RecordWell Data

Wetlands Board Meeting Packet (PDF)

City of Suffolk · Suffolk City County · meeting of Feb 19, 2026 · Agenda packets

Open the original document More from City of Suffolk

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

AMENDED SUFFOLK WETLANDS BOARD AGENDA FOR FEBRUARY 19, 2026 PREPARED BY THE CITY OF SUFFOLK PLANNING DIVISION CASSIDY MCKELVIE, SUFFOLK WETLANDS BOARD SECRETARY A MEETING WILL BE HELD AT 6:00 P.M. IN THE SUFFOLK CITY COUNCIL CHAMBERS OF THE CITY HALL BUILDING IF YOU CANNOT ATTEND OR NEED SPECIAL ACCOMMODATIONS AT THE MEETING, PLEASE CALL OR EMAIL THE CITY OF SUFFOLK PLANNING DIVISION AT 757-514-4060 OR PLANNINGEMAIL@SUFFOLKVA.US PRIOR TO 12:00 NOON ON WEDNESDAY, FEBRUARY 18, 2026 GEOFFREY HINSHELWOOD CHAIRMAN *AMENDED AGENDA SUFFOLK WETLANDS BOARD February 19, 2026 6:00 P.M. I. Call to Order II. Roll Call III. Approval of Minutes from the October 16, 2025 meeting. IV. Public Hearing A. VMRC2025-2641, submitted by Matthew Otto of Corblu Ecology Group, LLC, applicant, on behalf of Colonial Pipeline Company, owner, for a permit for the maintenance of an existing 16-inch diameter underground pipeline with associated tidal wetland impacts to th e Nansemond River, Chuckatuck Creek, Bennett’s Creek, and their tributaries. V. Restoration Hearings - None VI. Permit Extensions A. *VMRC2024-1833, submitted by Jullan Hernandez, Crofton Construction Services, Inc., agent and applicant, on behalf of VP Properties LLC, Brent Mudd, property owner, for a permit to replace a 350-foot portion of an existing 495-foot timber bulkhead located at 1500 Steeple Drive, Tax Map 5B*45, along the Chuckatuck Creek. VII. Old Business - None VIII. New Business - None IX. Compliance and Inspections – None X. Adjournment 1 MINUTES SUFFOLK WETLANDS BOARD October 16, 2025 6:00 P.M. The meeting of the Suffolk Wetlands Bo ard was held on Thursday, October 16, 2025, at 6:00 p.m., in the City Council Chambers of the City Hall Building, 442 West Washington Street, Suffolk, Virginia. MEMBERS: Darius Davenport, Vice-Chairman Carter Hotchkiss Richard Vroman Kathy Doerner Kittrell Eberwine, III Dallas Ellis, Jr. Bryan Cattenhead STAFF: Cassidy McKelvie, Wetlands Board Secretary Margaret Pittenger, Assistant Director of Planning Rebecca Powers, Assistant City Attorney III ROLL CALL: The meeting was called to order by Vice -Chairman Davenport. The roll was then called by Ms. McKelvie, who informed Vice-Chairman Davenport that a quorum was present. ELECTION OF OFFICERS: Geoffrey Hinshelwood was nominated as Ch airman. This nomination and election of Geoffrey Hinshelwood as Chairman of the Suffolk Wetlands Board was approved by a voice vote of 7 to 0. Minutes Suffolk Wetlands Board October 16, 2025 2 Darius Davenport was nominated as Vice-Chairman. This nomination and election of Darius Davenport as Vice-Chairman of the Suffolk Wetlands Board was approved by a voice vote of 7 to 0. The appointment of Cassidy McKelvie as Secretary was approved by a voice vote of 7 to 0. APPROVAL OF THE MINUTES: The minutes of the previous meeting were approved as presented by a voice vote of 7 to 0. PERMIT EXTENSION: VMRC2024-1833, submitted by Jullan Herna ndez, Crofton Construction Services, Inc., agent and applicant, on behalf of VP Properties LLC, Brent Mudd, property owner, for a permit to replace a 350-foot portion of an existing 495-foot timber bulkhead. This project does not qualify for a General Permit. The property is located on 1500 Steeple Dr, along the Chuckatuck Creek. This permit was previously approved with an expiration date of December 19, 2025. The applicant has requested that the permit coverage be extended until March 13, 2026. Ms. McKelvie gave a presentation and overview of the project and the reason for the extension. Staff recommends the approval of the permit extension for VMRC2024- 1833. Following discussion by the board, Boar d Member Vroman made a motion to Minutes Suffolk Wetlands Board October 16, 2025 3 approve the permit extension request. The motion was seconded by Board Member Hotchkiss and was approved by a voice vote of 7 to 0. OLD BUSINESS: Ms. McKelvie gave a presentation prov iding updates on previously approved projects VMRC23-0690 and VMRC23-2872. Both projects have been completed. ADJOURNMENT: There being no further business, the meeting was adjourned. SUFFOLK WETLANDS BOARD OCTOBER 16, 2025 MT: Vroman 2 ND: Hotchkiss TO: Approve BOARD MEMBERS ATTENDANCE VMRC24-1833 Extension VOTE: 7-0 PRESENT ABSENT YES NO Chairman Geoffrey Hinshelwood X Vice-Chairman Darius Davenport X X Sidney Hazelwood X Carter Hotchkiss X X Richard Vroman X X Kathy Doerner X X Kittrell Eberwine X X Ellis Dallas - Alternate X X Bryan Cattenhead - Alternate X X CITY OF SUFFOLK 442 W. WASHINGTON STREET, P.O. BOX 1858, SUFFOLK, VIRGINIA 23439-1858 PHONE: (757) 514-4060 FAX: (757) 514-4099 February 19, 2026 Suffolk Wetlands Board City of Suffolk, Virginia Dear Board Members: Attached for your consid eration is information pertaining to Joint Pe rmit Application (JPA) VMRC25-2641, submitted by Matthew Otto, Corblu Ecology Group, LLC, applicant, on behalf of Colonial Pipeline Company, owner, for a perm it for the maintenance of an existing 16-inch diameter underground pipeline within a utility easement with associ ated tidal wetland impacts to the Nansemond River, Chuckatuck Creek, Bennett’s Creek, and their tributaries. Information and maps pertaining to this request are attached for your consideration. Please contact me if you have any questions in advance of the February 19, 2026 meeting. Respectfully submitted, Cassidy McKelvie Cassidy McKelvie Wetlands Board Secretary Attachments DEPARTMENT OF PLANNING & COMMUNITY DEVELOPMENT Division of Planning STAFF REPORT DESCRIPTION PROPOSED PROJECT: The applicant is requesting a Wetlands Board permit, VMRC25-2641, for potential temporary tidal wetland impacts associ ated with the maintenance of an existing 16- inch diameter underground pipeline, Colonial Pipeline Line 27. APPLICANT: Submitted by Matthew Otto, Corblu Ecology Group, LLC, on behalf of Colonial Pipeline Company (CPC), pipeline owner. LOCATION: The pipeline is located within a utility easement that extends from Cumberland County, Virginia to the City of Chesapeake, Virginia. In attached Exhi bit “A”, the applicant identified four tidal crossings in the City of Suffolk across Bennett’s Creek (Crossing 7), the Nansemond River (Crossing 8), and Chuckatuck Creek (Crossings 9 and 10), along with associated marshes. PERMIT HISTORY: A permit was originally issued for this project in January 2006 under VMRC05-2245. Several extensions of VMRC05-2245 were granted since it s original issuance, the latest of which was a five-year extension, granted in August 2020. This permit expired on August 20, 2025. VIMS REPORT: None. PUBLIC NOTICE: This request has been duly advertised in accordance with the public notice requirements set forth in Sectio n 28.2-1302 of the Code of Virgin ia, as amended, and with the applicable provisions of the Unified Development Ordinance. A copy of staff’s report shall be provided to the applicant. STAFF ANALYSIS ISSUE The applicant is requesting a permit from the Suffolk Wetlands Board for required preventive maintenance of an existing 16-inch diameter underground pipeline, Colonial Pipeline Line 27, as part of CPC’s pipeline Integrity Management Program (IMP) as required by the U.S. Department of Transportation (USDOT). The exact locations of the proposed maintena nce activities are not known at this time, but may cause temporary disturbance to tidal wetlands if anomalies are detected in or near tidal crossings. Regular assessments are conducted on Line 27 using a variety of tools and methods to identify defects requiring repair. Maintenance activities can typically be completed within 5 to 30 days, but may be longer or shorter depending on the repair required. A Preventative Maintenance letter detailing common maintenance repairs and asso ciated timelines is included in Exhibit “C”(attached). Once a maintenance location is identified, the applicant will evaluate whether jurisdictional waters and wetlands may be imp acted using various res ources such as U.S. Geological Survey Maps, U.S. Department of Agriculture soil maps, National Wetland Inventory maps, aerial photographs, the 1987 Corps of Engi neers Wetlands Delin eation Manual, and the appropriate USACE Regional Supplement. Typical maintenance activities require excavation of the pipeline, which is expected to be no larger than 30 feet by 60 feet (1,800 square feet). When a maintenance area is located within a wetland, or access requires traversing wetland areas, pre- fabricated equipment ma ts will be used to distribute the weight of the required equipmen t to approximately 2.15 pounds of pressure per square inch to prevent excessive soil disturbance and compaction. Smaller and lighter equipment will be used within wetland areas whenever feasible. All excavated soils will be ordered, and if field conditions are favorable, temporarily stored within the wetland on geotextile fabric or similar material. If temporary storage within the wetland is not feasible, excavated soils will be placed in the adjacent upland area. Once maintenance is completed, all excavated soils will be returned, with topsoil containing rooted material segregated and returned to the surface of the excavated area. Finally, disturbed areas will be reseeded with an appropriate herbaceous wetland plant mix, which is detailed in attached Exhibit “D”. CONSIDERATIONS AND CONCLUSIONS 1. This project requires authorization from th e Virginia Marine Resources Commission (VMRC) as the proposed work extends over state-owned submerged lands. Permitting and approvals from other agencies, including, but not limited to, the Virginia Department of Environmental Quality and the Army Corps of Engineers, may be required prior to any land disturbing activities. Ob taining all required permits a nd approvals is proposed as a condition of approval for the permit. 2. All proposed wetland impacts are temporary, and affected areas are proposed to be returned to pre-project site conditions. Additionally, affected areas are proposed to be reseeded following work completion. 3. The applicant indicated that CPC has needed to use the coverage under similar permits across the entirety of Line 27 approximately 12 times over the course of 20 years. This indicates that temporary wetland impacts under similar permit c overage have historically been infrequent. 4. According to Section 31-415(f)(3)(A) of th e City of Suffolk’s Unified Development Ordinance, the operation and maintenance of natural gas lines and their appurtenant structures in accordance with the City's Erosion and Sedimentation Control and Stormwater Management Ordinance requirements will be deemed to constitute compliance with the Chesapeake Bay Overlay District regulations. Therefore, the maintenance of the existing pipeline is exempt from Chesapeake Bay Preservation Area regulations. 5. This project does not include the installati on of new structures, expansion of existing structures, or fill within Special Flood Hazard Areas. Therefore, impacts to the floodplain are not expected. 6. Pursuant to Section 34-325 of the Suffolk Code of Ordinances, the Board shall prevent the despoliation and destruction of wetlands while accommodating necessary economic development in a manner consistent with wetlands preservation. Section 34-327 of the Suffolk Code of Ordinances states that a Wetlands Permit may be issued by the Board only if the applicant demonstrates that: a) The anticipated public and private benefi t of the proposed activity exceeds its anticipated public and private detriment. The public and private benefit of the proposed project is anticipated to be greater than the detriment. The regular maintenance of the existing petroleum pipeline will allow the applicant to operate the pipelin e and support facilities in a manner that protects the safety of the public, the environment, and its workforce. b) The proposed development conforms with the standards prescribed in Code of Virginia, § 28.2-1308 and guidelines promulgated pursuant to Code of Virginia, § 28.2-1301. i. Wetlands of primary ecological significance shall not be altered so that the ecological systems in the wetlands are unreasonably disturbed. All proposed wetland impacts are temporary and affected areas are proposed to be returned to pre-project conditions. Therefore, no wetlands, nor their ecological systems, of primary ecological significance are expected to be unreasonably disturbed. ii. Development in Tidewater Virginia, to the maximum extent practical, shall be concentrated in wetlands of lesser ecological significance, in vegetated wetlands which have been irreversibly disturbed before July 1, 1972, in nonvegetated wetlands which have been irreversibly disturbed prior to January 1, 1983, and in areas of Tidewater Virginia outside of wetlands. The proposed project does not include any development activities as the petroleum pipeline is existing and has been in operation since the 1960’s. c) The proposed activity does not violate the purposes and intent of Chapter 13 Title 28.2 of the Code of Virginia, (§ 28.2-1300 et seq.) and of Article VIII of the Suffolk Code of Ordinances. The intent of these regulations and th e purpose of the Board is to allow for necessary economic development in a manner consistent with wetlands preservation. The proposed regular maintenance is necessary for the continued use of the existing petroleum pipeline. RECOMMENDATION It is staff’s opinion that the proposed permit fo r routine maintenance of an existing petroleum pipeline with tidal wetland crossings meets the requirements established by Section 34-327 of the Suffolk Code of Ordinances. Therefore, staff recommends approval of permit application VMRC25-2641 with the following conditions: 1. The Wetlands Permit for this project shall expire on February 19, 2031, after which time this permit shall be void. Permit coverage may be extended by the Board, at its discretion, provided that a written request describing the reasons for the extension and the requested new expiration date is submitted to the Suffolk Planning Division no later than December 19, 2030. 2. The permittee shall notify the Board of all proposed pipeline maintenance locations with a repair schedule and restoration/monitoring plans in writing prior to the commencement of any work under this permit. 3. The permittee shall notify the Board no later than 48 hours prior to the commencement of any work under this permit. 4. The permittee shall comply with all applicab le laws, ordinances, rules, and regulations affecting the conduct of the project. The gr anting of this permit shall not relieve the permittee of the responsibility of obtaining any and all other permits or authority required for the project, including but not limited to approvals from the Department of Environmental Quality, the Virginia Marine Resources Commission, the Army Corps of Engineers, and the City of Suffolk. 5. All phases of the project shall conform in all particulars to the permittee’s application for Wetlands Permit. The duly authorized agents of the Board shall have the right to enter upon the premises at any reasonable time for the purposes of inspecting the work being done pursuant to this permit. 6. The permittee shall, to the greatest extent practical, minimize the adverse effects of the project upon adjacent properties, wetlands, and the natural resources of the Commonwealth. 7. This permit shall not be transferred without the prior written approval of the Board. 8. This permit may be revoked at any time by th e Board upon the failure of the permittee to comply with any of the terms and conditions hereof. Attachments • Proposed Permit • Exhibit A – Crossing Location Maps • Exhibit B – Preventative Maintenance Letter • Exhibit C – Proposed Wetland Plant Mix • Exhibit D – Wetlands Board Application Checklist • Exhibit E – JPA Application CITY OF SUFFOLK WETLANDS BOARD Wetlands Permit 25-2641 Granted February 19, 2026 Expires February 19, 2031 Pursuant to Chapter 13 of Title 28.2 of the Code of Virginia (1950, as amended) and the City of Suffolk Wetlands Ordinance, the City of Suffolk Wetlands Board, hereinafter referred to as the Board, hereby grants unto Corblu Ecology Group, LLC, on behalf of Colonial Pipeline Company (CPC), pipeline owner herein after referred to as the permittee, permission to undertake the following described project. Location: Four tidal crossings in the City of Suffolk across Bennett’s Creek (Crossing 7), the Nansemond River (Crossing 8), and Chuckatuck Creek (Crossings 9 and 10), along with associated marshes. Description of Project: Potential temporary tidal wetland impacts associated with the maintenance of an existing 16- inch diameter underground pipeline, Colonial Pipeline Line 27. Conditions: 1. The Wetlands Permit for this project shall expire on February 19, 2031, after which time this permit shall be void. Permit coverage may be extended by the Board, at its discretion, provided that a written request describing the reasons for the extension and the requested new expiration date is submitted to the Suffolk Planning Division no later than December 19, 2030. 2. The permittee shall notify the Board of all proposed pipeline maintenance locations with a repair schedule and restoration/monitoring plans in writing prior to the commencement of any work under this permit. 3. The permittee shall notify the Board no later than 48 hours prior to the commencement of any work under this permit. 4. The permittee shall comply with all applicable laws, ordinances, rules, and regulations affecting the conduct of the project. The granting of this permit shall not relieve the permittee of the responsibility of obtaining any and all other permits or authority required for the project; including but not limited to approvals from the Department of Environmental Quality, the Virginia Marine Resources Commission, the Army Corps of Engineers, and the City of Suffolk. 5. All phases of the project shall conform in all particulars to the permittee’s application for Wetlands Permit. The duly authorized agents of the Board shall have the right to enter upon the premises at any reasonable time for the purposes of inspecting the work being done pursuant to this permit. 6. The permittee shall, to the greatest extent practical, minimize the adverse effects of the project upon adjacent properties, wetlands, and the natural resources of the Commonwealth. 7. This permit shall not be transferred without the prior written approval of the Board. 8. This permit may be revoked at any time by the Board upon the failure of the permittee to comply with any of the terms and conditions hereof. IN WITNESS WHEREOF, the City of Suffolk Wetlands Board has caused these presents to be executed on its behalf by CITY OF SUFFOLK WETLANDS BOARD By:__________________________________ (Chairman or designee) Bennett Creek and Marsh Crossing 7 Nansemond River and Marshes Crossing 8 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community Figure 3c Crossings 7 and 8 Corblu Project No. 02-041901-01 Colonial Pipeline Company Line 27 JPA Suffolk, Virginia Lawrenceville & Woodstock, Georgia 1:24,000 Legend Tidal Crossings Tidal Wetlands Tidal Waters CPC Line 27 ± Base map source: ESRI Basemaps - World Imagery City of Suffolk Tidal Marsh Inventory Chuckatuck Creek and Marsh Crossing 9 Unnamed Tributary to Chuckatuck Marsh Crossing 10 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community Figure 3d Crossings 9 and 10 Corblu Project No. 02-041901-01 Colonial Pipeline Company Line 27 JPA Suffolk, Virginia Lawrenceville & Woodstock, Georgia 1:24,000 Legend Tidal Crossings CPC Line 27 Tidal Wetlands Tidal Waters ± Base map source: ESRI Basemaps - World Imagery City of Suffolk Tidal Marsh Inventory 929 Hoods Mill Road | Woodbine, Maryland 21797 | www.colpipe.com January 21, 2026 Department of Planning & Community Development City of Suffolk Wetland Board 441 Market Street Suffolk, VA 23439 Re: Colonial Pipeline Company – Preventative Maintenance Colonial Pipeline Company (Colonial) is an interstate common carrier of refined petroleum products (e.g., gasoline, heating oil, diesel fuel, commercial jet fuel, and military fuels). Colonial is the largest, by-volume, refined petroleum pipeline in the United States . It is a critical energy artery in the nation’s fuel supply, is considered a critical infrastructure by the Department of Homeland Security, and the pipeline serves more than 50 million Americans. The pipeline stretches from Houston to the New York-New Jersey harbor (5,500 miles) and operates 24 hours per day, 7 days per week, 365 days per year and transports approximately 100 million gallons per day serving airports, hospitals, and military installations among other private and public entities. On any given day, Colonial provides up to 30% of the refined petroleum to the Northeast market. Colonial has been operating a lawfully existing subsurface pipeline since the 1960’s within the City of Suffolk. Colonial operates one (1) pipeline within the City- Line 27 is a 14-inch stubline that is located within an existing and maintained right -of-way. The majority of the surrounding land use is rural, agricultural land with some mixed-used residential. The preventative maintenance work performed by Colonial is done to ensure pipeline integrity in accordance with the Pipeline and Hazardous Materials Safety Administration (PHMSA) regulations, the protection of human health and the environment, and to facilitate the uninterrupted service of this critical infrastructure. Colonial is required to complete prescribed preventative maintenance work on their pipelines to sustain pipeline protection and integrity as part of Colonial’s Integrity Management Program (IMP). The IMP provides an important means of achieving spill-free, error-free operations to protect human safety and surrounding environmental resources . The purpose of the IMP is to maintain the integrity of Colonial’s system including pipelines, facilities, equipment, tanks, and delivery lines. Colonial’s IMP meets the requirements of 49 CFR Part 195 - “Pipeline Safety: Pipeline Integrity in High Consequence Areas (Hazardous Liquid Operators with 500 or More Miles of Pipeline); Final Rule ”. § § 195.450 and 195.452 as administered by the U.S. Department of Transportation (USDOT , PHMSA ). Federal Code requires an IMP, which includes prescriptive requirements for inspection of pipeline systems and requires excavation of certain defects according to specific schedules. It should be noted that USDOT has completed an Environmental Assessment (EA) under the National Environmental Policy Act (NEPA) concerning repairs an operator must perform to its pipeline following an integrity assessment. The EA and corresponding Finding of No Significant Impact concluded that these actions would not significantly affect the quality of the human environment (Docket No. RSPA-00-6355). 929 Hoods Mill Road | Woodbine, Maryland 21797 In accordance with 49 CFR Part 195, Colonial’s IMP includes an Assessment Plan. Under the specifications of this plan, Colonial performs an assessment of their pipelines on a regular basis which may include but is not limited to facility assessments, internal line inspections, corrosion surveys, and external surveys/inspections (aerial flyovers, ground truthing inspections). These assessments determine the need for pipeline preventative maintenance work that must be initiated under Colonial’s IMP . Various pipeline preventative maintenance activities include anomaly digs, recoating, corrosion work, and exposure/shallow cover repairs. • Anomaly Digs are initiated using internal line inspection (ILI) tools, continued with analysis of the ILI results and other line information, and completed with the issuance of an anomaly list for excavation and hands-on inspection. The timeline depends on the characterization of the anomaly and its location compared to High Consequence Areas (HCA’s). The groups of anomalies are referred to as “immediate conditions”, “60-day conditions”, “180-day conditions”, or “365-day conditions”. • Pipeline recoating is initiated using internal line inspection (ILI) tools and external field inspections/testing that determine the condition of the pipeline coating. The timeline depends on the characteristics of the internal and external testing results but typically must be completed within 365 days or less. Some high-priority recoating activities typically have a shorter timeline with a deadline of 180 days or less. • Corrosion preventative maintenance is initiated through external field inspections and testing of the pipelines. These inspections and test account for the corrosion potential to the underground pipelines from natural sources, and any surrounding man -made structures such as utility lines, third party pipelines, underground cable and telephone lines and other electrical sources that produce a current that can damage the pipeline. Normal corrosion preventative maintenance has a deadline of 365 days or less. • Exposure/shallow pipe maintenance is initiated through external surveys/inspections (aerial flyovers, ground truthing inspections). The exposed nature of the pipeline elevates the potential risk to not only the pipeline but also the safety of the surrounding public and safety of the environment. Exposures typically have a deadline of 365 days or less. Colonial’s preventative maintenance program is a comprehensive and effective program to ensure the safety of the surrounding public and sensitive n atural resources adjacent to their pipelines. Most maintenance activities are short duration with minimal land disturbance and are completed within the existing maintained right-of-way. All work includes evaluating nearby environmental resources, permitting requirements, identification of available access routes to the specific location, excavation at the location to expose a section of subsurface pipeline where repairs are needed, inspection and field evaluation of the pipeline, and the performance of necessary repairs to the pipeline to address any deficiencies and/or integrity issues. Once work is completed the area is backfilled and compacted to original contours and seeded/mulched . Colonial stockpiles excavated soil to restore the location to its original vegetative condition . The excavation, and any other disturbed areas will be reseeded and stabilized to pre-work conditions. All work is temporary in nature. Anomaly digs typically have a duration of 7 -14 days, pipeline recoating typically has a duration of 21-30 days, corrosion work is typically 5-7 days and exposures/shallow pipes are typically 30+ days but can be longer contingent upon the engineering design and related permitting conditions. 929 Hoods Mill Road | Woodbine, Maryland 21797 Colonial works towards excellence in all operations and projects . Maintenance of the pipeline is a high - priority responsibility that Colonial regards with the upmost importance . We place high value on environmental, safety, health and compliance and believe zero is possible in everything we do - zero accidents, environmental events, and compliance incidents. If additional information is required, please contact me at (240) 204-1158 or email at mwyant@colpipe.com. Best Regards Matthew Wyant Senior Environmental Specialist Colonial Pipeline Company Chesapeake Valley Seed, Inc. 8869 Greenwood Place Suite C Savage, MD 20763 301-725-7333 CERTIFICATE OF COMPLIANCE/SOURCE OF SUPPLY DATE: TO: JOB: General Wetland Mixture % BY WT. Riverbank Wildrye 29.00% Switchgrass 40.00% Fox Sedge 20.00% Virginia Wildrye 10.00% Soft Rush 1.00% TOTAL 100.00% ALL MATERIAL WILL MEET OR EXCEED FEDERAL & STATE REQUIREMENTS Company Official Tim Chandler 2/26/2021 W.S. Connelly Companies Stock Product Planning Department: 441 Market Street – P.O. Box 1858, Suffolk, VA 23439 – Phone (757) 514-4060 – Fax (757) 514-4099 City of Suffolk, Virginia Department of Planning & Community Development Division of Planning City of Suffolk Wetlands Board Joint Permit Application – Submittal Checklist Revised July 29, 2022 The following information is required to be submitted along with a completed Joint Permit Application for any project that requires action by the City of Suffolk’s Wetlands Board 1. Once staff has received a joint permit application that proposes waterfront construction within the Wetlands Board’s jurisdiction the applicant will be contacted and informed that this application will require action by the Board and the applicant will be required to submit the review fee or after the fact review fee. 2. Answer all applicable questions and fill in all the blanks required on the joint permit application. 3. All submitted drawings must be legible and contained on the fewest number of sheets nec essary to adequately illustrate the project. 4. The proposed alignment of all projects shall have been staked in the field at the time the application is submitted. The seaward extent of the proposed structure shall be staked at each angle and also stake the landward end of the project. For bulkheads stake the seaward face of the sheeting. For rip rap revetments stake the seaward toe. Clearly label all stakes in the field. 5. The following information must be included on ALL project drawings: (plan and section, as appropriate) a) North arrow; b) Waterway name; c) Existing and proposed structures, labeled as such. Specify if existing structures will remain or be removed; d) Dimensions of proposed structures; e) Limits of vegetated wetlands (if applicable); f) Ebb/flow direction; g) Adjacent property lines and owner’s name; h) Distances from proposed structures to fixed points of reference (benchmarks) and adjacent property lines. 6. All plan and section views must be drawn to scale. Specify the scale and provide a written scale on each drawing. General Information Project Drawings Planning Department: 441 Market Street – P.O. Box 1858, Suffolk, VA 23439 – Phone (757) 514-4060 – Fax (757) 514-4099 7. Clearly note the jurisdictional limits of the Wetlands Board on all drawings. (Vegetated wetlands – mean low water to one and half times the mean tide range. Nonvegetated wetlands – mean low water to mean high water). 8. Show and label the location of the Mean High Water (MHW) and the Mean Low Water (MLW). 9. Specify the distance from MLW to the most channelward point of a proposed structure. 10. Provide the adjacent property owners information and also provide written documentation that all adjacent property owners were notified of the proposed shoreline construction. 11. Show and label the location of all easements. 12. Provide tie down distances to the seaward face of any proposed bulkhead or the toe of any proposed rip rap revetment. 13. Address how you plan on mitigating or compensating for impacts to tidal wetlands resulting from the construction of the proposed project ie. direct wetlands replacement or purchase of credits in an established mitigation bank. 14. Indicate on the drawings the construction access way(s) to the project area. Access to the project will be provided with the minimum disturbance necessary. 15. Indicate the limits of construction and all land disturbing activities along the entire limit of the construction footprint. 16. Provide accurate cross sections, drawn to scale, with appropriate grade elevations showing existing and proposed bank and bottom profiles as well as the proposed slope of the bank for all proposed shoreline erosion control projects. 17. Specify the size and type of all construction materials. 18. Provide a complete timeline for construction to include methods and phasing of construct ion, availability of materials, and seasonal growth calendar. 19. Specify that all erosion and sediment control measures including silt fence will be properly installed for a ll disturbed areas in accordance with the Virginia Erosion and Sediment Control Handbook. Erosion control measures will be installed at the conclusion of each work day and maintained until a permanent vegetative cover has been established and as required by City inspectors. 20. If the shoreline project proposes to disturb 2,500 square feet or more landward of the Wetlands Board’s jurisdiction then a land disturbance permit will be required by the Department of Public Works. This will also require the preparation and submittal of an Erosion and Sediment Control Plan prepared in accordance with the Virginia Erosion and Sediment Control Handbook. 21. All proposed land disturbance, clearing and grading related to this JPA must comply with the Chesapeake Bay Preservation Area Overlay District. Chesapeake Bay Preservation Act Information Construction sequence and Erosion & Sediment Control requirements Planning Department: 441 Market Street – P.O. Box 1858, Suffolk, VA 23439 – Phone (757) 514-4060 – Fax (757) 514-4099 22. All drawings must note the location 100-foot Resource Protection Area buffer. 23. Provide the total square footage of land disturbance landward of the Wetlands Board’s jurisdiction. 24. Show existing vegetation which will be impacted within the 100- foot RPA buffer. Re-establishment of woody vegetation in the buffer will be required to mitigate for the removal or disturbance of buffer vegetation associated with your proposed project. 25. A buffer restoration plan will be required to be prepared and submitted to the Department of Planning to be reviewed and approved by staff for impacts to vegetation within the 100-foot RPA buffer. This plan shall clearly illustrate the existing vegetation within the buffer, all vegetation proposed to be impacted, and the installation of new vegetation for compensation. 26. Provide a Water Quality Impact Assessment for all projects in accordance with Appendix B-13 of the UDO. 27. Provide scientific reasoning and justification as to why a living shoreline is not conducive for the subject property, if applicable. Describe all alternatives that were considered and why the proposed methods were selected. (In accordance with Virginia State Code § 28.2-104.1, living shorelines are the preferred alternative for stabilizing tidal shorelines in the Commonwealth.) 