors unless outdoor storage is occasionally necessitated. The applicant graphically depicts
a limited storage for trailers that would need to be stored outdoors adjacent to the proposed
garage addition within the attached sketch plan (Exhibit C) . The applicant notes in their
attached narrative that customer/client contact would occur on site by appointment and trailer
drop-off and pick-up will only occur on the property.
3. The subject property is “land-locked”, which means it does not have any public road frontage
and is surrounded by other parcels . The subject property is accessed via a 2 2-foot wide
ingress/egress easement that contains a dirt driveway . The easement and driveway traverse
the adjacent propert ies to the east (T.M. 52*13 and 52*29) to connect to Holland Corner
Road. This driveway connection was previously aligned with an easement that has since been
vacated and, as noted in the attached sketch plan provided by the applicant, the driveway has
since been re- aligned to the location of the current ingress/egress easement serving the
property. The applicant has also executed an access agreement (attached as Exhibit D) with
adjacent property owners to permit the general public to utilize the ingress/egress easement
for the purpose of patronizing the proposed agribusiness on the applicant’s property.
4. Overall impervious surfaces will comprise approximately 5,632 square feet, or 8.5%, of 1.5
Planning Commission
March 17, 2026
CUP2025-020
Page 3 of 6
total acres, which falls below the 16% impervious surface maximum permitted for
development within the Agricultural zoning district. The applicant will only be installing a
1,024 square -foot building addition and thus falls below the 10,000 square-foot area of
disturbance threshold for a Land Disturbing Permit and stormwater management. However,
the applicant will need to obtain all required building permits from the City, and a proposed
condition of approval to this effect has been included in the proposed Ordinance and Planning
Commission recommendation.
5. An Environmental Site Assessment (ESA) was waived for this CUP request. The Department
of Public Works has reviewed the application materials and expressed no concerns at the
time of this report.
6. A Major Water Quality Impact Assessment was waived for this request , as the property is
outside of the Chesapeake Bay Preservation Area overlay. The subject parcel appears to be
free of environmental constraints , and since the applicant is proposing minimal land
disturbance as part of this application, t he Department of Public Works has expressed no
concerns at the time of this report.
7. A traffic study was waived for this application. The Department of Public Works’ Traffic
Engineering Division has reviewed this request and has expressed no concerns, given the
limited volume of customer traffic proposed.
8. The subject property is served by a private well and a private septic system. The applicant is
not proposing any new plumbing fixtures as part of this request, and thus no increased
demand on either the well or septic system from the establishment of the proposed business
is anticipated. The Department of Health has reviewed this request and the proximity of the
proposed building addition to the existing private well and expressed no concerns with the
location of the new construction.
9. Pursuant to Section 31-306 of the UDO, a CUP provides a means of authorizing certain uses
which, because of their unique characteristics or potential impacts on adjacent land uses, are
not generally permitted in certain zoning districts as a matter of right. Rather, such uses are
permitted through the approval of a CUP by City Council when the right set of circumstances
and conditions are found acceptable. Section 31-306(c) specifically establishes eight criteria
that should be satisfied for approval. The proposed agribusiness meets these requirements as
follows:
a) The proposed conditional use shall be in compliance with all regulations of the
applicable zoning district, the provisions of Article 6 of the ordinance and any
applicable supplemental use standards as set forth in Article 7 of the Ordinance.
The proposed agribusiness is a listed conditional use in the Agricultural zoning district.
There are no specific supplemental use regulations for agribusiness uses outlined in the
UDO, however, staff reviewed the applicant’s conceptual plan as to its conformance to
the various zoning standards for the Agricultural zoning district and found it acceptable
to move forward with the CUP application. If the use permit is granted, the applicant
must then obtain the proper City permits prior to commencing construct ion. A
condition of approval is proposed to enforce this requirement.
Planning Commission
March 17, 2026
CUP2025-020
Page 4 of 6
b) The proposed conditional use shall conform to the character of the neighborhood
within the same zoning district in which it is located. The proposal as submitted or
modified shall have no more adverse effects on health, safety or comfort of persons
living or working in or driving through the neighborhood, or shall be no more injurious
to property or improvements in the neighborhood, than would any other use generally
permitted in the same district. In making such a determination, consideration should
be given to the location, type and height of buildings or structures, the type and extent
of landscaping and screening on the site and whether the proposed use is consistent
with any theme, action, policy or map of the Comprehensive Plan which encourages
mixed uses and/or densities.
The 2045 Comprehensive Plan designates the subject property as Rural Agriculture,
outside of the growth area . The trailer repair and maintenance operation, which will
serve agricultural equipment needs , is consistent with th e subject property’s
designation in the Comprehensive Plan and is compatible with the surrounding
agricultural intensity and land use patterns of the immediate area.
c) Adequate measures shall be taken to provide ingress and egress so designed as to
minimize traffic hazards and to minimize traffic congestion on the public roads.
As previously noted, th is is a low traffic -generating business with limited daily
customer/client interaction on the applicant’s property. While the trailer repair and
maintenance business will be accessed solely from a private driveway running along a
private ingress/egress easement from Holland Corner Road, note that business patrons
will only be on- site by appointment per the applicant’s narrative . Given that the
applicant states only three trailers will be stored on s ite at a time, it follows that the
number of daily customer appointments will be limited. While the Institute of
Transportation Engineers (ITE) Trip Generation Manual (11
th Edition) does not provide
an exact daily trip generation rate for horse/livestock trailer repair, one can utilize the
rate for “Specialty Trade Contractor” establishments as a comparable use type for
analysis purposes. The daily trip generation this ITE land use code is 9.82 trips per
1,000 square feet of gross floor area, which would yield 25.14 daily trips for the
proposed use given the size of the workspace (2,560 square feet). Please note this trip
estimate is very conservative and the site will likely see much lower daily trips . Since
Holland Corner Road is classified as a minor arterial road , even under the most
conservative trip generation scenario yielded through the ITE, the traffic generated by
the proposed use will have little impact on overall traffic patterns for Holland Corner
Road. Given the limited patronage of the horse trailer and repair use, the size of the
private gravel driveway and access arrangement is sufficient and is not anticipated to
negatively impact the adjacent public roadway or properties.
d) The proposed use shall not be noxious or offensive by reason of vibration, noise, odor,
dust, smoke or gas.
This proposed hors e, livestock and utility trailer repair business is not expected to
negatively affect the adjacent properties . The business is contained on parcel that is
surrounded by cropland and undeveloped forest , and the nearest residential structure
Planning Commission
March 17, 2026
CUP2025-020
Page 5 of 6
(aside from the applicant’s own place of residence) is located approximately 1,899 feet
from the detached garage where trailer repair and maintenance will be conducted.
Additionally, as noted in the applicant’s narrative, trailer repair will be conduc ted
indoors utilizing domestic tools and a hydraulic floor lift . To this end, a condition of
approval is proposed that requires work on trailers to be conducted indoors only, and
therefore, the proposed agribusiness is therefore sufficiently buffered from adjacent
residences by virtue of distance and enclosure within a building, so that any noise or
dust generated by the use will not negatively impact neighboring properties.
e) The proposed use shall not be injurious to the use and enjoyment of the property in the
immediate vicinity for the purposes already permitted nor substantially diminish or
impair the property values within the neighborhood.
The proposed use is not expected to be injurious to the use and enjoyment of the
properties in the immediate vicinity , as it is adequately separated from adjacent
residential uses and conforms with expected character and intensity of the Agricultural
zoning district. As noted above, repair and maintenance work on trailers will occur
indoors, and the subject property is surrounded by farmland which will not be
negatively impacted by the proposed agribusiness.
f) The establishment of the proposed use shall not impede the orderly development and
improvement of surrounding property for uses permitted within the zoning district.
This area of the city is primarily agricultural, with low -density residential uses
embedded with active farming operations. Given this proposed agribusiness is located
in the middle of cropland and serves the needs of adjacent agricultural businesses, the
proposed use is not anticipated to impede the improvement of any surrounding
property.
g) The establishment, maintenance or operation of the proposed use shall not be
detrimental to or endanger the public health, safety, morals, comfort or general
welfare.
The proposed use is not expected to be detrimental to the public health, safety, morals,
comfort or general welfare, as it is a small- scale operation within a detached garage
and, as noted prior in this report, is significantly separated from adjacent residential
uses. It should be noted that much of the work involves hand tools and machinery found
in a typical home garage and therefore will be inherently limited in scope and impact.
h) The public interest and welfare supporting the proposed conditional use shall be
sufficient to outweigh the individual interests which are adversely affected by the
establishment of the proposed use.
Based on the prior analysis in this report, the proposed agribusiness serves a practical
need for the local agricultural community, generates minimal traffic and nuisance
impacts, and is well- buffered from residential neighbors. Any potential adverse
individual impacts appear to be minimal , therefore the public interest in supporting
agricultural service businesses in a rural area is sufficient to satisfy this standard.
Planning Commission
March 17, 2026
CUP2025-020
Page 6 of 6
RECOMMENDATION
It is staff’s opinion that the subject property at 2101 Holland Corner Road is appropriate for the
establishment of a proposed agribusiness comprised of horse, utility, and livestock trailer repair
and maintenance services. The use is consistent with the agricultural character of the area, serves
a practical need for the community with minimal impacts on adjacent property owners , and
appropriate conditions of approval will address customer/client contact and indoor operations to
ensure the use remains low-impact. Therefore, due to the considerations and conclusions noted in
this report, staff recommends the Planning Commission forward Conditional Use Permit r equest
CUP2025-020 to City Council with a recommendation of approval . Should the application be
approved by City Council, the following conditions are recommended:
1. This Conditional Use Permit shall authorize an agribusiness use for property located at
2101 Holland Corner Road, Zoning Map 52, Parcel 13A ; as identified and depicted in
Exhibit “B”.
2. The agribusiness use authorized by this Conditional Use Permit shall consist of the repair
and maintenance of horse, livestock, and utility trailers only.
3. The applicant shall obtain all necessary permits and licenses from the City of Suffolk prior
to operation of the business . Except as set forth herein, the use shall be developed in
accordance with the sketch plan titled “ Trailerworx Site Plan R2” further identified as
Exhibit “C”
4. No dismantling, servicing, or maintenance of trailers shall occur outside of the building
designated for the proposed use, as shown on Exhibit “C”.
5. Customer/client contact on the premises shall be by appointment only. The driveway access
to the business shall be maintained in accordance with the access agreement further
identified as “Exhibit D”.
6. The applicant shall obtain all necessary permits prior to development and operation. The
development and operations shall comply with applicable codes, ordinances and
regulations of federal, state and local government.
Attachments
• General Location Map
• Zoning / Land Use Map
• Applicant’s Narrative
• Application Disclosure Form
• Proposed Ordinance
• Exhibit A – Planning Commission Recommendation
• Exhibit B – Property Map
• Exhibit C – “Trailerworx Site Plan R2”
• Exhibit D – Access Agreement
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap
contributors, and the GIS User Community
0 1.5 3 4.5 60.75
Miles
^_
Author: KOSSAI
Date: 12-29-2025
±
GENERAL LOCATION MAP
CUP2025-00020
Subject Property
VILLAGE
TRADITIONAL
NEIGHBORHOOD
SUBURBAN NEIGHBORHOOD
RIGHT OF WAY
RURAL NEIGHBORHOOD
RURAL CONSERVATION
RURAL AGRICULTURE
PARKS AND OPEN SPACE
OFFICE/INSTITUTIONAL
MIXED USE CORE
MULTIFAMILY
NEIGHBORHOOD
Employment Center
COMMERCIAL CORRIDOR
^_ SUBJECT PROPERTY
HOLLAND CORNER RD
A
52*13A
153900800
0 290 580 870 1,160145
Feet
Subject Property
Image: Suffolk Pictometry 2024
Author: KOSSAI
Date: 12-29-2025
±
ZONING / LAND USE MAP
CUP2025-00020
A
A
PART 2: Required Information for Application
Project: TRAILERWORX – Proposed Horse and Utility Trailer Service
Bullet 1: Narrative Description of the Property
Subject property is a 1.5 Acre parcel located in Holy Neck Borough at 2101 Holland Corner
Road, Suffolk VA 23437 Property ACC#153900800. The property is surrounded by
farmland owned by Short Pines LLC, Property ACC# 150415000. To prevent being
landlocked there is an agreed upon and signed upon 22’ easement with Ingress/Egress
shown on INST#000073440. (Enclosed)
Bullet 2: Narrative Description of the Proposed Use
The proposed business, TRAILERWORX, will provide light maintenance and repair services
for horse, livestock, and utility trailers at the above-referenced property. Operations will be
conducted by appointment only, ensuring a limited and orderly flow of customer traffic.
Operating hours will be Monday through Friday, 7:00 am to 3:30 pm. At this time there are
no plans to extend beyond being a sole proprietorship, but if for some reason that were to
have to change, appropriate parking concession would be made adjacent to the workshop.
The implementation of another employee would end up facilitating reconsideration of this
CUP as provisions for toilet and sanitary facilities would have to be addressed.
The property is situated approximately three-eighths (3/8) of a mile from Holland Corner
Road and is accessed by a private lane. The shop and service area are not visible from the
public roadway, further reducing any potential impact on the surrounding community.
Services offered will be routine maintenance and light repairs, including brake and wheel
bearing inspection and replacement, electrical wiring, and minor sheet metal repair. No
heavy industrial work will be performed on-site. Any comprehensive work, i.e., sheet metal
repair, bearing replacement, major rewiring, will be accomplished inside the building with
minor light replacement or other quick repairs may be accomplished outside. The intent is
to conduct as much work inside out of the weather as possible due to the heat and humid
conditions we experience in our area. In order to facilitate the trailer repairs proposed, the
following are anticipated to be utilized: basic hand tools, ratchets, sockets, screwdrivers,
hammers etc. For more extensive repairs, a floor jack and jackstands for safe lifting and
eventually a hydraulic scissor lift to allow easier lifting of the trailer, Battery operated drill
and pneumatic rivet guns for sheet metal repair, and a multipurpose welder for any repairs
where welding would be required.
The workshop, a proposed addition to my existing structure, is anticipated to be a 36’ X 36’,
5 to 6” thick concrete pad holding a 32’ x 32’ tubular steel framed insulated building with
12’ ceilings to facilitate taller trailers and allow for the lifting of the trailers to address
wheel and axle repairs. Having a building of this nature allows for a more conducive
working environment for me and a more aesthetically pleasing work area as it will be able
to be constructed using the same or similar exterior metal of the same colors. This building
is not expected to have any plumbing fixtures added as the septic is located 45 deg to the SE
on the other side of the property, making it impractical to be able to tie into the septic
properly.
In order to minimize activity on the property, no more than three (3) customer trailers will
be kept on the premises at any given time. For those instances where customer trailers
would be stored on the property, they would optimally be stored within the work building.
But in circumstances where internal storage is not possible, they would be parked adjacent
to the building and secured in a manner to prevent theft. (Tongue locks, wheel locks, etc.)
Because appointments will be scheduled in advance, no significant increase in traffic along
Holland Corner Road is anticipated. Increased vehicle activity will be limited to the private
lane serving the property.
The business will not utilize or store hazardous materials and will not generate abnormal or
hazardous waste. Any incidental residuals from cleaning or repair activities will be properly
collected and disposed of in compliance with all local, state, and federal regulations.
Overall, TRAILERWORX is intended to remain a low-impact, quiet, and community-
conscious operation, while providing a much-needed service for horse, livestock, and utility
trailer owners in the rural Suffolk area. At this time there are no plans to extend beyond
being a sole proprietorship, but if for some reason that were to have to change, appropriate
parking concession would be made adjacent to the workshop. The implementation of
another employee would end up facilitating reconsideration of this CUP as provisions for
toilet and sanitary facilities would have to be addressed.
ORDINANCE NUMBER ______________
AN ORDINANCE TO GRANT A CONDITIONAL USE PERMIT TO
ESTABLISH A N AGRIBUSINESS USE ON PROPERTY LOCATED AT
2101 HOLLAND CORNER ROAD, ZONING MAP 52, PARCEL 13A,
ACCOUNT NUMBER 153900800; CUP2025-020
WHEREAS, Michael and Audrey McLane, applicants and property owners, have requested a
Conditional Use Permit to establish an agribusiness use located at 2101 Holland Corner Road, which
land is designated on the Zoning Map of the City of Suffolk, Virginia as Zoning Map 52, Parcel 13A
and is more particularly depicted in Exhibit "B"; and,
WHEREAS, the procedural requirements of Article 3, Section 31-306 of the Code of the City
of Suffolk, Virginia, 1998 (as amended), have been followed; and,
WHEREAS, in acting upon this request, the Planning Commission and City Council have
considered the matters enunciated in Section 15.2-2284 of the Code of Virginia (1950), as amended,
and Section 31-102 and Section 31 -306(c)(1 through 8) of the Code of the City of Suffolk, 1998 (as
amended), with respect to the purposes stated in Sections 15.2-2200 and 15.2-2283 of the Code of
Virginia (1950), as amended; and,
WHEREAS, the Planning Commission has made a recommendation as stated in Exhibit "A".
NOW, THEREFORE, BE IT ORDAINED by the Council of the City of Suffolk, Virginia,
that:
Section 1. Exhibits.
Exhibit "A", "Planning Commission Recommendation", Exhibit "B", "Property Map", Exhibit
“C”, “Trailerworx Site Plan R2”, and Exhibit “D”, “Access Agreement”, which are attached
hereto, are hereby incorporated as part of this ordinance.
Section 2. Findings.
Council finds that the proposal for a Conditional Use Permit, as submitted or modified with
conditions herein, the expressed purpose of which is an agribusiness use, is in conformity with
the standards of the Unified Development Ordinance of the City of Suffolk and that it will have
no more adverse effects on the health, safety or comfort of persons living, working in, or
driving through the neighborhood, and will be no more injurious to property or improvements
in the neighborhood than would any other use generally permitted in the same district, taking
into consideration the location, type and height of buildings or s tructures, the type and extent
of landscaping and screening on site and whether the use is consistent with any theme, action,
policy or map of the Comprehensive Plan which encourages mixed uses and/or densities with
the conditions set forth below.
These findings are based upon the consideration for the existing use and character of property,
the Comprehensive Plan, the suitability of property for various uses, the trends of growth or
change, the current and future requirements of the community as to land for various purposes
as determined by population, e conomic, and other studies, the transportation requirements of
the community, the requirements for airports, housing, schools, parks, playgrounds, recreation
areas and other public services, the conservation of natural resources, the preservation of flood
plains, the preservation of agricultural and forestal land, the conservation of properties and
their values, and the encouragement of the most appropriate use of land throughout the City.
These findings are based upon a determination that the most reasonable and limited way of
avoiding the adverse impacts of the agribusiness use is by the imposition of the conditions
provided herein.
Section 3. Permit Granted.
The Conditional Use Permit for the property be, and is hereby approved for the property,
subject to the following conditions and the general conditions set forth in Section 4 hereof. The
Conditional Use Permit specifically permits an agribusiness use in compliance with Sections
31-306 and 31-406 of the Code of the City of Suffolk.
Conditions
1. This Conditional Use Permit shall authorize an agribusiness use for property located at 2101
Holland Corner Road, Zoning Map 52, Parcel 13A; as identified and depicted in Exhibit “B”.
2. The agribusiness use authorized by this Conditional Use Permit shall consist of the repair and
maintenance of horse, livestock, and utility trailers only.
3. The applicant shall obtain all necessary permits and licenses from the City of Suffolk prior to
operation of the business. Except as set forth herein, the use shall be developed in accordance
with the sketch plan titled “Trailerworx Site Plan R2” further identified as Exhibit “C”
4. No dismantling, servicing, or maintenance of trailers shall occur outside of the building
designated for the proposed use as shown on Exhibit “C”.
5. Customer/client contact on the premises shall be by appointment only. The driveway access to
the business shall be maintained in accordance with the access agreement further identified as
“Exhibit D”.
6. The applicant shall obtain all necessary permits prior to development and operation. The
development and operations shall comply with applicable codes, ordinances and regulations of
federal, state and local government.
Section 4. General Conditions.
(a) The Conditional Use Permit may be revoked by City Council upon failure to comply
with any of the conditions contained herein, after ten days’ written notice to the
property owner or their successors in interest, and a hearing at which time all such
persons shall have the opportunity to be heard.
(b) To the extent applicable, the requirements set forth in Section 31-306 of the Code of
the City of Suffolk, Virginia shall be met.
(c) The commencement of the Use described in Section 3 of this ordinance shall be deemed
acceptance by the property owner, or any party undertaking or maintaining such U se,
of the conditions to which the Conditional Use Permit herein granted is subject.
Section 5. Severability.
It is the intention of the City Council that the provisions, sections, paragraphs, sentences,
clauses and phrases of this ordinance are severable. If any phrase, clause, sentence, paragraph,
section or provision of this ordinance is declared unconstitutional or otherwise invalid by the
valid judgment or decree of a court of competent jurisdiction, such unconstitutionality or
invalidity shall not affect any of the remaining phrases, clauses, sentences, paragraphs, sections
or provisions of this ordinance, t o the extent that they can be enforced notwithstanding such
determination.
Section 6. Recordation.
A certified copy of this ordinance shall be recorded, by the applicant, in the name of the
property owner as grantor in the office of the Clerk of Circuit Court.
Section 7. Effective Date.
This ordinance shall be effective upon passage and shall not be published or codified. The
Conditional Use authorized by this Permit shall be implemented within two (2) years from the
date of approval by the City Council and shall terminate if not initiated within that time period.
READ AND PASSED: __________________________
TESTE: __________________________
Erika S. Dawley, City Clerk
Approved as to Form:
_______________________________________
William E. Hutchings, Jr., City Attorney
EXHIBIT “A”
RESOLUTION NO. 26-03-01
CITY OF SUFFOLK PLANNING COMMISSION
A RESOLUTION TO PRESENT A REPORT AND RECOMMENDATION
TO CITY COUNCIL RELATING TO CONDITIONAL USE PERMIT
CUP2025-020
TO GRANT A CONDITIONAL USE PERMIT TO ESTABLISH AN AGRIBUSINESS
USE ON PROPERTY LOCATED AT 2101 HOLLAND CORNER ROAD, ZONING MAP
52, PARCEL 13A, ACCOUNT NUMBER 153900800
WHEREAS, Michael and Audrey McLane, applicants and property owners, have
requested a Conditional Use Permit to establish an agribusiness use located at 2101 Holland Corner
Road, which land is designated on the Zoning Map of the City of Suffolk, Virginia as Zoning Map
52, Parcel 13A and is more particularly depicted in Exhibit "B"; and,
WHEREAS, the procedural requirements for the consideration of this request by the
Planning Commission have been met.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of
Suffolk, Virginia, that:
Section 1. Findings.
The Suffolk Planning Commission finds that the proposal for a Conditional Use Permit, as
submitted or modified herein:
a) Will have no more adverse effects on the health, safety or comfort of persons
living or working in or driving through the neighborhood,
b) Will have more adverse effects on the health, safety or comfort of persons living
or working in or driving through the neighborhood,
c) Will be no more injurious to property or improvements in the neighborhood, or
d) Will be more injurious to property or improvements in the neighborhood than
would any other use generally permitted in the same district, taking into
consideration the location, type and height of buildings or structures, the type and
extent of landscaping and screening on site and whether the use is consistent with
any theme, action, policy or map of the Comprehensive Plan which encourages
mixed uses and/or densities.
Section 2. Recommendation to Council.
The Planning Commission recommends to City Council that the request, CUP2 026-001
be:
a) Granted as submitted, and that the City Council adopt the proposed Ordinance
without modification.
b) Denied, and that Council not adopt the proposed Ordinance.
c) Granted with the modifications set forth on the attached listing of specific
recommendations and that Council adopt the proposed Ordinance with such
modifications.
READ AND ADOPTED:_________________________________
TESTE:________________________________________
CONDITIONAL USE PERMIT
CUP2025-020
CONDITIONS
1. This Conditional Use Permit shall authorize an agribusiness use for property located at 2101
Holland Corner Road, Zoning Map 52, Parcel 13A; as identified and depicted in Exhibit “B”.
2. The agribusiness use authorized by this Conditional Use Permit shall consist of the repair and
maintenance of horse, livestock, and utility trailers only.
3. The applicant shall obtain all necessary permits and licenses from the City of Suffolk prior to
operation of the business. Except as set forth herein, the use shall be developed in accordance
with the sketch plan titled “Trailerworx Site Plan R2” further identified as Exhibit “C”
4. No dismantling, servicing, or maintenance of trailers shall occur outside of the building
designated for the proposed use, as shown on Exhibit “C”.
5. Customer/client contact on the premises shall be by appointment only. The driveway access to
the business shall be maintained in accordance with the access agreement further identified as
“Exhibit D”.
6. The applicant shall obtain all necessary permits prior to development and operation. The
development and operations shall comply with applicable codes, ordinances and regulations of
federal, state and local government.
Trailerworx Site Plan R2 - McLane CUP Application
Holland Corner Rd.
XXX
Gravel drive
EXHIBIT C
EXHIBIT D
EXHIBIT D
i�
�
§
"' �j�
I
���
����
i
.tl.Qfil
1. THIS - w;s PREPARED WTTliOUT BENEFTT OF A mLE REPORT.
ALL fASEMEIITS OR RESTRICTIONS MAY NOT BE SHOWN HEREON.
2. THIS PU.T IS FOR El<H18IT PURPOSES ONLY AND IS PREPARED
AS AN ATTACHMEIIT TO A DEED OF fASEMEIIT.
\{,
\{\
i
<!).