28. Include an assessment of the impacts of sea-level rise, climate change, and coastal resilience on the subject property as it relates to the proposed shoreline stabilization methods. (In 2020, the General Assembly amended the Chesapeake Bay Act to add criteria to encourage and promote coastal resilience and adaptation to sea-level rise and climate change, 9VAC25-830-155.) Attachments for Reference: 1. Please refer to the attached excerpt, pages 9 -12, from the VMRC Tidal Wetlands Guidance, May 2021 Update, for information as to strategies for evaluating shoreline modification projects. All of the above items must be completed prior to any application for shoreline construction being placed on an agenda for action by the Wetlands Board. If any of the above information is not provided then the application will be considered incomplete. Deviation from an approved permit and conditions of approved permits by the Wetlands Board may result in noncompliance and appropriate corrective actions taken. APPLICANT: Sign and date below to acknowledge that the above listed application materials/information were provided with your application. Signature: _______________________________________________ Date: ____________________ November 24, 2025 Mr. Bradley Reams Virginia Marine Resources Commission Habitat Management Division 380 Fenwick Road, Bldg. 96 Fort Monroe, VA 23651 Subject: Joint Permit Application Encroachment upon Tidal Wetlands and Tidal Waters Colonial Pipeline Company Maintenance Project 8 Counties in Central and Eastern Virginia Corblu Project No. 02-041901-01-Line 27 Dear Mr. Owen: Corblu Ecology Group, LLC (Corblu) is pleased to submit the attached Joint Permit Application (JPA) (Appendix A) for po tential encroachments upon tidal wetlands and tidal waters (i.e., rivers, creeks, bays, inlets, etc.) for ongoing and required preventative pipeline maintenance activities on behalf of our client, Colonial Pipeline Company (CPC). Proposed project activities consists of required ongoing preventative maintenance of CPC’s existing Line 27, a 16 -inch-diameter underground petroleum pipeline . Line 27 is located in a single , maintained right-of-way (ROW), which traverses a corridor from CPC’s Mitchell Junction in western Cumberland County, Virginia, to CPC’s Norfolk Delivery Station in Chesapeake City, Virginia (Figures 1) . Tidal wetlands and tidal waters are located in the eight eastern most counties along this ROW (Figure 2). The exact locations of the proposed maintenance activities along the project corridor are not known but are performed as needed on a continuing basis and are a component of CPC’s pipeline Integrity Management Program (IMP) as required by the U.S. Department of Transportation (USDOT) . Based on our past experience and previous Line 27 permits (VRMC Permit Nos. 05-2245 and 2015-1211), we anticipate a portion of the maintenance locations may require temporary disturbance to tidal wetlands and tidal waters. The proposed maintenance activities will be located within CPC’s existing and maintained ROW for Line 27. The ROW for Line 27 crosses 16 jurisdictional tidal waters (Figures 3a-3i; Table 1) . We understand that maintenance disturbances to tidal wetlands and tidal waters are subject to the Virginia Marine Resources Commission (VMRC) JPA process. As indicated above, specific pipeline maintenance locations are not known at this time; however, once the maintenance locations are determined, it is possible that some of these locations will Joint Permit Application November 24, 2025 Colonial Pipeline Company – Maintenance NE Corblu Project No. 02-041901-01-Line 27 2 need to be repaired immediately upon discovery (see description below) . Therefore, we are submitting this JPA to permit potential temporary disturbances to tidal wetlands and tidal waters crossed by the project corridor (Table 1) so that CPC has authorization to proceed with the required pipeline maintenance activity . Based on past experience, t he actual number of tidal wetlands and tidal waters to be disturbed by maintenance activities will likely be less than the 16 crossings identified in this JPA , but which of these sites that may require maintenance/repair cannot be determined in advance of ongoing pipeline integrity monitoring . As required, landowner information at each of the 16 crossings has been provided in Table 2. Previous VMRC Permit for Line 27 The VMRC previously issued a permit for CPC’s Line 27 in 2005 (Permit No. 05-2245) and 2015 (15-1211) for the same requested locations . The active VMRC Permit No. 15-1211 is scheduled to expire on December 8, 20 25 (Appendix B) . Additionally, the following local wetland boards issued permits: 1) James City, Permit No. W-04-16/VMRC 15-1211; 2) City of Suffolk, Permit No. VMRC 05-2245; 3) Charles City, Permit No. 15-1211; 4) Surry, Permit No. 05-2245; and 5) Isle of Wight, 15-1211 (Appendix B). As specified in the current VMRC permit, CPC is agreeable to permit conditions/requirements that once specific maintenance locations and extent of temporary disturbance to tidal wetlands and/or tidal waters have been determined for future pipeline maintenance activities , an “Awareness Letter” will be submitted to the VMRC and the U.S. Army Corps of Engineers (USACE) describing the proposed site specific maintenance technique and the actual extent of the disturbance. CPC Pipeline Integrity Program CPC is committed to operating their pipeline and support facilities in a manner that protects the safety of the public, the environment, and its workforce . The proposed pipeline maintenance is part of CPC’s IMP. The IMP provides an important means of achieving spill -free, error -free operations. The purpose of the IMP is to maintain/improve the integrity of CPC’s system – including pipelines, facilities, equipment, tanks, and delivery lines. CPC’s IMP also meets the requirements of 27 CFR Part 195 - “Pipeline Safety: Pipeline Integrity in High Consequence Areas (Hazardous Liquid Operators with 500 or More Miles of Pipeline); Final Rule.” § § 195.450 and 195.452 as administered by the USDOT . Federal Code requires an IMP, which includes prescriptive requirements for inspection of pipeline systems, and requires excavation of certain defects according to specific schedules . It should be noted that USDOT has completed an Environmental Assessment (EA) under the National Environmental Policy Act (NEPA) concerning repairs an operator would have to make to its pipeline following an integrity Joint Permit Application November 24, 2025 Colonial Pipeline Company – Maintenance NE Corblu Project No. 02-041901-01-Line 27 3 assessment. The EA and corresponding Finding of No Significant Impact concluded that these actions would not significantly affect the quality of the human environment (Docket No. RSPA -00- 6355). In accordance with 27 CFR Part 195, CPC’s IMP includes a Baseline Assessment Plan . Under the specifications of this plan, CPC regularly performs an assessment of “Line 27” from Mitchell Junction in western Cumberland County to CPC’s Norfolk Delivery Station in the City of Chesapeake. The assessment is initiated with the running of internal line inspection (ILI) tools, continues with analysis of the ILI results and other line information, and ends with “discovery” of defects on the line and the issuance of an anomaly remediation list . Please note this permit application will also be used for other required pipeline maintenance activities (exposures, recoats, and cathodic work). As stated in 27 CFR Part 195.452, the requirements timeline between discovery and repair are established and can vary from an immediate emergency repair to 1 year from discovery . The timeline depends on the type of pipeline anomaly (i.e., dent , striation, exposure , etc.) and the location compared to High Consequence Areas (HCA’s) . The groups of anomalies are referred to as “60 -day conditions”, “180 -day conditions”, “365 -day conditions” or an “ emergency (i.e., immediate) maintenance repair”. The remediation method for each anomaly can vary, depending on the type . For a significant portion of the anomalies, the best remediation method is excavation of the pipeline, analysis of the anomaly and repair where necessary . Unless multiple anomalies are located in a relatively small pipeline segment, the approximate area of disturbance is typically not larger than 30 feet by 60 feet (1,800 square -feet) and an additional area for temporary soil storage . In the majority of circumstances all work is conducted within CPC’s maintained ROW . Also, as discovered during routine field inspections, pipeline exposures within streams and wetlands when observed, must be addressed promptly . Under current regulations, there is a required minimum protective cover of two feet over CPC’s lines . In these instances the exposed line is excavated and examined for any possible anomalies, repaired if needed and pre -existing contours are returned. Tools to re - establish required protective cover may include the use of pre -cast revetment mats and /or riprap for streambank stabilization with site specific plan designs provided in individual “Awareness Letters”. The Virginia Department of Environmental Quality Office of Stormwater Management approved CPC’s 2025 Annual Standards and Specifications for Erosion and Sediment Control (ESC) and Stormwater Management (SWM) (Appendix C) on August 1, 2025 . In addition, a ll sedimentation and erosion controls outlined in CPC’s Soil Erosion and Sediment Control Best Management Practices (BMPs) for Pipeline Maintenance Activities (Appendix D) will be followed and meet the Joint Permit Application November 24, 2025 Colonial Pipeline Company – Maintenance NE Corblu Project No. 02-041901-01-Line 27 4 standards set by the Virginia Sedimentation and Erosion Control Handbook including the use of Certified Responsible Land Disturber. Proposed Activities within Tidal Wetlands and Tidal Waters Once a maintenance location is identified, Corblu personnel will screen the site using various mapping tools (i.e., U.S. Geological Survey Maps, U.S. Department of Agriculture soil maps, National Wetland Inventory maps, aerial photographs, etc.) followed by a field assessment to determine the presence of jurisdictional waters that maybe within the footprint of the maintenance location. In the field Corblu personnel will evaluate the site using the 1987 Corps of Engineers Wetlands Delineation Manual 1, and the appropriate USACE Regional Supplement 2 to locate jurisdictional waters marked the boundary of these waters, and GPS locate delineated boundaries. As indicated above, CPC will typically excavate an area approximately 30 feet by 60 feet at each discovered anomaly/exposed pipeline location, visually confirm the need for repair, and repair the pipeline if necessary . The proposed maintenance activities may result in minimal, temporary disturbance to tidal wetlands and/or tidal waters only if the anomaly/exposure is located within or abutting these areas. The construction methods may vary based on the size of the stream and the location of the anomaly/exposure . Typically, excavated materials will be temporarily stored on adjacent upland areas with erosion and sedimentation control measures . Additionally and most often, stream segments and/or wetlands located up and downstream of the repair site will be avoided when practicable. All work activities will be completed “in -the-dry.” To minimize sedimentation in smaller streams (less than 15 feet wide) during pipeline maintenance operations , temporary dams (constructed of sand bags, steel plates, or water -inflatable plastic dams) will be placed upstream of the maintenance area and the stream flow will be pumped around the maintenance area. The pumps will be placed above the upstream dam with the discharge line routed through the maintenance area (i.e., existing ROW) , discharging immediately downstream of the maintenance activity. The pumps used will be able to sufficiently accommodate the stream flow (Appendix D, Figures - Typical Dam and Pump Maintenance Dig) . All temporary dams will be removed following completion of the required maintenance activity. In larger streams (15 to 50 feet wide) an alternative to the pump method, CPC may use a steel flume pipe or flumes to convey the stream flow through the reach of stream to be disturbed . The 1 Environmental Laboratory. 1987. Corps of Engineers Wetlands Delineation Manual . U.S. Army Corps of Engineers, Washington, D.C. 100 pp. plus appendices. 2 U.S. Army Corps of Engineers. 2010. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic and Gulf Coastal Plain Region (Version 2.0), ed. J. S. Wakeley, R. W. Lichvar, and C. V. Noble. ERDC/EL TR-10- 20. Vicksburg, MS: U.S. Army Engineer Research and Development Center. Joint Permit Application November 24, 2025 Colonial Pipeline Company – Maintenance NE Corblu Project No. 02-041901-01-Line 27 5 flume will be used to maintain flow to the downstream end of the maintenance area, the trenched excavation will be carried out under the flume (Appendi x D, Figures - Typical Dry Flume Maintenance Dig). Both techniques allow the maintenance activities to occur without contact with flowing water, thus reducing downstream sedimentation . Please note if pipeline maintenance is required at the James River (Crossing No s. 12 and 16), typical maintenance methods may not be used, and a site specific method and approach will be prepared and submitted to the VRMC for review and approval. Occasionally, a pipeline anomaly is located adjacent to or abutting a stream and a portion of the excavation area may encroach into the stream bottom . In such cases, a coffer dam (constructed of steel sheet pile, water -inflatable plastic dams, or pre-cast concrete barriers) will be used to isolate the excavation area from stream flow. The excavation area will be dewatered with a pump, the water will be filtered before it is returned to the stream (Appendi x D, Figures - Maintenance Dig at Streambank Coffer Dam Approach) . Regardless of maintenance technique, upon completion of the required maintenance activity, the stream channel will be returned to its pre - maintenance conditions and contours and stream flow will be restored (e.g., removal of dams). When required maintenance activities are located in streams with severe bed and bank erosion resulting in the loss of required protective pipeline cover within the stream channel , scour protection may be used to prevent excessive erosion and sedimentation . In such cases, to prevent the erosion of backfilled substrate, thus exposing the buried pipeline, CPC will conduct all maintenance activities “in -the-dry” and may install either pre-cast concrete or articulated grout revetment matting at grade level on the streambed and/or stream banks where the stream was disturbed (Appendix E). The revetment mats are placed in the stream at grade level and “keyed” into the banks and “toed” into each end of the streambed . The revetment mats are placed in the stream at grade level and “keyed” into the banks and “toed” into each end of the streambed to maintain normal stream flow post -repair. Also, if necessary for streambank erosion riprap may be used to help prevent future bank migration issues. This type of scour protection is not always necessary for maintenance activities within streams . As indicated above, t he VMRC and USACE will be notified of CPC’s intention to use revetment mats in the “Awareness Letter” that will be submitted for any maintenance activities discovered within the 27 identified crossings. In the event that the maintenance area is located within a wetland, or access along the ROW requires traversing wetland areas , pre-fabricated equipment mats will be used to prevent excessive soil disturbance and compaction . These equipment mats distribute the weight of the required equipment over a 280 – square foot surface and, when loaded, apply approximately 2.15 pounds of pressure per square inch, significantly reducing soil disturbance. Where appropriate and feasible, smaller equipment and wetland specific machinery (smaller and lighter) will be used when excavating within wetlands . All excavated soils will be ordered, and if field conditions are Joint Permit Application November 24, 2025 Colonial Pipeline Company – Maintenance NE Corblu Project No. 02-041901-01-Line 27 6 favorable, temporarily stored within the wetland on geotextile fabric or similar material when practicable. Should conditions not be conducive to temporary wetland area storage, ordered soils will be temporarily stored in the adjacent upland area. Once the maintenance is complete, the excavated soils will be returned to the excavated area . Topsoil containing rooted material will be segregated and returned to the top of the excavated area. Additionally, the disturbed areas will be reseeded with an appropriate herbace ous wetland plant mix (Appendix D, Figures - Typical Wetland Maintenance Dig). Additional routine maintenance activities which may potentially occur within the 27 identified crossings also include pipeline recoats and cathodic protection . As stated above the specific pipeline maintenance locations are not known at this time and may result in minimal, temporary disturbance to tidal wetlands/State-owned bottoms. The employed maintenance method may vary based on the size of the stream and the locat ion of the maintenance activity; however, similar approach and erosion control methods will be used as previously stated. As indicated above, the disturbances to jurisdictional waters are temporary and will be limited to CPC’s existing and maintained ROW . Each pipeline maintenance location will be accessed from the existing mowed and maintained ROW, no clearing or grading for additional ROW or access roads is proposed. Additionally, each pipeline maintenance location will be protected from erosion and sedimentation and all pre -construction/pre-erosional contours will be restored . Excavated material will be returned to the trench and all streambed/wetland substrates will be ordered and replaced during the restoration efforts . The excavation, inspection, and maintenance repair activity (if necessary) can typically be completed within one to 5 days, and stabilization will be conducted immediately following completion of the maintenance activity. Federal and State Permit Compliance The disturbance to waters of the U.S. associated with the described activity are authorized under USACE Nationwide Permit 3 (a) and (c) [NWP 3 (a)(c)] and typically do not require that a pre - construction notification (PCN) be submitted to the USACE . The NWP General Conditions as specified in the Federal Register (Vol. 86, No. 245, dated December 27, 2021) will be upheld, and the proposed maintenance activities will meet all of the NWP Regional Conditions set forth by the USACE, Norfolk District . The Virginia Department of Environmental Quality (DEQ) has provided conditional 401 Water Quality Certification for use of NWP 3(a)(c) in Virginia on December 21. 2020. Therefore, because the activities are authorized by NWP 3, the disturbances to surface waters also are authorized by the Virginia Water Protection (VWP) Permit Program . As described above an “Awareness Letter” will be submitted to the USACE and the VMRC for all maintenance activities which involve the disturbance of waters of the U.S. Joint Permit Application November 24, 2025 Colonial Pipeline Company – Maintenance NE Corblu Project No. 02-041901-01-Line 27 7 Threatened & Endangered Species Corblu conducted a review of the Virginia Department of Wildlife Resources (VDWR) database to compile a listed of protected species that may occur at the 16 tidal water crossings (Table 3). According to the VD WR database, the federally protected species listed as potentially occurring in City of Chesapeake , Suffolk City , Isle of Wight , Surry, James City , Charles City , Richmond City, and Henrico Counties include: the West Indian manatee (Trichechus manatus ); James spinymussel (Pleurobema collina); Dwarf wedgemussel ( Alasmidonta heterodon); Atlantic pigtoe (Fusconaia masoni ); Northern long -eared bat ( Myotis septentrionalis ); Loggerhead sea turtle (Caretta caretta ); Green sea turtle ( Chelonia mydas ); Leatherback sea turtle ( Dermochelys coriacea); Hawksbill sea turtle ( Eretmochelys imbricata ); Kemp's ridley sea turtle ( Lepidochelys kempii); Red knot (Calidris canutus rufa); Red-cockaded woodpecker (Picoides borealis); Eastern black rail (Laterallus jamaicensis jamaicensis ); Piping plover ( Charadrius melodus); and Atlantic sturgeon (Acipenser oxyrinchus). Since maintenance activities are limited to CPC’s existing and maintained ROW, no impacts to terrestrial protected species or their habitat are expected. Based on this review (Table 3), and as requested, we will address the protected species issues at each of the individual tidal wetland/ State-owned bottoms crossings as appropriate (i.e., actual pipeline maintenance activity is found to be located at the identified crossings with protected species concerns). This previously used approach has been used successfully for similar CPC projects in full compliance with VMRC Permit No. 05-2245. Once the maintenance locations are identified, and before the maintenance activity is performed, CPC will consult the VD WR completed review ( Table 3) to confirm that the proposed pipeline maintenance activities will not adversely affect protected species or their habitat . If necessary, further consultation with VD WR to comply with requirements of the VMRC permit will be conducted. The result of this effort will be provided to the VMRC and USACE in the “Awareness Letter” which will be submitted in the event that one of the 16 identified crossings must be disturbed for maintenance . Time-of-year restrictions on in -stream work will be observed to the greatest extent possible unless the maintenance activity required is an “Immediate” or “60 -day condition” with the federally mandated time line falling within the time-of-year restrictions; however, the VMRC will be notified in advance and CPC will work with the VMRC to determine if additional protection measures are necessary. Joint Permit Application November 24, 2025 Colonial Pipeline Company – Maintenance NE Corblu Project No. 02-041901-01-Line 27 8 Joint Permit Application Required Information Summary The proposed project may require temporary disturbance to tidal wetlands and/or tidal waters. As instructed in the JPA checklist, Parts 1, 2, and 3 are attached . A discussion of the required forms is provided below. Part 1 – General Information • Applicant’s name and complete mailing address: Colonial Pipeline Company Contact Numbers Attn. Mr. Matt Wyant Mob. (240) 204-1158 Senior Environmental Specialist E-mail: mwyant@colpipe.com 929 Hoods Mill Road Woodbine, MD 21797 • Property Owner’s name and complete mailing address: CPC owns an easement that encompasses the proposed project corridor. Adjacent property owner information is provided in Table 2. • Authorized agent’s name and complete mailing address: Corblu Ecology Group, LLC Contact Numbers Mr. Matthew W. Otto Bus. 770-591-9990 3225 South Cherokee Lane, Building 800 Mob. 404-357-4290 Woodstock, Georgia 30188 Fax. 770-591-9993 E-mail: motto@corblu.com • Provide a detailed description of the project: Please refer to the Proposed Activities within Tidal Wetland and Tidal Waters section of this letter; also provided on JPA Form. • Contractor Information: To be determined on a project by project basis. • Name address, and telephone number of the newspaper having general circulation in the area of the project: Richmond Times & Dispatch Daily Press 8460 Times Dispatch Blvd. Virginia Media, PO Box 2820 Mechanicsville, VA 23116 Norfolk, VA 23501 (804)559-8200 (757) 247-4600 Virginian-Pilot 223 E. City Hall Ave Norfolk, VA 23510 (757) 446-2000 Joint Permit Application November 24, 2025 Colonial Pipeline Company – Maintenance NE Corblu Project No. 02-041901-01-Line 27 9 • Project location: Varies by location within Line 27 pipeline ROW; see Figures 1, 2, and 3a-3i. Once identified, specific locations and access information will be provided in the submitted “Awareness Letter” to the VMRC and USACE. • Rural area driving directions: Refer to the maps provided as Figures 3a-3i • What is the primary and secondary purpose of the project: CPC's pipeline preventative maintenance project will consist of required maintenance to their existing Line 27 (16 -inch diameter), underground pipeline which transport s refined petroleum products. The pipeline repair/maintenance is required by federal regulation (see CPC Pipeline Integrity Management Program described above) and thus no practicable/feasible alternatives are available. The required maintenance activities will be completed within the existing and maintained CPC Line 27 ROW. To initiate the required maintenance activities, CPC conducts regularly scheduled internal line inspection s. Currently, pipeline maintenance for Line 27 in jurisdictional waters is authorized under CPC’s VMRC Permit No. 15-1211; however, other pipeline repairs have and may be required in tidal wetlands or tidal waters . Any internal line inspection, and the subsequent analysis of the acquired data, will produce a "Remediation List" of "anomalies" which must be inspected and repaired to ensure safe and reliable transport of petroleum products within CPC’s Line 27 . USDOT regulations for pipeline safety establish timelines for the required pipeline repair/maintenance activities. The anomaly -specific timeline is determined by the severity of the pipeline anomaly and location to HCA’s. Typically to inspect and repair the anomalies, an area of approximately 30 feet by 60 feet (within the existing ROW), will be excavated to expose the pipeline and confirm the presence of the anomaly before completing repairs . The locations of the anomalies (if any) are unknown at this time . These anomalies can occur anywhere along the pipeline corridor, including within tidal wetlands, tidal waters, or other waters of the U.S. CPC’s Line 27 crosses at its 16 identified crossings as regulated by the VMRC (see attached Table 1 and Figures 3a -3i). The JPA is being submitted prior to the identification of actual preventative maintenance locations to obtain authorization of possible maintenance locations regulated by VRMC due to the USDOT timeline restrictions for repair/maintenance which vary from "Immediate," "60 -days," "180-days," or "1 -year" depending on the severity of the pipeline anomaly and for other potential required pipeline repairs that may be needed after the expiration of CPC’s existing VMRC Permit No. 15-1211 on December 8, 2025. The repair/maintenance activities which may be necessary and are located within jurisdictional waters will be conducted "in -the-dry" through the use of cofferdams and/or aquabarriers or Porta-Dams to control downstream sedimentation and impacts to aquatic resources (see attached Appendix D for CPC's typical maintenance drawings). The maintenance may require a temporary disturbance to jurisdictional waters within CPC’s existing ROW; however, all site grades and vegetative conditions will be returned to pre - maintenance conditions upon completion of the required maintenance activities . All maintenance activities will be protected from erosion by the implementation of State - approved sedimentation and erosion control BMPs (see Appendices C and D). • Proposed use: Multi-user as indicated on JPA form Joint Permit Application November 24, 2025 Colonial Pipeline Company – Maintenance NE Corblu Project No. 02-041901-01-Line 27 10 • Describe the measures that will be taken to avoid and minimize impacts, to the maximum extent practicable, to wetlands, surface waters, submerged lands, and buffer areas associated with any disturbance (clearing, grading, excavating) during and after project construction: Refer to the ‘Proposed Activities within Tidal Wetlands and Tidal Waters section of this application letter and to CPC’s Soil Erosion and Sedimentation Control: 2025 Standards and Specification and Best Management Practices for Pipeline Maintenance Activities, which is included as Appendix C and D, respectively . Also, preventative maintenance activities will only be performed at pipeline anomaly locations as required by federal regulations. • Is this application being submitted for after-the-fact authorization for work which has already begun or has been completed? No • Approximate cost of the entire project and cost of only that portion of the project below mean low water level (MLW): CPC estimates that each maintenance location will cost approximately $ 50,000. The number and locations of the maintenance sites ha ve not yet been determined, and the number of repairs that may disturb tidal areas is not known at this time . Therefore, the actual cost below MLW of each maintenance location is unknown at this time. • Completion date of the proposed work: The maintenance activities requiring disturbance to jurisdictional waters will be completed within one year (or sooner) of the date that the remediation list is as mandated by federal regulations or when other maintenance requirements are noted (e.g., exposed pipeline) . Please note required pipeline maintenance is a continuous requirement and practice. • List the name and complete mailing address of each adjacent property owner to the project: CPC has a permanent ROW easement which encompasses Line 27 . Line 27 ROW crosses the properties of multiple land owners. Contact information for those property owners is provided in Table 2. Part 2 – Signatures Included in JPA Forms Part 3 – Appendix C –Crossings • What is the purpose and method of installation of the crossing: The proposed activities consist of maintenance of an existing structure (i.e., pipeline) , no new installation. Purposes and methods are provided on JPA forms and discussed in the Proposed Activities within State-owned Bottoms section of this letter. • What is the width of the waterway and/or wetland to be crossed? Unknown until the location of pipeline anomalies have been determined. Joint Permit Application November 24, 2025 Colonial Pipeline Company – Maintenance NE Corblu Project No. 02-041901-01-Line 27 11 • For bridges: Not applicable • For overhead crossings: Not applicable • For buried crossings, what will the depth below the substrate be? Each crossing differs, but average depth of the existing pipeline ranges from 8 -12 feet. • Will there be any excavation or fill required for placement of abutments, piers, towers, or other permanent structures on State -owned submerged lands, tidal wetlands, and dunes/beaches? Yes, approximately 1,800 square-feet (30 feet x 60 feet) of temporary excavation may be required at the 16 identified locations in the event the pipeline at each of these locations is discovered to be in need of inspection and/or repair . Please note, no additional fill or structures are proposed to be placed in tidal wetlands and tidal waters; only maintenance of the existing pipeline. Part 4 – Project Drawing Plan View Drawing Plan view drawings of typical construction methods used in streams and wetlands are included in CPC’s Soil Erosion and Sedimentation Control Best Management Practices for Pipeline Maintenance Activities (Appendix D). Cross-Sectional Drawing Conceptual Cross-Sectional Drawings will be included with the “Awareness Letter” which will be submitted in the event that maintenance activities are required at any of the 16 identified tidal wetlands and/or tidal waters. Part 5 – Chesapeake Bay Preservation Act Information For waters and Resource Protection Areas (RPA) within the Chesapeake Bay watershed, protection is afforded through the Chesapeake Bay Preservation Act (CBPA) . The CBPA gives localities within Tidewater Virginia the authority to pass regulations aimed at defining and protecting Chesapeake Bay Preservation Areas as defined in the CBPA. The maintenance activities proposed have been given exemption (Sec. 9 VAC 10 -20-150 B) from the local CBPA RPA permitting process. Further Comments CPC has not conducted an archeological survey for this project as all of the maintenance activities will be conducted in the existing and maintained ROW which has been previously disturbed for the installation/operation of the pipeline. Furthermore, all excavated materials will be returned to the point of excavation and the maintenance site will be returned to pre -existing conditions. However, CPC and its contractors are fully aware of the federal and state regulations concerning the protection of cultural resources, and if during the course of performing the Joint Permit Application November 24, 2025 Colonial Pipeline Company – Maintenance NE Corblu Project No. 02-041901-01-Line 27 12 required maintenance, potential cultural resources are observed, the activities will be temporarily stopped, and the appropriate actions will be taken as described on Page 17 of Appendix D. The proposed maintenance in jurisdictional waters and within the FEMA 100 -year floodplain does not include the installation of new structures and thus will not result in additional fill within the 100 - year floodplain. Conclusion Based on this submittal, Corblu respectfully requests a VMRC permit for the potential encroachment upon the 16 above referenced State-owned stream bottoms for the described and required Line 27 pipeline maintenance activity. We look forward to corresponding with the VMRC prior to placement of a public notice in the area newspapers . If you have any questions or comments, please contact the undersigned at (770) 591-9990. Sincerely, CORBLU ECOLOGY GROUP, LLC Matthew W. Otto, CSE, WPIT Richard W. Whiteside, PhD, CWB, CSE Senior Ecologist President Enclosures: Figure 1 – Line 27 Pipeline Corridor Overview Figure 2 – Line 27 Tidal Wetlands and Waters Figures 3a-3i –Crossing Numbers Table 1 – Identified Line 27 Tidal Stream Crossings in Virginia Table 2 – Property Owner’s List Table 3 – Virginia Department of Wildlife Resources Database Search of CPC’s Line 27 Crossings Appendix A – Joint Public Application Form Appendix B – CPC VMRC and Wetland Board Permits Appendix C – CPC’s 2025 Annual Standards and Specifications for Erosion and Sediment Control and Stormwater Management Appendix D – CPC’s Soil Erosion and Sedimentation Control Best Management Practices for Pipeline Maintenance Activities Appendix E – Typical Revetment Mat Drawing c: Mr. Matt Wyant, CPC Senior Environmental Specialist, Permittee – via email One electric and PDF Copy distributed to: USACE, Norfolk District and Local Wetland Boards (LWB) Suffolk Surry Louisa Buckingham Charlotte Chesterfield Fluvanna Henrico Chesapeake Powhatan Isle of Wight Prince Edward York Charles City Cumberland Halifax James City Appomattox Newport News Richmond City Portsmouth Portsmouth ± 1:1,000,000 Legend CPC Line 27 County Boundary Virginia State Boundary Figure 1 Line 27 Pipeline Corridor Overview Corblu Project No. 02-041901-01 Colonial Pipeline Company Lines 27 JPA Central and Eastern Virginia Lawrenceville & Woodstock, Georgia Surry Chesterfield Suffolk Isle of Wight York Henrico Charles City James City Chesapeake Powhatan Newport News Richmond City Henrico Portsmouth Portsmouth ± 1:600,000 Legend County Boundary CPC Line 27 Tidal Waters Tidal Wetlands Figure 2 Line 27 Tidal Wetlands and Waters Corblu Project No. 02-041901-01 Colonial Pipeline Company Lines 27 JPA Central and Eastern Virginia Lawrenceville & Woodstock, Georgia Jones Creek Crossing 1 Gilligan Creek Crossing 2 Deep Creek Canal and Marsh Crossing 4 Southern Branch Elizabeth River Crossing 3 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community, Copyright:© 2013 National Geographic Society, i-cubed Figure 3a Crossings 1-4 Corblu Project No. 02-041901-01 Colonial Pipeline Company Line 27 JPA Chesapeake, Virginia Lawrenceville & Woodstock, Georgia Base map source: ESRI Basemaps - World Imagery City of Chesapeake Tidal Marsh Inventory 1:24,000 Legend Tidal Crossings Tidal Wetlands Tidal Waters CPC Line 27 ± Bailey Creek Marsh Crossing 6 Goose Creek and Marsh Crossing 5 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community Figure 3b Crossings 5 and 6 Corblu Project No. 02-041901-01 Colonial Pipeline Company Line 27 JPA Chesapeake, Virginia Lawrenceville & Woodstock, Georgia 1:24,000 Legend Tidal Crossings Tidal Wetlands Tidal Waters CPC Line 27 ± Base map source: ESRI Basemaps - World Imagery City of Chesapeake Tidal Marsh Inventory Bennett Creek and Marsh Crossing 7 Nansemond River and Marshes Crossing 8 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community Figure 3c Crossings 7 and 8 Corblu Project No. 02-041901-01 Colonial Pipeline Company Line 27 JPA Suffolk, Virginia Lawrenceville & Woodstock, Georgia 1:24,000 Legend Tidal Crossings Tidal Wetlands Tidal Waters CPC Line 27 ± Base map source: ESRI Basemaps - World Imagery City of Suffolk Tidal Marsh Inventory Chuckatuck Creek and Marsh Crossing 9 Unnamed Tributary to Chuckatuck Marsh Crossing 10 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community Figure 3d Crossings 9 and 10 Corblu Project No. 02-041901-01 Colonial Pipeline Company Line 27 JPA Suffolk, Virginia Lawrenceville & Woodstock, Georgia 1:24,000 Legend Tidal Crossings CPC Line 27 Tidal Wetlands Tidal Waters ± Base map source: ESRI Basemaps - World Imagery City of Suffolk Tidal Marsh Inventory Champion Swamp Marsh Crossing 11 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community Figure 3e Crossing 11 Corblu Project No. 02-041901-01 Colonial Pipeline Company Line 27 JPA Isle of Wight County, Virginia Lawrenceville & Woodstock, Georgia 1:24,000 Legend Tidal Crossings Tidal Wetlands Tidal Waters CPC Line 27 ± Base map source: ESRI Basemaps - World Imagery Isle of Wight County Tidal Marsh Inventory James River Crossing 12 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community Figure 3f Crossing 12 Corblu Project No. 02-041901-01 Colonial Pipeline Company Line 27 JPA Surry and James City Counties Virginia Lawrenceville & Woodstock, Georgia 1:35,000 Legend Tidal Crossings Tidal Wetlands Tidal Waters CPC Line 27 ± Base map source: ESRI Basemaps - World Imagery James City County and Sury Couny Tidal Marsh Inventory College Creek and Marsh Crossing 14 Unnamed Tributary to Halfway Creek and Marsh Crossing 13 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community Figure 3g Crossing 13 and 14 Corblu Project No. 02-041901-01 Colonial Pipeline Company Line 27 JPA James City County,Virginia Lawrenceville & Woodstock, Georgia 1:24,000 Legend Tidal Crossings Tidal Wetlands Tidal Waters CPC Line 27 ± Base map source: ESRI Basemaps - World Imagery James City County Tidal Marsh Inventory Chickahominy River Crossing 15 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community Figure 3h Crossing 15 Corblu Project No. 02-041901-01 Colonial Pipeline Company Line 27 JPA Charles City County and James City County, Virginia Lawrenceville & Woodstock, Georgia 1:24,000 Legend Tidal Crossings Tidal Wetlands Tidal Waters CPC Line 27 ± Base map source: ESRI Basemaps - World Imagery Charles City County and James City County Tidal Marsh Inventory James River Crossing 16 Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community Figure 3i Crossings 16 Corblu Project No. 02-041901-01 Colonial Pipeline Company Line 27 JPA Richmond City County and Henrico County, Virginia Lawrenceville & Woodstock, Georgia 1:24,000 Legend Tidal Crossings Tidal Waters CPC Line 27 ± Base map source: ESRI Basemaps - World Imagery Henrico County and Richmond City Couny Tidal Marsh Inventory Table 1: Identified Line 27 Tidal Stream Crossings in Virginia Crossing No. Stream Name Latitude / Longitude HUC Tidal 1 Jones Creek 36.802222 N / -76.283289 W 02080208 Y 2 Gilligan Creek 36.799036 N / -76.285878 W 02080208 Y 3 South Branch Elizabeth River 36.771889 N / -76.307836 W 02080208 Y 4 Deep Creek Canal & Marsh 36.770714 N / -76.317303 W 02080208 Y 5 Goose Creek & Marsh 36.801742 N / -76.405486 W 02080208 Y 6 Bailey Creek Marsh 36.812628 N / -76.429192 W 02080208 Y 7 Bennett Creek & Marsh 36.840153 N / -76.495739 W 02080208 Y 8 Nansemond River & Marshes 36.856497 N / -76.524833 W 02080208 Y 9 Chuckatuck Creek & Marsh 36.879322 N / -76.559578 W 02080206 Y 10 Unnamed Tributary to Chuckatuck Marsh 36.880136 N / -76.561497 W 02080206 Y 11 Champion Swamp Marsh 36.943297 N / -76.626489 W 02080206 Y 12 James River 37.176111 N / -76.647500 W 02080206 Y 13 Unnamed Tributary to Halfway Creek & Marsh 37.245383 N / -76.692142 W 02080206 Y 14 College Creek & Marsh 37.245072 N / -76.713897 W 02080206 Y 15 Chickahominy River 37.264489 N / -76.878233 W 02080206 Y 16 James River 37.502683 N / -77.420044 W 02080206 Y 1 of 3 Table 2: Property Owners List This list depicts the known property owners on either side of the referenced crossings where CPC’s ROW exists. List compiled from Colonial Pipeline Company’s Strip Map of Line 27 City or County Stream Crossing West Side Tract No. and Property Owner East Side Tract No. and Property Owner Chesapeake City 1. Jones Creek 171- Parcel: 1440000000021 / PAR C SUB PROP TEXACO INC 30.878 AC COMMONWEALTH OF VA VA PORT AUTH 101 W MAIN ST STE 600 NORFOLK, VA 23510-1685 172A-Parcel:1380000000040 / 8.4668 AC SO NORFOLK HGTS JONES JAMES H ET ALS 3025 SIR WALTER CT CHESAPEAKE, VA 23321-5812 Chesapeake City 2. Gilligan Creek 170- Parcel: 1440000000020 / PAR C UNRECORDED PLAT OF STAR ENTERPRISES 31.971 A KINDER MORGAN VA LIQUIDS TERM PROPERTY TAX DEPT PO BOX 4372 HOUSTON, TX 77210-4372 170A- Parcel: 1440000000020 Same As Tract 170 Chesapeake City 3. South Branch Elizabeth River 151- Parcel: 0260000000120 / B-1 RESUB A & B CHESTER ENERGY CO. 86.0 AC IMTT-VIRGINIA LLC 400 POYDRAS ST STE 3000 NEW ORLEANS, LA 70130 152- Parcel: 1630000000020 / MONEY POINT 17.165 ACRES ERT HOLDING CO INC L/H KINDER MORGAN PROPERTY TAX DEPT PO BOX 4372 HOUSTON, TX 77210-4372 Chesapeake City 4. Deep Creek Canal 147- Parcel: 0254031000120 / 12 RESUB META POINTE SEC 2 ROBY DANIELLE F & KEVIN J 733 META POINTE DR CHESAPEAKE, VA 23323-5818 148- Parcel: 0261001000060/ 25Q 6 GARY W & LEILA FRIEDL 1512 SHELL RD CHESAPEAKE, VA 23321 Chesapeake City 5. West Branch Elizabeth River 116- Parcel: 160000000430 / MT AIRY 14.24 AC WAGGONER PHYLLIS C 1715 DOCK LANDING RD CHESAPEAKE, VA 23321-3223 117- Parcel: 0160000000270 / BOWERS HILL 2.25 AC CURLING JOYCE I TRUSTEE & HIER TERESA L 4262 SCHOONER TRL CHESAPEAKE, VA 23321-3233 2 of 3 Chesapeake City 6. Bailey Creek 108A- Parcel: 150000001334 / BDRY SUR E BAUM LIFE INT PARTITION PEEK FARM 4.06 WASHBURN ERIC C 4613 PEEK TRL CHESAPEAKE, VA 23321-2146 108PC- Parcel: 150000001370/ NR JOLIFF 3 AC MEARS GARY D TRUSTEE 8740 HIGHWAY 131 ODESSA, MO 64076-7331 109-Parcel: 150000001230/ DOCK LANDING 8.354AC Same Owner as 108PC above 110- Parcel: 0156003000650 LOT 65 DOCK HARBOUR WHITE RONDIA & LAVETTA L 4404 ANCHOR BEND CT CHESAPEAK, VA 23321 Suffolk City 7. Bennett Creek 090B- Parcel: 12K*C *A Russell Development Corp. No new Owner information: Open/Green Space for Creekview Subdivision 091- Parcel: 12*24H BARBARA W WINSLOW 5000 BOB WHITE LN SUFFOLK, VA 23435 Suffolk City 8. Nansemond River 087- Parcel: 11*17 LANDMARK INDUSTRIES LLC 213 59TH ST VIRGINIA BEACH VA 23451 088-Parcel:11*26 NICHOLAS C JR WRIGHT ET ALS 213 59TH ST VIRGINIA BEACH VA 23451 089-Parcel:11D*22 WILLIAM A JR & PATRICIA M TODD 2752 WINDJAMMER RD SUFFOLK, VA 23435 089A-Parcel: 11D*21 CECIL THOMAS & LINDA S CHAPMAN 2754 WINDJAMMER RD SUFFOLK, VA 23435 Suffolk City 9. Chuckatuck Swamp & Cypress Creek 081- Parcel: 3*6 CHUCKATUCK CREEK LLC 2830 E BRIGSTOCK RD MIDLOTHIAN VA 23113 082- Parcel: 3*10 JONES LEONA P REVOCABL LVNG TR 6620 CRITTENDEN RD SUFFOLK VA 23432 Suffolk City 10. Chuckatuck Swamp Marsh 081- Parcel: 3*6 CHUCKATUCK CREEK LLC 2830 E BRIGSTOCK RD MIDLOTHIAN VA 23113 082- Parcel: 3*10 JONES LEONA P REVOCABL LVNG TR 6620 CRITTENDEN RD SUFFOLK VA 23432 3 of 3 Isle of Wight 11. Champion Swamp 061- Parcel: 31 -01 – 098 KOZAR WARREN D & MARY E 355 CRAWFORD PKWY STE 700 PORTSMOUTH, VA 23704 062- Parcel: 32 -02 - 004 BARLOW BROS FARM LLC 14112 GREAT SPRING RD SMITHFIELD VA 23430 James City / Surry 12. James River 005- Parcel: 5940100003 BASF CORPORATION 100 PARK AVENUE FLORHAM PARK, NJ 079321049 006- Parcel: 31-22A VA POWER & ELECTRIC COMPANY 006A- Parcel: 1B JT & DR DREWRY TRUSTEES 110 COMMONAGE DR GREAT FALLS, VA 22066 James City 13. Trib to Halfway Creek 162-Parcel: 4920300003 WELSH, NANCY L & SCHULMAN, LEWIS S 900 S ENGLAND CIR WILLIAMSBURG, VA 23185 162B-Parcel: 4920300002 MCKEOWN, JOHN J & BERTHIAUME, DENISE L 800 S ENGLAND CIR WILLIAMSBURG, VA 23185 163- Parcel: 4920100006 JAMES CITY COUNTY PO BOX 8784 WILLIAMSBURG, VA 23187 James City 14. College Creek 156- 4820100003 WILLIAMSBURG LANDING INC 5700 WILLIAMSBURG LANDING DR WILLIAMSBURG VA 231853775 157- Parcel:4910230001A KINGSPOINT CLUB INC PO BOX 365 WILLIAMSBURG, VA 231870365 157PC-Parcel: 49103A0002A BOYD, JAMES M 3199 ADAM KEELING RD VIRGINIA BEACH, VA 23454 Charles City / James City 15. Chickahominy River 134- Parcel: 78-12 N AND J FERRY FARM TRACT LLC 17100 TOMAHUND DRIVE WILLIAMSBURG, VA 23185 135- Parcel: 3430100002 JAMES CITY COUNTY PO BOX 8784 WILLIAMSBURG, VA 231878784 City of Richmond/ Henrico 16. James River 002- Parcel: S0071042008 008 VULCAN LANDS INC 1200 URBAN CENTER DR BIRMINGHAM, AL 35242 003- Parcel: 797-710-8067 IMTT VIRGINIA LLC 5500 OLD OSBORNE TPKE HENRICO VA 23231 Table 3: Virginia Department of Wildlife Resources Database Search of CPC’s Line 27 Tidewater Crossings City or County Stream Crossing Species Name (Scientific Name) Known or Likely to Occur Within a 3 Mile Radius State Status Federal Status City of Chesapeake 1. Jones Creek 2. Gilligan Creek 3. Southern Branch Elizabeth River 4. Deep Creek Canal and Marsh 5. Goose Creek and Marsh 6. Bailey Creek and Tidal Marsh Atlantic sturgeon (Acipenser oxyrinchus) SE FE West Indian manatee (Trichechus manatus) SE FT Loggerhead sea turtle (Caretta caretta) ST FT Green sea turtle (Chelonia mydas) ST FT Leatherback sea turtle (Dermochelys coriacea) SE FE Hawksbill sea turtle (Eretmochelys imbricata) SE FE Kemp’s ridley sea turtle (Lepidochelys kempii) SE FE Red knot (Calidris canutus rufa) ST FT Northern long-eared bat (Myotis septentrionalis) SE FE Eastern black rail (Laterallus jamaicensis jamaicensis) SE FT Piping plover (Charadrius melodus) ST FT Red-cockaded woodpecker (Picoides borealis) SE FT Tricolored bat (Perimyotis subflavus) SE PFE Monarch butterfly (Danaus plexippus) None PFT Wilson’s plover (Charadrius wilsonia) SE None Gull-billed tern (Gelochelidon nilotica) ST None Little brown bat (Myotis lucifugus) SE None Rafinesque’s eastern big-eared bat (Corynorhinus rafinesquii macrotis) SE None Canebrake rattlesnake (Crotalus horridus) SE None Peregrine falcon (Falco peregrinus) ST None Loggerhead shrike (Lanius ludovicainus) ST None Mabee’s salamander (Ambystoma mabeei) ST None Migrant loggerhead shrike (Lanius ludovicianus migrans) ST None Suffolk City 7. Bennet Creek and Marshes 8. Nansemond River and Marshes 9. Chuckatuck Creek and Marshes 10. Unnamed Tributary to Chuckatuck Creek and Marsh Atlantic sturgeon (Acipenser oxyrinchus) SE FE Red-cockaded woodpecker (Picoides borealis) SE FT Loggerhead sea turtle (Caretta caretta) ST FT Red knot (Calidris canutus rufa) ST FT Northern long-eared bat (Myotis septentrionalis) SE FE Eastern black rail (Laterallus jamaicensis jamaicensis) SE FT Green sea turtle (Chelonia mydas) ST FT Kemp's ridley sea turtle (Lepidochelys kempii) SE FE Piping plover (Charadrius melodus) ST FT West Indian manatee (Trichechus manatus) SE FT Tricolored bat (Perimyotis subflavus) SE PFE Table 3: Virginia Department of Wildlife Resources Database Search of CPC’s Lines 27 Tidewater Crossings (cont.) 2 of 4 City or County Stream Crossing Species Name (Scientific Name) Known or Likely to Occur Within a 3 Mile Radius State Status Federal Status Suffolk City Continued Monarch butterfly (Danaus plexippus) None PFT Little brown bat (Myotis lucifugus) SE None Rafinesque’s eastern big-eared bat (Corynorhinus rafinesquii macrotis) SE None Canebrake rattlesnake (Crotalus horridus) SE None Peregrine falcon (Falco peregrinus) ST None Loggerhead shrike (Lanius ludovicainus) ST None Henslow’s sparrow (Aimophila henslowii) ST None Mabee’s salamander (Ambystoma mabeei) ST None Migrant loggerhead shrike (Lanius ludovicianus migrans) ST None Eastern chicken turtle (Deirochelys reticularia reticularia) SE None Eastern tiger salamander (Ambystoma tigrinum) SE None Isle of Wight 11. Champion Swamp Marsh Atlantic sturgeon (Acipenser oxyrinchus) SE FE Loggerhead sea turtle (Caretta caretta) ST FT Red knot (Calidris canutus rufa) ST FT Northern long-eared bat (Myotis septentrionalis) SE FE Eastern black rail (Laterallus jamaicensis jamaicensis) SE FT Kemp's ridley sea turtle (Lepidochelys kempii) SE FE Tricolored bat (Perimyotis subflavus) SE PFE Little brown bat (Myotis lucifugus) SE None Rafinesque’s eastern big-eared bat (Corynorhinus rafinesquii macrotis) SE None Canebrake rattlesnake (Crotalus horridus) SE None Peregrine falcon (Falco peregrinus) ST None Loggerhead shrike (Lanius ludovicainus) ST None Henslow’s sparrow (Aimophila henslowii) ST None Mabee’s salamander (Ambystoma mabeei) ST None Migrant loggerhead shrike (Lanius ludovicianus migrans) ST None Eastern chicken turtle (Deirochelys reticularia reticularia) SE None Eastern tiger salamander (Ambystoma tigrinum) SE None Table 3: Virginia Department of Wildlife Resources Database Search of CPC’s Lines 27 Tidewater Crossings (cont.) 3 of 4 City or County Stream Crossing Species Name (Scientific Name) Known or Likely to Occur Within a 3 Mile Radius State Status Federal Status Surry and James City 12. James River Atlantic sturgeon (Acipenser oxyrinchus) SE FE Red-cockaded woodpecker (Picoides borealis) SE FT Red knot (Calidris canutus rufa) ST FT Northern long-eared bat (Myotis septentrionalis) SE FE Eastern black rail (Laterallus jamaicensis jamaicensis) SE FT Kemp’s ridley sea turtle (Lepidochelys kempii) SE FE Leatherback sea turtle (Dermochelys coriacea) SE FE Loggerhead sea turtle (Caretta caretta) ST FT Piping plover (Charadrius melodus) ST FT Tricolored bat (Perimyotis subflavus) SE PFE Monarch butterfly (Danaus plexippus) None PFT Rafinesque’s eastern big-eared bat (Corynorhinus rafinesquii macrotis) SE None Little brown bat (Myotis lucifugus) SE None Canebrake rattlesnake (Crotalus horridus) SE None Peregrine falcon (Falco peregrinus) ST None Loggerhead shrike (Lanius ludovicainus) ST None Henslow’s sparrow (Aimophila henslowii) ST None Mabee’s salamander (Ambystoma mabeei) ST None Migrant loggerhead shrike (Lanius ludovicianus migrans) ST None Blackbanded sunfish (Enneacanthus chaetodon) SE None Eastern chicken turtle (Deirochelys reticularia reticularia) SE None Eastern tiger salamander (Ambystoma tigrinum) SE None James City 13. Unnamed Tributary to Halfway Creek and Marshes 14. College Creek and Marsh Atlantic sturgeon (Acipenser oxyrinchus) SE FE Red knot (Calidris canutus rufa) ST FT Northern long-eared bat (Myotis septentrionalis) SE FE Eastern black rail (Laterallus jamaicensis jamaicensis) SE FT Rafinesque’s eastern big-eared bat (Corynorhinus rafinesquii macrotis) SE None Kemp’s ridley sea turtle (Lepidochelys kempii) SE FE Loggerhead sea turtle (Caretta caretta) ST FT Red-cockaded woodpecker (Picoides borealis) SE FT Roseate tern (Sterna douglallii dougallii) SE FE Piping plover (Charadrius melodus) ST FT Tricolored bat (Perimyotis subflavus) SE PFE Monarch butterfly (Danaus plexippus) None PFT Eastern tiger salamander (Ambystoma tigrinum) SE None Canebrake rattlesnake (Crotalus horridus) SE None Peregrine falcon (Falco peregrinus) ST None Little brown bat (Myotis lucifugus) SE None Loggerhead shrike (Lanius ludovicainus) ST None Henslow’s sparrow (Aimophila henslowii) ST None Table 3: Virginia Department of Wildlife Resources Database Search of CPC’s Lines 27 Tidewater Crossings (cont.) 4 of 4 City or County Stream Crossing Species Name (Scientific Name) Known or Likely to Occur Within a 3 Mile Radius State Status Federal Status James City Continued Mabee’s salamander (Ambystoma mabeei) ST None Blackbanded sunfish (Enneacanthus chaetodon) SE None Migrant shrike loggerhead (Lanius ludovicianus migrans) ST None James City and Charles City 15. Chickahominy River Atlantic sturgeon (Acipenser oxyrinchus) SE FE Red knot (Calidris canutus rufa) ST FT Northern long-eared bat (Myotis septentrionalis) FE SE Eastern black rail (Laterallus jamaicensis jamaicensis) SE FT Tricolored bat (Perimyotis subflavus) SE PFE Monarch butterfly (Danaus plexippus) None PFT Little brown bat (Myotis lucifugus) SE None Rafinesque’s eastern big-eared bat (Corynorhinus rafinesquii macrotis) SE None Peregrine falcon (Falco peregrinus) ST None Loggerhead shrike (Lanius ludovicainus) ST None Mabee’s salamander (Ambystoma mabeei) ST None Migrant shrike loggerhead (Lanius ludovicianus migrans) ST None Richmond City and Henrico 16. James River Atlantic sturgeon (Acipenser oxyrinchus) SE FE Northern long-eared bat (Myotis septentrionalis) SE FE James spinymussel (Pleurobema collina) SE FE Dwarf wedgemussel (Alasmidonta heterodon) SE FE Atlantic pigtoe (Fusconaia masoni) ST FT Tricolored bat (Perimyotis subflavus) SE PFE Little brown bat (Myotis lucifugus) SE None Peregrine falcon (Falco peregrinus) ST None Loggerhead shrike (Lanius ludovicainus) ST None Migrant shrike loggerhead (Lanius ludovicianus migrans) ST None FE = Federally Endangered, FT = Federally Threatened, PFE = Proposed Federally Endangered, PFT = Proposed Federally Threatened, FC = Federal Candidate, SE = State Endangered, ST = State Threatened Prepared by: MWO Date: 11/09/25 Check by: MAB Date: 11/18/25 Appendix A Joint Public Application Form m US Army Corps of Engineers ® Norfolk District • ~!lW VIRO MENTAL QUALITY Regulatory Agency Contact Information Virginia Marine Resources Commission (VMRC) Habitat Management Division 380 Fenwick Road, Building 96 Fort Monroe, VA 23651 Phone: (757) 247-2200, Fax: (757) 247-8062 Website: http://www.mrc.virginia.gov/hmac/hmoverview.shtm United States Army Corps of Engineers (USACE) Norfolk District 803 Front Street, ATTN: CENAO-WR-R Norfolk, Virginia 23510-1011 Phone: (757) 201-7652, Fax: (757) 201-7678 Website: http://www.nao.usace.army.mil/Missions/Regulatory.aspx Virginia Department of Environmental Quality (DEQ) Virginia Water Protection Permit Program Post Office Box 1105 Richmond, Virginia 23218 Phone: (804) 698-4000 Website: http://www.deq.virginia.gov/ LOCAL WETLANDS BOARD (LWB) CONTACT INFORMATION: Links to LWB information on the Web can be found at http://ccrm.vims.edu/permits_web/guidance/local_wetlands_boards.html In addition, the phone numbers listed below can be used to contact the LWB. Please be advised that these phone numbers are subject to change at any time. Accomack County (757) 787-5721, Cape Charles (757) 331-3259, Charles City County (804) 829- 9296, Chesapeake (757) 382 -6248, Colonial Heights (804) 520- 9275, Essex County (804) 443- 4951, Fairfax County (703) 324- 1364, Fredericksburg (540) 372 -1179, Gloucester County (804) 693-2744, Hampton (757) 727- 6140, Hopewell (804) 541- 2267, Isle of Wight County (757) 365- 6211, James City County (757) 253-6673, King and Queen County (804) 769-4978, King George County (540) 775-7111, King William County (804) 769-4927, Lancaster County (804) 462-5220, Mathews County (804) 725- 5025, Middlesex County (804) 758- 0500, New Kent County (804) 966-9690, Newport News (757) 247 -8437, Norfolk (757) 664 -4368, Northampton County (757) 678-0442, Northumberland County (804) 580-8910, Poquoson (757) 868-3040, Portsmouth (757) 393-8836, Prince William County (703) 792- 6984, Richmond County (804) 333- 3415, Stafford County (540) 658- 8668, Suffolk (757) 923- 3650, Virginia Beach (757) 427- 8246, Westmoreland County (804) 493-0120, West Point (804) 843-3330, Williamsburg (757) 220-6130, York County (757) 890-3538 Application Revised: August 2023 1 Tidewater Joint Permit Application (JPA) For Projects Involving Tidal Waters, Tidal Wetlands and/or Dunes and Beaches in Virginia This application may be used for most commercial and noncommercial projects involving tidal waters, tidal wetlands and/or dunes and beaches in Virginia which require review and/or authorization by Local Wetlands Boards (LWB), the Virginia Marine Resources Commission (VMRC), the Department of Environmental Quality (DEQ), and/or the U. S. Army Corps of Engineers (USACE). This application can be used for: • Access-related activities, including piers, boathouses, boat ramps (without associated dredging or excavation*), moorings, marinas. • Shoreline stabilization projects including living shorelines, riprap revetments, marsh toe stabilization, bulkheads, breakwaters, beach nourishment, groins, and jetties. It is the policy of the Commonwealth that living shorelines are the preferred alternative for stabilizing tidal shorelines (Va. Code § 28.2-104.1). • Crossings over or under tidal waters and wetlands including bridges and utility lines (water, sewer, electric). • Aquaculture structures, including cages and floats except “oyster gardening”** *Note: for all dredging, excavation, or surface water withdrawal projects you MUST use the Standard JPA form; for noncommercial, riparian shellfish aquaculture projects (i.e., “oyster gardening”) you must use the abbreviated JPA found at https://mrc.virginia.gov/forms/2019/ VGP3_Aquaculture_form_2019.pdf or call VMRC for a form. The DEQ and the USACE use this form to determine whether projects qualify for certain General, Regional, and/or Nationwide permits. If your project does not qualify for these permits and you need a DEQ Virginia Water Protection permit or an individual USACE permit, you must submit the Standard Joint Permit application form. You can find this application at http://www.nao.usace.army.mil/Missions/Regulatory/JPA.aspx. Please note that some health departments and local agencies, such as local building officials and erosion and sediment control authorities, do not use the Joint Permit Application process or forms and may have different informational requirements. The applicant is responsible for contacting these agencies for information regarding those permitting requirements. HOW TO APPLY Submit one (1) completed copy of the Tidewater JPA to VMRC: 1. If by mail or courier, use the VMRC address provided on page 1. 2. If by electronic mail, address the package to: JPA.permits@mrc.virginia.gov. The application must be provided in the .pdf format and should not exceed 10 MB. If larger than 10 MB you may provide a file transfer protocol (ftp) site for download purposes. The Tidewater JPA should include the following: 1. Part 1 – General Information 2. Part 2 – Signatures 3. Part 3 - Appendices (A, B, C, and/or D as applicable to your project) 4. Part 4 – Project Drawings. The drawings shall include the following for ALL projects: • Vicinity Map (USGS topographic map, road map or similar showing project location) • Plan View Drawing (overhead, to scale or with dimensions clearly marked) • Section View Drawing (side-view, to scale or with dimensions clearly marked) Application Revised: August 2023 2 Sample drawings are included at the end of Part 4 of this application to show examples of the information needed to consider your application complete and allow for the timely processing. When completing this form, use the legal name of the applicant, agent, and/or property owner. For DEQ application purposes, legal name means the full legal name of an individual, business, or other organization. For an individual, the legal name is the first name, middle initial, last name, and suffix. For an entity authorized to do business in Virginia, the legal name is the exact name set forth in the entity's articles of incorporation, organization or trust, or formation agreement, as applicable. Also provide the name registered with the State Corporation Commission, if required to register. DEQ issues a permit or grants coverage to the so-named individual or business, who becomes the ‘permittee’. Correspondence from some agencies, including permits, authorizations, and/or coverage, may be provided via electronic mail. If the applicant and/or agent wishes to receive their permit via electronic mail, please remember to include an e-mail address at the requested place in the application. In order for projects requiring LWB authorization to be considered complete (Virginia Code § 28.2- 1302); “The permit application shall include the following: the name and address of the applicant; a detailed description of the proposed activities; a map, drawn to an appropriate and uniform scale, showing the area of wetlands directly affected, the location of the proposed work thereon, the area of existing and proposed fill and excavation, the location, width, depth and length of any proposed channel and disposal area, and the location of all existing and proposed structures, sewage collection and treatment facilities, utility installations, roadways, and other related appurtenances of facilities, including those on the adjacent uplands; a description of the type of equipment to be used and the means of access to the activity site; the names and addresses of record of adjacent land and known claimants of water rights in or adjacent to the wetland of whom the applicant has notice; an estimate of cost; the primary purpose of the project; and secondary purpose of the proposed project; a complete description of measures to be taken during and after alteration to reduce detrimental offsite effects; the completion date of the proposed work, project, or structure; and such additional materials and documentation as the wetlands board may require.” You may include signed Adjacent Property Owner (APO) Acknowledgement Forms found at the end of this Short Form. You must provide these addresses in Part 1 whether or not you use the APO forms. VMRC will request comments from APOs for projects that require permits for encroachment over state- owned submerged lands. VMRC or your local wetlands board must notify all APO’s of public hearings required for all proposals involving tidal wetlands and dunes/beaches that are not authorized by statute. This information will not be used by DEQ to meet the requirements of notifying riparian land owners. Regional Permit 17 (RP-17), authorizes the installation and/or construction of open-pile piers, mooring structures/devices, fender piles, covered boathouses/boatslips, boatlifts, osprey pilings/platforms, accessory pier structures, and certain devices associated with shellfish gardening, for private use, subject to strict compliance with all conditions and limitations further set out in the RP-17 enclosure located at http://www.nao.usace.army.mil/Missions/Regulatory/RBregional/. In addition to the information required in this JPA, prospective permittees seeking authorization under RP-17 must complete and submit the ‘Regional Permit 17 Checklist’ with their JPA. A copy of the ‘Regional Permit 17 Checklist’ is found on pages 13 and 14 of this application package. If the prospective permittee answers “yes” (or “N/A”, where applicable) to all of the questions on the ‘Regional Permit 17 Checklist’, the permittee is in compliance with RP-17 and will not receive any other written authorization from the Corps but may not proceed with construction until they have obtained all necessary state and local permits. Note: If the prospective permittee answers “no” to any of the questions on the ‘Regional Permit 17 Checklist’ then their proposed structure(s) does not meet the terms and conditions of RP-17 and written authorization from the Corps is required before commencement of any work. Application Revised: August 2023 3 Note: Land disturbance (grading, filling, etc.) or removal of vegetation associated with projects located in Chesapeake Bay Preservation Areas will require approval from local governments. Certain localities utilize this application during their Bay Act review. Part 5 of this application is included to provide assistance for the applicant to comply with Bay Act /or Erosion and Sediment Control requirements concurrent with this application. WHAT HAPPENS NEXT Upon receipt of an application, VMRC will assign a permit application number to the JPA and will then distribute a copy of the application and any original plan copies submitted to the other regulatory agencies that are involved in the JPA process. All agencies will conduct separate but concurrent reviews of your project. Please be aware that each agency must issue a separate permit (or a notification that no permit is required). Note that in some cases, DEQ may be taking an action on behalf of the USACE, such as when the State Program General Permit (SPGP) applies. Make sure that you have received all necessary authorizations, or documentation that no permit is required, from each agency prior to beginning the proposed work. During the JPA review process, site inspections may be necessary to evaluate a proposed project. Failure to allow an authorized representative of a regulatory agency to enter the property, or to take photographs of conditions at the project site, may result in either the withdrawal or denial of your permit application. For certain federal and state permit applications, a public notice is published in a newspaper having circulation in the project area, is mailed to adjacent and/or riparian property owners, and/or is posted on the agency’s web page. The public may comment on the project during a designated comment period, if applicable, which varies depending upon the type of permit being applied for and the issuing agency. In certain circumstances, the project may be heard by a governing board, such as a Local Wetlands Board, the State Water Control Board, or VMRC in cases where a locality does not have a wetlands board and with certain subaqueous cases. You may be responsible for bearing the costs for advertisement of public notices. Public hearings that are held by VMRC occur at their regularly scheduled monthly commission meetings under the following situations: Protested applications for VMRC permits which cannot be resolved; projects costing over $500,000 involving encroachment over state-owned subaqueous land; and all projects affecting tidal wetlands and dunes/beaches in localities without a LWB. All interested parties will be officially notified regarding the date and time of the hearing and Commission meeting procedures. The Commission will usually make a decision on the project at the meeting unless a decision for continuance is made. If a proposed project is approved, a permit or similar agency correspondence is sent to the applicant. In some cases, notarized signatures, as well as processing fees and royalties, are required before the permit is validated. If the project is denied, the applicant will be notified in writing. PERMIT APPLICATION OR OTHER FEES Do not send any fees with the JPA. VMRC is not responsible for accounting for fees required by other agencies. Please consult agency websites or contact agencies directly for current fee information and submittal instructions.  USACE: Permit application fees are required for USACE Individual (Standard) permits. A USACE project manager will contact you regarding the proper fee and submittal requirements. Application Revised: August 2023 4 □ □  DEQ: Permit application fees required for Virginia Water Protection permits – while detailed in 9VAC25-20 – are conveyed to the applicant by the applicable DEQ office (http://www.deq.virginia.gov/Locations.aspx). Complete the Permit Application Fee Form and submit it per the instructions to the address listed on the form. Instructions for submitting any other fees will be provided to the applicant by DEQ staff.  VMRC: An application fee of $300 may be required for projects impacting tidal wetlands, beaches and/or dunes when VMRC acts as the LWB. VMRC will notify the applicant in writing if the fee is required. Permit fees involving subaqueous lands are $25.00 for projects costing $10,000 or less and $100 for projects costing more than $10,000. Royalties may also be required for some projects. The proper permit fee and any required royalty is paid at the time of permit issuance by VMRC. VMRC staff will send the permittee a letter notifying him/her of the proper permit fees and submittal requirements.  LWB: Permit fees vary by locality. Contact the LWB for your project area or their website for fee information and submittal requirements. Contact information for LWBs may be found at http://ccrm.vims.edu/permits_web/guidance/local_wetlands_boards.html. FOR AGENCY USE ONLY Notes: JPA # APPLICANTS Part 1 – General Information PLEASE PRINT OR TYPE ALL ANSWERS: If a question does not apply to your project, please print N/A (not applicable) in the space provided. If additional space is needed, attach 8-1/2 x 11 inch sheets of paper. Check all that apply Pre-Construction Notification (PCN) NWP # _____________________ (For Nationwide Permits ONLY - No DEQ- VWP permit writer will be assigned) PASDO – PGP Self Verification (Replaces Regional Permit 17 (RP-17) checklist) County or City in which the project is located:_________________________________________ Waterway at project site:___________________________________________________________ PREVIOUS ACTIONS RELATED TO THE PROPOSED WORK (Include all federal, state, and local pre application coordination, site visits, previous permits, or applications whether issued, withdrawn, or denied) Historical information for past permit submittals can be found online with VMRC - https://webapps.mrc.virginia.gov/public/habitat/ - or VIMS - http://ccrm.vims.edu/perms/newpermits.html Agency Action / Activity Permit/Project number, including any non-reporting Nationwide permits previously used (e.g., NWP 13) Date of Action If denied, give reason for denial Application Revised: August 2023 5 Part 1 - General Information (continued) 1. Applicant’s legal name* and complete mailing address: Contact Information: Home (____)_____________ Work (____)_____________ Fax (____)_____________ Cell (____)_____________ e-mail __________________ State Corporation Commission Name and ID Number (if applicable) _____________ 2. Property owner(s) legal name* and complete address, if different from applicant: Contact Information: Home (____)_____________ Work (____)_____________ Fax (____)_____________ Cell (____)_____________ e-mail __________________ State Corporation Commission Name and ID Number (if applicable) _____________ 3. Authorized agent name * and complete mailing Contact Information: address (if applicable): Home (____)_____________ Work (____)_____________ Fax (____)_____________ Cell (____)_____________ e-mail __________________ State Corporation Commission Name and ID Number (if applicable) _____________ * If multiple applicants, property owners, and/or agents, each must be listed and each must sign the applicant signature page. 4. Provide a detailed description of the project in the space below, including the type of project, its dimensions, materials, and method of construction. Be sure to include how the construction site will be accessed and whether tree clearing and/or grading will be required, including the total acreage. If the project requires pilings, please be sure to include the total number, type (e.g. wood, steel, etc), diameter, and method of installation (e.g. hammer, vibratory, jetted, etc). If additional space is needed, provide a separate sheet of paper with the project description. Application Revised: August 2023 6 Part 1 - General Information (continued) 5. Have you obtained a contractor for the project? ___ Yes* ___ No. *If your answer is “Yes” complete the remainder of this question and submit the Applicant’s and Contractor’s Acknowledgment Form (enclosed) Contractor’s name* and complete mailing address: Contact Information: Home (____)_____________ Work (____)_____________ Fax (____)_____________ Cell (____)_____________ email __________________ State Corporation Commission Name and ID Number (if applicable) _____________________ * If multiple contractors, each must be listed and each must sign the applicant signature page. 6. List the name, address and telephone number of the newspaper having general circulation in the area of the project. Failure to complete this question may delay local and State processing. Name and complete mailing address: Telephone number (____) __________________ 7. Give the following project location information: Street Address (911 address if available)_________________________________________ Lot/Block/Parcel#___________________________________________________________ Subdivision________________________________________________________________ City / County___________________________________ ZIP Code_____________________ Latitude and Longitude at Center Point of Project Site (Decimal Degrees): ________________________ / -________________________ (Example: 36.41600/-76.30733) If the project is located in a rural area, please provide driving directions giving distances from the best and nearest visible landmarks or major intersections. Note: if the project is in an undeveloped subdivision or property, clearly stake and identify property lines and location of the proposed project. A supplemental map showing how the property is to be subdivided should also be provided. 