'\'?-
� �\
���%
�\\ \
--- ---
--� � -----� ----------
t10W OR roR�ERLY
,
NiC1•1£LJ-/�NE
� AU%. 52•1:JA
ACC-11,39()0800
t<Sl/000073440 NOW OR FORMERLY
SHORT PIN[S lLC
T.P. S2'1.J
ACC./! 50415000
/NST./2200/2858
r------------------ ----------�
JO' DRAINAGE EASEMENT --
o/oZ,fRsi�IIJ:,°7.f; {INST. 12000, JB<l) \ , :°c1w°£';/7!}/tfik r.P s2•,9 \ r.P. s2•s0•1
ACNT./154000729 22' R/li' RES[RVAnON \ \ ACNT./1540008SJ ':le /NST./210019267
�
l C£NT[R£D ON f ROAO \ INST/2100/8534 � (P.8. 8, PC. IBA) Z0/1[0, A EX!SnNG ROAO
,;;. �
-- ____:___ � =--=i- __ -_ -=- --�1.�� t\�
'. - ·---'------- � ;_ _ _:_:"'s::"'-1:=-- -""\ \ " '6 � !'..
LOT I
NOW OR FORM[RLr
S£A80ARO [NTERPRISES JNr
T.P. 52'49'/
ACNTf/54001082
INS1/240009157
I �\l
'3.��
� � i"
�\
� 'o 2-
LOT 2
I/OW OR FORMERLY
JONES SWAMP £LC
T.P. 52"49"2
ACIIT./154001083
INST.f2l0019267
LOT J
NOW OIi FORM[Rl Y
JON[S SWAMP LLC
T.P. 52'49'J
ACNT./1S4001084
INST./210019267
I
I
I
I
22' R/W RESERVATION \
HERfBY VICATED AND _,,, __ _,
REI.EA5£D ' '
JO' ORA/NACE £ASE1,1£NT "'\
{C[I/T[R[O ON EXIST/NC 0/TCH) -A__
{INST. /230009094)
£XISTtNC 22' R/li' RESERVATION
CENTF:r/£0 ON i? ROAO
EXIST/NC ROAD
�
P.8. 8, PG. /BA)
IS f E:ASEM[NT _j_ __ ____ _
-d_
- -=-=- = = = = = I 20' INGRESS/EGRESS EASEMENT -
L R[COROEO IN INST. /000073<40
\
\
IS HEREBY VAC4/f0 ANO REL£AS£0
NOW OR FOIIM£�LY
JONES SWAMP LLC
T.P. S2'�9
ACNT./154000729
INST./210019267
.,, ,.
,��:g l:,
3
iii i
p \ ts
LOCATION MAP
SCALE 1•-2000•
INGRESS/EGRESS EXHIBIT FOR
THE EXCLUSIVE BENEFIT OF re�RRISH T.P. 52*13A - 52*13
52•49•1 - 52•49•2 & 52•49•3 AYN E FOR
JONES SWAMP, LLC, SEABOARD ENTERPRISES, INC. DESIGN GROUP
& MICHAEL E. MCLANE & AUDREY L. MCLANE Engmeers•Surveyors•Planners
-------
HOLY NECK BOROUGH SUFFOLK VIRGINIA P.0. Bn\ 9161,Cheia;ta.te, VA 23321
DRAWN: DMJ DATE: .'./6/25 RrnSI0N: Poo-e: 151.686.3345 Fai: 1l1.68�J348
-------
, .. = 100'
100 50 0
scale
100
feet
200 COMP: BJL SCALE: 1 • 100· REF: ,m =7:i«0
I
SHEET NO 1
�- 220012868
CHECKED: BJL �sr. 2!0009157
P,8 8, PC. 181 SHEET: 1 of 1
4538.4-22
f
EXHIBIT D
EXHIBIT D
STAFF REPORT
DESCRIPTION
ORDINANCE TEXT AMENDMENT O TA2026-003: Presented for your consideration,
attached please find proposed amendments to Unified Development Ordinance of the Code of the
City of Suffolk Section 31-416.2, Floodplain Overlay District. The purpose of the text amendment
is to update and refine the Code of the City of Suffolk, Chapter 31, Unified Development
Ordinance due to a change in circumstance.
APPLICANT: The proposed ordinance text amendment has been initiated by the City of Suffolk.
PUBLIC NOTICE: This request has been duly advertised in accordance with the public notice
requirements set forth in Section 15.2- 2204 of the Code of Virginia, as amended, and with the
applicable provisions of the Unified Development Ordinance.
STAFF ANALYSIS
ISSUE AND BACKGROUND
The Federal Emergency Management Agency (FEMA) partners with communities through the
Risk Mapping, Assessment, and Planning (Risk MAP) program to identify flood hazards, assess
flood risks, and provide accurate data to guide stakeholders in taking effective mitigation actions
that result in safer and more resilient communities. This data is incorporated into flood maps,
known as Flood Insurance Rate Maps (FIRMs), that support the National Flood Insurance Program
(NFIP) and provide the basis for community fl oodplain management regulations and flood
insurance requirements. Flood hazards are dynamic and can change frequently because of a variety
of factors, including weather patterns, erosion, and new development. FEMA, through the Risk
MAP program, works with communities to collect new or updated flood hazard data and
periodically updates flood maps to reflect these changes.
FEMA has produced new FIRMs for Suffolk. We received the Letter of Final Determination (LFD)
from FEMA on January 7, 2026. (Note that this was delayed from the preliminary date due to the
Federal government shutdown.) The City’s flood maps were last updated on August 3, 2015. The
new FIRMs and updated ordinance will be effective on July 7, 2026.
As a National Flood Insurance Program (NFIP) participating community, the City must ensure that
our Floodplain Management Ordinance and enforcement procedures meet NFIP requirements (44
CFR 59.22), including amending the city’s floodplain ordinance to adopt the new maps.
The flood map changes are mostly relatively minor with small strips of land being added in the
regulated flood zones in some areas primarily along Shingle Creek. Some of these areas are
undeveloped, however, there will be some existing structures that will be within the regulated flood
zones on the new flood maps. There are also some areas where there will be a decrease in the
regulated flood zones. These areas are mostly small and scattered but some large areas of flod zone
Planning Commission
March 17, 2026
OTA2026-003
Page 2 of 3
area reduction exist within the Great Dismal Swamp National Wildlife Refuge and the SPSA
landfill.
The Flood Insurance Rate Maps (FIRMs) come with a Flood Insurance Study (FIS) . The FIS has
the technical data on which the flood maps are based. It revises and updates information on the
existence and severity of flood hazards for the study area (which covers the entire geographic area
of City of Suffolk). The studies described in this report developed flood hazard data to assist us in
efforts to implement sound floodplain management.
In order for our ordinance to meet the NFIP requirements (44 CFR 59.22), the city must adopt the
minimum standards required by the federal regulations. The City’s flood regulations are contained
in Section 31-416.2 of the UDO. Adopting higher standards helps protect citizens and properties.
The proposed amendments adopt a wider definition of development in the floodplain, additional
freeboard, limits on the size of enclosures and accessory structures, and a requirement for non -
conversion agreements for accessory structures . These proposed higher standards will better
protect people, property, and businesses from nuisance flooding and potentially major floods.
The proposed ordinance amendments include the addition of a minimum of 12 inches of freeboard
for all construction in all regulated flood zones, a minimum 18 inches of freeboard in the Coastal
A Zones (which are areas that are seaward of the Limit of Moderate Wave Action (LiMWA) and
are the high-risk zones that are subject to wave heights between 1.5 feet and 3 feet), and a minimum
18 inches of freeboard in the VE Zones , which are the high- risk zones that are subject to wave
heights greater than 3 feet. Freeboard is a factor of safety usually expressed in feet above a flood
level for purposes of floodplain management. Freeboard tends to compensate for the many
unknown factors that could contribute to flood heights greater than the height calculated for a
selected size flood and fl oodway conditions, such as wave action, bridge openings, and the
hydrological effect of urbanization in the watershed. The flood maps anticipate one foot of rise in
Base Flood Elevation (BFE) due to fill in the floodplain, so while building to BFE is the minimum
requirement; flooding will result all assumptions made in mapping are correct. For this reason,
requiring additional elevation of structures is recommended. For flood zones subject to wave
action, additional freeboard is recommended for increased safety of those structures.
The proposed amendments also include a change to the definition of “Accessory structure” which
will apply to all accessory structures in the regulatory flood zones to comply with the FEMA
Region 3 requirements for accessory structures in flood zones including restricting them to no
greater than 600 square feet. This is the FEMA Region 3 minimum. Our ordinance could regulate
them to a smaller maximum size (i.e. less than 600 square feet) ; however, the proposed
amendments include the 600 square feet maximum size limit. The proposed amendments also
incorporate standards for accessory structures in the flood zones to comply with the FEMA
minimum standards.
Also proposed is incorporation of a change in the state model ordinance related to existing
structures in floodplain areas [Section (e)]. The current language in Section (e) will be deleted and
replaced with language from the state model ordinance. Additionally proposed in the Variance
section [Section (f)] is a stipulation that variances will not be issued for any accessory structure in
the regulatory flood zones . This is a FEMA requirement since our regulations don’t completely
Planning Commission
March 17, 2026
OTA2026-003
Page 3 of 3
prohibit accessory structures in the regulated flood zones . Staff is proposing to amend the
definition of “Development” within the regulated flood zones to include temporary structures and
permanent or temporary storage of equipment or materials, as well. Also proposed is the deletion
of some definitions that have been deleted from the state model ordinance.
Lastly, the table of FIRM Panel Dates at the end of the regulations will be updated with the new
panel suffixes and effective dates to align with the updated FIRMs.
The Flood Insurance Rate Maps (FIRMs) and the Flood Insurance Study (FIS) files can be
accessed on the FEMA website at https://msc.fema.gov/portal/home.
RECOMMENDATION
In that regard, the proposed text amendment shown in the attached Exhibit B is presented for your
favorable consideration with a staff recommendation for approval.
Attachments
• Proposed Ordinance
• Exhibit A – Planning Commission Recommendation
• Exhibit B – “Amendments to Section 31-416.2 of the Unified Development Ordinance of
the City of Suffolk, Virginia”
ORDINANCE NUMBER
AN ORDINANCE TO AMEND SECTION 31-416.2 OF THE UNIFIED
DEVELOPMENT ORDINANCE OF THE CITY OF SUFFOLK,
VIRGINIA; OTA2026-003
WHEREAS, the City of Suffolk, Virginia has initiated the aforementioned amendments to the
Code of the City of Suffolk Unified Development Ordinance for the purpose of updating and
improving clarity and consistency due to a change in circumstances; and,
WHEREAS, the specified amendments to the Unified Development Ordinance as shown in
Exhibit “B” are in compliance with the 2045 Comprehensive Plan, as adopted; and,
WHEREAS, the Planning Commission has made a recommendation as stated in Exhibit "A";
and,
WHEREAS, the procedural requirements for the consideration of this request by the Planning
Commission have been met.
NOW, THEREFORE, BE IT ORDAINED by the Council of the City of Suffolk, Virginia,
that:
Section 1. Exhibit “B,” “Amendments to Section 31-416.2 of the Unified Development Ordinance
of the City of Suffolk, Virginia” which is attached hereto, is hereby incorporated as part
of this ordinance.
Section 2. Unified Development Ordinance , Section 31-416.2 is hereby amended to read as
referenced in Exhibit “B”.
Section 3. All phrases, clauses, sentences, paragraphs, subsections, sections and chapters of the
Code not amended hereby remain in full force and effect.
This ordinance shall be effective on July 7, 2026, and shall not be published.
READ AND PASSED:
TESTE:
Erika S. Dawley, City Clerk
Approved as to Form:
_________________________________
William E. Hutchings, Jr., City Attorney
Exhibit “A”
RESOLUTION NO. 26-03-02
CITY OF SUFFOLK PLANNING COMMISSION
A RESOLUTION TO PRESENT A REPORT AND RECOMMENDATION
TO CITY COUNCIL RELATING TO
OTA2026-003
AN ORDINANCE TO AMEND SECTION 31-416.2 OF THE UNIFIED DEVELOPMENT
ORDINANCE OF THE CITY OF SUFFOLK, VIRGINIA.
WHEREAS, the City of Suffolk, Virginia has initiated the aforementioned amendments to
Chapter 31 of the Unified Development Ordinance for the purpose of updating and improving clarity and
consistency due to a change in circumstances; and
WHEREAS, the specified amendments to the Unified Development Ordinance as shown in
Exhibit “B” are in compliance with the 2045 Comprehensive Plan, as adopted; and
WHEREAS, the procedural requirements for the consideration of this request by the Planning
Commission have been met.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of Suffolk,
Virginia, that:
Section 1. Findings.
The Suffolk Planning Commission finds that the proposed ordinance amendments are reasonable
and warranted.
Section 2. Recommendation to City Council.
The Planning Commission recommends to the City Council of the City of Suffolk, Virginia that
the proposed amendments be;
_____a. Adopted as submitted without modification.
_____b. Denied, and that Council not pass the proposed ordinance.
_____c. Adopted with the modifications set forth on the attached listing of specific
recommendations, and that Council adopt the proposed Ordinance with such
modifications.
READ AND ADOPTED:
TESTE:
“Exhibit B”
“Amendments to Section 31-416.2 of the Unified Development Ordinance of the City of
Suffolk, Virginia”
SEC. 31-416.2. FLOODPLAIN OVERLAY DISTRICT (F).