8. What are the primary and secondary purposes of and the need for the project? For example, the primary purpose may be “to protect property from erosion due to boat wakes” and the secondary purpose may be “to provide safer access to a pier.” Application Revised: August 2023 7 Part 1 - General Information (continued) 9. Proposed use (check one): ___ Single user (private, non-commercial, residential) ___ Multi-user (community, commercial, industrial, government) 10. Describe alternatives considered and the measures that will be taken to avoid and minimize impacts, to the maximum extent practicable, to wetlands, surface waters, submerged lands, and buffer areas associated with any disturbance (clearing, grading, excavating) during and after project construction. Please be advised that unavoidable losses of tidal wetlands and/or aquatic resources may require compensatory mitigation. 11. Is this application being submitted for after-the-fact authorization for work which has already begun or been completed? ___Yes ___No. If yes, be sure to clearly depict the portions of the project which are already complete in the project drawings. 12. Approximate cost of the entire project (materials, labor, etc.): $___________________________ Approximate cost of that portion of the project that is channelward of mean low water: $____________ 13. Completion date of the proposed work:________________________________-_____________ 14. Adjacent Property Owner Information: List the name and complete mailing address, including zip code, of each adjacent property owner to the project. (NOTE: If you own the adjacent lot, provide the requested information for the first adjacent parcel beyond your property line.) Failure to provide this information may result in a delay in the processing of your application by VMRC. Application Revised: August 2023 8 _____________________________________ _____________________________________ _____________________________________ _____________________________________ _____________________________________ _____________________________________ ___________________________________ ___________________________________ ____________________________________ ____________________________________ Part 2 - Signatures 1. Applicants and property owners (if different from applicant). NOTE: REQUIRED FOR ALL PROJECTS PRIVACY ACT STATEMENT: The Department of the Army permit program is authorized by Section 10 of the Rivers and Harbors Act of 1899, Section 404 of the Clean Water Act, and Section 103 of the Marine Protection Research and Sanctuaries Act of 1972. These laws require that individuals obtain permits that authorize structures and work in or affecting navigable waters of the United States, the discharge of dredged or fill material into waters of the United States, and the transportation of dredged material for the purpose of dumping it into ocean waters prior to undertaking the activity. Information provided in the Joint Permit Application will be used in the permit review process and is a matter of public record once the application is filed. Disclosure of the requested information is voluntary, but it may not be possible to evaluate the permit application or to issue a permit if the information requested is not provided. CERTIFICATION: I am hereby applying for all permits typically issued by the DEQ, VMRC, USACE, and/or Local Wetlands Boards for the activities I have described herein. I agree to allow the duly authorized representatives of any regulatory or advisory agency to enter upon the premises of the project site at reasonable times to inspect and photograph site conditions, both in reviewing a proposal to issue a permit and after permit issuance to determine compliance with the permit. In addition, I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalt ies for submitting false information, including the possibility of fine and imprisonment for knowing violations. Applicant’s Legal Name (printed/typed) Applicant’s Signature Date Property Owner’s Legal Name (printed/typed) (If different from Applicant) Property Owner’s Signature Date (Use if more than one applicant) (Use if more than one applicant) (Use if more than one owner) (Use if more than one owner) Application Revised: August 2023 9 _____________________________________ _____________________________________ _____________________________________ _____________________________________ __________________________________ __________________________________ Part 2 – Signatures (continued) 2. Applicants having agents (if applicable) CERTIFICATION OF AUTHORIZATION I (we),_____________________, hereby certify that I (we) have authorized ____________________________ (Applicant’s legal name(s)) (Agent’s name(s)) to act on my behalf and take all actions necessary to the processing, issuance and acceptance of this permit and any and all standard and special conditions attached. We hereby certify that the information submitted in this application is true and accurate to the best of our knowledge. (Agent’s Signature) (Date) (Applicant’s Signature) (Date) 3. Applicant’s having contractors (if applicable) CONTRACTOR ACKNOWLEDGEMENT (Use if more than one agent) (Use if more than one applicant) I (we), _______________________, have contracted_______________________________________________ (Applicant’s legal name(s)) (Contractor’s name(s)) to perform the work described in this Joint Permit Application, signed and dated_________________________. We will read and abide by all conditions set forth in all Federal, State and Local permits as required for this project. We understand that failure to follow the conditions of the permits may constitute a violation of applicable Federal, state and local statutes and that we will be liable for any civil and/or criminal penalties imposed by these statutes. In addition, we agree to make available a copy of any permit to any regulatory representative visiting the project to ensure permit compliance. If we fail to provide the applicable permit upon request, we understand that the representative will have the option of stopping our operation until it has been determined that we have a properly signed and executed permit and are in full compliance with all terms and conditions. _________________________________ Contractor’s name or name of firm ______________________________________ Contractor’s or firms address _________________________________ ______________________________________ Contractor’s signature and title Contractor’s License Number _________________________________ ______________________________________ Applicant’s signature (use if more than one applicant) _________________________________ Date Application Revised: August 2023 10 _____________________________________ ________________________ Part 2 – Signatures (continued) ADJACENT PROPERTY OWNER’S ACKNOWLEDGEMENT FORM I (we), _____________________________________, own land next to (across the water (Print adjacent/nearby property owner’s name) from/on the same cove as) the land of_______________________________________. (Print applicant’s name(s)) I have reviewed the applicant’s project drawings dated _________________________ (Date) to be submitted for all necessary federal, state and local permits. I HAVE NO COMMENT_______ ABOUT THE PROJECT. I DO NOT OBJECT ______ TO THE PROJECT. I OBJECT ______ TO THE PROJECT. The applicant has agreed to contact me for additional comments if the proposal changes prior to construction of the project. (Before signing this form be sure you have checked the appropriate option above). Adjacent/nearby property owner’s signature(s) Date Note: If you object to the proposal, the reason(s) you oppose the project must be submitted in writing to VMRC. An objection will not necessarily result in denial of the project; however, valid complaints will be given full consideration during the permit review process. Application Revised: August 2023 11 _____________________________________ ________________________ Part 2 – Signatures (continued) ADJACENT PROPERTY OWNER’S ACKNOWLEDGEMENT FORM I (we), _____________________________________, own land next to (across the water (Print adjacent/nearby property owner’s name) from/on the same cove as) the land of________________________________________. (Print applicant’s name(s)) I have reviewed the applicant’s project drawings dated __________________________ (Date) to be submitted for all necessary federal, state and local permits. I HAVE NO COMMENT_______ ABOUT THE PROJECT. I DO NOT OBJECT ______ TO THE PROJECT. I OBJECT ______ TO THE PROJECT. The applicant has agreed to contact me for additional comments if the proposal changes prior to construction of the project. (Before signing this form, be sure you have checked the appropriate option above). Adjacent/nearby property owner’s signature(s) Date Note: If you object to the proposal, the reason(s) you oppose the project must be submitted in writing to VMRC. An objection will not necessarily result in denial of the project; however, valid complaints will be given full consideration during the permit review process. Application Revised: August 2023 12 DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, NORFOLK DISTRICT 23-SPGP-PASDO SELF-VERIFICATION FORM CATEGORY A PIER STRUCTURES Expires: August 21, 2028 Please review the 23-SPGP-PASDO before completing this form. This can only be used for proposed PRIVATE USE structures that comply with the terms and conditions of the 23-SPGP-PASDO located on the Corps website: https://www.nao.usace.army.mil/Missions/Regulatory/RBregional/ . 1. Has the permittee reviewed the 23-SPGP-PASDO and verified that the proposed structures are in compliance with all the terms, conditions, and limitations of 23-SPGP-PASDO? ☐ YES ☐ NO 2. Are the proposed structures for private use only? ☐ YES ☐ NO 3. To avoid adverse effects to navigation, do the proposed structures extend no more than one- fourth of the distance across the waterway measured from either mean high water (MHW) to MHW (including all channelward wetlands) or ordinary high water (OHW) to OHW (including all channelward wetlands)? ☐ YES ☐ NO 4. If the proposed structures cross wetland vegetation, are they an open-pile design that has a maximum width of five (5) feet and a minimum height of four (4) feet between the decking and the wetland substrate? ☐ YES ☐ NO ☐ N/A 5. Do the proposed structures include no more than two (2) lifts and no more than two (2) boat slips? ☐ YES ☐ NO ☐ N/A 6. Is the open-sided roof structure designed to shelter a boat no more than 700 square feet and/or is the open-sided roof structure or gazebo structure designed to shelter a pier no more than 400 square feet? ☐ YES ☐ NO ☐ N/A 7. Are all piles associated with the proposed structure non-steel, no more than 12” in diameter, and will there be no more than 25 piles installed channelward of MHW? ☐ YES ☐ NO 8. When operationally feasible, is all work occurring behind cofferdams, turbidity curtains, or other methods used to control turbidity? ☐ YES ☐ NO 9. If the proposed structures are to be located within an anadromous fish use area, will the prospective permittee adhere to the anadromous fish use area time of year restriction (TOYR) prohibiting in- water work from occurring between February 15 through June 30 of any given year if 1) piles are to be installed with a cushioned impact hammer and there are fewer than 492 feet between the most channelward pile and mean low water (MLW) on the opposite shoreline; or 2) piles are to be installed with a vibratory hammer and there are fewer than 384 feet between the most channelward pile and MLW on the opposite shoreline? https://services.dwr.virginia.gov/fwis/ . ☐ YES ☐ NO ☐ N/A 10. Is all work occurring outside of submerged aquatic vegetation (SAV) mapped by the Virginia Institute of Marine Sciences’ (VIMS) most recent survey year and 5-year composite? https://mobjack.vims.edu/sav/savwabmap/ ☐ YES ☐ NO 11. Has the permittee ensured the construction of the proposed structures will not affect federally listed threatened or endangered species or designated critical habitat? NOAA PRD: https://www.fisheries.noaa.gov/new-england-mid-atlantic/consultations/section-7- consultations-greater-atlantic-region ; and US Fish and Wildlife Service: https://ipac.ecosphere.fws.gov/ ☐ YES ☐ NO 13 _____________________________________ _____________________________________ _____________________________________ _____________________________________ _____________________________________ 12. Will the proposed structures be located outside of the following waterbodies: Broad Creek in Middlesex County, Fisherman’s Cove in Norfolk, or the Salt Ponds in Hampton? ☐ YES ☐ NO 13. Is your project located outside of the Section 408 Review Area boundaries for civil works projects (e.g. federal navigation channels, flood risk management projects, or aquatic ecosystem restoration projects) as depicted on the “Norfolk District Section 408 Review Layer” in the Norfolk District Section 408 Map? https://www.nao.usace.army.mil/408Review/ ☐ YES ☐ NO 14. Is your project located outside of any federal property? Federal property can be located on the “NAO Real Estate Data – CWLDM Land Parcel Area” layer on the Norfolk District Section 408 Map? https://www.nao.usace.army.mil/408Review/ . ☐ YES ☐ NO 15. Will the proposed structures be located outside of any Designated Trout Waters? https://services.dwr.virginia.gov/fwis/ ☐ YES ☐ NO 16. If the proposed structures include floatation units, will the floating sections be braced so they will not rest on the bottom during periods of low water? ☐ YES ☐ NO ☐ N/A 17. Does the permittee recognize this form does not authorize any dredging or filling of waters of the United States (including wetlands) and does not imply that future dredging proposals or any other structures will be approved by the Corps? ☐ YES ☐ NO If you have answered “NO” to any of the questions above, then the Category A Self-Verification of the 23-SPGP-PASDO does NOT apply, and you are required to obtain written authorization from the Corps prior to performing the work. If you answered “YES” (or “N/A, where applicable) to all of the questions above, you are in compliance with the Category A Self-Verification of the 23-SPGP-PASDO. Please sign below and submit this self- verification form with your completed Joint Permit Application (JPA). This signed form serves as your letter of authorization from the Corps. You WILL NOT receive any other written authorization from the Corps; however, you MAY NOT proceed with construction until you have obtained all other necessary state and local permits. By signing below, I certify that I have read and understand all conditions of the Army Corps of Engineers Norfolk District Regulatory Branch 23-SPGP-PASDO, dated August 22, 2023. I accept all of the terms and conditions of the permit, including the limits of federal liability contained in the 23-SPGP-PASDO enclosure. I acknowledge that structures authorized under this permit may be exposed to waves caused by passing vessels. The permittee is solely responsible for the integrity of the permitted structures and any resulting wave damage to such structures or moored vessels. I accept that the United States is not liable in any way for such damage and that the permittee will not seek to involve the United States in any actions or claims regarding such damage. Proposed work location: Signature of Property Owner(s) or Agent Date VMRC Number 14 ------------------------------------------------------------------------------------------------------------ Part 3 – Appendices Please complete and submit the appendix questions applicable to your project, and attach the required vicinity map(s) and drawings to your application. If an item does not apply to your project, please write “N/A” in the space provided. Appendix A: (TWO PAGES) Projects for Access to the water such as private and community piers, boathouses, marinas, moorings, and boat ramps. Answer all questions that apply. 1. Briefly describe your proposed project. 2. For private, noncommercial piers: Do you have an existing pier on your property? ____Yes____ No If yes, will it be removed? ____Yes ____No Is your lot platted to the mean low water shoreline? ____Yes ____No What is the overall length of the proposed structure? ________feet. Channelward of Mean High Water? ________feet. Channelward of Mean Low Water? ________feet. What is the area of the piers and platforms that will be constructed over Tidal non-vegetated wetlands __________ square feet. Tidal vegetated wetlands _________ square feet. Submerged lands __________square feet. What is the total size of any and all L- or T-head platforms?_______sq. ft. For boathouses, what is the overall size of the roof structure? ________sq. ft. Will your boathouse have sides?_____Yes____ No. NOTE: All proposals for piers, boathouses and shelter roofs must be reviewed by the Virginia Marine Resources Commission (Commission or VMRC), however, pursuant to § 28.2-1203 A 5 of the Code of Virginia a VMRC permit may not be required for such structures (except as required by subsection D of § 28.2-1205 for piers greater than 100 feet in length involving commercially productive leased oyster or clam grounds), provided that (i) the piers do not extend beyond the navigation line or private pier lines established by the Commission or the United States Army Corps of Engineers (USACE), (ii) the piers do not exceed six feet in width and finger piers do not exceed five feet in width, (iii) any L or T head platforms and appurtenant floating docking platforms do not exceed, in the aggregate, 400 square feet, (iv) if prohibited by local ordinance open-sided shelter roofs or gazebo-type structures shall not be placed on platforms as described in clause (iii), but may be placed on such platforms if not prohibited by local ordinance, and (v) the piers are determined not to be a navigational hazard by the Commission. Subject to any applicable local ordinances, such piers may include an attached boat lift and an open-sided roof designed to shelter a single boat slip or boat lift. In cases in which open-sided roofs designed to shelter a single boat, boat slip or boat lift will exceed 700 square feet in coverage or the open-sided shelter roofs or gazebo structures exceed 400 square feet, and in cases in which an adjoining property owner objects to a proposed roof structure, permits shall be required as provided in § 28.2-1204. Application Revised: August 2023 15 _______________________________________________________________________________________ _______________________________________________________________________________________ _____________________________________________________________________ Part 3 – Appendices (continued) 3. 4. 5. 6. For USACE permits, in cases where the proposed pier will encroach beyond one fourth the waterway width (as determined by measuring mean high water to mean high water or ordinary high water mark to ordinary high water mark), the following information must be included before the application will be considered complete. For an application to be considered complete: a. The USACE MAY require depth soundings across the waterway at increments designated by the USACE project manager. Typically 10-foot increments for waterways less than 200 feet wide and 20- foot increments for waterways greater than 200 feet wide with the date and time the measurements were taken and how they were taken (e.g., tape, range finder, etc.). b. The applicant MUST provide a justification as to purpose if the proposed work would extend a pier greater than one-fourth of the distance across the open water measured from mean high water or the channelward edge of the wetlands. c. The applicant MUST provide justification if the proposed work would involve the construction of a pier greater than five feet wide or less than four feet above any wetland substrate. Provide the type, size, and registration number of the vessel(s) to be moored at the pier or mooring buoy. Type Length Width Draft Registration # For Marinas, Commercial Piers, Governmental Piers, Community Piers and other non-private piers, provide the following information: A) Have you obtained approval for sanitary facilities from the Virginia Department of Health?___________ (required pursuant to Section 28.2-1205 C of the Code of Virginia). B) Will petroleum products or other hazardous materials be stored or handled at your facility?_______________. C) Will the facility be equipped to off-load sewage from boats?__________. D) How many wet slips are proposed?_______. How many are existing?______. E) What is the area of the piers and platforms that will be constructed over Tidal non-vegetated wetlands __________ square feet Tidal vegetated wetlands _________ square feet Submerged lands __________square feet For boat ramps, what is the overall length of the structure?________feet. From Mean High Water?________feet. From Mean Low Water?________feet. Note: drawings must include the construction materials, method of installation, and all dimensions. If tending piers are proposed, complete the pier portion. Note: If dredging or excavation is required, you must complete the Standard Joint Point Permit application. Application Revised: August 2023 16 Part 3 – Appendices (continued) Appendix B: Projects for Shoreline Stabilization in tidal wetlands, tidal waters and dunes/beaches including riprap revetments and associated backfill, marsh toe stabilization, bulkheads and associated backfill, breakwaters, beach nourishment, groins, jetties, and living shoreline projects. Answer all questions that apply. Please provide any reports provided from the Shoreline Erosion Advisory Service or VIMS. NOTE: It is the policy of the Commonwealth that living shorelines are the preferred alternative for stabilizing tidal shorelines (Va. Code § 28.2-104.1). Information on non-structural, vegetative alternatives (i.e., Living Shoreline) for shoreline stabilization is available at http://ccrm.vims.edu/coastal_zone/living_shorelines/index.html. 1. Describe each revetment, bulkhead, marsh toe, breakwater, groin, jetty, other structure, or living shoreline project separately in the space below. Include the overall length in linear feet, the amount of impacts in acres, and volume of associated backfill below mean high water and/or ordinary high water in cubic yards, as applicable: 2. What is the maximum encroachment channelward of mean high water?_______feet. Channelward of mean low water?_______feet. Channelward of the back edge of the dune or beach?_____feet. 3. Please calculate the square footage of encroachment over: • Vegetated wetlands __________square feet • Non-vegetated wetlands __________square feet • Subaqueous bottom __________square feet • Dune and/or beach __________square feet 4. For bulkheads, is any part of the project maintenance or replacement of a previously authorized, currently serviceable, existing structure? ____ Yes____ No. If yes, will the construction of the new bulkhead be no further than two (2) feet channelward of the existing bulkhead? _____Yes ____No. If no, please provide an explanation for the purpose and need for the additional encroachment. Application Revised: August 2023 17 ________________________________________________________ Part 3 – Appendices (continued) 5. 6. 7. Describe the type of construction and all materials to be used, including source of backfill material, if applicable (e.g., vinyl sheet-pile bulkhead, timber stringers and butt piles, 100% sand backfill from upland source; broken concrete core material with Class II quarry stone armor over filter cloth). NOTE: Drawings must include construction details, including dimensions, design and all materials, including fittings if used. If using stone, broken concrete, etc. for your structure(s), what is the average weight of the: Core (inner layer) material__________ pounds per stone Class size ________ Armor (outer layer) material __________ pounds per stone Class size ________ For beach nourishment, including that associated with breakwaters, groins or other structures, provide the following: • Volume of material • Area to be covered ___________ cubic yards channelward of mean low water ___________ cubic yards landward of mean low water ___________ cubic yards channelward of mean high water ___________ cubic yards landward of mean high water ___________ square feet channelward of mean low water ___________ square feet landward of mean low water ___________ square feet channelward of mean high water ___________ square feet landward of mean high water • Source of material, composition (e.g. 90% sand, 10% clay):___________________________ • Method of transportation and placement: • Describe any proposed vegetative stabilization measures to be used, including planting schedule, spacing, monitoring, etc. Additional guidance is available at http://www.vims.edu/about/search/index.php?q=planting+guidelines: Application Revised: August 2023 18 Part 3 – Appendices (continued) Appendix C: Crossings in, on, over, or under, waters, submerged lands, tidal wetlands and/or dunes and beaches, including but not limited to, bridges, walkways, pipelines and utility lines. 1. 2. 3. 4. 5. 6. What is the purpose and method of installation of the crossing? What is the width of the waterway and/or wetlands to be crossed from mean high water to mean high water (tidal waters)? _______ feet. from mean low water to mean low water (tidal waters)? _______ feet. from ordinary high water to ordinary high water (non-tidal waters)? _______ feet. For bridges (footbridges, golf cart bridges, roadway bridges, etc.), what is the width of the structure over the tidal wetlands, dunes/beaches and/or submerged lands? ____________square feet. For overhead crossings: a. What will be the height above mean high water? _______feet. b. If there are other overhead crossings in the area, what is the minimum height? _____feet. c. If the proposed crossing is an electrical line, please confirm the total number of electrical circuits: _________ For buried crossings, what will be the depth below the substrate? __________feet. Will the proposed utility provide empty conduits for any additional utilities that may propose to co-locate at a later date? _____Yes _____No. Will there be any excavation or fill required for placement of abutments, piers, towers, or other permanent structures on State-owned submerged lands, tidal wetlands, and dunes/beaches? ____Yes ____ No. If yes, please provide the following: a. Amount of excavation in wetlands _________ cubic yards _________ square feet b. Amount of excavation in submerged land _________ cubic yards _________ square feet c. Amount of excavation in dune/beach _________ cubic yards _________ square feet d. Amount of fill in wetlands _________ cubic yards _________ square feet e. Amount of fill in submerged lands _________ cubic yards _________ square feet f. Amount of fill in dune/beach ________ cubic yards ________ square feet Application Revised: August 2023 19 Part 3 – Appendices (continued) Appendix D: Aquaculture Related Structures such as cages and floats. Before completing this appendix, please review the aquaculture requirements summary at: http://mrc.virginia.gov/Shellfish_Aquaculture.shtm. 1. Will the activity be for commercial purposes? _____Yes _____ No. If Yes and structures will be placed upon an oyster ground lease, you may qualify for the VMRC General Permit #4 for Temporary Protective Enclosures for Shellfish. For more info see: http://www.mrc.virginia.gov/regulations/MRC_Scanned_Regs/Shellfish_Mix/fr1130_12-0107.pdf. If you qualify for the General Permit #4, or if such structures are proposed that are not on an oyster planting ground lease, or for floating structures of any kind, complete this Joint Permit Application and include the necessary information requested below in question 2 through 11. If No, you may qualify for the VMRC General Permit #3, for Noncommercial Riparian Shellfish Growing (i.e. “Gardening”) For more information see: http://www.mrc.virginia.gov/forms/VGP3_Aquaculture.doc.pdf. If you qualify for this general permit use the Abbreviated Joint Permit Application For Noncommercial Riparian Shellfish Aquaculture Structures available at https://mrc.virginia.gov/forms/2019/VGP3_Aquaculture_form_2019.pdf do not use this Joint Permit Application. 2. Will aquaculture structures be attached to an existing pier or other structure? ____ Yes ____ No. 3. The plat file # if proposed upon oyster planting ground lease(s).___________________________ 4. The maximum area where enclosures are proposed. ___________ square feet 5. The maximum number of enclosures being proposed to be deployed. _____________ 6. The species of shellfish to be cultured. ____________________________ 7. A detailed description of the enclosures to include width, length and height. 8. In addition to the requirements itemized in Part 4 Project Drawings, the following additional information must be included on your project drawings: A general description of the area within 500 feet of deployment area. Provide a drawing that depicts existing marine resources such as SAV, shellfish beds, fixed fishing devices, public grounds, piers, water depths at mean low water, tide range, and the minimum clearance at mean low tide over the enclosures. 9. Provide the date enclosures are proposed to be deployed _______________. How will the structures be secured? ______________________________________________________________________. Application Revised: August 2023 20 Part 3 – Appendices (continued) 10. List of all riparian land owners within 500 feet of the area where enclosures are proposed along with a map (tax map or other suitable map) depicting the locations of such parcels or riparian property owner acknowledgement forms signed by the riparian land owner with any comments concerning the enclosures deployment request. 11. Proof that the applicant holds a current oyster or clam aquaculture product owners permit, and verification that the applicant is in compliance with Mandatory Harvest Reporting requirements, and verification that the current years oyster ground rent is paid, if structures are proposed on an oyster ground lease. Application Revised: August 2023 21 ---- Part 4 - Project Drawings Plan view and cross-sectional view drawings are required for all projects. Application drawings do not need to be prepared by a professional draftsman, but they must be clear, accurate, and should be to an appropriate scale. If a scale is not used, all dimensions must be clearly depicted in the drawings. If available, a plat of the property should be included, with the existing and proposed structures clearly indicated. Distances from the proposed structure(s) to fixed points of reference (benchmarks) and to the adjacent property lines must be shown. A vicinity map (County road map, USGS Topographic map, etc.) must also be provided to show the location of the property. NOTE: The sample drawings have been included at the end of this section to provide guidance on the information required for different types of projects. Clear and accurate drawings are essential for project review and compliance determination. Incomplete or unclear drawings may cause delays in the processing of your application. The following items must be included on ALL project drawings: (plan and cross-sectional, as appropriate) - name of project - north arrow - scale - waterway name - existing and proposed structures, labeled as such - dimensions of proposed structures - mean high water and mean low water lines - all delineated wetlands and all surface waters on the site, including the Cowardin classification (i.e., emergent, scrub-shrub, or forested) for those surface waters (if applicable) - limits of proposed impacts to surface waters, such as fill areas, riprap scour protection placement, and dredged areas, and the amount of such impacts in square feet and acres - ebb/flood direction - adjacent property lines and owner’s name - distances from proposed structures to fixed points of reference (benchmarks) and adjacent property lines Application Revised: August 2023 22 Part 5 - Chesapeake Bay Preservation Act Information All proposed development, redevelopment, land disturbance, clearing or grading related to this Tidewater JPA must comply with the Chesapeake Bay Preservation Area Designation and Management Regulations, which are enforced through locally adopted Chesapeake Bay Preservation Area (CBPA) ordinances. Compliance with state and local CBPA requirements mandates the submission of a Water Quality Impact Assessment (WQIA) for the review and approval of the local government. Contact the appropriate local government office to determine if a WQIA is required for the proposed activity(ies). Because the 84 local governments within Tidewater Virginia are responsible for enforcing the CBPA Regulations, the completion of the JPA process does not constitute compliance with the Bay Act Regulations nor does it guarantee that the local government will approve encroachments into the RPA that may result from this project. Applicants should contact their local government as early in the design process as possible to ensure that the final design and construction of the proposed project meets all applicable CBPA requirements. Early cooperation with local government staff can help applicants avoid unnecessary and costly delays to construction. Applicants should provide local government staff with information regarding existing vegetation within the Resource Protection Area (RPA) as well as a description and site drawings of any proposed land disturbance, construction, or vegetation clearing. As part of their review and approval processes, local government staff will evaluate the proposed project and determine whether or not approval can be granted. Once the locality has made a decision on the project, they will advise the Local Wetlands Boards and other appropriate parties of applicable CBPA concerns or issues. Resource Protection Areas (RPAs) are composed of the following features: 1. Tidal wetlands; 2. Nontidal wetlands connected by surface flow and contiguous to tidal wetlands or water bodies with perennial flow; 3. Tidal shores; 4. Other lands considered by the local government to meet the provisions of subsection A of 9VAC25-830-80 and to be necessary to protect the quality of state waters; and 5. A buffer area not less than 100 feet in width located adjacent to and landward of the components listed in subdivisions 1 through 4 above, and along both sides of any water body with perennial flow. Notes for all projects in RPAs Development, redevelopment, construction, land disturbance, or placement of fill within the RPA features listed above requires the approval of the locality and may require an exception or variance from the local Bay Act ordinance. Please contact the appropriate local government to determine the types of development or land uses that are permitted within RPAs. Pursuant to 9VAC25-830-110, on-site delineation of the RPA is required for all projects in CBPAs. Because USGS maps are not always indicative of actual “in-field” conditions, they may not be used to determine the site-specific boundaries of the RPA. Notes for shoreline erosion control projects in RPAs Re-establishment of woody vegetation in the buffer will be required by the locality to mitigate for the removal or disturbance of buffer vegetation associated with your proposed project. Please contact the local government to determine the mitigation requirements for impacts to the 100-foot RPA buffer. Application Revised: August 2023 23 Part 5 - Chesapeake Bay Preservation Act Information (continued) Pursuant to 9VAC25-830-140 5 a (4) of the Virginia Administrative Code, shoreline erosion projects are a permitted modification to RPAs provided that the project is based on the “best technical advice” and complies with applicable permit conditions. In accordance with 9VAC25-830-140 1 of the Virginia Administrative Code, the locality will use the information provided in this Part V, in the project drawings, in this permit application, and as required by the locality, to make a determination that: 1. Any proposed shoreline erosion control measure is necessary and consistent with the nature of the erosion occurring on the site, and the measures have employed the “best available technical advice” 2. Indigenous vegetation will be preserved to the maximum extent practicable 3. Proposed land disturbance has been minimized 4. Appropriate mitigation plantings will provide the required water quality functions of the buffer (9VAC25-830-140 3) 5. The project is consistent with the locality’s comprehensive plan 6. Access to the project will be provided with the minimum disturbance necessary. Application Revised: August 2023 24 Appendix B CPC VMRC and Wetland Board Permits COMMONWEALTH of VIRGINIA Marine Resources Commission Building 96 380 Fenwick Road Fort Monroe, Virginia 23651 An Agency of the Natural Resources Secretariat www.mrc.virginia.gov Telephone (757) 247-2200 Information and Emergency Hotline 1-800-541-4646 Jamie L. Green Commissioner Travis A. Voyles Secretary of Natural and Historic Resources November 20, 2024 Colonial Pipeline Company Attn: Mr. Matthew Otto c/o Corblu Ecology Group, LLC Attn: Mr. Matthew Wyant 1305 Lakes Parkway, Suite 110 Lawrenceville, GA 30043 MWyant@colpipe.com motto@corblu.com Re: VMRC #2015-1211 Dear Mr. Otto: This is in response to your request for an extension of the above-referenced permit. Specifically, that permit authorizes you to replace or repair petroleum pipeline (Line 27) segments, at multiple stream crossings, as needed in Cumberland, Henrico, Powhatan, Chesterfield, Charles City, James City, Surry, and Isle of Wight Counties and the Cities of Richmond, Suffolk, and Chesapeake. Your extension request is hereby granted. The new expiration date for the previously authorized work will be December 8, 2025. Attach this letter to your original permit as verification of this extension. Please be advised you may also need to request an extension from the Department of Environmental Quality, the U. S. Army Corps of Engineers and/or the local wetlands board for any permits they require. If you have any questions, please feel free to contact Mr. Bradley Reams of my staff at (757) 247-8120 or via email at brad.reams@mrc.virginia.gov Sincerely, Randal D. Owen Randal D. Owen Chief, Habitat Management RDO/br:lra HM cc: U.S. Army Corp of Engineers Department of Environmental Quality #6 James City & Suffolk County Local Wetlands Boards Applicant Permit #15-1211 Commonwealth of Virginia Marine Resources Commission Authorization A Permit has been issued to: Colonial Pipeline Company 929 Hoods Mill Road Woodbine, MD 21797 Permittee is hereby authorized to modify an existing permit to allow for the installation, by directional bore method, of a 14-inch diameter gas transmission replacement line, in an existing easement, a minimum of 80 feet beneath a 4,200 linear foot wide section of the Nansemond River in the City of Suffolk. Issuance Date: December 28, 2015 Expiration Date: December 31, 2028 Randal D. Owen Chief, Habitat Management Division This Notice Must be Conspicuously Displayed at Site of Work RESOLUTION GRANTING A WETLANDS PERMIT EXTENSION ON JAMES CITY COUNTY REAL ESTATE TAX PARCELS IDNOs. 5940100003. 4920100006. 4910230001A. 49103A0002A. 4610100008. 3430100002 WHEREAS, Ms. Shanna Cahill and Mr. Neil Blackman ofCorblu Ecology Group, LLC, on behalf of Mr. Stanley Carpenter of the Colonial Pipeline Company (the "Applicant"), have requested an extension of the permit granted by the Wetlands Board of James City County (the "Board") on November 12, 2015. The permit is to allow for potential tidal wetland impacts along and within the existing Colonial Pipeline easement corridor within James City County. The crossings are identified as the James River Parcel ID No. 5940100003, Halfway Creek Parcel ID No. 4920100006, College Creek Parcels ID No. 4910230001A and ID No. 49103A0002A, Powhatan Creek Parcel ID No. 4610100008 and the Chickahominy River Parcel D3 No. 3430100002 (the "Property") as set forth in the application W-04-16/VMRC No. 15-1211; and WHEREAS, the Board has listened to the arguments presented and has carefully considered all evidence entered into the record. NOW, THEREFORE, having coaducted a public hearing on November 12, 2015, and pursuant to the current request for an extension, the Wetlands Board of James City County, Virginia, by a majority vote of its members FFNDS that: 1. The anticipated public and private benefit of the proposed activity in the wetlands exceeds its anticipated public and private detriment. 2. The proposed development conforms to the standards prescribed in Section 28.2- 1308 of the Code of Virginia, and the guidelines promulgated pursuant to Section 28. 2-1301 of the Code of Virginia. 3. The proposed activity does not violate the purpose and intent of Chapter 22 of the James City County Code or Sections 28.2-1300 et. seq. of the Code of Virginia. 4. In granting this wetlands permit, the following conditions are hereby imposed: a) The Applicant shall inform the Stormwater and Resource Protection Division on all 'Awareness Letters' submitted to Virginia Marine Resources Commission and/or the United States Army Corps of Engineers that are within James City County. b) The Applicant shall inform the Stormwater and Resource Protection Division of all emergency repairs performed within James City County and when the work in these areas of James City County are to commence. -2- c) The Applicant shall monitor any impact area for a period of two years post-repair to ensure that the areas have achieved adequate stabilization (90% aerial coverage). If inadequately stabilized after two years, a restoration plan must be submitted and approved by the Stormwater and Resource Protection Division. d) The wetlands permit for this project shall expire on December 31, 2025. IJL^J^}^^-^ Michael D. Woolson Secretary to the Board Adopted by the Wetlands Board of James City County, Virginia, this 26th day of September 2018. THE FORGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME THIS ^?^ DAY OF ^/yfe^i^-^ 20 /^ IN THE COMMONWEALTH OF VIRGINIA IN THE'COUNTY OF JAMES CITY. C-xJ?/^^- J,^ NOTARY PUBLIC (^ MY COMMISSION EXPIRES-^.'<-^t^^ ^, ^7^^ JANiCEE.PEHY NOTARY PUBLIC COMMISSION #209699 COMMONWEALTH OF VIRGINIA MY COMMISSION EXPIRES JANUARY 31, 2022 W04-16ColPipeext25 -res Appendix C CPC’s 2025 Annual Standards and Specifications for Erosion and Sediment Control and Stormwater Management COLONIAL PIPELINE COMPANY 2025 STANDARDS & SPECIFICATIONS EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT MARCH 2025 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 1 STANDARDS AND SPECIFICATIONS #SS007 STANDARDS AND SPECIFICATIONS AGREEMENT FOR COLONIAL PIPELINE COMPANY Standards and Specifications Entity Entity Name: Colonial Pipeline Company Entity Address: 929 Hoods Mill Road City, State, and Zip Code: Woodbine, MD 21791 Contact Name: Matthew Wyant, NED Senior Environmental Specialist Contact Phone: 240-204-1158 Contact Email: mwyant@colpipe.com Alt. Contact Name: Tara Ryan, NED Environmental Program Manager Alt. Contact Phone: 240-429-4864 Alt. Contact Email:tryan@colpipe.com Standards and Specifications Entity Type ☐ State ☐ Federal ☒ Linear Utility ☐ Public Service Authority ☐ Wetland/Stream Standards and Specifications Agreement Information Agreement Date: Date of previously approved agreement: August 2021 Have there been any updates to your previously approved agreement? ☒ Yes ☐ No Certification “I certify under penalty of law that this agreement and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are si gnificant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations”. __________________________________________________________________ Signature Date Matthew Wyant, NED Senior Environmental Specialist Printed Name 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 2 Table of Contents 1.0 INTRODUCTION ......................................................................................................................................... 4 2.0 REGULATED LAND-DISTURBING ACTIVITIES ............................................................................................... 5 3.0 PURPOSE AND USE .................................................................................................................................... 8 3.1 GENERAL ......................................................................................................................................................... 8 3.2 DEPARTMENT OVERSIGHT ................................................................................................................................... 8 3.3 STANDARDS & SPECIFICATIONS AND COLONIAL PROJECT OVERSIGHT .......................................................................... 9 3.4 LONG-TERM MAINTENANCE OF PERMANENT STORMWATER MANAGEMENT FACILITIES ................................................ 11 4.0 GENERAL SEQUENCE OF CONSTRUCTION FOR LINEAR PROJECTS ............................................................ 11 4.1 NOTIFICATION ................................................................................................................................................ 12 4.2 INSPECTION OVERSIGHT ................................................................................................................................... 12 4.3 INSTALLATION OF SEDIMENT CONTROL MEASURES ................................................................................................ 12 4.4 CONSTRUCTION AND MAINTENANCE ACTIVITIES .................................................................................................... 13 4.5 SITE STABILIZATION ......................................................................................................................................... 13 5.0 COLONIAL PIPELINE COMPANY INTERNAL REVIEW ................................................................................. 15 5.1 REPORTS AND RECORD KEEPING ........................................................................................................................ 16 5.2 NON-VSMH CONTROL MEASURES .................................................................................................................... 16 6.0 GENERAL NOTES AND STANDARDS ......................................................................................................... 17 6.1 EROSION & SEDIMENT CONTROL MINIMUM STANDARDS ....................................................................................... 17 6.2 OFFSITE COMPLIANCE OPTIONS ......................................................................................................................... 21 6.3 CONSTRUCTION STORMWATER REQUIREMENTS .................................................................................................... 22 7.0 VARIANCE AND EXEMPTION REQUESTS .................................................................................................. 23 8.0 STORMWATER POLLUTION PREVENTION PLAN REQUIREMENTS ............................................................. 25 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 3 Appendix A – Erosion & Sediment Control Details FIGURE 1.01: SAFETY FENCE (C-PCM-01) ........................................................................................................................... 28 FIGURE 1.02: STRAW BALE BARRIER (C-PCM-02) ................................................................................................................. 29 FIGURE 1.03: SILT FENCE – WITH WIRE SUPPORT (C-PCM-04)............................................................................................... 30 FIGURE 1.03: SILT FENCE – WITHOUT WIRE SUPPORT (C-PCM-04) ......................................................................................... 31 FIGURE 1.04: COMPOST FILTER SOCK (C-PCM-05) ............................................................................................................... 32 FIGURE 1.04: COMPOST FILTER SOCK (C-PCM-05) ............................................................................................................... 33 FIGURE 1.05: CONSTRUCTION ROAD STABILIZATION (C-SCM-02) ............................................................................................ 34 FIGURE 1.06: TEMPORARY STONE CONSTRUCTION ENTRANCE (C-SCM-03) ............................................................................... 35 FIGURE 1.06: TEMPORARY CONSTRUCTION ENTRANCE – PRE-FABRICATED .................................................................................. 36 FIGURE 1.07: DEWATERING STRUCTURE (C-SCM-10) ............................................................................................................ 37 FIGURE 1.08: CONCRETE WASHOUT PIT (C-SCM-13) ............................................................................................................ 38 FIGURE 1.08: CONCRETE WASHOUT PIT (C-SCM-13) ............................................................................................................ 39 FIGURE 1.09: IMPERMEABLE DIVERSION FENCE (C-ECM-02) .................................................................................................. 40 FIGURE 1.10: TEMPORARY RIGHT-OF-WAY DIVERSION (C-ECM-07) ........................................................................................ 41 FIGURE 1.11: RIPRAP (C-ECM-13)..................................................................................................................................... 42 FIGURE 1.12: TEMPORARY VEHICULAR STREAM CROSSING (C-ENV-03) .................................................................................... 43 FIGURE 1.12: TEMPORARY VEHICULAR STREAM CROSSING (C-ENV-03) .................................................................................... 44 FIGURE 1.13: UTILITY STREAM CROSSING (C-ENV-04) ........................................................................................................... 45 FIGURE 1.13: UTILITY STREAM CROSSING (C-ENV-04) ........................................................................................................... 46 FIGURE 1.13: UTILITY STREAM CROSSING (C-ENV-04) ........................................................................................................... 47 FIGURE 1.13: UTILITY STREAM CROSSING (C-ENV-04) ........................................................................................................... 48 FIGURE 1.13: UTILITY STREAM CROSSING (C-ENV-04) ........................................................................................................... 49 FIGURE 1.14: COFFERDAM CROSSING (C-ENV-05) ................................................................................................................ 50 FIGURE 1.14: COFFERDAM CROSSING (C-ENV-05) ................................................................................................................ 51 FIGURE 1.14: COFFERDAM CROSSING (C-ENV-05) ................................................................................................................ 52 FIGURE 1.15: STABLE WETLAND CROSSING (C-ENV-06) ........................................................................................................ 53 FIGURE 1.15: STABLE WETLAND CROSSING (C-ENV-06) ........................................................................................................ 54 FIGURE 1.16: PUMP AROUND DIVERSION (C-ENV-08) .......................................................................................................... 55 FIGURE 1.17: TREE PRESERVATION AND PROTECTION (C-SSM-01) ........................................................................................... 56 FIGURE 1.18: SOIL STABILIZATION BLANKETS (C-SSM-05) ...................................................................................................... 57 FIGURE 1.18: SOIL STABILIZATION BLANKETS (C-SSM-05) ...................................................................................................... 58 FIGURE 1.18: SOIL STABILIZATION BLANKETS (C-SSM-05) ...................................................................................................... 59 FIGURE 1.18: SOIL STABILIZATION BLANKETS (C-SSM-05) ...................................................................................................... 60 FIGURE 1.18: SOIL STABILIZATION BLANKETS (C-SSM-05) ...................................................................................................... 61 FIGURE 1.18: SOIL STABILIZATION BLANKETS (C-SSM-05) ...................................................................................................... 62 FIGURE 1.19: SODDING (C-SSM-06) .................................................................................................................................. 63 FIGURE 1.19: SODDING (C-SSM-06) .................................................................................................................................. 64 FIGURE 1.20: PERMANENT SEEDING (C-SSM-10) ................................................................................................................. 65 FIGURE 1.20: PERMANENT SEEDING (C-SSM-10) ................................................................................................................. 66 FIGURE 1.20: PERMANENT SEEDING (C-SSM-10) ................................................................................................................. 67 FIGURE 1.20: PERMANENT SEEDING (C-SSM-10) ................................................................................................................. 68 FIGURE 1.20: PERMANENT SEEDING – COLONIAL SPECIFIC ....................................................................................................... 69 FIGURE 1.21: MULCHING (C-SSM-11) ............................................................................................................................... 70 Appendix B – Colonial Stormwater Pollution Prevention Plan Template 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 4 1.0 Introduction Per § 62.1-44.15:31 of the Code of Virginia, the Virginia Department of Transportation shall; any other state agency or federal entity may; and electric, natural gas, and telephone utility companies; interstate and intrastate natural gas pipeline companies; railroad companies; and authorities created pursuant to § 15.2 -5102 of the Code of Virginia may submit standards and specifications, for approval by the Virginia Dep artment of Environmental Quality ( the “Department”), who serves as the Virginia Erosion and Stormwater Management Program (VESMP) authority for all land -disturbing activities subject to approved standards and specifications. The Standards and Specifications Program is designed to provide a single set of standards and specifications, the Virginia Stormwater Management Handbook (VSMH), Version 1.0, that describes how entities with approved standards and specifications conduct land - disturbing activities in a manner that will be consistent with the requirements of the Virginia Erosion and Stormwater Management Act (VESMA), Virginia Erosi on and Stormwater Management Regulation (VESMR), and the General Virginia Pollutant Discharge Elimination System (VPDES) Permit for Discharges of Stormwater from Construction Activities (Construction General Permit). Colonial Pipeline Company, hereinafter “Colonial,” is responsible for administering, implementing, and complying with the standards and specifications for Erosion and Sediment Control (ESC) and Stormwater Management (SWM) set out in this agreement by following the design criteria in the Virginia Stormwa ter Management Handbook, Version 1.0, for l inear projects related to the Construction, Installation, or Maintenance of pipelines. 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 5 2.0 Regulated Land-Disturbing Activities A. Land-disturbing activities that meet one of the criteria below are regulated as follows: 1) Land-disturbing activity that disturbs 10,000 square feet or more, is less than one acre, not in an area of a locality designated as a Chesapeake Bay Preservation Area, and not part of a common plan of development or sale, is subject to criteria defined in Article 2 (9VAC25-875-540 et seq.) of Part V of the Virginia Erosion and Stormwater Management Regulation (Regulation). 2) Land-disturbing activity that disturbs 2,500 square feet or more, is less than one acre, and in an area of a locality designated as a Chesapeake Bay Preservation Area is subject to criteria defined in Article 2 (9VAC25-875-540 et seq.) and Article 3 (9VAC25-875-570 et seq.) of Part V of the Regulation unless Article 4 (9VAC25- 875-670 et seq) of Part V is applicable, as determined in accordance with 9VAC25- 875-480 and 9VAC25-875-490. 3) Land-disturbing activity that disturbs less than one acre, but is part of a larger common plan of development or sale that disturbs one acre or more, is subject to criteria defined in Article 2 (9VAC25-875-540 et seq.) and Article 3 (9VAC25-875- 570 et seq.) of Part V of the Regulation unless Article 4 (9VAC25-875-670 et seq) of Part V is applicable, as determined in accordance with 9VAC25 -875-480 and 9VAC25-875-490. 4) Land-disturbing activity that disturbs one acre or more is subject to criteria defined in Article 2 (9VAC25-875-540 et seq.) and Article 3 (9VAC25-875-570 et seq.) of Part V of the Regulation unless Article 4 (9VAC25 -875-670 et seq.) of Part V is applicable, as determined in accordance with 9VAC25- 875-480 and 9VAC25-875- 490. B. Land-disturbing activities exempt per 9VAC25-875-90 are not required to comply with the requirements of the VESMA unless otherwise required by federal law. Notwithstanding any other provisions of the VESMA, the following activities are not required to comply with the requirements of the VESMA unless otherwise required by federal law: 1) Minor land -disturbing activities, including home gardens and individual home landscaping, repairs, and maintenance work; 2) Installation, maintenance, or repair of any individual service connection; 3) Installation, maintenance, or repair of any underground utility line when such activity occurs on an existing hard surfaced road, street, or sidewalk, provided the land-disturbing activity is confined to the area of the road, street, or sidewalk that is hard surfaced; 4) Installation, maintenance, or repair of any septic tank line or drainage field unless included in an overall plan for land-disturbing activity relating to construction of the 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 6 building to be served by the septic tank system; 5) Permitted surface or deep mining operations and projects, or oil and gas operations and projects conducted pursuant to Title 45.2 of the Code of Virginia; 6) Clearing of lands specifically for bona fide agricultural purposes; the management, tilling, planting, or harvesting of agricultural, horticultural, or forest crops; livestock feedlot operations; agricultural engineering operations, including construction of terraces, terrace outlets, check dams, desilting basins, dikes, ponds, ditches, strip cropping, lister furrowing, contour cultivating, contour furrowing, land drainage, and land irrigation; or as additionally set forth by the board in regulations. However, this exception shall not apply to harvesting of forest crops unless the area on which harvesting occurs is reforested artificially or naturally in accordance with the provisions of Chapter 11 (§ 10.1-1100 et seq.) of Title 10.1 of the Code of Virginia or is converted to bona fide agricultural or improved pasture use as described in subsection B of § 10.1-1163 of the Code of Virginia; 7) Installation of fence and signposts or telephone and electric poles and other kinds of posts or poles; 8) Shoreline erosion control projects on tidal waters when all of the land -disturbing activities are within the regulatory authority of and approved by local wetlands boards, the Virginia Marine Resources Commission, or the U.S. Army Corps of Engineers; however, any associated land that is disturbed outside of this exempted area shall remain subject to the VESMA and the regulations adopted pursuant thereto; 9) Repair or rebuilding of the tracks, rights-of-way, bridges, communication facilities, and other related structures and facilities of a railroad company; 10) Land-disturbing activities in response to a public emergency where the related work requires immediate authorization to avoid imminent endangerment to human health or the environment. In such situations, the VESMP or VSMP authority shall be advised of the disturbance within seven days of commencing the land - disturbing activity, and compliance with the administrative requirements of 9VAC25-875-530 is required within 30 days of commencing the land -disturbing activity; and 11) Discharges to a sanitary sewer or a combined sewer system that are not from a land-disturbing activity. C. Notwithstanding any other provision of the VESMA, the following activities are required to comply with the soil erosion control requirements but are not required to comply with the water quantity and water quality technical criteria, unless otherwise required by federal law: 1) Activities under a state or federal reclamation program to return an abandoned 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 7 property to an agricultural or open land use; 2) Routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original construction of the project. The paving of an existing road with a compacted or impervious surface and reestablishment of existing associated dit ches and shoulders shall be deemed routine maintenance if performed in accordance with this subsection; and 3) Discharges from a land-disturbing activity to a sanitary sewer or a combined sewer system. 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 8 3.0 Purpose and Use 3.1 General A. The Standards and Specifications are composed of specifications for ESC and SWM that apply to regulated land-disturbing activities and include by reference the Virginia Erosion and Stormwater Management Regulation (9VAC25-875) and General VPDES Permit for Discharges of Stormwater from Construction Activities (9VAC25-880). B. An S&S holder may enter into agreements or contracts with soil and water conservation districts, adjacent localities, or other public or private entities to assist with carrying out the provisions of this article, including the review and determination of adequacy of ESC plans submitted for land-disturbing activities on a unit or units of land as well as for monitoring, reports, inspections, and enforcement where authorized in this article, of such land - disturbing activities. C. When ESC/SWM control devices or other techniques are required for regulated land - disturbing activities their individual site-specific plans (construction drawings/sheets and narrative) will contain adequate information to ensure the long ‐term responsibility and maintenance of the required control devices or other techniques. D. ESC/SWM Program administration, plan design, review and approval and construction inspection and enforcement will be conducted in compliance with the approved S&S and all referenced laws, regulations, handbooks, and technical bulletins. E. A Department-certified Responsible Land Disturber (“ RLD”) will be named for each regulated land-disturbing activity prior to initiating land -disturbance. ESC/SWM Program personnel will have already obtained certification or will enroll in the Department Erosion and Sediment Control and Stormwater Management Training and Certification Program prior to conducting site inspections. F. Project information must be provided to the Department two (2) weeks in advance of land disturbing activities as documented under “ Notification” in the “ General Sequence of Construction for Linear Projects” Section. G. Colonial will provide bi-annual reports to the Department. The following information will be submitted for each project: project name or number, location (including nearest major intersection, latitude, and longitude), on -site Colonial Representative information, description, acreage of disturbed area, start and finish dates. H. In compliance with the VESMA, on-site changes to the individual site-specific plan may occur when adequate documentation of the changes are shown on the individual site- specific plan and the Stormwater Management Pollution Prevention Plan (if required). 3.2 Department Oversight A. In addition to Colonial’s internal plan review, Colonial may (at the Department’s discretion) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 9 be required to submit individual site-specific plans to the Department for review and approval. B. The Department shall have the authority to enforce approved specifications and charge fees equal to the lower of (i) $1,000.00 or (ii) an amount sufficient to cover the costs associated with standard and specification review and approval, inspection, and compliance. Costs associated may include Department plan review and inspection. C. The Department is the authority and shall be performing random site inspections or inspections in response to a complaint to assure compliance with the associated laws/regulations and these standards and specifications. D. The Department may take enforcement actions. E. Colonial will adhere to these requirements when specifically required by the Department on a site-specific basis. F. Inspection reports conducted by Colonial as well as complaint logs and complaint responses may be required to be submitted to the Department upon request. G. Colonial may be required to provide weekly e -reporting to the department’s applicable regional office including: 1) Inspection reports; 2) Pictures; 3) Complaint logs and complaint responses; and 4) Other compliance documents. H. The site-specific plan, Department approval, and supporting documents may be required to be posted on Colonial webpage that is publicly available for review upon request by the Department. 