(a) GENERAL PROVISIONS.
(1) Purpose and Intent. As authorized by the National Flood Insurance Program (NFIP),
Section 59.22(a)(2) and pursuant to the authority granted to localities by Code of
Virginia § 15.2-2280, provisions of this Section are established to regulate land use on
all lands identified as being within the Floodplain Overlay District. The purpose of
these provisions is to prevent: the loss of life and property, the creation of health and
safety hazards, the disruption of commerce and governmental services, the
extraordinary and unnecessary expenditure of public funds for flood protection and
relief, and the impairment of the tax base by:
A. Regulating uses, activities, and development which, alone or in combination with
other existing or future uses, activities, and development, will cause unacceptable
increases in flood heights, velocities, and frequencies;
B. Restricting or prohibiting certain uses, activities, and development from locating
within districts subject to flooding;
C. Requiring all those uses, activities, and developments that do occur in flood-prone
districts to be protected and/or floodproofed against flooding and flood damage;
and
D. Protecting individuals from buying land and structures which are unsuited for
intended purposes because of flood hazards.
(2) Applicability. These provisions shall apply to all privately and publicly owned lands
within the jurisdiction of the City of Suffolk and identified as areas of special flood
hazard according to the fFlood iInsurance rRate mMap (FIRM) that is provided by the
Federal Emergency Management Agency (FEMA).
(3) Compliance and Liability.
A. No land shall hereafter be developed and no structure shall be located, relocated,
constructed, reconstructed, enlarged, or structurally altered except in full
compliance with the terms and provisions of this Section and any other applicable
ordinances and regulations which apply to uses within the jurisdiction of this
Section.
B. The degree of flood protection sought by the provisions of this Section is
considered reasonable for regulatory purposes and is based on acceptable
engineering methods of study, but does not imply total flood protection. Larger
floods may occur on rare occasions. Flood heights may be increased by man-made
or natural causes, such as ice jams and bridge openings restricted by debris. This
ordinance does not imply that districts outside the floodplain district or land uses
permitted within such district will be free from flooding or flood damages.
C. Records of actions associated with administering this Section shall be kept on file
and maintained by the City of Suffolk's Planning and Community Development
Director or as otherwise designated by the City Manager in perpetuity.
D. This Section shall not create liability on the part of the City of Suffolk or any
officer or employee thereof for any flood damages that result from reliance on this
Section or any administrative decision lawfully made thereunder.
(4) Abrogation and Greater Restrictions. This Section supersedes any ordinance
currently in effect in flood-prone districts. However, any underlying ordinance shall
remain in full force and effect to the extent that its provisions are more restrictive than
this Section.
(5) Severability. If any section, subsection, paragraph, sentence, clause, or phrase of this
ordinance shall be declared invalid for any reason whatsoever, such decision shall not
affect the remaining portions of this ordinance. The remaining portions shall remain in
full force and effect; and for this purpose, the provisions of this ordinance are hereby
declared to be severable.
(6) Penalty for Violations. Any person who fails to comply with any of the requirements
or provisions of this Section shall be guilty of a misdemeanor subject to the penalties
and enforcement procedures as prescribed in Section 31-310 of this Ordinance. In
addition to these penalties, all other actions are hereby reserved, including an action in
equity for the proper enforcement of the ordinance. The imposition of a fine or penalty
for any violation of, or noncompliance with, this Section shall not excuse the violation
or noncompliance or permit it to continue; and all such persons shall be required to
correct or remedy such violations within a reasonable time. Any structure constructed,
reconstructed, enlarged, altered or relocated in noncompliance with this Section may
be declared by the Suffolk City Council to be a public nuisance and abatable as such.
Flood insurance may be withheld from structures constructed in violation of this
Section.
The VA USBC addresses building code violations and the associated penalties in
Section 104 and Section 115.
(b) ADMINISTRATION.
(1) Designation of the Floodplain Administrator. [44 CFR 59.22(b)] The Director of
Planning and Community Development; or other designee of the City Manager; is
hereby appointed to administer and implement these regulations and is referred to
herein as the Floodplain Administrator. The Floodplain Administrator may:
A. Do the work themselves. In the absence of a designated Floodplain Administrator,
the duties are conducted by the City of Suffolk's chief executive officer;.
B. Delegate duties and responsibilities set forth in these regulations to qualified
technical personnel, plan examiners, inspectors, and other employees;.
C. Enter into a written agreement or written contract with another community or
private sector entity to administer specific provisions of these regulations.
Administration of any part of these regulations by another entity shall not relieve
the community of its responsibilities pursuant to the participation requirements of
the National Flood Insurance Program as set forth in the Code of Federal
Regulations at 44 C.F.R. Section 59.22.
(2) Duties and Responsibilities of the Floodplain Administrator. [44 CFR 60.3] The
duties and responsibilities of the Floodplain Administrator shall include but are not
limited to:
A. Review applications for permits to determine whether proposed activities will be
located in the Special Flood Hazard Area (SFHA);.
B. Interpret floodplain boundaries and provide available base flood elevation and
flood hazard information;.
C. Review applications to determine whether proposed activities will be reasonably
safe from flooding and require new construction and substantial improvements to
meet the requirements of these regulations;.
D. Review applications to determine whether all necessary permits have been
obtained from the Federal, State or local agencies from which prior or concurrent
approval is required; in particular, permits from state agencies for any
construction, reconstruction, repair, or alteration of a dam, reservoir, or waterway
obstruction (including bridges, culverts, structures), any alteration of a
watercourse, or any change of the course, current, or cross section of a stream or
body of water, including any change to the 100-year frequency floodplain of free-
flowing non-tidal waters of the State;.
E. Verify that applicants proposing an alteration of a watercourse have notified
adjacent communities, the Department of Conservation and Recreation (Division
of Dam Safety and Floodplain Management), and other appropriate agencies
(VADEQ, USACE) and have submitted copies of such notifications to FEMA;.
F. Approve applications and issue permits to develop in flood hazard areas if the
provisions of these regulations have been met, or disapprove applications if the
provisions of these regulations have not been met;..
G. Inspect or cause to be inspected, buildings, structures, and other development for
which permits have been issued to determine compliance with these regulations or
to determine if non-compliance has occurred or violations have been committed;.
H. Review Elevation Certificates and require incomplete or deficient certificates to
be corrected;.
I. Submit to FEMA, or require applicants to submit to FEMA, data and information
necessary to maintain FIRMs, including hydrologic and hydraulic engineering
analyses prepared by or for the City of Suffolk, within six months after such data
and information becomes available if the analyses indicate changes in base flood
elevations;.
J. Maintain and permanently keep records that are necessary for the administration
of these regulations, including:
(i) Flood Insurance Studies, Flood Insurance Rate Maps (including historic
studies and maps and current effective studies and maps) and Letters of Map
Change; and
(ii) Documentation supporting issuance and denial of permits, Elevation
Certificates, documentation of the elevation (in relation to the datum on the
FIRM) to which structures have been floodproofed, other required design
certifications, variances, and records of enforcement actions taken to correct
violations of these regulations.
K. Enforce the provisions of these regulations, investigate violations, issue notices of
violations or stop work orders, and require permit holders to take corrective
action;.
L. Advise the Board of Zoning Appeals regarding the intent of these regulations and,
for each application for a variance, prepare a staff report and recommendation;.
M. Administer the requirements related to proposed work on existing buildings:
(i) Make determinations as to whether buildings and structures that are located
in flood hazard areas and that are damaged by any cause have been
substantially damaged.
(ii) Make reasonable efforts to notify owners of substantially damaged structures
of the need to obtain a permit to repair, rehabilitate, or reconstruct, and
prohibit the non-compliant repair of substantially damaged buildings except
for temporary emergency protective measures necessary to secure a property
or stabilize a building or structure to prevent additional damage.
N. Undertake, as determined appropriate by the Floodplain Administrator due to the
circumstances, other actions which may include but are not limited to: issuing
press releases, public service announcements, and other public information
materials related to permit requests and repair of damaged structures; coordinating
with other Federal, State, and local agencies to assist with substantial damage
determinations; providing owners of damaged structures information related to the
proper repair of damaged structures in special flood hazard areas; and assisting
property owners with documentation necessary to file claims for Increased Cost of
Compliance coverage under NFIP flood insurance policies;.
O. Notify the Federal Emergency Management Agency when the corporate
boundaries of the City of Suffolk have been modified, and:
(i) Provide a map that clearly delineates the new corporate boundaries or the
new area for which the authority to regulate pursuant to these regulations has
either been assumed or relinquished through annexation; and
(ii) If the FIRM for any annexed area includes special flood hazard areas that
have flood zones that have regulatory requirements that are not set forth in
these regulations, prepare amendments to these regulations to adopt the
FIRM and appropriate requirements, and submit the amendments to the
governing body for adoption; such adoption shall take place at the same time
as or prior to the date of annexation and a copy of the amended regulations
shall be provided to Department of Conservation and Recreation (Division of
Dam Safety and Floodplain Management) and FEMA.
P. Upon the request of FEMA, complete and submit a report concerning
participation in the NFIP which may request information regarding the number of
buildings in the SFHA, number of permits issued for development in the SFHA,
and number of variances issued for development in the SFHA;. and
Q. It is the duty of the Floodplain Administrator to take into account flood, mudslide
and flood-related erosion hazards, to the extent that they are known, in all official
actions relating to land management and use throughout the entire jurisdictional
area of the Community, whether or not those hazards have been specifically
delineated geographically (e.g. via mapping or surveying).
(3) Use and Interpretation of FIRMs. [44 CFR 60.3] The Floodplain Administrator shall
make interpretations, where needed, as to the exact location of special flood hazard
areas, floodplain boundaries, and floodway boundaries. The following shall apply to
the use and interpretation of FIRMs and data:
A. Where field surveyed topography indicates that adjacent ground elevations:
(i) Are below the base flood elevation, even in areas not delineated as a special
flood hazard area on a FIRM, the area shall be considered as special flood
hazard area and subject to the requirements of these regulations;
(ii) Are above the base flood elevation, the area shall be regulated as special
flood hazard area unless the applicant obtains a Letter of Map Change that
removes the area from the SFHA.
B. In FEMA-identified special flood hazard areas where base flood elevation and
floodway data have not been identified and in areas where FEMA has not
identified SFHAs, any other flood hazard data available from a Federal, State, or
other source shall be reviewed and reasonably used.
C. Base flood elevations and designated floodway boundaries on FIRMs and in FISs
shall take precedence over base flood elevations and floodway boundaries by any
other sources if such sources show reduced floodway widths and/or lower base
flood elevations.
D. Other sources of data shall be reasonably used if such sources show increased
base flood elevations and/or larger floodway areas than are shown on FIRMs and
in FISs.
E. If a Preliminary Flood Insurance Rate Map and/or a Preliminary Flood Insurance
Study has been provided by FEMA;
(i) Upon the issuance of a Letter of Final Determination by FEMA, the
preliminary flood hazard data shall be used and shall replace the flood hazard
data previously provided from FEMA for the purposes of administering these
regulations.
(ii) Prior to the issuance of a Letter of Final Determination by FEMA, the use of
preliminary flood hazard data shall be deemed the best available data
pursuant to Subsection (c)(1)(C) of this Section and used where no base
flood elevations and/or floodway areas are provided on the effective FIRM.
(iii) Prior to issuance of a Letter of Final Determination by FEMA, the use of
preliminary flood hazard data is permitted where the preliminary base flood
elevations or floodway areas exceed the base flood elevations and/or
designated floodway widths in existing flood hazard data provided by
FEMA. Such preliminary data may be subject to change and/or appeal to
FEMA.
(4) Jurisdictional Boundary Changes. [44 CFR 59.22, 65.3] The City floodplain
ordinance in effect on the date of annexation shall remain in effect and shall be
enforced by the municipality for all annexed areas until the municipality adopts and
enforces an ordinance which meets the requirements for participation in the National
Flood Insurance Program. Municipalities with existing floodplain ordinances shall pass
a resolution acknowledging and accepting responsibility for enforcing floodplain
ordinance standards prior to annexation of any area containing identified flood hazards.
If the FIRM for any annexed area includes special flood hazard areas that have flood
zones that have regulatory requirements that are not set forth in these regulations,
prepare amendments to these regulations to adopt the FIRM and appropriate
requirements, and submit the amendments to the governing body for adoption; such
adoption shall take place at the same time as or prior to the date of annexation and a
copy of the amended regulations shall be provided to Department of Conservation and
Recreation (Division of Dam Safety and Floodplain Management) and FEMA.in
accordance with the Code of Federal Regulations, Title 44 Subpart (B) Section 59.22
(a)(9) (v) all NFIP participating communities must notify the Federal Insurance
Administration and optionally the State Coordinating Office in writing whenever the
boundaries of the community have been modified by annexation or the community has
otherwise assumed or no longer has authority to adopt and enforce floodplain
management regulations for a particular area. In order that all Flood Insurance Rate
Maps accurately represent the community's boundaries, a copy of a map of the
community suitable for reproduction, clearly delineating the new corporate limits or
new area for which the community has assumed or relinquished floodplain
management regulatory authority must be included with the notification.