3.3 Standards & Specifications and Colonial Project Oversight Colonial will verify that each site-specific ESC and/or SWM plan meets the requirements set forth in the standards and specifications and ensure site -specific ESC/SWM plan is prepared and certified by a contracted third-party Department-certified plan reviewer or combined administrator. Once a project has started, a contracted third-party, Department-certified ESC (and SWM, when applicable) inspector will conduct on-site inspections at least once every fourteen (14) calendar days (seven (7) for SWM) and within 48 hours following any runoff producing storm event to ensure project operations and site co nditions adhere to the S&S. Inspections will also occur immediately following installation of ESC controls and at the end of the project prior to the release of any performance bonds. Periodic ESC /SWM Inspections shall ensure compliance with the Colonial S&S and the ESC/SWM statutes and regulations. Inspection reports shall document onsite changes by noting issues of non-compliance. Corrective actions shall be called out on inspection reports and include 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 10 timeframes for completion. As part of the inspection, the Department-certified ESC/SWM Inspector shall: A. Record the date and time of the inspection and when applicable the date and rainfall amount of the last measurable storm event. B. Record the information and a description of any discharges occurring at the time of the inspection. C. Record any land -disturbing activities that have occurred outside of the approved ESC and/or SWM plan. D. Inspect the following for installation in accordance with the approved ESC Plan (and SWM Plan, when applicable), and identification of any maintenance needs: 1) All perimeter erosion and sediment controls; 2) Installation of stormwater management measures, if required; 3) Soil stockpiles, and borrow areas, if required; 4) Earthen structures, such as dams, dikes, ditches, and diversions; 5) Cut and fill slopes; 6) Sediment barriers, and other measures installed to control sediment discharge from stormwater; 7) Construction vehicle access routes that intersect or access paved roads for minimizing sediment tracking; 8) Development, updating, and implementation of a Stormwater Pollution Prevention Plan (SWPPP), if required; 9) Development and implementation of any additional control measures necessary to address a TMDL; and 10) Conduct such investigations and perform such other actions as are necessary to conduct the provisions of the S&S. E. Evaluate the effectiveness of the installed erosion control measures . This includes reviewing for the presence of the following: 1) Concentrated flows of stormwater in conveyances such as rills, rivulets or channels that have not been filtered, settled, or similarly treated prior to discharge, or evidence thereof; 2) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; 3) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters, inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; 4) Sediment deposition on any property (including public and private streets) outside of the construction activity covered by this general permit; 5) Required stabilization has not been initiated or completed on portions of the site; 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 11 and 6) Land disturbance outside of the approved area to be disturbed; F. Inspect areas that have reached final grade or that will remain dormant for more than fourteen (14) days for completion of stabilization activities within seven (7) days of reaching grade or stopping work. G. Identify and document the presence of any evidence of unauthorized discharges of pollutants prohibited by this S&S. H. Monitor and prepare reports to ensure compliance with the permit and to determine whether the measures required in the permit provide erosion control. 3.4 Long-Term Maintenance of Permanent Stormwater Management Facilities A. If constructed, Colonial shall maintain long-term responsibility for maintenance of stormwater management facilities under their purview . Such requirements shall be set forth in an agreement recorded in the local land records prior to state permit termination, as required by the VSMP authority, and shall at a minimum be required to: 1) Submit to the VSMP authority for review and approval prior to the approval of the SWM plan; 2) Stated to run with the land; 3) Provide for necessary access to the property for purposes of maintenance and regulatory inspections; 4) Provide for inspections and maintenance and the submission of inspection and maintenance reports to the VESCP, or VESMP authority; and 5) Be enforceable by all appropriate governmental parties. B. At the discretion of the VSMP Authority, such recorded instruments need not be required for stormwater management facilities designed to treat stormwater runoff primarily from an individual residential lot on which they are located, provided it is demonstrated to the satisfaction of the VSMP Authority that future maintenance of such facilities will be addressed through an enforceable mechanism at the discretion of the VSMP Authority. C. CPC will serve as the entity responsible for long -term maintenance of the utility right -of- way. Agreements concerning utility right -of-way and BMP maintenance will be available at the request of the Department and will be consistent with the Virginia Stormwater BMP Clearinghouse. 4.0 General Sequence of Construction for Linear Projects Colonial is required to and responsible for meeting all applicable safety codes and regulations in the performance of work. The work must be performed under the direction of a Department- certified RLD. 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 12 4.1 Notification Colonial must notify the Department at least two (2) weeks prior to the start of any work under the S&S. The Department can be notified by email at StandardsandSpecs@deq.virginia.gov . This notification will include: 1) Project name or number (any associated Construction General Permit ( CGP) permit number); 2) The location & description of the activity (including nearest intersection, latitude, and longitude); 3) Scheduled start and finish date of the activity; 4) Any variances, exceptions, waivers, or deviations; 5) The acreage of disturbance; 6) The onsite Colonial Representative name and contact information; and 7) The contact information for the onside RLD. Deviations to approved ESC measures may be submitted for agency review as part of this notification process. It is recommended that a pre -construction meeting be held on -site with Colonial, contractor, subcontractor, and consultants prior to the start of work to review the ESC specifications. Colonial is obligated to ensure self -inspection, reporting, training, certification, environmental protection, and safety. 4.2 Inspection Oversight Routine site inspections are conducted at least once every fourteen (14) calendar days (seven (7) for SWM) and within 48 hours following any runoff producing storm event to ensure construction and site conditions adhere to the S&S. Inspections will also occur immediately following installation o f ESC controls and at the end of the project prior to the release of any performance bonds. Once vegetative stabilization has been achieved, any remaining erosion control measures (e.g., silt fencing) will be removed, and inspections will be terminated. 4.3 Installation of Sediment Control Measures Installation of erosion control measures must be complete prior to any land disturb ing activity. Install necessary measures in accordance with Appendix A – Erosion and Sediment Control Details, or the VSMH. If required, for protection of people, wildlife, or livestock safety or other exclusion fencing may be placed around the disturbed and/or trench area . Tree fencing may be placed around adjacent mature trees to be protected. Safety fencing may also be used around critical infrastructure in the area such as wellheads, vent pipes, rectifiers, power poles and other support features near the work area. Construction access: The site excavation locations would be accessed from the nearest public road or other approved access, as agreed with the landowner. Equipment and materials may be offloaded at the staging area adjacent to the public road or designated access point . Surface 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 13 disturbance would be minimal to none around the staging area. Due to the short duration of the pipeline excavation work, equipment traffic is normally limited (i.e., once -in, once -out). Construction entrances will typically consist of f iberglass mats pinned together . Mats will be cleaned, as needed, and mud removed from vehicles prior to leaving the site . Any tracked materials onto public roads will be cleaned with a street sweeper or brush brooms. Preparation of work area: The limits of disturbance (LOD) shall be clearly marked by Colonial representatives or their contractors. All underground utilities will be marked by calling Miss Utility at 811. The LOD will be cleared of brush, vegetation or mowed, as necessary. Erosion control measures will be installed prior to any land disturbance or excavation work . All topsoil shall be segregated in residential areas, wetlands areas, all cultivated agricultural areas, and as requested by the landowner or oth er local agency . If needed , soil stockpiles and borrow areas will be protected with additional ESC measures. Off-site laydown, soil stockpile and/or borrow areas: Any off -site areas used for material/equipment storage, soil stockpile and soil borrow will be managed in accordance with the S&S. Soil stockpile and soil borrow areas will include proper ESC measures, as appropriate. ESC measures will be removed and area restored once work in the area is complete. Material and equipment laydown areas typically do not require ESC or SWM measures as they are non - erodible materials such as stone, steel plates, piping, sleeves, or equipment. If they are erodible, they shall be managed in accordance with the S&S. Movement of soil to an off -site stockpile location will be documented on the site -specific ESC Plan for all regulated land disturbing activities. If deemed appropriate, a site -specific ESC or SWM plan will be prepared b y a contracted third-party Department-certified plan reviewer or combined administrator and inspected by a contracted third-party Department-certified inspector. 4.4 Construction and Maintenance Activities Construction and maintenance activities will be performed utilizing the guidelines established in the S&S. The excavation will include a 360° view of the pipeline plus additional area for properly sloping for safety purposes. Trench boxes may be utilized to limit the excavation but ensure the safety of the excavation walls. Where feasible, the spoil shall be placed on the upslope side of the pipeline excavation trench to prevent sediment runoff from the soil stockpiles . The pipeline excavation, visual inspection, repair, recoating, and backfilling should be limited to the minimum area necessary to complete the preventative maintenance work in a safe and timely manner . Any accumulated ground water will be pumped out of the pipeline trench and discharged through a filter bag that is consistent with the criteria stated in the dewatering specification. Discharges shall flow onto well vegetated, grassy area adjacent to the site and away from waterways . No trench water shall discharge directly into waterways in accordance with Minimum Standard 19. 4.5 Site Stabilization Stabilization is to be performed in accordance with the details contained in the S&S. All measures are to be maintained in accordance with the S&S until adequate permanent stabilization is achieved. 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 14 1) Final grading and cleanup shall be performed upon completion of the excavation work. All disturbed areas will be restored to their original contours and conditions. If necessary, the disturbed area will be plowed, tilled, or scarified to achieve the satisfactory soil compaction. 2) After completion of the final grading, the disturbed area will be revegetated, chatted, or paved (depending on location and pre-work conditions). 3) All temporary soil ESC measures shall be inspected, maintained, and/or repaired in accordance with the VSMH criteria for each individual control measure, and to assure continued performance of their intended function until removal after a permanent vegetative cover is established per Minimum Standard 3. All excavation sites shall be inspected after a runoff pro ducing storm event until final site stabilization is achieved. All measures shall be disposed of within thirty (30) days after the final site stabilization is achieved or after the temporary measures are no longer needed. 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 15 5.0 Colonial Pipeline Company Internal Review A. ESC and/or SWM plans for all regulated land disturbing activities will be prepared by a contracted third -party Department-certified plan reviewer or combined administrator to ensure consistency and objectivity. Professional Engineer (PE) certification of these plans is standard for all regulated land disturbance activities that require site specific ESC or SWM plans. Department-certified personnel serve to protect the quality and quantity of state waters from the potential harm of unmanaged stormwater befor e, during, and after construction. Colonial will employ the use of the Department ESC and SWM checklists to ensure that all ESC and SWM plans meet the requirements set forth in the VESMA. The certification of Program Administration cannot be contracted out and must be an employee of Colonial. B. Colonial will ensure that their contracted third-party Department certifications are valid and will hold contracted third -party Department-certified personnel accountable for plan review, site inspection, and other responsibilities, as required. C. The PE -certified site-specific ESC or SWM plans are provide d to the Colonial Project Manager by the Colonial Program Administrator for implementation under a signed Environmental Permit Approval Letter. The Environmental Permit Approval Letter details the requirements of all approved permits/plans and outlines specific conditions for each permit/plan. D. The Department-certified Plan Reviewer will notify Colonial when the plans are finalized. Colonial will approve the plans and will provide an Environmental Permit Approval Letter on Colonial letterhead; the letter shall include the date of the approved plans and shall be signed by the Colonial Department-certified Program Administrator. In addition, the plans will be stamped “Approved” by the Colonial Department-certified Program Administrator. E. The Colonial Project team will operate under these standards and specifications, or a PE- certified site-specific ESC and/or SWM plan. A contracted third-party Department-certified inspector will confirm adherence to these plans while conducting site inspections. The Colonial Project Manager for the individual project is responsible for maintaining and observing the guidance set in these standards and specifications. F. The Colonial Project Inspectors, Colonial Project Managers, Colonial Program Administrator, and Colonial construction contractors will maintain their Responsible Land Disturber certification. However, a contracted third -party Department-certified inspector completes all inspections to verify compliance to avoid potential conflict with self - inspection by the field crews. G. Significant changes to the site -specific plan (e.g., additional construction footprint, new ESC/SWM measures, etc.) will be reviewed in the field by Colonial personnel, the construction contractor, and the contracted third-party Department-certified inspector. The contracted third-party Department-certified inspector will red-line the appropriate sections of the on-site ESC Plan, SWM Plan, SWPPP or other applicable document to record the 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 16 changes discussed in the field. The contracted third-party Department-certified inspector will coordinate the changes with the Colonial Program Administrator and contracted third- party Department-certified Plan Reviewer. If deemed appropriate, the redlined documents will be sent to the contracted third -party Department-certified Plan Reviewer for official revision of the plans and re-certification. The re-certified plans will be returned to the field for implementation by the Project team. 5.1 Reports and Record Keeping A. The site-specific ESC and/or SWM plan are to be kept onsite and made available upon request. B. Colonial shall keep records in accordance with the following: 1) Project records, including approved plans, shall be kept for three (3) years after state permit termination or project completion. 2) Stormwater management facility inspection records shall be documented and retained for at least five (5) years from the date of inspection. C. Construction record drawings of any permanent SWM feature shall be maintained in perpetuity or until a stormwater management facility is removed. D. Colonial shall maintain, either onsite or in a readily accessible electronic file, a copy of the approved ESC plan and a record of inspections for each active land-disturbing activity. 5.2 Non-VSMH Control Measures The use of the VSMH, along with accompanying technical documents and guidance, control measures, is strongly preferred. Non-VSMH control measures, BMPs, and specifications may be included in the S&S submission, but their use may be further reviewed and approved by the applicable Department Regional Office on a site-specific basis. Submissions may be made with the submittal of the project two (2) week notification. For all non -VSMH and proprietary control measures, please include all applicable practical information including definition, purpose, conditions where practice applies, planning considerations, design criteria, construction specifications, design tables and plates, and maintenance and inspections. Non-VSMH and proprietary control measures shall be installed per the manufacturer’s instructions and with the intent of the VSMH specifications. Should non-VSMH control measures fail to effectively control soil erosion, sediment deposition, and non-agricultural runoff, then VSMH control measures shall be utilized. 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 17 6.0 General Notes and Standards All land disturbing activities must meet the 19 Minimum Standards for ESC in Section 9VAC25- 875-560 of the VESMR. The applicant must submit the ESC plan for internal review and approval to a Department-certified ESC/SWM Plan Reviewer or combined administrator. The applicant is responsible for ensuring compliance with the minimum standards that apply to the specific maintenance activities. 6.1 Erosion & Sediment Control Minimum Standards 1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than fourteen (14) days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. 2) During construction, soil stockpiles and borrow areas shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilizations of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the site. 3) A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosion. 4) Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional before upslope land disturbances takes place. 5) Stabilization measures shall be applied to earthen structures such as dams, dikes, and diversions immediately after installation. 6) Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin. a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap shall only control drainage areas less than three (3) acres. b. Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three (3) acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of draina ge area. The outfall system shall, at a minimum, maintain the structural integrity of the basin during a 25-year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 18 7) Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one (1) year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8) Concentrated runoff shall not flow down cut or fill slopes unless contained within and adequate temporary or permanent channel, flume or slope drain structure. 9) Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10) All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11) Before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12) When work in a live water course is performed, precautions shall be taken to minimize encroachment, control sediment transport, and stabilize the work area to the greatest extent possible during construction. Non -erodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by non-erodible cover materials. 13) When a live watercourse must be crossed by construction vehicles more than twice in any six (6) month period, a temporary vehicular stream crossing constructed of non -erodible material shall be provided. 14) All applicable federal, state, and local requirements pertaining to working in or crossing live watercourses shall be met. 15) The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16) Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: a. No more than 500 linear feet of trench may be opened at one time. b. Excavated material shall be placed on the uphill side of trenches. c. Effluent from dewatering operations shall be filtered or passed through and approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off-site property. 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 19 d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e. Restabilization shall be accomplished in accordance with this chapter. f. Applicable safety requirements shall be complied with. 17) Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the ro ad surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well as to larger land -disturbing activities. 18) All temporary erosion and sediment control measures shall be removed within thirty (30) days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the VESCP Authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. 19) Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion, and damage due to increases in volume, velocity, and peak flow rate of stormwater runoff for the stated frequency storm of 24 -hour duration in accordance with the following standards and criteria. Stream restoration and relocation activities that incorporate natural channel design concepts are not manmade channels and shall be exempt from any flow rate capacity and velocity requirements for natur al or manmade channels: a. Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate natural or man -made receiving channel, pipe, or storm sewer system. For those sites where runoff is discharged into a pipe or pipe system, downstream stability analyses at the outfall of the pipe or pipe system shall be performed. b. Adequacy of all channels and pipes shall be verified in the following manner: i. The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is one hundred times greater than the contributing drainage area of the project in question; or 1. (a) Natural channels shall be analyzed by the use of a two (2) year storm to verify that stormwater will not overtop channel banks nor cause erosion of channel bed or banks. 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 20 2. (b) All previously constructed man -made channels shall be analyzed by the use of a 10-year storm to verify that stormwater will not overtop its banks and by the use of a two (2) year storm to demonstrate that stormwater will not cause erosion of channel bed or banks; and 3. (c) Pipes and storm sewer systems shall be analyzed by the use of a 10-year storm to verify that stormwater will be contained within the pipe or system. c. If existing natural receiving channels or previously constructed man -made channels or pipes are not adequate, the applicant shall: i. Improve the channels to a condition where a 10 -year storm will not cause erosion to the channel, the bed, or the banks; or ii. Improve the pipe or pipe system to a condition where the 10-year storm is contained within the appurtenances; or iii. Develop a site design that will not cause the pre-development peak runoff rate from a two -year storm to increase when runoff outfalls into a natural channel or will not cause the pre-development peak runoff rate from a 10- year storm to increase when runoff outfalls into a man-made channel; or iv. Provide a combination of channel improvement, stormwater detention or other measures which is satisfactory to the VESCP authority to prevent downstream erosion. d. The applicant shall provide evidence of permission to make the improvements. e. All hydrologic analyses shall be based on the existing watershed characteristics and the ultimate development condition of the subject project. f. If the applicant chooses an option that includes stormwater detention, he shall obtain approval from the VESCP of a plan for maintenance of the detention facilities. The plan shall set forth the maintenance requirements of the facility and the person responsible for performing the maintenance. g. Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipaters shall be placed at the outfall of all detention facilities as necessary to provide a stabilized transition from the facility to the receiving channel. h. All on-site channels must be verified to be adequate. i. Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent property shall be diverted to a stable outlet, adequate channel, pipe, or 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 21 pipe system, or to a detention facility. j. In applying these stormwater management criteria, individual lots, or parcels in a residential, commercial, or industrial development shall not be considered to be separate development projects. Instead, the development, as a whole, shall be considered to be a single development project. Hydrologic parameters that reflect the ultimate development condition shall be used in all engineering calculations. k. All measures used to protect properties and waterways shall be employed in a manner which minimizes impacts on the physical, chemical, and biological integrity of rivers, streams, and other waters of the state. l. Any plan approved prior to July 1, 2014, that provides for stormwater management that addresses any flow rate capacity and velocity requirements for natural or manmade channels shall satisfy the flow rate capacity and velocity requirements for natural or m anmade channels if the practices are designed to (i) detain the water quality volume and to release it over 48 hours; (ii) detain and release over a 24-hour period the expected rainfall resulting from the one year, 24 -hour storm; and (iii) reduce the allowable peak flow rate resulting from the 1.5-year, two-year, and 10-year 24-hour storms to a level that is less than or equal to the peak flow rate from the site assuming the site was in a good forested condition, achieved through multiplication of the fores ted peak flow rate by a reduction factor that is equal to the runoff volume from the site when the site was in a good forested condition divided by the runoff volume from the site in the site's proposed condition, and shall be exempt from any flow rate cap acity and velocity requirements for natural or manmade channels as defined in any regulations promulgated pursuant to § 62.1 -44.15:28 of the Code of Virginia (VESMA) or § 62.1 -44.15:54 or 62.1 - 44.15:65 of the Code of Virginia (ESCL). m. For plans approved on and after July 1, 2014, the flow rate capacity and velocity requirements of § 62.1 -44.15:52 A of the Code of Virginia (ESCL) and this subdivision 19 shall be satisfied by compliance with water quantity requirements in the VESMA and attendant regulations, unless such land-disturbing activities (i) are in accordance with provisions for time limits on applicability of approved design criteria in 9VAC25-875-480 or grandfathering in 9VAC25-875-490, in which case the flow rate capacity and velocity requirements of § 62.1-44.15:52 A of the Code of Virginia (ESCL) shall apply; or (ii) are exempt pursuant to § 62.1 -44.15:34 G 2 of the Code of Virginia (VESMA). n. Compliance with the water quantity minimum standards set out in 9VAC25 -875- 600 shall be deemed to satisfy the requirements of this subdivision 19. 6.2 Offsite Compliance Options Offsite compliance options in 9VAC25 -875-610 may be utilized, as necessary, to meet the required phosphorus nutrient reductions. The offsite compliance options may only be considered when the criteria set forth in 9VAC25-875-610 are met. 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 22 6.3 Construction Stormwater Requirements CPC designs, installs, implements, and maintains pollution prevention measures to: A. Minimize the exposure of on-site construction materials, construction debris, general wastes, fertilizers, sanitary waste, and other materials to precipitation and stormwater; B. Implement spill and leak prevention and response procedures to minimize the potential of discharging pollutants from spills and leaks; C. Implement appropriate concrete washout methods and procedures to prevent the discharge of concrete washwater; D. Prevent wastewater release from the clean up associated with paint, form release oils, curing compounds, and similar construction materials; and E. Implement fueling best management practices to prevent the discharge of fuels, oils, or other pollutants during equipment operation and emergency equipment maintenance activities (regular maintenance is not performed on Colonial sites). CPC and/or construction activity operator provides reasonable assurance to the Department or the local VSMP authority that all of the above conditions will be satisfied. The above conditions shall be incorporated into the erosion and sediment control plan developed for the project. 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 23 7.0 Variance and Exemption Requests Waiver, variance, and exemption requests will be considered freestanding of this S&S submission and on a site-specific basis. A. The Department may waive or modify any of the standards that are deemed to be inappropriate or too restrictive for site conditions, by granting a variance. A variance may be granted under these conditions: 1) Prior to construction, the S&S Entity may request a variance to become part of the approved erosion and sediment control plan. The S&S Entity shall explain the reasons for requesting variances in writing. Specific variances which are allowed by the Department shall be documented in the plan. 2) During construction, the person responsible for implementing the approved plan may request a variance in writing from the Department. The Department shall respond in writing either approving or disapproving such a request. If the department does not approve a variance within 10 days of receipt of the request, the request shall be considered disapproved. Following disapproval, the applicant may resubmit a variance request with additional documentation. B. In accordance with Department Guidance Memo No. 15-2003, if the project will not result in significant changes to the predevelopment runoff characteristics of the land surface after the completion of construction and final stabilization, then the Department, at their discretion, may waive the requirement for the prepa ration and implementation of a stormwater management (SWM) plan. For projects requesting a waiver under Guidance Memo No. 15-2003, the Department requires a complete ESC plan and additional water quality calculations be submitted for review; this information must reasonably demonstrate that the project will not significantly change the predevelopment runoff characteristics of the land surface after the completion of construction and final stabil ization. If non significance is determined, then the Department , at their discretion, may waive the requirement for the preparation and implementation of a SWM plan. C. Coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities may be required for projects that are ≥ 1 acre of land disturbance or < 1 acre but part of a common plan of development or sale that is ≥ 1 acre. Pursuant to 9VAC25-875-20, “Common plan of development or sale” means a contiguous area where separate and distinct construction activities may be taking place at separate times on different schedules. Colonial transports refined products, which is not exempt ed from Stormwater Permitting per the EPA National Pollutant Discharge Elimination System (NPDES). Construction of above ground or underground linear utilities may be conducted without requiring coverage under the general VPDES Permit for discharges of stormwater from construction activities (Construction General Permit (CGP)) provided that: 1) The project does not significantly alter the predevelopment runoff characteristics of the land surface after the completion of construction and final stabilization; 2) The disturbed land where work has been completed is adequately stabilized on a daily basis; 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 24 3) The environment is protected from erosion and sedimentation damage associated with the land disturbing activity; D. ESC plans and calculations shall be submitted to Department’s central office for review with a transmittal letter specifically requesting a SWM Plan/CGP Waiver. The Department will evaluate each project on an individual basis. 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 25 8.0 Stormwater Pollution Prevention Plan Requirements SWPPP requirements shall be inspected and maintained per request from the Department for specific site locations. A. SWPPPs are required for projects ≥ one (1) acre. B. A SWPPP shall include, but not be limited to, an approved ESC, an approved SWM Plan (if required), a Pollution Prevention Plan for regulated land -disturbing activities, and a description of any additional control measures necessary to address a Total Maximum Daily Load (TMDL). C. An ESC Plan consistent with the requirements of the VESMA must be designed and implemented during construction activities . Prior to land disturbance, this plan must be approved by a Virginia Professional Engineer (P.E.), Professional Soil Scientist, Landscape Architect, Architect, or a Virginia Certified ESC Plan Reviewer, and if necessary, the Department, in accordance with the VESMA. D. A SWM Plan consistent with the requirements of the VESMA must be designed and implemented during construction activities . Prior to land disturbance, this plan must be reviewed and approved by a Virginia Certified Stormwater Management Plan Reviewer, and if necessary , the Department , in accordance with the VESMA and other attendant regulations. E. A Pollution Prevention Plan that identifies potential sources of pollutants that may reasonably be expected to affect the quality of stormwater discharges from the construction site and describe control measures that will be used to minimize pollutants in stormwater discharges from the construction site. This plan must be developed before land disturbance commences . For plans where SWM plans are not required, pollution prevention plan language will be added to the site -specific ESC plan for the project. A pollution prevention section will be added to projects where land disturbance exceeds 1 acre, but no SWM Plan was necessary for the project. The pollution prevention plan shall detail the design, installation, implementation, and maintenance of effective pollution prevention measures as specified in 40 CFR 450.21(d) to minimize the discharge of pollutants. At a minimum, such measures must be designed, installed, implemented, and maintained to: 1) Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Wash waters must be treated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge; 2) Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials present on the site to precipitation and to stormwater; and 3) Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures. 