(5) District Boundary Changes. The delineation of any of the Floodplain Districts may
be revised by the City of Suffolk where natural or man-made changes have occurred
and/or where more detailed studies have been conducted or undertaken by the U. S.
Army Corps of Engineers or other qualified agency, or an individual documents the
need for such change. However, prior to any such change, approval must be obtained
from the Federal Emergency Management Agency.
(6) Interpretation of District Boundaries. Initial interpretations of the boundaries of the
Floodplain Districts shall be made by the Floodplain Administrator. Should a dispute
arise concerning the boundaries of any of the Districts, the Board of Zoning Appeals
shall make the necessary determination. The person questioning or contesting the
location of the District boundary shall be given a reasonable opportunity to present his
case to the Board and to submit his own technical evidence if he so desires.
(7) Submitting Model Backed Technical Data. [44 CFR 65.3] A community's base flood
elevations may increase or decrease resulting from physical changes affecting flooding
conditions. As soon as practicable, but not later than six months after the date such
information becomes available, a community shall notify the Federal Emergency
Management Agency of the changes by submitting technical or scientific data. The
community may submit data via a LOMR. Such a submission is necessary so that upon
confirmation of those physical changes affecting flooding conditions, risk premium
rates and floodplain management requirements will be based upon current data.
(8) Letters of Map Revision. When development in the floodplain will cause or causes a
change in the base flood elevation, the applicant, including state agencies, must notify
FEMA by applying for a Conditional Letter of Map Revision (CLOMR) and then a
Letter of Map Revision (LOMR) and receiving the approval of the Federal Emergency
Management Agency (FEMA).
Example cases:
• Any development that causes a rise in the base flood elevations within the
floodway.
• Any development occurring in Zones A1—30 and AE without a designated
floodway, which will cause a rise of more than one foot in the base flood
elevation.
• Alteration or relocation of a stream (including but not limited to installing
culverts and bridges) 44 Code of Federal Regulations § 65.3 and §
65.6(a)(12)
(c) ESTABLISHMENT OF ZONING DISTRICTS.
(1) Description of Special Flood Hazard Districts. [44 CFR 59.1, 60.3]
Basis of Districts. The various special flood hazard districts shall include the SFHAs.
The basis for the delineation of these districts shall be the FIS and the FIRM for the
City of Suffolk prepared by the Federal Emergency Management Agency, Federal
Insurance Administration, dated July 7, 2026 August 3, 2015, and any subsequent
revisions or amendments thereto. The City of Suffolk may identify and regulate local
flood hazard or ponding areas that are not delineated on the FIRM. These areas may be
delineated on a "Local Flood Hazard Map" using best available topographic data and
locally derived information such as flood of record, historic high water marks or
approximate study methodologies. The boundaries of the SFHA Districts are
established as shown on the FIRM which is declared to be a part of this Section and
which shall be kept on file at the City of Suffolk's offices.
A. The Floodway District is in an AE Zone and is delineated, for purposes of this
Section, using the criterion that certain areas within the floodplain must be
capable of carrying the waters of the one percent annual chance flood without
increasing the water surface elevation of that flood more than one (1) foot at any
point. The areas included in this District are specifically defined in Table 23 5 of
the above-referenced FIS and shown on the accompanying FIRM.
The following provisions shall apply within the Floodway District of an AE zone
[44 CFR 60.3(d)]:
(i) Within any floodway area, no encroachments, including fill, new
construction, substantial improvements, or other development shall be
permitted unless it has been demonstrated through hydrologic and hydraulic
analysis performed in accordance with standard engineering practice that the
proposed encroachment will not result in any increase in flood levels within
the community during the occurrence of the base flood discharge.
Hydrologic and hydraulic analyses shall be undertaken only by professional
engineers or others of demonstrated qualifications, who shall certify that the
technical methods used correctly reflect currently-accepted technical
concepts. Studies, analyses, computations, etc., shall be submitted in
sufficient detail to allow a thorough review by the Floodplain Administrator.
Development activities which increase the water surface elevation of the
base flood may be allowed, provided that the applicant first applies— with
the City of Suffolk's endorsement—for a Conditional Letter of Map Revision
(CLOMR), and receives the approval of the Federal Emergency Management
Agency.
If subsection(c)(1)(A)(i) of this Section is satisfied, all new construction and
substantial improvements shall comply with all applicable flood hazard
reduction provisions of subsection (d) of this Section.
(ii) The placement of manufactured homes (mobile homes) is prohibited, except
in an existing manufactured home (mobile home) park or subdivision. A
replacement manufactured home may be placed on a lot in an existing
manufactured home park or subdivision provided the anchoring, elevation,
and encroachment standards are met.
B. The AE, or AH Zones on the FIRM accompanying the FIS shall be those areas
for which one-percent annual chance flood elevations have been provided and the
floodway has not been delineated. The following provisions shall apply within an
AE or AH zone [44 CFR 60.3(c)]*:
Until a regulatory floodway is designated, no new construction, substantial
improvements, or other development (including fill) shall be permitted within the
areas of special flood hazard, designated as Zones A1—30 and AE or AH on the
FIRM, unless it is demonstrated that the cumulative effect of the proposed
development, when combined with all other existing and anticipated
development, will not increase the water surface elevation of the base flood more
than one foot at any point within the City of Suffolk.
Development activities in Zones A1-30 and AE or AH, on the City of Suffolk's
FIRM which increase the water surface elevation of the base flood by more than
one foot may be allowed, provided that the applicant first applies—with the City
of Suffolk's endorsement for a Conditional Letter of Map Revision, and receives
the approval of the Federal Emergency Management Agency.
* The requirement in 60.3(c)(10) only applies along rivers, streams, and
other watercourses where FEMA has provided base flood elevations. The
requirement does not apply along lakes, bays and estuaries, and the ocean
coast.
C. The A Zone on the FIRM accompanying the FIS shall be those areas for which no
detailed flood profiles or elevations are provided, but the one percent annual
chance floodplain boundary has been approximated. For these areas, the following
provisions shall apply [44 CFR 60.3(b)]:
The Approximated Floodplain District shall be that floodplain area for which no
detailed flood profiles or elevations are provided, but where a one hundred (100)-
year floodplain boundary has been approximated. Such areas are shown as Zone
A on the maps accompanying the FIS. For these areas, the base flood elevations
and floodway information from federal, state, and other acceptable sources shall
be used, when available. Where the specific one percent annual chance flood
elevation cannot be determined for this area using other sources of data, such as
the U. S. Army Corps of Engineers Floodplain Information Reports, U. S.
Geological Survey Flood-Prone Quadrangles, etc., then the applicant for the
proposed use, development and/or activity shall determine this base flood
elevation. For development proposed in the approximate floodplain the applicant
must use technical methods that correctly reflect currently accepted non-detailed
technical concepts, such as point on boundary, high water marks, or detailed
methodologies hydrologic and hydraulic analyses. Studies, analyses,
computations, etc., shall be submitted in sufficient detail to allow a thorough
review by the Floodplain Administrator.
The Floodplain Administrator reserves the right to require a hydrologic and
hydraulic analysis for any development. When such base flood elevation data is
utilized, the lowest floor shall be elevated to or above the base flood level plus
twelve (12) inches.
During the permitting process, the Floodplain Administrator shall obtain:
(i) The elevation of the lowest floor (including the basement) of all new and
substantially improved structures; and
(ii) If the structure has been floodproofed in accordance with the requirements of
this Section, the elevation (in relation to mean sea level) to which the
structure has been floodproofed.
Base flood elevation data shall be obtained from other sources or developed using
detailed methodologies comparable to those contained in a FIS for subdivision
proposals and other proposed development proposals (including manufactured
home parks and subdivisions) that exceed fifty five (5) lots or five (5) acres,
whichever is the lesser.
D. The AO Zone on the FIRM accompanying the FIS shall be those areas of shallow
flooding identified as AO on the FIRM. For these areas, the following provisions
shall apply [44 CFR 60.3(c)]:
(i) All new construction and substantial improvements of residential structures
shall have the lowest floor, including basement, elevated to or above the
flood depth specified on the FIRM, above the highest adjacent grade at least
as high as the depth number specified in feet on the FIRM. If no flood depth
number is specified, the lowest floor, including basement, shall be elevated
no less than two feet above the highest adjacent grade.
(ii) All new construction and substantial improvements of non- residential
structures shall:
a. Have the lowest floor, including basement, elevated to or above the
flood depth specified on the FIRM, above the highest adjacent
grade at least as high as the depth number specified in feet on the
FIRM. If no flood depth number is specified, the lowest floor,
including basement, shall be elevated at least two feet above the
highest adjacent grade; or,
b. Together with attendant utility and sanitary facilities be completely
floodproofed to the specified flood level so that any space below
that level is watertight with walls substantially impermeable to the
passage of water and with structural components having the
capability of resisting hydrostatic and hydrodynamic loads and
effects of buoyancy.
(iii) Adequate drainage paths around structures on slopes shall be provided to
guide floodwaters around and away from proposed structures.
E. The Coastal A Zone shall be those areas, as defined by the VA USBC, that are
subject to wave heights between 1.5 feet and 3 feet, and identified on the FIRM as
areas of Limits of Moderate Wave Action (LiMWA). For these areas, the
following provisions shall apply:
Buildings and structures within this zone shall have the lowest floor elevated to or
above the base flood elevation plus one foot eighteen (18) inches of freeboard,
and must comply with the provisions in subsection (c)(1)(B) and subsections
(d)(2) and (d)(3) of this Section.
F. The VE or V Zones on FIRMs accompanying the FIS shall be those areas that are
known as Coastal High Hazard areas, extending from offshore to the inland limit
of a primary frontal dune along an open coast. For these areas, the following
provisions shall apply [44 CFR 60.3(e)]:
(i) All new construction and substantial improvements in Zones V and VE (V if
base flood elevation is available) shall be elevated on pilings or columns so
that:
a. The bottom of the lowest horizontal structural member of the
lowest floor (excluding the pilings or columns) is elevated to or
above the base flood level plus eighteen (18) inches if the lowest
horizontal structural member is parallel to the direction of wave
approach or elevated at least one foot two (2) feet above the base
flood level if the lowest horizontal structural member is
perpendicular to the direction of wave approach; and,
b. The pile or column foundation and structure attached thereto is
anchored to resist flotation, collapse, and lateral movement due to
the effects of wind and water loads acting simultaneously on all
building components. Wind and water loading values shall each
have a one percent chance of being equaled or exceeded in any
given year (one-percent annual chance).
(ii) A registered professional engineer or architect shall develop or review the
structural design, specifications and plans for the construction, and shall
certify that the design and methods of construction to be used are in
accordance with accepted standards of practice for meeting the provisions of
subsection (c)(1)(F)(i) of this Section.
(iii) The Floodplain Administrator shall obtain the elevation (in relation to mean
sea level) of the bottom of the lowest horizontal structural member of the
lowest floor (excluding pilings and columns) of all new and substantially
improved structures in Zones V and VE. The Floodplain Administrator shall
maintain a record of all such information.
(iv) All new construction shall be located landward of the reach of mean high
tide.
(v) All new construction and substantial improvements shall have the space
below the lowest floor either free of obstruction or constructed with non-
supporting breakaway walls, open wood-lattice work, or insect screening
intended to collapse under wind and water loads without causing, collapse,
displacement, or other structural damage to the elevated portion of the
building or supporting foundation system. For the purpose of this section, a
breakaway wall shall have a design safe loading resistance of not less than 10
and no more than 20 pounds per square foot. Use of breakaway walls which
exceed a design safe loading resistance of 20 pounds per square foot (either
by design or when so required by local codes) may be permitted only if a
registered professional engineer or architect certifies that the designs
proposed meet the following conditions:
a. Breakaway wall collapse shall result from water load less than that
which would occur during the base flood; and
b. The elevated portion of the building and supporting foundation
system shall not be subject to collapse, displacement, or other
structural damage due to the effects of wind and water loads acting
simultaneously on all building components (structural and non-
structural). Maximum wind and water loading values to be used in
this determination shall each have a one percent chance of being
equaled or exceeded in any given year.
(vi) The enclosed space below the lowest floor shall be used solely for parking of
vehicles, building access, or storage. Such space shall not be partitioned into
multiple rooms, temperature-controlled, or used for human habitation. The
enclosed space shall be less than 300 square feet.
(vii) The use of fill for structural support of buildings is prohibited. When non-
structural fill is proposed in a coastal high hazard area, appropriate
engineering analyses shall be conducted to evaluate the impacts of the fill
prior to issuance of a development permit.
(viii) The man-made alteration of sand dunes, which would increase potential
flood damage, is prohibited.
(2) Overlay Concept. The Floodplain Districts described above shall be overlays to the
existing underlying districts as shown on the Official Zoning Ordinance Map, and as
such, the provisions for the floodplain districts shall serve as a supplement to the
underlying district provisions.
If there is any conflict between the provisions or requirements of the Floodplain
Districts and those of any underlying district, the more restrictive provisions and/or
those pertaining to the floodplain districts shall apply.
In the event any provision concerning a Floodplain District is declared inapplicable as
a result of any legislative or administrative actions or judicial decision, the basic
underlying provisions shall remain applicable.
(d) DISTRICT PROVISIONS. [44 CFR 59.22, 60.2, 60.3]
(1) Permit and Application Requirements.
A. Permit Requirement. All uses, activities, and development occurring within any
floodplain district, including placement of manufactured homes, shall be
undertaken only upon the issuance of a zoning permit. Such development shall be
undertaken only in strict compliance with the provisions of this Section and with
all other applicable codes and ordinances, as amended, such as the Virginia
Uniform Statewide Building Code (VA USBC) and the City of Suffolk's Unified
Development Ordinance. Prior to the issuance of any such permit, the Floodplain
Administrator shall require all applications to include compliance with all
applicable state and federal laws and shall review all sites to assure they are
reasonably safe from flooding. Under no circumstances shall any use, activity,
and/or development adversely affect the capacity of the channels or floodway of
any watercourse, drainage ditch, or any other drainage facility or system.
B. Site Plans and Permit Applications. All applications for development within
any floodplain district and all building permits issued for the floodplain shall
incorporate the following information:
(i) The elevation of the Base Flood at the site.
(ii) The elevation of the lowest floor (including basement) or, in V zones, the
lowest horizontal structural member.
(iii) For structures to be floodproofed (non-residential only), the elevation to
which the structure will be floodproofed.
(iv) Topographic information showing existing and proposed ground elevations.
(v) An Elevation Certificate based on the proposed development showing
compliance with these floodplain regulations.
C. Certificate of Occupancy. Submissions Required Prior to Issuance of a
Certificate of Occupancy The following certifications are required to be submitted
by the permittee for development that is permitted in special flood hazard areas
prior to the issuance of a Certificate of Occupancy:
(i) For new or substantially improved residential structures or nonresidential
structures that have been elevated, an Elevation Certificate that shows the
ground elevation and finished elevations (identified in Section C of the
Elevation Certificate as "Finished Construction").
(ii) If non-residential floodproofing is used to meet the regulatory flood
protection elevation requirements, a Floodproofing Certificate with
supporting data are required prior to the actual start of any new construction.
(2) General Standards. The following provisions shall apply to all permits:
A. New construction and substantial improvements shall be according to subsection
(c)(1) of this Section and the VA USBC, and anchored to prevent flotation,
collapse or lateral movement of the structure.
B. Manufactured homes shall be anchored to prevent flotation, collapse, or lateral
movement. Methods of anchoring may include, but are not limited to, use of over-
the-top or frame ties to ground anchors. This standard shall be in addition to and
consistent with applicable state anchoring requirements for resisting wind forces.
C. New construction and substantial improvements shall be constructed with
materials and utility equipment resistant to flood damage.
D. New construction or substantial improvements shall be constructed by methods
and practices that minimize flood damage.
E. Electrical, heating, ventilation, plumbing, air conditioning equipment and other
service facilities, including duct work, shall be designed and/or located so as to
prevent water from entering or accumulating within the components during
conditions of flooding.
F. New and replacement water supply systems shall be designed to minimize or
eliminate infiltration of flood waters into the system.
G. New and replacement sanitary sewage systems shall be designed to minimize or
eliminate infiltration of flood waters into the systems and discharges from the
systems into flood waters.
H. On-site waste disposal systems shall be located and constructed to avoid
impairment to them or contamination from them during flooding.
In addition to provisions A—H above, in all special flood hazard areas, the additional
provisions shall apply:
1. Prior to any proposed alteration or relocation of any channels or of any
watercourse, stream, etc., within this jurisdiction a permit shall be obtained from
the U. S. Army Corps of Engineers, the Virginia Department of Environmental
Quality, and the Virginia Marine Resources Commission (a joint permit
application is available from any of these organizations). Furthermore, in riverine
areas, notification of the proposal shall be given by the applicant to all affected
adjacent jurisdictions, the Department of Conservation and Recreation (Division
of Dam Safety and Floodplain Management), other required agencies, and the
Federal Emergency Management Agency.
2. The flood carrying capacity within an altered or relocated portion of any
watercourse shall be maintained.
(3) Elevation and Construction Standards. [44 CFR 60.3] In all identified flood hazard
areas where base flood elevations have been provided in the FIS or generated by a
certified professional in accordance with subsection (c)(1)(C) of this Section, the
following provisions shall apply:
A. Residential Construction - New construction or substantial improvement of any
residential structure (including manufactured homes) in Zones A1-30, AE, AH
and A with detailed base flood elevations shall have the lowest floor, including
basement, elevated to or above the base flood level plus twelve (12) inches. See
subsections (c)(1)(E) and (c)(1)(F) of this Section for requirements in the Coastal
A and VE zones.
B. Non-Residential Construction - New construction or substantial improvement of
any commercial, industrial, or non-residential building (or manufactured home)
shall have the lowest floor, including basement, elevated to or above the base
flood level plus twelve (12) inches. See subsections (c)(1)(E) and (c)(1)(F) of this
Section for requirements in the Coastal A and VE zones. Non-residential
buildings located in all A1—30, AE, and AH zones may be floodproofed in lieu
of being elevated provided that all areas of the building components below the
elevation corresponding to the BFE plus one foot twelve (12) inches are water
tight with walls substantially impermeable to the passage of water, and use
structural components having the capability of resisting hydrostatic and
hydrodynamic loads and the effect of buoyancy. A registered professional
engineer or architect shall certify that the standards of this subsection are satisfied.
Such certification, including the specific elevation (in relation to mean sea level)
to which such structures are floodproofed, shall be maintained by the Floodplain
Administrator in perpetuity.
C. Space Below the Lowest Floor - In zones A, AE, AH, AO, and A1-A30, fully
enclosed areas of new construction or substantially improved structures which are
below the base flood elevation shall:
(i) Not be designed or used for human habitation, but shall only be used for
parking of vehicles, building access, or limited storage of maintenance
equipment used in connection with the premises. Access to the enclosed area
shall be the minimum necessary to allow for parking of vehicles (garage
door) or limited storage of maintenance equipment (standard exterior door),
or entry to the living area (stairway or elevator).
(ii) Be constructed entirely of flood resistant materials below the base flood
elevation;
(iii) Include measures to automatically equalize hydrostatic flood forces on walls
by allowing for the entry and exit of floodwaters. To meet this requirement,
the openings must either be certified by a professional engineer or architect
or meet the following minimum design criteria:
a. Provide a minimum of two openings on different sides of each
enclosed area subject to flooding.
b. The total net area of all openings must be at least one (1) square
inch for each square foot of enclosed area subject to flooding.
c. If a building has more than one enclosed area, each area must have
openings to allow floodwaters to automatically enter and exit.
d. The bottom of all required openings shall be no higher than one (1)
foot above the adjacent grade.
e. Openings may be equipped with screens, louvers, or other opening
coverings or devices, provided they permit the automatic flow of
floodwaters in both directions.
f. Foundation enclosures made of flexible skirting are not considered
enclosures for regulatory purposes, and, therefore, do not require
openings. Masonry or wood underpinning, regardless of structural
status, is considered an enclosure and requires openings as outlined
above.
D. Accessory Structures
(i) Accessory structures in the SFHA shall comply with the elevation requirements
and other requirements of Section 31- 416.2(d)(3)(B) or, if not elevated or dry
floodproofed, shall:
a. Not be used for human habitation;
b. Be limited to no more than 600 square feet in total floor area;
c. Be useable only for parking of vehicles or limited storage;
d. Be constructed with flood damage-resistant materials below the base
flood elevation;
e. Be constructed and placed to offer the minimum resistance to the
flow of floodwaters;
f. Be anchored to prevent flotation;
g. Have electrical service and mechanical equipment elevated to or
above the base flood elevation;
h. Shall be provided with flood openings which shall meet the
following criteria:
(1) There shall be a minimum of two flood openings on different
sides of each enclosed area; if a building has more than one
enclosure below the lowest floor, each such enclosure shall
have flood openings on exterior walls.
(2) The total net area of all flood openings shall be at least 1 square
inch for each square foot of enclosed area (non- engineered
flood openings), or the flood openings shall be engineered flood
openings that are designed and certified by a licensed
professional engineer to automatically allow entry and exit of
floodwaters; the certification requirement may be satisfied by
an individual certification or an Evaluation Report issued by the
ICC Evaluation Service, Inc.
(3) The bottom of each flood opening shall be 1 foot or less above
the higher of the interior floor or grade, or the exterior grade,
immediately below the opening.
(4) Any louvers, screens or other covers for the flood openings
shall allow the automatic flow of floodwaters into and out of
the enclosed area.
(ii) A signed Declaration of Land Restriction (Non- Conversion Agreement) shall
be recorded on the property deed.
D. E. Standards for Manufactured Homes and Recreational Vehicles.
(i) In zones A, AE, AH, and AO, Aall manufactured homes placed, or
substantially improved, on individual lots or parcels, must meet all the
requirements for new construction, including the elevation and anchoring
requirements in subsections (d)(2) and (d)(3) of this Section.
(ii) All recreational vehicles placed on sites must either:
a. Be on the site for fewer than 180 consecutive days, be fully
licensed and ready for highway use (a recreational vehicle is ready
for highway use if it is on its wheels or jacking system, is attached
to the site only by quick disconnect type utilities and security
devices and has no permanently attached additions); or
b. Meet all the requirements for manufactured homes in subsection
(d)(4)(D)(i) of this Section.
(4) Standards for Subdivision Proposals.
A. All subdivision proposals shall be consistent with the need to minimize flood
damage;
B. All subdivision proposals shall have public utilities and facilities such as sewer,
gas, electrical and water systems located and constructed to minimize flood
damage;
C. All subdivision proposals shall have adequate drainage provided to reduce
exposure to flood hazards; and
D. Base flood elevation data shall be obtained from other sources or developed using
detailed methodologies, hydraulic and hydrologic analysis, comparable to those
contained in a Flood Insurance Study for subdivision proposals and other
proposed development proposals (including manufactured home parks and
subdivisions) that exceed fifty five (5) lots or five (5) acres, whichever is the
lesser.
(e) EXISTING STRUCTURES IN FLOODPLAIN AREAS. Any structure or use of a
structure or premises which lawfully existed before the enactment of these provisions, but
which is not in conformity with these provisions, may be continued subject to the following
conditions must be brought into conformity with these provisions when it is changed,
repaired, or improved unless one of the following exceptions is established before the
change is made:
(1) Existing structures in the Floodway Area shall not be expanded or enlarged unless it
has been demonstrated through hydrologic and hydraulic analyses performed in
accordance with standard engineering practices that the proposed expansion would not
result in any increase in the base flood elevation.
(2) Any modification, alteration, repair, reconstruction, or improvement of any kind to a
structure and/or use located in any floodplain areas to an extent or amount of less than
fifty (50) percent of its market value shall conform to the VA USBC and the
appropriate provisions of this ordinance.
(3) The modification, alteration, repair, reconstruction, or improvement of any kind to a
structure and/or use, regardless of its location in a floodplain area to an extent or
amount of fifty (50) percent or more of its market value shall be undertaken only in full
compliance with this ordinance and shall require the entire structure to conform to the
VA USBC.
(1) The Floodplain Administrator has determined that:
A. Change is not a substantial repair or substantial improvement; and
B. No new square footage is being built in the floodplain that is not complaint; and
C. No new square footage is being built in the floodway; and
D. The change complies with this Section and the VA USBC.
(2) The changes are required to comply with a citation for a health or safety violation.
(3) The structure is a historic structure and the change required would impair the historic
nature of the structure.
(f) VARIANCES - FACTORS TO BE CONSIDERED. [44 CFR 60.6] Variances shall be
issued only upon (i) a showing of good and sufficient cause, (ii) after the Board of Zoning
Appeals has determined that failure to grant the variance would result in exceptional
hardship to the applicant, and (iii) after the Board of Zoning Appeals has determined that
the granting of such variance will not result in (a) unacceptable or prohibited increases in
flood heights, (b) additional threats to public safety, (c) extraordinary public expense; and
will not (d) create nuisances, (e) cause fraud or victimization of the public, or (f) conflict
with local laws or ordinances.
While the granting of variances generally is limited to a lot size less than one-half acre,
deviations from that limitation may occur. However, as the lot size increases beyond one-
half acre, the technical justification required for issuing a variance increases. Variances may
be issued by the Board of Zoning Appeals for new construction and substantial
improvements to be erected on a lot of one-half acre or less in size contiguous to and
surrounded by lots with existing structures constructed below the base flood level, in
conformance with the provisions of this section.
Variances may be issued for new construction and substantial improvements and for other
development necessary for the conduct of a functionally dependent use provided that the
criteria of this section are met, and the structure or other development is protected by
methods that minimize flood damages during the base flood and create no additional threats
to public safety.
In passing upon applications for variances, the Board of Zoning Appeals shall satisfy all
relevant factors and procedures specified in other sections of the zoning ordinance and
consider the following additional factors:
1. The danger to life and property due to increased flood heights or velocities caused by
encroachments. No variance shall be granted for any proposed use, development, or
activity within any Floodway District that will cause any increase in the one percent
(1%) chance flood elevation.