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 26 F. The pollution prevention plan shall include effective best management practices to prohibit the following discharges in accordance with 40 CFR 450.21(e): 1) Wastewater from washout of concrete, unless managed by an appropriate control; 2) Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; 3) Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; and 4) Soaps or solvents used in vehicle and equipment washing. G. Discharges from dewatering activities, including discharges from dewatering of trenches and excavations, are prohibited unless managed by appropriate controls in accordance with 40 CFR 450.21(c). H. In addition to the requirements of subsection A through D of this section, if a specific waste load allocation (WLA) for a pollutant has been established in an approved TMDL and is assigned to stormwater discharges from a construction activity, additional control measures must be identified and implemented by the operator so that discharges are consistent with the assumptions and requirements of the WLA. I. The SWPPP shall be amended whenever there is a change in design, construction, operation, or maintenance that has significant effect on the discharge of pollutants to state waters and that has not been previously addressed in the SWPPP. The SWPPP must be maintained at a central location onsite . If an onsite location is unavailable, notice of the SWPPP’s location must be posted near the main entrance of the construction site. J. SWPPPs shall be inspected at the start of construction and periodically throughout. 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 27 Appendix A Erosion & Sediment Control Details1 1 All BMP’s contained within the current edition of the VSMH are incorporated by reference and may be utilized on Colonial sites. The details contained herein are the most commonly utilized ESC BMPs for Colonial’s activities. 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 28 FIGURE 1.01: SAFETY FENCE (C-PCM-01) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 29 FIGURE 1.02: STRAW BALE BARRIER (C-PCM-02) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 30 FIGURE 1.03: SILT FENCE – WITH WIRE SUPPORT (C-PCM-04) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 31 FIGURE 1.03: SILT FENCE – WITHOUT WIRE SUPPORT (C-PCM-04) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 32 FIGURE 1.04: COMPOST FILTER SOCK (C-PCM-05) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 33 FIGURE 1.04: COMPOST FILTER SOCK (C-PCM-05) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 34 FIGURE 1.05: CONSTRUCTION ROAD STABILIZATION (C-SCM-02) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 35 FIGURE 1.06: TEMPORARY STONE CONSTRUCTION ENTRANCE (C-SCM-03) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 36 FIGURE 1.06: TEMPORARY CONSTRUCTION ENTRANCE – PRE-FABRICATED 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 37 FIGURE 1.07: DEWATERING STRUCTURE (C-SCM-10) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 38 FIGURE 1.08: CONCRETE WASHOUT PIT (C-SCM-13) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 39 FIGURE 1.08: CONCRETE WASHOUT PIT (C-SCM-13) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 40 FIGURE 1.09: IMPERMEABLE DIVERSION FENCE (C-ECM-02) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 41 FIGURE 1.10: TEMPORARY RIGHT-OF-WAY DIVERSION (C-ECM-07) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 42 FIGURE 1.11: RIPRAP (C-ECM-13) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 43 FIGURE 1.12: TEMPORARY VEHICULAR STREAM CROSSING (C-ENV-03) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 44 FIGURE 1.12: TEMPORARY VEHICULAR STREAM CROSSING (C-ENV-03) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 45 FIGURE 1.13: UTILITY STREAM CROSSING (C-ENV-04) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 46 FIGURE 1.13: UTILITY STREAM CROSSING (C-ENV-04) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 47 FIGURE 1.13: UTILITY STREAM CROSSING (C-ENV-04) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 48 FIGURE 1.13: UTILITY STREAM CROSSING (C-ENV-04) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 49 FIGURE 1.13: UTILITY STREAM CROSSING (C-ENV-04) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 50 FIGURE 1.14: COFFERDAM CROSSING (C-ENV-05) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 51 FIGURE 1.14: COFFERDAM CROSSING (C-ENV-05) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 52 FIGURE 1.14: COFFERDAM CROSSING (C-ENV-05) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 53 FIGURE 1.15: STABLE WETLAND CROSSING (C-ENV-06) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 54 FIGURE 1.15: STABLE WETLAND CROSSING (C-ENV-06) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 55 FIGURE 1.16: PUMP AROUND DIVERSION (C-ENV-08) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 56 FIGURE 1.17: TREE PRESERVATION AND PROTECTION (C-SSM-01) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 57 FIGURE 1.18: SOIL STABILIZATION BLANKETS (C-SSM-05) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 58 FIGURE 1.18: SOIL STABILIZATION BLANKETS (C-SSM-05) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 59 FIGURE 1.18: SOIL STABILIZATION BLANKETS (C-SSM-05) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 60 FIGURE 1.18: SOIL STABILIZATION BLANKETS (C-SSM-05) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 61 FIGURE 1.18: SOIL STABILIZATION BLANKETS (C-SSM-05) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 62 FIGURE 1.18: SOIL STABILIZATION BLANKETS (C-SSM-05) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 63 FIGURE 1.19: SODDING (C-SSM-06) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 64 FIGURE 1.19: SODDING (C-SSM-06) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 65 FIGURE 1.20: PERMANENT SEEDING (C-SSM-10) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 66 FIGURE 1.20: PERMANENT SEEDING (C-SSM-10) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 67 FIGURE 1.20: PERMANENT SEEDING (C-SSM-10) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 68 FIGURE 1.20: PERMANENT SEEDING (C-SSM-10) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 69 PERMANENT SEEDING SPECIFICATIONS – Colonial SPECIFIC WETLAND AREAS ▪ Any temporarily disturbed jurisdictional areas (e.g., wetlands, buffers, streambanks, etc.) Will be revegetated with a native wetland seed mix to stabilize the recently disturbed soils. Seed mix shall be “General Wetland Mixture” by Chesapeake Valley Seed, Inc. (or approved equal) @ 20 lb./acre ▪ Provide a cover crop (i.e., Oats, Rye, or Millet) @ 20 lb./acre UPLAND AREAS 100 lb./acre of Rye/Fescue/Clover seed mix (Soil Defender-Cool or approved equal): ▪ 73% Fescue ▪ 3% Red-top ▪ 12% Rye grass ▪ 8% Clover ▪ 5% Perennial Rye Apply 14-20-14 fertilizer @ 150 lb./acre Apply agricultural-grade limestone @ 90 lb./1,000 SF. FIGURE 1.20: PERMANENT SEEDING – COLONIAL SPECIFIC 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 70 FIGURE 1.21: MULCHING (C-SSM-11) 2025 Standards & Specifications for Erosion & Sediment Control and Stormwater Management 71 Appendix B Colonial Stormwater Pollution Prevention Plan Template VIRGINIA STORMWATER POLLUTION PREVENTION PLAN FOR Colonial Pipeline Maintenance Activities Colonial Pipeline Company 929 Hoods Mill Road Woodbine, MD 21797 "Revision Date" “Revision Date” STORMWATER POLLUTION PREVENTION PLAN 1 Colonial Pipeline Maintenance Erosion & Sediment Control Plan Virginia Applicability Notice: This Stormwater Pollution Prevention Plan (SWPPP) complies with the requirements presented by the Virginia Erosion and Stormwater Management Act (VESMA), Virginia Erosion and Stormwater Management Regulation, and the General Virginia Pollutant Discharge Elimination System (VPDES) Permit for Discharges of Stormwater from Construction Activities (Constru ction General Permit). The routine maintenance activities associated with this land disturbance are exempt from construction general permit coverage per Code of Virginia § 62.1-44.15:34.G(2). “Revision Date” STORMWATER POLLUTION PREVENTION PLAN 2 Table of Contents 1.0 GENERAL INFORMATION ................................................................................................. 3 2.0 PROJECT DESCRIPTION .................................................................................................. 4 2.1 Excavation and Backfill .............................................................................................. 4 2.2 Staging Areas/Stabilization ........................................................................................ 4 2.3 Construction Sequence .............................................................................................. 5 2.4 Temporary Impacts .................................................................................................... 5 2.5 Runoff Coefficient after Construction ......................................................................... 5 2.6 ESC Plan .................................................................................................................... 5 3.0 POLLUTION PREVENTION ............................................................................................... 6 3.1 Inventory of Pollution Prevention Plan ....................................................................... 6 3.2 Spill Prevention .......................................................................................................... 6 3.2.1 Good Housekeeping ............................................................................................................ 6 3.2.2 Hazardous Products ............................................................................................................ 7 3.2.3 Product Specific Practices ................................................................................................... 7 3.3 Spill Prevention Practices ........................................................................................... 9 3.4 Spill Response ........................................................................................................... 9 4.0 RECORDKEEPING ........................................................................................................... 10 4.1 Site Requirements .................................................................................................... 10 4.2 Record Retention ..................................................................................................... 10 APPENDICES APPENDIX A - SITE SPECIFIC SWPPP REGULATORY INFORMATION APPENDIX B - EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT PLAN APPENDIX C - INSPECTION AND MAINTENANCE REPORT “Revision Date” STORMWATER POLLUTION PREVENTION PLAN 3 1.0 GENERAL INFORMATION Location: Virginia This SWPPP covers Colonial Pipeline Company (“Colonial”) l and disturbance activities for preventative and routine maintenance activities in Virginia, such as pipe recoating, corrosion protection (e.g., anode beds, linear anodes, and deep wells), integrity pig digs, pipe replacement/removal, relocation projects, facility maintenance projects, and any associated repairs such as sleeves. This SWPPP has been prepared in accordance with the Virginia Erosion and Stormwater Management Act (VESMA), Virginia Erosion and Stormwater Management Regulation , the most recent version of the Virginia Stormwater Management Handbook (VSMH), and the most recent version of the Standards and Specifications for Erosion & Sediment Control and Stormwater Management. Site specific regulatory information is included in Appendix A. Owner Name and Address: Colonial Pipeline Company 929 Hoods Mill Road Woodbine, MD 21797 Contact: Primary: Matthew Wyant, NED Environmental Specialist Colonial Pipeline Company 929 Hoods Mill Road Woodbine, MD 21791 240-204-1158 mwyant@colpipe.com Secondary: Tara Ryan, NED Environmental Manager Colonial Pipeline Company 929 Hoods Mill Road Woodbine, MD 21791 240-429-4864 tryan@colpipe.com Contractor Names, Addresses and Phone Numbers: General Contractor: See Appendix A Subcontractor: See Appendix A “Revision Date” STORMWATER POLLUTION PREVENTION PLAN 4 2.0 PROJECT DESCRIPTION 2.1 Excavation and Backfill Most maintenance activities will consist of a trench excavation to complete the activity on Colonial’s pipeline which is then b ackfilled and vegetatively s tabilized. Land disturbing activities will typically occur on the Colonial right-of-way (ROW) but there is potential for off-ROW disturbance or maintenance activities on Colonial’s facilities . Excavated soils are typically placed on the upslope side of the trench. Trench depth will vary depending on the depth of the pipeline. Any groundwater or accumulated water will be pumped out of the pipeline trench , as necessary, and discharged through a filter media ( e.g., hay bales, dewatering filtering bag ) prior to discharge . Once the maintenance work is completed the excavation will be backfilled with the original excavated soils, as appropriate, and compacted in accordance with the appropriate design specifications . The area will be graded to original contours and vegetatively stabilized with the appropriate seed mix for the region the work is occurring. Per §62.1-44.15:34.G(2), “Routine Maintenance” is “maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original construction of the project. The paving of an existing road with a compacted or impervious surface and reestablishment of existing associated ditches and shoulders shall be deemed routine maintenance if performed in accordance with this subsection”. Maintenance activities may include but are not limited to: • Removing existing pipeline coating and replacing with new coating; • Removing existing coating and placing sleeves on lines; • Testing pipeline (various activities); • Replacing pipeline/pipeline removal; • Relocating pipeline; and • Inspection pipeline for damage or anomalies, including coatings. • Restoration of pipeline protective cover (min 12”) with granular fill, hard armoring, or other selected protective cover. 2.2 Staging Areas/Stabilization The land topography and contours will not be altered as a result of the land disturbing activities associated with Colonial’s maintenance activities. Post construction topographic contours, drainage, discharge, imperviousness, land use, and vegetation density will mirror pre-construction conditions once final stabilization is achieved in accordance with the PE-certified site-specific erosion and sediment control (ESC) plan (see Appendix B). Any excavation within a jurisdictional area, such as a wetland, will be stockpiled on plastic or similar in an adjacent upland in accordance with the site -specific ESC plan and/or associated environmental permit doc uments. In the event any hard surfaces such as a roadway or sidewalk are damaged during the course of the land disturbing activities they will be restored to pre-construction conditions in accordance with the specifications of the Authority Having Jurisdiction (AHJ). “Revision Date” STORMWATER POLLUTION PREVENTION PLAN 5 2.3 Construction Sequence • Contractor shall mobilize equipment to areas designated on the PE certified site-specific ESC Plan and/or associated construction plans. • Contractor shall install all ESC measures as shown PE certified site-specific ESC Plan prior to any land disturbing activities commencing on-site (the activity may be divided into sections or areas- ESC measure need to be installed in each section or area prior to work in each section or area). • After all ESC measures are installed, contractor shall commence land disturbance activities and completion of the maintenance activities. • Contractor shall secure all construction areas at the end of each day to prevent any erosion. • Contractor will backfill all areas once maintenance activities in the current section or area is complete. Areas will be graded to pre-existing contours and vegetatively stabilized. 2.4 Temporary Impacts Temporary impacts will typically be limited and promptly revegetated following disturbance. All impacts to jurisdictional features such as wetlands or streams will be permitted in accordance with applicable Federal and state regulations. 2.5 Runoff Coefficient after Construction Colonial’s ROW run s south to north in Virginia from the North Carolina border to the Maryland border and east to west from the Atlantic/tidewater coastal plain to the valley and ridge region. Various soil types, vegetative covers, and drainage areas are encountered within the Colonial ROW in Virginia. As these conditions vary along Colonial’s ROW, it is not feasible to develop a general runoff coefficient for a specific preventative maintenance activity . A runoff coefficient is not applicable to this type of construction because the activity will be promptly returned to its pre -construction condition. Due to the linear nature of the construction activity, rapid stabilization at the completion of the activity, maintaining existing drainage contours, and installation of ESC measures there are no anticipated adverse impacts to soils. 2.6 ESC Plan The PE certified site-specific ESC plan can be found in Appendix B. As site conditions will not be permanently altered, a post construction map is not applicable. Post construction site conditions will mirror those encountered prior to the permitted land disturbing activity. “Revision Date” STORMWATER POLLUTION PREVENTION PLAN 6 3.0 POLLUTION PREVENTION The following sections address materials expected to be present at the site during work and appropriate spill prevention and response measures. Non -stormwater discharges from the project are not anticipated, except after completion any hydrostatic testing of newly installed pipes. Hydrostatic testing would be completed in accordance with a VAG- 83 permit. The section is considered the Pollution Prevention (P2) Plan for the applicable land disturbing activity. 3.1 Inventory of Pollution Prevention Plan The following substances are expected to be present on-site during construction: • Concrete, asphalt, curing compounds • Coating epoxies; • Fuels; • Lubricants; • Cleaning solvents; • General construction debris and waste; • Paint; • Dust; • Asbestos containing material (removed coating) • Sand blast materials; • Sanitary wastes; • Fertilizers; and, • Pipe solvent weld (if needed). 3.2 Spill Prevention The following are management practices that will be used to reduce the risk of spills or other accidental exposure of the materials and substances to stormwater. Materials that are not being used during excavation activities will be stored in the appropriate labeled container away from stormwater discharge to reduce to chance of spilled materials entering the stormwater system. 3.2.1 Good Housekeeping The following good housekeeping practices will be followed on -site during the construction project. • Equipment and vehicles will be routinely inspected for any signs of leaks. • Trash and debris will be routinely removed from the site. • Designated waste collection and sanitary facility locations will be in areas that are level, covered, or in containment with access for periodic servicing. • An effort will be made to store only the amount of product sufficient to complete the work. • All materials stored on -site will be stored in a neat, orderly manner in their “Revision Date” STORMWATER POLLUTION PREVENTION PLAN 7 appropriate containers and, if possible, under a roof or other enclosure. • Products will be kept in their original containers with the original manufacturer’s label. • Substances will not be mixed with one another unless recommended by the manufacturer. • Whenever possible, all of a product will be used before disposing of the container. • Manufacturers’ recommendations for proper use and disposal will be followed. • The Contractor will inspect daily to ensure proper use and disposal of materials on-site. • At the end of each day, materials and/or substances will be properly secured n the appropriate containers and labels and checked to ensure materials are in good condition. • Refueling equipment will be conducted at least 100 feet away from environmental sensitive areas (e.g., streams, wetlands). • Minimize the exposure of waste materials to precipitation by closing or covering waste containers during precipitation events and at the end of the business day, or implementing other similarly effective practices. Minimization of exposure is not required in cases where the exposure to precipitation will not result in a discharge of pollutants; and “requirements for discharges to nutrient and sediment impaired waters. 3.2.2 Hazardous Products These practices will be used to reduce the risks associated with hazardous materials if hazardous materials are used. • Products will be kept in original containers unless they are not re-sealable. • Original labels and Safety Data Sheets (SDSs) will be retained. • If surplus product must be disposed, state or local regulatory guidelines for proper disposal will be followed . If state or local methods are not available the manufacturer recommended method of disposal will be followed. 3.2.3 Product Specific Practices The following product specific practices will be followed on -site. When applicable, Colonial Pipeline Company Standard Operating Procedures will be followed. Concrete: Concrete trucks will not be allowed to wash out or discharge surplus concrete or drum wash water on-site unless controlled in an appropriately designed wash out container away from stormwater conveyance channels and jurisdictional features. Asphalt: Any asphalt used on-site will be applied according to the manufacturer’s recommendations. Surplus asphalt material will be disp osed of off-site or reused “Revision Date” STORMWATER POLLUTION PREVENTION PLAN 8 appropriately on-site. Curing compounds: All curing compounds will be stored in sealed containers and disposed of per the manufacturer’s guidelines. Petroleum Products: All on-site vehicles will be monitored for leaks and receive regular preventive maintenance to reduce the chance of leakage. Petroleum products will be stored in tightly sealed containers, which are clearly labeled. In the event of leak or spill from a piece of equipment or vehicle, the Contractor is responsible for cleaning, containerizing, and disposing of any impacted material resulting from the leak. Lubricants: All containers will be tightly sealed and stored when not in use. Excess material will not be stored near any stormwater conveyance channels and/or jurisdictional features . Any unused or unneeded material w ill be properly disposed of according to State and local regulations or manufacturers’ instructions. Cleaning solvents: Cleaning solvents will be disposed of at a designated hazardous waste disposal facility. General construction debris and waste: Construction debris and waste will be hauled off site and disposed of accordingly. Any useful non-hazardous material will be reused on site for filling and grading purposes. Paint: Any surplus paint will be reused or disposed of at a designated hazardous waste facility. Dust: Dust will be controlled, as needed, with applications of water or other appropriate method. Asbestos containing material (removed coating): All removed coating material containing asbestos will be disposed of per appropriate Federal regulations by a contractor permitted to handle asbestos. Sand blast materials: Sand blast materials and wastes will be collected following sand blasting activities. Materials will be stored in suitable containers, and wastes will be property disposed of accordingly. Sanitary wastes: All sanitary waste will be contained in a portable lavatory. The lavatory will be p laced on level ground away from any stormwater conveyance channels and/or jurisdictional features. Fertilizers: Fertilizers will be applied in accordance with the PE certified site- specific ESC plan . Once applied, fertilizer will be worked into the soil to limit exposure to storm water. Fertilizer will be secured under cover and away from weather. The contents of any partially used bags of fertilizer will be transferred to a sealed container to avoid spills. Pipe Solvent Weld: All containers will be tightly sealed and stored when not required for use. Excess material will not be stored near any stormwater conveyance channels and/or jurisdictional features . Any unused or unneeded material will be properly disposed of according to State and local regulations or manufacturers’ instructions. “Revision Date” STORMWATER POLLUTION PREVENTION PLAN 9 3.3 Spill Prevention Practices The following practices will be followed for spill prevention and cleanup. • Manufacturers’ recommended met hods and procedures for spill cleanup will be clearly understood by site personnel including the location of the information, and cleanup supplies. • Materials and equipment necessary for spill cleanup will be kept on -site. Equipment and materials will include , but are not limited to, brooms, dustpans, mops, rags, gloves, goggles, loose absorbent , sand, sawdust, sorbent pads, booms, and trash containers specifically for this purpose. • All spills will be cleaned up immediately after discovery. The spill area will be kept well-ventilated, and personnel will wear appropriate protective clothing to prevent injury from contact with a hazardous substance. • Spills of toxic or hazardous material will be reported to the Colonial Project Inspector who will contact the appropriate Colonial personnel and any appropriate governmental agency. • Stormwater flow through co ntaminated areas will be prevent, as needed . Contaminated stockpiles will not be located near any stormwater conveyance channels and/or jurisdictional features. The Contractor responsible for day-to-day site operations will assign a person as the site Spill Prevention and Cleanup Coordinator. He may designate at least one other site person who will receive spill prevention and cleanup training. These individuals will each become responsible for a particular phase of prevention and cleanup. 3.4 Spill Response In the event of a hazardous material release, containment and cleanup of the spilled materials will begin immediately upon notice of the spill. Equipment, such as spill kits, will be kept on-site for immediate deployment. Spill kits will be located in various places during construction where necessary and will include sorbent materials such as pads and booms. All hazardous material spills will be reported to the Colonial Project Inspector who will contact the appropriate emergency responders and disposal service. The spill will be documented including the location of the spill, date and time, type of material and quantity and spill origination. The appropriate agency will be notified of the spill in accordance with company policy. “Revision Date” STORMWATER POLLUTION PREVENTION PLAN 10 4.0 RECORDKEEPING 4.1 Site Requirements A copy of the SWPPP, any authorizations, modifications, inspection reports, and other documentation required by regulatory guidelines shall be readily available on-site at all times until construction is complete, the site has undergone final stabilization, and all pollution prevention controls have been removed from the site. 4.2 Record Retention A copy of SWPPP amendments, inspection records, site notices, and any other associated documents shall be forwarded to the Program Administrator . Inspection reports will be maintained onsite with the SWPPP in Appendix C. The Project Manager may also maintain a copy of the records. All required records shall be maintained by Colonial Pipeline for a period of at least 3-years from project completion. APPENDIX A REGULATORY DOCUMENTATION Site Specific SWPPP Information “Project Name – County, Virginia” Location The project is located “add project name and location information”. Project Description The proposed work “add project specifics, information, and details”. Responsible Parties Owner Name and Address: Colonial Pipeline Company 929 Hoods Mill Road Woodbine, MD 21797 Contact: Matthew Wyant, Colonial Senior Environmental Specialist - (240) 204-1158 Tara Ryan, Colonial District Environmental Manager - (240) 429-4864 Contractor Names, Addresses and Phone Numbers: General Contractor: “Add contractor information” Duration: “add duration details” APPENDIX B EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT PLAN APPENDIX C INSPECTION AND MAINTENANCE REPORT Appendix D CPC Soil Erosion and Sediment Control Best Management Practices for Maintenance Activities SOIL EROSION and SEDIMENT CONTROL BEST MANAGEMENT PRACTICES for MAINTENANCE ACTIVITIES PREPARED FOR Colonial Pipeline Company PREPARED BY Hurt & Proffitt 2524 Langhorne Road Lynchburg, VA 24501 June 2025 Rev. 0 Soil Erosion and Sediment Control Best Management Practices for Maintenance Activities June 2025 ____________________________________________________________________________ 1 Table of Contents 1.0 INTRODUCTION ............................................................................................................. 3 1.1 T YPICAL PROJECTS REQUIRING SOIL EROSION AND SEDIMENT CONTROLS ....................... 3 1.2 I NSPECTION................................................................................................................... 3 1.3 S OIL EROSION AND SEDIMENT CONTROL ........................................................................ 4 2.0 BEST MANAGEMENT PRACTICES .............................................................................. 5 2.1 S ITE PREPARATION ........................................................................................................ 5 2.1.1 Topsoil Segregation .............................................................................................. 5 2.2 A CCESS TO WORK LOCATIONS ....................................................................................... 5 2.2.1 Temporary Construction Entrance Details ............................................................. 6 2.2.1.1 Prefabricated Matting ........................................................................................ 6 2.2.1.2 Stone Construction Entrance ............................................................................. 6 2.3 P ERIMETER EROSION CONTROLS ................................................................................... 6 2.3.1 Silt Fence & Super Silt Fence ............................................................................... 7 2.3.2 Filter Log ............................................................................................................... 7 2.3.3 Straw Bale Barrier ................................................................................................. 7 2.4 S TREAM DIVERSIONS ..................................................................................................... 8 2.4.1 Pump Around Diversion ........................................................................................ 8 2.4.2 Dry Flume ............................................................................................................. 8 2.4.3 Streambank Cofferdam ......................................................................................... 8 2.5 T EMPORARY STREAM CROSSINGS .................................................................................. 9 2.5.1 Temporary Bridge Crossing .................................................................................. 9 2.5.2 Temporary Railcar Crossing ................................................................................. 9 2.6 D EWATERING MEASURES ............................................................................................... 9 2.6.1 Filter Bag .............................................................................................................10 2.6.2 Straw Bale Dewatering Structure .........................................................................10 2.7 P ERMANENT DIVERSION BERMS ....................................................................................10 2.8 PERMANENT TRENCH BREAKERS ...................................................................................10 2.9 R ESTORATION AND REVEGETATION ...............................................................................11 2.9.1 Backfilling ............................................................................................................11 2.9.2 Temporary Stabilization .......................................................................................11 2.9.3 Permanent Restoration Measures ........................................................................11 2.9.4 Revegetation and Seeding ...................................................................................11 2.9.5 Mulching ..............................................................................................................12 2.9.6 Soil Stabilization Matting ......................................................................................12 2.9.7 Rip-Rap Stabilization ...........................................................................................13 2.9.8 Permanent Channel Liner ....................................................................................13 3.0 SPECIALIZED WORK AREAS ......................................................................................13 3.1 W ETLANDS ...................................................................................................................13 3.1.1 General Requirements .........................................................................................13 3.1.2 Cleanup/Restoration ............................................................................................ 14 3.2 W ATERBODIES .............................................................................................................14 Soil Erosion and Sediment Control Best Management Practices for Maintenance Activities June 2025 ____________________________________________________________________________ 2 3.2.1 General Requirements .........................................................................................15 3.2.1.1 Schedule ..........................................................................................................15 3.2.1.2 Additional Workspace Areas ............................................................................15 3.2.1.3 Spoil Pile Placement/Control ............................................................................15 3.2.1.4 Cleanup/Restoration .........................................................................................15 4.0 SPILL PREVENTION .....................................................................................................16 4.1 G OOD HOUSEKEEPING ..................................................................................................16 4.2 H AZARDOUS PRODUCTS ................................................................................................16 4.3 S PILL PREVENTION PRACTICES ......................................................................................17 4.4 S PILL RESPONSE ..........................................................................................................17 5.0 UNANTICIPATED DISCOVERY - ARCHAEOLOGICAL & CULTURAL RESOURCES 17 Attachments Attachment No. Attachment Name STS-1 Stockpiles for Topsoil And Subbase PCE-1 P refabricated Matting Construction Entrance SCE-1 Stone Construction Entrance SF-1 Silt Fence SSF-1 Super Silt Fence FL-1 Filter Log SBB-1 Straw Bale Barrier PAD-1 Pump Around Diversion Pipeline Maintenance DF-1 Dry Flume Pipeline Maintenance CD-1 Streambank Cofferdam Pipeline Maintenance TBC-1 Temporary Bridge Crossing TRB-1 Temporary Railcar Bridge Crossing FB-1 Filter Bag SBDS-1 Straw Bale Dewatering Structure PDB-1 Permanent Diversion Berm PTB-1 Permanent Trench Breakers SSM-1 Soil Stabilization Matting RRS-1 Rip-Rap Stabilization PCL-1 Permanent Channel Liner WET-1 Wetland Pipeline Maintenance PFM-1 Prefabricated Mat CW-1 Concrete Washout Soil Erosion and Sediment Control Best Management Practices for Maintenance Activities June 2025 ____________________________________________________________________________ 3 1.0 Introduction The Soil Erosion and Sediment Control Best Management Practices for Pipeline Maintenance Activities ( the “Plan”) describes the basic environmental construction techniques and best management practices (BMPs) that Colonial Pipeline Company (“Colonial”), and their Contractors will implement during maintenance activities for Colonial. The purpose of this Plan is to protect the environment by minimizing the potential effects of maintenance related soil disturbance activities in uplands, within jurisdictional areas (streams, rivers, wetlands, etc.) and other sensitive areas. The Plan has been tailored to meet the requirements of the Storm Water Pollution Prevention Plan (SWPPP) required under the U.S. Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) storm water permit, US Army Corps of Engineers maintenance related Nationwide Permits and associated general and regional conditions, as well as state wetland and waterbody permits and conditions for maintenance work. This plan must be amended and modified prior to the implementation of any maintenance activity to include additional requirements that may be imposed by any federal, state, or local agency. 1.1 Typical Projects Requiring Soil Erosion and Sediment Controls Maintenance activities include anomaly digs, recoats, corrosion projects, relocations, and shallow pipe/exposed pipe conditions typically on Colonial’s right-of-way (ROW). However, maintenance activities can extend within the facility fenceline to include additional activities such as tank piping work, valve replacements, conduit/underground electrical work, etc. Soil disturbing activities associated with maintenance work primarily involve excavation, soil stockpiles, material laydown areas, vehicle/equipment parking, and access roads to the maintenance location. 1.2 Inspection Colonial Project Inspectors (“Inspectors”) will receive appropriate training to perform their duties as described in this document and that construction activities will be in compliance with applicable federal, state, and local environmental permits and approvals. Colonial may employ 3rd-party Environmental Inspectors to oversee or supplement the inspection of Colonial projects to ensure compliance with applicable permits and environmental regulations. Colonial will also require Contractors to be aware of the relevant environmental issues in order that they may identify and address issues during maintenance activities. Accordingly, Colonial will conduct training to ensure that BMPs are installed and maintained. Colonial Environmental (“Environmental”) in coordination with the applicable Project Manager and Inspector will review all documents (permits, alignment sheets, and relevant plans) prior to performing work to ensure an understanding of the environmental conditions and limitations associated with the activity. During work, the Inspector, designated Contractor, or assigned 3 rd- party Environmental Inspector is responsible for: • I nspecting activities daily to verify and document that Contractors are complying with this Plan, mitigation measures, and applicable federal, state, and local permit requirements. • E nsuring that all activities occur within authorized work areas. Soil Erosion and Sediment Control Best Management Practices for Maintenance Activities June 2025 ____________________________________________________________________________ 4 • P hoto-documenting sensitive areas and workspaces before, during, and after construction. • E nsuring erosion and sedimentation control measures are installed and maintained properly. • E nsuring the timely repair of damaged erosion control measures. • Implementing corrective actions for any discovered issues after consulting with Environmental. • M onitoring restoration and revegetation of disturbed areas. • E nsuring the appropriate wetland and waterbody methods are utilized at the actual time of work as stipulated in the project permit documents. • E nsuring that excavation and dewatering activities do not cause sedimentation into a wetland or waterbody. • P roviding notification of maintenance activities to assigned Environmental. • W orking with Environmental to assure that this plan is properly implemented. • E ducating new construction personnel and other personnel on project environmental concerns and plans prior to starting work at the site. The Inspector or designee will correct and report compliance problems to Environmental that could or do violate the environmental permit or regulatory requirements. 1.3 Soil Erosion and Sediment Control It is Colonial’s objective to minimize the potential for erosion and sedimentation during maintenance activities and to effectively restore and revegetate disturbed areas upon completion of work. Colonial will meet this objective by employing the erosion and sediment control measures contained in this Plan. These erosion and sediment control measures will serve as minimum standards during maintenance work. The measures are designed to mitigate erosion and sedimentation by: • M inimizing the area and duration of disturbance. • R educing the velocity of runoff. • R edirecting runoff from sensitive areas. • I nstalling and maintaining erosion and sediment control measures during construction. • Implementing restoration activities immediately upon reaching final grade of an area. • I nspecting and maintaining erosion and sediment controls until final stabilization is achieved. Inspectors or designee shall have the primary responsibility for ensuring that contractors implement and maintain their work locations in accordance with this Plan. They are responsible to regularly inspect and assess the condition of the erosion and sediment control measures employed during maintenance work. Most maintenance activities will disturb relatively small areas (less than one acre) and may require local, or state agency land disturbance permits especially for those disturbances within jurisdictional areas (streams, wetlands, etc.). Maintenance activities that disturb greater than one acre of land will typically require a construction stormwater permit and project -specific SWPPP depending on the jurisdiction. These permits have specific Soil Erosion and Sediment Control Best Management Practices for Maintenance Activities June 2025 ____________________________________________________________________________ 5 requirements related to the installation, maintenance, and inspection of soil erosion and sediment control BMP’s. All work must be conducted in accordance with specific permit conditions if a permit is required. 2.0 Best Management Practices The following is an outline of the various soil erosion and sediment control practices that should be employed for any maintenance activity in the absence of site or project specific land disturbing permits. This plan can be used to also supplement any land disturbance permit, as appropriate . The Project Manager and assigned Inspector shall coordinate with Environmental prior to mobilizing to the project location. Site personnel shall utilize this manual for selection and installation of required erosion and sediment control practices but should recognize state or localities may differ slightly or be more stringent (e.g., width of silt fence staking, depth of silt fence trench, etc.). 2.1 Site Preparation The limits of disturbance (LOD), sensitive features, and jurisdictional waters (streams, wetlands, etc.) must be identified and clearly delineated before beginning work. Anticipated workspace requirements must also be identified along with perimeter erosion control measures and other erosion control measures be installed prior to any soil disturbance. A 3rd-party survey group may be utilized to define the LOD for the project site. 2.1.1 Topsoil Segregation Topsoil segregation is required for all maintenance work . Topsoil should be the last layer to achieve final grade used for restoration purposes. Other requirements are listed below. • Topsoil should be segregated prior to excavation and stockpiled separately from subsoil. (see FIGURE STS-1 STOCKPILES FOR TOPSOIL AND SUBBASE) • Topsoil should be removed to its actual depth or to a maximum depth of 12 inches. • In residential areas the importation of approved topsoil is an acceptable alternative to topsoil segregation. • Under no circumstances shall topsoil be used for padding, backfill or trench breakers. 2.2 Access to Work Locations Colonial will maintain and ensure safe conditions of all access road and right of way ingress/egress points. Prefabricated mats or crushed stone access pads must be utilized to limit rutting and tracking of mud or debris onto roadways. If a stone construction entrance is utilized, it must be underlaid with synthetic fabric to facilitate removal of the stone upon work completion. • Soil and debris tracked onto roads must be removed immediately. • Temporary access across a waterbody must use an approved crossing method. Equipment crossings will be maintained to prevent soil from entering the waterbody. • Where necessary for stabilization and/or rutting protection on the right of way or access roads, prefabricated mats or additional base material underlain by a geotextile fabric may be necessary. These materials will be removed during clean up. Soil Erosion and Sediment Control Best Management Practices for Maintenance Activities June 2025 ____________________________________________________________________________ 6 • Access roads will be restored to pre -construction conditions unless specified by the landowner and approved by applicable permits. • Perimeter erosion control measures will be installed and maintained at the edge of access roads, as appropriate, to prevent siltation of ponds, wetlands, or other adjacent or down- slope waterbodies. 2.2.1 Temporary Construction Entrance Details Temporary construction entrances are used at vehicular ingress and egress on a construction site. These mats minimize the amount of sediment, such as dirt or mud, leaving or being tracked out from the construction site from vehicles. 2.2.1.1 Prefabricated Matting Prefabricated mats (see FIGURE PCE-1 PREFABRICATED MATTING CONSTRUCTION ENTRANCE) are either constructed of lashed wood timbers, slats fastened together, or composite mats . Either option requires individual mats to be attached together and affixed to the ground to prevent the movement of the mats as personnel and equipment pass across them. Both serve to protect the entrance of a construction site off of a public roadway. 2.2.1.2 Stone Construction Entrance The stone construction entrance (see FIGURE SCE-1 STONE CONSTRUCTION ENTRANCE) has a nonwoven geotextile laid underneath the stone to minimize the dissipation of the aggregate into the underlying soil. • Inspect construction entrances weekly and immediately after a rainfall event. • Maintain a stockpile of stone near the entrance to top dress the entrance with additional stone periodically. • Immediately remove all materials from the adjoining roadway that have been spilled, dropped, washed, or tracked out from the construction site. • Materials tracked off-site onto adjoining roadways shall be manually removed with brooms and shovels or via a street sweeper. Water hoses or trucks shall not be utilized to remove materials dropped or tracked onto roadways. 2.3 Perimeter Erosion Controls Perimeter erosion control measures are necessary to prevent sediment from leaving disturbed areas barriers and are required prior to the initial disturbance of the soil. • Located at the outlet of a water bar when vegetation is not adequate to control erosion. • Located along banks of waterbodies between the worksite and waterbody. • Positioned down-slope of any stockpiled soil in the vicinity of water bodies and wetlands. • Put at the base of slopes adjacent to road crossings until disturbed vegetation has been reestablished. • Located at side-slope and down-slope boundaries of the disturbed area where runoff is not otherwise directed by a water bar/terrace. • Maintained throughout construction and remain in place until permanent revegetation has been judged successful. Soil Erosion and Sediment Control Best Management Practices for Maintenance Activities June 2025 ____________________________________________________________________________ 7 • Placed between wetlands and adjacent disturbed upland areas. • Installed as necessary to prevent siltation of ponds, wetlands, or other waterbodies adjacent to/down-slope of the ROW. • Located at the edge of the ROW or work area as needed to contain spoil and sediment. 2.3.1 Silt Fence & Super Silt Fence Silt fence (see FIGURES SF-1 SILT FENCE) intercepts and detains small amounts of sediment from disturbed areas during construction to prevent sediment from leaving the site. Super silt fence (see FIGURE SSF-1 SUPER SILT FENCE) is backed with a wire -mesh and reinforced stakes to control runoff from steep slope areas or places where maximum lengths for standard silt fence cannot control the erosion potential of the project location. • Silt fence shall be installed per manufacturer's recommendations or as indicated in the detailed design. • Inspect silt fences immediately after each rainfall event and make any repairs immediately. • Repair any silt fence that has signs of undercutting. • Replace fabric on silt fence is decomposed or is ineffective before expected usable life. • Remove trash and large sediment deposits after each storm event and when deposits reach approximately one half the height of the barrier. • Once perimeter erosion control measure is removed, match existing grade and seed any areas disturbed from the fabric filter removal. 2.3.2 Filter Log Filter log (see FIGURE FL-1 FILTER LOG) is a temporary sediment control practice consisting of a biodegradable mesh tube filled with coarse compost media to filter sediment with construction and prevent sediment from leaving site. • Inspect filter log weekly and after each runoff event and make any repairs immediately. • Replace filter log according to manufacturer’s frequency recommendations. • Do not permit traffic to cross filter log. • Remove accumulated sediment when it reaches half the above ground height of the filter log. • Upon stabilization of the area, the stakes can be removed. The mesh can be cut to spread the compost media to function as a soil supplement. The mesh should be removed from the site and properly disposed. 2.3.3 Straw Bale Barrier A straw bale barrier (see F IGURE SSB-1 STRAW BALE BARRIER) is a temporary barrier made of anchored straw used to intercept sediment runoff from drainage area. • Do not use straw bales where water will concentrate or in wetlands. • Bales shall be installed with the bindings parallel to the ground surface. • Inspect straw bales immediately after each rainfall event and daily during prolonged rainfall. • Repair or replace bales that are damaged or where there are signs of undercutting. • Remove straw bales once the upslope areas have been permanently stabilized. Soil Erosion and Sediment Control Best Management Practices for Maintenance Activities June 2025 ____________________________________________________________________________ 8 • Once straw bales are removed, dress any sediment deposits to conform to the existing grade and seed areas accordingly. 2.4 Stream Diversions These forms of diversions are necessary when maintenance activities are located in or adjacent to a streambank or within a stream channel. These practices limit the potential downstream sedimentation resulting from streambank or in-stream work . In accordance with jurisdictional environmental permits work within stream must be completed “in the dry” and all denuded areas will be stabilized before re-introduction of water back into the stream channel. 2.4.1 Pump Around Diversion The pump around diversion (see FIGURE PAD-1 PUMP AROUND DIVERSION PIPELINE MAINTENANCE) is a dewatering practice used for temporary pumping flow around segments of a stream channel during construction. • Dams shall be installed upstream and downstream. Dam material shall be made of steel plates, inflatable dams, sandbags, or rip-rap materials. • Earthen material shall not be used for the dams. • Pumps and hoses shall be of sufficient size to dewater the work area. • Pump should be located at least 10 feet from the streambank and recommended to be placed in secondary containment if diesel-driven. • All dam materials including energy dissipater area should be removed from the stream in their entirety. • In-stream work shall not commence until the section of stream has been dewater ed. All excavation shall be performed in only dry or isolated areas of the work zone. 2.4.2 Dry Flume The dry flume (see F IGURE DF-1 DRY FLUME PIPELINE MAINTENANCE) is a dewatering practice used for temporarily channeling the flow of the stream through prefabricated flumes during construction. • Flume capacity shall accommodate at least 1.5 times the stream flow. • Use shall occur during low-flow stream conditions. • Flume shall be used in combination with a dam diversion constructed of steel plates, inflatable dames, sandbags, or rip-rap materials. 2.4.3 Streambank Cofferdam A cofferdam (See FIGURE CD-1 STREAMBANK COFFERDAM PIPELINE MAINTENANCE) is a temporary structure within a waterway or body of water designed to provide a dry work area for temporary construction. Cofferdams are used for utility work near the shorelines, where the water diverted around the work site area. • Cofferdam shall be monitored daily due to the potential for washout is high. • Regularly inspect cofferdams for leaks and deficiencies. • Return all disturbed soil within the coffered area to its original condition by retaining the existing soil profile prior to construction. Soil Erosion and Sediment Control Best Management Practices for Maintenance Activities June 2025 ____________________________________________________________________________ 9 • Reseed the side slopes, stabilize with erosion control blanket and restore the substrate to pre-construction condition. • Stabilize all disturbed areas immediately following the removal of the cofferdam. 2.5 Temporary Stream Crossings A temporary vehicular stream crossing is a temporary structural span installed across a body of water used by construction traffic. • Crossings shall be installed for the shortest practical period due to these structures can cause flow backups and washouts during high flow. • Bridge should fully span the stream and installed to ensure the streambanks do not collapse into the stream channel. • Install perimeter controls along the edge of the streambank and near the temporary structure. • Recommend installation of geotextile under the bridge to prevent tracked material on the bridge from falling into the stream channel. • Inspect crossings after every rainfall event and at least once per week whether it has rained or not and repair damages immediately. • Inspect stream bank for any erosion and repair any perimeter controls, as necessary. • Once temporary stream crossing is removed, stabilize the stream banks with seed and erosion controls trying to minimize the amount of sediment into the stream. 2.5.1 Temporary Bridge Crossing The temporary bridge stream crossing provides a means for construction traffic to cross flowing streams without damaging the channel or stream banks. See F IGURE TBC-1 TEMPORARY BRIDGE CROSSING for further details. 2.5.2 Temporary Railcar Crossing The temporary railcar crossing provides a method for a larger bridge span across bodies of water versus the temporary bridge for construction traffic cross ing. See F IGURE TRB-1 TEMPORARY RAILCAR BRIDGE CROSSING for more details. 2.6 Dewatering Measures Dewatering structure is a temporary settling and filtering device used to process water discharged from dewatering actions. Dewatering structures pump sediment laden water to be filtered before being discharged off site. • Inspect filtering devices daily and repair or replace once the sediment buildup prevents the structure from functioning as designed. • Remove accumulated sediment from dewatering device, spread on site and stabilized. • Monitor dewatering structure during operation to ensure that the discharge is not causing erosion. • Install silt fence of filter log below dewatering structure to capture any remaining sediment from leaving the site. • Hose intakes must be elevated off of the ditch bottom and/or within a sump pit. Soil Erosion and Sediment Control Best Management Practices for Maintenance Activities June 2025 ____________________________________________________________________________ 10 • Dewatering locations will be approved by Environmental or shown on approved site drawings. • If the discharge location is greater than 150 feet from a wetland or stream bank, the discharge will be directed into a well vegetated area. • The discharge should be diffused into vegetation and not cause channeling of the water flow in any form. 2.6.1 Filter Bag Filter bags (see F IGURE FB-1 FILTER BAG) are used to trap sediment from a water source that is pumped, and water is drained out of the filter bag. Filter bags should preferably be placed in an upland location and continuously monitored. Replacement of the bag may be necessary. 2.6.2 Straw Bale Dewatering Structure Straw bales (see FIGURE SBDS-1 STRAW BALE DEWATERING STRUCTURE) are used to create a pit for water to be discharged into and filter through the straw bales before the water leaves the site. 2.7 Permanent Diversion Berms Permanent diversion berms (i.e., slope breakers or water bars) (See FIGURE PDB-1 PERMANENT DIVERSION BERMS) are a channel constructed across a slope with an earthen ridge on the lower side. These diversions manage stormwater runoff by reducing slope length to intercept and divert stormwater to a stabilized outlet. • Slope Breakers (water bars) shall be installed or replaced at an outslope of 2 to 8 degrees across the ROW on slopes to control erosion by reducing and shortening the length and concentration of runoff. • Temporary slope breakers can be used uphill of work areas to divert stormwater away from disturbed areas and open trenches. • For the construction of permanent slope breakers, soil should be slightly excavated and compacted to form a temporary channel with an adjacent down slope berm or ridge of compacted soil. • The slope breaker shall permit traffic to move over it safely without easily destroying it. • Before stabilization, inspect the diversion after every rainfall event and at least once per week. • Remove accumulated sediment from the channel and make any repairs, as necessary. • Inspect outlets for obstructions, erosive conditions and other intrusions and make repairs immediately. 2.8 Permanent Trench Breakers Trench breakers are installed to prevent erosion and wash out of the soil within the trench along a slope. These breakers can be composed of sandbags, earth, cement, or synthetic foam. See F IGURE PTB-1 PERMANENT TRENCH BREAKERS. • Inspect these breakers after a rainfall event to look for signs of erosion and repair the issues immediately. • Consist of, cement, sand, earth- filled sacks, foam, or other approved materials Soil Erosion and Sediment Control Best Management Practices for Maintenance Activities June 2025 ____________________________________________________________________________ 11 permanently installed in the ditch prior to backfilling. • Topsoil shall not be used to fill the sacks. • Must be a minimum of 2 sacks wide. • Installed as required on slopes, the base of slopes, adjacent to waterbodies and/or wetlands and in agricultural fields and residential areas to control channeling along the pipeline. • Installed at the same spacing and immediately up slope of, permanent slope breakers unless otherwise determined by the Inspector. 2.9 Restoration and Revegetation Restoration and revegetation incorporate permanent erosion and sediment control measures. However, in the event that final restoration cannot occur in a timely manner due to weather or soil conditions, temporary erosion and sediment control measures will be maintained until the weather is suitable for final cleanup and revegetation. 2.9.1 Backfilling • Backfill material and methods will be approved by the Inspector. • To minimize settling, heavy equipment may be used to compact the backfilled ditch, or a crown of soil will be put over the pipeline to compensate for future soil settling. Openings shall be left in the crown to allow for lateral surface drainage. 2.9.2 Temporary Stabilization • Stabilization measures shall be initiated as soon as practical on portions of the site where activities have temporarily or permanently ceased. • If work is completed more than 30 calendar days before the perennial vegetation seeding season, work areas shall be mulched with 3 tons/acre of straw, or its equivalent. • Temporary plantings will be fertilized in accordance with the recommendations of the local Natural Resources Conservation Service (NRCS) office(s) or other soil conservation authority. 2.9.3 Permanent Restoration Measures • Final grading and installation of permanent erosion control structures shall be completed within 7 working days after backfilling. If this schedule cannot be met due to weather conditions, work must be completed as soon as possible. • Construction debris shall be removed, and the site shall be graded so that the soil is left in the proper condition for planting. • Where trench compaction has not been done, the site shall be graded to pre-construction contours, as practical, with a small crown of soil left over the ditch to compensate for settling, but not to interfere with natural drainage. • Where topsoil has been segregated, the topsoil shall be uniformly spread as the final layer of soil. 2.9.4 Revegetation and Seeding • The Inspector, in conjunction with Environmental, will determine the specific revegetation requirements. All upland portions shall be tilled, fertilized, seeded, and mulched in accordance with these specific requirements. Soil Erosion and Sediment Control Best Management Practices for Maintenance Activities June 2025 ____________________________________________________________________________ 12 • Wetlands will be revegetated in accordance with permit requirements. Lime, fertilizer, and other soil amendments are not to be applied inside wetland boundaries. • The site will be seeded within 7 working days of final grading in accordance with recommended seeding dates, weather and soil conditions permitting. • Turf, ornamental shrubs and other landscaping materials shall be restored in accordance with landowner agreements. • Where broadcast or hydro-seeding is to be done, the seedbed will be scarified to ensure sites for seeds to lodge and germinate. • The seedbed will be prepared to depth of 4 inches using appropriate equipment to provide a firm, smooth seedbed, free of debris, and where possible, lime and fertilizer will be incorporated into the top 2 inches of soil. • Weather permitting, slopes steeper than 3:1 shall be seeded and mulched immediately after final grading, in accordance with recommended seeding dates. • Seed shall be purchased in accordance with the Pure Live Seed (PLS) specifications for seed mixes and used within 12 months of testing. • Legume seed will be treated with a species-specific inoculant per manufacturer’s specifications. • The seed shall be applied and covered uniformly per local soil conservation authorities’ recommendations, depending on seed size. Where broadcast seeding is used, the seedbed shall be firmed after seeding. • Other alternative seed mixes specifically requested by the landowner or land-managing agency may be used. 2.9.5 Mulching • After seeding, mulch will be applied at a rate of approximately 2 tons per acre. • If construction or restoration activity is interrupted for extended periods, mulch will be applied in lieu of seeding at that time. • If mulching before seeding, mulch application will be increased on all slopes within 100 feet of waterbodies and wetlands to a rate of 3 tons/acre. • If a mulch blower is used, the strands of the mulching material shall be at least 8 inches long to allow anchoring. • Loose mulch shall be avoided on steep slopes and streambanks. Soil stabilization matting shall be used in lieu of loos mulching. • When mechanically anchoring mulch, a mulch anchoring tool or tracked equipment will be used to crimp the mulch to a depth of 2 to 3 inches. • When anchoring with liquid mulch binders, use rates recommended by the manufacturer. Liquid mulch binders will not be used within 100 feet of wetlands or waterbodies. 2.9.6 Soil Stabilization Matting These methods of stabilizations are to protect the steep slopes from erosion and scouring due to concentrated water runoff. Stabilization is used on slopes when plantings are likely too slow to provide adequate protective cover. See F IGURE SSM-1 SOIL STABILIZATION MATTING • Matting or netting consists of jute, wood excelsior, or similar materials, and is used to hold the seed and stabilize the surface of the soil during the critical period of vegetative Soil Erosion and Sediment Control Best Management Practices for Maintenance Activities June 2025 ____________________________________________________________________________ 13 establishment. • Matting will be applied as specified by Environmental or Inspector to critical, sensitive areas (e.g., steep slopes, banks of waterbodies, bar ditches, etc.). • Matting or netting will be anchored with staples. • Inspect all soil stabilization matting and blankets periodically after installation and after a rainfall event to check for undermining. • Repair any failures immediately after repairing the damage to the slope or channel. • Monitor these areas until they become permanently stabilized. 2.9.7 Rip-Rap Stabilization Rip-rap (see F IGURE RRS-1 RIP-RAP STABILIZATION) is a permanent erosion resistant ground cover of large loose rocks installed with filter fabric underlining. Rip-rap will protect soil slopes from concentrated runoff and slow the velocity of the water. Rip- rap can be used on channel banks, ditches, toe of slopes, diversion channels, etc. The Inspector shall periodically inspect the placed rip-rap to determine if there are signs of scour beneath the rip-rap or filter fabric and repair immediately. 2.9.8 Permanent Channel Liner Channel liners (see FIGURE PCL-1 PERMANENT CHANNEL LINER) help stabilize a stream channel bed using filter fabric. This practice is used during stream restoration when there is an active disturbance to an existing stream channel. 3.0 Specialized Work Areas Colonial intends to use specialized construction techniques in certain areas. Although pre- determined, the method most suitable for a given location may be dependent upon site conditions at the time of construction. 3.1 Wetlands Colonial will protect and minimize potential adverse impacts to wetlands by: • E xpediting construction in and around wetlands, and, to reduce disturbances of wetland soils, limiting the amount of equipment and activities within wetlands. • R estoring wetlands to the original contours and flow regimes to the greatest extent practical. • P ermanently stabilizing upland areas near wetlands as soon as possible after backfilling; and inspecting the site periodically during and after construction and repairing any erosion control or restoration features until permanent revegetation is successful. • Wetlands should be avoided (or the area minimized) to obtain access to maintenance work areas. In the event wetlands must be crossed for access to work areas, all equipment must cross on mats. 3.1.1 General Requirements The size of workspace areas within wetlands must be minimized to the extent practical (see FIGURE WET-1 WETLAND PIPELINE MAINTENANCE). Where topographical conditions permit, additional workspace areas for staging, pipe make- up, etc. will be located at least 50 feet from Soil Erosion and Sediment Control Best Management Practices for Maintenance Activities June 2025 ____________________________________________________________________________ 14 the edge of the wetland. Where site conditions do not allow a 50-foot setback, a minimum 10-foot setback will be maintained. The wetlands and setbacks will be clearly marked prior to the start of construction. The following is a list of conditions generally applicable for all wetland work. • No rubber -tired equipment will be allowed to work in wetlands its use is approved by Environmental. • Spoil will be stockpiled in adjacent uplands if practical. If not practical, spoil material shall be stored on plastic, Geotex or prefabricated mats. • Topsoil (top 12-18-inches) will be segregated and returned in a uniform layer to all graded areas. • All equipment must work from prefabricated mats (see FIGURE PFM-1 PREFABRICATED MAT). • Spoil will be contained with perimeter erosion control measures to prevent spoil materials from flowing into waterbodies or off of the workspace area. • Permanent trench breakers shall be installed at both ends of the wetland to prevent drainage of the wetland along the pipeline trench (providing the excavation is at the wetland boundary. 3.1.2 Cleanup/Restoration • All construction debris shall be removed following backfilling of the pipeline. • Once backfilling is complete, Colonial will restore the original contours and flow regimes to the extent practical, with the exceptions of unnatural features and unstable grades. • Disturbed wetland areas will be allowed to naturally revegetate or in accordance with specific regulatory guidelines. However, the site should be seeded with an annual species of wetland seed mixture in accordance with permit condition or coordination with Environmental, to stabilize the area until indigenous wetland species can re- establish themselves. If the wetland is within an active agricultural parcel, reseeding will be performed according to appropriate land management or state agency permits and/or landowner agreements. • No soil amendments shall be used in wetlands. 3.2 Waterbodies Every attempt should be made to avoid crossing streams or wetlands to access work locations. In the event no other alternative is practical, streams must be crossed using a suitable bridge. Bridges typically consist of mats, rail car frames, etc . (reference F IGURE TBC-1 TEMPORARY BRIDGE CROSSING and TRB-1 TEMPORARY RAILCAR BRIDGE CROSSING). Disturbance to the stream bottom and banks s

Text truncated. Open the original for the full document.

Source: City of Suffolk website. First collected Nov 3, 2026.