2. The danger that materials may be swept on to other lands or downstream to the injury
of others.
3. The proposed water supply and sanitation systems and the ability of these systems to
prevent disease, contamination, and unsanitary conditions.
4. The susceptibility of the proposed facility and its contents to flood damage and the
effect of such damage on the individual owners.
5. The importance of the services provided by the proposed facility to the community.
6. The requirements of the facility for a waterfront location.
7. The availability of alternative locations not subject to flooding for the proposed use.
8. The compatibility of the proposed use with existing development and development
anticipated in the foreseeable future.
9. The relationship of the proposed use to the comprehensive plan and floodplain
management program for the area.
10. The safety of access by ordinary and emergency vehicles to the property in time of
flood.
11. The expected heights, velocity, duration, rate of rise, and sediment transport of the
flood waters expected at the site.
12. The historic nature of a structure. Variances for repair or rehabilitation of historic
structures may be granted upon a determination that the proposed repair or
rehabilitation will not preclude the structure's continued designation as a historic
structure and the variance is the minimum necessary to preserve the historic character
and design of the structure.
13. Variances will not be issued for any accessory structure within the SFHA.
143. Such other factors which are relevant to the purposes of this Section.
The Board of Zoning Appeals may refer any application and accompanying documentation
pertaining to any request for a variance to any engineer or other qualified person or agency
for technical assistance in evaluating the proposed project in relation to flood heights and
velocities, and the adequacy of the plans for flood protection and other related matters.
Variances shall be issued only after the Board of Zoning Appeals has determined that the
granting of such will not result in (a) unacceptable or prohibited increases in flood heights,
(b) additional threats to public safety, (c) extraordinary public expense; and will not (d)
create nuisances, (e) cause fraud or victimization of the public, or (f) conflict with local
laws or ordinances.
Variances shall be issued only after the Board of Zoning Appeals has determined that the
variance will be the minimum required to provide relief.
The Board of Zoning Appeals shall notify the applicant for a variance, in writing, that the
issuance of a variance to construct a structure below the one percent (1%) chance flood
elevation (a) increases the risks to life and property and (b) will result in increased premium
rates for flood insurance.
A record shall be maintained of the above notification as well as all variance actions,
including justification for the issuance of the variances. Any variances that are issued shall
be noted in the annual or biennial report submitted to the Federal Insurance Administrator.
(g) VIOLATIONS AND ENFORCEMENT. Any persons in violation of the provisions of
this Section shall be subject to enforcement action as provided for in Section 31-310 of this
Ordinance.
(h) DEFINITIONS. [44 CFR 59.1]
0.2-Percent-Annual-Chance Flood - The flood that has a 0.2-percent chance of being
equaled or exceeded in any given year.
1-Percent-Annual-Chance Flood - The flood that has a 1-percent chance of being equaled
or exceeded in any given year.
1-Percent-Annual-Chance Flood Elevation - See Base Flood Elevation (BFE).
2-Percent-Annual-Chance Flood - The flood that has a 2-percent chance of being equaled
or exceeded in any given year.
10-Percent-Annual-Chance Flood - The flood that has a 10-percent chance of being
equaled or exceeded in any given year.
10-Year Flood - See 10-Percent Annual Chance Flood.
50-Year Flood - See 2-Percent Annual Chance Flood.
100-Year Flood - See 1-Percent Annual Chance Flood.
500-Year Flood - See 0.2-Percent Annual Chance Flood.
Appurtenant or accessory structure - For floodplain management purposes, accessory
structures not to exceed 200 sq. ft. a non-residential structure which is on the same parcel of
property as the principal structure and the use of which is incidental to the use of the
principal structure. Accessory structures are not to exceed 600 square feet.
Base flood - The flood having a one-percent (1%) chance of being equaled or exceeded in
any given year.
Base flood elevation (BFE) - The water surface elevations of the base flood, that is, the
flood level that has a one percent or greater chance of occurrence in any given year. The
water surface elevation of the base flood in relation to the datum specified on the
community's Flood Insurance Rate Map. For the purposes of this section, the base flood is
the 1% annual chance flood.
Basement - For floodplain management purposes, any area of the building having its floor
sub-grade (below ground level) on all sides.
Board of Zoning Appeals (BZA) - The board appointed to review appeals made by
individuals with regard to decisions of the Zoning Administrator in the interpretation of this
ordinance.
Bulkhead - A structure or partition to retain or prevent sliding of the land.
Coastal A Zone - Flood hazard areas that have been delineated as subject to wave heights
between 1.5 feet and 3 feet.
Development - For floodplain management purposes, any man-made change to improved
or unimproved real estate, including, but not limited to, buildings or other structures,
temporary structures, mining, dredging, filling, grading, paving, excavation, or drilling
operations or permanent or temporary storage of equipment or materials.
Digital Flood Insurance Rate Map (DFIRM) - A Flood Insurance Rate Map that has been
prepared as a digital product, which may involve converting an existing manually produced
FIRM to digital format, or creating a product from new digital data sources using a
Geographic Information System environment. The DFIRM product allows for the creation
of interactive, multi-hazard digital maps. Linkages are built into an associated database to
allow users options to access the engineering backup material used to develop the DFIRM,
such as hydrologic and hydraulic models, Flood Profiles, data tables, Digital Elevation
Models, and structure-specific data, such as digital elevation certificates and digital
photographs of bridges and culverts.
DFIRM Database - A database designed to facilitate collecting, storing, processing, and
accessing data developed by FEMA, enabling Mapping Partners to share the data necessary
for the DFIRM production and conversion process. Where possible, all mapping and
engineering data elements are linked to physical geographic features and georeferenced.
The use of a Geographic Information System as a component of the DFIRM database
provides the ability to georeference and overlay the mapping and engineering data, allowing
the database to support a variety of existing and forthcoming engineering and mapping
products.
Director - For floodplain management purposes, title of the Community Floodplain
Administrator or other official designated by the City Manager.
Elevated building - A non-basement building built to have the lowest floor elevated above
the ground level by means of solid foundation perimeter walls, pilings, or columns (posts
and piers).
Elevation Certificate - The form, developed by FEMA, to be used to provide elevation
information necessary to ensure compliance with community floodplain management
ordinances, to determine the proper insurance premium rate, and to support a request for a
Letter of Map Amendment or Letter of Map Revision Based on Fill.
Encroachment - The advance or infringement of uses, plant growth, fill, excavation,
buildings, permanent structures or development into a floodplain, which may impede or
alter the flow capacity of a floodplain.
Erosion - For floodplain management purposes, the process by which floodwaters lower the
ground surface in an area by removing upper layers of soil.
Existing construction - Structures for which the "start of construction" commenced before
the effective date of the FIRM. "Existing construction" may also be referred to as "existing
structures."
Existing manufactured home park or subdivision - A manufactured home park or
subdivision for which the construction of facilities for servicing the lots on which the
manufactured homes are to be affixed (including, at a minimum, the installation of utilities,
the construction of streets, and either final site grading or the pouring of concrete pads) is
completed before the effective date of the floodplain management regulations adopted by a
community.
Expansion to an existing manufactured home park or subdivision - The preparation of
additional sites by the construction of facilities for servicing the lots on which the
manufacturing homes are to be affixed (including the installation of utilities, the
construction of streets, and either final site grading or the pouring of concrete pads).
Federal Emergency Management Agency (FEMA) - The component of the U. S.
Department of Homeland security that oversees the administration of the NFIP.
Fill and fill material - For floodplain management purposes, soil that is brought in to raise
the level of the ground. Depending on where the soil is placed, fill may change the flow of
water or increase flood elevations. Fill may be used to elevate a building to meet NFIP
requirements. Sometimes fill is combined with other methods of elevation such as pilings or
foundation walls. Placement of fill requires a local permit from the community.
Flood or flooding - For floodplain management purposes.
1. A general or temporary condition of partial or complete inundation of normally
dry land areas from:
a. The overflow of inland or tidal waters; or
b. The unusual and rapid accumulation or runoff of surface waters from any
source.
c. Mudflows which are proximately caused by flooding as defined in paragraph
(1)(b) of this definition and are akin to a river of liquid and flowing mud on
the surfaces of normally dry land areas, as when earth is carried by a current
of water and deposited along the path of the current.
2. The collapse or subsidence of land along the shore of a lake or other body of
water as a result of erosion or undermining caused by waves or currents of water
exceeding anticipated cyclical levels or suddenly caused by an unusually high
water level in a natural body of water, accompanied by a severe storm, or by an
unanticipated force of nature such as flash flood or an abnormal tidal surge, or by
some similarly unusual and unforeseeable event which results in flooding as
defined in paragraph 1(a) of this definition.
Flood Insurance Rate Map (FIRM) - An official map of a community, on which the
Federal Emergency Management Agency has delineated both the special hazard areas and
the risk premium zones applicable to the community. A FIRM that has been made available
digitally is called a Digital Flood Insurance Rate Map (DFIRM).
Flood Insurance Risk Zones - The zones, also referred to as "risk premium rate zones" and
"flood insurance rate zones", shown on a FIRM or FHBM that are used to determine flood
insurance premium rates for properties in a mapped area. Flood insurance risk zones include
SFHAs and non-SFHAs.
Flood Insurance Study (FIS) - A report by FEMA that examines, evaluates and determines
flood hazards and, if appropriate, corresponding water surface elevations, or an
examination, evaluation and determination of mudflow and/or flood-related erosion hazards.
Floodplain or flood-prone area - Any land area susceptible to being inundated by water
from any source.
Floodproofing - Any combination of structural and non-structural additions, changes, or
adjustments to structures which reduce or eliminate flood damage to real estate or improved
real property, water and sanitary facilities, structures and their contents.
Floodway - The channel of a river or other watercourse and the adjacent land areas that
must be reserved in order to discharge the base flood without cumulatively increasing the
water surface elevation more than one foot at any point within the community.
Freeboard - A factor of safety usually expressed in feet above a flood level for purposes of
floodplain management. "Freeboard" tends to compensate for the many unknown factors
that could contribute to flood heights greater than the height calculated for a selected size
flood and floodway conditions, such as wave action, bridge openings, and the hydrological
effect of urbanization in the watershed.
Functionally Ddependent use - A use which cannot perform its intended purpose unless it
is located or carried out in close proximity to water. The term includes only docking
facilities, port facilities that are necessary for the loading and unloading of cargo or
passengers, and ship building and ship repair facilities, but does not include long-term
storage or related manufacturing facilities.
Hazard Mitigation Grant Program (HMGP)
- The program, authorized under Section
404 of the Stafford Act, under which FEMA provides grants to States and local
governments to implement long-term hazard mitigation measures after a presidential
disaster declaration. The purpose of the HMGP is to reduce the loss of life and property due
to natural disasters and to enable mitigation measures to be implemented during the
immediate recovery from a presidentially declared disaster.
Highest adjacent grade - The highest natural elevation of the ground surface prior to
construction next to the proposed walls of a structure.
Historic structure - For floodplain management purposes, any structure that is:
1. Listed individually in the National Register of Historic Places (a listing
maintained by the Department of Interior) or preliminarily determined by the
Secretary of the Interior as meeting the requirements for individual listing on the
National Register;
2. Certified or preliminarily determined by the Secretary of the Interior as
contributing to the historical significance of a registered historic district or a
district preliminarily determined by the Secretary to qualify as a registered
historic district;
3. Individually listed on a state inventory of historic places in states with historic
preservation programs which have been approved by the Secretary of the Interior;
or,
4. Individually listed on a local inventory of historic places in communities with
historic preservation programs that have been certified either
a. By an approved state program as determined by the Secretary of the Interior;
or
b. Directly by the Secretary of the Interior in states without approved programs.
Hydrologic and Hydraulic Engineering Analysis - Analyses performed by a licensed
professional engineer, in accordance with standard engineering practices that are accepted
by the Virginia Department of Conservation and Recreation and FEMA, used to determine
the base flood, other frequency floods, flood elevations, floodway information and
boundaries, and flood profiles.
Letters of Map Change (LOMC) - A Letter of Map Change is an official FEMA
determination, by letter, that amends or revises an effective Flood Insurance Rate Map or
Flood Insurance Study. Letters of Map Change include:
Letter of Map Amendment (LOMA): An amendment based on technical data showing
that a property was incorrectly included in a designated special flood hazard area. A LOMA
amends the current effective Flood Insurance Rate Map and establishes that a Land as
defined by meets and bounds or structure is not located in a special flood hazard area.
Letter of Map Revision (LOMR): A revision based on technical data that may show
changes to flood zones, flood elevations, floodplain and floodway delineations, and
planimetric features. A Letter of Map Revision Based on Fill (LOMR-F), is a determination
that a structure or parcel of land has been elevated by fill above the base flood elevation and
is, therefore, no longer exposed to flooding associated with the base flood. In order to
qualify for this determination, the fill must have been permitted and placed in accordance
with the community's floodplain management regulations.
Conditional Letter of Map Revision (CLOMR): A formal review and comment as to
whether a proposed flood protection project or other project complies with the minimum
NFIP requirements for such projects with respect to delineation of special flood hazard
areas. A CLOMR does not revise the effective Flood Insurance Rate Map or Flood
Insurance Study.
Lowest Adjacent Grade (LAG) - The lowest natural elevation of the ground surface next
to the walls of a structure.
Lowest Finished Ffloor Elevation (LFFE) - The lowest floor of the lowest enclosed area
(including basement). An unfinished or flood-resistant enclosure, usable solely for parking
of vehicles, building access or storage in an area other than a basement area is not
considered a building's lowest floor; provided, that such enclosure is not built so as to render
the structure in violation of the applicable non-elevation design requirements of Federal
Code 44CFR §60.3.
Manufactured home - A structure, transportable in one or more sections, which is built on
a permanent chassis and is designed for use with or without a permanent foundation when
connected to the required utilities. For floodplain management purposes the term
"manufactured home" also includes park trailers, travel trailers, and other similar vehicles
placed on a site for greater than 180 consecutive days.
Manufactured home park or subdivision - A parcel (or contiguous parcels) of land
divided into two or more manufactured home lots for rent or sale.
Mean sea level - is an elevation point that represents the average height of the ocean's
surface (such as the halfway point between the mean high tide and the mean low tide) which
is used as a standard in reckoning land elevation. for purposes of the National Flood
Insurance Program, the National Geodetic Vertical Datum (NGVD) of 1929 or the North
American Vertical Datum (NAVD) of 1988 to which base flood elevations shown on a
community’s FIRM are referenced.
Mitigation - For floodplain management purposes, a sustained action taken to reduce or
eliminate long-term risk to people and property from flood hazards and their effects.
Mitigation distinguishes actions that have a long-term impact from those that are more
closely associated with preparedness for, immediate response to, and short-term recovery
from specific events.
New construction - For the purposes of determining insurance rates, structures for which
the "start of construction" commenced on or after November 16, 1990, and includes any
subsequent improvements to such structures. For floodplain management purposes, new
construction means structures for which the start of construction commenced on or after the
effective date of a floodplain management regulation adopted by a community and includes
any subsequent improvements to such structures.
Post-FIRM structures - A structure for which construction or substantial improvement
occurred on or after November 16, 1990. For floodplain management purposes, a structure
for which construction, or other development for which the “start of construction” occurred
on or after November 16, 1990.
Pre-FIRM structures - A structure for which construction or substantial improvement
occurred on or before November 16, 1990. For floodplain management purposes, a structure
for which construction or other development for which the “start of construction” occurred
before November 16. 1990.
Primary frontal dune - a continuous or nearly continuous mound or ridge of sand with
relatively steep seaward and landward slopes immediately landward and adjacent to the
beach and subject to erosion and overtopping from high tides and waves during major
coastal storms.
Public Assistance (PA) Program - The program through which FEMA provides Federal
funding to State and local governments, and some non-profit organizations, to respond to,
recover from, and mitigate the future effects of disasters. The primary goal of the PA
program is to help communities and their citizens recover from catastrophic disasters.
Recreational vehicle - For floodplain management purposes, a vehicle which is:
1. Built on a single chassis;
2. 400 square feet or less when measured at the largest horizontal projection;
3. Designed to be self-propelled or permanently towable by a light duty truck; and
4. Designed primarily not for use as a permanent dwelling but as temporary living
quarters for recreational camping, travel, or seasonal use.
Repetitive loss structure - A building covered by a contract for flood insurance that has
incurred flood-related damages on two occasions in a 10-year period, in which the cost of the
repair, on the average, equaled or exceeded 25 percent of the market value of the structure at
the time of each such flood event; and at the time of the second incidence of flood-related
damage, the contract for flood insurance contains increased cost of compliance coverage.
Severe repetitive loss structure - A structure that: (a) Is covered under a contract for flood
insurance made available under the NFIP; and (b) Has incurred flood related damage - (i) For
which 4 or more separate claims payments have been made under flood insurance coverage
with the amount of each such claim exceeding $5,000.00, and with the cumulative amount of
such claims payments exceeding $20,000.00; or (ii) For which at least 2 separate claims
payments have been made under such coverage, with the cumulative amount of such claims
exceeding the market value of the insured structure.
Shallow flooding area - A special flood hazard area with base flood depths from one to three
feet where a clearly defined channel does not exist, where the path of flooding is
unpredictable and indeterminate, and where velocity flow may be evident. Such flooding is
characterized by ponding or sheet flow.
Special flood hazard area - The land in the floodplain subject to a one (1%) percent or
greater chance of being flooded in any given year as determined in subsection (c) of this
Section.
Start of construction - For floodplain management purposes - for other than new
construction and substantial improvement, under the Coastal Barriers Resource Act (P.L. -
97-348), means the date the building permit was issued, provided the actual start of
construction, repair, reconstruction, rehabilitation, addition, placement, substantial
improvement or other improvement was within 180 days of the permit date. The actual start
means either the first placement of permanent construction of a structure on a site, such as
the pouring of slab or footings, the installation of piles, the construction of columns, or any
work beyond the stage of excavation; or the placement of a manufactured home on a
foundation. Permanent construction does not include land preparation, such as clearing,
grading and filling; nor does it include the installation of streets and/or walkways; nor does it
include excavation for a basement, footings, piers, or foundations or the erection of
temporary forms; nor does it include the installation on the property of accessory buildings,
such as garages or sheds not occupied as dwelling units or not part of the main structure. For
a substantial improvement, the actual start of the construction means the first alteration of
any wall, ceiling, floor, or other structural part of a building, whether or not that alteration
affects the external dimensions of the building.
Structure - For floodplain management purposes, a walled and roofed building, including a
gas or liquid storage tank, that is principally above ground, as well as a manufactured home.
Substantial damage - For floodplain management purposes, damage of any origin sustained
by a structure whereby the cost of restoring the structure to its before damaged condition
would equal or exceed 50 percent of the market value of the structure before the damage
occurred.
Substantial improvement - For floodplain management purposes, any reconstruction,
rehabilitation, addition, or other improvement of a structure, the cost of which equals or
exceeds 50 percent of the market value of the structure before the start of construction of the
improvement. This term includes structures which have incurred repetitive loss or substantial
damage regardless of the actual repair work performed. The term does not, however, include
either:
1. Any project for improvement of a structure to correct existing violations of state or
local health, sanitary, or safety code specifications which have been identified by the
local code enforcement official and which are the minimum necessary to assure safe
living conditions; or
2. Any alteration of a historic structure, provided that the alteration will not preclude the
structure's continued designation as a historic structure.
3. Historic structures undergoing repair or rehabilitation that would constitute a
substantial improvement as defined above, must comply with all ordinance
requirements that do not preclude the structure's continued designation as a historic
structure. Documentation that a specific ordinance requirement will cause removal of
the structure from the National Register of Historic Places or the State Inventory of
Historic places must be obtained from the Secretary of the Interior or the State Historic
Preservation Officer. Any exemption from ordinance requirements will be the
minimum necessary to preserve the historic character and design of the structure.
Violation - The failure of a structure or other development to be fully compliant with the
community's floodplain management regulations. A structure or other development without
the elevation certificate, other certifications, or other evidence of compliance required is
presumed to be in violation until such time as that documentation is provided.
Watercourse - For floodplain management purposes, a lake, river, creek, stream, wash,
channel or other topographic feature on or over which waters flow at least periodically.
Watercourse includes specifically designated areas in which substantial flood damage may
occur.
FIRM Panel Dates for Printed Panels of CITY OF SUFFOLK, VIRGINIA (Independent
City)
PANEL EFFECTIVE DATE
0085 ED November 16, 2011 July 7, 2026
0090 ED November 16, 2011 July 7, 2026
0095 ED November 16, 2011 July 7, 2026
0140 ED November 16, 2011 July 7, 2026
0170 ED November 16, 2011 July 7, 2026
0180 ED November 16, 2011 July 7, 2026
0185 ED November 16, 2011 July 7, 2026
0190 ED November 16, 2011 July 7, 2026
0195 ED November 16, 2011 July 7, 2026
0205 ED November 16, 2011 July 7, 2026
0210 ED November 16, 2011 July 7, 2026
0215 ED November 16, 2011 July 7, 2026
0220 ED November 16, 2011 July 7, 2026
0240 ED November 16, 2011 July 7, 2026
0245 ED November 16, 2011 July 7, 2026
0285 ED November 16, 2011 July 7, 2026
0295 ED November 16, 2011 July 7, 2026
0305 ED November 16, 2011 July 7, 2026
0310 ED November 16, 2011 July 7, 2026
0315 ED November 16, 2011 July 7, 2026
0320 ED November 16, 2011 July 7, 2026
0330 ED November 16, 2011 July 7, 2026
0335 ED November 16, 2011 July 7, 2026
0340 ED November 16, 2011 July 7, 2026
0345 ED November 16, 2011 July 7, 2026
0355 ED November 16, 2011 July 7, 2026
0360 ED November 16, 2011 July 7, 2026
0365 ED November 16, 2011 July 7, 2026
0370 ED November 16, 2011 July 7, 2026
PANEL EFFECTIVE DATE
0014 FE August 3, 2015 July 7, 2026
0016 FE August 3, 2015 July 7, 2026
0017 FE August 3, 2015 July 7, 2026
0018 FE August 3, 2015 July 7, 2026
0019 FE August 3, 2015 July 7, 2026
0036 FE August 3, 2015 July 7, 2026
0038 FE August 3, 2015 July 7, 2026
0039 FE August 3, 2015 July 7, 2026
0043 FE August 3, 2015 July 7, 2026
0044 FE August 3, 2015 July 7, 2026
0102 FE August 3, 2015 July 7, 2026
0104 FE August 3, 2015 July 7, 2026
0105 FE August 3, 2015 July 7, 2026
0106 FE August 3, 2015 July 7, 2026
0107 FE August 3, 2015 July 7, 2026
0108 FE August 3, 2015 July 7, 2026
0109 FE August 3, 2015 July 7, 2026
0112 FE August 3, 2015 July 7, 2026
0114 FE August 3, 2015 July 7, 2026
0115 FE August 3, 2015 July 7, 2026
0116 FE August 3, 2015 July 7, 2026
0117 FE August 3, 2015 July 7, 2026
0118 FE August 3, 2015 July 7, 2026
0119 FE August 3, 2015 July 7, 2026
0126 FE August 3, 2015 July 7, 2026
0127 FE August 3, 2015 July 7, 2026
0128 FE August 3, 2015 July 7, 2026
0129 FE August 3, 2015 July 7, 2026
0131 FE August 3, 2015 July 7, 2026
0227 FE August 3, 2015 July 7, 2026
0230 FE August 3, 2015 July 7, 2026
0231 FE August 3, 2015 July 7, 2026
0235 FE August 3, 2015 July 7, 2026
RESULTS OF THE
CITY COUNCIL
MEETING OF
February 18, 2026
A. REZONING REQUEST, RZN2025-00004, (Conditional), Riverbend, 1700 & 1802 N.
Main St.: to rezone and amend the official zoning map of the City of Suffolk to change the
zoning on a portion of the property from B-2, General Commercial zoning district to RU-18
(Conditional), Residential Urban zoning district, for properties located at 1700 & 1802 N.
Main St, Zoning Map 25, Parcel 45A & 45E and Zoning Map 26E, Parcel F*G*PT*J.
B. REZONING REQUEST, RZN2025-00008, (Conditional), 2821 & 2821 A Holland Road
Race Trac: to rezone and amend the official zoning map of the City of Suffolk in order to
amend the previously approved proffers for the property located at 2821 A Holland Road,
Zoning Map 32, Parcel 29*2, and to change the zoning from M-1, Light Industrial
(Conditional) zoning district to B-2, General Commercial (Conditional) zoning district for a
portion of the property located at 2821 Holland Road, Zoning Map 32, Parcel 29.
C. CONDITIONAL USE PERMIT REQUEST, CUP2025 -00004, Zealous Blue
Commercial Dog Kennel: to grant a Conditional Use Permit to establish a Kennel,
Commercial, use on property located at 6128 Old Myrtle Road, Zoning Map 23, Parcels 19
and 19A. The affected area is further identified as being located in the Holy Neck Borough,
zoned A, Agriculture zoning district. The 2045 Comprehensive Plan designates this area as
part of the Rural Agriculture Land Use Type.
D. CONDITIONAL USE PERMIT REQUEST, CUP2025-00005, Holland Road Race
Trac: to grant a Conditional Use Permit to establish a truck stop/travel plaza use on
properties located at 2821-A and 2821 Holland Road, Zoning Map 32, Parcels 29*2 and 29.
E. CONDITIONAL USE PERMIT REQUEST, CUP2025-00014, Race Trac Pruden: to
grant a Conditional Use Permit to establish a truck stop/travel plaza use on property located
on Pruden Boulevard at Zoning Map 25, Parcel 57*57A*11.
Deferred until
3/18/26
Approved
w/proffers
Denied
Approved
w/conditions
Approved
w/conditions
Source: City of Suffolk website. First collected Nov 3, 2026.